23 rd World Gas Conference 5 – 9 June 2006 Amsterdam

30
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX – Business Development Manager Offshore LNG Department: Technip France Guillaume ROMBAULT – Research & Development Division: Gaz de France

description

23 rd World Gas Conference 5 – 9 June 2006 Amsterdam. Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM. Phillip COX – Business Development Manager Offshore LNG Department: Technip France Guillaume ROMBAULT – Research & Development - PowerPoint PPT Presentation

Transcript of 23 rd World Gas Conference 5 – 9 June 2006 Amsterdam

Page 1: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

23rd World Gas Conference5 – 9 June 2006

Amsterdam

Full Scale Qualification Trialsand Certification of the

AMPLITUDE-LNG LOADING SYSTEMPhillip COX – Business Development Manager

Offshore LNG Department: Technip France

Guillaume ROMBAULT – Research & Development Division: Gaz de France

Page 2: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

2

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

A.L.L.S. is an LNG transfer system incorporating a Cryogenic single length flexible, an integrated QCDC and ERS, all instrumentation & control equipment including Position Monitoring System, together

with a full Qualification and Certification package

AMPLITUDE-LNGLOADING SYSTEM

(A.L.L.S.)For all offshore andnearshore dynamic

transfer configurations

Page 3: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

3

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

Demonstrate that flexible loading systems for LNG are mature for use in marine and dynamic environments

OPERABILITY

REPEATABILITY

Page 4: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

4

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

Montoir Operational Pilot Unit

2004 / 2006 FEED and Qualification Trials

A multi- phase development programme to meet the requirements of the Offshore LNG industry

2001 Cryogenic Flexible2002- 03

QC-DC / ERS ConnectorAmplitude-LNG

Page 5: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

5

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

Loire river

Upstream jettyGaz de FranceGaz de France

Montoir TerminalMontoir Terminal

LNG circulation, either from the storage tanks or directly from the

LNG carrier, up to 4000m3/hr

2) LNG carrier offloading operations

1) LNG transfer under dynamic motions

with LNG flow

Page 6: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

6

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Instrumentation Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 7: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

7

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Hydraulic Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 8: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

8

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

Phase 1: Operations with LNG

- Preliminary tests at ambient temperature

- Connection of the test bench to the Montoir LNG piping

- Purge tests

- Disconnection / Storage test

- Quick cooling down test

- LNG flow tests (offloading mode) - dynamic

Page 9: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

9

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

Phase 2: Connection / Disconnection performances

- Connection / Disconnection tests without torsion - static & dynamic

- Connection / Disconnection tests with torsion - static & dynamic

Phase 3: Emergency Disconnection Tests

- Emergency disconnection test at ambient temperature

- Emergency disconnection test with LNG

Page 10: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

10

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

The concluding step is to offload LNG from a carrier

This will be carried out on the offloading jetty at Montoirand will finally validate the complete development

Page 11: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

11

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

Confirmation of procedures

Familiarisation of equipmentby the LNG carrier captain & crew

Offloading through the 16” IDAmplitude-LNG system in parallel to the existing arms

Page 12: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

12

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Hydraulic Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 13: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

13

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

2. Analysis of the system in up to 6.5m sig. wave height simulation

Photo courtesy of Gaz de France

25m

75m

Page 14: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

14

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

2. Analysis of the system in up to 6.5m sig. wave height simulation

Photo courtesy of Gaz de France

Here we have a differentview of the completed towers.

The dynamic arm will be placed as shown

Dynamic arm to be placed here

Dynamic arm ready for mounting

Page 15: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

15

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

2. Analysis of the system in up to 6.5m sig. wave height simulation

+ / - 6.5m

4 m/sec² acceleration

Real time motion

Page 16: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

16

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Hydraulic Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 17: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

17

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

3. Definition of Control & Hydraulic Systems

Montoir OPU:

• 254 sensors• 16 kms cabling

Flow rates TemperaturesPressureVibration Pressure dropValve & clamp action…..

Page 18: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

18

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

3. Definition of Control & Hydraulic Systems

Montoir maincircuit diagramshowing allcontrol and shut-down valves

Page 19: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

19

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

3. Definition of Control & Hydraulic Systems

From the Montoirexperience we have derived full controland instrumentationdiagrams for completetransfer systems including the Position Monitoring System

On-line monitoringcan be included

Page 20: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

20

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Hydraulic Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 21: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

21

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

4. Qualification of flexible manufacturing procedures

Completed 50m x 16” Stainless steel bellows

Installation of double cross-wound armours

Dedicated manufacturing facility for cryogenic flexibles

Page 22: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

22

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

4. Qualification of flexible manufacturing procedures

Completed flexiblewith insulation andouter leakproof layer

50m long x 16” ID

Ready for preppingand end-fitting mounting

A second flexible is currently being manufactured

Page 23: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

23

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

1. Elaboration of full operational procedures

2. Analysis of the system in up to 6.5m sig. wave height simulation

3. Definition of Control & Hydraulic Systems

4. Qualification of flexible manufacturing procedures

5. Certification of complete system

Page 24: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

24

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

5. Certification of complete system

DNV-RP-A203

ALLSStatementOfEndorsement

Page 25: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

25

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

5. Certification of complete system

Workshops: FMEA HAZID HAZOP Issuance of Technology Qualification Plan

and Statement of Endorsement

Statement ofEndorsement

Page 26: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

26

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

Define Qualification Basis

Analysis and Testing

Reliability Analysis

Concept Improvement

Selection of Qualification Methods

Qualification Work Process

Technology Assessment

PoS Evaluation

Failure Mode Identification and Risk Ranking

III

TECHNICAL REPORT

DET NORSKE VERITAS

TechnologyAssessment

Report

Statement ofFeasibility

TECHNICAL REPORT

DET NORSKE VERITAS

TechnologyQualification

Plan

Statement ofEndorsement

Statement ofFitness for Service

TECHNICAL REPORT

DET NORSKE VERITAS

TechnologyQualification

Report

DNV Statements: Phase 1 and 2 Q4 2006

Q3 2004

List of the main results expected from Montoir:

5. Certification of complete system

Page 27: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

27

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

List of the main results expected from Montoir:

5. Certification of complete system

This SYSTEM OPERABILITY qualification conforms to new European standards presently being written.

EN 1474 is being updated to include 2 new sections:

Design and testing of Cryogenic hoses

Offshore Transfer Systems………….

in which the Certifying Authorities have included that –

“Where novel transfer solutions (new technology or novel application of known technology) are intended to be used, this technology is to undergo a recognized qualification procedure”

Page 28: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

28

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

CONCLUSIONS: 1of 2

Complete full scale trials including instrumentation & control systems

80% of the results are from the studies and documentation

20% of the results will come from the on-site testing

Open book co-operation with Certifying Authorities (B.V. and D.N.V.) and JIP members

Oil & Gas + Operators participation and familiarisation through Joint Industry Programmes

Page 29: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

29

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

CONCLUSIONS: 1of 2

Amplitude-LNG Loading System is both technically & commercially matureand will be complete with certification by Q4 this year

Opens up new Marine facilities architectures for both ends of the LNG chain

Easy and repeatable Side-by-side (ship to ship) operations

Marine facilities can now include cryogenic flexibles and Pipe-in-Pipe systems

Page 30: 23 rd  World Gas Conference 5 – 9 June 2006 Amsterdam

30

AMPLITUDE-LNG LOADING SYSTEM – Full scale trials

23rd World Gas Conference

Phillip COX – Business Development ManagerTechnip Offshore LNG Department

email: [email protected]: 33 6 8011 9480

Thank you for

your kind attention