    EMC PROGRAM ON THE ACCELERATOR RINGS

    Basic concept of grounding in the accelerator ring Cabling and grounding in the RCS Cabling and grounding in the main ring

    Cabling and grounding of injection/extraction pulse power system Grounding and shielding of RF system Ceramic breaks of the main ring Noise immunity reinforcement plan of beam monitors

    K. Okamura (KEK), Y. Watanabe (JAEA)

    TOPICS

  • 7/29/2019 24a7b.pdf

    2/17

    BASIC CONCEPT OF GROUNDING IN THEACCELARATOR RING

    Vacuum chambers including monitors are grounded in the tunnel.Beam pipes passing through magnets are isolated from themagnet.RF, kicker, collimator, and SEP are grounded in the tunnel.

    BM, QM, SM, and StM are grounded in the power supply building.Ion pumps are isolated from beam pipes.Ceramic breaks are provided at upstream point of BMs.In RCS, ceramic breaks are provided with every magnet using

    ceramic duct.

  • 7/29/2019 24a7b.pdf

    3/17

    CABLING AND GROUNDING IN THE

    RCS All power cable is twisted and shielded. Cable shielding is grounded in one-sided. Power supply housing is insulated from floor and water pipe. Main circuit is only grounded in neutral point.

    Policy

    Switchgear Transformer Power supply

    Chokes Capacitor banks

    Earth point(Utility) Earth point(Magnet)

    MagnetsNeutral point

    ToChokes

  • 7/29/2019 24a7b.pdf

    4/17

  • 7/29/2019 24a7b.pdf

    5/17

    CERAMIC BREAKS RCS-

    Dipole magnet

    Ceramics duct

    Epoxy resin

    capacitor

    Titanium sleeve

    Ceramics vacuum duct installed in dipole magnet

    Ceramics duct is installed in every dipole and quadrupole magnets.

  • 7/29/2019 24a7b.pdf

    6/17

    CABLING AND GROUNDING POLICY IN

    THE MAIN RING Main circuits are fed by cables with shields.

    Magnets are not grounded in the tunnel but at power

    supply side. Grounding cables are installed separately with each

    magnet family B, 11 Q-families, 3 S-families) .

    Grounding cables are also installed between atransformer and a power supply.

    Grounding of cable racks is under consideration.

    TRANS YARD BUILDING

    TUNNEL

    P

    N

    0

    0

    Potential of the Power Line

  • 7/29/2019 24a7b.pdf

    7/17

    Q**,S ++

    Earth Cable are separately fedby each magnet family and

    has open end symmetrically. QFP,SDB

    **:FN,DN,FX,DX

    FR,FS,FT,DR,DS,DT

    ++:FA,DA

    GROUNDING CONNECTION OF QUADRUPOLE AND SEXTUPOLE MAGNETS

    Potential 0 Potential 0

  • 7/29/2019 24a7b.pdf

    8/17

    Grounding Cable are separatelyfed by each power supplybuilding

    Building D3

    Building D1

    BM1BM

    BM3

    BM4

    BM5

    BM6

    P

    P

    P

    P

    P

    P NN

    N

    N

    N

    N

    Building D2

    GROUNDING CONNECTION OF BENDING MAGNETS

  • 7/29/2019 24a7b.pdf

    9/17

    PULSE MAGNET POWER SUPPLY FOR INJECTION

    AND EXTRACTION SYSTEM

    Coils are not grounded in the tunnel but grounded inpower supply buildings through power cables.

    Magnetic core, vacuum duct, and frame are groundedboth in the tunnel and buildings.

    Each grounding points are connected by cables.

    400mm2 400mm2

    Vacuum

    Chamber

  • 7/29/2019 24a7b.pdf

    10/17

    PULSE MAGNET POWER SUPPLY FOR A KICKER

    SYSTEM

    Outer conductor of a coaxial cable is connected toframes at both end.

    Magnetic core, vacuum chamber, and frame aregrounded in a tunnel, also grounded in a buildingthrough the coaxial cable.

    HV

    PS

  • 7/29/2019 24a7b.pdf

    11/17

    GROUNDING AND SHIELDING OF RF SYSTEM

    In general, grounding is designed so that drive current must directlyreturn to each corresponding power supply.

    1.2MW anode power supplies are switched mode power supply w/IGBT inverters.Tri-axial cable for tube anode supply is used for shielding highfrequency EMI noise.

    Single point grounding is performed.However, cavity /amplifier chassis are grounded w/ resistor forsafety

  • 7/29/2019 24a7b.pdf

    12/17

  • 7/29/2019 24a7b.pdf

    13/17

    CERAMIC BREAKS OF THE MAIN RING

    ARC section (#1,#2, #3): Breaks at an upper stream point of each bending magnet

  • 7/29/2019 24a7b.pdf

    14/17

    Noise immunity reinforcement plan of beam monitors

    Grounding is done in the tunnel or the control room(power supply buildings).

    (possible to ground at the both ends, optionally)

    Beam pipe will be grounded in the tunnel via each BPM,

    to prevent from charging up.

    Use high shielding efficiency cables

    Proper use of noise-shielded transformers.

    Use common mode chokes

    high shielding efficienc cables

  • 7/29/2019 24a7b.pdf

    15/17

    high shielding efficiency cables Screening effectiveness depends on the construction of outer conductor:

    Semi-rigid, corrugated metal > longitudinal metale.g. aluminium) foil > braid wire

    other factors to be considered

    radiation hardness, cost

    Example: induced noise on the cable under noisy environment

    with a switching power supply

    outer conductor RG58 c/u: copper braid wire ( 5 m)S04272B: longitudinal metal foil ( 4 m )

    from the HUBER+SUHNER cable catalgue

    rigid! flexible

    10MHzDC

  • 7/29/2019 24a7b.pdf

    16/17

    ch.1&2

    ch.3&4

    Beam position monitors (BPMs)

    noise cut trans.

    AC100V

    Connection tothe GNDdepends on

    noise observation.

    The shielding of coaxial cablesare connected to the beam pipevia connectors.

    Grounding in the tunnel.

    High shielding efficiency coaxial cables

    surrounded by another shield.

    option: commom mode choke coil.

    Tunnel

    Control room(power supply

    building) Grounding in the control room

  • 7/29/2019 24a7b.pdf

    17/17

    SUMMARY

    EMC program of the accelerator ring is mainly focused on grounding.

    Two golden rules of grounding are one point grounding and safety.

    Power supply, beam pipes, vacuum pumps are grounded separately.

    Grounding of cable rack is under consideration.

    As to beam monitors, high efficiency shielding cables are selected