21.10.20 1 0 г. JSC GAZPROMNEFT

15
21.10.2010 г. JSC GAZPROMNEFT JI PROJECT YETY-PUROVSKOE, POST KYOTO POSSIBILITIES IN ENERGY SAVING PROJECT DIRECTOR NIKOLAY SEREGIN

description

JI PROJECT YETY-PUROVSKOE, POST KYOTO POSSIBILITIES IN ENERGY SAVING PROJECT DIRECTOR NIKOLAY SEREGIN. 21.10.20 1 0 г. JSC GAZPROMNEFT. ENVIRONMENTAL AND SOCIAL IMPACT OF THE PROJECT IN THE REGION. - PowerPoint PPT Presentation

Transcript of 21.10.20 1 0 г. JSC GAZPROMNEFT

Page 1: 21.10.20 1 0 г. JSC GAZPROMNEFT

21.10.2010 г. JSC GAZPROMNEFT

JI PROJECT YETY-PUROVSKOE, POST KYOTO POSSIBILITIES

IN ENERGY SAVING

PROJECT DIRECTOR NIKOLAY SEREGIN

Page 2: 21.10.20 1 0 г. JSC GAZPROMNEFT

ENVIRONMENTAL AND SOCIAL IMPACT OF THE PROJECT IN THE REGION

about 40% of associated gas from the wells of the oilfields is utilized in the gas processing plants

40% is used for electricity production, the rest 20% is being flared

2

Page 3: 21.10.20 1 0 г. JSC GAZPROMNEFT

GAZPROMNEFT-NNG

3

Page 4: 21.10.20 1 0 г. JSC GAZPROMNEFT

JI - JOINT IMPLEMENTATION MECHANISM

JOINT IMPLEMENTATION - THE WAY FOR RUSSIAN COMPANIES TO USE KYOTO MECHANISM

GAZPROMNEFT STARED RESEARCH SINCE 2006

4

Page 5: 21.10.20 1 0 г. JSC GAZPROMNEFT

ETY-PUROVSKOE OILFIELD

TILL AUGUST 2008 FLARING OF ASSOCIATED GAS WAS THE ONLY WAY TO DEAL WITH IT CREATING СО2 EMISSION

5

Page 6: 21.10.20 1 0 г. JSC GAZPROMNEFT

Yety-Purovskoe oil field in Yamal-Nenets autonomous region

On-site use for associated gas 0,4% in 2008

Investment committee decision 23 April 2008 to implement utilization project taken into consideration Kyoto Protocol

6

Page 7: 21.10.20 1 0 г. JSC GAZPROMNEFT

PROBLEMS OF JI IMPLEMENTION

1

DELAY OF RATIFICATION

IN RUSSIA

NO LEGAL REGULATION TILL THE END OF 2007

TENDER PROCEDURE

DELAYS2010

2 3 4

NEW REGULATION

SINCE NOVEMBER 2009

7

Page 8: 21.10.20 1 0 г. JSC GAZPROMNEFT

PIN

INITIAL CHECK UP BY THE COMPANY

CHECK UP OF THE COMPLIANCE WITH

CRITERIA OF JI

BASE LINE

PDD

MAIN STEPS FOR JI IN RUSSIA TRACK 1

JI

PartnersSberbank of

Russia

Ministry of Economic Development of the Russian Federation

Ministerial act

EXPERT COUNCIL

VERIFICATION

DETERMINATION PROCEDURE BY

AIE

Letter of approval

ERU

LEGAL CONSULTANTS

TENDER TERMS Letter of Approval by the

Government of JapanMONITORING

REPORTS

FRAMEWORK AGREEMENT

WITH PARTNER

– technical part

– registration and tender

8

Page 9: 21.10.20 1 0 г. JSC GAZPROMNEFT

Gazprom Pipeline

Yety-Purovskoe

PROJECT SCHEME

Start of the Project (August 2008)Vingayahinskoe

Novogodnee

Vingapurovskoe

Yarainerskoe

Noyabrsk

Vingayahinskoe CS

Vingapurovskoe CS

AG

AG

AG

AG

AG

9

Russia (Host Party):

JSC Gazprom Neft

JSC Gazpromneft-Noyabrskneftegaz

Japan:

Nippon Oil Corporation

Mitsubishi Corporation

Project participants:

Page 10: 21.10.20 1 0 г. JSC GAZPROMNEFT

PARTNERS

Mitsubishi corporation and Nippon Oil corporation:

Nippon Oil corporation – the author of methodology AM009 for the projects of utilization of associated gas from oil wells which is usually burnt.

Methodology approved by UN

Mitsubishi corporation is number 3 in the rating of the leading world developers of such projects (Reuter 2008)

10

Page 11: 21.10.20 1 0 г. JSC GAZPROMNEFT

11

Page 12: 21.10.20 1 0 г. JSC GAZPROMNEFT

12

Page 13: 21.10.20 1 0 г. JSC GAZPROMNEFT

Kyoto protocol is valid till 2012 but Kyoto mechanisms including JI are not restricted by time and may be used by interested parties

Alternative schemes to increase project feasibility and energy efficiency

GAZPROMNEFT will reduce CO2 emissions by decreasing flaring with a target of 95% utilization of associated gas within 3 years

KYOTO AND POST KYOTO POSSIBILITIES

Page 14: 21.10.20 1 0 г. JSC GAZPROMNEFT

13

Page 15: 21.10.20 1 0 г. JSC GAZPROMNEFT

THANK YOU