2022-2025 Draft Statewide Transportation Improvement Program
Transcript of 2022-2025 Draft Statewide Transportation Improvement Program
Wisconsin Department of Transportation
2022 – 2025
STIP
Statewide
Transportation Improvement
Program
Prepared in accordance with 23 U.S.C. Sections 134 and 135
2022 – 2025 Statewide Transportation Improvement Program
Introduction This Statewide Transportation Improvement Program (STIP) is intended to satisfy the requirements of 23 U.S.C. Sections 134 and 135 and their implementing regulations 23 CFR 450 and 49 CFR 613. This STIP has been prepared in accordance with joint FHWA/FTA regulations (23 CFR Part 450 and 49 CFR Part 613) accounting for related statutory changes in Public Law 114-357 Fixing America’s Surface Transportation Act (FAST Act) enacted on December 4, 2015. All current project fund commitments anticipated by the Wisconsin Department of Transportation (WisDOT) during the four-year period from January 1, 2022 through December 31, 2025 are listed. The projects programmed in the STIP have been reviewed and prioritized by WisDOT in accordance with system asset management principles except as follows. In urbanized areas with populations of 200,000 or greater (Milwaukee, Madison, Appleton, Green Bay and Wisconsin portions of the Round Lake Beach, IL and Minneapolis/St. Paul, MN areas), federally funded projects off the National Highway System (NHS) have been reviewed and prioritized by the respective Metropolitan Planning Organizations (MPOs). In urbanized areas with populations between 50,000 and 200,000, federally funded projects off the NHS and State Trunk Highway Network (STN) have been reviewed and prioritized by the respective MPOs. Projects in areas with populations between 5,000 and 50,000 off the NHS and STN have been reviewed, prioritized, and approved under WisDOT’s formula-based entitlement process. The 2022 – 2025 STIP is based on anticipated state and federal funds. This overall multi-modal STIP reflects WisDOT’s currently approved state and local programs within the limits of apportioned federal aid. All projects in the 2022 – 2025 timeframe are affordable and selected for implementation. Any subsequent changes in the project listing involving the addition or deletion of projects or significant changes in project schedule or estimated cost will be processed in accordance with the STIP amendment or backlog advanceable process outlined herein prior to requesting obligation of federal funds on the project.
2022 – 2025 Statewide Transportation Improvement Program
Certifications STATEWIDE TRANSPORTATION PLANNING PROCESS CERTIFICATION In accordance with 23 CFR 450.220, the Wisconsin Department of Transportation hereby certifies that its statewide transportation planning process is addressing major issues facing the State and its non-urbanized areas, and is being carried out in accordance with the following requirements:
(1) 23 U.S.C. 134 and 135, 49 U.S.C. 5303 and 5304, and this part; (2) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d–1) and 49 CFR
part 21;
(3) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity;
(4) Section 11101(e) of the Infrastructure Investment and Jobs Act (Public Law No: 117-58) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in DOT funded projects;
(5) 23 CFR part 230, regarding implementation of an equal employment opportunity
program on Federal and Federal-aid highway construction contracts;
(6) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49 CFR parts 27, 37, and 38;
(7) In non-attainment and maintenance areas, sections 174 and 176 (c) and (d) of the Clean
Air Act, as amended (42 U.S.C. 7504, 7506 (c) and (d)) and 40 CFR part 93;
(8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance;
(9) Section 324 of title 23 U.S.C., regarding the prohibition of discrimination based on
gender; and
(10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities.
2022 – 2025 Statewide Transportation Improvement Program
Contents STIP contents are referenced by tabs as follows:
Tab 1 – STIP Financial Plan Tab 2 – STIP Financial Summary Tab 3 – Obligation Plan Tab 4 – Individual MPO TIP Approvals Tab 5 – Federal Transit Assistance Programs Tab 6 – Federal Railroad Administration Program Tab 7 – Roadway and Bridge Improvement Programs Tab 8 – Backlog Advanceable Pilot Program Tab 9 – Federal Lands Transportation Improvement Programs Tab 10 – Public Involvement Tab 11 – Performance Measures Tab 12 – Summary of Public Comments Tab 13 – Amendments
2022 – 2025 Statewide Transportation Improvement Program Tab 1
STIP
Financial
Plan
____________________________________________________________________________ 2022 – 2025 Statewide Transportation Improvement Program 1 – 1
Financial Plan The Statewide Transportation Improvement Program (STIP) financial plan addresses fiscal constraint requirements of the federal-aid surface transportation act. In managing the implementation of the transportation improvement program, WisDOT will exercise the authority to refinance projects among federal, state, and local funds, and to reschedule projects within the four years of the STIP to maintain fiscal constraint. All four years of the STIP are fiscally constrained within Wisconsin’s state fiscal years (July 1 – June 30). Revenue Assumptions The Wisconsin Department of Transportation’s annual budget is set biennially through the State of Wisconsin’s budget process. State Fiscal Year 2022 is from 2021 Wisconsin Act 58, the State of Wisconsin’s 2021 – 2023 Biennial Budget authorizing federal, state, and local funding for this year. Since Wisconsin’s budget is approved for only two years at a time, this analysis assumes the budget approved for State Fiscal Year (SFY) 2023 will be held constant for SFY 2023 – SFY 2025. The federal fund revenue approved in 2021 Wisconsin Act 58 and included in this plan is $808 million for SFY 2022. Since SFY 2023 – SFY 2025 budget amounts are held constant, future budgets are not increased; however, for planning purposes, the program schedule is set by applying an inflation rate to projects in the second, third, and fourth years to account for costs in the year of expenditure dollars. WisDOT cannot assume that a future state legislature will commit higher project revenues than exists in the approved biennial budget. Therefore, when doing an all funds (federal, state, and local) analysis, WisDOT uses only resources approved in the most recent biennial budget except where noted. Any future legislative budget action that impacts revenue or programming will be accounted for in Amendments to the STIP. Wisconsin law allows WisDOT to allot additional local revenue authority on an as-needed basis depending on the summation of local municipal agreement revenue received within the fiscal year. Similarly, it is WisDOT’s policy to allot additional federal authority to programs in which federal funds are programmed. Local Programs The programs directed at the locally-owned system face unique challenges due to the wide range of owners. WisDOT is working closely with local partners to formalize change management and programming strategies to reduce the movement of projects between fiscal years. In the past few years, WisDOT implemented project ‘sunsets’ as a management strategy to reduce project movement. In addition, state law requires Transportation Alternatives (290) Program projects must be commenced within four years of the date the grant is awarded. Wisconsin has the flexibility to allocate funds between subprograms within overall programming to balance under and over programming each biennium in the four-year STIP period. WisDOT routinely does this formally during the current fiscal year. However, because of local project movement, there may be periods of time where one year or program is over programmed, and another year or program is under programmed. WisDOT may also briefly experience a greater dollar amount in the schedule due to estimate changes and project slippage. The Department tries to avoid moving projects out because lining up the necessary local match can be a challenge. WisDOT has very clear program guidance regarding available funding. To remain fiscally constrained, projects are rescheduled or funds are transferred between programs.
____________________________________________________________________________ 2022 – 2025 Statewide Transportation Improvement Program 1 – 2
Program Cost and Schedule Assumptions WisDOT’s Financial Integrated Improvement Programming System (FIIPS) reflects estimates of transportation improvement project costs in current 2021-year dollars. To change these values to the federally-mandated year of expenditure amounts for this publication, SFY 2023 – SFY 2025 project cost estimates in the Financial Plan table have been manually inflated by 1.74%. This inflationary rate is based on the current ten-year average change in the Consumer Price Index and matches the rate assumed by Wisconsin MPOs in their TIPs and long-range plans. Project estimates in SFY 22 reflect current cost expectations, so they have not been inflated in the table. The Federal Highway Administration requires state Departments of Transportation STIPs and Metropolitan Planning Organizations TIPs to document revenues and expenditures annually. In Wisconsin, these publications report estimates by calendar year, (January 1 – December 31), based on letting or delivery dates. Since the State of Wisconsin approves budgets by State Fiscal Year, (July 1 – June 30), the 2022 – 2025 STIP Financial Summary table shows revenue and programmed amounts according to State Fiscal Years. Operation and Maintenance Wisconsin’s 2021 – 2023 Biennial Budget authorizes WisDOT’s Highway Maintenance, Repair and Traffic Operations Program (305) to spend $302 million per year. Of that amount, approximately $10 million per year is authorized for Intelligent Transportation System and Traffic Signal Improvements; those projects are reflected in the 2022 – 2025 Financial Summary. Wisconsin allocates state funding under several programs to assist local governments with the operation, maintenance and improvement of highways and bridges on the local system.
Program SFY 2022 SFY 2023 SFY 2024 SFY 2025
General Transportation Aids (GTA) (Total)
$510,152,500 $520,355,600 $520,355,600 $520,355,600
Connecting Highway Aids $12,063,500 $12,063,500 $12,063,500 $12,063,500
Lift Bridge Aids $2,659,200 $2,659,200 $2,659,200 $2,659,200
County Forest Road Aids $320,600 $320,600 $320,600 $320,600
TOTALS $525,195,800 $535,398,900 $535,398,900 $535,398,900
State statute requires that local agencies submit pavement condition ratings to WisDOT every two years to monitor responsible use of state funding assistance provided for local transportation needs. Information on these programs, including allocation formulas, can be found at https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/default.aspx. It has been historically demonstrated that the level of funding set aside for operations and maintenance of the highway program has been adequate. WisDOT expects this to continue into future years.
2022 – 2025 Statewide Transportation Improvement Program Tab 2
STIP
Financial
Summary
Wisconsin Dept. of Transportation Final 2022-2025 STIP Financial Summary DTIM/BSHP/PFS
SFY Budget SFY Program (7) SFY Budget SFY Program
Inflated (3) SFY Budget SFY Program
Inflated (3) SFY Budget SFY Program
Inflated (3)
Local203 Rail Passenger Service (6) 6,800,000 - 6,800,000 - 6,800,000 54,306,304 6,800,000 -
205 Local Bridge Improvement Assistance 54,103,600 85,501,340 54,103,600 57,929,165 54,103,600 26,052,354 54,103,600 21,198,893
206 Local Transp Facility Improvement (4) 160,292,847 223,791,002 114,193,508 147,859,097 114,193,508 135,286,310 114,193,508 119,270,464
207 RR Crossing Improve, Protect & Repair 5,354,800 9,564,156 5,354,800 68,159,980 5,354,800 6,548,256 5,354,800 2,453,302
209 Transportation Economic Assistance 6,991,300 6,614,568 6,991,300 - 6,991,300 - 6,991,300 -
211 Congestion Mitigation & Air Quality Improvement 13,843,700 11,652,676 13,843,700 13,159,342 13,843,700 10,687,019 13,843,700 1,040,570
290 Transportation Alternatives 9,061,600 16,528,413 9,061,600 12,190,120 9,061,600 12,204,572 9,061,600 975,920
State
302Major Highway Development [includes bonding authority] 282,800,000 274,054,414 282,800,000 260,943,606 282,800,000 223,214,903 282,800,000 51,621,927
303State Highway Rehabilitation [includes bonding authority and what used to be 303SE] 1,050,884,500 1,061,111,104 1,041,299,100 845,898,911 1,041,299,100 873,556,899 1,041,299,100 882,381,062
301SE WI Freeway [includes bonding authority and Programs 301NS and 301ZO] 20,000,000 24,379,478 22,000,000 25,893,028 22,000,000 8,711,977 22,000,000 7,303,576
304 Major Interstate Bridge (5) - - - - - - - -
305 Highway Maint, Repair & Traffic Operations 11,894,292 11,894,292 9,651,142 9,651,142 3,061,166 3,061,166 1,296,166 1,296,166
Grand Totals 1,622,026,639 1,725,091,445 1,566,098,750 1,441,684,391 1,559,508,774 1,353,629,760 1,557,743,774 1,087,541,879
(1) Budget amounts reflect the approved biennial state budget for SFY 2022 - 2023, along with estimated budget for SFY 2024 - 2025.
(2) Budget amounts ["SFY Budget"] and Scheduled expenditures ["SFY Program"] are based on the state fiscal year (July – June).
(3) Legislative Sub-Program 209 currently does not have any dollars programed for SFY 2023 through SFY 2025.
(4) Sub-Program 206: SFY 2022 has local match of $88,010,047 and SFY 2023 has a local match of $41,910,708.
(5) Legislative Sub-Program 304 currently does not have any dollars programed for SFY 2022 through SFY 2025.
(6) Legislative Sub-Program 203 currently does not have any dollars programed for SFY 2022, 2023, or 2025.(7) SFY 2022 program levels in Legislative Sub-Programs 205 and 206 will be balanced through the use of carryover funding available as a result of General Fund supplements in the last two federal appropriations acts and prior state legislative actions in previous programming and budget cycles.
2022 2023 2024 2025
Legislative Sub-Programs (1&2)
Page 1 1/5/2022
2022 – 2025 Statewide Transportation Improvement Program Tab 3
Obligation
Plan
2022 – 2025 Statewide Transportation Improvement Program 3 – 1
Obligation Plan In any given federal fiscal year (October 1 – September 30), the Wisconsin Department of Transportation obligates all the federal fund authority it receives. Federal Fund Type Constraint On November 15, 2021, the Bipartisan Infrastructure Law (BIL) was signed by the president following passage by Congress. This represents a new multi-year reauthorization of federal surface transportation programs and funding. As of January 6, 2022, federal funding authority under the new BIL had not yet been provided to states, though multi-year apportionment estimates were made available by the Federal Highway Administration. WisDOT’s approach to programming incorporates federal funding flexibilities permitting transfer of funds between federal programs and the use of Advance Construction (AC), under which eligibility for federal funding is established to allow a project to proceed prior to obligation of federal funding. Under these provisions, specific federal fund types may be over programmed if the overall federal program in total is constrained across the four-year period. WisDOT also reserves federal funding associated with special obligation limitation to offset over programming and to cap the amount of funding under advance construction. WisDOT’s fiscally conservative standards do not allow the use of AC to exceed the level of apportionments received from FHWA. In other words, AC is used as a tool to manage the timing of obligation but not to increase the number of projects undertaken. When a project is funded with federal AC funds, WisDOT covers the federal cost-share with general transportation state funds until the funds can be obligated using available apportionments and obligation limitations. This ensures Wisconsin’s commitments are fiscally constrained within a guaranteed federal reimbursement level. Federal Fund Type Assessment Wisconsin Estimated FFY 2022 – 2025 Federal Aid Highway Apportionments and Program Levels table lists federal apportionment balances at the end of FFY 2021, the amount apportioned for FFY 2022, and estimated apportioned amounts for FFY 2023 – 2025. Over the past six years, WisDOT’s total federal obligation limitations (including Equity Bonus) have remained relatively flat and were $802 million in FFY 2021. The total expected federal funds available for obligation each state fiscal year is inflated beginning in FFY 2023 at 2.0% per year based on apportionment estimates in the BIL. To change the state fiscal year estimated program levels to the federally mandated year of expenditure amounts, cost estimates have been inflated 1.74% per year beginning in SFY 2023, similar to the Financial Plan table. As a further check, the STIP is fiscally constrained over the four-year period. This ensures that revenues exist to convert all projects advanced under advance construction within the period of the STIP.
January 3, 2022 January 3, 2022Fiscal Constraint Report Fiscal Constraint Report
Federal Fund Type Unobligated Balance from Previous Years (1)
FFY 2022 Apportionments (8)
SFY 2022 Estimated Program Levels
FFY 2023 Estimated Apportionments (2)
SFY 2023 Estimated Program Levels
FFY 2024 Estimated Apportionments (2)
SFY 2024 Estimated Program Levels
FFY 2025 Estimated Apportionments (2)
SFY 2025 Estimated Program Levels
Total FFY 2022‐2025 Estimated
Apportionments (3)
Total SFY 2022‐2025 Estimated Program Levels
Apportioned FundsNational Highway Performance Program 16,696,508$ 462,809,389$ 277,706,899$ 462,809,389$ 523,630,603$ 462,809,389$ 545,622,523$ 462,809,389$ 376,587,304$ 1,851,237,556$ 1,723,547,330$ Surface Transportation Block Grant 84,132,273$ 233,050,101$ 193,214,889$ 233,050,101$ 288,514,308$ 233,050,101$ 279,724,257$ 233,050,101$ 306,641,429$ 932,200,404$ 1,068,094,883$ Congestion Mitigation Air Quality 42,777,444$ 28,612,578$ 9,550,271$ 28,612,578$ 10,504,930$ 28,612,578$ 7,943,897$ 28,612,578$ 472,960$ 114,450,312$ 28,472,058$ Safety 38,612,546$ 50,872,817$ 37,923,130$ 50,872,817$ 54,561,342$ 50,872,817$ 41,684,941$ 50,872,817$ 35,884,690$ 203,491,268$ 170,054,102$ Transportation Alternatives 41,478,424$ 17,483,397$ 7,128,254$ 17,483,397$ 7,153,817$ 17,483,397$ 8,425,597$ 17,483,397$ ‐$ 69,933,588$ 22,707,668$ National Highway Freight Program 3,148,491$ 27,748,798$ ‐$ 27,748,798$ ‐$ 27,748,798$ ‐$ 27,748,798$ ‐$ 110,995,192$ ‐$ Sub‐Total ‐ Apportioned Funds 226,845,685$ 820,577,080$ 525,523,443$ 820,577,080$ 884,364,999$ 820,577,080$ 883,401,215$ 820,577,080$ 719,586,383$ 3,282,308,320$ 3,012,876,041$ Minimum Guarantee/Equity Bonus (4) ‐$ ‐$ 3,778,461$ ‐$ 2,078$ ‐$ ‐$ ‐$ ‐$ ‐$ 3,780,538$ National Highway Performance Program ‐ Exempt (4) 23,774,792$ 11,761,106$ 361,932$ 11,761,106$ ‐$ 11,761,106$ ‐$ 11,761,106$ ‐$ 47,044,424$ 361,932$ Highway Infrastructure ‐ Exempt (4) 57,341,277$ 26,999,863$ 40,003,760$ 26,999,863$ 1,651,854$ 26,999,863$ ‐$ 26,999,863$ ‐$ 107,999,452$ 41,655,614$ Total ‐ Apportioned Funds, Equity Bonus, and NHPP Exempt 307,961,755$ 859,338,049$ 569,667,596$ 859,338,049$ 886,018,931$ 859,338,049$ 883,401,215$ 859,338,049$ 719,586,383$ 3,437,352,196$ 3,058,674,125$ Advanced Construction ‐$ ‐$ 633,269,116$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ 633,269,116$ Total ‐ Apportioned Funds, Equity Bonus, and NHPP Exempt, and Advance Construction
307,961,755$ 859,338,049$ 1,202,936,711$ 859,338,049$ 886,018,931$ 859,338,049$ 883,401,215$ 859,338,049$ 719,586,383$ 3,437,352,196$ 3,691,943,241$
Allocated FundsCOVID Relief Funding (7) 131,418,628$ ‐$ 101,188,746$ ‐$ 9,810,000$ ‐$ ‐$ ‐$ ‐$ ‐$ 110,998,746$ Build Grant ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ INFRA Grant ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ High Priority Projects 43,989,764$ ‐$ 535,659$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ 535,659$ Federal Lands Access Program (5) ‐$ 160,000$ 401,600$ 160,000$ 1,906,000$ 160,000$ ‐$ 160,000$ ‐$ 640,000$ 2,307,600$ Recreational Trails Program (5) ‐$ 2,146,076$ ‐$ 2,146,076$ ‐$ 2,146,076$ ‐$ 2,146,076$ ‐$ 8,584,304$ ‐$ Other (6) 13,425,225$ 7,651,923$ 8,089,199$ 7,651,923$ 2,186,702$ ‐$ ‐$ ‐$ ‐$ 15,303,846$ 10,275,901$ Total Allocated Funds 188,833,617$ 9,957,999$ 110,215,204$ 9,957,999$ 13,902,702$ 2,306,076$ ‐$ 2,306,076$ ‐$ 24,528,150$ 124,117,906$
(2) FFY Estimated Apportionments are based on the FAST Act. Estimated Apportionment amounts are calculated on inflation amount of 2% based on FAST Act for FFY 2022‐2025.
(3) Unobligated balances from Previous Years are not included in the FFY 2022‐2025 Estimated Apportionments Total.
(5) Federal Lands Access Program and Recreational Trails Program are programmed on an annual basis.
(1) Unobligated Balances reflect prior year SAFETEA‐LU, MAP‐21, and Fast Act Program Balances. SAFETEA‐LU & MAP‐21 fund programs, e.g., IM, NHS, have been rolled into the corresponding FAST Fund Type.
(4) Equity Bonus & NHPP Exempt Funds Used to balance programming in FFY 2022 through FFY 2025 are applied by reducing the Unobligated Equity Bonus Balance in Previous Years. Unobligated Balances in Allocated Funds Categories (HPP, FLAP, RTP, Other) are similarly applied to balance estimated programming levels.
(6) Includes Section 112, Section 115, Section 117, PRNS, Highway Priority, Surface Transportation S129, NTPP, Map‐21 Training and Education, DBE Training, Skills Training, Ferry Boats; Emergency Relief, Highway‐Use Tax Evasion Project, Highways for Life Pilot Program and Misc. Demo funds.(7) COVID Relief funding respresents Wisconsin's FFY 2021 federal funding apportionment from the Coronavirus Response and Relief Supplemental Apprioriations Act of 2021 (CRRSA). This is one‐time fundingThe total includes $18,005,961 in Highway Infrastructure‐‐COVID Supplemental ‐ 23 U.S.C. 133(b) activities in urbanized areas with a population over 200,000.(8) FFY 2022 apportionments are listed as FFY 2021 totals, with FHWA Wisconsin Division Office concurrence. As of 1/3/2022, the FFY 2022 apportionment and obligation authority from the federal Bipartisan infrastructure Law of 2021 has not been finalized/loaded. Totals will be updated once this occurs.
2022 – 2025 Statewide Transportation Improvement Program Tab 4
Individual
MPO TIP
Approvals
2022 – 2025 Statewide Transportation Improvement Program 4 – 1
Transportation Improvement Program Approvals
WisDOT Secretary Craig Thompson, under authority delegated by Governor Tony Evers, has approved all the following Transportation Improvement Programs (TIPs) and/or TIP Amendments for the Metropolitan Planning Organizations (MPOs). Approved TIPs and TIP Amendments are included by reference in the 2022 – 2025 STIP:
1. State Line Area Transportation Study (Beloit, WI-IL MPO); phone 608.364.6690;
2022 – 2025 TIP as adopted on October 4, 2021 by Resolution No. 2021 – 11 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.
2. West Central Wisconsin Regional Planning Commission (Chippewa-Eau Claire MPO); phone 715.836.2918; 2022 – 2026 TIP as adopted on October 6, 2021 by Resolution No. 21 – 07 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.
3. East Central Wisconsin Regional Planning Commission (Fond du Lac MPO); phone 920.751.4770; 2022 – 2025 TIP as adopted on October 6, 2021 by Resolution No. 06 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
4. East Central Wisconsin Regional Planning Commission (Fox Cities MPO); phone 920.751.4770; 2022 – 2025 TIP as adopted on October 29, 2021 by Resolution No. 25 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
5. Brown County Planning Commission (Green Bay MPO); phone 920.448.6480; 2022 – 2025 TIP as adopted on October 6, 2021 by Resolution No. 2021 – 08 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.
6. Janesville Metropolitan Planning Organization (Janesville MPO); phone 608.755.3085;
2022 – 2027 TIP as adopted on October 25, 2021 by Resolution No. 2021 – 07 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
7. La Crosse Area Planning Committee (La Crosse, WI-MN MPO); phone 608.785.5977; 2022 – 2025 TIP as adopted on November 17, 2021 by Resolution No. 9 – 2021 for the 2040 long-range plan and approved by WisDOT on December 15, 2021.
8. Madison Area Transportation Planning Board (Madison MPO); phone 608.266.4336; 2022 – 2026 TIP as amended on November 3, 2021 by Resolution No. 13 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
2022 – 2025 Statewide Transportation Improvement Program 4 – 2
9. East Central Wisconsin Regional Planning Commission (Oshkosh MPO); phone
920.751.4770; 2022 – 2025 TIP as adopted on October 29, 2021 by Resolution No. 26 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
10. Southeastern Wisconsin Regional Planning Commission (Milwaukee, Racine, Kenosha, and Wisconsin portions of Round Lake Beach MPOs); phone 262.547.6721; 2021 – 2024 TIP as amended on November 18, 2021 by Resolution No. 2021 – 12 for the 2050 long-range plan and approved by WisDOT on December 2, 2021.
11. Bay-Lake Regional Planning Commission (Sheboygan MPO); phone 920.448.2820;
2022 – 2025 TIP as adopted on October 29, 2021 by Resolution 10 – 2021 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.
12. Duluth-Superior Metropolitan Interstate Council, (Duluth-Superior MPO); phone
218.529.7541; 2022 – 2025 TIP as adopted on October 20, 2021 by Resolution No. 21 – 16 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.
13. Marathon County Metropolitan Planning Commission (Wausau MPO); phone 715.261.6040; 2021 – 2024 TIP as amended on July 13, 2021 by Resolution No. 7 – 21 for the 2050 long-range plan and approved by WisDOT on September 3, 2021.
14. East Central Intergovernmental Association (Dubuque, IA MPO); phone 563.556.4166; 2022-2025 TIP as adopted on July 8, 2021 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.
15. Metropolitan Council (Twin Cities MPO); phone 651.602.1000; 2021 – 2024 TIP as adopted on September 23, 2020 by Business Item 2020 – 237 for the 2040 long-range plan and approved by WisDOT on December 14, 2020.
Transit Funds Sections 5303, 5304, 5311, 5314, 5316 and 5317, are reflected in individual TIPs and are administered by WisDOT. Transit Funds Sections 5307, 5309, 5310 and 5339, are reflected in individual TIPs and can be administered by WisDOT or directly between FTA and the urbanized area transit operator.
2022 – 2025 Statewide Transportation Improvement Program 4 – 3
2022 – 2025 Statewide Transportation Improvement Program Tab 5
Federal
Transit
Assistance
Programs
2022 – 2025 Statewide Transportation Improvement Program 5 – 1
Federal Transit Assistance Programs The following are federal transit assistance programs authorized under Fixing America’s Surface Transportation Act (FAST Act), which reauthorized the federal surface transportation programs. The FAST Act amended the federal transit laws and took effect October 1, 2015.
Section 5303: Metropolitan Transportation Planning Program Section 5303 is a formula-based grant program apportioned annually to states for use. All 5303 planning funds are transferred to the Federal Highway Administration. The federal share is 80% with a required 20% non-federal match. Section 5304: Statewide Transportation Planning Program Section 5304 is a formula-based grant program apportioned annually to the states for use in rural planning and research. The federal share is 80% with a required 20% non-federal match. Section 5307: Urbanized Area Formula Program This program provides grants to urbanized areas (over 50,000 in population) for public transportation capital, planning, and Job Access and Reverse Commute (JARC) projects, as well as operating expenses in certain circumstances. The federal share for capital projects is 80% with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. WisDOT allocates the portion of this funding known as the ‘Governor’s Apportionment’ among transit systems in communities with populations between 50,000 and 200,000 as defined by the most recent Census. Section 5310: Enhanced Mobility of Seniors and Individuals with Disabilities This program is intended to enhance the mobility of seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. This program consolidated two SAFETEA-LU programs: Section 5317 – New Freedom and Section 5310 – Elderly and Disabled Capital Assistance. The federal share for capital projects is 80% with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. Section 5311: Formula Grants for Rural Areas Section 5311 is a formula grant program for non-urbanized areas (under 50,000 in population) that provides capital and operating assistance for public transportation systems. Eligible activities include capital, operating assistance, and planning expenses. JARC projects, once funded through Section 5316, became eligible projects in the MAP-21 reauthorization bill in 2012. The federal share for capital projects is 80%, with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. Section 5311(b)(3): Rural Technical Assistance Program (RTAP) Section 5311(b)(3) is formula funding for states to provide research, technical assistance, and training to improve the delivery of transit services in non-urbanized areas (under 50,000 in population). There is no Federal requirement for a local match.
2022 – 2025 Statewide Transportation Improvement Program 5 – 2
Section 5329: State Safety Oversight (SSO) Program The purpose of the SSO program is to oversee the safety of rail transit systems. The SSO program is administered by eligible states with rail transit systems in their jurisdiction. FTA provides federal funds through the SSO Formula Grant Program for eligible states to develop and carry out their SSO programs. Under 49 U.S.C. Section 5329(e), as amended by the FAST Act, FTA is required to certify each state’s program to ensure compliance. SSO grant funds awarded to Wisconsin have a federal share of 80% and a required non-federal match of 20%. Section 5339: Bus and Bus Facilities Formula Grants Section 5339 provides capital funding to replace, rehabilitate, and purchase buses and related equipment, and to construct bus-related facilities. It replaced the Section 5309 Bus and Bus Facilities program under SAFETEA-LU. The federal share is 80% with a required 20% non-federal match. There are funds annually allocated to states by formula and a national discretionary program for which urban fixed-route transit systems and state departments of transportation may apply. Coronavirus Aid, Relief, and Economic Security (CARES) Act The CARES Act provides emergency assistance and health care response for individuals, families and businesses affected by the COVID-19 pandemic and provides emergency appropriations to support Executive Branch agency operations during the COVID-19 pandemic. All rural and urban recipients of Section 5311 and Section 5307 are eligible to receive CARES Act funds. Funding will be provided at a 100-percent federal share with no local match required, and will be available to support capital, operating, and other expenses eligible under those programs to prevent, prepare for, and respond to COVID-19. Coronavirus Response and Relief Supplemental Appropriations (CRRSAA) Act The supplemental funding due to the COVID-19 pandemic will be provided at 100-percent federal share, with no local match required. Funding will support expenses eligible under the relevant program, although the Act directs recipients to prioritize payroll and operational needs. All rural and urban public transit recipients of Section 5311 and Section 5307 and 5310 specialized transit recipeints are eligible to receive CRRSAA funds. American Rescue Plan (ARPA) Act Supplemental funding to support the nation’s public transportation systems as they continue to respond to the COVID-19 pandemic and support vaccinations in the U.S. The relief funds will be distributed at 100-percent federal share and are eligible to all rural and urban public transit recipients of Section 5311 and Section 5307 and 5310 specialized transit recipeints.
2022 – 2025 Statewide Transportation Improvement Program 5 – 3
Anticipated Federal Transit Funding Levels, 2022 – 2025 State of Wisconsin*
Program 2022 2023 2024 2025
FEDERAL LOCAL FEDERAL LOCAL FEDERAL LOCAL FEDERAL LOCAL
Section 5303[1] $1,574,646 NA $1,607,713 NA $1,640,832 NA $1,674,633 NA Section 5304 $345,740 $86,435 $353,000 $88,250 $360,272 $90,068 $367,693 $91,923
Type of local match Cash/tax levy Cash/tax levy Cash/tax levy Cash/tax levy
Section 5307[2] $18,333,640 $18,718,647 $19,104,251.13 $19,497,799
(Planning) $0 NA $0 NA $0 NA $0 NA
(Capital) $0 NA $0 NA $0 NA $0 NA
(Operating) $18,333,640 $18,333,640 $18,718,647 $18,718,647 $19,104,251 $1,187,855 $19,497,799 $1,212,325
Section 5310 $3,256,972 $3,325,368 $3,393,870.58 $3,463,784
(Administration) $325,697 $0 $332,537 $0 $339,387 $0 $346,379 $0 (Capital) $1,791,334 $447,834 $1,828,952 $457,238 $1,866,628 $466,657 $1,905,081 $476,270
(Operating) $1,139,940 $1,139,940 $1,163,879 $1,163,879 $1,187,855 $1,187,855 $1,212,325 $1,212,325
Type of local match Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy
Section 5311 $18,834,742 $19,230,271 $19,634,107.00 $20,038,570
(Administration) $450,000 $0 $450,000 $0 $450,000 $0 $459,270 $0 (Rural Technical
Assist) $312,244 $0 $318,801 $0 $325,496 $0 $332,201 $0
(IC bus – Section 5311(f)) $2,825,211 NA $2,884,541 NA $2,945,116 NA $3,005,785 NA
(Capital) $2,432,705 $608,176 $2,493,242 $623,310 $2,555,050 $638,762 $2,607,684 $651,920
(Operating) $12,814,581 $12,814,581 $13,083,687 $13,083,687 $13,358,445 $13,358,445 $13,633,629 $13,633,629
Section 5329 $307,818 $76,954 $314,282 $78,570 $320,756 $80,189.05 $327,364 $81,841
Type of local match Wis. Stat. 85.066 Wis. Stat. 85.066 Wis. Stat. 85.066 Wis. Stat. 85.066
Section 5339[3] $3,161,945 $790,486 $3,228,346 $807,086 $3,294,850 $823,712.48 $3,362,724 $840,681 Cash/tax levy Cash/tax levy Cash/tax levy Cash/tax levy
[1] Section 5303 funds are transferred to the Federal Highways Administration. [2] Section 5307 are the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems. [3] Section 5339 funds combine WisDOT’s statewide allocation and the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems.
*Amounts shown in this table are annual estimates. The available amount for a program is based on funding as authorized under Fixing America’s Surface Transportation Act (P. L. 112-141, 2015). **Section 5303 funds are transferred to the Federal Highways Administration. ***Section 5307 are the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems. ****Section 5339 funds combine WisDOT’s statewide allocation and the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems
Neillsville
Sun Prairie
Monona Milwaukee
Sheboygan
Ozaukee
Racine
Kenosha Western Kenosha
Walworth
Beloit
Janesville
Madison
Fond du Lac
Appleton
Oshkosh Manitowoc
Green Bay
Merrill
Eau Claire
La Crosse
Superior
Clark
Namekagon Transit
Bay Area Rural Transit
Oneida-Vilas Transit
Rusk
Chippewa Falls
Onalaska
Black River Falls
Tomah
Viroqua
Prairie du Chien
Reedsburg
Mauston
Baraboo Richland Center
Sauk Prairie
Marshfield
Wisconsin Rapids
Rhinelander
Marinette
Shawano
Clintonville
Waupaca
Plover
Stevens
Point
Ripon
Berlin
Waupun
Hartford Watertown
Lake Mills
Jefferson Waukesha
Stoughton
Edgerton Whitewater Monroe
to Escanaba
to MPLS/St.
Paul
to MPLS/
St. Paul
to
Ironwood
River Falls
New Richmond Dunn
Wisconsin Public Transit Systems 2021 Wisconsin Department of Transportation
Bureau of Transit, Local Roads, Railroads, & Harbors
This map identifies the general coverage areas of public transit systems within Wisconsin. For specific route information, contact transit systems directly.
Waukesha
Wausau Menominee
Transit
to Dubuque
Publicly Funded Inter-City Service
County-Wide Transit System
Multi-County Transit System
Fixed Route System
Shared Ride Taxi (SRT)
Shuttle/Commuter Service
Legend
Medford
Ft. Atkinson
Portage Beaver Dam
Platteville
West Bend
Grant
to Port Washington
to Mukwonago
Tribal Public Transit
Lac du Flambeau
2022 – 2025 Statewide Transportation Improvement Program Tab 6
Federal
Railroad
Adminstration
Program
2022 – 2025 Statewide Transportation Improvement Program 6 – 1
For informational purposes only
Intercity Passenger Rail Projects
Several Federal Railroad Administration Program funded projects have been identified in studies of two existing intercity passenger rail corridors and are eligible for federal funding for final design and construction.
In addition, WisDOT has submitted federal discretionary grant applications under the Federal-State Partnership for State of Good Repair Program, Consolidated Rail Infrastructure and Safety Improvement (CRISI) and Better Utilizing Investments to Leverage Development (BUILD) programs in SFY 2018, SFY 2019, and SFY 2020 for five passenger rail projects. All five of these projects have been selected for grants and will be fully funded projects in SFY2021 and SFY2022.
Corridor Improvement Projects:
1) Adding one to three additional daily round-trip frequencies between Milwaukee and Chicago on the Hiawatha Service, in cooperation with the State of Illinois. The full corridor improvements would involve final design (SFY 2022 – 2023) and construction (SFY 2024 – 2025), pending completion of the Environmental Assessment and Service Development Plan (completion SFY 2022). The corridor improvements in Wisconsin are already underway. a) Projects in Wisconsin required to accommodate the additional round-trip frequencies
(capital costs provided are rounded preliminary estimates): i) Muskego Yard signalization and track/bridge improvements (Milwaukee):
$54.6 million ii) Milwaukee Airport Rail Station second platform with overhead access (Milwaukee):
$10.1 million iii) Centralized train control (CTC) signalization between Milwaukee Intermodal Station
and Cutoff (Milwaukee): $5.4 million
2) Adding one new state-supported intercity passenger rail frequency between Chicago and the Twin Cities on the Amtrak Empire Builder corridor. Final Design will commence in late 2021 through 2022, with construction in 2023 and 2024. Service will start late 2024. a) Infrastructure improvements in Wisconsin include:
i) Rebuild Second Canadian Pacific (CP) Rail Main Track to the west and east of the La Crosse Amtrak Depot and extend La Crosse CP Rail Yard Lead West
2022 – 2025 Statewide Transportation Improvement Program 6 – 2
SFY 2022 Final Design and Construction Projects:
At the time of publication of the STIP, there were five projects with grant applications selected for the award by the Federal Railroad Administration (FRA) for the final design and construction of passenger rail improvements. The selected projects were obligated in SFY2021 or will be obligated in SFY2022. 1) Milwaukee Airport Rail Station second platform with overhead access (Milwaukee):
$10.1 million Grant awarded 2) CTC signalization between Milwaukee Intermodal Station and Cutoff (Milwaukee):
$5.4 million Selected for award 3) Acquisition of three cab-coach cars and six coach cars for the Amtrak Hiawatha Service:
$38.9 million Grant awarded 4) Muskego Yard Improvements and freight train bypass of Milwaukee Intermodal Station
(Milwaukee): $54.6 million Selected for award
5) Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Project $53 million Selected for award
Federal funding sources include, but are not limited to, the following grant programs:
• Infrastructure for Rebuilding America (INFRA) • Consolidated Rail Infrastructure and Safety Improvement (CRISI) • Better Utilizing Investments to Leverage Development (BUILD) • Federal-State Partnership for State of Good Repair
2022 – 2025 Statewide Transportation Improvement Program Tab 7
Roadway
and
Bridge
Improvement
Programs
2022 – 2025 Statewide Transportation Improvement Program 7 – 1
Roadway and Bridge Improvement Programs The pages that follow lists WisDOT's projects planned for implementation in Calendar Years 2022, 2023, 2024 and 2025. Projects are sorted in the following order:
CALENDAR YEAR
DIVISION-BUREAU (REGION)
COUNTY NAME
HIGHWAY NUMBER
SCHEDULE DATE
PROJECT ID It should be noted that the list contains some minimal over-programming (i.e. more projects than can be funded in a given year) to allow for attrition, that is, projects being delayed or dropped for other than financial reasons. Preliminary engineering projects will not be contained in the following list, although they are likely to be listed in the appropriate MPO TIP. It should also be noted that the FEDERAL FUND TYPE (or lack of) shown for each project represents a tentative fund assignment that may or may not become reality. WisDOT reserves the right to change the federal fund type on individual projects at any time prior to obligation, when necessary, consistent with its overall obligation plan to maximize the use of available federal aid. Programing based on FAST Act Funding Programs Federal-aid highway and transit funding programs are based on the 2015 transportation authorization act Fixing America’s Surface Transportation Act (FAST Act). WisDOT will make all required program adjustments in accordance with the FAST Act and any related federal regulations and guidance. Note: The estimated cost range is provided so that WisDOT can award projects by using the competitive process and not disclose bidding information.
2022 – 2025 Statewide Transportation Improvement Program 7 – 2
Funding Codes Fund Type Project Prefix Congestion Mitigation Air Quality CMAQ
Surface Transportation Program (STP) – state reference FAST Act program for the state STP is the Surface Transportation Block Grant (STBG) Program
STP
Highway Safety Improvement Program HSIP High Priority Projects HPP National Highway Freight Program
NHFP
National Recreational Trails (funds transferred to DNR) NRT
National Highway Performance Program NHPP
Discretionary Allocations ITS, ER
Bridge Replacement and Rehabilitation BR
Public Land and Forest Highway Programs PLH, FH
Statewide Metropolitan Planning Transportation Alternatives Program
SPR, PL TAP
2022 – 2025 Statewide Transportation Improvement Program 7 – 3
Local Programs All these programs, except for the Local Bridge Program, utilize federal and local funds to pay for local projects. In addition to federal and local funds, the Local Bridge Program may also utilize state funds to pay for local projects. Local Bridge Program: Funds the improvement of local bridges. This includes engineering and construction costs for administering and implementing bridge improvements on roads that are not a part of the State Trunk Highway (STH) System. Local Highway Improvement Assistance: Funds the improvement of local highways, including engineering, real estate, construction costs, and department services on roads that are not a part of the STH System.
STP Urban Program: Improvements in urban areas with populations greater than 5,000. Includes non-highway projects including multi-modal facilities, transit capital improvements, and bicycle and pedestrian facilities. STP Rural Program: Improvements to roads and streets functionally classified as higher than rural minor collectors. Includes non-highway projects including multi-modal facilities, transit capital improvements, and bicycle and pedestrian facilities.
Congestion Mitigation Air Quality (CMAQ): Funds projects that have a positive impact on air quality including highway efficiency improvements, carpooling, transit improvements, development of bicycle and pedestrian facilities, and alternative fuel facility and vehicle projects. These projects are located in or impact nonattainment and maintenance areas for criteria pollutants.
The Transportation Alternatives Program (TAP): Funds programs and projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, bicycle and pedestrian plans, and safe routes to school projects. It is the State of Wisconsin’s STBG-Set-Aside program.
2022 – 2025 Statewide Transportation Improvement Program 7 – 4
State Programs These programs utilize federal, state, and/or local funds to pay for projects located on the State Trunk Highway (STH) system. Major Highway Development: Major Highway Development projects are generally the most complex, costly and controversial projects initiated by WisDOT. They are long-term solutions to the most serious deficiencies on highly traveled segments of the highway system. A Major Project cost threshold is indexed to construction inflation. As of October 1, 2021, the cost thresholds are a total cost of more than $104.7 million for a High Cost Major or a total cost of more than $41.9 million for a Traditional Major. A Traditional Major project involves one of the following:
1) Constructing a new highway 2.5 miles or more in length; 2) Reconstructing or reconditioning an existing highway by one of the following:
a. Relocating 2.5 miles or more of an existing highway; b. Adding one or more lanes 5 miles or more in length to the existing highway; c. Improving to freeway standards 10 miles or more of an existing divided highway
having two or more lanes in either direction. A Traditional Major must be enumerated by the state legislature and a High Cost Major must be approved by the Transporation Projects Commission. Southeast Wisconsin Freeway Megaprojects: Southeast Freeway Megaprojects are also the most complex, costly and controversial projects initiated by WisDOT. This program provides funding for projects on the southeast Wisconsin freeway system. Like the Major Highway Development program, the megaproject cost threshold is indexed to construction inflation. As of October 1, 2021, the cost threshold for a Southeast Freeway Megaproject is $700.7 million. Megaprojects must be enumerated by the state legislature. State Highway Rehabilitation (SHR): The State Highway Rehabilitation subprogram funds improvements on Wisconsin’s state-owned highway system. Improvements funded in the SHR program include bridge preservation, bridge rehabilitation, bridge replacements, pavement preservation, pavement rehabilitation, pavement replacement, and intersection and interchange improvements. The program is managed as two separate sub-systems: The Backbone system and the 3R system. These two subsystems are managed as follows:
Backbone System: The Backbone Highway subprogram funds improvements on Wisconsin’s 1,597-mile Backbone highway system. The Backbone system includes all 878 miles of Interstate routes in the state and those freeways and expressways that are designated as Backbone roadways in Connections 2030, Wisconsin’s long-range transportation plan. Improvements funded in the Backbone Rehabilitation program include bridge preservation, bridge rehabilitation, bridge replacements, pavement preservation, pavement rehabilitation, pavement replacement, and intersection and interchange improvements.
3R System: The 3R program funds improvements (resurfacing, restoration, and rehabilitation) to existing roadways, the minor addition of lanes, traffic and safety
2022 – 2025 Statewide Transportation Improvement Program 7 – 5
improvements, and minor realignments of roadway. Improvements in this subprogram are categorized by the type of work involved:
o Resurfacing: Rehabilitating the surface of pavement to provide a smoother ride and to extend the pavement's structural life. Can also include pavement widening and/or shoulder paving to improve safety and reduce shoulder maintenance costs.
o Reconditioning: Resurfacing and improving an isolated grade, curve, or intersection.
o Pavement Replacement: The highest type of “resurfacing” whereby the existing pavement structure is replaced with a new one. Does not include widening of the roadway.
o Reconstruction: Total rebuilding of the highway to provide a safer facility, to improve geometrics (i.e. longer passing and stopping sight distances, broader turning radii, and additional lanes at intersections) and increased traffic handling capabilities. Other benefits are a smoother ride, reduced travel time and lower maintenance costs.
Major Interstate and High-cost State Highway Bridges: This subprogram includes two separate programs focusing on unique, high-cost structure projects across the state. Bridges are ineligible for this program if they are considered as part of a Southeast Wisconsin Freeway Megaprojects.
Major Interstate Bridge Program: A Major Interstate Bridge project is defined as any bridge project on a state highway that crosses a river forming a boundary of the state and for which the state’s estimated cost share is at least $100 million. The cost threshold for the Major Interstate Bridge program is not indexed to construction inflation High-cost State Highway Bridge Program: A High-cost State Highway Bridge project is defined as any bridge project on a state highway that has a total cost of more than $150 million. Bridges are ineligible for this program if they are considered as part of a Major Interstate Bridge project. The cost threshold for the High-cost bridge program is not indexed to construction inflation.
Highway Traffic Operations: This subprogram includes all the repair and operation of pavement markings, traffic signs, traffic operation improvements, and freeway detours. Maintenance Program: This program funds the refurbishment, repair, cleaning, painting, re-lamping, etc., of existing traffic control devices (TCDs). Although state crews do most of the routine maintenance on TCDs, the nature and/or volume of of some of the work requires outside help. The biggest items are sign refurbishment of the large freeway guide signs, cleaning and re-lamping of the highway lighting units, and traffic control signals on the system. Statewide Stand-alone Curb Ramp Program: This subprogram includes the design and construction of stand-alone curb ramp locations for the state trunk network including connecting highways. Stand-alone curb ramp locations are sites that are not within a roadway improvement project in the Six-year Program.
2022 – 2025 Statewide Transportation Improvement Program 7 – 6
Safety Programs All these programs utilize federal funds and the match is either state, local, or railroad funds, depending upon the jurisdiction of the highway and type of railroad project. These funds pay for activities that promote safety. The Highway Safety Improvement Program is incorporated into the safety-related projects listed by WisDOT Region in the STIP. Highway Safety Improvement Program (HSIP): A core federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads, including non-state-owned roads and roads on tribal land. HSIP utilizes a data-driven approach to improving safety on all public roads Railroad Crossing Warning Devices: Funds signal warning device installations, circuitry improvements, flashing lights, cantilevered flashing lights, and gates. Railroad Crossing Elimination of Hazards: Funds geometric improvements (grades), modular crossings, separations (limited because of high costs), consolidations, and closures.
2022 – 2025 Statewide Transportation Improvement Program 7 – 7
Project Listing Reference Information The tables on pages 7 – 7 through 7 – 9 are provided as a reference for the information within the preceding Tab 7 central office and region project listings:
Program (Pgm) code 205 Highway and local bridge improvement assistance 206 Local transportation facility improvement assistance 207 Railroad crossing improvement, protection, and repair assist 208 Multimodal transportation studies 209 Transportation facilities economic assistance and development 210 Surface transportation grants 211 Congestion mitigation and air quality improvement 290 Transportation alternatives 301 Southeast Wisconsin freeway megaprojects 302 Major highway development 303 State highway rehabilitation 304 Major interstate bridge construction 305 Highway maintenance, repair, and traffic operations
Contract Types
ATR TEA Rail Contract C/E Consultant Delivery (Preliminary or Construction Engineering)
CCO Contract Change Order (When a separate project ID is used) I/E In-house delivery (Prelim or Construction Engineering)
JTP Jurisdictional Transfer Payment (used only when a payment is being made to a local for work they are going to do on the roadway to be transferred)
LET Contract via Bid Letting LFA Local Force Account (replaces AUP, CRC and S&S) LLC Locally Let Contract M/E Municipal Engineering MIS Miscellaneous Negotiated Contract OST Other State Let Contract PRR Passenger Rail Service R/E Real Estate Acquisition (For encumbering real estate payments) R/R Railroad Contract SFA State Force Account TST Fund Transfer to Federal Transit Authority UTL Utility Contract (For compensable utility contracts)
2022 – 2025 Statewide Transportation Improvement Program 7 – 8
Concept Improvement Codes The FDM 11-1 Attachment 10.1 Improvement Strategies, Improvement Concepts, and Design Criteria Applications
2022 – 2025 Statewide Transportation Improvement Program 7 – 9
The following traffic operations improvement concepts should be used with Legislative Subprogram 305 – Highway Maintenance, Repair and Traffic Operations
Improvement Concept Code Improvement Concept Definition
TOPM STH – TRAFFIC OPERATIONS PAVEMENT MARKING – intended to cover all costs associated with general pavement marking including repainting centerline markings, lane line and no-passing zone markings, edge line-markings and special pavement markings on existing highways. Special markings include but are not limited to the following items: channelizing lines, railroad crossing markings, stop lines, crosswalks, words and symbols, arrows, diagonal markings, curb markings, parking stall lines, bike lane markings and island nose markings.
TOS STH – TRAFFIC OPERATIONS SIGNING – includes all work associated with the installation of new signs and supports along existing highways. It also includes the maintenance of highway signs, supports and sign bridges. Maintenance is defined as replacing, repairing, and refacing signs.
TOE STH – TRAFFIC OPERATIONS ELECTRICAL – includes all costs for the installation and maintenance of highway lighting (including relamping, repair, and replacement) and the maintenance of weigh station and sign lighting.
TOITS STH – TRAFFIC OPS INTELLIGENT TRANS SYSTEMS (ITS) – Intelligent Traffic Systems (ITS) are defined by FHWA as: …electronics, communications, or information processing used singly or in combination to improve the efficiency or safety of a surface transportation system. This definition provides the base for charging to program code 3890. Anticipated uses of 3890 will include but are not limited to: expenses relating to the operations and integration of ITS field devices, ITS deployment program planning expenses, and the expenses associated with the design and construction of ITS stand-alone project identified in the fiscal budget.
TOSIG STH – TRAFFIC OPERATIONS-TRAFFIC SIGNALS – includes all work associated with the installation, maintenance and repair of traffic control signals and beacons not part of an improvement project.
TOI STH – TRAFFIC OPERATIONS IMPROVEMENT BRIDGE REPAIR – only used for projects using sub-program 305 for urgent bridge repairs.
2022 – 2025 Statewide Transportation Improvement Program
Central Office Projects
2022-2025 FINAL STIP Project Listing 1Central Office
DANE
2022-2025 FINAL STIP Project Listing 1Central Office
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-85-31 06/25/2024 207 R/R MISC 0.000 LOC STR C STOUGHTON, SOUTH STREET $250,000 - $499,999
WSOR X-ING 391675D
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 2Central Office
DODGE
2022-2025 FINAL STIP Project Listing 2Central Office
DODGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-85-30 06/25/2024 207 R/R MISC 0.000 CTH CC T WESTFORD, CTH CC $250,000 - $499,999
UP X-ING 179164N
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2024 1009-85-32 06/25/2024 207 R/R MISC 0.000 CTH TW T HUBBARD, CTH TW $250,000 - $499,999
WSOR X-ING 387045C
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 3Central Office
DOUGLAS
2022-2025 FINAL STIP Project Listing 3Central Office
DOUGLAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-89-10 06/25/2024 207 R/R MISC 0.000 LOC STR V OF SOLON SPRINGS, JACK PINE AVE $250,000 - $499,999
WCL RR X-ING 186095A
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2024 1009-89-12 06/25/2024 207 R/R MISC 0.000 LOC STR V OF SOLON SPRINGS, MARION AVE $250,000 - $499,999
WCL RR X-ING 186096G
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2024 1009-89-14 06/25/2024 207 R/R MISC 0.000 LOC STR T BENNETT, TOWN LINE RD $250,000 - $499,999
WCL RR X-ING 186106K
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2022-2025 FINAL STIP Project Listing 4Central Office
DUNN
2022-2025 FINAL STIP Project Listing 4Central Office
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-89-22 06/25/2024 207 R/R MISC 0.000 CTH Q V DOWNING, CTH Q $250,000 - $499,999
WCL RR X-ING 693005W
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2023 1022-04-76 11/14/2023 303 LET MISC 0.420 IH 094 MENOMONIE - EAU CLAIRE $5,000,000 - $5,999,999
IH 94 SWEF 63 MENOMONIE
CONSTRUCTION/MISCELLANEOUS
ROADSIDE FACILITIES NON-FEDERAL
2023 1022-04-86 11/14/2023 303 LET MISC 0.000 IH 094 MENOMONIE - EAU CLAIRE $500,000 - $749,999
IH 94 SALT STORAGE FACILITY
CONSTRUCTION/MISCELLANEOUS
ROADSIDE FACILITIES NON-FEDERAL
2022-2025 FINAL STIP Project Listing 5Central OfficeEAU CLAIRE
2022-2025 FINAL STIP Project Listing 5Central OfficeEAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-89-24 06/25/2024 207 R/R MISC 0.000 CTH AF T BRIDGE CREEK, CTH AF $250,000 - $499,999
UP X-ING, FRA 183974M
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2024 1009-89-21 06/25/2024 207 R/R MISC 0.000 CTH V T OF LINCOLN, CTH V $250,000 - $499,999
UP X-ING, FRA 183972Y
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2022-2025 FINAL STIP Project Listing 6Central OfficeLA CROSSE
2022-2025 FINAL STIP Project Listing 6Central OfficeLA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1000-74-20 01/25/2022 207 R/E MISC 0.000 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999
LA CROSSE - ST. PAUL
INFRASTURE IMP FOR 2ND RND TRIP
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2022 1000-74-40 01/25/2022 207 UTL MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999
LA CROSSE - ST. PAUL
INFRASTURE IMP FOR 2ND RND TRIP
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FEDERAL
2022 1009-01-25 07/25/2022 290 MIS MISC 0.000 NONHWY
La Crosse Co SRTS Yr 1 of 2 $100,000 - $249,999
COUNTY-WIDE SAFE ROUTES TO SCHOOL
NON-INF SAFE ROUTES TO SCHOOL
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
2023 1000-74-51 04/25/2023 207 R/R MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $5,000,000 - $5,999,999
LA CROSSE - ST. PAUL
INFRASTURE IMP 2ND RND TRP WI ONLY
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-52 04/11/2023 207 LET MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $3,000,000 - $3,999,999
LA CROSSE - ST. PAUL
INFRASTURE IMP FOR 2ND RND TRIP
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-53 04/25/2023 207 R/R MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $15,000,000 - $16,999,999
2022-2025 FINAL STIP Project Listing 7Central OfficeLA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
LA CROSSE - ST. PAUL
INFRASTURE IMP 2ND RND TRP MN ONLY
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-54 04/25/2023 207 R/R MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $3,000,000 - $3,999,999
LA CROSSE - ST. PAUL
INFRASTURE IMP 2ND RND TRP WI ONLY
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-55 04/25/2023 207 R/R MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $15,000,000 - $16,999,999
LA CROSSE - ST. PAUL
INFRASTURE IMP 2ND RND TRP MN ONLY
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-70 05/09/2023 207 LET MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999
LA CROSSE - ST. PAUL
INFRASTURE IMP FOR 2ND RND TRIP
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1000-74-71 05/09/2023 207 LET MISC 0.700 NONHWY
TCMC INTERCITY PASSENGER RAIL GRANT $500,000 - $749,999
LA CROSSE - ST. PAUL
INFRASTURE IMP FOR 2ND RND TRIP
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
NON-FHWA FEDERALFUNDING
2023 1009-01-26 07/25/2023 290 MIS MISC 0.000 NONHWY
La Crosse Co SRTS Yr 2 of 2 $100,000 - $249,999
REGION-WIDE SAFE ROUTES TO SCHOOL
2022-2025 FINAL STIP Project Listing 8Central OfficeLA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
NON-INF SAFE ROUTES TO SCHOOL
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
2022-2025 FINAL STIP Project Listing 9Central OfficeMILWAUKEE
2022-2025 FINAL STIP Project Listing 9Central OfficeMILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-86-26 06/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, GRANVILLE RD $250,000 - $499,999
WSOR RR X-ING 386976N
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNINGDEVICES
RAIL HWY PROTECT DEV FAST
2022 1009-01-12 02/25/2022 290 MIS MISC 0.000 NONHWY
MPS/ BIKE FED SRTS PROGRAM $100,000 - $249,999
SFY 2019 (YR1 OF 2)
Milwaukee Public Schools Program
TAP > 200,000 TRANS ALTERNATIVES >200KF
2022 1009-01-23 07/25/2022 290 MIS MISC 0.000 NONHWY
MPS SRTS Program Yr 1 of 2 $100,000 - $249,999
DISTRICT WIDE SAFE ROUTES TO SCHOOL
NON-INF SRTS YR 1 OF 2
TAP > 200,000 TRANS ALTERNATIVES >200KF
2022-2025 FINAL STIP Project Listing 10Central OfficeOUTAGAMIE
2022-2025 FINAL STIP Project Listing 10Central OfficeOUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1009-01-17 07/25/2022 290 MIS MISC 0.000 NON HWY City of Appleton SRTS Program $100,000 - $249,999
CI APPLETON ONLY SRTS YR 1
SAFE ROUTES TO SCHOOL YEAR 1 OF 2
TAP > 200,000 TRANS ALTERNATIVES >200K F
2023 1009-01-18 07/25/2023 290 MIS MISC 0.000 NON HWY City of Appleton SRTS PRGM $100,000 - $249,999
CI APPLETON ONLY YR 2 OF 2
NON-INF SAFE ROUTES TO SCHOOL
TAP > 200,000 TRANS ALTERNATIVES >200K F
2022 1130-44-73 02/25/2022 303 C/E MISC 0.220 USH 041 APPLETON- GREEN BAY $2,000,000 - $2,999,999
WRIGHTSTOWN SAFETY/WEIGHT FACILITY
DSN/ WEIGHT STATION
ROADSIDE FACILITIES NAT'L HWY SYSTEM
2022-2025 FINAL STIP Project Listing 11Central Office
ROCK
2022-2025 FINAL STIP Project Listing 11Central Office
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 1009-85-33 06/25/2025 207 R/R MISC 0.000 CTH J T CLINTON, CTH J $250,000 - $499,999
UP X-ING 177962E
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2024 1009-85-29 06/25/2024 207 R/R MISC 0.000 CTH M T OF FULTON, CTH M $250,000 - $499,999
WSOR X-ING 391644E
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 12Central OfficeSHEBOYGAN
2022-2025 FINAL STIP Project Listing 12Central OfficeSHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1009-87-10 06/25/2023 207 R/R MISC 0.000 LOC STR C PLYMOUTH, CTH O (SOUTH ST) $100,000 - $249,999
WSOR X-ING 180332N
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST
2022-2025 FINAL STIP Project Listing 13Central Office
ST. CROIX
2022-2025 FINAL STIP Project Listing 13Central Office
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1020-01-80 05/10/2022 303 LET MISC 0.000 IH 094 HUDSON - BALDWIN $20,000,000 - $24,999,999
IH 94 SWEF 61 HUDSON
CONSTR/MISCELLANEOUS/SWEF
ROADSIDE FACILITIES NATIONAL HIGHWAY PERFFAST
2024 1009-89-23 06/25/2024 207 R/R MISC 0.000 LOCSTR
V WILSON $250,000 - $499,999
UP X-ING, FRA 183881T
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNINGDEVICES
RAIL HWY PROTECT DEV-FAST
2025 1009-89-25 06/25/2025 207 R/R MISC 0.000 LOCSTR
V ROBERTS, DIVISION STREET $250,000 - $499,999
UP X-ING, FRA 183845X
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNINGDEVICES
RAIL HWY PROTECT DEV FAST
2025 1009-89-26 06/25/2025 207 R/R MISC 0.000 LOCSTR
V ROBERTS, VINE STREET $250,000 - $499,999
UP X-ING, FRA 183844R
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNINGDEVICES
RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 14Central OfficeSTATEWIDE
2022-2025 FINAL STIP Project Listing 14Central OfficeSTATEWIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1000-02-35 03/25/2022 303 MIS MISC 0.000 NON HWY COLLEGE OF MENOMINEE NATION $0 - $99,999
FY22 NATL SUMMER TRANS INSTITUTE
ADMIN- TRAINING/NSTI PROGRAM
STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST
2022 1000-02-36 03/25/2022 303 MIS MISC 0.000 NON HWY COLLEGE OF MENOMINEE NATION $0 - $99,999
FY22 NATL SUMMER TRANS INSTITUTE
ADMIN- TRAINING/NSTI PROGRAM
STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST
1000-02-37 303 I/E MISC 0.000 OFF SYS HWY CONSTR WORKFORCE PARTSHP $250,000 - $499,999
STRATEGIC WORKFORCE DEV OJT/SS
ADMIN - HCWP/SWB GRANT PROGRAM
STP - DISCRETIONARY OJT SKILLS TRNG PGRM EXT
2022 1000-02-34 01/25/2022 303 MIS MISC 0.000 OFF SYS FFY22 TRANS PROGRAM $250,000 - $499,999
OJT/SS PROGRAM FY2022
ADMIN - TRAINING OJT/SS PROGRAM
STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST
2022 1009-01-13 07/25/2022 290 MIS MISC 0.000 VAR HWY East Central WI SRTS Program $250,000 - $499,999
REGION-WIDE YEAR 1 OF 2
NON-INF SAFE ROUTES TO SCHOOL
TAP > 200,000 TRANSP ALTERNATIVES FLEX F
2022 1009-01-28 04/25/2022 290 MIS MISC 0.000 VAR HWY WI Bike Fed Dane Co SRTS Yr 2 $0 - $99,999
DANE CO SAFE ROUTES TO SCHOOL
SAFE ROUTES TO SCHOOL YR 2 OF 2
TAP > 200,000 TRANSP ALTERNATIVES FLEX F
2023 1009-01-14 07/25/2023 290 MIS MISC 0.000 VAR HWY East Central WI SRTS Program $250,000 - $499,999
REGION-WIDE SRTS YEAR 2 OF 2
NON-INF SAFE ROUTES TO SCHOOL
TAP > 200,000 TRANSP ALTERNATIVES FLEX F
2022-2025 FINAL STIP Project Listing 15Central OfficeWALWORTH
2022-2025 FINAL STIP Project Listing 15Central OfficeWALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-86-24 06/25/2024 207 R/R MISC 0.000 CTH F T DARIEN, CTH F $250,000 - $499,999
WSOR X-ING 388185H
RR OPS/SAFETY/OCR SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2024 1009-86-25 06/25/2024 207 R/R MISC 0.000 CTH K T DARIEN, CTH K $250,000 - $499,999
WSOR RR X-ING 388232N
RR OPS/SAFETY/OCR/SIGNALS&GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 16Central OfficeWAUKESHA
2022-2025 FINAL STIP Project Listing 16Central OfficeWAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-86-27 06/25/2024 207 R/R MISC 0.000 LOC STR V EAGLE, PARTRIDGE ST $250,000 - $499,999
WSOR RR X-ING 391559P
RR OPS/SAFETY/OCR/SIGNALS&GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2024 1009-86-28 06/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, N 124TH ST/BOUNDARY RD $250,000 - $499,999
WSOR RR X-ING 386979J
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2025 1009-86-29 06/25/2025 207 R/R MISC 0.000 LOC STR T MERTON, KEESUS RD $250,000 - $499,999
UP X-ING 179046L
RR OPS/SAFETY/OCR/SIGNALS & GATES
SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022-2025 FINAL STIP Project Listing 17Central OfficeWINNEBAGO
2022-2025 FINAL STIP Project Listing 17Central OfficeWINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1009-01-10 02/25/2022 290 MIS MISC 0.000 VAR HWY ECWRPC SRTS PROGRAMMING $250,000 - $499,999
SFY 2022 (YR2 OF 2)
NONINFRASTRUCTURE PROGRAMMING
TAP > 200,000 TRANSP ALTERNATIVES FLEX F
2022 – 2025 Statewide Transportation Improvement Program
Southwest Region Projects
2022-2025 FINAL STIP Project Listing 18Southwest Region
ADAMS
2022-2025 FINAL STIP Project Listing 18Southwest Region
ADAMS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 4701-98-23 01/25/2022 305 MIS TOPM 0.000 VAR HWY ADAMS COUNTY PAVEMENT MARKING $250,000 - $499,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 19Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5432-00-72 12/13/2022 205 LET BRRPL 0.199 CTH A STH 146 - STH 73 $2,000,000 - $2,999,999
UPRR BRIDGE, B-11-0173
CONST OPS/BRIDGE RECONSTRUCTION
LOCAL BRIDGES NON-FEDERAL
1012-00-00 303 I/E PVRPLA 6.620 IH 039 MADISON - PORTAGE $4,000,000 - $4,999,999
CTH CS TO IH 90
DES/PE-PS&E/PAVEMENTREPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERFFAST
1161-02-03 303 I/E BRRHB 0.215 IH 039 PACKWAUKEE - PORTAGE $1,000,000 - $1,999,999
WISCONSIN RVR BRS B-11-55 & B-11-56
DESIGN/FULL PS&E DECK REPLACE BRRHB
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1010-10-22 04/25/2022 302 R/E BRRPLE 1.200 IH 039 MADISON - PORTAGE $250,000 - $499,999
WISCONSIN RIVER BRIDGES B-11-22/23
RE/CONST 1010-10-82/BRRPLE
MAJORS NON-FEDERAL
2022 1010-10-42 08/25/2022 302 UTL BRRPLE 1.200 IH 039 MADISON - PORTAGE $2,000,000 - $2,999,999
WISCONSIN RIVER BRIDGES B-11-22/23
UTL/CONST 1010-10-82/BRRPLE
MAJORS NON-FEDERAL
2022 1011-01-65 05/10/2022 303 LET PSRS10 3.590 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999
SOUTH COUNTY LINE TO STH 60
CONST/PAVE REPAIR,BOTH RDWYS/PSRS
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1012-01-74 05/10/2022 303 LET RECST 1.700 IH 039 MADISON - PORTAGE $14,000,000 - $14,999,999
2022-2025 FINAL STIP Project Listing 20Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 60 INTERCHANGE, B-11-165 & 166
CONST/REPL BRIDGES, INTERCH/RECST
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1161-00-70 03/08/2022 303 LET RSRF20 0.573 IH 039 MADISON - PACKWAUKEE $1,000,000 - $1,999,999
IH 90/94/78 TO THE WISCONSIN RIVER
CONST/CONCRETE O'LAY B-11-51/RSRF
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1010-10-82 12/12/2023 302 LET BRRPLE 1.200 IH 039 MADISON - PORTAGE $100 MILLION OR GREATER
WISCONSIN RIVER BRIDGES B11-XXX/XXX
CONST/BRRPLE
MAJORS NATIONAL HIGHWAY PERF FAST
1014-00-04 303 I/E PVRPLA 3.440 IH 090 WISCONSIN DELLS - PORTAGE $1,000,000 - $1,999,999
STH 33 TO IH 39
DES/PE-PS&E/PAV'T REPLACEM/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 6215-00-73 12/13/2022 205 LET BRRPL 0.088 LOC STR TOWN OF SCOTT, INGLEHART RD $1,000,000 - $1,999,999
UPRR BRIDGE, B-11-0178
CONST OPS/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022 6723-00-73 12/13/2022 205 LET BRRPL 0.104 LOC STR TOWN OF RANDOLPH, STERK RD $1,000,000 - $1,999,999
UPRR BRIDGE, B-11-0177
CONST OPS/BRIDGE REPLACMENT
LOCAL BRIDGES NON-FEDERAL
2023 6040-00-75 11/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF SCOTT, KOWALD ROAD $500,000 - $749,999
FOX RIVER BRIDGE, B-11-0181
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 6217-00-78 02/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF COLUMBUS, OLD STH 73 RD $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 21Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CRAWFISH RIVER BRIDGE, B-11-0175
CONST OPS/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022 6217-00-69 09/25/2022 290 LLC MISC 0.000 NON HWY C COLUMBUS, TRAIL NETWORK $500,000 - $749,999
VARIOUS CITY LOCATIONS
PEDESTRIAN/BICYCLE TRAIL
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
2022 6996-05-28 03/08/2022 290 LET MISC 0.000 NON HWY CITY OF PORTAGE, PORTAGE CANAL $500,000 - $749,999
ADAMS STREET TO CP RAILWAY BRIDGE
CONST - BIKE/PED PATH & REHAB CANAL
LOCAL ENHANCEMENTS HIGH PRIORITY PROJECTS SEC
1400-00-03 303 I/E MISC 0.012 STH 016 SALT STORAGE, COLUMBIA COUNTY $100,000 - $249,999
C OF PORTAGE
DES/PE-PS&E/REPLACE SALT SHED/MISC
BACKBONE NON-FEDERAL
2025 1400-00-73 02/11/2025 303 LET MISC 0.012 STH 016 SALT STORAGE, COLUMBIA COUNTY $1,000,000 - $1,999,999
C OF PORTAGE
CONST/REPLACE SALT SHED/MISC
BACKBONE NON-FEDERAL
6040-00-06 303 I/E PVRPLA 0.670 STH 033 C PORTAGE, COOK STREET $100,000 - $249,999
WISCONSIN RIVER TO STH 16
DESIGN-FULL PS&E/ PVRPLA
STATE 3R NON-FEDERAL
2022 6040-00-24 01/25/2022 303 R/E PVRPLA 0.050 STH 033 PORTAGE - FOX LAKE $0 - $99,999
KRUEGER RD TO UP RR BRIDGE B-11-066
REAL ESTATE
STATE 3R NON-FEDERAL
2022 6040-00-65 04/12/2022 303 LET RSRF10 7.614 STH 033 PORTAGE - FOX LAKE $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 22Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
0.13 MI E OF JACKSON ST TO STH 22
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 6040-00-74 11/14/2023 303 LET PVRPLA 6.030 STH 033 PORTAGE - FOX LAKE $7,000,000 - $7,999,999
0.19 MI W OF MORRIS DRIVE TO STH 73
CONST/ PAVE REPLACE, B-11-66
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 6630-00-21 01/25/2022 303 R/E BRRPL 0.018 STH 044 PARDEEVILLE - MANCHESTER $0 - $99,999
FOX RIVER STRUCTURE B-11-132
RIGHT OF WAY/ BRRPL
STATE 3R NON-FEDERAL
2023 6630-00-70 11/14/2023 303 LET RSRF30 5.840 STH 044 PARDEEVILLE - MANCHESTER $2,000,000 - $2,999,999
STH 33 TO CTH HH
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 6630-00-81 11/14/2023 303 LET BRRPL 0.018 STH 044 PARDEEVILLE - MANCHESTER $750,000 - $999,999
FOX RIVER STRUCTURE
CONST/ STRUCTURE REPLACEMENT
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2023 6010-00-73 11/14/2023 303 LET COLD20 14.686 STH 060 ARLINGTON - COLUMBUS $9,000,000 - $9,999,999
STH 22 TO COMMERCE DRIVE
CONST/ COLD IN-PLACE RECYCLE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 3060-00-74 01/14/2025 303 LET RSRF30 1.316 STH 073 C COLUMBUS, LUDINGTON STREET $1,000,000 - $1,999,999
FAITH DRIVE TO MIDDLETON STREET
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5630-06-20 04/25/2022 303 R/E MISC 0.108 STH 078 SAUK CITY - IH 39 $0 - $99,999
2022-2025 FINAL STIP Project Listing 23Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BOX CULVERT C-11-3072
RIGHT OF WAY/ MISC
STATE 3R NON-FEDERAL
2025 5630-06-80 11/11/2025 303 LET MISC 0.108 STH 078 SAUK CITY - IH 39 $250,000 - $499,999
BOX CULVERT C-11-3072
CONS/REPLACE BOX CULVERT C-11-3005
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5640-04-20 01/25/2022 303 R/E RSRF20 6.234 STH 113 LODI - BARABOO $0 - $99,999
STH 60 TO STH 188
R/E OPERATIONS
STATE 3R NON-FEDERAL
2022 5640-04-22 10/25/2022 303 R/E RSRF20 4.860 STH 113 LODI - BARABOO $500,000 - $749,999
CTH J TO STH 188
REAL ESTATE
STATE 3R NON-FEDERAL
2023 5640-04-70 04/11/2023 303 LET PSRS40 6.234 STH 113 LODI - BARABOO $2,000,000 - $2,999,999
STH 60 TO STH 188
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5640-04-72 12/09/2025 303 LET PSRS40 4.818 STH 113 LODI - BARABOO $6,000,000 - $6,999,999
CTH J TO STH 188
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 6707-01-73 11/11/2025 303 LET RSRF30 13.240 STH 146 FALL RIVER - CAMBRIA $7,000,000 - $7,999,999
STH 16 TO STH 33
CONS/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 6020-00-40 04/25/2022 303 UTL RECST 0.000 USH 051 DEFOREST - PORTAGE $0 - $99,999
2022-2025 FINAL STIP Project Listing 24Southwest Region
COLUMBIA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 22/STH 60 INTERSECTION
UTL OPS/CENTURYLINK UTL 40
STATE 3R NON-FEDERAL
2023 6020-04-50 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $250,000 - $499,999
TOMLINSON ROAD TO ONTARIO STREET
R/R OPS - REHAB GRADE CROSSING/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 6020-04-51 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $0 - $99,999
TOMLINSON ROAD TO ONTARIO STREET
R/R OPS - REHAB GRADE CROSSING/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 6020-04-52 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $100,000 - $249,999
TOMLINSON ROAD TO ONTARIO STREET
R/R OPS - CROSSING SIGNALS/RSRF30
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 6020-04-72 12/12/2023 303 LET RSRF30 10.711 USH 051 DEFOREST - PORTAGE $7,000,000 - $7,999,999
TOMLINSON ROAD TO ONTARIO STREET
CONST/ MILL & OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 1400-01-74 09/10/2024 303 LET RSRF20 0.000 USH 051 C PORTAGE, WISCONSIN STREET $250,000 - $499,999
PLEASANT STREET TO DEWITT STREET
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
1111-03-03 303 I/E BRRPL 0.017 USH 151 SUN PRAIRIE - BEAVER DAM $500,000 - $749,999
STH 16/60 B11-77; ROBBINS CR B11-86
DES/PE-PS&E/DECK & BRI RPL/BRRPL
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 25Southwest Region
CRAWFORD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5997-00-41 11/08/2022 206 LET RECST 0.800 LOC STR C PRAIRIE DU CHIEN, VILLA LOUIS RD $1,000,000 - $1,999,999
BLACKHAWK AVENUE TO TERMINI
CONST OPS/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2023 5540-02-71 11/14/2023 303 LET PVRPLA 8.507 STH 027 PRAIRIE DU CHIEN - VIROQUA $4,000,000 - $4,999,999
0.1 MI N NORTH AVENUE TO CTH C
CONST/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5160-07-70 12/13/2022 303 LET RSRF30 9.963 STH 035 PRAIRIE DU CHIEN - FERRYVILLE $9,000,000 - $9,999,999
CTH N TO CTH E/B-12-41,-42,-43,-45
CONST/MILL & OVERLAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 5160-07-72 11/11/2025 303 LET RSRF30 14.330 STH 035 PRAIRIE DU CHIEN - GENOA $7,000,000 - $7,999,999
CTH E TO OLD HWY 35
CONST/MILL & O'LAY/B-12-73/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 5180-00-70 01/10/2023 303 LET RSRF20 10.982 STH 060 BRIDGEPORT - BOSCOBEL $5,000,000 - $5,999,999
E JCT OLD HWY 60 TO KICKAPOO RIVER
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5180-00-71 01/10/2023 303 LET MISC 10.982 STH 060 BRIDGEPORT - BOSCOBEL $750,000 - $999,999
E JCT OLD HWY 60 TO KICKAPOO RIVER
CONST/SANITARY WATER/MISC
STATE 3R NON-FEDERAL
2023 5170-16-81 07/25/2023 303 OST BRRPL 0.430 STH 082 LANSING BRIDGE $40,000,000 - $44,999,999
B-12-XXXX AT IA/ WI STATE LINE
CONST/REIMBURSE TO IOWA DOT/BRRPL
SHR LARGE BRIDGES SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 26Southwest Region
CRAWFORD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5780-03-21 07/25/2022 303 R/E RSRF20 3.920 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999
BR KICKAPOO R BDGS B-12-705/801/818
RE/RSRF/CONST 5780-03-81
STATE 3R NON-FEDERAL
2022 5780-03-22 08/25/2022 303 R/E RSRF20 14.461 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999
SUNNY RIDGE ROAD TO PLEASANT STREET
RE OPS/5780-03-72/RSRF
STATE 3R NON-FEDERAL
2022 5780-03-23 05/25/2022 303 R/E RSRF10 0.525 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999
KICKAPOO RIVER B-12-172 TO USH 61
RE/5780-03-63/RSRF
STATE 3R NON-FEDERAL
2022 5780-03-24 08/25/2022 303 R/E RSRF20 7.720 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999
STH 60 TO 0.49 MI E RAILWAY ST
RE OPS/5780-03-61/RSRF
STATE 3R NON-FEDERAL
2024 5780-03-61 11/12/2024 303 LET RSRF20 7.720 STH 131 WAUZEKA - SOLDIERS GROVE $3,000,000 - $3,999,999
STH 60 TO 0.49 MI E RAILWAY ST
CONST/MILL & O'LAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5780-03-72 11/12/2024 303 LET RSRF20 14.610 STH 131 WAUZEKA - SOLDIERS GROVE $6,000,000 - $6,999,999
SUNNY RIDGE ROAD TO PLEASANT STREET
CONST/MILL & O'LAY/B-12-79/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5780-03-81 11/12/2024 303 LET RSRF20 4.430 STH 131 WAUZEKA - SOLDIERS GROVE $5,000,000 - $5,999,999
0.49M E RAILWAY ST TO SUNNYRIDGE RD
CONST/BRIDGE REPLACEMENTS/RSRF
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 27Southwest Region
CRAWFORD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5790-02-22 07/25/2022 303 R/E RSRF20 11.690 STH 171 FERRYVILLE - ROLLING GROUND $0 - $99,999
STH 27 TO USH 61
RE/RSRF/CONST 5790-02-72
STATE 3R NON-FEDERAL
2024 5790-01-80 11/12/2024 303 LET RECST 0.051 STH 171 FERRYVILLE - ROLLING GROUND $250,000 - $499,999
FLOWING STREAM STRUCTURE C-12-0063
CONST/CULVERT REPLACEMENT/RECST
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2022 5870-02-81 04/12/2022 303 LET BRRPL 0.165 STH 179 EASTMAN - STEUBEN $2,000,000 - $2,999,999
KICKAPOO RIVER BRIDGE B-12-0195
CONSTRUCTION/BRRPL
SHR BRIDGES HWY INFRA COVID SUPP
2023 1660-02-23 08/25/2023 303 R/E RECST 0.164 USH 018 MARQUETTE - PRAIRIE DU CHIEN $0 - $99,999
MAIN STREET INTERSECTION
RE/1660-02-73 RECST/RAB
STATE 3R NON-FEDERAL
2023 1661-09-72 03/14/2023 303 LET MISC 0.123 USH 018 PRAIRIE DU CHIEN - FENNIMORE $250,000 - $499,999
SOUTH TOWN LN/SELCH RD INTERSECTION
CONS/OFFST LT TRN LNS/MONOTUBE/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022-2025 FINAL STIP Project Listing 28Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5848-00-72 12/13/2022 205 LET BRRPL 0.000 CTH A USH 14 - STH 138 $750,000 - $999,999
BADFISH CREEK BRIDGE, B-13-0887
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 5856-00-72 01/10/2023 205 LET BRRPL 0.000 CTH E CTH Z - STH 78 $750,000 - $999,999
GERMAN VALLEY CREEK BR, B-13-0888
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2022 5665-00-75 09/13/2022 205 LET BRRPL 0.000 CTH JG CTH A - USH 151 $750,000 - $999,999
W BR OF SUGAR RIVER BR, B-13-0884
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 5572-00-72 01/10/2023 205 LET BRRPL 0.000 CTH KP STH 78 - USH 14 $1,000,000 - $1,999,999
BLACK EARTH CREEK, B-13-0883
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG-URBANIZED >200K FAST
2024 5572-00-50 06/25/2024 207 R/R MISC 0.015 CTH KP V CROSS PLAINS, CTH KP $0 - $99,999
WSOR RR XING 391768X
RR OPS/REPLACE DETECTION EQUIP/MISC
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2023 5954-00-01 08/08/2023 206 LET RECSTE 0.287 CTH M CTH Q - STH 113 (CTH M) $20,000,000 - $24,999,999
ONCKEN ROAD TO STH 113
CONST OPS/RECONSTRUCTION
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2023 5954-00-51 05/25/2023 206 R/R RECSTE 0.000 CTH M CTH Q - STH 113 (CTH M) $100,000 - $249,999
ONCEKN ROAD TO STH 113
RR OPS/CROSSING SURFACE
STP URBAN OVER 200,000 NON-FEDERAL
2022-2025 FINAL STIP Project Listing 29Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6218-00-73 05/10/2022 206 LET RCND20 4.010 CTH V VILLAGE OF DANE - I39/90 $3,000,000 - $3,999,999
STH 113 TO CTH I
CONST OPS/RECONDITION
STP RURAL STBG <5K POP FAST
2022 5986-00-71 08/09/2022 205 LET BRRPL 0.000 CTH Y USH 14 - STH 78 $750,000 - $999,999
DUNLAP CREEK BRIDGE, B-13-0889
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1002-01-02 303 I/E BRRHB 0.000 IH 039 C OF MADISON $100,000 - $249,999
MILWAUKEE STREET BRIDGE B-13-0477
DES/PE-PS&E/WIDEN DECK REPLAC/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1011-01-60 05/10/2022 303 LET PSRS10 4.173 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999
.55 MI S CTH V TO NORTH COUNTY LINE
CONST/PAV'T REPAIR, BOTH RDWYS/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1011-01-75 05/10/2022 303 LET PVRPLA 1.016 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999
CTH V TO 0.4 MI N OF CTH I, NB RDWY
CONS/RPL CNTR-OUTSD NB LANES/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1001-00-66 12/09/2025 303 LET PSRS10 4.920 IH 039 JANESVILLE - PORTAGE $5,000,000 - $5,999,999
USH 12/18 TO LIEN ROAD
CONST/CONCRETE PAV'T REPAIR/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
1066-00-32 303 I/E BRPVTV 0.004 IH 094 MADISON - LAKE MILLS $250,000 - $499,999
IH 90 WB B-13-0438; CTH T B-13-0450
DES/PE-PS&E/DECK O'LAY/PAINT/BRPVTV
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 30Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 1066-03-65 12/09/2025 303 LET BRPVTV 0.087 IH 094 MADISON - LAKE MILLS $4,000,000 - $4,999,999
STH 73 BRIDGES; MISSOURI RD BRIDGES
CONST/B-13-158,159,162,163 BRPVTV
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1066-03-75 11/11/2025 303 LET RSRF20 9.639 IH 094 MADISON - LAKE MILLS $15,000,000 - $16,999,999
CTH N TO AIRPORT ROAD
CONST/RESURFACE EB & WB RDWYS
BACKBONE NATIONAL HIGHWAY PERF FAST
5849-02-06 206 I/E RECST 0.359 LOC STR C FITCHBURG, SYRENE ROAD $0 - $99,999
MCCOY ROAD INTERSECTION
DESIGN - FULL PS&E RECST
SAFETY (REGULAR HSIP) NON-FEDERAL
5992-07-22 206 I/E MISC 0.156 LOC STR C MADISON, MINERAL POINT ROAD $0 - $99,999
HIGH POINT ROAD INTERSECTION
DESIGN - FULL PS&E MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 5796-00-74 12/13/2022 205 LET BRRPL 0.000 LOC STR TOWN OF VERONA, VALLEY ROAD $750,000 - $999,999
SUGAR RIVER BRIDGE, B-13-0886
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2022 5992-10-04 12/13/2022 205 LET BRRPL 0.016 LOC STR V SHOREWOOD HILLS, LAKE MENDOTA DR $1,000,000 - $1,999,999
MULTI-USE TRAIL, B-13-0692
CONST OPS/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022 5992-11-01 05/10/2022 206 LET RECSTE 1.398 LOC STR C MIDDLETON, PLEASANT VIEW ROAD $17,000,000 - $19,999,999
TIMBER WOLF TRAIL TO USH 14
CONST OPS/RECONSTRUCTION
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 31Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5992-11-02 05/10/2022 206 LET RECST 1.398 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $2,000,000 - $2,999,999
TIMBER WOLF TRAIL TO USH 14
CONST OPS/WATER MAIN & SEWER
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-31 03/08/2022 206 LET RECST 0.667 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $20,000,000 - $24,999,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
CONST OPS/RECONSTRUCTION
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 5992-11-32 03/08/2022 206 LET RECST 0.610 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $2,000,000 - $2,999,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
CONST OPS/WATER AND SANITARY SEWER
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-33 03/08/2022 206 LET RECST 0.610 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $1,000,000 - $1,999,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
CONST OPS/SANITARY SEWER
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-50 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999
TIMBER WOLF TRAIL TO USH 14
R/R OPS/ CROSSING SURFACE
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-51 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999
TIMBER WOLF TRAIL TO USH 14
R/R OPS/ SWITCH REPLACEMENT
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-52 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999
TIMBER WOLF TRAIL TO USH 14
R/R OPS/ CROSSING SIGNALS
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 32Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5992-11-55 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $250,000 - $499,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
R/R OPS/ CROSSING SIGNALS
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-56 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $100,000 - $249,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
R/R OPS/ CROSSING SURFACE
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-57 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $250,000 - $499,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
R/R OPS/ CROSSING SIGNALS
STP URBAN OVER 200,000 NON-FEDERAL
2022 5992-11-58 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $100,000 - $249,999
SHOREWOOD BLVD TO UNIVERSITY BAY DR
R/R OPS/ CROSSING SURFACE
STP URBAN OVER 200,000 NON-FEDERAL
2022 6992-00-75 12/13/2022 205 LET BRRPL 0.000 LOC STR VILLAGE OF WINDSOR, WINDSOR ROAD $750,000 - $999,999
YAHARA RIVER BRIDGE, B-13-0890
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG-URBANIZED >200K FAST
2023 3996-00-10 05/09/2023 206 LET RCND10 0.310 LOC STR C SUN PRAIRIE, INTERSECTION IMPRVMT $750,000 - $999,999
MAIN/WALKER;MAIN/BIRD;BIRD/LINNERUD
CONST/INTERSECTION IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 5685-00-05 08/08/2023 206 LET RECST 0.860 LOC STR V OF MCFARLAND, EXCHANGE STREET $2,000,000 - $2,999,999
FARWELL ST TO SLEEPY HOLLOW ROAD
CONST OPS/RECONSTRUCTION
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 33Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5685-00-06 08/08/2023 206 LET RECST 0.860 LOC STR V OF MCFARLAND, EXCHANGE STREET $1,000,000 - $1,999,999
FARWELL ST TO SLEEPY HOLLOW ROAD
CONST OPS/UTILITIES
STP URBAN OVER 200,000 NON-FEDERAL
2024 5685-00-50 06/25/2024 207 R/R MISC 0.006 LOC STR V MCFARLAND, HOLSCHER ROAD $0 - $99,999
WSOR RR XING 911336M
RR OPS/REPLACE DETECTION EQUIP/MISC
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2024 5742-00-72 09/10/2024 205 LET BRRPL 0.000 LOC STR T OF RUTLAND, LAKE KEGONSA ROAD $500,000 - $749,999
BADFISH CREEK BRIDGE, B-13-0885
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 5849-02-07 02/13/2024 206 LET RECST 0.359 LOC STR C FITCHBURG, SYRENE ROAD $2,000,000 - $2,999,999
MCCOY ROAD INTERSECTION
CONST/RECONFIG INTERSECTION RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 5992-07-19 03/12/2024 206 LET RCND10 0.102 LOC STR C MADISON, GAMMON ROAD $500,000 - $749,999
WATTS ROAD INTERSECTION
CONST/LEFT TURN LANES/MONOTUBES
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 5992-07-23 02/11/2025 206 LET MISC 0.157 LOC STR C MADISON, MINERAL POINT ROAD $750,000 - $999,999
HIGH POINT ROAD INTERSECTION
CONST/LEFT TURN LANES/MONOTUBES
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 3996-00-16 09/25/2022 290 LLC MISC 0.000 NON HWY C SUN PRAIRIE, MULTI-USE PATH $250,000 - $499,999
BIRD STREET TO KRONCKE DRIVE
PEDESTRIAN/BICYCLE TRAIL
TAP > 200,000 TRANS ALTERNATIVES >200K F
2022-2025 FINAL STIP Project Listing 34Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5992-00-62 08/25/2022 290 LLC MISC 0.000 NONHWY
C MADISON, W TOWNE PATH $500,000 - $749,999
COMMERCE DR TO JUNCTION RD
PEDESTRIAN/BICYCLE TRAIL
TAP > 200,000 TRANS ALTERNATIVES >200K F
2022 5992-08-48 11/25/2022 206 MIS MISC 0.070 NONHWY
PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999
CITY OF MADISON - 2023
FUNDING FOR CALENDAR YR 2023/2024
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 5992-08-51 11/25/2022 206 MIS MISC 0.070 NONHWY
RIDESHARE/TDM PROGRAM 2023 $100,000 - $249,999
MADISON AREA MPO
FUNDING FOR CALENDAR YEAR 2023/2024
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 6992-00-11 08/25/2022 290 LLC MISC 0.000 NONHWY
V DEFOREST, MULTI-USE PATH $500,000 - $749,999
VARIOUS VILLAGE LOCATIONS
SRTS MULTI-USE PATH
TAP > 200,000 TRANS ALTERNATIVES >200K F
2023 5992-00-66 01/25/2023 290 LLC MISC 0.000 NONHWY
C MADISON, BIKE/PED SAFETY PROJECT $100,000 - $249,999
SW COMMUTER PATH TO S CARROL STREET
PEDESTRAIN SAFETY IMPROVEMENTS
TAP > 200,000 TRANS ALTERNATIVES >200K F
2023 5992-08-49 11/25/2023 206 MIS MISC 0.070 NONHWY
PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999
CITY OF MADISON - 2024
FUNDING FOR CALENDAR YR 2024/2025
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 35Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5992-08-52 11/25/2023 206 MIS MISC 0.070 NONHWY
RIDESHARE/TDM PROGRAM 2024 $100,000 - $249,999
MADISON AREA MPO
FUNDING FOR CALENDAR YEAR 2024/2025
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 5992-08-50 11/25/2024 206 MIS MISC 0.070 NONHWY
PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999
CITY OF MADISON - 2025
FUNDING FOR CALENDAR YR 2025/2026
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 5992-08-53 11/25/2024 206 MIS MISC 0.070 NONHWY
RIDESHARE/TDM PROGRAM 2025 $100,000 - $249,999
MADISON AREA MPO
FUNDING FOR CALENDAR 2025/2026
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 5145-00-41 01/25/2022 303 UTL RSRF30 9.560 STH 019 MAZOMANIE - USH 12 $0 - $99,999
STH 78 TO USH 12
UTL OPS/5145-00-71/RSRF
STATE 3R NON-FEDERAL
2022 5145-00-71 11/08/2022 303 LET RSRF30 9.560 STH 019 MAZOMANIE - USH 12 $12,000,000 - $12,999,999
STH 78 TO USH 12
CONST/PULVERZ/B13-796,-797 RPL/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 6085-02-26 08/25/2022 303 R/E MISC 0.466 STH 019 MAZOMANIE - SUN PRAIRIE $0 - $99,999
WESTMOUNT DRIVE INTERSECTION
RE OPS/6085-02-76/MISC
STATE 3R NON-FEDERAL
2022 6085-02-27 01/25/2022 303 R/E MISC 0.271 STH 019 C SUN PRAIRIE, WINDSOR STREET $0 - $99,999
N THOMPSON RD INTR;DAVISON DR INTR
2022-2025 FINAL STIP Project Listing 36Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE OPS/6085-02-77/RCND
STATE 3R NON-FEDERAL
2023 3050-01-26 08/25/2023 303 R/E RSRF30 6.644 STH 019 SUN PRAIRIE - WATERTOWN $0 - $99,999
WOOD VIOLET LANE TO BR MAUNESHA RVR
RE/RSRF/CONST 3050-01-76
STATE 3R NON-FEDERAL
2023 6085-02-75 12/12/2023 303 LET MISC 0.244 STH 019 MAZOMANIE - SUN PRAIRIE $750,000 - $999,999
USH 151 INTERCHANGE
CONST/LONG LT TURN LNS/MONOTUB/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 6085-02-77 05/09/2023 303 LET MISC 0.275 STH 019 C SUN PRAIRIE, WINDSOR STREET $750,000 - $999,999
N THOMPSON RD INTR;DAVISON DR INTR
CONST/LEFT TURN LNS/MONOTUBES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 6085-02-76 08/13/2024 303 LET MISC 0.467 STH 019 MAZOMANIE - SUN PRAIRIE $750,000 - $999,999
WESTMOUNT DRIVE INTERSECTION
CONST/LEFT TURN LANES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 3050-01-76 11/11/2025 303 LET RSRF30 6.644 STH 019 SUN PRAIRIE - WATERTOWN $4,000,000 - $4,999,999
WOOD VIOLET LANE TO BR MAUNESHA RVR
CONST/MILL & O'LAY/B-13-345/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5290-02-71 12/09/2025 303 LET RSRF20 3.626 STH 019 MAZOMANIE - SUN PRAIRIE $4,000,000 - $4,999,999
DIVISION STREET TO RIVER ROAD
CONST/MILL & O'LAY/B-13-188/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5490-00-62 03/08/2022 303 LET BRRHB 0.107 STH 030 C MADISON, STH 30 $250,000 - $499,999
FAIR OAKS AVE B-13-206
2022-2025 FINAL STIP Project Listing 37Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/CONCRETE OVERLAYS/BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022 5490-00-63 03/08/2022 303 LET PSRS30 2.096 STH 030 C MADISON, STH 30 $3,000,000 - $3,999,999
FAIR OAKS AVENUE TO IH 39 RAMP
CONST/CONCRETE JOINT REPAIR/PSRS
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1693-05-43 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $500,000 - $749,999
CTH D TO VALLEY ROAD
UTL/CHARTER COMMUNICATIONS UTL 103
STATE 3R NON-FEDERAL
2022 1693-05-45 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $0 - $99,999
CTH D TO VALLEY ROAD
UTL/TDS TELECOM UTL 111
STATE 3R NON-FEDERAL
2022 1693-05-46 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $0 - $99,999
CTH D TO VALLEY ROAD
UTL/WE ENERGIES - GAS UTL 104
STATE 3R NON-FEDERAL
3070-05-00 303 I/E RSRF30 5.807 STH 073 I39 - COLUMBUS $100,000 - $249,999
PIERCE ROAD TO CTH B
DESIGN-FULL PS&E RSRF30
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 3060-03-21 12/25/2022 303 R/E PVRPLA 1.360 STH 073 I39 - COLUMBUS $0 - $99,999
STH 19 TO N MARSHALL V LIMIT
RE/PVRPLA/CONST 3060-03-71
STATE 3R NON-FEDERAL
2022 3060-03-70 11/08/2022 303 LET RSRF30 9.430 STH 073 I39 - COLUMBUS $3,000,000 - $3,999,999
N MARSHALL V LIMIT TO DEANSVILLE RD
2022-2025 FINAL STIP Project Listing 38Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 3070-04-60 01/10/2023 303 LET RSRF30 1.676 STH 073 I39 - COLUMBUS $2,000,000 - $2,999,999
SHAUL LANE TO NORTH STREET
CONST/MILL & O'LAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 3060-03-51 07/25/2024 303 R/R PVRPLA 1.360 STH 073 I39 - COLUMBUS $250,000 - $499,999
STH 19 TO N MARSHALL V LIMIT
RR/SIGNALS/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 3060-03-71 12/10/2024 303 LET PVRPLA 1.360 STH 073 I39 - COLUMBUS $1,000,000 - $1,999,999
STH 19 TO N MARSHALL V LIMIT
CONST/PAV'T RPLC, B-13-73/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
5600-00-06 303 I/E PVRPLA 0.840 STH 078 ARGYLE - MT HOREB $100,000 - $249,999
CTH E TO MT HOREB V LIMIT
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5600-05-80 04/12/2022 303 LET BRRPL 0.047 STH 078 MT HOREB - BLACK EARTH $500,000 - $749,999
VERMONT CREEK BRIDGE B-13-855
CONST/BRIDGE REPLACEMENT/BRRPL
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2022 3670-00-24 01/25/2022 303 R/E RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $0 - $99,999
CLARKSON ROAD TO AVALON ROAD
RE/RSRF/CONST 3670-00-74
STATE 3R NON-FEDERAL
2022 3670-00-44 01/25/2022 303 UTL RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $0 - $99,999
CLARKSON ROAD TO AVALON ROAD
2022-2025 FINAL STIP Project Listing 39Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
UTL OPS/ LOE
STATE 3R NON-FEDERAL
2023 3670-00-74 12/12/2023 303 LET RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $2,000,000 - $2,999,999
CLARKSON ROAD TO AVALON ROAD
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5926-05-60 11/14/2023 303 LET PSRS40 7.344 STH 092 MT HOREB - BROOKLYN $2,000,000 - $2,999,999
E JCT CTH G TO STH 69
CONST/MILL & OVERLAY/PSRS
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5280-01-73 03/14/2023 303 LET RECST 0.318 STH 113 MADISON - LODI $2,000,000 - $2,999,999
CTH P/CTH V INTERSECTION
CONS/INTERSECTION IMPROVEMENT/RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 5420-02-72 02/14/2023 303 LET PVRPLA 3.410 STH 113 MADISON - LODI $9,000,000 - $9,999,999
KNUTSON DRIVE TO STH 19
CONST/PAV'T REPLACE/B-13-233/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5280-03-21 12/25/2024 303 R/E PVRPLA 2.822 STH 113 MADISON - LODI $0 - $99,999
CTH V TO CTH P
RE/PVRPLA/CONST 5280-03-71
STATE 3R NON-FEDERAL
2024 5280-03-50 05/25/2024 303 R/R RSRF25 0.000 STH 113 MADISON - LODI $100,000 - $249,999
WSOR RR X SURFACE 178068H/917705C
RR OPS/XING RESURFACE/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5280-03-53 05/25/2024 303 R/R RSRF25 0.000 STH 113 MADISON - LODI $250,000 - $499,999
WSOR RR X SIGNALS 178068H/917705C
2022-2025 FINAL STIP Project Listing 40Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RR OPS/SIGNALS/MISC
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5280-03-70 01/09/2024 303 LET RSRF25 3.870 STH 113 MADISON - LODI $2,000,000 - $2,999,999
SUNSET LANE TO CTH V
CONST/PAV'T REPLACE/B-13-871/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5280-03-71 12/09/2025 303 LET PVRPLA 2.822 STH 113 MADISON - LODI $2,000,000 - $2,999,999
CTH V TO CTH P
CONST/PAV'T REPLACEMENT/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5280-03-72 12/09/2025 303 LET PVRPLA 2.822 STH 113 MADISON - LODI $1,000,000 - $1,999,999
CTH V TO CTH P
CONST/WATER & SANITARY SEWER/PVRPLA
STATE 3R NON-FEDERAL
5924-00-02 303 I/E PVRPLA 5.710 STH 138 COOKSVILLE - STOUGHTON $250,000 - $499,999
STH 59 TO MILWAUKEE ST
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
1206-04-03 303 I/E BRRHB 0.009 USH 012 SAUK CITY - MADISON $100,000 - $249,999
RIMROCK ROAD BRIDGE B-13-0310
DES/PE-PS&E/CONC DECK O'LAY/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
1206-04-04 303 I/E BRRPL 0.009 USH 012 MADISON - CAMBRIDGE $250,000 - $499,999
BR YAHARA RIVER B-13-193
DES/PE-PS&E/BOX CULVERT REPL/BRRPL
BACKBONE NATIONAL HIGHWAY PERF FAST
1206-04-06 303 I/E PVRPLA 1.920 USH 012 C MADISON, MADISON BELTLINE $1,000,000 - $1,999,999
USH 18 TO CTH D
2022-2025 FINAL STIP Project Listing 41Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
DES/PE-PS&E/PAV'T REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
1206-04-07 303 I/E PVRPLA 6.210 USH 012 C MADISON, MADISON BELTLINE $2,000,000 - $2,999,999
CTH D TO IH 39
DES/PE-PS&E/EB PAV'T REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
1206-04-08 303 I/E PVRPLA 0.000 USH 012 C MADISON, MADISON BELTLINE $2,000,000 - $2,999,999
CTH D TO IH 39
DES/PE-PS&E/WB PAV'T REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
5300-00-02 303 I/E RSRF20 3.612 USH 012 SAUK CITY - MADISON $750,000 - $999,999
TERRACE AVENUE TO GAMMON ROAD
DESIGN-FULL PS&E RSRF20
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 3080-01-40 07/12/2022 303 LET MISC 2.602 USH 012 MADISON - CAMBRIDGE $250,000 - $499,999
CTH AB OVERPASS
CONST/SANITARY, WATER, FIBER/MIS
STATE 3R NON-FEDERAL
2022 3080-01-45 01/25/2022 303 UTL BRNEW 2.061 USH 012 MADISON - CAMBRIDGE $0 - $99,999
CTH AB OVERPASS
UTL/FRONTIER COMM UTL 50/BRNEW
STATE 3R NON-FEDERAL
2022 3080-01-46 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999
CTH AB INTERCHANGE
UTL/ALLIANT ENERGY ELEC 209/RECSTE
STATE 3R NON-FEDERAL
2022 3080-01-47 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999
CTH AB INTERCHANGE
2022-2025 FINAL STIP Project Listing 42Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
UTL/FLINT HILLS RESOURCE-GAS/RECSTE
STATE 3R NON-FEDERAL
2022 3080-01-48 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999
CTH AB INTERCHANGE
UTL/FRONTIER COMM UTL 202/RECSTE
STATE 3R NON-FEDERAL
2022 3080-01-75 07/12/2022 303 LET BRNEW 0.020 USH 012 MADISON - CAMBRIDGE $11,000,000 - $11,999,999
CTH AB OVERPASS
CONST/B-13-893/BRNEW
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 3080-01-76 07/12/2022 303 LET RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $15,000,000 - $16,999,999
CTH AB INTERCHANGE
CONSTRUCTION/RECSTE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 3080-01-86 06/25/2023 303 MIS MISC 1.631 USH 012 MADISON - CAMBRIDGE $0 - $99,999
CTH AB INTERCHANGE
TOIP PARTICIPATING/3080-01-76
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1670-01-76 12/09/2025 303 LET MISC 0.288 USH 012 SAUK CITY - MADISON $500,000 - $749,999
STH 188/TETIVA ROAD INTERSECTION
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 3080-01-78 11/11/2025 303 LET RECST 0.218 USH 012 MADISON - CAMBRIDGE $1,000,000 - $1,999,999
CTH W/OAK PARK ROAD INTERSECTION
CONST/INTERSECTN IMPROVEM/RAB/RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 5310-02-55 04/25/2022 303 R/R MISC 0.000 USH 014 SPRING GREEN - MADISON $250,000 - $499,999
WISC & SOUTHERN RR XING 391751U
2022-2025 FINAL STIP Project Listing 43Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RR OPS/REPLACE CROSSING SURF/MISC
STATE 3R NON-FEDERAL
2022 5310-02-56 04/25/2022 303 R/R MISC 0.004 USH 014 SPRING GREEN - MADISON $250,000 - $499,999
WISC & SOUTHERN RR XING 391751U
RR OPS/REPLACE CROSSING SIGNAL/MISC
STATE 3R NON-FEDERAL
2022 5310-02-75 05/10/2022 303 LET MISC 0.225 USH 014 SPRING GREEN - MADISON $1,000,000 - $1,999,999
PLEASANT VIEW ROAD INTERSECTION
CONST/LEFT TURN LNS/MONOTUBES/RCND
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 5310-02-78 01/09/2024 303 LET MISC 0.324 USH 014 SPRING GREEN - MADISON $500,000 - $749,999
DEMING WAY INTERSECTION
CONST/LT TURN/MONOTUBES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1204-05-05 303 I/E RSRF30 6.990 USH 018 MOUNT HOREB - MADISON $250,000 - $499,999
W JUNCTION CTH MV TO CTH PD
DES/PE-PS&E/RESURFACE EB & WB/RSRF
BACKBONE NON-FEDERAL
2022 1204-08-65 11/08/2022 303 LET RSRF30 13.046 USH 018 MOUNT HOREB - MADISON $20,000,000 - $24,999,999
TOWN HALL ROAD TO CTH PD
CONSTRUCTION/RSRF30
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1204-05-77 01/14/2025 303 LET MISC 0.304 USH 018 DODGEVILLE - MOUNT HOREB $500,000 - $749,999
CTH F INTERSECTION
CONST/HSIP/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 5410-00-24 01/25/2022 303 R/E PVRPLA 0.800 USH 051 MADISON - DEFOREST $0 - $99,999
USH 151 TO PIERSTORFF STREET
2022-2025 FINAL STIP Project Listing 44Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE/PVRPLA/CONST 5410-00-74
STATE 3R NON-FEDERAL
2022 5410-00-25 01/25/2022 303 R/E MISC 0.800 USH 051 MADISON - DEFOREST $0 - $99,999
USH 151 TO PIERSTORFF STREET
RE/MISC/CONS 5410-00-74/TLE EXHIBIT
STATE 3R NON-FEDERAL
2022 5410-00-74 12/13/2022 303 LET PVRPLA 0.800 USH 051 MADISON - DEFOREST $2,000,000 - $2,999,999
USH 151 TO PIERSTORFF STREET
CONST/REPLACE PAVEMENT NB/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 5410-05-02 02/25/2022 302 C/E RECSTE 11.000 USH 051 MADISON - DEFOREST $1,000,000 - $1,999,999
VOGES ROAD TO STH 19
CORRIDOR DESIGN MANAGEMENT/RECSTE
MAJORS NON-FEDERAL
2022 5410-06-00 12/25/2022 302 C/E MISC 4.760 USH 051 MADISON - DEFOREST $5,000,000 - $5,999,999
VOGES ROAD TO STH 30
PLANNING ENV LINKAGE-PEL
MAJORS NON-FEDERAL
2022 5845-01-20 01/25/2022 303 R/E MISC 0.281 USH 051 STOUGHTON - MADISON $250,000 - $499,999
CTH B/CTH AB INTERSECTION
RE/CONST 5845-01-70/MISC
STATE 3R NON-FEDERAL
2022 5845-16-22 11/25/2022 302 R/E RECST 1.360 USH 051 STOUGHTON - MADISON $500,000 - $749,999
SPRING RD TO FIFTH ST
RE/CONST 5845-16-72/RECST
MAJORS NON-FEDERAL
2022 5845-16-23 11/25/2022 302 R/E RECST 1.665 USH 051 STOUGHTON - MADISON $500,000 - $749,999
HARRISON ST TO ROBY RD
2022-2025 FINAL STIP Project Listing 45Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE/CONST 5845-16-73/RECST
MAJORS NON-FEDERAL
2022 5845-16-27 11/25/2022 302 R/E RECST 1.620 USH 051 STOUGHTON - MADISON $0 - $99,999
LARSON BEACH RD TO VOGES RD
RE/CONST 5845-16-77/RECST
MAJORS NON-FEDERAL
2022 5845-16-52 11/25/2022 302 R/R RECST 0.000 USH 051 STOUGHTON - MADISON $250,000 - $499,999
SPRING RD TO FIFTH ST
RR/391684C SURFACE/RECST
MAJORS NON-FEDERAL
2023 5845-01-70 11/14/2023 302 LET RCND10 0.280 USH 051 STOUGHTON - MADISON $3,000,000 - $3,999,999
CTH B/CTH AB INTERSECTION
CONST/INTERSECTION SAFETY/RAB/RCND
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 5845-16-21 05/25/2023 302 R/E RECST 4.980 USH 051 STOUGHTON - MADISON $500,000 - $749,999
I39/90 TO SPRING RD
RE/CONST 5845-16-71/RECST
MAJORS NON-FEDERAL
2023 5845-16-24 11/25/2023 302 R/E RECST 3.800 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999
ROBY ROAD TO S CTH B/AB
RE/CONSTR 5845-16-74/RECST
MAJORS NON-FEDERAL
2023 5845-16-28 11/25/2023 302 R/E RECST 6.570 USH 051 STOUGHTON - MADISON $250,000 - $499,999
EXCHANGE STREET INTERSECTION
RE OPS/5845-16-84/RECST
MAJORS NON-FEDERAL
2024 5845-16-25 10/25/2024 302 R/E RECST 2.760 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999
CTH B/AB TO EXCHANGE STREET
2022-2025 FINAL STIP Project Listing 46Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE/CONST 5845-16-75/RECST
MAJORS NON-FEDERAL
2024 5845-16-72 11/12/2024 302 LET RECST 1.360 USH 051 STOUGHTON - MADISON $9,000,000 - $9,999,999
SPRING RD TO FIFTH ST
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
2024 5845-16-77 11/12/2024 302 LET RECST 1.620 USH 051 STOUGHTON - MADISON $12,000,000 - $12,999,999
LARSON BEACH RD TO VOGES RD
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
2024 5845-16-79 11/12/2024 302 LET RECST 1.360 USH 051 STOUGHTON - MADISON $500,000 - $749,999
SPRING RD TO FIFTH ST
CONST/SANITARY SEWER & WATER/RECST
MAJORS NON-FEDERAL
2024 5845-16-86 07/09/2024 302 LET RECST 1.620 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999
LARSON BEACH RD TO VOGES RD
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
2025 5845-16-26 10/25/2025 302 R/E RECST 1.090 USH 051 STOUGHTON - MADISON $250,000 - $499,999
EXCHANGE ST TO LARSON BEACH RD
RE/CONST 5845-16-76/RECST
MAJORS NON-FEDERAL
2025 5845-16-45 10/25/2025 302 UTL RECST 2.760 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999
CTH B/AB TO EXCHANGE STREET
UTL/CONST 5845-16-75/RECST
MAJORS NON-FEDERAL
2025 5845-16-73 11/12/2025 302 LET RECST 1.666 USH 051 STOUGHTON - MADISON $9,000,000 - $9,999,999
HARRISON ST TO ROBY RD
2022-2025 FINAL STIP Project Listing 47Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
2025 5845-16-74 11/11/2025 302 LET RECST 3.800 USH 051 STOUGHTON - MADISON $25,000,000 - $29,999,999
ROBY ROAD TO S CTH B/AB
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
2025 5845-16-84 11/11/2025 302 LET RECST 0.034 USH 051 STOUGHTON - MADISON $4,000,000 - $4,999,999
EXCHANGE STREET INTERSECTION
CONST/RECST
MAJORS NATIONAL HIGHWAY PERF FAST
1111-02-09 303 I/E PVRPLA 3.860 USH 151 C SUN PRAIRIE $2,000,000 - $2,999,999
MAIN STREET-CTH VV/B13-0268 TO 0273
DES/PE-PS&E/B-13-275,276/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
5400-00-01 303 I/E PVRPLA 0.490 USH 151 C MADISON, PARK STREET $500,000 - $749,999
WSOR CROSSING TO OLIN AVENUE
DES-FULL PS&E/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 5400-00-22 01/25/2022 303 R/E RECST 0.030 USH 151 C MADISON, S BLAIR ST/JOHN NOLAN DR $0 - $99,999
WILSON/WILLIAMSON ST INTERSECTION
RE FOR 5400-00-72
STATE 3R NON-FEDERAL
2022 5400-00-23 01/25/2022 303 R/E PVRPLA 0.097 USH 151 C MADISON, BLAIR ST/E WASHINGTON AV $100,000 - $249,999
E WILSON ST TO BLOUNT ST
RE FOR 5400-00-73
STATE 3R NON-FEDERAL
2022 4713-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY DANE COUNTY PAVEMENT MARKING $250,000 - $499,999
LOCATIONS ON STH PER ANNUAL PLAN
2022-2025 FINAL STIP Project Listing 48Southwest Region
DANE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 49Southwest Region
DODGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 3926-00-70 01/09/2024 205 LET BRRPL 0.000 CTH NP CTH P - CTH V $500,000 - $749,999
BUTLER CREEK BRIDGE, B-14-0229
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1107-00-02 303 I/E PVRPLA 7.336 IH 041 MILWAUKEE - FOND DU LAC $2,000,000 - $2,999,999
STH 28 - NORTH COUNTY LINE
DES/PE-PS&E/PAV'T REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 3804-00-75 12/10/2024 205 LET BRRPL 0.000 LOC STR TOWN OF LOWELL, WELL ROAD $250,000 - $499,999
SHAW CREEK BRIDGE, B-13-0226
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 3813-00-70 01/09/2024 205 LET BRRPL 0.000 LOC STR TOWN OF HUBBARD, WILDCAT ROAD $500,000 - $749,999
WILDCAT CREEK BRIDGE, B-14-0227
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 3814-00-70 12/10/2024 205 LET BRRPL 0.000 LOC STR T OF HUSTISFORD, ST. HELENA ROAD $500,000 - $749,999
DEAD CREEK BRIDGE, B-14-0228
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 1400-00-89 11/14/2023 303 LET BRRHB 0.349 STH 016 COLUMBUS - WATERTOWN $1,000,000 - $1,999,999
CMSTPP RR BRIDGE B-14-066
CONST/ CONCRETE OVERLAY
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
3050-06-00 303 I/E PVRPLA 6.260 STH 019 SUN PRAIRIE - WATERTOWN $500,000 - $749,999
STH 89 TO CRAWFISH RVR
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 50Southwest Region
DODGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1390-06-04 303 I/E RECST 11.154 STH 026 WATERTOWN - WAUPUN $1,000,000 - $1,999,999
STH 33 TO 0.2 MI S OF MILLIGAN RD
DESIGN-FULL PS&E RECONST
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1390-01-26 01/25/2022 303 R/E RSRF15 0.530 STH 026 WATERTOWN - WAUPUN $0 - $99,999
CENTER STREET TO CTH DF
REAL ESTATE
STATE 3R NON-FEDERAL
2023 1390-06-50 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $0 - $99,999
WISC & SOUTHERN RR XING 387053U
RR OPS/ CROSSING REPAIR/ RESURFACE
STATE 3R NON-FEDERAL
2023 1390-06-52 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $100,000 - $249,999
WISC & SOUTHERN RR XING 387632D
RR OPS/ CROSSING REPAIR/ RESURFACE
STATE 3R NON-FEDERAL
2023 1390-06-53 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $100,000 - $249,999
WISC & SOUTHERN RR XING 387632D
RR OPS/ FLASHING LIGHT SIGNALS
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1390-06-70 12/12/2023 303 LET PSRS40 12.420 STH 026 WATERTOWN - WAUPUN $5,000,000 - $5,999,999
STH 33 TO 0.2 MI S OF MILLIGAN RD
CONST/ PSRS40
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 4060-05-72 03/08/2022 303 LET RECST 0.571 STH 028 HORICON - KEWASKUM $2,000,000 - $2,999,999
STH 67/175/TW INTERSECTION
CONST/INTERSECTION IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 51Southwest Region
DODGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 3020-00-70 11/12/2024 303 LET RSRF20 4.670 STH 028 HORICON - KEWASKUM $2,000,000 - $2,999,999
CTH V TO STH 175
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 3270-01-74 12/10/2024 303 LET RSRF20 3.540 STH 028 HORICON - KEWASKUM $1,000,000 - $1,999,999
ELLSWORTH STREET TO N JCT CTH TW
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
1411-02-00 303 I/E PVRPLA 11.111 STH 033 HORICON - WEST BEND $750,000 - $999,999
HORICON C LIMIT TO WASHINGTON CO
DESIGN-FULL PS&E PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6070-01-63 09/10/2024 303 LET RSRF20 4.640 STH 033 PORTAGE - FOX LAKE $3,000,000 - $3,999,999
STH 73 TO FOREST STREET
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
3010-02-00 303 I/E PVRPLA 2.150 STH 049 LOMIRA - WAUPUN $100,000 - $249,999
CTH KK TO CENTER DRIVE
DESIGN FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
3042-00-09 303 I/E MISC 15.860 STH 060 LOWELL - HARTFORD $250,000 - $499,999
STH 26 TO S GOODLAND ROAD
CORRIDOR PRESERVATION STUDY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 3042-01-21 01/25/2022 303 R/E RSRF30 0.288 STH 060 LOWELL - HARTFORD $0 - $99,999
CTH M TO BECKER ROAD
RIGHT OF WAY
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 52Southwest Region
DODGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 3042-01-71 02/14/2023 303 LET PVRPLA 10.550 STH 060 LOWELL - HARTFORD $9,000,000 - $9,999,999
.32M E OF CTH W TO STH 67
CONST/ PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 3030-05-24 09/25/2022 303 R/E RSRF20 1.104 STH 067 OCONOMOWOC - MAYVILLE $0 - $99,999
LINCOLN ROAD TO ROOSEVELT ROAD
REAL ESTATE/ RSRF20
STATE 3R NON-FEDERAL
2023 3030-02-56 04/25/2023 303 R/R RSRF10 0.000 STH 067 OCONOMOWOC - MAYVILLE $100,000 - $249,999
WSOR RR XING 387041A
RR OPS/ CROSSING REPAIR/ RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 4090-01-74 11/12/2024 303 LET PVRPLA 2.490 STH 067 MAYVILLE - CAMPBELLSPORT $2,000,000 - $2,999,999
STH 175 TO EAST COUNTY LINE
CONST/ PAVE REPLACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
6060-02-01 303 I/E PVRPLA 13.627 STH 073 COLUMBUS - PRINCETON $1,000,000 - $1,999,999
MIDDLETON ST TO COMMERCE COURT
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 1112-02-77 01/14/2025 303 LET MISC 0.274 USH 151 SUN PRAIRIE - BEAVER DAM $500,000 - $749,999
CTH DE/JACKSON ROAD INTERSECTION
CONST/HSIP/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 4714-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY DODGE COUNTY PAVEMENT MARKING $250,000 - $499,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 53Southwest Region
GRANT
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5609-00-70 11/08/2022 206 LET RCND20 6.808 CTH H KIELER - CUBA CITY (CTH H) $5,000,000 - $5,999,999
ELM STREET TO STH 80
CONST OPS/RECONITIONING
STP RURAL STBG <5K POP FAST
2023 5722-00-73 10/25/2023 290 LLC MISC 0.000 NON HWY C BOSCOBEL, MULTI-USE PATH $1,000,000 - $1,999,999
WSOR RR TO RIVER VIEW LANE
PEDESTRIAN/BICYCLE TRAIL
TAP < 5,000 TRANS ALTERN 5K AND UNDER
1706-06-02 303 I/E PVRPLA 0.630 STH 011 DUBUQUE - SHULLSBURG $100,000 - $249,999
USH 61 TO 0.3 MI E OF STH 35
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 1706-06-21 01/25/2022 303 R/E RSRF30 1.490 STH 011 DUBUQUE - SHULLSBURG $500,000 - $749,999
V HAZEL GREEN W LIMIT TO V N LIMIT
RIGHT OF WAY RSRF30
STATE 3R NON-FEDERAL
2022 1706-06-70 04/12/2022 303 LET RSRF20 1.441 STH 011 DUBUQUE - SHULLSBURG $750,000 - $999,999
V HAZEL GREEN N LIMIT TO STH 80
CONSTRUCTIN/RSRF20
STATE 3R NON-FEDERAL
2023 1706-06-71 12/12/2023 303 LET RSRF30 1.631 STH 011 DUBUQUE - SHULLSBURG $1,000,000 - $1,999,999
V HAZEL GREEN W LIMIT TO V N LIMIT
CONSTRUCTION/RSRF30
STATE 3R NATIONAL HIGHWAY PERF FAST
5748-01-02 303 I/E PVRPLA 0.860 STH 035 DUBUQUE - DICKEYVILLE $100,000 - $249,999
ILLINOIS STATE LINE TO STH 11
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 54Southwest Region
GRANT
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5215-00-67 03/08/2022 303 LET RSRF10 6.342 STH 035 LANCASTER - BLOOMINGTON $1,000,000 - $1,999,999
MCKINLEY ST TO GRANT RIVER BRIDGE
CONST/MILL & OVERLAY/RSRF
STATE 3R HWY INFRA COVID SUPP
2024 5580-04-70 11/12/2024 303 LET RSRF30 6.090 STH 035 BLOOMINGTON - PRAIRIE DU CHIEN $3,000,000 - $3,999,999
W JUNCTION STH 133 TO USH 18
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5235-03-70 11/08/2022 303 LET RSRF20 8.730 STH 080 HAZEL GREEN - PLATTEVILLE $6,000,000 - $6,999,999
N LIMIT CUBA CITY TO BUS 151
CONSTRUCTION/RESRF20
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5235-03-71 04/12/2022 303 LET RSRF20 1.479 STH 080 HAZEL GREEN - PLATTEVILLE $750,000 - $999,999
E JCT STH 11 TO CUBA CITY S LIMIT
CONSTRUCTION/RSRF20
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5330-02-23 01/25/2022 303 R/E RSRF20 0.377 STH 080 HAZEL GREEN - PLATTEVILLE $0 - $99,999
ILLINOIS STATE LINE TO STH 11
RIGHT OF WAY RSRF20
STATE 3R NON-FEDERAL
2023 5330-02-73 12/12/2023 303 LET RSRF20 1.790 STH 080 HAZEL GREEN - PLATTEVILLE $1,000,000 - $1,999,999
ILLINOIS STATE LINE TO STH 11
CONSTRUCTION/RSRF20
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5215-02-74 11/08/2022 303 LET RSRF20 8.880 STH 081 CASSVILLE - LANCASTER $4,000,000 - $4,999,999
CTH Y TO STH 35
CONST/MILL & O'LAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 55Southwest Region
GRANT
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
5205-03-09 303 I/E PVRPLA 7.308 STH 133 TENNYSON - CASSVILLE $500,000 - $749,999
BREWERY HOLLOW RD TO N JCN CTH N
DESIGN FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
5616-02-02 303 I/E RSRF30 6.098 STH 133 BOSCOBEL - MUSCODA $100,000 - $249,999
CTH T TO SPORTSMANS DRIVE
DESIGN-FULL PS&E RSRF30
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 1650-00-77 01/10/2023 303 LET RECST 0.416 USH 061 DICKEYVILLE - LANCASTER $2,000,000 - $2,999,999
SOUTH JUNCTION STH 81
CONST/INTERSECTION IMPROVEM/RECST
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 1650-06-40 09/25/2023 303 UTL MISC 17.700 USH 061 DICKEYVILLE - LANCASTER $0 - $99,999
HICKORY LANE TO ALONA LANE
UTL OPS/1650-06-72/LOE/MISC
STATE 3R NON-FEDERAL
2023 1650-06-72 01/10/2023 303 LET MISC 17.700 USH 061 DICKEYVILLE - LANCASTER $6,000,000 - $6,999,999
HICKORY LANE TO ALONA LANE
CONST/PASSING LANES & SLOPES/MISC
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 56Southwest Region
GREEN
2022-2025 FINAL STIP Project Listing 56Southwest Region
GREEN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5208-00-73 12/13/2022 206 LET BRRPL 0.100 CTH C CTH X - CTH E $1,000,000 - $1,999,999
SUGAR RIVER BRIDGE B-23-0181
CONST OPS/RECONSTRUCT W BRRPL
STP RURAL STBG <5K POP FAST
2022 5646-00-76 04/12/2022 205 LET BRRPL 0.027 LOC STR TOWN OF ADAMS, PRAIRIE VIEW RD $250,000 - $499,999
DOUGHERTY CREEK BRIDGE, B-23-0180
CONST OPS/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2022 5970-02-20 09/25/2022 303 R/E RSRF30 10.911 STH 039 HOLLANDALE - NEW GLARUS $0 - $99,999
CTH K TO 0.16MI E OF YORK CENTER RD
RE OPD FOR 5970-02-74
STATE 3R NON-FEDERAL
2024 5970-02-74 11/12/2024 303 LET RSRF30 10.911 STH 039 HOLLANDALE - NEW GLARUS $4,000,000 - $4,999,999
CTH K TO 0.16MI E OF YORK CENTER RD
CONST/ MILL & OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 1690-04-62 11/11/2025 303 LET RSRF10 12.568 STH 069 MONROE - NEW GLARUS $5,000,000 - $5,999,999
BUSHNELL CREEK TO COW PATH LANE
CONST/ MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1690-04-73 11/11/2025 303 LET RECST 0.321 STH 069 MONROE - NEW GLARUS $4,000,000 - $4,999,999
WITTENWYLER RD &CTH C INTERSECTIONS
CONST/IMPROVE INTERSECTIONS,B-23-23
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5606-03-20 01/25/2022 303 R/E RSRF10 13.117 STH 092 MT HOREB - BROOKLYN $0 - $99,999
EAST AVENUE TO USH 14
RE OPS FOR 5606-03-70
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 57Southwest Region
GREEN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 5606-03-70 11/12/2024 303 LET RSRF10 13.117 STH 092 MT HOREB - BROOKLYN $3,000,000 - $3,999,999
EAST AVENUE TO USH 14
CONST/MILL & OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 58Southwest Region
IOWA
2022-2025 FINAL STIP Project Listing 58Southwest Region
IOWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5683-00-72 09/13/2022 205 LET BRRPL 0.072 CTH W STH 39 - STH 191 $500,000 - $749,999
DODGE BRANCH BRIDGE, B-25-0195
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
5245-04-00 303 I/E PVRPLA 1.543 STH 023 MINERAL POINT - SPRING GREEN $100,000 - $249,999
DODGE STREET TO USH 151
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
5970-03-04 303 I/E PVRPLA 12.534 STH 039 MINERAL POINT - HOLLANDALE $750,000 - $999,999
STH 23 TO HOLLANDALE V LIMIT
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5952-03-72 11/14/2023 303 LET RSRF20 3.510 STH 039 EDMUND - MINERAL POINT $1,000,000 - $1,999,999
USH 18 TO N LIMITS V LINDEN
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5952-03-73 11/14/2023 303 LET RSRF30 6.797 STH 039 EDMUND - MINERAL POINT $4,000,000 - $4,999,999
N LIMITS V LINDEN TO FAIR STREET
CONS/MILL&OVERLAY, SPOT PAINTBRDGS
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5939-00-23 04/25/2022 303 R/E RSRF10 0.177 STH 080 COBB - AVOCA $0 - $99,999
MORREY CREEK TRIBUTARY
REAL ESTATE/ RSRF10
STATE 3R NON-FEDERAL
2023 5939-00-22 10/25/2023 303 R/E RSRF20 0.660 STH 080 COBB - AVOCA $0 - $99,999
KENNEDY STREET TO PROGRESSIVE WAY
RIGHT OF WAY/ RSRF20
2022-2025 FINAL STIP Project Listing 59Southwest Region
IOWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2023 5939-00-70 11/14/2023 303 LET RSRF20 6.670 STH 080 COBB - AVOCA $2,000,000 - $2,999,999
USH 18 TO KENNEDY STREET
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5939-00-72 11/11/2025 303 LET RSRF20 1.972 STH 080 COBB - AVOCA $1,000,000 - $1,999,999
KENNEDY STREET TO 0.27 MILE N CTH I
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5770-02-20 04/25/2023 303 R/E RSRF20 4.351 STH 130 STH 23 - LONE ROCK $0 - $99,999
STH 23 TO STH 133
RIGHT OF WAY RSRF20
STATE 3R NON-FEDERAL
2025 5770-02-72 12/09/2025 303 LET RECST 0.370 STH 130 STH 23 - LONE ROCK $1,000,000 - $1,999,999
GARTHWAITE LN TO SPRING VALLEY RD
CONST/CURVE/RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1640-03-26 07/25/2022 303 R/E RSRF20 5.730 USH 014 SPRING GREEN - MADISON $0 - $99,999
OAK STREET TO WALTER ROAD
REAL ESTATE
STATE 3R NON-FEDERAL
2025 1640-00-63 11/11/2025 303 LET RSRF20 6.543 USH 014 SPRING GREEN - MADISON $2,000,000 - $2,999,999
WISCONSIN RIVER TO OAK STREET
CONST/ MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 1640-03-76 11/11/2025 303 LET RSRF20 5.740 USH 014 SPRING GREEN - MADISON $3,000,000 - $3,999,999
OAK STREET TO WALTER ROAD
2022-2025 FINAL STIP Project Listing 60Southwest Region
IOWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/ MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
1204-00-06 303 I/E MISC 0.476 USH 018 DODGEVILLE - MOUNT HOREB $100,000 - $249,999
CTH YZ INTERSECTION
DESIGN - FULL PS&E RCUTS MISC
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 4725-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY IOWA COUNTY PAVEMENT MARKING $500,000 - $749,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 61Southwest Region
JEFFERSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3335-00-30 01/25/2022 206 C/E MISC 9.550 CTH F SULLIVAN - CTH P $0 - $99,999
USH 18 TO CTH P
PE-FULL PS&E/MISC/RUMBLE/SIGN/MARK
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2024 3335-00-60 01/09/2024 206 LET MISC 9.555 CTH F SULLIVAN - CTH P $500,000 - $749,999
USH 18 TO CTH P
CONST/MISC/CLRUMBLE/SIGN/MARK
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2022 3588-00-30 01/25/2022 206 C/E MISC 5.750 CTH G LAKE MILLS - STH 19 $0 - $99,999
STH 89 TO STH 19
PE-FILL PS&E/MISC/RUMBLE/SIGN/MARK
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2024 3588-00-60 01/09/2024 206 LET MISC 5.750 CTH G LAKE MILLS - STH 19 $500,000 - $749,999
STH 89 TO STH 19
CONST/MISC/RUMBLE/SIGN/MARK
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
1067-04-00 303 I/E RECST 10.789 IH 094 MADISON - OCONOMOWOC $7,000,000 - $7,999,999
AIRPORT RD TO CTH Y/B28-36,38,44,47
DES/PE-PS&E/E&WB/B28-584,585/RECST
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1009-11-80 05/10/2022 305 LET TOI 0.003 IH 094 LAKE MILLS - OCONOMOWOC $100,000 - $249,999
CTH E STRUCTURE B-28-49
CONST/BRI REPAIR/0077-01-82/BRRHB
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2022 1067-01-62 05/10/2022 303 LET BRPVTV 0.002 IH 094 LAKE MILLS - OCONOMOWOC $100,000 - $249,999
CTH E STRUCTURE B-28-0049
CONST/BRG DECK O'LAY/PAINT/BRPVTV
2022-2025 FINAL STIP Project Listing 62Southwest Region
JEFFERSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1067-02-73 09/10/2024 303 LET BRRPL 0.128 IH 094 MADISON - LAKE MILLS $4,000,000 - $4,999,999
NEWVILLE ROAD BR; ROCK LAKE ROADBR
CONST/B28-184,-185 REPLACE/BRRPL
BACKBONE NATIONAL HIGHWAY PERFFAST
2025 1067-04-61 12/09/2025 303 LET PSRS20 1.257 IH 094 LAKE MILLS - OCONOMOWOC $1,000,000 - $1,999,999
STH 26 INTERCHANGE AREA
CONST/PAVEMENT REPAIR/GRIND
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 3993-01-41 01/25/2022 303 UTL BRRPL 0.095 LOC STR S MAIN STREET, C JEFFERSON $0 - $99,999
ROCK RIVER STRUCTURE B-28-XX
UTL OPS/LEVEL OF EFFORT
SHR BRIDGES NON-FEDERAL
2022 3993-01-81 05/10/2022 303 LET BRRPL 0.095 LOC STR S MAIN STREET, C JEFFERSON $4,000,000 - $4,999,999
ROCK RIVER STRUCTURE B-28-0192
CONST/REPLACE STRUCTURE
SHR BRIDGES HWY INFRA COVID SUPP
2023 3638-00-75 08/25/2023 290 LLC MISC 0.000 NON HWY C LAKE MILLS, SIDEWALK IMPROVEMENTS $500,000 - $749,999
VARIOUS CITY LOCATIONS
CONST OPS/SIDEWALK CURB RAMPS
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
2024 1370-00-74 02/13/2024 303 LET RSRF10 1.930 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999
ROCK RIVER ROAD TO ECL
CONST/ MILL AND OVERLAY
2022-2025 FINAL STIP Project Listing 63Southwest Region
JEFFERSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1370-00-73 01/14/2025 303 LET PVRPLA 7.890 STH 016 WATERTOWN- WAUKESHA $8,000,000 - $8,999,999
E MAIN ST TO ROCK RIVER ROAD
CONST/PAVE REPL,REPAIR B-28-12,-22
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1370-00-76 01/14/2025 303 LET RECST 0.222 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999
MAIN ST/OAK HILL RD INTERSECTION
CONST/INTERSECTION IMPROVEMENT/RAB
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
3050-01-08 303 I/E PVRPLA 0.722 STH 019 C WATERTOWN, MAIN STREET $250,000 - $499,999
CHURCH STREET TO MARKET STREET
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 3050-04-21 10/25/2022 303 R/E BRRPL 0.060 STH 019 C WATERTOWN, MAIN STREET $0 - $99,999
ROCK RIVER STRUCTURE B-28-0906
RE OPS
STATE 3R NON-FEDERAL
2025 3050-04-81 09/09/2025 303 LET BRRPL 0.060 STH 019 C WATERTOWN, MAIN STREET $3,000,000 - $3,999,999
ROCK RIVER STRUCTURE B-28-193
CONST/REPLACE STRUCTURE
SHR BRIDGES STBG 5-200K POP FASTG
2022 3110-00-25 04/25/2022 303 R/E PVRPLA 0.680 STH 059 WHITEWATER - NORTH PRAIRIE $0 - $99,999
STH 106 TO EAST COUNTY LINE
RIGHT OF WAY PVRPLA
STATE 3R NON-FEDERAL
2025 3110-00-75 12/09/2025 303 LET PVRPLA 2.510 STH 059 WHITEWATER - NORTH PRAIRIE $2,000,000 - $2,999,999
STH 106 TO EAST COUNTY LINE
CONST/ PAVE REPLACE
2022-2025 FINAL STIP Project Listing 64Southwest Region
JEFFERSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R SURFACE TRANS BLOCK-FLEX E
3290-00-05 303 I/E PVRPLA 0.880 STH 089 LAKE MILLS - COLUMBUS $100,000 - $249,999
WATERLOO EAST LIMIT TO B-28-77
DESIGN-FULL PS&E/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
3300-00-03 303 I/E RSRF25 5.030 STH 089 FT ATKINSON - LAKE MILLS $100,000 - $249,999
USH 18 TO CTH A
DESIGN-FULL PS&E/ RSRF25
STATE 3R RAIL HWY CROSS HAZARD ELM
2024 3601-00-74 12/10/2024 303 LET RSRF20 2.660 STH 089 FT ATKINSON - LAKE MILLS $2,000,000 - $2,999,999
E BLACKHAWK DR TO USH 18
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 3576-01-25 01/25/2022 303 R/E PSRS40 0.340 STH 106 FT ATKINSON - PALMYRA $0 - $99,999
FIRST STREET TO STH 59
RE OPS/RIGHT OF WAY
STATE 3R NON-FEDERAL
2025 3576-01-64 11/11/2025 303 LET RSRF10 9.745 STH 106 FT ATKINSON - PALMYRA $2,000,000 - $2,999,999
0.01 MI E OF EDGEWATER RD TO CTH CI
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 3576-01-72 11/11/2025 303 LET PVRPLA 0.850 STH 106 C FORT ATKINSON, RIVERSIDE DRIVE $3,000,000 - $3,999,999
PARK DRIVE TO ROBERT STREET
CONST/ PAVEMENT REPLACEMENT
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 3576-01-73 11/11/2025 303 LET PVRPLA 0.850 STH 106 C FORT ATKINSON, RIVERSIDE DR $1,000,000 - $1,999,999
PARK DRIVE TO ROBERT STREET
CONS/ SANITARY SEWER AND WATER MAIN
2022-2025 FINAL STIP Project Listing 65Southwest Region
JEFFERSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2025 3576-01-75 01/14/2025 303 LET PSRS40 0.340 STH 106 FT ATKINSON - PALMYRA $100,000 - $249,999
FIRST STREET TO STH 59
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
3575-09-03 303 I/E PVRPLA 0.214 USH 012 C FORT ATKINSON, S THIRD STREET $100,000 - $249,999
JANESVILLE AVENUE TO MAIN STREET
DESIGN-FULL PS&E PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 3575-04-81 04/12/2022 303 LET BRRHB 0.181 USH 012 C FT ATKINSON, ROBERT STREET $2,000,000 - $2,999,999
ROCK RIVER BRIDGE B-28-0009
CONSTRUCTION/ DECK REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2023 3575-02-73 02/14/2023 303 LET RSRF20 1.560 USH 012 C FORT ATKINSON, WHITEWATER AVENUE $1,000,000 - $1,999,999
MADISON AVENUE TO CTH M
CONST OPS/MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 66Southwest Region
JUNEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1016-05-03 303 I/E PVRPLA 4.870 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999
STH 58 TO SEVEN MILE CREEK
DES/PRE-CON ENG/PAVT REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
1016-05-37 303 I/E BRRHB 0.018 IH 090 MAUSTON - LYNDON STATION $0 - $99,999
19TH AVENUE BRDGS B-29-27 & B-29-28
DES/PE-PS&E/DECK O'LAYS/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
1016-08-08 303 I/E PVRPLA 2.400 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999
24TH AVENUE TO USH 12
DES/PRE-CON ENG/PAVT REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1016-01-61 11/08/2022 303 LET PSRS30 17.141 IH 090 TOMAH - PORTAGE $8,000,000 - $8,999,999
CAMP DOUGLAS TO SEVEN MILE CREEK
CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1016-01-62 11/08/2022 303 LET PSRS30 0.000 IH 090 TOMAH - PORTAGE $7,000,000 - $7,999,999
24TH AVENUE TO MIRROR LAKE BRIDGE
CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1016-01-94 01/25/2022 303 MIS MISC 0.016 IH 090 JUNEAU COUNTY STRUCTURE REPAIR $100,000 - $249,999
B-29-18,19,44,45
SERVICE PATROL/1016-01-64/MIS
BACKBONE NON-FEDERAL
2022 1016-05-81 06/25/2022 303 MIS MISC 2.256 IH 090 TOMAH - MAUSTON $0 - $99,999
STH 82 INTERCHANGE
INCIDENTAL ITS ITEMS FOR 1016-05-70
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 67Southwest Region
JUNEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1016-05-90 01/25/2022 303 MIS MISC 2.239 IH 090 TOMAH - MAUSTON $250,000 - $499,999
STH 82 INTERCHNG/B29-36,152-155,157
SERVICE PATROL/1016-05-70/MIS
BACKBONE NON-FEDERAL
2024 1016-04-63 12/10/2024 303 LET BRRHB 0.012 IH 090 TOMAH - MAUSTON $500,000 - $749,999
CTH M BRIDGES B-29-48 & B-29-49
CONST/CONCRETE OVERLAY/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1016-05-65 12/10/2024 303 LET BRRHB 0.017 IH 090 TOMAH - MAUSTON $750,000 - $999,999
43RD ST W BRIDGES B-29-41 & B-29-42
CONST/BRIDGE O'LAYS/NEW JOINT/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1016-05-67 11/11/2025 303 LET BRRHB 0.013 IH 090 MAUSTON - LYNDON STATION $500,000 - $749,999
19TH AVENUE BRDGS B-29-27 & B-29-28
CONST/CONCRETE DECK O'LAYS/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 6160-00-50 10/25/2024 303 R/R RSRF30 3.308 STH 021 NECEDAH - COLOMA $100,000 - $249,999
SHERIDAN STREET TO EAST COUNTY LINE
RR/UPGRADE CROSSING 392668W/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6160-00-51 10/25/2024 303 R/R RSRF30 3.308 STH 021 NECEDAH - COLOMA $250,000 - $499,999
CANADIAN NAT'L ASSOC. XING 392668W
RR/SIGNAL REPLACE/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6160-00-70 12/10/2024 303 LET RSRF30 3.320 STH 021 NECEDAH - COLOMA $5,000,000 - $5,999,999
SHERIDAN STREET TO EAST COUNTY LINE
CONST/MILL & O'LAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 68Southwest Region
JUNEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5032-00-20 08/25/2023 303 R/E RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $0 - $99,999
BARABOO RIVER TO V WONEWOC S LIMIT
RE OPS/ 5032-00-70/ RSRF
STATE 3R NON-FEDERAL
2025 5032-00-70 11/11/2025 303 LET RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $2,000,000 - $2,999,999
BARABOO RIVER TO V WONEWOC S LIMIT
CONST/MILL & O'LAY/B-29-XXX/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5032-00-72 11/11/2025 303 LET RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $100,000 - $249,999
BARABOO RIVER TO V WONEWOC S LIMIT
CONST/SANITARY SEWER & WATER/ RSRF
STATE 3R NON-FEDERAL
2022 5020-01-60 04/12/2022 303 LET RSRF10 14.266 STH 058 LAVALLE - MAUSTON $3,000,000 - $3,999,999
STH 33 TO 0.05 MI N SARA LANE
CONST/MILL & OVERLAY/RSRF
STATE 3R HWY INFRA COVID SUPP
5010-04-02 303 I/E PVRPLA 3.642 STH 080 HILLSBORO - NEW LISBON $250,000 - $499,999
STH 33 TO BARABOO RIVER B-29-108
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 1620-02-78 11/08/2022 303 LET RSRF30 15.993 STH 080 NECEDAH - BABCOCK $9,000,000 - $9,999,999
STH 21 TO COUNTY LINE ROAD
CONST/REPLACE B-29-XXX/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1620-05-70 02/14/2023 303 LET MISC 0.570 STH 080 NEW LISBON - NECEDAH $500,000 - $749,999
25TH ST W TO 400' N OF KINGSBURY DR
CONST/ADD TURN LANES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022-2025 FINAL STIP Project Listing 69Southwest Region
JUNEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
5880-01-02 303 I/E PVRPLA 1.135 USH 012 MAUSTON - WISCONSIN DELLS $100,000 - $249,999
CTH J TO SAUK COUNTY LINE
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5880-00-66 04/12/2022 303 LET RSRF10 7.858 USH 012 TOMAH - MAUSTON $2,000,000 - $2,999,999
MONROE COUNTY LINE TO A STREET
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5880-00-67 11/11/2025 303 LET RSRF10 5.626 USH 012 MAUSTON - WISCONSIN DELLS $2,000,000 - $2,999,999
MEADOW LANE TO 0.07 MI E OF CTH J
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 70Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7049-00-70 04/12/2022 205 LET BRRPL 0.105 CTH D T OF ONALASKA - T OF FARMINGTON $750,000 - $999,999
HALFWAY CREEK BRIDGE, B-32-0240
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E
2023 7323-00-71 12/12/2023 205 LET BRRPL 0.000 CTH M STH 16 - CTH S $3,000,000 - $3,999,999
LA CROSSE RIVER BRIDGE, B-32-0245
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG 5-200K POP FASTG
2022 7076-01-02 06/25/2022 206 C/E RECST 0.149 CTH U BANGOR -ROCKLAND $0 - $99,999
CURVE 0.3 MI W OF ROCKLAND V LIMIT
DESIGN - FULL PS&E CURVE RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 7076-01-72 05/13/2025 206 LET RECST 0.152 CTH U BANGOR -ROCKLAND $1,000,000 - $1,999,999
CURVE 0.3 MI W OF ROCKLAND V LIMIT
CONST/CURVE RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1070-04-03 303 I/E RECST 0.605 IH 090 LA CROSSE - SPARTA $750,000 - $999,999
STH 157 INTERCHANGE
DES/PE-PS&E/INTERCHANGE/RECST
BACKBONE NATIONAL HIGHWAY PERF FAST
1071-01-02 303 I/E RSRF20 7.267 IH 090 LA CROSSE - WEST SALEM $500,000 - $749,999
THEATER ROAD TO CTH C
DESIGN - FULL PS&E RSRF20
BACKBONE NATIONAL HIGHWAY PERF FAST
1071-07-06 303 I/E PVRPLA 6.620 IH 090 LACROSSE-SPARTA $1,000,000 - $1,999,999
STH 16-CTH C/B-32-0023 TO B-32-0028
DES/PE-PS&E/BRIDGE REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 71Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1071-08-04 303 I/E RECST 1.860 IH 090 LA CROSSE - SPARTA $1,000,000 - $1,999,999
STH 16 INTERCHANGE/B-32-0053,-0054
DES/PE-PS&E/INTERCH IMPROVE/RECST
BACKBONE NATIONAL HIGHWAY PERFFAST
1074-00-31 303 I/E BRRHB 0.066 IH 090 WEST SALEM - SPARTA $100,000 - $249,999
CTH C BR; FISH CR EB BR; STH 27S BR
DES/PE-PS&E/B32-57,63/B41-123/BRRHB
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1070-04-64 11/14/2023 303 LET BRRHB 0.212 IH 090 LA CROSSE - SPARTA $3,000,000 - $3,999,999
BLACK RVR, ROUND LK, BAINBRIDGE BRG
CONST/B-32-34,35,46,47,73/BRRHB
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 5991-02-62 02/14/2023 206 LET RECST 0.047 LOC STR C ONALASKA, EAST AVENUE N $250,000 - $499,999
RIDERS CLUB ROAD INTERSECTION
CONST/MINI-RAB/RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 5991-05-52 06/25/2023 207 R/R MISC 0.011 LOC STR T OF SHELBY, LOSEY BOULEVARD $250,000 - $499,999
BNSF RR XING 079827S
RR OP/REPL SIGNAL,BNGLW,CIRC'T/MISC
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2023 5991-05-53 06/25/2023 207 R/R MISC 0.004 LOC STR C LA CROSSE, SIMS PLACE $250,000 - $499,999
BNSF RR XING 917431D
RR OPS/REPL SIGNALS; ADD GATES/MISC
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2022 5991-08-73 10/25/2022 290 LLC MISC 0.000 NONHWY
LA CROSSE CO, MULTI-USE TRAIL $500,000 - $749,999
2022-2025 FINAL STIP Project Listing 72Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
S KINNEY COULEE RD TO LANDFILL RD
PEDESTRIAN/BICYCLE TRAIL
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
2022 5991-08-74 10/25/2022 290 LLC MISC 0.000 NONHWY
LA CROSSE RIVER BICYCLE/PED BRIDGE $500,000 - $749,999
CTH VP IN VETERAN'S PARK
PEDESTRIAN/BICYCLE BRIDGE
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
7575-01-05 303 I/E BRRPLE 1.410 STH 016 LACROSSE - SPARTA $2,000,000 - $2,999,999
CMSTPP RR STRUCTURE B-32-111
DES/PE-PS&E/STRUCTURE RECONS/BRRPLE
SHR LARGE BRIDGES NON-FEDERAL
2022 7575-01-26 10/25/2022 303 R/E RSRF15 2.890 STH 016 LA CROSSE - SPARTA $0 - $99,999
LOSEY BLV TO SOUTH KINNEY COULEE RD
RE OPS/ 7575-01-76/ RSRF
STATE 3R NON-FEDERAL
2022 7575-07-70 04/12/2022 303 LET MISC 0.083 STH 016 C LA CROSSE, INTERSECTION IMPRVMNTS $500,000 - $749,999
LA CROSSE ST/STH 35/WEST AVE INTER
CONS/LEFT TURNLANES/MONOTUBES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 7575-07-73 04/12/2022 303 LET RECST 0.887 STH 016 C LA CROSSE, LA CROSSE STREET $4,000,000 - $4,999,999
OAKLAND ST TO LOSEY BLVD
CONST/PATCH AND OVERLAY/RECST
STATE 3R HIGHWAY SAFETY IMP PROG-FA
2022 7575-07-83 04/12/2022 303 LET RECST 0.000 STH 016 C LA CROSSE, LA CROSSE STREET $1,000,000 - $1,999,999
OAKLAND ST TO LOSEY BLVD
CONST/SANITARY SEWER & WATER/RECST
2022-2025 FINAL STIP Project Listing 73Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2024 7570-05-70 01/09/2024 303 LET MISC 0.103 STH 016 LA CROSSE - SPARTA $500,000 - $749,999
CTH M INTERSECTION
CONST/MONOTUBES & LFT TURN LNS/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2024 7575-01-65 12/10/2024 303 LET BRRHB 0.130 STH 016 LA CROSSE - SPARTA $2,000,000 - $2,999,999
MEDARY OVERPASS B-32-111
CONST/CONC O'LAY/PAINT/REPAIR/BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2024 7575-01-76 11/12/2024 303 LET RSRF15 2.890 STH 016 LA CROSSE - SPARTA $4,000,000 - $4,999,999
LOSEY BLV TO SOUTH KINNEY COULEE RD
CONST/MILL & O'LAY/B-32-100/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 7575-01-80 12/09/2025 303 LET BRRPLE 1.410 STH 016 LACROSSE - SPARTA $25,000,000 - $29,999,999
GILLETTE STREET TO STH 157
CONST/REPLACE B-32-244/BRRPL EXPANS
SHR LARGE BRIDGES NATIONAL HIGHWAY PERF FAST
5120-02-02 303 I/E MISC 0.105 STH 033 C LA CROSSE, STATE ROAD $100,000 - $249,999
LOSEY BOULEVARD INTERSECTION
DESIGN - FULL PS&E/MISC
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 5120-02-72 12/09/2025 303 LET MISC 0.105 STH 033 C LA CROSSE, STATE ROAD $1,000,000 - $1,999,999
LOSEY BOULEVARD INTERSECTION
CONST/LT TURN/MONOTUBES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 5163-07-42 01/25/2022 303 UTL RECST 2.550 STH 035 GENOA - LACROSSE $0 - $99,999
LACROSSE CO LINE TO GARNER PLACE
UTL/COON VALLEY FARMER TEL CO/RECST
2022-2025 FINAL STIP Project Listing 74Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2024 5163-07-52 11/25/2024 303 R/R RECST 1.561 STH 035 GENOA - LACROSSE $0 - $99,999
LACROSSE CO LINE TO SUNNYSIDE DR
RR OPS/5163-07-72/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 5163-07-53 11/25/2024 303 R/R RECST 1.561 STH 035 GENOA - LACROSSE $0 - $99,999
LACROSSE CO LINE TO SUNNYSIDE DR
RR OPS/5163-07-72/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 5163-07-72 11/12/2024 303 LET RECST 1.561 STH 035 GENOA - LACROSSE $5,000,000 - $5,999,999
LACROSSE CO LINE TO SUNNYSIDE DR
CONST/DECK RPL B-32-163/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 7140-00-82 09/09/2025 303 LET BRRPL 0.380 STH 035 LACROSSE - TREMPEALEAU $9,000,000 - $9,999,999
BLACK RVR BRDGS B-32-XXX & B-32-XXX
CONST/BRIDGE REPLACEMENTS/BRRPL
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
2022 5820-01-28 04/25/2022 303 R/E RSRF20 5.731 STH 162 COON VALLEY - BANGOR $0 - $99,999
USH 14 TO STH 33
RE OPS/ 5820-01-68/RSRF
STATE 3R NON-FEDERAL
2023 5820-00-60 11/14/2023 303 LET BRRHB 0.055 STH 162 COON VALLEY - BANGOR $750,000 - $999,999
DUTCH CREEK BRIDGE B-32-15
CONST/CONCRETE OVERLAY/BRRHB
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
2022-2025 FINAL STIP Project Listing 75Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1641-02-42 01/25/2022 303 UTL RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $0 - $99,999
GREEN BAY STREET TO WARD AVENUE
UTL/XCEL ENERGY ELEC UTL 101/RECST
STATE 3R NON-FEDERAL
2022 1641-02-53 01/25/2022 303 R/R RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999
GREEN BAY STREET TO WARD AVENUE
RR/SURFACE/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1641-02-54 01/25/2022 303 R/R RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999
GREEN BAY STREET TO WARD AVENUE
RR/SIGNAL UPGRADES/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3700-10-79 01/11/2022 305 LET TOSIG 0.000 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999
GREEN BAY ST AND SOUTH AVE
TRF/SIGNAL REHAB/TOSIG
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 1640-01-75 09/10/2024 303 LET RSRF20 0.630 USH 014 LA CROSSE - WESTBY $500,000 - $749,999
MARION ROAD TO GARNER PLACE
CONST/MILL & O'LAY/B-32-82/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 5200-03-63 02/13/2024 303 LET BRRHB 0.210 USH 014 C LACROSSE, CAMERON AVE & CASS ST $2,000,000 - $2,999,999
MISSISSIPPI RVR B-32-202 & B-32-300
CONST/REPAIRS & SPOT PAINT/BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
1630-03-00 303 I/E BRRHB 1.730 USH 053 LA CROSSE - GALESVILLE $100,000 - $249,999
2022-2025 FINAL STIP Project Listing 76Southwest Region
LA CROSSE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
B-32-131, 132, 135, 136, 139, 140
DESIGN - FULL PS&E BRRHB
STATE 3R NATIONAL HIGHWAY PERFFAST
1630-03-03 303 I/E RSRF30 3.384 USH 053 LA CROSSE - GALESVILLE $250,000 - $499,999
OLD HWY 93 TO BLACK RIVER
DESIGN-FULL PS&E RSRF30
STATE 3R NATIONAL HIGHWAY PERFFAST
1630-03-04 303 I/E PVRPLA 4.718 USH 053 LA CROSSE - GALESVILLE $500,000 - $749,999
STH 157 TO HOLMEN DRIVE
DESIGN-FULL PS&E PVRPLA
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 1630-03-80 01/09/2024 303 LET BRRHB 1.730 USH 053 LA CROSSE - GALESVILLE $500,000 - $749,999
B-32-131, 132, 135, 136, 139, 140
CONSTRUCTION/BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2022 3700-10-89 01/25/2022 305 MIS TOSIG 0.000 VARHWY
CITY OF LACROSSE $250,000 - $499,999
VARIOUS HWYS/INTERSECTIONS
TRF/SIGNAL RETROFIT CABINET REPLACE
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022-2025 FINAL STIP Project Listing 77Southwest Region
LAFAYETTE
2022-2025 FINAL STIP Project Listing 77Southwest Region
LAFAYETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5720-00-74 12/13/2022 205 LET BRRPL 0.000 CTH C CTH G - CTH O $500,000 - $749,999
BONNER BRANCH BRIDGE, B-33-0140
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2022 5307-00-73 12/13/2022 205 LET BRRPL 0.000 CTH O STH 11 - STH 81 $250,000 - $499,999
AMES BRANCH BRIDGE, B-33-0139
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1706-00-08 303 I/E RSRF25 1.109 STH 011 DUBUQUE - SHULLSBURG $100,000 - $249,999
WHITE STREET TO E LIMIT BENTON
DESIGN-FULL PS&E RSRF25
STATE 3R NATIONAL HIGHWAY PERF FAST
1706-01-09 303 I/E MISC 55.410 STH 011 DUBUQUE - MONROE $250,000 - $499,999
USH 61 TO STH 81 NORTH
CORRIDOR PRESERVATION & ACCESS
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1706-02-64 03/08/2022 303 LET RSRF10 10.517 STH 011 SHULLSBURG - MONROE $2,000,000 - $2,999,999
SHULLSBURG BRANCH BRDG TO WOLF CRK
CONST/ MILL AND OVERLAY
STATE 3R HWY INFRA COVID SUPP
2024 1706-03-80 12/10/2024 303 LET BRRPL 0.064 STH 011 SHULLSBURG - MONROE $1,000,000 - $1,999,999
SHULLSBURG BRANCH BRIDGES
CONST/ REPLACEMENTS B-33-XXX, -XXX
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2025 1706-03-72 11/11/2025 303 LET RECST 0.314 STH 011 SHULLSBURG - MONROE $3,000,000 - $3,999,999
STH 23 INTERSECTION
CONST/ IMPROVE INTERSECTION
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 78Southwest Region
LAFAYETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
5245-00-06 303 I/E PVRPLA 5.819 STH 023 STH 11 - MINERAL POINT $250,000 - $499,999
STH 11 TO COUNTY SHOP ROAD
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
5260-00-03 303 I/E RSRF25 5.750 STH 078 WARREN - ARGYLE $250,000 - $499,999
ILLINOIS STATE LINE TO STH 11
DESIGN-FULL PS&E RSRF25
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5590-00-72 08/09/2022 303 LET PVRPLA 6.450 STH 078 WARREN - ARGYLE $2,000,000 - $2,999,999
STH 11 TO CTH D
CONST/ PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5590-05-21 10/25/2022 303 R/E RSRF20 0.940 STH 078 ARGYLE - MT HOREB $0 - $99,999
LIEN COURT TO CENTER STREET
DESIGN-RIGHT OF WAY RSRF20
STATE 3R NON-FEDERAL
2022 5944-04-24 01/25/2022 303 R/E RSRF30 0.892 STH 081 DARLINGTON - ARGYLE $0 - $99,999
STH 23 TO WILDCAT ROAD
REAL ESTATE
STATE 3R NON-FEDERAL
2025 5944-04-74 12/09/2025 303 LET RSRF30 0.650 STH 081 DARLINGTON - ARGYLE $1,000,000 - $1,999,999
STH 23 TO WILDCAT ROAD
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5967-01-70 03/08/2022 303 LET RSRF30 4.650 STH 126 STH 81 - BELMONT $1,000,000 - $1,999,999
STH 81 TO CTH G
CONSTRUCTION/RSRF30
STATE 3R HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 79Southwest Region
MONROE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7373-00-70 04/12/2022 206 LET RECST 1.790 CTH ET T OF TOMAH - T OF LA GRANGE $3,000,000 - $3,999,999
C OF TOMAH TO FLARE AVENUE
CONST OPS/RECONSTRUCT
STP RURAL STBG <5K POP - FAST EXT
2022 7373-00-71 12/13/2022 206 LET RECST 0.260 CTH ET T OF TOMAH - T OF LA GRANGE $500,000 - $749,999
FLARE AVENUE TO STH 21
CONST OPS/RECONSTRUCT
STP RURAL STBG <5K POP - FAST EXT
2022 7117-00-71 03/08/2022 206 LET RECST 0.147 CTH PP VILLAGE OF OAKDALE, CTH PP $750,000 - $999,999
IH 90/94 TO US 12/16
CONST OPS/RECONSTRUCT
STP RURAL STBG <5K POP - FAST EXT
2023 7117-00-72 01/10/2023 205 LET BRRPL 0.000 CTH PP VILLAGE OAKDALE - STH 21 $500,000 - $749,999
E FORK LEMONWEIR RV BR B-41-0320
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2023 5017-00-70 01/10/2023 205 LET BRRPL 0.034 CTH U V OF NORWALK - T OF RIDGEVILLE $750,000 - $999,999
MORRIS CREEK BRIDGE B-41-0319
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP - FAST EXT
1077-02-02 303 I/E PVRPLA 10.340 IH 090 SPARTA - TOMAH $4,000,000 - $4,999,999
STH 16 TO CTH M
DES/PE-PS&E/PAV'T REPLACE/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
1077-03-31 303 I/E PSRS10 4.271 IH 090 SPARTA - TOMAH $0 - $99,999
0.65 MI W OF CTH M TO USH 12
DES/PE-PS&E/PAVT REPAIR/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 80Southwest Region
MONROE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1017-01-71 11/08/2022 303 LET RSRF30 15.742 IH 090 TOMAH - CAMP DOUGLAS, EB $17,000,000 - $19,999,999
USH 12 TO CTH C/PREP/B41-45,-46,-50
CONST/SHLDRS FOR 1017-01-73/RSRF
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1017-01-73 11/14/2023 303 LET RSRF30 15.773 IH 090 TOMAH - CAMP DOUGLAS, EB $14,000,000 - $14,999,999
USH 12 TO CTH C
CONST/MILL & OVERLAY EB RDWY/RSRF
BACKBONE NATIONAL HIGHWAY PERF FAST
5634-00-31 303 I/E PSRS10 0.548 STH 016 SWR,MONROE COUNTY CURVES HFST $0 - $99,999
STH 16, STH 131
DESIGN - FULL PS&E PSRS10
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5634-00-61 11/12/2024 303 LET PSRS10 0.547 STH 016 SWR,MONROE COUNTY CURVES HFST $250,000 - $499,999
STH 16, STH 131
CONST/HFST/PSRS10
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 7570-05-65 01/09/2024 303 LET PSRS10 0.475 STH 016 LA CROSSE - SPARTA $100,000 - $249,999
E JCT HAMLET AVE TO ALPINE RD
CONST/CONVERT TO A TWLTL/PSRS
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 7010-01-63 04/12/2022 303 LET RSRF10 8.231 STH 021 TOMAH - NECEDAH $3,000,000 - $3,999,999
0.15M E EATON AVE TO JUNEAU CO LINE
CONST/MILL & OVERLAY/RSRF
STATE 3R HWY INFRA COVID SUPP
2023 7605-06-62 11/14/2023 303 LET PSRS40 15.700 STH 021 SPARTA - TOMAH $6,000,000 - $6,999,999
C SPARTA E LIMIT TO EMERSON ROAD
CONST/MILL & OVERLAY/PSRS
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 81Southwest Region
MONROE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7062-02-73 02/14/2023 303 LET MISC 15.557 STH 027 SPARTA - BLACK RIVER FALLS $1,000,000 - $1,999,999
SPARTA N CITY LIMITS TO N COUNTY LN
CONS/WIDE PVD SHLDR/RMBLE STRP/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 5510-00-20 01/25/2022 303 R/E RSRF30 11.343 STH 071 SPARTA - ELROY $0 - $99,999
CTH U TO CTH V
RE/RSRF/CONST 5510-00-70
STATE 3R NON-FEDERAL
2023 5510-00-63 02/14/2023 303 LET MISC 11.740 STH 071 SPARTA - WILTON $0 - $99,999
HARMONY AVENUE TO NORTH STREET
CONST/SHOULDER RUMBLE STRIPS/MISC
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 5545-00-20 07/25/2023 303 R/E RSRF30 9.730 STH 071 WILTON - ELROY $0 - $99,999
CTH V TO STH 80
RE OPS/5545-00-70/RSRF
STATE 3R NON-FEDERAL
2024 5510-00-70 11/12/2024 303 LET RSRF30 11.343 STH 071 SPARTA - ELROY $8,000,000 - $8,999,999
CTH U TO CTH V/B-41-25,-161,-159
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
5130-05-05 303 I/E PVRPLA 4.050 STH 131 ONTARIO - TOMAH $250,000 - $499,999
CTH A TO HIAWATHA AVE
DESIGN-FULL PS&E PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5130-05-63 02/14/2023 303 LET RSRF10 4.690 STH 131 ONTARIO - TOMAH $2,000,000 - $2,999,999
STH 71 TO CTH A/B-41-21,-136,-137
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 82Southwest Region
MONROE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5880-00-25 01/25/2022 303 R/E RSRF30 8.110 USH 012 TOMAH - MAUSTON $0 - $99,999
GRANT AVENUE TO E COUNTY LINE
RE/RSRF/CONST 5880-00-75
STATE 3R NON-FEDERAL
2022 7998-00-77 12/13/2022 303 LET PVRPLA 0.157 USH 012 TOMAH - MAUSTON $2,000,000 - $2,999,999
VETERANS STREET INTERSECTION AREA
CONST/PAV'T REPLACE/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 7998-00-78 12/13/2022 303 LET PVRPLA 0.157 USH 012 TOMAH - MAUSTON $250,000 - $499,999
VETERANS STREET INTERSECTION AREA
CONST/WATER MAIN & SSN SEWER/PVRPLA
STATE 3R NON-FEDERAL
2024 7189-03-72 02/13/2024 303 LET MISC 0.205 USH 012 BLACK RIVER FALLS - TOMAH $1,000,000 - $1,999,999
WITTIG ROAD INTERSECTION
CONST/LEFT TURN LNS/MONOTUBES/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 5880-00-75 02/11/2025 303 LET RSRF30 8.110 USH 012 TOMAH - MAUSTON $5,000,000 - $5,999,999
GRANT AVENUE TO E COUNTY LINE
CONST/RESURFACE/B-41-147/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 83Southwest Region
RICHLAND
2022-2025 FINAL STIP Project Listing 83Southwest Region
RICHLAND
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5455-00-70 04/12/2022 205 LET BRRPL 0.029 CTH H STH 56 - CTH I $500,000 - $749,999
GAULT HOLLOW CREEK BRIDGE,B-52-0280
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2023 5419-06-70 01/10/2023 206 LET RECST 2.874 CTH O STH 80 - RICHLAND CENTER $4,000,000 - $4,999,999
CTH 00 TO CARDINAL CREST ROAD
CONST OPS/RECONSTRUCTION
STP RURAL STBG <5K POP FAST
2022 5750-06-20 07/25/2022 303 R/E RSRF30 13.766 STH 058 USH 14 - LAVALLE $0 - $99,999
0.7MI N OF CTH N TO LEE LAKE BRIDGE
RE OPS/5750-06-70/RSRF
SHR BRIDGES NON-FEDERAL
2024 5750-06-70 11/12/2024 303 LET RSRF30 13.766 STH 058 USH 14 - LAVALLE $6,000,000 - $6,999,999
0.7MI N OF CTH N TO LEE LAKE BRIDGE
CONST/MILL & O'LAY/B-52-60/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5190-07-60 11/12/2024 303 LET PVRPLA 2.290 STH 060 BOSCOBEL - GOTHAM $5,000,000 - $5,999,999
SLEEPY HOLLOW ROAD TO PUBLIC RDSIDE
CONST/MILL & O'LAY/B-52-143/PVRPLA
STATE 3R NON-FEDERAL
2024 5190-07-71 11/12/2024 303 LET PVRPLA 3.510 STH 060 STH 80 - SLEEPY HOLLOW ROAD $3,000,000 - $3,999,999
STH 80 EAST TO SLEEPY HOLLOW RD
CONST/MILL & O'LAY/B-52-233/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5190-07-72 11/12/2024 303 LET RECST 2.480 STH 060 BOSCOBEL - GOTHAM $4,000,000 - $4,999,999
PUBLIC ROADSIDE TO USH 14
CONST/GRADE-BASE-SURFACE/RECST
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 84Southwest Region
RICHLAND
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 5770-01-71 08/13/2024 303 LET BRRPL 0.700 STH 130 STH 23 - LONE ROCK $30,000,000 - $34,999,999
WISCONSIN RIVER/B-25-192,B-52-279
CONST/ROADWAY/BRRPL
SHR LARGE BRIDGES SURFACE TRANSP BLOCK GRTS-
2025 5770-02-71 11/11/2025 303 LET RSRF20 1.434 STH 130 LONE ROCK - STH 154 $1,000,000 - $1,999,999
WISCONSIN RIVER TO USH 14
CONST/MILL & O'LAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5070-01-72 01/10/2023 303 LET PVRPLA 3.530 STH 154 STH 58 - ROCK SPRINGS $1,000,000 - $1,999,999
STH 58 TO EAST COUNTY LINE
CONST/PAV'T REPLACE/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5555-02-63 04/12/2022 303 LET RSRF10 1.380 STH 193 STH 60 - STH 80 $500,000 - $749,999
STH 60 TO STH 80
CONSTMILL & OVERLAY/RSRF
STATE 3R HWY INFRA COVID SUPP
2024 1640-03-73 11/12/2024 303 LET RSRF15 1.575 USH 014 RICHLAND CENTER - SPRING GREEN $4,000,000 - $4,999,999
BOHMANN DRIVE TO CTH O
CONST/MILL & OVERLAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1640-07-60 09/10/2024 303 LET RSRF10 10.400 USH 014 READSTOWN - RICHLAND CENTER $4,000,000 - $4,999,999
VERNON CO LINE TO KALISH LANE
CON/MILL&O'LAY/B52-139,823,XXX/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1640-03-75 11/11/2025 303 LET RSRF30 11.540 USH 014 RICHLAND CENTER - SPRING GREEN $7,000,000 - $7,999,999
0.1 MI E STH 58 TO SAUK CO LINE
CONST/MILL & OVERLAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 85Southwest Region
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5334-00-70 12/13/2022 205 LET BRRPL 0.070 CTH E CITY OF JANESVILLE - US 14 $750,000 - $999,999
MARSH CREEK BRIDGE, B-53-0385
CONST OPS/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022 1001-10-82 04/12/2022 302 LET MISC 52.601 IH 039 ILLINOIS STATE LINE - MADISON $1,000,000 - $1,999,999
PAVEMENT MARKINGS CORRIDOR WIDE
CONSTRUCTION/ MISC
MAJORS NATIONAL HIGHWAY PERF FAST
2022 1001-10-91 03/25/2022 302 MIS MISC 0.000 IH 039 ILLINOIS STATE LINE - MADISON $3,000,000 - $3,999,999
ILLINOIS STATE LINE - MADISON
INCIDENT MANAGEMENT
MAJORS NON-FEDERAL
2022 1001-10-94 01/25/2022 302 MIS MISC 46.080 IH 039 ILLINOIS STATE LINE - MADISON $0 - $99,999
ILLINOIS STATE LINE - MADISON
ITS INCIDENTAL PO ITEMS TOMTOM
MAJORS NON-FEDERAL
2024 1093-01-81 11/12/2024 303 LET RSRF30 5.870 IH 043 BELOIT - ELKHORN $15,000,000 - $16,999,999
CTH X TO STH 140; B-53-111 & 113
CONSTRUCTION/RSRF30
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 5989-00-24 08/08/2023 206 LET RCND20 0.420 LOC STR C OF BELOIT, HENRY AVE/SHOPIERE RD $500,000 - $749,999
ROYCE AVENUE TO PRAIRIE AVENUE
CONST OPS/RECONDITION
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2023 5989-00-31 02/14/2023 206 LET RCND10 1.560 LOC STR TOWN OF BELOIT, PARK AVENUE $3,000,000 - $3,999,999
CRANSTON ROAD TO E INMAN PARKWAY
CONST OPS/RECONDITION
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2022-2025 FINAL STIP Project Listing 86Southwest Region
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5990-01-41 01/10/2023 206 LET RECST 0.290 LOC STR C OF JANESVILLE, EAST MILWAUKEE STR $3,000,000 - $3,999,999
ATWOOD AVENUE TO MAIN STREET
CONST OPS/RECONSTRUCTION
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2024 5990-01-34 11/12/2024 206 LET RSRF10 1.440 LOC STR C JANESVILLE, W COURT STREET $4,000,000 - $4,999,999
WAVELAND ROAD TO PEARL STREET
CONST/CONVERT TO TWLTL
STP URBAN 50,000 - 200,000 HIGHWAY SFTY IMP PRG FAST
2024 5990-01-36 11/12/2024 206 LET RCND10 0.292 LOC STR C JANESVILLE, W COURT ST INTERSCTNS $1,000,000 - $1,999,999
N CROSBY AV; N ARCH ST; N PEARL ST
CONST/TURN LANES/MONOTUBES
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 5670-00-65 11/11/2025 303 LET RSRF30 3.580 STH 059 MONROE - EVANSVILLE $2,000,000 - $2,999,999
STH 104 TO STH 213
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
5340-00-05 303 I/E RSRF30 6.340 STH 081 MONROE - BELOIT $100,000 - $249,999
CTH K TO S PADDOCK ROAD
DESIGN-FULL PS&E RSRF30
STATE 3R SURFACE TRANS BLOCK-FLEX E
5340-00-06 303 I/E PVRPLA 6.872 STH 081 MONROE - BELOIT $500,000 - $749,999
WILLOW CREEK BRIDGE TO CTH K
DESIGN-FULL PS&E PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 3320-02-20 01/25/2022 303 R/E RECST 4.003 STH 140 BERGEN - EMERALD GROVE $0 - $99,999
ILLINOIS STATE LINE TO V CLINTON
RE OPS FOR 3320-02-70
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 87Southwest Region
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3320-02-21 01/25/2022 303 R/E RSRF25 6.212 STH 140 BERGEN - EMERALD GROVE $0 - $99,999
0.17 MI N OGDEN AVENUE TO USH 14
RE - OPS FOR 3320-02-71
STATE 3R NON-FEDERAL
2023 3320-02-51 04/25/2023 303 R/R MISC 0.000 STH 140 BERGEN - EMERALD GROVE $100,000 - $249,999
WISC & SOUTHERN RR XING 387963R
RR OPS/ CROSSING REPAIR/ RESURFACE
STATE 3R NON-FEDERAL
2023 3320-02-52 04/25/2023 303 R/R PVRPLA 0.000 STH 140 BERGEN - EMERALD GROVE $250,000 - $499,999
WISC & SOUTHERN RR XING 387963R
RR OPS/ SIGNALS
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 3320-02-70 11/14/2023 303 LET RECST 4.004 STH 140 BERGEN - EMERALD GROVE $8,000,000 - $8,999,999
ILLINOIS STATE LINE TO V CLINTON
CONST/ RECONSTRUCT
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 3320-02-71 11/12/2024 303 LET RSRF25 6.212 STH 140 BERGEN - EMERALD GROVE $5,000,000 - $5,999,999
0.17 MI N OGDEN AVENUE TO USH 14
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5636-03-71 03/25/2022 303 LFA MISC 0.010 STH 213 SALT STORAGE, ROCK COUNTY $500,000 - $749,999
V OF ORFORDVILLE
LFA/CONSTRUCT NEW SALT SHED
STATE 3R NON-FEDERAL
2024 5571-00-52 11/25/2024 303 R/R RSRF30 0.000 STH 213 BELOIT - EVANSVILLE $250,000 - $499,999
WSOR RR XING 392441D & 392442K
RR OPS/ CROSSING REPAIR/ RESURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 88Southwest Region
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 5571-00-53 11/25/2024 303 R/R RSRF30 0.000 STH 213 BELOIT - EVANSVILLE $250,000 - $499,999
WSOR RR XING 392441D & 392442K
RR OPS/ SIGNALS
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5571-00-72 11/11/2025 303 LET RSRF30 12.606 STH 213 BELOIT - EVANSVILLE $11,000,000 - $11,999,999
BURTON STREET TO STH 11
CONS/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
1706-00-06 303 I/E RSRF30 8.680 USH014
JANESVILLE - DARIEN $250,000 - $499,999
0.3M E CTH O TO EAST COUNTY LINE
DESIGN-FULL PS&E RSRF30
STATE 3R SURFACE TRANS BLOCK-FLEX E
3315-00-04 303 I/E RSRF30 3.163 USH014
JANESVILLE - DARIEN $100,000 - $249,999
.17M E WRIGHT RD TO .3M S CTH MM
DESIGN-FULL PS&E RSRF30
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 5155-02-74 11/11/2025 303 LET RSRF25 5.321 USH014
MADISON - EVANSVILLE $2,000,000 - $2,999,999
STH 92 TO C EVANSVILLE N LIMIT
CONST/ MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 5350-02-50 04/25/2023 303 R/R MISC 0.000 USH051
C JANESVILLE, CENTER AVENUE $250,000 - $499,999
UNION PACIFIC RR XING 177418U
RR OPS/CROSSING SURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 89Southwest Region
ROCK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5350-02-72 08/08/2023 303 LET MISC 0.143 USH051
C JANESVILLE, CENTER AVENUE $750,000 - $999,999
COURT/MILWAUKEE/CENTERWAYINTERSCTN
CONST/INTERSECTION IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2023 5350-02-73 08/08/2023 303 LET MISC 0.027 USH051
C JANESVILLE, CENTER AVENUE $100,000 - $249,999
MCKINLEY STREET INTERSECTION
CONST/PEDESTRIAN REFUGE
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2024 5350-02-70 02/13/2024 303 LET PVRPLA 1.460 USH051
C JANESVILLE, CENTER AVENUE $8,000,000 - $8,999,999
NICOLET STREET TO COURT STREET
CONST/ PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 5350-02-71 02/13/2024 303 LET PVRPLA 1.127 USH051
C JANESVILLE, CENTER AVE $1,000,000 - $1,999,999
NICOLET STREET TO COURT STREET
CONST/ WATER MAIN
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 90Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5897-00-60 05/10/2022 206 LET MISC 11.418 CTH H REEDSBURG - WISCONSIN DELLS $500,000 - $749,999
GOLF COURSE ROAD TO OLD 12
CONST/SIGNING/MARKING IMPROVEMENTS
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2024 5899-00-60 02/13/2024 206 LET MISC 3.486 CTH HH REEDSBURG - LYNDON STATION $250,000 - $499,999
CTH H TO THE JUNEAU COUNTY LINE
CONST/SIGNING/MARKING/CURVE PAV'T
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2023 5677-00-78 08/08/2023 205 LET BRRPL 0.000 CTH N CTH G - STH 23 $250,000 - $499,999
SUGAR GROVE CREEK, B-56-0241
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2023 5263-00-60 02/14/2023 206 LET MISC 4.612 CTH T BARABOO - IH 90/94 $250,000 - $499,999
CITY VIEW RD/MAN MOUND RD TO CTH U
CONST/SIGNING/MARKING/CURVE PAV'T
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2023 5976-00-75 01/10/2023 205 LET BRRPL 0.000 CTH W CTH PF - USH 12 $750,000 - $999,999
SEELEY CREEK BRIDGE, B-56-0242
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1014-00-03 303 I/E PVRPLA 4.260 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999
USH 12 TO STH 23
DES/PE-PS&E/PAV'T REPLACEM/PVRPLA
BACKBONE NATIONAL HIGHWAY PERF FAST
1014-00-06 303 I/E BRRPL 0.010 IH 090 WISCONSIN DELLS - PORTAGE $100,000 - $249,999
CTH A, B-56-0034
DES/PE-PS&E/BRI REPLACE/BRRPL
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 91Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1014-00-10 303 I/E BRRPL 0.007 IH 090 WISCONSIN DELLS - PORTAGE $100,000 - $249,999
TROUT ROAD BRIDGE B-56-41
DES/PE-PS&E/BRIDGE REPLACE/BRRPL
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1016-01-63 11/14/2023 303 LET PSRS30 14.600 IH 090 TOMAH - PORTAGE $7,000,000 - $7,999,999
MIRROR LAKE BRIDGE TO STH 33
CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1014-00-75 02/11/2025 303 LET RSRF20 4.260 IH 090 MAUSTON - WISCONSIN DELLS $9,000,000 - $9,999,999
USH 12 TO STH 23
CONST/RESURFACING/RSRF
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1014-00-95 01/25/2025 303 SFA MISC 4.260 IH 090 USH 12 TO STH 23 $100,000 - $249,999
MAUSTON - WISCONSIN DELLS
TRF MIT 1014-00-75
BACKBONE NON-FEDERAL
2022 5978-00-74 11/08/2022 205 LET BRRPL 0.000 LOC STR T OF IRONTON, MARSHALL ROAD $250,000 - $499,999
CARR VALLEY BR BRIDGE, B-56-0244
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 5976-00-76 08/13/2024 205 LET BRRPL 0.000 LOC STR T OF FREEDOM, DIAMOND HILL ROAD $750,000 - $999,999
SEELEY CREEK BRIDGE, B-56-0243
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2022 5080-02-22 01/25/2022 303 R/E BRRPL 0.005 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999
STRUCTURES B-56-137 & B-56-138
R/E PE/REPLACE STRUCTURES
SHR BRIDGES NON-FEDERAL
2022-2025 FINAL STIP Project Listing 92Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5080-02-23 01/25/2022 303 R/E RSRF30 12.030 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999
USH 14 TO CTH GG
RE OPS
STATE 3R NON-FEDERAL
2022 5080-09-23 03/25/2022 303 R/E MISC 0.965 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999
ELDER RIDGE ROAD TO CTH K
R/E OPERATIONS
STATE 3R NON-FEDERAL
2022 5255-01-20 01/25/2022 303 R/E RSRF30 2.790 STH 023 MINERAL POINT - SPRING GREEN $0 - $99,999
WISCONSIN RIVER BRIDGE TO USH 14
RE OPS FOR 5255-01-73
STATE 3R NON-FEDERAL
2022 5637-02-21 01/25/2022 303 R/E MISC 3.695 STH 023 SOUTHWEST REGION, ADA CURB RAMPS $100,000 - $249,999
SAUK COUNTY VARIOUS LOCATIONS
RE OPS FOR 5637-02-71
CURB RAMP STANDALONE NON-FEDERAL
2023 5050-01-76 02/14/2023 303 LET RECST 0.487 STH 023 REEDSBURG - WISCONSIN DELLS $2,000,000 - $2,999,999
STH 136 INTERSECTION
CONST/INTERSECTION IMPROVEMENT/RAB
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 5255-01-73 11/14/2023 303 LET RSRF25 2.790 STH 023 MINERAL POINT - SPRING GREEN $2,000,000 - $2,999,999
WISCONSIN RIVER BRIDGE TO USH 14
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5060-00-77 11/12/2024 303 LET PVRPLA 7.327 STH 023 REEDSBURG - WISCONSIN DELLS $4,000,000 - $4,999,999
STH 33 TO IH 90 RAMP
CONST/ PAVE REPLACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 93Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 5080-02-74 02/13/2024 303 LET COLD20 12.030 STH 023 SPRING GREEN - REEDSBURG $7,000,000 - $7,999,999
USH 14 TO CTH GG
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5080-02-75 02/13/2024 303 LET RSRF30 1.060 STH 023 SPRING GREEN - REEDSBURG $100,000 - $249,999
USH 14 TO CTH GG
CONST/SANITARY SEWER & WATER MAIN
STATE 3R NON-FEDERAL
2024 5080-02-82 02/13/2024 303 LET BRRPL 0.005 STH 023 SPRING GREEN - REEDSBURG $2,000,000 - $2,999,999
STRUCTURES B-56-235 & B-56-236
CONST/REPLACE STRUCTURE
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2024 5080-09-73 12/10/2024 303 LET PVRPLA 8.120 STH 023 SPRING GREEN - REEDSBURG $6,000,000 - $6,999,999
ELDER RIDGE ROAD TO CTH K
CONST/ PAVE REPLACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 5080-09-74 12/10/2024 303 LET RECST 0.965 STH 023 SPRING GREEN - REEDSBURG $500,000 - $749,999
V LOGANVILLE S LIMIT TO N LIMIT
CONST OPS / RECONST / UTILITIES
STATE 3R NON-FEDERAL
2024 5637-02-71 02/13/2024 303 LET MISC 3.695 STH 023 SOUTHWEST REGION, ADA CURB RAMPS $1,000,000 - $1,999,999
SAUK COUNTY VARIOUS LOCATIONS
CONST/ CURB RAMP PROGRAM
CURB RAMP STANDALONE SURFACE TRANSP BLOCK GRTS-
2022 5030-01-72 11/08/2022 303 LET RSRF20 7.181 STH 033 HILLSBORO - REEDSBURG $3,000,000 - $3,999,999
V WONEWOC S LIMITS TO MAIN STREET
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 94Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 5030-01-73 11/08/2022 303 LET RSRF30 6.576 STH 033 HILLSBORO - REEDSBURG $4,000,000 - $4,999,999
LA VALLE STREET TO PRESTON AVENUE
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5030-01-74 11/08/2022 303 LET RSRF30 0.290 STH 033 REEDSBURG - BARABOO $100,000 - $249,999
PRESTON AVENUE TO STH 23
CONST/ MILL & OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 5090-05-60 08/08/2023 303 LET PVRPLA 0.410 STH 033 REEDSBURG - BARABOO $3,000,000 - $3,999,999
W MULBERRY ST TO E V LIMITS
CONST/ PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 5090-05-61 08/08/2023 303 LET PVRPLA 0.410 STH 033 REEDSBURG - BARABOO $750,000 - $999,999
W MULBERRY ST TO E V LIMITS
CONST/WATER MAIN/SANITARY SEWER
STATE 3R NON-FEDERAL
2023 5090-05-71 08/08/2023 303 LET PVRPLA 1.900 STH 033 C BARABOO, EIGHTH STREET $10,000,000 - $10,999,999
W CITY LIMIT TO LINCOLN AVENUE
CONST/ PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 5090-05-72 08/08/2023 303 LET PVRPLA 1.900 STH 033 C BARABOO, EIGHTH STREET $2,000,000 - $2,999,999
W CITY LIMIT TO LINCOLN AVENUE
CONST/SANITARY SEWER/WATER MAIN
STATE 3R NON-FEDERAL
2023 5752-00-72 11/14/2023 303 LET RSRF30 6.738 STH 058 USH 14 - LAVALLE $3,000,000 - $3,999,999
LEE LAKE BRIDGE TO STH 33
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 95Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 5680-04-70 11/12/2024 303 LET RSRF30 9.380 STH 060 SPRING GREEN - SAUK CITY $5,000,000 - $5,999,999
FOX ROAD TO USH 12
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5630-06-23 04/25/2022 303 R/E RSRF20 2.850 STH 078 SAUK CITY - IH 39 $0 - $99,999
V MERRIMAC N LIMIT TO CTH DL
RIGHT OF WAY/RSRF20
STATE 3R NON-FEDERAL
2025 5630-06-73 11/11/2025 303 LET RSRF20 2.850 STH 078 SAUK CITY - IH 39 $1,000,000 - $1,999,999
V MERRIMAC N LIMIT TO CTH DL
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5620-00-72 11/11/2025 303 LET RSRF30 7.670 STH 113 LODI - BARABOO $4,000,000 - $4,999,999
STH 78 TO MOUND STREET
CONS/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5880-01-20 01/25/2022 303 R/E PVRPLA 1.310 USH 012 MAUSTON - WISCONSIN DELLS $0 - $99,999
NORTH COUNTY LINE TO STH 13
RE OPS FOR 5880-01-70
STATE 3R NON-FEDERAL
2022 6145-01-20 07/25/2022 303 R/E PVRPLA 0.536 USH 012 WISCONSIN DELLS - BARABOO $0 - $99,999
STH 13 TO CTH A
RE - OPS FOR 6145-01-74
STATE 3R NON-FEDERAL
2022 6145-01-22 07/25/2022 303 R/E PVRPLA 1.040 USH 012 WISCONSIN DELLS - BARABOO $100,000 - $249,999
CTH A TO PILGRIM DRIVE
RE - OPS FOR 6145-01-72
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 96Southwest Region
SAUK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 6145-01-23 07/25/2023 303 R/E PVRPLA 0.983 USH 012 WISCONSIN DELLS - BARABOO $100,000 - $249,999
PILGRIM DRIVE TO E ADAMS ST
RE - OPS FOR 6145-01-73
STATE 3R NON-FEDERAL
2024 6145-01-72 11/12/2024 303 LET PVRPLA 1.039 USH 012 WISCONSIN DELLS - BARABOO $4,000,000 - $4,999,999
CTH A TO PILGRIM DRIVE
CONSTRUCTION/PVRPLA
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 6145-01-74 11/12/2024 303 LET PVRPLA 0.536 USH 012 WISCONSIN DELLS - BARABOO $2,000,000 - $2,999,999
STH 13 TO CTH A
CONSTRUCTION/ PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5880-01-70 12/09/2025 303 LET PVRPLA 1.310 USH 012 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999
NORTH COUNTY LINE TO STH 13
CONS/ PAVE REPLACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 6145-01-73 11/11/2025 303 LET PVRPLA 0.983 USH 012 WISCONSIN DELLS - BARABOO $4,000,000 - $4,999,999
PILGRIM DRIVE TO E ADAMS ST
CONST/FIVE LANE TWLTL
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 1640-03-77 11/11/2025 303 LET RSRF20 7.965 USH 014 RICHLAND CENTER - SPRING GREEN $4,000,000 - $4,999,999
RICHLAND CO LINE TO WISCONSIN RIVER
CONS/ MILL & OVERLAY
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 97Southwest Region
VERNON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 5478-00-77 11/14/2023 205 LET BRRPL 0.000 CTH P STH 131 - CTH V $500,000 - $749,999
WARNER CREEK BRIDGE, B-62-0268
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2022 5378-00-72 12/13/2022 205 LET BRRPL 0.027 LOC STR TOWN OF COON, OLD LINE ROAD $250,000 - $499,999
BR N FORK BAD AXE RV BR, B-62-0248
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E
2023 5385-00-71 11/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF FRANKLIN, ELLEFSON ROAD $250,000 - $499,999
HORNBY CREEK BRIDGE, B-62-0267
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 5150-00-70 10/25/2023 290 LLC MISC 0.000 NONHWY
V DE SOTO, MULTI-USE PATH $250,000 - $499,999
LOFTUS STREET TO NE VILLAGE LIMIT
PEDESTRIAN/BICYCLE PATH
TAP < 5,000 TRANS ALTERN 5K AND UNDER
2024 5407-00-71 01/25/2024 290 LLC MISC 0.000 NONHWY
C VIROQUA, PED/BIKE SAFETY PROJECT $500,000 - $749,999
SOUTH STREET TO DECKER STR (STH 56)
PEDESTRAIN SAFETY IMPROVEMENTS
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
2022 5540-02-70 12/13/2022 303 LET RSRF25 13.020 STH 027 MT STERLING - VIROQUA $7,000,000 - $7,999,999
.49 MI S CTH C TO N BROOKVILLE RD
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 5100-01-20 01/25/2022 303 R/E PSRS40 15.019 STH 033 CASHTON - HILLSBORO $0 - $99,999
KICKAPOO R BR TO C HILLSBORO LIMIT
2022-2025 FINAL STIP Project Listing 98Southwest Region
VERNON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE/CONSTR 5100-01-60/PSRS
STATE 3R NON-FEDERAL
2024 5100-01-60 11/12/2024 303 LET PSRS40 15.019 STH 033 CASHTON - HILLSBORO $5,000,000 - $5,999,999
KICKAPOO R BR TO C HILLSBORO LIMIT
CONST/MILL & O'LAY/B-62-063/PSRS
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5100-01-73 12/09/2025 303 LET PVRPLA 1.040 STH 033 HILLSBORO - REEDSBURG $1,000,000 - $1,999,999
C HILLSBORO W LIMIT TO CTH HH
CONST/PAV'T REPLACE/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5730-00-71 04/12/2022 303 LET PVRPLA 11.578 STH 056 VIROQUA - RICHLAND CENTER $5,000,000 - $5,999,999
MAHONEY RD TO S JUNCTION STH 131
CONST/PULVERIZE AND RELAY/PVRLA
STATE 3R HWY INFRA COVID SUPP
2022 5730-00-80 04/12/2022 303 LET BRRPL 0.137 STH 056 VIROQUA - RICHLAND CENTER $1,000,000 - $1,999,999
BISHOP BRANCH BRIDGE B-62-258
CONST/BRIDGE REPLACEMENT/BRRPL
SHR BRIDGES HWY INFRA COVID SUPP
2022 5040-03-70 12/13/2022 303 LET RSRF20 11.790 STH 080 RICHLAND CENTER - HILLSBORO $8,000,000 - $8,999,999
CTH C TO S FORK BARABOO R STRUCTURE
CONST/MILL & O'LAY/BRI O'LAYS/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 5040-03-71 12/09/2025 303 LET PVRPLA 0.594 STH 080 HILLSBORO - NEW LISBON $1,000,000 - $1,999,999
S FORK BARABOO R BRIDGE TO STH 33
CONST/PAV'T REPLACE/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 5150-02-20 01/25/2022 303 R/E RSRF30 14.860 STH 082 DESOTO - VIROQUA $0 - $99,999
STH 35 TO STH 27
2022-2025 FINAL STIP Project Listing 99Southwest Region
VERNON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
RE/RSRF/CONST 5150-02-70
STATE 3R NON-FEDERAL
2022 5710-00-71 11/08/2022 303 LET PVRPLA 11.056 STH 082 VIROQUA - LAFARGE $6,000,000 - $6,999,999
STH 56 TO KICKAPOO RIVER
CONS/MILL & O'LAY/B62-20,-24/PVRPLA
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 5710-00-73 11/08/2022 303 LET PVRPLA 0.395 STH 082 LAFARGE - HILLSBORO $500,000 - $749,999
KICKAPOO RIVER TO MAPLE ST
CONST/ CURB & GUTTER/ PVRPL
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 5867-01-75 01/25/2022 305 MIS TOI 122.854 STH 082 VERNON COUNTY, 2018 FLOOD EVENT $1,000,000 - $1,999,999
AUGUST 2018 ST HWY FLOOD SITES
CONST/FLOOD 2018-2019/EMERG REPAIR
EMERGENCY FLOOD RELIEF EMERGENCY REL 2018
2023 5150-02-70 11/14/2023 303 LET RSRF30 14.860 STH 082 DESOTO - VIROQUA $7,000,000 - $7,999,999
STH 35 TO STH 27
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2024 5710-00-72 11/12/2024 303 LET RSRF20 16.000 STH 082 LAFARGE - HILLSBORO $9,000,000 - $9,999,999
KICKAPOO RIVER TO STH 33
CONST/MILL & O'LAY,B62-51,-238/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2025 5110-06-70 11/11/2025 303 LET RSRF30 12.230 STH 131 READSTOWN - ONTARIO $8,000,000 - $8,999,999
STH 82 TO STH 33/ B-62-34,-47,-187
CONST/MILL & OVERLAY/RSRF
2022-2025 FINAL STIP Project Listing 100Southwest Region
VERNON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 5865-02-65 04/12/2022 303 LET RSRF10 4.253 STH 162 STODDARD - COON VALLEY $1,000,000 - $1,999,999
CTH KK TO USH 14
CONST/MILL & OVERLAY/RSRF
STATE 3R HWY INFRA COVID SUPP
2025 5865-02-64 11/11/2025 303 LET RSRF20 6.910 STH 162 STODDARD - COON VALLEY $3,000,000 - $3,999,999
VILLAGE PARK DRIVEWAY TO DEPOT ST
CON/MILL & O'LAY/B62-29,83,984/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 1640-04-72 12/13/2022 303 LET RECST 0.689 USH 014 WESTBY - READSTOWN $2,000,000 - $2,999,999
EAST JUNCTION STH 27
CONST/INTERSECT IMPROVE-RAB/RECST
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2022 1646-08-22 01/25/2022 303 R/E RECST 1.440 USH 014 C WESTBY, N MAIN STREET $500,000 - $749,999
HIGH ECHO LANE TO LOCUST STREET
RE/RECST/CONST 1646-08-72
STATE 3R NON-FEDERAL
2023 1640-01-74 05/09/2023 303 LET PSRS10 1.717 USH 014 C VIROQUA, MAIN STREET $250,000 - $499,999
BRENDEL LN TO SOUTH WASHINGTONAVE
CONST/CONVERT TO TWLTL/PSRS
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2024 1646-08-72 02/14/2024 303 LET RECST 1.440 USH 014 C WESTBY, N MAIN STREET $8,000,000 - $8,999,999
HIGH ECHO LANE TO LOCUST STREET
CONST/RECONSTRUCT ROADWAY/RECST
2022-2025 FINAL STIP Project Listing 101Southwest Region
VERNON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 1646-08-82 02/14/2024 303 LET RECST 1.440 USH 014 C WESTBY, N MAIN STREET $0 - $99,999
HIGH ECHO LANE TO LOCUST STREET
CONST/SANITARY SEWER & WATER/RECST
STATE 3R NON-FEDERAL
2025 1640-03-74 11/11/2025 303 LET RSRF30 1.850 USH 014 LA CROSSE - WESTBY $1,000,000 - $1,999,999
S JCT STH 162 TO CHURCH STREET
CON/MILL & O'LAY/B-62-105,-106/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4762-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
VERNON COUNTY PAVEMENT MARKING $250,000 - $499,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCKGRTS-
2022 – 2025 Statewide Transportation Improvement Program
Southeast Region Projects
2022-2025 FINAL STIP Project Listing 102Southeast Region
KENOSHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3732-09-71 03/08/2022 206 LET RECSTE 1.324 CTH K CTH K $8,000,000 - $8,999,999
UPRR TO 94TH CT
CONST/RECONSTRUCT NO ADDL LANES
STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP
2023 3751-03-70 01/10/2023 206 LET RCND20 1.532 CTH W RANDALL - SALEM LAKES $2,000,000 - $2,999,999
ILL STATE LINE TO CTH C EAST
CONST/RECONDITION
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 3762-03-70 12/13/2022 206 LET MISC 0.021 CTH Y V SOMERS CTH Y $1,000,000 - $1,999,999
INTERSECTION WITH CTH A
CONST/ROUND ABOUT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 3831-07-72 02/14/2023 206 LET MISC 0.005 LOC STR C KENOSHA WASHINGTON ROAD $1,000,000 - $1,999,999
INTERSECTION WITH 39TH AVE
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 3831-07-71 11/12/2024 206 LET MISC 0.006 LOC STR C KENOSHA WASHINGTON ROAD $2,000,000 - $2,999,999
INTERSECTION WITH 30TH AVE
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1032-10-75 03/08/2022 303 LET RSRF20 3.459 OFF SYS NORTH SOUTH FREEWAY, CTH ML-STH 50 $4,000,000 - $4,999,999
EAST FRONTAGE ROAD
CONST / RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2390-08-70 09/12/2023 303 LET PSRS20 5.128 STH 031 PLEASANT PRAIRIE - CALEDONIA $2,000,000 - $2,999,999
IL STATE LINE TO STH 50
CONST/PATCH,REPAIR,DIAMOND GRIND
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 103Southeast Region
KENOSHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 3330-07-70 09/12/2023 303 LET PSRS20 2.570 STH 031 GREEN BAY RD - CITY OF KENOSHA $4,000,000 - $4,999,999
STH 50 TO CTH S
CONST/PATCH, REPAIR, DIAMOND GRIND
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 3340-09-70 09/12/2023 303 LET RECST 0.020 STH 031 GREEN BAY ROAD, CITY OF KENOSHA $100,000 - $249,999
78TH STREET INTERSECTION
CONST/TURNING LANE
STATE 3R NON-FEDERAL
2023 3240-00-23 01/25/2023 303 R/E RSRF20 5.740 STH 032 SHERIDAN ROAD $0 - $99,999
ALFORD PARK DRIVE TO 21ST STREET
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 3240-16-70 03/14/2023 303 LET RSRF30 3.257 STH 032 PLEASANT PRAIRIE - RACINE $3,000,000 - $3,999,999
ILLINOIS STATE LINE TO 91ST ST
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1310-04-70 06/14/2022 303 LET RECST 1.190 STH 050 75TH ST, VILLAGE OF PADDOCK LAKE $11,000,000 - $11,999,999
256TH AVE TO 236TH AVE
CONST /RECONSTRUCT
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1310-14-70 09/12/2023 303 LET RECST 0.130 STH 050 GENEVA RD, TOWN OF WHEATLAND $3,000,000 - $3,999,999
S CTH W TO 1750 FEET EAST
CONST/MITIGATE FOX RIVER FLOODING
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2420-00-20 01/25/2022 303 R/E RSRF30 12.080 STH 075 S BEAUMONT AVE - TOWN OF DOVER $0 - $99,999
2022-2025 FINAL STIP Project Listing 104Southeast Region
KENOSHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 50 - STH 20
RE/RESURFACE
STATE 3R NON-FEDERAL
2024 2420-00-70 09/10/2024 303 LET RSRF30 12.080 STH 075 PADDOCK LAKE - BEAUMONT $9,000,000 - $9,999,999
STH 50 - STH 20
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEXE
2022 3380-06-20 01/25/2022 303 R/E RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH-BURLINGTON $100,000 - $249,999
IL STATE LINE TO STH 50
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 3380-06-70 09/12/2023 303 LET RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH - BURLINGTON $6,000,000 - $6,999,999
IL STATE LINE TO STH 50
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3220-09-70 09/13/2022 303 LET BRRPL 0.000 STH 158 52ND STREET, CITY OF KENOSHA $8,000,000 - $8,999,999
RAILROAD BRIDGES B-30-0002, 0003
CONST/BRIDGE REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3700-22-00 03/25/2022 305 M/E TOSIG 0.004 STH 158 STH 158 & 39TH AVE SIGNAL RETROFIT $0 - $99,999
STH 158 AND 39TH AVE INTERSECTION
STAND ALONE PROJECT ID SER2201L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022 3700-22-70 07/25/2022 305 MIS TOSIG 0.004 STH 158 STH 158 & 39TH AVE SIGNAL RETROFIT $250,000 - $499,999
STH 158 AND 39TH AVE INTERSECTION
2022-2025 FINAL STIP Project Listing 105Southeast Region
KENOSHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STAND ALONE PROJECT ID SER2201L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 3220-09-71 11/12/2024 303 LET RSRF20 2.010 STH 158 C KENOSHA, 52ND STREET $3,000,000 - $3,999,999
IH41/94 FRONTAGE RD TO CTH H
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 3700-11-70 02/14/2023 305 LET TOSIG 0.173 VARHWY
SIGNAL INSTALL & SIGNAL REPLACEMENT $1,000,000 - $1,999,999
VARIOUS SIGNALIZED INTERSECTIONS
STANDALONE PROJECT ID SE2107/SE2108
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022-2025 FINAL STIP Project Listing 106Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2050-04-70 03/08/2022 206 LET RECST 0.480 CTH BB WEST RAWSON AVENUE $3,000,000 - $3,999,999
S 27TH STREET TO S 20TH STREET
CONST/RECONSTRUCT W/ NO ADDL LANES
STP URBAN OVER 200,000 HWY INFRA >200K POP AP/GB/
2023 2050-08-21 05/25/2023 206 R/E RECST 1.003 CTH BB C OAK CREEK W RAWSON AVENUE $250,000 - $499,999
S 13TH STREET TO S HOWELL AVENUE
RE/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2050-12-70 03/12/2024 206 LET MISC 0.029 CTH BB C FRANKLIN W RAWSON AVENUE $250,000 - $499,999
INTERSECTIONS WITH 68TH,51ST & 31ST
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 2050-08-71 01/14/2025 206 LET RECST 1.003 CTH BB C OAK CREEK W RAWSON AVENUE $6,000,000 - $6,999,999
S 13TH STREET TO S HOWELL AVENUE
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2305-02-70 03/12/2024 206 LET MISC 0.023 CTH OO C FRANKLIN FOREST HOME AVENUE $0 - $99,999
INTERSECT WITH SPEEDWAY
CONST/FULL PS/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2130-15-70 02/08/2022 205 LET BRRPL 0.000 CTH PP CTH PP (GOOD HOPE ROAD) $1,000,000 - $1,999,999
BRIDGE OVER BR MILWAUKEE RIVER
CONST/BRIDGE REPLACEMENT B-40-0370
LOCAL BRIDGES NON-FEDERAL
2023 2984-07-76 04/11/2023 206 LET MISC 0.039 CTH PP C MILWAUKEE GOOD HOPE ROAD $500,000 - $749,999
99TH ST TO 60TH ST
CONST/INTERSECTION MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 107Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2160-17-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (NB) $1,000,000 - $1,999,999
BRIDGE OVER STH 36 B-40-0573
CONST/DECK OVERLAY
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2022 2160-18-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (SB) $1,000,000 - $1,999,999
BRIDGE OVER STH 36 B-40-574
CONST/BRIDGE REHAB
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2022 2505-03-21 07/25/2022 206 R/E RECST 1.008 CTH V C OAK CREEK S 13TH STREET $250,000 - $499,999
W PUETZ ROAD TO W DREXEL AVENUE
RE/RECONSTRUCT W/ NO ADDL LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2023 2505-03-71 12/12/2023 206 LET RECST 1.009 CTH V C OAK CREEK S 13TH STREET $4,000,000 - $4,999,999
W PUETZ ROAD TO W DREXEL AVENUE
CONST/RECONSTRUCT NO ADDL LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2025 2355-08-70 02/11/2025 206 LET MISC 0.008 CTH ZZ C OAK CREEK - MILWAUKEE $250,000 - $499,999
INTERSECTION WITH 20TH STREET
CONST/SIGNALS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1030-43-20 02/25/2022 303 R/E MISC 0.000 IH 041 IH 41 MITCHELL I/C $0 - $99,999
WB I43/I94 35TH-RAWSON-HOWARD
RE/RESURE
BACKBONE NON-FEDERAL
2022 1030-43-21 02/25/2022 303 R/E RSRF20 6.554 IH 041 IH 41 MITCHELL I/C $0 - $99,999
EB I43/I94 35TH-RAWSON-HOWARD
RE/RESURFACE
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 108Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1090-03-03 07/25/2022 303 C/E MISC 9.420 IH 041 IH 894 & IH 43 $2,000,000 - $2,999,999
ZOO, MITCHELL & MOORLAND-HALE IC'S
PE/SAFETY AND OPERATIONS STUDIES
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1100-17-76 04/12/2022 303 LET PSRS30 1.116 IH 041 MILWAUKEE - FOND DU LAC $5,000,000 - $5,999,999
GOOD HOPE RD TO WAUKESHA CO LN
CONST/DIAMOND GRIND
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1100-46-90 02/25/2022 303 MIS MISC 0.118 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999
60TH STREET BRIDGE
TRAFFIC MITIGATION 1100-46-70
BACKBONE NON-FEDERAL
2023 1030-43-71 11/14/2023 303 LET RSRF20 0.000 IH 041 IH 41 MITCHELL I/C $20,000,000 - $24,999,999
WB I43/I94 35TH-RAWSON-HOWARD
CONST/RESURFACING
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1030-43-72 11/14/2023 303 LET RSRF20 6.554 IH 041 IH 41 MITCHELL I/C $20,000,000 - $24,999,999
EB I43/I94 35TH-RAWSON-HOWARD
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1100-20-70 02/14/2023 303 LET RSRF25 1.012 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999
BURLEIGH ST TO CAPITOL DR
CONST/RESURFACE/PHASE I
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1100-20-92 03/25/2023 303 MIS MISC 1.756 IH 041 IH 41 ZOO FREEWAY $250,000 - $499,999
BURLEIGH ST TO CAPITOL DR
TRAFFIC MITIGATION 1100-20-70
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 109Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1100-45-70 02/14/2023 303 LET RSRF30 3.060 IH 041 IH 41 AIRPORT FREEWAY $40,000,000 - $44,999,999
84TH ST TO 35TH ST (MAINLINE)
CONST/RSRF/BRIDGE REHAB/NOISE BARR
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1100-45-90 03/25/2023 303 MIS MISC 3.080 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999
84TH ST TO 35TH ST (MAINLINE)
TRAFFIC MITIGATION 1100-45-70
BACKBONE NON-FEDERAL
2023 1100-46-71 02/14/2023 303 LET BRRPL 0.002 IH 041 IH 41 AIRPORT FREEWAY $11,000,000 - $11,999,999
STH 36 (LOOMIS RD) BRIDGE
CONST/BRIDGE REPLACEMENT, PRESERV
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1100-20-71 09/10/2024 303 LET RSRF25 1.910 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999
CAPITOL DR TO SILVER SPRING DR
CONST/RESURFACE/PHASE II
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1100-20-91 09/25/2024 303 MIS MISC 5.060 IH 041 IH 41 ZOO FREEWAY $750,000 - $999,999
CAPITOL DR TO SILVER SPRING DR
TRAFFIC MITIGATION 1100-20-71
BACKBONE NON-FEDERAL
2025 1100-21-70 09/09/2025 303 LET RSRF30 5.060 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999
SILVER SPRING DR TO GOOD HOPE RD
CONST/RESURFACE/PHASE 3
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1100-21-90 09/25/2025 303 MIS MISC 5.060 IH 041 IH 41 ZOO FREEWAY $750,000 - $999,999
SILVER SPRING DR TO GOOD HOPE RD
TRAFFIC MITIGATION 1100-21-70
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 110Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 1100-35-71 09/09/2025 303 LET BRRHB 0.004 IH 041 IH 41 ZOO FREEWAY $4,000,000 - $4,999,999
HOWARD AVE TO UPRR
CONST/BRIDGE REHABILTATION
BACKBONE NATIONAL HIGHWAY PERF PLAN
2022 1228-09-23 01/25/2022 303 R/E RSRF30 4.174 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999
MITCHELL I/C TO MARQUETTE I/C
RE/RESURFACE/BRIDGE MAINT
BACKBONE NON-FEDERAL
2022 1228-09-26 07/25/2022 303 R/E RSRF30 0.101 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999
MITCHELL IC-MARQUETTE IC ON/OFF RMP
RE/RESURFACE/BRIDGE MAINTANENCE
BACKBONE NON-FEDERAL
2022 1228-09-93 04/25/2022 303 MIS RSRF30 4.174 IH 043 IH 43 NORTH SOUTH FREEWAY $0 - $99,999
MITCHELL I/C TO MARQUETTE I/C
TRAFFIC MITIGATION FOR 1228-09-73
BACKBONE NON-FEDERAL
2022 1228-22-03 03/25/2022 303 C/E BRRHB 0.780 IH 043 IH 43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999
KEEFE AVENUE TO CAPITOL AVENUE
PE-FULL PS&E-BRIDGE REHAB
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1228-22-70 08/09/2022 303 LET RSRF30 2.350 IH 043 IH 43 NORTH SOUTH FREEWAY $40,000,000 - $44,999,999
BROWN STREET TO CAPITOL DRIVE
CONST / RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1228-22-74 04/12/2022 303 LET BRRPL 0.000 IH 043 IH43 NORTH SOUTH FREEWAY $4,000,000 - $4,999,999
HAMPTON AVE-SB RAMP OVER MILW RVR
CONST/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 111Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1228-22-83 08/25/2022 303 MIS MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $250,000 - $499,999
CAPITOL DR-2100 FT N OF HAMPTON AVE
TRAF MIT-MCSO 1228-22-71
BACKBONE NON-FEDERAL
2022 1228-22-90 09/25/2022 303 MIS MISC 5.270 IH 043 IH 43 NORTH SOUTH FREEWAY $250,000 - $499,999
BROWN STREET TO CAPITOL DRIVE
MIS/TRAFFIC MITIGATION 1228-22-70
BACKBONE NON-FEDERAL
2022 1229-04-72 10/11/2022 302 LET RECSTE 0.000 IH 043 I-43 NORTH SOUTH FREEWAY $14,000,000 - $14,999,999
UNION PACIFIC RR BRIDGE B-40-921
CONST/PHASE 3 RECST W/ EXPANSION
MAJORS NATIONAL HIGHWAY PERFFAST
2022 1229-04-73 10/11/2022 302 LET RECSTE 3.286 IH 043 I-43 NORTH SOUTH FREEWAY $100 MILLION OR GREATER
BENDER ROAD TO BROWN DEER ROAD
CONST/RECONSTRUCTION W/ EXPANSION
MAJORS NATIONAL HIGHWAY PERFFAST
2022 1229-04-95 10/25/2022 302 MIS RECSTE 0.004 IH 043 I-43 NORTH SOUTH FREEWAY $750,000 - $999,999
SILVER SPRING TO DONGES BAY ROAD
TRAFFIC MITIGATION FOR 1229-04-73
MAJORS NON-FEDERAL
2023 1090-32-20 03/25/2023 303 R/E BRRPL 0.000 IH 043 IH 43 AIRPORT FREEWAY $100,000 - $249,999
HALE I/C TO 92ND STREET BRIDGE
RE/BRIDGE REPLACEMENT
BACKBONE NON-FEDERAL
2023 1228-22-76 09/12/2023 303 LET MISC 2.350 IH 043 IH 43 NORTH SOUTH FREEWAY $6,000,000 - $6,999,999
BROWN STREET TO CAPITOL DRIVE
2022-2025 FINAL STIP Project Listing 112Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST / NOISE WALLS
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1228-09-76 01/09/2024 303 LET RSRF30 0.101 IH 043 IH 43 NORTH SOUTH FREEWAY $2,000,000 - $2,999,999
MITCHELL IC-MARQUETTE IC ON/OFF RMP
CONST/RESURFACE/BRIDGE MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERFFAST
2025 1090-32-70 09/09/2025 303 LET BRRPL 0.000 IH 043 IH 43 AIRPORT FREEWAY $5,000,000 - $5,999,999
HALE I/C TO 92ND STREET BRIDGE
CONST/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFPLAN
2025 1090-32-90 09/25/2025 303 MIS MISC 2.090 IH 043 IH 43 AIRPORT FREEWAY $250,000 - $499,999
HALE I/C TO 92ND STREET BRIDGE
TRAFFIC MITIGATION 1090-32-70
BACKBONE NON-FEDERAL
2025 1228-03-76 09/09/2025 303 LET RSRF30 1.425 IH 043 IH 43 NORTH SOUTH FREEWAY $8,000,000 - $8,999,999
OAK LEAF TRAIL TO BENDER
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFPLAN
1100-17-01 303 I/E RSRF30 4.890 IH 094 IH 94 EAST WEST FREEWAY $1,000,000 - $1,999,999
ZOO I/C TO MARQUETTE I/C
PE-FULL PS&E-RSRF30
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1300-03-08 01/25/2022 303 C/E BRRPL 0.885 IH 794 MILWAUKEE-CUDAHY $10,000,000 - $10,999,999
LAKE INTERCHANGE STUDY PHASE 2
PE/PRELIM DESIGN TO 60%
2022-2025 FINAL STIP Project Listing 113Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1300-15-70 05/09/2023 305 LET TOI 1.190 IH 794 MILWAUKEE - CUDAHY $1,000,000 - $1,999,999
S OF CLYBOURN-N OF LINCOLN MEMORIAL
CONST/FENCING
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 1060-48-70 09/10/2024 303 LET BRRHB 0.620 IH 794 IH 794 EAST WEST FREEWAY $10,000,000 - $10,999,999
MARQUETTE IC TO LAKE IC
CONST/BRIDGE DECK OVERLAY
BACKBONE NATIONAL HIGHWAY PERFFAST
2025 1100-35-91 11/25/2025 303 MIS MISC 0.220 IH 894 ZOO FREEWAY $100,000 - $249,999
LINCOLN AND HOWARD AVE BRIDGES
TRAFFC MITIGATION FOR ID 1100-35-71
BACKBONE NON-FEDERAL
2022 1229-04-71 10/11/2022 302 LET RECSTE 0.599 LOCSTR
CITY GLENDALE, N PORT WASHINGTON RD $12,000,000 - $12,999,999
BENDER RD TO W DAPHNE RD
CONST/PHASE 2 RECST W/ EXPANSION
MAJORS NATIONAL HIGHWAY PERFFAST
2022 2135-04-71 12/13/2022 206 LET RECST 0.860 LOCSTR
C WAUWATOSA W NORTH AVENUE $8,000,000 - $8,999,999
MAYFAIR ROAD TO N 95TH STREET
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 2160-05-71 03/08/2022 206 LET MISC 0.008 LOCSTR
S 76TH STREET $500,000 - $749,999
INTERSECTION WITH W BECHER STREET
2022-2025 FINAL STIP Project Listing 114Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/HSIP/TRAFFICSIGNALS/RESURFACE
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2190-10-70 12/13/2022 205 LET BRRPL 0.000 LOC STR C WAUWATOSA W WISCONSIN AVENUE $2,000,000 - $2,999,999
BRIDGE OVER HONEY CREEK P-40-776
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022 2265-00-78 11/08/2022 206 LET MISC 0.085 LOC STR C MILWAUKEE N 27TH STREET $500,000 - $749,999
INTERSECT W/LOCUST, CENTER & NORTH
CONST/HSIP/INTERSECT IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2345-07-71 03/08/2022 206 LET PSRS30 1.000 LOC STR W DREXEL AVENUE $2,000,000 - $2,999,999
CTH V TO STH 38
CONST/RESURFACE
STP URBAN OVER 200,000 HWY INFRA >200K POP AP/GB/
2022 2410-13-70 12/13/2022 206 LET RECST 0.185 LOC STR W NATIONAL AVENUE $2,000,000 - $2,999,999
S 62ND STREET TO S 65TH STREET
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 2545-13-70 05/10/2022 205 LET BRRHB 0.000 LOC STR C GLENDALE W HAMPTON AVENUE $750,000 - $999,999
BRIDGE OVER MILWAUKEE RIVER
CONST/BRIDGE DECK OVERLAY P-40-0750
LOCAL BRIDGES NON-FEDERAL
2022 2674-02-70 11/08/2022 206 LET RECST 0.539 LOC STR C MILWAUKEE W WALNUT STREET $6,000,000 - $6,999,999
N 20TH STREET TO N 12TH STREET
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 2984-12-05 08/25/2022 205 M/E BRRHB 0.000 LOC STR C MILWAUKEE N HOLTON ST PHASE 3 $250,000 - $499,999
BR OVR MILW RIVER,COMMERCE, WATER
2022-2025 FINAL STIP Project Listing 115Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
PE-FULL PS&E-BRIDGE REHAB
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2022 2984-17-71 03/25/2022 290 LLC MISC 1.544 LOC STR E/W WASHINGTON ST & W SCOTT ST $500,000 - $749,999
KK RIVER TRAIL-20TH & 20TH-LAYTON
CONST/PED/BIKE FACILITIES
TAP > 200,000 TRANS ALTERN >200K FAST EX
2022 2984-21-01 04/25/2022 206 M/E MISC 0.009 LOC STR C MILWAUKEE - N 35TH ST $100,000 - $249,999
INTERSECTION WITH W CENTER ST
PE/FULL PS&E/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2984-21-02 04/25/2022 206 M/E RECST 0.031 LOC STR C MILWAUKEE-N 35TH STREET $250,000 - $499,999
INTERSECTIONS WITH NORTH & LISBON
PE/FULL PS&E ROW RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2984-21-03 04/25/2022 206 M/E MISC 0.015 LOC STR C MILWAUKEE W MORGAN AVENUE $100,000 - $249,999
INTS W/ 20TH, 16TH, 13TH & 6TH ST
PE/FULL PS&E/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2995-04-74 03/08/2022 206 LET MISC 0.005 LOC STR S 92ND STREET $1,000,000 - $1,999,999
INTERSECTION WITH LINCOLN AVE
CONST/HSIP/TRAFFIC SIGNALS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2995-05-77 03/08/2022 206 LET MISC 0.070 LOC STR S 60TH STREET $250,000 - $499,999
INTERSECTION WITH W GREENFIELD AVE
CONST/TRAFFIC SIGNAL FLASHERS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 2090-16-70 05/09/2023 206 LET MISC 0.050 LOC STR C MILWAUKEE W SILVER SPRING DRIVE $1,000,000 - $1,999,999
6 LOCAL INTERSECTIONS
2022-2025 FINAL STIP Project Listing 116Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/HSIP TRAFFIC SIGNAL/FLASHERS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2023 2395-05-71 04/12/2023 206 LET RECST 1.270 LOCSTR
C MILWAUKEE E/W HOWARD AVENUE $7,000,000 - $7,999,999
S 6TH STREET TO S CLEMENT AVENUE
CONST/RECONSTRUCT W/ NO ADDL LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2023 2525-03-71 01/10/2023 206 LET RECST 0.637 LOCSTR
W BELOIT ROAD $9,000,000 - $9,999,999
S 60TH STREET TO LINCOLN AVENUE
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2023 2545-09-71 03/14/2023 206 LET RCND20 2.020 LOCSTR
C MILWAUKEE W HAMPTON AVENUE $8,000,000 - $8,999,999
N 60TH STREET TO N TEUTONIA AVENUE
CONST/RECONDITION
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2023 2656-00-72 03/14/2023 205 LET BRRPL 0.000 LOCSTR
C MILWAUKEE S 70TH STREET $2,000,000 - $2,999,999
BRIDGE OVER CP RR/HAST P-40-856
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2023 2984-12-73 01/10/2023 205 LET BRRHB 0.000 LOCSTR
C MILWAUKEE, N HOLTON ST PHASE 1 $4,000,000 - $4,999,999
BR OVER MILW RVR, COMMERCE, WATER
PE/BRIDGE REHABILITATION/P-40-0875
2022-2025 FINAL STIP Project Listing 117Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2023 2984-13-74 03/14/2023 206 LET MISC 0.002 LOCSTR
C MILWAUKEE W CENTER STREET $250,000 - $499,999
INTS W/ W LISBON AVE & N 60TH ST
CONST/HSIP/INTERSECT IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2023 2984-15-71 05/09/2023 206 LET MISC 0.013 LOCSTR
C MILWAUKEE W VILLARD AVENUE $1,000,000 - $1,999,999
INTERSECTIONS OF N 60TH & N 51ST ST
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2024 2145-07-50 03/25/2024 207 R/R MISC 0.000 LOCSTR
C MILWAUKEE, BRADLEY ROAD CROSSING $0 - $99,999
WISC & SOUTHERN RR(WSOR)XING386975G
RR/REPLACE WARNING DEVICE EQUIPMENT
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEVFAST
2024 2155-05-70 02/06/2024 206 LET MISC 0.103 LOCSTR
C MILWAUKEE N SHERMAN BLVD $1,000,000 - $1,999,999
7 LOCAL STREET INTERSECTIONS
CONST/SIGNAL UPDATES & PED RAMPS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2024 2155-05-71 02/06/2024 206 LET MISC 0.075 LOCSTR
C MILWAUKEE N SHERMAN BLVD $1,000,000 - $1,999,999
6 LOCAL STREET INTERSECTIONS
CONST/SIGNAL UPDATES & PED RAMPS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2022-2025 FINAL STIP Project Listing 118Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2160-19-70 12/25/2024 211 MIS MISC 0.000 LOC STR GREENFIELD - WEST ALLIS $500,000 - $749,999
OKLAHOMA-COLD SPRING & 92ND-76TH
CNST/ADAPTIVE TRAFFIC SIGNAL SYSTEM
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2024 2230-07-73 01/09/2024 206 LET RCND20 0.710 LOC STR V WEST MILW W GREENFIELD AVENUE $3,000,000 - $3,999,999
S 56TH STREET TO MILLER PARK WAY
CONST/RECONDITION
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2024 2365-05-71 01/09/2024 206 LET RCND20 0.497 LOC STR V GREENDALE W GRANGE AVENUE $2,000,000 - $2,999,999
S 76TH STREET TO S 84TH STREET
CONST/RECONDITION
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2024 2400-07-71 03/25/2024 290 LLC MISC 1.470 LOC STR OKLAHOMA AVENUE MULTIMODAL $500,000 - $749,999
S 27TH ST TO S 6TH ST
CONST/PEDESTRIAN IMPROVEMENTS
TAP > 200,000 TRANS ALTERN >200K FASTEX
2024 2455-07-70 01/09/2024 206 LET RCND20 0.739 LOC STR C MILWAUKEE E/W LOCUST STREET $3,000,000 - $3,999,999
N 7TH STREET TO N HOLTON STREET
CONST/RECONDITION
STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST
2024 2984-12-74 01/09/2024 205 LET BRRHB 0.000 LOC STR C MILWAUKEE, N HOLTON ST PHASE 2 $3,000,000 - $3,999,999
BR OVER MILW RVR, COMMERCE, WATER
CONST/BRIDGE REHABILITATION/P400875
LOCAL BRIDGES SURFACE TRANSBLOCK-FLEX E
2022-2025 FINAL STIP Project Listing 119Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2984-16-52 03/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, 107TH ST CROSSING $0 - $99,999
WIS & SOUTHRN RR(WSOR) XING386977V
RR/REPLACE WARNING DEVICE EQUIP
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEVFAST
2025 2984-12-75 01/14/2025 205 LET BRRHB 0.000 LOC STR C MILWAUKEE, N HOLTON ST PHASE 3 $3,000,000 - $3,999,999
BR OVR MILW RIVER, COMMERCE, WATER
CONST/BRIDGE REHABILITATION
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2025 2984-21-71 02/11/2025 206 LET MISC 0.009 LOC STR C MILWAUKEE - N 35TH ST $500,000 - $749,999
INTERSECTION WITH W CENTER ST
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2025 2984-21-72 03/11/2025 206 LET RECST 0.031 LOC STR C MILWAUKEE-N 35TH STREET $1,000,000 - $1,999,999
INTERSECTIONS WITH NORTH & LISBON
CONST/FULL PS&E ROW RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2025 2984-21-73 03/11/2025 206 LET MISC 0.015 LOC STR C MILWAUKEE W MORGAN AVENUE $1,000,000 - $1,999,999
INTS W/ 20TH, 16TH, 13TH & 6TH ST
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2022 1693-06-09 02/25/2022 211 MIS MISC 0.000 NONHWY
BIG LAKE MARINE TOWBOAT $750,000 - $999,999
2 TOWBOATS
PE-PROCURE TOWBOAT RETROFIT
2022-2025 FINAL STIP Project Listing 120Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 1693-34-36 11/25/2022 211 TST MISC 0.000 NONHWY
MILW CO TRANSIT REPLACEMENT BUSES $5,000,000 - $5,999,999
PHASE 3 - BUS PURCHASE FY20-24
TST/TRANSIT
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 1693-34-42 12/25/2022 211 TST MISC 0.000 NONHWY
CLEAN DIESEL ENGINE BUS PURCHASE $100,000 - $249,999
PURCHASE OF 7 BUSES PHASE 5 OF 5
MILWAUKEE TRANSIT, CMAQ
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 1693-34-43 07/25/2022 211 TST MISC 0.000 NONHWY
MCTS PUBLIC OUTREACH $500,000 - $749,999
MCTS AWARENESS CAMPAIGN
TST/TRANSIT-MARKETING
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 2967-11-01 07/25/2022 211 M/E MISC 0.000 NONHWY
OAK LEAF TR CONNECTIVITY-BENDER PRK $100,000 - $249,999
BENDER PARK
PE-FULL PS&E-BIKE/PED TRAIL
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 2967-11-02 07/25/2022 211 M/E MISC 0.000 NONHWY
OAK LEAF TRAIL EXTENSION $250,000 - $499,999
KOHL PARK CONNECTION
PE/PED BIKE FACILITIES
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ TO REDUCE PM 2.5 EMI
2022-2025 FINAL STIP Project Listing 121Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2980-06-71 03/25/2022 211 LLC MISC 0.000 NONHWY
POWERLINE TRAIL PHASE 1 $1,000,000 - $1,999,999
W COLD SPRING RD TO 60TH STREET
CONST/PED BIKE TRAIL
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2022 2984-13-83 03/25/2022 290 LLC MISC 0.000 NONHWY
SRTS IMPLEMENTATION PHASE I $500,000 - $749,999
CITY OF MILWAUKEE
CONST/SAFE ROUTE TO SCHOOL PROGRAM
TAP > 200,000 TRANS ALTERN >200K FASTEX
2022 2984-18-73 01/25/2022 290 LLC MISC 0.000 NONHWY
PEDESTRIAN & TRANSIT INTS IMPRVMNTS $500,000 - $749,999
8 LOCAL INTERSECTIONS
CONST/PED & TRANSIT IMPROVEMENTS
TAP > 200,000 TRANS ALTERN >200K FASTEX
2023 1693-06-07 07/25/2023 211 TST MISC 0.000 NONHWY
EAST WEST BUS RAPID TRANSIT $2,000,000 - $2,999,999
MILWAUKEE COUNTY
TST/OPERATING COSTS 3RD YR
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2023 1693-06-81 01/25/2023 211 MIS MISC 0.000 NONHWY
CNG REFUSE PACKERS $1,000,000 - $1,999,999
PH 2 33 REFUSE TRUCK CNG CONVERSION
MIS/REFUSE TRUCK CNG CONVERSION
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2023 1693-34-39 09/25/2023 211 TST MISC 0.000 NONHWY
MILW CO TRANSIT REPLACEMENT BUSES $3,000,000 - $3,999,999
2022-2025 FINAL STIP Project Listing 122Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
PHASE 4 - BUS PURCHASE FY20-24
TST/TRANSIT
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2023 2555-07-70 03/25/2023 211 LLC MISC 0.000 NONHWY
SAFE ROUTES TO TRANSIT PHASE 1 $1,000,000 - $1,999,999
W BURLEIGH, S CESAR CHAVEZ
CONST/PED BIKE FACILITIES
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2023 2984-22-74 03/25/2023 211 LLC MISC 0.000 NONHWY
KINNICKINNIC RVR TRAIL CONNECTIONS $1,000,000 - $1,999,999
VARIOUS LOCATIONS IN THE CITY
CONST/PED BIKE FACILITIES
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2023 2984-22-75 03/25/2023 290 LLC MISC 0.000 NONHWY
20TH ST POWER LINE & BEERLINE TRAIL $750,000 - $999,999
OLIVE ST-VILLARD AVE & 20TH-24TH ST
CONST/BIKE PEDESTRIAN TRAIL
TAP > 200,000 TRANS ALTERN >200K FASTEX
2023 2984-22-92 03/25/2023 211 LFA MISC 0.000 NONHWY
ATC CONTROLLER & COMM UPGRADE GR 6 $1,000,000 - $1,999,999
53 INTERSECTIONS
CONST/VAR CORRIDORS S SIDE
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2023 2984-22-93 03/25/2023 211 LFA MISC 0.000 NONHWY
ATC CONTROLLER & COMM UPGRADE GR 7 $1,000,000 - $1,999,999
70 INTERSECTIONS
2022-2025 FINAL STIP Project Listing 123Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
LFA/VAR CORRIDORS MILW CBD
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2023 2987-09-70 02/25/2023 290 LLC MISC 0.000 NONHWY
SAFE ROUTES TO SCHOOL-PHASE 1 $500,000 - $749,999
5 SCHOOL LOCATIONS
CONST/SIDEWALK SIGNS BIKE/PED
TAP > 200,000 TRANS ALTERN >200K FASTEX
2023 2994-00-72 03/25/2023 290 LLC MISC 0.000 NONHWY
WAUWATOSA BIKE SHARE III $100,000 - $249,999
VARIOUS LOCATIONS
CONST/BIKE/PED
TAP > 200,000 TRANS ALTERN >200K FASTEX
2024 2967-02-72 07/25/2024 206 TST MISC 0.000 NONHWY
TRANSIT SYSTEM BUS REPLACEMENT $4,000,000 - $4,999,999
15 MILWAUKEE COUNTY BUSES PHASE 2
TST/TRANSIT
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2967-11-71 03/25/2024 211 LLC MISC 0.000 NONHWY
OAK LEAF TR CONNECTIVITY-BENDER PRK $1,000,000 - $1,999,999
BENDER PARK
CONST/PED BIKE FACILITIES
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2024 2967-11-72 03/25/2024 211 LLC MISC 0.000 NONHWY
OAK LEAF TRAIL EXTENSION $2,000,000 - $2,999,999
KOHL PARK CONNECTION
CONST/PED BIKE FACILITIES
2022-2025 FINAL STIP Project Listing 124Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2022 1100-20-73 06/25/2022 305 CCO TOI 0.000 OFFSYS
ZOO FREEWAY $0 - $99,999
N40-65 (SB EXIT RAMP TO LINCOLN)
TRAFFIC ACCIDENT CLAIM 0077-12-49
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2023 1060-53-70 12/12/2023 303 LET MISC 0.000 OFFSYS
VARIOUS NOISE WALL LOCATIONS $1,000,000 - $1,999,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/NOISE BARRIER REHAB
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 2120-18-20 03/25/2022 303 R/E MISC 5.270 STH 024 W FOREST HOME AVE $100,000 - $249,999
USH 45 TO 45TH STREET
RE/RESURFACE
STATE 3R NON-FEDERAL
2022 2120-18-21 06/25/2022 303 R/E RSRF30 5.270 STH 024 HALES CORNERS-MILWAUKEE $500,000 - $749,999
USH 45 TO 45TH STREET
RE/RSRF30
STATE 3R NON-FEDERAL
2022 2120-18-22 08/25/2022 303 R/E RSRF30 5.270 STH 024 HALES CORNERS-MILWAUKEE $100,000 - $249,999
USH 45 TO 45TH STREET
RE/RSRF30
STATE 3R NON-FEDERAL
2024 2120-18-70 09/10/2024 303 LET RSRF30 5.307 STH 024 HALES CORNERS - MILWAUKEE $13,000,000 - $13,999,999
USH 45 TO 45TH STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 125Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2185-09-70 03/25/2022 209 LLC RECST 0.003 STH 032 C MILWAUKEE/KOMATSU MINING $1,000,000 - $1,999,999
S KINNICKINNIC AVE N/S OF RR BRIDGE
CONST/RECONST
TRANS ECONOMIC ASSISTANCE (TEA) NON-FEDERAL
2022 2195-04-20 05/25/2022 303 R/E MISC 0.440 STH 032 WELLS STREET $0 - $99,999
N BROADWAY TO N PROSPECT AVE
RE/RECONSTRUCT NO ADDITIONAL LANES
STATE 3R NON-FEDERAL
2023 2195-04-70 09/12/2023 303 LET PVRPLA 0.255 STH 032 WELLS STREET, CITY OF MILWAUKEE $2,000,000 - $2,999,999
N BROADWAY TO N VAN BUREN STREET
CONST/RECONSTRUCT NO ADDL LANES
STATE 3R SURFACE TRANS BLOCK-FLEX E
2024 2225-15-70 02/13/2024 303 LET PVRPLA 0.852 STH 032 C MILWAUKEE, N LAKE DR $5,000,000 - $5,999,999
NEWBERRY BLVD TO EDGEWOOD AVE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 2225-00-73 09/09/2025 303 LET RSRF30 2.630 STH 032 V FOX POINT, N LAKE DR $2,000,000 - $2,999,999
SCHOOL ROAD TO DEAN ROAD
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 2225-13-70 09/09/2025 303 LET PVRPLA 1.216 STH 032 V SHOREWOOD, N LAKE DR $5,000,000 - $5,999,999
EDGEWOOD AVE TO KENSINGTON BLVD
CONST/PAVEMENT REPLACEMENT
STATE 3R SURFACE TRANS FLEX - MAP-2
2022 2240-00-28 07/25/2022 303 R/E RSRF30 5.338 STH 036 WATERFORD - MILWAUKEE $0 - $99,999
STH 100 TO 51ST STREET
RE/RESURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 126Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2240-00-78 02/13/2024 303 LET RSRF30 5.338 STH 036 WATERFORD - MILWAUKEE $12,000,000 - $12,999,999
STH 100 TO 51ST STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 2060-18-70 12/12/2023 303 LET BRRPL 0.000 STH 038 CHASE AVE, CITY OF MILWAUKEE $4,000,000 - $4,999,999
BRIDGE OVER UP RR B40-571
CONST/BRIDGE REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2565-02-71 03/14/2023 303 LET MISC 0.037 STH 057 C GLENDALE, SILVER SPRING DR $1,000,000 - $1,999,999
INTERSECTION WITH CTH PP
CONST/TURNING LANES HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 2275-05-70 01/09/2024 303 LET RSRF30 1.058 STH 057 C MILWAUKEE, N 20TH ST $3,000,000 - $3,999,999
NORTH AVE TO HOPKINS ST
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 2410-10-20 09/25/2022 303 R/E MISC 2.620 STH 059 C MILWAUKEE, W NATIONAL AVE $0 - $99,999
39TH ST TO 1ST ST
RE/RECONSTRUCT
STATE 3R NON-FEDERAL
2025 2410-10-70 09/09/2025 303 LET PVRPLA 2.620 STH 059 C MILWAUKEE, W NATIONAL AVE $20,000,000 - $24,999,999
39TH ST TO 1ST ST
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 2030-10-21 04/25/2022 303 R/E MISC 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $100,000 - $249,999
W BURLEIGH ST TO W SILVER SPRING DR
RE/BRIDGE REPLACEMENT
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 127Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2030-10-22 05/25/2022 303 R/E MISC 2.989 STH 100 C WAUWATOSA, N MAYFAIR RD/LOVERS LN $0 - $99,999
W BURLEIGH ST TO W SILVER SPRING DR
RE/BRIDGE REPLACEMENT
STATE 3R NON-FEDERAL
2022 2040-03-75 11/08/2022 303 LET RSRF10 2.390 STH 100 RYAN ROAD $1,000,000 - $1,999,999
SHEPARD AVE TO STH 32
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 2040-20-70 11/08/2022 303 LET BRRHB 0.000 STH 100 C OAK CREEK, RYAN ROAD $1,000,000 - $1,999,999
BRIDGE OVER RR B-40-530
CONST/BRIDGE REHABILITATION
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 2040-15-23 01/25/2023 303 R/E RECST 2.958 STH 100 C FRANKLIN, LOVERS LANE $100,000 - $249,999
60TH STREET TO ST MARTINS ROAD
RE/RECONSTRUCT PRESERVATION
STATE 3R NON-FEDERAL
2023 2040-15-24 01/25/2023 303 R/E RECST 2.958 STH 100 C FRANKLIN, LOVERS LANE $100,000 - $249,999
60TH STREET TO ST MARTINS ROAD
RE/RECONSTRUCT PRESERVATION
STATE 3R NON-FEDERAL
2024 2030-10-71 09/10/2024 303 LET BRRPL 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $17,000,000 - $19,999,999
W BURLEIGH ST TO W SILVER SPRING DR
CONST/BRIDGE REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 2040-15-73 09/09/2025 303 LET PVRPLA 2.958 STH 100 C FRANKLIN, LOVERS LANE $12,000,000 - $12,999,999
60TH STREET TO ST MARTINS ROAD
CONST/PAVE REPLACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 128Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2015-10-71 09/12/2023 303 LET PVRPLA 0.213 STH 119 GENERAL MITCHELL AIRPORT SPUR $2,000,000 - $2,999,999
STH 119 AT HOWELL AVE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1360-12-70 11/14/2023 303 LET BRRPL 0.016 STH 145 C MILWAUKEE, FOND DU LAC AVE $3,000,000 - $3,999,999
107TH ST BRIDGE
CONST/B-40-252
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1360-13-70 11/14/2023 303 LET BRRHB 0.010 STH 145 C MILWAUKEE, FOND DU LAC AVE $3,000,000 - $3,999,999
76TH, PED BRIDGES
CONST/BRIDGE REHAB
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1360-13-71 11/14/2023 303 LET BRRHB 0.050 STH 145 C MILWAUKEE, FOND DU LAC AVE $2,000,000 - $2,999,999
SILVER SPRING BRIDGES
CONST/BRIDGE REHAB
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1360-12-90 03/25/2024 303 LFA BRRPL 0.016 STH 145 C MILWAUKEE, FOND DU LAC AVE $0 - $99,999
107TH ST BRIDGE
CONST/SIGNALS INCIDENTAL 1360-12-70
STATE 3R NON-FEDERAL
2023 2010-03-22 01/25/2023 303 R/E RSRF30 4.265 STH 175 C MILWAUKEE, APPLETON AVE $100,000 - $249,999
STH 181 TO IH 41
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 2967-17-70 03/14/2023 303 LET BRRHB 0.037 STH 175 C MILWAUKEE, APPLETON AVENUE $1,000,000 - $1,999,999
BRIDGE OVER MENOMONEE RIVER
CONST/BRIDGE REHAB
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 129Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2010-03-72 09/09/2025 303 LET RSRF30 4.265 STH 175 C MILWAUKEE, APPLETON AVE $8,000,000 - $8,999,999
STH 181 TO IH 41
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 2140-14-20 04/25/2023 303 R/E RSRF25 4.529 STH 181 C MILWAUKEE 76TH STREET $250,000 - $499,999
FLORIST AVE TO CTH Q
RE/RSRF25
STATE 3R NON-FEDERAL
2023 2545-03-72 03/14/2023 303 LET MISC 0.019 STH 181 76TH ST (STH 181) $500,000 - $749,999
INTERSECTION WITH HAMPTON AVENUE
CONST/INTERSECTION AND SIGNALS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 2545-03-92 03/25/2023 303 LFA MISC 0.019 STH 181 76TH ST (STH 181) $0 - $99,999
INTERSECTION WITH HAMPTON AVENUE
LFA/ INCIDENTAL TO 2545-03-72
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 2967-17-71 03/14/2023 303 LET BRRHB 0.007 STH 181 C MILWAUKEE N 76TH ST $2,000,000 - $2,999,999
BRIDGE OVER UPC RR
CONST/BRIDGE REHAB
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 2140-14-70 09/09/2025 303 LET RSRF25 4.529 STH 181 C MILWAUKEE 76TH STREET $11,000,000 - $11,999,999
FLORIST AVE TO CTH Q
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2025-20-70 05/10/2022 303 LET BRRHB 0.000 STH 190 CAPITOL DR, CITY OF WAUWATOSA $2,000,000 - $2,999,999
124TH ST TO STH 100
2022-2025 FINAL STIP Project Listing 130Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/RIDGE DECK OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2265-18-20 07/25/2022 303 R/E MISC 2.003 STH 241 OAK CREEK - MILWAUKEE $100,000 - $249,999
LAYTON AVE TO COLLEGE AVE
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 2265-10-71 01/10/2023 303 LET BRRHB 0.442 STH 241 OAK CREEK - MILWAUKEE $3,000,000 - $3,999,999
8 MILE RD TO ELM RD
CONST/BRIDGE DECK REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 2265-18-70 09/10/2024 303 LET RSRF20 2.003 STH 241 OAK CREEK - MILWAUKEE $4,000,000 - $4,999,999
COLLEGE AVE TO LAYTON AVE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1060-35-82 08/09/2022 301ZO LET MISC 0.000 USH 045 USH 45, ZOO IC, N LEG LANDSCAPING $500,000 - $749,999
MAYFAIR ROAD TO BURLEIGH STREET
CONST/LANDSCAPING
SE FREEWAY-ZOO INTERCHANGE NON-FEDERAL
2024 2040-14-70 09/10/2024 303 LET RECST 1.000 USH 045 LOVERS LANE (CITY OF FRANKLIN) $12,000,000 - $12,999,999
RAWSON AVE TO COLLEGE AVE
CONST/RECONSTRUCT
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1000-13-76 06/14/2022 305 LET TOE 0.155 VARHWY
HIGHWAY LIGHTING 2022 SE REGION $2,000,000 - $2,999,999
VARIOUS HIGHWAYS, MILWAUKEE CO
TRAFFIC/LIGHTING
2022-2025 FINAL STIP Project Listing 131Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022 2967-00-77 04/12/2022 206 LET MISC 0.117 VARHWY
6 LOCAL INTERSECTIONS $750,000 - $999,999
GOOD HOPE, PORT WASH & SHERMAN
CONST/HSIP/INTERSECT IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2022 2984-13-95 08/25/2022 206 LFA MISC 0.000 VARHWY
VARIOUS LOCATIONS $500,000 - $749,999
73 CITY INTERSECTIONS
LFA/HSIP/INTERSECT IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2022 2984-13-96 08/25/2022 206 LFA MISC 0.000 VARHWY
VARIOUS LOCATIONS $500,000 - $749,999
72 CITY INTERSECTIONS
HSIP/INTERSECTION IMPROVEMENTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2022 2984-28-91 04/25/2022 211 LFA MISC 0.000 VARHWY
FIBER OPTIC INTERCONNECT $1,000,000 - $1,999,999
LISBON, WALNUT AND 27TH CORRIDORS
LFA/FIBER OPTIC
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
CONGESTION MITIGAT FASTEX
2022 2984-28-92 04/25/2022 211 LFA MISC 0.000 VARHWY
ATC CONTROLLER & COMM UPGRADE GR 3 $1,000,000 - $1,999,999
79 INTERSECTIONS
LFA/VAR CORRIDORS NEAR N-W
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
CONGESTION MITIGAT FASTEX
2022-2025 FINAL STIP Project Listing 132Southeast Region
MILWAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2984-28-94 04/25/2022 211 LFA MISC 0.000 VARHWY
FIBER OPTIC INTERCONNECT $750,000 - $999,999
CESAR CHAVEZ DR & NATIONAL AVE CORR
LFA/FIBER OPTIC
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
CONGESTION MITIGAT FASTEX
2022 4740-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
MILWAUKEE COUNTY PAVEMENT MARKING $100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSBLOCK-FLEX E
2023 2090-14-70 12/25/2023 211 MIS MISC 0.000 VARHWY
C MILWAUKEE SILVER SPRING DRIVE $250,000 - $499,999
124TH ST TO 91ST ST
MIS/ADAPTIVE TRAFFIC SIGNAL SYS
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMI FAST
2022-2025 FINAL STIP Project Listing 133Southeast Region
OZAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 4822-07-01 04/25/2022 206 C/E MISC 8.953 CTH H FREDONIA - PORT WASHINGTON $0 - $99,999
WASHCOLINE-CTHA, CTH A-CTH KW
PE/FULL PS&E/MISC
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2024 4822-07-71 02/13/2024 206 LET MISC 8.953 CTH H FREDONIA - PORT WASHINGTON $500,000 - $749,999
WASHCOLINE-CTHA, CTH A-CTH KW
CONST/MISC
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2022 2330-08-70 05/10/2022 206 LET MISC 3.889 CTH NN CEDARBURG - JACKSON $250,000 - $499,999
WASHINGTON COUNT LINE TO STH 60
CONST/HSIP
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2023 2695-07-71 02/14/2023 206 LET MISC 0.010 CTH NN CEDARBURG CTH NN $750,000 - $999,999
INTERSECTION WITH CTH Y
CONST/RECON INTERSECTION & SIGNALS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1229-04-03 302 I/E RECSTE 7.871 IH 043 I-43 NORTH SOUTH FREEWAY $3,000,000 - $3,999,999
DONGES BAY TO STH 60
PE-FULL PS&E-RE-UTIL-RR-RECSTE
MAJORS NATIONAL HIGHWAY PERFFAST
2022 1229-04-96 01/25/2022 302 MIS MISC 14.095 IH 043 I-43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999
SILVER SPRING TO STH 60
FST MITIGATION/1229-04-70 TO 76
MAJORS NON-FEDERAL
2023 1229-04-75 07/11/2023 302 LET RECSTE 2.534 IH 043 I-43 NORTH SOUTH FREEWAY $50,000,000 - $59,999,999
MEQUON RD INTERCHANGE
CONST/RECONSTRUCTION W/ EXPANSION
2022-2025 FINAL STIP Project Listing 134Southeast Region
OZAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
MAJORS NATIONAL HIGHWAY PERFFAST
2025 1229-03-71 09/09/2025 303 LET RSRF30 1.699 IH 043 IH 43 NORTH SOUTH FREEWAY $3,000,000 - $3,999,999
STH 60 TO STH 32
CONST/RESURFACING
BACKBONE NATIONAL HIGHWAY PERFFAST
2025 1229-03-91 09/25/2025 303 MIS MISC 1.699 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999
STH 60 TO STH 32
TRAFFC MITIGATION FOR ID 1229-03-71
BACKBONE NON-FEDERAL
2022 2695-11-70 03/08/2022 205 LET BRRPL 0.100 LOC STR COVERED BRIDGE ROAD $1,000,000 - $1,999,999
BRIDGE OVER CEDAR CREEK B-45-0013
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEXE
2022 1410-01-71 05/10/2022 303 LET RECST 0.390 STH 033 STH 33 $2,000,000 - $2,999,999
INTERSECTION WITH CTH I
CONST/INTERSECTION MOD ROUND-ABOUT
STATE 3R HIGHWAY SFTY IMP PRG FAST
2022 3700-22-71 03/25/2022 305 MIS TOSIG 0.007 STH 060 STH 60 & 12TH AVE SIGNAL IMPROVEMNT $0 - $99,999
STH 60 & 12TH AVE INTERSECTION
STAND ALONE PROJECT ID SER2206L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022 1380-02-70 09/13/2022 303 LET RSRF30 3.740 STH 167 MEQUON ROAD, CITY OF MEQUON $2,000,000 - $2,999,999
WASHINGTON CO LINE TO BUNTROCK AVE
CONST / RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 135Southeast Region
OZAUKEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2729-05-70 04/12/2022 303 LET RSRF30 2.939 STH 181 WAUWATOSA RD, CITY OF CEDARBURG $3,000,000 - $3,999,999
CTH C TO STH 60
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2729-07-20 07/25/2022 303 R/E RSRF20 2.209 STH 181 WEST ALLIS - CEDARBURG $0 - $99,999
COUNTY LINE ROAD TO MEQUON ROAD
RE/RSRF20
STATE 3R NON-FEDERAL
2022 4745-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
OZAUKEE COUNTY PAVEMENT MARKING $0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE
2024 4821-04-20 04/25/2024 303 R/E MISC 6.471 VARHWY
SOUTHEAST REGION, ADA CURB RAMPS $100,000 - $249,999
PORT WASH/SAUK AREA VAR LOC PER PLN
PER WISDOT ADA TRANS PLAN RAMPS
CURB RAMP STANDALONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 136Southeast Region
RACINE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2390-09-73 12/10/2024 206 LET RECST 0.609 CTH C MOUNT PLEASANT - RACINE $4,000,000 - $4,999,999
NORTH OHIO STREET TO FAIRWAY DRIVE
CONST/RECONSTRUCT NO ADDED CAPACITY
STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT
2022 3755-03-70 05/10/2022 206 LET MISC 5.757 CTH D V ROCHESTER CTH D $100,000 - $249,999
WALWORTH COUNTY LINE TO STH 20
CONST/HSIP/SIGNING, PVMT MARKING
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2023 3755-02-70 01/10/2023 206 LET RECST 1.860 CTH D CTH D $2,000,000 - $2,999,999
HERITAGE RD TO 753 FT W OF STATE ST
CONST/RECONSTRUCT NO ADDED CAPACITY
STP RURAL STBG <5K POP - FAST EXT
2024 2814-03-70 02/13/2024 206 LET MISC 0.027 CTH J V ROCHESTER CTH J $1,000,000 - $1,999,999
INTERSECTION WITH CTH A
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2803-03-01 07/25/2022 206 C/E RECST 0.008 CTH U V RAYMOND - 76TH ST $100,000 - $249,999
INTERSECTION WITH CTH G
PE/FULL PS&E
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 2816-03-70 02/13/2024 206 LET MISC 0.024 CTH U V RAYMOND CTH U $1,000,000 - $1,999,999
INTERSECTION WITH 7 MILE ROAD
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 2803-03-71 02/11/2025 206 LET RECST 0.008 CTH U V RAYMOND - 76TH ST $1,000,000 - $1,999,999
INTERSECTION WITH CTH G
CONST/RECST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 137Southeast Region
RACINE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2702-03-70 03/08/2022 205 LET BRRPL 0.000 LOC STR 58TH ROAD $500,000 - $749,999
BRIDGE OVER W BR ROOT RIVER CANAL
CONST/BRIDGE REPLACEMENT/P-51-0058
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E
2022 2703-09-21 05/25/2022 206 R/E RECST 0.536 LOC STR N MAIN STREET $100,000 - $249,999
GOOLD ST TO MELVIN AVE
RE/RECONSTRUCT NO ADDL LANES
STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT
2022 3834-00-72 11/08/2022 205 LET BRRPL 0.000 LOC STR JEFFERSON STREET $2,000,000 - $2,999,999
BRIDGE OVER FOX RIVER B-51-0001
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2024 2703-09-71 11/12/2024 206 LET RECST 0.536 LOC STR C RACINE N MAIN STREET $2,000,000 - $2,999,999
GOOLD ST TO MELVIN AVE
CONST/RECONSTRUCT NO ADDL LANES
STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT
2023 1030-09-76 05/09/2023 303 LET RSRF30 0.000 OFF SYS IH 41 NORTH SOUTH FREEWAY $9,000,000 - $9,999,999
EAST AND WEST FRONTAGE ROADS
CONST/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 1320-23-75 03/14/2023 303 LET MISC 0.000 OFF SYS BURLINGTON - RACINE $100,000 - $249,999
STH 11 PARK AND RIDE
CONST/RESTORATION
STATE 3R NON-FEDERAL
2022 1320-07-23 04/25/2022 303 R/E MISC 0.004 STH 011 STH 11 $0 - $99,999
CTH J
RE/ROUND ABOUT
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 138Southeast Region
RACINE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2260-08-40 01/25/2022 303 UTL RECST 0.384 STH 011 DURAND AVE, CITY OF RACINE $0 - $99,999
KEARNEY AVE TO STH 32
UTIL/WE ENERGIES/CITY RACINE
STATE 3R NON-FEDERAL
2024 1320-07-73 02/13/2024 303 LET MISC 0.315 STH 011 BURLINGTON - RACINE $1,000,000 - $1,999,999
CTH J
HSIP/ROUND ABOUT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2340-10-70 09/13/2022 303 LET RSRF30 8.460 STH 020 WASHINGTON AVE, TOWN DOVER $7,000,000 - $7,999,999
STH 36 TO SB USH 45
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 2340-00-79 09/12/2023 303 LET RSRF15 3.559 STH 020 EAST TROY - RACINE $1,000,000 - $1,999,999
HONEY CREEK ROAD TO BUENA PARKROAD
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2340-03-73 01/10/2023 303 LET BRRHB 1.432 STH 020 WASHINGTON AVENUE $2,000,000 - $2,999,999
90TH STREET TO OAKES ROAD
CONST/BRIDGE REHAB
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 2250-15-70 09/10/2024 303 LET RSRF30 1.240 STH 020 WASHINGTON AVE - VIL OF MT PLEASANT $5,000,000 - $5,999,999
OAKES RD TO STH 31
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2390-12-20 12/25/2022 303 R/E MISC 1.510 STH 031 GREEN BAY RD, C RACINE/V MT PLEASNT $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 139Southeast Region
RACINE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 11 TO STH 20
RE/RECONSTRUCTION
STATE 3R NON-FEDERAL
2025 2350-15-70 09/09/2025 303 LET RSRF30 4.620 STH 032 V CALEDONIA, DOUGLAS AVENUE $3,000,000 - $3,999,999
4 MILE RD TO E COUNTY LINE RD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3180-00-76 05/10/2022 303 LET RSRF10 7.938 STH 036 SPRINGFIELD - WATERFORD $9,000,000 - $9,999,999
STH 83 TO STH 20
CONST/RESURFACING
STATE 3R HWY INFRA COVID SUPP
2022 2290-03-73 12/13/2022 303 LET BRRPL 0.022 STH 038 RACINE - MILWAUKEE $6,000,000 - $6,999,999
BRIDGE OVER ROOT RIVER B-51-0012
CONST/BRIDGE REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 2290-24-20 01/25/2022 303 R/E BRSHRM 8.589 STH 038 CALEDONIA - OAK CREEK $0 - $99,999
DUNKELOW RD TO E OAKWOOD RD
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 2290-24-70 12/12/2023 303 LET PSRS40 8.589 STH 038 CALEDONIA - OAK CREEK $4,000,000 - $4,999,999
DUNKELOW RD TO E OAKWOOD RD
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2290-25-20 10/25/2023 303 R/E RECST 0.038 STH 038 V CALEDONIA, NORTHWESTERN AVENUE $0 - $99,999
INTERSECTION WITH 4 MILE ROAD
RE FULL PS & E W/ROW RECST
SAFETY (REGULAR HSIP) NON-FEDERAL
2022-2025 FINAL STIP Project Listing 140Southeast Region
RACINE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2290-26-20 10/25/2023 303 R/E MISC 0.007 STH 038 V CALEDONIA, NORTHWESTERN AVENUE $0 - $99,999
INTERSECTION WITH 5 MILE ROAD
RE/RECST
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 1300-09-70 12/13/2022 303 LET PSRS40 7.190 STH 083 NORTHWEST HIGHWAY (STH 83) $9,000,000 - $9,999,999
STH 20 TO IH 43
CONST/RECONDITIONING
STATE 3R HWY INFRA COVID SUPP
2023 2430-07-20 04/25/2023 303 R/E RSRF30 2.813 USH 045 RAYNOR AVE, UNION GROVE-HALESCRNRS
$0 - $99,999
STH 20 TO 2000 FT NORTH OF CTH K
RE/RSRF30
STATE 3R NON-FEDERAL
2022 4751-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
RACINE COUNTY PAVEMENT MARKING $250,000 - $499,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E
2022-2025 FINAL STIP Project Listing 141Southeast Region
SOUTHEAST REGION WIDE
2022-2025 FINAL STIP Project Listing 141Southeast Region
SOUTHEAST REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1000-33-40 303 I/E MISC 0.000 NON HWY UTILITY COORD-DEVELOP 6-YR PROGRAM $100,000 - $249,999
REGION-WIDE
CE
STATE 3R NON-FEDERAL
2022 1000-12-35 07/25/2022 303 C/E MISC 0.000 NON HWY SAFETY ANALYSIS FOR 3R PROJECTS $750,000 - $999,999
SE REGION
PE/SAFETY ANALYSIS
STATE 3R NON-FEDERAL
2023 3742-00-17 07/25/2023 303 C/E MISC 0.000 NON HWY PDS PROGRAM CONTROL MANAGEMENT $750,000 - $999,999
TRACKING, FY 24-28
PE
STATE 3R NON-FEDERAL
1000-01-32 303 I/E MISC 0.000 VAR HWY WEST ALLIS INVENTORY CONTROL $0 - $99,999
SE REGION
PE
STATE 3R NON-FEDERAL
1000-29-52 303 I/E MISC 0.000 VAR HWY VARIOUS HIGHWAYS $250,000 - $499,999
UTILITY COORDINATION
--
STATE 3R NON-FEDERAL
2022 1000-03-04 03/25/2022 303 C/E MISC 0.000 VAR HWY SE REGION WIDE $2,000,000 - $2,999,999
EARLY SURVEY TO MEET ADV DATES
PE/ANNUAL SURVEY PROJ IN SCOPING
STATE 3R NON-FEDERAL
2022 1000-70-14 06/25/2022 303 C/E MISC 0.000 VAR HWY THERMOGRAPHIC BRIDGE DECK SURVEYS $2,000,000 - $2,999,999
VARIOUS LOCATIONS
FY 21-25
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 142Southeast Region
SOUTHEAST REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1000-77-23 05/09/2023 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2023 $1,000,000 - $1,999,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/PAVEMENT MARKING
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E
2023 1000-80-23 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2023 $250,000 - $499,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/CLEAN & RELAMP LTG SYSTEMS
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2023 1000-80-24 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2024 $250,000 - $499,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/CLEAN & RELAMP LTG SYSTEMS
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2024 1000-77-24 05/14/2024 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2024 $1,000,000 - $1,999,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/ PAVEMENT MARKING
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E
2022-2025 FINAL STIP Project Listing 143Southeast Region
STATEWIDE
2022-2025 FINAL STIP Project Listing 143Southeast Region
STATEWIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1000-20-64 12/13/2022 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2022 $1,000,000 - $1,999,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/SIGN BRIDGE REPAIR & REPLACE
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2022 1000-20-65 12/13/2022 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2023 $500,000 - $749,999
LOCATIONS ON STN PER ANNUAL PLAN
CONST/SIGN BRIDGE REPAIR & REPLACE
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2022-2025 FINAL STIP Project Listing 144Southeast Region
WALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3839-00-70 03/08/2022 205 LET BRRPL 0.025 LOC STR LAUDERDALE DRIVE $750,000 - $999,999
BRIDGE OVER GREEN LAKE P-64-0921
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2022 3841-03-70 11/08/2022 205 LET BRRHB 0.000 LOC STR C DELAVAN RICHMOND ROAD $500,000 - $749,999
BRIDGE OVER SWAN CREEK B-64-0157
CONST/BRIDGE REHABILITATION
LOCAL BRIDGES STBG <5K POP FAST
2024 3841-05-70 11/12/2024 206 LET RCND20 0.498 LOC STR C DELAVAN WRIGHT STREET $1,000,000 - $1,999,999
RACINE ST (STH 11) TO HOBBS DRIVE
CONST/RECONDITION
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2024 3845-05-71 03/25/2024 290 LLC MISC 0.000 NON HWY SOUTH STREET TRAIL $750,000 - $999,999
LAKE SHORE-STH 120, ALONG H .5 MI S
CONST/TRAIL
TAP 5,000 - 50,000 TRANS ALTERN 5-200K FAST E
2022 1320-22-70 05/10/2022 303 LET MISC 0.002 STH 011 ELKHORN - BURLINGTON $750,000 - $999,999
INDIAN RUN CR 0.7 MI E CLAUSSEN RD
CONST/CULVERT REPLACE/REPAIR
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 3180-00-77 05/10/2022 303 LET RSRF30 2.387 STH 011 ELKHORN - BURLINGTON $6,000,000 - $6,999,999
E OF LYONS TO E OF SPRING VALLEY RD
CONST/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 4910-02-20 02/25/2022 303 R/E MISC 0.007 STH 011 ELKHORN-BURLINGTON $0 - $99,999
BAKER CREEK 0.8 MI NE OF USH 12
RE/CULVERT REPLACE C-64-0038
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 145Southeast Region
WALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4910-02-70 09/10/2024 303 LET MISC 0.007 STH 011 ELKHORN-BURLINGTON $250,000 - $499,999
BAKER CREEK 0.8 MI NE OF USH 12
CONST/CULVERT REPLACE C-64-0038
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2698-03-70 09/12/2023 303 LET PSRS40 6.124 STH 020 EAST TROY - RACINE $10,000,000 - $10,999,999
THOMAS DRIVE TO HONEY CREEK ROAD
CONST/RECONDITIONING
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 2698-03-73 09/12/2023 303 LET PSRS40 6.124 STH 020 EAST TROY - RACINE $250,000 - $499,999
THOMAS DRIVE TO HONEY CREEK ROAD
CONST/PSRS40/UTILITY
STATE 3R NON-FEDERAL
2022 3190-11-20 07/25/2022 303 R/E RSRF15 6.197 STH 036 SPRINGFIELD TO BURLINGTON $0 - $99,999
STH 120 TO STH 11
RE/RESURFACE
STATE 3R NON-FEDERAL
2024 3190-11-70 05/14/2024 303 LET RSRF15 6.197 STH 036 SPRINGFIELD TO BURLINGTON $3,000,000 - $3,999,999
STH 120 TO STH 11
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 3170-11-20 08/25/2022 303 R/E MISC 4.428 STH 050 DELAVAN - LAKE GENEVA $0 - $99,999
LAKE LAWN TO STH 67
RE/RESURFACE
STATE 3R NON-FEDERAL
2022 3170-12-70 11/08/2022 303 LET RSRF30 4.620 STH 050 DELAVAN - LAKE GENEVA $6,000,000 - $6,999,999
GENEVA NATIONAL TO FOREST
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 146Southeast Region
WALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 3170-11-70 09/09/2025 303 LET RSRF25 4.428 STH 050 DELAVAN - LAKE GENEVA $3,000,000 - $3,999,999
LAKE LAWN TO STH 67
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 3110-03-23 02/25/2023 303 R/E RSRF20 2.524 STH 059 MILTON TO WHITEWATER $0 - $99,999
WCL TO WILLIS RAY ROAD
RE/RESURFACE
STATE 3R NON-FEDERAL
2024 3110-03-73 11/12/2024 303 LET RSRF20 2.524 STH 059 MILTON TO WHITEWATER $2,000,000 - $2,999,999
WCL TO WILLIS RAY ROAD
CONST/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 3325-06-71 01/10/2023 303 LET RSRF30 1.210 STH 067 WALWORTH - ELKHORN $2,000,000 - $2,999,999
GENEVA ST TO GLENWOOD DR
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 3325-06-72 01/10/2023 303 LET RSRF30 1.210 STH 067 WALWORTH - ELKHORN $1,000,000 - $1,999,999
GENEVA ST TO GLENWOOD DR
CONST/UTILITY
STATE 3R NON-FEDERAL
2023 3390-04-70 04/11/2023 303 LET RSRF30 7.294 STH 089 RICHMOND - WHITEWATER $3,000,000 - $3,999,999
CTH A TO WILLIS RAY ROAD
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 3694-00-21 02/25/2022 303 R/E MISC 9.422 STH 120 HEBRON - EAST TROY $0 - $99,999
STH 36 TO O'LEARY LN
RE/RESURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 147Southeast Region
WALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 3180-03-24 10/25/2023 303 R/E MISC 0.000 STH 120 ILLINOIS - LAKE GENEVA $0 - $99,999
BRIDGE OVR NIPPERSINK CREEK B64-007
PE/BRIDGE REPLACEMENT
STATE 3R NON-FEDERAL
2023 3694-00-71 05/09/2023 303 LET RSRF20 9.422 STH 120 HEBRON - EAST TROY $6,000,000 - $6,999,999
STH 36 TO O'LEARY LN
CONST/RSRF 20 RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEXE
2022 3120-12-20 02/25/2022 303 R/E MISC 0.598 USH 012 USH 12 $100,000 - $249,999
INTERSECTION WITH CTH ES
RE/INTERSECTION MODIFICATION
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 3130-03-21 10/25/2022 303 R/E RSRF30 7.640 USH 012 WHITEWATER TO ELKHORN $0 - $99,999
COX ROAD TO STH 20/67
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 3120-13-70 11/14/2023 303 LET MISC 0.000 USH 012 C ELKHORN, USH 12 $250,000 - $499,999
INTERSECTION WITH STH 67
CONST/HSIP INTERSECT MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 3120-10-70 09/10/2024 303 LET RSRF10 7.420 USH 012 ELKHORN - WHITEWATER $4,000,000 - $4,999,999
STH 20 TO USH 12/STH 67 SPLIT
CONST / RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 3120-12-70 09/10/2024 303 LET MISC 0.698 USH 012 ELKHORN - WHITEWATER $1,000,000 - $1,999,999
INTERSECTION WITH CTH ES
2022-2025 FINAL STIP Project Listing 148Southeast Region
WALWORTH
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/INTERSECTION MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 3130-09-70 03/12/2024 303 LET MISC 4.432 USH 012 WHITEWATER - RICHMOND $250,000 - $499,999
ROCK COUNTY LINE TO COX ROAD
CONST/HSIP/RUMBLE STRIPS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 3130-03-71 09/09/2025 303 LET RSRF30 7.640 USH 012 WHITEWATER TO ELKHORN $5,000,000 - $5,999,999
CTH P TO STH 20/67
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3150-06-20 05/25/2022 303 R/E MISC 14.200 USH 014 DARIEN-BIG FOOT $2,000,000 - $2,999,999
CTH K TO ILLINOIS ST LINE
RE/RECONDITIONING/MILL & OVERLAY
STATE 3R NON-FEDERAL
2023 3150-07-70 09/12/2023 303 LET PVRPLA 2.780 USH 014 JANESVILLE - BIG FOOT $4,000,000 - $4,999,999
IH 43 TO CTH K
CONST/PAVEMENT REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEXE
2022 4764-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
WALWORTH COUNTY PAVEMENTMARKING
$100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE
2022-2025 FINAL STIP Project Listing 149Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2711-06-70 12/12/2023 206 LET RECST 1.846 CTH P POLK - JACKSON $2,000,000 - $2,999,999
STH 145 TO SHERMAN ROAD
CONST/RECONSTRUCT NO ADDL LANES
STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT
2023 2709-07-70 04/11/2023 206 LET MISC 0.028 CTH Q LISBON - RICHFIELD $1,000,000 - $1,999,999
INTERSECTION WITH HILLSIDE ROAD
CONST/INTERSECTION MOD-ROUND-ABOUT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 3700-43-90 07/25/2022 305 MIS TOSIG 0.003 IH 041 MILWAUKEE - FOND DU LAC $0 - $99,999
762FT N OF 1 MI ADV SIGN STH 167
STAND ALONE PROJECT BT02203
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 1100-43-70 01/10/2023 303 LET BRRHB 11.529 IH 041 MILWAUKEE - FOND DU LAC $15,000,000 - $16,999,999
WASHINGTON CO LINE TO STH 60
CONST/BRIDGE REHAB
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1100-43-90 01/25/2023 303 MIS MISC 19.770 IH 041 MILWAUKEE - FOND DU LAC $500,000 - $749,999
WASHINGTON CO LINE TO STH 60
TRAFFIC MITIGATION 1100-43-70
BACKBONE NON-FEDERAL
2023 3700-43-70 01/10/2023 305 LET TOSIG 0.003 IH 041 MILWAUKEE - FOND DU LAC $100,000 - $249,999
762FT N OF 1 MI ADV SIGN STH 167
STAND ALONE PROJECT BT02203
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022 2707-06-70 03/08/2022 206 LET RECST 0.522 LOCSTR
18TH AVENUE $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 150Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
VOGT DRIVE TO PARADISE DRIVE
CONST/RECONSTRUCT
STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP
2022 4824-03-71 11/08/2022 205 LET BRRPL 0.000 LOC STR BADGER ROAD $500,000 - $749,999
BRIDGE OVER KEWASKUM CREEK P-66-913
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP - FAST EXT
2022 4824-04-70 05/10/2022 205 LET BRRPL 0.000 LOC STR TRADING POST TRAIL ROAD $1,000,000 - $1,999,999
BR OVR N BR MILW RIVER P-66-0907
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2024 2707-09-70 03/12/2024 206 LET MISC 0.054 LOC STR C WEST BEND MAIN & PARADISE $1,000,000 - $1,999,999
INTER/DECORAH/PARADISE/SILVERBROOK
CONST/FULL PS/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2310-09-01 303 I/E BRRHB 0.000 OFF SYS IH 41 SB OFF RAMP $250,000 - $499,999
INTERSECTION WITH STH 60
PE/FULL PS&E ROW/BRIDGE REHAB
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 2310-09-21 10/25/2024 303 R/E MISC 0.000 OFF SYS IH 41 SB OFF RAMP $0 - $99,999
INTERSECTION WITH STH 60
RE/BRIDGE REHAB
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 4060-00-75 09/13/2022 303 LET PSRS40 8.500 STH 028 MAYVILLE TO KEWAUSKUM $2,000,000 - $2,999,999
WEST WASHINGTON CO LN TO USH 45
CONST/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
1410-11-01 303 I/E MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999
2022-2025 FINAL STIP Project Listing 151Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
INTERSECTION WITH 7TH AVE/MAIN ST
PE/FULL PS&E ROW/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1410-11-02 303 I/E MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999
INTERSECTION WITH 18TH AVE
PE/FULL PS&E ROW/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1410-11-03 303 I/E MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999
INTERSECTION WITH RIVER RD
PE/FULL PS&E ROW/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
1410-15-00 303 I/E RSRF30 1.396 STH 033 HORICAN-WEST BEND $250,000 - $499,999
W WASHINGTON CO LN-NEW PLAT ST
PE/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1410-11-21 11/25/2022 303 R/E MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999
INTERSECTION WITH 7TH AVE/MAIN ST
RE/MISC
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 1410-11-22 11/25/2022 303 R/E MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999
INTERSECTION WITH 18TH AVE
RE/MISC
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 1410-11-23 11/25/2022 303 R/E MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999
INTERSECTION WITH RIVER RD
RE/MISC
SAFETY (REGULAR HSIP) NON-FEDERAL
2024 1410-00-73 09/10/2024 303 LET RSRF30 2.734 STH 033 WEST BEND TO NEWBURG, T OF TRENTON $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 152Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1/2 MI WEST OF N POPLAR RD TO CTH Y
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1410-11-71 04/09/2024 303 LET MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999
INTERSECTION WITH 7TH AVE/MAIN ST
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1410-11-72 04/09/2024 303 LET MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999
INTERSECTION WITH 18TH AVE
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1410-11-73 04/09/2024 303 LET MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999
INTERSECTION WITH RIVER RD
CONST/MISC
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2310-13-20 01/25/2022 303 R/E RSRF30 1.040 STH 060 MAIN ST, VILLAGE JACKSON $100,000 - $249,999
CTH P TO EAGLE DR
RE/RESURFACE
STATE 3R NON-FEDERAL
2023 2310-13-70 09/12/2023 303 LET RSRF20 1.650 STH 060 MAIN ST, VILLAGE JACKSON $3,000,000 - $3,999,999
CTH P TO EAGLE DR
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1330-33-70 09/12/2023 303 LET RSRF10 4.207 STH 083 CHENEQUA - HARTFORD, TOWN ERIN $2,000,000 - $2,999,999
WASHINGTON S CO LN TO STH 167
CONST/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 1330-22-70 09/10/2024 303 LET RSRF30 3.910 STH 083 STH 83 - HARTFORD TO CHENEQUA $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 153Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 167 TO MONROE AVENUE
CONST / RESURFACING
STATE 3R SURFACE TRANS BLOCK-FLEXE
2023 4010-18-20 02/25/2023 303 R/E RSRF10 8.457 STH 144 WEST BEND - WALDO $0 - $99,999
SKYLINE DR TO NCL
RE/RESURFACE
STATE 3R NON-FEDERAL
2024 4010-18-70 11/12/2024 303 LET RSRF10 8.457 STH 144 WEST BEND - WALDO $3,000,000 - $3,999,999
SKYLINE DR TO NCL
CONST/RESURFACE
STATE 3R SURFACE TRANSP BLOCKGRTS-
2475-04-01 303 I/E RECST 0.030 STH 145 V GERMANTOWN-FOND DU LAC AVENUE $250,000 - $499,999
INTERSECTION WITH CTH G
PE/FULL PS&E ROW/RECST
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 2475-04-21 11/25/2023 303 R/E RECST 0.030 STH 145 V GERMANTOWN-FOND DU LAC AVENUE $0 - $99,999
INTERSECTION WITH CTH G
RE/RECST
SAFETY (REGULAR HSIP) NON-FEDERAL
2740-02-00 303 I/E RECST 0.011 STH 167 V GERMANTOWN, LANNON ROAD $100,000 - $249,999
INTERSECTION WITH MAPLE ROAD
PE/FULL PS&E/RECONSTRUCT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2300-06-20 05/25/2022 303 R/E MISC 2.105 STH 167 STH 167 $100,000 - $249,999
CTH K TO CTH CC
RE/RESURFACE
2022-2025 FINAL STIP Project Listing 154Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SAFETY (REGULAR HSIP) NON-FEDERAL
2022 2300-08-20 01/25/2022 303 R/E RSRF20 3.371 STH 167 HOLY HILL ROAD $0 - $99,999
STH 164 TO STH 175
RE/RESURFACE
STATE 3R NON-FEDERAL
2022 2300-08-70 05/10/2022 303 LET RSRF20 3.371 STH 167 V RICHFIELD, HOLY HILL RD $2,000,000 - $2,999,999
STH 164 TO STH 175
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 2300-06-70 04/09/2024 303 LET MISC 2.105 STH 167 WAUKESHA - SLINGER $1,000,000 - $1,999,999
CTH K TO CTH CC
CONST/RESURFACE
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 2740-02-70 03/12/2024 303 LET RECST 0.011 STH 167 V GERMANTOWN, LANNON ROAD $500,000 - $749,999
INTERSECTION WITH MAPLE ROAD
CONST/RECONSTRUCT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1000-09-86 05/10/2022 303 LET BRRHB 0.000 USH 045 USH 45 $100,000 - $249,999
IH 41/USH 45 BOX CULVERT
CONST/BRIDGE REHABILITATION
STATE 3R SURFACE TRANS BLOCK-FLEXE
2023 4070-00-70 09/12/2023 303 LET RSRF30 1.212 USH 045 FOND DU LAC AVENUE $2,000,000 - $2,999,999
WB CTH H TO WB STH 28
CONST / RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 4070-00-71 09/12/2023 303 LET RSRF30 1.198 USH 045 FOND DU LAC AVENUE $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 155Southeast RegionWASHINGTON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
WB CTH H TO WB STH 28
CONST / RESURFACING
STATE 3R NON-FEDERAL
2022 3360-17-70 05/10/2022 303 LET MISC 0.002 VARHWY
STH 175 AND STH 167 $1,000,000 - $1,999,999
LOCATIONS ON STN PER PLAN
CONST/CULVERT REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEXE
2022 4766-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
WASHINGTON COUNTY PAVEMENTMARKING
$100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE
2023 2707-08-20 04/25/2023 303 R/E MISC 6.194 VARHWY
SOUTHEAST REGION, ADA CURB RAMPS $250,000 - $499,999
WEST BEND AREA VAR LOC PER PLAN
PER WISDOT ADA TRANS PLAN RAMPS
CURB RAMP STANDALONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 156Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3779-03-70 05/10/2022 206 LET MISC 0.009 CTH B CTH B $250,000 - $499,999
INTERSECTION WITH MORGAN ROAD
CONST/INTERSECTION MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 3782-04-70 04/11/2023 206 LET MISC 0.015 CTH D CTH D $500,000 - $749,999
INTERSECTION W/ MORAINE HILLS DRIVE
CONST/INTERSECTION MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2717-03-70 12/13/2022 205 LET BRRHB 0.000 CTH F C PEWAUKEE REDFORD BLVD $500,000 - $749,999
BRIDGE OVER GREEN ROAD, B-67-0095
CONST/BRIDGE REHABILITATION
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2023 2754-05-70 04/11/2023 206 LET MISC 0.029 CTH F C PEWAUKEE CTH F $750,000 - $999,999
INTERSECTION WITH LINDSAY ROAD
CONST/HSIP INTERSECT MODIFICATION
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 2722-04-01 03/25/2022 206 C/E PVRPLA 1.469 CTH O MOORLAND ROAD $750,000 - $999,999
CTH D TO STH 59
PE/FULL PS&E-RE-PVRPLA
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 2722-08-21 05/25/2022 206 R/E PVRPLA 1.326 CTH O MOORLAND ROAD $750,000 - $999,999
CTH ES TO CTH D
RE/PAVEMENT REPLACEMENT
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022 2722-08-22 12/25/2022 206 R/E RECSTE 1.065 CTH O NEW BERLIN - BROOKFIELD $500,000 - $749,999
CTH HH TO GRANGE AVENUE
RE/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 157Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2722-04-21 01/25/2023 206 R/E PVRPLA 1.469 CTH O C NEW BERLIN MOORLAND ROAD $1,000,000 - $1,999,999
CTH D TO STH 59
RE/PAVEMENT REPLACEMENT
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2023 2722-07-72 02/14/2023 206 LET PVRPLA 1.358 CTH O C NEW BERLIN MOORLAND ROAD $11,000,000 - $11,999,999
W BELOIT ROAD TO W NATIONAL AVE
CONST/REPLACEMENT
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2722-08-71 12/10/2024 206 LET PVRPLA 1.326 CTH O C NEW BERLIN MOORLAND ROAD $6,000,000 - $6,999,999
CTH ES TO CTH D
CONST/PAVEMENT REPLACEMENT
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2722-08-72 12/10/2024 206 LET RECSTE 1.065 CTH O NEW BERLIN - BROOKFIELD $7,000,000 - $7,999,999
CTH HH TO GRANGE AVENUE
CONST/RECONSTRUCT NO ADD'L LANES
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 2717-04-70 01/09/2024 206 LET RSRF30 0.970 CTH T C WAUKESHA GRANDVIEW BLVD $2,000,000 - $2,999,999
NORTHVIEW ROAD TO IH-94
CONST/RESURFACE
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2023 2753-08-70 04/11/2023 206 LET MISC 0.009 CTH VV V MENOMONEE FALLS CTH VV $750,000 - $999,999
INTERSECTION WITH CTH YY
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1090-08-90 03/25/2022 303 MIS MISC 3.620 IH 043 IH 43 ROCK FREEWAY $0 - $99,999
MOORLAND RD TO HALE I/C
TRAFFIC MITIGATION FOR 1090-08-71
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 158Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1090-09-76 09/10/2024 303 LET RSRF20 5.971 IH 043 IH 43 ROCK FREEWAY $20,000,000 - $24,999,999
STH 164 TO MOORLAND RD
CONST/RESURFACING
BACKBONE NATIONAL HIGHWAY PERFFAST
2025 1090-39-70 11/11/2025 303 LET RSRF30 7.080 IH 043 IH 43 ROCK FREEWAY $30,000,000 - $34,999,999
STH 83 TO STH 164
CONSTRUCTION/RSRF30
BACKBONE NATIONAL HIGHWAY PERFFAST
1060-13-06 303 I/E RSRF30 9.343 IH 094 IH 94 EAST WEST FREEWAY $4,000,000 - $4,999,999
STH 16 TO WAUKESHA E CO LN
PE/FULL PS&E RSRF30
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1060-10-22 05/25/2022 303 R/E MISC 0.307 IH 094 IH 94 EAST WEST FREEWAY $0 - $99,999
MOORLAND I/C
RE/RSRF 10
BACKBONE NON-FEDERAL
2022 1060-54-00 07/25/2022 303 C/E MISC 26.708 IH 094 EAST WEST FREEWAY $2,000,000 - $2,999,999
WILLOW GLEN ROAD TO ZOO IC
PE SAFETY AND OPERATIONS STUDIES
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1060-10-72 05/09/2023 303 LET RSRF10 0.307 IH 094 IH 94 EAST WEST FREEWAY $1,000,000 - $1,999,999
MOORLAND I/C
CONST/RSRF 10
BACKBONE NON-FEDERAL
2024 1060-47-70 09/10/2024 303 LET RSRF30 6.661 IH 094 IH 94 EAST WEST FREEWAY $25,000,000 - $29,999,999
2022-2025 FINAL STIP Project Listing 159Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 83 TO STH 16
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1060-47-90 09/25/2024 303 MIS MISC 6.661 IH 094 IH 94 EAST WEST FREEWAY $750,000 - $999,999
STH 83 TO STH 16
TRAFFIC MITIGATION 1060-47-70
BACKBONE NON-FEDERAL
2022 2370-04-70 05/10/2022 205 LET BRRPL 0.000 LOC STR DUPLAINVILLE ROAD $250,000 - $499,999
BRIDGE OVER SPRING CREEK B-67-0009
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES SURFACE TRANSBLOCK-FLEX E
2022 2720-05-01 07/25/2022 205 C/E BRRPL 0.000 LOC STR V MENOMONEE FALLS OVERVIEW DRIVE $100,000 - $249,999
BRIDGE OVER BUTLER DITCH, P-67-0774
PE/FULL PS&E-BRRPL
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE
2023 2722-09-70 05/09/2023 206 LET RECST 0.012 LOC STR C NEW BERLIN S CALHOUN ROAD $250,000 - $499,999
INTERSECTION WITH SMALL ROAD
CONST/RECONST
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2023 3853-03-70 11/14/2023 205 LET BRRPL 0.000 LOC STR V SUMMIT DELAFIELD ROAD $250,000 - $499,999
BRIDGE OVER BATTLE CREEK B-67-0670
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE
2024 2720-05-71 11/12/2024 205 LET BRRPL 0.000 LOC STR V MENOMONEE FALLS OVERVIEW DR $750,000 - $999,999
BRIDGE OVER BUTLER DITCH, P-67-0774
2022-2025 FINAL STIP Project Listing 160Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE
2022 1693-34-40 01/25/2022 211 TST MISC 0.000 NONHWY
WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999
FY 2022
TST/TRANSIT-MARKETING
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2023 1693-34-41 09/25/2023 211 TST MISC 0.000 NONHWY
WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999
FY 2024
TST/TRANSIT-MARKETING
CONGESTION MITIGATION AND AIR QUALITY(CMAQ)
PROJ RDUCE PM 2.5 EMIFAST
2024 1330-47-71 09/10/2024 303 LET RSRF30 0.000 OFF SYS C DELAFIELD, STATE ROAD 83 $250,000 - $499,999
NAGAWAUKEE PARK AND RIDE LOT
CONST/RESURFACE
STATE 3R NON-FEDERAL
2022 1370-17-70 08/09/2022 303 LET MISC 7.373 STH 016 STH 16 $2,000,000 - $2,999,999
5800' WEST OF STH 83 TO STH 190
CONST/HSIP/GUARD RAILS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST
2024 3310-06-70 02/13/2024 303 LET RSRF10 1.588 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999
WCL TO STH 67
CONST/RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 2450-00-73 05/09/2023 303 LET RSRF10 0.515 STH 059 T GENESEE, GENESEE RD $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 161Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SAYLESVILLE CREEK TO ROCKWOOD TRAIL
CONST/RSRF10
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 2773-10-70 02/14/2023 303 LET PSRS30 1.990 STH 059 EAST WAUKESHA BYPASS $6,000,000 - $6,999,999
SUNSET DRIVE TO ARCADIAN AVENUE
CONST/PATCH/REPAIR/GRIND/INTERSCT
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 2773-10-72 02/14/2023 303 LET MISC 0.005 STH 059 C WAUKESHA, LES PAUL PARKWAY $250,000 - $499,999
STH 59 AND CTH XX INTERSECTION
CONST/INTERSECTION IMPROVEMENTS
STATE 3R NON-FEDERAL
2023 3110-08-20 04/25/2023 303 R/E MISC 16.524 STH 059 WHITEWATER - MILWAUKEE $0 - $99,999
W COUNTY LINE TO CTH X
RE/RESURFACE
STATE 3R NON-FEDERAL
2022 3120-01-61 03/08/2022 303 LET PSRS40 9.610 STH 067 DOUSMAN - EAGLE $3,000,000 - $3,999,999
1000' N STH 59 TO 200' S USH 18
CONST/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 3100-00-25 01/25/2023 303 R/E RSRF30 7.837 STH 067 ELKHORN TO EAGLE $0 - $99,999
USH 12 TO STH 59
RE/RESURFACE
STATE 3R NON-FEDERAL
2025 3100-00-75 09/09/2025 303 LET PSRS40 7.837 STH 067 ELKHORN TO EAGLE $3,000,000 - $3,999,999
USH 12 TO STH 59
CONST/PSRS40 RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 1300-09-71 12/13/2022 303 LET PSRS40 0.639 STH 083 NORTHWEST HIGHWAY (STH 83) $750,000 - $999,999
2022-2025 FINAL STIP Project Listing 162Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
W BOXHORN DR TO WOLF RUN
CONST/PSRS40
STATE 3R NON-FEDERAL
2022 1330-00-23 06/25/2022 303 R/E MISC 3.229 STH 083 DELAFIELD - HARTLAND $0 - $99,999
GOLF RD TO VETTELSON RD
RE/PAVEMENT REPLACEMENT
STATE 3R NON-FEDERAL
2023 1330-29-70 09/12/2023 303 LET RSRF10 2.742 STH 083 STH 83 (MILL ST) $1,000,000 - $1,999,999
OCONOMOWOC RVR TO N WAUKESHA COLN
CONST/RESURFACE (B-67-0952)
STATE 3R SURFACE TRANS BLOCK-FLEX E
2024 1330-00-73 05/14/2024 303 LET PVRPLA 3.229 STH 083 DELAFIELD - HARTLAND $9,000,000 - $9,999,999
GOLF RD TO VETTELSON RD
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2810-08-20 08/25/2022 303 R/E PVRPLA 2.310 STH 164 WATERFORD - WAUKESHA $0 - $99,999
HENNEBERRY AVE TO DENOON RD
RE/PAVEMENT REPLACEMENT
STATE 3R NON-FEDERAL
2023 2370-00-25 04/25/2023 303 R/E RSRF30 8.027 STH 164 WAUKESHA - SLINGER $0 - $99,999
SWAN ROAD TO NORTH COUNTY LINE
RE/RSRF30
STATE 3R NON-FEDERAL
2024 2810-08-70 09/10/2024 303 LET PVRPLA 2.310 STH 164 WATERFORD - WAUKESHA $4,000,000 - $4,999,999
HENNEBERRY AVE TO DENOON RD
CONST/PAVEMENT REPLACEMENT
2022-2025 FINAL STIP Project Listing 163Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 2025-03-23 01/25/2022 303 R/E RSRF30 4.054 STH 190 CAPITOL DR, CITY OF BROOKFIELD $250,000 - $499,999
BROOKFIELD RD TO 124TH ST
RE/RESURFACE
STATE 3R NON-FEDERAL
2025 2025-03-73 09/09/2025 303 LET RSRF30 4.054 STH 190 C BROOKFIELD, CAPITOL DR $11,000,000 - $11,999,999
BROOKFIELD RD TO 124TH ST
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 2025-07-73 09/09/2025 303 LET RSRF30 2.070 STH 190 PEWAUKEE - SHOREWOOD $11,000,000 - $11,999,999
STH 16 TO .3 MI E OF 5 FIELDS RD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 2788-03-70 09/10/2024 303 LET RSRF30 0.273 STH 318 C WAUKESHA MEADOWBROOK ROAD $250,000 - $499,999
ROLLING RIDGE DR TO IH 94 EB RAMPS
CONST/RSRF30
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 3080-04-70 05/10/2022 303 LET RSRF30 3.965 USH 018 SUNSET DRIVE $2,000,000 - $2,999,999
STH 67 TO MORAINE VIEW DR
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 2210-12-70 05/09/2023 303 LET RSRF30 5.120 USH 018 SUMMIT AVE, TOWN DELAFIELD $5,000,000 - $5,999,999
STH 83 TO STH 318
CONST/RESURFACE
2022-2025 FINAL STIP Project Listing 164Southeast Region
WAUKESHA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 2200-20-70 09/10/2024 303 LET RSRF30 5.264 USH 018 C BROOKFIELD, BLUEMOUND RD $13,000,000 - $13,999,999
IH 94 TO EAST COUNTY LINE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4767-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY
WAUKESHA COUNTY PAVEMENT MARKING $100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS/PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E
2023 2715-03-73 05/09/2023 303 LET BRRPL 0.000 VARHWY
VARIOUS BRIDGE LOCATIONS $7,000,000 - $7,999,999
STH 59 & USH 18
CONST/BRIDGE REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022 – 2025 Statewide Transportation Improvement Program
Northeast Region Projects
2022-2025 FINAL STIP Project Listing 165Northeast Region
BROWN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 4555-03-71 01/10/2023 206 LET MISC 3.090 CTH MM T LEDGEVIEW, CTH MM $250,000 - $499,999
CTH G - I43
CONST OPS/HRRRP
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2023 4987-02-78 02/14/2023 205 LET BRRPL 0.033 LOC STR C GREEN BAY, CHANTEL STREET $500,000 - $749,999
BEAVER DAM CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2024 4516-10-71 01/09/2024 206 LET RECST 0.917 LOC STR V BELLEVUE, ALLOUEZ AVENUE $2,000,000 - $2,999,999
HAZEN ROAD - USH 141
CNST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 4517-06-71 01/09/2024 206 LET RECST 1.033 LOC STR V ALLOUEZ, LIBAL STREET $4,000,000 - $4,999,999
STH 172 TO KALB AVE
CNST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 4985-00-62 12/10/2024 206 LET RECST 0.479 LOC STR C DEPERE, LAWRENCE DRIVE $3,000,000 - $3,999,999
FORTUNE AVENUE TO SCHEURING ROAD
CONST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2024 4987-12-71 02/13/2024 205 LET BRRPL 0.010 LOC STR C GREEN BAY, LARSEN ROAD $750,000 - $999,999
BEAVER DAM CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2025 4987-02-75 01/14/2025 206 LET RECST 0.910 LOC STR C GREEN BAY, COUNTRY CLUB ROAD $5,000,000 - $5,999,999
MASON ST FRONTAGE RD TO INDIAN HILL
CONST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 166Northeast Region
BROWN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
4180-06-00 303 I/E RSRF30 0.950 STH 029 SHAWANO AVE, C GREEN BAY $100,000 - $249,999
HUDSON ST - N OAKLAND AVE
DSGN/FULL PSE/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
4180-08-00 303 I/E BRRHB 0.193 STH 029 WALNUT STREET, CITY OF GREEN BAY $100,000 - $249,999
FOX RIVER BRIDGE
DSGN/FULL PSE/BRRHB B-05-0269
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022 9200-10-73 11/08/2022 303 LET MISC 8.370 STH 029 SHAWANO - GREEN BAY $1,000,000 - $1,999,999
STH 156 - IH 41
CONSTR OPS/MISC FENCING
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 4085-62-71 11/08/2022 303 LET BRRPL 0.000 STH 032 CITY OF DE PERE, GREENLEAF ROAD $1,000,000 - $1,999,999
STH 32 NORTHBOUND OVER CTH PP
CONST/BRIDGE REPLACE B-05-0052
SHR BRIDGES NATIONAL HWY PERF PROGRAM
2022 9210-19-71 11/08/2022 303 LET BRRHB 0.032 STH 032 W MASON ST, CITY OF GREEN BAY $100,000 - $249,999
BEAVER DAM CREEK BRIDGE
CONST/BRRPL BOX CULVERT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
9210-20-00 303 I/E BRRHB 0.240 STH 054 ONEIDA - GREEN BAY $0 - $99,999
DUCK CREEK BRIDGE B-05-0392
DESIGN/FULL PSE/BRRHB
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
9210-21-00 303 I/E RSRF30 2.610 STH 054 SEYMOUR - GREEN BAY $0 - $99,999
STH 172 - PLEASANT LN
DSN/FULL PSE/RSRF30
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 167Northeast Region
BROWN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1480-27-71 11/08/2022 303 LET RSRF20 4.800 STH 054 GREEN BAY-LUXEMBURG $5,000,000 - $5,999,999
UNIVERSITY WAY-STH57
CONST OPS/RESURFACE ASPHALT PAVE
STATE 3R NATIONAL HIGHWAY PERFFAST
1481-08-00 303 I/E RSRF20 0.580 STH 057 MONROE STREET, CITY OF GREEN BAY $100,000 - $249,999
SOUTH CITY LIMITS - CASS STREET
DSN/FULL PSE/RESURFACE URBAN
STATE 3R NAT'L HWY SYSTEM
2025 4085-68-71 11/11/2025 303 LET RSRF20 2.875 STH 057 C. OF DE PERE-V. OF ALLOUEZ $2,000,000 - $2,999,999
RANDALL AVE-GRIGNON ST
CONST/RESURF
STATE 3R NATIONAL HIGHWAY PERFFAST
4075-42-00 303 I/E RSRF30 3.190 STH 096 WRIGHTSTOWN - GREENLEAF $100,000 - $249,999
SHANTY RD - BRECKENRIDGE FALLS BLVD
DSGN/FULL PSE/RSRF
STATE 3R STBG <5K POP FAST
2022 1210-09-71 12/13/2022 303 LET RSRF20 6.560 STH 172 IH 41-IH 43 $15,000,000 - $16,999,999
IH 41-IH 43
CONST/RESURF MILL/OVERLAY
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1210-11-71 12/13/2022 303 LET RSRF20 2.820 STH 172 ONEIDA-GREEN BAY $5,000,000 - $5,999,999
AIRPORT ENTRANCE-IH 41
CONST OPS/RESURF
STATE 3R NATIONAL HIGHWAY PERFPLAN
2023 1210-17-71 11/14/2023 303 LET RSRF30 2.640 STH 172 ONEIDA - GREEN BAY $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 168Northeast Region
BROWN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STH 54 - AIRPORT ENTRANCE
CONST OPS/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1210-18-71 11/14/2023 303 LET BRRPL 0.017 STH 172 ONEIDA - GREEN BAY $750,000 - $999,999
UNNAMED CREEK, C-05-0122
CONST OPS/BRRPL
STATE 3R NATIONAL HIGHWAY PERFFAST
4161-03-00 303 I/E RSRF30 0.507 STH X04 ASHLAND AVE, C GREEN BAY $0 - $99,999
IH 41 - N. EIGHT ST
DSN/FULL PSE/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
1450-15-00 303 I/E RSRF25 1.241 USH 141 MAIN STREET, CITY OF GREEN BAY $250,000 - $499,999
BAIRD STREET - FOX RIVER
DSN/FULL PSE/RESURFACE URBAN
STATE 3R MINIMUM GUARANTEE
2022 1450-18-21 03/25/2022 303 R/E RSRF30 2.645 USH 141 LEDGEVIEW - BELLEVUE $0 - $99,999
CTH MM - CONTINENTAL DR
RE ACQUISTION/RW
STATE 3R NON-FEDERAL
2023 1450-18-40 11/25/2023 303 UTL RSRF30 2.645 USH 141 LEDGEVIEW - BELLEVUE $0 - $99,999
CTH MM - CONTINENTAL DR
UTL RELOCATION
STATE 3R NON-FEDERAL
2022 4705-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
BROWN COUNTY PAVEMENT MARKING2022
$0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
2022-2025 FINAL STIP Project Listing 169Northeast Region
BROWN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 170Northeast Region
CALUMET
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 4474-03-71 01/10/2023 205 LET BRRPL 0.010 LOC STR T BRILLION, NORTH COUNTY LINE ROAD $500,000 - $749,999
EAST RIVER BRIDGE
CNST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2023 4984-01-81 12/25/2023 290 LLC MISC 2.890 NON HWY APPLETON WEENERGIES TRAIL PHASE 1 $1,000,000 - $1,999,999
C APPLETON
CONST/MISC BIKE/PED TRAIL
TAP > 200,000 TRANS ALTERNATIVES >200K F
2022 4085-67-21 01/25/2022 303 R/E RSRF20 4.671 STH 032 NEW HOLSTEIN-CHILTON $0 - $99,999
ALTONA AVENUE-USH 151
RE/RW RE ACQUISITION
STATE 3R NON-FEDERAL
2022 4085-67-40 12/25/2022 303 UTL RSRF20 4.671 STH 032 NEW HOLSTEIN-CHILTON $0 - $99,999
ALTONA AVENUE-USH 151
UTL RELOCATION
STATE 3R NON-FEDERAL
2023 4085-60-71 07/11/2023 303 LET RSRF10 2.439 STH 032 KIEL-NEW HOLSTEIN $1,000,000 - $1,999,999
CTH AA-JORDAN AVENUE
CONST/RSRF10/R/W-NO
STATE 3R NATIONAL HWY PERF PROGRAM
2023 4085-66-21 05/25/2023 303 R/E RSRF30 7.120 STH 032 CHILTON - HILBERT $100,000 - $249,999
BREED ST - STH 114
RE/RW OPS
STATE 3R NON-FEDERAL
2023 4085-67-71 11/14/2023 303 LET RSRF20 5.281 STH 032 NEW HOLSTEIN-CHILTON $2,000,000 - $2,999,999
ALTONA AVENUE-USH 151
CONST/RESURF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 171Northeast Region
CALUMET
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
4050-22-00 303 I/E RSRF20 11.670 STH 055 FOND DU LAC-SHERWOOD $250,000 - $499,999
USH 151-STH 114
DSGN/FULL PSE/RESURFACE
STATE 3R NON-FEDERAL
2022 4050-27-21 08/25/2022 303 R/E BRRPL 11.440 STH 055 FOND DU LAC - SHERWOOD $0 - $99,999
USH 151 - STH 114
RE ACQUISITION/ROW /BRRPL
SHR BRIDGES NON-FEDERAL
2023 4050-15-71 07/11/2023 303 LET RSRF20 1.640 STH 055 SHERWOOD-KAUKAUNA $750,000 - $999,999
STH 114-USH 10
CONST/RESURFACE LEVEL IMPROVEMENT
STATE 3R STP ANY AREA
2024 4050-27-71 11/12/2024 303 LET BRRPL 11.440 STH 055 FOND DU LAC - SHERWOOD $3,000,000 - $3,999,999
USH 151 - STH 114
CONST OPS/CULVERT REPLACEMENTS
SHR BRIDGES SURFACE TRANS BLOCK-FLEX E
2025 4050-21-71 11/11/2025 303 LET RSRF20 2.850 STH 055 SHERWOOD-KAUKAUNA $1,000,000 - $1,999,999
USH 10-RIDGECREST LANE
CONST/MILL & OVERLAY RW-NO
STATE 3R SURFACE TRANS FLEX - MAP-2
1500-50-00 303 I/E RSRF20 8.390 USH 010 APPLETON-BRILLION $100,000 - $249,999
CTH N-STH 32/57
DSN/FULL PSE/RESURF MILL/OVERLAY
STATE 3R NATIONAL HIGHWAY PERFPLAN
1500-69-00 303 I/E RSRF20 11.940 USH 010 APPLETON-BRILLION $100,000 - $249,999
STH 32/57-CTH HR
DESIGN/RESURF
2022-2025 FINAL STIP Project Listing 172Northeast Region
CALUMET
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERF FAST
1500-76-00 303 I/E RECST 0.086 USH 010 APPLETON - FOREST JUNCTION $100,000 - $249,999
N MARX RD/CTH D INTERSECTION
DSN/FULL PSE/RECST
STATE 3R NATIONAL HIGHWAY PERF FAST
4100-25-00 303 I/E RSRF20 0.360 USH 151 W. MAIN STREET, CITY OF CHILTON $0 - $99,999
HEIMANN STREE - STH 32/57
DSN/FULL PSE/RESURFACE URBAN
STATE 3R MINIMUM GUARANTEE
4100-36-00 303 I/E RSRF20 11.480 USH 151 FOND DU LAC-CHILTON $100,000 - $249,999
SCL-QUINNEY ROAD
DESIGN/FULL PSE/RESURF
STATE 3R NON-FEDERAL
2023 4050-28-40 12/25/2023 303 UTL BRRPL 0.038 USH 151 FOND DU LAC - STOCKBRIDGE $0 - $99,999
SCL - STH 55
UTL RELOCATION
STATE 3R NON-FEDERAL
2024 4050-28-71 11/12/2024 303 LET BRRPL 0.028 USH 151 FOND DU LAC - STOCKBRIDGE $500,000 - $749,999
SCL - STH 55
CONST OPS/C08-0065 UNNAMED CREEK
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2022 4685-33-71 11/08/2022 303 LET BRPVTV 0.000 VARHWY
MENASHA - APPLETON $1,000,000 - $1,999,999
VARIOUS HWY
CONSTR OPS/BRPVTV
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 4708-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
CALUMET COUNTY PAVEMENT MARKING $0 - $99,999
2022-2025 FINAL STIP Project Listing 173Northeast Region
CALUMET
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMASCY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 174Northeast Region
DOOR
2022-2025 FINAL STIP Project Listing 174Northeast Region
DOOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
4140-32-00 303 I/E RSRF20 6.660 STH 042 EGG HARBOR-FISH CREEK $100,000 - $249,999
RAINBOW RIDGE-GIBRALTAR BLUFF
DESIGN/FULL PSE/RESURF
STATE 3R NATIONAL HIGHWAY PERF FAST
4610-09-00 303 I/E RSRF20 12.020 STH 042 SISTER BAY-GILLS ROCK $100,000 - $249,999
SCANDIA ROAD-FERRY LANDING
DSGN/FULL PSE/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX - MAP-2
2022 4140-34-60 12/13/2022 303 LET PSRS40 7.042 STH 042 EGG HARBOR-FISH CREEK $2,000,000 - $2,999,999
RAINBOW RIDGE RD-BLUFF LN
CONST/PSRS
STATE 3R NON-FEDERAL
2022 4423-00-01 07/25/2022 290 LLC MISC 1.280 STH 042 WALK, BIKE & EGGSPLORE EGG HARBOR $1,000,000 - $1,999,999
V EGG HARBOR
CONST/MISC PED/BIKE TRAIL
TAP < 5,000 TRANS ALTERN 5K AND UNDER
2022 4430-21-71 11/08/2022 303 LET RSRF20 0.769 STH 042 STURGEON BAY - EGG HARBOR $1,000,000 - $1,999,999
EGG HARBOR ROAD - MID JCT 42/57
CONST/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
4150-20-00 303 I/E RSRF20 14.340 STH 057 MID JUNCTION - JACKSON PORT $100,000 - $249,999
STH 42 - SUMMIT ROAD
DESIGN/FULL PSE/RESURFACE
STATE 3R STP ANY AREAS
2023 4150-26-71 08/08/2023 303 LET BRRPL 0.305 STH 057 MID JUNCTION - BAILEYS HARBOR $3,000,000 - $3,999,999
STH 42 - SUMMIT ROAD
CONST/BOX CULVERT REPLACEMENT
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 175Northeast RegionFOND DU LAC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 4986-12-50 10/25/2022 205 R/R BRRPL 0.000 CTH KW C FOND DU LAC, WEST DIVISION STREET $0 - $99,999
CN RR SIGNAL 690112B MP 156.21
R/R OPS- SIGNAL ADJUSTMENTS
LOCAL BRIDGES NON-FEDERAL
2024 6296-02-71 02/13/2024 205 LET BRRPL 0.181 CTH M T ROSENDALE, CTH M $250,000 - $499,999
FOND DU LAC RIVER BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4840-00-71 12/10/2024 205 LET BRRPL 0.178 CTH T T EMPIRE, CTH T $250,000 - $499,999
TAYCHEEDAH CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4840-01-71 12/10/2024 205 LET BRRPL 0.078 CTH T T EMPIRE, CTH T $500,000 - $749,999
TAYCHEEDAH CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4831-05-71 01/09/2024 206 LET RECST 0.530 CTH VV C FOND DU LAC, CTH VV $2,000,000 - $2,999,999
CTH V TO MARTIN AVENUE
CONST OPS/RECST
STP URBAN 50,000 - 200,000 STBG-URBANIZED >200K FAST
2022 1100-50-71 05/10/2022 303 LET RSRF10 7.230 IH 041 MILWAUKEE-FOND DU LAC $11,000,000 - $11,999,999
SCL-USH 151
CONST OPS/RESURF
BACKBONE NATIONAL HIGHWAY PERFPLAN
2023 1150-74-71 01/10/2023 303 LET BRRHB 0.002 IH 041 FOND DU LAC - OSHKOSH $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 176Northeast RegionFOND DU LAC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TOWN LINE ROAD OVERPASS
CONST/BRRHB B-20-0060 R/W - NO
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 4986-12-71 03/14/2023 205 LET BRRPL 0.000 LOC STR C FOND DU LAC, WEST DIVISON STREET $2,000,000 - $2,999,999
WEST BRANCH FOND DU LAC RIVER BRIDG
CONST OPS/BRRPL
LOCAL BRIDGES NON-FEDERAL
2024 3822-02-71 12/10/2024 205 LET BRRPL 0.057 LOC STR T LAMARTINE, TOWNLINE ROAD $1,000,000 - $1,999,999
W BRANCH FOND DU LAC RIVER BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4816-00-71 12/10/2024 205 LET BRRPL 0.241 LOC STR T FOREST, POPULAR ROAD $250,000 - $499,999
SHEBOYGAN RIVER BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4986-00-57 12/10/2024 205 LET BRRPL 0.163 LOC STR C FOND DU LAC, PROMEN DRIVE $1,000,000 - $1,999,999
LAKESIDE PARK LAGOON
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4986-00-59 02/13/2024 205 LET BRRPL 0.087 LOC STR V NORTH FOND DU LAC,MCKINLEY STREET $250,000 - $499,999
MOSHER CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2022 3700-30-42 07/25/2022 305 MIS TOSIG 1.920 STH 023 C RIPON, W FOND DU LAC ST $100,000 - $249,999
WESTGATE DR-METOMEN ST REHAB/RTRFIT
2022-2025 FINAL STIP Project Listing 177Northeast RegionFOND DU LAC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TRF DSN/OPS TOSIG/ NE2301L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
1110-16-00 303 I/E RSRF10 16.250 STH 026 WAUPUN - NCL $250,000 - $499,999
CATTARAUGUS RD - CTH FF
DSN/FULL PSE/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1110-15-71 02/14/2023 303 LET BRRPL 0.000 STH 026 ROSENDALE-OSHKOSH $1,000,000 - $1,999,999
STH 23 - CTH FF
CONST/BRIDGE REPLACE B-20-0651
SHR BRIDGES NATIONAL HWY PERFPROGRAM
2023 6100-08-60 07/11/2023 303 LET PSRS40 3.588 STH 044 FAIRWATER-BRANDON $1,000,000 - $1,999,999
WCL-STH 49
CONST OPS/PSRS
STATE 3R NON-FEDERAL
2025 6090-14-50 04/25/2025 303 R/R RSRF10 0.050 STH 049 BRANDON-RIPON $250,000 - $499,999
WSOR XING SIGNALS 387487G
RR CROSSING SIGNALS
STATE 3R STBG <5K POP FAST
4080-07-00 303 I/E RSRF20 14.055 USH 045 KEWASKUM-EDEN $250,000 - $499,999
SCL-WINTER ROAD
DSGN/FULL PSE/RESURFACE
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 4080-06-71 09/13/2022 303 LET BRRPL 0.000 USH 045 KEWASKUM-EDEN $1,000,000 - $1,999,999
MILWAUKEE RIVER BRIDGE
CONST/BRIDGE REPLACEMENT B-20-0154
2022-2025 FINAL STIP Project Listing 178Northeast RegionFOND DU LAC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 4110-28-71 04/09/2024 303 LET RSRF20 7.420 USH 045 FOND DU LAC-OSHKOSH $4,000,000 - $4,999,999
SCOTT STREET-NCL
CONST OPS/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
4050-29-00 303 I/E RSRF10 5.930 USH 151 FOND DU LAC - CHILTON $100,000 - $249,999
CTH K - NCL
DSGN/FULL PSE/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 4050-23-71 04/12/2022 303 LET BRRPL 0.015 USH 151 FOND DU LAC-CHILTON $750,000 - $999,999
DRAINAGE WAY CULVERT REPLACEMENT
CONST/BRRPL
SHR BRIDGES HWY INFRA COVID SUPP
2022 4720-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
FOND DU LAC COUNTY PAVEMENTMARKING
$0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 179Northeast Region
KEWAUNEE
2022-2025 FINAL STIP Project Listing 179Northeast Region
KEWAUNEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4390-07-71 01/09/2024 206 LET RCND10 3.329 CTH C KEWAUNEE - RYANS CORNER $2,000,000 - $2,999,999
STH 29 TO CTH L
CONST OPS/RCND10
STP RURAL STBG <5K POP FAST
4125-10-00 303 I/E RSRF20 13.390 STH 029 GREEN BAY-KEWAUNEE $100,000 - $249,999
WCL-STH 42
DSGN/FULL PSE/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX MAP-21
2023 4130-11-71 03/14/2023 303 LET RSRF20 12.780 STH 054 LUXEMBURG - ALGOMA $7,000,000 - $7,999,999
VALLEY ROAD - SUNSET AVENUE
CONST/RSRF RURAL/HSIP-RUMBLE STRIPS
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4731-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
KEWAUNEE COUNTY PAVEMENTMARKING
$0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 180Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 4323-08-72 01/10/2023 206 LET PVRPLA 3.580 CTH W MAPLE GROVE - NORTH COUNTY LINE $3,000,000 - $3,999,999
TAUS ROAD TO MANCAL ROAD
CONST OPS/PVRPLA
STP RURAL STBG <5K POP FAST
2022 4305-03-71 05/10/2022 205 LET BRRPL 0.039 LOCSTR
T TWO RIVERS, EAST HILLCREST ROAD $1,000,000 - $1,999,999
EAST TWIN RIVER BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
2022 4310-01-71 03/08/2022 205 LET BRRPL 0.099 LOCSTR
T MANITOWOC RAPIDS, N UNION ROAD $750,000 - $999,999
BRANCH RIVER ROAD BRIDGE
CONST OPS/BRRPL B360240
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEXE
2025 4312-09-71 01/14/2025 205 LET BRRPL 0.126 LOCSTR
T GIBSON, ROCKLEDGE ROAD $750,000 - $999,999
EAST TWIN RIVER BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-
4085-71-00 303 I/E PVRPLA 1.444 STH 032 WATER-FREEMONT-CALUMET STS, C KIEL $500,000 - $749,999
STH 67 - CTH AA
DSGN/FULL PSE/ BRRPL/PVRPLA
STATE 3R NATIONAL HIGHWAY PERFFAST
4570-25-00 303 I/E RSRF20 14.630 STH 042 HOWARDS GROVE - MANITOWOC $100,000 - $249,999
SCL - USH 10
DSGN/FULL PSE/RSRF
2022-2025 FINAL STIP Project Listing 181Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R SURFACE TRANSP BLOCKGRTS-
2022 1470-27-21 08/25/2022 303 R/E RSRF20 3.950 STH 042 MANITOWOC-TWO RIVERS $0 - $99,999
E MAGNOLIA AVE-12TH STREET
RE ACQUISTION/ROW /RESURF
STATE 3R NON-FEDERAL
2022 1470-30-71 12/13/2022 303 LET COLD10 11.213 STH 042 TWO RIVERS-KEWAUNEE $8,000,000 - $8,999,999
34TH STREET-NCL
CONST OPS/COLD10/HSIP
STATE 3R STBG 5-200K POP FAST EXT
2022 3700-30-44 12/25/2022 305 MIS TOSIG 0.015 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999
STH 147 INTERSECTION SIGNAL REHAB
TRF DSN/TOSIG NE2306L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 3700-30-48 09/25/2023 305 MIS TOSIG 0.015 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999
STH 147 INTERSECTION SIGNAL REHAB
TRF OPS/TOSIG NE2306L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 3700-30-49 12/25/2023 305 MIS TOSIG 0.176 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999
16TH ST - 18TH ST SIGNAL REHAB
TRF DSN/TOSIG NE2402L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 1470-27-71 11/12/2024 303 LET RSRF20 3.950 STH 042 MANITOWOC-TWO RIVERS $4,000,000 - $4,999,999
E MAGNOLIA AVE-12TH STREET
CONST/RESURF-MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX - MAP-2
2022-2025 FINAL STIP Project Listing 182Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1470-33-71 11/12/2024 303 LET BRRHB 0.100 STH 042 CITY OF TWO RIVERS, WASHINGTON ST $500,000 - $749,999
WEST TWIN RIVER BRIDGE B360117
CONST/DECK OVERLAY/BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2024 1470-37-71 11/12/2024 303 LET RSRF20 0.460 STH 042 MANITOWOC - TWO RIVERS $500,000 - $749,999
WALDO BLVD - E MAGNOLIA AVE
CONSTR RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2024 3700-30-51 09/25/2024 305 MIS TOSIG 0.176 STH 042 C TWO RIVERS, WASHINGTON ST $100,000 - $249,999
16TH ST - 18TH ST SIGNAL REHAB
TRF OPS/TOSIG NE2402L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 4337-23-50 04/25/2024 303 R/R RSRF30 0.039 STH 310 IH 43-TWO RIVERS $100,000 - $249,999
XING SURFACE WCL RR 181417U
RR CROSSING
STATE 3R STBG <5K POP FAST
2025 4337-23-71 11/11/2025 303 LET RSRF30 5.929 STH 310 IH 43-TWO RIVERS $3,000,000 - $3,999,999
CTH R-COLUMBUS STREET
CONST OPS/RESURF
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1500-71-71 11/08/2022 303 LET BRRPL 0.013 USH010
BRILLION-REEDSVILLE $500,000 - $749,999
UNNAMED CREEK BOX CULVERT C360058
CONST OPS/BRRPL
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 183Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1500-68-21 08/25/2023 303 R/E RSRF30 5.044 USH010
BRILLION-REEDSVILLE $0 - $99,999
BRILLION ECPL-CTH W
REAL ESTATE/RIGHT OF WAY
STATE 3R NON-FEDERAL
2023 1500-75-21 08/25/2023 303 R/E RSRF10 1.100 USH010
MAIN STREET, V. OF REEDSVILLE $0 - $99,999
CTH W - PLEASANT VIEW RD
REAL ESTATE/RIGHT OF WAY
STATE 3R NON-FEDERAL
2024 1500-68-40 12/25/2024 303 UTL RSRF30 5.044 USH010
BRILLION-REEDSVILLE $0 - $99,999
BRILLION ECPL-CTH W
UTL RELOCATION
STATE 3R NON-FEDERAL
2025 1500-56-71 11/11/2025 303 LET RSRF20 1.490 USH010
BRILLION-MANITOWOC $2,000,000 - $2,999,999
CTH P-CTH R
CONST/RESURF
STATE 3R NATIONAL HWY PERFPROGRAM
2025 1500-68-71 11/11/2025 303 LET RSRF30 5.044 USH010
BRILLION-REEDSVILLE $3,000,000 - $3,999,999
BRILLION ECPL-CTH W
CONST/RESURFACE
STATE 3R NATIONAL HWY PERFPROGRAM
2025 1500-75-71 11/11/2025 303 LET RSRF10 1.131 USH010
MAIN STREET, V. OF REEDSVILLE $750,000 - $999,999
CTH W - PLEASANT VIEW RD
2022-2025 FINAL STIP Project Listing 184Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
4100-32-00 303 I/E RSRF20 13.220 USH151
CHILTON-VALDERS $100,000 - $249,999
IRISH ROAD-CHRISTEL DRIVE
DSGN/RESURF
STATE 3R SURFACE TRANS FLEX - MAP-2
4100-39-00 303 I/E RSRF10 0.520 USH151
USH 151, VILLAGE OF VALDERS $100,000 - $249,999
ROOSEVELT STREET - JACKSON STREET
DSGN/FULL PSE/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
4100-41-00 303 I/E BRRHB 0.000 USH151
VALDERS - MANITOWOC $100,000 - $249,999
SILVER CREEK, B-36-0026
DSN/FULL PSE/BRRHB DECK REPLACMENT
SHR BRIDGES STBG 5-200K POP FAST EXT
4100-42-00 303 I/E PVRPLA 3.110 USH151
CALUMET/WASHINGTON, C MANITOWOC $500,000 - $749,999
IH43 - S 8TH STREET
DSN/FULL PSE/PVRPLA
STATE 3R NATIONAL HIGHWAY PERFFAST
4100-42-01 303 I/E PVRPLA 1.780 USH151
CALUMET/WASHINGTON AVE, C MANITOWOC $500,000 - $749,999
35TH STREET - 8TH STREET
DSN/FULL PSE/PVRPLA
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 185Northeast RegionMANITOWOC
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 3700-30-40 07/25/2022 305 MIS TOSIG 0.026 USH151
C MANITOWOC, WASHINGTON ST $0 - $99,999
21ST ST INTERSECTION SIGNAL REHAB
TRF DSN/TOSIG NE2302L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 3700-30-45 08/25/2023 305 MIS TOSIG 0.026 USH151
C MANITOWOC, WASHINGTON ST $250,000 - $499,999
21ST ST INTERSECTION SIGNAL REHAB
TRF OPS/TOSIG NE2302L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2022-2025 FINAL STIP Project Listing 186Northeast Region
MARINETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
9160-18-00 303 I/E RSRF20 7.770 STH 064 BRAZEAU-POUND $100,000 - $249,999
CTH S-USH 141
DESGN/FULL PSE/RESURF
STATE 3R SURFACE TRANS FLEX MAP-21
2022 9160-21-21 11/25/2022 303 R/E PSRS40 0.680 STH 064 MOUNTAIN - POUND $0 - $99,999
N 17TH RD - USH 141
RE ACQUISITION/RW
STATE 3R NON-FEDERAL
2023 9160-17-71 02/08/2023 303 LET RSRF10 10.760 STH 064 POUND-MARINETTE $4,000,000 - $4,999,999
USH 141-CTH E
CONST/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 9160-19-71 11/14/2023 303 LET RSRF10 7.040 STH 064 POUND-MARINETTE $3,000,000 - $3,999,999
CTH E-STH 180
CONST OPS/RSRF/HSIP RUMBLE STRIPS
STATE 3R SURFACE TRANS FLEX MAP-21
2024 9160-21-40 06/25/2024 303 UTL PSRS40 0.680 STH 064 MOUNTAIN - POUND $0 - $99,999
N 17TH RD - USH 141
UTL RELOCATION
STATE 3R NON-FEDERAL
9670-17-00 303 I/E RSRF10 15.910 STH 180 MARINETTE - WAUSAUKEE $750,000 - $999,999
CTH X - USH 141
DSGN/RSRF10
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 9560-06-71 07/08/2025 303 LET RSRF10 2.120 USH 008 PEMBINE - MICHIGAN STATE LINE $4,000,000 - $4,999,999
S JCT USH 141-N JCT USH 141
CONST/RSRF/HSIP RUMBLE STRIPS
2022-2025 FINAL STIP Project Listing 187Northeast Region
MARINETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R STBG <5K POP - FAST EXT
2025 9560-06-72 07/08/2025 303 LET RSRF30 2.090 USH 008 PEMBINE - MICHIGAN STATE LINE $1,000,000 - $1,999,999
N JCT USH 141-MENOMINEE RIVER
CONST/RSRF HSIP
STATE 3R STBG <5K POP - FAST EXT
2023 1150-64-50 01/25/2023 303 R/R RSRF20 0.000 USH 041 PESHTIGO-MARINETTE $100,000 - $249,999
CTH T, CNRR XING 181588V SIGNAL
RR SIGNAL INTERCONNECT
BACKBONE STBG 5-200K POP FAST EXT
2024 1150-64-71 07/09/2024 303 LET RSRF20 2.400 USH 041 PESHTIGO-MARINETTE $6,000,000 - $6,999,999
PESHTIGO BYPASS-CTH T
CONST/RESURF
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1491-22-71 05/09/2023 303 LET RSRF30 3.770 USH 141 WAUSAUKEE-NIAGARA $2,000,000 - $2,999,999
CTH Z-CTH R
CONST/RESURF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2025 1491-23-71 07/08/2025 303 LET RSRF20 1.350 USH 141 PEMBINE-NIAGARA $1,000,000 - $1,999,999
USH 8-SCPL NIAGARA
CONST/RESURF
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4738-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
MARINETTE COUNTY PAVEMENTMARKING
$0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 188Northeast Region
NORTHEAST REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated
Funding
2023 1009-33-27 03/14/2023 303 LET BRPVTV 0.000 VAR HWY REGION WIDE DECK SEALING FY23 $100,000 - $249,999
VARIOUS BACKBONE ROUTES STH
CONST/BRPVTV DECK SEALING FY23
BACKBONE NON-FEDERAL
2023 1009-33-34 03/14/2023 303 LET BRPVTV 0.000 VAR HWY REGION WIDE DECK SEALING FY23 $100,000 - $249,999
VARIOUS 3R/LCB ROUTES STH
CONST/BRPVTV DECK SEALING FY23
STATE 3R NON-FEDERAL
2024 1009-33-37 03/12/2024 303 LET BRPVTV 0.000 VAR HWY NE REGION WIDE DECK SEALING FY24 $250,000 - $499,999
VARIOUS ROUTES/HWY
CONSTR/BRPVTV NE REGION WIDE
BACKBONE NON-FEDERAL
2025 1009-33-39 03/11/2025 303 LET BRPVTV 0.000 VAR HWY NE REGION WIDE DECK SEALING FY25 $250,000 - $499,999
VARIOUS ROUTES/HWY
CONST/BRPVTV REGION WIDE
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 189Northeast Region
OCONTO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
9180-26-00 303 I/E MISC 6.910 STH 022 OCONTO FALLS-OCONTO $100,000 - $249,999
USH 141-USH 41
DSGN/FULL PSE/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX MAP-21
9180-34-00 303 I/E RSRF10 7.810 STH 022 GILLETT - OCONTO FALLS $100,000 - $249,999
STH 32 - CTH B
DSN/RSRF10/FULL PSE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 9180-25-71 03/08/2022 303 LET RSRF20 3.498 STH 022 SHAWANO-GILLETT $1,000,000 - $1,999,999
SCL-FINNEGAN LAKE RD
CONST OPS/RESURF RW-Y
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 9180-35-71 11/11/2025 303 LET RECST 1.040 STH 022 C. GILLETT, MAIN & McKENZIE STRTS $4,000,000 - $4,999,999
S CPL - N CPL
CONST/RECST
STATE 3R STBG 5-200K POP FAST EXT
9150-08-00 303 I/E RSRF20 5.990 STH 032 MOUNTAIN-WABENO $250,000 - $499,999
STH 64-NCL
DSGN/RSRF20/FULL PSE
STATE 3R NATIONAL HIGHWAY PERF FAST
9170-15-00 303 I/E RSRF20 7.389 STH 032 GILLETTE-SURING $100,000 - $249,999
STH 22-CTH Z
DSGN/FULL PSE/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
1150-57-00 303 I/E RSRF20 12.370 USH 041 ABRAMS - OCONTO $250,000 - $499,999
CTH D - CITY OF OCONTO
DSN/FULL PSE/RSRF CONCRETE GRIND
BACKBONE NAT'L HWY SYSTEM
2022-2025 FINAL STIP Project Listing 190Northeast Region
OCONTO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1150-73-00 303 I/E RSRF30 5.100 USH 041 GREEN BAY-OCONTO $100,000 - $249,999
USH 141-CTH SS
DSGN/FULL PSE/RESURF
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1150-76-71 08/09/2022 303 LET BRRHB 0.016 USH 041 GREEN BAY - OCONTO $750,000 - $999,999
LITTLE SUAMICO RIVER BRIDGE
CONST OPS/BRRHB B-42-19 S.B OVERLAY
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1150-79-00 04/25/2022 303 C/E RSRF30 12.220 USH 041 GREEN BAY - OCONTO $750,000 - $999,999
OAK ORCHARD RD - FROG POND RD
DSN/FULL PSE/RESURF
BACKBONE STBG 5-200K POP FAST EXT
2022-2025 FINAL STIP Project Listing 191Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 4160-06-71 02/14/2023 206 LET MISC 0.062 CTH CE V KIMBERLY - CTH N $1,000,000 - $1,999,999
S RAILROAD ST INTERSECTION
CONST OPS/MISC HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 4676-04-71 12/10/2024 206 LET RECST 0.896 CTH N T BUCHANAN, CTH N $4,000,000 - $4,999,999
CTH KK TO CTH CE
CONST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2023 4677-10-71 02/14/2023 206 LET MISC 0.101 CTH OO T GRAND CHUTE - V LITTLE CHUTE $500,000 - $749,999
FRENCH RD INTERSECTION
CONST/MISC HSIP INTERSECTION MOD
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 4679-02-71 12/10/2024 206 LET RECST 0.910 CTH Z BUCHANAN - EAST COUNTY LINE $4,000,000 - $4,999,999
CTH ZZ TO OUTAGAMIE ROAD
CONST OPS/RECST
STP RURAL STBG <5K POP FAST
2022 1130-63-21 02/25/2022 302 R/E RECSTE 23.596 IH 041 APPLETON - DE PERE $2,000,000 - $2,999,999
STH 96 - CTH F
RE OPS/RE ACQUISITION
MAJORS NON-FEDERAL
2023 4656-07-71 01/10/2023 205 LET BRRPL 0.091 LOC STR T BUCHANAN, COUNTY LINE ROAD $250,000 - $499,999
BRANCH OF PLUM CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2023 4656-08-71 01/10/2023 205 LET BRRPL 0.096 LOC STR T BUCHANAN, NEW ROAD $250,000 - $499,999
BRANCH OF PLUM CREEK BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 192Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4984-01-79 12/10/2024 205 LET BRRPL 0.152 LOC STR C APPLETON, OLDE ONEIDA STREET $2,000,000 - $2,999,999
SOUTH MILL RACE BRIDGE
CONST OPS/BRRPL
LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-
2022 1146-75-74 07/25/2022 302 JTP RECSTE 10.820 STH 015 STH 76-NEW LONDON $5,000,000 - $5,999,999
CTH T/GIVENS ROAD-USH 45
JT PAYMENT 2 OF 2 /JT AGREEMENT 358
MAJORS NON-FEDERAL
2022 1146-75-76 11/08/2022 302 LET RECSTE 3.920 STH 015 STH 76-NEW LONDON $5,000,000 - $5,999,999
CTH T-WI CENTRAL RR
CONST/RECSTE ADDITION LANES
MAJORS NATIONAL HIGHWAY PERF PLAN
2022 1146-75-77 11/08/2022 302 LET RECSTE 3.920 STH 015 STH 76-NEW LONDON $6,000,000 - $6,999,999
WI CENTRAL RR-CTH JJ
CONST/RECSTE ADDITION LANES
MAJORS NATIONAL HWY PERF PROGRAM
2023 1146-75-73 11/14/2023 302 LET RECSTE 3.260 STH 015 STH 76-NEW LONDON $15,000,000 - $16,999,999
CTH T/GIVENS ROAD-USH 45
CONST OPS/RECSTE
MAJORS NATIONAL HIGHWAY PERF PLAN
2024 1146-75-80 02/13/2024 302 LET BRPVTV 10.820 STH 015 STH 76 - NEW LONDON $250,000 - $499,999
CTH JJ - CTH T/GIVENS RD
CONST/BRPVTV
MAJORS NATIONAL HIGHWAY PERF PLAN
2022 6240-30-21 10/25/2022 303 R/E RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $0 - $99,999
BURDICK ST - NCL
RE ACQUISITION/ROW
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 193Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 6240-22-71 11/14/2023 303 LET RSRF30 10.871 STH 047 APPLETON - BLACK CREEK $6,000,000 - $6,999,999
CTH JJ - CTH B
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 6240-29-71 11/14/2023 303 LET RSRF10 0.480 STH 047 S MAIN STREET, V OF BLACK CREEK $500,000 - $749,999
CTH B-BURDICK STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 6240-30-40 09/25/2023 303 UTL RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $0 - $99,999
BURDICK ST - NCL
UTL RELOCATION/RSRF
STATE 3R NON-FEDERAL
2023 6240-31-21 03/25/2023 303 R/E MISC 0.778 STH 047 V BLACK CREEK, STH 47 $100,000 - $249,999
STORM SEWER IMPROVEMENT
RW/RE ACQUISITION
STATE 3R NON-FEDERAL
2023 6240-31-40 12/25/2023 303 UTL MISC 0.778 STH 047 V BLACK CREEK, STH 47 $0 - $99,999
STORM SEWER IMPROVEMENT
UTL RELOCATION/MISC
STATE 3R NON-FEDERAL
2024 6240-30-71 05/14/2024 303 LET RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $3,000,000 - $3,999,999
BURDICK ST - NCL
CONST/RSRF HSIP
STATE 3R STBG 5-200K POP FAST EXT
2024 6240-31-71 11/12/2024 303 LET MISC 0.820 STH 047 V BLACK CREEK, STH 47 $2,000,000 - $2,999,999
STORM SEWER IMPROVEMENT
CONST/MISC
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 194Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6230-14-41 03/25/2022 303 UTL RSRF30 10.930 STH 054 SHIOCTON - SEYMOUR $0 - $99,999
PARK AVENUE - FRENCH ROAD
UTL RELOCATION/RESURF
STATE 3R NON-FEDERAL
2022 6230-14-71 11/08/2022 303 LET RSRF30 11.300 STH 054 SHIOCTON - SEYMOUR $7,000,000 - $7,999,999
PARK AVENUE - FRENCH ROAD
CONST/RESUR
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 6230-14-72 11/08/2022 303 LET RSRF10 0.389 STH 054 E. STATE STREET, V. OF BLACK CREEK $250,000 - $499,999
TOWER DRIVE - N BEECH STREET
CONST/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 6230-20-40 05/25/2022 303 UTL RSRF30 7.670 STH 054 SEYMOUR-GREEN BAY $0 - $99,999
FRENCH ROAD-SEMINARY ROAD
UTL
STATE 3R NON-FEDERAL
2023 6230-20-71 11/14/2023 303 LET RSRF30 7.599 STH 054 SEYMOUR-GREEN BAY $6,000,000 - $6,999,999
FRENCH ROAD-SEMINARY ROAD
CONST OPS/RESURF
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6230-16-71 11/12/2024 303 LET RSRF30 9.200 STH 054 NEW LONDON-SHIOCTON $6,000,000 - $6,999,999
WCL-PARK AVENUE
CONST OPS/RESURF/HSIP
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 6560-08-71 03/08/2022 303 LET MISC 0.493 STH 055 KAUKAUNA-SEYMOUR $3,000,000 - $3,999,999
CTH JJ INTERSECTION
CONST/INTERSECTION MODIFICATION
STATE 3R HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 195Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6570-09-71 03/08/2022 303 LET COLD20 13.591 STH 055 KAUKAUNA-SEYMOUR $8,000,000 - $8,999,999
IH 41-STH 54
CONST/RESURF MILL/OVERLAY
STATE 3R STBG 5-200K POP FAST EXT
2022 6517-15-60 11/08/2022 303 LET PSRS40 4.650 STH 076 STEPHENSVILLE-SHIOCTON $2,000,000 - $2,999,999
SOUTH JCT S-STH 54
CONST/RESURF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 6430-20-71 11/14/2023 303 LET MISC 0.370 STH 076 STH 96 - STH 15 $2,000,000 - $2,999,999
SCHOOL ROAD INTERSECTION
CONST/HSIP INTERSECTION
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 6518-06-71 11/14/2023 303 LET COLD20 12.148 STH 076 SHIOCTON - BEAR CREEK $5,000,000 - $5,999,999
STH 54 - NCL
CONST/SURFACE
STATE 3R STBG 5-200K POP FAST EXT
2023 6518-07-71 11/14/2023 303 LET BRRPL 2.579 STH 076 SHIOCTON - NCL $1,000,000 - $1,999,999
BOELTER RD - CTH W
CONST/BRRPL C-44-919, C-44-022
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2025 6517-16-50 01/25/2025 303 R/R MISC 1.420 STH 076 STH 15 - CTH JJ $100,000 - $249,999
CN RR XING 181837Y
CN RR XING
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 6517-16-71 02/11/2025 303 LET RECST 1.420 STH 076 STH 15 - CTH JJ $7,000,000 - $7,999,999
EVERGLADE ROAD - CTH JJ
CONST OPS/RECST GRADE, BASE, PAVT
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 196Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 4075-40-21 09/25/2022 303 R/E RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $250,000 - $499,999
CASALOMA DRIVE - N BADGER AVENUE
RW/RE ACQUISITION
STATE 3R NON-FEDERAL
2023 4075-35-71 11/14/2023 303 LET RSRF10 1.860 STH 096 KAUKAUNA-WRIGHTSTOWN $750,000 - $999,999
CLARIBEL STREET-CTH JJ
CONST/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX - MAP-2
2023 4075-35-72 11/14/2023 303 LET RSRF25 3.090 STH 096 KAUKAUNA-WRIGHTSTOWN $2,000,000 - $2,999,999
CTH JJ - CTH D
CONST/RESURF MILL/OVERLAY
STATE 3R SURFACE TRANS FLEX - MAP-2
2023 4075-40-40 06/25/2023 303 UTL RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $0 - $99,999
CASALOMA DRIVE - N BADGER AVENUE
UTL RELOCATION/RSRF
STATE 3R NON-FEDERAL
2024 4075-41-71 05/14/2024 303 LET RSRF20 3.030 STH 096 WCL - APPLETON $1,000,000 - $1,999,999
CLEARY COURT - TOWER VIEW DRIVE
CONST/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 4075-40-71 11/11/2025 303 LET RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $5,000,000 - $5,999,999
CASALOMA DRIVE - N BADGER AVENUE
CONST/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 6526-00-71 11/14/2023 303 LET BRRPL 0.000 STH 125 T. GRAND CHUTE, COLLEGE AVE $3,000,000 - $3,999,999
IH41 - BLUEMOUND DRIVE
CONST/BRRPL
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 197Northeast Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
4685-28-00 303 I/E RSRF20 6.500 STH 441 USH 41-USH 41 $250,000 - $499,999
USH 10-USH 41
DESIGN/RESURF
BACKBONE NAT'L HWY SYSTEM
2023 4685-29-60 02/14/2023 303 LET PSRS20 5.740 STH 441 APPLETON, STH 441 $6,000,000 - $6,999,999
USH 10-NORTH JUNCTION IH 41
CONST/ RDMTN-PATCH JOINTS/PAVEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 198Northeast Region
SHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4232-00-71 12/10/2024 206 LET RECST 1.226 CTH EE C SHEBOYGAN, WEEDEN CREEK ROAD $6,000,000 - $6,999,999
CTH OK TO S 12TH STREET
CONST OPS/RECST
STP URBAN 50,000 - 200,000 STBG-URBANIZED >200K FAST
2022 4236-02-71 05/10/2022 206 LET MISC 6.303 CTH F T MITCHELL, CTH F $0 - $99,999
WCL - STH 28
CONST OPS/MISC HRRR RUMBLE STRIPS
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST
2023 4995-03-02 01/10/2023 290 LET MISC 0.552 NONHWY
CITY OF PLYMOUTH $2,000,000 - $2,999,999
SIDEWALK GAP IMPROVEMENTS
CONST/ MISC-SIDEWALK IMPROV NMTPP
LOCAL ENHANCEMENTS NONMOTORIZED TRANS S-LUEX
2022 3700-30-43 08/25/2022 305 MIS TOSIG 0.392 STH 023 C SHEBOYGAN, KOHLER MEMORIAL DR $0 - $99,999
TAYLOR DR INTERSECTION SIGNAL REHAB
TRF DSN/TOSIG SIGNAL REHAB NE2303L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 1440-41-21 03/25/2023 303 R/E RSRF10 10.530 STH 023 FOND DU LAC - SHEBOYGAN $0 - $99,999
CTH P - STH 32
RE ACQUISITION/RW
STATE 3R NON-FEDERAL
2023 3700-30-46 08/25/2023 305 MIS TOSIG 0.392 STH 023 C SHEBOYGAN, KOHLER MEMORIAL DR $250,000 - $499,999
TAYLOR DR INTERSECTION SIGNAL REHAB
TRF OPS/TOSIG SIGNAL REHAB NE2303L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 1440-41-40 10/25/2024 303 UTL RSRF10 10.530 STH 023 FOND DU LAC - SHEBOYGAN $0 - $99,999
2022-2025 FINAL STIP Project Listing 199Northeast Region
SHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CTH P - STH 32
UTL RELOCATION
STATE 3R NON-FEDERAL
2022 4010-21-21 05/25/2022 303 R/E RSRF30 13.400 STH028
KEWASKUM-WALDO $0 - $99,999
SCL-STH 57
RE ACQUISTION/RW RSRF
STATE 3R NON-FEDERAL
2023 3700-30-47 08/25/2023 305 MIS TOSIG 0.061 STH028
C SHEBOYGAN, BUSINESS DRIVE $0 - $99,999
WASHINGTON AVE SIGNAL REHAB
TRF DSN/TOSIG NE2401L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 4010-21-50 04/25/2023 303 R/R RSRF30 0.017 STH028
KEWASKUM-WALDO $250,000 - $499,999
WSOR XING SIGNALS 387113B
RR XING SIGNALS
STATE 3R STBG <5K POP FAST
2024 3700-30-50 08/25/2024 305 MIS TOSIG 0.061 STH028
C SHEBOYGAN, BUSINESS DRIVE $250,000 - $499,999
WASHINGTON AVE SIGNAL REHAB
TRF OPS/TOSIG NE2401L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 4010-21-71 08/13/2024 303 LET RSRF30 13.400 STH028
KEWASKUM-WALDO $9,000,000 - $9,999,999
SCL-STH 57
CONST/RESURF-MILL/OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 200Northeast Region
SHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4010-26-71 08/13/2024 303 LET BRRPL 0.086 STH 028 V. OF CASCADE, N. BRANCH MIL RIVER $250,000 - $499,999
BRANCH MILWAUKEE RIVER BRIDGE
CONST/BRRPL B-05-0321
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
4540-33-30 303 I/E PSRS40 1.060 STH 032 STH 32, CITY OF SHEBOYGAN FALLS $0 - $99,999
FOND DU LAC AVE-STH 23
DSGN/RDMTN
STATE 3R NON-FEDERAL
2022 4540-36-21 03/25/2022 303 R/E RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $0 - $99,999
CTH D-STH 28
RE ACQUISTION/ROW OPS
STATE 3R NON-FEDERAL
2023 4540-36-41 10/25/2023 303 UTL RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $0 - $99,999
CTH D-STH 28
UTL OPS RELOCATION
STATE 3R NON-FEDERAL
2025 4540-34-71 08/12/2025 303 LET BRRPL 10.070 STH 032 CEDAR GROVE - SHEBOYGAN FALLS $1,000,000 - $1,999,999
CTH D - STH 28
CNST/BRRPL/C-05-0093/2650/2916/0080
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
2025 4540-36-71 08/12/2025 303 LET RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $4,000,000 - $4,999,999
CTH D-STH 28
CONST OPS/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
1460-10-00 303 I/E RSRF30 3.910 STH 042 HOWARDS GROVE-MANITOWOC $100,000 - $249,999
STH 32-NCL
2022-2025 FINAL STIP Project Listing 201Northeast Region
SHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
DSGN/FULL PSE/RESURFACE
STATE 3R NATIONAL HWY PERF EXMFAST
2022 4570-26-21 05/25/2022 303 R/E RSRF15 0.900 STH 042 V HOWARDS GROVE, STH 42 $0 - $99,999
PIGEON RIVER - N VILLAGE LIMITS
RE ACQUISITION/ROW /RSRF10
STATE 3R NON-FEDERAL
2024 4570-26-71 05/14/2024 303 LET RSRF15 0.900 STH 042 V HOWARDS GROVE, STH 42 $500,000 - $749,999
PIGEON RIVER - N VILLAGE LIMITS
CONST OPS/RSRF
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4015-22-21 03/25/2022 303 R/E RSRF20 9.020 STH 057 RANDOM LAKE-WALDO $0 - $99,999
SCL-STH 28
RE ACQUISTION/ROW RSRF
STATE 3R NON-FEDERAL
2023 4015-22-22 08/25/2023 303 R/E RSRF20 16.050 STH 057 WALDO - KIEL $0 - $99,999
STH 28 - NCL
RE OPS/RW RSRF
STATE 3R NON-FEDERAL
2025 4015-22-71 11/11/2025 303 LET RSRF20 8.260 STH 057 RANDOM LAKE-WALDO $8,000,000 - $8,999,999
SCL-STH 28
CONST/MILL/OVERLAY
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4759-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY
SHEBOYGAN COUNTY PAVEMENTMARKING
$0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
2022-2025 FINAL STIP Project Listing 202Northeast Region
SHEBOYGAN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 203Northeast Region
WAUPACA
2022-2025 FINAL STIP Project Listing 203Northeast Region
WAUPACA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 6528-07-52 05/25/2023 302 R/R MISC 0.000 USH 045 STH 15-NEW LONDON $100,000 - $249,999
USH 45, WCL XING SURFACE 693839C
CONST/MISC RR 693839C SURFACE
MAJORS NATIONAL HIGHWAY PERF FAST
2023 6528-07-53 05/25/2023 302 R/R MISC 0.000 USH 045 STH 15-NEW LONDON $250,000 - $499,999
USH 45, WCL XING SIG/GATES 693839C
CONST/MISC RR SIG/GATES 693839C
MAJORS NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 204Northeast Region
WINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 4636-05-72 01/09/2024 206 LET RECST 0.520 CTH I C OSHKOSH, CTH I $1,000,000 - $1,999,999
W RIPPLE AVE - W WAUKAU AVE
CONST OPS/RECST
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2024 4646-02-71 12/10/2024 206 LET RECST 1.450 CTH P C MENASHA, CTH P $6,000,000 - $6,999,999
STH 47 TO MIDWAY ROAD
CONSTR OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
1120-63-00 303 I/E MISC 0.590 IH 041 OSHKOSH - APPLETON $250,000 - $499,999
IH 41 LAKE BUTTE DES MORTS
DSN/FULL PSE/MISC APPROACH SLABS
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1120-57-60 11/14/2023 303 LET PSRS20 9.650 IH 041 NEENAH-APPLETON $12,000,000 - $12,999,999
BREEZEWOOD-STH 15
CONST/JOINT,APPROACH DECK REPAIR
BACKBONE NATIONAL HIGHWAY PERF PLAN
2024 1120-63-71 03/12/2024 303 LET MISC 0.590 IH 041 OSHKOSH - APPLETON $2,000,000 - $2,999,999
IH 41 LAKE BUTTE DES MORTS
CONST OPS/MISC APPROACH SLABS
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 4992-00-60 12/10/2024 206 LET RECST 0.740 LOC STR C MENASHA, RACINE STREET $4,000,000 - $4,999,999
THIRD STREET TO NINTH STREET
CONST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2025 4993-01-01 01/14/2025 206 LET RECST 1.470 LOC STR C NEENAH, COMMERCIAL STREET $7,000,000 - $7,999,999
STANLEY STREET TO TYLER STREET
CNST OPS/RECST
STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST
2022-2025 FINAL STIP Project Listing 205Northeast Region
WINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 4994-07-21 03/25/2025 303 R/E BRRPL 0.124 LOCSTR
OREGON/JACKSON ST, C OF OSHKOSH $750,000 - $999,999
FOX RIVER BRIDGE AND APPROACHES
DSGN/BRIDGE REPLACE
SHR LARGE BRIDGES NON-FEDERAL
6180-26-00 303 I/E RSRF20 7.050 STH 021 REDGRANITE-OMRO $100,000 - $249,999
WCL-STH 116
DESIGN/FULL PSE/RESURF
STATE 3R NATIONAL HIGHWAY PERFFAST
6180-28-00 303 I/E BRRHB 0.143 STH 021 CONGRESS AVENUE, CITY OF OSHKOSH $100,000 - $249,999
FOX RIVER BRIDGE B-70-0091
DSGN/FULL PSE/BR REHAB-GRID DECK
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 6180-30-21 02/25/2023 303 R/E RSRF10 6.310 STH 021 OMRO - OSHKOSH $0 - $99,999
STH 116 - LEONARD POINT ROAD
RE ACQUSITION/ ROW/RSRF
STATE 3R NON-FEDERAL
6110-25-00 303 I/E PSRS20 0.900 STH 044 RIPON - OSHKOSH $0 - $99,999
STH 91 - IH 41
DSGN/FULL PSE/PSRS
STATE 3R SURFACE TRANSP BLOCKGRTS-
4660-08-00 303 I/E RSRF20 1.110 STH 047 APPLETON ROAD, CITY OF MENASHA $100,000 - $249,999
9TH ST - CTH AP
DESIGN/FULL PSE/RESURF
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 206Northeast Region
WINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
6430-21-00 303 I/E RSRF30 4.390 STH 076 OSHKOSH - GREENVILLE $100,000 - $249,999
MURDOCK AVENUE - GREEN HILL CT
DSGN/FULL PSE/RSRF
STATE 3R SURFACE TRANSP BLOCKGRTS-
2023 6540-08-50 01/25/2023 303 R/R RSRF30 0.039 STH 091 STH 91 & CLAIRVILLE RD XING SURFACE $100,000 - $249,999
WSOR RR 387462L
RR CROSSING XING SURFACE
STATE 3R STBG <5K POP FAST
2023 6540-10-71 05/09/2023 303 LET BRRHB 0.060 STH 091 BERLIN - OSHKOSH $250,000 - $499,999
WAUKAU CREEK STRUCTURE
CONST/BRRHB B-70-0039
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2023 6540-11-71 05/09/2023 303 LET BRRPL 0.031 STH 091 BERLIN - OSHKOSH $500,000 - $749,999
JAMES ROAD - CLAIRVILLE ROAD
CONST/BRRPL B-70-0326
SHR BRIDGES SURFACE TRANSP BLOCKGRTS-
2024 6540-08-71 11/12/2024 303 LET RSRF30 14.780 STH 091 BERLIN-OSHKOSH $9,000,000 - $9,999,999
WCL-STH 44
CONST/RESURF MILL/OVERLAY HSIP
STATE 3R STBG 5-200K POP FAST EXT
2022 3700-30-41 07/25/2022 305 MIS TOSIG 0.060 STH 114 C MENASHA, WASHINGTON ST $100,000 - $249,999
RIVER ST INTERSECTION SIGNAL REHAB
TRF DSN/OPS TOSIG NE2305L
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 4065-17-21 01/25/2024 303 R/E RECST 0.841 STH 114 PLANK ROAD, CITY OF MENASHA $100,000 - $249,999
2022-2025 FINAL STIP Project Listing 207Northeast Region
WINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
MANITOWOC STREET-MELISSA STREET
RE ACQUISTION/ROW RECST
STATE 3R NON-FEDERAL
2024 4065-18-21 01/25/2024 303 R/E RECST 1.048 STH 114 MENASHA-SHERWOOD $100,000 - $249,999
MELISSA STREET-USH 10
RE ACQUISTION/ROW RECST
STATE 3R NON-FEDERAL
2025 4065-17-40 07/25/2025 303 UTL RECST 0.841 STH 114 PLANK ROAD, CITY OF MENASHA $0 - $99,999
MANITOWOC STREET - MELISSA STREET
UTL RELOCATION/ RECST
STATE 3R NON-FEDERAL
2025 4065-18-40 07/25/2025 303 UTL RECST 1.048 STH 114 MENASHA-SHERWOOD $0 - $99,999
MELISSA STREET-USH 10
UTL RELOCATION OPS/ RECST
STATE 3R NON-FEDERAL
6190-18-00 303 I/E RSRF10 4.510 STH 116 OMRO - WINNECONNE $100,000 - $249,999
N VILLAGE LIMITS - S VILLAGE LIMITS
DSGN/FULL PSE/RSRF
STATE 3R STBG <5K POP FAST
2025 6190-26-71 01/14/2025 303 LET RSRF30 1.870 STH 116 WINNECONNE-USH 45 $1,000,000 - $1,999,999
EAST VILLAGE LIMITS-USH 45
CONST OPS/RESURFACE
STATE 3R SURFACE TRANSP BLOCK GRTS-
1517-12-00 303 I/E RSRF20 16.950 USH 010 WAUPACA-MENASHA $250,000 - $499,999
NCL-STH 441
DSN FULL PSE/PATCH/OVERLAY ASPHALT
BACKBONE NATIONAL HWY PERF PROGRAM
2023 1517-14-71 11/14/2023 303 LET MISC 0.051 USH 010 V FOX CROSSING, USH 10 $100,000 - $249,999
2022-2025 FINAL STIP Project Listing 208Northeast Region
WINNEBAGO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
COLD SPRING RD N-70-0009
CONST OPS/MISC NOISE WALL N700009
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1500-48-60 11/12/2024 303 LET PSRS20 16.102 USH 010 WAUPACA-MENASHA $6,000,000 - $6,999,999
NCL-STH 441
CONST/PSRS/RDMTN RW-NO
BACKBONE STP NON-URBAN
2022 4110-32-21 03/25/2022 303 R/E RSRF20 7.130 USH 045 FOND DU LAC-OSHKOSH $0 - $99,999
SCL-SCPL OSHKOSH
RE/ REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2024 4110-32-71 11/12/2024 303 LET RSRF20 7.160 USH 045 FOND DU LAC-OSHKOSH $4,000,000 - $4,999,999
SCL-SCPL OSHKOSH
CONST/RSRF HSIP-RUMBLE STRIPS
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 4110-33-71 11/11/2025 303 LET BRRHB 0.117 USH 045 MAIN STREET, CITY OF OSHKOSH $5,000,000 - $5,999,999
BRIDGE DECK GRATES
CONST OPS/BRRHB B-70-56-0001-3
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2025 6200-19-71 03/11/2025 303 LET MISC 0.162 USH 045 OSHKOSH - WINCHESTER $750,000 - $999,999
BROOKS ROAD OVERPASS, R-70-0007
CONST OPS/MISC
BACKBONE STBG 5-200K POP FASTG
2022 – 2025 Statewide Transportation Improvement Program
North Central Region Projects
2022-2025 FINAL STIP Project Listing 209North Central Region
ADAMS
2022-2025 FINAL STIP Project Listing 209North Central Region
ADAMS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated
Funding
6140-00-18 303 I/E RSRF30 3.470 STH 013 ADAMS - WISCONSIN RAPIDS $100,000 - $249,999
MOUNDVIEW DRIVE TO STH 21
DESIGN/FULL PSE/RESURFACE
STATE 3R STBG <5K POP FAST
2022 6140-01-26 04/25/2022 303 R/E RSRF10 0.660 STH 013 V OF FRIENDSHIP $0 - $99,999
NORTH ST TO MOUND VIEW DR
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2025 6140-01-66 11/11/2025 303 LET RSRF10 0.660 STH 013 V OF FRIENDSHIP $750,000 - $999,999
NORTH ST TO MOUND VIEW DR
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2022 4701-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY ADAMS CO PAVEMENT MARKING TMA'S $100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS-PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 210North Central Region
FLORENCE
2022-2025 FINAL STIP Project Listing 210North Central Region
FLORENCE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 9911-00-70 04/12/2022 206 LET BRRPL 0.000 LOC STR T FENCE, ROCK CREEK BRIDGE $250,000 - $499,999
ROCK CREEK ROAD; FR 2383
CONST/FLAP PROG REPLACEMENT
FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA
2022 9100-05-22 03/25/2022 303 R/E RSRF20 12.536 STH 070 TIPLER - FLORENCE $100,000 - $249,999
FOREST ROAD 2154 TO USH 2
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2023 9120-09-21 02/25/2023 303 R/E RSRF25 1.230 USH 002 BRULE RIVER - IRON MOUNTAIN $0 - $99,999
PEWABIC STREET TO CTH NN
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2025 9120-09-71 12/09/2025 303 LET RSRF25 1.230 USH 002 BRULE RIVER - IRON MOUNTAIN $500,000 - $749,999
PEWABIC STREET TO CTH NN
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 211North Central Region
FOREST
2022-2025 FINAL STIP Project Listing 211North Central Region
FOREST
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 9330-01-70 03/14/2023 206 LET BRRPL 0.033 CTH C T WABENO, SOPER STREET $1,000,000 - $1,999,999
N BR OCONTO RIVER BRIDGE
CONST/FLAP PROG REPLACEMENT
FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA
2023 9815-00-70 12/12/2023 205 LET BRRPL 0.000 LOC STR T HILES, WEST PINE LAKE ROAD $250,000 - $499,999
WOLF RIVER BRIDGE P-21-0905
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 9813-02-70 04/25/2024 290 LLC MISC 0.000 NON HWY USH 8 SHARED PATHWAY PHASE 1 $750,000 - $999,999
FIREKEEPER ROAD TO LOVE KNOT LANE
CONST/PHASE 1/MISC
TAP < 5,000 TRANS ALTERN 5K AND UNDER
2022 9130-00-70 09/13/2022 303 LET RSRF10 4.079 STH 032 MOUNTAIN - WABENO $2,000,000 - $2,999,999
OCONTO COUNTY LINE TO CTH C
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 9260-00-21 11/25/2022 303 R/E PVRPLA 0.570 STH 032 C CRANDON, LAKE AVENUE $100,000 - $249,999
USH 8 TO CRANDON RR OVERHEAD
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2024 9130-03-72 08/13/2024 303 LET PVRPLA 1.123 STH 032 WABENO - CRANDON $2,000,000 - $2,999,999
CTH C TO FOREST AVENUE
CONST/PVRPLA
STATE 3R STBG <5K POP FAST
2025 9260-00-71 02/11/2025 303 LET PVRPLA 0.570 STH 032 C CRANDON, LAKE AVENUE $2,000,000 - $2,999,999
USH 8 TO CRANDON RR OVERHEAD
CONST/PVRPLA
STATE 3R STBG 5-200K POP FASTG
2022-2025 FINAL STIP Project Listing 212North Central Region
FOREST
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 9165-13-71 02/14/2023 303 LET COLD10 5.790 STH 055 ARGONNE - NELMA $3,000,000 - $3,999,999
STH 70 TO MICHIGAN STATE LINE
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 1590-18-22 11/25/2022 303 R/E RSRF25 5.050 USH 008 MONICO - LAONA $100,000 - $249,999
STH 55 SOUTH TO OTTER CREEK ROAD
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 1590-18-72 09/10/2024 303 LET RSRF10 0.240 USH 008 C CRANDON, W GLEN STREET $250,000 - $499,999
BOULEVARD AVENUE TO LAKE AVENUE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1590-18-70 02/11/2025 303 LET RSRF10 0.490 USH 008 C CRANDON, LAKE AVENUE $250,000 - $499,999
GLEN STREET TO PIONEER STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1590-18-71 02/11/2025 303 LET RSRF25 5.050 USH 008 MONICO - LAONA $6,000,000 - $6,999,999
STH 55 SOUTH TO OTTER CREEK ROAD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1590-18-81 09/09/2025 303 LET RSRF25 6.320 USH 008 MONICO - LAONA $3,000,000 - $3,999,999
OTTER CREEK ROAD TO STH 32 SOUTH
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1590-18-82 02/11/2025 303 LET MISC 0.000 USH 008 MONICO - LAONA $0 - $99,999
MULTI MODAL TUNNEL
CONST/MISC
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 213North Central Region
GREEN LAKE
2022-2025 FINAL STIP Project Listing 213North Central Region
GREEN LAKE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1430-08-79 12/13/2022 303 LET RSRF10 2.580 STH 023 PRINCETON - RIPON $1,000,000 - $1,999,999
CTH T TO CTH A (N)
CONST/RESURF10
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1430-08-81 02/13/2024 303 LET RECST 0.057 STH 023 PRINCETON - RIPON $750,000 - $999,999
STH 73/PYE ALLEY ROAD INTERSECTION
CONST/RECONSTRUCT
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 6100-00-20 06/25/2022 303 R/E RSRF10 7.430 STH 044 MANCHESTER - RIPON $0 - $99,999
GRAND RIVER BR TO FOND DU LAC CL
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 6630-01-73 09/10/2024 303 LET BRRHB 0.000 STH 044 PARDEEVILLE - MANCHESTER $500,000 - $749,999
BRIDGE OVERLAY B-24-0019
CONST/BRIDGE OVERLAY
SHR BRIDGES STBG <5K POP FAST
2022 6530-01-72 03/08/2022 303 LET RSRF10 0.670 STH 073 PRINCETON - PLAINFIELD $250,000 - $499,999
FOX RIVER BRIDGE TO CTH J
CONSTR/RESURFACE
STATE 3R NON-FEDERAL
2024 6640-00-70 09/10/2024 303 LET RSRF10 9.920 STH 073 COLUMBUS - PRINCETON $3,000,000 - $3,999,999
N JCT STH 44 TO S JCT STH 23
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 1009-46-62 12/13/2022 303 LET PSRS20 0.115 VAR HWY GREEN LAKE CO WIDE CULVERT RPLMT $250,000 - $499,999
STH 44 AND STH 73
CONSTR/PSRS20
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 214North Central Region
IRON
2022-2025 FINAL STIP Project Listing 214North Central Region
IRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 9250-12-61 02/14/2023 303 LET PSRS40 7.055 STH 077 MELLEN - HURLEY $2,000,000 - $2,999,999
ASHLAND CO LINE TO UPSON LAKE ROAD
CONST/PREV MAINT APPRVL 2/10/15
STATE 3R STP <5K POP - MAP 21
2024 1185-02-71 08/13/2024 303 LET RSRF20 8.480 USH 002 ASHLAND - SAXON $3,000,000 - $3,999,999
ASHLAND COUNTY LINE TO CTH B
DESIGN/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1185-03-60 12/10/2024 303 LET BRRHB 0.000 USH 002 CITY OF HURLEY $500,000 - $749,999
WI/MI BORDER BRIDGE B-26-0008
CONST/REHAB/CONCRETE OVERLAY
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022 1175-19-21 08/25/2022 303 R/E BRRHB 0.000 USH 051 MANITOWISH - HURLEY $0 - $99,999
TURTLE RIVER BRIDGE B-26-0016
REAL ESTATE/REHAB/DECK REPLACEMENT
SHR BRIDGES NON-FEDERAL
2022 1175-21-20 05/25/2022 303 R/E RSRF30 1.520 USH 051 MANITOWISH - HURLEY $100,000 - $249,999
IRON STREET TO USH 2
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2023 1175-18-74 08/08/2023 303 LET RSRF10 7.036 USH 051 MANITOWISH - HURLEY $2,000,000 - $2,999,999
VILAS COUNTY LINE TO BEACHWAY DRIVE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1175-19-72 08/08/2023 303 LET RSRF10 3.490 USH 051 MANITOWISH - HURLEY $1,000,000 - $1,999,999
CTH J TO WEBER CREEK BRIDGE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 215North Central Region
IRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1175-19-71 12/10/2024 303 LET BRRHB 0.000 USH 051 MANITOWISH - HURLEY $750,000 - $999,999
TURTLE RIVER BRIDGE B-26-0016
CONST/REHAB/DECK REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2025 1175-21-70 09/09/2025 303 LET PVRPLA 1.520 USH 051 MANITOWISH - HURLEY $1,000,000 - $1,999,999
IRON STREET TO USH 2
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF PLAN
2022-2025 FINAL STIP Project Listing 216North Central Region
LANGLADE
2022-2025 FINAL STIP Project Listing 216North Central Region
LANGLADE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 9835-00-71 01/09/2024 205 LET BRRPL 0.000 LOC STR C ANTIGO, 4TH AVENUE $750,000 - $999,999
SPRINGBROOK CREEK BRIDGE P-34-0701
CONST/REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 9835-04-70 01/09/2024 206 LET PVRPLA 0.360 LOC STR C ANTIGO, CLERMONT STREET $500,000 - $749,999
10TH AVENUE TO 7TH AVENUE
CONST/PVRPLA
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2024 9835-05-70 01/09/2024 206 LET PVRPLA 0.190 LOC STR C ANTIGO, 7TH AVENUE $250,000 - $499,999
DORR STREET TO CLERMONT STREET
CONST/PVRPLA
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2024 9835-02-71 04/25/2024 290 LLC MISC 0.000 NONHWY
SPRINGBROOK BIKE/PEDESTRIAN TRAIL $750,000 - $999,999
CITY OF ANTIGO
CONST/MISC
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
2024 9155-05-71 12/10/2024 303 LET BRRPL 0.000 STH 055 LANGLADE - PICKEREL $750,000 - $999,999
NINE MILE CREEK B-34-0010
CONST/REPLACEMENT
SHR BRIDGES STBG <5K POP FAST
9140-12-11 303 I/E BRRPL 0.000 STH 064 ANTIGO - LANGLADE $250,000 - $499,999
WOLF RIVER BRIDGE B-34-0838
DESIGN/FULL PSE/REPLACEMENT
SHR BRIDGES STBG <5K POP FAST
2022 1602-10-21 02/25/2022 303 R/E PVRPLA 0.666 USH 045 T ELCHO, ANTIGO STREET $0 - $99,999
CLINIC STREET TO OTTER LAKE LANE
REAL ESTATE/PAVEMENT REPLACEMENT
2022-2025 FINAL STIP Project Listing 217North Central Region
LANGLADE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2024 1602-10-71 09/10/2024 303 LET PVRPLA 0.666 USH 045 T ELCHO, ANTIGO STREET $2,000,000 - $2,999,999
CLINIC STREET TO OTTER LAKE LANE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4734-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY LANGLADE CO PAVEMENT MARKINGTMA'S
$500,000 - $749,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS-PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 218North Central Region
LINCOLN
2022-2025 FINAL STIP Project Listing 218North Central Region
LINCOLN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 9431-00-70 03/12/2024 205 LET BRRPL 0.000 CTH X T PINE RIVER, CTH X $250,000 - $499,999
LITTLE OXBO CREEK BRIDGE P-35-0046
CONST/REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2022 9305-09-61 09/13/2022 303 LET PSRS20 0.014 STH 107 MERRILL - TOMAHAWK $750,000 - $999,999
CULVERT REPLACEMENT & REPAIR
CONST/RDMTN/SHRM
SHR BRIDGES NON-FEDERAL
2022 9305-09-62 09/13/2022 303 LET PSRS20 0.076 STH 107 MERRILL - TOMAHAWK $100,000 - $249,999
SMALL CULVERT REPLACEMENTS
CONST/RDMTN/SHRM
SHR BRIDGES NON-FEDERAL
2022 1580-30-74 05/10/2022 303 LET BRRPL 0.000 USH 008 PRENTICE - BRADLEY $500,000 - $749,999
SCOTT CREEK BOX CULVERT B-35-167
CONST/REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2023 1580-30-71 11/14/2023 303 LET COLD10 3.970 USH 008 PRENTICE - BRADLEY $2,000,000 - $2,999,999
CTH YY TO TRACY ROAD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1590-14-26 10/25/2023 303 R/E RSRF10 0.290 USH 008 PRENTICE - BRADLEY $0 - $99,999
CTH A INTERSECTION
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 1590-14-52 03/25/2024 303 R/R RSRF10 0.000 USH 008 PRENTICE - BRADLEY $100,000 - $249,999
MCCORD ROAD TO CTH L
RR OPS/XING SURFACE 855242H
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 219North Central Region
LINCOLN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1590-14-72 08/13/2024 303 LET RSRF10 9.230 USH 008 PRENTICE - BRADLEY $2,000,000 - $2,999,999
MCCORD ROAD TO CTH L
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
1176-21-32 303 I/E PSRS30 14.850 USH 051 MERRILL - TOMAHAWK $100,000 - $249,999
CTH K TO CTH S, NB
DESIGN/JOINT REPAIRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1176-22-93 08/25/2022 303 SFA PVRPLA 0.000 USH 051 MARATHON COUNTY LINE TO CTH K $0 - $99,999
WAUSAU - MERRILL
TRAFFIC MITIGATION 1176-22-72/73
BACKBONE NON-FEDERAL
2025 1176-23-65 09/09/2025 303 LET BRRHB 0.000 USH 051 TOMAHAWK - MINOCQUA $1,000,000 - $1,999,999
STRUCTURE B-35-0059
CONST/DECK OVERLAY
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 220North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
6999-10-11 303 I/E RSRF25 2.020 BUS 051 V ROTHSCHILD, GRAND AVENUE $250,000 - $499,999
EAGLE NEST BLVD TO EVEREST DRIVE
DESIGN/FULL PSE/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 6999-10-25 02/25/2023 303 R/E PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $100,000 - $249,999
EVEREST DRIVE TO SCHOFIELD AVENUE
REAL ESTATE/PAVEMENT REPLACEMENT
STATE 3R NON-FEDERAL
2025 6999-10-80 09/09/2025 303 LET PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999
EVEREST DRIVE TO SCHOFIELD AVENUE
CONST/LOCAL UTILITY/ROTHSCHILD
STATE 3R NON-FEDERAL
2025 6999-10-85 09/09/2025 303 LET PVRPLA 0.917 BUS 051 ROTHSCHILD - SCHOFIELD $4,000,000 - $4,999,999
EVEREST DRIVE TO SCHOFIELD AVENUE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 6999-10-86 09/09/2025 303 LET PVRPLA 0.210 BUS 051 ROTHSCHILD - SCHOFIELD $2,000,000 - $2,999,999
STH 29 EB RAMP TO STH 29 WB RAMP
CONST/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 6999-10-87 11/11/2025 303 LET PVRPLA 0.580 BUS 051 ROTHSCHILD - SCHOFIELD $3,000,000 - $3,999,999
E GRAND AVE TO EAU CLAIRE RVR BRDGE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 6999-10-88 11/11/2025 303 LET PVRPLA 0.580 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999
E GRAND AVE TO EAU CLAIRE RVR BRDGE
CONST/LOCAL UTILITIES/SCHOFIELD
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 221North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 6999-10-89 09/09/2025 303 LET PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999
EVEREST DRIVE TO SCHOFIELD AVENUE
CONST/LOCAL UTILITIES/WESTON
STATE 3R NON-FEDERAL
2024 6653-00-71 01/09/2024 206 LET PVRPLA 6.770 CTH C CTH J - STH 49 $2,000,000 - $2,999,999
CTH J TO CTH I
CONST/PVRPLA
STP RURAL STBG <5K POP FAST
2023 9491-06-70 01/10/2023 206 LET RCND20 8.500 CTH K WAUSAU - MERRILL $3,000,000 - $3,999,999
DECATOR DRIVE TO LINCOLN CO LINE
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2023 9491-06-71 01/10/2023 206 LET RCND20 7.360 CTH K WAUSAU - MERRILL $1,000,000 - $1,999,999
FALCON DRIVE TO LINCOLN COUNTY LINE
CONST/RECONDITION
STP RURAL STBG <5K POP FAST
2024 9478-06-70 03/12/2024 205 LET BRRPL 0.000 CTH L T BERN, CTH L $500,000 - $749,999
BLACK CREEK BRIDGE P-37-0163
CONST/REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 6664-00-70 01/09/2024 205 LET BRRPL 0.000 CTH O T BERGEN, CTH O $1,000,000 - $1,999,999
LITTLE EAU PLEINE RVR BR B370047
CONST/REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
1166-09-32 303 I/E PSRS30 4.580 IH 039 USH 51/STH 29 CORRIDOR-WAUSAU $100,000 - $249,999
FOXGLOVE RD TO BIG RIB RVR BRDGE NB
DESIGN/JOINT REPAIRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 222North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1166-00-83 03/12/2024 303 LET RSRF10 9.397 IH 039 STEVENS POINT - WAUSAU $3,000,000 - $3,999,999
PORTAGE CO LN TO MAPLE RIDGE RD, NB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1166-00-66 09/09/2025 303 LET BRPVTV 0.000 IH 039 STEVENS POINT - WAUSAU $500,000 - $749,999
IH 39 BRIDGE POLYMER OVERLAYS
CONST/BRIDGE PREVENTIVE
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1166-01-84 09/09/2025 303 LET RSRF10 1.706 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999
BUSINESS 51 TO FOXGLOVE ROAD
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1166-05-81 09/09/2025 303 LET RSRF10 4.473 IH 039 STEVENS POINT - WAUSAU $4,000,000 - $4,999,999
BULL JUNIOR CREEK TO BUSINESS 51
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1166-05-85 09/09/2025 303 LET RSRF10 5.620 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999
STH 34 TO BULL JUNIOR CREEK, SB
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 6678-01-70 01/10/2023 205 LET BRRPL 0.000 LOC STR T EAU PLEINE, EQUITY STREET $500,000 - $749,999
NOISY CREEK BRIDGE P-37-0301
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 6688-00-70 02/14/2023 205 LET BRRPL 0.000 LOC STR T GREEN VALLEY, RANGELINE ROAD $750,000 - $999,999
LITTLE EAU PLEINE RVR BR P370360
CONST/REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022-2025 FINAL STIP Project Listing 223North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 9525-01-70 03/14/2023 205 LET BRRPL 0.000 LOC STR T RIB FALLS, JERSEY FALLS TRAIL $500,000 - $749,999
PINE CREEK BRIDGE P370194
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 9526-00-70 03/14/2023 205 LET BRRPL 0.000 LOC STR T STETTIN, STETTIN DRIVE $500,000 - $749,999
ARTUS CREEK BRIDGE P-37-0203
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2023 9526-00-71 02/14/2023 205 LET BRRPL 0.000 LOC STR T STETTIN, HIGHLAND DRIVE $500,000 - $749,999
ARTUS CREEK BRIDGE P-37-0204
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 6999-09-72 02/13/2024 206 LET RECST 1.510 LOC STR C WAUSAU, STEWART AVENUE $5,000,000 - $5,999,999
S 72ND AVENUE TO S 48TH AVENUE
CONST/RECONSTRUCT
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2024 6999-16-73 02/13/2024 206 LET PVRPLA 1.350 LOC STR C MOSINEE, MAIN STREET $500,000 - $749,999
4TH STREET TO RANGELINE ROAD
CONST/PVRPLA
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2022 6999-14-73 07/25/2022 290 LLC MISC 0.000 NON HWY ROTHSCHILD-SCHOFIELD BUS 51 TRAIL $500,000 - $749,999
LILI LANE TO SCHOFIELD AVENUE
CONST/TAP
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
2022 6999-18-79 04/25/2022 290 LLC MISC 1.030 NON HWY BUSINESS CAMPUS TRAIL - 72ND AVENUE $500,000 - $749,999
PACKER DRIVE TO INTERNATIONALDRIVE
CONST/TAP
2022-2025 FINAL STIP Project Listing 224North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K
2022 1620-00-61 11/08/2022 303 LET PSRS40 0.750 STH 013 MARSHFIELD - ABBOTSFORD $500,000 - $749,999
SOUTH CTH N TO NORTH STREET
CONSTR/PM APPROVED 6.6.16
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1620-03-73 11/08/2022 303 LET RSRF10 0.770 STH 013 C OF ABBOTSFORD $500,000 - $749,999
LINDEN ST TO PINE ST
CONSTR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1620-03-74 11/08/2022 303 LET RSRF10 1.988 STH 013 C OF COLBY; C OF ABBOTSFORD $1,000,000 - $1,999,999
NORTH ST TO LINDEN ST
CONSTR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1620-03-72 08/08/2023 303 LET RSRF10 4.200 STH 013 MARSHFIELD - ABBOTSFORD $1,000,000 - $1,999,999
26TH ROAD TO STH 98
CONSTR/RSRF10
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1620-01-62 01/09/2024 303 LET PSRS20 10.240 STH 013 MARSHFIELD - ABBOTSFORD $7,000,000 - $7,999,999
STH 98 TO SOUTH JUNCTION CTH N
CONSTR/PREV MAINT APPRVL 3/25/15
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1620-01-63 01/09/2024 303 LET BRRHB 0.000 STH 013 REGIONWIDE CONCRETE OVERLAYS $250,000 - $499,999
MARATHON CO B-37-0184; B-37-0185
CONSTR/CONCRETE OVERLAY
STATE 3R STBG <5K POP FAST
1053-02-07 303 I/E PVRPLA 2.450 STH 029 ABBOTSFORD - WAUSAU $100,000 - $249,999
PURPLE MARTIN LANE TO 152ND AVE
DESIGN/PAVEMENT REPLACEMENT
2022-2025 FINAL STIP Project Listing 225North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERF FAST
1053-02-09 303 I/E RECST 1.340 STH 029 WAUSAU - WITTENBERG $500,000 - $749,999
US 51 TO BUS 51, WB
DESIGN, RECONSTRUCT
BACKBONE NATIONAL HIGHWAY PERF FAST
1053-04-10 303 I/E RECST 1.630 STH 029 MARATHON CITY - WAUSAU $100,000 - $249,999
STH 107 TO 128TH AVENUE SOUTH
DESIGN/RECONSTRUCT
BACKBONE NATIONAL HIGHWAY PERF FAST
1053-04-14 303 I/E RSRF10 5.960 STH 029 ABBOTSFORD - WAUSAU $250,000 - $499,999
PURPLE MARTIN LN TO LITTLE RIB RVR
DESIGN/FULL PSE/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
1053-07-07 303 I/E PSRS30 9.140 STH 029 ABBOTSFORD - WAUSAU $250,000 - $499,999
CLARK CO LINE TO CTH E SOUTH, WB
DESIGN/FULL PSE/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1053-07-75 12/13/2022 303 LET PVRPLA 8.640 STH 029 ABBOTSFORD - WAUSAU $13,000,000 - $13,999,999
CTH E TO CTH H, EB
CONST/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1053-07-76 12/13/2022 303 LET RSRF10 0.047 STH 029 WAUSAU - WITTENBERG $2,000,000 - $2,999,999
BASS LAKE ROAD TO CTH D, WB
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1053-07-30 06/25/2023 303 C/E PSRS30 2.770 STH 029 WAUSAU - WITTENBERG $100,000 - $249,999
CTH D TO CTH OO
DESIGN/FULL PSE/PREV MAINTENANCE
2022-2025 FINAL STIP Project Listing 226North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1053-02-83 11/11/2025 303 LET PSRS20 4.420 STH 029 ABBOTSFORD - WAUSAU $3,000,000 - $3,999,999
CTH H TO PURPLE MARTIN LANE, EB
CONST/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1053-07-85 11/11/2025 303 LET PSRS20 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999
CTH E SOUTH TO STH 97, WB
CONST/PSRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1053-07-86 11/11/2025 303 LET PVRPLA 0.000 STH 029 ABBOTSFORD - WAUSAU $12,000,000 - $12,999,999
STH 97 TO PHEASANT FALLS ROAD, WB
CONST/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1053-07-87 11/11/2025 303 LET RSRF30 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999
PHEASANT FALLS TO PURPLE MARTIN, WB
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 6610-04-70 05/10/2022 303 LET PVRPLA 0.049 STH 034 RUDOLPH - KNOWLTON $2,000,000 - $2,999,999
STH 34 & CTH DB/OLD 51 INTERSECTION
CONST/PAVEMENT REPLACEMENT
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2025 6610-00-51 08/25/2025 303 R/R RSRF25 0.000 STH 034 RUDOLPH - KNOWLTON $250,000 - $499,999
HOSTA RD CN RR XING SIGNALS MP71.82
RAIL CROSSING SIGNALS/392768B
STATE 3R STBG <5K POP FAST
2025 6270-00-75 09/09/2025 303 LET BRRHB 0.000 STH 049 NORTHLAND - STH 29 $250,000 - $499,999
LITTLE WOLF RIVER BRIDGE B-37-0428
CONST/DECK REPLACEMENT
2022-2025 FINAL STIP Project Listing 227North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SHR BRIDGES STBG <5K POP FAST
2022 6380-00-62 05/10/2022 303 LET RSRF10 8.702 STH 097 MARSHFIELD - STRATFORD $6,000,000 - $6,999,999
NORTHRIDGE ST TO REFLECTION ST
CONSTR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 9535-05-72 09/09/2025 303 LET BRRHB 0.000 STH 097 STRATFORD - GOODRICH $500,000 - $749,999
BRIDGE OVERLAY B-37-0548
CONST/POLYMER OVERLAY/JOINT/PAINT
SHR BRIDGES STBG <5K POP FAST
2023 7040-05-51 05/25/2023 207 R/R MISC 0.000 STH 098 VILLAGE OF SPENCER, STH 98 EAST $100,000 - $249,999
RAIL-HWY CROSSING REPAIR
XING REPAIR 689933J MILE POST 289.8
RAILROAD CROSSING REPAIR NON-FEDERAL
2023 1009-46-64 02/14/2023 303 LET BRRHB 0.000 STH 107 REGIONWIDE CONCRETE OVERLAYS $750,000 - $999,999
MARATHON COUNTY BRIDGE OVERLAYS
CONSTR/CONCRETE OVERLAY/JOINTS
STATE 3R STBG <5K POP FAST
2023 6360-05-70 02/14/2023 303 LET RSRF10 0.566 STH 107 V MARATHON CITY, MAIN STREET $250,000 - $499,999
NORTH STREET TO MARATECH AVENUE
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2025 6360-05-25 11/25/2025 303 R/E RSRF10 0.493 STH 107 V MARATHON CITY, MAIN STREET $0 - $99,999
CTH B TO NORTH STREET
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2025 6360-05-75 12/09/2025 303 LET RSRF10 0.493 STH 107 V MARATHON CITY, MAIN STREET $250,000 - $499,999
CTH B TO NORTH STREET
CONST/RESURFACE
2022-2025 FINAL STIP Project Listing 228North Central Region
MARATHON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R STBG <5K POP FAST
6370-00-03 303 I/E RSRF10 0.515 STH 153 STRATFORD - ELDERON $100,000 - $249,999
WISCONSIN RIVER BRIDGE TO OLD 51 RD
DESIGN/FULL PSE/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
6600-00-01 303 I/E PVRPLA 1.337 STH 153 MOSINEE - ELDERON $250,000 - $499,999
OLD 51 TO EAST VIEW DRIVE
DESIGN/FULL PSE/PVRPLA
STATE 3R STBG 5-200K POP FASTG
2022 6370-00-72 09/13/2022 303 LET RSRF10 5.900 STH 153 STRATFORD - MOSINEE $2,000,000 - $2,999,999
STH 107 TO RANGELINE RD
CONST/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2023 6370-01-77 02/14/2023 303 LET RSRF25 10.950 STH 153 STH 13 - STRATFORD $5,000,000 - $5,999,999
STH 13 TO STAINLESS AVENUE
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2023 1170-01-76 09/12/2023 303 LET RSRF10 8.720 USH 051 WAUSAU - MERRILL $6,000,000 - $6,999,999
DECATOR DRIVE TO LINCOLN CO LINE
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
6999-19-00 303 I/E MISC 6.030 VAR HWY WAUSAU AREA VARIOUS STREETS $2,000,000 - $2,999,999
BUS 51/STH52 CURB RAMP IMPROVEMENTS
PER WISDOT ADA TRANS PLAN 975 RAMPS
CURB RAMP STANDALONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 229North Central Region
MARQUETTE
2022-2025 FINAL STIP Project Listing 229North Central Region
MARQUETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 6748-02-70 03/14/2023 205 LET BRRPL 0.000 CTH CX T OXFORD, CTH CX $500,000 - $749,999
CHAPMAN CREEK BRIDGE B-39-0013
CONST/REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2025 1166-04-84 11/11/2025 303 LET RSRF30 0.000 IH 039 PORTAGE - COLOMA $7,000,000 - $7,999,999
COLUMBIA CO LINE TO FAWN COURT,SB
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1166-04-85 11/11/2025 303 LET RSRF30 0.000 IH 039 PORTAGE - COLOMA $7,000,000 - $7,999,999
FAWN COURT TO WAUSHARA CO LINE,SB
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 6744-02-70 03/14/2023 205 LET BRRPL 0.000 LOC STR V WESTFIELD, MAIN STREET $500,000 - $749,999
WESTFIELD CREEK BRIDGE B-39-0977
CONST/REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2023 6750-00-70 02/14/2023 205 LET BRRPL 0.000 LOC STR T MONTELLO, 14TH ROAD $1,000,000 - $1,999,999
UP RAILROAD BRIDGE, P-39-0040
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
6150-01-34 303 I/E PSRS40 0.190 STH 022 C OF MONTELLO, E MONTELLO STREET $0 - $99,999
N JCT STH 23 TO FERN DRIVE
DESIGN, PREVENTATIVE MAINTENANCE
STATE 3R NON-FEDERAL
2023 1430-02-73 05/09/2023 303 LET COLD20 7.040 STH 023 ENDEAVOR - PRINCETON $4,000,000 - $4,999,999
8TH COURT TO MORNINGSIDE COURT
CONSTR/COLD20
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 230North Central Region
MARQUETTE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6530-01-71 03/08/2022 303 LET RSRF10 8.780 STH 073 PRINCETON - PLAINFIELD $2,000,000 - $2,999,999
CTH J TO WHITE RIVER BRIDGE
CONSTR/RESURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 231North Central Region
MENOMINEE
2022-2025 FINAL STIP Project Listing 231North Central Region
MENOMINEE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
9660-01-04 206 I/E RECST 0.144 CTH M SHAWANO - LANGLADE $100,000 - $249,999
STH 55 AND CTH M (E) INTERSECTION
DESIGN/RECONSTRUCT/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 9660-01-74 11/11/2025 206 LET RECST 0.144 CTH M SHAWANO - LANGLADE $500,000 - $749,999
STH 55 AND CTH M (E) INTERSECTION
CONST/RECONSTRUCT/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 1009-43-69 09/09/2025 303 LET PSRS20 3.407 STH 047 MENOMINEE CO CULVERT REPLACEMENT $750,000 - $999,999
STH 47 COUNTYWIDE
CONST/CULVERT
STATE 3R STBG <5K POP FAST
2025 1009-43-68 09/09/2025 303 LET PSRS20 0.701 STH 055 MENOMINEE CO CULVERT REPLACEMENT $500,000 - $749,999
STH 55 COUNTYWIDE
CONSTR/CULVERT
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 232North Central Region
NORTH CENTRAL REGION WIDE
2022-2025 FINAL STIP Project Listing 232North Central Region
NORTH CENTRAL REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1009-42-26 305 I/E TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
DESIGN/TRF OPS- PAVMT MARKING
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1009-42-28 305 I/E TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $0 - $99,999
LOCATIONS ON STN PER ANNUAL PLAN
DESIGN/TRF OPS- PAVMT MARKING
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2022 1009-42-27 01/11/2022 305 LET TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $1,000,000 - $1,999,999
LOCATIONS ON STN PER ANNUAL PLAN
REGION WIDE/TRF OPS- PAVMT MARKING
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
2022 1009-42-92 02/25/2022 303 SFA MISC 0.000 VAR HWY BIANNUAL TUB GIRDER INSPECTIONS $0 - $99,999
USH 51/STH 29 SYSTEM INTERCHANGE
TRAFFIC MITIGATION
BACKBONE NON-FEDERAL
2022 3700-40-34 11/25/2022 305 MIS TOSIG 0.000 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999
NC REGIONWIDE VARIOUS LOCATIONS
ITS/TRAFFIC/STANDALONE PROGRAM
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL
2023 1009-42-29 05/09/2023 305 LET TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $750,000 - $999,999
LOCATIONS ON STN PER ANNUAL PLAN
REGION WIDE/TRF OPS- PAVMT MARKING
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2023 3700-40-35 11/25/2023 305 MIS TOSIG 0.000 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999
NC REGIONWIDE VARIOUS LOCATIONS
ITS/TRAFFIC/STANDALONE PROGRAM
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL
2022-2025 FINAL STIP Project Listing 233North Central Region
NORTH CENTRAL REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1009-47-63 12/10/2024 303 LET BRRHB 0.000 VAR HWY REGIONWIDE BRIDGE REPAIR $250,000 - $499,999
B-37-0097 AND B-71-0002
CONST/REHAB/BOX CULVERT REPAIR
SHR BRIDGES STBG 5-200K POP FASTG
2024 3700-40-36 11/25/2024 305 MIS TOSIG 0.020 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999
NC REGIONWIDE VARIOUS LOCATIONS
ITS/TRAFFIC/STANDALONE PROGRAM
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL
2022-2025 FINAL STIP Project Listing 234North Central Region
ONEIDA
2022-2025 FINAL STIP Project Listing 234North Central Region
ONEIDA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 9040-03-71 12/13/2022 303 LET PVRPLA 3.196 STH 017 RHINELANDER - EAGLE RIVER $7,000,000 - $7,999,999
USH 8 TO STEVENS STREET
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 9040-02-71 08/13/2024 303 LET PVRPLA 1.067 STH 017 RHINELANDER - EAGLE RIVER $1,000,000 - $1,999,999
STEVENS STREET TO POLLYANNA ROAD
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG 5-200K POP FASTG
2022 9050-03-71 03/08/2022 303 LET RSRF10 11.940 STH 047 RHINELANDER - WOODRUFF $4,000,000 - $4,999,999
KILDEER ROAD TO VILAS COUNTY LINE
CONST/RESURF10 FAST TRACK
STATE 3R NON-FEDERAL
9070-03-03 303 I/E RSRF30 6.926 STH 070 FIFIELD - WOODRUFF $100,000 - $249,999
CTH F TO MORGAN ROAD
DESIGN/RSRF30
STATE 3R NON-FEDERAL
2022 1580-30-75 05/10/2022 303 LET BRRPL 0.000 USH 008 PRENTICE - BRADLEY $1,000,000 - $1,999,999
LITTLE SOMO RIVER BRIDGE B-35-157
CONST/REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022 1590-12-73 12/13/2022 303 LET PVRPLA 0.077 USH 008 RHINELANDER - MONICO $1,000,000 - $1,999,999
USH 8 AND USH 45 SOUTH INTERSECTION
CONST/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1590-12-74 08/09/2022 303 LET RSRF25 8.397 USH 008 RHINELANDER - MONICO $4,000,000 - $4,999,999
CTH P TO USH 45 NORTH
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 235North Central Region
ONEIDA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1580-30-72 11/14/2023 303 LET COLD10 3.032 USH 008 PRENTICE - BRADLEY $1,000,000 - $1,999,999
TRACY ROAD TO NORTH MCCORD ROAD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1595-09-73 08/08/2023 303 LET PVRPLA 3.200 USH 008 BRADLEY - RHINELANDER $4,000,000 - $4,999,999
NORTH RIFLE ROAD TO STH 47
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1590-12-75 09/09/2025 303 LET PVRPLA 5.990 USH 008 RHINELANDER - MONICO $10,000,000 - $10,999,999
STH 47 TO CTH P
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1600-14-70 09/10/2024 303 LET PVRPLA 5.680 USH 045 ANTIGO - MONICO $2,000,000 - $2,999,999
LCL TO CTH B & CTH Q TO USH 8 SOUTH
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1600-14-71 09/10/2024 303 LET PVRPLA 1.750 USH 045 ANTIGO - MONICO $1,000,000 - $1,999,999
CTH B TO CTH Q
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1170-19-23 03/25/2023 303 R/E PSRS20 0.387 USH 051 MINOCQUA - MANITOWISH $0 - $99,999
MINOCQUA BRIDGE TO FRONT STREET
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2023 1170-19-72 11/14/2023 303 LET PVRPLA 0.429 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999
MANITOU PARK TO MINOCQUA LK BRIDGE
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 236North Central Region
ONEIDA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1174-10-74 08/13/2024 303 LET RSRF10 1.740 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999
FRONT STREET - 3RD AVENUE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1170-19-61 09/09/2025 303 LET PSRS20 0.387 USH 051 MINOCQUA - MANITOWISH $500,000 - $749,999
MINOCQUA BRIDGE TO FRONT STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 237North Central Region
OUTAGAMIE
2022-2025 FINAL STIP Project Listing 237North Central Region
OUTAGAMIE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1140-00-06 303 I/E PVRPLA 7.080 USH 045 WINCHESTER - NEW LONDON $1,000,000 - $1,999,999
CTH W TO CTH D
DESIGN/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1140-00-26 06/25/2025 303 R/E PVRPLA 7.080 USH 045 WINCHESTER - NEW LONDON $100,000 - $249,999
CTH W TO CTH D
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 238North Central Region
PORTAGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
6414-00-12 303 I/E RECST 0.000 BUS 051 VILLAGE OF PLOVER, POST ROAD $0 - $99,999
CTH B TO GREEN DRIVE
DESIGN/RECONSTRUCT
STATE 3R NON-FEDERAL
2024 6767-01-71 02/13/2024 206 LET RECST 0.680 CTH B V PLOVER, CTH B $4,000,000 - $4,999,999
WISCONSIN AVENUE TO HOOVER AVENUE
CONST/RECONSTRUCT
STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG
2024 6767-02-71 02/13/2024 206 LET PVRPLA 0.450 CTH B V PLOVER, CTH B $2,000,000 - $2,999,999
HOOVER AVENUE TO IH 39 INTERCHANGE
CONST/PVRPLA
STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG
1166-05-36 303 I/E PSRS30 8.940 IH 039 STEVENS POINT - WAUSAU $100,000 - $249,999
USH 10 TO STH 34, SB
DESIGN/FULL PSE/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
1166-13-01 303 I/E RECSTE 11.130 IH 039 PLAINFIELD - STEVENS POINT $2,000,000 - $2,999,999
STH 54 TO N 2ND STREET
DESIGN/RECONSTRUCTION
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1166-00-81 04/12/2022 303 LET RSRF10 5.900 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999
CTH X TO MARATHON COUNTY LINE, NB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1166-05-84 08/13/2024 303 LET BRRHB 0.000 IH 039 PLAINFIELD - STEVENS POINT $750,000 - $999,999
CTH HH BRIDGE, B-49-0021
CONSTR/BRIDGE PAINTING
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 239North Central Region
PORTAGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1166-12-78 12/10/2024 303 LET RSRF10 11.130 IH 039 PLAINFIELD - STEVENS POINT $8,000,000 - $8,999,999
STH 54 TO N 2ND STREET
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 6340-00-24 03/25/2023 303 R/E PVRPLA 6.444 STH 013 RUDOLPH - MARSHFIELD $0 - $99,999
2ND STREET NORTH TO CTH P
REAL ESTATE/PAVEMENT REPLACEMENT
STATE 3R NON-FEDERAL
2025 6340-00-74 03/11/2025 303 LET PVRPLA 6.444 STH 013 RUDOLPH - MARSHFIELD $6,000,000 - $6,999,999
2ND STREET NORTH TO CTH P
CONST/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 6610-00-66 09/09/2025 303 LET BRPVTV 0.000 STH 034 RUDOLPH - KNOWLTON $100,000 - $249,999
LITTLE EAU PLEINE RIVER B-49-0092
CONST/BRIDGE PREVENTIVE
SHR BRIDGES STBG <5K POP FAST
2022 1520-01-20 02/25/2022 303 R/E PSRS20 12.992 STH 054 WISCONSIN RAPIDS - PLOVER $100,000 - $249,999
26TH STREET NORTH TO CTH B
REAL ESTATE/PSRS20
STATE 3R NON-FEDERAL
2023 1009-40-68 06/25/2023 303 MIS MISC 0.000 STH 054 PLOVER - WAUPACA $100,000 - $249,999
MAPLE DRIVE INTERSECTION
MAINTENANCE TRANSFER PAYMENT
STATE 3R NON-FEDERAL
2024 1520-01-53 08/25/2024 303 R/R PSRS20 0.000 STH 054 WISCONSIN RAPIDS - PLOVER $100,000 - $249,999
26TH STREET NORTH TO CTH B
PLOVER WCL XING SURFACE 693765M
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 240North Central Region
PORTAGE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 6414-01-74 07/08/2025 303 LET PVRPLA 1.660 STH 054 PLOVER - WAUPACA $1,000,000 - $1,999,999
MAPLE DRIVE TO I-39
CONSTR/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 6280-00-60 01/10/2023 303 LET PSRS40 10.480 STH 066 STEVENS POINT - ROSHOLT $2,000,000 - $2,999,999
NORTH CTH J TO STH 49
CONSTR/PM APPROVED 6.6.16
STATE 3R STBG <5K POP FAST
2023 6998-15-20 09/25/2023 303 R/E MISC 4.770 STH 066 C STEVENS POINT, VARIOUS STREETS $100,000 - $249,999
US10/STH66 CURB RAMP IMPROVEMENTS
PER WISDOT ADA TRANS PLAN 303 RAMPS
CURB RAMP STANDALONE NON-FEDERAL
6290-05-30 303 I/E PSRS30 3.970 USH 010 STEVENS POINT - WAUPACA $100,000 - $249,999
IH 39 TO CTH J
DESIGN/FULL PSE/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 4749-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY PORTAGE CO PAVEMENT MARKING TMA'S $250,000 - $499,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS-PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 241North Central Region
PRICE
2022-2025 FINAL STIP Project Listing 241North Central Region
PRICE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1610-41-70 04/12/2022 303 LET RSRF10 14.066 STH 013 MEDFORD - PRENTICE $4,000,000 - $4,999,999
TAYLOR COUNTY LINE TO CTH A NORTH
CONST/RESURFACE
STATE 3R HWY INFRA COVID SUPP
2024 1610-44-71 01/09/2024 303 LET PVRPLA 1.999 STH 013 C PHILLIPS, LAKE STREET $2,000,000 - $2,999,999
CTH D TO CTH F
CONST/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 9931-02-72 12/10/2024 303 LET RSRF10 1.920 STH 013 CITY OF PARK FALLS $750,000 - $999,999
N FORK FLAMBEAU RVR BRDG - 5TH ST N
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1580-30-70 11/14/2023 303 LET COLD10 6.500 USH 008 PRENTICE - BRADLEY $3,000,000 - $3,999,999
LUSTILA ROAD TO CTH YY
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 242North Central Region
SHAWANO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 6997-05-00 05/25/2023 206 C/E RECST 0.302 LOC STR C SHAWANO, W GREEN BAY STREET $250,000 - $499,999
BARTLETT STREET TO MAIN STREET
DESIGN/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2024 6997-04-70 01/09/2024 206 LET RECST 0.361 LOC STR C SHAWANO, E FIFTH STREET $750,000 - $999,999
N MAIN STREET TO N HAMLIN STREET
CONST/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2025 6997-05-70 02/11/2025 206 LET RECST 0.302 LOC STR C SHAWANO, W GREEN BAY STREET $1,000,000 - $1,999,999
BARTLETT STREET TO MAIN STREET
CONST/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
9180-23-03 303 I/E PVRPLA 1.000 STH 022 C SHAWANO, SOUTH MAIN STREET $250,000 - $499,999
ZINGLER AVENUE TO GREEN BAY STREET
DESIGN/FULL PSE/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 9180-17-71 11/12/2024 303 LET COLD20 5.810 STH 022 SHAWANO - GILLETT $4,000,000 - $4,999,999
CTH BE TO CTH R
CONST/RESURFACE
STATE 3R STBG 5-200K POP FASTG
2024 9180-17-72 11/12/2024 303 LET COLD20 5.920 STH 022 SHAWANO - GILLETT $4,000,000 - $4,999,999
CTH R TO OCONTO COUNTY LINE
CONST/RESURFACE
STATE 3R STBG 5-200K POP FASTG
2025 9180-23-23 03/25/2025 303 R/E PVRPLA 1.000 STH 022 C SHAWANO, SOUTH MAIN STREET $0 - $99,999
ZINGLER AVENUE TO GREEN BAY STREET
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 243North Central Region
SHAWANO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1058-22-30 06/25/2023 303 C/E PSRS30 19.710 STH 029 WITTENBERG - SHAWANO $500,000 - $749,999
CTH J TO CTH M
DESIGN/FULL PSE/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1058-25-30 06/25/2023 303 C/E PSRS30 11.590 STH 029 SHAWANO - GREEN BAY $500,000 - $749,999
CTH M TO SOUTH HIGHLINE ROAD
DESIGN/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1058-23-72 09/10/2024 303 LET RECST 0.084 STH 029 WITTENBERG - SHAWANO $2,000,000 - $2,999,999
CTH MMM/CLARK DRIVE INTERSECTION
CONST/RECONSTRUCT
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2025 1058-25-62 11/11/2025 303 LET BRRHB 0.000 STH 029 SHAWANO - GREEN BAY $1,000,000 - $1,999,999
SLOPE STABILIZATION B-58-0075
CONST/REHAB
BACKBONE NATIONAL HIGHWAY PERFFAST
9180-23-04 303 I/E PVRPLA 0.260 STH 047 C SHAWANO, NORTH MAIN STREET $100,000 - $249,999
GREEN BAY STREET TO SHAWANO CREEK
DESIGN/FULL PSE/PVRPLA
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 6243-05-73 09/12/2023 303 LET RSRF10 9.420 STH 047 BLACK CREEK - BONDUEL $2,000,000 - $2,999,999
OUTAGAMIE CO LINE TO STH 29
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 244North Central Region
SHAWANO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 9180-23-24 03/25/2025 303 R/E PVRPLA 0.260 STH 047 C SHAWANO, NORTH MAIN STREET $0 - $99,999
GREEN BAY STREET TO SHAWANO CREEK
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2023 9220-04-72 09/12/2023 303 LET PVRPLA 1.110 STH 117 BONDUEL - CECIL $1,000,000 - $1,999,999
EXPRESS WAY TO MUTZY LANE
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP FAST
2023 9220-04-82 09/12/2023 303 LET PVRPLA 0.000 STH 117 BONDUEL - CECIL $500,000 - $749,999
EXPRESS WAY TO MUTZY LANE
LOCAL UTILITY/PVRPLA
STATE 3R NON-FEDERAL
2022 6580-10-22 02/25/2022 303 R/E MISC 0.005 STH 156 CLINTONVILLE - HOWARD $0 - $99,999
HERMAN CREEK GUARDRAILRESTORATION
REAL ESTATE/REPLACEMENT
STATE 3R NON-FEDERAL
2023 6580-10-61 09/12/2023 303 LET MISC 0.005 STH 156 CLINTONVILLE - HOWARD $100,000 - $249,999
HERMAN CREEK GUARDRAILRESTORATION
CONST/MISC
STATE 3R STBG <5K POP FAST
2022 1600-02-20 12/25/2022 303 R/E RSRF10 15.330 USH 045 WITTENBERG - ANTIGO $0 - $99,999
STH 29 TO LANGLADE COUNTY LINE
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2023 1600-02-70 11/14/2023 303 LET RSRF10 15.330 USH 045 WITTENBERG - ANTIGO $6,000,000 - $6,999,999
STH 29 TO LANGLADE COUNTY LINE
2022-2025 FINAL STIP Project Listing 245North Central Region
SHAWANO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4758-98-22 10/25/2022 305 MIS TOPM 0.000 VARHWY
SHAWANO CO PAVEMENT MARKING TMA'S $100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
TRF OPS-PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 246North Central Region
VILAS
2022-2025 FINAL STIP Project Listing 246North Central Region
VILAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
9493-00-00 206 I/E RCND20 5.300 CTH A T PHELPS, CTH A $250,000 - $499,999
STH 17 TO EAGLE FARM ROAD
DESIGN/FULL PSE/FLAP RECONDITION
FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA
2023 9493-00-70 05/09/2023 206 LET RCND20 5.300 CTH A T PHELPS, CTH A $1,000,000 - $1,999,999
STH 17 TO EAGLE FARM ROAD
CONST/FLAP PROG RECONDITION
FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA
2022 9513-00-70 11/08/2022 206 LET RECST 3.260 CTH S CTH K - CTH B $3,000,000 - $3,999,999
CTH K TO N FLOWAGE LAKE ROAD
CONST/RECONSTRUCT
STP RURAL STBG <5K POP FAST
2025 1009-43-66 09/09/2025 303 LET PSRS20 0.541 STH 017 VILAS COUNTY CULVERT REPLACEMENT $500,000 - $749,999
STH 17 COUNTYWIDE
CONST/CULVERTS
STATE 3R STBG <5K POP FAST
2022 9231-07-72 12/13/2022 303 LET MISC 0.069 STH 047 WOODRUFF - LAC DU FLAMBEAU $500,000 - $749,999
STORMWATER DRAINAGE IMPROVEMENTS
CONST/MISC
STATE 3R STBG <5K POP FAST
2022 9205-03-20 04/25/2022 303 R/E RSRF10 6.940 STH 155 SAINT GERMAIN - SAYNER $0 - $99,999
STH 70 TO LAKE STREET
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 9205-03-60 09/10/2024 303 LET RSRF10 6.940 STH 155 SAINT GERMAIN - SAYNER $2,000,000 - $2,999,999
STH 70 TO LAKE STREET
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 247North Central Region
VILAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1170-20-60 08/08/2023 303 LET PSRS40 15.310 USH 051 MINOCQUA - MANITOWISH $4,000,000 - $4,999,999
CTH M TO CTH W
CONST/PREVENTIVE MAINTENANCE
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 1175-18-75 08/08/2023 303 LET RSRF10 2.090 USH 051 MANITOWISH - HURLEY $500,000 - $749,999
CTH W TO IRON COUNTY LINE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1170-22-70 12/10/2024 303 LET BRRPL 0.040 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999
MANITOWISH RIVER BRIDGE, B-63-0003
CONST/BRIDGE REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 248North Central Region
WAUPACA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 6996-04-72 01/09/2024 206 LET RECST 0.280 CTH D C NEW LONDON, N WATER STREET $3,000,000 - $3,999,999
SHAWANO STREET TO N PEARL STREET
CONST/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2023 6844-01-71 01/10/2023 206 LET MISC 6.810 CTH E WAUPACA - OGDENSBURG $500,000 - $749,999
CONSTANCE ROAD TO FULTON STREET
CONST/HRRRP/MISC
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2024 6838-00-00 05/25/2024 206 C/E PVRPLA 4.580 CTH W WINNEBAGO CO LINE - NEW LONDON $100,000 - $249,999
STH 96 TO CUT OFF ROAD
DESIGN/PVRPLA
STP RURAL STBG <5K POP FAST
2025 6838-00-70 01/14/2025 206 LET PVRPLA 4.580 CTH W WINNEBAGO CO LINE - NEW LONDON $1,000,000 - $1,999,999
STH 96 TO CUT OFF ROAD
CONST/PVRPLA
STP RURAL STBG <5K POP FAST
2022 6250-02-23 03/25/2022 303 R/E COLD30 4.420 STH 022 CLINTONVILLE - SHAWANO $0 - $99,999
STH 156 TO LAKE WAGNER ROAD
REAL ESTATE/PAVEMENT REPLACEMENT
STATE 3R NON-FEDERAL
2023 6590-01-24 02/25/2023 303 R/E RSRF25 3.480 STH 022 WAUPACA - CLINTONVILLE $100,000 - $249,999
STH 54 TO S JCT CTH B
REAL ESTATE/RESURF
STATE 3R NON-FEDERAL
2024 6220-01-76 03/12/2024 303 LET RSRF10 1.800 STH 022 CITY OF WAUPACA $750,000 - $999,999
USH 10 RAMPS TO WCL RR BRIDGE
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 249North Central Region
WAUPACA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 6250-02-73 02/11/2025 303 LET COLD30 4.420 STH 022 CLINTONVILLE - SHAWANO $3,000,000 - $3,999,999
STH 156 TO LAKE WAGNER ROAD
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG 5-200K POP FASTG
2025 6590-01-74 09/09/2025 303 LET RSRF25 3.480 STH 022 WAUPACA - CLINTONVILLE $2,000,000 - $2,999,999
STH 54 TO S JCT CTH B
CONSTR/RESURF
STATE 3R STBG <5K POP FAST
2022 6270-00-63 03/08/2022 303 LET PSRS40 4.320 STH 049 WAUPACA - NORTHLAND $1,000,000 - $1,999,999
DEPOT STREET TO S JCT STH 161
CONST/SHRM STATE FUND APRVL 10/6/11
STATE 3R NON-FEDERAL
2023 6420-00-72 09/12/2023 303 LET RSRF10 7.875 STH 049 WAUPACA - NORTHLAND $3,000,000 - $3,999,999
NORTH STREET TO DEPOT STREET
CONSTR/RESURF
STATE 3R STBG 5-200K POP FASTG
2025 6220-04-76 11/11/2025 303 LET PVRPLA 0.917 STH 054 NEW LONDON - BLACK CREEK $2,000,000 - $2,999,999
W JEANNE STREET TO CTH S
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 6991-00-74 03/11/2025 303 LET RSRF10 4.650 STH 054 PLOVER - WAUPACA $1,000,000 - $1,999,999
PORTAGE CO LINE TO FOXFIRE DRIVE
CONST/RESURFACE
STATE 3R STBG 5-200K POP FASTG
2023 6518-00-70 11/14/2023 303 LET COLD20 0.510 STH 076 GREENVILLE - BEAR CREEK $500,000 - $749,999
OUTAGAMIE COUNTY LINE TO USH 45
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 250North Central Region
WAUPACA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 4075-00-71 09/09/2025 303 LET RSRF10 5.540 STH 096 FREMONT - APPLETON $1,000,000 - $1,999,999
STH 110 TO USH 45
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2023 6590-02-28 05/25/2023 303 R/E RSRF10 1.159 STH 110 C MARION, MAIN STREET $0 - $99,999
BERTRAM STREET TO USH 45
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 6590-01-53 04/25/2024 303 R/R RSRF10 0.000 STH 110 FREMONT - MARION $250,000 - $499,999
CN RR TO S JCT STH 22
RAILROAD CROSSING/SURFACE 692-450F
STATE 3R STBG <5K POP FAST
2025 6590-01-73 09/09/2025 303 LET RSRF10 4.090 STH 110 FREMONT - MARION $1,000,000 - $1,999,999
CN RR TO S JCT STH 22
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2025 6590-02-72 09/09/2025 303 LET RSRF10 6.951 STH 110 FREMONT - MARION $2,000,000 - $2,999,999
STH 161 TO W JCT CTH C
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2025 6590-02-73 09/09/2025 303 LET RSRF10 5.176 STH 110 FREMONT - MARION $1,000,000 - $1,999,999
W JCT CTH C TO BERTRAM STREET
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2025 6590-02-78 09/09/2025 303 LET RSRF10 1.159 STH 110 C MARION, MAIN STREET $1,000,000 - $1,999,999
BERTRAM STREET TO USH 45
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 251North Central Region
WAUPACA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1510-01-31 303 I/E PSRS30 4.950 USH 010 STEVENS POINT - WAUPACA $100,000 - $249,999
ANDERSON ROAD TO APPLETREE LANE WB
DESIGN/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
1510-02-30 303 I/E PSRS30 8.960 USH 010 WAUPACA - APPLETON $100,000 - $249,999
APPLETREE LANE TO OLD STH 49, EB
DESIGN/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
1510-02-32 303 I/E PSRS30 6.890 USH 010 WAUPACA - APPLETON $100,000 - $249,999
OLD STH 49 TO WINNEBAGO CO LINE WB
DESIGN/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
6290-05-31 303 I/E PSRS30 5.680 USH 010 STEVENS POINT - WAUPACA $250,000 - $499,999
PORTAGE CO LINE TO ANDERSON ROAD
DESIGN/FULL PSE/PREV MAINTENANCE
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1600-15-20 05/25/2023 303 R/E PVRPLA 8.030 USH 045 CLINTONVILLE - WITTENBERG $0 - $99,999
CTH C TO GOLLNOW ROAD
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2023 1600-15-70 05/09/2023 303 LET PVRPLA 8.030 USH 045 CLINTONVILLE - WITTENBERG $11,000,000 - $11,999,999
CTH C TO GOLLNOW ROAD
CONST/PVRPLA
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1140-00-77 11/11/2025 303 LET PVRPLA 7.490 USH 045 MANCHESTER - CLINTONVILLE $8,000,000 - $8,999,999
GIVENS ROAD TO CHURCH ROAD
CONST/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 252North Central Region
WAUSHARA
2022-2025 FINAL STIP Project Listing 252North Central Region
WAUSHARA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6987-00-73 05/10/2022 206 LET PVRPLA 5.210 CTH E CTH M - WAUPACA COUNTY LINE $2,000,000 - $2,999,999
CTH E TO CTH AE
CONST/PVRPLA
STP RURAL STBG <5K POP FAST
2022 1166-05-77 09/13/2022 303 LET RSRF20 13.940 IH 039 PACKWAUKEE - PLAINFIELD $7,000,000 - $7,999,999
MARQUETTE COUNTY LINE TO CTH O, NB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1166-07-79 03/08/2022 303 LET PVRPLA 7.470 IH 039 COLOMA - PLAINFIELD $6,000,000 - $6,999,999
COTTONVILLE AVENUE TO CTH O, SB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1166-07-80 11/08/2022 303 LET RSRF20 5.540 IH 039 COLOMA - STEVENS POINT $2,000,000 - $2,999,999
CTH O TO PORTAGE COUNTY LINE, SB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1166-07-99 02/25/2022 303 SFA PVRPLA 7.420 IH 039 COTTONVILLE AVENUE TO CTH O, SB $0 - $99,999
COLOMA - PLAINFIELD
TRAFFIC MITIGATION 1166-07-79
BACKBONE NON-FEDERAL
2022 1166-08-79 03/08/2022 303 LET RSRF20 5.860 IH 039 PACKWAUKEE - COLOMA $3,000,000 - $3,999,999
MARQUETTE C L TO COTTONVILLE AVE,SB
CONSTR/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 6871-00-70 03/12/2024 205 LET BRRPL 0.000 LOC STR T SAXEVILLE, 29TH DRIVE $250,000 - $499,999
2022-2025 FINAL STIP Project Listing 253North Central Region
WAUSHARA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
AUSTIN CREEK BRIDGE P-69-0012
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2022 6170-00-70 12/13/2022 303 LET PVRPLA 12.990 STH 021 COLOMA - WAUTOMA $10,000,000 - $10,999,999
MADISON STREET TO STH 22
CONST/RECONDITION
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 6170-00-74 12/13/2022 303 LET PVRPLA 0.482 STH 021 COLOMA - WAUTOMA $750,000 - $999,999
MADISON STREET TO STH 22
CONST/HSIP
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA
2025 6180-00-60 08/12/2025 303 LET PSRS20 0.046 STH 021 REDGRANITE - OSHKOSH $250,000 - $499,999
FREDERICKS CREEK CULVERT C-69-9000
CONST/CULVERT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
2025 6180-00-71 08/12/2025 303 LET RSRF10 4.990 STH 021 REDGRANITE - OSHKOSH $4,000,000 - $4,999,999
STH 49 TO WINNEBAGO COUNTY LINE
CONSTR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 6866-06-70 02/14/2023 303 LET RSRF10 7.040 STH 152 WAUTOMA - MT MORRIS $2,000,000 - $2,999,999
NORTH TOWNLINE ROAD TO CTH G
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 4769-98-22 10/25/2022 305 MIS TOPM 0.000 VARHWY
WAUSHARA CO PAVEMENT MARKINGTMA'S
$100,000 - $249,999
LOCATIONS ON STN PER ANNUAL PLAN
2022-2025 FINAL STIP Project Listing 254North Central Region
WAUSHARA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
TRF OPS-PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 255North Central Region
WOOD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6999-11-78 04/12/2022 206 LET RECST 0.389 LOC STR C WISCONSIN RAPIDS, W JACKSON ST $3,000,000 - $3,999,999
W RIVERVIEW EXP TO JACKSON ST BRDGE
CONST/RECONSTRUCT
STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG
2023 7397-01-70 03/14/2023 205 LET BRRPL 0.009 LOC STR T ROCK, LYNN LINE ROAD $250,000 - $499,999
EAST FORK BLACK RIVER BRIDGE
CONST/REPLACEMENT
LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG
2024 6995-12-70 01/09/2024 206 LET RECST 0.240 LOC STR C MARSHFIELD, S LINCOLN AVENUE $1,000,000 - $1,999,999
WEST 5TH STREET TO ADLER ROAD
CONST/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2023 6995-12-01 05/25/2023 290 M/E MISC 0.000 NON HWY ADLER ROAD TRAIL EXTENSION $0 - $99,999
CITY OF MARSHFIELD
DESIGN/MISC
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
2024 6995-12-71 04/25/2024 290 LLC MISC 0.000 NON HWY ADLER ROAD TRAIL EXTENSION $250,000 - $499,999
CITY OF MARSHFIELD
CONST/MISC
TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K
6340-00-05 303 I/E PVRPLA 0.891 STH 013 WISCONSIN RAPIDS - MARSHFIELD $0 - $99,999
EDGEWOOD PL TO STH 66
DESIGN/PAVEMENT REPLACMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 6950-04-22 03/25/2022 303 R/E RSRF20 3.950 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $100,000 - $249,999
SWANSON ROAD TO SENECA ROAD
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 256North Central Region
WOOD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1520-01-52 08/25/2024 303 R/R PSRS20 0.000 STH 054 WISCONSIN RAPIDS - PLOVER $250,000 - $499,999
26TH STREET NORTH TO CTH B
BIRON WCL XING SIGNALS 281612V
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6950-04-72 02/13/2024 303 LET RSRF20 3.950 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $3,000,000 - $3,999,999
SWANSON ROAD TO SENECA ROAD
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 6950-04-73 02/13/2024 303 LET RSRF10 1.090 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $500,000 - $749,999
CTH G TO SWANSON ROAD
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 1520-00-24 02/25/2022 303 R/E PVRPLA 0.032 STH 073 C OF PITTSVILLE $0 - $99,999
STH 73 AND STH 80 INTERSECTION
REAL ESTATE/PVRPLA
STATE 3R NON-FEDERAL
2022 6320-00-25 05/25/2022 303 R/E RSRF20 2.080 STH 073 PLAINFIELD - WISCONSIN RAPIDS $0 - $99,999
STH 173 TO STH 54
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2022 6320-00-56 04/25/2022 303 R/R RSRF20 0.000 STH 073 PLAINFIELD - WISCONSIN RAPIDS $0 - $99,999
STH 173 TO STH 54
RR CROSSING SWITCH/TRACK 392709Y
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1520-00-74 02/13/2024 303 LET PVRPLA 0.032 STH 073 C OF PITTSVILLE $1,000,000 - $1,999,999
STH 73 AND STH 80 INTERSECTION
CONSTR/PVRPLA
STATE 3R STBG 5-200K POP FASTG
2022-2025 FINAL STIP Project Listing 257North Central Region
WOOD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1520-00-77 02/13/2024 303 LET PVRPLA 5.860 STH 073 WISCONSIN RAPIDS - PITTSVILLE $4,000,000 - $4,999,999
INDUSTRIAL STREET TO STH 186
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG 5-200K POP FASTG
2024 6320-00-75 02/13/2024 303 LET RSRF20 2.080 STH 073 PLAINFIELD - WISCONSIN RAPIDS $1,000,000 - $1,999,999
STH 173 TO STH 54
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1620-02-27 02/25/2022 303 R/E RSRF20 1.617 STH 080 C OF PITTSVILLE $0 - $99,999
POPLAR ST TO STH 73
REAL ESTATE/RESURFACE
STATE 3R NON-FEDERAL
2024 1620-02-77 02/13/2024 303 LET RSRF20 1.617 STH 080 C OF PITTSVILLE $1,000,000 - $1,999,999
POPLAR STREET TO STH 73
CONSTR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1620-02-87 02/13/2024 303 LET RSRF20 1.617 STH 080 C OF PITTSVILLE $100,000 - $249,999
POPLAR STREET TO STH 73
CONSTR/LOCAL UTILITY
STATE 3R NON-FEDERAL
2025 1620-02-76 09/09/2025 303 LET PVRPLA 4.710 STH 080 NECEDAH - BABCOCK $5,000,000 - $5,999,999
JUNEAU CO LINE TO STH 173 N
CONSTR/PAVEMENT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 6933-00-21 06/25/2022 303 R/E PSRS20 0.035 STH 173 BABCOCK - NEKOOSA $0 - $99,999
CULVERT REPLACEMENT
REAL ESTATE/PSRS20
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 258North Central Region
WOOD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 6933-00-57 11/25/2022 303 R/R COLD10 0.000 STH 173 BABCOCK - NEKOOSA $100,000 - $249,999
STH 80 NB TO CRANBERRY BRIDGE
RAIL CROSSING SIGNALS 392695T
STATE 3R STBG <5K POP FAST
2022 7020-00-71 04/12/2022 303 LET RSRF30 4.157 STH 173 WYEVILLE - BABCOCK $2,000,000 - $2,999,999
JUNEAU CO LN TO STH 80
CONSTR/RESURFACE
STATE 3R STBG <5K POP FAST
2024 6933-00-61 09/10/2024 303 LET PSRS20 0.035 STH 173 BABCOCK - NEKOOSA $250,000 - $499,999
CULVERT REPLACEMENT
CONST/PSRS20
STATE 3R STBG <5K POP FAST
2024 6933-00-77 09/10/2024 303 LET RSRF15 5.230 STH 173 BABCOCK - NEKOOSA $2,000,000 - $2,999,999
STH 80 NB TO CRANBERRY BRIDGE
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2025 6999-21-20 03/25/2025 303 R/E MISC 10.300 VAR HWY C WISCONSIN RAPIDS, VARIOUS STREETS $100,000 - $249,999
STH 13/54/73 CURB RAMP IMPROVEMENTS
PER WISDOT ADA TRANS PLAN 412 RAMPS
CURB RAMP STANDALONE NON-FEDERAL
2022 – 2025 Statewide Transportation Improvement Program
Northwest Region Projects
2022-2025 FINAL STIP Project Listing 259Northwest Region
ASHLAND
2022-2025 FINAL STIP Project Listing 259Northwest Region
ASHLAND
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 8895-00-14 03/12/2024 206 LET RECST 0.350 LOC STR C ASHLAND, PRENTICE AVE $1,000,000 - $1,999,999
11TH STREET E TO 6TH STREET E
CONSTRUCTION/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2024 9955-00-70 01/09/2024 205 LET BRRPL 0.011 LOC STR C MELLEN, E TYLER AVE $500,000 - $749,999
BAD RIVER BRIDGE B-02-0073
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1610-01-12 303 I/E RSRF10 18.070 STH 013 PARK FALLS - MELLEN $100,000 - $249,999
PRICE CO LN TO MORSE RD
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1610-00-27 05/25/2022 303 R/E RSRF20 3.680 STH 013 MELLEN - ASHLAND $0 - $99,999
BUTTERWORTH RD TO USH 2
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 1610-00-56 08/25/2022 303 R/R MISC 0.000 STH 013 C MELLEN, MAIN STREET $250,000 - $499,999
WISCONSIN CENTRAL LTD RR 699392L
RR/UPGRADE RAIL CROSSING
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022 1610-00-57 08/25/2022 303 R/R MISC 0.000 STH 013 C MELLEN, MAIN STREET $250,000 - $499,999
WISCONSIN CENTRAL LTD RR 699392L
RR/INSTALL FLASHING LIGHTS & GATES
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 1610-00-76 01/10/2023 303 LET PVRPLA 2.980 STH 013 MELLEN - ASHLAND $5,000,000 - $5,999,999
JEFFERSON AVE TO GOLF COURSE ROAD
CONSTRUCTION/RESURFACING
2022-2025 FINAL STIP Project Listing 260Northwest Region
ASHLAND
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1610-00-78 01/10/2023 303 LET MISC 0.960 STH 013 MELLEN - ASHLAND $1,000,000 - $1,999,999
JEFFERSON AVE TO GOLF COURSE ROAD
CONSTRUCTION/LOCAL UTILITIES
STATE 3R NON-FEDERAL
2023 1610-00-86 01/10/2023 303 LET MISC 2.978 STH 013 MELLEN - ASHLAND $0 - $99,999
JEFFERSON AVE TO GOLF COURSE ROAD
CONSTRUCTION/SAFETY/RUMBLE STRIPS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1610-00-77 11/12/2024 303 LET RSRF20 3.680 STH 013 MELLEN - ASHLAND $5,000,000 - $5,999,999
BUTTERWORTH RD TO USH 2
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 1610-00-80 11/12/2024 303 LET MISC 2.680 STH 013 MELLEN - ASHLAND $500,000 - $749,999
BUTTERWORTH RD TO USH 2
CONSTRUCTION/LOCAL UTILITIES
STATE 3R NON-FEDERAL
2024 9925-00-70 11/12/2024 303 LET RSRF20 10.290 STH 169 MELLEN - USH 2 $4,000,000 - $4,999,999
STH 13 TO ASHLAND/IRON CO LN
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
1189-01-02 303 I/E BRRHB 0.000 USH 002 ASHLAND - SAXON $0 - $99,999
BEARTRAP CREEK BRIDGE B-02-0014
DESIGN - FULL PS&E BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2023 1180-44-70 11/14/2023 303 LET RSRF20 9.000 USH 002 ODANAH - SAXON $4,000,000 - $4,999,999
2022-2025 FINAL STIP Project Listing 261Northwest Region
ASHLAND
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
GOVERNMENT ROAD TO EAST COUNTYLINE
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2022-2025 FINAL STIP Project Listing 262Northwest Region
BARRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8833-00-71 05/10/2022 206 LET RCND20 4.170 CTH A DALLAS - CTH SS $3,000,000 - $3,999,999
CTH U TO CTH I
CONSTRUCTION/RECONDITION
STP RURAL STBG <5K POP FAST
2025 8798-00-73 11/11/2025 303 LET BRRHB 0.157 CTH D C CHETEK, SUMNER AVE $1,000,000 - $1,999,999
LAKE CHETEK BRIDGE B-03-0036
CONSTRUCTION/CONCRETE OVERLAY
STATE 3R STBG <5K POP - FAST EXT
2023 8829-00-01 05/25/2023 206 C/E MISC 0.036 CTH O DALLAS - RICE LAKE $100,000 - $249,999
DECKER DRIVE INTERSECTION
DESIGN - FULL PS&E SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2023 8829-00-71 11/14/2023 206 LET MISC 0.036 CTH O DALLAS - RICE LAKE $250,000 - $499,999
DECKER DRIVE INTERSECTION
CONSTR/SFTY/INTERSECTION IMPRVMNTS
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 8953-00-71 12/13/2022 205 LET BRRHB 0.022 CTH SS NEW AUBURN - CHETEK $500,000 - $749,999
CHETEK RIVER BRIDGE B-03-0725
CONSTRUCTION/BRRHB
LOCAL BRIDGES STBG <5K POP - FAST EXT
2022 8335-00-70 03/08/2022 205 LET BRRPL 0.026 LOC STR T VANCE CREEK, 5TH ST & 1/2 AVE $250,000 - $499,999
VANCE CREEK BRIDGE B-03-0210
CONSTRUCTION/BRRPL
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
8570-00-01 303 I/E BRRHB 0.000 STH 048 RICE LAKE - BIRCHWOOD $0 - $99,999
RED CEDAR RIVER BRIDGE B-03-0096
DESIGN - FULL PSE&E BRRHB
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 263Northwest Region
BARRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8120-00-70 11/08/2022 303 LET MISC 0.500 STH 048 C RICE LAKE, HAMMOND AVENUE $1,000,000 - $1,999,999
DRAINAGE WAY CULVERT C-03-0063
CONST/MISC/CULVERT REPLACEMENT
SHR BRIDGES STBG 5-200K POP FAST EXT
2022 8120-07-70 05/10/2022 303 LET RSRF20 3.850 STH 048 MCKINLEY - RICE LAKE $2,000,000 - $2,999,999
STH 25 TO WEST AVENUE
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
2024 8120-02-66 02/13/2024 303 LET MISC 9.120 STH 048 MCKINLEY - RICE LAKE $250,000 - $499,999
USH 63 NORTH TO STH 25
CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2024 8120-02-76 02/13/2024 303 LET COLD20 9.120 STH 048 MCKINLEY - RICE LAKE $5,000,000 - $5,999,999
USH 63 NORTH TO STH 25
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1195-05-02 303 I/E BRRHB 0.000 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999
CTH W BRIDGE B-03-0039 & B-03-0040
DESIGN - FULL PS&E BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
1195-06-33 303 I/E BRPVTV 0.336 USH 053 NEW AUBURN - SPOONER $0 - $99,999
BRDG PAINT B-03-0037,0038,0047,0057
DESIGN/BRIDGE PAINTS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1196-04-98 03/25/2022 303 SFA MISC 8.350 USH 053 CTH I TO USH 8 (NB) $0 - $99,999
NEW AUBURN - RICE LAKE
TRF MITIFGATION(CONS ID 1196-04-78)
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 264Northwest Region
BARRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1196-05-97 03/25/2022 303 SFA MISC 7.650 USH 053 CHIPPEWA CO LINE TO CHETEK RIVER $0 - $99,999
NEW AUBURN - RICE LAKE
TRAFFIC MITIGATION 1196-05-77
BACKBONE NON-FEDERAL
2023 1196-04-77 11/14/2023 303 LET RSRF20 16.630 USH 053 NEW AUBURN - RICE LAKE $12,000,000 - $12,999,999
CHIPPEWA COUNTY LINE - USH 8 (SB)
CONSTR/RESURFACE/BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1196-04-97 03/25/2023 303 SFA MISC 0.000 USH 053 CHIPPEWA COUNTY LINE TO USH 8 (SB) $0 - $99,999
NEW AUBURN - RICE LAKE
TRF MITIGATION CONSTR ID 1196-04-77
BACKBONE NON-FEDERAL
2023 1198-10-77 12/12/2023 303 LET PVRPLA 7.830 USH 053 RICE LAKE - SPOONER $20,000,000 - $24,999,999
26TH AVE TO PINE GROVE RD (NB & SB)
CONSTRUCTION/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1198-10-78 12/12/2023 303 LET MISC 1.100 USH 053 RICE LAKE - SPOONER $100,000 - $249,999
26TH AVENUE TO 27TH AVENUE
CONSTR/SAFETY/CABLE BARRIER
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2024 1195-05-60 11/12/2024 303 LET BRRHB 0.050 USH 053 RICE LAKE - SPOONER $250,000 - $499,999
OAKLAWN RD/22ND 1/2 AVE SB B030050
CONSTRUCTION/BRIDGE REHABILITATION
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1195-06-60 11/12/2024 303 LET BRRHB 0.050 USH 053 RICE LAKE - SPOONER $250,000 - $499,999
OAKLAWN RD/22ND 1/2 AVE NB B030051
CONSTRUCTION/BRIDGE REHABILITATION
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 265Northwest Region
BARRON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1550-04-22 09/25/2022 303 R/E MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $0 - $99,999
BEAVER DAM LAKE C-03-1459
REAL ESTATE ACQUISTION/1550-04-79
STATE 3R NON-FEDERAL
2022 1550-04-24 11/25/2022 303 R/E RSRF20 2.330 USH 063 C CUMBERLAND, ELM STR AND 2ND AVE $0 - $99,999
WEST JUNCTION STH 48 TO CHARRIE LN
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 1550-04-27 11/25/2023 303 R/E RSRF20 0.000 USH 063 CUMBERLAND - SPOONER $0 - $99,999
CHARRIE LN TO BARRON/WASHBURN CO LN
REAL ESTATE ACQUISTION
STATE 3R NON-FEDERAL
2024 1550-04-74 11/12/2024 303 LET RSRF20 2.303 USH 063 C CUMBERLAND, ELM STR AND 2ND AVE $2,000,000 - $2,999,999
WEST JUNCTION STH 48 TO CHARRIE LN
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 1550-04-79 11/12/2024 303 LET MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $1,000,000 - $1,999,999
BEAVER DAM LAKE C-03-0066
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R NON-FEDERAL
2025 1550-04-77 11/11/2025 303 LET RSRF20 6.517 USH 063 CUMBERLAND - SPOONER $4,000,000 - $4,999,999
CHARRIE LN TO BARRON/WASHBURN CO LN
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 266Northwest Region
BAYFIELD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1560-00-08 303 I/E MISC 0.016 LOCSTR
DRUMMOND - USH 2 $0 - $99,999
20 MILE CREEK CULVERT C-04-0001
DESIGN - FULL PSE&E, CULVERT
STATE 3R NATIONAL HIGHWAY PERFFAST
8510-00-06 303 I/E MISC 0.022 STH 013 PORT WING - SUPERIOR $100,000 - $249,999
.05 MILES W OF AIRPORT RD
DESIGN/SHORELINE RPR WAYSIDE OVLK
ROADSIDE FACILITIES SURFACE TRANSP BLOCK GRTS-
2022 8160-00-23 11/25/2022 303 R/E BRRPL 0.000 STH 013 ASHLAND - BAYFIELD $0 - $99,999
LITTLE WHITTLESEY CREEK B-04-0037
REAL ESTATE ACQUISITION
SHR BRIDGES NON-FEDERAL
2022 8160-00-25 05/25/2022 303 R/E MISC 1.100 STH 013 C WASHBURN, BAYFIELD STREET $0 - $99,999
THOMPSON CREEK TO WASHINGTON AVE
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 8510-03-72 11/08/2022 303 LET MISC 21.520 STH 013 CORNUCOPIA - SUPERIOR $1,000,000 - $1,999,999
BARK POINT ROAD TO CTH H
CONSTRUCTUCTION/MISC/SMALLCULVERTS
STATE 3R STBG <5K POP FAST
2023 8160-00-26 11/25/2023 303 R/E PVRPLA 2.080 STH 013 C WASHBURN, BAYFIELD STREET $0 - $99,999
WASHINGTON AVE TO SUPERIOR AVE
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8160-00-75 12/12/2023 303 LET PVRPLA 1.100 STH 013 C WASHBURN, BAYFIELD STREET $5,000,000 - $5,999,999
THOMPSON CREEK TO WASHINGTON AVE
2022-2025 FINAL STIP Project Listing 267Northwest Region
BAYFIELD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTRUCTION/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP FAST
2023 8160-00-78 12/12/2023 303 LET MISC 0.875 STH 013 C WASHBURN, BAYFIELD STREET $1,000,000 - $1,999,999
THOMPSON CREEK TO WASHINGTON AVE
CONSTR/LOCAL UTILITIES
STATE 3R NON-FEDERAL
2024 8510-00-72 09/10/2024 303 LET BRRHB 0.011 STH 013 BAYFIELD - CORNUCOPIA $100,000 - $249,999
SAND RIVER BRIDGE B-04-0011
CONSTRUCTION/BRIDGE REHABILITATION
SHR BRIDGES STBG <5K POP - FAST EXT
2024 8510-02-77 12/10/2024 303 LET COLD20 7.389 STH 013 CORNUCOPIA - PORT WING $3,000,000 - $3,999,999
BARK POINT ROAD TO CTH A
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2025 8160-00-73 09/09/2025 303 LET BRRPL 0.004 STH 013 ASHLAND - BAYFIELD $750,000 - $999,999
LITTLE WHITTLESEY CREEK B-04-0126
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2025 8160-00-76 12/09/2025 303 LET PVRPLA 1.030 STH 013 C WASHBURN, BAYFIELD STREET $5,000,000 - $5,999,999
WASHINGTON AVE TO SUPERIOR AVE
CONSTRUCTION/PAVEMENT REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEX E
2025 8160-00-77 12/09/2025 303 LET MISC 1.030 STH 013 C WASHBURN, BAYFIELD STREET $1,000,000 - $1,999,999
WASHINGTON AVE TO SUPERIOR AVE
CONSTRUCTION/LOCAL UTILITIES
STATE 3R NON-FEDERAL
2025 8510-00-71 11/11/2025 303 LET MISC 0.564 STH 013 CORNUCOPIA - PORT WING $1,000,000 - $1,999,999
LOST CREEK CULVERTS C-04-0070,71,72
2022-2025 FINAL STIP Project Listing 268Northwest Region
BAYFIELD
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTRUCTION/CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2024 8150-00-70 09/10/2024 303 LET BRRPL 0.003 STH 027 HAYWARD - BRULE $500,000 - $749,999
OUNCE RIVER BRIDGE B-04-0125
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2025 1180-00-79 09/09/2025 303 LET BRRHB 0.024 USH 002 INO - ASHLAND $750,000 - $999,999
N FISH CREEK BRIDGE B-04-0022
CONSTR/BRIDGE REHABILITATION/REDECK
SHR BRIDGES STBG <5K POP FAST
2022 1560-02-24 05/25/2022 303 R/E MISC 0.380 USH 063 DRUMMOND - USH 2 $0 - $99,999
MILL POND DAM
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 1560-02-74 12/12/2023 303 LET MISC 0.380 USH 063 DRUMMOND - USH 2 $1,000,000 - $1,999,999
MILL POND DAM
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 269Northwest Region
BUFFALO
2022-2025 FINAL STIP Project Listing 269Northwest Region
BUFFALO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7317-00-70 03/08/2022 205 LET BRRPL 0.026 CTH J STH 37 - CTH JJ $250,000 - $499,999
TIFFANY CREEK BRIDGE B-06-0195
CONSTRUCTION/BRRPL
LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E
2023 7170-00-76 11/14/2023 303 LET RSRF20 13.560 STH 025 WABASHA - DURAND $7,000,000 - $7,999,999
STH 35 N TO PLEASANT RIDGE RD
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 7160-04-75 12/13/2022 303 LET BRRPL 0.470 STH 035 TREMPEALEAU - FOUNTAIN CITY $3,000,000 - $3,999,999
MISSISSIPPI RVR TRIBUTARY/3 BRIDGES
CONSTRUCT/BRRPL B-06-0201,0204,0206
SHR BRIDGES STBG <5K POP - FAST EXT
2025 7160-00-72 09/09/2025 303 LET BRRHB 0.064 STH 035 FOUNTAIN CITY - ALMA $500,000 - $749,999
WAUMANDEE CREEK BRIDGE B-06-0059
CONSTRUCTION/BRRHB/CONCRETEOVERLAY
SHR BRIDGES STBG <5K POP - FAST EXT
2025 7160-04-56 10/25/2025 303 R/R RSRF20 0.029 STH 035 TREMPEALEAU - ALMA $250,000 - $499,999
BNSF R/R X-ING 079923U
RR OPS - SIGNALS
STATE 3R STBG <5K POP - FAST EXT
2025 7160-04-76 11/11/2025 303 LET RSRF20 8.489 STH 035 TREMPEALEAU - ALMA $5,000,000 - $5,999,999
OLD STH 35 TO INDIAN CREEK RD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 7125-00-20 05/25/2022 303 R/E PVRPLA 3.470 STH 037 ALMA - MONDOVI $100,000 - $249,999
STH 88 TO USH 10
2022-2025 FINAL STIP Project Listing 270Northwest Region
BUFFALO
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 7125-00-71 11/08/2022 303 LET BRRPL 0.147 STH 037 ALMA - MONDOVI $1,000,000 - $1,999,999
BRANCH TROUT CREEK BRIDGE B-06-0207
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2024 7125-00-70 11/12/2024 303 LET PVRPLA 3.470 STH 037 ALMA - MONDOVI $7,000,000 - $7,999,999
STH 88 TO USH 10
CONSTRUCTION/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP FAST
2024 7125-00-72 11/12/2024 303 LET MISC 1.300 STH 037 ALMA - MONDOVI $750,000 - $999,999
STH 88 TO USH 10
CONSTRUCTION/LOCAL UTILITIES
STATE 3R NON-FEDERAL
2025 7550-00-76 11/11/2025 303 LET RSRF20 0.710 STH 054 WINONA - GALESVILLE $250,000 - $499,999
MN/WI STATE LINE TO STH 35
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1530-05-04 303 I/E PVRPLA 1.480 USH010
DURAND - OSSEO $100,000 - $249,999
CTH A TO STH 37 N
DESIGN - FULL PS&E PVRPLA
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 271Northwest Region
BURNETT
2022-2025 FINAL STIP Project Listing 271Northwest Region
BURNETT
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8841-00-20 08/25/2022 206 R/E RCND10 3.650 CTH D GRANTSBURG - STH 35 $0 - $99,999
N WILLIAMS ROAD TO CTH M
REAL ESTATE ACQUISITION
STP RURAL STBG <5K POP FAST
2022 8841-00-70 03/08/2022 206 LET RCND10 3.636 CTH D GRANTSBURG - STH 35 $1,000,000 - $1,999,999
N WILLIAMS ROAD TO CTH M
CONSTRUCTION/RECONDITION
STP RURAL STBG <5K POP - FAST EXT
2022 8377-00-70 03/08/2022 205 LET BRRPL 0.054 LOC STR T UNION, YELLOW LAKE ROAD $500,000 - $749,999
YELLOW LAKE BRIDGE B-07-0060
CONSTRUCTION/BRRPL
LOCAL BRIDGES NON-FEDERAL
8010-00-06 303 I/E PSRS40 21.270 STH 035 DANBURY - DAIRLAND $100,000 - $249,999
YELLOW RVR UNDER TO BURN/DOUG CO LN
DESIGN - FULL PS&E PSRS40
STATE 3R STBG <5K POP - FAST EXT
2022 8010-01-20 12/25/2022 303 R/E RSRF20 2.560 STH 035 SIREN - DANBURY $0 - $99,999
LANQUIST ST TO STH 70 E
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2025 8010-01-79 11/11/2025 303 LET RSRF20 2.560 STH 035 SIREN - DANBURY $6,000,000 - $6,999,999
LANQUIST ST TO STH 70 E
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
8040-00-01 303 I/E RSRF30 4.690 STH 070 ST. CROIX RIVER - GRANTSBURG $100,000 - $249,999
MN/WI STATE LN TO STH 48
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 272Northwest Region
BURNETT
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8040-01-74 09/13/2022 303 LET BRRHB 0.050 STH 070 ST CROIX RIVER - GRANTSBURG $1,000,000 - $1,999,999
ST CROIX RIVER BRIDGE B-07-0020
CONST/BRRHB/WI LEAD/COST SHARE MN
SHR BRIDGES NON-FEDERAL
2022 8560-01-73 05/10/2022 303 LET BRRHB 0.030 STH 077 ST CROIX RIVER - DANBURY $750,000 - $999,999
ST CROIX RIVER BRIDGE B-07-0006
CONST/BRRHB/WI LEAD/COST SHARE MN
SHR BRIDGES NON-FEDERAL
2024 8560-01-24 11/25/2024 303 R/E PSRS40 3.960 STH 077 ST CROIX RIVER - DANBURY $0 - $99,999
MN/WI STATE LN TO STH 35 S
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 273Northwest Region
CHIPPEWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 8902-05-70 11/14/2023 205 LET BRRPL 0.027 CTH G STH 29 - STH 64 $1,000,000 - $1,999,999
YELLOW RIVER BRIDGE B-09-0394
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 8996-01-07 01/09/2024 206 LET RECST 0.338 CTH J CHIPPEWA FALLS - CTH K $1,000,000 - $1,999,999
CTH J & 50TH AVE INTERSECTION
CONSTRUCTION/RECONSTRUCT
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2022 8953-04-72 03/08/2022 206 LET PVRPLA 3.139 CTH SS BLOOMER - NEW AUBURN $2,000,000 - $2,999,999
83RD STREET TO CTH Q
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP - FAST EXT
2023 8919-03-75 11/14/2023 206 LET PVRPLA 3.290 CTH X CHIPPEWA FALLS - CADOTT $3,000,000 - $3,999,999
197TH ST TO CTH XX
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP FAST
2023 8915-00-71 01/10/2023 205 LET BRRPL 0.010 LOC STR T ARTHUR, 155TH AVE $250,000 - $499,999
LITTLE DRYWOOD CREEK BRIDGE B090395
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 7862-00-70 02/13/2024 205 LET BRRPL 0.010 LOC STR T SIGEL, 240TH STREET $250,000 - $499,999
PAINT CREEK BRIDGE B-09-0393
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 7863-00-72 01/09/2024 290 LET MISC 0.000 OFF SYS CHIPPEWA COUNTY, 50TH AVE TRAIL $1,000,000 - $1,999,999
STILLSON SCHOOL TO CTH J
CONSTR/TAP/SHARED USE PATH
BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E
2022-2025 FINAL STIP Project Listing 274Northwest Region
CHIPPEWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
8180-00-03 303 I/E RSRF30 2.400 STH 027 CORNELL - LADYSMITH $0 - $99,999
JOHNSON ROAD TO STH 64 E
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2023 7070-06-72 02/14/2023 303 LET COLD20 5.520 STH 027 AUGUSTA - CADOTT $3,000,000 - $3,999,999
EAU CLAIRE/CHIPPEWA CO LN TO STH 29
CONSTRUCTION/CIR/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2024 8200-00-21 09/25/2024 303 R/E RSRF20 15.560 STH 027 CADOTT - CORNELL $0 - $99,999
STH 29 TO JOHNSON ROAD
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2025 8200-00-71 09/09/2025 303 LET RSRF20 15.420 STH 027 CADOTT - CORNELL $8,000,000 - $8,999,999
STH 29 TO JOHNSON ROAD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1050-00-12 303 I/E BRRPL 0.040 STH 029 CHIPPEWA FALLS - THORP $100,000 - $249,999
CTH X/37TH AVE BRIDGE B-09-0030
DESIGN - FULL PS&E BRRPL
BACKBONE NATIONAL HIGHWAY PERF FAST
1050-00-13 303 I/E BRRHB 0.000 STH 029 CHIPPEWA FALLS - THORP $0 - $99,999
CTH X BRIDGE B-09-0022
DESIGN - FULL PS&E BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
1050-00-33 303 I/E PSRS30 13.232 STH 029 MENOMONIE - CHIPPEWA FALLS $500,000 - $749,999
CTH T TO STILLSON CREEK (E & W BD)
DESIGN/MAINLINE&RAMP/JOINT REPAIRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 275Northwest Region
CHIPPEWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1050-00-30 06/25/2022 303 C/E RSRF20 14.065 STH 029 CHIPPEWA FALLS - ABBOTSFORD $1,000,000 - $1,999,999
320TH ST TO KOSER AVE EB & WB
DESIGN/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1050-01-20 01/25/2022 303 R/E BRRPL 0.036 STH 029 CHIPPEWA FALLS - CADOTT $0 - $99,999
50TH AVENUE BRIDGE B-09-0033
REAL ESTATE ACQUISITION
BACKBONE NON-FEDERAL
2023 1050-00-81 02/14/2023 303 LET BRPVTV 0.000 STH 029 NW REGION, STH 29 BRDG DECK SEALING $100,000 - $249,999
BRIDGE DECK SEALING (VAR)
CONSTRUCTION/BRIDGE DECK SEALING
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1050-01-79 01/09/2024 303 LET BRRPL 0.050 STH 029 CHIPPEWA FALLS - CADOTT $3,000,000 - $3,999,999
50TH AVENUE BRIDGE B-09-0309
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 8190-01-72 12/10/2024 303 LET PSRS40 9.150 STH 064 CORNELL - GILMAN $2,000,000 - $2,999,999
STH 27 N TO CTH H
CONSTRUCTION/HOT IN PLACE RECYCLING
STATE 3R STBG <5K POP - FAST EXT
2023 7255-00-71 11/14/2023 303 LET RSRF20 2.900 STH 124 LAKE HALLIE - CHIPPEWA FALLS $4,000,000 - $4,999,999
1500FT N CTHOO - 1300FT S BUS STH29
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 8610-02-74 02/13/2024 303 LET RSRF20 0.820 STH 124 C CHIPPEWA FALLS, BAY STREET $1,000,000 - $1,999,999
2022-2025 FINAL STIP Project Listing 276Northwest Region
CHIPPEWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
HIGH STREET TO BRIDGE STREET
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 8610-08-72 02/13/2024 303 LET RSRF20 10.610 STH 124 CHIPPEWA FALLS - BLOOMER $6,000,000 - $6,999,999
CTH S TO STH 64
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
2024 8610-08-73 02/13/2024 303 LET RSRF20 1.870 STH 124 CHIPPEWA FALLS - BLOOMER $1,000,000 - $1,999,999
ELM STREET TO CTH S
CONSTRUCTION/RESURFACING/RSRF20
STATE 3R NATIONAL HIGHWAY PERFFAST
8600-00-02 303 I/E RSRF20 3.640 STH 178 CHIPPEWA FALLS - CORNELL $100,000 - $249,999
STH 29 TO CTH S
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG 5-200K POP FAST EXT
8600-08-04 303 I/E BRRPL 0.000 STH 178 CHIPPEWA FALLS - CORNELL $100,000 - $249,999
ONEIL CREEK BRIDGE B-09-0010
DESIGN/BRIDGE REPLACEMENT
SHR BRIDGES NON-FEDERAL
1190-04-04 303 I/E BRRHB 0.000 USH 053 CHIPPEWA FALLS - NEW AUBURN $0 - $99,999
RHEINGAN CREEK BRIDGE B-09-0069
DESIGN - FULL PS&E BRRHB
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1190-08-79 12/12/2023 303 LET PVRPLA 7.595 USH 053 CHIPPEWA FALLS - NEW AUBURN $35,000,000 - $39,999,999
40TH AVENUE - CTH B (NB & SB)
2022-2025 FINAL STIP Project Listing 277Northwest Region
CHIPPEWA
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTRUCTION/PAVEMENTREPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1190-01-85 02/13/2024 303 LET BRPVTV 0.000 USH 053 NW REGION, USH 53 BRDG DECK SEALING $100,000 - $249,999
BRIDGE DECK SEALING (VAR)
CONSTRUCTION/BRIDGE DECK SEALING
BACKBONE NATIONAL HIGHWAY PERFFAST
8610-00-04 303 I/E BRPVTV 0.021 VARHWY
NW REGION, VARIOUS HIGHWAYS $0 - $99,999
THIN POLYMER DECK OVERLAYS
DESIGN - FULL PS&E BRPVTV
SHR BRIDGES SURFACE TRANS BLOCK-FLEX E
2022-2025 FINAL STIP Project Listing 278Northwest Region
CLARK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7840-03-73 11/08/2022 205 LET BRRPL 0.054 CTH G USH 10 - GREENWOOD $2,000,000 - $2,999,999
BLACK RIVER BRIDGE B-10-0398
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP - FAST EXT
2024 7839-03-71 11/12/2024 205 LET BRRPL 0.038 CTH M CTH I - THORP $1,000,000 - $1,999,999
S FORK EAU CLAIRE RVR BRDG B100397
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2022 7849-03-73 12/13/2022 206 LET PVRPLA 4.010 CTH Y USH 10 - STH 98 $1,000,000 - $1,999,999
USH 10 TO CTH H
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP FAST
2022 7854-00-72 04/12/2022 205 LET BRRPL 0.027 LOC STR T PINE VALLEY, FAIRGROUND AVE $250,000 - $499,999
JACK CREEK BRIDGE B-10-0400
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP - FAST EXT
2023 7859-00-71 02/14/2023 205 LET BRRPL 0.006 LOC STR T WASHBURN, CARDINAL AVE $250,000 - $499,999
ROCK CREEK BRIDGE B-10-0401
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 7839-00-70 02/13/2024 205 LET BRRPL 0.020 LOC STR T MEAD, STARKS ROAD $500,000 - $749,999
S FORK EAU CLAIRE RVR BRDG B100396
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 7850-00-71 03/12/2024 205 LET BRRPL 0.006 LOC STR T YORK, ROMADKA AVE $250,000 - $499,999
MIDDLE BR ONEILL CREEK BRDG B100399
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 279Northwest Region
CLARK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1610-02-23 11/25/2023 303 R/E BRRPL 0.000 STH 013 ABBOTSFORD - MEDFORD $0 - $99,999
PORKY CREEK B-10-0240 & B-10-0241
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2025 1610-02-73 07/08/2025 303 LET BRRPL 0.040 STH 013 ABBOTSFORD - MEDFORD $750,000 - $999,999
PORKY CREEK B-10-0250 & B-10-0251
CONSTRUCTION/BRIDGE REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERFFAST
1050-01-04 303 I/E RSRF20 24.155 STH 029 THORP - ABBOTTSFORD $750,000 - $999,999
CTH D TO STH 13
DESIGN/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1050-00-62 12/10/2024 303 LET RSRF20 15.130 STH 029 CHIPPEWA FALLS - ABBOTSFORD $20,000,000 - $24,999,999
KOSER AVE TO CTH D EB & WB
CONSTRUCTION/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 7050-00-22 05/25/2022 303 R/E PVRPLA 12.590 STH 073 NEILLSVILLE - THORP $0 - $99,999
ROCK CREEK BRIDGE TO HUNT STREET
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2024 7050-00-72 11/12/2024 303 LET RSRF20 11.710 STH 073 NEILLSVILLE - THORP $5,000,000 - $5,999,999
HUNT STREET TO STH 29 E
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2024 7050-00-73 11/12/2024 303 LET RSRF20 0.880 STH 073 NEILLSVILLE - THORP $500,000 - $749,999
ROCK CREEK BRIDGE TO HUNT STREET
2022-2025 FINAL STIP Project Listing 280Northwest Region
CLARK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP FAST
7520-00-10 303 I/E PSRS40 14.380 STH 095 MERRILLAN - NEILLSVILLE $100,000 - $249,999
CTH K TO STH 73 S
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2025 7040-00-72 09/09/2025 303 LET PSRS30 4.590 STH 098 GREENWOOD - SPENCER $2,000,000 - $2,999,999
STH 73 TO HELM STREET
CONSTRUCTION - ROADWAYMAINTENANCE
STATE 3R STBG <5K POP - FAST EXT
1520-02-03 303 I/E RSRF20 7.800 USH 010 FAIRCHILD - NEILLSVILLE $250,000 - $499,999
BACHELORS AVE TO STH 73 S
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1520-02-72 12/13/2022 303 LET COLD20 8.805 USH 010 OSSEO - NEILLSVILLE $4,000,000 - $4,999,999
USH 12 EAST JCT TO BACHELORS AVENUE
CONSTRUCTION/CIR/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 1520-00-63 01/25/2022 303 LFA MISC 0.000 VARHWY
NW REGION, CULVERT LINE & REPLACE $100,000 - $249,999
VARIOUS HIGHWAYS
CONSTR - LFA/CULVERTS
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 281Northwest Region
DOUGLAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 8758-00-72 12/12/2023 206 LET RECST 3.580 CTH C MN STATE LINE - STH 35 $4,000,000 - $4,999,999
MN STATE LINE TO BARNES ROAD
CONSTRUCTION/RECONSTRUCT
STP RURAL STBG <5K POP FAST
2024 8758-00-52 05/25/2024 207 R/R MISC 0.000 CTH C DEWEY - STH 35 $250,000 - $499,999
BNSF RR XING 086402V
R/R OPS/SAFETY RAIL WARNING DEVICES
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
2024 8759-00-50 05/25/2024 207 R/R MISC 0.000 CTH W FOXBORO - DEWEY $250,000 - $499,999
BNSF RR XING 061443D
R/R OPS/SAFETY RAIL WARNING DEVICES
SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST
8998-00-35 206 I/E RECST 0.500 LOCSTR
C SUPERIOR, HAMMOND AVE $0 - $99,999
N 21ST STREET TO N 28TH STREET
DESIGN/RECONSTRUCTION
STP URBAN 50,000 - 200,000 NON-FEDERAL
2022 8381-00-50 01/25/2022 207 MIS MISC 0.000 LOCSTR
T AMNICON, LUNDEEN ROAD $0 - $99,999
RR CROSSING CLOSURE WCL 186114C
RR XING CLOSURE INCENTIVE PAYMENT
SAFETY - RAILROAD, ELIMINATION OFHAZARDS
RAIL HWY CRS HAZ ELM FAST
2023 8386-00-72 02/14/2023 205 LET BRRPL 0.016 LOCSTR
T GORDON, WEST MAIL ROAD $500,000 - $749,999
ST CROIX RIVER BRIDGE B-16-0147
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES NON-FEDERAL
2022-2025 FINAL STIP Project Listing 282Northwest Region
DOUGLAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 8998-00-36 12/12/2023 206 LET RECST 0.500 LOC STR C SUPERIOR, HAMMOND AVE $1,000,000 - $1,999,999
N 21ST STREET TO N 28TH STREET
CONSTRUCTION/RECONSTRUCTION
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
8998-00-37 290 I/E MISC 0.000 OFF SYS C SUPERIOR, VARIOUS LOCATIONS $0 - $99,999
BUS STOP IMPROVEMENTS
DESIGN/BUS STOP IMPRVMTS/TAP
TAP 50,000 - 200,000 NON-FEDERAL
2023 8998-00-38 02/25/2023 290 LLC MISC 0.000 OFF SYS C SUPERIOR, VARIOUS LOCATIONS $250,000 - $499,999
BUS STOP IMPROVEMENTS
CONSTR/BUS STOP IMPRVMTS/TAP
TAP 50,000 - 200,000 TRANS ALTERN >200K FAST EX
2022 8510-01-70 11/08/2022 303 LET RSRF20 15.790 STH 013 PORT WING - SUPERIOR $9,000,000 - $9,999,999
CTH H TO ENGDAHL ROAD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 8010-00-03 10/25/2022 303 C/E RSRF20 4.050 STH 035 C SUPERIOR, TOWER AVENUE $250,000 - $499,999
64TH STREET TO BELKNAP STREET
DESIGN/RESURFACE/CONCRETE REPAIR
STATE 3R NATIONAL HIGHWAY PERF FAST
1180-00-31 303 I/E PSRS20 6.520 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999
53RD AVE E TO CTH C
DESIGN/JOINT REPAIR
BACKBONE NON-FEDERAL
1180-01-02 303 I/E RSRF10 5.150 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999
USH 53 S TO CTH D
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 283Northwest Region
DOUGLAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1180-05-24 11/25/2022 303 R/E MISC 0.005 USH 002 WENTWORTH - BRULE $0 - $99,999
C-16-0100
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2024 1180-05-74 09/10/2024 303 LET MISC 0.005 USH 002 WENTWORTH - BRULE $500,000 - $749,999
BAYFIELD RD TO CTH D
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 1195-03-70 11/11/2025 303 LET BRRHB 0.000 USH 002 SUPERIOR - WENTWORTH $1,000,000 - $1,999,999
STH 13 BRIDGE B-16-0024
CONSTRUCTION/BRIDGE REHABILITATION
BACKBONE STBG 5-200K POP FASTG
1198-00-09 303 I/E MISC 0.160 USH 053 SOLON SPRINGS - SUPERIOR $0 - $99,999
USH 2 INTERCHANGE
DESIGN - FULL PS&E SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1198-03-23 05/25/2022 303 R/E RSRF20 1.556 USH 053 C SUPERIOR, EAST SECOND STREET $100,000 - $249,999
2ND AVENUE EAST TO HUGHITT AVENUE
REAL ESTATE ACQUISITION
BACKBONE NON-FEDERAL
2023 1198-00-79 11/14/2023 303 LET MISC 0.160 USH 053 SOLON SPRINGS - SUPERIOR $500,000 - $749,999
USH 2 INTERCHANGE
CONSTR - FULL PS&E SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1198-03-73 11/12/2024 303 LET RSRF20 1.552 USH 053 C SUPERIOR, EAST SECOND STREET $2,000,000 - $2,999,999
2ND AVENUE EAST TO HUGHITT AVENUE
CONSTRUCTION/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 284Northwest Region
DOUGLAS
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1198-03-80 11/12/2024 303 LET MISC 0.008 USH 053 C SUPERIOR, EAST SECOND STREET $750,000 - $999,999
E STREET INTERSECTION
CONSTRUCTION/SAFETY IMPROVEMENT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 285Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7996-00-43 02/14/2023 206 LET RECST 1.200 CTH B C MENOMONIE, CTH B $4,000,000 - $4,999,999
USH 12 TO EB IH-94 RAMPS
CONSTRUCTION/RECONSTRUCTION
STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG
2022 8923-09-70 05/10/2022 206 LET MISC 1.970 CTH BB USH 12 - CEDAR FALLS $250,000 - $499,999
USH 12 TO STH 25
CONSTR/HRRR/SAFETY TREATMENTS
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA
2024 7879-03-74 01/09/2024 205 LET BRRPL 0.009 CTH C DOWNSVILLE - EAST COUNTY LINE $500,000 - $749,999
MUDDY CREEK BRIDGE B-17-0234
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2024 7881-05-73 11/12/2024 206 LET RCND20 1.560 CTH D SCL - STH 25 $2,000,000 - $2,999,999
CTH K TO 420TH STREET
CONSTRUCTION/RECONDITION
STP RURAL STBG <5K POP FAST
2022 7880-07-73 03/08/2022 206 LET PVRPLA 2.539 CTH H CARYVILLE - CTH M $2,000,000 - $2,999,999
CTH HH TO CTH M
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP - FAST EXT
1020-05-33 303 I/E PSRS20 2.900 IH 094 MENOMONIE - EAU CLAIRE $250,000 - $499,999
WILSON CREEK - RED CEDAR RIVER
DESIGN - FULL PS&E CONCRETE REPAIR
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1021-01-25 02/25/2022 303 R/E BRRPL 0.009 IH 094 BALDWIN - MENOMONIE $0 - $99,999
HALL ESTATE RD/160TH ST B-17-0020
REAL ESTATE ACQUISITION
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 286Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1022-05-70 11/12/2024 303 LET RSRF30 8.589 IH 094 MENOMONIE - EAU CLAIRE $13,000,000 - $13,999,999
RED CEDAR RIVER TO USH 12 (EB & WB)
CONSTRUCTION/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1022-07-78 12/10/2024 303 LET RSRF30 7.327 IH 094 MENOMONIE - EAU CLAIRE $13,000,000 - $13,999,999
USH 12/STH 29 TO STH 312 (EB & WB)
CONSTRUCTION/RESURFACING
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1020-00-81 02/11/2025 303 LET BRPVTV 0.000 IH 094 NW REGION, IH94 BRIDGE DECK SEALING $250,000 - $499,999
BRIDGE DECK SEALING (VAR)
CONSTRUCTION/BRIDGE DECK SEALING
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1021-01-78 11/11/2025 303 LET BRRHB 0.000 IH 094 BALDWIN - MENOMONIE $750,000 - $999,999
EAST BR WILSON CR BRIDGE B-17-0051
CONSTR/BRIDGE REHABILITATION
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1021-01-79 11/11/2025 303 LET BRRPL 0.030 IH 094 BALDWIN - MENOMONIE $2,000,000 - $2,999,999
HALL ESTATE RD/160TH ST B-17-0216
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1021-01-99 09/25/2025 303 SFA MISC 0.030 IH 094 HALL ESTATE RD/160TH ST B-17-0216 $0 - $99,999
BALDWIN - MENOMONIE
TRF MIT 1021-01-79
BACKBONE NON-FEDERAL
7220-00-09 303 I/E RSRF20 0.500 STH 025 DURAND - MENOMONIE $0 - $99,999
12TH AVE TO USH 12 E
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 287Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7220-00-78 03/08/2022 303 LET RSRF20 6.273 STH 025 DURAND - MENOMONIE $4,000,000 - $4,999,999
RED CEDAR RIVER TO 490TH STREET
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 8090-00-73 05/10/2022 303 LET MISC 0.040 STH 025 MENOMONIE - RIDGELAND $750,000 - $999,999
S FORK LOWER PINE CREEK C-17-0049
CONSTRUCTION/2-CELL BOX CULVERT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2025 8100-01-72 12/09/2025 303 LET COLD20 4.800 STH 025 MENOMONIE - RIDGELAND $4,000,000 - $4,999,999
IH 94 TO CTH D
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 7610-00-08 02/25/2022 303 C/E RSRF20 0.190 STH 029 SPRING VALLEY - MENOMONIE $0 - $99,999
STH 25 S TO USH 12 E
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 7610-00-77 09/09/2025 303 LET BRRHB 0.000 STH 029 SPRING VALLEY - MENOMONIE $250,000 - $499,999
RED CEDAR RIVER BRIDGE B-17-0005
CONSTRUCTION/BRIDGE REHABILITATION
SHR BRIDGES SURFACE TRANS BLOCK-FLEX E
2023 8620-00-25 11/25/2023 303 R/E RSRF20 8.900 STH 040 ELK MOUND - BLOOMER $0 - $99,999
USH 12 TO CTH M
REAL ESTATE ACQUISTION
STATE 3R NON-FEDERAL
2024 8620-00-74 09/10/2024 303 LET MISC 0.050 STH 040 ELK MOUND - BLOOMER $250,000 - $499,999
BRANCH SINKING CREEK C-17-1124
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R SURFACE TRANS BLOCK-FLEX E
2022-2025 FINAL STIP Project Listing 288Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2025 8620-00-54 08/25/2025 303 R/R MISC 0.000 STH 040 ELK MOUND - BLOOMER $250,000 - $499,999
WCL RR XING 692959P
R/R OPS - SIGNAL REPLACEMENT
STATE 3R STBG <5K POP - FAST EXT
2025 8620-00-55 08/25/2025 303 R/R MISC 0.000 STH 040 ELK MOUND - BLOOMER $100,000 - $249,999
WCL RR XING 692959P
R/R OPS - R/R XING SURFACE
STATE 3R STBG <5K POP - FAST EXT
2025 8620-00-75 12/09/2025 303 LET RSRF20 9.078 STH 040 ELK MOUND - BLOOMER $5,000,000 - $5,999,999
USH 12 TO CTH M
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2024 8110-01-72 09/10/2024 303 LET BRRHB 12.390 STH 064 CONNORSVILLE - BLOOMER $1,000,000 - $1,999,999
CTH O TO NORTH JCT CTH W
CONSTRUCTION/BRIDGE REHAB
STATE 3R STBG <5K POP - FAST EXT
2024 8110-01-78 12/10/2024 303 LET PSRS40 12.390 STH 064 CONNORSVILLE - BLOOMER $2,000,000 - $2,999,999
CTH O TO NORTH JCT CTH W
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
8640-00-02 303 I/E BRRHB 0.000 STH 079 MENOMONIE - CONNORSVILLE $0 - $99,999
S FK HAY RIVER BRIDGE B-17-0014
DESIGN - FULL PS&E BRRHB
SHR BRIDGES STBG <5K POP - FAST EXT
2024 8640-00-71 09/10/2024 303 LET BRRPL 0.201 STH 079 MENOMONIE - BOYCEVILLE $1,000,000 - $1,999,999
COON CREEK BRIDGE B-17-0368
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 289Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 8640-00-73 09/10/2024 303 LET BRRPL 0.180 STH 079 MENOMONIE - CONNORSVILLE $1,000,000 - $1,999,999
CLACK CREEK BRIDGE B-17-0369
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
7120-00-06 303 I/E BRRPL 0.000 STH 085 DURAND - EAU CLAIRE $0 - $99,999
BR CHIPPEWA RIVER BRIDGE B-17-0131
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
2024 7120-00-74 09/10/2024 303 LET COLD20 9.692 STH 085 DURAND - EAU CLAIRE $2,000,000 - $2,999,999
CTH O TO 1010TH STREET
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2025 8630-00-70 11/11/2025 303 LET BRRHB 0.120 STH 170 GLENWOOD CITY - COLFAX $1,000,000 - $1,999,999
RED CEDAR RIVER BRIDGE B-17-0002
CONSTR/BRIDGE REHABILITATION/REDECK
SHR BRIDGES STBG <5K POP - FAST EXT
7600-00-03 303 I/E RSRF20 0.687 USH 012 MENOMONIE - EAU CLAIRE $100,000 - $249,999
RED CEDAR RIVER TO 6TH ST E
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
8949-00-08 303 I/E BRRPL 0.000 USH 012 BALDWIN - MENOMONIE $0 - $99,999
WILSON CREEK BRIDGE B-17-0979
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
2022 7600-01-75 05/10/2022 303 LET MISC 1.070 USH 012 C MENOMONIE, STOUT ROAD $1,000,000 - $1,999,999
6TH STREET TO 21ST STREET
CONST/SAFETY/TWO WAY LEFT TURN LANE
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 290Northwest Region
DUNN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 8949-00-70 05/14/2024 303 LET MISC 0.038 USH 012 BALDWIN - MENOMONIE $1,000,000 - $1,999,999
WILSON CREEK TRIB CULVERT C-17-0048
CONST/MISC/CULVERT REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2024 8949-00-77 09/10/2024 303 LET MISC 0.015 USH 012 C MENOMONIE, USH 12/PINE AVE E $750,000 - $999,999
STH 25 INTERSECTION
CONSTRUCTION/SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2025 7600-00-52 08/25/2025 303 R/R RSRF20 0.000 USH 012 MENOMONIE - EAU CLAIRE $0 - $99,999
UNION PACIFIC RR XING 411776X
RR OPS/CROSSING SURFACE UPGRADES
STATE 3R STBG <5K POP - FAST EXT
2025 7600-00-72 12/09/2025 303 LET RSRF20 1.238 USH 012 MENOMONIE - EAU CLAIRE $1,000,000 - $1,999,999
STH 29 TO PRINCETON DRIVE
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2025 8949-00-76 12/09/2025 303 LET RSRF20 0.597 USH 012 BALDWIN - MENOMONIE $250,000 - $499,999
IH 94 TO STH 25 N
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 291Northwest Region
EAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7823-07-73 03/08/2022 206 LET RCND10 3.698 CTH D FALL CREEK - NCL $1,000,000 - $1,999,999
CTH XX TO STH 27
CONSTRUCTION/RECONDITION
STP RURAL STBG <5K POP - FAST EXT
2024 7995-02-63 03/12/2024 206 LET RECST 0.660 CTH F C EAU CLAIRE, STATE ST/CTH F $750,000 - $999,999
HEATHER ROAD TO HAMILTON AVE
CONSTRUCTION/RECONSTRUCT
STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT
2023 7831-06-70 02/14/2023 206 LET PVRPLA 2.600 CTH M SCL - USH 12 $1,000,000 - $1,999,999
SCL TO LANGE ROAD
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP FAST
1022-00-04 303 I/E BRRHB 0.148 IH 094 MENOMONIE - EAU CLAIRE $100,000 - $249,999
CHIPPEWA RIVER B-18-23,24,44,45
DESIGN - FULL PS&E BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1022-08-74 05/10/2022 303 LET PVRPLA 5.914 IH 094 MENOMONIE - EAU CLAIRE $20,000,000 - $24,999,999
STH 312/CTH EE TO STH 37
CONSTRUCTION/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1021-00-80 12/12/2023 303 LET BRRHB 0.228 IH 094 MENOMONIE - EAU CLAIRE $500,000 - $749,999
LOWES CREEK BRIDGE B-18-0228
CONSTRUCTION - BRRHB
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1021-00-90 12/25/2023 303 SFA MISC 0.036 IH 094 LOWES CREEK BRIDGE B-18-0228 $0 - $99,999
MENOMONIE - EAU CLAIRE
TRF MIT 1021-00-80
BACKBONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 292Northwest Region
EAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1021-03-71 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999
CTH J BRIDGE B-18-0212 (WEST BOUND)
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1021-03-72 09/12/2023 303 LET BRRPL 0.052 IH 094 EAU CLAIRE - OSSEO $4,000,000 - $4,999,999
CTH D BRIDGE B-18-0213 (EAST BOUND)
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1021-03-73 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $2,000,000 - $2,999,999
CTH J BRIDGE B-18-0211 (EAST BOUND)
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1021-03-91 11/25/2023 303 SFA MISC 0.000 IH 094 CTH J BRIDGE B-18-0212 (WEST BOUND) $100,000 - $249,999
EAU CLAIRE - OSSEO
TRF MITIGATION CONST ID 1021-03-71
BACKBONE NON-FEDERAL
2023 1022-08-94 03/25/2023 303 SFA MISC 5.840 IH 094 STH 312/CTH EE TO STH 37 $100,000 - $249,999
MENOMONIE - EAU CLAIRE
TRF MITIGATION/CONSTR ID 1022-08-74
BACKBONE NON-FEDERAL
2023 1022-09-74 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999
CTH D BRIDGE B-18-0214 (WEST BOUND)
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2023 1022-09-78 09/12/2023 303 LET PVRPLA 9.395 IH 094 EAU CLAIRE - OSSEO $50,000,000 - $59,999,999
USH 53 TO MALLARD ROAD (EB & WB)
CONSTRUCTION/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 293Northwest Region
EAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 1021-03-80 07/09/2024 303 LET BRRHB 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999
STH-93 BRIDGES B-18-0034, B-18-0119
CONSTRUCTION/BRIDGE REHABILITATION
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1022-09-98 03/25/2024 303 SFA MISC 0.000 IH 094 USH 53 TO MALLARD ROAD (EB & WB) $100,000 - $249,999
EAU CLAIRE - OSSEO
TRF MITIGATION/CONSTR ID 1022-09-78
BACKBONE NON-FEDERAL
2022 7995-02-61 05/10/2022 206 LET RECST 1.020 LOC STR C EAU CLAIRE, JEFFERS ROAD $1,000,000 - $1,999,999
STH 312 TO COUNTY LINE ROAD
CONSTRUCTION/RECST
STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP
2023 7829-00-70 02/14/2023 205 LET BRRPL 0.016 LOC STR T CLEAR CREEK, E BUNTING ROAD $250,000 - $499,999
PINE CREEK BRIDGE B-18-0242
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2023 7995-02-59 02/14/2023 206 LET RECST 0.500 LOC STR C EAU CLAIRE, FAIRFAX STREET $1,000,000 - $1,999,999
S HASTINGS WAY TO SPOONER AVENUE
CONSTRUCTION/RECST
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2023 7995-02-65 02/14/2023 206 LET RECST 0.930 LOC STR C EAU CLAIRE, S HASTINGS WAY $1,000,000 - $1,999,999
GATEWAY DRIVE TO PINE LODGE ROAD
CONSTRUCTION/RECONSTRUCT
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2024 7995-02-20 02/25/2024 303 R/E MISC 0.000 LOC STR C EAU CLAIRE, VARIOUS HIGHWAYS $0 - $99,999
STH 93, 312 & USH 12 CURB RAMPS
REAL ESTATE ACQUISITION/7995-02-72
CURB RAMP STANDALONE NON-FEDERAL
2022-2025 FINAL STIP Project Listing 294Northwest Region
EAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7995-02-69 07/25/2023 290 LLC MISC 0.000 OFF SYS C EAU CLAIRE, HALF MOON TRAIL $750,000 - $999,999
MADISON STREET TO FOLSOM STREET
CONSTRUCTION/TAP/BIKE PED TRAIL
BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E
2022 7070-00-20 06/25/2022 303 R/E MISC 0.065 STH 027 AUGUSTA - CADOTT $0 - $99,999
DARROW CREEK CULVERT C-18-1864
REAL ESTATE/CULVERT REPLACEMENT
SHR BRIDGES NON-FEDERAL
2024 7590-00-73 09/10/2024 303 LET RSRF20 8.370 STH 093 ELEVA - EAU CLAIRE $5,000,000 - $5,999,999
SOUTH COUNTY LINE TO CEDAR ROAD
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
7080-00-06 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $0 - $99,999
FIRST TRESTLE CREEK B-18-0073
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
7080-00-07 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $0 - $99,999
DIAMOND VALLEY CREEK B-18-0074
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
7090-00-07 303 I/E BRRHB 0.000 USH 012 C EAU CLAIRE, CLAIREMONT AVE $0 - $99,999
CHIPPEWA RIVER BRIDGE B-18-0114
DESIGN - FULL PS&E BRRHB
SHR BRIDGES STBG 5-200K POP FAST EXT
7090-00-08 303 I/E BRRHB 0.000 USH 012 C EAU CLAIRE, CLAIREMONT AVE $0 - $99,999
CHIPPEWA RIVER BRIDGE B-18-0171
DESIGN - FULL PS&E BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 295Northwest Region
EAU CLAIRE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
7090-00-09 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $100,000 - $249,999
OTTER CREEK BRIDGE B-18-0113
DESIGN - FULL PS&E BRRPL
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2024 7080-01-73 12/10/2024 303 LET RSRF20 6.835 USH 012 EAU CLAIRE - FAIRCHILD $4,000,000 - $4,999,999
INDUSTRIAL DR TO FALL CREEK UNDER
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1190-03-03 303 I/E RSRF20 0.530 USH 053 OSSEO - EAU CLAIRE $100,000 - $249,999
KEYSTONE CROSSING TO GOLF ROAD
DESIGN - FULL PS&E RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 1190-01-89 09/10/2024 303 LET BRPVTV 0.048 USH 053 EAU CLAIRE - CHIPPEWA FALLS $500,000 - $749,999
THIN POLYMER OVERLAY, VAR HWYS
CONSTRUCTION/THIN POLYMER OVERLAY
BACKBONE NATIONAL HIGHWAY PERF FAST
2025 1190-06-61 09/09/2025 303 LET PSRS20 9.830 USH 053 EAU CLAIRE - CHIPPEWA FALLS $7,000,000 - $7,999,999
GOLF ROAD TO 40TH AVENUE
CONSTRUCTION/CONCRETE REPAIR
BACKBONE NATIONAL HIGHWAY PERF FAST
7995-02-66 206 I/E MISC 0.000 VAR HWY C EAU CLAIRE, VARIOUS LOCATIONS $0 - $99,999
CITY TRANSIT STOP IMPROVEMENTS
DESIGN/MISCELLANEOUS
STP URBAN 50,000 - 200,000 NON-FEDERAL
2024 7995-02-67 01/09/2024 206 LET MISC 0.000 VAR HWY C EAU CLAIRE, VARIOUS LOCATIONS $250,000 - $499,999
CITY TRANSIT STOP IMPROVEMENTS
CONSTRUCTION/MISCELLANEOUS
STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG
2022-2025 FINAL STIP Project Listing 296Northwest Region
JACKSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7027-00-71 11/08/2022 206 LET MISC 0.097 CTH O MILLSTON - CTH HH $250,000 - $499,999
MCKENNA ROAD INTERSECTION
CONSTRUCTION/SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 7244-00-70 02/13/2024 205 LET BRRPL 0.029 CTH Z STH 54 - NORTH COUNTY LINE $250,000 - $499,999
HAY CREEK BRIDGE B-27-0176
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
1023-06-08 303 I/E RSRF30 7.440 IH 094 BLACK RIVER FALLS - TOMAH $250,000 - $499,999
CTH O TO CTH EW (EB)
DESIGN/RESURFACE
BACKBONE NON-FEDERAL
2022 1023-00-89 02/25/2022 303 MIS MISC 4.550 IH 094 BLACK RIVER FALLS - TOMAH $0 - $99,999
BLACK RIVER - PERRY CREEK
ITEMS FOR CONST ID 1023-00-79
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1023-00-99 02/25/2022 303 SFA MISC 0.000 IH 094 BLACK RIVER - PERRY CREEK (EB & WB) $0 - $99,999
BLACK RIVER FALLS - TOMAH
TRF MITIGATION CONST ID 1023-00-79
BACKBONE NON-FEDERAL
2022 1024-01-90 02/25/2022 303 SFA MISC 2.374 IH 094 CTH F TO BLACK RIVER (EAST/WEST BD) $0 - $99,999
OSSEO - BLACK RIVER FALLS
TRAFFIC MITIGATION 1024-01-75
BACKBONE NON-FEDERAL
2023 1023-01-74 05/09/2023 303 LET BRRHB 0.000 IH 094 BLACK RIVER FALLS - TOMAH $5,000,000 - $5,999,999
B-27-039 & 043 EB/B-27-040 & 044 WB
CONSTRUCTION/BRIDGE REHABILITATION
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 297Northwest Region
JACKSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1023-01-94 05/25/2023 303 SFA MISC 0.000 IH 094 B-27-039 & 043 EB/B-27-040 & 044 WB $0 - $99,999
BLACK RIVER FALLS - TOMAH
TRF MITIGATION/CONSTR ID 1023-01-74
BACKBONE NON-FEDERAL
2024 1023-00-71 12/10/2024 303 LET RSRF30 7.930 IH 094 BLACK RIVER FALLS - TOMAH $13,000,000 - $13,999,999
PERRY CREEK TO CTH O (EB & WB)
CONSTRUCTION/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 7249-00-70 04/12/2022 205 LET BRRPL 0.114 LOC STR T GARFIELD, MOE ROAD (EAST) $500,000 - $749,999
NF BUFFALO RIVER BRIDGE B-27-0174
CONSTRUCTION/BRRPL
LOCAL BRIDGES NON-FEDERAL
2022 7550-00-25 06/25/2022 303 R/E BRRPL 0.004 STH 054 GALESVILLE - MELROSE $0 - $99,999
WILSON CR & MILL CR BR B270233,0018
REAL ESTATE ACQUISITION
SHR BRIDGES NON-FEDERAL
2024 7550-00-75 11/12/2024 303 LET BRRPL 0.004 STH 054 GALESVILLE - MELROSE $2,000,000 - $2,999,999
WILSON CR & MILL CR BR B270175,0235
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2022 7710-00-71 04/12/2022 303 LET RSRF20 1.360 STH 071 MELROSE - SPARTA $1,000,000 - $1,999,999
STH 54 TO STH 108
CONSTRUCTION/RESURFACE
STATE 3R HWY INFRA COVID SUPP
2023 7710-00-70 03/14/2023 303 LET BRRHB 0.132 STH 071 MELROSE - SPARTA $250,000 - $499,999
BLACK RIVER BRIDGE B-27-0074
CONSTR/BRRHB/JOINT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 298Northwest Region
JACKSON
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7520-00-27 01/25/2022 303 R/E BRRPL 0.071 STH 095 MERRILLAN - NEILLSVILLE $0 - $99,999
E FK HALLS CREEK BRIDGE B-27-0147
REAL ESTATE/BRIDGE REPLACEMENT
SHR BRIDGES NON-FEDERAL
2022 7520-00-77 12/13/2022 303 LET BRRPL 0.070 STH 095 MERRILLAN - NEILLSVILLE $750,000 - $999,999
E FK HALLS CREEK BRIDGE B-27-0238
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2023 7520-00-78 01/10/2023 303 LET BRRPL 0.060 STH 095 BLAIR - MERRILLAN $1,000,000 - $1,999,999
HALLS CREEK BRIDGE B-27-0168
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2023 7520-00-79 01/10/2023 303 LET BRRPL 0.028 STH 095 BLAIR - MERRILLAN $500,000 - $749,999
CISNA CREEK BRIDGE B-27-0169
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2024 7560-05-74 01/09/2024 303 LET RSRF20 10.070 STH 095 BLAIR - MERRILLAN $4,000,000 - $4,999,999
TREMPEALEAU/JACKSON CO LN TO IH 94
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 7930-00-71 04/12/2022 303 LET RSRF20 2.662 STH 108 WEST SALEM - MELROSE $1,000,000 - $1,999,999
LA CROSSE/JACKSON CO LN TO STH 71 N
CONSTRUCTION/RESURFACE
STATE 3R HWY INFRA COVID SUPP
2022-2025 FINAL STIP Project Listing 299Northwest Region
NORTHWEST REGION WIDE
2022-2025 FINAL STIP Project Listing 299Northwest Region
NORTHWEST REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
1000-18-58 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2023 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
DESIGN/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1000-18-60 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2024 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
DESIGN/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1000-18-62 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2025 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
CONST/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1000-18-64 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2026 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
DESIGN/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1000-18-66 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2027 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
DESIGN/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
1000-18-68 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2028 $0 - $99,999
VARIOUS HIGHWAYS, NW REGION WIDE
DESIGN/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL
9227-01-29 303 I/E MISC 0.000 VAR HWY NW REGION,CULV PIPE & MIS STRC INSP $100,000 - $249,999
VAR HWY CULV PIPE/MIS STRC INSP
PE/INSPECTION/LOC ON STN ANNUAL PLN
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 300Northwest Region
NORTHWEST REGION WIDE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1000-18-49 05/25/2022 303 C/E MISC 0.000 VAR HWY NW REGION, MATERIALS CERTIFICATION $100,000 - $249,999
MATERIALS CERTIFICATION SERVICES
REDISTRIBUTION CONTRACT SFY2021
STATE 3R NON-FEDERAL
2023 1000-18-59 05/09/2023 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2023 $1,000,000 - $1,999,999
VARIOUS HIGHWAYS, NW REGION WIDE
CONST/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2024 1000-18-61 05/14/2024 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2024 $1,000,000 - $1,999,999
VARIOUS HIGHWAYS, NW REGION WIDE
CONST/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2025 1000-18-63 05/13/2025 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2022 $1,000,000 - $1,999,999
VARIOUS HIGHWAYS, NW REGION WIDE
CONST/TRF/PVMT MRK/STN ANNUAL PLN
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL STIP Project Listing 301Northwest Region
PEPIN
2022-2025 FINAL STIP Project Listing 301Northwest Region
PEPIN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7180-00-77 11/14/2023 303 LET RSRF20 4.486 STH 035 PEPIN - HAGER CITY $3,000,000 - $3,999,999
WALNUT ST TO PEPIN/PIERCE CO LINE
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1530-07-05 303 I/E RECST 0.060 USH 010 ELLSWORTH - DURAND $0 - $99,999
STH 25 NORTH JUNCTION INTERSECTION
DESIGN/RECONSTRUCTION
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 302Northwest Region
PIERCE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7994-00-50 08/25/2022 206 R/E RECST 0.710 LOC STR C RIVER FALLS, S WASSON LANE $100,000 - $249,999
830TH AVE TO E CASCADE AVE
REAL ESTATE ACQUISITION
STP URBAN 5,000 - 20,000 STBG 5-200K POP FAST EXT
2023 7994-00-51 12/12/2023 206 LET RECST 0.710 LOC STR C RIVER FALLS, S WASSON LANE $3,000,000 - $3,999,999
830TH AVE TO E CASCADE AVE
CONSTRUCTION/RECONSTRUCT
STP URBAN 5,000 - 20,000 STBG 5-200K POP FAST EXT
2022 7994-00-35 01/25/2022 290 C/E MISC 0.000 NON HWY C RIVER FALLS, VARIOUS LOCATIONS $0 - $99,999
BICYCLE AND PEDESTRIAN PLAN
PLANNING/BIKE & PEDESTRIAN PLAN/TAP
TAP 5,000 - 50,000 TAP AREAS 5K-200K MAP21-EX
7630-00-04 303 I/E PSRS40 5.770 STH 029 RIVER FALLS - SPRING VALLEY $0 - $99,999
USH 63 S TO CTH CC S
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
7180-00-10 303 I/E RSRF20 0.980 STH 035 HAGER CITY - PRESCOTT $0 - $99,999
WACOTA ST TO USH 10
DESIGN - FULL PS&E RESURFACE
STATE 3R NON-FEDERAL
2022 7180-00-28 05/25/2022 303 R/E MISC 0.097 STH 035 PEPIN - HAGER CITY $0 - $99,999
GREEN STREET TO PARK STREET
REAL ESTATE ACQUISTION
STATE 3R NON-FEDERAL
2023 7180-00-78 11/14/2023 303 LET MISC 0.097 STH 035 PEPIN - HAGER CITY $2,000,000 - $2,999,999
GREEN STREET TO PARK STREET
CONSTR/REPLACE RETAINING WALLS
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 303Northwest Region
PIERCE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7180-00-79 05/09/2023 303 LET MISC 0.058 STH 035 PEPIN - HAGER CITY $500,000 - $749,999
USH 63 INTERSECTION
CONSTR/CULVERT REPAIR & REPLACEMENT
STATE 3R STBG <5K POP - FAST EXT
2023 7180-02-72 11/14/2023 303 LET BRRHB 0.002 STH 035 HAGER CITY - PRESCOTT $750,000 - $999,999
BIG RIVER BRIDGE B-47-0042
CONST/BRIDGE REHABILITATION/REDECK
SHR BRIDGES STBG <5K POP - FAST EXT
2022 1540-00-23 11/25/2022 303 R/E MISC 0.162 STH 065 ELLSWORTH - RIVER FALLS $0 - $99,999
CULVERT C-47-0002 & C-47-0005
REAL ESTATE ACQUISITION
SHR BRIDGES NON-FEDERAL
2024 1540-00-73 11/12/2024 303 LET MISC 0.162 STH 065 ELLSWORTH - RIVER FALLS $250,000 - $499,999
CULVERTS C-47-0063 & C-47-0005
CONSTR/MISC/CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2023 7105-00-23 11/25/2023 303 R/E COLD20 10.940 STH 072 ELLSWORTH - DOWNSVILLE $0 - $99,999
CTH BB TO CTH G
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
1530-00-11 303 I/E MISC 0.050 USH 010 PRESCOTT - ELLSWORTH $0 - $99,999
CTH E INTERSECTION
DESIGN - FULL PS&E SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 1530-01-26 11/25/2022 303 R/E MISC 0.048 USH 010 ELLSWORTH - DURAND $0 - $99,999
CULVERTS C-47-0062 & C-47-0236
REAL ESTATE ACQUISITION
SHR BRIDGES NON-FEDERAL
2022-2025 FINAL STIP Project Listing 304Northwest Region
PIERCE
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 1530-00-79 01/10/2023 303 LET MISC 0.136 USH 010 PRESCOTT - ELLSWORTH $1,000,000 - $1,999,999
SPRING CR CULVERTS C-47-0060 & 0061
CONSTR/CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2023 1530-02-70 01/10/2023 303 LET RSRF20 13.777 USH 010 PRESCOTT - ELLSWORTH $10,000,000 - $10,999,999
STH 29 TO SOUTH JUNCTION USH 63
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2023 1530-02-80 01/10/2023 303 LET MISC 13.777 USH 010 PRESCOTT - ELLSWORTH $500,000 - $749,999
STH 29 TO SOUTH JUNCTION USH 63
CONSTR/SFTY/WDN PVD SHLDRS/RMBLSTRP
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1530-00-81 11/12/2024 303 LET MISC 0.050 USH 010 PRESCOTT - ELLSWORTH $500,000 - $749,999
CTH E INTERSECTION
CONSTR/SFTY/INTERSECTION MOD
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 1530-01-76 11/12/2024 303 LET MISC 0.048 USH 010 ELLSWORTH - DURAND $250,000 - $499,999
CULVERTS C-47-0062 & C-47-0236
CONSTRUCTION/CULVERTS
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 305Northwest Region
POLK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8857-00-70 12/13/2022 205 LET BRRPL 0.006 CTH B STH 87 - CTH Z $250,000 - $499,999
TRADE RIVER BRIDGE B-48-0058
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2022 8142-00-70 03/08/2022 206 LET PVRPLA 2.475 CTH F STH 35 - CLEAR LAKE $1,000,000 - $1,999,999
CTH PP TO PONDHURST DRIVE
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP - FAST EXT
2022 8397-00-70 12/13/2022 205 LET BRRPL 0.010 CTH K CTH M - CTH PP $250,000 - $499,999
WAPOGASSET BRANCH BRIDGE B-48-0057
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
2023 8010-01-24 11/25/2023 303 R/E MISC 2.040 STH 035 LUCK - SIREN $0 - $99,999
STH 48 E TO POLK STREET
REAL ESTATE ACQ/CURB RAMP UPGRADES
STATE 3R NON-FEDERAL
8030-00-01 303 I/E RSRF30 6.930 STH 046 AMERY - MILLTOWN $100,000 - $249,999
YORK PARK ENTRANCE TO USH 8
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2025 8030-00-70 12/09/2025 303 LET COLD20 11.420 STH 046 AMERY - MILLTOWN $7,000,000 - $7,999,999
USH 8 TO STH 35
CONSTRUCTION/CIR/RESURFACING
STATE 3R STBG FAST OFF-SYS BRIDGE E
2023 8820-00-20 11/25/2023 303 R/E MISC 11.140 STH 048 FREDERIC - MCKINLEY $0 - $99,999
STH 35 TO BASS LAKE LANE
REAL ESTATE ACQ/CURB UPGRADES
STATE 3R NON-FEDERAL
2022-2025 FINAL STIP Project Listing 306Northwest Region
POLK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8865-00-24 01/25/2022 303 R/E RSRF20 14.880 STH 065 NEW RICHMOND - USH 8 $100,000 - $249,999
NORTH JCT JEWELL STREET TO USH 8
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8865-00-74 02/14/2023 303 LET RSRF20 14.880 STH 065 NEW RICHMOND - USH 8 $8,000,000 - $8,999,999
NORTH JCT JEWELL STREET TO USH 8
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2023 8840-00-20 11/25/2023 303 R/E RSRF20 1.110 STH 087 ST. CROIX FALLS - GRANTSBURG $0 - $99,999
USH 8 TO 240' N OF MINNESOTA ST
REAL ESTATE ACQ/CIR/RESURFACE
STATE 3R NON-FEDERAL
8417-00-07 303 I/E RSRF20 0.210 STH 243 ST CROIX RIVER - OSCEOLA $0 - $99,999
ST CROIX RIVER TO STH 35
DESIGN/RESURFACE
STATE 3R STBG <5K POP FAST
2024 8417-00-76 12/25/2024 303 OST BRRPL 0.000 STH 243 ST CROIX RIVER - OSCEOLA $4,000,000 - $4,999,999
ST CROIX RIVER BRIDGE B-48-0NEW
CONSTRUCTION/BRRPL(MNDOT LEAD)
SHR BRIDGES SURFACE TRANSP BLOCK GRTS-
2024 8417-00-77 12/25/2024 303 OST RSRF20 0.210 STH 243 ST CROIX RIVER - OSCEOLA $100,000 - $249,999
ST CROIX RIVER TO STH 35
CONSTR/REIMBURSEMENT TO MINNESOTA
STATE 3R STBG <5K POP FAST
2025 1570-00-78 12/09/2025 303 LET RSRF20 9.620 USH 008 ST CROIX FALLS - TURTLE LAKE $7,000,000 - $7,999,999
STH 35 N TO STH 46 S
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 307Northwest Region
POLK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1550-02-76 09/13/2022 303 LET RSRF20 8.400 USH 063 BALDWIN - CUMBERLAND $4,000,000 - $4,999,999
ST CROIX/POLK CO LN TO CTH J
CONSTRUCTION/CIR/RESURFACING
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1550-04-76 09/13/2022 303 LET RECST 0.019 USH 063 CLEAR LAKE - CUMBERLAND $100,000 - $249,999
60TH AVENUE INTERSECTION
CONSTRUCTION/SFTY/REALIGNMENT
SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA
2022 1550-06-75 09/13/2022 303 LET MISC 0.003 USH 063 BALDWIN - CLEAR LAKE $500,000 - $749,999
PEDESTRIAN TRAIL C-48-0025
CONSTR/MISC/CULVERT REPLACEMENT
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 308Northwest Region
RUSK
2022-2025 FINAL STIP Project Listing 308Northwest Region
RUSK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 8793-00-73 01/10/2023 205 LET BRRPL 0.015 CTH B SOUTH COUNTY LINE - GLEN FLORA $500,000 - $749,999
MAIN CREEK BRIDGE B-54-0140
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
8798-00-04 303 I/E BRRHB 0.000 CTH D CTH E - STH 27 $0 - $99,999
CHIPPEWA RIVER BRIDGE B-54-0018
DESIGN - FULL PS&E BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2023 8436-00-70 01/10/2023 205 LET BRRPL 0.005 LOC STR T RUSK, HORSESHOE LAKE ROAD $250,000 - $499,999
MCDERMOTT CREEK BRIDGE B-54-0139
CONSTRUCTION/BRIDGE REPLACEMENT
LOCAL BRIDGES STBG <5K POP FAST
8210-01-02 303 I/E BRRPL 0.000 STH 073 THORP - INGRAM $0 - $99,999
CRAZY HORSE CREEK BRIDGE B-54-0744
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
2022 1570-06-22 01/25/2022 303 R/E RSRF20 9.150 USH 008 CAMERON - LADYSMITH $0 - $99,999
CEDAR SWAMP ROAD TO CHIPPEWA RIVER
REAL ESTATE ACQUISITION/RESURFACE
STATE 3R NON-FEDERAL
2022 1580-04-22 01/25/2022 303 R/E RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $0 - $99,999
RIVER AVENUE TO PRENTICE STREET
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 1580-04-23 01/25/2022 303 R/E RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $0 - $99,999
PRENTICE STREET TO RUSK/PRICE CO LN
REAL ESTATE ACQUISITION
2022-2025 FINAL STIP Project Listing 309Northwest Region
RUSK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NON-FEDERAL
2023 1570-06-72 11/14/2023 303 LET RSRF20 9.150 USH 008 CAMERON - LADYSMITH $5,000,000 - $5,999,999
CEDAR SWAMP ROAD TO CHIPPEWA RIVER
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1580-04-54 02/25/2023 303 R/R MISC 0.000 USH 008 LADYSMITH - PRENTICE $250,000 - $499,999
BRADLEY SUB XING 691304W
RR OPS/RAIL UPGRADES
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 1580-04-72 12/12/2023 303 LET RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $5,000,000 - $5,999,999
RIVER AVENUE TO PRENTICE STREET
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1580-04-73 12/12/2023 303 LET RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $4,000,000 - $4,999,999
PRENTICE STREET TO RUSK/PRICE CO LN
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 1580-04-74 01/10/2023 303 LET MISC 20.550 USH 008 LADYSMITH - PRENTICE $1,000,000 - $1,999,999
E 16TH ST N/OLD 8 RD TO PRICE CO LN
CONSTRUCTION/CULVERTS/WINGWALLS
STATE 3R NATIONAL HIGHWAY PERFFAST
2024 1580-00-70 07/09/2024 303 LET BRRPL 0.002 USH 008 CAMERON - LADYSMITH $1,000,000 - $1,999,999
LITTLE SOFT MAPLE CR BRG B-54-0131
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 310Northwest Region
RUSK
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
8590-02-03 303 I/E BRPVTV 0.000 VARHWY
NW REGION, THIN POLYMER DECKOVRLYS
$0 - $99,999
VARIOUS HIGHWAYS, NORTH HALF
DESIGN - FULL PS&E BRPVTV
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 311Northwest Region
SAWYER
2022-2025 FINAL STIP Project Listing 311Northwest Region
SAWYER
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
8140-00-09 303 I/E PSRS40 5.500 STH 027 OJIBWA - STONE LAKE $0 - $99,999
STH 70 E TO STH 40
DESIGN - FULL PS&E PSRS40
STATE 3R STBG <5K POP - FAST EXT
2022 8140-00-27 12/25/2022 303 R/E RSRF20 18.040 STH 027 OJIBWA - HAYWARD $0 - $99,999
125' W OF STH 40 S TO BOYLAND RD
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8170-01-74 12/12/2023 303 LET BRNEW 0.024 STH 070 OJIBWA - OXBO $500,000 - $749,999
LOG CREEK C-57-0033
CONSTR/BRNEW/B-57-0094
STATE 3R STBG <5K POP FAST
2022 8520-01-06 06/25/2022 303 C/E PSRS40 11.360 STH 077 HAYWARD - CLAM LAKE $100,000 - $249,999
CTH OO TO HOLLYWOOD RD
DESIGN - FULL PS&E PSR40
STATE 3R STBG <5K POP - FAST EXT
2022 8520-01-25 01/25/2022 303 R/E RSRF20 4.910 STH 077 HAYWARD - CLAM LAKE $0 - $99,999
USH 63 TO CTH K
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2024 8520-01-75 12/10/2024 303 LET RSRF20 4.910 STH 077 HAYWARD - CLAM LAKE $3,000,000 - $3,999,999
USH 63 TO CTH K
CONSTRUCTION/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
2025 8520-02-71 07/08/2025 303 LET BRRHB 0.048 STH 077 HAYWARD - CLAM LAKE $100,000 - $249,999
TEAL RIVER BRIDGE B-57-0025
CONSTRUCTION/BRIDGE REHABILITATION
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 312Northwest Region
SAWYER
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 1560-00-75 05/10/2022 303 LET MISC 0.060 USH 063 C HAYWARD, FIRST STREET $500,000 - $749,999
SMITH LAKE CREEK CULVERT
CONSTRUCTION/CULVERT REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL STIP Project Listing 313Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 8944-04-71 11/14/2023 206 LET MISC 0.058 CTH A HUDSON - NEW RICHMOND $1,000,000 - $1,999,999
MCCUTCHEON ROAD INTERSECTION
CONSTRUCTION/SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022 8939-08-76 03/08/2022 206 LET PVRPLA 2.005 CTH E HOULTON - STH 65 $2,000,000 - $2,999,999
14TH STREET TO CTH V
CONSTRUCTION/PAVEMENT REPLACEMENT
STP RURAL STBG <5K POP - FAST EXT
2023 8939-03-78 12/12/2023 206 LET MISC 6.933 CTH I CTH A - SOMERSET $750,000 - $999,999
CTH A TO KOHLER DRIVE
CONSTRUCTION/HRRR/SAFETYTREATMENTS
SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMPPROG-FA
7994-00-52 206 I/E BRRPL 0.000 CTH MM C RIVER FALLS, POWELL AVE $0 - $99,999
KINNICKINNIC RIVER BRIDGE P-55-0148
DESIGN - FULL PS&E BRRPL
LOCAL BRIDGES NON-FEDERAL
1020-02-31 303 I/E RSRF30 4.330 IH 094 HUDSON - BALDWIN $250,000 - $499,999
STH 35 NORTH JCT TO USH 12(EB & WB)
DESIGN/RESURFACE
BACKBONE NON-FEDERAL
1020-06-04 303 I/E PVRPLA 5.630 IH 094 HUDSON - MENOMONIE $1,000,000 - $1,999,999
STH 65 TO CTH T (EAST & WESTBOUND)
DESIGN/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFPLAN
2023 1020-00-80 11/14/2023 303 LET BRRHB 0.500 IH 094 HUDSON - BALDWIN $3,000,000 - $3,999,999
ST CROIX RIVER B-55-0061, B-55-0126
2022-2025 FINAL STIP Project Listing 314Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTRUCTION/POLYMER OVERLAY
BACKBONE NATIONAL HIGHWAY PERFFAST
2023 1021-00-96 07/25/2023 303 SFA MISC 0.000 IH 094 RUSH RIVER BRIDGE WB B-55-0262 $0 - $99,999
HUDSON - BALDWIN
TRF MITIGATION CONSTR ID 1021-00-76
BACKBONE NON-FEDERAL
2023 1021-00-97 07/25/2023 303 SFA MISC 0.000 IH 094 RUSH RIVER BRIDGE EB B-55-0045 $0 - $99,999
HUDSON - BALDWIN
TRF MITIGATION CONSTR ID 1021-00-77
BACKBONE NON-FEDERAL
2024 1020-00-73 11/12/2024 303 LET RSRF30 5.814 IH 094 BALDWIN - MENOMONIE $9,000,000 - $9,999,999
CTH BB TO STH 128 (EB & WB)
CONSTRUCTION/RESURFACE
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1020-07-70 11/12/2024 303 LET RSRF30 5.790 IH 094 HUDSON - MENOMONIE $10,000,000 - $10,999,999
CTH T TO CTH BB (EB & WB)
CONSTRUCTION/RESURFACING
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1020-07-79 07/09/2024 303 LET BRRPL 0.473 IH 094 HUDSON - BALDWIN $5,000,000 - $5,999,999
KINNEY ROAD BRIDGE WB B-55-0250
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1020-07-80 07/09/2024 303 LET BRRPL 0.473 IH 094 HUDSON - BALDWIN $4,000,000 - $4,999,999
KINNEY ROAD BRIDGE EB B-55-0251
CONSTRUCTION/BRIDGE REPLACEMENT
2022-2025 FINAL STIP Project Listing 315Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1020-07-81 07/09/2024 303 LET BRRPL 0.360 IH 094 HUDSON - BALDWIN $5,000,000 - $5,999,999
100TH ST/TWIN LK RD BR WB B-55-0252
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
2024 1020-07-82 07/09/2024 303 LET BRRPL 0.360 IH 094 HUDSON - BALDWIN $4,000,000 - $4,999,999
100TH ST/TWIN LK RD BR EB B-55-0253
CONSTRUCTION/BRIDGE REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 8940-00-17 01/25/2022 290 LLC MISC 0.000 NONHWY
C NEW RICHMOND, CTH A BIKE TRAIL $750,000 - $999,999
W RICHMOND WAY TO W 4TH STREET
CONSTR/PAVED BIKE PED TRAIL/TAP
BICYCLE AND PEDESTRIAN FACILITIES STBG 5-200K POP FAST EXT
2023 8080-00-72 07/25/2023 290 LLC MISC 0.000 OFF SYS ST CROIX COUNTY, HWY 35 TRAIL $250,000 - $499,999
SOMMERS STREET TO OLD HWY 35
CONSTR/TAP/BIKE PED TRAIL
BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E
2022 8060-00-20 01/25/2022 303 R/E PVRPLA 1.227 STH 035 SOMERSET - ST CROIX FALLS $0 - $99,999
CTH C TO LASER DRIVE
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8060-00-70 02/14/2023 303 LET PVRPLA 1.228 STH 035 SOMERSET - ST CROIX FALLS $4,000,000 - $4,999,999
CTH C TO LASER DRIVE
CONSTRUCTION/PAVEMENTREPLACEMENT
2022-2025 FINAL STIP Project Listing 316Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R NATIONAL HIGHWAY PERF FAST
2023 8060-00-72 02/14/2023 303 LET MISC 1.227 STH 035 SOMERSET - ST CROIX FALLS $1,000,000 - $1,999,999
CTH C TO LASER DRIVE
CONSTR/SANITARY SEWER & WATER MAIN
STATE 3R NON-FEDERAL
2024 8080-08-75 12/10/2024 303 LET PSRS30 6.510 STH 035 HUDSON - SOMERSET $3,000,000 - $3,999,999
150TH AVE TO CTH C
CONSTR/CONCRETE REPAIR & REPLACEMNT
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 8110-00-79 12/10/2024 303 LET PSRS30 6.689 STH 064 STILLWATER - NEW RICHMOND $2,000,000 - $2,999,999
STH 35 TO 142ND STREET
CONSTR/CONCRETE REPAIR & REPLACEMNT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1540-02-26 01/25/2022 303 R/E RSRF20 2.119 STH 065 RIVER FALLS - NEW RICHMOND $0 - $99,999
70TH AVE TO USH 12 WEST
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 8650-00-23 06/25/2022 303 R/E COLD10 6.140 STH 128 ELMWOOD - STH 64 $0 - $99,999
STH 170 TO STH 64
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 7620-00-21 07/25/2023 303 R/E COLD10 5.830 STH 128 ELMWOOD - STH 64 $0 - $99,999
STH 29 TO USH 12
REAL ESTATE/CIR/RESURFACE
STATE 3R NON-FEDERAL
2023 7620-00-70 02/14/2023 303 LET RSRF20 5.830 STH 128 ELMWOOD - STH 64 $3,000,000 - $3,999,999
STH 29 TO USH 12
CONSTRUCTION/RESURFACE
2022-2025 FINAL STIP Project Listing 317Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
STATE 3R STBG <5K POP - FAST EXT
2023 7620-00-73 09/12/2023 303 LET MISC 0.038 STH 128 ELMWOOD - STH 64 $100,000 - $249,999
IH94 (KWIK TRIP) INTERSECTION
CONSTRUCTION/SAFETY
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2024 8650-00-50 10/25/2024 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $250,000 - $499,999
WCL RR XING 693015C MP 396.24
RR OPS/INSTALL SIGNALS AND GATES
STATE 3R STBG <5K POP FAST
2024 8650-00-51 10/25/2024 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $0 - $99,999
WCL RR XING 693015C MP 396.24
RR OPS/INSTALL NEW CROSSING SURFACE
STATE 3R STBG <5K POP FAST
2024 8650-00-72 11/12/2024 303 LET MISC 0.027 STH 128 GLENWOOD CITY - STH 64 $500,000 - $749,999
CULVERTS C-55-0NEW AND C-55-0037
CONSTRUCTION/CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2024 8650-00-73 11/12/2024 303 LET COLD10 6.140 STH 128 ELMWOOD - STH 64 $3,000,000 - $3,999,999
STH 170 TO STH 64
CONSTRUCTION/CIR/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2025 8650-00-74 12/09/2025 303 LET COLD20 7.810 STH 128 ELMWOOD - STH 64 $4,000,000 - $4,999,999
USH 12 TO STH 170
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
1000-18-81 303 I/E BRRHB 0.000 USH 010 NW REGION, WINGWALL REPAIRS $0 - $99,999
VAR HWYS, MULTIPLE STRUCTURES
DESIGN - FULL PS&E BRRHB
2022-2025 FINAL STIP Project Listing 318Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SHR BRIDGES SURFACE TRANS BLOCK-FLEX E
2025 8949-00-73 11/11/2025 303 LET BRRHB 0.064 USH 012 HUDSON - BALDWIN $1,000,000 - $1,999,999
CNW RR BRIDGE B-55-0076
CONSTR/BRIDGE REHABILITATION
SHR BRIDGES STBG <5K POP - FAST EXT
1550-02-09 303 I/E BRRPL 0.000 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999
RUSH RIVER BRIDGE B-55-0609
DESIGN - FULL PS&E BRRPL
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
7210-04-03 303 I/E RSRF20 2.060 USH 063 ELLSWORTH - BALDWIN $100,000 - $249,999
IH 94 TO USH 12 E
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 1550-02-23 11/25/2022 303 R/E BRRPL 0.211 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999
BRANCH RUSH RIVER BRIDGE B-55-0636
REAL ESTATE ACQUISTION
SHR BRIDGES NON-FEDERAL
2023 1550-02-27 09/25/2023 303 R/E MISC 0.009 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999
SPRUCE STREET INTERSECTION
REAL ESTATE ACQUISITION
SAFETY (REGULAR HSIP) NON-FEDERAL
2024 1550-02-73 09/10/2024 303 LET BRRPL 0.324 USH 063 BALDWIN - CLEAR LAKE $1,000,000 - $1,999,999
BRANCH RUSH RIVER BRIDGE B-55-0289
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2024 1550-02-75 09/10/2024 303 LET BRRHB 0.003 USH 063 BALDWIN - CLEAR LAKE $250,000 - $499,999
BR WILLOW RIVER BRIDGE B-55-0055
CONSTR/BRIDGE REHABILITATION
2022-2025 FINAL STIP Project Listing 319Northwest Region
ST. CROIX
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
SHR BRIDGES STBG <5K POP - FAST EXT
2024 1550-02-77 09/10/2024 303 LET MISC 0.009 USH 063 BALDWIN - CLEAR LAKE $250,000 - $499,999
SPRUCE STREET INTERSECTION
CONSTR/SAFETY/INTERSECTION IMPRVMNT
SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST
2022-2025 FINAL STIP Project Listing 320Northwest Region
TAYLOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 8888-08-76 11/08/2022 206 LET RECST 1.030 CTH O STH 64 - ECL $2,000,000 - $2,999,999
GIBSON STREET TO STH 13
CONSTRUCTION/RECONSTRUCTION
STP RURAL STBG <5K POP FAST
2022 1610-01-26 11/25/2022 303 R/E RSRF20 1.570 STH013
ABBOTSFORD - MEDFORD $0 - $99,999
CTH O TO TAYLOR STREET
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 3700-50-61 12/13/2022 305 LET TOSIG 0.330 STH013
C MEDFORD, STH 13 $1,000,000 - $1,999,999
PERKINS STREET TO CLARK STREET
CONSTRUCTION/SIGNAL RECONSTRUCTION
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 1610-01-76 11/14/2023 303 LET RSRF20 1.580 STH013
ABBOTSFORD - MEDFORD $1,000,000 - $1,999,999
CTH O TO TAYLOR STREET
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
2023 3700-50-62 03/25/2023 305 MIS TOSIG 0.330 STH013
C MEDFORD, STH 13 $0 - $99,999
PERKINS STREET TO CLARK STREET
CONSTRUCTION/MISCELLANEOUS
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2023 3700-50-79 11/14/2023 305 LET TOSIG 0.019 STH013
C MEDFORD, STH 13 $500,000 - $749,999
STH 64 INTERSECTION
CONSTRUCTION/SIGNAL RECONSTRUCTION
2022-2025 FINAL STIP Project Listing 321Northwest Region
TAYLOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
2024 1610-02-72 09/10/2024 303 LET BRRHB 0.011 STH013
ABBOTSFORD - MEDFORD $750,000 - $999,999
LITTLE BLACK RIVER BRIDGE B-60-0012
CONSTRUCTION/BRRHB/DECK REPLACEMENT
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2024 3700-50-80 03/25/2024 305 MIS TOSIG 0.019 STH013
C MEDFORD, STH 13 $0 - $99,999
STH 64 INTERSECTION
MISCELLANEOUS/SIGNAL RECONSTRUCTION
INTELLIGENT TRANSPORTATION SYSTEMS(ITS)
NON-FEDERAL
8220-00-02 303 I/E PSRS40 8.770 STH064
GILMAN - MEDFORD $100,000 - $249,999
STH 73 TO COYOTE DRIVE
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
9000-00-06 303 I/E PSRS40 14.350 STH064
MEDFORD - MERRILL $100,000 - $249,999
STH 13 TO LINCOLN COUNTY LINE
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 8220-00-26 05/25/2022 303 R/E RSRF20 1.105 STH064
GILMAN - MEDFORD $0 - $99,999
NATIONAL AVE TO STH 13
REAL ESTATE ACQUISTION
STATE 3R NON-FEDERAL
2022 8220-00-71 04/12/2022 303 LET RSRF20 4.434 STH064
GILMAN - MEDFORD $2,000,000 - $2,999,999
2022-2025 FINAL STIP Project Listing 322Northwest Region
TAYLOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CTH B TO STH 73 S
CONSTRUCTION/RESURFACE
STATE 3R HWY INFRA COVID SUPP
2022 9000-00-24 11/25/2022 303 R/E MISC 0.044 STH 064 MEDFORD - MERRILL $0 - $99,999
CULVERT C-60-1096
REAL ESTATE ACQUISITION
SHR BRIDGES NON-FEDERAL
2022 9000-00-25 11/25/2022 303 R/E MISC 0.017 STH 064 MEDFORD - MERRILL $0 - $99,999
WATERWAY CULVERT C-60-1352
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8220-00-56 09/25/2023 303 R/R MISC 0.005 STH 064 GILMAN - MEDFORD $250,000 - $499,999
WISCONSIN CENTRAL LTD 699488B
RR OPS/SIGNAL UPGRADE & INSTALL
STATE 3R STBG <5K POP FAST
2023 8220-00-57 09/25/2023 303 R/R MISC 0.005 STH 064 GILMAN - MEDFORD $0 - $99,999
WISCONSIN CENTRAL LTD 699488B
RR OPS/CROSSING SURFACEREPLACEMENT
STATE 3R STBG <5K POP FAST
2023 8220-00-70 11/14/2023 303 LET BRRHB 0.020 STH 064 GILMAN - MEDFORD $1,000,000 - $1,999,999
BLACK RIVER BRIDGE B-60-0001
CONSTRUCTION/BRIDGE REHABILITATION
SHR BRIDGES STBG <5K POP FAST
2023 8220-00-76 11/14/2023 303 LET RSRF20 1.105 STH 064 GILMAN - MEDFORD $750,000 - $999,999
NATIONAL AVE TO STH 13
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL STIP Project Listing 323Northwest Region
TAYLOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2024 9000-00-74 11/12/2024 303 LET MISC 0.044 STH 064 MEDFORD - MERRILL $250,000 - $499,999
CULVERT C-60-0020
CONSTR/CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2024 9000-00-75 11/12/2024 303 LET MISC 0.017 STH 064 MEDFORD - MERRILL $250,000 - $499,999
WATERWAY CULVERT C-60-0021
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R STBG <5K POP - FAST EXT
8210-08-06 303 I/E MISC 0.013 STH 073 THORP - INGRAM $0 - $99,999
FISHER RIVER CULVERT C-60-0803
DESIGN - FULL PS&E CULVERT REPLACE
SHR BRIDGES STBG <5K POP - FAST EXT
2023 8210-00-51 08/25/2023 303 R/R RSRF20 0.000 STH 073 THORP - INGRAM $100,000 - $249,999
WCL RR XING 697265D
RR OPS/CROSSING SURFACEREPLACEMENT
STATE 3R SURFACE TRANSP BLOCKGRTS-
2023 8210-00-71 11/14/2023 303 LET RSRF20 11.506 STH 073 THORP - INGRAM $6,000,000 - $6,999,999
PARK ST TO STH 64 E
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2024 8210-00-72 11/12/2024 303 LET RSRF20 9.250 STH 073 THORP - INGRAM $3,000,000 - $3,999,999
STH 64 W TO CTH M WEST JCT
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022 9225-00-03 05/25/2022 303 C/E PSRS40 7.420 STH 102 CHELSEA - SPIRIT $100,000 - $249,999
CTH D TO PRICE COUNTY LINE
2022-2025 FINAL STIP Project Listing 324Northwest Region
TAYLOR
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 4760-98-22 06/25/2022 305 MIS TOPM 0.000 VAR HWY TAYLOR COUNTY PAVEMENT MARKING $500,000 - $749,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE
2022-2025 FINAL STIP Project Listing 325Northwest RegionTREMPEALEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7146-00-72 03/08/2022 205 LET BRRPL 0.030 CTH D ETTRICK - WHITEHALL $750,000 - $999,999
IRVIN CREEK BRIDGE B-61-0247
CONSTRUCTION/BRRPL
LOCAL BRIDGES NON-FEDERAL
1021-01-10 303 I/E BRPVTV 0.000 IH 094 BALDWIN - OSSEO $0 - $99,999
B-55-259, B-61-216,218,215,217
DESIGN - FULL PS&E BRPVTV
BACKBONE NATIONAL HIGHWAY PERF FAST
2022 1022-00-79 04/12/2022 303 LET PVRPLA 3.560 IH 094 EAU CLAIRE - OSSEO $20,000,000 - $24,999,999
CTH NN TO EAST COUNTY LINE
CONSTRUCTION/PAVEMENT REPLACEMENT
BACKBONE NON-FEDERAL
2022 1022-00-99 07/25/2022 303 SFA MISC 0.000 IH 094 CTH NN TO EAST COUNTY LINE $100,000 - $249,999
EAU CLAIRE - OSSEO
TRF MITIGATION CONSTR ID 1022-00-79
BACKBONE NON-FEDERAL
2022 7276-00-74 12/13/2022 205 LET BRRPL 0.006 LOC STR T ARCADIA, RAINEY VALLEY ROAD $100,000 - $249,999
RAINEY VALLEY CREEK BRIDGE B610244
CONSTRUCTION/BRRPL
LOCAL BRIDGES NON-FEDERAL
2022 7281-00-73 03/08/2022 205 LET BRRPL 0.031 LOC STR T ETTRICK, JOE COULEE ROAD $250,000 - $499,999
NF BEAVER CREEK BRIDGE B-61-0245
CONSTRUCTION/BRRPL
LOCAL BRIDGES STBG <5K POP - FAST EXT
2022 7281-00-74 03/08/2022 205 LET BRRPL 0.034 LOC STR T ETTRICK, HAGESTAD ROAD $250,000 - $499,999
NF BEAVER CREEK BRIDGE B-61-0246
CONSTRUCTION/BRRPL
LOCAL BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 326Northwest RegionTREMPEALEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2022 7160-04-41 05/25/2022 303 UTL BRRPL 0.000 STH 035 TREMPEALEAU - FOUNTAIN CITY $0 - $99,999
TREMP RVR E CHANNEL BRG B-61-0029
UTL/INT 201/CENTURYLINK/7160-04-72
SHR BRIDGES NON-FEDERAL
2023 7140-00-70 02/14/2023 303 LET COLD20 6.140 STH 035 LA CROSSE - TREMPEALEAU $4,000,000 - $4,999,999
LA CROSSE/TREMP CO LN TO 10TH ST
CONSTRUCTION/CIR/RESURFACE
STATE 3R SURFACE TRANS BLOCK-FLEX E
2023 7150-00-70 02/14/2023 303 LET RSRF20 4.900 STH 035 TREMPEALEAU - FOUNTAIN CITY $2,000,000 - $2,999,999
STH 93 TO BUFFALO/TREMP COUNTY LINE
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2025 7140-00-71 09/09/2025 303 LET BRRPL 0.165 STH 035 LA CROSSE - TREMPEALEAU $2,000,000 - $2,999,999
TANK CREEK BRIDGE B-61-0288
CONSTRUCT/BRIDGE REPLACEMENT
STATE 3R STBG <5K POP - FAST EXT
2022 7550-00-23 01/25/2022 303 R/E RSRF20 10.210 STH 054 WINONA - GALESVILLE $0 - $99,999
BUFFALO/TREMP CO LN TO WINNEBAGO RD
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 7550-00-73 02/14/2023 303 LET RSRF20 5.310 STH 054 WINONA - GALESVILLE $2,000,000 - $2,999,999
STH 93 TO WINNEBAGO ROAD
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2025 7130-08-74 09/09/2025 303 LET BRRPL 0.011 STH 093 INDEPENDENCE - ELEVA $1,000,000 - $1,999,999
TROUT CREEK BRIDGE B-61-0287
CONSTRUCTION/BRIDGE REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2022-2025 FINAL STIP Project Listing 327Northwest RegionTREMPEALEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
2023 7720-00-21 11/25/2023 303 R/E RSRF20 2.003 STH 095 C ARCADIA, MAIN STREET $0 - $99,999
CTH A TO 250' W OF STH 93
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2025 7720-00-71 11/11/2025 303 LET RSRF20 2.004 STH 095 C ARCADIA, MAIN STREET $2,000,000 - $2,999,999
CTH A TO 250' W OF STH 93
CONSTRUCTION/RESURFACING
STATE 3R SURFACE TRANS BLOCK-FLEXE
2025 7720-00-81 11/11/2025 303 LET MISC 2.003 STH 095 C ARCADIA, MAIN STREET $100,000 - $249,999
CTH A TO 250' W OF STH 93
CONSTRUCTION/CITY UTILITIES
STATE 3R NON-FEDERAL
1520-00-09 303 I/E RSRF10 2.110 USH 010 OSSEO - FAIRCHILD $0 - $99,999
IH 94 TO TREMP/JACKSON COUNTY LINE
DESIGN - FULL PS&E RESURFACE
STATE 3R NATIONAL HIGHWAY PERFFAST
1530-06-00 303 I/E BRRHB 0.000 USH 010 MONDOVI - OSSEO $0 - $99,999
BUFFALO RIVER BRIDGE B-61-0283
DESIGN - FULL PS&E BRRHB
SHR BRIDGES STBG <5K POP - FAST EXT
1530-06-03 303 I/E BRRHB 0.000 USH 010 MONDOVI - OSSEO $0 - $99,999
LINDSAY CREEK BRIDGE B-61-0882
DESIGN - FULL PS&E BRRHB
SHR BRIDGES STBG <5K POP - FAST EXT
2022 1530-06-22 11/25/2022 303 R/E MISC 13.208 USH 010 MONDOVI - OSSEO $0 - $99,999
HUNT LANE TO NELSON ROAD
2022-2025 FINAL STIP Project Listing 328Northwest RegionTREMPEALEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 1535-07-23 01/25/2022 303 R/E PVRPLA 1.141 USH 010 MONDOVI - OSSEO $0 - $99,999
NELSON ROAD TO IH 94
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 1535-07-73 11/14/2023 303 LET PVRPLA 1.310 USH 010 MONDOVI - OSSEO $3,000,000 - $3,999,999
NELSON RD TO IH 94 EB RAMPS
CONSTRUCTION/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP - FAST EXT
2023 1535-07-74 11/14/2023 303 LET MISC 1.141 USH 010 MONDOVI - OSSEO $1,000,000 - $1,999,999
NELSON RD TO IH 94
CONST/SANITARY SEWER AND WATER MAIN
STATE 3R NON-FEDERAL
1630-00-06 303 I/E BRRHB 0.000 USH 053 GALESVILLE - WHITEHALL $0 - $99,999
BR N FK BEAVER CREEK B-61-0101
DESIGN - FULL PS&E BRRHB
SHR BRIDGES STBG <5K POP - FAST EXT
1630-00-07 303 I/E BRRPL 0.024 USH 053 GALESVILLE - WHITEHALL $0 - $99,999
BEAVER CREEK BRIDGE B-61-0751
DESIGN - FULL PS&E BRRPL
SHR BRIDGES STBG <5K POP - FAST EXT
2022 1630-00-22 12/25/2022 303 R/E RSRF20 13.950 USH 053 GALESVILLE - WHITEHALL $0 - $99,999
BEAVER CR TO STH 95 W
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2022 1630-00-71 04/12/2022 303 LET BRNEW 0.090 USH 053 GALESVILLE - WHITEHALL $1,000,000 - $1,999,999
CULVERTS B-61-0290 & B-61-0289
2022-2025 FINAL STIP Project Listing 329Northwest RegionTREMPEALEAU
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
CONSTR/CULVERT REPLACEMENT
SHR BRIDGES NON-FEDERAL
2022 1632-03-20 01/25/2022 303 R/E RSRF20 0.015 USH 053 LA CROSSE - GALESVILLE $0 - $99,999
SOUTH COUNTY LINE TO HARRIS ROAD
REAL ESTATE/RESURFACING
STATE 3R NON-FEDERAL
2023 1632-03-70 02/14/2023 303 LET RSRF20 3.534 USH 053 LA CROSSE - GALESVILLE $3,000,000 - $3,999,999
SOUTH COUNTY LINE TO HARRIS ROAD
CONSTRUCTION/RESURFACING
STATE 3R NATIONAL HIGHWAY PERFFAST
2022 4761-98-22 06/25/2022 305 MIS TOPM 0.000 VARHWY
TREMPEALEAU COUNTY PAVEMENTMARKING
$500,000 - $749,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE
2022-2025 FINAL STIP Project Listing 330Northwest Region
WASHBURN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
8130-00-03 303 I/E PSRS40 5.880 STH 070 SPOONER - STONE LAKE $0 - $99,999
CTH B W TO STH 27 N
DESIGN - FULL PS&E RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 8050-00-22 02/25/2022 303 R/E RSRF20 2.603 STH 070 SIREN - STONE LANE $0 - $99,999
AUTO LANE TO USH 53
REAL ESTATE ACQUISITION
STATE 3R NON-FEDERAL
2023 8550-00-70 11/14/2023 303 LET COLD10 5.840 STH 077 MINONG - HAYWARD $3,000,000 - $3,999,999
CTH G TO CTH M
CONSTRUCTION/RESURFACE/COLD10
STATE 3R STBG <5K POP - FAST EXT
2023 8550-02-72 11/14/2023 303 LET COLD20 6.930 STH 077 MINONG - HAYWARD $4,000,000 - $4,999,999
CTH I TO CTH G
CONSTRUCTION/CIR/RESURFACE
STATE 3R STBG <5K POP FAST
2025 8550-00-71 09/09/2025 303 LET BRRHB 0.018 STH 077 MINONG - HAYWARD $250,000 - $499,999
SOO LINE BRIDGE B-65-0006
CONSTR/BRRHB/JOINT REPLACEMENT
SHR BRIDGES STBG <5K POP FAST
1196-01-02 303 I/E PVRPLA 4.890 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999
BUS 53 (MINONG) TO CTH T (NB)
DESIGN/PAVEMENT REPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
1196-02-00 303 I/E RSRF20 0.000 USH 053 SPOONER - MINONG $100,000 - $249,999
WHALEN LAKE RD TO BUS 53 (SB)
DESIGN/RESURFACING
2022-2025 FINAL STIP Project Listing 331Northwest Region
WASHBURN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
BACKBONE NATIONAL HIGHWAY PERFFAST
1198-02-35 303 I/E PSRS30 6.620 USH 053 SPOONER - MINONG $0 - $99,999
CTH H TO WHALEN LAKE ROAD (NB & SB)
DESIGN/RDMTN/CONCRETE REPAIRS
BACKBONE NON-FEDERAL
2022 1196-00-62 11/08/2022 303 LET PSRS20 3.040 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999
BUS 53 (MINONG) TO LAKESIDE RD (NB)
CONST/CONCRETE/JOINT REPAIR
BACKBONE NATIONAL HIGHWAY PERFFAST
2022 1197-00-40 06/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $0 - $99,999
TREGO INTERCHANGE
UTILITY/LEVEL-OF-EFFORT
BACKBONE NON-FEDERAL
2022 1197-00-41 05/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $100,000 - $249,999
TREGO INTERCHANGE
UTL/INT 34/WE ENERGIES/1197-00-70
BACKBONE NON-FEDERAL
2022 1197-00-42 05/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $0 - $99,999
TREGO INTERCHANGE
UTL/INT XX/WE ENERGIES/1197-00-70
BACKBONE NON-FEDERAL
2022 1197-18-77 04/12/2022 303 LET PVRPLA 5.954 USH 053 NEW AUBURN - SPOONER $17,000,000 - $19,999,999
PINE GROVE RD TO WILDCAT RD (NB&SB)
CONSTRUCTION/PAVEMENTREPLACEMENT
BACKBONE NON-FEDERAL
2023 1197-18-78 12/12/2023 303 LET PVRPLA 6.470 USH 053 NEW AUBURN - SPOONER $20,000,000 - $24,999,999
2022-2025 FINAL STIP Project Listing 332Northwest Region
WASHBURN
Year Project Schd Dt PgmContract
Type CONCEPTNet
Miles RouteProject DescriptionWISDOT Program
EstimateAnticipated Funding
WILDCAT RD TO CTH A (NB & SB)
CONSTRUCTION/PAVEMENTREPLACEMENT
BACKBONE NATIONAL HIGHWAY PERFFAST
1550-04-14 303 I/E BRRHB 0.000 USH 063 CUMBERLAND - SPOONER $0 - $99,999
YELLOW RIVER BRIDGE B-65-0014
DESIGN - FULL PS&E BRRHB
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2025 1560-00-73 12/09/2025 303 LET BRRPL 0.028 USH 063 SPOONER - HAYWARD $1,000,000 - $1,999,999
NAMEKAGON RIVER BRIDGE B-65-0061
CONSTRUCTION/BRRPL
SHR BRIDGES NATIONAL HIGHWAY PERFFAST
2022 4765-98-22 06/25/2022 305 MIS TOPM 0.000 VARHWY
WASHBURN COUNTY PAVEMENT MARKING $500,000 - $749,999
LOCATIONS ON STH PER ANNUAL PLAN
TRF OPS- PAVEMENT MARKING TMAS CY22
STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E
2022 – 2025 Statewide Transportation Improvement Program Tab 8
Backlog
Advanceable
Pilot
Program
2022 – 2025 Statewide Transportation Improvement 8 – 1
Backlog-Advanceable Pilot Program
For calendar year 2022, WisDOT and FHWA have agreed to a Backlog-Advanceable Pilot Program. Backlog-Advanceable projects are in the Wisconsin State Highway Rehabilitation (SHR) program [identified in non-MPA areas (rural)] and are outside of the STIP four-year period. If additional federal funding becomes available during a Federal Fiscal Year (FFY), Backlog-Advanceable projects will be advanced into the 4-year STIP period to authorize the additional federal funds within that FFY. Backlog-Advanceable projects are listed separately in this tab in the 2022 STIP. The annual STIP public comment period will serve to meet the federally required 30-day comment process for these projects. The Backlog-Advanceable project list is updated on an annual basis. Backlog-Advanceable Pilot projects are screened and identified to have low levels of environmental impacts and use WisDOT Categorical Exclusion Checklist (CEC) environmental documentation. The project candidate list screening process will not allow any project requiring conformity determination. The Backlog-Advanceable pilot program funding amounts are capped at no more than 15% of the annual Wisconsin State Highway Rehabilitation (SHR) program funding. As part of the pilot program process, the Backlog-Advanceable project list will remain static and no projects will be added until developing the listing for the next annual STIP update.
Backlog-Advanceable projects can move into any part of the four-year period without an amendment to the STIP, provided they comply with the fiscal constraint of the STIP. Backlog-Advanceable projects moved into the four-year STIP period will be included in the fiscal constraint determination of the next monthly STIP amendment.
The goal of the Backlog-Advanceable Pilot Program is to provide a list of projects that are included in the STIP so these projects are eligible for further planning development and design engineering. This eligible project planning development and design engineering will enable projects to be ready for advancement if funding becomes available without disrupting the current programmed projects. Funding for the Backlog-Advanceable projects is anticipated to be available based on historical project letting cost savings and FHWA August redistribution of unused federal obligation authority.
The enclosed Backlog-Advanceable projects have been identified with Early Let (ELET) dates to which the project could be advanced for letting once available funding is identified. The let date is the date the project is scheduled to be awarded to the successful bidding contractor to perform the work associated with the project. These Backlog-Advanceable projects have ELET dates within the 2022 – 2025 STIP calendar years.
The calendar year (CY) for the ELET (move to CY) and the CY for the current scheduled Let date (move from CY) are included in the following 2022 – 2025 Backlog-Advanceable Pilot Program STIP project listing.
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 1Southwest Region
COLUMBIA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 1Southwest Region
COLUMBIA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 1161-00-78 303 LET PSRS20 0.000 IH 039 PORTAGE - PACKWAUKEE $2,000,000 - $2,999,999
STH 78 TO USH 51
CONST/REPAIR SB RDWY/PSRS20
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 2Southwest Region
CRAWFORD
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 2Southwest Region
CRAWFORD
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 5180-00-62 303 LET RSRF30 2.010 STH 060 BRIDGEPORT - BOSCOBEL $1,000,000 - $1,999,999
USH 18 TO E JCT OLD HWY 60
CONST/MILL & O'LAY/B-12-26/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 2027 5780-03-63 303 LET RSRF10 0.525 STH 131 WAUZEKA - SOLDIERS GROVE $250,000 - $499,999
KICKAPOO RIVER B-12-172 TO USH 61
CONST/MILL & OVERLAY/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 2027 5790-02-72 303 LET RSRF20 11.690 STH 171 FERRYVILLE - ROLLING GROUND $5,000,000 - $5,999,999
STH 27 TO USH 61
CONST/MILL & O'LAY/B-12-137/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 3Southwest Region
DODGE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 3Southwest Region
DODGE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 1370-00-75 303 LET RSRF20 2.900 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999
CTH L/ BUS 26 TO E MAIN STREET
CONST/ MILL AND OVERLAY
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 2028 3042-01-62 303 LET PVRPLA 5.000 STH 060 LOWELL - HARTFORD $4,000,000 - $4,999,999
STH 67 TO WASHINGTON CO LINE
CONST/ PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 2027 3030-02-66 303 LET RSRF30 7.180 STH 067 OCONOMOWOC - MAYVILLE $3,000,000 - $3,999,999
STH 60 TO W JCT CTH S
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2023 2027 3364-00-75 303 LET RSRF25 3.510 STH 067 MAYVILLE - CAMPBELLSPORT $2,000,000 - $2,999,999
STH 28 TO STH 175
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 4Southwest Region
GRANT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 4Southwest Region
GRANT
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 5215-03-61 303 LET RSRF10 2.560 STH 081 CASSVILLE - LANCASTER $500,000 - $749,999
SCHOOL STREET TO CTH Y
CONST/MILL & O'LAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 5Southwest Region
GREEN
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 5Southwest Region
GREEN
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 5590-05-71 303 LET RSRF20 6.320 STH 078 ARGYLE - MT HOREB $2,000,000 - $2,999,999
LIEN COURT TO NORTH JUNCTION CTH H
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 6Southwest Region
IOWA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 6Southwest Region
IOWA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2028 5939-00-63 303 LET RSRF10 8.821 STH 080 COBB - AVOCA $2,000,000 - $2,999,999
CTH I TO STH 133
CONST/ RSRF10/ B-25-176
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 7Southwest Region
JEFFERSON
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 7Southwest Region
JEFFERSON
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2021 2027 1067-01-88 303 LET BRRHB 0.001 IH 094 LAKE MILLS - OCONOMOWOC $250,000 - $499,999
CTH F STRUCTURE B-28-0050
CONST/CONCRETE BRIDGE DECK O'LAY
BACKBONE NATIONAL HIGHWAY PERF FAST
2024 2027 3050-01-77 303 LET RSRF30 5.285 STH 019 SUN PRAIRIE - WATERTOWN $3,000,000 - $3,999,999
CRAWFISH RIVER BRIDGE TO GYPSY ROAD
CONST/ MILL AND OVERLAY
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 8Southwest Region
MONROE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 8Southwest Region
MONROE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 5120-05-65 303 LET PVRPLA 8.480 STH 033 LACROSSE - CASHTON $2,000,000 - $2,999,999
LA CROSSE CO LINE TO STH 27
CONST/MILL & OVERLAY/PVRPLA
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 9Southwest Region
RICHLAND
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 9Southwest Region
RICHLAND
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 1640-03-78 303 LET RSRF20 0.650 USH 014 C RICHLAND CENTER, USH 14 $1,000,000 - $1,999,999
STH 80 TO BOHMAN DRIVE
CONST/MILL & OVERLAY/RSRF
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 10Southwest Region
VERNON
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 10Southwest Region
VERNON
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 5820-01-68 303 LET RSRF20 4.050 STH 162 COON VALLEY - BANGOR $2,000,000 - $2,999,999
USH 14 TO STH 33/B-62-XXX,-XXX
CONST/MILL & O'LAY/RPL BRDGS/RSRF
STATE 3R SURFACE TRANSP BLOCK GRTS-
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 11Northeast Region
DOOR
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 11Northeast Region
DOOR
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 4150-14-71 303 LET RSRF25 1.460 STH 057 SUMMIT RD - BAILEYS HARBOR $1,000,000 - $1,999,999
SUMMIT RD - CTH Q
CONST OPS/RSRF
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 12Northeast Region
MARINETTE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 12Northeast Region
MARINETTE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated
Funding
2025 2027 9160-21-71 303 LET PSRS40 1.290 STH 064 MOUNTAIN - POUND $500,000 - $749,999
N 17TH RD - USH 141
CONST/PSRS MILL & OVERLAY
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 13North Central Region
FLORENCE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 13North Central Region
FLORENCE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 9100-05-71 303 LET RSRF20 8.155 STH 070 TIPLER - FLORENCE $3,000,000 - $3,999,999
STH 139 SOUTH TO FOREST ROAD 2154
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2023 2028 9100-05-72 303 LET RSRF20 12.536 STH 070 TIPLER - FLORENCE $4,000,000 - $4,999,999
FOREST ROAD 2154 TO USH 2
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 14North Central Region
FOREST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 14North Central Region
FOREST
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 9165-13-70 303 LET RSRF10 15.830 STH 055 ARGONNE - NELMA $4,000,000 - $4,999,999
SCOTT LAKE ROAD TO STH 70
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 15North Central Region
GREEN LAKE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 15North Central Region
GREEN LAKE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 6100-00-70 303 LET RSRF10 7.430 STH 044 MANCHESTER - RIPON $3,000,000 - $3,999,999
GRAND RIVER BR TO FOND DU LAC CL
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 16North Central Region
IRON
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 16North Central Region
IRON
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 9303-03-71 303 LET PVRPLA 9.680 STH 122 UPSON - MONTREAL RIVER $3,000,000 - $3,999,999
STH 77 TO SOUTH JUNCTION CTH B
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP FAST
2023 2028 9303-03-72 303 LET PVRPLA 4.712 STH 122 UPSON - MONTREAL RIVER $2,000,000 - $2,999,999
WEST MILL STREET TO MI STATE LINE
CONST/PAVEMENT REPLACEMENT
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 17North Central Region
LANGLADE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 17North Central Region
LANGLADE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2028 9140-12-75 303 LET PSRS40 5.750 STH 064 ANTIGO - LANGLADE $2,000,000 - $2,999,999
CLOVER ROAD TO FIFTH AVENUE ROAD
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 18North Central Region
MARATHON
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 18North Central Region
MARATHON
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 1053-00-71 303 LET BRRHB 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999
BRIDGE OVERLAYS B-37-0116, 0287
CONST/CONCRETE OVERLAY
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 19North Central Region
MARQUETTE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 19North Central Region
MARQUETTE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 1430-01-66 303 LET RSRF25 10.438 STH 023 ENDEAVOR - PRINCETON $5,000,000 - $5,999,999
CTH C TO CANAL STREET
CONSTR/PREV MAINT APPRVL 3/25/15
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 20North Central Region
ONEIDA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 20North Central Region
ONEIDA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2021 2029 1170-16-63 303 LET BRRHB 0.000 USH 051 TOMAHAWK - MINOCQUA $250,000 - $499,999
LAKE KATHERINE CROSSING B-43-0021
CONST/PREV MAINT APPRVL 11/3/2016
SHR BRIDGES NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 21North Central Region
PORTAGE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 21North Central Region
PORTAGE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2028 6270-00-66 303 LET BRRHB 0.004 STH 049 NORTHLAND - STH 29 $100,000 - $249,999
HOLT CREEK BRIDGE B-49-527
CONSTR/PM APPR 11.3.16
SHR BRIDGES STBG <5K POP FAST
2024 2028 1520-01-60 303 LET PSRS20 12.992 STH 054 WISCONSIN RAPIDS - PLOVER $6,000,000 - $6,999,999
26TH STREET NORTH TO CTH B
CONST/PSRS20
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 2028 6280-02-76 303 LET BRRHB 0.000 STH 066 STEVENS POINT - ROSHOLT $250,000 - $499,999
BRIDGE OVERLAYS B-49-0073, 0074
CONST/CONCRETE OVERLAY
SHR BRIDGES STBG <5K POP FAST
2024 2028 6280-02-77 303 LET RSRF25 6.010 STH 066 STEVENS POINT - ROSHOLT $4,000,000 - $4,999,999
STEVENS PT AIRPORT TO E JCT CTH J
CONST/RESURFACE
STATE 3R STBG 5-200K POP FASTG
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 22North Central Region
PRICE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 22North Central Region
PRICE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 1610-44-72 303 LET RSRF20 12.310 STH 013 PRENTICE - PARK FALLS $6,000,000 - $6,999,999
CTH F TO WALNUT STREET
CONST/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 23North Central Region
WAUPACA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 23North Central Region
WAUPACA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2028 6210-01-74 303 LET RSRF25 1.340 STH 049 AURORAVILLE - FREMONT $750,000 - $999,999
ARNDT ROAD TO USH 10
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2022 2028 6590-02-77 303 LET RSRF10 3.090 STH 110 FREMONT - MARION $2,000,000 - $2,999,999
USH 10 TO STH 96
CONST/RESURFACE
STATE 3R STBG <5K POP FAST
2023 2028 1510-02-74 303 LET RSRF25 0.430 USH 010 WAUPACA - APPLETON $500,000 - $749,999
STH 49/STH 110 INTERCHANGE
CONST/RESURFACE
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 24North Central Region
WAUSHARA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 24North Central Region
WAUSHARA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated
Funding
2025 2028 6150-00-62 303 LET BRRHB 0.021 STH 022 MONTELLO - WAUTOMA $100,000 - $249,999
W BR WHITE RIVER B-69-41
CONSTR/PM APPR 11.3.16
SHR BRIDGES STBG <5K POP FAST
2025 2028 6210-00-66 303 LET BRRHB 0.000 STH 049 AURORAVILLE - FREMONT $100,000 - $249,999
PINE RIVER CROSSING B-69-26,27
CONSTR/PM APPR 11.3.16 ON B-69-26
SHR BRIDGES STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 25North Central Region
WOOD
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 25North Central Region
WOOD
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated
Funding
2025 2027 6340-00-62 303 LET BRRHB 0.000 VAR HWY WISCONSIN RAPIDS - MARSHFIELD $500,000 - $749,999
WIS 13 & 80 BRIDGES B-71-62,79
CONSTR/PM APPR 11.3.16
SHR BRIDGES STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 26Northwest Region
ASHLAND
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 26Northwest Region
ASHLAND
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 8520-00-71 303 LET RSRF20 5.710 STH 077 MELLEN - HURLEY $3,000,000 - $3,999,999
STH 13 TO EAST COUNTY LINE
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 27Northwest Region
BARRON
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 27Northwest Region
BARRON
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 1550-04-78 303 LET RSRF20 10.889 USH 063 CLEAR LAKE - CUMBERLAND $7,000,000 - $7,999,999
USH 8 E TO STH 48 W
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 28Northwest Region
BAYFIELD
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 28Northwest Region
BAYFIELD
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2022 2027 8510-00-75 303 LET RSRF20 7.290 STH 013 CORNUCOPIA - PORT WING $3,000,000 - $3,999,999
OLD 13 RD TO BARK POINT RD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2023 2027 8731-00-70 303 LET RSRF20 4.770 STH 137 USH 2 - ASHLAND $2,000,000 - $2,999,999
USH 2 TO STH 112
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 29Northwest Region
BUFFALO
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 29Northwest Region
BUFFALO
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 7170-00-75 303 LET RSRF20 2.034 STH 025 WABASHA - DURAND $1,000,000 - $1,999,999
MN/WI ST LN TO 100' S OF STH 35 S
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022 2027 7720-00-72 303 LET RSRF20 8.650 STH 095 FOUNTAIN CITY - ARCADIA $3,000,000 - $3,999,999
0.2 MI N OF JEFFERSON ST TO CTH G
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 2027 1530-06-79 303 LET RSRF20 5.217 USH 010 DURAND - MONDOVI $2,000,000 - $2,999,999
PEPIN COUNTY LINE TO CTH A
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 30Northwest Region
CHIPPEWA
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 30Northwest Region
CHIPPEWA
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 8580-00-72 303 LET COLD20 15.046 STH 040 BLOOMER - BRUCE $7,000,000 - $7,999,999
STH 64 E TO CHIPPEWA/RUSK CO LN
CONSTRUCTION/CIR/RESURFACING
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 31Northwest Region
DOUGLAS
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 31Northwest Region
DOUGLAS
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 1196-00-60 303 LET RSRF30 0.000 USH 053 MINONG - SOLON SPRINGS $2,000,000 - $2,999,999
CTH Y TO CTH M (SB)
CONSTR/RSRF30
BACKBONE NATIONAL HIGHWAY PERF FAST
2021 2027 1196-00-61 303 LET RSRF10 8.090 USH 053 MINONG - SOLON SPRINGS $5,000,000 - $5,999,999
CTH M TO WIS CENTRAL LTD RR
CONST/RESURFACE AND JOINT REPAIRS
BACKBONE NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 32Northwest Region
DUNN
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 32Northwest Region
DUNN
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 7105-00-74 303 LET RSRF20 10.084 STH 072 ELLSWORTH - DOWNSVILLE $5,000,000 - $5,999,999
PIERCE/DUNN COUNTY LINE TO STH 25
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 33Northwest Region
EAU CLAIRE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 33Northwest Region
EAU CLAIRE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 7070-00-70 303 LET MISC 0.065 STH 027 AUGUSTA - CADOTT $250,000 - $499,999
DARROW CREEK CULVERT C-18-0053
CONSTRUCTION - CULVERT REPLACEMENT
SHR BRIDGES STBG <5K POP - FAST EXT
2023 2027 7070-00-71 303 LET COLD20 7.982 STH 027 AUGUSTA - CADOTT $5,000,000 - $5,999,999
BLACK BEAR RD TO NORTH COUNTY LINE
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 34Northwest Region
PEPIN
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 34Northwest Region
PEPIN
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 1530-05-73 303 LET RSRF20 8.191 USH 010 ELLSWORTH - DURAND $4,000,000 - $4,999,999
PIERCE/PEPIN COUNTY LINE TO CTH P
CONSTRUCTION/RESURFACE/RSRF20
STATE 3R STBG <5K POP FAST
2023 2027 1530-05-83 303 LET RSRF20 0.180 USH 010 DURAND - MONDOVI $0 - $99,999
DURAND ST TO 950' EAST OF DURAND ST
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 35Northwest Region
PIERCE
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 35Northwest Region
PIERCE
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 7105-00-73 303 LET COLD20 10.860 STH 072 ELLSWORTH - DOWNSVILLE $6,000,000 - $6,999,999
CTH BB TO CTH G
CONSTRUCTION/CIR/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2024 2027 7210-00-80 303 LET RSRF20 11.643 USH 063 RED WING - ELLSWORTH $6,000,000 - $6,999,999
MN/WI STATE LINE TO USH 10
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 36Northwest Region
POLK
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 36Northwest Region
POLK
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2025 2027 8840-00-71 303 LET COLD20 13.530 STH 087 ST. CROIX FALLS - GRANTSBURG $8,000,000 - $8,999,999
240' N OF MINNESOTA ST TO 270TH AVE
CONSTRUCTION/CIR/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2024 2027 8840-02-70 303 LET MISC 14.670 STH 087 ST CROIX FALLS - GRANTSBURG $2,000,000 - $2,999,999
USH 8 TO 270TH AVE
CONSTRUCTION/CULVERT REPLACEMENT
STATE 3R SURFACE TRANSP BLOCK GRTS-
2024 2027 1570-00-79 303 LET RSRF20 2.191 USH 008 ST CROIX FALLS - TURTLE LAKE $2,000,000 - $2,999,999
MN/WI STATE LINE TO GLACIER ROAD
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2024 2027 1570-00-80 303 LET MISC 2.191 USH 008 ST CROIX FALLS - TURTLE LAKE $250,000 - $499,999
MN/WI STATE LINE TO GLACIER ROAD
CONSTR/SFTY/INTERSECTION IMPRVMNT
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 37Northwest Region
RUSK
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 37Northwest Region
RUSK
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 8210-00-73 303 LET RSRF20 9.430 STH 073 THORP - INGRAM $4,000,000 - $4,999,999
TAYLOR/RUSK CO LN TO USH 8
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 38Northwest Region
SAWYER
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 38Northwest Region
SAWYER
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 8140-00-77 303 LET RSRF20 18.040 STH 027 OJIBWA - HAYWARD $9,000,000 - $9,999,999
125' W OF STH 40 S TO BOYLAND RD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2023 2027 8140-00-78 303 LET RSRF20 8.850 STH 027 STONE LAKE - HAYWARD $4,000,000 - $4,999,999
BOYLAN RD TO 700FT N OF CAROL DR
CONSTRUCTION - RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 39Northwest Region
ST. CROIX
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 39Northwest Region
ST. CROIX
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2023 2027 8110-01-77 303 LET RSRF20 6.315 STH 064 NEW RICHMOND - CONNORSVILLE $3,000,000 - $3,999,999
142ND ST TO USH 63 S
CONSTRUCTION/RESURFACE
STATE 3R NATIONAL HIGHWAY PERF FAST
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 40Northwest RegionTREMPEALEAU
2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 40Northwest RegionTREMPEALEAU
ToCY
FromCY Project Pgm
ContractType CONCEPT
NetMiles Route
Project DescriptionWISDOT Program
EstimateAnticipated Funding
2024 2027 1530-06-80 303 LET RSRF20 13.208 USH 010 MONDOVI - OSSEO $7,000,000 - $7,999,999
HUNT LANE TO NELSON ROAD
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2023 2027 1630-00-72 303 LET RSRF20 13.950 USH 053 GALESVILLE - WHITEHALL $8,000,000 - $8,999,999
BEAVER CR TO STH 95 W
CONSTRUCTION/RESURFACE
STATE 3R STBG <5K POP - FAST EXT
2022 – 2025 Statewide Transportation Improvement Program Tab 9
Federal
Lands
Transportation
Improvement
Programs
2022 – 2025 Statewide Transportation Improvement Program 9 – 1
Federal Lands Transportation Improvement Program FHWA has “established a coordinated Federal lands highways program that … appl[ies] to public lands highways, park roads and parkways, refuge roads, and Indian reservation roads and bridges” (23 USC 204 (a)(1)). The Federal lands highway projects are to be included in the state’s STIP for the projects located within the state. Current projects from the Eastern Federal Lands Highway Division and Indian Reservation Roads Programs are included within the following pages. The project listings are updated as made available from FHWA. A listing of tribal contacts is also included for informational purposes.
2022 – 2025 Statewide Transportation Improvement Program 9 – 2
Tribal Contacts: Honorable Mike Wiggins, Jr. Chair, Bad River Band of Lake Superior Chippewa PO Box 39 Odanah, WI 54861
Honorable Shannon Holsey President, Stockbridge-Munsee Band of Mohican Indians PO Box 70 Bowler, WI 54416
Honorable Ned Daniels, Jr. Chair, Forest County Potawatomi Community PO Box 340 Crandon, WI 54520
Honorable Tehassi Hill Chair, Oneida Nation of Wisconsin PO Box 365 Oneida, WI 54155-0365
Honorable Marlon WhiteEagle President, Ho-Chunk Nation PO Box 667 Black River Falls, WI 54615
Honorable Chris Boyd Chair, Red Cliff Band of Lake Superior Chippewa 88385 Pike Rd, Hwy 13 Bayfield, WI 54814
Honorable Louis Taylor, Sr. Chair, Lac Courte Oreilles Band of Lake Superior Chippewa Tribal Governing Board 13394 West Trepenia Road Hayward, WI 54843
Honorable William Reynolds Chair, St. Croix Chippewa Community 24663 Angeline Avenue Webster, WI 54893
Honorable John Johnson President, Lac du Flambeau Band of Lake Superior Chippewa PO Box 67 Lac du Flambeau, WI 54538
Honorable Robert VanZile, Jr. Tribal Chair, Sokaogon Chippewa Community (Mole Lake Band of Lake Superior Chippewa Indians) 3051 Sand Lake Road Crandon, WI 54520
Honorable Gunnar Peters Chair, Menominee Nation Tribal Legislature PO Box 910 Keshena, WI 54135-0910
Tribal Transportation Program Transportation Improvement Program
2021
Tribal Transporation Program
Transportation Improvement Program
State of
This report includes all construction projects on current approved Tribal TIPs in this State.
Wisconsin
INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS
CSTIP Report
The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all three reservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how to read subtotals.
The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.
Any type of CSTIP may be the subject of the report.
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 3 of 34
F5543001
F5543010
F5543011
F5543012
F5543013
F5543014
3,000
80,000
5,000
0
0
0
3,000
370,000
1,000
12,000
0
0
3,000
11,000
0
380,000
12,000
7,000
0
0
0
0
0
0
12,000
473,000
9,000
398,000
12,000
7,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
1,000 1,000 1,000
0
20,000 60,000
0 0
0 1,000 4,000
0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
10,000 340,000 20,000
0
0 0
1,000 0
10,000 1,000 1,000
0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 1,000
10,000 0
0 0 0 0
15,000 350,000 15,000
0
10,000 1,000 1,000
0
5,000 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
4,000 4,000 4,000
0
40,000 402,000 31,000
0
0 1,000 8,000
0
30,000 352,000 16,000
0
10,000 1,000 1,000
0
5,000 1,000 1,000
0
BAD RIVER SAFETY PROJECT
OLD ODANAH ROAD
CEMETERY ROAD
BAD RIVER WALKING TRAIL
WEST FIRE LANE
CNW TRAIL
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
SAFETY
REHAB
REHAB
WALKWY
RECONS
WALKWY
O
R
R
R
R
R
P2
7
3
7
3
3
55 - WisconsinState F55430 - Bad River
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 617,877
FIRST PAGE FOR CSTIPF55430 - BAD RIVER BANDEntity Name
1,000 1,000 1,000
0
10,000 1,000 1,000
0
0 0
3,000 0
5,000 1,000
0 0
0 0 0 0
0 0 0 0
3,000
12,000
3,000
6,000
0
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
24-MAY-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 4 of 34
F5543015
F5543016
F5543017
F5543018
F5543019
F5543020
26,000
0
0
25,000
7,000
17,000
1,000
2,000
3,000
0
25,000
7,000
0
3,000
7,000
0
5,000
0
0
0
0
0
0
0
43,000
5,000
13,000
31,000
362,000
36,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
5,000 1,000
20,000 0
0 0 0 0
0 0 0 0
0 10,000 15,000
0
7,000 0 0 0
1,000 1,000
15,000 0
0 0
1,000 0
1,000 1,000
0 0
1,000 1,000 1,000
0
0 0 0 0
0 10,000 15,000
0
1,000 1,000 5,000
0
0 0 0 0
1,000 1,000 1,000
0
5,000 1,000 1,000
0
0 0 0 0
0 0
5,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
10,000 2,000
31,000 0
2,000 2,000 1,000
0
9,000 2,000 2,000
0
0 11,000 20,000
0
27,000 310,000 25,000
0
3,000 3,000
30,000 0
BAD RIVER ERFO
HISTORICAL PRESERVATION PROJECT
NEW HOUSING DEVELOPMENT
Headstart Access Road
Maple Street Rehabilitation
2018 ERFO
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
ERFO
NEWCON
NEWCON
NEWCON
RECONS
ERFO
R
R
R
R
R
R
C3
7
7
7
D1
D1
55 - WisconsinState F55430 - Bad River
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 617,877
F55430 - BAD RIVER BANDEntity Name
5,000 1,000
10,000 0
0 0 0 0
3,000 0 0 0
0 1,000 5,000
0
20,000 300,000
5,000 0
1,000 1,000
10,000 0
16,000
0
3,000
6,000
325,000
12,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
24-MAY-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 5 of 34
F5543021
F5543022
F5543023
F55430RI
F55430RM
F55430TP
37,000
11,000
159,877
1,000
200,000
45,000
5,000
0
2,000
1,000
150,000
40,000
0
0
0
1,000
150,000
40,000
0
0
0
0
0
0
67,000
20,000
171,877
4,000
650,000
170,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
7,000 25,000
5,000 0
10,000 1,000
0 0
8,000 149,877
2,000 0
1,000 0 0 0
0 0 0
200,000
45,000 0 0 0
0 0
5,000 0
0 0 0 0
0 0
2,000 0
1,000 0 0 0
0 0 0
150,000
40,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 0 0 0
0 0 0
150,000
40,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
7,000 35,000 25,000
0
13,000 2,000 5,000
0
9,000 150,877 12,000
0
4,000 0 0 0
0 0 0
650,000
170,000 0 0 0
Boat Landing Acces Road
Bad River Roads Rehab (BUILD)
Tobie Can/Wake House Road
Bad River Road Inventory Project
Bad River Road Maintenance Project
Bad RiverTransportation Planning
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
RECONS
PLANING
PLANING
PLANING
R
R
R
O
O
O
7
7
7
P8
P10
P9
55 - WisconsinState F55430 - Bad River
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
003 - Ashland
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 617,877
F55430 - BAD RIVER BANDEntity Name
0 10,000 15,000
0
3,000 1,000 5,000
0
1,000 1,000 8,000
0
1,000 0 0 0
0 0 0
150,000
45,000 0 0 0
25,000
9,000
10,000
1,000
150,000
45,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
24-MAY-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 6 of 34
617,877 627,000 623,000 620,000 0 2,487,877 2,487,877
617,877 627,000 623,000 620,000 0 2,487,877
F55430TR
1,000 1,000 1,000 0 4,000
PECONS
CEZ
0 0
1,000 0
0 0
1,000 0
0 0
1,000 0
0 0 0 0
0 0
4,000 0
Bad River Transit
TotalPhase
617,877 627,000 623,000 620,000
TRANSIT
O
T2
55 - WisconsinState F55430 - Bad River
003 - AshlandNameCountyProject TypeWork Type
PCASClass
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 617,877
F55430 - BAD RIVER BANDEntity Name
0
0 0
1,000 0
1,000Total
FY 2021 ($) FY 2022 ($) FY 2023 ($) FY 2024 ($) FY 2025 ($)
24-MAY-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 7 of 34
F5543417
F5543423
F5543424
F5543425
F5543426
F5543427
2,000
1,000
1,000
1,000
1,000
50,000
251,000
0
1,000
1,000
0
0
251,000
0
1,000
0
0
0
0
0
0
0
0
0
755,000
2,000
4,000
3,000
2,000
55,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
1,000 1,000
0 0
1,000 0 0 0
1,000 0 0 0
1,000 0 0 0
1,000 0 0 0
50,000 0 0 0
1,000 240,000 10,000
0
0 0 0 0
1,000 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
1,000 240,000 10,000
0
0 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
4,000 721,000 30,000
0
2,000 0 0 0
4,000 0 0 0
3,000 0 0 0
2,000 0 0 0
55,000 0 0 0
FCPC HOUSING ROADS
EVERYBODY'S ROAD (MISH KO SWEN
Roadway Drainage Improvements
County Road Improvements
Town Road Resurfacings
US 8 Corridor Safety and Connectivity Im
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
WALKWY
RECONS
REHAB
REHAB
SAFETY
R
R
R
R
R
R
7
F1
7
7
7
SP
55 - WisconsinState F55434 - Forest County Potawatomi
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 258,825
FIRST PAGE FOR CSTIPF55434 - FOREST COUNTY POTAWATOMI COMMUNITYEntity Name
1,000 240,000 10,000
0
1,000 0 0 0
1,000 0 0 0
1,000 0 0 0
1,000 0 0 0
5,000 0 0 0
251,000
1,000
1,000
1,000
1,000
5,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
17-JUN-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 8 of 34
258,825 270,000 257,000 256,000 0 1,041,825 1,041,825
258,825 270,000 257,000 256,000 0 1,041,825
F5543428
F5543429
F55434RI
F55434RM
F55434SA
F55434TP
1,000
1,000
4,265
152,560
5,000
39,000
0
1,000
1,000
1,000
0
1,000
0
1,000
1,000
1,000
0
1,000
0
0
0
0
0
0
2,000
4,000
7,265
155,560
10,000
42,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
1,000 0 0 0
1,000 0 0 0
4,265 0 0 0
0 0 0
152,560
5,000 0 0 0
39,000 0 0 0
0 0 0 0
1,000 0 0 0
1,000 0 0 0
0 0 0
1,000
0 0 0 0
1,000 0 0 0
0 0 0 0
1,000 0 0 0
1,000 0 0 0
0 0 0
1,000
0 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
2,000 0 0 0
4,000 0 0 0
7,265 0 0 0
0 0 0
155,560
10,000 0 0 0
42,000 0 0 0
Carter Roads
Sugarbush Lane
TTP ROAD INVENTORY PROJECT
TTP ROAD MAINTENANCE PROJECT
FCP Safety
TTP TRANSPORTATION PLANNING PRO
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
258,825 270,000 257,000 256,000
REHAB
NEWCON
PLANING
PLANING
SAFETY
PLANING
R
R
O
O
O
O
7
7
P8
P10
ST
P9
55 - WisconsinState F55434 - Forest County Potawatomi
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 258,825
F55434 - FOREST COUNTY POTAWATOMI COMMUNITYEntity Name
0
1,000 0 0 0
1,000 0 0 0
1,000 0 0 0
0 0 0
1,000
5,000 0 0 0
1,000 0 0 0
1,000
1,000
1,000
1,000
5,000
1,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
17-JUN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 9 of 34
F5543903
F5543950
F5543952
F5543983
F5543985
F5543986
5,000
0
0
0
0
3,000
427,000
0
0
0
0
0
0
3,000
3,000
3,000
415,000
0
0
0
0
0
0
0
887,000
3,000
3,000
3,000
415,000
5,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
5,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
12,000 400,000 15,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
1,000 1,000 1,000
0
1,000 1,000 1,000
0
5,000 400,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
37,000 825,000 25,000
0
1,000 1,000 1,000
0
1,000 1,000 1,000
0
1,000 1,000 1,000
0
5,000 400,000 10,000
0
1,000 2,000 2,000
0
Winneshiek Property (Winnebago Height
Wazee North and South
Little Blackhawk
Ho Chunk Village - Parcels 11 & 12
East Colley Road
Well #5 Mortensen
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
NEWCON
NEWCON
NEWCON
REHAB
RECONS
RECONS
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
053 - Jackson
053 - Jackson
053 - Jackson
111 - Sauk
105 - Rock
111 - Sauk
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
FIRST PAGE FOR CSTIPF55439 - Ho-Chunk NationEntity Name
20,000 425,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1,000 1,000
0
455,000
0
0
0
0
2,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 10 of 34
F5543995
F5543996
F5543997
F55439D4
F55439D7
F55439E8
0
6,000
0
0
0
0
0
0
425,000
0
3,000
7,000
3,000
0
21,000
3,000
3,000
7,000
0
0
0
0
0
0
3,000
10,000
449,000
3,000
6,000
14,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0 0
0 1,000 5,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
20,000 385,000 20,000
0
0 0 0 0
1,000 1,000 1,000
0
5,000 1,000 1,000
0
1,000 1,000 1,000
0
0 0 0 0
0 1,000
20,000 0
1,000 1,000 1,000
0
1,000 1,000 1,000
0
5,000 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 2,000 8,000
0
23,000 386,000 40,000
0
1,000 1,000 1,000
0
2,000 2,000 2,000
0
10,000 2,000 2,000
0
Christensen Property
Lowe Avenue
Mortensen Property
Mo Ra Je Ga Road
District 1 Walking Trail
Willowbrook Road
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
NEWCON
RECONS
NEWCON
RECONS
WALKWY
REHAB
R
R
R
R
R
R
7
7
7
7
F1
7
55 - WisconsinState F55439 - Ho-Chunk Nation
053 - Jackson
053 - Jackson
141 - Wood
115 - Shawano
053 - Jackson
105 - Rock
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 0 0 0
0 1,000 3,000
0
3,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0
4,000
3,000
0
0
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 11 of 34
F55439F7
F55439F8
F55439G2
F55439G3
F55439G4
F55439G6
6,000
0
0
10,000
0
12,000
0
0
3,000
0
3,000
0
0
3,000
2,000
0
2,000
0
0
0
0
0
0
0
7,000
3,000
7,000
12,000
5,000
15,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 1,000 5,000
0
0 0 0 0
0 0 0 0
0 5,000 5,000
0
0 0 0 0
1,000 1,000
10,000 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 0 0 0
1,000 1,000 1,000
0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 1,000 1,000
0
0 0 0 0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1,000 6,000
0
1,000 1,000 1,000
0
2,000 3,000 2,000
0
0 6,000 6,000
0
1,000 2,000 2,000
0
1,000 2,000
12,000 0
STH 21 Turn Lanes
Potch Cha Chee
Ho Chunk Village Walking Trail - Sauk Co
Mission Road
Sand Pillow Trail
Mission Road Community Overlays
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
RECONS
WALKWY
REHAB
WALKWY
REHAB
R
R
O
R
O
R
7
7
F1
7
F1
7
55 - WisconsinState F55439 - Ho-Chunk Nation
081 - Monroe
115 - Shawano
111 - Sauk
053 - Jackson
053 - Jackson
053 - Jackson
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 0
1,000 0
0 0 0 0
1,000 1,000
0 0
0 1,000 1,000
0
0 0 0 0
0 1,000 2,000
0
1,000
0
2,000
2,000
0
3,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 12 of 34
F55439G7
F55439H1
F55439H2
F55439H4
F55439H6
F55439H8
2,000
21,000
0
2,000
2,000
2,000
0
0
10,000
0
0
0
0
0
445,000
0
0
0
0
0
0
0
0
0
4,000
27,000
455,000
3,000
3,000
2,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 1,000 1,000
0
1,000 10,000 10,000
0
0 0 0 0
0 1,000 1,000
0
0 1,000 1,000
0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
10,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
10,000 425,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 2,000 2,000
0
1,000 11,000 15,000
0
20,000 425,000 10,000
0
0 1,000 2,000
0
0 1,000 2,000
0
0 1,000 1,000
0
CTH HH - Juneau County
Blue Wing Village
Sandpillow West
CTH Y Richland County
CTH A Jackson County
Lynn Hill Road
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
WALKWY
NEWCON
RECONS
REHAB
RECONS
R
O
R
R
R
R
7
F1
7
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
057 - Juneau
081 - Monroe
053 - Jackson
103 - Richland
053 - Jackson
141 - Wood
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 1,000 1,000
0
0 1,000 5,000
0
0 0 0 0
0 0
1,000 0
0 0
1,000 0
0 0 0 0
2,000
6,000
0
1,000
1,000
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 13 of 34
F55439H9
F55439I3
F55439I4
F55439I6
F55439I7
F55439I8
3,000
2,000
5,000
449,346
525,000
0
5,000
0
2,000
0
0
3,000
0
0
0
0
0
2,000
0
0
0
0
0
0
173,000
2,000
12,000
474,346
555,000
5,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
3,000 0 0 0
0 1,000 1,000
0
3,000 1,000 1,000
0
20,000 419,346 10,000
0
15,000 500,000 10,000
0
0 0 0 0
0 0
5,000 0
0 0 0 0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
13,000 150,000 10,000
0
0 1,000 1,000
0
4,000 3,000 5,000
0
20,000 429,346 25,000
0
15,000 510,000 30,000
0
1,000 2,000 2,000
0
Ho Chunk Road
CTH D Wood County
Hwy 12 Access to Badger Ammunition
Old 54
Bartos Road
River Drive
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
REHAB
REHAB
RECONS
REHAB
REHAB
REHAB
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
115 - Shawano
141 - Wood
111 - Sauk
053 - Jackson
053 - Jackson
053 - Jackson
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
10,000 150,000
5,000 0
0 0 0 0
1,000 1,000 3,000
0
0 10,000 15,000
0
0 10,000 20,000
0
0 0 0 0
165,000
0
5,000
25,000
30,000
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 14 of 34
F55439I9
F55439J1
F55439J2
F55439J3
F55439J4
F55439J5
2,000
0
291,000
21,000
6,000
220,000
0
11,000
3,000
0
10,000
0
0
0
25,000
0
0
0
0
0
0
0
0
0
2,000
405,000
325,000
27,000
606,000
240,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 1,000 1,000
0
0 0 0 0
15,000 275,000
1,000 0
10,000 1,000
10,000 0
5,000 1,000
0 0
15,000 200,000
5,000 0
0 0 0 0
0 1,000
10,000 0
1,000 1,000 1,000
0
0 0 0 0
0 10,000
0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 10,000 15,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1,000 1,000
0
5,000 385,000 15,000
0
16,000 287,000 22,000
0
10,000 2,000
15,000 0
10,000 591,000
5,000 0
15,000 210,000 15,000
0
CTH J Lacrosse County
Hemlock Road
Tribal Courts Walking Trail (Executive)
Elder Circle
Ho Chunk Madison Gaming
White Eagle Road
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
REHAB
REHAB
WALKWY
RECONS
RECONS
REHAB
R
R
O
R
R
R
7
7
F1
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
053 - Jackson
141 - Wood
053 - Jackson
053 - Jackson
025 - Dane
111 - Sauk
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 0 0 0
5,000 384,000
5,000 0
0 1,000 5,000
0
0 1,000 5,000
0
5,000 580,000
5,000 0
0 10,000 10,000
0
0
394,000
6,000
6,000
590,000
20,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 15 of 34
F55439J6
F55439J7
F55439J8
F55439J9
F55439K1
F55439K2
3,000
15,000
2,000
2,000
6,000
425,000
0
0
0
0
5,000
0
0
0
0
0
0
0
0
0
0
0
0
0
5,000
475,000
4,000
4,000
17,000
429,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
1,000 1,000 1,000
0
15,000 0 0 0
0 1,000 1,000
0
0 1,000 1,000
0
5,000 1,000
0 0
10,000 400,000 15,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
5,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 2,000 2,000
0
20,000 450,000
5,000 0
0 2,000 2,000
0
0 2,000 2,000
0
5,000 2,000
10,000 0
10,000 401,000 18,000
0
Wazee Road Phase III
White Hawk Road
CTH N Shawano County
CTH XX LaCrosse County
Reedsburg BD Road
Allen Property
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
RECONS
SAFETY
RECONS
SAFETY
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
053 - Jackson
053 - Jackson
115 - Shawano
063 - La Crosse
111 - Sauk
111 - Sauk
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 1,000 1,000
0
5,000 450,000
5,000 0
0 1,000 1,000
0
0 1,000 1,000
0
0 1,000 5,000
0
0 1,000 3,000
0
2,000
460,000
2,000
2,000
6,000
4,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 16 of 34
F55439K3
F55439K4
F55439K5
F55439K6
F55439K7
F55439K8
0
413,000
0
705,000
0
207,000
13,000
0
30,000
0
510,000
0
0
0
0
0
0
0
0
0
0
0
0
0
273,000
424,000
645,000
711,000
510,000
211,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0 0
10,000 400,000
3,000 0
0 0 0 0
0 700,000
5,000 0
0 0 0 0
2,000 200,000
5,000 0
0 10,000
3,000 0
0 0 0 0
0 10,000 20,000
0
0 0 0 0
0 500,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 260,000 13,000
0
10,000 401,000 13,000
0
0 615,000 30,000
0
0 701,000 10,000
0
0 500,000 10,000
0
2,000 201,000
8,000 0
Garfield Town Road
South Yellow Thunder Road
Oak Ridge Road
CTH X Wood County
CTH N Jackson County
Egret Road
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
RECONS
RECONS
RECONS
RECONS
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55439 - Ho-Chunk Nation
053 - Jackson
111 - Sauk
053 - Jackson
141 - Wood
053 - Jackson
081 - Monroe
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 250,000 10,000
0
0 1,000
10,000 0
0 605,000 10,000
0
0 1,000 5,000
0
0 0 0 0
0 1,000 3,000
0
260,000
11,000
615,000
6,000
0
4,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 17 of 34
F55439K9
F55439L1
F55439L2
F55439L3
F55439L4
F55439PA
0
0
0
0
0
1,295,000
335,000
900,000
0
0
0
1,800,000
4,000
4,000
212,000
870,000
300,000
2,000,000
0
0
0
0
0
0
339,000
904,000
212,000
870,000
300,000
6,595,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,295,000 0 0 0
25,000 300,000 10,000
0
20,000 870,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
1,800,000 0 0 0
0 1,000 3,000
0
0 1,000 3,000
0
10,000 200,000
2,000 0
0 850,000 20,000
0
0 300,000
0 0
2,000,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
25,000 301,000 13,000
0
20,000 871,000 13,000
0
10,000 200,000
2,000 0
0 850,000 20,000
0
0 300,000
0 0
6,595,000 0 0 0
Chahk Hah Chee Village
West Clay School Road
Indian Heights
CTH Z Wood County
CTH D Shawano County
TTP Administration - Ho-Chunk
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
SAFETY
RECONS
SAFETY
RECONS
REHAB
PLANING
R
R
R
R
R
O
P6
7
P6
7
7
P9
55 - WisconsinState F55439 - Ho-Chunk Nation
141 - Wood
053 - Jackson
057 - Juneau
141 - Wood
115 - Shawano
053 - Jackson
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,500,000 0 0 0
0
0
0
0
0
1,500,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 18 of 34
5,957,346 5,984,000 6,006,000 5,951,000 0 23,898,346 23,898,346
5,957,346 5,984,000 6,006,000 5,951,000 0 23,898,346
F55439RI
F55439RM
F55439RW
F55439TP
F55439TR
2,000
1,000,000
0
287,000
0
2,000
1,210,000
1,000
287,000
1,000
2,000
1,331,000
1,000
287,000
0
0
0
0
0
0
8,000
4,641,000
2,000
1,148,000
1,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
2,000 0 0 0
0 0 0
1,000,000
0 0 0 0
287,000 0 0 0
0 0 0 0
2,000 0 0 0
0 0 0
1,210,000
1,000 0 0 0
287,000 0 0 0
0 0
1,000 0
2,000 0 0 0
0 0 0
1,331,000
1,000 0 0 0
287,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
8,000 0 0 0
0 0 0
4,641,000
2,000 0 0 0
1,148,000 0 0 0
0 0
1,000 0
TTP Road Inventory Project - Ho Chunk
TTP Road Maintenance - Ho Chunk
TTP ROW Acquisition - Ho Chunk
TTP Transportation Planning - Ho Chunk
TTP Transit - Ho Chunk
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
5,957,346 5,984,000 6,006,000 5,951,000
PLANING
SAFETY
PLANING
PLANING
TRANSIT
O
O
O
O
O
P8
3
P9
P9
T1
55 - WisconsinState F55439 - Ho-Chunk Nation
081 - Monroe
081 - Monroe
081 - Monroe
081 - Monroe
081 - Monroe
Name
Name
Name
Name
Name
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 5,957,346
F55439 - Ho-Chunk NationEntity Name
0
2,000 0 0 0
0 0 0
1,100,000
0 0 0 0
287,000 0 0 0
0 0 0 0
2,000
1,100,000
0
287,000
0
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
28-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 19 of 34
F5543111
F5543115
F5543116
F5543117
F5543118
F5543119
1,000
4,000
1,000
4,000
1,000
1,000
0
0
0
0
0
135,000
0
0
0
0
0
20,000
0
0
0
0
0
0
1,000
5,000
1,000
5,000
1,000
166,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0
1,000 0
0 2,000 2,000
0
0 0
1,000 0
0 2,000 2,000
0
0 0
1,000 0
1,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
5,000 125,000
5,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 10,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
1,000 0
0 2,000 3,000
0
0 0
1,000 0
0 2,000 3,000
0
0 0
1,000 0
16,000 135,000 15,000
0
WATER TOWER CONNECTOR
LCO TRAIL
POPPLE TOWN ROAD
VETERAN'S MEMORIAL PARKING
TREPANIA ROAD
CASINO RV PARK ROAD
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
NEWCON
WALKWY
NEWCON
RECONS
RECONS
NEWCON
R
R
R
R
R
R
7
7
7
7
7
3
55 - WisconsinState F55431 - Lac Courte Oreilles
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 474,254
FIRST PAGE FOR CSTIPF55431 - LAC COURTE OREILLES BANDEntity Name
0 0 0 0
0 0
1,000 0
0 0 0 0
0 0
1,000 0
0 0 0 0
10,000 0 0 0
0
1,000
0
1,000
0
10,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
14-JAN-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 20 of 34
F5543120
F5543121
F5543123
F5543124
F5543125
F5543126
30,000
183,254
0
11,000
52,000
1,000
6,000
6,000
135,000
0
0
6,000
0
0
3,000
0
0
0
0
0
0
0
0
0
56,000
381,254
149,000
13,000
55,000
65,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
5,000 10,000 15,000
0
5,000 170,254
8,000 0
0 0 0 0
0 10,000
1,000 0
1,000 50,000
1,000 0
1,000 0 0 0
0 1,000 5,000
0
0 1,000 5,000
0
5,000 120,000 10,000
0
0 0 0 0
0 0 0 0
0 1,000 5,000
0
0 0 0 0
0 0 0 0
0 1,000 2,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
5,000 21,000 30,000
0
7,000 346,254 28,000
0
15,000 122,000 12,000
0
0 11,000
2,000 0
2,000 51,000
2,000 0
6,000 51,000
8,000 0
ADMINISTRATION ROAD
C-STORE PARKING LOT
GRINDSTONE SPRINGS ROAD
CTH E Bridge
CTH B Rehab Project
CTH H Landing
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
RECONS
RECONS
REPLACE
REHAB
RECONS
R
R
R
B
R
R
7
7
7
SD
7
7
55 - WisconsinState F55431 - Lac Courte Oreilles
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 474,254
F55431 - LAC COURTE OREILLES BANDEntity Name
0 10,000 10,000
0
2,000 175,000 15,000
0
10,000 1,000
0 0
0 1,000 1,000
0
1,000 1,000 1,000
0
5,000 50,000
3,000 0
20,000
192,000
11,000
2,000
3,000
58,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
14-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 21 of 34
474,254 476,000 467,000 486,000 0 1,903,254 1,903,254
474,254 476,000 467,000 486,000 0 1,903,254
F5543127
F55431RI
F55431RM
F55431TP
F55431TR
F5560604
0
10,000
100,000
35,000
40,000
0
0
1,000
100,000
35,000
40,000
3,000
215,000
1,000
170,000
35,000
40,000
2,000
0
0
0
0
0
0
215,000
13,000
470,000
140,000
160,000
7,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0 0
10,000 0 0 0
0 0 0
100,000
35,000 0 0 0
0 0
40,000 0
0 0 0 0
0 0 0 0
1,000 0 0 0
0 0 0
100,000
35,000 0 0 0
0 0
40,000 0
1,000 1,000 1,000
0
10,000 200,000
5,000 0
1,000 0 0 0
0 0 0
170,000
35,000 0 0 0
0 0
40,000 0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
10,000 200,000
5,000 0
13,000 0 0 0
0 0 0
470,000
140,000 0 0 0
0 0
160,000 0
2,000 3,000 2,000
0
Blueberry Firelane Road
TTP ROAD INVENTORY PROJECT
TTP ROAD MAINTENANCE PROJECT
TTP TRANSPORTATION PLANNING PRO
LCO TRANSIT PROJECT
LARSON ROAD NORTH
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
474,254 476,000 467,000 486,000
RECONS
PLANING
PLANING
PLANING
TRANSIT
RECONS
R
O
O
O
O
R
7
P8
P10
P9
T2
7
55 - WisconsinState F55431 - Lac Courte Oreilles
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
113 - Sawyer
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 474,254
F55431 - LAC COURTE OREILLES BANDEntity Name
0
0 0 0 0
1,000 0 0 0
0 0 0
100,000
35,000 0 0 0
0 0
40,000 0
1,000 1,000
0 0
0
1,000
100,000
35,000
40,000
2,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
14-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 22 of 34
F5844003
F5844006
F5844009
F5844010
F5844011
F5844028
70,000
0
30,000
470,000
45,000
40,000
0
215,000
20,000
285,000
60,000
100,000
0
0
100,000
395,000
60,000
125,000
0
0
0
0
0
0
120,000
255,000
170,000
1,610,000
225,000
315,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
15,000 40,000 15,000
0
0 0 0 0
0 30,000
0 0
35,000 405,000 30,000
0
10,000 35,000
0 0
5,000 30,000
5,000 0
0 0 0 0
25,000 180,000 10,000
0
0 20,000
0 0
40,000 225,000 20,000
0
10,000 50,000
0 0
15,000 75,000 10,000
0
0 0 0 0
0 0 0 0
0 100,000
0 0
40,000 335,000 20,000
0
10,000 50,000
0 0
15,000 100,000 10,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
20,000 80,000 20,000
0
35,000 205,000 15,000
0
0 170,000
0 0
155,000 1,365,000
90,000 0
40,000 185,000
0 0
40,000 245,000 30,000
0
Tower Road
Ponfil Road
Street Lighting Iniative and Repair
Parking Lot/Sidewalk Initiative
Road/Trail Initiative and Repair
STH 47/55
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
NEWCON
REHAB
SAFETY
WALKWY
WALKWY
RECONS
R
R
O
O
O
R
7
7
P6
F1
F1
7
55 - WisconsinState F58440 - Menominee
078 - Menominee
078 - Menominee
078 - Menominee
078 - Menominee
078 - Menominee
078 - Menominee
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 1,277,742
FIRST PAGE FOR CSTIPF58440 - MENOMINEE INDIAN TRIBEEntity Name
5,000 40,000
5,000 0
10,000 25,000
5,000 0
0 20,000
0 0
40,000 400,000 20,000
0
10,000 50,000
0 0
5,000 40,000
5,000 0
50,000
40,000
20,000
460,000
60,000
50,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
14-JAN-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 23 of 34
1,277,742 1,277,742 1,277,742 1,277,742 0 5,110,968 5,110,968
1,277,742 1,277,742 1,277,742 1,277,742 0 5,110,968
F58440RM
F58440TP
F58440TR
500,000
83,592
39,150
500,000
57,742
40,000
500,000
57,742
40,000
0
0
0
2,000,000
256,818
159,150
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0
500,000
83,592 0 0 0
0 0
39,150 0
0 0 0
500,000
57,742 0 0 0
0 0
40,000 0
0 0 0
500,000
57,742 0 0 0
0 0
40,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0
2,000,000
256,818 0 0 0
0 0
159,150 0
TTP Road Maintenance Project
TTP Transportation Planning
TTP Transit Project
Total
Total
Total
Phase
Phase
Phase
1,277,742 1,277,742 1,277,742 1,277,742
PLANING
PLANING
TRANSIT
O
O
O
P10
P9
T2
55 - WisconsinState F58440 - Menominee
078 - Menominee
078 - Menominee
078 - Menominee
Name
Name
Name
County
County
County
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 1,277,742
F58440 - MENOMINEE INDIAN TRIBEEntity Name
0
0 0 0
500,000
57,742 0 0 0
0 0
40,000 0
500,000
57,742
40,000
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
14-JAN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 24 of 34
F5543315
F5543318
F5543326
F5543328
F5543330
F5543331
407,500
155,000
0
0
0
429,000
0
300,300
240,000
278,700
230,000
0
0
0
0
744,000
0
0
0
0
0
0
0
0
407,500
884,300
240,000
1,022,700
230,000
1,079,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
30,000 376,000
1,500 0
10,000 140,000
5,000 0
0 0 0 0
0 0 0 0
0 0 0 0
24,000 400,000
5,000 0
0 0 0 0
5,000 290,300
5,000 0
30,000 200,000 10,000
0
5,000 268,700
5,000 0
15,000 200,000 15,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
50,000 644,000 50,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
30,000 376,000
1,500 0
115,000 734,300 35,000
0
30,000 200,000 10,000
0
55,000 912,700 55,000
0
15,000 200,000 15,000
0
74,000 950,000 55,000
0
Smit Farm (Peter Hill Lane/Bread Creek V
Manders Court (Metoxen Lane / Uskah V
Minoka Hill Drive
Seminary Road
Sand Hill Court
O-NA-STE Trail (Maple Leaf West)
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
RECONS
NEWCON
RECONS
REHAB
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55433 - Oneida Nation - Wisconsin
009 - Brown
087 - Outagamie
087 - Outagamie
087 - Outagamie
087 - Outagamie
009 - Brown
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 1,205,457
FIRST PAGE FOR CSTIPF55433 - ONEIDA TRIBE OF INDIANS (WI)Entity Name
0 0 0 0
100,000 304,000 25,000
0
0 0 0 0
0 0 0 0
0 0 0 0
50,000 550,000 50,000
0
0
429,000
0
0
0
650,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
17-JUN-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 25 of 34
1,205,457 1,205,457 1,205,457 1,205,457 0 4,821,828 4,821,828
1,205,457 1,205,457 1,205,457 1,205,457 0 4,821,828
F55433RM
F55433T1
F55433TP
50,000
100,000
63,957
106,000
0
50,457
81,000
330,000
50,457
0
0
0
313,000
430,000
215,328
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0
50,000
10,000 90,000
0 0
0 0 0
63,957
0 0 0
106,000
0 0 0 0
0 0 0
50,457
0 0 0
81,000
30,000 300,000
0 0
0 0 0
50,457
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0
313,000
40,000 390,000
0 0
0 0 0
215,328
TPP Road Maintenance Project
Oneida - Pedestrian Infrastructure Projec
TPP Transportation Planning
Total
Total
Total
Phase
Phase
Phase
1,205,457 1,205,457 1,205,457 1,205,457
PLANING
WALKWY
PLANING
O
O
O
P10
F1
P9
55 - WisconsinState F55433 - Oneida Nation - Wisconsin
087 - Outagamie
085 - Oneida
087 - Outagamie
Name
Name
Name
County
County
County
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 1,205,457
F55433 - ONEIDA TRIBE OF INDIANS (WI)Entity Name
0
0 0 0
76,000
0 0 0 0
0 0 0
50,457
76,000
0
50,457
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
17-JUN-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 26 of 34
F5543506
F5543508
F5543512
F5543523
F5543524
F5543525
2,000
3,000
1,000
2,000
0
1,000
0
0
3,000
16,000
2,000
2,000
0
0
3,000
0
2,000
2,000
0
0
0
0
0
0
2,000
4,000
10,000
24,000
4,000
5,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 1,000 1,000
0
1,000 1,000 1,000
0
1,000 0 0 0
1,000 1,000
0 0
0 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
3,000 10,000
3,000 0
0 1,000 1,000
0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 0 0 0
0 1,000 1,000
0
0 1,000 1,000
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1,000 1,000
0
1,000 1,000 2,000
0
4,000 3,000 3,000
0
9,000 12,000
3,000 0
0 2,000 2,000
0
1,000 2,000 2,000
0
COMMUNITY DRIVE
ROWLEY ROAD
BRADUM DEVELOPMENT
BISHOP LANE LOOP
SUPPORTIVE HOUSING PROJECT
LITTLE SAND BAY ROAD
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
REHAB
RECONS
NEWCON
RECONS
NEWCON
RECONS
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55435 - Red Cliff
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 460,966
FIRST PAGE FOR CSTIPF55435 - RED CLIFF BANDEntity Name
0 0 0 0
0 0
1,000 0
1,000 1,000 1,000
0
5,000 1,000
0 0
0 0 0 0
0 0 0 0
0
1,000
3,000
6,000
0
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
11-FEB-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 27 of 34
F5543526
F5543527
F55435ER
F55435RI
F55435RM
F55435TP
76,000
11,000
6,000
1,000
172,966
35,000
0
3,000
0
1,000
320,000
35,000
0
0
0
1,000
340,000
35,000
0
0
0
0
0
0
86,000
19,000
9,000
4,000
1,152,966
140,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
8,000 60,000
8,000 0
10,000 1,000
0 0
0 1,000 5,000
0
1,000 0 0 0
0 0 0
172,966
35,000 0 0 0
0 0 0 0
1,000 1,000 1,000
0
0 0 0 0
1,000 0 0 0
0 0 0
320,000
35,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1,000 0 0 0
0 0 0
340,000
35,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
9,000 65,000 12,000
0
14,000 3,000 2,000
0
0 2,000 7,000
0
4,000 0 0 0
0 0 0
1,152,966
140,000 0 0 0
Dock Road
Red Cliff Rehab Projects
RED CLIFF ERFO PROJECT
TTP INVENTORY PROJECT
TTP ROAD MAINTENANCE PROJECT
TTP TRANSPORTATION PLANNING PRO
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
ERFO
PLANING
PLANING
PLANING
R
R
O
O
O
O
7
7
D1
P8
P9
P9
55 - WisconsinState F55435 - Red Cliff
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
007 - Bayfield
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 460,966
F55435 - RED CLIFF BANDEntity Name
1,000 5,000 4,000
0
3,000 1,000 1,000
0
0 1,000 2,000
0
1,000 0 0 0
0 0 0
320,000
35,000 0 0 0
10,000
5,000
3,000
1,000
320,000
35,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
11-FEB-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 28 of 34
460,966 464,000 462,000 463,000 0 1,849,966 1,849,966
460,966 464,000 462,000 463,000 0 1,849,966
F55435TR
150,000 80,000 80,000 0 390,000
PECONS
CEZ
0 0
150,000 0
0 0
80,000 0
0 0
80,000 0
0 0 0 0
0 0
390,000 0
RED CLIFF TRANSIT
TotalPhase
460,966 464,000 462,000 463,000
TRANSIT
O
T2
55 - WisconsinState F55435 - Red Cliff
007 - BayfieldNameCountyProject TypeWork Type
PCASClass
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 460,966
F55435 - RED CLIFF BANDEntity Name
0
0 0
80,000 0
80,000Total
FY 2021 ($) FY 2022 ($) FY 2023 ($) FY 2024 ($) FY 2025 ($)
11-FEB-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 29 of 34
F5543605
F5543606
F5543609
F5543613
F5543617
F5543618
3,000
2,000
120,799
13,000
0
3,000
95,000
45,000
1,000
6,000
32,000
0
2,000
7,000
0
0
31,000
0
0
0
0
0
0
0
136,000
85,000
136,799
104,000
63,000
3,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
3,000 0 0 0
2,000 0 0 0
3,000 115,799
2,000 0
5,000 5,000 3,000
0
0 0 0 0
0 1,000 2,000
0
0 90,000
5,000 0
0 40,000
5,000 0
0 0
1,000 0
0 1,000 5,000
0
5,000 25,000
2,000 0
0 0 0 0
0 1,000 1,000
0
0 5,000 2,000
0
0 0 0 0
0 0 0 0
1,000 25,000
5,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
8,000 121,000
7,000 0
7,000 70,000
8,000 0
3,000 120,799 13,000
0
5,000 81,000 18,000
0
6,000 50,000
7,000 0
0 1,000 2,000
0
2-1/8 STREET
2-5/8 STREET
SHORT ROAD
2-1/2 STREET
CLIFFORD LANDING
HERTEL FRONTAGE ROAD
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
REHAB
REHAB
REHAB
RECONS
RECONS
NEWCON
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55436 - St. Croix
095 - Polk
095 - Polk
095 - Polk
095 - Polk
095 - Polk
013 - Burnett
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 279,799
FIRST PAGE FOR CSTIPF55436 - ST. CROIX CHIPPEWA INDIANSEntity Name
5,000 30,000
1,000 0
5,000 25,000
1,000 0
0 5,000
10,000 0
0 75,000 10,000
0
0 0 0 0
0 0 0 0
36,000
31,000
15,000
85,000
0
0
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
09-APR-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 30 of 34
279,799 288,000 287,000 292,000 0 1,146,799 1,146,799
279,799 288,000 287,000 292,000 0 1,146,799
F5543621
F5543622
F5543623
F55436RM
F55436SA
F55436TP
18,000
0
15,000
70,000
5,000
30,000
0
3,000
3,000
70,000
2,000
30,000
0
152,000
0
70,000
0
30,000
0
0
0
0
0
0
30,000
155,000
24,000
280,000
10,000
120,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
2,000 1,000
15,000 0
0 0 0 0
5,000 5,000 5,000
0
0 0 0
70,000
1,000 1,000 3,000
0
30,000 0 0 0
0 0 0 0
3,000 0 0 0
0 0
3,000 0
0 0 0
70,000
0 1,000 1,000
0
30,000 0 0 0
0 0 0 0
7,000 140,000
5,000 0
0 0 0 0
0 0 0
70,000
0 0 0 0
30,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
3,000 2,000
25,000 0
10,000 140,000
5,000 0
5,000 6,000
13,000 0
0 0 0
280,000
1,000 3,000 6,000
0
120,000 0 0 0
2019 ERFO
West Minerva Dam Road
St. Croix Safety Project Round Lake
St. Croix Road Maintenance Project
DANBURY PEDESTRIAN TRAIL
St. Croiix Transportation Planning
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
279,799 288,000 287,000 292,000
ERFO
RECONS
SAFETY
PLANING
SAFETY
PLANING
R
R
R
O
O
O
7
7
7
P10
F1
P9
55 - WisconsinState F55436 - St. Croix
095 - Polk
013 - Burnett
095 - Polk
013 - Burnett
013 - Burnett
013 - Burnett
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 279,799
F55436 - ST. CROIX CHIPPEWA INDIANSEntity Name
0
1,000 1,000
10,000 0
0 0 0 0
0 1,000 5,000
0
0 0 0
70,000
0 1,000 2,000
0
30,000 0 0 0
12,000
0
6,000
70,000
3,000
30,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
09-APR-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 31 of 34
F5543702
F5543704
F5543708
F5543710
F5543711
F5543712
2,000
0
1,000
0
0
4,000
2,000
1,000
65,000
1,000
1,000
5,000
0
3,000
6,000
1,000
1,000
0
0
0
0
0
0
0
6,000
4,000
74,000
2,000
2,000
73,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
1,000 0
1,000 0
0 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
3,000 1,000
0 0
1,000 0
1,000 0
1,000 0 0 0
3,000 60,000
2,000 0
1,000 0 0 0
1,000 0 0 0
0 1,000 4,000
0
0 0 0 0
1,000 1,000 1,000
0
1,000 1,000 4,000
0
1,000 0 0 0
1,000 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
3,000 0
3,000 0
2,000 1,000 1,000
0
7,000 61,000
6,000 0
2,000 0 0 0
2,000 0 0 0
5,000 62,000
6,000 0
POW WOW GROUNDS ROAD
COMMUNITY DRIVE
ACKLEY CIRCLE
VANZILE ROAD
MCGESHICK ROAD
CONNECTOR ROAD (BLACK LANE)
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
OVRLAY
REHAB
RECONS
RECONS
RECONS
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55437 - Sokaogon Chippewa Community
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 192,990
FIRST PAGE FOR CSTIPF55437 - SOKAOGON CHIPPEWA COMMUNITYEntity Name
1,000 0
1,000 0
0 0 0 0
2,000 0 0 0
0 0 0 0
0 0 0 0
2,000 60,000
2,000 0
2,000
0
2,000
0
0
64,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
25-FEB-21FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 32 of 34
192,990 193,000 191,000 199,000 0 775,990 775,990
192,990 193,000 191,000 199,000 0 775,990
F5543713
F55437RI
F55437RM
F55437TP
F55437TR
0
1,000
180,990
3,000
1,000
1,000
1,000
110,000
3,000
1,000
83,000
1,000
100,000
3,000
1,000
0
0
0
0
0
84,000
4,000
510,990
12,000
4,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
0 0 0 0
1,000 0 0 0
0 0 0
180,990
3,000 0 0 0
0 0
1,000 0
1,000 0 0 0
1,000 0 0 0
0 0 0
110,000
3,000 0 0 0
0 0
1,000 0
5,000 75,000
3,000 0
1,000 0 0 0
0 0 0
100,000
3,000 0 0 0
0 0
1,000 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
6,000 75,000
3,000 0
4,000 0 0 0
0 0 0
510,990
12,000 0 0 0
0 0
4,000 0
INDIAN SETTLEMENT
TTP ROAD INVENTORY PROJECT
TTP ROAD MAINTENANCE PROJECT
TTP TRANSPORTATION PLANNING PRO
TTP TRIBAL TRANSIT
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
192,990 193,000 191,000 199,000
REHAB
RECONS
PLANING
PLANING
TRANSIT
R
O
O
O
O
7
P8
P10
P9
T4
55 - WisconsinState F55437 - Sokaogon Chippewa Community
041 - Forest
041 - Forest
041 - Forest
041 - Forest
041 - Forest
Name
Name
Name
Name
Name
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 192,990
F55437 - SOKAOGON CHIPPEWA COMMUNITYEntity Name
0
0 0 0 0
1,000 0 0 0
0 0 0
120,000
3,000 0 0 0
0 0
1,000 0
0
1,000
120,000
3,000
1,000
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
25-FEB-21
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 33 of 34
F5543809
F5543813
F5543815
F5543820
F5543821
F5543822
50,000
5,000
5,000
5,000
60,000
180,000
160,000
5,000
5,000
5,000
110,000
60,000
15,000
105,000
200,000
185,000
15,000
15,000
0
0
0
0
0
0
325,000
120,000
215,000
200,000
295,000
315,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
5,000 45,000
0 0
5,000 0 0 0
5,000 0 0 0
5,000 0 0 0
10,000 50,000
0 0
30,000 150,000
0 0
5,000 155,000
0 0
5,000 0 0 0
5,000 0 0 0
5,000 0 0 0
10,000 100,000
0 0
10,000 50,000
0 0
5,000 10,000
0 0
5,000 100,000
0 0
5,000 195,000
0 0
5,000 180,000
0 0
5,000 10,000
0 0
5,000 10,000
0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
20,000 305,000
0 0
20,000 100,000
0 0
20,000 195,000
0 0
20,000 180,000
0 0
35,000 260,000
0 0
55,000 260,000
0 0
School House Road
Hillside Drive
Maple Road
North Branch Road
Moh He Con Nuck Road and Circle Subd
Little Road
Total
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
Phase
RECONS
REHAB
REHAB
REHAB
RECONS
RECONS
R
R
R
R
R
R
7
7
7
7
7
7
55 - WisconsinState F55438 - Stockbridge Munsee Community
115 - Shawano
115 - Shawano
115 - Shawano
115 - Shawano
115 - Shawano
115 - Shawano
Name
Name
Name
Name
Name
Name
County
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 590,554
FIRST PAGE FOR CSTIPF55438 - STOCKBRIDGE MUNSEE COMMUNITYEntity Name
5,000 95,000
0 0
5,000 0 0 0
5,000 0 0 0
5,000 0 0 0
10,000 100,000
0 0
10,000 50,000
0 0
100,000
5,000
5,000
5,000
110,000
60,000
Total
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
23-DEC-20FHWA Approved Date
Indian Reservation Roads ProgramsFederal Lands Highway
15-OCT-2021
REPORT FILTERS:
Location = F-**-***
program_class_code = 6K1
CSTIP Type = TIPAny level TIP/EIP Report
Reporting each CSTIP that meets the filter.
Page 34 of 34
590,554 590,554 590,554 590,554 0 2,362,216 2,362,216
590,554 590,554 590,554 590,554 0 2,362,216
F5543823
F5543824
F5543825
F55438RM
F55438TP
60,000
60,000
140,000
10,554
15,000
110,000
110,000
0
10,554
15,000
15,000
15,000
0
10,554
15,000
0
0
0
0
0
305,000
295,000
190,000
42,216
60,000
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
PECONS
CEZ
10,000 50,000
0 0
10,000 50,000
0 0
0 140,000
0 0
0 0 0
10,554
0 0 0
15,000
10,000 100,000
0 0
10,000 100,000
0 0
0 0 0 0
0 0 0
10,554
0 0 0
15,000
5,000 10,000
0 0
5,000 10,000
0 0
0 0 0 0
0 0 0
10,554
0 0 0
15,000
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
35,000 270,000
0 0
35,000 260,000
0 0
0 190,000
0 0
0 0 0
42,216
0 0 0
60,000
River Road/West Town Hall Road
Town Hall Road
CTH A
TTP Road Maintenance
TTP Transportation Planning
Total
Total
Total
Total
Total
Phase
Phase
Phase
Phase
Phase
590,554 590,554 590,554 590,554
RECONS
RECONS
RECONS
PLANING
PLANING
R
R
R
O
O
7
7
7
P10
P9
55 - WisconsinState F55438 - Stockbridge Munsee Community
115 - Shawano
115 - Shawano
115 - Shawano
115 - Shawano
115 - Shawano
Name
Name
Name
Name
Name
County
County
County
County
County
Project Type
Project Type
Project Type
Project Type
Project Type
Work Type
Work Type
Work Type
Work Type
Work Type
PCAS
PCAS
PCAS
PCAS
PCAS
Class
Class
Class
Class
Class
Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section
Location Subtotal
State SubtotalCSTIP Subtotal
6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021
Funding Amount 590,554
F55438 - STOCKBRIDGE MUNSEE COMMUNITYEntity Name
0
10,000 110,000
0 0
10,000 100,000
0 0
0 50,000
0 0
0 0 0
10,554
0 0 0
15,000
120,000
110,000
50,000
10,554
15,000
Total
Total
Total
Total
Total
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2021 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2022 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2023 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2024 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
FY 2025 ($)
23-DEC-20
���������������� ���������������������������������������������� �!"#$%�&�'�(")"*+��+",)-�*+��)������� �.�)�*�!"#$%�&�/"0"*",) .�*+�1�")+��2�345645758
1�#��59�,:�;5 '<<�,0� �*"#)�+=���"*�*$,%)�,)�:"�*+�<�#��<�>?�+�,) &@�A$�� "*+")#���: �>+*�� �)�% &�"��)+":"����)��<�,#��((����)�4,��(,�":"���<�,B�>+*��*�,:�C�&�56D�5758@�
�EFGHI �EFJEK����LIKM��HKE LKH IF�N� �KEOP�EH��JHP��FEHL�FE�FQHE��KENHERKJHNI� SHLIE���FN ��H�F��TFEO �E��KE����NS�LF�EIH �FKM��EFJEK��HS�K�F�N� ��NSL��EF���MH SHM�UHEHS�V� LK�L IFNJEHLL�FNKM�S�LE�I �M�K�EHJ�FNWX�YA�67Z85[ 5758 WX Y+@�\�,"] \$�"*+"�)*+��4������"?*+���'��� �$�_@��("�,:�a=��)�C��&�!%&@�:��Y=))&�X* ��X)+@D�\$�"*+"�)*+���+,�!�))�$b*��*+�X)+@D�������"?*+�� ;.cd 1 �'YA �e��������857D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA� `Z8;3[ 5758 WX Y+@�\�,"] \$�"*+"�)*+���'��� X(<�0()+*�+,�+��63j�Zk")#�\�,**�Y+[D�+��63�-@�Zk")#�Y+[��)��63�l@�Z\,(<�)&�Y+[@ ;. -XCd �e�����;D777D777@77� i+$�� -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAmZ775[�YAAZ77j[ 5758 WX Y+@�m,$)�4�Y+@�A$,(�* h4' 5786�-(��#�)>&�� "�:D�Y+@�m,$)*�1�,B�>+�5D�Y+@�A$,(�*�1�,B�>+�j@ .Yc;! /iA �e�����6D56jD777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAAZ773[ 5758 WX Y+@�A$,(�* h4' -(_�)?(�)+�*+�_" "n�+",)��)�����")�#����<�"��:,��+�;;fY$"_="@ .Yc;! /iA �e�����5Dj77D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�;9Z5[�\5 5755 WX Y+@�A$,(�* oY�W"�#")�X* �)�*�/�<��+(�)+�,:�1=_ ">�l,�?* �<$=)��!" ����)��A�;98�")+��*�>+",)�"(<�,0�(�)+*�f�\,)+��>+�5 h-l A- �!lp�e�����jD677D777@77�A"+ ��5; -�.!/ X)�/�*"#) WXf'+.��#� gch'ciA!WX�;9Z5[�\; 5755 WX Y+@�A$,(�* oY�W"�#")�X* �)�*�/�<��+(�)+�,:�1=_ ">�l,�?* �<$=)��!" ���%"��)�q�"(<�,0��_�+%��)�+$��\,)+�>+�8��)��5�Z7@6�(" �[ ;! A- �!lp�e���59D377D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�/1\�';jZ8[�\,)+��>+�5 5755 WX Y+@�A$,(�* o@Y@�W"�#")�X* �)�*D�/�<��+(�)+�,:�1=_ ">�l,�?*�ZWX/1l[ W�+���)b*�/�"0�D�1$�*��5 ;!ch-l -XCd �e�873D777D777@77� i+$�� -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAAZ77r[ 5755 WX Y+@�A$,(�* oYWX�/�<��+(�)+�,:�1=_ ">�l,�?* �<�"��+��::">�*"#)� *��+�9�")+��*�>+",)*�,)�W�+���)*�/�"0���)��,+$����,��*@ CXY\ -�i �e�����5D777D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAgZ77j[ 5755 WX Y+@�\�,"] oYWX�/�<��+(�)+�,:�1=_ ">�l,�?* �<�"��+��::">�*"#)� *��+�r�")+��*�>+",)*�,)�C� 0")�!@�-0�)*�!"#$%�&�q�d�**")�A�"�)# �@ CXY\ -�i �e�����5D777D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!h1�WXXY�877Z;[�875Z8[�-A\ 575j WX Ad/ W"�#")�X* �)�*�h�+",)� �1��? Y>,<")#�+�"<���<,�+���<�"��.&)��!,=*��'>>�**��D�.�(�*$=���D�Y� +�1,)���D����)>"*�d�&��41��?")#�' ;. �.A1 �e��������537D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� h1YT� s�� ��lX�-�i��Y�578rf8Zr[ 5757 lX d�&:"� �D�Y�%&�� \$�t=�(�#,)�h">, �+�h�+",)� ��,��*+ ��;9;�Y)�?��,���/�>,(("**",)")#@ ;! -�i �e��������r8D63j@;j�A"+ ��5; -�.!/ X)�/�*"#) lXf76 oY�YlX�-�i��Y�578rf8Zr[ 5757 lX d�&:"� �D�Y�%&�� \$�t=�(�#,)�h">, �+�h�+",)� ��,��*+ ��;9;�Y)�?��,���/�>,(("**",)")#@ ;! -�i r8D63j@;je��������� A"+ ��5; -�.!/ X)�/�*"#) lXf76 oY�YlX��.'1�d�./�\A!CZ5[ 5757 lX d�&:"� � �,��*+�Y��0">��4�\$�t=�(�#,)fh">, �+�h�+",)� ��,��*+ �$�_" "+�+",)�,:�\A!C ;. �.'1 �e�����8D567D777@77�A"+ ��5; YA'A- o)����\,)*+�=>+",) lXf76 oY�Y
���������������� ���������������������������������������������� �!"#$%�&�'�(")"*+��+",)-�*+��)������� �.�)�*�!"#$%�&�/"0"*",) .�*+�1�")+��2�345645758
1�#��59�,:�;5 '<<�,0� �*"#)�+=���"*�*$,%)�,)�:"�*+�<�#��<�>?�+�,) &@�A$�� "*+")#���: �>+*�� �)�% &�"��)+":"����)��<�,#��((����)�4,��(,�":"���<�,B�>+*��*�,:�C�&�56D�5758@�
�EFGHI �EFJEK����LIKM��HKE LKH IF�N� �KEOP�EH��JHP��FEHL�FE�FQHE��KENHERKJHNI� SHLIE���FN ��H�F��TFEO �E��KE����NS�LF�EIH �FKM��EFJEK��HS�K�F�N� ��NSL��EF���MH SHM�UHEHS�V� LK�L IFNJEHLL�FNKM�S�LE�I �M�K�EHJ�FNWX��.'1�YZ[.�.[\Y]8 5757 WX \�&:"� � _1[D�'<,*+ ��X* �)�*�_�+",)� �.�?�*$,�� Y,��%�&���$�D�%"��)")#D�*$,= ����>,)*+�=>+",)D����")�#��"(<�,0�(�)+*D��)��("*>� �)�,=*�%,�?@ ;Y!a;Y. �.'1 �b��������c3;D777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 _1[WX��.'1�YZ[.�fd!g]8 5757 WX \�&:"� � _1[D�'<,*+ ��X* �)�*�_�+",)� �.�?�*$,�� Y,��%�&���$�D�%"��)")#D�*$,= ����>,)*+�=>+",)D����")�#��"(<�,0�(�)+*D��)��("*>� �)�,=*�%,�? ;Y!a;Y. �.'1 �b�����5D;h3D665@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 _1[WX��.'1�AYX11��YiW]8 5757 WX \�&:"� � X�,)�Y"0���_�+",)� ��"*$�!�+>$��& Y�>,)*+�=>+",)�,:�8�(" ��,:���"�0"�%�Y,���")�A�"<<�A,%)*$"<D�WX@ ;Y! �.'1 �b��������;63D5;7@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 �W[WX��.'1�'[!��!;5]8 5758 WX '*$ �)� �,��*+�[��0">�4�d$�j=�(�#,)e�_">, �+�_�+",)� ��,��*+ C" ")#��)����*=�:�>")#�9@5�(" �*�,:��,��*+�!"#$%�&�;5�+$�,=#$�d$�j=�(�#,)e_">, �+�_�@ ;Y. �.'1 �b�����8D567D777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 Z[�[WX��.'1��-_d�58c;]8 5758 WX � ,��)>� Z[��,��*+�[��0">�D�d$�j=�(�#,)e_">, �+�_�+",)� ��,��*+ Y,>?�d���?�\�"�#��Y�< �>�(�)+�1e89e7975D�*,=+$�,:�1,<< ��Y"0��@ \YY1 �.'1 �b��������;66D377@77�A"+ ��5; [A'A- X)�/�*"#) WXe76 Z[�[WX��.'1�W'[!�586c]8 5758 WX i" �* �,��*+�[��0">�D�d$�j=�(�#,)e�_">, �+�_�+",)� ��,��*+ Y�*=�:�>")#D�%"��)")#D�")>���*���*$,= ����%"�+$�k�"(<�,0��*�:�+&�,)�C" "+��&�Y,���]YA�586c ;Y. �.'1 �b��������cllD777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 Z[�[WX��.A1��W�Z1.'�]8 5758 WX .��d�,**� Z<<���C"**@�_Wk�Y�e�.��d�,**��/"*+�">+ i"*"+,��d�)+���1��?")#�.,+�<�+>$")#D�*+�"<")#D���<�"�* ;Y �.A1 �b��������837D777@77�A"+ ��5; �W[ X)�/�*#") WXe7; �W[�W�AY-C�87]8 5755 WX \=::� , A��(<�� ��=�_�+",)� �W" � ":��Y�:=#� [�:�+&�"(<�,0�(�)+*�:,��-)+��)>��Y,���]Y,=+��87 ;Y. �.A1 �b�����5Dh77D777@77�A"+ ��5; -�.!/ X)�/�*"#) WXe7; �W[[+,>?:��(�\�"�#��Y�< �>�(�)+ 5755 WX '*$ �)� d$�j=�(�#,)e_">, �+�_� Y�< �>�(�)+�,:���h;e&����, �D�*�0�)e*<�)D�*")# �� �)�D�+"( ����"�#��%"+$�)�%D�+$���e*<�)D�5e �)��+"( ����"�#�@ \YY1 �.A1 �b�����8Dl77D777@77�A"+ ��5; Z[�[ 1 �))�� WXe76 Z[�[WX��.A1��W�.-f1�]8 575l WX d, =( "� .�,<, ��WC/ !m�*"+��<��?")#�"(<�,0�(�)+*�1$�*��8 CX[d �.A1 �b��������537D777@77�A"+ ��5; �W[ 1 �))�� WXe7h �W[T� ��U������Wi�-Y�f��[�578he8]5 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ -(��#�)>&���<�"�*�,)��[ech�:�,(�(" �<,*+�83@8�+,�8c@l@ ;Y! -Y�f �b�����;D697D963@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[Wi�-Y�f��[�578he8]3 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ -(��#�)>&���<�"�*�,)��[ech�:�,(�(" �<,*+�7@5�+,�6@5@ ;Y! -Y�f �b�����;D3lcD6c;@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[Wi�-Y�f��[�578he8]h 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ /�>,(("**",)")#�,:��[e689��)����$�" "+�+",)�,:�)�%�*�#(�)+@ Y!a.[Ya\YY -Y�f �b�����;D;75Dh95@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[
2022 – 2025 Statewide Transportation Improvement Program Tab 10
Public
Involvement
2022 – 2025 Statewide Transportation Improvement Program 10 – 1
Public Involvement Current federal legislation requires the Governor to ensure that WisDOT and the MPOs develop plans to actively involve the public in the development of the STIP. WisDOT uses an ongoing STIP public involvement plan that includes:
• 30-day written comment period on the STIP (yearly) • State Trunk Highway System project development and Six-Year Highway Program
hearings (ongoing) • MPO public hearings on TIPs (yearly) • Local government hearings on transit projects for smaller systems (ongoing) • Local government hearings on local road projects (ongoing)
The focus of this plan is on maximizing public involvement at the state, MPO, and local levels—on an ongoing basis—when initial project decisions are presented and made. WisDOT published its first STIP Public Involvement Plan in November of 1993. The STIP Public Involvement Plan (PIP), which was updated in November 2016, continues to focus on the public involvement processes used on various types of transportation projects. The 2016 update of the STIP PIP includes public involvement aspects of new legislation; Public Law 112 – 141 Moving Ahead for Progress in the 21st Century Act along with Public Law 114 – 357 Fixing America’s Surface Transportation Act (FAST). In April 2021, the STIP PIP was incorporated into WisDOT’s Coordination Document and is available at https://wisconsindot.gov/Documents/doing-bus/local-gov/plning-orgs/coordination.pdf#page=20. Although the STIP Public Involvement Plan does not require any public hearings, WisDOT may agree to have a public hearing if one is requested. The STIP Public Involvement Plan will continue to rely on written comments from the public regarding the draft STIP. The legal notice advertising the draft STIP was published on November 2, 2021. A copy of the notice is presented below.
LEGAL NOTICE
The Wisconsin Department of Transportation announces the availability of its draft multimodal 2022-2025 Statewide Transportation Improvement Program (STIP). The draft STIP is available from the State Transportation Improvement Program website: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/stip.aspx. The comprehensive improvement program includes all federally funded highway, transit, bike and pedestrian projects to be undertaken in Wisconsin during the 2022-2025 timeframe. The draft STIP is subject to a 30-day public comment period. The final STIP will be issued in January 2022. Inquiries about the draft STIP and written comments on the improvement program should be directed, before December 2, 2021, to the Wisconsin Department of Transportation’s Division of Transportation Investment Management, Bureau of Planning and Economic Development, P.O. Box 7913, Madison, WI 53707-7913; comments by phone at 608-266-3662 or comments by email at [email protected].
2022 – 2025 Statewide Transportation Improvement Program Tab 11
Performance
Measures
2022 – 2025 Statewide Transportation Improvement Program 11 – 1
Performance Measures
Introduction MAP-21 and the FAST ACT requires the incorporation of Performance-Based Planning and Programming (PBPP) in the development of the State’s Long-Range Transportation Plans (LRTP) and Statewide Transportation Improvement Plans (STIP). The incorporation of PBPP in the STIP contributes to the achievement of National Performance goals (23 USC 150). The Statewide and Nonmetropolitan Transportation Planning; Metropolitan Transportation Planning; Final Rule further defined that the STIP shall include, to the maximum extent practicable, a description of the anticipated effect of the STIP toward achieving the performance measures targets identified in the statewide transportation or State Performance-based plan(s), linking investment priorities to those performance targets (23 CFR 450.218(q)). 23 USC 150: National Performance Measure Goals are:
• Safety - To achieve a significant reduction in traffic fatalities and serious injuries on all public roads
• Infrastructure Condition - To maintain the highway infrastructure asset system in a state of good repair
• Congestion Reduction - To achieve a significant reduction in congestion on the National Highway System
• System Reliability - To improve the efficiency of the surface transportation system • Freight Movement and Economic Vitality - To improve the national freight network,
strengthen the ability of rural communities to access national and international trade markets, and support regional economic development
• Environmental Sustainability - To enhance the performance of the transportation system while protecting and enhancing the natural environment
• Reduced Project Delivery Delays - To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices FHWA - About Transportation Performance Management
WisDOT Performance-Based Planning and Programming Processes
MAPSS Performance Improvement
WisDOT has utilized the MAPSS Performance Improvement Program since January 2012 to measure transportation performance across Wisconsin. MAPSS is organized around five strategic department goal areas: Mobility, Accountability, Preservation, Safety, and Service. Many of the MAPSS performance measures are closely related to the MAP-21/FAST Act performance measures. Preservation performance measures include State Highway Pavement Condition and State Bridge Condition. Safety performance measures include the number of Traffic Fatalities and Serious Injuries. Additional performance measures are included within each of the MAPSS goal areas. Measures are posted on the WisDOT MAPSS internet site: MAPSS Performance Improvement Program.
2022 – 2025 Statewide Transportation Improvement Program 11 – 2
WisDOT Data-Driven Project Development WisDOT has embraced a “data-driven” asset management approach to achieve the goals for projects and programs. In conjunction with a strong reliance on data for decision-making, WisDOT has committed to a process of continual data quality improvement (e.g. standards for collection and storage, leverage of technology, integration strategies, etc.). WisDOT has developed a comprehensive set of data and analysis tools for developing and managing the Six-Year Highway Improvement Program. The primary components of the dataset include a geographically integrated set of databases (using specialized tools) representing:
• Pavement and bridge condition • Six-Year Program information • Highway geometric and attribute information • Highway crashes, highway capacity, etc. • Pavement and bridge deterioration and improvement models • Analysis models for evaluating alternatives, costing, priorities, and budget constraints
The data is used to:
• Identify, scope, and prioritize projects • Evaluate program performance (e.g. before/after analyses) • Estimate future conditions and needs • Establish program goals • Allocate resources for programs and WisDOT transportation regions
A data-driven project development approach identifies condition, needs, and priorities related to the Wisconsin State Trunk Highway System. Efforts enhance statewide program development consistency by facilitating an improved understanding of how program goals and performance measures.
MAP-21/FAST Act Performance Measures MAP-21/Fast Act Performance Measures are established in 49 USC 625 and 23 CFR 490. State Department of Transportations (DOTs) and Metropolitan Planning Organizations (MPOs) are currently required to establish targets for the following federal performance measures:
• Transit Asset Management o Rolling Stock: The percentage of revenue vehicles (by type) that exceed the
useful life benchmark (ULB) o Equipment: The percentage of non-revenue service vehicles (by type) that exceed
the ULB o Facilities: The percentage of facilities (by group) that are rated less than 3.0
(adequate) out of 5 (excellent) on the Transit Economic Requirements Model (TERM) Scale
o Infrastructure: The percentage of track segments (by mode) that have performance restrictions. Track segments are measured to the nearest 0.01 of a mile
2022 – 2025 Statewide Transportation Improvement Program 11 – 3
• Safety o Number of fatalities o Fatalities per 100 million vehicle miles traveled o Number of serious injuries o Serious injuries per 100 million vehicle miles traveled o Number of non-motorized fatalities and non-motorized serious injuries
• Infrastructure
o Percentage of pavements of the Interstate System in Good condition o Percentage of pavements of the Interstate System in Poor condition o Percentage of pavements of the non-Interstate NHS in Good condition o Percentage of pavements of the non-Interstate NHS in Poor condition o Percentage of NHS bridges classified as in Good condition o Percentage of NHS bridges classified as in Poor condition
• System Performance on NHS
o Interstate Travel Time Reliability Measure: The percent of person-miles traveled on the Interstate that are reliable
o Non-Interstate Travel Time Reliability Measure: The percent of person-miles traveled on the non-Interstate NHS that are reliable
• Freight Movement
o Freight Reliability Measure: Interstate Truck Travel Time Reliability (TTTR) Index
• Congestion Mitigation and Air Quality (CMAQ) - Congestion Reduction
o Peak Hour Excessive Delay (PHED) Measure: Annual Hours of Peak Hour Excessive Delay (PHED) Per Capita
o Non-Single Occupancy Vehicle Travel (SOV) Measure: Percent of Non-Single Occupancy Vehicle (SOV) Travel
o Emissions Measure: Total Emission Reductions These performance measures have been established within a series of FHWA and FTA rulemaking regulations. The performance measure targets have been established based on the final rules for the measures and are included in the Statewide Transportation Improvement Program (STIP). A description of the Transit, Safety, Infrastructure, System Performance, Freight Movement, and CMAQ - Congestion Reduction performance measure targets and methodologies are included in the following discussions.
2022 – 2025 Statewide Transportation Improvement Program 11 – 4
2022 Transit Performance Target of Capital Assets In accordance with 49 CFR Parts 625 and 630 for Transit Asset Management (TAM), the Wisconsin Department of Transportation (WisDOT), is the TAM sponsor for all Section 5311 Formula Grants for Rural Areas, Section 5310 Enhanced Mobility for Seniors and Individuals with Disabilities, and some Section 5307 Formula Grants for Urbanized Areas sub-recipients. Methodology WisDOT provided an opt-in opportunity for all Section 5311 Formula Grants for Rural Areas, Section 5310 Enhanced Mobility for Seniors and Individuals with Disabilities, and some Section 5307 Formula Grants for Urbanized Areas sub-recipients to be included in the WisDOT TAM Plan. WisDOT worked with sub-recipients to update the inventory information of federally funded vehicles, equipment, and facilities in its BlackCat web-based grants management system. In early 2018, WisDOT staff presented the TAM targets and a draft TAM Plan at a WisDOT Planning Section meeting with representatives from the state Metropolitan Planning Organizations (MPOs) and Regional Planning Commissions (RPCs). WisDOT staff fielded questions from attendees, provided them with a PowerPoint presentation about the federal TAM initiative, and a copy of the draft plan. Vehicles WisDOT evaluated the inventory of its sub-recipient vehicle capital items and used FTA’s Useful Life Age Benchmark (ULB) set in FTA 5010.1D, page IV-7 to determine if the vehicles were beyond their useful life. WisDOT and its sub-recipients have set the following TAM performance targets: Rolling Stock – Acceptable percentage of revenue vehicle fleet that is past its useful life
Equipment – Acceptable percentage of non-revenue vehicle fleet that is past its useful life Performance Measure 2021 Target (%) 2022 Target (%) Automobiles 33 33 Trucks or other Tiered Vehicles 29 29
Performance Measure 2021 Target (%) 2022 Target (%) AO – Automobile 77 77 BU – Bus 44 44 CU – Cutaway 47 47 SB – School Bus 100 0 MV – Minivan n/a 51 VN – Van 27 27
2022 – 2025 Statewide Transportation Improvement Program 11 – 5
Facility Targets WisDOT evaluated the condition of the facilities in its sponsored TAM plan FTA's Transit Economic Requirements Model (TERM) as a guide. This scale has the following values:
• 5 – Excellent • 4 – Good • 3 – Adequate • 2 – Marginal • 1 – Poor
Facility – Acceptable percentage of facilities that are rated below a “3” on the TERM guide Performance Measure 2021 Target (%) 2022 Target (%) Administrative/Maintenance Facilities 10 10 Most transit facilities in WisDOT’s sponsored TAM Plan are relatively new and in excellent condition. None of the facilities are beyond their useful life of 40 years or below adequate condition (rated below a 3 on the condition scale). WisDOT and its sub-recipients set the TAM performance target to allow up to 10 percent of the facilities to be rated below a “3 – Adequate” on the condition scale. Next Steps for the TAM and Transit Targets Funding is dedicated to replacing priority vehicles within the TAM Plan, as transit providers continue to operate services with aging fleets.. There will be a growing financial gap from year to year associated with the number of vehicles due for replacement to meet the established TAM targets and the funding levels for vehicles that are currently available. WisDOT will assist transit providers the use of the useful life benchmarks established in the TAM Plan to prioritize their vehicle requests at the time of grant application and is working to share best practices on vehicle maintenance across agencies and organizations. WisDOT will also continue to work closely with its sub-recipients and FTA on any additional asset management requirements or changes, and will update the TAM targets and plan as necessary.
Public Transit Agency Safety Plans (PTASP) On July 19, 2018, FTA published the Public Transportation Agency Safety Plan (PTASP) Final Rule, which requires certain operators of public transportation systems that receive federal funds under FTA's Urbanized Area Formula Grants to develop safety plans that include the processes and procedures to implement Safety. Management Systems (SMS).
2022 – 2025 Statewide Transportation Improvement Program 11 – 6
• The PTASP rule became effective on July 19, 2019. • FTA published a Notice of Enforcement Discretion on April 22, 2020 effectively extending
the PTASP compliance deadline from July 20, 2020 to December 31, 2020. The plan must include safety performance targets. Find additional guidance on planning and target setting on FTA's Performance-Based Planning pages. Transit operators also must certify that they have a safety plan in place meeting the requirements of the rule by December 31, 2020. The plan must be annually updated and certified by the transit agency. The rule applies to all operators of public transportation systems that are recipients and sub-recipients of federal financial assistance under the Urbanized Area Formula Program (49 U.S.C. § 5307). WisDOT worked with a number of large urban systems to create a task group to develop a compliant PTASP template that larger systems could use for their own plan or that smaller systems could use if they decided to have WisDOT write their PTASP. The template was completed in early CY2020 and sent out to all of the public transit systems that received FTA 5307 funds. WisDOT also sent letters asking systems to either “opt-out” and develop their own plan, or to “opt-in” in having WisDOT craft their plan. WisDOT staff have also communicated with MPO staff on their adoption of PTASP targets into the TIPs. The deadline was pushed back until June 30, 2021 due to COVID-19 (or 180 days after the public transit agencies need to finalize their plans). FTA would not approve TIP or TIP amendments if the PTASP targets were include after the deadline. All Wisconsin transit operators and MPOs met the June 30, 2021 deadline. WisDOT will assist any agency that needs help with their plans, but the certification of each plan is done by the transit agency, their accountable executive, and the board of directors through their individual FTA Certifications and Assurances process each year. WisDOT has no oversight of these plans and is only responsible for the creation of them.
2022 – 2025 Statewide Transportation Improvement Program 11 – 7
Highway Safety Improvement Program Performance Measures
National Performance Management Measures First Performance Measure Rule (PM1) The Highway Safety Improvement Program (HSIP) is a core Federal-aid program with the purpose of achieving a significant reduction in fatalities and serious injuries on all public roads. As per 23 U.S.C. 148(h) and 23 CFR 924.15, states are required to report annually on the progress being made to advance HSIP implementation and evaluation efforts. HSIP Project Prioritization Wisconsin evaluates potential HSIP projects by comparing the estimated crash reduction benefits expected from the project with the cost of that project. Crash reduction benefits are estimated by multiplying up to two crash modification factors (CMF) by five years of observed crash data. CMFs and target crashes are identified by the safety analyst and a spreadsheet tool is used to calculate the estimated crash reduction benefits. The spreadsheet tool incorporates the WisDOT CMF Table and logic described in our statewide policy at the following link:
Crash Modification Factor Policy A key component in the development of the HSIP is the Project Evaluation Factor (PEF). The PEF is a measurement that is used to evaluate and compare proposed projects. It provides a comparison of the estimated crash reduction potential of a proposed improvement with the cost of the project. Although it has similarities to a benefit/cost analysis, it does not include all the elements of a traditional benefit/cost analysis tool for ranking the relative merits of a group of projects and should not be compared to a benefit/cost analysis. Internal and External Coordination The HSIP Program is managed by WisDOT's Division of Transportation Investment Management (DTIM) and the Bureau of State of Highway Programs (BSHP). DTIM/BSHP makes all final application approvals or denials and related project change or cost increase requests. However, DTIM/BSHP coordinates its efforts with several internal partners that both, directly and indirectly, influence the decision-making process. Below is a summary of these partners and their role in the program: - Traffic Safety Council (TSC): The TSC is comprised of representatives from the Division of Transportation System Development (DTSD), DTIM, DMV, Division of State Patrol (DSP), and various Executive Offices within WisDOT. Among this group's responsibilities is developing and maintaining the Wisconsin Strategic Highway Safety Plan (SHSP), which helps guide the safety efforts of the HSIP Program. - Traffic Safety Engineering Workgroup (TSEWG): TSEWG is comprised of the State HSIP Coordinator, State Traffic Safety Engineer, and the Regional Traffic Safety Engineers. In some cases, the Regional HSIP Coordinators also participate. This group identifies and evaluates potential safety initiatives both within and outside of the HSIP Program, provides peer support, and reviews proposed HSIP projects. After a group evaluation, a recommendation to approve or not approve is forwarded to the State HSIP Coordinator for final review
2022 – 2025 Statewide Transportation Improvement Program 11 – 8
- State Project Oversight Engineers: The State Project Oversight Engineers are a critical component of the joint process with the TSEWG for application review and approval. The DTSD State Project Oversight Engineers, Regional Traffic Safety Engineers, the State Traffic Safety Engineer, and the State HSIP Coordinator provide a consensus approval or disapproval of HSIP funding after a comprehensive in-person peer review. Each Region has one Project Oversight Engineer. State Project Oversight Engineers only review applications originating from the Region in which they are assigned. This consensus approval or disapproval is advisory to DTIM/BSHP. The HSIP is fully coordinated and integrated with the work of other organizations, associations, and stakeholders (e.g., law enforcement, academia, local governments, and MPOs) that play a role in reducing fatalities and serious injuries. One of the basic foundations of the HSIP is the direct linkage between the data-driven priorities established in the Strategic Highway Safety Plan (SHSP) and the identification, development, and implementation of HSIP projects. Local and regional governments both contribute towards achieving the goals and objectives of the SHSP and help guide program decisions and project selections. More specifically, where there is a high percentage of crashes that occur off the state system, WisDOT works with local jurisdictions to help them develop and implement HSIP projects that address priority safety issues on locally-owned roadways. This is either done by locals doing work as local force accounts or they are let by WisDOT. Stakeholders will continue to contribute to and support the goals established in the SHSP. This in turn encourages safety projects that meet established safety performance targets. Coordination with MPOs and RPCs on safety targets were part of multiple quarterly Directors meetings in recent years. Starting with the Notice of Proposed Rulemaking, Final Rule publication and establishment of WisDOT and MPO safety targets. WisDOT continues coordinating with individual MPOs as they establish their planning area safety targets. Calendar Year 2022 Targets Safety Targets are calculated as five-year rolling averages for each performance measure.
Measure 2016 - 2020
Baseline Averages1
2022 Safety Targets1
Number of Fatalities 596.6 584.7
Rate of Fatalities per 100 million VMT 0.938 0.919
Number of Serious Injuries 3056.6 2995.5
Rate of Serious Injury per 100 million VMT 4.808 4.712
Number of Non-Motorized Fatalities and Serious Injuries 365.8 358.5 11 Final 2020 FARS data was not available at the time of target setting. The historical difference between state fatality data and FARS data was used to adjust 2020 state fatalities data in calculating the fatalities baselines and targets.
2022 – 2025 Statewide Transportation Improvement Program 11 – 9
HSIP projects are included in the STIP. In addition, safety is a major consideration in the scoping, prioritization, selection, and development of all WisDOT state and local projects. The efforts made toward addressing safety within the HSIP and all projects will continue to impact how progress is made toward achieving Highway Safety Improvement Program performance measure targets.
2022 – 2025 Statewide Transportation Improvement Program 11 – 10
Pavement and Bridge Condition Performance Measures National Performance Management Measures Second Performance Measure Rule (PM2) Pursuant to the regulations promulgated by the U.S. Department of Transportation Federal Highway Administration (FHWA), the Wisconsin Department of Transportation (WisDOT) has established statewide targets for federal performance measures intended to assess pavement and bridge conditions on the National Highway System (NHS). The 2019 and 2021 NHS pavement condition targets are identified in Exhibit A. The 2019 and 2021 NHS bridge condition targets are identified in Exhibit B. Exhibit A Wisconsin Department of Transportation NHS Pavement Condition Targets
Measure 2-Year
Target (2019) 4-Year Target
(2021) Interstate – Percentage pavements in “Good” condition NA* ≥ 45% Interstate – Percentage pavements in “Poor” condition NA* < 5% Non-Interstate NHS – Percentage pavements in “Good” condition ≥ 20% ≥ 20% Non-Interstate NHS – Percentage pavements in “Poor” condition < 12% < 12%
* Targets not required per rule. Exhibit B Wisconsin Department of Transportation NHS Bridge Condition Targets
Measure 2-Year Target
(2019) 4-Year Target
(2021) Percentage of NHS bridges by deck area in “Good” condition ≥ 50% ≥ 50% Percentage of NHS bridges by deck area in “Poor” condition < 3% < 3%
As part of FHWA’s Transportation Performance Management program, state DOT’s were required to submit a 2020 Mid Performance Period (MPP) progress report. The 2-year conditions reported for PM2 pavement performance on the Interstate and non-Interstate NHS using full distress plus International Roughness Index (IRI) metrics and NHS bridges were within established targets. Wisconsin’s State Highway Infrastructure Report can be found on FHWA’s State Performance Dashboard website. Wisconsin’s State Trunk Highway (STH) system continues to support the state’s economy, the mobility needs of Wisconsin citizens and the broader public good. The WisDOT owned STH System encompasses 11,742 center-line miles and 5,328 bridges. The NHS is a high priority subset of the STH system, representing nearly 45% of STH center-line miles and carrying 80% of STH vehicle miles. The state-owned STH system includes approximately 5,318 NHS center-line miles along with 3,260 NHS bridges. There are also 650 NHS center-line miles and 312 NHS bridges under the jurisdiction of local governments in Wisconsin. WisDOT manages and prioritizes investments of the roadway and bridges using data-driven analysis with the goal of allocating funding to the “right” place, at the “right” time and for the “right” type of improvements. Flexible and responsive planning, budgeting and project delivery
2022 – 2025 Statewide Transportation Improvement Program 11 – 11
processes ensure WisDOT makes the best possible use of the resources available. By implementing the data-driven set of NHS infrastructure investments, WisDOT fully expects its NHS pavement and bridge condition targets will be met. Federal law requires each state DOT to document its 10-year investment plan for the NHS in a Transportation Asset Management Plan (TAMP). The NHS investment plan presented in the TAMP must be constrained by the level of funding expected to be reasonably available. Each state DOT must also develop targets for NHS pavement and bridge conditions, demonstrate that their NHS investment plan was developed using sound asset management processes, and document whether the plan will allow their NHS pavement and bridge targets to be met. Wisconsin’s TAMP can be found on the WisDOT internet site: Transportation Asset Management Plan (TAMP) There is a direct relationship between the TAMP and the STIP, with the STIP providing further assurance that the TAMP will be implemented over time.
2022 – 2025 Statewide Transportation Improvement Program 11 – 12
System Performance, Freight Movement, and Congestion Management Air Quality Performance Measures
National Performance Management Measures Third Performance Measure Rule (PM3) Pursuant to the regulations promulgated by the U.S. Department of Transportation Federal Highway Administration (FHWA), the Wisconsin Department of Transportation (WisDOT) has established statewide targets for the federal performance measures intended to assess the performance of the National Highway System, freight movement on the Interstate System and Congestion Mitigation and Air Quality (CMAQ) Improvement Program. WisDOT and the Southeastern Wisconsin Regional Planning Commission (SEWRPC) collectively agreed to unified targets for the Peak Hour Excessive Delay (PHED) measure and the Non-Single Occupancy Vehicles (Non-SOV) measure for the Milwaukee urbanized area. The 2019 and 2021 targets for the six performance measures are identified in Exhibits C and D Additionally, WisDOT coordinated with the Minnesota Department of Transportation (MnDOT) and the Metropolitan Council (Council), the Minneapolis-St. Paul metropolitan area MPO, to establish PHED and Non- SOV performance measures. The PHED and Non-SOV targets that MnDOT, WisDOT, and the Council collectively established are included in Exhibit D. The system performance, freight movement and CMAQ measures were analyzed with the establishment of a PM3 Workgroup consisting of WisDOT (central office), Region, and SEWRPC staff members. The PM3 Workgroup then provided target recommendations to WisDOT management for input and approval. The reliability measure uses the National Performance Management Research Data Set (NPMRDS). Due to a new data provider and methodologies, only one year of NPMRDS data was available at the time the PM3 measures were required to be established. The PM3 workgroup continues to monitor and analyze the PM3 measures and targets as NPMRDS data becomes available. The reliability measures are based on the following metrics:
• Travel Reliability Metric: 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝑜𝑜𝑜𝑜 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿 𝑅𝑅𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅𝑇𝑇𝐿𝐿𝑇𝑇𝑅𝑅𝑅𝑅 (𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅) = the 80𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿 divided by the 50𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿. Road segments with a LOTTR less than 1.5 were deemed reliable. • Freight Reliability Metric: 𝑇𝑇𝑇𝑇𝑇𝑇𝑝𝑝𝑇𝑇 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿 𝑅𝑅𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅𝑇𝑇𝐿𝐿𝑇𝑇𝑅𝑅𝑅𝑅 (𝑇𝑇𝑇𝑇𝑇𝑇𝑅𝑅) = 95𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿 divided by 50𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿. Lower TTTRs relate to being more reliable.
The PHED targets were established as required using the following datasets: NPMRDS, Highway Performance Management System (HPMS), WisDOT travel data, posted speeds, and SEWRPC modeling data. As part of FHWA’s Transportation Performance Management program, state DOT’s were required to submit a Mid Performance Period (MPP) progress report in 2020. The 2-year conditions reported for Travel Reliablity on the Interstate and non-Interstate NHS, Freight Reliability on the Interstate, and Peak Hours Excessive Delay for the Milwaukee and Minneapolis-St. Paul Urbanized Areas were all within established targets. Full performance period targets (to be reported in 2022) are on
2022 – 2025 Statewide Transportation Improvement Program 11 – 13
track to be met. Wisconsin’s State Highway Reliabilty report can be found on FHWA’s State Performance Dashboard website.
Exhibit C
Wisconsin Department of Transportation Measure 2017
Results
2-Year Target (2019)
4-Year Target (2021)
Travel Reliability 1) Percent of person-miles traveled that are reliable on the Interstate
97.9%
94.0%
90.0%
2) Percent of person-miles traveled that are reliable on Non-Interstate NHS 93.9% NA* 86.0% Freight Reliability 3) Truck Travel Time Reliability Index on the Interstate
1.16
1.40
1.60
Peak Hour Excessive Delay 4) Annual Hours of Peak Hour Excessive Delay per Capita on NHS routes in the
Milwaukee Urbanized Area
8.96
Hours per capita
NA*
8.6 Hours per capita
Non-SOV Travel 5) Percent of Non-SOV Travel on NHS routes in the Milwaukee Urbanized Area 20.3%
(2016) 20.2% 20.1%
Emission Reductions 6) Total Emissions Reductions in nonattainment or maintenance areas for:
• VOC • NOx • PM2.5
41.754 Kgs 89.747Kgs 5.287 Kgs
12.154 Kgs 90.354 Kgs 9.043 Kgs
30.123 Kgs 150.388 Kgs 13.820 Kgs
Exhibit D Minneapolis-St. Paul-MN-WI Urbanized Area Measure
2017 Results
2-Year Target (2019)
4-Year Target (2021)
Peak Hour Excessive Delay 4) Annual Hours of Peak Hour Excessive Delay per Capita on NHS routes in the
Minneapolis-St. Paul Urbanized Area
8.65
Hours per capita
NA*
8.50
Hours per capita
Non-SOV Travel 5) Percent of Non-SOV Travel on NHS routes in the Minneapolis/St. Paul Urbanized Area
23.2% (2016)
25.0% 25.0%
* Targets not required per rule
The Non-SOV targets were established using the U.S. Census Non-SOV data and analyzing the previous five years of Non-SOV percentages for the Milwaukee and Minneapolis/St. Paul urbanized areas. CMAQ Public Access System data was used to determine the Emission Reduction targets. The Public Access System data includes estimated emission reductions for projects funded by the FHWA CMAQ program. FHWA CMAQ funding is limited to projects that are within an air quality non-attainment or maintenance area.
2022 – 2025 Statewide Transportation Improvement Program 11 – 14
Two-year results for Non-SOV Travel and Emission Reductions submitted in 2020 as part of the Mid-Period Performance Progress Report were generally in line with targets, and 4-year targets are on track to be met. WisDOT will continue to monitor all PM3 measures and use the results to include project development and strategies to meet the established targets.
WisDOT’s Federal Performance Measure Webpage More information on WisDOT’s Federal Performance Measures can be found at: WisDOT - Federal Transportation Performance Measures
2022 – 2025 Statewide Transportation Improvement Program Tab 12
Summary
of
Public
Comments
2022 – 2025 Statewide Transportation Improvement Program Tab 12 - 1
Summary of Public Comments WisDOT received one comment on the Draft 2022 – 2025 STIP during the public comment period. Summary of the comment and WisDOT’s response are listed below. Comment: Staff member at the Brown County Planning Commision/Green Bay MPO inquired why the Oneida Public Transit was not shown on the Wisconsin Transit Systems mapping (page 5-3).
WisDOT’s Response: Thank you for the comment. The STIP transit map only reflects current recipients of funding (Federal and/or state) through WisDOT. The Oneida Nation did not apply for funding through WisDOT in 2021. While the Oneida Nation has applied for funding through WisDOT previously, they are also eligible to receive funding directly from FTA. Direct FTA recipients are not included to increase the transparency [i.e.clarity] of the mapping.
2022 – 2025 Statewide Transportation Improvement Program Tab 13
Amendments
2022 – 2025 Statewide Transportation Improvement Program 13 – 1
STIP Amendments The STIP is approved by WisDOT, FHWA, and FTA. Throughout the year, it may be necessary to amend the 2022 – 2025 STIP to incorporate projects not included in the original project listing. The following are changes that may necessitate a STIP amendment:
• significant change in the scope and/or cost of a project, • changing the letting date of a project beyond the four year STIP period, • adding/advancing a project to the STIP, etc.
All such amendments will be added to the STIP webpage for record-keeping purposes: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/stip.aspx.