Page 1: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 2: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 3: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 4: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 5: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 6: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 7: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 8: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 9: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 10: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved
Page 11: 202.61.117.163202.61.117.163/attachments/GridAttach/hira/nproj/14830000000001/… · Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved