21st century gallery on the park : The first 6 months

26
21 st Century Gallery in a Park The first six months (November 2012 – April 2013)

description

The first 6 months of building work on the capital development project which will transform the Gallery for visitors.

Transcript of 21st century gallery on the park : The first 6 months

Page 1: 21st century gallery on the park : The first 6 months

21st Century Gallery in a ParkThe first six months

(November 2012 – April 2013)

Page 2: 21st century gallery on the park : The first 6 months

The cartway with original cobbled floor

Page 3: 21st century gallery on the park : The first 6 months

Lions’ Den emptied for handover to ISG

Page 4: 21st century gallery on the park : The first 6 months

Breaking ground ceremony Dec 2012

Page 5: 21st century gallery on the park : The first 6 months

Demolition of the old shop store and fire escape

Page 6: 21st century gallery on the park : The first 6 months

ISG lay a ‘haul’ road to bring in site vehicles and keep mud off the highway

Page 7: 21st century gallery on the park : The first 6 months

Creating a temporary fire escape at the back of the galleries

Page 8: 21st century gallery on the park : The first 6 months

Piling starts for the foundations

Page 9: 21st century gallery on the park : The first 6 months

Piles in place in readiness for the main crane

Page 10: 21st century gallery on the park : The first 6 months

Digging out the slab in the Lions’ Den

Page 11: 21st century gallery on the park : The first 6 months

Strip out of the exhibition galleries

Page 12: 21st century gallery on the park : The first 6 months

Bagging up the old loliondo flooring

Page 13: 21st century gallery on the park : The first 6 months

View from the Whitworth Park

Page 14: 21st century gallery on the park : The first 6 months

Laying foundations for the staff entrance

Page 15: 21st century gallery on the park : The first 6 months

Pouring concrete for the staff entrance

Page 16: 21st century gallery on the park : The first 6 months

Earth tubes ready to be laid in the ground for ventilation

Page 17: 21st century gallery on the park : The first 6 months

Strip out of the Lecture Theatre

Page 18: 21st century gallery on the park : The first 6 months

The barrel vault ceiling revealed in the exhibition galleries

Page 19: 21st century gallery on the park : The first 6 months

Original Edwardian features

Page 20: 21st century gallery on the park : The first 6 months

Service trenches under the Collections Store

Page 21: 21st century gallery on the park : The first 6 months

The main crane arrives on site

Page 22: 21st century gallery on the park : The first 6 months

Floor slab - kitchen

Page 23: 21st century gallery on the park : The first 6 months

Learning studio with Art Garden to left

Page 24: 21st century gallery on the park : The first 6 months

Footprint of Clore Learning studio

Page 25: 21st century gallery on the park : The first 6 months

Staff entrance with window onto loading bay

Page 26: 21st century gallery on the park : The first 6 months

Walls go up on Study Centre