EMC PROGRAM ON THE ACCELERATOR RINGS
Basic concept of grounding in the accelerator ring Cabling and grounding in the RCS Cabling and grounding in the main ring
Cabling and grounding of injection/extraction pulse power system Grounding and shielding of RF system Ceramic breaks of the main ring Noise immunity reinforcement plan of beam monitors
K. Okamura (KEK), Y. Watanabe (JAEA)
TOPICS
-
7/29/2019 24a7b.pdf
2/17
BASIC CONCEPT OF GROUNDING IN THEACCELARATOR RING
Vacuum chambers including monitors are grounded in the tunnel.Beam pipes passing through magnets are isolated from themagnet.RF, kicker, collimator, and SEP are grounded in the tunnel.
BM, QM, SM, and StM are grounded in the power supply building.Ion pumps are isolated from beam pipes.Ceramic breaks are provided at upstream point of BMs.In RCS, ceramic breaks are provided with every magnet using
ceramic duct.
-
7/29/2019 24a7b.pdf
3/17
CABLING AND GROUNDING IN THE
RCS All power cable is twisted and shielded. Cable shielding is grounded in one-sided. Power supply housing is insulated from floor and water pipe. Main circuit is only grounded in neutral point.
Policy
Switchgear Transformer Power supply
Chokes Capacitor banks
Earth point(Utility) Earth point(Magnet)
MagnetsNeutral point
ToChokes
-
7/29/2019 24a7b.pdf
4/17
-
7/29/2019 24a7b.pdf
5/17
CERAMIC BREAKS RCS-
Dipole magnet
Ceramics duct
Epoxy resin
capacitor
Titanium sleeve
Ceramics vacuum duct installed in dipole magnet
Ceramics duct is installed in every dipole and quadrupole magnets.
-
7/29/2019 24a7b.pdf
6/17
CABLING AND GROUNDING POLICY IN
THE MAIN RING Main circuits are fed by cables with shields.
Magnets are not grounded in the tunnel but at power
supply side. Grounding cables are installed separately with each
magnet family B, 11 Q-families, 3 S-families) .
Grounding cables are also installed between atransformer and a power supply.
Grounding of cable racks is under consideration.
TRANS YARD BUILDING
TUNNEL
P
N
0
0
Potential of the Power Line
-
7/29/2019 24a7b.pdf
7/17
Q**,S ++
Earth Cable are separately fedby each magnet family and
has open end symmetrically. QFP,SDB
**:FN,DN,FX,DX
FR,FS,FT,DR,DS,DT
++:FA,DA
GROUNDING CONNECTION OF QUADRUPOLE AND SEXTUPOLE MAGNETS
Potential 0 Potential 0
-
7/29/2019 24a7b.pdf
8/17
Grounding Cable are separatelyfed by each power supplybuilding
Building D3
Building D1
BM1BM
BM3
BM4
BM5
BM6
P
P
P
P
P
P NN
N
N
N
N
Building D2
GROUNDING CONNECTION OF BENDING MAGNETS
-
7/29/2019 24a7b.pdf
9/17
PULSE MAGNET POWER SUPPLY FOR INJECTION
AND EXTRACTION SYSTEM
Coils are not grounded in the tunnel but grounded inpower supply buildings through power cables.
Magnetic core, vacuum duct, and frame are groundedboth in the tunnel and buildings.
Each grounding points are connected by cables.
400mm2 400mm2
Vacuum
Chamber
-
7/29/2019 24a7b.pdf
10/17
PULSE MAGNET POWER SUPPLY FOR A KICKER
SYSTEM
Outer conductor of a coaxial cable is connected toframes at both end.
Magnetic core, vacuum chamber, and frame aregrounded in a tunnel, also grounded in a buildingthrough the coaxial cable.
HV
PS
-
7/29/2019 24a7b.pdf
11/17
GROUNDING AND SHIELDING OF RF SYSTEM
In general, grounding is designed so that drive current must directlyreturn to each corresponding power supply.
1.2MW anode power supplies are switched mode power supply w/IGBT inverters.Tri-axial cable for tube anode supply is used for shielding highfrequency EMI noise.
Single point grounding is performed.However, cavity /amplifier chassis are grounded w/ resistor forsafety
-
7/29/2019 24a7b.pdf
12/17
-
7/29/2019 24a7b.pdf
13/17
CERAMIC BREAKS OF THE MAIN RING
ARC section (#1,#2, #3): Breaks at an upper stream point of each bending magnet
-
7/29/2019 24a7b.pdf
14/17
Noise immunity reinforcement plan of beam monitors
Grounding is done in the tunnel or the control room(power supply buildings).
(possible to ground at the both ends, optionally)
Beam pipe will be grounded in the tunnel via each BPM,
to prevent from charging up.
Use high shielding efficiency cables
Proper use of noise-shielded transformers.
Use common mode chokes
high shielding efficienc cables
-
7/29/2019 24a7b.pdf
15/17
high shielding efficiency cables Screening effectiveness depends on the construction of outer conductor:
Semi-rigid, corrugated metal > longitudinal metale.g. aluminium) foil > braid wire
other factors to be considered
radiation hardness, cost
Example: induced noise on the cable under noisy environment
with a switching power supply
outer conductor RG58 c/u: copper braid wire ( 5 m)S04272B: longitudinal metal foil ( 4 m )
from the HUBER+SUHNER cable catalgue
rigid! flexible
10MHzDC
-
7/29/2019 24a7b.pdf
16/17
ch.1&2
ch.3&4
Beam position monitors (BPMs)
noise cut trans.
AC100V
Connection tothe GNDdepends on
noise observation.
The shielding of coaxial cablesare connected to the beam pipevia connectors.
Grounding in the tunnel.
High shielding efficiency coaxial cables
surrounded by another shield.
option: commom mode choke coil.
Tunnel
Control room(power supply
building) Grounding in the control room
-
7/29/2019 24a7b.pdf
17/17
SUMMARY
EMC program of the accelerator ring is mainly focused on grounding.
Two golden rules of grounding are one point grounding and safety.
Power supply, beam pipes, vacuum pumps are grounded separately.
Grounding of cable rack is under consideration.
As to beam monitors, high efficiency shielding cables are selected