2022-2025 Draft Statewide Transportation Improvement Program

474
Wisconsin Department of Transportation 2022 – 2025 STIP Statewide Transportation Improvement Program Prepared in accordance with 23 U.S.C. Sections 134 and 135

Transcript of 2022-2025 Draft Statewide Transportation Improvement Program

Page 1: 2022-2025 Draft Statewide Transportation Improvement Program

Wisconsin Department of Transportation

2022 – 2025

STIP

Statewide

Transportation Improvement

Program

Prepared in accordance with 23 U.S.C. Sections 134 and 135

Page 2: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Introduction This Statewide Transportation Improvement Program (STIP) is intended to satisfy the requirements of 23 U.S.C. Sections 134 and 135 and their implementing regulations 23 CFR 450 and 49 CFR 613. This STIP has been prepared in accordance with joint FHWA/FTA regulations (23 CFR Part 450 and 49 CFR Part 613) accounting for related statutory changes in Public Law 114-357 Fixing America’s Surface Transportation Act (FAST Act) enacted on December 4, 2015. All current project fund commitments anticipated by the Wisconsin Department of Transportation (WisDOT) during the four-year period from January 1, 2022 through December 31, 2025 are listed. The projects programmed in the STIP have been reviewed and prioritized by WisDOT in accordance with system asset management principles except as follows. In urbanized areas with populations of 200,000 or greater (Milwaukee, Madison, Appleton, Green Bay and Wisconsin portions of the Round Lake Beach, IL and Minneapolis/St. Paul, MN areas), federally funded projects off the National Highway System (NHS) have been reviewed and prioritized by the respective Metropolitan Planning Organizations (MPOs). In urbanized areas with populations between 50,000 and 200,000, federally funded projects off the NHS and State Trunk Highway Network (STN) have been reviewed and prioritized by the respective MPOs. Projects in areas with populations between 5,000 and 50,000 off the NHS and STN have been reviewed, prioritized, and approved under WisDOT’s formula-based entitlement process. The 2022 – 2025 STIP is based on anticipated state and federal funds. This overall multi-modal STIP reflects WisDOT’s currently approved state and local programs within the limits of apportioned federal aid. All projects in the 2022 – 2025 timeframe are affordable and selected for implementation. Any subsequent changes in the project listing involving the addition or deletion of projects or significant changes in project schedule or estimated cost will be processed in accordance with the STIP amendment or backlog advanceable process outlined herein prior to requesting obligation of federal funds on the project.

Page 3: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Certifications STATEWIDE TRANSPORTATION PLANNING PROCESS CERTIFICATION In accordance with 23 CFR 450.220, the Wisconsin Department of Transportation hereby certifies that its statewide transportation planning process is addressing major issues facing the State and its non-urbanized areas, and is being carried out in accordance with the following requirements:

(1) 23 U.S.C. 134 and 135, 49 U.S.C. 5303 and 5304, and this part; (2) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d–1) and 49 CFR

part 21;

(3) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity;

(4) Section 11101(e) of the Infrastructure Investment and Jobs Act (Public Law No: 117-58) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in DOT funded projects;

(5) 23 CFR part 230, regarding implementation of an equal employment opportunity

program on Federal and Federal-aid highway construction contracts;

(6) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49 CFR parts 27, 37, and 38;

(7) In non-attainment and maintenance areas, sections 174 and 176 (c) and (d) of the Clean

Air Act, as amended (42 U.S.C. 7504, 7506 (c) and (d)) and 40 CFR part 93;

(8) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance;

(9) Section 324 of title 23 U.S.C., regarding the prohibition of discrimination based on

gender; and

(10) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities.

Page 4: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Contents STIP contents are referenced by tabs as follows:

Tab 1 – STIP Financial Plan Tab 2 – STIP Financial Summary Tab 3 – Obligation Plan Tab 4 – Individual MPO TIP Approvals Tab 5 – Federal Transit Assistance Programs Tab 6 – Federal Railroad Administration Program Tab 7 – Roadway and Bridge Improvement Programs Tab 8 – Backlog Advanceable Pilot Program Tab 9 – Federal Lands Transportation Improvement Programs Tab 10 – Public Involvement Tab 11 – Performance Measures Tab 12 – Summary of Public Comments Tab 13 – Amendments

Page 5: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 1

STIP

Financial

Plan

Page 6: 2022-2025 Draft Statewide Transportation Improvement Program

____________________________________________________________________________ 2022 – 2025 Statewide Transportation Improvement Program 1 – 1

Financial Plan The Statewide Transportation Improvement Program (STIP) financial plan addresses fiscal constraint requirements of the federal-aid surface transportation act. In managing the implementation of the transportation improvement program, WisDOT will exercise the authority to refinance projects among federal, state, and local funds, and to reschedule projects within the four years of the STIP to maintain fiscal constraint. All four years of the STIP are fiscally constrained within Wisconsin’s state fiscal years (July 1 – June 30). Revenue Assumptions The Wisconsin Department of Transportation’s annual budget is set biennially through the State of Wisconsin’s budget process. State Fiscal Year 2022 is from 2021 Wisconsin Act 58, the State of Wisconsin’s 2021 – 2023 Biennial Budget authorizing federal, state, and local funding for this year. Since Wisconsin’s budget is approved for only two years at a time, this analysis assumes the budget approved for State Fiscal Year (SFY) 2023 will be held constant for SFY 2023 – SFY 2025. The federal fund revenue approved in 2021 Wisconsin Act 58 and included in this plan is $808 million for SFY 2022. Since SFY 2023 – SFY 2025 budget amounts are held constant, future budgets are not increased; however, for planning purposes, the program schedule is set by applying an inflation rate to projects in the second, third, and fourth years to account for costs in the year of expenditure dollars. WisDOT cannot assume that a future state legislature will commit higher project revenues than exists in the approved biennial budget. Therefore, when doing an all funds (federal, state, and local) analysis, WisDOT uses only resources approved in the most recent biennial budget except where noted. Any future legislative budget action that impacts revenue or programming will be accounted for in Amendments to the STIP. Wisconsin law allows WisDOT to allot additional local revenue authority on an as-needed basis depending on the summation of local municipal agreement revenue received within the fiscal year. Similarly, it is WisDOT’s policy to allot additional federal authority to programs in which federal funds are programmed. Local Programs The programs directed at the locally-owned system face unique challenges due to the wide range of owners. WisDOT is working closely with local partners to formalize change management and programming strategies to reduce the movement of projects between fiscal years. In the past few years, WisDOT implemented project ‘sunsets’ as a management strategy to reduce project movement. In addition, state law requires Transportation Alternatives (290) Program projects must be commenced within four years of the date the grant is awarded. Wisconsin has the flexibility to allocate funds between subprograms within overall programming to balance under and over programming each biennium in the four-year STIP period. WisDOT routinely does this formally during the current fiscal year. However, because of local project movement, there may be periods of time where one year or program is over programmed, and another year or program is under programmed. WisDOT may also briefly experience a greater dollar amount in the schedule due to estimate changes and project slippage. The Department tries to avoid moving projects out because lining up the necessary local match can be a challenge. WisDOT has very clear program guidance regarding available funding. To remain fiscally constrained, projects are rescheduled or funds are transferred between programs.

Page 7: 2022-2025 Draft Statewide Transportation Improvement Program

____________________________________________________________________________ 2022 – 2025 Statewide Transportation Improvement Program 1 – 2

Program Cost and Schedule Assumptions WisDOT’s Financial Integrated Improvement Programming System (FIIPS) reflects estimates of transportation improvement project costs in current 2021-year dollars. To change these values to the federally-mandated year of expenditure amounts for this publication, SFY 2023 – SFY 2025 project cost estimates in the Financial Plan table have been manually inflated by 1.74%. This inflationary rate is based on the current ten-year average change in the Consumer Price Index and matches the rate assumed by Wisconsin MPOs in their TIPs and long-range plans. Project estimates in SFY 22 reflect current cost expectations, so they have not been inflated in the table. The Federal Highway Administration requires state Departments of Transportation STIPs and Metropolitan Planning Organizations TIPs to document revenues and expenditures annually. In Wisconsin, these publications report estimates by calendar year, (January 1 – December 31), based on letting or delivery dates. Since the State of Wisconsin approves budgets by State Fiscal Year, (July 1 – June 30), the 2022 – 2025 STIP Financial Summary table shows revenue and programmed amounts according to State Fiscal Years. Operation and Maintenance Wisconsin’s 2021 – 2023 Biennial Budget authorizes WisDOT’s Highway Maintenance, Repair and Traffic Operations Program (305) to spend $302 million per year. Of that amount, approximately $10 million per year is authorized for Intelligent Transportation System and Traffic Signal Improvements; those projects are reflected in the 2022 – 2025 Financial Summary. Wisconsin allocates state funding under several programs to assist local governments with the operation, maintenance and improvement of highways and bridges on the local system.

Program SFY 2022 SFY 2023 SFY 2024 SFY 2025

General Transportation Aids (GTA) (Total)

$510,152,500 $520,355,600 $520,355,600 $520,355,600

Connecting Highway Aids $12,063,500 $12,063,500 $12,063,500 $12,063,500

Lift Bridge Aids $2,659,200 $2,659,200 $2,659,200 $2,659,200

County Forest Road Aids $320,600 $320,600 $320,600 $320,600

TOTALS $525,195,800 $535,398,900 $535,398,900 $535,398,900

State statute requires that local agencies submit pavement condition ratings to WisDOT every two years to monitor responsible use of state funding assistance provided for local transportation needs. Information on these programs, including allocation formulas, can be found at https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/default.aspx. It has been historically demonstrated that the level of funding set aside for operations and maintenance of the highway program has been adequate. WisDOT expects this to continue into future years.

Page 8: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 2

STIP

Financial

Summary

Page 9: 2022-2025 Draft Statewide Transportation Improvement Program

Wisconsin Dept. of Transportation Final 2022-2025 STIP Financial Summary DTIM/BSHP/PFS

SFY Budget SFY Program (7) SFY Budget SFY Program

Inflated (3) SFY Budget SFY Program

Inflated (3) SFY Budget SFY Program

Inflated (3)

Local203 Rail Passenger Service (6) 6,800,000 - 6,800,000 - 6,800,000 54,306,304 6,800,000 -

205 Local Bridge Improvement Assistance 54,103,600 85,501,340 54,103,600 57,929,165 54,103,600 26,052,354 54,103,600 21,198,893

206 Local Transp Facility Improvement (4) 160,292,847 223,791,002 114,193,508 147,859,097 114,193,508 135,286,310 114,193,508 119,270,464

207 RR Crossing Improve, Protect & Repair 5,354,800 9,564,156 5,354,800 68,159,980 5,354,800 6,548,256 5,354,800 2,453,302

209 Transportation Economic Assistance 6,991,300 6,614,568 6,991,300 - 6,991,300 - 6,991,300 -

211 Congestion Mitigation & Air Quality Improvement 13,843,700 11,652,676 13,843,700 13,159,342 13,843,700 10,687,019 13,843,700 1,040,570

290 Transportation Alternatives 9,061,600 16,528,413 9,061,600 12,190,120 9,061,600 12,204,572 9,061,600 975,920

State

302Major Highway Development [includes bonding authority] 282,800,000 274,054,414 282,800,000 260,943,606 282,800,000 223,214,903 282,800,000 51,621,927

303State Highway Rehabilitation [includes bonding authority and what used to be 303SE] 1,050,884,500 1,061,111,104 1,041,299,100 845,898,911 1,041,299,100 873,556,899 1,041,299,100 882,381,062

301SE WI Freeway [includes bonding authority and Programs 301NS and 301ZO] 20,000,000 24,379,478 22,000,000 25,893,028 22,000,000 8,711,977 22,000,000 7,303,576

304 Major Interstate Bridge (5) - - - - - - - -

305 Highway Maint, Repair & Traffic Operations 11,894,292 11,894,292 9,651,142 9,651,142 3,061,166 3,061,166 1,296,166 1,296,166

Grand Totals 1,622,026,639 1,725,091,445 1,566,098,750 1,441,684,391 1,559,508,774 1,353,629,760 1,557,743,774 1,087,541,879

(1) Budget amounts reflect the approved biennial state budget for SFY 2022 - 2023, along with estimated budget for SFY 2024 - 2025.

(2) Budget amounts ["SFY Budget"] and Scheduled expenditures ["SFY Program"] are based on the state fiscal year (July – June).

(3) Legislative Sub-Program 209 currently does not have any dollars programed for SFY 2023 through SFY 2025.

(4) Sub-Program 206: SFY 2022 has local match of $88,010,047 and SFY 2023 has a local match of $41,910,708.

(5) Legislative Sub-Program 304 currently does not have any dollars programed for SFY 2022 through SFY 2025.

(6) Legislative Sub-Program 203 currently does not have any dollars programed for SFY 2022, 2023, or 2025.(7) SFY 2022 program levels in Legislative Sub-Programs 205 and 206 will be balanced through the use of carryover funding available as a result of General Fund supplements in the last two federal appropriations acts and prior state legislative actions in previous programming and budget cycles.

2022 2023 2024 2025

Legislative Sub-Programs (1&2)

Page 1 1/5/2022

Page 10: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 3

Obligation

Plan

Page 11: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 3 – 1

Obligation Plan In any given federal fiscal year (October 1 – September 30), the Wisconsin Department of Transportation obligates all the federal fund authority it receives. Federal Fund Type Constraint On November 15, 2021, the Bipartisan Infrastructure Law (BIL) was signed by the president following passage by Congress. This represents a new multi-year reauthorization of federal surface transportation programs and funding. As of January 6, 2022, federal funding authority under the new BIL had not yet been provided to states, though multi-year apportionment estimates were made available by the Federal Highway Administration. WisDOT’s approach to programming incorporates federal funding flexibilities permitting transfer of funds between federal programs and the use of Advance Construction (AC), under which eligibility for federal funding is established to allow a project to proceed prior to obligation of federal funding. Under these provisions, specific federal fund types may be over programmed if the overall federal program in total is constrained across the four-year period. WisDOT also reserves federal funding associated with special obligation limitation to offset over programming and to cap the amount of funding under advance construction. WisDOT’s fiscally conservative standards do not allow the use of AC to exceed the level of apportionments received from FHWA. In other words, AC is used as a tool to manage the timing of obligation but not to increase the number of projects undertaken. When a project is funded with federal AC funds, WisDOT covers the federal cost-share with general transportation state funds until the funds can be obligated using available apportionments and obligation limitations. This ensures Wisconsin’s commitments are fiscally constrained within a guaranteed federal reimbursement level. Federal Fund Type Assessment Wisconsin Estimated FFY 2022 – 2025 Federal Aid Highway Apportionments and Program Levels table lists federal apportionment balances at the end of FFY 2021, the amount apportioned for FFY 2022, and estimated apportioned amounts for FFY 2023 – 2025. Over the past six years, WisDOT’s total federal obligation limitations (including Equity Bonus) have remained relatively flat and were $802 million in FFY 2021. The total expected federal funds available for obligation each state fiscal year is inflated beginning in FFY 2023 at 2.0% per year based on apportionment estimates in the BIL. To change the state fiscal year estimated program levels to the federally mandated year of expenditure amounts, cost estimates have been inflated 1.74% per year beginning in SFY 2023, similar to the Financial Plan table. As a further check, the STIP is fiscally constrained over the four-year period. This ensures that revenues exist to convert all projects advanced under advance construction within the period of the STIP.

Page 12: 2022-2025 Draft Statewide Transportation Improvement Program

January 3, 2022 January 3, 2022Fiscal Constraint Report Fiscal Constraint Report

Federal Fund Type Unobligated Balance from Previous Years (1) 

 FFY 2022 Apportionments (8) 

 SFY 2022 Estimated Program Levels 

 FFY 2023 Estimated Apportionments (2) 

 SFY 2023 Estimated Program Levels 

 FFY 2024 Estimated Apportionments (2) 

 SFY 2024 Estimated Program Levels 

 FFY 2025 Estimated Apportionments (2) 

 SFY 2025 Estimated Program Levels 

 Total FFY 2022‐2025 Estimated 

Apportionments (3) 

 Total SFY 2022‐2025 Estimated Program Levels 

Apportioned FundsNational Highway Performance Program 16,696,508$                        462,809,389$                       277,706,899$                         462,809,389$                        523,630,603$                       462,809,389$                        545,622,523$                        462,809,389$                         376,587,304$                        1,851,237,556$                     1,723,547,330$                     Surface Transportation Block Grant 84,132,273$                        233,050,101$                       193,214,889$                         233,050,101$                        288,514,308$                       233,050,101$                        279,724,257$                        233,050,101$                         306,641,429$                        932,200,404$                         1,068,094,883$                     Congestion Mitigation Air Quality 42,777,444$                        28,612,578$                          9,550,271$                             28,612,578$                          10,504,930$                         28,612,578$                          7,943,897$                            28,612,578$                           472,960$                                114,450,312$                         28,472,058$                          Safety 38,612,546$                        50,872,817$                          37,923,130$                           50,872,817$                          54,561,342$                         50,872,817$                          41,684,941$                          50,872,817$                           35,884,690$                          203,491,268$                         170,054,102$                        Transportation Alternatives 41,478,424$                        17,483,397$                          7,128,254$                             17,483,397$                          7,153,817$                            17,483,397$                          8,425,597$                            17,483,397$                           ‐$                                             69,933,588$                           22,707,668$                          National Highway Freight Program 3,148,491$                           27,748,798$                          ‐$                                              27,748,798$                          ‐$                                            27,748,798$                          ‐$                                             27,748,798$                           ‐$                                             110,995,192$                         ‐$                                             Sub‐Total ‐ Apportioned Funds 226,845,685$                      820,577,080$                       525,523,443$                         820,577,080$                        884,364,999$                       820,577,080$                       883,401,215$                       820,577,080$                         719,586,383$                        3,282,308,320$                     3,012,876,041$                    Minimum Guarantee/Equity Bonus (4) ‐$                                           ‐$                                            3,778,461$                             ‐$                                             2,078$                                   ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              3,780,538$                             National Highway Performance Program ‐ Exempt (4) 23,774,792$                        11,761,106$                          361,932$                                 11,761,106$                          ‐$                                            11,761,106$                          ‐$                                             11,761,106$                           ‐$                                             47,044,424$                           361,932$                                Highway Infrastructure ‐ Exempt (4) 57,341,277$                        26,999,863$                          40,003,760$                           26,999,863$                          1,651,854$                            26,999,863$                          ‐$                                             26,999,863$                           ‐$                                             107,999,452$                         41,655,614$                           Total ‐ Apportioned Funds, Equity Bonus, and NHPP Exempt  307,961,755$                      859,338,049$                       569,667,596$                         859,338,049$                        886,018,931$                       859,338,049$                       883,401,215$                       859,338,049$                         719,586,383$                        3,437,352,196$                     3,058,674,125$                    Advanced Construction ‐$                                           ‐$                                            633,269,116$                         ‐$                                             ‐$                                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              633,269,116$                         Total ‐ Apportioned Funds, Equity Bonus, and NHPP Exempt, and Advance Construction 

307,961,755$                      859,338,049$                       1,202,936,711$                     859,338,049$                        886,018,931$                       859,338,049$                       883,401,215$                       859,338,049$                         719,586,383$                        3,437,352,196$                     3,691,943,241$                    

Allocated FundsCOVID Relief Funding (7) 131,418,628$                      ‐$                                            101,188,746$                         ‐$                                             9,810,000$                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              110,998,746$                        Build Grant ‐$                                           ‐$                                            ‐$                                              ‐$                                             ‐$                                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              ‐$                                             INFRA Grant ‐$                                           ‐$                                            ‐$                                              ‐$                                             ‐$                                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              ‐$                                             High Priority Projects 43,989,764$                        ‐$                                            535,659$                                 ‐$                                             ‐$                                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             ‐$                                              535,659$                                Federal Lands Access Program (5) ‐$                                           160,000$                               401,600$                                 160,000$                                1,906,000$                            160,000$                                ‐$                                             160,000$                                 ‐$                                             640,000$                                2,307,600$                             Recreational Trails Program (5) ‐$                                           2,146,076$                            ‐$                                              2,146,076$                            ‐$                                            2,146,076$                            ‐$                                             2,146,076$                             ‐$                                             8,584,304$                             ‐$                                             Other (6) 13,425,225$                        7,651,923$                            8,089,199$                             7,651,923$                            2,186,702$                            ‐$                                             ‐$                                             ‐$                                              ‐$                                             15,303,846$                           10,275,901$                          Total Allocated Funds 188,833,617$                      9,957,999$                            110,215,204$                         9,957,999$                            13,902,702$                         2,306,076$                            ‐$                                             2,306,076$                             ‐$                                             24,528,150$                           124,117,906$                        

(2) FFY Estimated Apportionments are based on the FAST Act. Estimated Apportionment amounts are calculated on inflation amount of 2% based on FAST Act for FFY 2022‐2025.

(3) Unobligated balances from Previous Years are not included in the FFY 2022‐2025 Estimated Apportionments Total.

(5) Federal Lands Access Program and Recreational Trails Program are programmed on an annual basis.

(1) Unobligated Balances reflect prior year SAFETEA‐LU, MAP‐21, and Fast Act Program Balances. SAFETEA‐LU & MAP‐21 fund programs, e.g., IM, NHS, have been rolled into the corresponding FAST Fund Type.

(4) Equity Bonus & NHPP Exempt Funds Used to balance programming in FFY 2022 through FFY 2025 are applied by reducing the Unobligated Equity Bonus Balance in Previous Years.  Unobligated Balances in Allocated Funds Categories (HPP, FLAP, RTP, Other) are similarly applied to balance estimated programming levels.

(6) Includes Section 112, Section 115, Section 117, PRNS, Highway Priority, Surface Transportation S129, NTPP, Map‐21 Training and Education, DBE Training, Skills Training, Ferry Boats; Emergency Relief, Highway‐Use Tax Evasion Project, Highways for Life Pilot Program and Misc. Demo funds.(7) COVID Relief funding respresents Wisconsin's FFY 2021 federal funding apportionment from the Coronavirus Response and Relief Supplemental Apprioriations Act of 2021 (CRRSA). This is one‐time fundingThe total includes $18,005,961 in Highway Infrastructure‐‐COVID Supplemental ‐ 23 U.S.C. 133(b) activities in urbanized areas with a population over 200,000.(8) FFY 2022 apportionments are listed as FFY 2021 totals, with FHWA Wisconsin Division Office concurrence. As of 1/3/2022, the FFY 2022 apportionment and obligation authority from the federal Bipartisan infrastructure Law of 2021 has not been finalized/loaded. Totals will be updated once this occurs.

Page 13: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 4

Individual

MPO TIP

Approvals

Page 14: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 4 – 1

Transportation Improvement Program Approvals

WisDOT Secretary Craig Thompson, under authority delegated by Governor Tony Evers, has approved all the following Transportation Improvement Programs (TIPs) and/or TIP Amendments for the Metropolitan Planning Organizations (MPOs). Approved TIPs and TIP Amendments are included by reference in the 2022 – 2025 STIP:

1. State Line Area Transportation Study (Beloit, WI-IL MPO); phone 608.364.6690;

2022 – 2025 TIP as adopted on October 4, 2021 by Resolution No. 2021 – 11 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.

2. West Central Wisconsin Regional Planning Commission (Chippewa-Eau Claire MPO); phone 715.836.2918; 2022 – 2026 TIP as adopted on October 6, 2021 by Resolution No. 21 – 07 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.

3. East Central Wisconsin Regional Planning Commission (Fond du Lac MPO); phone 920.751.4770; 2022 – 2025 TIP as adopted on October 6, 2021 by Resolution No. 06 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

4. East Central Wisconsin Regional Planning Commission (Fox Cities MPO); phone 920.751.4770; 2022 – 2025 TIP as adopted on October 29, 2021 by Resolution No. 25 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

5. Brown County Planning Commission (Green Bay MPO); phone 920.448.6480; 2022 – 2025 TIP as adopted on October 6, 2021 by Resolution No. 2021 – 08 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.

6. Janesville Metropolitan Planning Organization (Janesville MPO); phone 608.755.3085;

2022 – 2027 TIP as adopted on October 25, 2021 by Resolution No. 2021 – 07 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

7. La Crosse Area Planning Committee (La Crosse, WI-MN MPO); phone 608.785.5977; 2022 – 2025 TIP as adopted on November 17, 2021 by Resolution No. 9 – 2021 for the 2040 long-range plan and approved by WisDOT on December 15, 2021.

8. Madison Area Transportation Planning Board (Madison MPO); phone 608.266.4336; 2022 – 2026 TIP as amended on November 3, 2021 by Resolution No. 13 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

Page 15: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 4 – 2

9. East Central Wisconsin Regional Planning Commission (Oshkosh MPO); phone

920.751.4770; 2022 – 2025 TIP as adopted on October 29, 2021 by Resolution No. 26 – 21 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

10. Southeastern Wisconsin Regional Planning Commission (Milwaukee, Racine, Kenosha, and Wisconsin portions of Round Lake Beach MPOs); phone 262.547.6721; 2021 – 2024 TIP as amended on November 18, 2021 by Resolution No. 2021 – 12 for the 2050 long-range plan and approved by WisDOT on December 2, 2021.

11. Bay-Lake Regional Planning Commission (Sheboygan MPO); phone 920.448.2820;

2022 – 2025 TIP as adopted on October 29, 2021 by Resolution 10 – 2021 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.

12. Duluth-Superior Metropolitan Interstate Council, (Duluth-Superior MPO); phone

218.529.7541; 2022 – 2025 TIP as adopted on October 20, 2021 by Resolution No. 21 – 16 for the 2045 long-range plan and approved by WisDOT on December 15, 2021.

13. Marathon County Metropolitan Planning Commission (Wausau MPO); phone 715.261.6040; 2021 – 2024 TIP as amended on July 13, 2021 by Resolution No. 7 – 21 for the 2050 long-range plan and approved by WisDOT on September 3, 2021.

14. East Central Intergovernmental Association (Dubuque, IA MPO); phone 563.556.4166; 2022-2025 TIP as adopted on July 8, 2021 for the 2050 long-range plan and approved by WisDOT on December 15, 2021.

15. Metropolitan Council (Twin Cities MPO); phone 651.602.1000; 2021 – 2024 TIP as adopted on September 23, 2020 by Business Item 2020 – 237 for the 2040 long-range plan and approved by WisDOT on December 14, 2020.

Transit Funds Sections 5303, 5304, 5311, 5314, 5316 and 5317, are reflected in individual TIPs and are administered by WisDOT. Transit Funds Sections 5307, 5309, 5310 and 5339, are reflected in individual TIPs and can be administered by WisDOT or directly between FTA and the urbanized area transit operator.

Page 16: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 4 – 3

Page 17: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 5

Federal

Transit

Assistance

Programs

Page 18: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 5 – 1

Federal Transit Assistance Programs The following are federal transit assistance programs authorized under Fixing America’s Surface Transportation Act (FAST Act), which reauthorized the federal surface transportation programs. The FAST Act amended the federal transit laws and took effect October 1, 2015.

Section 5303: Metropolitan Transportation Planning Program Section 5303 is a formula-based grant program apportioned annually to states for use. All 5303 planning funds are transferred to the Federal Highway Administration. The federal share is 80% with a required 20% non-federal match. Section 5304: Statewide Transportation Planning Program Section 5304 is a formula-based grant program apportioned annually to the states for use in rural planning and research. The federal share is 80% with a required 20% non-federal match. Section 5307: Urbanized Area Formula Program This program provides grants to urbanized areas (over 50,000 in population) for public transportation capital, planning, and Job Access and Reverse Commute (JARC) projects, as well as operating expenses in certain circumstances. The federal share for capital projects is 80% with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. WisDOT allocates the portion of this funding known as the ‘Governor’s Apportionment’ among transit systems in communities with populations between 50,000 and 200,000 as defined by the most recent Census. Section 5310: Enhanced Mobility of Seniors and Individuals with Disabilities This program is intended to enhance the mobility of seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. This program consolidated two SAFETEA-LU programs: Section 5317 – New Freedom and Section 5310 – Elderly and Disabled Capital Assistance. The federal share for capital projects is 80% with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. Section 5311: Formula Grants for Rural Areas Section 5311 is a formula grant program for non-urbanized areas (under 50,000 in population) that provides capital and operating assistance for public transportation systems. Eligible activities include capital, operating assistance, and planning expenses. JARC projects, once funded through Section 5316, became eligible projects in the MAP-21 reauthorization bill in 2012. The federal share for capital projects is 80%, with a required 20% non-federal match. The federal share for operating projects is 50% of the net deficit. Section 5311(b)(3): Rural Technical Assistance Program (RTAP) Section 5311(b)(3) is formula funding for states to provide research, technical assistance, and training to improve the delivery of transit services in non-urbanized areas (under 50,000 in population). There is no Federal requirement for a local match.

Page 19: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 5 – 2

Section 5329: State Safety Oversight (SSO) Program The purpose of the SSO program is to oversee the safety of rail transit systems. The SSO program is administered by eligible states with rail transit systems in their jurisdiction. FTA provides federal funds through the SSO Formula Grant Program for eligible states to develop and carry out their SSO programs. Under 49 U.S.C. Section 5329(e), as amended by the FAST Act, FTA is required to certify each state’s program to ensure compliance. SSO grant funds awarded to Wisconsin have a federal share of 80% and a required non-federal match of 20%. Section 5339: Bus and Bus Facilities Formula Grants Section 5339 provides capital funding to replace, rehabilitate, and purchase buses and related equipment, and to construct bus-related facilities. It replaced the Section 5309 Bus and Bus Facilities program under SAFETEA-LU. The federal share is 80% with a required 20% non-federal match. There are funds annually allocated to states by formula and a national discretionary program for which urban fixed-route transit systems and state departments of transportation may apply. Coronavirus Aid, Relief, and Economic Security (CARES) Act The CARES Act provides emergency assistance and health care response for individuals, families and businesses affected by the COVID-19 pandemic and provides emergency appropriations to support Executive Branch agency operations during the COVID-19 pandemic. All rural and urban recipients of Section 5311 and Section 5307 are eligible to receive CARES Act funds. Funding will be provided at a 100-percent federal share with no local match required, and will be available to support capital, operating, and other expenses eligible under those programs to prevent, prepare for, and respond to COVID-19. Coronavirus Response and Relief Supplemental Appropriations (CRRSAA) Act The supplemental funding due to the COVID-19 pandemic will be provided at 100-percent federal share, with no local match required. Funding will support expenses eligible under the relevant program, although the Act directs recipients to prioritize payroll and operational needs. All rural and urban public transit recipients of Section 5311 and Section 5307 and 5310 specialized transit recipeints are eligible to receive CRRSAA funds. American Rescue Plan (ARPA) Act Supplemental funding to support the nation’s public transportation systems as they continue to respond to the COVID-19 pandemic and support vaccinations in the U.S. The relief funds will be distributed at 100-percent federal share and are eligible to all rural and urban public transit recipients of Section 5311 and Section 5307 and 5310 specialized transit recipeints.

Page 20: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 5 – 3

Anticipated Federal Transit Funding Levels, 2022 – 2025 State of Wisconsin*

Program 2022 2023 2024 2025

FEDERAL LOCAL FEDERAL LOCAL FEDERAL LOCAL FEDERAL LOCAL

Section 5303[1] $1,574,646 NA $1,607,713 NA $1,640,832 NA $1,674,633 NA Section 5304 $345,740 $86,435 $353,000 $88,250 $360,272 $90,068 $367,693 $91,923

Type of local match Cash/tax levy Cash/tax levy Cash/tax levy Cash/tax levy

Section 5307[2] $18,333,640 $18,718,647 $19,104,251.13 $19,497,799

(Planning) $0 NA $0 NA $0 NA $0 NA

(Capital) $0 NA $0 NA $0 NA $0 NA

(Operating) $18,333,640 $18,333,640 $18,718,647 $18,718,647 $19,104,251 $1,187,855 $19,497,799 $1,212,325

Section 5310 $3,256,972 $3,325,368 $3,393,870.58 $3,463,784

(Administration) $325,697 $0 $332,537 $0 $339,387 $0 $346,379 $0 (Capital) $1,791,334 $447,834 $1,828,952 $457,238 $1,866,628 $466,657 $1,905,081 $476,270

(Operating) $1,139,940 $1,139,940 $1,163,879 $1,163,879 $1,187,855 $1,187,855 $1,212,325 $1,212,325

Type of local match Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy Cash / in-kind / Wis. 85.21/ levy

Section 5311 $18,834,742 $19,230,271 $19,634,107.00 $20,038,570

(Administration) $450,000 $0 $450,000 $0 $450,000 $0 $459,270 $0 (Rural Technical

Assist) $312,244 $0 $318,801 $0 $325,496 $0 $332,201 $0

(IC bus – Section 5311(f)) $2,825,211 NA $2,884,541 NA $2,945,116 NA $3,005,785 NA

(Capital) $2,432,705 $608,176 $2,493,242 $623,310 $2,555,050 $638,762 $2,607,684 $651,920

(Operating) $12,814,581 $12,814,581 $13,083,687 $13,083,687 $13,358,445 $13,358,445 $13,633,629 $13,633,629

Section 5329 $307,818 $76,954 $314,282 $78,570 $320,756 $80,189.05 $327,364 $81,841

Type of local match Wis. Stat. 85.066 Wis. Stat. 85.066 Wis. Stat. 85.066 Wis. Stat. 85.066

Section 5339[3] $3,161,945 $790,486 $3,228,346 $807,086 $3,294,850 $823,712.48 $3,362,724 $840,681 Cash/tax levy Cash/tax levy Cash/tax levy Cash/tax levy

[1] Section 5303 funds are transferred to the Federal Highways Administration. [2] Section 5307 are the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems. [3] Section 5339 funds combine WisDOT’s statewide allocation and the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems.

*Amounts shown in this table are annual estimates. The available amount for a program is based on funding as authorized under Fixing America’s Surface Transportation Act (P. L. 112-141, 2015). **Section 5303 funds are transferred to the Federal Highways Administration. ***Section 5307 are the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems. ****Section 5339 funds combine WisDOT’s statewide allocation and the Governor’s Apportionment. Funds are also allocated directly to large urban transit systems

Page 21: 2022-2025 Draft Statewide Transportation Improvement Program

Neillsville

Sun Prairie

Monona Milwaukee

Sheboygan

Ozaukee

Racine

Kenosha Western Kenosha

Walworth

Beloit

Janesville

Madison

Fond du Lac

Appleton

Oshkosh Manitowoc

Green Bay

Merrill

Eau Claire

La Crosse

Superior

Clark

Namekagon Transit

Bay Area Rural Transit

Oneida-Vilas Transit

Rusk

Chippewa Falls

Onalaska

Black River Falls

Tomah

Viroqua

Prairie du Chien

Reedsburg

Mauston

Baraboo Richland Center

Sauk Prairie

Marshfield

Wisconsin Rapids

Rhinelander

Marinette

Shawano

Clintonville

Waupaca

Plover

Stevens

Point

Ripon

Berlin

Waupun

Hartford Watertown

Lake Mills

Jefferson Waukesha

Stoughton

Edgerton Whitewater Monroe

to Escanaba

to MPLS/St.

Paul

to MPLS/

St. Paul

to

Ironwood

River Falls

New Richmond Dunn

Wisconsin Public Transit Systems 2021 Wisconsin Department of Transportation

Bureau of Transit, Local Roads, Railroads, & Harbors

This map identifies the general coverage areas of public transit systems within Wisconsin. For specific route information, contact transit systems directly.

Waukesha

Wausau Menominee

Transit

to Dubuque

Publicly Funded Inter-City Service

County-Wide Transit System

Multi-County Transit System

Fixed Route System

Shared Ride Taxi (SRT)

Shuttle/Commuter Service

Legend

Medford

Ft. Atkinson

Portage Beaver Dam

Platteville

West Bend

Grant

to Port Washington

to Mukwonago

Tribal Public Transit

Lac du Flambeau

Page 22: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 6

Federal

Railroad

Adminstration

Program

Page 23: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 6 – 1

For informational purposes only

Intercity Passenger Rail Projects

Several Federal Railroad Administration Program funded projects have been identified in studies of two existing intercity passenger rail corridors and are eligible for federal funding for final design and construction.

In addition, WisDOT has submitted federal discretionary grant applications under the Federal-State Partnership for State of Good Repair Program, Consolidated Rail Infrastructure and Safety Improvement (CRISI) and Better Utilizing Investments to Leverage Development (BUILD) programs in SFY 2018, SFY 2019, and SFY 2020 for five passenger rail projects. All five of these projects have been selected for grants and will be fully funded projects in SFY2021 and SFY2022.

Corridor Improvement Projects:

1) Adding one to three additional daily round-trip frequencies between Milwaukee and Chicago on the Hiawatha Service, in cooperation with the State of Illinois. The full corridor improvements would involve final design (SFY 2022 – 2023) and construction (SFY 2024 – 2025), pending completion of the Environmental Assessment and Service Development Plan (completion SFY 2022). The corridor improvements in Wisconsin are already underway. a) Projects in Wisconsin required to accommodate the additional round-trip frequencies

(capital costs provided are rounded preliminary estimates): i) Muskego Yard signalization and track/bridge improvements (Milwaukee):

$54.6 million ii) Milwaukee Airport Rail Station second platform with overhead access (Milwaukee):

$10.1 million iii) Centralized train control (CTC) signalization between Milwaukee Intermodal Station

and Cutoff (Milwaukee): $5.4 million

2) Adding one new state-supported intercity passenger rail frequency between Chicago and the Twin Cities on the Amtrak Empire Builder corridor. Final Design will commence in late 2021 through 2022, with construction in 2023 and 2024. Service will start late 2024. a) Infrastructure improvements in Wisconsin include:

i) Rebuild Second Canadian Pacific (CP) Rail Main Track to the west and east of the La Crosse Amtrak Depot and extend La Crosse CP Rail Yard Lead West

Page 24: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 6 – 2

SFY 2022 Final Design and Construction Projects:

At the time of publication of the STIP, there were five projects with grant applications selected for the award by the Federal Railroad Administration (FRA) for the final design and construction of passenger rail improvements. The selected projects were obligated in SFY2021 or will be obligated in SFY2022. 1) Milwaukee Airport Rail Station second platform with overhead access (Milwaukee):

$10.1 million Grant awarded 2) CTC signalization between Milwaukee Intermodal Station and Cutoff (Milwaukee):

$5.4 million Selected for award 3) Acquisition of three cab-coach cars and six coach cars for the Amtrak Hiawatha Service:

$38.9 million Grant awarded 4) Muskego Yard Improvements and freight train bypass of Milwaukee Intermodal Station

(Milwaukee): $54.6 million Selected for award

5) Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Project $53 million Selected for award

Federal funding sources include, but are not limited to, the following grant programs:

• Infrastructure for Rebuilding America (INFRA) • Consolidated Rail Infrastructure and Safety Improvement (CRISI) • Better Utilizing Investments to Leverage Development (BUILD) • Federal-State Partnership for State of Good Repair

Page 25: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 7

Roadway

and

Bridge

Improvement

Programs

Page 26: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 1

Roadway and Bridge Improvement Programs The pages that follow lists WisDOT's projects planned for implementation in Calendar Years 2022, 2023, 2024 and 2025. Projects are sorted in the following order:

CALENDAR YEAR

DIVISION-BUREAU (REGION)

COUNTY NAME

HIGHWAY NUMBER

SCHEDULE DATE

PROJECT ID It should be noted that the list contains some minimal over-programming (i.e. more projects than can be funded in a given year) to allow for attrition, that is, projects being delayed or dropped for other than financial reasons. Preliminary engineering projects will not be contained in the following list, although they are likely to be listed in the appropriate MPO TIP. It should also be noted that the FEDERAL FUND TYPE (or lack of) shown for each project represents a tentative fund assignment that may or may not become reality. WisDOT reserves the right to change the federal fund type on individual projects at any time prior to obligation, when necessary, consistent with its overall obligation plan to maximize the use of available federal aid. Programing based on FAST Act Funding Programs Federal-aid highway and transit funding programs are based on the 2015 transportation authorization act Fixing America’s Surface Transportation Act (FAST Act). WisDOT will make all required program adjustments in accordance with the FAST Act and any related federal regulations and guidance. Note: The estimated cost range is provided so that WisDOT can award projects by using the competitive process and not disclose bidding information.

Page 27: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 2

Funding Codes Fund Type Project Prefix Congestion Mitigation Air Quality CMAQ

Surface Transportation Program (STP) – state reference FAST Act program for the state STP is the Surface Transportation Block Grant (STBG) Program

STP

Highway Safety Improvement Program HSIP High Priority Projects HPP National Highway Freight Program

NHFP

National Recreational Trails (funds transferred to DNR) NRT

National Highway Performance Program NHPP

Discretionary Allocations ITS, ER

Bridge Replacement and Rehabilitation BR

Public Land and Forest Highway Programs PLH, FH

Statewide Metropolitan Planning Transportation Alternatives Program

SPR, PL TAP

Page 28: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 3

Local Programs All these programs, except for the Local Bridge Program, utilize federal and local funds to pay for local projects. In addition to federal and local funds, the Local Bridge Program may also utilize state funds to pay for local projects. Local Bridge Program: Funds the improvement of local bridges. This includes engineering and construction costs for administering and implementing bridge improvements on roads that are not a part of the State Trunk Highway (STH) System. Local Highway Improvement Assistance: Funds the improvement of local highways, including engineering, real estate, construction costs, and department services on roads that are not a part of the STH System.

STP Urban Program: Improvements in urban areas with populations greater than 5,000. Includes non-highway projects including multi-modal facilities, transit capital improvements, and bicycle and pedestrian facilities. STP Rural Program: Improvements to roads and streets functionally classified as higher than rural minor collectors. Includes non-highway projects including multi-modal facilities, transit capital improvements, and bicycle and pedestrian facilities.

Congestion Mitigation Air Quality (CMAQ): Funds projects that have a positive impact on air quality including highway efficiency improvements, carpooling, transit improvements, development of bicycle and pedestrian facilities, and alternative fuel facility and vehicle projects. These projects are located in or impact nonattainment and maintenance areas for criteria pollutants.

The Transportation Alternatives Program (TAP): Funds programs and projects defined as transportation alternatives, including on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, bicycle and pedestrian plans, and safe routes to school projects. It is the State of Wisconsin’s STBG-Set-Aside program.

Page 29: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 4

State Programs These programs utilize federal, state, and/or local funds to pay for projects located on the State Trunk Highway (STH) system. Major Highway Development: Major Highway Development projects are generally the most complex, costly and controversial projects initiated by WisDOT. They are long-term solutions to the most serious deficiencies on highly traveled segments of the highway system. A Major Project cost threshold is indexed to construction inflation. As of October 1, 2021, the cost thresholds are a total cost of more than $104.7 million for a High Cost Major or a total cost of more than $41.9 million for a Traditional Major. A Traditional Major project involves one of the following:

1) Constructing a new highway 2.5 miles or more in length; 2) Reconstructing or reconditioning an existing highway by one of the following:

a. Relocating 2.5 miles or more of an existing highway; b. Adding one or more lanes 5 miles or more in length to the existing highway; c. Improving to freeway standards 10 miles or more of an existing divided highway

having two or more lanes in either direction. A Traditional Major must be enumerated by the state legislature and a High Cost Major must be approved by the Transporation Projects Commission. Southeast Wisconsin Freeway Megaprojects: Southeast Freeway Megaprojects are also the most complex, costly and controversial projects initiated by WisDOT. This program provides funding for projects on the southeast Wisconsin freeway system. Like the Major Highway Development program, the megaproject cost threshold is indexed to construction inflation. As of October 1, 2021, the cost threshold for a Southeast Freeway Megaproject is $700.7 million. Megaprojects must be enumerated by the state legislature. State Highway Rehabilitation (SHR): The State Highway Rehabilitation subprogram funds improvements on Wisconsin’s state-owned highway system. Improvements funded in the SHR program include bridge preservation, bridge rehabilitation, bridge replacements, pavement preservation, pavement rehabilitation, pavement replacement, and intersection and interchange improvements. The program is managed as two separate sub-systems: The Backbone system and the 3R system. These two subsystems are managed as follows:

Backbone System: The Backbone Highway subprogram funds improvements on Wisconsin’s 1,597-mile Backbone highway system. The Backbone system includes all 878 miles of Interstate routes in the state and those freeways and expressways that are designated as Backbone roadways in Connections 2030, Wisconsin’s long-range transportation plan. Improvements funded in the Backbone Rehabilitation program include bridge preservation, bridge rehabilitation, bridge replacements, pavement preservation, pavement rehabilitation, pavement replacement, and intersection and interchange improvements.

3R System: The 3R program funds improvements (resurfacing, restoration, and rehabilitation) to existing roadways, the minor addition of lanes, traffic and safety

Page 30: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 5

improvements, and minor realignments of roadway. Improvements in this subprogram are categorized by the type of work involved:

o Resurfacing: Rehabilitating the surface of pavement to provide a smoother ride and to extend the pavement's structural life. Can also include pavement widening and/or shoulder paving to improve safety and reduce shoulder maintenance costs.

o Reconditioning: Resurfacing and improving an isolated grade, curve, or intersection.

o Pavement Replacement: The highest type of “resurfacing” whereby the existing pavement structure is replaced with a new one. Does not include widening of the roadway.

o Reconstruction: Total rebuilding of the highway to provide a safer facility, to improve geometrics (i.e. longer passing and stopping sight distances, broader turning radii, and additional lanes at intersections) and increased traffic handling capabilities. Other benefits are a smoother ride, reduced travel time and lower maintenance costs.

Major Interstate and High-cost State Highway Bridges: This subprogram includes two separate programs focusing on unique, high-cost structure projects across the state. Bridges are ineligible for this program if they are considered as part of a Southeast Wisconsin Freeway Megaprojects.

Major Interstate Bridge Program: A Major Interstate Bridge project is defined as any bridge project on a state highway that crosses a river forming a boundary of the state and for which the state’s estimated cost share is at least $100 million. The cost threshold for the Major Interstate Bridge program is not indexed to construction inflation High-cost State Highway Bridge Program: A High-cost State Highway Bridge project is defined as any bridge project on a state highway that has a total cost of more than $150 million. Bridges are ineligible for this program if they are considered as part of a Major Interstate Bridge project. The cost threshold for the High-cost bridge program is not indexed to construction inflation.

Highway Traffic Operations: This subprogram includes all the repair and operation of pavement markings, traffic signs, traffic operation improvements, and freeway detours. Maintenance Program: This program funds the refurbishment, repair, cleaning, painting, re-lamping, etc., of existing traffic control devices (TCDs). Although state crews do most of the routine maintenance on TCDs, the nature and/or volume of of some of the work requires outside help. The biggest items are sign refurbishment of the large freeway guide signs, cleaning and re-lamping of the highway lighting units, and traffic control signals on the system. Statewide Stand-alone Curb Ramp Program: This subprogram includes the design and construction of stand-alone curb ramp locations for the state trunk network including connecting highways. Stand-alone curb ramp locations are sites that are not within a roadway improvement project in the Six-year Program.

Page 31: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 6

Safety Programs All these programs utilize federal funds and the match is either state, local, or railroad funds, depending upon the jurisdiction of the highway and type of railroad project. These funds pay for activities that promote safety. The Highway Safety Improvement Program is incorporated into the safety-related projects listed by WisDOT Region in the STIP. Highway Safety Improvement Program (HSIP): A core federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads, including non-state-owned roads and roads on tribal land. HSIP utilizes a data-driven approach to improving safety on all public roads Railroad Crossing Warning Devices: Funds signal warning device installations, circuitry improvements, flashing lights, cantilevered flashing lights, and gates. Railroad Crossing Elimination of Hazards: Funds geometric improvements (grades), modular crossings, separations (limited because of high costs), consolidations, and closures.

Page 32: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 7

Project Listing Reference Information The tables on pages 7 – 7 through 7 – 9 are provided as a reference for the information within the preceding Tab 7 central office and region project listings:

Program (Pgm) code 205 Highway and local bridge improvement assistance 206 Local transportation facility improvement assistance 207 Railroad crossing improvement, protection, and repair assist 208 Multimodal transportation studies 209 Transportation facilities economic assistance and development 210 Surface transportation grants 211 Congestion mitigation and air quality improvement 290 Transportation alternatives 301 Southeast Wisconsin freeway megaprojects 302 Major highway development 303 State highway rehabilitation 304 Major interstate bridge construction 305 Highway maintenance, repair, and traffic operations

Contract Types

ATR TEA Rail Contract C/E Consultant Delivery (Preliminary or Construction Engineering)

CCO Contract Change Order (When a separate project ID is used) I/E In-house delivery (Prelim or Construction Engineering)

JTP Jurisdictional Transfer Payment (used only when a payment is being made to a local for work they are going to do on the roadway to be transferred)

LET Contract via Bid Letting LFA Local Force Account (replaces AUP, CRC and S&S) LLC Locally Let Contract M/E Municipal Engineering MIS Miscellaneous Negotiated Contract OST Other State Let Contract PRR Passenger Rail Service R/E Real Estate Acquisition (For encumbering real estate payments) R/R Railroad Contract SFA State Force Account TST Fund Transfer to Federal Transit Authority UTL Utility Contract (For compensable utility contracts)

Page 33: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 8

Concept Improvement Codes The FDM 11-1 Attachment 10.1 Improvement Strategies, Improvement Concepts, and Design Criteria Applications

Page 34: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 7 – 9

The following traffic operations improvement concepts should be used with Legislative Subprogram 305 – Highway Maintenance, Repair and Traffic Operations

Improvement Concept Code Improvement Concept Definition

TOPM STH – TRAFFIC OPERATIONS PAVEMENT MARKING – intended to cover all costs associated with general pavement marking including repainting centerline markings, lane line and no-passing zone markings, edge line-markings and special pavement markings on existing highways. Special markings include but are not limited to the following items: channelizing lines, railroad crossing markings, stop lines, crosswalks, words and symbols, arrows, diagonal markings, curb markings, parking stall lines, bike lane markings and island nose markings.

TOS STH – TRAFFIC OPERATIONS SIGNING – includes all work associated with the installation of new signs and supports along existing highways. It also includes the maintenance of highway signs, supports and sign bridges. Maintenance is defined as replacing, repairing, and refacing signs.

TOE STH – TRAFFIC OPERATIONS ELECTRICAL – includes all costs for the installation and maintenance of highway lighting (including relamping, repair, and replacement) and the maintenance of weigh station and sign lighting.

TOITS STH – TRAFFIC OPS INTELLIGENT TRANS SYSTEMS (ITS) – Intelligent Traffic Systems (ITS) are defined by FHWA as: …electronics, communications, or information processing used singly or in combination to improve the efficiency or safety of a surface transportation system. This definition provides the base for charging to program code 3890. Anticipated uses of 3890 will include but are not limited to: expenses relating to the operations and integration of ITS field devices, ITS deployment program planning expenses, and the expenses associated with the design and construction of ITS stand-alone project identified in the fiscal budget.

TOSIG STH – TRAFFIC OPERATIONS-TRAFFIC SIGNALS – includes all work associated with the installation, maintenance and repair of traffic control signals and beacons not part of an improvement project.

TOI STH – TRAFFIC OPERATIONS IMPROVEMENT BRIDGE REPAIR – only used for projects using sub-program 305 for urgent bridge repairs.

Page 35: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Central Office Projects

Page 36: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 1Central Office

DANE

2022-2025 FINAL STIP Project Listing 1Central Office

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-85-31 06/25/2024 207 R/R MISC 0.000 LOC STR C STOUGHTON, SOUTH STREET $250,000 - $499,999

WSOR X-ING 391675D

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

Page 37: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 2Central Office

DODGE

2022-2025 FINAL STIP Project Listing 2Central Office

DODGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-85-30 06/25/2024 207 R/R MISC 0.000 CTH CC T WESTFORD, CTH CC $250,000 - $499,999

UP X-ING 179164N

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

2024 1009-85-32 06/25/2024 207 R/R MISC 0.000 CTH TW T HUBBARD, CTH TW $250,000 - $499,999

WSOR X-ING 387045C

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

Page 38: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 3Central Office

DOUGLAS

2022-2025 FINAL STIP Project Listing 3Central Office

DOUGLAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-89-10 06/25/2024 207 R/R MISC 0.000 LOC STR V OF SOLON SPRINGS, JACK PINE AVE $250,000 - $499,999

WCL RR X-ING 186095A

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

2024 1009-89-12 06/25/2024 207 R/R MISC 0.000 LOC STR V OF SOLON SPRINGS, MARION AVE $250,000 - $499,999

WCL RR X-ING 186096G

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

2024 1009-89-14 06/25/2024 207 R/R MISC 0.000 LOC STR T BENNETT, TOWN LINE RD $250,000 - $499,999

WCL RR X-ING 186106K

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

Page 39: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 4Central Office

DUNN

2022-2025 FINAL STIP Project Listing 4Central Office

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-89-22 06/25/2024 207 R/R MISC 0.000 CTH Q V DOWNING, CTH Q $250,000 - $499,999

WCL RR X-ING 693005W

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2023 1022-04-76 11/14/2023 303 LET MISC 0.420 IH 094 MENOMONIE - EAU CLAIRE $5,000,000 - $5,999,999

IH 94 SWEF 63 MENOMONIE

CONSTRUCTION/MISCELLANEOUS

ROADSIDE FACILITIES NON-FEDERAL

2023 1022-04-86 11/14/2023 303 LET MISC 0.000 IH 094 MENOMONIE - EAU CLAIRE $500,000 - $749,999

IH 94 SALT STORAGE FACILITY

CONSTRUCTION/MISCELLANEOUS

ROADSIDE FACILITIES NON-FEDERAL

Page 40: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 5Central OfficeEAU CLAIRE

2022-2025 FINAL STIP Project Listing 5Central OfficeEAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-89-24 06/25/2024 207 R/R MISC 0.000 CTH AF T BRIDGE CREEK, CTH AF $250,000 - $499,999

UP X-ING, FRA 183974M

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

2024 1009-89-21 06/25/2024 207 R/R MISC 0.000 CTH V T OF LINCOLN, CTH V $250,000 - $499,999

UP X-ING, FRA 183972Y

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

Page 41: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 6Central OfficeLA CROSSE

2022-2025 FINAL STIP Project Listing 6Central OfficeLA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1000-74-20 01/25/2022 207 R/E MISC 0.000 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999

LA CROSSE - ST. PAUL

INFRASTURE IMP FOR 2ND RND TRIP

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2022 1000-74-40 01/25/2022 207 UTL MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999

LA CROSSE - ST. PAUL

INFRASTURE IMP FOR 2ND RND TRIP

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FEDERAL

2022 1009-01-25 07/25/2022 290 MIS MISC 0.000 NONHWY

La Crosse Co SRTS Yr 1 of 2 $100,000 - $249,999

COUNTY-WIDE SAFE ROUTES TO SCHOOL

NON-INF SAFE ROUTES TO SCHOOL

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

2023 1000-74-51 04/25/2023 207 R/R MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $5,000,000 - $5,999,999

LA CROSSE - ST. PAUL

INFRASTURE IMP 2ND RND TRP WI ONLY

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-52 04/11/2023 207 LET MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $3,000,000 - $3,999,999

LA CROSSE - ST. PAUL

INFRASTURE IMP FOR 2ND RND TRIP

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-53 04/25/2023 207 R/R MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $15,000,000 - $16,999,999

Page 42: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 7Central OfficeLA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

LA CROSSE - ST. PAUL

INFRASTURE IMP 2ND RND TRP MN ONLY

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-54 04/25/2023 207 R/R MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $3,000,000 - $3,999,999

LA CROSSE - ST. PAUL

INFRASTURE IMP 2ND RND TRP WI ONLY

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-55 04/25/2023 207 R/R MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $15,000,000 - $16,999,999

LA CROSSE - ST. PAUL

INFRASTURE IMP 2ND RND TRP MN ONLY

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-70 05/09/2023 207 LET MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $250,000 - $499,999

LA CROSSE - ST. PAUL

INFRASTURE IMP FOR 2ND RND TRIP

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1000-74-71 05/09/2023 207 LET MISC 0.700 NONHWY

TCMC INTERCITY PASSENGER RAIL GRANT $500,000 - $749,999

LA CROSSE - ST. PAUL

INFRASTURE IMP FOR 2ND RND TRIP

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

NON-FHWA FEDERALFUNDING

2023 1009-01-26 07/25/2023 290 MIS MISC 0.000 NONHWY

La Crosse Co SRTS Yr 2 of 2 $100,000 - $249,999

REGION-WIDE SAFE ROUTES TO SCHOOL

Page 43: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 8Central OfficeLA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

NON-INF SAFE ROUTES TO SCHOOL

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

Page 44: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 9Central OfficeMILWAUKEE

2022-2025 FINAL STIP Project Listing 9Central OfficeMILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-86-26 06/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, GRANVILLE RD $250,000 - $499,999

WSOR RR X-ING 386976N

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNINGDEVICES

RAIL HWY PROTECT DEV FAST

2022 1009-01-12 02/25/2022 290 MIS MISC 0.000 NONHWY

MPS/ BIKE FED SRTS PROGRAM $100,000 - $249,999

SFY 2019 (YR1 OF 2)

Milwaukee Public Schools Program

TAP > 200,000 TRANS ALTERNATIVES >200KF

2022 1009-01-23 07/25/2022 290 MIS MISC 0.000 NONHWY

MPS SRTS Program Yr 1 of 2 $100,000 - $249,999

DISTRICT WIDE SAFE ROUTES TO SCHOOL

NON-INF SRTS YR 1 OF 2

TAP > 200,000 TRANS ALTERNATIVES >200KF

Page 45: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 10Central OfficeOUTAGAMIE

2022-2025 FINAL STIP Project Listing 10Central OfficeOUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1009-01-17 07/25/2022 290 MIS MISC 0.000 NON HWY City of Appleton SRTS Program $100,000 - $249,999

CI APPLETON ONLY SRTS YR 1

SAFE ROUTES TO SCHOOL YEAR 1 OF 2

TAP > 200,000 TRANS ALTERNATIVES >200K F

2023 1009-01-18 07/25/2023 290 MIS MISC 0.000 NON HWY City of Appleton SRTS PRGM $100,000 - $249,999

CI APPLETON ONLY YR 2 OF 2

NON-INF SAFE ROUTES TO SCHOOL

TAP > 200,000 TRANS ALTERNATIVES >200K F

2022 1130-44-73 02/25/2022 303 C/E MISC 0.220 USH 041 APPLETON- GREEN BAY $2,000,000 - $2,999,999

WRIGHTSTOWN SAFETY/WEIGHT FACILITY

DSN/ WEIGHT STATION

ROADSIDE FACILITIES NAT'L HWY SYSTEM

Page 46: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 11Central Office

ROCK

2022-2025 FINAL STIP Project Listing 11Central Office

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 1009-85-33 06/25/2025 207 R/R MISC 0.000 CTH J T CLINTON, CTH J $250,000 - $499,999

UP X-ING 177962E

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2024 1009-85-29 06/25/2024 207 R/R MISC 0.000 CTH M T OF FULTON, CTH M $250,000 - $499,999

WSOR X-ING 391644E

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

Page 47: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 12Central OfficeSHEBOYGAN

2022-2025 FINAL STIP Project Listing 12Central OfficeSHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1009-87-10 06/25/2023 207 R/R MISC 0.000 LOC STR C PLYMOUTH, CTH O (SOUTH ST) $100,000 - $249,999

WSOR X-ING 180332N

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV-FAST

Page 48: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 13Central Office

ST. CROIX

2022-2025 FINAL STIP Project Listing 13Central Office

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1020-01-80 05/10/2022 303 LET MISC 0.000 IH 094 HUDSON - BALDWIN $20,000,000 - $24,999,999

IH 94 SWEF 61 HUDSON

CONSTR/MISCELLANEOUS/SWEF

ROADSIDE FACILITIES NATIONAL HIGHWAY PERFFAST

2024 1009-89-23 06/25/2024 207 R/R MISC 0.000 LOCSTR

V WILSON $250,000 - $499,999

UP X-ING, FRA 183881T

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNINGDEVICES

RAIL HWY PROTECT DEV-FAST

2025 1009-89-25 06/25/2025 207 R/R MISC 0.000 LOCSTR

V ROBERTS, DIVISION STREET $250,000 - $499,999

UP X-ING, FRA 183845X

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNINGDEVICES

RAIL HWY PROTECT DEV FAST

2025 1009-89-26 06/25/2025 207 R/R MISC 0.000 LOCSTR

V ROBERTS, VINE STREET $250,000 - $499,999

UP X-ING, FRA 183844R

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNINGDEVICES

RAIL HWY PROTECT DEV FAST

Page 49: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 14Central OfficeSTATEWIDE

2022-2025 FINAL STIP Project Listing 14Central OfficeSTATEWIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1000-02-35 03/25/2022 303 MIS MISC 0.000 NON HWY COLLEGE OF MENOMINEE NATION $0 - $99,999

FY22 NATL SUMMER TRANS INSTITUTE

ADMIN- TRAINING/NSTI PROGRAM

STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST

2022 1000-02-36 03/25/2022 303 MIS MISC 0.000 NON HWY COLLEGE OF MENOMINEE NATION $0 - $99,999

FY22 NATL SUMMER TRANS INSTITUTE

ADMIN- TRAINING/NSTI PROGRAM

STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST

1000-02-37 303 I/E MISC 0.000 OFF SYS HWY CONSTR WORKFORCE PARTSHP $250,000 - $499,999

STRATEGIC WORKFORCE DEV OJT/SS

ADMIN - HCWP/SWB GRANT PROGRAM

STP - DISCRETIONARY OJT SKILLS TRNG PGRM EXT

2022 1000-02-34 01/25/2022 303 MIS MISC 0.000 OFF SYS FFY22 TRANS PROGRAM $250,000 - $499,999

OJT/SS PROGRAM FY2022

ADMIN - TRAINING OJT/SS PROGRAM

STP - DISCRETIONARY NATIONAL HIGHWAY PERF FAST

2022 1009-01-13 07/25/2022 290 MIS MISC 0.000 VAR HWY East Central WI SRTS Program $250,000 - $499,999

REGION-WIDE YEAR 1 OF 2

NON-INF SAFE ROUTES TO SCHOOL

TAP > 200,000 TRANSP ALTERNATIVES FLEX F

2022 1009-01-28 04/25/2022 290 MIS MISC 0.000 VAR HWY WI Bike Fed Dane Co SRTS Yr 2 $0 - $99,999

DANE CO SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL YR 2 OF 2

TAP > 200,000 TRANSP ALTERNATIVES FLEX F

2023 1009-01-14 07/25/2023 290 MIS MISC 0.000 VAR HWY East Central WI SRTS Program $250,000 - $499,999

REGION-WIDE SRTS YEAR 2 OF 2

NON-INF SAFE ROUTES TO SCHOOL

TAP > 200,000 TRANSP ALTERNATIVES FLEX F

Page 50: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 15Central OfficeWALWORTH

2022-2025 FINAL STIP Project Listing 15Central OfficeWALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-86-24 06/25/2024 207 R/R MISC 0.000 CTH F T DARIEN, CTH F $250,000 - $499,999

WSOR X-ING 388185H

RR OPS/SAFETY/OCR SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2024 1009-86-25 06/25/2024 207 R/R MISC 0.000 CTH K T DARIEN, CTH K $250,000 - $499,999

WSOR RR X-ING 388232N

RR OPS/SAFETY/OCR/SIGNALS&GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

Page 51: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 16Central OfficeWAUKESHA

2022-2025 FINAL STIP Project Listing 16Central OfficeWAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-86-27 06/25/2024 207 R/R MISC 0.000 LOC STR V EAGLE, PARTRIDGE ST $250,000 - $499,999

WSOR RR X-ING 391559P

RR OPS/SAFETY/OCR/SIGNALS&GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2024 1009-86-28 06/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, N 124TH ST/BOUNDARY RD $250,000 - $499,999

WSOR RR X-ING 386979J

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2025 1009-86-29 06/25/2025 207 R/R MISC 0.000 LOC STR T MERTON, KEESUS RD $250,000 - $499,999

UP X-ING 179046L

RR OPS/SAFETY/OCR/SIGNALS & GATES

SAFETY OCR - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

Page 52: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 17Central OfficeWINNEBAGO

2022-2025 FINAL STIP Project Listing 17Central OfficeWINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1009-01-10 02/25/2022 290 MIS MISC 0.000 VAR HWY ECWRPC SRTS PROGRAMMING $250,000 - $499,999

SFY 2022 (YR2 OF 2)

NONINFRASTRUCTURE PROGRAMMING

TAP > 200,000 TRANSP ALTERNATIVES FLEX F

Page 53: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Southwest Region Projects

Page 54: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 18Southwest Region

ADAMS

2022-2025 FINAL STIP Project Listing 18Southwest Region

ADAMS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 4701-98-23 01/25/2022 305 MIS TOPM 0.000 VAR HWY ADAMS COUNTY PAVEMENT MARKING $250,000 - $499,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 55: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 19Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5432-00-72 12/13/2022 205 LET BRRPL 0.199 CTH A STH 146 - STH 73 $2,000,000 - $2,999,999

UPRR BRIDGE, B-11-0173

CONST OPS/BRIDGE RECONSTRUCTION

LOCAL BRIDGES NON-FEDERAL

1012-00-00 303 I/E PVRPLA 6.620 IH 039 MADISON - PORTAGE $4,000,000 - $4,999,999

CTH CS TO IH 90

DES/PE-PS&E/PAVEMENTREPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERFFAST

1161-02-03 303 I/E BRRHB 0.215 IH 039 PACKWAUKEE - PORTAGE $1,000,000 - $1,999,999

WISCONSIN RVR BRS B-11-55 & B-11-56

DESIGN/FULL PS&E DECK REPLACE BRRHB

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1010-10-22 04/25/2022 302 R/E BRRPLE 1.200 IH 039 MADISON - PORTAGE $250,000 - $499,999

WISCONSIN RIVER BRIDGES B-11-22/23

RE/CONST 1010-10-82/BRRPLE

MAJORS NON-FEDERAL

2022 1010-10-42 08/25/2022 302 UTL BRRPLE 1.200 IH 039 MADISON - PORTAGE $2,000,000 - $2,999,999

WISCONSIN RIVER BRIDGES B-11-22/23

UTL/CONST 1010-10-82/BRRPLE

MAJORS NON-FEDERAL

2022 1011-01-65 05/10/2022 303 LET PSRS10 3.590 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999

SOUTH COUNTY LINE TO STH 60

CONST/PAVE REPAIR,BOTH RDWYS/PSRS

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1012-01-74 05/10/2022 303 LET RECST 1.700 IH 039 MADISON - PORTAGE $14,000,000 - $14,999,999

Page 56: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 20Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 60 INTERCHANGE, B-11-165 & 166

CONST/REPL BRIDGES, INTERCH/RECST

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1161-00-70 03/08/2022 303 LET RSRF20 0.573 IH 039 MADISON - PACKWAUKEE $1,000,000 - $1,999,999

IH 90/94/78 TO THE WISCONSIN RIVER

CONST/CONCRETE O'LAY B-11-51/RSRF

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1010-10-82 12/12/2023 302 LET BRRPLE 1.200 IH 039 MADISON - PORTAGE $100 MILLION OR GREATER

WISCONSIN RIVER BRIDGES B11-XXX/XXX

CONST/BRRPLE

MAJORS NATIONAL HIGHWAY PERF FAST

1014-00-04 303 I/E PVRPLA 3.440 IH 090 WISCONSIN DELLS - PORTAGE $1,000,000 - $1,999,999

STH 33 TO IH 39

DES/PE-PS&E/PAV'T REPLACEM/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 6215-00-73 12/13/2022 205 LET BRRPL 0.088 LOC STR TOWN OF SCOTT, INGLEHART RD $1,000,000 - $1,999,999

UPRR BRIDGE, B-11-0178

CONST OPS/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2022 6723-00-73 12/13/2022 205 LET BRRPL 0.104 LOC STR TOWN OF RANDOLPH, STERK RD $1,000,000 - $1,999,999

UPRR BRIDGE, B-11-0177

CONST OPS/BRIDGE REPLACMENT

LOCAL BRIDGES NON-FEDERAL

2023 6040-00-75 11/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF SCOTT, KOWALD ROAD $500,000 - $749,999

FOX RIVER BRIDGE, B-11-0181

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 6217-00-78 02/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF COLUMBUS, OLD STH 73 RD $1,000,000 - $1,999,999

Page 57: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 21Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CRAWFISH RIVER BRIDGE, B-11-0175

CONST OPS/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2022 6217-00-69 09/25/2022 290 LLC MISC 0.000 NON HWY C COLUMBUS, TRAIL NETWORK $500,000 - $749,999

VARIOUS CITY LOCATIONS

PEDESTRIAN/BICYCLE TRAIL

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

2022 6996-05-28 03/08/2022 290 LET MISC 0.000 NON HWY CITY OF PORTAGE, PORTAGE CANAL $500,000 - $749,999

ADAMS STREET TO CP RAILWAY BRIDGE

CONST - BIKE/PED PATH & REHAB CANAL

LOCAL ENHANCEMENTS HIGH PRIORITY PROJECTS SEC

1400-00-03 303 I/E MISC 0.012 STH 016 SALT STORAGE, COLUMBIA COUNTY $100,000 - $249,999

C OF PORTAGE

DES/PE-PS&E/REPLACE SALT SHED/MISC

BACKBONE NON-FEDERAL

2025 1400-00-73 02/11/2025 303 LET MISC 0.012 STH 016 SALT STORAGE, COLUMBIA COUNTY $1,000,000 - $1,999,999

C OF PORTAGE

CONST/REPLACE SALT SHED/MISC

BACKBONE NON-FEDERAL

6040-00-06 303 I/E PVRPLA 0.670 STH 033 C PORTAGE, COOK STREET $100,000 - $249,999

WISCONSIN RIVER TO STH 16

DESIGN-FULL PS&E/ PVRPLA

STATE 3R NON-FEDERAL

2022 6040-00-24 01/25/2022 303 R/E PVRPLA 0.050 STH 033 PORTAGE - FOX LAKE $0 - $99,999

KRUEGER RD TO UP RR BRIDGE B-11-066

REAL ESTATE

STATE 3R NON-FEDERAL

2022 6040-00-65 04/12/2022 303 LET RSRF10 7.614 STH 033 PORTAGE - FOX LAKE $2,000,000 - $2,999,999

Page 58: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 22Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

0.13 MI E OF JACKSON ST TO STH 22

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 6040-00-74 11/14/2023 303 LET PVRPLA 6.030 STH 033 PORTAGE - FOX LAKE $7,000,000 - $7,999,999

0.19 MI W OF MORRIS DRIVE TO STH 73

CONST/ PAVE REPLACE, B-11-66

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 6630-00-21 01/25/2022 303 R/E BRRPL 0.018 STH 044 PARDEEVILLE - MANCHESTER $0 - $99,999

FOX RIVER STRUCTURE B-11-132

RIGHT OF WAY/ BRRPL

STATE 3R NON-FEDERAL

2023 6630-00-70 11/14/2023 303 LET RSRF30 5.840 STH 044 PARDEEVILLE - MANCHESTER $2,000,000 - $2,999,999

STH 33 TO CTH HH

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 6630-00-81 11/14/2023 303 LET BRRPL 0.018 STH 044 PARDEEVILLE - MANCHESTER $750,000 - $999,999

FOX RIVER STRUCTURE

CONST/ STRUCTURE REPLACEMENT

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 6010-00-73 11/14/2023 303 LET COLD20 14.686 STH 060 ARLINGTON - COLUMBUS $9,000,000 - $9,999,999

STH 22 TO COMMERCE DRIVE

CONST/ COLD IN-PLACE RECYCLE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 3060-00-74 01/14/2025 303 LET RSRF30 1.316 STH 073 C COLUMBUS, LUDINGTON STREET $1,000,000 - $1,999,999

FAITH DRIVE TO MIDDLETON STREET

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5630-06-20 04/25/2022 303 R/E MISC 0.108 STH 078 SAUK CITY - IH 39 $0 - $99,999

Page 59: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 23Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BOX CULVERT C-11-3072

RIGHT OF WAY/ MISC

STATE 3R NON-FEDERAL

2025 5630-06-80 11/11/2025 303 LET MISC 0.108 STH 078 SAUK CITY - IH 39 $250,000 - $499,999

BOX CULVERT C-11-3072

CONS/REPLACE BOX CULVERT C-11-3005

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5640-04-20 01/25/2022 303 R/E RSRF20 6.234 STH 113 LODI - BARABOO $0 - $99,999

STH 60 TO STH 188

R/E OPERATIONS

STATE 3R NON-FEDERAL

2022 5640-04-22 10/25/2022 303 R/E RSRF20 4.860 STH 113 LODI - BARABOO $500,000 - $749,999

CTH J TO STH 188

REAL ESTATE

STATE 3R NON-FEDERAL

2023 5640-04-70 04/11/2023 303 LET PSRS40 6.234 STH 113 LODI - BARABOO $2,000,000 - $2,999,999

STH 60 TO STH 188

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5640-04-72 12/09/2025 303 LET PSRS40 4.818 STH 113 LODI - BARABOO $6,000,000 - $6,999,999

CTH J TO STH 188

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 6707-01-73 11/11/2025 303 LET RSRF30 13.240 STH 146 FALL RIVER - CAMBRIA $7,000,000 - $7,999,999

STH 16 TO STH 33

CONS/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 6020-00-40 04/25/2022 303 UTL RECST 0.000 USH 051 DEFOREST - PORTAGE $0 - $99,999

Page 60: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 24Southwest Region

COLUMBIA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 22/STH 60 INTERSECTION

UTL OPS/CENTURYLINK UTL 40

STATE 3R NON-FEDERAL

2023 6020-04-50 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $250,000 - $499,999

TOMLINSON ROAD TO ONTARIO STREET

R/R OPS - REHAB GRADE CROSSING/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 6020-04-51 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $0 - $99,999

TOMLINSON ROAD TO ONTARIO STREET

R/R OPS - REHAB GRADE CROSSING/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 6020-04-52 11/25/2023 303 R/R RSRF30 0.000 USH 051 DEFOREST - PORTAGE $100,000 - $249,999

TOMLINSON ROAD TO ONTARIO STREET

R/R OPS - CROSSING SIGNALS/RSRF30

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 6020-04-72 12/12/2023 303 LET RSRF30 10.711 USH 051 DEFOREST - PORTAGE $7,000,000 - $7,999,999

TOMLINSON ROAD TO ONTARIO STREET

CONST/ MILL & OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 1400-01-74 09/10/2024 303 LET RSRF20 0.000 USH 051 C PORTAGE, WISCONSIN STREET $250,000 - $499,999

PLEASANT STREET TO DEWITT STREET

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

1111-03-03 303 I/E BRRPL 0.017 USH 151 SUN PRAIRIE - BEAVER DAM $500,000 - $749,999

STH 16/60 B11-77; ROBBINS CR B11-86

DES/PE-PS&E/DECK & BRI RPL/BRRPL

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 61: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 25Southwest Region

CRAWFORD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5997-00-41 11/08/2022 206 LET RECST 0.800 LOC STR C PRAIRIE DU CHIEN, VILLA LOUIS RD $1,000,000 - $1,999,999

BLACKHAWK AVENUE TO TERMINI

CONST OPS/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2023 5540-02-71 11/14/2023 303 LET PVRPLA 8.507 STH 027 PRAIRIE DU CHIEN - VIROQUA $4,000,000 - $4,999,999

0.1 MI N NORTH AVENUE TO CTH C

CONST/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5160-07-70 12/13/2022 303 LET RSRF30 9.963 STH 035 PRAIRIE DU CHIEN - FERRYVILLE $9,000,000 - $9,999,999

CTH N TO CTH E/B-12-41,-42,-43,-45

CONST/MILL & OVERLAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 5160-07-72 11/11/2025 303 LET RSRF30 14.330 STH 035 PRAIRIE DU CHIEN - GENOA $7,000,000 - $7,999,999

CTH E TO OLD HWY 35

CONST/MILL & O'LAY/B-12-73/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 5180-00-70 01/10/2023 303 LET RSRF20 10.982 STH 060 BRIDGEPORT - BOSCOBEL $5,000,000 - $5,999,999

E JCT OLD HWY 60 TO KICKAPOO RIVER

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5180-00-71 01/10/2023 303 LET MISC 10.982 STH 060 BRIDGEPORT - BOSCOBEL $750,000 - $999,999

E JCT OLD HWY 60 TO KICKAPOO RIVER

CONST/SANITARY WATER/MISC

STATE 3R NON-FEDERAL

2023 5170-16-81 07/25/2023 303 OST BRRPL 0.430 STH 082 LANSING BRIDGE $40,000,000 - $44,999,999

B-12-XXXX AT IA/ WI STATE LINE

CONST/REIMBURSE TO IOWA DOT/BRRPL

SHR LARGE BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 62: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 26Southwest Region

CRAWFORD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5780-03-21 07/25/2022 303 R/E RSRF20 3.920 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999

BR KICKAPOO R BDGS B-12-705/801/818

RE/RSRF/CONST 5780-03-81

STATE 3R NON-FEDERAL

2022 5780-03-22 08/25/2022 303 R/E RSRF20 14.461 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999

SUNNY RIDGE ROAD TO PLEASANT STREET

RE OPS/5780-03-72/RSRF

STATE 3R NON-FEDERAL

2022 5780-03-23 05/25/2022 303 R/E RSRF10 0.525 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999

KICKAPOO RIVER B-12-172 TO USH 61

RE/5780-03-63/RSRF

STATE 3R NON-FEDERAL

2022 5780-03-24 08/25/2022 303 R/E RSRF20 7.720 STH 131 WAUZEKA - SOLDIERS GROVE $0 - $99,999

STH 60 TO 0.49 MI E RAILWAY ST

RE OPS/5780-03-61/RSRF

STATE 3R NON-FEDERAL

2024 5780-03-61 11/12/2024 303 LET RSRF20 7.720 STH 131 WAUZEKA - SOLDIERS GROVE $3,000,000 - $3,999,999

STH 60 TO 0.49 MI E RAILWAY ST

CONST/MILL & O'LAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5780-03-72 11/12/2024 303 LET RSRF20 14.610 STH 131 WAUZEKA - SOLDIERS GROVE $6,000,000 - $6,999,999

SUNNY RIDGE ROAD TO PLEASANT STREET

CONST/MILL & O'LAY/B-12-79/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5780-03-81 11/12/2024 303 LET RSRF20 4.430 STH 131 WAUZEKA - SOLDIERS GROVE $5,000,000 - $5,999,999

0.49M E RAILWAY ST TO SUNNYRIDGE RD

CONST/BRIDGE REPLACEMENTS/RSRF

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 63: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 27Southwest Region

CRAWFORD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5790-02-22 07/25/2022 303 R/E RSRF20 11.690 STH 171 FERRYVILLE - ROLLING GROUND $0 - $99,999

STH 27 TO USH 61

RE/RSRF/CONST 5790-02-72

STATE 3R NON-FEDERAL

2024 5790-01-80 11/12/2024 303 LET RECST 0.051 STH 171 FERRYVILLE - ROLLING GROUND $250,000 - $499,999

FLOWING STREAM STRUCTURE C-12-0063

CONST/CULVERT REPLACEMENT/RECST

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 5870-02-81 04/12/2022 303 LET BRRPL 0.165 STH 179 EASTMAN - STEUBEN $2,000,000 - $2,999,999

KICKAPOO RIVER BRIDGE B-12-0195

CONSTRUCTION/BRRPL

SHR BRIDGES HWY INFRA COVID SUPP

2023 1660-02-23 08/25/2023 303 R/E RECST 0.164 USH 018 MARQUETTE - PRAIRIE DU CHIEN $0 - $99,999

MAIN STREET INTERSECTION

RE/1660-02-73 RECST/RAB

STATE 3R NON-FEDERAL

2023 1661-09-72 03/14/2023 303 LET MISC 0.123 USH 018 PRAIRIE DU CHIEN - FENNIMORE $250,000 - $499,999

SOUTH TOWN LN/SELCH RD INTERSECTION

CONS/OFFST LT TRN LNS/MONOTUBE/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

Page 64: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 28Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5848-00-72 12/13/2022 205 LET BRRPL 0.000 CTH A USH 14 - STH 138 $750,000 - $999,999

BADFISH CREEK BRIDGE, B-13-0887

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 5856-00-72 01/10/2023 205 LET BRRPL 0.000 CTH E CTH Z - STH 78 $750,000 - $999,999

GERMAN VALLEY CREEK BR, B-13-0888

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 5665-00-75 09/13/2022 205 LET BRRPL 0.000 CTH JG CTH A - USH 151 $750,000 - $999,999

W BR OF SUGAR RIVER BR, B-13-0884

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 5572-00-72 01/10/2023 205 LET BRRPL 0.000 CTH KP STH 78 - USH 14 $1,000,000 - $1,999,999

BLACK EARTH CREEK, B-13-0883

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG-URBANIZED >200K FAST

2024 5572-00-50 06/25/2024 207 R/R MISC 0.015 CTH KP V CROSS PLAINS, CTH KP $0 - $99,999

WSOR RR XING 391768X

RR OPS/REPLACE DETECTION EQUIP/MISC

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2023 5954-00-01 08/08/2023 206 LET RECSTE 0.287 CTH M CTH Q - STH 113 (CTH M) $20,000,000 - $24,999,999

ONCKEN ROAD TO STH 113

CONST OPS/RECONSTRUCTION

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2023 5954-00-51 05/25/2023 206 R/R RECSTE 0.000 CTH M CTH Q - STH 113 (CTH M) $100,000 - $249,999

ONCEKN ROAD TO STH 113

RR OPS/CROSSING SURFACE

STP URBAN OVER 200,000 NON-FEDERAL

Page 65: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 29Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6218-00-73 05/10/2022 206 LET RCND20 4.010 CTH V VILLAGE OF DANE - I39/90 $3,000,000 - $3,999,999

STH 113 TO CTH I

CONST OPS/RECONDITION

STP RURAL STBG <5K POP FAST

2022 5986-00-71 08/09/2022 205 LET BRRPL 0.000 CTH Y USH 14 - STH 78 $750,000 - $999,999

DUNLAP CREEK BRIDGE, B-13-0889

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1002-01-02 303 I/E BRRHB 0.000 IH 039 C OF MADISON $100,000 - $249,999

MILWAUKEE STREET BRIDGE B-13-0477

DES/PE-PS&E/WIDEN DECK REPLAC/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1011-01-60 05/10/2022 303 LET PSRS10 4.173 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999

.55 MI S CTH V TO NORTH COUNTY LINE

CONST/PAV'T REPAIR, BOTH RDWYS/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1011-01-75 05/10/2022 303 LET PVRPLA 1.016 IH 039 MADISON - PORTAGE $1,000,000 - $1,999,999

CTH V TO 0.4 MI N OF CTH I, NB RDWY

CONS/RPL CNTR-OUTSD NB LANES/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1001-00-66 12/09/2025 303 LET PSRS10 4.920 IH 039 JANESVILLE - PORTAGE $5,000,000 - $5,999,999

USH 12/18 TO LIEN ROAD

CONST/CONCRETE PAV'T REPAIR/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

1066-00-32 303 I/E BRPVTV 0.004 IH 094 MADISON - LAKE MILLS $250,000 - $499,999

IH 90 WB B-13-0438; CTH T B-13-0450

DES/PE-PS&E/DECK O'LAY/PAINT/BRPVTV

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 66: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 30Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 1066-03-65 12/09/2025 303 LET BRPVTV 0.087 IH 094 MADISON - LAKE MILLS $4,000,000 - $4,999,999

STH 73 BRIDGES; MISSOURI RD BRIDGES

CONST/B-13-158,159,162,163 BRPVTV

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1066-03-75 11/11/2025 303 LET RSRF20 9.639 IH 094 MADISON - LAKE MILLS $15,000,000 - $16,999,999

CTH N TO AIRPORT ROAD

CONST/RESURFACE EB & WB RDWYS

BACKBONE NATIONAL HIGHWAY PERF FAST

5849-02-06 206 I/E RECST 0.359 LOC STR C FITCHBURG, SYRENE ROAD $0 - $99,999

MCCOY ROAD INTERSECTION

DESIGN - FULL PS&E RECST

SAFETY (REGULAR HSIP) NON-FEDERAL

5992-07-22 206 I/E MISC 0.156 LOC STR C MADISON, MINERAL POINT ROAD $0 - $99,999

HIGH POINT ROAD INTERSECTION

DESIGN - FULL PS&E MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 5796-00-74 12/13/2022 205 LET BRRPL 0.000 LOC STR TOWN OF VERONA, VALLEY ROAD $750,000 - $999,999

SUGAR RIVER BRIDGE, B-13-0886

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 5992-10-04 12/13/2022 205 LET BRRPL 0.016 LOC STR V SHOREWOOD HILLS, LAKE MENDOTA DR $1,000,000 - $1,999,999

MULTI-USE TRAIL, B-13-0692

CONST OPS/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2022 5992-11-01 05/10/2022 206 LET RECSTE 1.398 LOC STR C MIDDLETON, PLEASANT VIEW ROAD $17,000,000 - $19,999,999

TIMBER WOLF TRAIL TO USH 14

CONST OPS/RECONSTRUCTION

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 67: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 31Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5992-11-02 05/10/2022 206 LET RECST 1.398 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $2,000,000 - $2,999,999

TIMBER WOLF TRAIL TO USH 14

CONST OPS/WATER MAIN & SEWER

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-31 03/08/2022 206 LET RECST 0.667 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $20,000,000 - $24,999,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

CONST OPS/RECONSTRUCTION

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 5992-11-32 03/08/2022 206 LET RECST 0.610 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $2,000,000 - $2,999,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

CONST OPS/WATER AND SANITARY SEWER

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-33 03/08/2022 206 LET RECST 0.610 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $1,000,000 - $1,999,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

CONST OPS/SANITARY SEWER

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-50 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999

TIMBER WOLF TRAIL TO USH 14

R/R OPS/ CROSSING SURFACE

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-51 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999

TIMBER WOLF TRAIL TO USH 14

R/R OPS/ SWITCH REPLACEMENT

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-52 05/25/2022 206 R/R RECST 0.000 LOC STR C OF MIDDLETON, PLEASANT VIEW ROAD $250,000 - $499,999

TIMBER WOLF TRAIL TO USH 14

R/R OPS/ CROSSING SIGNALS

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 68: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 32Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5992-11-55 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $250,000 - $499,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

R/R OPS/ CROSSING SIGNALS

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-56 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $100,000 - $249,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

R/R OPS/ CROSSING SURFACE

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-57 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $250,000 - $499,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

R/R OPS/ CROSSING SIGNALS

STP URBAN OVER 200,000 NON-FEDERAL

2022 5992-11-58 03/25/2022 206 R/R RECST 0.000 LOC STR CITY OF MADISON, UNIVERSITY AVENUE $100,000 - $249,999

SHOREWOOD BLVD TO UNIVERSITY BAY DR

R/R OPS/ CROSSING SURFACE

STP URBAN OVER 200,000 NON-FEDERAL

2022 6992-00-75 12/13/2022 205 LET BRRPL 0.000 LOC STR VILLAGE OF WINDSOR, WINDSOR ROAD $750,000 - $999,999

YAHARA RIVER BRIDGE, B-13-0890

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG-URBANIZED >200K FAST

2023 3996-00-10 05/09/2023 206 LET RCND10 0.310 LOC STR C SUN PRAIRIE, INTERSECTION IMPRVMT $750,000 - $999,999

MAIN/WALKER;MAIN/BIRD;BIRD/LINNERUD

CONST/INTERSECTION IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 5685-00-05 08/08/2023 206 LET RECST 0.860 LOC STR V OF MCFARLAND, EXCHANGE STREET $2,000,000 - $2,999,999

FARWELL ST TO SLEEPY HOLLOW ROAD

CONST OPS/RECONSTRUCTION

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 69: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 33Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5685-00-06 08/08/2023 206 LET RECST 0.860 LOC STR V OF MCFARLAND, EXCHANGE STREET $1,000,000 - $1,999,999

FARWELL ST TO SLEEPY HOLLOW ROAD

CONST OPS/UTILITIES

STP URBAN OVER 200,000 NON-FEDERAL

2024 5685-00-50 06/25/2024 207 R/R MISC 0.006 LOC STR V MCFARLAND, HOLSCHER ROAD $0 - $99,999

WSOR RR XING 911336M

RR OPS/REPLACE DETECTION EQUIP/MISC

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2024 5742-00-72 09/10/2024 205 LET BRRPL 0.000 LOC STR T OF RUTLAND, LAKE KEGONSA ROAD $500,000 - $749,999

BADFISH CREEK BRIDGE, B-13-0885

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 5849-02-07 02/13/2024 206 LET RECST 0.359 LOC STR C FITCHBURG, SYRENE ROAD $2,000,000 - $2,999,999

MCCOY ROAD INTERSECTION

CONST/RECONFIG INTERSECTION RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 5992-07-19 03/12/2024 206 LET RCND10 0.102 LOC STR C MADISON, GAMMON ROAD $500,000 - $749,999

WATTS ROAD INTERSECTION

CONST/LEFT TURN LANES/MONOTUBES

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 5992-07-23 02/11/2025 206 LET MISC 0.157 LOC STR C MADISON, MINERAL POINT ROAD $750,000 - $999,999

HIGH POINT ROAD INTERSECTION

CONST/LEFT TURN LANES/MONOTUBES

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 3996-00-16 09/25/2022 290 LLC MISC 0.000 NON HWY C SUN PRAIRIE, MULTI-USE PATH $250,000 - $499,999

BIRD STREET TO KRONCKE DRIVE

PEDESTRIAN/BICYCLE TRAIL

TAP > 200,000 TRANS ALTERNATIVES >200K F

Page 70: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 34Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5992-00-62 08/25/2022 290 LLC MISC 0.000 NONHWY

C MADISON, W TOWNE PATH $500,000 - $749,999

COMMERCE DR TO JUNCTION RD

PEDESTRIAN/BICYCLE TRAIL

TAP > 200,000 TRANS ALTERNATIVES >200K F

2022 5992-08-48 11/25/2022 206 MIS MISC 0.070 NONHWY

PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999

CITY OF MADISON - 2023

FUNDING FOR CALENDAR YR 2023/2024

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 5992-08-51 11/25/2022 206 MIS MISC 0.070 NONHWY

RIDESHARE/TDM PROGRAM 2023 $100,000 - $249,999

MADISON AREA MPO

FUNDING FOR CALENDAR YEAR 2023/2024

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 6992-00-11 08/25/2022 290 LLC MISC 0.000 NONHWY

V DEFOREST, MULTI-USE PATH $500,000 - $749,999

VARIOUS VILLAGE LOCATIONS

SRTS MULTI-USE PATH

TAP > 200,000 TRANS ALTERNATIVES >200K F

2023 5992-00-66 01/25/2023 290 LLC MISC 0.000 NONHWY

C MADISON, BIKE/PED SAFETY PROJECT $100,000 - $249,999

SW COMMUTER PATH TO S CARROL STREET

PEDESTRAIN SAFETY IMPROVEMENTS

TAP > 200,000 TRANS ALTERNATIVES >200K F

2023 5992-08-49 11/25/2023 206 MIS MISC 0.070 NONHWY

PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999

CITY OF MADISON - 2024

FUNDING FOR CALENDAR YR 2024/2025

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 71: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 35Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5992-08-52 11/25/2023 206 MIS MISC 0.070 NONHWY

RIDESHARE/TDM PROGRAM 2024 $100,000 - $249,999

MADISON AREA MPO

FUNDING FOR CALENDAR YEAR 2024/2025

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 5992-08-50 11/25/2024 206 MIS MISC 0.070 NONHWY

PEDESTRIAN BIKE SAFETY EDUCATION $100,000 - $249,999

CITY OF MADISON - 2025

FUNDING FOR CALENDAR YR 2025/2026

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 5992-08-53 11/25/2024 206 MIS MISC 0.070 NONHWY

RIDESHARE/TDM PROGRAM 2025 $100,000 - $249,999

MADISON AREA MPO

FUNDING FOR CALENDAR 2025/2026

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 5145-00-41 01/25/2022 303 UTL RSRF30 9.560 STH 019 MAZOMANIE - USH 12 $0 - $99,999

STH 78 TO USH 12

UTL OPS/5145-00-71/RSRF

STATE 3R NON-FEDERAL

2022 5145-00-71 11/08/2022 303 LET RSRF30 9.560 STH 019 MAZOMANIE - USH 12 $12,000,000 - $12,999,999

STH 78 TO USH 12

CONST/PULVERZ/B13-796,-797 RPL/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 6085-02-26 08/25/2022 303 R/E MISC 0.466 STH 019 MAZOMANIE - SUN PRAIRIE $0 - $99,999

WESTMOUNT DRIVE INTERSECTION

RE OPS/6085-02-76/MISC

STATE 3R NON-FEDERAL

2022 6085-02-27 01/25/2022 303 R/E MISC 0.271 STH 019 C SUN PRAIRIE, WINDSOR STREET $0 - $99,999

N THOMPSON RD INTR;DAVISON DR INTR

Page 72: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 36Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE OPS/6085-02-77/RCND

STATE 3R NON-FEDERAL

2023 3050-01-26 08/25/2023 303 R/E RSRF30 6.644 STH 019 SUN PRAIRIE - WATERTOWN $0 - $99,999

WOOD VIOLET LANE TO BR MAUNESHA RVR

RE/RSRF/CONST 3050-01-76

STATE 3R NON-FEDERAL

2023 6085-02-75 12/12/2023 303 LET MISC 0.244 STH 019 MAZOMANIE - SUN PRAIRIE $750,000 - $999,999

USH 151 INTERCHANGE

CONST/LONG LT TURN LNS/MONOTUB/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 6085-02-77 05/09/2023 303 LET MISC 0.275 STH 019 C SUN PRAIRIE, WINDSOR STREET $750,000 - $999,999

N THOMPSON RD INTR;DAVISON DR INTR

CONST/LEFT TURN LNS/MONOTUBES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 6085-02-76 08/13/2024 303 LET MISC 0.467 STH 019 MAZOMANIE - SUN PRAIRIE $750,000 - $999,999

WESTMOUNT DRIVE INTERSECTION

CONST/LEFT TURN LANES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 3050-01-76 11/11/2025 303 LET RSRF30 6.644 STH 019 SUN PRAIRIE - WATERTOWN $4,000,000 - $4,999,999

WOOD VIOLET LANE TO BR MAUNESHA RVR

CONST/MILL & O'LAY/B-13-345/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5290-02-71 12/09/2025 303 LET RSRF20 3.626 STH 019 MAZOMANIE - SUN PRAIRIE $4,000,000 - $4,999,999

DIVISION STREET TO RIVER ROAD

CONST/MILL & O'LAY/B-13-188/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5490-00-62 03/08/2022 303 LET BRRHB 0.107 STH 030 C MADISON, STH 30 $250,000 - $499,999

FAIR OAKS AVE B-13-206

Page 73: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 37Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/CONCRETE OVERLAYS/BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2022 5490-00-63 03/08/2022 303 LET PSRS30 2.096 STH 030 C MADISON, STH 30 $3,000,000 - $3,999,999

FAIR OAKS AVENUE TO IH 39 RAMP

CONST/CONCRETE JOINT REPAIR/PSRS

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1693-05-43 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $500,000 - $749,999

CTH D TO VALLEY ROAD

UTL/CHARTER COMMUNICATIONS UTL 103

STATE 3R NON-FEDERAL

2022 1693-05-45 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $0 - $99,999

CTH D TO VALLEY ROAD

UTL/TDS TELECOM UTL 111

STATE 3R NON-FEDERAL

2022 1693-05-46 01/25/2022 303 UTL RECST 8.660 STH 069 NEW GLARUS - VERONA $0 - $99,999

CTH D TO VALLEY ROAD

UTL/WE ENERGIES - GAS UTL 104

STATE 3R NON-FEDERAL

3070-05-00 303 I/E RSRF30 5.807 STH 073 I39 - COLUMBUS $100,000 - $249,999

PIERCE ROAD TO CTH B

DESIGN-FULL PS&E RSRF30

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 3060-03-21 12/25/2022 303 R/E PVRPLA 1.360 STH 073 I39 - COLUMBUS $0 - $99,999

STH 19 TO N MARSHALL V LIMIT

RE/PVRPLA/CONST 3060-03-71

STATE 3R NON-FEDERAL

2022 3060-03-70 11/08/2022 303 LET RSRF30 9.430 STH 073 I39 - COLUMBUS $3,000,000 - $3,999,999

N MARSHALL V LIMIT TO DEANSVILLE RD

Page 74: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 38Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 3070-04-60 01/10/2023 303 LET RSRF30 1.676 STH 073 I39 - COLUMBUS $2,000,000 - $2,999,999

SHAUL LANE TO NORTH STREET

CONST/MILL & O'LAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 3060-03-51 07/25/2024 303 R/R PVRPLA 1.360 STH 073 I39 - COLUMBUS $250,000 - $499,999

STH 19 TO N MARSHALL V LIMIT

RR/SIGNALS/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 3060-03-71 12/10/2024 303 LET PVRPLA 1.360 STH 073 I39 - COLUMBUS $1,000,000 - $1,999,999

STH 19 TO N MARSHALL V LIMIT

CONST/PAV'T RPLC, B-13-73/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

5600-00-06 303 I/E PVRPLA 0.840 STH 078 ARGYLE - MT HOREB $100,000 - $249,999

CTH E TO MT HOREB V LIMIT

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5600-05-80 04/12/2022 303 LET BRRPL 0.047 STH 078 MT HOREB - BLACK EARTH $500,000 - $749,999

VERMONT CREEK BRIDGE B-13-855

CONST/BRIDGE REPLACEMENT/BRRPL

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 3670-00-24 01/25/2022 303 R/E RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $0 - $99,999

CLARKSON ROAD TO AVALON ROAD

RE/RSRF/CONST 3670-00-74

STATE 3R NON-FEDERAL

2022 3670-00-44 01/25/2022 303 UTL RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $0 - $99,999

CLARKSON ROAD TO AVALON ROAD

Page 75: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 39Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

UTL OPS/ LOE

STATE 3R NON-FEDERAL

2023 3670-00-74 12/12/2023 303 LET RSRF10 9.830 STH 089 LAKE MILLS - COLUMBUS $2,000,000 - $2,999,999

CLARKSON ROAD TO AVALON ROAD

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5926-05-60 11/14/2023 303 LET PSRS40 7.344 STH 092 MT HOREB - BROOKLYN $2,000,000 - $2,999,999

E JCT CTH G TO STH 69

CONST/MILL & OVERLAY/PSRS

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5280-01-73 03/14/2023 303 LET RECST 0.318 STH 113 MADISON - LODI $2,000,000 - $2,999,999

CTH P/CTH V INTERSECTION

CONS/INTERSECTION IMPROVEMENT/RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 5420-02-72 02/14/2023 303 LET PVRPLA 3.410 STH 113 MADISON - LODI $9,000,000 - $9,999,999

KNUTSON DRIVE TO STH 19

CONST/PAV'T REPLACE/B-13-233/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5280-03-21 12/25/2024 303 R/E PVRPLA 2.822 STH 113 MADISON - LODI $0 - $99,999

CTH V TO CTH P

RE/PVRPLA/CONST 5280-03-71

STATE 3R NON-FEDERAL

2024 5280-03-50 05/25/2024 303 R/R RSRF25 0.000 STH 113 MADISON - LODI $100,000 - $249,999

WSOR RR X SURFACE 178068H/917705C

RR OPS/XING RESURFACE/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5280-03-53 05/25/2024 303 R/R RSRF25 0.000 STH 113 MADISON - LODI $250,000 - $499,999

WSOR RR X SIGNALS 178068H/917705C

Page 76: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 40Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RR OPS/SIGNALS/MISC

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5280-03-70 01/09/2024 303 LET RSRF25 3.870 STH 113 MADISON - LODI $2,000,000 - $2,999,999

SUNSET LANE TO CTH V

CONST/PAV'T REPLACE/B-13-871/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5280-03-71 12/09/2025 303 LET PVRPLA 2.822 STH 113 MADISON - LODI $2,000,000 - $2,999,999

CTH V TO CTH P

CONST/PAV'T REPLACEMENT/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5280-03-72 12/09/2025 303 LET PVRPLA 2.822 STH 113 MADISON - LODI $1,000,000 - $1,999,999

CTH V TO CTH P

CONST/WATER & SANITARY SEWER/PVRPLA

STATE 3R NON-FEDERAL

5924-00-02 303 I/E PVRPLA 5.710 STH 138 COOKSVILLE - STOUGHTON $250,000 - $499,999

STH 59 TO MILWAUKEE ST

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

1206-04-03 303 I/E BRRHB 0.009 USH 012 SAUK CITY - MADISON $100,000 - $249,999

RIMROCK ROAD BRIDGE B-13-0310

DES/PE-PS&E/CONC DECK O'LAY/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

1206-04-04 303 I/E BRRPL 0.009 USH 012 MADISON - CAMBRIDGE $250,000 - $499,999

BR YAHARA RIVER B-13-193

DES/PE-PS&E/BOX CULVERT REPL/BRRPL

BACKBONE NATIONAL HIGHWAY PERF FAST

1206-04-06 303 I/E PVRPLA 1.920 USH 012 C MADISON, MADISON BELTLINE $1,000,000 - $1,999,999

USH 18 TO CTH D

Page 77: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 41Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

DES/PE-PS&E/PAV'T REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

1206-04-07 303 I/E PVRPLA 6.210 USH 012 C MADISON, MADISON BELTLINE $2,000,000 - $2,999,999

CTH D TO IH 39

DES/PE-PS&E/EB PAV'T REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

1206-04-08 303 I/E PVRPLA 0.000 USH 012 C MADISON, MADISON BELTLINE $2,000,000 - $2,999,999

CTH D TO IH 39

DES/PE-PS&E/WB PAV'T REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

5300-00-02 303 I/E RSRF20 3.612 USH 012 SAUK CITY - MADISON $750,000 - $999,999

TERRACE AVENUE TO GAMMON ROAD

DESIGN-FULL PS&E RSRF20

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 3080-01-40 07/12/2022 303 LET MISC 2.602 USH 012 MADISON - CAMBRIDGE $250,000 - $499,999

CTH AB OVERPASS

CONST/SANITARY, WATER, FIBER/MIS

STATE 3R NON-FEDERAL

2022 3080-01-45 01/25/2022 303 UTL BRNEW 2.061 USH 012 MADISON - CAMBRIDGE $0 - $99,999

CTH AB OVERPASS

UTL/FRONTIER COMM UTL 50/BRNEW

STATE 3R NON-FEDERAL

2022 3080-01-46 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999

CTH AB INTERCHANGE

UTL/ALLIANT ENERGY ELEC 209/RECSTE

STATE 3R NON-FEDERAL

2022 3080-01-47 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999

CTH AB INTERCHANGE

Page 78: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 42Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

UTL/FLINT HILLS RESOURCE-GAS/RECSTE

STATE 3R NON-FEDERAL

2022 3080-01-48 01/25/2022 303 UTL RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $0 - $99,999

CTH AB INTERCHANGE

UTL/FRONTIER COMM UTL 202/RECSTE

STATE 3R NON-FEDERAL

2022 3080-01-75 07/12/2022 303 LET BRNEW 0.020 USH 012 MADISON - CAMBRIDGE $11,000,000 - $11,999,999

CTH AB OVERPASS

CONST/B-13-893/BRNEW

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 3080-01-76 07/12/2022 303 LET RECSTE 2.065 USH 012 MADISON - CAMBRIDGE $15,000,000 - $16,999,999

CTH AB INTERCHANGE

CONSTRUCTION/RECSTE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 3080-01-86 06/25/2023 303 MIS MISC 1.631 USH 012 MADISON - CAMBRIDGE $0 - $99,999

CTH AB INTERCHANGE

TOIP PARTICIPATING/3080-01-76

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1670-01-76 12/09/2025 303 LET MISC 0.288 USH 012 SAUK CITY - MADISON $500,000 - $749,999

STH 188/TETIVA ROAD INTERSECTION

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 3080-01-78 11/11/2025 303 LET RECST 0.218 USH 012 MADISON - CAMBRIDGE $1,000,000 - $1,999,999

CTH W/OAK PARK ROAD INTERSECTION

CONST/INTERSECTN IMPROVEM/RAB/RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 5310-02-55 04/25/2022 303 R/R MISC 0.000 USH 014 SPRING GREEN - MADISON $250,000 - $499,999

WISC & SOUTHERN RR XING 391751U

Page 79: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 43Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RR OPS/REPLACE CROSSING SURF/MISC

STATE 3R NON-FEDERAL

2022 5310-02-56 04/25/2022 303 R/R MISC 0.004 USH 014 SPRING GREEN - MADISON $250,000 - $499,999

WISC & SOUTHERN RR XING 391751U

RR OPS/REPLACE CROSSING SIGNAL/MISC

STATE 3R NON-FEDERAL

2022 5310-02-75 05/10/2022 303 LET MISC 0.225 USH 014 SPRING GREEN - MADISON $1,000,000 - $1,999,999

PLEASANT VIEW ROAD INTERSECTION

CONST/LEFT TURN LNS/MONOTUBES/RCND

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 5310-02-78 01/09/2024 303 LET MISC 0.324 USH 014 SPRING GREEN - MADISON $500,000 - $749,999

DEMING WAY INTERSECTION

CONST/LT TURN/MONOTUBES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1204-05-05 303 I/E RSRF30 6.990 USH 018 MOUNT HOREB - MADISON $250,000 - $499,999

W JUNCTION CTH MV TO CTH PD

DES/PE-PS&E/RESURFACE EB & WB/RSRF

BACKBONE NON-FEDERAL

2022 1204-08-65 11/08/2022 303 LET RSRF30 13.046 USH 018 MOUNT HOREB - MADISON $20,000,000 - $24,999,999

TOWN HALL ROAD TO CTH PD

CONSTRUCTION/RSRF30

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1204-05-77 01/14/2025 303 LET MISC 0.304 USH 018 DODGEVILLE - MOUNT HOREB $500,000 - $749,999

CTH F INTERSECTION

CONST/HSIP/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 5410-00-24 01/25/2022 303 R/E PVRPLA 0.800 USH 051 MADISON - DEFOREST $0 - $99,999

USH 151 TO PIERSTORFF STREET

Page 80: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 44Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE/PVRPLA/CONST 5410-00-74

STATE 3R NON-FEDERAL

2022 5410-00-25 01/25/2022 303 R/E MISC 0.800 USH 051 MADISON - DEFOREST $0 - $99,999

USH 151 TO PIERSTORFF STREET

RE/MISC/CONS 5410-00-74/TLE EXHIBIT

STATE 3R NON-FEDERAL

2022 5410-00-74 12/13/2022 303 LET PVRPLA 0.800 USH 051 MADISON - DEFOREST $2,000,000 - $2,999,999

USH 151 TO PIERSTORFF STREET

CONST/REPLACE PAVEMENT NB/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 5410-05-02 02/25/2022 302 C/E RECSTE 11.000 USH 051 MADISON - DEFOREST $1,000,000 - $1,999,999

VOGES ROAD TO STH 19

CORRIDOR DESIGN MANAGEMENT/RECSTE

MAJORS NON-FEDERAL

2022 5410-06-00 12/25/2022 302 C/E MISC 4.760 USH 051 MADISON - DEFOREST $5,000,000 - $5,999,999

VOGES ROAD TO STH 30

PLANNING ENV LINKAGE-PEL

MAJORS NON-FEDERAL

2022 5845-01-20 01/25/2022 303 R/E MISC 0.281 USH 051 STOUGHTON - MADISON $250,000 - $499,999

CTH B/CTH AB INTERSECTION

RE/CONST 5845-01-70/MISC

STATE 3R NON-FEDERAL

2022 5845-16-22 11/25/2022 302 R/E RECST 1.360 USH 051 STOUGHTON - MADISON $500,000 - $749,999

SPRING RD TO FIFTH ST

RE/CONST 5845-16-72/RECST

MAJORS NON-FEDERAL

2022 5845-16-23 11/25/2022 302 R/E RECST 1.665 USH 051 STOUGHTON - MADISON $500,000 - $749,999

HARRISON ST TO ROBY RD

Page 81: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 45Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE/CONST 5845-16-73/RECST

MAJORS NON-FEDERAL

2022 5845-16-27 11/25/2022 302 R/E RECST 1.620 USH 051 STOUGHTON - MADISON $0 - $99,999

LARSON BEACH RD TO VOGES RD

RE/CONST 5845-16-77/RECST

MAJORS NON-FEDERAL

2022 5845-16-52 11/25/2022 302 R/R RECST 0.000 USH 051 STOUGHTON - MADISON $250,000 - $499,999

SPRING RD TO FIFTH ST

RR/391684C SURFACE/RECST

MAJORS NON-FEDERAL

2023 5845-01-70 11/14/2023 302 LET RCND10 0.280 USH 051 STOUGHTON - MADISON $3,000,000 - $3,999,999

CTH B/CTH AB INTERSECTION

CONST/INTERSECTION SAFETY/RAB/RCND

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 5845-16-21 05/25/2023 302 R/E RECST 4.980 USH 051 STOUGHTON - MADISON $500,000 - $749,999

I39/90 TO SPRING RD

RE/CONST 5845-16-71/RECST

MAJORS NON-FEDERAL

2023 5845-16-24 11/25/2023 302 R/E RECST 3.800 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999

ROBY ROAD TO S CTH B/AB

RE/CONSTR 5845-16-74/RECST

MAJORS NON-FEDERAL

2023 5845-16-28 11/25/2023 302 R/E RECST 6.570 USH 051 STOUGHTON - MADISON $250,000 - $499,999

EXCHANGE STREET INTERSECTION

RE OPS/5845-16-84/RECST

MAJORS NON-FEDERAL

2024 5845-16-25 10/25/2024 302 R/E RECST 2.760 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999

CTH B/AB TO EXCHANGE STREET

Page 82: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 46Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE/CONST 5845-16-75/RECST

MAJORS NON-FEDERAL

2024 5845-16-72 11/12/2024 302 LET RECST 1.360 USH 051 STOUGHTON - MADISON $9,000,000 - $9,999,999

SPRING RD TO FIFTH ST

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

2024 5845-16-77 11/12/2024 302 LET RECST 1.620 USH 051 STOUGHTON - MADISON $12,000,000 - $12,999,999

LARSON BEACH RD TO VOGES RD

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

2024 5845-16-79 11/12/2024 302 LET RECST 1.360 USH 051 STOUGHTON - MADISON $500,000 - $749,999

SPRING RD TO FIFTH ST

CONST/SANITARY SEWER & WATER/RECST

MAJORS NON-FEDERAL

2024 5845-16-86 07/09/2024 302 LET RECST 1.620 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999

LARSON BEACH RD TO VOGES RD

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

2025 5845-16-26 10/25/2025 302 R/E RECST 1.090 USH 051 STOUGHTON - MADISON $250,000 - $499,999

EXCHANGE ST TO LARSON BEACH RD

RE/CONST 5845-16-76/RECST

MAJORS NON-FEDERAL

2025 5845-16-45 10/25/2025 302 UTL RECST 2.760 USH 051 STOUGHTON - MADISON $1,000,000 - $1,999,999

CTH B/AB TO EXCHANGE STREET

UTL/CONST 5845-16-75/RECST

MAJORS NON-FEDERAL

2025 5845-16-73 11/12/2025 302 LET RECST 1.666 USH 051 STOUGHTON - MADISON $9,000,000 - $9,999,999

HARRISON ST TO ROBY RD

Page 83: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 47Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

2025 5845-16-74 11/11/2025 302 LET RECST 3.800 USH 051 STOUGHTON - MADISON $25,000,000 - $29,999,999

ROBY ROAD TO S CTH B/AB

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

2025 5845-16-84 11/11/2025 302 LET RECST 0.034 USH 051 STOUGHTON - MADISON $4,000,000 - $4,999,999

EXCHANGE STREET INTERSECTION

CONST/RECST

MAJORS NATIONAL HIGHWAY PERF FAST

1111-02-09 303 I/E PVRPLA 3.860 USH 151 C SUN PRAIRIE $2,000,000 - $2,999,999

MAIN STREET-CTH VV/B13-0268 TO 0273

DES/PE-PS&E/B-13-275,276/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

5400-00-01 303 I/E PVRPLA 0.490 USH 151 C MADISON, PARK STREET $500,000 - $749,999

WSOR CROSSING TO OLIN AVENUE

DES-FULL PS&E/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 5400-00-22 01/25/2022 303 R/E RECST 0.030 USH 151 C MADISON, S BLAIR ST/JOHN NOLAN DR $0 - $99,999

WILSON/WILLIAMSON ST INTERSECTION

RE FOR 5400-00-72

STATE 3R NON-FEDERAL

2022 5400-00-23 01/25/2022 303 R/E PVRPLA 0.097 USH 151 C MADISON, BLAIR ST/E WASHINGTON AV $100,000 - $249,999

E WILSON ST TO BLOUNT ST

RE FOR 5400-00-73

STATE 3R NON-FEDERAL

2022 4713-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY DANE COUNTY PAVEMENT MARKING $250,000 - $499,999

LOCATIONS ON STH PER ANNUAL PLAN

Page 84: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 48Southwest Region

DANE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 85: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 49Southwest Region

DODGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 3926-00-70 01/09/2024 205 LET BRRPL 0.000 CTH NP CTH P - CTH V $500,000 - $749,999

BUTLER CREEK BRIDGE, B-14-0229

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1107-00-02 303 I/E PVRPLA 7.336 IH 041 MILWAUKEE - FOND DU LAC $2,000,000 - $2,999,999

STH 28 - NORTH COUNTY LINE

DES/PE-PS&E/PAV'T REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 3804-00-75 12/10/2024 205 LET BRRPL 0.000 LOC STR TOWN OF LOWELL, WELL ROAD $250,000 - $499,999

SHAW CREEK BRIDGE, B-13-0226

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 3813-00-70 01/09/2024 205 LET BRRPL 0.000 LOC STR TOWN OF HUBBARD, WILDCAT ROAD $500,000 - $749,999

WILDCAT CREEK BRIDGE, B-14-0227

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 3814-00-70 12/10/2024 205 LET BRRPL 0.000 LOC STR T OF HUSTISFORD, ST. HELENA ROAD $500,000 - $749,999

DEAD CREEK BRIDGE, B-14-0228

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 1400-00-89 11/14/2023 303 LET BRRHB 0.349 STH 016 COLUMBUS - WATERTOWN $1,000,000 - $1,999,999

CMSTPP RR BRIDGE B-14-066

CONST/ CONCRETE OVERLAY

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

3050-06-00 303 I/E PVRPLA 6.260 STH 019 SUN PRAIRIE - WATERTOWN $500,000 - $749,999

STH 89 TO CRAWFISH RVR

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 86: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 50Southwest Region

DODGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1390-06-04 303 I/E RECST 11.154 STH 026 WATERTOWN - WAUPUN $1,000,000 - $1,999,999

STH 33 TO 0.2 MI S OF MILLIGAN RD

DESIGN-FULL PS&E RECONST

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1390-01-26 01/25/2022 303 R/E RSRF15 0.530 STH 026 WATERTOWN - WAUPUN $0 - $99,999

CENTER STREET TO CTH DF

REAL ESTATE

STATE 3R NON-FEDERAL

2023 1390-06-50 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $0 - $99,999

WISC & SOUTHERN RR XING 387053U

RR OPS/ CROSSING REPAIR/ RESURFACE

STATE 3R NON-FEDERAL

2023 1390-06-52 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $100,000 - $249,999

WISC & SOUTHERN RR XING 387632D

RR OPS/ CROSSING REPAIR/ RESURFACE

STATE 3R NON-FEDERAL

2023 1390-06-53 08/25/2023 303 R/R PVRPLA 0.000 STH 026 WATERTOWN - WAUPUN $100,000 - $249,999

WISC & SOUTHERN RR XING 387632D

RR OPS/ FLASHING LIGHT SIGNALS

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1390-06-70 12/12/2023 303 LET PSRS40 12.420 STH 026 WATERTOWN - WAUPUN $5,000,000 - $5,999,999

STH 33 TO 0.2 MI S OF MILLIGAN RD

CONST/ PSRS40

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 4060-05-72 03/08/2022 303 LET RECST 0.571 STH 028 HORICON - KEWASKUM $2,000,000 - $2,999,999

STH 67/175/TW INTERSECTION

CONST/INTERSECTION IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 87: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 51Southwest Region

DODGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 3020-00-70 11/12/2024 303 LET RSRF20 4.670 STH 028 HORICON - KEWASKUM $2,000,000 - $2,999,999

CTH V TO STH 175

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 3270-01-74 12/10/2024 303 LET RSRF20 3.540 STH 028 HORICON - KEWASKUM $1,000,000 - $1,999,999

ELLSWORTH STREET TO N JCT CTH TW

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

1411-02-00 303 I/E PVRPLA 11.111 STH 033 HORICON - WEST BEND $750,000 - $999,999

HORICON C LIMIT TO WASHINGTON CO

DESIGN-FULL PS&E PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6070-01-63 09/10/2024 303 LET RSRF20 4.640 STH 033 PORTAGE - FOX LAKE $3,000,000 - $3,999,999

STH 73 TO FOREST STREET

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

3010-02-00 303 I/E PVRPLA 2.150 STH 049 LOMIRA - WAUPUN $100,000 - $249,999

CTH KK TO CENTER DRIVE

DESIGN FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

3042-00-09 303 I/E MISC 15.860 STH 060 LOWELL - HARTFORD $250,000 - $499,999

STH 26 TO S GOODLAND ROAD

CORRIDOR PRESERVATION STUDY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 3042-01-21 01/25/2022 303 R/E RSRF30 0.288 STH 060 LOWELL - HARTFORD $0 - $99,999

CTH M TO BECKER ROAD

RIGHT OF WAY

STATE 3R NON-FEDERAL

Page 88: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 52Southwest Region

DODGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 3042-01-71 02/14/2023 303 LET PVRPLA 10.550 STH 060 LOWELL - HARTFORD $9,000,000 - $9,999,999

.32M E OF CTH W TO STH 67

CONST/ PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 3030-05-24 09/25/2022 303 R/E RSRF20 1.104 STH 067 OCONOMOWOC - MAYVILLE $0 - $99,999

LINCOLN ROAD TO ROOSEVELT ROAD

REAL ESTATE/ RSRF20

STATE 3R NON-FEDERAL

2023 3030-02-56 04/25/2023 303 R/R RSRF10 0.000 STH 067 OCONOMOWOC - MAYVILLE $100,000 - $249,999

WSOR RR XING 387041A

RR OPS/ CROSSING REPAIR/ RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 4090-01-74 11/12/2024 303 LET PVRPLA 2.490 STH 067 MAYVILLE - CAMPBELLSPORT $2,000,000 - $2,999,999

STH 175 TO EAST COUNTY LINE

CONST/ PAVE REPLACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

6060-02-01 303 I/E PVRPLA 13.627 STH 073 COLUMBUS - PRINCETON $1,000,000 - $1,999,999

MIDDLETON ST TO COMMERCE COURT

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 1112-02-77 01/14/2025 303 LET MISC 0.274 USH 151 SUN PRAIRIE - BEAVER DAM $500,000 - $749,999

CTH DE/JACKSON ROAD INTERSECTION

CONST/HSIP/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 4714-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY DODGE COUNTY PAVEMENT MARKING $250,000 - $499,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 89: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 53Southwest Region

GRANT

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5609-00-70 11/08/2022 206 LET RCND20 6.808 CTH H KIELER - CUBA CITY (CTH H) $5,000,000 - $5,999,999

ELM STREET TO STH 80

CONST OPS/RECONITIONING

STP RURAL STBG <5K POP FAST

2023 5722-00-73 10/25/2023 290 LLC MISC 0.000 NON HWY C BOSCOBEL, MULTI-USE PATH $1,000,000 - $1,999,999

WSOR RR TO RIVER VIEW LANE

PEDESTRIAN/BICYCLE TRAIL

TAP < 5,000 TRANS ALTERN 5K AND UNDER

1706-06-02 303 I/E PVRPLA 0.630 STH 011 DUBUQUE - SHULLSBURG $100,000 - $249,999

USH 61 TO 0.3 MI E OF STH 35

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 1706-06-21 01/25/2022 303 R/E RSRF30 1.490 STH 011 DUBUQUE - SHULLSBURG $500,000 - $749,999

V HAZEL GREEN W LIMIT TO V N LIMIT

RIGHT OF WAY RSRF30

STATE 3R NON-FEDERAL

2022 1706-06-70 04/12/2022 303 LET RSRF20 1.441 STH 011 DUBUQUE - SHULLSBURG $750,000 - $999,999

V HAZEL GREEN N LIMIT TO STH 80

CONSTRUCTIN/RSRF20

STATE 3R NON-FEDERAL

2023 1706-06-71 12/12/2023 303 LET RSRF30 1.631 STH 011 DUBUQUE - SHULLSBURG $1,000,000 - $1,999,999

V HAZEL GREEN W LIMIT TO V N LIMIT

CONSTRUCTION/RSRF30

STATE 3R NATIONAL HIGHWAY PERF FAST

5748-01-02 303 I/E PVRPLA 0.860 STH 035 DUBUQUE - DICKEYVILLE $100,000 - $249,999

ILLINOIS STATE LINE TO STH 11

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 90: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 54Southwest Region

GRANT

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5215-00-67 03/08/2022 303 LET RSRF10 6.342 STH 035 LANCASTER - BLOOMINGTON $1,000,000 - $1,999,999

MCKINLEY ST TO GRANT RIVER BRIDGE

CONST/MILL & OVERLAY/RSRF

STATE 3R HWY INFRA COVID SUPP

2024 5580-04-70 11/12/2024 303 LET RSRF30 6.090 STH 035 BLOOMINGTON - PRAIRIE DU CHIEN $3,000,000 - $3,999,999

W JUNCTION STH 133 TO USH 18

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5235-03-70 11/08/2022 303 LET RSRF20 8.730 STH 080 HAZEL GREEN - PLATTEVILLE $6,000,000 - $6,999,999

N LIMIT CUBA CITY TO BUS 151

CONSTRUCTION/RESRF20

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5235-03-71 04/12/2022 303 LET RSRF20 1.479 STH 080 HAZEL GREEN - PLATTEVILLE $750,000 - $999,999

E JCT STH 11 TO CUBA CITY S LIMIT

CONSTRUCTION/RSRF20

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5330-02-23 01/25/2022 303 R/E RSRF20 0.377 STH 080 HAZEL GREEN - PLATTEVILLE $0 - $99,999

ILLINOIS STATE LINE TO STH 11

RIGHT OF WAY RSRF20

STATE 3R NON-FEDERAL

2023 5330-02-73 12/12/2023 303 LET RSRF20 1.790 STH 080 HAZEL GREEN - PLATTEVILLE $1,000,000 - $1,999,999

ILLINOIS STATE LINE TO STH 11

CONSTRUCTION/RSRF20

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5215-02-74 11/08/2022 303 LET RSRF20 8.880 STH 081 CASSVILLE - LANCASTER $4,000,000 - $4,999,999

CTH Y TO STH 35

CONST/MILL & O'LAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 91: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 55Southwest Region

GRANT

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

5205-03-09 303 I/E PVRPLA 7.308 STH 133 TENNYSON - CASSVILLE $500,000 - $749,999

BREWERY HOLLOW RD TO N JCN CTH N

DESIGN FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

5616-02-02 303 I/E RSRF30 6.098 STH 133 BOSCOBEL - MUSCODA $100,000 - $249,999

CTH T TO SPORTSMANS DRIVE

DESIGN-FULL PS&E RSRF30

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1650-00-77 01/10/2023 303 LET RECST 0.416 USH 061 DICKEYVILLE - LANCASTER $2,000,000 - $2,999,999

SOUTH JUNCTION STH 81

CONST/INTERSECTION IMPROVEM/RECST

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 1650-06-40 09/25/2023 303 UTL MISC 17.700 USH 061 DICKEYVILLE - LANCASTER $0 - $99,999

HICKORY LANE TO ALONA LANE

UTL OPS/1650-06-72/LOE/MISC

STATE 3R NON-FEDERAL

2023 1650-06-72 01/10/2023 303 LET MISC 17.700 USH 061 DICKEYVILLE - LANCASTER $6,000,000 - $6,999,999

HICKORY LANE TO ALONA LANE

CONST/PASSING LANES & SLOPES/MISC

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 92: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 56Southwest Region

GREEN

2022-2025 FINAL STIP Project Listing 56Southwest Region

GREEN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5208-00-73 12/13/2022 206 LET BRRPL 0.100 CTH C CTH X - CTH E $1,000,000 - $1,999,999

SUGAR RIVER BRIDGE B-23-0181

CONST OPS/RECONSTRUCT W BRRPL

STP RURAL STBG <5K POP FAST

2022 5646-00-76 04/12/2022 205 LET BRRPL 0.027 LOC STR TOWN OF ADAMS, PRAIRIE VIEW RD $250,000 - $499,999

DOUGHERTY CREEK BRIDGE, B-23-0180

CONST OPS/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2022 5970-02-20 09/25/2022 303 R/E RSRF30 10.911 STH 039 HOLLANDALE - NEW GLARUS $0 - $99,999

CTH K TO 0.16MI E OF YORK CENTER RD

RE OPD FOR 5970-02-74

STATE 3R NON-FEDERAL

2024 5970-02-74 11/12/2024 303 LET RSRF30 10.911 STH 039 HOLLANDALE - NEW GLARUS $4,000,000 - $4,999,999

CTH K TO 0.16MI E OF YORK CENTER RD

CONST/ MILL & OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 1690-04-62 11/11/2025 303 LET RSRF10 12.568 STH 069 MONROE - NEW GLARUS $5,000,000 - $5,999,999

BUSHNELL CREEK TO COW PATH LANE

CONST/ MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1690-04-73 11/11/2025 303 LET RECST 0.321 STH 069 MONROE - NEW GLARUS $4,000,000 - $4,999,999

WITTENWYLER RD &CTH C INTERSECTIONS

CONST/IMPROVE INTERSECTIONS,B-23-23

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5606-03-20 01/25/2022 303 R/E RSRF10 13.117 STH 092 MT HOREB - BROOKLYN $0 - $99,999

EAST AVENUE TO USH 14

RE OPS FOR 5606-03-70

STATE 3R NON-FEDERAL

Page 93: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 57Southwest Region

GREEN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 5606-03-70 11/12/2024 303 LET RSRF10 13.117 STH 092 MT HOREB - BROOKLYN $3,000,000 - $3,999,999

EAST AVENUE TO USH 14

CONST/MILL & OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 94: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 58Southwest Region

IOWA

2022-2025 FINAL STIP Project Listing 58Southwest Region

IOWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5683-00-72 09/13/2022 205 LET BRRPL 0.072 CTH W STH 39 - STH 191 $500,000 - $749,999

DODGE BRANCH BRIDGE, B-25-0195

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

5245-04-00 303 I/E PVRPLA 1.543 STH 023 MINERAL POINT - SPRING GREEN $100,000 - $249,999

DODGE STREET TO USH 151

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

5970-03-04 303 I/E PVRPLA 12.534 STH 039 MINERAL POINT - HOLLANDALE $750,000 - $999,999

STH 23 TO HOLLANDALE V LIMIT

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5952-03-72 11/14/2023 303 LET RSRF20 3.510 STH 039 EDMUND - MINERAL POINT $1,000,000 - $1,999,999

USH 18 TO N LIMITS V LINDEN

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5952-03-73 11/14/2023 303 LET RSRF30 6.797 STH 039 EDMUND - MINERAL POINT $4,000,000 - $4,999,999

N LIMITS V LINDEN TO FAIR STREET

CONS/MILL&OVERLAY, SPOT PAINTBRDGS

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5939-00-23 04/25/2022 303 R/E RSRF10 0.177 STH 080 COBB - AVOCA $0 - $99,999

MORREY CREEK TRIBUTARY

REAL ESTATE/ RSRF10

STATE 3R NON-FEDERAL

2023 5939-00-22 10/25/2023 303 R/E RSRF20 0.660 STH 080 COBB - AVOCA $0 - $99,999

KENNEDY STREET TO PROGRESSIVE WAY

RIGHT OF WAY/ RSRF20

Page 95: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 59Southwest Region

IOWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2023 5939-00-70 11/14/2023 303 LET RSRF20 6.670 STH 080 COBB - AVOCA $2,000,000 - $2,999,999

USH 18 TO KENNEDY STREET

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5939-00-72 11/11/2025 303 LET RSRF20 1.972 STH 080 COBB - AVOCA $1,000,000 - $1,999,999

KENNEDY STREET TO 0.27 MILE N CTH I

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5770-02-20 04/25/2023 303 R/E RSRF20 4.351 STH 130 STH 23 - LONE ROCK $0 - $99,999

STH 23 TO STH 133

RIGHT OF WAY RSRF20

STATE 3R NON-FEDERAL

2025 5770-02-72 12/09/2025 303 LET RECST 0.370 STH 130 STH 23 - LONE ROCK $1,000,000 - $1,999,999

GARTHWAITE LN TO SPRING VALLEY RD

CONST/CURVE/RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1640-03-26 07/25/2022 303 R/E RSRF20 5.730 USH 014 SPRING GREEN - MADISON $0 - $99,999

OAK STREET TO WALTER ROAD

REAL ESTATE

STATE 3R NON-FEDERAL

2025 1640-00-63 11/11/2025 303 LET RSRF20 6.543 USH 014 SPRING GREEN - MADISON $2,000,000 - $2,999,999

WISCONSIN RIVER TO OAK STREET

CONST/ MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 1640-03-76 11/11/2025 303 LET RSRF20 5.740 USH 014 SPRING GREEN - MADISON $3,000,000 - $3,999,999

OAK STREET TO WALTER ROAD

Page 96: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 60Southwest Region

IOWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/ MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

1204-00-06 303 I/E MISC 0.476 USH 018 DODGEVILLE - MOUNT HOREB $100,000 - $249,999

CTH YZ INTERSECTION

DESIGN - FULL PS&E RCUTS MISC

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 4725-98-22 01/25/2022 305 MIS TOPM 0.000 VAR HWY IOWA COUNTY PAVEMENT MARKING $500,000 - $749,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 97: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 61Southwest Region

JEFFERSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3335-00-30 01/25/2022 206 C/E MISC 9.550 CTH F SULLIVAN - CTH P $0 - $99,999

USH 18 TO CTH P

PE-FULL PS&E/MISC/RUMBLE/SIGN/MARK

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2024 3335-00-60 01/09/2024 206 LET MISC 9.555 CTH F SULLIVAN - CTH P $500,000 - $749,999

USH 18 TO CTH P

CONST/MISC/CLRUMBLE/SIGN/MARK

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2022 3588-00-30 01/25/2022 206 C/E MISC 5.750 CTH G LAKE MILLS - STH 19 $0 - $99,999

STH 89 TO STH 19

PE-FILL PS&E/MISC/RUMBLE/SIGN/MARK

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2024 3588-00-60 01/09/2024 206 LET MISC 5.750 CTH G LAKE MILLS - STH 19 $500,000 - $749,999

STH 89 TO STH 19

CONST/MISC/RUMBLE/SIGN/MARK

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

1067-04-00 303 I/E RECST 10.789 IH 094 MADISON - OCONOMOWOC $7,000,000 - $7,999,999

AIRPORT RD TO CTH Y/B28-36,38,44,47

DES/PE-PS&E/E&WB/B28-584,585/RECST

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1009-11-80 05/10/2022 305 LET TOI 0.003 IH 094 LAKE MILLS - OCONOMOWOC $100,000 - $249,999

CTH E STRUCTURE B-28-49

CONST/BRI REPAIR/0077-01-82/BRRHB

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2022 1067-01-62 05/10/2022 303 LET BRPVTV 0.002 IH 094 LAKE MILLS - OCONOMOWOC $100,000 - $249,999

CTH E STRUCTURE B-28-0049

CONST/BRG DECK O'LAY/PAINT/BRPVTV

Page 98: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 62Southwest Region

JEFFERSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1067-02-73 09/10/2024 303 LET BRRPL 0.128 IH 094 MADISON - LAKE MILLS $4,000,000 - $4,999,999

NEWVILLE ROAD BR; ROCK LAKE ROADBR

CONST/B28-184,-185 REPLACE/BRRPL

BACKBONE NATIONAL HIGHWAY PERFFAST

2025 1067-04-61 12/09/2025 303 LET PSRS20 1.257 IH 094 LAKE MILLS - OCONOMOWOC $1,000,000 - $1,999,999

STH 26 INTERCHANGE AREA

CONST/PAVEMENT REPAIR/GRIND

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 3993-01-41 01/25/2022 303 UTL BRRPL 0.095 LOC STR S MAIN STREET, C JEFFERSON $0 - $99,999

ROCK RIVER STRUCTURE B-28-XX

UTL OPS/LEVEL OF EFFORT

SHR BRIDGES NON-FEDERAL

2022 3993-01-81 05/10/2022 303 LET BRRPL 0.095 LOC STR S MAIN STREET, C JEFFERSON $4,000,000 - $4,999,999

ROCK RIVER STRUCTURE B-28-0192

CONST/REPLACE STRUCTURE

SHR BRIDGES HWY INFRA COVID SUPP

2023 3638-00-75 08/25/2023 290 LLC MISC 0.000 NON HWY C LAKE MILLS, SIDEWALK IMPROVEMENTS $500,000 - $749,999

VARIOUS CITY LOCATIONS

CONST OPS/SIDEWALK CURB RAMPS

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

2024 1370-00-74 02/13/2024 303 LET RSRF10 1.930 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999

ROCK RIVER ROAD TO ECL

CONST/ MILL AND OVERLAY

Page 99: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 63Southwest Region

JEFFERSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1370-00-73 01/14/2025 303 LET PVRPLA 7.890 STH 016 WATERTOWN- WAUKESHA $8,000,000 - $8,999,999

E MAIN ST TO ROCK RIVER ROAD

CONST/PAVE REPL,REPAIR B-28-12,-22

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1370-00-76 01/14/2025 303 LET RECST 0.222 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999

MAIN ST/OAK HILL RD INTERSECTION

CONST/INTERSECTION IMPROVEMENT/RAB

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

3050-01-08 303 I/E PVRPLA 0.722 STH 019 C WATERTOWN, MAIN STREET $250,000 - $499,999

CHURCH STREET TO MARKET STREET

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 3050-04-21 10/25/2022 303 R/E BRRPL 0.060 STH 019 C WATERTOWN, MAIN STREET $0 - $99,999

ROCK RIVER STRUCTURE B-28-0906

RE OPS

STATE 3R NON-FEDERAL

2025 3050-04-81 09/09/2025 303 LET BRRPL 0.060 STH 019 C WATERTOWN, MAIN STREET $3,000,000 - $3,999,999

ROCK RIVER STRUCTURE B-28-193

CONST/REPLACE STRUCTURE

SHR BRIDGES STBG 5-200K POP FASTG

2022 3110-00-25 04/25/2022 303 R/E PVRPLA 0.680 STH 059 WHITEWATER - NORTH PRAIRIE $0 - $99,999

STH 106 TO EAST COUNTY LINE

RIGHT OF WAY PVRPLA

STATE 3R NON-FEDERAL

2025 3110-00-75 12/09/2025 303 LET PVRPLA 2.510 STH 059 WHITEWATER - NORTH PRAIRIE $2,000,000 - $2,999,999

STH 106 TO EAST COUNTY LINE

CONST/ PAVE REPLACE

Page 100: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 64Southwest Region

JEFFERSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R SURFACE TRANS BLOCK-FLEX E

3290-00-05 303 I/E PVRPLA 0.880 STH 089 LAKE MILLS - COLUMBUS $100,000 - $249,999

WATERLOO EAST LIMIT TO B-28-77

DESIGN-FULL PS&E/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

3300-00-03 303 I/E RSRF25 5.030 STH 089 FT ATKINSON - LAKE MILLS $100,000 - $249,999

USH 18 TO CTH A

DESIGN-FULL PS&E/ RSRF25

STATE 3R RAIL HWY CROSS HAZARD ELM

2024 3601-00-74 12/10/2024 303 LET RSRF20 2.660 STH 089 FT ATKINSON - LAKE MILLS $2,000,000 - $2,999,999

E BLACKHAWK DR TO USH 18

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 3576-01-25 01/25/2022 303 R/E PSRS40 0.340 STH 106 FT ATKINSON - PALMYRA $0 - $99,999

FIRST STREET TO STH 59

RE OPS/RIGHT OF WAY

STATE 3R NON-FEDERAL

2025 3576-01-64 11/11/2025 303 LET RSRF10 9.745 STH 106 FT ATKINSON - PALMYRA $2,000,000 - $2,999,999

0.01 MI E OF EDGEWATER RD TO CTH CI

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 3576-01-72 11/11/2025 303 LET PVRPLA 0.850 STH 106 C FORT ATKINSON, RIVERSIDE DRIVE $3,000,000 - $3,999,999

PARK DRIVE TO ROBERT STREET

CONST/ PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 3576-01-73 11/11/2025 303 LET PVRPLA 0.850 STH 106 C FORT ATKINSON, RIVERSIDE DR $1,000,000 - $1,999,999

PARK DRIVE TO ROBERT STREET

CONS/ SANITARY SEWER AND WATER MAIN

Page 101: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 65Southwest Region

JEFFERSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2025 3576-01-75 01/14/2025 303 LET PSRS40 0.340 STH 106 FT ATKINSON - PALMYRA $100,000 - $249,999

FIRST STREET TO STH 59

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

3575-09-03 303 I/E PVRPLA 0.214 USH 012 C FORT ATKINSON, S THIRD STREET $100,000 - $249,999

JANESVILLE AVENUE TO MAIN STREET

DESIGN-FULL PS&E PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 3575-04-81 04/12/2022 303 LET BRRHB 0.181 USH 012 C FT ATKINSON, ROBERT STREET $2,000,000 - $2,999,999

ROCK RIVER BRIDGE B-28-0009

CONSTRUCTION/ DECK REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2023 3575-02-73 02/14/2023 303 LET RSRF20 1.560 USH 012 C FORT ATKINSON, WHITEWATER AVENUE $1,000,000 - $1,999,999

MADISON AVENUE TO CTH M

CONST OPS/MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 102: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 66Southwest Region

JUNEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1016-05-03 303 I/E PVRPLA 4.870 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999

STH 58 TO SEVEN MILE CREEK

DES/PRE-CON ENG/PAVT REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

1016-05-37 303 I/E BRRHB 0.018 IH 090 MAUSTON - LYNDON STATION $0 - $99,999

19TH AVENUE BRDGS B-29-27 & B-29-28

DES/PE-PS&E/DECK O'LAYS/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

1016-08-08 303 I/E PVRPLA 2.400 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999

24TH AVENUE TO USH 12

DES/PRE-CON ENG/PAVT REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1016-01-61 11/08/2022 303 LET PSRS30 17.141 IH 090 TOMAH - PORTAGE $8,000,000 - $8,999,999

CAMP DOUGLAS TO SEVEN MILE CREEK

CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1016-01-62 11/08/2022 303 LET PSRS30 0.000 IH 090 TOMAH - PORTAGE $7,000,000 - $7,999,999

24TH AVENUE TO MIRROR LAKE BRIDGE

CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1016-01-94 01/25/2022 303 MIS MISC 0.016 IH 090 JUNEAU COUNTY STRUCTURE REPAIR $100,000 - $249,999

B-29-18,19,44,45

SERVICE PATROL/1016-01-64/MIS

BACKBONE NON-FEDERAL

2022 1016-05-81 06/25/2022 303 MIS MISC 2.256 IH 090 TOMAH - MAUSTON $0 - $99,999

STH 82 INTERCHANGE

INCIDENTAL ITS ITEMS FOR 1016-05-70

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 103: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 67Southwest Region

JUNEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1016-05-90 01/25/2022 303 MIS MISC 2.239 IH 090 TOMAH - MAUSTON $250,000 - $499,999

STH 82 INTERCHNG/B29-36,152-155,157

SERVICE PATROL/1016-05-70/MIS

BACKBONE NON-FEDERAL

2024 1016-04-63 12/10/2024 303 LET BRRHB 0.012 IH 090 TOMAH - MAUSTON $500,000 - $749,999

CTH M BRIDGES B-29-48 & B-29-49

CONST/CONCRETE OVERLAY/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1016-05-65 12/10/2024 303 LET BRRHB 0.017 IH 090 TOMAH - MAUSTON $750,000 - $999,999

43RD ST W BRIDGES B-29-41 & B-29-42

CONST/BRIDGE O'LAYS/NEW JOINT/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1016-05-67 11/11/2025 303 LET BRRHB 0.013 IH 090 MAUSTON - LYNDON STATION $500,000 - $749,999

19TH AVENUE BRDGS B-29-27 & B-29-28

CONST/CONCRETE DECK O'LAYS/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 6160-00-50 10/25/2024 303 R/R RSRF30 3.308 STH 021 NECEDAH - COLOMA $100,000 - $249,999

SHERIDAN STREET TO EAST COUNTY LINE

RR/UPGRADE CROSSING 392668W/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6160-00-51 10/25/2024 303 R/R RSRF30 3.308 STH 021 NECEDAH - COLOMA $250,000 - $499,999

CANADIAN NAT'L ASSOC. XING 392668W

RR/SIGNAL REPLACE/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6160-00-70 12/10/2024 303 LET RSRF30 3.320 STH 021 NECEDAH - COLOMA $5,000,000 - $5,999,999

SHERIDAN STREET TO EAST COUNTY LINE

CONST/MILL & O'LAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 104: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 68Southwest Region

JUNEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5032-00-20 08/25/2023 303 R/E RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $0 - $99,999

BARABOO RIVER TO V WONEWOC S LIMIT

RE OPS/ 5032-00-70/ RSRF

STATE 3R NON-FEDERAL

2025 5032-00-70 11/11/2025 303 LET RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $2,000,000 - $2,999,999

BARABOO RIVER TO V WONEWOC S LIMIT

CONST/MILL & O'LAY/B-29-XXX/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5032-00-72 11/11/2025 303 LET RSRF20 4.538 STH 033 HILLSBORO - REEDSBURG $100,000 - $249,999

BARABOO RIVER TO V WONEWOC S LIMIT

CONST/SANITARY SEWER & WATER/ RSRF

STATE 3R NON-FEDERAL

2022 5020-01-60 04/12/2022 303 LET RSRF10 14.266 STH 058 LAVALLE - MAUSTON $3,000,000 - $3,999,999

STH 33 TO 0.05 MI N SARA LANE

CONST/MILL & OVERLAY/RSRF

STATE 3R HWY INFRA COVID SUPP

5010-04-02 303 I/E PVRPLA 3.642 STH 080 HILLSBORO - NEW LISBON $250,000 - $499,999

STH 33 TO BARABOO RIVER B-29-108

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 1620-02-78 11/08/2022 303 LET RSRF30 15.993 STH 080 NECEDAH - BABCOCK $9,000,000 - $9,999,999

STH 21 TO COUNTY LINE ROAD

CONST/REPLACE B-29-XXX/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1620-05-70 02/14/2023 303 LET MISC 0.570 STH 080 NEW LISBON - NECEDAH $500,000 - $749,999

25TH ST W TO 400' N OF KINGSBURY DR

CONST/ADD TURN LANES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

Page 105: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 69Southwest Region

JUNEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

5880-01-02 303 I/E PVRPLA 1.135 USH 012 MAUSTON - WISCONSIN DELLS $100,000 - $249,999

CTH J TO SAUK COUNTY LINE

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5880-00-66 04/12/2022 303 LET RSRF10 7.858 USH 012 TOMAH - MAUSTON $2,000,000 - $2,999,999

MONROE COUNTY LINE TO A STREET

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5880-00-67 11/11/2025 303 LET RSRF10 5.626 USH 012 MAUSTON - WISCONSIN DELLS $2,000,000 - $2,999,999

MEADOW LANE TO 0.07 MI E OF CTH J

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 106: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 70Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7049-00-70 04/12/2022 205 LET BRRPL 0.105 CTH D T OF ONALASKA - T OF FARMINGTON $750,000 - $999,999

HALFWAY CREEK BRIDGE, B-32-0240

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E

2023 7323-00-71 12/12/2023 205 LET BRRPL 0.000 CTH M STH 16 - CTH S $3,000,000 - $3,999,999

LA CROSSE RIVER BRIDGE, B-32-0245

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG 5-200K POP FASTG

2022 7076-01-02 06/25/2022 206 C/E RECST 0.149 CTH U BANGOR -ROCKLAND $0 - $99,999

CURVE 0.3 MI W OF ROCKLAND V LIMIT

DESIGN - FULL PS&E CURVE RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 7076-01-72 05/13/2025 206 LET RECST 0.152 CTH U BANGOR -ROCKLAND $1,000,000 - $1,999,999

CURVE 0.3 MI W OF ROCKLAND V LIMIT

CONST/CURVE RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1070-04-03 303 I/E RECST 0.605 IH 090 LA CROSSE - SPARTA $750,000 - $999,999

STH 157 INTERCHANGE

DES/PE-PS&E/INTERCHANGE/RECST

BACKBONE NATIONAL HIGHWAY PERF FAST

1071-01-02 303 I/E RSRF20 7.267 IH 090 LA CROSSE - WEST SALEM $500,000 - $749,999

THEATER ROAD TO CTH C

DESIGN - FULL PS&E RSRF20

BACKBONE NATIONAL HIGHWAY PERF FAST

1071-07-06 303 I/E PVRPLA 6.620 IH 090 LACROSSE-SPARTA $1,000,000 - $1,999,999

STH 16-CTH C/B-32-0023 TO B-32-0028

DES/PE-PS&E/BRIDGE REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 107: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 71Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1071-08-04 303 I/E RECST 1.860 IH 090 LA CROSSE - SPARTA $1,000,000 - $1,999,999

STH 16 INTERCHANGE/B-32-0053,-0054

DES/PE-PS&E/INTERCH IMPROVE/RECST

BACKBONE NATIONAL HIGHWAY PERFFAST

1074-00-31 303 I/E BRRHB 0.066 IH 090 WEST SALEM - SPARTA $100,000 - $249,999

CTH C BR; FISH CR EB BR; STH 27S BR

DES/PE-PS&E/B32-57,63/B41-123/BRRHB

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1070-04-64 11/14/2023 303 LET BRRHB 0.212 IH 090 LA CROSSE - SPARTA $3,000,000 - $3,999,999

BLACK RVR, ROUND LK, BAINBRIDGE BRG

CONST/B-32-34,35,46,47,73/BRRHB

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 5991-02-62 02/14/2023 206 LET RECST 0.047 LOC STR C ONALASKA, EAST AVENUE N $250,000 - $499,999

RIDERS CLUB ROAD INTERSECTION

CONST/MINI-RAB/RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 5991-05-52 06/25/2023 207 R/R MISC 0.011 LOC STR T OF SHELBY, LOSEY BOULEVARD $250,000 - $499,999

BNSF RR XING 079827S

RR OP/REPL SIGNAL,BNGLW,CIRC'T/MISC

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2023 5991-05-53 06/25/2023 207 R/R MISC 0.004 LOC STR C LA CROSSE, SIMS PLACE $250,000 - $499,999

BNSF RR XING 917431D

RR OPS/REPL SIGNALS; ADD GATES/MISC

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2022 5991-08-73 10/25/2022 290 LLC MISC 0.000 NONHWY

LA CROSSE CO, MULTI-USE TRAIL $500,000 - $749,999

Page 108: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 72Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

S KINNEY COULEE RD TO LANDFILL RD

PEDESTRIAN/BICYCLE TRAIL

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

2022 5991-08-74 10/25/2022 290 LLC MISC 0.000 NONHWY

LA CROSSE RIVER BICYCLE/PED BRIDGE $500,000 - $749,999

CTH VP IN VETERAN'S PARK

PEDESTRIAN/BICYCLE BRIDGE

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

7575-01-05 303 I/E BRRPLE 1.410 STH 016 LACROSSE - SPARTA $2,000,000 - $2,999,999

CMSTPP RR STRUCTURE B-32-111

DES/PE-PS&E/STRUCTURE RECONS/BRRPLE

SHR LARGE BRIDGES NON-FEDERAL

2022 7575-01-26 10/25/2022 303 R/E RSRF15 2.890 STH 016 LA CROSSE - SPARTA $0 - $99,999

LOSEY BLV TO SOUTH KINNEY COULEE RD

RE OPS/ 7575-01-76/ RSRF

STATE 3R NON-FEDERAL

2022 7575-07-70 04/12/2022 303 LET MISC 0.083 STH 016 C LA CROSSE, INTERSECTION IMPRVMNTS $500,000 - $749,999

LA CROSSE ST/STH 35/WEST AVE INTER

CONS/LEFT TURNLANES/MONOTUBES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 7575-07-73 04/12/2022 303 LET RECST 0.887 STH 016 C LA CROSSE, LA CROSSE STREET $4,000,000 - $4,999,999

OAKLAND ST TO LOSEY BLVD

CONST/PATCH AND OVERLAY/RECST

STATE 3R HIGHWAY SAFETY IMP PROG-FA

2022 7575-07-83 04/12/2022 303 LET RECST 0.000 STH 016 C LA CROSSE, LA CROSSE STREET $1,000,000 - $1,999,999

OAKLAND ST TO LOSEY BLVD

CONST/SANITARY SEWER & WATER/RECST

Page 109: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 73Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2024 7570-05-70 01/09/2024 303 LET MISC 0.103 STH 016 LA CROSSE - SPARTA $500,000 - $749,999

CTH M INTERSECTION

CONST/MONOTUBES & LFT TURN LNS/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2024 7575-01-65 12/10/2024 303 LET BRRHB 0.130 STH 016 LA CROSSE - SPARTA $2,000,000 - $2,999,999

MEDARY OVERPASS B-32-111

CONST/CONC O'LAY/PAINT/REPAIR/BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2024 7575-01-76 11/12/2024 303 LET RSRF15 2.890 STH 016 LA CROSSE - SPARTA $4,000,000 - $4,999,999

LOSEY BLV TO SOUTH KINNEY COULEE RD

CONST/MILL & O'LAY/B-32-100/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 7575-01-80 12/09/2025 303 LET BRRPLE 1.410 STH 016 LACROSSE - SPARTA $25,000,000 - $29,999,999

GILLETTE STREET TO STH 157

CONST/REPLACE B-32-244/BRRPL EXPANS

SHR LARGE BRIDGES NATIONAL HIGHWAY PERF FAST

5120-02-02 303 I/E MISC 0.105 STH 033 C LA CROSSE, STATE ROAD $100,000 - $249,999

LOSEY BOULEVARD INTERSECTION

DESIGN - FULL PS&E/MISC

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 5120-02-72 12/09/2025 303 LET MISC 0.105 STH 033 C LA CROSSE, STATE ROAD $1,000,000 - $1,999,999

LOSEY BOULEVARD INTERSECTION

CONST/LT TURN/MONOTUBES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 5163-07-42 01/25/2022 303 UTL RECST 2.550 STH 035 GENOA - LACROSSE $0 - $99,999

LACROSSE CO LINE TO GARNER PLACE

UTL/COON VALLEY FARMER TEL CO/RECST

Page 110: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 74Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2024 5163-07-52 11/25/2024 303 R/R RECST 1.561 STH 035 GENOA - LACROSSE $0 - $99,999

LACROSSE CO LINE TO SUNNYSIDE DR

RR OPS/5163-07-72/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 5163-07-53 11/25/2024 303 R/R RECST 1.561 STH 035 GENOA - LACROSSE $0 - $99,999

LACROSSE CO LINE TO SUNNYSIDE DR

RR OPS/5163-07-72/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 5163-07-72 11/12/2024 303 LET RECST 1.561 STH 035 GENOA - LACROSSE $5,000,000 - $5,999,999

LACROSSE CO LINE TO SUNNYSIDE DR

CONST/DECK RPL B-32-163/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 7140-00-82 09/09/2025 303 LET BRRPL 0.380 STH 035 LACROSSE - TREMPEALEAU $9,000,000 - $9,999,999

BLACK RVR BRDGS B-32-XXX & B-32-XXX

CONST/BRIDGE REPLACEMENTS/BRRPL

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

2022 5820-01-28 04/25/2022 303 R/E RSRF20 5.731 STH 162 COON VALLEY - BANGOR $0 - $99,999

USH 14 TO STH 33

RE OPS/ 5820-01-68/RSRF

STATE 3R NON-FEDERAL

2023 5820-00-60 11/14/2023 303 LET BRRHB 0.055 STH 162 COON VALLEY - BANGOR $750,000 - $999,999

DUTCH CREEK BRIDGE B-32-15

CONST/CONCRETE OVERLAY/BRRHB

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

Page 111: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 75Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1641-02-42 01/25/2022 303 UTL RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $0 - $99,999

GREEN BAY STREET TO WARD AVENUE

UTL/XCEL ENERGY ELEC UTL 101/RECST

STATE 3R NON-FEDERAL

2022 1641-02-53 01/25/2022 303 R/R RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999

GREEN BAY STREET TO WARD AVENUE

RR/SURFACE/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1641-02-54 01/25/2022 303 R/R RECST 1.050 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999

GREEN BAY STREET TO WARD AVENUE

RR/SIGNAL UPGRADES/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3700-10-79 01/11/2022 305 LET TOSIG 0.000 USH 014 C LACROSSE, SOUTH AVENUE $100,000 - $249,999

GREEN BAY ST AND SOUTH AVE

TRF/SIGNAL REHAB/TOSIG

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 1640-01-75 09/10/2024 303 LET RSRF20 0.630 USH 014 LA CROSSE - WESTBY $500,000 - $749,999

MARION ROAD TO GARNER PLACE

CONST/MILL & O'LAY/B-32-82/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 5200-03-63 02/13/2024 303 LET BRRHB 0.210 USH 014 C LACROSSE, CAMERON AVE & CASS ST $2,000,000 - $2,999,999

MISSISSIPPI RVR B-32-202 & B-32-300

CONST/REPAIRS & SPOT PAINT/BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

1630-03-00 303 I/E BRRHB 1.730 USH 053 LA CROSSE - GALESVILLE $100,000 - $249,999

Page 112: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 76Southwest Region

LA CROSSE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

B-32-131, 132, 135, 136, 139, 140

DESIGN - FULL PS&E BRRHB

STATE 3R NATIONAL HIGHWAY PERFFAST

1630-03-03 303 I/E RSRF30 3.384 USH 053 LA CROSSE - GALESVILLE $250,000 - $499,999

OLD HWY 93 TO BLACK RIVER

DESIGN-FULL PS&E RSRF30

STATE 3R NATIONAL HIGHWAY PERFFAST

1630-03-04 303 I/E PVRPLA 4.718 USH 053 LA CROSSE - GALESVILLE $500,000 - $749,999

STH 157 TO HOLMEN DRIVE

DESIGN-FULL PS&E PVRPLA

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 1630-03-80 01/09/2024 303 LET BRRHB 1.730 USH 053 LA CROSSE - GALESVILLE $500,000 - $749,999

B-32-131, 132, 135, 136, 139, 140

CONSTRUCTION/BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2022 3700-10-89 01/25/2022 305 MIS TOSIG 0.000 VARHWY

CITY OF LACROSSE $250,000 - $499,999

VARIOUS HWYS/INTERSECTIONS

TRF/SIGNAL RETROFIT CABINET REPLACE

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

Page 113: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 77Southwest Region

LAFAYETTE

2022-2025 FINAL STIP Project Listing 77Southwest Region

LAFAYETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5720-00-74 12/13/2022 205 LET BRRPL 0.000 CTH C CTH G - CTH O $500,000 - $749,999

BONNER BRANCH BRIDGE, B-33-0140

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 5307-00-73 12/13/2022 205 LET BRRPL 0.000 CTH O STH 11 - STH 81 $250,000 - $499,999

AMES BRANCH BRIDGE, B-33-0139

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1706-00-08 303 I/E RSRF25 1.109 STH 011 DUBUQUE - SHULLSBURG $100,000 - $249,999

WHITE STREET TO E LIMIT BENTON

DESIGN-FULL PS&E RSRF25

STATE 3R NATIONAL HIGHWAY PERF FAST

1706-01-09 303 I/E MISC 55.410 STH 011 DUBUQUE - MONROE $250,000 - $499,999

USH 61 TO STH 81 NORTH

CORRIDOR PRESERVATION & ACCESS

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1706-02-64 03/08/2022 303 LET RSRF10 10.517 STH 011 SHULLSBURG - MONROE $2,000,000 - $2,999,999

SHULLSBURG BRANCH BRDG TO WOLF CRK

CONST/ MILL AND OVERLAY

STATE 3R HWY INFRA COVID SUPP

2024 1706-03-80 12/10/2024 303 LET BRRPL 0.064 STH 011 SHULLSBURG - MONROE $1,000,000 - $1,999,999

SHULLSBURG BRANCH BRIDGES

CONST/ REPLACEMENTS B-33-XXX, -XXX

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2025 1706-03-72 11/11/2025 303 LET RECST 0.314 STH 011 SHULLSBURG - MONROE $3,000,000 - $3,999,999

STH 23 INTERSECTION

CONST/ IMPROVE INTERSECTION

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 114: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 78Southwest Region

LAFAYETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

5245-00-06 303 I/E PVRPLA 5.819 STH 023 STH 11 - MINERAL POINT $250,000 - $499,999

STH 11 TO COUNTY SHOP ROAD

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

5260-00-03 303 I/E RSRF25 5.750 STH 078 WARREN - ARGYLE $250,000 - $499,999

ILLINOIS STATE LINE TO STH 11

DESIGN-FULL PS&E RSRF25

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5590-00-72 08/09/2022 303 LET PVRPLA 6.450 STH 078 WARREN - ARGYLE $2,000,000 - $2,999,999

STH 11 TO CTH D

CONST/ PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5590-05-21 10/25/2022 303 R/E RSRF20 0.940 STH 078 ARGYLE - MT HOREB $0 - $99,999

LIEN COURT TO CENTER STREET

DESIGN-RIGHT OF WAY RSRF20

STATE 3R NON-FEDERAL

2022 5944-04-24 01/25/2022 303 R/E RSRF30 0.892 STH 081 DARLINGTON - ARGYLE $0 - $99,999

STH 23 TO WILDCAT ROAD

REAL ESTATE

STATE 3R NON-FEDERAL

2025 5944-04-74 12/09/2025 303 LET RSRF30 0.650 STH 081 DARLINGTON - ARGYLE $1,000,000 - $1,999,999

STH 23 TO WILDCAT ROAD

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5967-01-70 03/08/2022 303 LET RSRF30 4.650 STH 126 STH 81 - BELMONT $1,000,000 - $1,999,999

STH 81 TO CTH G

CONSTRUCTION/RSRF30

STATE 3R HWY INFRA COVID SUPP

Page 115: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 79Southwest Region

MONROE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7373-00-70 04/12/2022 206 LET RECST 1.790 CTH ET T OF TOMAH - T OF LA GRANGE $3,000,000 - $3,999,999

C OF TOMAH TO FLARE AVENUE

CONST OPS/RECONSTRUCT

STP RURAL STBG <5K POP - FAST EXT

2022 7373-00-71 12/13/2022 206 LET RECST 0.260 CTH ET T OF TOMAH - T OF LA GRANGE $500,000 - $749,999

FLARE AVENUE TO STH 21

CONST OPS/RECONSTRUCT

STP RURAL STBG <5K POP - FAST EXT

2022 7117-00-71 03/08/2022 206 LET RECST 0.147 CTH PP VILLAGE OF OAKDALE, CTH PP $750,000 - $999,999

IH 90/94 TO US 12/16

CONST OPS/RECONSTRUCT

STP RURAL STBG <5K POP - FAST EXT

2023 7117-00-72 01/10/2023 205 LET BRRPL 0.000 CTH PP VILLAGE OAKDALE - STH 21 $500,000 - $749,999

E FORK LEMONWEIR RV BR B-41-0320

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2023 5017-00-70 01/10/2023 205 LET BRRPL 0.034 CTH U V OF NORWALK - T OF RIDGEVILLE $750,000 - $999,999

MORRIS CREEK BRIDGE B-41-0319

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP - FAST EXT

1077-02-02 303 I/E PVRPLA 10.340 IH 090 SPARTA - TOMAH $4,000,000 - $4,999,999

STH 16 TO CTH M

DES/PE-PS&E/PAV'T REPLACE/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

1077-03-31 303 I/E PSRS10 4.271 IH 090 SPARTA - TOMAH $0 - $99,999

0.65 MI W OF CTH M TO USH 12

DES/PE-PS&E/PAVT REPAIR/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 116: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 80Southwest Region

MONROE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1017-01-71 11/08/2022 303 LET RSRF30 15.742 IH 090 TOMAH - CAMP DOUGLAS, EB $17,000,000 - $19,999,999

USH 12 TO CTH C/PREP/B41-45,-46,-50

CONST/SHLDRS FOR 1017-01-73/RSRF

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1017-01-73 11/14/2023 303 LET RSRF30 15.773 IH 090 TOMAH - CAMP DOUGLAS, EB $14,000,000 - $14,999,999

USH 12 TO CTH C

CONST/MILL & OVERLAY EB RDWY/RSRF

BACKBONE NATIONAL HIGHWAY PERF FAST

5634-00-31 303 I/E PSRS10 0.548 STH 016 SWR,MONROE COUNTY CURVES HFST $0 - $99,999

STH 16, STH 131

DESIGN - FULL PS&E PSRS10

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5634-00-61 11/12/2024 303 LET PSRS10 0.547 STH 016 SWR,MONROE COUNTY CURVES HFST $250,000 - $499,999

STH 16, STH 131

CONST/HFST/PSRS10

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 7570-05-65 01/09/2024 303 LET PSRS10 0.475 STH 016 LA CROSSE - SPARTA $100,000 - $249,999

E JCT HAMLET AVE TO ALPINE RD

CONST/CONVERT TO A TWLTL/PSRS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 7010-01-63 04/12/2022 303 LET RSRF10 8.231 STH 021 TOMAH - NECEDAH $3,000,000 - $3,999,999

0.15M E EATON AVE TO JUNEAU CO LINE

CONST/MILL & OVERLAY/RSRF

STATE 3R HWY INFRA COVID SUPP

2023 7605-06-62 11/14/2023 303 LET PSRS40 15.700 STH 021 SPARTA - TOMAH $6,000,000 - $6,999,999

C SPARTA E LIMIT TO EMERSON ROAD

CONST/MILL & OVERLAY/PSRS

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 117: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 81Southwest Region

MONROE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7062-02-73 02/14/2023 303 LET MISC 15.557 STH 027 SPARTA - BLACK RIVER FALLS $1,000,000 - $1,999,999

SPARTA N CITY LIMITS TO N COUNTY LN

CONS/WIDE PVD SHLDR/RMBLE STRP/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 5510-00-20 01/25/2022 303 R/E RSRF30 11.343 STH 071 SPARTA - ELROY $0 - $99,999

CTH U TO CTH V

RE/RSRF/CONST 5510-00-70

STATE 3R NON-FEDERAL

2023 5510-00-63 02/14/2023 303 LET MISC 11.740 STH 071 SPARTA - WILTON $0 - $99,999

HARMONY AVENUE TO NORTH STREET

CONST/SHOULDER RUMBLE STRIPS/MISC

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 5545-00-20 07/25/2023 303 R/E RSRF30 9.730 STH 071 WILTON - ELROY $0 - $99,999

CTH V TO STH 80

RE OPS/5545-00-70/RSRF

STATE 3R NON-FEDERAL

2024 5510-00-70 11/12/2024 303 LET RSRF30 11.343 STH 071 SPARTA - ELROY $8,000,000 - $8,999,999

CTH U TO CTH V/B-41-25,-161,-159

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

5130-05-05 303 I/E PVRPLA 4.050 STH 131 ONTARIO - TOMAH $250,000 - $499,999

CTH A TO HIAWATHA AVE

DESIGN-FULL PS&E PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5130-05-63 02/14/2023 303 LET RSRF10 4.690 STH 131 ONTARIO - TOMAH $2,000,000 - $2,999,999

STH 71 TO CTH A/B-41-21,-136,-137

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 118: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 82Southwest Region

MONROE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5880-00-25 01/25/2022 303 R/E RSRF30 8.110 USH 012 TOMAH - MAUSTON $0 - $99,999

GRANT AVENUE TO E COUNTY LINE

RE/RSRF/CONST 5880-00-75

STATE 3R NON-FEDERAL

2022 7998-00-77 12/13/2022 303 LET PVRPLA 0.157 USH 012 TOMAH - MAUSTON $2,000,000 - $2,999,999

VETERANS STREET INTERSECTION AREA

CONST/PAV'T REPLACE/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 7998-00-78 12/13/2022 303 LET PVRPLA 0.157 USH 012 TOMAH - MAUSTON $250,000 - $499,999

VETERANS STREET INTERSECTION AREA

CONST/WATER MAIN & SSN SEWER/PVRPLA

STATE 3R NON-FEDERAL

2024 7189-03-72 02/13/2024 303 LET MISC 0.205 USH 012 BLACK RIVER FALLS - TOMAH $1,000,000 - $1,999,999

WITTIG ROAD INTERSECTION

CONST/LEFT TURN LNS/MONOTUBES/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 5880-00-75 02/11/2025 303 LET RSRF30 8.110 USH 012 TOMAH - MAUSTON $5,000,000 - $5,999,999

GRANT AVENUE TO E COUNTY LINE

CONST/RESURFACE/B-41-147/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 119: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 83Southwest Region

RICHLAND

2022-2025 FINAL STIP Project Listing 83Southwest Region

RICHLAND

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5455-00-70 04/12/2022 205 LET BRRPL 0.029 CTH H STH 56 - CTH I $500,000 - $749,999

GAULT HOLLOW CREEK BRIDGE,B-52-0280

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2023 5419-06-70 01/10/2023 206 LET RECST 2.874 CTH O STH 80 - RICHLAND CENTER $4,000,000 - $4,999,999

CTH 00 TO CARDINAL CREST ROAD

CONST OPS/RECONSTRUCTION

STP RURAL STBG <5K POP FAST

2022 5750-06-20 07/25/2022 303 R/E RSRF30 13.766 STH 058 USH 14 - LAVALLE $0 - $99,999

0.7MI N OF CTH N TO LEE LAKE BRIDGE

RE OPS/5750-06-70/RSRF

SHR BRIDGES NON-FEDERAL

2024 5750-06-70 11/12/2024 303 LET RSRF30 13.766 STH 058 USH 14 - LAVALLE $6,000,000 - $6,999,999

0.7MI N OF CTH N TO LEE LAKE BRIDGE

CONST/MILL & O'LAY/B-52-60/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5190-07-60 11/12/2024 303 LET PVRPLA 2.290 STH 060 BOSCOBEL - GOTHAM $5,000,000 - $5,999,999

SLEEPY HOLLOW ROAD TO PUBLIC RDSIDE

CONST/MILL & O'LAY/B-52-143/PVRPLA

STATE 3R NON-FEDERAL

2024 5190-07-71 11/12/2024 303 LET PVRPLA 3.510 STH 060 STH 80 - SLEEPY HOLLOW ROAD $3,000,000 - $3,999,999

STH 80 EAST TO SLEEPY HOLLOW RD

CONST/MILL & O'LAY/B-52-233/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5190-07-72 11/12/2024 303 LET RECST 2.480 STH 060 BOSCOBEL - GOTHAM $4,000,000 - $4,999,999

PUBLIC ROADSIDE TO USH 14

CONST/GRADE-BASE-SURFACE/RECST

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 120: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 84Southwest Region

RICHLAND

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 5770-01-71 08/13/2024 303 LET BRRPL 0.700 STH 130 STH 23 - LONE ROCK $30,000,000 - $34,999,999

WISCONSIN RIVER/B-25-192,B-52-279

CONST/ROADWAY/BRRPL

SHR LARGE BRIDGES SURFACE TRANSP BLOCK GRTS-

2025 5770-02-71 11/11/2025 303 LET RSRF20 1.434 STH 130 LONE ROCK - STH 154 $1,000,000 - $1,999,999

WISCONSIN RIVER TO USH 14

CONST/MILL & O'LAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5070-01-72 01/10/2023 303 LET PVRPLA 3.530 STH 154 STH 58 - ROCK SPRINGS $1,000,000 - $1,999,999

STH 58 TO EAST COUNTY LINE

CONST/PAV'T REPLACE/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5555-02-63 04/12/2022 303 LET RSRF10 1.380 STH 193 STH 60 - STH 80 $500,000 - $749,999

STH 60 TO STH 80

CONSTMILL & OVERLAY/RSRF

STATE 3R HWY INFRA COVID SUPP

2024 1640-03-73 11/12/2024 303 LET RSRF15 1.575 USH 014 RICHLAND CENTER - SPRING GREEN $4,000,000 - $4,999,999

BOHMANN DRIVE TO CTH O

CONST/MILL & OVERLAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1640-07-60 09/10/2024 303 LET RSRF10 10.400 USH 014 READSTOWN - RICHLAND CENTER $4,000,000 - $4,999,999

VERNON CO LINE TO KALISH LANE

CON/MILL&O'LAY/B52-139,823,XXX/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1640-03-75 11/11/2025 303 LET RSRF30 11.540 USH 014 RICHLAND CENTER - SPRING GREEN $7,000,000 - $7,999,999

0.1 MI E STH 58 TO SAUK CO LINE

CONST/MILL & OVERLAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 121: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 85Southwest Region

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5334-00-70 12/13/2022 205 LET BRRPL 0.070 CTH E CITY OF JANESVILLE - US 14 $750,000 - $999,999

MARSH CREEK BRIDGE, B-53-0385

CONST OPS/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2022 1001-10-82 04/12/2022 302 LET MISC 52.601 IH 039 ILLINOIS STATE LINE - MADISON $1,000,000 - $1,999,999

PAVEMENT MARKINGS CORRIDOR WIDE

CONSTRUCTION/ MISC

MAJORS NATIONAL HIGHWAY PERF FAST

2022 1001-10-91 03/25/2022 302 MIS MISC 0.000 IH 039 ILLINOIS STATE LINE - MADISON $3,000,000 - $3,999,999

ILLINOIS STATE LINE - MADISON

INCIDENT MANAGEMENT

MAJORS NON-FEDERAL

2022 1001-10-94 01/25/2022 302 MIS MISC 46.080 IH 039 ILLINOIS STATE LINE - MADISON $0 - $99,999

ILLINOIS STATE LINE - MADISON

ITS INCIDENTAL PO ITEMS TOMTOM

MAJORS NON-FEDERAL

2024 1093-01-81 11/12/2024 303 LET RSRF30 5.870 IH 043 BELOIT - ELKHORN $15,000,000 - $16,999,999

CTH X TO STH 140; B-53-111 & 113

CONSTRUCTION/RSRF30

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 5989-00-24 08/08/2023 206 LET RCND20 0.420 LOC STR C OF BELOIT, HENRY AVE/SHOPIERE RD $500,000 - $749,999

ROYCE AVENUE TO PRAIRIE AVENUE

CONST OPS/RECONDITION

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2023 5989-00-31 02/14/2023 206 LET RCND10 1.560 LOC STR TOWN OF BELOIT, PARK AVENUE $3,000,000 - $3,999,999

CRANSTON ROAD TO E INMAN PARKWAY

CONST OPS/RECONDITION

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

Page 122: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 86Southwest Region

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5990-01-41 01/10/2023 206 LET RECST 0.290 LOC STR C OF JANESVILLE, EAST MILWAUKEE STR $3,000,000 - $3,999,999

ATWOOD AVENUE TO MAIN STREET

CONST OPS/RECONSTRUCTION

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2024 5990-01-34 11/12/2024 206 LET RSRF10 1.440 LOC STR C JANESVILLE, W COURT STREET $4,000,000 - $4,999,999

WAVELAND ROAD TO PEARL STREET

CONST/CONVERT TO TWLTL

STP URBAN 50,000 - 200,000 HIGHWAY SFTY IMP PRG FAST

2024 5990-01-36 11/12/2024 206 LET RCND10 0.292 LOC STR C JANESVILLE, W COURT ST INTERSCTNS $1,000,000 - $1,999,999

N CROSBY AV; N ARCH ST; N PEARL ST

CONST/TURN LANES/MONOTUBES

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 5670-00-65 11/11/2025 303 LET RSRF30 3.580 STH 059 MONROE - EVANSVILLE $2,000,000 - $2,999,999

STH 104 TO STH 213

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

5340-00-05 303 I/E RSRF30 6.340 STH 081 MONROE - BELOIT $100,000 - $249,999

CTH K TO S PADDOCK ROAD

DESIGN-FULL PS&E RSRF30

STATE 3R SURFACE TRANS BLOCK-FLEX E

5340-00-06 303 I/E PVRPLA 6.872 STH 081 MONROE - BELOIT $500,000 - $749,999

WILLOW CREEK BRIDGE TO CTH K

DESIGN-FULL PS&E PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 3320-02-20 01/25/2022 303 R/E RECST 4.003 STH 140 BERGEN - EMERALD GROVE $0 - $99,999

ILLINOIS STATE LINE TO V CLINTON

RE OPS FOR 3320-02-70

STATE 3R NON-FEDERAL

Page 123: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 87Southwest Region

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3320-02-21 01/25/2022 303 R/E RSRF25 6.212 STH 140 BERGEN - EMERALD GROVE $0 - $99,999

0.17 MI N OGDEN AVENUE TO USH 14

RE - OPS FOR 3320-02-71

STATE 3R NON-FEDERAL

2023 3320-02-51 04/25/2023 303 R/R MISC 0.000 STH 140 BERGEN - EMERALD GROVE $100,000 - $249,999

WISC & SOUTHERN RR XING 387963R

RR OPS/ CROSSING REPAIR/ RESURFACE

STATE 3R NON-FEDERAL

2023 3320-02-52 04/25/2023 303 R/R PVRPLA 0.000 STH 140 BERGEN - EMERALD GROVE $250,000 - $499,999

WISC & SOUTHERN RR XING 387963R

RR OPS/ SIGNALS

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 3320-02-70 11/14/2023 303 LET RECST 4.004 STH 140 BERGEN - EMERALD GROVE $8,000,000 - $8,999,999

ILLINOIS STATE LINE TO V CLINTON

CONST/ RECONSTRUCT

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 3320-02-71 11/12/2024 303 LET RSRF25 6.212 STH 140 BERGEN - EMERALD GROVE $5,000,000 - $5,999,999

0.17 MI N OGDEN AVENUE TO USH 14

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5636-03-71 03/25/2022 303 LFA MISC 0.010 STH 213 SALT STORAGE, ROCK COUNTY $500,000 - $749,999

V OF ORFORDVILLE

LFA/CONSTRUCT NEW SALT SHED

STATE 3R NON-FEDERAL

2024 5571-00-52 11/25/2024 303 R/R RSRF30 0.000 STH 213 BELOIT - EVANSVILLE $250,000 - $499,999

WSOR RR XING 392441D & 392442K

RR OPS/ CROSSING REPAIR/ RESURFACE

STATE 3R NON-FEDERAL

Page 124: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 88Southwest Region

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 5571-00-53 11/25/2024 303 R/R RSRF30 0.000 STH 213 BELOIT - EVANSVILLE $250,000 - $499,999

WSOR RR XING 392441D & 392442K

RR OPS/ SIGNALS

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5571-00-72 11/11/2025 303 LET RSRF30 12.606 STH 213 BELOIT - EVANSVILLE $11,000,000 - $11,999,999

BURTON STREET TO STH 11

CONS/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

1706-00-06 303 I/E RSRF30 8.680 USH014

JANESVILLE - DARIEN $250,000 - $499,999

0.3M E CTH O TO EAST COUNTY LINE

DESIGN-FULL PS&E RSRF30

STATE 3R SURFACE TRANS BLOCK-FLEX E

3315-00-04 303 I/E RSRF30 3.163 USH014

JANESVILLE - DARIEN $100,000 - $249,999

.17M E WRIGHT RD TO .3M S CTH MM

DESIGN-FULL PS&E RSRF30

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 5155-02-74 11/11/2025 303 LET RSRF25 5.321 USH014

MADISON - EVANSVILLE $2,000,000 - $2,999,999

STH 92 TO C EVANSVILLE N LIMIT

CONST/ MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 5350-02-50 04/25/2023 303 R/R MISC 0.000 USH051

C JANESVILLE, CENTER AVENUE $250,000 - $499,999

UNION PACIFIC RR XING 177418U

RR OPS/CROSSING SURFACE

STATE 3R NON-FEDERAL

Page 125: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 89Southwest Region

ROCK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5350-02-72 08/08/2023 303 LET MISC 0.143 USH051

C JANESVILLE, CENTER AVENUE $750,000 - $999,999

COURT/MILWAUKEE/CENTERWAYINTERSCTN

CONST/INTERSECTION IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2023 5350-02-73 08/08/2023 303 LET MISC 0.027 USH051

C JANESVILLE, CENTER AVENUE $100,000 - $249,999

MCKINLEY STREET INTERSECTION

CONST/PEDESTRIAN REFUGE

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2024 5350-02-70 02/13/2024 303 LET PVRPLA 1.460 USH051

C JANESVILLE, CENTER AVENUE $8,000,000 - $8,999,999

NICOLET STREET TO COURT STREET

CONST/ PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 5350-02-71 02/13/2024 303 LET PVRPLA 1.127 USH051

C JANESVILLE, CENTER AVE $1,000,000 - $1,999,999

NICOLET STREET TO COURT STREET

CONST/ WATER MAIN

STATE 3R NON-FEDERAL

Page 126: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 90Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5897-00-60 05/10/2022 206 LET MISC 11.418 CTH H REEDSBURG - WISCONSIN DELLS $500,000 - $749,999

GOLF COURSE ROAD TO OLD 12

CONST/SIGNING/MARKING IMPROVEMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2024 5899-00-60 02/13/2024 206 LET MISC 3.486 CTH HH REEDSBURG - LYNDON STATION $250,000 - $499,999

CTH H TO THE JUNEAU COUNTY LINE

CONST/SIGNING/MARKING/CURVE PAV'T

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2023 5677-00-78 08/08/2023 205 LET BRRPL 0.000 CTH N CTH G - STH 23 $250,000 - $499,999

SUGAR GROVE CREEK, B-56-0241

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2023 5263-00-60 02/14/2023 206 LET MISC 4.612 CTH T BARABOO - IH 90/94 $250,000 - $499,999

CITY VIEW RD/MAN MOUND RD TO CTH U

CONST/SIGNING/MARKING/CURVE PAV'T

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2023 5976-00-75 01/10/2023 205 LET BRRPL 0.000 CTH W CTH PF - USH 12 $750,000 - $999,999

SEELEY CREEK BRIDGE, B-56-0242

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1014-00-03 303 I/E PVRPLA 4.260 IH 090 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999

USH 12 TO STH 23

DES/PE-PS&E/PAV'T REPLACEM/PVRPLA

BACKBONE NATIONAL HIGHWAY PERF FAST

1014-00-06 303 I/E BRRPL 0.010 IH 090 WISCONSIN DELLS - PORTAGE $100,000 - $249,999

CTH A, B-56-0034

DES/PE-PS&E/BRI REPLACE/BRRPL

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 127: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 91Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1014-00-10 303 I/E BRRPL 0.007 IH 090 WISCONSIN DELLS - PORTAGE $100,000 - $249,999

TROUT ROAD BRIDGE B-56-41

DES/PE-PS&E/BRIDGE REPLACE/BRRPL

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1016-01-63 11/14/2023 303 LET PSRS30 14.600 IH 090 TOMAH - PORTAGE $7,000,000 - $7,999,999

MIRROR LAKE BRIDGE TO STH 33

CONST/PAV'T REPAIR/SHLDR/PIPE/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1014-00-75 02/11/2025 303 LET RSRF20 4.260 IH 090 MAUSTON - WISCONSIN DELLS $9,000,000 - $9,999,999

USH 12 TO STH 23

CONST/RESURFACING/RSRF

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1014-00-95 01/25/2025 303 SFA MISC 4.260 IH 090 USH 12 TO STH 23 $100,000 - $249,999

MAUSTON - WISCONSIN DELLS

TRF MIT 1014-00-75

BACKBONE NON-FEDERAL

2022 5978-00-74 11/08/2022 205 LET BRRPL 0.000 LOC STR T OF IRONTON, MARSHALL ROAD $250,000 - $499,999

CARR VALLEY BR BRIDGE, B-56-0244

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 5976-00-76 08/13/2024 205 LET BRRPL 0.000 LOC STR T OF FREEDOM, DIAMOND HILL ROAD $750,000 - $999,999

SEELEY CREEK BRIDGE, B-56-0243

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 5080-02-22 01/25/2022 303 R/E BRRPL 0.005 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999

STRUCTURES B-56-137 & B-56-138

R/E PE/REPLACE STRUCTURES

SHR BRIDGES NON-FEDERAL

Page 128: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 92Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5080-02-23 01/25/2022 303 R/E RSRF30 12.030 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999

USH 14 TO CTH GG

RE OPS

STATE 3R NON-FEDERAL

2022 5080-09-23 03/25/2022 303 R/E MISC 0.965 STH 023 SPRING GREEN - REEDSBURG $0 - $99,999

ELDER RIDGE ROAD TO CTH K

R/E OPERATIONS

STATE 3R NON-FEDERAL

2022 5255-01-20 01/25/2022 303 R/E RSRF30 2.790 STH 023 MINERAL POINT - SPRING GREEN $0 - $99,999

WISCONSIN RIVER BRIDGE TO USH 14

RE OPS FOR 5255-01-73

STATE 3R NON-FEDERAL

2022 5637-02-21 01/25/2022 303 R/E MISC 3.695 STH 023 SOUTHWEST REGION, ADA CURB RAMPS $100,000 - $249,999

SAUK COUNTY VARIOUS LOCATIONS

RE OPS FOR 5637-02-71

CURB RAMP STANDALONE NON-FEDERAL

2023 5050-01-76 02/14/2023 303 LET RECST 0.487 STH 023 REEDSBURG - WISCONSIN DELLS $2,000,000 - $2,999,999

STH 136 INTERSECTION

CONST/INTERSECTION IMPROVEMENT/RAB

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 5255-01-73 11/14/2023 303 LET RSRF25 2.790 STH 023 MINERAL POINT - SPRING GREEN $2,000,000 - $2,999,999

WISCONSIN RIVER BRIDGE TO USH 14

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5060-00-77 11/12/2024 303 LET PVRPLA 7.327 STH 023 REEDSBURG - WISCONSIN DELLS $4,000,000 - $4,999,999

STH 33 TO IH 90 RAMP

CONST/ PAVE REPLACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 129: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 93Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 5080-02-74 02/13/2024 303 LET COLD20 12.030 STH 023 SPRING GREEN - REEDSBURG $7,000,000 - $7,999,999

USH 14 TO CTH GG

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5080-02-75 02/13/2024 303 LET RSRF30 1.060 STH 023 SPRING GREEN - REEDSBURG $100,000 - $249,999

USH 14 TO CTH GG

CONST/SANITARY SEWER & WATER MAIN

STATE 3R NON-FEDERAL

2024 5080-02-82 02/13/2024 303 LET BRRPL 0.005 STH 023 SPRING GREEN - REEDSBURG $2,000,000 - $2,999,999

STRUCTURES B-56-235 & B-56-236

CONST/REPLACE STRUCTURE

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2024 5080-09-73 12/10/2024 303 LET PVRPLA 8.120 STH 023 SPRING GREEN - REEDSBURG $6,000,000 - $6,999,999

ELDER RIDGE ROAD TO CTH K

CONST/ PAVE REPLACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 5080-09-74 12/10/2024 303 LET RECST 0.965 STH 023 SPRING GREEN - REEDSBURG $500,000 - $749,999

V LOGANVILLE S LIMIT TO N LIMIT

CONST OPS / RECONST / UTILITIES

STATE 3R NON-FEDERAL

2024 5637-02-71 02/13/2024 303 LET MISC 3.695 STH 023 SOUTHWEST REGION, ADA CURB RAMPS $1,000,000 - $1,999,999

SAUK COUNTY VARIOUS LOCATIONS

CONST/ CURB RAMP PROGRAM

CURB RAMP STANDALONE SURFACE TRANSP BLOCK GRTS-

2022 5030-01-72 11/08/2022 303 LET RSRF20 7.181 STH 033 HILLSBORO - REEDSBURG $3,000,000 - $3,999,999

V WONEWOC S LIMITS TO MAIN STREET

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 130: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 94Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 5030-01-73 11/08/2022 303 LET RSRF30 6.576 STH 033 HILLSBORO - REEDSBURG $4,000,000 - $4,999,999

LA VALLE STREET TO PRESTON AVENUE

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5030-01-74 11/08/2022 303 LET RSRF30 0.290 STH 033 REEDSBURG - BARABOO $100,000 - $249,999

PRESTON AVENUE TO STH 23

CONST/ MILL & OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 5090-05-60 08/08/2023 303 LET PVRPLA 0.410 STH 033 REEDSBURG - BARABOO $3,000,000 - $3,999,999

W MULBERRY ST TO E V LIMITS

CONST/ PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 5090-05-61 08/08/2023 303 LET PVRPLA 0.410 STH 033 REEDSBURG - BARABOO $750,000 - $999,999

W MULBERRY ST TO E V LIMITS

CONST/WATER MAIN/SANITARY SEWER

STATE 3R NON-FEDERAL

2023 5090-05-71 08/08/2023 303 LET PVRPLA 1.900 STH 033 C BARABOO, EIGHTH STREET $10,000,000 - $10,999,999

W CITY LIMIT TO LINCOLN AVENUE

CONST/ PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 5090-05-72 08/08/2023 303 LET PVRPLA 1.900 STH 033 C BARABOO, EIGHTH STREET $2,000,000 - $2,999,999

W CITY LIMIT TO LINCOLN AVENUE

CONST/SANITARY SEWER/WATER MAIN

STATE 3R NON-FEDERAL

2023 5752-00-72 11/14/2023 303 LET RSRF30 6.738 STH 058 USH 14 - LAVALLE $3,000,000 - $3,999,999

LEE LAKE BRIDGE TO STH 33

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 131: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 95Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 5680-04-70 11/12/2024 303 LET RSRF30 9.380 STH 060 SPRING GREEN - SAUK CITY $5,000,000 - $5,999,999

FOX ROAD TO USH 12

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5630-06-23 04/25/2022 303 R/E RSRF20 2.850 STH 078 SAUK CITY - IH 39 $0 - $99,999

V MERRIMAC N LIMIT TO CTH DL

RIGHT OF WAY/RSRF20

STATE 3R NON-FEDERAL

2025 5630-06-73 11/11/2025 303 LET RSRF20 2.850 STH 078 SAUK CITY - IH 39 $1,000,000 - $1,999,999

V MERRIMAC N LIMIT TO CTH DL

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5620-00-72 11/11/2025 303 LET RSRF30 7.670 STH 113 LODI - BARABOO $4,000,000 - $4,999,999

STH 78 TO MOUND STREET

CONS/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5880-01-20 01/25/2022 303 R/E PVRPLA 1.310 USH 012 MAUSTON - WISCONSIN DELLS $0 - $99,999

NORTH COUNTY LINE TO STH 13

RE OPS FOR 5880-01-70

STATE 3R NON-FEDERAL

2022 6145-01-20 07/25/2022 303 R/E PVRPLA 0.536 USH 012 WISCONSIN DELLS - BARABOO $0 - $99,999

STH 13 TO CTH A

RE - OPS FOR 6145-01-74

STATE 3R NON-FEDERAL

2022 6145-01-22 07/25/2022 303 R/E PVRPLA 1.040 USH 012 WISCONSIN DELLS - BARABOO $100,000 - $249,999

CTH A TO PILGRIM DRIVE

RE - OPS FOR 6145-01-72

STATE 3R NON-FEDERAL

Page 132: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 96Southwest Region

SAUK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 6145-01-23 07/25/2023 303 R/E PVRPLA 0.983 USH 012 WISCONSIN DELLS - BARABOO $100,000 - $249,999

PILGRIM DRIVE TO E ADAMS ST

RE - OPS FOR 6145-01-73

STATE 3R NON-FEDERAL

2024 6145-01-72 11/12/2024 303 LET PVRPLA 1.039 USH 012 WISCONSIN DELLS - BARABOO $4,000,000 - $4,999,999

CTH A TO PILGRIM DRIVE

CONSTRUCTION/PVRPLA

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 6145-01-74 11/12/2024 303 LET PVRPLA 0.536 USH 012 WISCONSIN DELLS - BARABOO $2,000,000 - $2,999,999

STH 13 TO CTH A

CONSTRUCTION/ PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5880-01-70 12/09/2025 303 LET PVRPLA 1.310 USH 012 MAUSTON - WISCONSIN DELLS $1,000,000 - $1,999,999

NORTH COUNTY LINE TO STH 13

CONS/ PAVE REPLACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 6145-01-73 11/11/2025 303 LET PVRPLA 0.983 USH 012 WISCONSIN DELLS - BARABOO $4,000,000 - $4,999,999

PILGRIM DRIVE TO E ADAMS ST

CONST/FIVE LANE TWLTL

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 1640-03-77 11/11/2025 303 LET RSRF20 7.965 USH 014 RICHLAND CENTER - SPRING GREEN $4,000,000 - $4,999,999

RICHLAND CO LINE TO WISCONSIN RIVER

CONS/ MILL & OVERLAY

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 133: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 97Southwest Region

VERNON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 5478-00-77 11/14/2023 205 LET BRRPL 0.000 CTH P STH 131 - CTH V $500,000 - $749,999

WARNER CREEK BRIDGE, B-62-0268

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2022 5378-00-72 12/13/2022 205 LET BRRPL 0.027 LOC STR TOWN OF COON, OLD LINE ROAD $250,000 - $499,999

BR N FORK BAD AXE RV BR, B-62-0248

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E

2023 5385-00-71 11/14/2023 205 LET BRRPL 0.000 LOC STR TOWN OF FRANKLIN, ELLEFSON ROAD $250,000 - $499,999

HORNBY CREEK BRIDGE, B-62-0267

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 5150-00-70 10/25/2023 290 LLC MISC 0.000 NONHWY

V DE SOTO, MULTI-USE PATH $250,000 - $499,999

LOFTUS STREET TO NE VILLAGE LIMIT

PEDESTRIAN/BICYCLE PATH

TAP < 5,000 TRANS ALTERN 5K AND UNDER

2024 5407-00-71 01/25/2024 290 LLC MISC 0.000 NONHWY

C VIROQUA, PED/BIKE SAFETY PROJECT $500,000 - $749,999

SOUTH STREET TO DECKER STR (STH 56)

PEDESTRAIN SAFETY IMPROVEMENTS

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

2022 5540-02-70 12/13/2022 303 LET RSRF25 13.020 STH 027 MT STERLING - VIROQUA $7,000,000 - $7,999,999

.49 MI S CTH C TO N BROOKVILLE RD

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 5100-01-20 01/25/2022 303 R/E PSRS40 15.019 STH 033 CASHTON - HILLSBORO $0 - $99,999

KICKAPOO R BR TO C HILLSBORO LIMIT

Page 134: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 98Southwest Region

VERNON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE/CONSTR 5100-01-60/PSRS

STATE 3R NON-FEDERAL

2024 5100-01-60 11/12/2024 303 LET PSRS40 15.019 STH 033 CASHTON - HILLSBORO $5,000,000 - $5,999,999

KICKAPOO R BR TO C HILLSBORO LIMIT

CONST/MILL & O'LAY/B-62-063/PSRS

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5100-01-73 12/09/2025 303 LET PVRPLA 1.040 STH 033 HILLSBORO - REEDSBURG $1,000,000 - $1,999,999

C HILLSBORO W LIMIT TO CTH HH

CONST/PAV'T REPLACE/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5730-00-71 04/12/2022 303 LET PVRPLA 11.578 STH 056 VIROQUA - RICHLAND CENTER $5,000,000 - $5,999,999

MAHONEY RD TO S JUNCTION STH 131

CONST/PULVERIZE AND RELAY/PVRLA

STATE 3R HWY INFRA COVID SUPP

2022 5730-00-80 04/12/2022 303 LET BRRPL 0.137 STH 056 VIROQUA - RICHLAND CENTER $1,000,000 - $1,999,999

BISHOP BRANCH BRIDGE B-62-258

CONST/BRIDGE REPLACEMENT/BRRPL

SHR BRIDGES HWY INFRA COVID SUPP

2022 5040-03-70 12/13/2022 303 LET RSRF20 11.790 STH 080 RICHLAND CENTER - HILLSBORO $8,000,000 - $8,999,999

CTH C TO S FORK BARABOO R STRUCTURE

CONST/MILL & O'LAY/BRI O'LAYS/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 5040-03-71 12/09/2025 303 LET PVRPLA 0.594 STH 080 HILLSBORO - NEW LISBON $1,000,000 - $1,999,999

S FORK BARABOO R BRIDGE TO STH 33

CONST/PAV'T REPLACE/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 5150-02-20 01/25/2022 303 R/E RSRF30 14.860 STH 082 DESOTO - VIROQUA $0 - $99,999

STH 35 TO STH 27

Page 135: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 99Southwest Region

VERNON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

RE/RSRF/CONST 5150-02-70

STATE 3R NON-FEDERAL

2022 5710-00-71 11/08/2022 303 LET PVRPLA 11.056 STH 082 VIROQUA - LAFARGE $6,000,000 - $6,999,999

STH 56 TO KICKAPOO RIVER

CONS/MILL & O'LAY/B62-20,-24/PVRPLA

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 5710-00-73 11/08/2022 303 LET PVRPLA 0.395 STH 082 LAFARGE - HILLSBORO $500,000 - $749,999

KICKAPOO RIVER TO MAPLE ST

CONST/ CURB & GUTTER/ PVRPL

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 5867-01-75 01/25/2022 305 MIS TOI 122.854 STH 082 VERNON COUNTY, 2018 FLOOD EVENT $1,000,000 - $1,999,999

AUGUST 2018 ST HWY FLOOD SITES

CONST/FLOOD 2018-2019/EMERG REPAIR

EMERGENCY FLOOD RELIEF EMERGENCY REL 2018

2023 5150-02-70 11/14/2023 303 LET RSRF30 14.860 STH 082 DESOTO - VIROQUA $7,000,000 - $7,999,999

STH 35 TO STH 27

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2024 5710-00-72 11/12/2024 303 LET RSRF20 16.000 STH 082 LAFARGE - HILLSBORO $9,000,000 - $9,999,999

KICKAPOO RIVER TO STH 33

CONST/MILL & O'LAY,B62-51,-238/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2025 5110-06-70 11/11/2025 303 LET RSRF30 12.230 STH 131 READSTOWN - ONTARIO $8,000,000 - $8,999,999

STH 82 TO STH 33/ B-62-34,-47,-187

CONST/MILL & OVERLAY/RSRF

Page 136: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 100Southwest Region

VERNON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 5865-02-65 04/12/2022 303 LET RSRF10 4.253 STH 162 STODDARD - COON VALLEY $1,000,000 - $1,999,999

CTH KK TO USH 14

CONST/MILL & OVERLAY/RSRF

STATE 3R HWY INFRA COVID SUPP

2025 5865-02-64 11/11/2025 303 LET RSRF20 6.910 STH 162 STODDARD - COON VALLEY $3,000,000 - $3,999,999

VILLAGE PARK DRIVEWAY TO DEPOT ST

CON/MILL & O'LAY/B62-29,83,984/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 1640-04-72 12/13/2022 303 LET RECST 0.689 USH 014 WESTBY - READSTOWN $2,000,000 - $2,999,999

EAST JUNCTION STH 27

CONST/INTERSECT IMPROVE-RAB/RECST

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2022 1646-08-22 01/25/2022 303 R/E RECST 1.440 USH 014 C WESTBY, N MAIN STREET $500,000 - $749,999

HIGH ECHO LANE TO LOCUST STREET

RE/RECST/CONST 1646-08-72

STATE 3R NON-FEDERAL

2023 1640-01-74 05/09/2023 303 LET PSRS10 1.717 USH 014 C VIROQUA, MAIN STREET $250,000 - $499,999

BRENDEL LN TO SOUTH WASHINGTONAVE

CONST/CONVERT TO TWLTL/PSRS

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2024 1646-08-72 02/14/2024 303 LET RECST 1.440 USH 014 C WESTBY, N MAIN STREET $8,000,000 - $8,999,999

HIGH ECHO LANE TO LOCUST STREET

CONST/RECONSTRUCT ROADWAY/RECST

Page 137: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 101Southwest Region

VERNON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 1646-08-82 02/14/2024 303 LET RECST 1.440 USH 014 C WESTBY, N MAIN STREET $0 - $99,999

HIGH ECHO LANE TO LOCUST STREET

CONST/SANITARY SEWER & WATER/RECST

STATE 3R NON-FEDERAL

2025 1640-03-74 11/11/2025 303 LET RSRF30 1.850 USH 014 LA CROSSE - WESTBY $1,000,000 - $1,999,999

S JCT STH 162 TO CHURCH STREET

CON/MILL & O'LAY/B-62-105,-106/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4762-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

VERNON COUNTY PAVEMENT MARKING $250,000 - $499,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCKGRTS-

Page 138: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Southeast Region Projects

Page 139: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 102Southeast Region

KENOSHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3732-09-71 03/08/2022 206 LET RECSTE 1.324 CTH K CTH K $8,000,000 - $8,999,999

UPRR TO 94TH CT

CONST/RECONSTRUCT NO ADDL LANES

STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP

2023 3751-03-70 01/10/2023 206 LET RCND20 1.532 CTH W RANDALL - SALEM LAKES $2,000,000 - $2,999,999

ILL STATE LINE TO CTH C EAST

CONST/RECONDITION

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 3762-03-70 12/13/2022 206 LET MISC 0.021 CTH Y V SOMERS CTH Y $1,000,000 - $1,999,999

INTERSECTION WITH CTH A

CONST/ROUND ABOUT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 3831-07-72 02/14/2023 206 LET MISC 0.005 LOC STR C KENOSHA WASHINGTON ROAD $1,000,000 - $1,999,999

INTERSECTION WITH 39TH AVE

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 3831-07-71 11/12/2024 206 LET MISC 0.006 LOC STR C KENOSHA WASHINGTON ROAD $2,000,000 - $2,999,999

INTERSECTION WITH 30TH AVE

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1032-10-75 03/08/2022 303 LET RSRF20 3.459 OFF SYS NORTH SOUTH FREEWAY, CTH ML-STH 50 $4,000,000 - $4,999,999

EAST FRONTAGE ROAD

CONST / RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2390-08-70 09/12/2023 303 LET PSRS20 5.128 STH 031 PLEASANT PRAIRIE - CALEDONIA $2,000,000 - $2,999,999

IL STATE LINE TO STH 50

CONST/PATCH,REPAIR,DIAMOND GRIND

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 140: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 103Southeast Region

KENOSHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 3330-07-70 09/12/2023 303 LET PSRS20 2.570 STH 031 GREEN BAY RD - CITY OF KENOSHA $4,000,000 - $4,999,999

STH 50 TO CTH S

CONST/PATCH, REPAIR, DIAMOND GRIND

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 3340-09-70 09/12/2023 303 LET RECST 0.020 STH 031 GREEN BAY ROAD, CITY OF KENOSHA $100,000 - $249,999

78TH STREET INTERSECTION

CONST/TURNING LANE

STATE 3R NON-FEDERAL

2023 3240-00-23 01/25/2023 303 R/E RSRF20 5.740 STH 032 SHERIDAN ROAD $0 - $99,999

ALFORD PARK DRIVE TO 21ST STREET

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 3240-16-70 03/14/2023 303 LET RSRF30 3.257 STH 032 PLEASANT PRAIRIE - RACINE $3,000,000 - $3,999,999

ILLINOIS STATE LINE TO 91ST ST

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1310-04-70 06/14/2022 303 LET RECST 1.190 STH 050 75TH ST, VILLAGE OF PADDOCK LAKE $11,000,000 - $11,999,999

256TH AVE TO 236TH AVE

CONST /RECONSTRUCT

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1310-14-70 09/12/2023 303 LET RECST 0.130 STH 050 GENEVA RD, TOWN OF WHEATLAND $3,000,000 - $3,999,999

S CTH W TO 1750 FEET EAST

CONST/MITIGATE FOX RIVER FLOODING

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2420-00-20 01/25/2022 303 R/E RSRF30 12.080 STH 075 S BEAUMONT AVE - TOWN OF DOVER $0 - $99,999

Page 141: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 104Southeast Region

KENOSHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 50 - STH 20

RE/RESURFACE

STATE 3R NON-FEDERAL

2024 2420-00-70 09/10/2024 303 LET RSRF30 12.080 STH 075 PADDOCK LAKE - BEAUMONT $9,000,000 - $9,999,999

STH 50 - STH 20

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEXE

2022 3380-06-20 01/25/2022 303 R/E RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH-BURLINGTON $100,000 - $249,999

IL STATE LINE TO STH 50

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 3380-06-70 09/12/2023 303 LET RSRF30 5.140 STH 083 ANTIOCH RD, ANTIOCH - BURLINGTON $6,000,000 - $6,999,999

IL STATE LINE TO STH 50

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3220-09-70 09/13/2022 303 LET BRRPL 0.000 STH 158 52ND STREET, CITY OF KENOSHA $8,000,000 - $8,999,999

RAILROAD BRIDGES B-30-0002, 0003

CONST/BRIDGE REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3700-22-00 03/25/2022 305 M/E TOSIG 0.004 STH 158 STH 158 & 39TH AVE SIGNAL RETROFIT $0 - $99,999

STH 158 AND 39TH AVE INTERSECTION

STAND ALONE PROJECT ID SER2201L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2022 3700-22-70 07/25/2022 305 MIS TOSIG 0.004 STH 158 STH 158 & 39TH AVE SIGNAL RETROFIT $250,000 - $499,999

STH 158 AND 39TH AVE INTERSECTION

Page 142: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 105Southeast Region

KENOSHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STAND ALONE PROJECT ID SER2201L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 3220-09-71 11/12/2024 303 LET RSRF20 2.010 STH 158 C KENOSHA, 52ND STREET $3,000,000 - $3,999,999

IH41/94 FRONTAGE RD TO CTH H

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 3700-11-70 02/14/2023 305 LET TOSIG 0.173 VARHWY

SIGNAL INSTALL & SIGNAL REPLACEMENT $1,000,000 - $1,999,999

VARIOUS SIGNALIZED INTERSECTIONS

STANDALONE PROJECT ID SE2107/SE2108

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

Page 143: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 106Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2050-04-70 03/08/2022 206 LET RECST 0.480 CTH BB WEST RAWSON AVENUE $3,000,000 - $3,999,999

S 27TH STREET TO S 20TH STREET

CONST/RECONSTRUCT W/ NO ADDL LANES

STP URBAN OVER 200,000 HWY INFRA >200K POP AP/GB/

2023 2050-08-21 05/25/2023 206 R/E RECST 1.003 CTH BB C OAK CREEK W RAWSON AVENUE $250,000 - $499,999

S 13TH STREET TO S HOWELL AVENUE

RE/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2050-12-70 03/12/2024 206 LET MISC 0.029 CTH BB C FRANKLIN W RAWSON AVENUE $250,000 - $499,999

INTERSECTIONS WITH 68TH,51ST & 31ST

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 2050-08-71 01/14/2025 206 LET RECST 1.003 CTH BB C OAK CREEK W RAWSON AVENUE $6,000,000 - $6,999,999

S 13TH STREET TO S HOWELL AVENUE

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2305-02-70 03/12/2024 206 LET MISC 0.023 CTH OO C FRANKLIN FOREST HOME AVENUE $0 - $99,999

INTERSECT WITH SPEEDWAY

CONST/FULL PS/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2130-15-70 02/08/2022 205 LET BRRPL 0.000 CTH PP CTH PP (GOOD HOPE ROAD) $1,000,000 - $1,999,999

BRIDGE OVER BR MILWAUKEE RIVER

CONST/BRIDGE REPLACEMENT B-40-0370

LOCAL BRIDGES NON-FEDERAL

2023 2984-07-76 04/11/2023 206 LET MISC 0.039 CTH PP C MILWAUKEE GOOD HOPE ROAD $500,000 - $749,999

99TH ST TO 60TH ST

CONST/INTERSECTION MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 144: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 107Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2160-17-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (NB) $1,000,000 - $1,999,999

BRIDGE OVER STH 36 B-40-0573

CONST/DECK OVERLAY

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2022 2160-18-70 03/08/2022 205 LET BRRHB 0.000 CTH U S 76TH STREET (SB) $1,000,000 - $1,999,999

BRIDGE OVER STH 36 B-40-574

CONST/BRIDGE REHAB

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2022 2505-03-21 07/25/2022 206 R/E RECST 1.008 CTH V C OAK CREEK S 13TH STREET $250,000 - $499,999

W PUETZ ROAD TO W DREXEL AVENUE

RE/RECONSTRUCT W/ NO ADDL LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2023 2505-03-71 12/12/2023 206 LET RECST 1.009 CTH V C OAK CREEK S 13TH STREET $4,000,000 - $4,999,999

W PUETZ ROAD TO W DREXEL AVENUE

CONST/RECONSTRUCT NO ADDL LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2025 2355-08-70 02/11/2025 206 LET MISC 0.008 CTH ZZ C OAK CREEK - MILWAUKEE $250,000 - $499,999

INTERSECTION WITH 20TH STREET

CONST/SIGNALS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1030-43-20 02/25/2022 303 R/E MISC 0.000 IH 041 IH 41 MITCHELL I/C $0 - $99,999

WB I43/I94 35TH-RAWSON-HOWARD

RE/RESURE

BACKBONE NON-FEDERAL

2022 1030-43-21 02/25/2022 303 R/E RSRF20 6.554 IH 041 IH 41 MITCHELL I/C $0 - $99,999

EB I43/I94 35TH-RAWSON-HOWARD

RE/RESURFACE

BACKBONE NON-FEDERAL

Page 145: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 108Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1090-03-03 07/25/2022 303 C/E MISC 9.420 IH 041 IH 894 & IH 43 $2,000,000 - $2,999,999

ZOO, MITCHELL & MOORLAND-HALE IC'S

PE/SAFETY AND OPERATIONS STUDIES

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1100-17-76 04/12/2022 303 LET PSRS30 1.116 IH 041 MILWAUKEE - FOND DU LAC $5,000,000 - $5,999,999

GOOD HOPE RD TO WAUKESHA CO LN

CONST/DIAMOND GRIND

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1100-46-90 02/25/2022 303 MIS MISC 0.118 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999

60TH STREET BRIDGE

TRAFFIC MITIGATION 1100-46-70

BACKBONE NON-FEDERAL

2023 1030-43-71 11/14/2023 303 LET RSRF20 0.000 IH 041 IH 41 MITCHELL I/C $20,000,000 - $24,999,999

WB I43/I94 35TH-RAWSON-HOWARD

CONST/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1030-43-72 11/14/2023 303 LET RSRF20 6.554 IH 041 IH 41 MITCHELL I/C $20,000,000 - $24,999,999

EB I43/I94 35TH-RAWSON-HOWARD

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1100-20-70 02/14/2023 303 LET RSRF25 1.012 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999

BURLEIGH ST TO CAPITOL DR

CONST/RESURFACE/PHASE I

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1100-20-92 03/25/2023 303 MIS MISC 1.756 IH 041 IH 41 ZOO FREEWAY $250,000 - $499,999

BURLEIGH ST TO CAPITOL DR

TRAFFIC MITIGATION 1100-20-70

BACKBONE NON-FEDERAL

Page 146: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 109Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1100-45-70 02/14/2023 303 LET RSRF30 3.060 IH 041 IH 41 AIRPORT FREEWAY $40,000,000 - $44,999,999

84TH ST TO 35TH ST (MAINLINE)

CONST/RSRF/BRIDGE REHAB/NOISE BARR

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1100-45-90 03/25/2023 303 MIS MISC 3.080 IH 041 IH 41 AIRPORT FREEWAY $500,000 - $749,999

84TH ST TO 35TH ST (MAINLINE)

TRAFFIC MITIGATION 1100-45-70

BACKBONE NON-FEDERAL

2023 1100-46-71 02/14/2023 303 LET BRRPL 0.002 IH 041 IH 41 AIRPORT FREEWAY $11,000,000 - $11,999,999

STH 36 (LOOMIS RD) BRIDGE

CONST/BRIDGE REPLACEMENT, PRESERV

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1100-20-71 09/10/2024 303 LET RSRF25 1.910 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999

CAPITOL DR TO SILVER SPRING DR

CONST/RESURFACE/PHASE II

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1100-20-91 09/25/2024 303 MIS MISC 5.060 IH 041 IH 41 ZOO FREEWAY $750,000 - $999,999

CAPITOL DR TO SILVER SPRING DR

TRAFFIC MITIGATION 1100-20-71

BACKBONE NON-FEDERAL

2025 1100-21-70 09/09/2025 303 LET RSRF30 5.060 IH 041 IH 41 ZOO FREEWAY $25,000,000 - $29,999,999

SILVER SPRING DR TO GOOD HOPE RD

CONST/RESURFACE/PHASE 3

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1100-21-90 09/25/2025 303 MIS MISC 5.060 IH 041 IH 41 ZOO FREEWAY $750,000 - $999,999

SILVER SPRING DR TO GOOD HOPE RD

TRAFFIC MITIGATION 1100-21-70

BACKBONE NON-FEDERAL

Page 147: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 110Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 1100-35-71 09/09/2025 303 LET BRRHB 0.004 IH 041 IH 41 ZOO FREEWAY $4,000,000 - $4,999,999

HOWARD AVE TO UPRR

CONST/BRIDGE REHABILTATION

BACKBONE NATIONAL HIGHWAY PERF PLAN

2022 1228-09-23 01/25/2022 303 R/E RSRF30 4.174 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999

MITCHELL I/C TO MARQUETTE I/C

RE/RESURFACE/BRIDGE MAINT

BACKBONE NON-FEDERAL

2022 1228-09-26 07/25/2022 303 R/E RSRF30 0.101 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999

MITCHELL IC-MARQUETTE IC ON/OFF RMP

RE/RESURFACE/BRIDGE MAINTANENCE

BACKBONE NON-FEDERAL

2022 1228-09-93 04/25/2022 303 MIS RSRF30 4.174 IH 043 IH 43 NORTH SOUTH FREEWAY $0 - $99,999

MITCHELL I/C TO MARQUETTE I/C

TRAFFIC MITIGATION FOR 1228-09-73

BACKBONE NON-FEDERAL

2022 1228-22-03 03/25/2022 303 C/E BRRHB 0.780 IH 043 IH 43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999

KEEFE AVENUE TO CAPITOL AVENUE

PE-FULL PS&E-BRIDGE REHAB

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1228-22-70 08/09/2022 303 LET RSRF30 2.350 IH 043 IH 43 NORTH SOUTH FREEWAY $40,000,000 - $44,999,999

BROWN STREET TO CAPITOL DRIVE

CONST / RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1228-22-74 04/12/2022 303 LET BRRPL 0.000 IH 043 IH43 NORTH SOUTH FREEWAY $4,000,000 - $4,999,999

HAMPTON AVE-SB RAMP OVER MILW RVR

CONST/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 148: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 111Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1228-22-83 08/25/2022 303 MIS MISC 1.080 IH 043 IH 43 NORTH SOUTH FREEWAY $250,000 - $499,999

CAPITOL DR-2100 FT N OF HAMPTON AVE

TRAF MIT-MCSO 1228-22-71

BACKBONE NON-FEDERAL

2022 1228-22-90 09/25/2022 303 MIS MISC 5.270 IH 043 IH 43 NORTH SOUTH FREEWAY $250,000 - $499,999

BROWN STREET TO CAPITOL DRIVE

MIS/TRAFFIC MITIGATION 1228-22-70

BACKBONE NON-FEDERAL

2022 1229-04-72 10/11/2022 302 LET RECSTE 0.000 IH 043 I-43 NORTH SOUTH FREEWAY $14,000,000 - $14,999,999

UNION PACIFIC RR BRIDGE B-40-921

CONST/PHASE 3 RECST W/ EXPANSION

MAJORS NATIONAL HIGHWAY PERFFAST

2022 1229-04-73 10/11/2022 302 LET RECSTE 3.286 IH 043 I-43 NORTH SOUTH FREEWAY $100 MILLION OR GREATER

BENDER ROAD TO BROWN DEER ROAD

CONST/RECONSTRUCTION W/ EXPANSION

MAJORS NATIONAL HIGHWAY PERFFAST

2022 1229-04-95 10/25/2022 302 MIS RECSTE 0.004 IH 043 I-43 NORTH SOUTH FREEWAY $750,000 - $999,999

SILVER SPRING TO DONGES BAY ROAD

TRAFFIC MITIGATION FOR 1229-04-73

MAJORS NON-FEDERAL

2023 1090-32-20 03/25/2023 303 R/E BRRPL 0.000 IH 043 IH 43 AIRPORT FREEWAY $100,000 - $249,999

HALE I/C TO 92ND STREET BRIDGE

RE/BRIDGE REPLACEMENT

BACKBONE NON-FEDERAL

2023 1228-22-76 09/12/2023 303 LET MISC 2.350 IH 043 IH 43 NORTH SOUTH FREEWAY $6,000,000 - $6,999,999

BROWN STREET TO CAPITOL DRIVE

Page 149: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 112Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST / NOISE WALLS

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1228-09-76 01/09/2024 303 LET RSRF30 0.101 IH 043 IH 43 NORTH SOUTH FREEWAY $2,000,000 - $2,999,999

MITCHELL IC-MARQUETTE IC ON/OFF RMP

CONST/RESURFACE/BRIDGE MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERFFAST

2025 1090-32-70 09/09/2025 303 LET BRRPL 0.000 IH 043 IH 43 AIRPORT FREEWAY $5,000,000 - $5,999,999

HALE I/C TO 92ND STREET BRIDGE

CONST/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFPLAN

2025 1090-32-90 09/25/2025 303 MIS MISC 2.090 IH 043 IH 43 AIRPORT FREEWAY $250,000 - $499,999

HALE I/C TO 92ND STREET BRIDGE

TRAFFIC MITIGATION 1090-32-70

BACKBONE NON-FEDERAL

2025 1228-03-76 09/09/2025 303 LET RSRF30 1.425 IH 043 IH 43 NORTH SOUTH FREEWAY $8,000,000 - $8,999,999

OAK LEAF TRAIL TO BENDER

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFPLAN

1100-17-01 303 I/E RSRF30 4.890 IH 094 IH 94 EAST WEST FREEWAY $1,000,000 - $1,999,999

ZOO I/C TO MARQUETTE I/C

PE-FULL PS&E-RSRF30

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1300-03-08 01/25/2022 303 C/E BRRPL 0.885 IH 794 MILWAUKEE-CUDAHY $10,000,000 - $10,999,999

LAKE INTERCHANGE STUDY PHASE 2

PE/PRELIM DESIGN TO 60%

Page 150: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 113Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1300-15-70 05/09/2023 305 LET TOI 1.190 IH 794 MILWAUKEE - CUDAHY $1,000,000 - $1,999,999

S OF CLYBOURN-N OF LINCOLN MEMORIAL

CONST/FENCING

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 1060-48-70 09/10/2024 303 LET BRRHB 0.620 IH 794 IH 794 EAST WEST FREEWAY $10,000,000 - $10,999,999

MARQUETTE IC TO LAKE IC

CONST/BRIDGE DECK OVERLAY

BACKBONE NATIONAL HIGHWAY PERFFAST

2025 1100-35-91 11/25/2025 303 MIS MISC 0.220 IH 894 ZOO FREEWAY $100,000 - $249,999

LINCOLN AND HOWARD AVE BRIDGES

TRAFFC MITIGATION FOR ID 1100-35-71

BACKBONE NON-FEDERAL

2022 1229-04-71 10/11/2022 302 LET RECSTE 0.599 LOCSTR

CITY GLENDALE, N PORT WASHINGTON RD $12,000,000 - $12,999,999

BENDER RD TO W DAPHNE RD

CONST/PHASE 2 RECST W/ EXPANSION

MAJORS NATIONAL HIGHWAY PERFFAST

2022 2135-04-71 12/13/2022 206 LET RECST 0.860 LOCSTR

C WAUWATOSA W NORTH AVENUE $8,000,000 - $8,999,999

MAYFAIR ROAD TO N 95TH STREET

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 2160-05-71 03/08/2022 206 LET MISC 0.008 LOCSTR

S 76TH STREET $500,000 - $749,999

INTERSECTION WITH W BECHER STREET

Page 151: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 114Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/HSIP/TRAFFICSIGNALS/RESURFACE

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2190-10-70 12/13/2022 205 LET BRRPL 0.000 LOC STR C WAUWATOSA W WISCONSIN AVENUE $2,000,000 - $2,999,999

BRIDGE OVER HONEY CREEK P-40-776

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2022 2265-00-78 11/08/2022 206 LET MISC 0.085 LOC STR C MILWAUKEE N 27TH STREET $500,000 - $749,999

INTERSECT W/LOCUST, CENTER & NORTH

CONST/HSIP/INTERSECT IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2345-07-71 03/08/2022 206 LET PSRS30 1.000 LOC STR W DREXEL AVENUE $2,000,000 - $2,999,999

CTH V TO STH 38

CONST/RESURFACE

STP URBAN OVER 200,000 HWY INFRA >200K POP AP/GB/

2022 2410-13-70 12/13/2022 206 LET RECST 0.185 LOC STR W NATIONAL AVENUE $2,000,000 - $2,999,999

S 62ND STREET TO S 65TH STREET

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 2545-13-70 05/10/2022 205 LET BRRHB 0.000 LOC STR C GLENDALE W HAMPTON AVENUE $750,000 - $999,999

BRIDGE OVER MILWAUKEE RIVER

CONST/BRIDGE DECK OVERLAY P-40-0750

LOCAL BRIDGES NON-FEDERAL

2022 2674-02-70 11/08/2022 206 LET RECST 0.539 LOC STR C MILWAUKEE W WALNUT STREET $6,000,000 - $6,999,999

N 20TH STREET TO N 12TH STREET

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 2984-12-05 08/25/2022 205 M/E BRRHB 0.000 LOC STR C MILWAUKEE N HOLTON ST PHASE 3 $250,000 - $499,999

BR OVR MILW RIVER,COMMERCE, WATER

Page 152: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 115Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

PE-FULL PS&E-BRIDGE REHAB

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2022 2984-17-71 03/25/2022 290 LLC MISC 1.544 LOC STR E/W WASHINGTON ST & W SCOTT ST $500,000 - $749,999

KK RIVER TRAIL-20TH & 20TH-LAYTON

CONST/PED/BIKE FACILITIES

TAP > 200,000 TRANS ALTERN >200K FAST EX

2022 2984-21-01 04/25/2022 206 M/E MISC 0.009 LOC STR C MILWAUKEE - N 35TH ST $100,000 - $249,999

INTERSECTION WITH W CENTER ST

PE/FULL PS&E/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2984-21-02 04/25/2022 206 M/E RECST 0.031 LOC STR C MILWAUKEE-N 35TH STREET $250,000 - $499,999

INTERSECTIONS WITH NORTH & LISBON

PE/FULL PS&E ROW RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2984-21-03 04/25/2022 206 M/E MISC 0.015 LOC STR C MILWAUKEE W MORGAN AVENUE $100,000 - $249,999

INTS W/ 20TH, 16TH, 13TH & 6TH ST

PE/FULL PS&E/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2995-04-74 03/08/2022 206 LET MISC 0.005 LOC STR S 92ND STREET $1,000,000 - $1,999,999

INTERSECTION WITH LINCOLN AVE

CONST/HSIP/TRAFFIC SIGNALS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2995-05-77 03/08/2022 206 LET MISC 0.070 LOC STR S 60TH STREET $250,000 - $499,999

INTERSECTION WITH W GREENFIELD AVE

CONST/TRAFFIC SIGNAL FLASHERS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 2090-16-70 05/09/2023 206 LET MISC 0.050 LOC STR C MILWAUKEE W SILVER SPRING DRIVE $1,000,000 - $1,999,999

6 LOCAL INTERSECTIONS

Page 153: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 116Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/HSIP TRAFFIC SIGNAL/FLASHERS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2023 2395-05-71 04/12/2023 206 LET RECST 1.270 LOCSTR

C MILWAUKEE E/W HOWARD AVENUE $7,000,000 - $7,999,999

S 6TH STREET TO S CLEMENT AVENUE

CONST/RECONSTRUCT W/ NO ADDL LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2023 2525-03-71 01/10/2023 206 LET RECST 0.637 LOCSTR

W BELOIT ROAD $9,000,000 - $9,999,999

S 60TH STREET TO LINCOLN AVENUE

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2023 2545-09-71 03/14/2023 206 LET RCND20 2.020 LOCSTR

C MILWAUKEE W HAMPTON AVENUE $8,000,000 - $8,999,999

N 60TH STREET TO N TEUTONIA AVENUE

CONST/RECONDITION

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2023 2656-00-72 03/14/2023 205 LET BRRPL 0.000 LOCSTR

C MILWAUKEE S 70TH STREET $2,000,000 - $2,999,999

BRIDGE OVER CP RR/HAST P-40-856

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

2023 2984-12-73 01/10/2023 205 LET BRRHB 0.000 LOCSTR

C MILWAUKEE, N HOLTON ST PHASE 1 $4,000,000 - $4,999,999

BR OVER MILW RVR, COMMERCE, WATER

PE/BRIDGE REHABILITATION/P-40-0875

Page 154: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 117Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2023 2984-13-74 03/14/2023 206 LET MISC 0.002 LOCSTR

C MILWAUKEE W CENTER STREET $250,000 - $499,999

INTS W/ W LISBON AVE & N 60TH ST

CONST/HSIP/INTERSECT IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2023 2984-15-71 05/09/2023 206 LET MISC 0.013 LOCSTR

C MILWAUKEE W VILLARD AVENUE $1,000,000 - $1,999,999

INTERSECTIONS OF N 60TH & N 51ST ST

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2024 2145-07-50 03/25/2024 207 R/R MISC 0.000 LOCSTR

C MILWAUKEE, BRADLEY ROAD CROSSING $0 - $99,999

WISC & SOUTHERN RR(WSOR)XING386975G

RR/REPLACE WARNING DEVICE EQUIPMENT

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEVFAST

2024 2155-05-70 02/06/2024 206 LET MISC 0.103 LOCSTR

C MILWAUKEE N SHERMAN BLVD $1,000,000 - $1,999,999

7 LOCAL STREET INTERSECTIONS

CONST/SIGNAL UPDATES & PED RAMPS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2024 2155-05-71 02/06/2024 206 LET MISC 0.075 LOCSTR

C MILWAUKEE N SHERMAN BLVD $1,000,000 - $1,999,999

6 LOCAL STREET INTERSECTIONS

CONST/SIGNAL UPDATES & PED RAMPS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

Page 155: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 118Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2160-19-70 12/25/2024 211 MIS MISC 0.000 LOC STR GREENFIELD - WEST ALLIS $500,000 - $749,999

OKLAHOMA-COLD SPRING & 92ND-76TH

CNST/ADAPTIVE TRAFFIC SIGNAL SYSTEM

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2024 2230-07-73 01/09/2024 206 LET RCND20 0.710 LOC STR V WEST MILW W GREENFIELD AVENUE $3,000,000 - $3,999,999

S 56TH STREET TO MILLER PARK WAY

CONST/RECONDITION

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2024 2365-05-71 01/09/2024 206 LET RCND20 0.497 LOC STR V GREENDALE W GRANGE AVENUE $2,000,000 - $2,999,999

S 76TH STREET TO S 84TH STREET

CONST/RECONDITION

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2024 2400-07-71 03/25/2024 290 LLC MISC 1.470 LOC STR OKLAHOMA AVENUE MULTIMODAL $500,000 - $749,999

S 27TH ST TO S 6TH ST

CONST/PEDESTRIAN IMPROVEMENTS

TAP > 200,000 TRANS ALTERN >200K FASTEX

2024 2455-07-70 01/09/2024 206 LET RCND20 0.739 LOC STR C MILWAUKEE E/W LOCUST STREET $3,000,000 - $3,999,999

N 7TH STREET TO N HOLTON STREET

CONST/RECONDITION

STP URBAN OVER 200,000 STBG-URBANIZED >200KFAST

2024 2984-12-74 01/09/2024 205 LET BRRHB 0.000 LOC STR C MILWAUKEE, N HOLTON ST PHASE 2 $3,000,000 - $3,999,999

BR OVER MILW RVR, COMMERCE, WATER

CONST/BRIDGE REHABILITATION/P400875

LOCAL BRIDGES SURFACE TRANSBLOCK-FLEX E

Page 156: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 119Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2984-16-52 03/25/2024 207 R/R MISC 0.000 LOC STR C MILWAUKEE, 107TH ST CROSSING $0 - $99,999

WIS & SOUTHRN RR(WSOR) XING386977V

RR/REPLACE WARNING DEVICE EQUIP

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEVFAST

2025 2984-12-75 01/14/2025 205 LET BRRHB 0.000 LOC STR C MILWAUKEE, N HOLTON ST PHASE 3 $3,000,000 - $3,999,999

BR OVR MILW RIVER, COMMERCE, WATER

CONST/BRIDGE REHABILITATION

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2025 2984-21-71 02/11/2025 206 LET MISC 0.009 LOC STR C MILWAUKEE - N 35TH ST $500,000 - $749,999

INTERSECTION WITH W CENTER ST

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2025 2984-21-72 03/11/2025 206 LET RECST 0.031 LOC STR C MILWAUKEE-N 35TH STREET $1,000,000 - $1,999,999

INTERSECTIONS WITH NORTH & LISBON

CONST/FULL PS&E ROW RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2025 2984-21-73 03/11/2025 206 LET MISC 0.015 LOC STR C MILWAUKEE W MORGAN AVENUE $1,000,000 - $1,999,999

INTS W/ 20TH, 16TH, 13TH & 6TH ST

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2022 1693-06-09 02/25/2022 211 MIS MISC 0.000 NONHWY

BIG LAKE MARINE TOWBOAT $750,000 - $999,999

2 TOWBOATS

PE-PROCURE TOWBOAT RETROFIT

Page 157: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 120Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 1693-34-36 11/25/2022 211 TST MISC 0.000 NONHWY

MILW CO TRANSIT REPLACEMENT BUSES $5,000,000 - $5,999,999

PHASE 3 - BUS PURCHASE FY20-24

TST/TRANSIT

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 1693-34-42 12/25/2022 211 TST MISC 0.000 NONHWY

CLEAN DIESEL ENGINE BUS PURCHASE $100,000 - $249,999

PURCHASE OF 7 BUSES PHASE 5 OF 5

MILWAUKEE TRANSIT, CMAQ

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 1693-34-43 07/25/2022 211 TST MISC 0.000 NONHWY

MCTS PUBLIC OUTREACH $500,000 - $749,999

MCTS AWARENESS CAMPAIGN

TST/TRANSIT-MARKETING

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 2967-11-01 07/25/2022 211 M/E MISC 0.000 NONHWY

OAK LEAF TR CONNECTIVITY-BENDER PRK $100,000 - $249,999

BENDER PARK

PE-FULL PS&E-BIKE/PED TRAIL

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 2967-11-02 07/25/2022 211 M/E MISC 0.000 NONHWY

OAK LEAF TRAIL EXTENSION $250,000 - $499,999

KOHL PARK CONNECTION

PE/PED BIKE FACILITIES

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ TO REDUCE PM 2.5 EMI

Page 158: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 121Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2980-06-71 03/25/2022 211 LLC MISC 0.000 NONHWY

POWERLINE TRAIL PHASE 1 $1,000,000 - $1,999,999

W COLD SPRING RD TO 60TH STREET

CONST/PED BIKE TRAIL

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2022 2984-13-83 03/25/2022 290 LLC MISC 0.000 NONHWY

SRTS IMPLEMENTATION PHASE I $500,000 - $749,999

CITY OF MILWAUKEE

CONST/SAFE ROUTE TO SCHOOL PROGRAM

TAP > 200,000 TRANS ALTERN >200K FASTEX

2022 2984-18-73 01/25/2022 290 LLC MISC 0.000 NONHWY

PEDESTRIAN & TRANSIT INTS IMPRVMNTS $500,000 - $749,999

8 LOCAL INTERSECTIONS

CONST/PED & TRANSIT IMPROVEMENTS

TAP > 200,000 TRANS ALTERN >200K FASTEX

2023 1693-06-07 07/25/2023 211 TST MISC 0.000 NONHWY

EAST WEST BUS RAPID TRANSIT $2,000,000 - $2,999,999

MILWAUKEE COUNTY

TST/OPERATING COSTS 3RD YR

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2023 1693-06-81 01/25/2023 211 MIS MISC 0.000 NONHWY

CNG REFUSE PACKERS $1,000,000 - $1,999,999

PH 2 33 REFUSE TRUCK CNG CONVERSION

MIS/REFUSE TRUCK CNG CONVERSION

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2023 1693-34-39 09/25/2023 211 TST MISC 0.000 NONHWY

MILW CO TRANSIT REPLACEMENT BUSES $3,000,000 - $3,999,999

Page 159: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 122Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

PHASE 4 - BUS PURCHASE FY20-24

TST/TRANSIT

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2023 2555-07-70 03/25/2023 211 LLC MISC 0.000 NONHWY

SAFE ROUTES TO TRANSIT PHASE 1 $1,000,000 - $1,999,999

W BURLEIGH, S CESAR CHAVEZ

CONST/PED BIKE FACILITIES

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2023 2984-22-74 03/25/2023 211 LLC MISC 0.000 NONHWY

KINNICKINNIC RVR TRAIL CONNECTIONS $1,000,000 - $1,999,999

VARIOUS LOCATIONS IN THE CITY

CONST/PED BIKE FACILITIES

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2023 2984-22-75 03/25/2023 290 LLC MISC 0.000 NONHWY

20TH ST POWER LINE & BEERLINE TRAIL $750,000 - $999,999

OLIVE ST-VILLARD AVE & 20TH-24TH ST

CONST/BIKE PEDESTRIAN TRAIL

TAP > 200,000 TRANS ALTERN >200K FASTEX

2023 2984-22-92 03/25/2023 211 LFA MISC 0.000 NONHWY

ATC CONTROLLER & COMM UPGRADE GR 6 $1,000,000 - $1,999,999

53 INTERSECTIONS

CONST/VAR CORRIDORS S SIDE

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2023 2984-22-93 03/25/2023 211 LFA MISC 0.000 NONHWY

ATC CONTROLLER & COMM UPGRADE GR 7 $1,000,000 - $1,999,999

70 INTERSECTIONS

Page 160: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 123Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

LFA/VAR CORRIDORS MILW CBD

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2023 2987-09-70 02/25/2023 290 LLC MISC 0.000 NONHWY

SAFE ROUTES TO SCHOOL-PHASE 1 $500,000 - $749,999

5 SCHOOL LOCATIONS

CONST/SIDEWALK SIGNS BIKE/PED

TAP > 200,000 TRANS ALTERN >200K FASTEX

2023 2994-00-72 03/25/2023 290 LLC MISC 0.000 NONHWY

WAUWATOSA BIKE SHARE III $100,000 - $249,999

VARIOUS LOCATIONS

CONST/BIKE/PED

TAP > 200,000 TRANS ALTERN >200K FASTEX

2024 2967-02-72 07/25/2024 206 TST MISC 0.000 NONHWY

TRANSIT SYSTEM BUS REPLACEMENT $4,000,000 - $4,999,999

15 MILWAUKEE COUNTY BUSES PHASE 2

TST/TRANSIT

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2967-11-71 03/25/2024 211 LLC MISC 0.000 NONHWY

OAK LEAF TR CONNECTIVITY-BENDER PRK $1,000,000 - $1,999,999

BENDER PARK

CONST/PED BIKE FACILITIES

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2024 2967-11-72 03/25/2024 211 LLC MISC 0.000 NONHWY

OAK LEAF TRAIL EXTENSION $2,000,000 - $2,999,999

KOHL PARK CONNECTION

CONST/PED BIKE FACILITIES

Page 161: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 124Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

2022 1100-20-73 06/25/2022 305 CCO TOI 0.000 OFFSYS

ZOO FREEWAY $0 - $99,999

N40-65 (SB EXIT RAMP TO LINCOLN)

TRAFFIC ACCIDENT CLAIM 0077-12-49

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2023 1060-53-70 12/12/2023 303 LET MISC 0.000 OFFSYS

VARIOUS NOISE WALL LOCATIONS $1,000,000 - $1,999,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/NOISE BARRIER REHAB

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 2120-18-20 03/25/2022 303 R/E MISC 5.270 STH 024 W FOREST HOME AVE $100,000 - $249,999

USH 45 TO 45TH STREET

RE/RESURFACE

STATE 3R NON-FEDERAL

2022 2120-18-21 06/25/2022 303 R/E RSRF30 5.270 STH 024 HALES CORNERS-MILWAUKEE $500,000 - $749,999

USH 45 TO 45TH STREET

RE/RSRF30

STATE 3R NON-FEDERAL

2022 2120-18-22 08/25/2022 303 R/E RSRF30 5.270 STH 024 HALES CORNERS-MILWAUKEE $100,000 - $249,999

USH 45 TO 45TH STREET

RE/RSRF30

STATE 3R NON-FEDERAL

2024 2120-18-70 09/10/2024 303 LET RSRF30 5.307 STH 024 HALES CORNERS - MILWAUKEE $13,000,000 - $13,999,999

USH 45 TO 45TH STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 162: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 125Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2185-09-70 03/25/2022 209 LLC RECST 0.003 STH 032 C MILWAUKEE/KOMATSU MINING $1,000,000 - $1,999,999

S KINNICKINNIC AVE N/S OF RR BRIDGE

CONST/RECONST

TRANS ECONOMIC ASSISTANCE (TEA) NON-FEDERAL

2022 2195-04-20 05/25/2022 303 R/E MISC 0.440 STH 032 WELLS STREET $0 - $99,999

N BROADWAY TO N PROSPECT AVE

RE/RECONSTRUCT NO ADDITIONAL LANES

STATE 3R NON-FEDERAL

2023 2195-04-70 09/12/2023 303 LET PVRPLA 0.255 STH 032 WELLS STREET, CITY OF MILWAUKEE $2,000,000 - $2,999,999

N BROADWAY TO N VAN BUREN STREET

CONST/RECONSTRUCT NO ADDL LANES

STATE 3R SURFACE TRANS BLOCK-FLEX E

2024 2225-15-70 02/13/2024 303 LET PVRPLA 0.852 STH 032 C MILWAUKEE, N LAKE DR $5,000,000 - $5,999,999

NEWBERRY BLVD TO EDGEWOOD AVE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 2225-00-73 09/09/2025 303 LET RSRF30 2.630 STH 032 V FOX POINT, N LAKE DR $2,000,000 - $2,999,999

SCHOOL ROAD TO DEAN ROAD

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 2225-13-70 09/09/2025 303 LET PVRPLA 1.216 STH 032 V SHOREWOOD, N LAKE DR $5,000,000 - $5,999,999

EDGEWOOD AVE TO KENSINGTON BLVD

CONST/PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANS FLEX - MAP-2

2022 2240-00-28 07/25/2022 303 R/E RSRF30 5.338 STH 036 WATERFORD - MILWAUKEE $0 - $99,999

STH 100 TO 51ST STREET

RE/RESURFACE

STATE 3R NON-FEDERAL

Page 163: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 126Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2240-00-78 02/13/2024 303 LET RSRF30 5.338 STH 036 WATERFORD - MILWAUKEE $12,000,000 - $12,999,999

STH 100 TO 51ST STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 2060-18-70 12/12/2023 303 LET BRRPL 0.000 STH 038 CHASE AVE, CITY OF MILWAUKEE $4,000,000 - $4,999,999

BRIDGE OVER UP RR B40-571

CONST/BRIDGE REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2565-02-71 03/14/2023 303 LET MISC 0.037 STH 057 C GLENDALE, SILVER SPRING DR $1,000,000 - $1,999,999

INTERSECTION WITH CTH PP

CONST/TURNING LANES HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 2275-05-70 01/09/2024 303 LET RSRF30 1.058 STH 057 C MILWAUKEE, N 20TH ST $3,000,000 - $3,999,999

NORTH AVE TO HOPKINS ST

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 2410-10-20 09/25/2022 303 R/E MISC 2.620 STH 059 C MILWAUKEE, W NATIONAL AVE $0 - $99,999

39TH ST TO 1ST ST

RE/RECONSTRUCT

STATE 3R NON-FEDERAL

2025 2410-10-70 09/09/2025 303 LET PVRPLA 2.620 STH 059 C MILWAUKEE, W NATIONAL AVE $20,000,000 - $24,999,999

39TH ST TO 1ST ST

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 2030-10-21 04/25/2022 303 R/E MISC 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $100,000 - $249,999

W BURLEIGH ST TO W SILVER SPRING DR

RE/BRIDGE REPLACEMENT

STATE 3R NON-FEDERAL

Page 164: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 127Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2030-10-22 05/25/2022 303 R/E MISC 2.989 STH 100 C WAUWATOSA, N MAYFAIR RD/LOVERS LN $0 - $99,999

W BURLEIGH ST TO W SILVER SPRING DR

RE/BRIDGE REPLACEMENT

STATE 3R NON-FEDERAL

2022 2040-03-75 11/08/2022 303 LET RSRF10 2.390 STH 100 RYAN ROAD $1,000,000 - $1,999,999

SHEPARD AVE TO STH 32

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 2040-20-70 11/08/2022 303 LET BRRHB 0.000 STH 100 C OAK CREEK, RYAN ROAD $1,000,000 - $1,999,999

BRIDGE OVER RR B-40-530

CONST/BRIDGE REHABILITATION

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 2040-15-23 01/25/2023 303 R/E RECST 2.958 STH 100 C FRANKLIN, LOVERS LANE $100,000 - $249,999

60TH STREET TO ST MARTINS ROAD

RE/RECONSTRUCT PRESERVATION

STATE 3R NON-FEDERAL

2023 2040-15-24 01/25/2023 303 R/E RECST 2.958 STH 100 C FRANKLIN, LOVERS LANE $100,000 - $249,999

60TH STREET TO ST MARTINS ROAD

RE/RECONSTRUCT PRESERVATION

STATE 3R NON-FEDERAL

2024 2030-10-71 09/10/2024 303 LET BRRPL 2.989 STH 100 N MAYFAIR RD/N LOVERS LN $17,000,000 - $19,999,999

W BURLEIGH ST TO W SILVER SPRING DR

CONST/BRIDGE REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 2040-15-73 09/09/2025 303 LET PVRPLA 2.958 STH 100 C FRANKLIN, LOVERS LANE $12,000,000 - $12,999,999

60TH STREET TO ST MARTINS ROAD

CONST/PAVE REPLACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 165: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 128Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2015-10-71 09/12/2023 303 LET PVRPLA 0.213 STH 119 GENERAL MITCHELL AIRPORT SPUR $2,000,000 - $2,999,999

STH 119 AT HOWELL AVE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1360-12-70 11/14/2023 303 LET BRRPL 0.016 STH 145 C MILWAUKEE, FOND DU LAC AVE $3,000,000 - $3,999,999

107TH ST BRIDGE

CONST/B-40-252

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1360-13-70 11/14/2023 303 LET BRRHB 0.010 STH 145 C MILWAUKEE, FOND DU LAC AVE $3,000,000 - $3,999,999

76TH, PED BRIDGES

CONST/BRIDGE REHAB

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1360-13-71 11/14/2023 303 LET BRRHB 0.050 STH 145 C MILWAUKEE, FOND DU LAC AVE $2,000,000 - $2,999,999

SILVER SPRING BRIDGES

CONST/BRIDGE REHAB

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1360-12-90 03/25/2024 303 LFA BRRPL 0.016 STH 145 C MILWAUKEE, FOND DU LAC AVE $0 - $99,999

107TH ST BRIDGE

CONST/SIGNALS INCIDENTAL 1360-12-70

STATE 3R NON-FEDERAL

2023 2010-03-22 01/25/2023 303 R/E RSRF30 4.265 STH 175 C MILWAUKEE, APPLETON AVE $100,000 - $249,999

STH 181 TO IH 41

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 2967-17-70 03/14/2023 303 LET BRRHB 0.037 STH 175 C MILWAUKEE, APPLETON AVENUE $1,000,000 - $1,999,999

BRIDGE OVER MENOMONEE RIVER

CONST/BRIDGE REHAB

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 166: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 129Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2010-03-72 09/09/2025 303 LET RSRF30 4.265 STH 175 C MILWAUKEE, APPLETON AVE $8,000,000 - $8,999,999

STH 181 TO IH 41

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 2140-14-20 04/25/2023 303 R/E RSRF25 4.529 STH 181 C MILWAUKEE 76TH STREET $250,000 - $499,999

FLORIST AVE TO CTH Q

RE/RSRF25

STATE 3R NON-FEDERAL

2023 2545-03-72 03/14/2023 303 LET MISC 0.019 STH 181 76TH ST (STH 181) $500,000 - $749,999

INTERSECTION WITH HAMPTON AVENUE

CONST/INTERSECTION AND SIGNALS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 2545-03-92 03/25/2023 303 LFA MISC 0.019 STH 181 76TH ST (STH 181) $0 - $99,999

INTERSECTION WITH HAMPTON AVENUE

LFA/ INCIDENTAL TO 2545-03-72

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 2967-17-71 03/14/2023 303 LET BRRHB 0.007 STH 181 C MILWAUKEE N 76TH ST $2,000,000 - $2,999,999

BRIDGE OVER UPC RR

CONST/BRIDGE REHAB

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 2140-14-70 09/09/2025 303 LET RSRF25 4.529 STH 181 C MILWAUKEE 76TH STREET $11,000,000 - $11,999,999

FLORIST AVE TO CTH Q

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2025-20-70 05/10/2022 303 LET BRRHB 0.000 STH 190 CAPITOL DR, CITY OF WAUWATOSA $2,000,000 - $2,999,999

124TH ST TO STH 100

Page 167: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 130Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/RIDGE DECK OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2265-18-20 07/25/2022 303 R/E MISC 2.003 STH 241 OAK CREEK - MILWAUKEE $100,000 - $249,999

LAYTON AVE TO COLLEGE AVE

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 2265-10-71 01/10/2023 303 LET BRRHB 0.442 STH 241 OAK CREEK - MILWAUKEE $3,000,000 - $3,999,999

8 MILE RD TO ELM RD

CONST/BRIDGE DECK REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 2265-18-70 09/10/2024 303 LET RSRF20 2.003 STH 241 OAK CREEK - MILWAUKEE $4,000,000 - $4,999,999

COLLEGE AVE TO LAYTON AVE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1060-35-82 08/09/2022 301ZO LET MISC 0.000 USH 045 USH 45, ZOO IC, N LEG LANDSCAPING $500,000 - $749,999

MAYFAIR ROAD TO BURLEIGH STREET

CONST/LANDSCAPING

SE FREEWAY-ZOO INTERCHANGE NON-FEDERAL

2024 2040-14-70 09/10/2024 303 LET RECST 1.000 USH 045 LOVERS LANE (CITY OF FRANKLIN) $12,000,000 - $12,999,999

RAWSON AVE TO COLLEGE AVE

CONST/RECONSTRUCT

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1000-13-76 06/14/2022 305 LET TOE 0.155 VARHWY

HIGHWAY LIGHTING 2022 SE REGION $2,000,000 - $2,999,999

VARIOUS HIGHWAYS, MILWAUKEE CO

TRAFFIC/LIGHTING

Page 168: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 131Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2022 2967-00-77 04/12/2022 206 LET MISC 0.117 VARHWY

6 LOCAL INTERSECTIONS $750,000 - $999,999

GOOD HOPE, PORT WASH & SHERMAN

CONST/HSIP/INTERSECT IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2022 2984-13-95 08/25/2022 206 LFA MISC 0.000 VARHWY

VARIOUS LOCATIONS $500,000 - $749,999

73 CITY INTERSECTIONS

LFA/HSIP/INTERSECT IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2022 2984-13-96 08/25/2022 206 LFA MISC 0.000 VARHWY

VARIOUS LOCATIONS $500,000 - $749,999

72 CITY INTERSECTIONS

HSIP/INTERSECTION IMPROVEMENTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2022 2984-28-91 04/25/2022 211 LFA MISC 0.000 VARHWY

FIBER OPTIC INTERCONNECT $1,000,000 - $1,999,999

LISBON, WALNUT AND 27TH CORRIDORS

LFA/FIBER OPTIC

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

CONGESTION MITIGAT FASTEX

2022 2984-28-92 04/25/2022 211 LFA MISC 0.000 VARHWY

ATC CONTROLLER & COMM UPGRADE GR 3 $1,000,000 - $1,999,999

79 INTERSECTIONS

LFA/VAR CORRIDORS NEAR N-W

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

CONGESTION MITIGAT FASTEX

Page 169: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 132Southeast Region

MILWAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2984-28-94 04/25/2022 211 LFA MISC 0.000 VARHWY

FIBER OPTIC INTERCONNECT $750,000 - $999,999

CESAR CHAVEZ DR & NATIONAL AVE CORR

LFA/FIBER OPTIC

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

CONGESTION MITIGAT FASTEX

2022 4740-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

MILWAUKEE COUNTY PAVEMENT MARKING $100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSBLOCK-FLEX E

2023 2090-14-70 12/25/2023 211 MIS MISC 0.000 VARHWY

C MILWAUKEE SILVER SPRING DRIVE $250,000 - $499,999

124TH ST TO 91ST ST

MIS/ADAPTIVE TRAFFIC SIGNAL SYS

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMI FAST

Page 170: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 133Southeast Region

OZAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 4822-07-01 04/25/2022 206 C/E MISC 8.953 CTH H FREDONIA - PORT WASHINGTON $0 - $99,999

WASHCOLINE-CTHA, CTH A-CTH KW

PE/FULL PS&E/MISC

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2024 4822-07-71 02/13/2024 206 LET MISC 8.953 CTH H FREDONIA - PORT WASHINGTON $500,000 - $749,999

WASHCOLINE-CTHA, CTH A-CTH KW

CONST/MISC

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2022 2330-08-70 05/10/2022 206 LET MISC 3.889 CTH NN CEDARBURG - JACKSON $250,000 - $499,999

WASHINGTON COUNT LINE TO STH 60

CONST/HSIP

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2023 2695-07-71 02/14/2023 206 LET MISC 0.010 CTH NN CEDARBURG CTH NN $750,000 - $999,999

INTERSECTION WITH CTH Y

CONST/RECON INTERSECTION & SIGNALS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1229-04-03 302 I/E RECSTE 7.871 IH 043 I-43 NORTH SOUTH FREEWAY $3,000,000 - $3,999,999

DONGES BAY TO STH 60

PE-FULL PS&E-RE-UTIL-RR-RECSTE

MAJORS NATIONAL HIGHWAY PERFFAST

2022 1229-04-96 01/25/2022 302 MIS MISC 14.095 IH 043 I-43 NORTH SOUTH FREEWAY $1,000,000 - $1,999,999

SILVER SPRING TO STH 60

FST MITIGATION/1229-04-70 TO 76

MAJORS NON-FEDERAL

2023 1229-04-75 07/11/2023 302 LET RECSTE 2.534 IH 043 I-43 NORTH SOUTH FREEWAY $50,000,000 - $59,999,999

MEQUON RD INTERCHANGE

CONST/RECONSTRUCTION W/ EXPANSION

Page 171: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 134Southeast Region

OZAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

MAJORS NATIONAL HIGHWAY PERFFAST

2025 1229-03-71 09/09/2025 303 LET RSRF30 1.699 IH 043 IH 43 NORTH SOUTH FREEWAY $3,000,000 - $3,999,999

STH 60 TO STH 32

CONST/RESURFACING

BACKBONE NATIONAL HIGHWAY PERFFAST

2025 1229-03-91 09/25/2025 303 MIS MISC 1.699 IH 043 IH 43 NORTH SOUTH FREEWAY $100,000 - $249,999

STH 60 TO STH 32

TRAFFC MITIGATION FOR ID 1229-03-71

BACKBONE NON-FEDERAL

2022 2695-11-70 03/08/2022 205 LET BRRPL 0.100 LOC STR COVERED BRIDGE ROAD $1,000,000 - $1,999,999

BRIDGE OVER CEDAR CREEK B-45-0013

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEXE

2022 1410-01-71 05/10/2022 303 LET RECST 0.390 STH 033 STH 33 $2,000,000 - $2,999,999

INTERSECTION WITH CTH I

CONST/INTERSECTION MOD ROUND-ABOUT

STATE 3R HIGHWAY SFTY IMP PRG FAST

2022 3700-22-71 03/25/2022 305 MIS TOSIG 0.007 STH 060 STH 60 & 12TH AVE SIGNAL IMPROVEMNT $0 - $99,999

STH 60 & 12TH AVE INTERSECTION

STAND ALONE PROJECT ID SER2206L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2022 1380-02-70 09/13/2022 303 LET RSRF30 3.740 STH 167 MEQUON ROAD, CITY OF MEQUON $2,000,000 - $2,999,999

WASHINGTON CO LINE TO BUNTROCK AVE

CONST / RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 172: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 135Southeast Region

OZAUKEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2729-05-70 04/12/2022 303 LET RSRF30 2.939 STH 181 WAUWATOSA RD, CITY OF CEDARBURG $3,000,000 - $3,999,999

CTH C TO STH 60

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2729-07-20 07/25/2022 303 R/E RSRF20 2.209 STH 181 WEST ALLIS - CEDARBURG $0 - $99,999

COUNTY LINE ROAD TO MEQUON ROAD

RE/RSRF20

STATE 3R NON-FEDERAL

2022 4745-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

OZAUKEE COUNTY PAVEMENT MARKING $0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE

2024 4821-04-20 04/25/2024 303 R/E MISC 6.471 VARHWY

SOUTHEAST REGION, ADA CURB RAMPS $100,000 - $249,999

PORT WASH/SAUK AREA VAR LOC PER PLN

PER WISDOT ADA TRANS PLAN RAMPS

CURB RAMP STANDALONE NON-FEDERAL

Page 173: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 136Southeast Region

RACINE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2390-09-73 12/10/2024 206 LET RECST 0.609 CTH C MOUNT PLEASANT - RACINE $4,000,000 - $4,999,999

NORTH OHIO STREET TO FAIRWAY DRIVE

CONST/RECONSTRUCT NO ADDED CAPACITY

STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT

2022 3755-03-70 05/10/2022 206 LET MISC 5.757 CTH D V ROCHESTER CTH D $100,000 - $249,999

WALWORTH COUNTY LINE TO STH 20

CONST/HSIP/SIGNING, PVMT MARKING

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2023 3755-02-70 01/10/2023 206 LET RECST 1.860 CTH D CTH D $2,000,000 - $2,999,999

HERITAGE RD TO 753 FT W OF STATE ST

CONST/RECONSTRUCT NO ADDED CAPACITY

STP RURAL STBG <5K POP - FAST EXT

2024 2814-03-70 02/13/2024 206 LET MISC 0.027 CTH J V ROCHESTER CTH J $1,000,000 - $1,999,999

INTERSECTION WITH CTH A

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2803-03-01 07/25/2022 206 C/E RECST 0.008 CTH U V RAYMOND - 76TH ST $100,000 - $249,999

INTERSECTION WITH CTH G

PE/FULL PS&E

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 2816-03-70 02/13/2024 206 LET MISC 0.024 CTH U V RAYMOND CTH U $1,000,000 - $1,999,999

INTERSECTION WITH 7 MILE ROAD

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 2803-03-71 02/11/2025 206 LET RECST 0.008 CTH U V RAYMOND - 76TH ST $1,000,000 - $1,999,999

INTERSECTION WITH CTH G

CONST/RECST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 174: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 137Southeast Region

RACINE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2702-03-70 03/08/2022 205 LET BRRPL 0.000 LOC STR 58TH ROAD $500,000 - $749,999

BRIDGE OVER W BR ROOT RIVER CANAL

CONST/BRIDGE REPLACEMENT/P-51-0058

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGE E

2022 2703-09-21 05/25/2022 206 R/E RECST 0.536 LOC STR N MAIN STREET $100,000 - $249,999

GOOLD ST TO MELVIN AVE

RE/RECONSTRUCT NO ADDL LANES

STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT

2022 3834-00-72 11/08/2022 205 LET BRRPL 0.000 LOC STR JEFFERSON STREET $2,000,000 - $2,999,999

BRIDGE OVER FOX RIVER B-51-0001

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2024 2703-09-71 11/12/2024 206 LET RECST 0.536 LOC STR C RACINE N MAIN STREET $2,000,000 - $2,999,999

GOOLD ST TO MELVIN AVE

CONST/RECONSTRUCT NO ADDL LANES

STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT

2023 1030-09-76 05/09/2023 303 LET RSRF30 0.000 OFF SYS IH 41 NORTH SOUTH FREEWAY $9,000,000 - $9,999,999

EAST AND WEST FRONTAGE ROADS

CONST/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1320-23-75 03/14/2023 303 LET MISC 0.000 OFF SYS BURLINGTON - RACINE $100,000 - $249,999

STH 11 PARK AND RIDE

CONST/RESTORATION

STATE 3R NON-FEDERAL

2022 1320-07-23 04/25/2022 303 R/E MISC 0.004 STH 011 STH 11 $0 - $99,999

CTH J

RE/ROUND ABOUT

STATE 3R NON-FEDERAL

Page 175: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 138Southeast Region

RACINE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2260-08-40 01/25/2022 303 UTL RECST 0.384 STH 011 DURAND AVE, CITY OF RACINE $0 - $99,999

KEARNEY AVE TO STH 32

UTIL/WE ENERGIES/CITY RACINE

STATE 3R NON-FEDERAL

2024 1320-07-73 02/13/2024 303 LET MISC 0.315 STH 011 BURLINGTON - RACINE $1,000,000 - $1,999,999

CTH J

HSIP/ROUND ABOUT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2340-10-70 09/13/2022 303 LET RSRF30 8.460 STH 020 WASHINGTON AVE, TOWN DOVER $7,000,000 - $7,999,999

STH 36 TO SB USH 45

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 2340-00-79 09/12/2023 303 LET RSRF15 3.559 STH 020 EAST TROY - RACINE $1,000,000 - $1,999,999

HONEY CREEK ROAD TO BUENA PARKROAD

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2340-03-73 01/10/2023 303 LET BRRHB 1.432 STH 020 WASHINGTON AVENUE $2,000,000 - $2,999,999

90TH STREET TO OAKES ROAD

CONST/BRIDGE REHAB

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 2250-15-70 09/10/2024 303 LET RSRF30 1.240 STH 020 WASHINGTON AVE - VIL OF MT PLEASANT $5,000,000 - $5,999,999

OAKES RD TO STH 31

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2390-12-20 12/25/2022 303 R/E MISC 1.510 STH 031 GREEN BAY RD, C RACINE/V MT PLEASNT $1,000,000 - $1,999,999

Page 176: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 139Southeast Region

RACINE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 11 TO STH 20

RE/RECONSTRUCTION

STATE 3R NON-FEDERAL

2025 2350-15-70 09/09/2025 303 LET RSRF30 4.620 STH 032 V CALEDONIA, DOUGLAS AVENUE $3,000,000 - $3,999,999

4 MILE RD TO E COUNTY LINE RD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3180-00-76 05/10/2022 303 LET RSRF10 7.938 STH 036 SPRINGFIELD - WATERFORD $9,000,000 - $9,999,999

STH 83 TO STH 20

CONST/RESURFACING

STATE 3R HWY INFRA COVID SUPP

2022 2290-03-73 12/13/2022 303 LET BRRPL 0.022 STH 038 RACINE - MILWAUKEE $6,000,000 - $6,999,999

BRIDGE OVER ROOT RIVER B-51-0012

CONST/BRIDGE REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 2290-24-20 01/25/2022 303 R/E BRSHRM 8.589 STH 038 CALEDONIA - OAK CREEK $0 - $99,999

DUNKELOW RD TO E OAKWOOD RD

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 2290-24-70 12/12/2023 303 LET PSRS40 8.589 STH 038 CALEDONIA - OAK CREEK $4,000,000 - $4,999,999

DUNKELOW RD TO E OAKWOOD RD

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2290-25-20 10/25/2023 303 R/E RECST 0.038 STH 038 V CALEDONIA, NORTHWESTERN AVENUE $0 - $99,999

INTERSECTION WITH 4 MILE ROAD

RE FULL PS & E W/ROW RECST

SAFETY (REGULAR HSIP) NON-FEDERAL

Page 177: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 140Southeast Region

RACINE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2290-26-20 10/25/2023 303 R/E MISC 0.007 STH 038 V CALEDONIA, NORTHWESTERN AVENUE $0 - $99,999

INTERSECTION WITH 5 MILE ROAD

RE/RECST

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 1300-09-70 12/13/2022 303 LET PSRS40 7.190 STH 083 NORTHWEST HIGHWAY (STH 83) $9,000,000 - $9,999,999

STH 20 TO IH 43

CONST/RECONDITIONING

STATE 3R HWY INFRA COVID SUPP

2023 2430-07-20 04/25/2023 303 R/E RSRF30 2.813 USH 045 RAYNOR AVE, UNION GROVE-HALESCRNRS

$0 - $99,999

STH 20 TO 2000 FT NORTH OF CTH K

RE/RSRF30

STATE 3R NON-FEDERAL

2022 4751-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

RACINE COUNTY PAVEMENT MARKING $250,000 - $499,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E

Page 178: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 141Southeast Region

SOUTHEAST REGION WIDE

2022-2025 FINAL STIP Project Listing 141Southeast Region

SOUTHEAST REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1000-33-40 303 I/E MISC 0.000 NON HWY UTILITY COORD-DEVELOP 6-YR PROGRAM $100,000 - $249,999

REGION-WIDE

CE

STATE 3R NON-FEDERAL

2022 1000-12-35 07/25/2022 303 C/E MISC 0.000 NON HWY SAFETY ANALYSIS FOR 3R PROJECTS $750,000 - $999,999

SE REGION

PE/SAFETY ANALYSIS

STATE 3R NON-FEDERAL

2023 3742-00-17 07/25/2023 303 C/E MISC 0.000 NON HWY PDS PROGRAM CONTROL MANAGEMENT $750,000 - $999,999

TRACKING, FY 24-28

PE

STATE 3R NON-FEDERAL

1000-01-32 303 I/E MISC 0.000 VAR HWY WEST ALLIS INVENTORY CONTROL $0 - $99,999

SE REGION

PE

STATE 3R NON-FEDERAL

1000-29-52 303 I/E MISC 0.000 VAR HWY VARIOUS HIGHWAYS $250,000 - $499,999

UTILITY COORDINATION

--

STATE 3R NON-FEDERAL

2022 1000-03-04 03/25/2022 303 C/E MISC 0.000 VAR HWY SE REGION WIDE $2,000,000 - $2,999,999

EARLY SURVEY TO MEET ADV DATES

PE/ANNUAL SURVEY PROJ IN SCOPING

STATE 3R NON-FEDERAL

2022 1000-70-14 06/25/2022 303 C/E MISC 0.000 VAR HWY THERMOGRAPHIC BRIDGE DECK SURVEYS $2,000,000 - $2,999,999

VARIOUS LOCATIONS

FY 21-25

STATE 3R NON-FEDERAL

Page 179: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 142Southeast Region

SOUTHEAST REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1000-77-23 05/09/2023 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2023 $1,000,000 - $1,999,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/PAVEMENT MARKING

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E

2023 1000-80-23 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2023 $250,000 - $499,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/CLEAN & RELAMP LTG SYSTEMS

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2023 1000-80-24 05/09/2023 305 LET TOE 0.000 VAR HWY HIGHWAY LIGHTING MAINTENANCE 2024 $250,000 - $499,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/CLEAN & RELAMP LTG SYSTEMS

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2024 1000-77-24 05/14/2024 305 LET TOPM 0.000 VAR HWY EPOXY PAVEMENT MARKING, 2024 $1,000,000 - $1,999,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/ PAVEMENT MARKING

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E

Page 180: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 143Southeast Region

STATEWIDE

2022-2025 FINAL STIP Project Listing 143Southeast Region

STATEWIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1000-20-64 12/13/2022 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2022 $1,000,000 - $1,999,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/SIGN BRIDGE REPAIR & REPLACE

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2022 1000-20-65 12/13/2022 305 LET TOS 0.000 VAR HWY ANCILLARY STRUCT REHAB/REPLACE 2023 $500,000 - $749,999

LOCATIONS ON STN PER ANNUAL PLAN

CONST/SIGN BRIDGE REPAIR & REPLACE

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

Page 181: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 144Southeast Region

WALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3839-00-70 03/08/2022 205 LET BRRPL 0.025 LOC STR LAUDERDALE DRIVE $750,000 - $999,999

BRIDGE OVER GREEN LAKE P-64-0921

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2022 3841-03-70 11/08/2022 205 LET BRRHB 0.000 LOC STR C DELAVAN RICHMOND ROAD $500,000 - $749,999

BRIDGE OVER SWAN CREEK B-64-0157

CONST/BRIDGE REHABILITATION

LOCAL BRIDGES STBG <5K POP FAST

2024 3841-05-70 11/12/2024 206 LET RCND20 0.498 LOC STR C DELAVAN WRIGHT STREET $1,000,000 - $1,999,999

RACINE ST (STH 11) TO HOBBS DRIVE

CONST/RECONDITION

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2024 3845-05-71 03/25/2024 290 LLC MISC 0.000 NON HWY SOUTH STREET TRAIL $750,000 - $999,999

LAKE SHORE-STH 120, ALONG H .5 MI S

CONST/TRAIL

TAP 5,000 - 50,000 TRANS ALTERN 5-200K FAST E

2022 1320-22-70 05/10/2022 303 LET MISC 0.002 STH 011 ELKHORN - BURLINGTON $750,000 - $999,999

INDIAN RUN CR 0.7 MI E CLAUSSEN RD

CONST/CULVERT REPLACE/REPAIR

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 3180-00-77 05/10/2022 303 LET RSRF30 2.387 STH 011 ELKHORN - BURLINGTON $6,000,000 - $6,999,999

E OF LYONS TO E OF SPRING VALLEY RD

CONST/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 4910-02-20 02/25/2022 303 R/E MISC 0.007 STH 011 ELKHORN-BURLINGTON $0 - $99,999

BAKER CREEK 0.8 MI NE OF USH 12

RE/CULVERT REPLACE C-64-0038

STATE 3R NON-FEDERAL

Page 182: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 145Southeast Region

WALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4910-02-70 09/10/2024 303 LET MISC 0.007 STH 011 ELKHORN-BURLINGTON $250,000 - $499,999

BAKER CREEK 0.8 MI NE OF USH 12

CONST/CULVERT REPLACE C-64-0038

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2698-03-70 09/12/2023 303 LET PSRS40 6.124 STH 020 EAST TROY - RACINE $10,000,000 - $10,999,999

THOMAS DRIVE TO HONEY CREEK ROAD

CONST/RECONDITIONING

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 2698-03-73 09/12/2023 303 LET PSRS40 6.124 STH 020 EAST TROY - RACINE $250,000 - $499,999

THOMAS DRIVE TO HONEY CREEK ROAD

CONST/PSRS40/UTILITY

STATE 3R NON-FEDERAL

2022 3190-11-20 07/25/2022 303 R/E RSRF15 6.197 STH 036 SPRINGFIELD TO BURLINGTON $0 - $99,999

STH 120 TO STH 11

RE/RESURFACE

STATE 3R NON-FEDERAL

2024 3190-11-70 05/14/2024 303 LET RSRF15 6.197 STH 036 SPRINGFIELD TO BURLINGTON $3,000,000 - $3,999,999

STH 120 TO STH 11

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 3170-11-20 08/25/2022 303 R/E MISC 4.428 STH 050 DELAVAN - LAKE GENEVA $0 - $99,999

LAKE LAWN TO STH 67

RE/RESURFACE

STATE 3R NON-FEDERAL

2022 3170-12-70 11/08/2022 303 LET RSRF30 4.620 STH 050 DELAVAN - LAKE GENEVA $6,000,000 - $6,999,999

GENEVA NATIONAL TO FOREST

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 183: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 146Southeast Region

WALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 3170-11-70 09/09/2025 303 LET RSRF25 4.428 STH 050 DELAVAN - LAKE GENEVA $3,000,000 - $3,999,999

LAKE LAWN TO STH 67

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 3110-03-23 02/25/2023 303 R/E RSRF20 2.524 STH 059 MILTON TO WHITEWATER $0 - $99,999

WCL TO WILLIS RAY ROAD

RE/RESURFACE

STATE 3R NON-FEDERAL

2024 3110-03-73 11/12/2024 303 LET RSRF20 2.524 STH 059 MILTON TO WHITEWATER $2,000,000 - $2,999,999

WCL TO WILLIS RAY ROAD

CONST/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 3325-06-71 01/10/2023 303 LET RSRF30 1.210 STH 067 WALWORTH - ELKHORN $2,000,000 - $2,999,999

GENEVA ST TO GLENWOOD DR

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 3325-06-72 01/10/2023 303 LET RSRF30 1.210 STH 067 WALWORTH - ELKHORN $1,000,000 - $1,999,999

GENEVA ST TO GLENWOOD DR

CONST/UTILITY

STATE 3R NON-FEDERAL

2023 3390-04-70 04/11/2023 303 LET RSRF30 7.294 STH 089 RICHMOND - WHITEWATER $3,000,000 - $3,999,999

CTH A TO WILLIS RAY ROAD

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2022 3694-00-21 02/25/2022 303 R/E MISC 9.422 STH 120 HEBRON - EAST TROY $0 - $99,999

STH 36 TO O'LEARY LN

RE/RESURFACE

STATE 3R NON-FEDERAL

Page 184: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 147Southeast Region

WALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 3180-03-24 10/25/2023 303 R/E MISC 0.000 STH 120 ILLINOIS - LAKE GENEVA $0 - $99,999

BRIDGE OVR NIPPERSINK CREEK B64-007

PE/BRIDGE REPLACEMENT

STATE 3R NON-FEDERAL

2023 3694-00-71 05/09/2023 303 LET RSRF20 9.422 STH 120 HEBRON - EAST TROY $6,000,000 - $6,999,999

STH 36 TO O'LEARY LN

CONST/RSRF 20 RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEXE

2022 3120-12-20 02/25/2022 303 R/E MISC 0.598 USH 012 USH 12 $100,000 - $249,999

INTERSECTION WITH CTH ES

RE/INTERSECTION MODIFICATION

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 3130-03-21 10/25/2022 303 R/E RSRF30 7.640 USH 012 WHITEWATER TO ELKHORN $0 - $99,999

COX ROAD TO STH 20/67

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 3120-13-70 11/14/2023 303 LET MISC 0.000 USH 012 C ELKHORN, USH 12 $250,000 - $499,999

INTERSECTION WITH STH 67

CONST/HSIP INTERSECT MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 3120-10-70 09/10/2024 303 LET RSRF10 7.420 USH 012 ELKHORN - WHITEWATER $4,000,000 - $4,999,999

STH 20 TO USH 12/STH 67 SPLIT

CONST / RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 3120-12-70 09/10/2024 303 LET MISC 0.698 USH 012 ELKHORN - WHITEWATER $1,000,000 - $1,999,999

INTERSECTION WITH CTH ES

Page 185: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 148Southeast Region

WALWORTH

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/INTERSECTION MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 3130-09-70 03/12/2024 303 LET MISC 4.432 USH 012 WHITEWATER - RICHMOND $250,000 - $499,999

ROCK COUNTY LINE TO COX ROAD

CONST/HSIP/RUMBLE STRIPS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 3130-03-71 09/09/2025 303 LET RSRF30 7.640 USH 012 WHITEWATER TO ELKHORN $5,000,000 - $5,999,999

CTH P TO STH 20/67

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3150-06-20 05/25/2022 303 R/E MISC 14.200 USH 014 DARIEN-BIG FOOT $2,000,000 - $2,999,999

CTH K TO ILLINOIS ST LINE

RE/RECONDITIONING/MILL & OVERLAY

STATE 3R NON-FEDERAL

2023 3150-07-70 09/12/2023 303 LET PVRPLA 2.780 USH 014 JANESVILLE - BIG FOOT $4,000,000 - $4,999,999

IH 43 TO CTH K

CONST/PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEXE

2022 4764-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

WALWORTH COUNTY PAVEMENTMARKING

$100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE

Page 186: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 149Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2711-06-70 12/12/2023 206 LET RECST 1.846 CTH P POLK - JACKSON $2,000,000 - $2,999,999

STH 145 TO SHERMAN ROAD

CONST/RECONSTRUCT NO ADDL LANES

STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT

2023 2709-07-70 04/11/2023 206 LET MISC 0.028 CTH Q LISBON - RICHFIELD $1,000,000 - $1,999,999

INTERSECTION WITH HILLSIDE ROAD

CONST/INTERSECTION MOD-ROUND-ABOUT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 3700-43-90 07/25/2022 305 MIS TOSIG 0.003 IH 041 MILWAUKEE - FOND DU LAC $0 - $99,999

762FT N OF 1 MI ADV SIGN STH 167

STAND ALONE PROJECT BT02203

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 1100-43-70 01/10/2023 303 LET BRRHB 11.529 IH 041 MILWAUKEE - FOND DU LAC $15,000,000 - $16,999,999

WASHINGTON CO LINE TO STH 60

CONST/BRIDGE REHAB

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1100-43-90 01/25/2023 303 MIS MISC 19.770 IH 041 MILWAUKEE - FOND DU LAC $500,000 - $749,999

WASHINGTON CO LINE TO STH 60

TRAFFIC MITIGATION 1100-43-70

BACKBONE NON-FEDERAL

2023 3700-43-70 01/10/2023 305 LET TOSIG 0.003 IH 041 MILWAUKEE - FOND DU LAC $100,000 - $249,999

762FT N OF 1 MI ADV SIGN STH 167

STAND ALONE PROJECT BT02203

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2022 2707-06-70 03/08/2022 206 LET RECST 0.522 LOCSTR

18TH AVENUE $2,000,000 - $2,999,999

Page 187: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 150Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

VOGT DRIVE TO PARADISE DRIVE

CONST/RECONSTRUCT

STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP

2022 4824-03-71 11/08/2022 205 LET BRRPL 0.000 LOC STR BADGER ROAD $500,000 - $749,999

BRIDGE OVER KEWASKUM CREEK P-66-913

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP - FAST EXT

2022 4824-04-70 05/10/2022 205 LET BRRPL 0.000 LOC STR TRADING POST TRAIL ROAD $1,000,000 - $1,999,999

BR OVR N BR MILW RIVER P-66-0907

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2024 2707-09-70 03/12/2024 206 LET MISC 0.054 LOC STR C WEST BEND MAIN & PARADISE $1,000,000 - $1,999,999

INTER/DECORAH/PARADISE/SILVERBROOK

CONST/FULL PS/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2310-09-01 303 I/E BRRHB 0.000 OFF SYS IH 41 SB OFF RAMP $250,000 - $499,999

INTERSECTION WITH STH 60

PE/FULL PS&E ROW/BRIDGE REHAB

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 2310-09-21 10/25/2024 303 R/E MISC 0.000 OFF SYS IH 41 SB OFF RAMP $0 - $99,999

INTERSECTION WITH STH 60

RE/BRIDGE REHAB

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 4060-00-75 09/13/2022 303 LET PSRS40 8.500 STH 028 MAYVILLE TO KEWAUSKUM $2,000,000 - $2,999,999

WEST WASHINGTON CO LN TO USH 45

CONST/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

1410-11-01 303 I/E MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999

Page 188: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 151Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

INTERSECTION WITH 7TH AVE/MAIN ST

PE/FULL PS&E ROW/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1410-11-02 303 I/E MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999

INTERSECTION WITH 18TH AVE

PE/FULL PS&E ROW/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1410-11-03 303 I/E MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $100,000 - $249,999

INTERSECTION WITH RIVER RD

PE/FULL PS&E ROW/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

1410-15-00 303 I/E RSRF30 1.396 STH 033 HORICAN-WEST BEND $250,000 - $499,999

W WASHINGTON CO LN-NEW PLAT ST

PE/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1410-11-21 11/25/2022 303 R/E MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999

INTERSECTION WITH 7TH AVE/MAIN ST

RE/MISC

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 1410-11-22 11/25/2022 303 R/E MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999

INTERSECTION WITH 18TH AVE

RE/MISC

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 1410-11-23 11/25/2022 303 R/E MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $0 - $99,999

INTERSECTION WITH RIVER RD

RE/MISC

SAFETY (REGULAR HSIP) NON-FEDERAL

2024 1410-00-73 09/10/2024 303 LET RSRF30 2.734 STH 033 WEST BEND TO NEWBURG, T OF TRENTON $2,000,000 - $2,999,999

Page 189: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 152Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1/2 MI WEST OF N POPLAR RD TO CTH Y

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1410-11-71 04/09/2024 303 LET MISC 0.007 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999

INTERSECTION WITH 7TH AVE/MAIN ST

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1410-11-72 04/09/2024 303 LET MISC 0.005 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999

INTERSECTION WITH 18TH AVE

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1410-11-73 04/09/2024 303 LET MISC 0.009 STH 033 C WEST BEND - E/W WASHINGTON ST $1,000,000 - $1,999,999

INTERSECTION WITH RIVER RD

CONST/MISC

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2310-13-20 01/25/2022 303 R/E RSRF30 1.040 STH 060 MAIN ST, VILLAGE JACKSON $100,000 - $249,999

CTH P TO EAGLE DR

RE/RESURFACE

STATE 3R NON-FEDERAL

2023 2310-13-70 09/12/2023 303 LET RSRF20 1.650 STH 060 MAIN ST, VILLAGE JACKSON $3,000,000 - $3,999,999

CTH P TO EAGLE DR

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1330-33-70 09/12/2023 303 LET RSRF10 4.207 STH 083 CHENEQUA - HARTFORD, TOWN ERIN $2,000,000 - $2,999,999

WASHINGTON S CO LN TO STH 167

CONST/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 1330-22-70 09/10/2024 303 LET RSRF30 3.910 STH 083 STH 83 - HARTFORD TO CHENEQUA $2,000,000 - $2,999,999

Page 190: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 153Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 167 TO MONROE AVENUE

CONST / RESURFACING

STATE 3R SURFACE TRANS BLOCK-FLEXE

2023 4010-18-20 02/25/2023 303 R/E RSRF10 8.457 STH 144 WEST BEND - WALDO $0 - $99,999

SKYLINE DR TO NCL

RE/RESURFACE

STATE 3R NON-FEDERAL

2024 4010-18-70 11/12/2024 303 LET RSRF10 8.457 STH 144 WEST BEND - WALDO $3,000,000 - $3,999,999

SKYLINE DR TO NCL

CONST/RESURFACE

STATE 3R SURFACE TRANSP BLOCKGRTS-

2475-04-01 303 I/E RECST 0.030 STH 145 V GERMANTOWN-FOND DU LAC AVENUE $250,000 - $499,999

INTERSECTION WITH CTH G

PE/FULL PS&E ROW/RECST

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 2475-04-21 11/25/2023 303 R/E RECST 0.030 STH 145 V GERMANTOWN-FOND DU LAC AVENUE $0 - $99,999

INTERSECTION WITH CTH G

RE/RECST

SAFETY (REGULAR HSIP) NON-FEDERAL

2740-02-00 303 I/E RECST 0.011 STH 167 V GERMANTOWN, LANNON ROAD $100,000 - $249,999

INTERSECTION WITH MAPLE ROAD

PE/FULL PS&E/RECONSTRUCT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2300-06-20 05/25/2022 303 R/E MISC 2.105 STH 167 STH 167 $100,000 - $249,999

CTH K TO CTH CC

RE/RESURFACE

Page 191: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 154Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SAFETY (REGULAR HSIP) NON-FEDERAL

2022 2300-08-20 01/25/2022 303 R/E RSRF20 3.371 STH 167 HOLY HILL ROAD $0 - $99,999

STH 164 TO STH 175

RE/RESURFACE

STATE 3R NON-FEDERAL

2022 2300-08-70 05/10/2022 303 LET RSRF20 3.371 STH 167 V RICHFIELD, HOLY HILL RD $2,000,000 - $2,999,999

STH 164 TO STH 175

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 2300-06-70 04/09/2024 303 LET MISC 2.105 STH 167 WAUKESHA - SLINGER $1,000,000 - $1,999,999

CTH K TO CTH CC

CONST/RESURFACE

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 2740-02-70 03/12/2024 303 LET RECST 0.011 STH 167 V GERMANTOWN, LANNON ROAD $500,000 - $749,999

INTERSECTION WITH MAPLE ROAD

CONST/RECONSTRUCT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1000-09-86 05/10/2022 303 LET BRRHB 0.000 USH 045 USH 45 $100,000 - $249,999

IH 41/USH 45 BOX CULVERT

CONST/BRIDGE REHABILITATION

STATE 3R SURFACE TRANS BLOCK-FLEXE

2023 4070-00-70 09/12/2023 303 LET RSRF30 1.212 USH 045 FOND DU LAC AVENUE $2,000,000 - $2,999,999

WB CTH H TO WB STH 28

CONST / RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 4070-00-71 09/12/2023 303 LET RSRF30 1.198 USH 045 FOND DU LAC AVENUE $1,000,000 - $1,999,999

Page 192: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 155Southeast RegionWASHINGTON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

WB CTH H TO WB STH 28

CONST / RESURFACING

STATE 3R NON-FEDERAL

2022 3360-17-70 05/10/2022 303 LET MISC 0.002 VARHWY

STH 175 AND STH 167 $1,000,000 - $1,999,999

LOCATIONS ON STN PER PLAN

CONST/CULVERT REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEXE

2022 4766-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

WASHINGTON COUNTY PAVEMENTMARKING

$100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE

2023 2707-08-20 04/25/2023 303 R/E MISC 6.194 VARHWY

SOUTHEAST REGION, ADA CURB RAMPS $250,000 - $499,999

WEST BEND AREA VAR LOC PER PLAN

PER WISDOT ADA TRANS PLAN RAMPS

CURB RAMP STANDALONE NON-FEDERAL

Page 193: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 156Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3779-03-70 05/10/2022 206 LET MISC 0.009 CTH B CTH B $250,000 - $499,999

INTERSECTION WITH MORGAN ROAD

CONST/INTERSECTION MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 3782-04-70 04/11/2023 206 LET MISC 0.015 CTH D CTH D $500,000 - $749,999

INTERSECTION W/ MORAINE HILLS DRIVE

CONST/INTERSECTION MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2717-03-70 12/13/2022 205 LET BRRHB 0.000 CTH F C PEWAUKEE REDFORD BLVD $500,000 - $749,999

BRIDGE OVER GREEN ROAD, B-67-0095

CONST/BRIDGE REHABILITATION

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2023 2754-05-70 04/11/2023 206 LET MISC 0.029 CTH F C PEWAUKEE CTH F $750,000 - $999,999

INTERSECTION WITH LINDSAY ROAD

CONST/HSIP INTERSECT MODIFICATION

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 2722-04-01 03/25/2022 206 C/E PVRPLA 1.469 CTH O MOORLAND ROAD $750,000 - $999,999

CTH D TO STH 59

PE/FULL PS&E-RE-PVRPLA

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 2722-08-21 05/25/2022 206 R/E PVRPLA 1.326 CTH O MOORLAND ROAD $750,000 - $999,999

CTH ES TO CTH D

RE/PAVEMENT REPLACEMENT

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2022 2722-08-22 12/25/2022 206 R/E RECSTE 1.065 CTH O NEW BERLIN - BROOKFIELD $500,000 - $749,999

CTH HH TO GRANGE AVENUE

RE/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 194: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 157Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2722-04-21 01/25/2023 206 R/E PVRPLA 1.469 CTH O C NEW BERLIN MOORLAND ROAD $1,000,000 - $1,999,999

CTH D TO STH 59

RE/PAVEMENT REPLACEMENT

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2023 2722-07-72 02/14/2023 206 LET PVRPLA 1.358 CTH O C NEW BERLIN MOORLAND ROAD $11,000,000 - $11,999,999

W BELOIT ROAD TO W NATIONAL AVE

CONST/REPLACEMENT

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2722-08-71 12/10/2024 206 LET PVRPLA 1.326 CTH O C NEW BERLIN MOORLAND ROAD $6,000,000 - $6,999,999

CTH ES TO CTH D

CONST/PAVEMENT REPLACEMENT

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2722-08-72 12/10/2024 206 LET RECSTE 1.065 CTH O NEW BERLIN - BROOKFIELD $7,000,000 - $7,999,999

CTH HH TO GRANGE AVENUE

CONST/RECONSTRUCT NO ADD'L LANES

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 2717-04-70 01/09/2024 206 LET RSRF30 0.970 CTH T C WAUKESHA GRANDVIEW BLVD $2,000,000 - $2,999,999

NORTHVIEW ROAD TO IH-94

CONST/RESURFACE

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2023 2753-08-70 04/11/2023 206 LET MISC 0.009 CTH VV V MENOMONEE FALLS CTH VV $750,000 - $999,999

INTERSECTION WITH CTH YY

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1090-08-90 03/25/2022 303 MIS MISC 3.620 IH 043 IH 43 ROCK FREEWAY $0 - $99,999

MOORLAND RD TO HALE I/C

TRAFFIC MITIGATION FOR 1090-08-71

BACKBONE NON-FEDERAL

Page 195: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 158Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1090-09-76 09/10/2024 303 LET RSRF20 5.971 IH 043 IH 43 ROCK FREEWAY $20,000,000 - $24,999,999

STH 164 TO MOORLAND RD

CONST/RESURFACING

BACKBONE NATIONAL HIGHWAY PERFFAST

2025 1090-39-70 11/11/2025 303 LET RSRF30 7.080 IH 043 IH 43 ROCK FREEWAY $30,000,000 - $34,999,999

STH 83 TO STH 164

CONSTRUCTION/RSRF30

BACKBONE NATIONAL HIGHWAY PERFFAST

1060-13-06 303 I/E RSRF30 9.343 IH 094 IH 94 EAST WEST FREEWAY $4,000,000 - $4,999,999

STH 16 TO WAUKESHA E CO LN

PE/FULL PS&E RSRF30

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1060-10-22 05/25/2022 303 R/E MISC 0.307 IH 094 IH 94 EAST WEST FREEWAY $0 - $99,999

MOORLAND I/C

RE/RSRF 10

BACKBONE NON-FEDERAL

2022 1060-54-00 07/25/2022 303 C/E MISC 26.708 IH 094 EAST WEST FREEWAY $2,000,000 - $2,999,999

WILLOW GLEN ROAD TO ZOO IC

PE SAFETY AND OPERATIONS STUDIES

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1060-10-72 05/09/2023 303 LET RSRF10 0.307 IH 094 IH 94 EAST WEST FREEWAY $1,000,000 - $1,999,999

MOORLAND I/C

CONST/RSRF 10

BACKBONE NON-FEDERAL

2024 1060-47-70 09/10/2024 303 LET RSRF30 6.661 IH 094 IH 94 EAST WEST FREEWAY $25,000,000 - $29,999,999

Page 196: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 159Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 83 TO STH 16

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1060-47-90 09/25/2024 303 MIS MISC 6.661 IH 094 IH 94 EAST WEST FREEWAY $750,000 - $999,999

STH 83 TO STH 16

TRAFFIC MITIGATION 1060-47-70

BACKBONE NON-FEDERAL

2022 2370-04-70 05/10/2022 205 LET BRRPL 0.000 LOC STR DUPLAINVILLE ROAD $250,000 - $499,999

BRIDGE OVER SPRING CREEK B-67-0009

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES SURFACE TRANSBLOCK-FLEX E

2022 2720-05-01 07/25/2022 205 C/E BRRPL 0.000 LOC STR V MENOMONEE FALLS OVERVIEW DRIVE $100,000 - $249,999

BRIDGE OVER BUTLER DITCH, P-67-0774

PE/FULL PS&E-BRRPL

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE

2023 2722-09-70 05/09/2023 206 LET RECST 0.012 LOC STR C NEW BERLIN S CALHOUN ROAD $250,000 - $499,999

INTERSECTION WITH SMALL ROAD

CONST/RECONST

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2023 3853-03-70 11/14/2023 205 LET BRRPL 0.000 LOC STR V SUMMIT DELAFIELD ROAD $250,000 - $499,999

BRIDGE OVER BATTLE CREEK B-67-0670

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE

2024 2720-05-71 11/12/2024 205 LET BRRPL 0.000 LOC STR V MENOMONEE FALLS OVERVIEW DR $750,000 - $999,999

BRIDGE OVER BUTLER DITCH, P-67-0774

Page 197: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 160Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYS BRIDGEE

2022 1693-34-40 01/25/2022 211 TST MISC 0.000 NONHWY

WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999

FY 2022

TST/TRANSIT-MARKETING

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2023 1693-34-41 09/25/2023 211 TST MISC 0.000 NONHWY

WAUKESHA TRNST COMMISSION MARKETING $0 - $99,999

FY 2024

TST/TRANSIT-MARKETING

CONGESTION MITIGATION AND AIR QUALITY(CMAQ)

PROJ RDUCE PM 2.5 EMIFAST

2024 1330-47-71 09/10/2024 303 LET RSRF30 0.000 OFF SYS C DELAFIELD, STATE ROAD 83 $250,000 - $499,999

NAGAWAUKEE PARK AND RIDE LOT

CONST/RESURFACE

STATE 3R NON-FEDERAL

2022 1370-17-70 08/09/2022 303 LET MISC 7.373 STH 016 STH 16 $2,000,000 - $2,999,999

5800' WEST OF STH 83 TO STH 190

CONST/HSIP/GUARD RAILS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRGFAST

2024 3310-06-70 02/13/2024 303 LET RSRF10 1.588 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999

WCL TO STH 67

CONST/RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 2450-00-73 05/09/2023 303 LET RSRF10 0.515 STH 059 T GENESEE, GENESEE RD $1,000,000 - $1,999,999

Page 198: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 161Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SAYLESVILLE CREEK TO ROCKWOOD TRAIL

CONST/RSRF10

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 2773-10-70 02/14/2023 303 LET PSRS30 1.990 STH 059 EAST WAUKESHA BYPASS $6,000,000 - $6,999,999

SUNSET DRIVE TO ARCADIAN AVENUE

CONST/PATCH/REPAIR/GRIND/INTERSCT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 2773-10-72 02/14/2023 303 LET MISC 0.005 STH 059 C WAUKESHA, LES PAUL PARKWAY $250,000 - $499,999

STH 59 AND CTH XX INTERSECTION

CONST/INTERSECTION IMPROVEMENTS

STATE 3R NON-FEDERAL

2023 3110-08-20 04/25/2023 303 R/E MISC 16.524 STH 059 WHITEWATER - MILWAUKEE $0 - $99,999

W COUNTY LINE TO CTH X

RE/RESURFACE

STATE 3R NON-FEDERAL

2022 3120-01-61 03/08/2022 303 LET PSRS40 9.610 STH 067 DOUSMAN - EAGLE $3,000,000 - $3,999,999

1000' N STH 59 TO 200' S USH 18

CONST/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 3100-00-25 01/25/2023 303 R/E RSRF30 7.837 STH 067 ELKHORN TO EAGLE $0 - $99,999

USH 12 TO STH 59

RE/RESURFACE

STATE 3R NON-FEDERAL

2025 3100-00-75 09/09/2025 303 LET PSRS40 7.837 STH 067 ELKHORN TO EAGLE $3,000,000 - $3,999,999

USH 12 TO STH 59

CONST/PSRS40 RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 1300-09-71 12/13/2022 303 LET PSRS40 0.639 STH 083 NORTHWEST HIGHWAY (STH 83) $750,000 - $999,999

Page 199: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 162Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

W BOXHORN DR TO WOLF RUN

CONST/PSRS40

STATE 3R NON-FEDERAL

2022 1330-00-23 06/25/2022 303 R/E MISC 3.229 STH 083 DELAFIELD - HARTLAND $0 - $99,999

GOLF RD TO VETTELSON RD

RE/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

2023 1330-29-70 09/12/2023 303 LET RSRF10 2.742 STH 083 STH 83 (MILL ST) $1,000,000 - $1,999,999

OCONOMOWOC RVR TO N WAUKESHA COLN

CONST/RESURFACE (B-67-0952)

STATE 3R SURFACE TRANS BLOCK-FLEX E

2024 1330-00-73 05/14/2024 303 LET PVRPLA 3.229 STH 083 DELAFIELD - HARTLAND $9,000,000 - $9,999,999

GOLF RD TO VETTELSON RD

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2810-08-20 08/25/2022 303 R/E PVRPLA 2.310 STH 164 WATERFORD - WAUKESHA $0 - $99,999

HENNEBERRY AVE TO DENOON RD

RE/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

2023 2370-00-25 04/25/2023 303 R/E RSRF30 8.027 STH 164 WAUKESHA - SLINGER $0 - $99,999

SWAN ROAD TO NORTH COUNTY LINE

RE/RSRF30

STATE 3R NON-FEDERAL

2024 2810-08-70 09/10/2024 303 LET PVRPLA 2.310 STH 164 WATERFORD - WAUKESHA $4,000,000 - $4,999,999

HENNEBERRY AVE TO DENOON RD

CONST/PAVEMENT REPLACEMENT

Page 200: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 163Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 2025-03-23 01/25/2022 303 R/E RSRF30 4.054 STH 190 CAPITOL DR, CITY OF BROOKFIELD $250,000 - $499,999

BROOKFIELD RD TO 124TH ST

RE/RESURFACE

STATE 3R NON-FEDERAL

2025 2025-03-73 09/09/2025 303 LET RSRF30 4.054 STH 190 C BROOKFIELD, CAPITOL DR $11,000,000 - $11,999,999

BROOKFIELD RD TO 124TH ST

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 2025-07-73 09/09/2025 303 LET RSRF30 2.070 STH 190 PEWAUKEE - SHOREWOOD $11,000,000 - $11,999,999

STH 16 TO .3 MI E OF 5 FIELDS RD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 2788-03-70 09/10/2024 303 LET RSRF30 0.273 STH 318 C WAUKESHA MEADOWBROOK ROAD $250,000 - $499,999

ROLLING RIDGE DR TO IH 94 EB RAMPS

CONST/RSRF30

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 3080-04-70 05/10/2022 303 LET RSRF30 3.965 USH 018 SUNSET DRIVE $2,000,000 - $2,999,999

STH 67 TO MORAINE VIEW DR

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 2210-12-70 05/09/2023 303 LET RSRF30 5.120 USH 018 SUMMIT AVE, TOWN DELAFIELD $5,000,000 - $5,999,999

STH 83 TO STH 318

CONST/RESURFACE

Page 201: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 164Southeast Region

WAUKESHA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 2200-20-70 09/10/2024 303 LET RSRF30 5.264 USH 018 C BROOKFIELD, BLUEMOUND RD $13,000,000 - $13,999,999

IH 94 TO EAST COUNTY LINE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4767-98-22 02/25/2022 305 MIS TOPM 0.000 VARHWY

WAUKESHA COUNTY PAVEMENT MARKING $100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS/PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E

2023 2715-03-73 05/09/2023 303 LET BRRPL 0.000 VARHWY

VARIOUS BRIDGE LOCATIONS $7,000,000 - $7,999,999

STH 59 & USH 18

CONST/BRIDGE REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEX E

Page 202: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Northeast Region Projects

Page 203: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 165Northeast Region

BROWN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 4555-03-71 01/10/2023 206 LET MISC 3.090 CTH MM T LEDGEVIEW, CTH MM $250,000 - $499,999

CTH G - I43

CONST OPS/HRRRP

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2023 4987-02-78 02/14/2023 205 LET BRRPL 0.033 LOC STR C GREEN BAY, CHANTEL STREET $500,000 - $749,999

BEAVER DAM CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2024 4516-10-71 01/09/2024 206 LET RECST 0.917 LOC STR V BELLEVUE, ALLOUEZ AVENUE $2,000,000 - $2,999,999

HAZEN ROAD - USH 141

CNST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 4517-06-71 01/09/2024 206 LET RECST 1.033 LOC STR V ALLOUEZ, LIBAL STREET $4,000,000 - $4,999,999

STH 172 TO KALB AVE

CNST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 4985-00-62 12/10/2024 206 LET RECST 0.479 LOC STR C DEPERE, LAWRENCE DRIVE $3,000,000 - $3,999,999

FORTUNE AVENUE TO SCHEURING ROAD

CONST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2024 4987-12-71 02/13/2024 205 LET BRRPL 0.010 LOC STR C GREEN BAY, LARSEN ROAD $750,000 - $999,999

BEAVER DAM CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2025 4987-02-75 01/14/2025 206 LET RECST 0.910 LOC STR C GREEN BAY, COUNTRY CLUB ROAD $5,000,000 - $5,999,999

MASON ST FRONTAGE RD TO INDIAN HILL

CONST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 204: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 166Northeast Region

BROWN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

4180-06-00 303 I/E RSRF30 0.950 STH 029 SHAWANO AVE, C GREEN BAY $100,000 - $249,999

HUDSON ST - N OAKLAND AVE

DSGN/FULL PSE/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

4180-08-00 303 I/E BRRHB 0.193 STH 029 WALNUT STREET, CITY OF GREEN BAY $100,000 - $249,999

FOX RIVER BRIDGE

DSGN/FULL PSE/BRRHB B-05-0269

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2022 9200-10-73 11/08/2022 303 LET MISC 8.370 STH 029 SHAWANO - GREEN BAY $1,000,000 - $1,999,999

STH 156 - IH 41

CONSTR OPS/MISC FENCING

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 4085-62-71 11/08/2022 303 LET BRRPL 0.000 STH 032 CITY OF DE PERE, GREENLEAF ROAD $1,000,000 - $1,999,999

STH 32 NORTHBOUND OVER CTH PP

CONST/BRIDGE REPLACE B-05-0052

SHR BRIDGES NATIONAL HWY PERF PROGRAM

2022 9210-19-71 11/08/2022 303 LET BRRHB 0.032 STH 032 W MASON ST, CITY OF GREEN BAY $100,000 - $249,999

BEAVER DAM CREEK BRIDGE

CONST/BRRPL BOX CULVERT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

9210-20-00 303 I/E BRRHB 0.240 STH 054 ONEIDA - GREEN BAY $0 - $99,999

DUCK CREEK BRIDGE B-05-0392

DESIGN/FULL PSE/BRRHB

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

9210-21-00 303 I/E RSRF30 2.610 STH 054 SEYMOUR - GREEN BAY $0 - $99,999

STH 172 - PLEASANT LN

DSN/FULL PSE/RSRF30

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 205: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 167Northeast Region

BROWN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1480-27-71 11/08/2022 303 LET RSRF20 4.800 STH 054 GREEN BAY-LUXEMBURG $5,000,000 - $5,999,999

UNIVERSITY WAY-STH57

CONST OPS/RESURFACE ASPHALT PAVE

STATE 3R NATIONAL HIGHWAY PERFFAST

1481-08-00 303 I/E RSRF20 0.580 STH 057 MONROE STREET, CITY OF GREEN BAY $100,000 - $249,999

SOUTH CITY LIMITS - CASS STREET

DSN/FULL PSE/RESURFACE URBAN

STATE 3R NAT'L HWY SYSTEM

2025 4085-68-71 11/11/2025 303 LET RSRF20 2.875 STH 057 C. OF DE PERE-V. OF ALLOUEZ $2,000,000 - $2,999,999

RANDALL AVE-GRIGNON ST

CONST/RESURF

STATE 3R NATIONAL HIGHWAY PERFFAST

4075-42-00 303 I/E RSRF30 3.190 STH 096 WRIGHTSTOWN - GREENLEAF $100,000 - $249,999

SHANTY RD - BRECKENRIDGE FALLS BLVD

DSGN/FULL PSE/RSRF

STATE 3R STBG <5K POP FAST

2022 1210-09-71 12/13/2022 303 LET RSRF20 6.560 STH 172 IH 41-IH 43 $15,000,000 - $16,999,999

IH 41-IH 43

CONST/RESURF MILL/OVERLAY

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1210-11-71 12/13/2022 303 LET RSRF20 2.820 STH 172 ONEIDA-GREEN BAY $5,000,000 - $5,999,999

AIRPORT ENTRANCE-IH 41

CONST OPS/RESURF

STATE 3R NATIONAL HIGHWAY PERFPLAN

2023 1210-17-71 11/14/2023 303 LET RSRF30 2.640 STH 172 ONEIDA - GREEN BAY $2,000,000 - $2,999,999

Page 206: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 168Northeast Region

BROWN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STH 54 - AIRPORT ENTRANCE

CONST OPS/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1210-18-71 11/14/2023 303 LET BRRPL 0.017 STH 172 ONEIDA - GREEN BAY $750,000 - $999,999

UNNAMED CREEK, C-05-0122

CONST OPS/BRRPL

STATE 3R NATIONAL HIGHWAY PERFFAST

4161-03-00 303 I/E RSRF30 0.507 STH X04 ASHLAND AVE, C GREEN BAY $0 - $99,999

IH 41 - N. EIGHT ST

DSN/FULL PSE/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

1450-15-00 303 I/E RSRF25 1.241 USH 141 MAIN STREET, CITY OF GREEN BAY $250,000 - $499,999

BAIRD STREET - FOX RIVER

DSN/FULL PSE/RESURFACE URBAN

STATE 3R MINIMUM GUARANTEE

2022 1450-18-21 03/25/2022 303 R/E RSRF30 2.645 USH 141 LEDGEVIEW - BELLEVUE $0 - $99,999

CTH MM - CONTINENTAL DR

RE ACQUISTION/RW

STATE 3R NON-FEDERAL

2023 1450-18-40 11/25/2023 303 UTL RSRF30 2.645 USH 141 LEDGEVIEW - BELLEVUE $0 - $99,999

CTH MM - CONTINENTAL DR

UTL RELOCATION

STATE 3R NON-FEDERAL

2022 4705-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

BROWN COUNTY PAVEMENT MARKING2022

$0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

Page 207: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 169Northeast Region

BROWN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 208: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 170Northeast Region

CALUMET

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 4474-03-71 01/10/2023 205 LET BRRPL 0.010 LOC STR T BRILLION, NORTH COUNTY LINE ROAD $500,000 - $749,999

EAST RIVER BRIDGE

CNST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 4984-01-81 12/25/2023 290 LLC MISC 2.890 NON HWY APPLETON WEENERGIES TRAIL PHASE 1 $1,000,000 - $1,999,999

C APPLETON

CONST/MISC BIKE/PED TRAIL

TAP > 200,000 TRANS ALTERNATIVES >200K F

2022 4085-67-21 01/25/2022 303 R/E RSRF20 4.671 STH 032 NEW HOLSTEIN-CHILTON $0 - $99,999

ALTONA AVENUE-USH 151

RE/RW RE ACQUISITION

STATE 3R NON-FEDERAL

2022 4085-67-40 12/25/2022 303 UTL RSRF20 4.671 STH 032 NEW HOLSTEIN-CHILTON $0 - $99,999

ALTONA AVENUE-USH 151

UTL RELOCATION

STATE 3R NON-FEDERAL

2023 4085-60-71 07/11/2023 303 LET RSRF10 2.439 STH 032 KIEL-NEW HOLSTEIN $1,000,000 - $1,999,999

CTH AA-JORDAN AVENUE

CONST/RSRF10/R/W-NO

STATE 3R NATIONAL HWY PERF PROGRAM

2023 4085-66-21 05/25/2023 303 R/E RSRF30 7.120 STH 032 CHILTON - HILBERT $100,000 - $249,999

BREED ST - STH 114

RE/RW OPS

STATE 3R NON-FEDERAL

2023 4085-67-71 11/14/2023 303 LET RSRF20 5.281 STH 032 NEW HOLSTEIN-CHILTON $2,000,000 - $2,999,999

ALTONA AVENUE-USH 151

CONST/RESURF

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 209: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 171Northeast Region

CALUMET

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

4050-22-00 303 I/E RSRF20 11.670 STH 055 FOND DU LAC-SHERWOOD $250,000 - $499,999

USH 151-STH 114

DSGN/FULL PSE/RESURFACE

STATE 3R NON-FEDERAL

2022 4050-27-21 08/25/2022 303 R/E BRRPL 11.440 STH 055 FOND DU LAC - SHERWOOD $0 - $99,999

USH 151 - STH 114

RE ACQUISITION/ROW /BRRPL

SHR BRIDGES NON-FEDERAL

2023 4050-15-71 07/11/2023 303 LET RSRF20 1.640 STH 055 SHERWOOD-KAUKAUNA $750,000 - $999,999

STH 114-USH 10

CONST/RESURFACE LEVEL IMPROVEMENT

STATE 3R STP ANY AREA

2024 4050-27-71 11/12/2024 303 LET BRRPL 11.440 STH 055 FOND DU LAC - SHERWOOD $3,000,000 - $3,999,999

USH 151 - STH 114

CONST OPS/CULVERT REPLACEMENTS

SHR BRIDGES SURFACE TRANS BLOCK-FLEX E

2025 4050-21-71 11/11/2025 303 LET RSRF20 2.850 STH 055 SHERWOOD-KAUKAUNA $1,000,000 - $1,999,999

USH 10-RIDGECREST LANE

CONST/MILL & OVERLAY RW-NO

STATE 3R SURFACE TRANS FLEX - MAP-2

1500-50-00 303 I/E RSRF20 8.390 USH 010 APPLETON-BRILLION $100,000 - $249,999

CTH N-STH 32/57

DSN/FULL PSE/RESURF MILL/OVERLAY

STATE 3R NATIONAL HIGHWAY PERFPLAN

1500-69-00 303 I/E RSRF20 11.940 USH 010 APPLETON-BRILLION $100,000 - $249,999

STH 32/57-CTH HR

DESIGN/RESURF

Page 210: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 172Northeast Region

CALUMET

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERF FAST

1500-76-00 303 I/E RECST 0.086 USH 010 APPLETON - FOREST JUNCTION $100,000 - $249,999

N MARX RD/CTH D INTERSECTION

DSN/FULL PSE/RECST

STATE 3R NATIONAL HIGHWAY PERF FAST

4100-25-00 303 I/E RSRF20 0.360 USH 151 W. MAIN STREET, CITY OF CHILTON $0 - $99,999

HEIMANN STREE - STH 32/57

DSN/FULL PSE/RESURFACE URBAN

STATE 3R MINIMUM GUARANTEE

4100-36-00 303 I/E RSRF20 11.480 USH 151 FOND DU LAC-CHILTON $100,000 - $249,999

SCL-QUINNEY ROAD

DESIGN/FULL PSE/RESURF

STATE 3R NON-FEDERAL

2023 4050-28-40 12/25/2023 303 UTL BRRPL 0.038 USH 151 FOND DU LAC - STOCKBRIDGE $0 - $99,999

SCL - STH 55

UTL RELOCATION

STATE 3R NON-FEDERAL

2024 4050-28-71 11/12/2024 303 LET BRRPL 0.028 USH 151 FOND DU LAC - STOCKBRIDGE $500,000 - $749,999

SCL - STH 55

CONST OPS/C08-0065 UNNAMED CREEK

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 4685-33-71 11/08/2022 303 LET BRPVTV 0.000 VARHWY

MENASHA - APPLETON $1,000,000 - $1,999,999

VARIOUS HWY

CONSTR OPS/BRPVTV

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 4708-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

CALUMET COUNTY PAVEMENT MARKING $0 - $99,999

Page 211: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 173Northeast Region

CALUMET

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMASCY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 212: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 174Northeast Region

DOOR

2022-2025 FINAL STIP Project Listing 174Northeast Region

DOOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

4140-32-00 303 I/E RSRF20 6.660 STH 042 EGG HARBOR-FISH CREEK $100,000 - $249,999

RAINBOW RIDGE-GIBRALTAR BLUFF

DESIGN/FULL PSE/RESURF

STATE 3R NATIONAL HIGHWAY PERF FAST

4610-09-00 303 I/E RSRF20 12.020 STH 042 SISTER BAY-GILLS ROCK $100,000 - $249,999

SCANDIA ROAD-FERRY LANDING

DSGN/FULL PSE/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX - MAP-2

2022 4140-34-60 12/13/2022 303 LET PSRS40 7.042 STH 042 EGG HARBOR-FISH CREEK $2,000,000 - $2,999,999

RAINBOW RIDGE RD-BLUFF LN

CONST/PSRS

STATE 3R NON-FEDERAL

2022 4423-00-01 07/25/2022 290 LLC MISC 1.280 STH 042 WALK, BIKE & EGGSPLORE EGG HARBOR $1,000,000 - $1,999,999

V EGG HARBOR

CONST/MISC PED/BIKE TRAIL

TAP < 5,000 TRANS ALTERN 5K AND UNDER

2022 4430-21-71 11/08/2022 303 LET RSRF20 0.769 STH 042 STURGEON BAY - EGG HARBOR $1,000,000 - $1,999,999

EGG HARBOR ROAD - MID JCT 42/57

CONST/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

4150-20-00 303 I/E RSRF20 14.340 STH 057 MID JUNCTION - JACKSON PORT $100,000 - $249,999

STH 42 - SUMMIT ROAD

DESIGN/FULL PSE/RESURFACE

STATE 3R STP ANY AREAS

2023 4150-26-71 08/08/2023 303 LET BRRPL 0.305 STH 057 MID JUNCTION - BAILEYS HARBOR $3,000,000 - $3,999,999

STH 42 - SUMMIT ROAD

CONST/BOX CULVERT REPLACEMENT

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 213: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 175Northeast RegionFOND DU LAC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 4986-12-50 10/25/2022 205 R/R BRRPL 0.000 CTH KW C FOND DU LAC, WEST DIVISION STREET $0 - $99,999

CN RR SIGNAL 690112B MP 156.21

R/R OPS- SIGNAL ADJUSTMENTS

LOCAL BRIDGES NON-FEDERAL

2024 6296-02-71 02/13/2024 205 LET BRRPL 0.181 CTH M T ROSENDALE, CTH M $250,000 - $499,999

FOND DU LAC RIVER BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4840-00-71 12/10/2024 205 LET BRRPL 0.178 CTH T T EMPIRE, CTH T $250,000 - $499,999

TAYCHEEDAH CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4840-01-71 12/10/2024 205 LET BRRPL 0.078 CTH T T EMPIRE, CTH T $500,000 - $749,999

TAYCHEEDAH CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4831-05-71 01/09/2024 206 LET RECST 0.530 CTH VV C FOND DU LAC, CTH VV $2,000,000 - $2,999,999

CTH V TO MARTIN AVENUE

CONST OPS/RECST

STP URBAN 50,000 - 200,000 STBG-URBANIZED >200K FAST

2022 1100-50-71 05/10/2022 303 LET RSRF10 7.230 IH 041 MILWAUKEE-FOND DU LAC $11,000,000 - $11,999,999

SCL-USH 151

CONST OPS/RESURF

BACKBONE NATIONAL HIGHWAY PERFPLAN

2023 1150-74-71 01/10/2023 303 LET BRRHB 0.002 IH 041 FOND DU LAC - OSHKOSH $1,000,000 - $1,999,999

Page 214: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 176Northeast RegionFOND DU LAC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TOWN LINE ROAD OVERPASS

CONST/BRRHB B-20-0060 R/W - NO

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 4986-12-71 03/14/2023 205 LET BRRPL 0.000 LOC STR C FOND DU LAC, WEST DIVISON STREET $2,000,000 - $2,999,999

WEST BRANCH FOND DU LAC RIVER BRIDG

CONST OPS/BRRPL

LOCAL BRIDGES NON-FEDERAL

2024 3822-02-71 12/10/2024 205 LET BRRPL 0.057 LOC STR T LAMARTINE, TOWNLINE ROAD $1,000,000 - $1,999,999

W BRANCH FOND DU LAC RIVER BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4816-00-71 12/10/2024 205 LET BRRPL 0.241 LOC STR T FOREST, POPULAR ROAD $250,000 - $499,999

SHEBOYGAN RIVER BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4986-00-57 12/10/2024 205 LET BRRPL 0.163 LOC STR C FOND DU LAC, PROMEN DRIVE $1,000,000 - $1,999,999

LAKESIDE PARK LAGOON

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4986-00-59 02/13/2024 205 LET BRRPL 0.087 LOC STR V NORTH FOND DU LAC,MCKINLEY STREET $250,000 - $499,999

MOSHER CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2022 3700-30-42 07/25/2022 305 MIS TOSIG 1.920 STH 023 C RIPON, W FOND DU LAC ST $100,000 - $249,999

WESTGATE DR-METOMEN ST REHAB/RTRFIT

Page 215: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 177Northeast RegionFOND DU LAC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TRF DSN/OPS TOSIG/ NE2301L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

1110-16-00 303 I/E RSRF10 16.250 STH 026 WAUPUN - NCL $250,000 - $499,999

CATTARAUGUS RD - CTH FF

DSN/FULL PSE/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1110-15-71 02/14/2023 303 LET BRRPL 0.000 STH 026 ROSENDALE-OSHKOSH $1,000,000 - $1,999,999

STH 23 - CTH FF

CONST/BRIDGE REPLACE B-20-0651

SHR BRIDGES NATIONAL HWY PERFPROGRAM

2023 6100-08-60 07/11/2023 303 LET PSRS40 3.588 STH 044 FAIRWATER-BRANDON $1,000,000 - $1,999,999

WCL-STH 49

CONST OPS/PSRS

STATE 3R NON-FEDERAL

2025 6090-14-50 04/25/2025 303 R/R RSRF10 0.050 STH 049 BRANDON-RIPON $250,000 - $499,999

WSOR XING SIGNALS 387487G

RR CROSSING SIGNALS

STATE 3R STBG <5K POP FAST

4080-07-00 303 I/E RSRF20 14.055 USH 045 KEWASKUM-EDEN $250,000 - $499,999

SCL-WINTER ROAD

DSGN/FULL PSE/RESURFACE

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 4080-06-71 09/13/2022 303 LET BRRPL 0.000 USH 045 KEWASKUM-EDEN $1,000,000 - $1,999,999

MILWAUKEE RIVER BRIDGE

CONST/BRIDGE REPLACEMENT B-20-0154

Page 216: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 178Northeast RegionFOND DU LAC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 4110-28-71 04/09/2024 303 LET RSRF20 7.420 USH 045 FOND DU LAC-OSHKOSH $4,000,000 - $4,999,999

SCOTT STREET-NCL

CONST OPS/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

4050-29-00 303 I/E RSRF10 5.930 USH 151 FOND DU LAC - CHILTON $100,000 - $249,999

CTH K - NCL

DSGN/FULL PSE/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 4050-23-71 04/12/2022 303 LET BRRPL 0.015 USH 151 FOND DU LAC-CHILTON $750,000 - $999,999

DRAINAGE WAY CULVERT REPLACEMENT

CONST/BRRPL

SHR BRIDGES HWY INFRA COVID SUPP

2022 4720-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

FOND DU LAC COUNTY PAVEMENTMARKING

$0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 217: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 179Northeast Region

KEWAUNEE

2022-2025 FINAL STIP Project Listing 179Northeast Region

KEWAUNEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4390-07-71 01/09/2024 206 LET RCND10 3.329 CTH C KEWAUNEE - RYANS CORNER $2,000,000 - $2,999,999

STH 29 TO CTH L

CONST OPS/RCND10

STP RURAL STBG <5K POP FAST

4125-10-00 303 I/E RSRF20 13.390 STH 029 GREEN BAY-KEWAUNEE $100,000 - $249,999

WCL-STH 42

DSGN/FULL PSE/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX MAP-21

2023 4130-11-71 03/14/2023 303 LET RSRF20 12.780 STH 054 LUXEMBURG - ALGOMA $7,000,000 - $7,999,999

VALLEY ROAD - SUNSET AVENUE

CONST/RSRF RURAL/HSIP-RUMBLE STRIPS

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4731-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

KEWAUNEE COUNTY PAVEMENTMARKING

$0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 218: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 180Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 4323-08-72 01/10/2023 206 LET PVRPLA 3.580 CTH W MAPLE GROVE - NORTH COUNTY LINE $3,000,000 - $3,999,999

TAUS ROAD TO MANCAL ROAD

CONST OPS/PVRPLA

STP RURAL STBG <5K POP FAST

2022 4305-03-71 05/10/2022 205 LET BRRPL 0.039 LOCSTR

T TWO RIVERS, EAST HILLCREST ROAD $1,000,000 - $1,999,999

EAST TWIN RIVER BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

2022 4310-01-71 03/08/2022 205 LET BRRPL 0.099 LOCSTR

T MANITOWOC RAPIDS, N UNION ROAD $750,000 - $999,999

BRANCH RIVER ROAD BRIDGE

CONST OPS/BRRPL B360240

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEXE

2025 4312-09-71 01/14/2025 205 LET BRRPL 0.126 LOCSTR

T GIBSON, ROCKLEDGE ROAD $750,000 - $999,999

EAST TWIN RIVER BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCKGRTS-

4085-71-00 303 I/E PVRPLA 1.444 STH 032 WATER-FREEMONT-CALUMET STS, C KIEL $500,000 - $749,999

STH 67 - CTH AA

DSGN/FULL PSE/ BRRPL/PVRPLA

STATE 3R NATIONAL HIGHWAY PERFFAST

4570-25-00 303 I/E RSRF20 14.630 STH 042 HOWARDS GROVE - MANITOWOC $100,000 - $249,999

SCL - USH 10

DSGN/FULL PSE/RSRF

Page 219: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 181Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R SURFACE TRANSP BLOCKGRTS-

2022 1470-27-21 08/25/2022 303 R/E RSRF20 3.950 STH 042 MANITOWOC-TWO RIVERS $0 - $99,999

E MAGNOLIA AVE-12TH STREET

RE ACQUISTION/ROW /RESURF

STATE 3R NON-FEDERAL

2022 1470-30-71 12/13/2022 303 LET COLD10 11.213 STH 042 TWO RIVERS-KEWAUNEE $8,000,000 - $8,999,999

34TH STREET-NCL

CONST OPS/COLD10/HSIP

STATE 3R STBG 5-200K POP FAST EXT

2022 3700-30-44 12/25/2022 305 MIS TOSIG 0.015 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999

STH 147 INTERSECTION SIGNAL REHAB

TRF DSN/TOSIG NE2306L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 3700-30-48 09/25/2023 305 MIS TOSIG 0.015 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999

STH 147 INTERSECTION SIGNAL REHAB

TRF OPS/TOSIG NE2306L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 3700-30-49 12/25/2023 305 MIS TOSIG 0.176 STH 042 C TWO RIVERS, WASHINGTON ST $0 - $99,999

16TH ST - 18TH ST SIGNAL REHAB

TRF DSN/TOSIG NE2402L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 1470-27-71 11/12/2024 303 LET RSRF20 3.950 STH 042 MANITOWOC-TWO RIVERS $4,000,000 - $4,999,999

E MAGNOLIA AVE-12TH STREET

CONST/RESURF-MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX - MAP-2

Page 220: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 182Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1470-33-71 11/12/2024 303 LET BRRHB 0.100 STH 042 CITY OF TWO RIVERS, WASHINGTON ST $500,000 - $749,999

WEST TWIN RIVER BRIDGE B360117

CONST/DECK OVERLAY/BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2024 1470-37-71 11/12/2024 303 LET RSRF20 0.460 STH 042 MANITOWOC - TWO RIVERS $500,000 - $749,999

WALDO BLVD - E MAGNOLIA AVE

CONSTR RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2024 3700-30-51 09/25/2024 305 MIS TOSIG 0.176 STH 042 C TWO RIVERS, WASHINGTON ST $100,000 - $249,999

16TH ST - 18TH ST SIGNAL REHAB

TRF OPS/TOSIG NE2402L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 4337-23-50 04/25/2024 303 R/R RSRF30 0.039 STH 310 IH 43-TWO RIVERS $100,000 - $249,999

XING SURFACE WCL RR 181417U

RR CROSSING

STATE 3R STBG <5K POP FAST

2025 4337-23-71 11/11/2025 303 LET RSRF30 5.929 STH 310 IH 43-TWO RIVERS $3,000,000 - $3,999,999

CTH R-COLUMBUS STREET

CONST OPS/RESURF

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1500-71-71 11/08/2022 303 LET BRRPL 0.013 USH010

BRILLION-REEDSVILLE $500,000 - $749,999

UNNAMED CREEK BOX CULVERT C360058

CONST OPS/BRRPL

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 221: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 183Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1500-68-21 08/25/2023 303 R/E RSRF30 5.044 USH010

BRILLION-REEDSVILLE $0 - $99,999

BRILLION ECPL-CTH W

REAL ESTATE/RIGHT OF WAY

STATE 3R NON-FEDERAL

2023 1500-75-21 08/25/2023 303 R/E RSRF10 1.100 USH010

MAIN STREET, V. OF REEDSVILLE $0 - $99,999

CTH W - PLEASANT VIEW RD

REAL ESTATE/RIGHT OF WAY

STATE 3R NON-FEDERAL

2024 1500-68-40 12/25/2024 303 UTL RSRF30 5.044 USH010

BRILLION-REEDSVILLE $0 - $99,999

BRILLION ECPL-CTH W

UTL RELOCATION

STATE 3R NON-FEDERAL

2025 1500-56-71 11/11/2025 303 LET RSRF20 1.490 USH010

BRILLION-MANITOWOC $2,000,000 - $2,999,999

CTH P-CTH R

CONST/RESURF

STATE 3R NATIONAL HWY PERFPROGRAM

2025 1500-68-71 11/11/2025 303 LET RSRF30 5.044 USH010

BRILLION-REEDSVILLE $3,000,000 - $3,999,999

BRILLION ECPL-CTH W

CONST/RESURFACE

STATE 3R NATIONAL HWY PERFPROGRAM

2025 1500-75-71 11/11/2025 303 LET RSRF10 1.131 USH010

MAIN STREET, V. OF REEDSVILLE $750,000 - $999,999

CTH W - PLEASANT VIEW RD

Page 222: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 184Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

4100-32-00 303 I/E RSRF20 13.220 USH151

CHILTON-VALDERS $100,000 - $249,999

IRISH ROAD-CHRISTEL DRIVE

DSGN/RESURF

STATE 3R SURFACE TRANS FLEX - MAP-2

4100-39-00 303 I/E RSRF10 0.520 USH151

USH 151, VILLAGE OF VALDERS $100,000 - $249,999

ROOSEVELT STREET - JACKSON STREET

DSGN/FULL PSE/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

4100-41-00 303 I/E BRRHB 0.000 USH151

VALDERS - MANITOWOC $100,000 - $249,999

SILVER CREEK, B-36-0026

DSN/FULL PSE/BRRHB DECK REPLACMENT

SHR BRIDGES STBG 5-200K POP FAST EXT

4100-42-00 303 I/E PVRPLA 3.110 USH151

CALUMET/WASHINGTON, C MANITOWOC $500,000 - $749,999

IH43 - S 8TH STREET

DSN/FULL PSE/PVRPLA

STATE 3R NATIONAL HIGHWAY PERFFAST

4100-42-01 303 I/E PVRPLA 1.780 USH151

CALUMET/WASHINGTON AVE, C MANITOWOC $500,000 - $749,999

35TH STREET - 8TH STREET

DSN/FULL PSE/PVRPLA

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 223: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 185Northeast RegionMANITOWOC

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 3700-30-40 07/25/2022 305 MIS TOSIG 0.026 USH151

C MANITOWOC, WASHINGTON ST $0 - $99,999

21ST ST INTERSECTION SIGNAL REHAB

TRF DSN/TOSIG NE2302L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 3700-30-45 08/25/2023 305 MIS TOSIG 0.026 USH151

C MANITOWOC, WASHINGTON ST $250,000 - $499,999

21ST ST INTERSECTION SIGNAL REHAB

TRF OPS/TOSIG NE2302L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

Page 224: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 186Northeast Region

MARINETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

9160-18-00 303 I/E RSRF20 7.770 STH 064 BRAZEAU-POUND $100,000 - $249,999

CTH S-USH 141

DESGN/FULL PSE/RESURF

STATE 3R SURFACE TRANS FLEX MAP-21

2022 9160-21-21 11/25/2022 303 R/E PSRS40 0.680 STH 064 MOUNTAIN - POUND $0 - $99,999

N 17TH RD - USH 141

RE ACQUISITION/RW

STATE 3R NON-FEDERAL

2023 9160-17-71 02/08/2023 303 LET RSRF10 10.760 STH 064 POUND-MARINETTE $4,000,000 - $4,999,999

USH 141-CTH E

CONST/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 9160-19-71 11/14/2023 303 LET RSRF10 7.040 STH 064 POUND-MARINETTE $3,000,000 - $3,999,999

CTH E-STH 180

CONST OPS/RSRF/HSIP RUMBLE STRIPS

STATE 3R SURFACE TRANS FLEX MAP-21

2024 9160-21-40 06/25/2024 303 UTL PSRS40 0.680 STH 064 MOUNTAIN - POUND $0 - $99,999

N 17TH RD - USH 141

UTL RELOCATION

STATE 3R NON-FEDERAL

9670-17-00 303 I/E RSRF10 15.910 STH 180 MARINETTE - WAUSAUKEE $750,000 - $999,999

CTH X - USH 141

DSGN/RSRF10

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 9560-06-71 07/08/2025 303 LET RSRF10 2.120 USH 008 PEMBINE - MICHIGAN STATE LINE $4,000,000 - $4,999,999

S JCT USH 141-N JCT USH 141

CONST/RSRF/HSIP RUMBLE STRIPS

Page 225: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 187Northeast Region

MARINETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R STBG <5K POP - FAST EXT

2025 9560-06-72 07/08/2025 303 LET RSRF30 2.090 USH 008 PEMBINE - MICHIGAN STATE LINE $1,000,000 - $1,999,999

N JCT USH 141-MENOMINEE RIVER

CONST/RSRF HSIP

STATE 3R STBG <5K POP - FAST EXT

2023 1150-64-50 01/25/2023 303 R/R RSRF20 0.000 USH 041 PESHTIGO-MARINETTE $100,000 - $249,999

CTH T, CNRR XING 181588V SIGNAL

RR SIGNAL INTERCONNECT

BACKBONE STBG 5-200K POP FAST EXT

2024 1150-64-71 07/09/2024 303 LET RSRF20 2.400 USH 041 PESHTIGO-MARINETTE $6,000,000 - $6,999,999

PESHTIGO BYPASS-CTH T

CONST/RESURF

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1491-22-71 05/09/2023 303 LET RSRF30 3.770 USH 141 WAUSAUKEE-NIAGARA $2,000,000 - $2,999,999

CTH Z-CTH R

CONST/RESURF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2025 1491-23-71 07/08/2025 303 LET RSRF20 1.350 USH 141 PEMBINE-NIAGARA $1,000,000 - $1,999,999

USH 8-SCPL NIAGARA

CONST/RESURF

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4738-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

MARINETTE COUNTY PAVEMENTMARKING

$0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 226: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 188Northeast Region

NORTHEAST REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated

Funding

2023 1009-33-27 03/14/2023 303 LET BRPVTV 0.000 VAR HWY REGION WIDE DECK SEALING FY23 $100,000 - $249,999

VARIOUS BACKBONE ROUTES STH

CONST/BRPVTV DECK SEALING FY23

BACKBONE NON-FEDERAL

2023 1009-33-34 03/14/2023 303 LET BRPVTV 0.000 VAR HWY REGION WIDE DECK SEALING FY23 $100,000 - $249,999

VARIOUS 3R/LCB ROUTES STH

CONST/BRPVTV DECK SEALING FY23

STATE 3R NON-FEDERAL

2024 1009-33-37 03/12/2024 303 LET BRPVTV 0.000 VAR HWY NE REGION WIDE DECK SEALING FY24 $250,000 - $499,999

VARIOUS ROUTES/HWY

CONSTR/BRPVTV NE REGION WIDE

BACKBONE NON-FEDERAL

2025 1009-33-39 03/11/2025 303 LET BRPVTV 0.000 VAR HWY NE REGION WIDE DECK SEALING FY25 $250,000 - $499,999

VARIOUS ROUTES/HWY

CONST/BRPVTV REGION WIDE

BACKBONE NON-FEDERAL

Page 227: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 189Northeast Region

OCONTO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

9180-26-00 303 I/E MISC 6.910 STH 022 OCONTO FALLS-OCONTO $100,000 - $249,999

USH 141-USH 41

DSGN/FULL PSE/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX MAP-21

9180-34-00 303 I/E RSRF10 7.810 STH 022 GILLETT - OCONTO FALLS $100,000 - $249,999

STH 32 - CTH B

DSN/RSRF10/FULL PSE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 9180-25-71 03/08/2022 303 LET RSRF20 3.498 STH 022 SHAWANO-GILLETT $1,000,000 - $1,999,999

SCL-FINNEGAN LAKE RD

CONST OPS/RESURF RW-Y

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 9180-35-71 11/11/2025 303 LET RECST 1.040 STH 022 C. GILLETT, MAIN & McKENZIE STRTS $4,000,000 - $4,999,999

S CPL - N CPL

CONST/RECST

STATE 3R STBG 5-200K POP FAST EXT

9150-08-00 303 I/E RSRF20 5.990 STH 032 MOUNTAIN-WABENO $250,000 - $499,999

STH 64-NCL

DSGN/RSRF20/FULL PSE

STATE 3R NATIONAL HIGHWAY PERF FAST

9170-15-00 303 I/E RSRF20 7.389 STH 032 GILLETTE-SURING $100,000 - $249,999

STH 22-CTH Z

DSGN/FULL PSE/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

1150-57-00 303 I/E RSRF20 12.370 USH 041 ABRAMS - OCONTO $250,000 - $499,999

CTH D - CITY OF OCONTO

DSN/FULL PSE/RSRF CONCRETE GRIND

BACKBONE NAT'L HWY SYSTEM

Page 228: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 190Northeast Region

OCONTO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1150-73-00 303 I/E RSRF30 5.100 USH 041 GREEN BAY-OCONTO $100,000 - $249,999

USH 141-CTH SS

DSGN/FULL PSE/RESURF

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1150-76-71 08/09/2022 303 LET BRRHB 0.016 USH 041 GREEN BAY - OCONTO $750,000 - $999,999

LITTLE SUAMICO RIVER BRIDGE

CONST OPS/BRRHB B-42-19 S.B OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1150-79-00 04/25/2022 303 C/E RSRF30 12.220 USH 041 GREEN BAY - OCONTO $750,000 - $999,999

OAK ORCHARD RD - FROG POND RD

DSN/FULL PSE/RESURF

BACKBONE STBG 5-200K POP FAST EXT

Page 229: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 191Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 4160-06-71 02/14/2023 206 LET MISC 0.062 CTH CE V KIMBERLY - CTH N $1,000,000 - $1,999,999

S RAILROAD ST INTERSECTION

CONST OPS/MISC HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 4676-04-71 12/10/2024 206 LET RECST 0.896 CTH N T BUCHANAN, CTH N $4,000,000 - $4,999,999

CTH KK TO CTH CE

CONST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2023 4677-10-71 02/14/2023 206 LET MISC 0.101 CTH OO T GRAND CHUTE - V LITTLE CHUTE $500,000 - $749,999

FRENCH RD INTERSECTION

CONST/MISC HSIP INTERSECTION MOD

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 4679-02-71 12/10/2024 206 LET RECST 0.910 CTH Z BUCHANAN - EAST COUNTY LINE $4,000,000 - $4,999,999

CTH ZZ TO OUTAGAMIE ROAD

CONST OPS/RECST

STP RURAL STBG <5K POP FAST

2022 1130-63-21 02/25/2022 302 R/E RECSTE 23.596 IH 041 APPLETON - DE PERE $2,000,000 - $2,999,999

STH 96 - CTH F

RE OPS/RE ACQUISITION

MAJORS NON-FEDERAL

2023 4656-07-71 01/10/2023 205 LET BRRPL 0.091 LOC STR T BUCHANAN, COUNTY LINE ROAD $250,000 - $499,999

BRANCH OF PLUM CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2023 4656-08-71 01/10/2023 205 LET BRRPL 0.096 LOC STR T BUCHANAN, NEW ROAD $250,000 - $499,999

BRANCH OF PLUM CREEK BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 230: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 192Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4984-01-79 12/10/2024 205 LET BRRPL 0.152 LOC STR C APPLETON, OLDE ONEIDA STREET $2,000,000 - $2,999,999

SOUTH MILL RACE BRIDGE

CONST OPS/BRRPL

LOCAL BRIDGES SURFACE TRANSP BLOCK GRTS-

2022 1146-75-74 07/25/2022 302 JTP RECSTE 10.820 STH 015 STH 76-NEW LONDON $5,000,000 - $5,999,999

CTH T/GIVENS ROAD-USH 45

JT PAYMENT 2 OF 2 /JT AGREEMENT 358

MAJORS NON-FEDERAL

2022 1146-75-76 11/08/2022 302 LET RECSTE 3.920 STH 015 STH 76-NEW LONDON $5,000,000 - $5,999,999

CTH T-WI CENTRAL RR

CONST/RECSTE ADDITION LANES

MAJORS NATIONAL HIGHWAY PERF PLAN

2022 1146-75-77 11/08/2022 302 LET RECSTE 3.920 STH 015 STH 76-NEW LONDON $6,000,000 - $6,999,999

WI CENTRAL RR-CTH JJ

CONST/RECSTE ADDITION LANES

MAJORS NATIONAL HWY PERF PROGRAM

2023 1146-75-73 11/14/2023 302 LET RECSTE 3.260 STH 015 STH 76-NEW LONDON $15,000,000 - $16,999,999

CTH T/GIVENS ROAD-USH 45

CONST OPS/RECSTE

MAJORS NATIONAL HIGHWAY PERF PLAN

2024 1146-75-80 02/13/2024 302 LET BRPVTV 10.820 STH 015 STH 76 - NEW LONDON $250,000 - $499,999

CTH JJ - CTH T/GIVENS RD

CONST/BRPVTV

MAJORS NATIONAL HIGHWAY PERF PLAN

2022 6240-30-21 10/25/2022 303 R/E RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $0 - $99,999

BURDICK ST - NCL

RE ACQUISITION/ROW

STATE 3R NON-FEDERAL

Page 231: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 193Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 6240-22-71 11/14/2023 303 LET RSRF30 10.871 STH 047 APPLETON - BLACK CREEK $6,000,000 - $6,999,999

CTH JJ - CTH B

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 6240-29-71 11/14/2023 303 LET RSRF10 0.480 STH 047 S MAIN STREET, V OF BLACK CREEK $500,000 - $749,999

CTH B-BURDICK STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 6240-30-40 09/25/2023 303 UTL RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $0 - $99,999

BURDICK ST - NCL

UTL RELOCATION/RSRF

STATE 3R NON-FEDERAL

2023 6240-31-21 03/25/2023 303 R/E MISC 0.778 STH 047 V BLACK CREEK, STH 47 $100,000 - $249,999

STORM SEWER IMPROVEMENT

RW/RE ACQUISITION

STATE 3R NON-FEDERAL

2023 6240-31-40 12/25/2023 303 UTL MISC 0.778 STH 047 V BLACK CREEK, STH 47 $0 - $99,999

STORM SEWER IMPROVEMENT

UTL RELOCATION/MISC

STATE 3R NON-FEDERAL

2024 6240-30-71 05/14/2024 303 LET RSRF10 8.055 STH 047 BLACK CREEK - BONDUEL $3,000,000 - $3,999,999

BURDICK ST - NCL

CONST/RSRF HSIP

STATE 3R STBG 5-200K POP FAST EXT

2024 6240-31-71 11/12/2024 303 LET MISC 0.820 STH 047 V BLACK CREEK, STH 47 $2,000,000 - $2,999,999

STORM SEWER IMPROVEMENT

CONST/MISC

STATE 3R NON-FEDERAL

Page 232: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 194Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6230-14-41 03/25/2022 303 UTL RSRF30 10.930 STH 054 SHIOCTON - SEYMOUR $0 - $99,999

PARK AVENUE - FRENCH ROAD

UTL RELOCATION/RESURF

STATE 3R NON-FEDERAL

2022 6230-14-71 11/08/2022 303 LET RSRF30 11.300 STH 054 SHIOCTON - SEYMOUR $7,000,000 - $7,999,999

PARK AVENUE - FRENCH ROAD

CONST/RESUR

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 6230-14-72 11/08/2022 303 LET RSRF10 0.389 STH 054 E. STATE STREET, V. OF BLACK CREEK $250,000 - $499,999

TOWER DRIVE - N BEECH STREET

CONST/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 6230-20-40 05/25/2022 303 UTL RSRF30 7.670 STH 054 SEYMOUR-GREEN BAY $0 - $99,999

FRENCH ROAD-SEMINARY ROAD

UTL

STATE 3R NON-FEDERAL

2023 6230-20-71 11/14/2023 303 LET RSRF30 7.599 STH 054 SEYMOUR-GREEN BAY $6,000,000 - $6,999,999

FRENCH ROAD-SEMINARY ROAD

CONST OPS/RESURF

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6230-16-71 11/12/2024 303 LET RSRF30 9.200 STH 054 NEW LONDON-SHIOCTON $6,000,000 - $6,999,999

WCL-PARK AVENUE

CONST OPS/RESURF/HSIP

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 6560-08-71 03/08/2022 303 LET MISC 0.493 STH 055 KAUKAUNA-SEYMOUR $3,000,000 - $3,999,999

CTH JJ INTERSECTION

CONST/INTERSECTION MODIFICATION

STATE 3R HIGHWAY SFTY IMP PRG FAST

Page 233: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 195Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6570-09-71 03/08/2022 303 LET COLD20 13.591 STH 055 KAUKAUNA-SEYMOUR $8,000,000 - $8,999,999

IH 41-STH 54

CONST/RESURF MILL/OVERLAY

STATE 3R STBG 5-200K POP FAST EXT

2022 6517-15-60 11/08/2022 303 LET PSRS40 4.650 STH 076 STEPHENSVILLE-SHIOCTON $2,000,000 - $2,999,999

SOUTH JCT S-STH 54

CONST/RESURF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 6430-20-71 11/14/2023 303 LET MISC 0.370 STH 076 STH 96 - STH 15 $2,000,000 - $2,999,999

SCHOOL ROAD INTERSECTION

CONST/HSIP INTERSECTION

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 6518-06-71 11/14/2023 303 LET COLD20 12.148 STH 076 SHIOCTON - BEAR CREEK $5,000,000 - $5,999,999

STH 54 - NCL

CONST/SURFACE

STATE 3R STBG 5-200K POP FAST EXT

2023 6518-07-71 11/14/2023 303 LET BRRPL 2.579 STH 076 SHIOCTON - NCL $1,000,000 - $1,999,999

BOELTER RD - CTH W

CONST/BRRPL C-44-919, C-44-022

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2025 6517-16-50 01/25/2025 303 R/R MISC 1.420 STH 076 STH 15 - CTH JJ $100,000 - $249,999

CN RR XING 181837Y

CN RR XING

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 6517-16-71 02/11/2025 303 LET RECST 1.420 STH 076 STH 15 - CTH JJ $7,000,000 - $7,999,999

EVERGLADE ROAD - CTH JJ

CONST OPS/RECST GRADE, BASE, PAVT

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 234: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 196Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 4075-40-21 09/25/2022 303 R/E RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $250,000 - $499,999

CASALOMA DRIVE - N BADGER AVENUE

RW/RE ACQUISITION

STATE 3R NON-FEDERAL

2023 4075-35-71 11/14/2023 303 LET RSRF10 1.860 STH 096 KAUKAUNA-WRIGHTSTOWN $750,000 - $999,999

CLARIBEL STREET-CTH JJ

CONST/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX - MAP-2

2023 4075-35-72 11/14/2023 303 LET RSRF25 3.090 STH 096 KAUKAUNA-WRIGHTSTOWN $2,000,000 - $2,999,999

CTH JJ - CTH D

CONST/RESURF MILL/OVERLAY

STATE 3R SURFACE TRANS FLEX - MAP-2

2023 4075-40-40 06/25/2023 303 UTL RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $0 - $99,999

CASALOMA DRIVE - N BADGER AVENUE

UTL RELOCATION/RSRF

STATE 3R NON-FEDERAL

2024 4075-41-71 05/14/2024 303 LET RSRF20 3.030 STH 096 WCL - APPLETON $1,000,000 - $1,999,999

CLEARY COURT - TOWER VIEW DRIVE

CONST/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 4075-40-71 11/11/2025 303 LET RSRF20 2.000 STH 096 W WISCONSIN AVE, T OF GRAND CHUTE $5,000,000 - $5,999,999

CASALOMA DRIVE - N BADGER AVENUE

CONST/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 6526-00-71 11/14/2023 303 LET BRRPL 0.000 STH 125 T. GRAND CHUTE, COLLEGE AVE $3,000,000 - $3,999,999

IH41 - BLUEMOUND DRIVE

CONST/BRRPL

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

Page 235: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 197Northeast Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

4685-28-00 303 I/E RSRF20 6.500 STH 441 USH 41-USH 41 $250,000 - $499,999

USH 10-USH 41

DESIGN/RESURF

BACKBONE NAT'L HWY SYSTEM

2023 4685-29-60 02/14/2023 303 LET PSRS20 5.740 STH 441 APPLETON, STH 441 $6,000,000 - $6,999,999

USH 10-NORTH JUNCTION IH 41

CONST/ RDMTN-PATCH JOINTS/PAVEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 236: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 198Northeast Region

SHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4232-00-71 12/10/2024 206 LET RECST 1.226 CTH EE C SHEBOYGAN, WEEDEN CREEK ROAD $6,000,000 - $6,999,999

CTH OK TO S 12TH STREET

CONST OPS/RECST

STP URBAN 50,000 - 200,000 STBG-URBANIZED >200K FAST

2022 4236-02-71 05/10/2022 206 LET MISC 6.303 CTH F T MITCHELL, CTH F $0 - $99,999

WCL - STH 28

CONST OPS/MISC HRRR RUMBLE STRIPS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SFTY IMP PRG FAST

2023 4995-03-02 01/10/2023 290 LET MISC 0.552 NONHWY

CITY OF PLYMOUTH $2,000,000 - $2,999,999

SIDEWALK GAP IMPROVEMENTS

CONST/ MISC-SIDEWALK IMPROV NMTPP

LOCAL ENHANCEMENTS NONMOTORIZED TRANS S-LUEX

2022 3700-30-43 08/25/2022 305 MIS TOSIG 0.392 STH 023 C SHEBOYGAN, KOHLER MEMORIAL DR $0 - $99,999

TAYLOR DR INTERSECTION SIGNAL REHAB

TRF DSN/TOSIG SIGNAL REHAB NE2303L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 1440-41-21 03/25/2023 303 R/E RSRF10 10.530 STH 023 FOND DU LAC - SHEBOYGAN $0 - $99,999

CTH P - STH 32

RE ACQUISITION/RW

STATE 3R NON-FEDERAL

2023 3700-30-46 08/25/2023 305 MIS TOSIG 0.392 STH 023 C SHEBOYGAN, KOHLER MEMORIAL DR $250,000 - $499,999

TAYLOR DR INTERSECTION SIGNAL REHAB

TRF OPS/TOSIG SIGNAL REHAB NE2303L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 1440-41-40 10/25/2024 303 UTL RSRF10 10.530 STH 023 FOND DU LAC - SHEBOYGAN $0 - $99,999

Page 237: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 199Northeast Region

SHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CTH P - STH 32

UTL RELOCATION

STATE 3R NON-FEDERAL

2022 4010-21-21 05/25/2022 303 R/E RSRF30 13.400 STH028

KEWASKUM-WALDO $0 - $99,999

SCL-STH 57

RE ACQUISTION/RW RSRF

STATE 3R NON-FEDERAL

2023 3700-30-47 08/25/2023 305 MIS TOSIG 0.061 STH028

C SHEBOYGAN, BUSINESS DRIVE $0 - $99,999

WASHINGTON AVE SIGNAL REHAB

TRF DSN/TOSIG NE2401L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 4010-21-50 04/25/2023 303 R/R RSRF30 0.017 STH028

KEWASKUM-WALDO $250,000 - $499,999

WSOR XING SIGNALS 387113B

RR XING SIGNALS

STATE 3R STBG <5K POP FAST

2024 3700-30-50 08/25/2024 305 MIS TOSIG 0.061 STH028

C SHEBOYGAN, BUSINESS DRIVE $250,000 - $499,999

WASHINGTON AVE SIGNAL REHAB

TRF OPS/TOSIG NE2401L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 4010-21-71 08/13/2024 303 LET RSRF30 13.400 STH028

KEWASKUM-WALDO $9,000,000 - $9,999,999

SCL-STH 57

CONST/RESURF-MILL/OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 238: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 200Northeast Region

SHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4010-26-71 08/13/2024 303 LET BRRPL 0.086 STH 028 V. OF CASCADE, N. BRANCH MIL RIVER $250,000 - $499,999

BRANCH MILWAUKEE RIVER BRIDGE

CONST/BRRPL B-05-0321

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

4540-33-30 303 I/E PSRS40 1.060 STH 032 STH 32, CITY OF SHEBOYGAN FALLS $0 - $99,999

FOND DU LAC AVE-STH 23

DSGN/RDMTN

STATE 3R NON-FEDERAL

2022 4540-36-21 03/25/2022 303 R/E RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $0 - $99,999

CTH D-STH 28

RE ACQUISTION/ROW OPS

STATE 3R NON-FEDERAL

2023 4540-36-41 10/25/2023 303 UTL RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $0 - $99,999

CTH D-STH 28

UTL OPS RELOCATION

STATE 3R NON-FEDERAL

2025 4540-34-71 08/12/2025 303 LET BRRPL 10.070 STH 032 CEDAR GROVE - SHEBOYGAN FALLS $1,000,000 - $1,999,999

CTH D - STH 28

CNST/BRRPL/C-05-0093/2650/2916/0080

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

2025 4540-36-71 08/12/2025 303 LET RSRF10 10.260 STH 032 CEDAR GROVE-SHEBOYGAN FALLS $4,000,000 - $4,999,999

CTH D-STH 28

CONST OPS/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

1460-10-00 303 I/E RSRF30 3.910 STH 042 HOWARDS GROVE-MANITOWOC $100,000 - $249,999

STH 32-NCL

Page 239: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 201Northeast Region

SHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

DSGN/FULL PSE/RESURFACE

STATE 3R NATIONAL HWY PERF EXMFAST

2022 4570-26-21 05/25/2022 303 R/E RSRF15 0.900 STH 042 V HOWARDS GROVE, STH 42 $0 - $99,999

PIGEON RIVER - N VILLAGE LIMITS

RE ACQUISITION/ROW /RSRF10

STATE 3R NON-FEDERAL

2024 4570-26-71 05/14/2024 303 LET RSRF15 0.900 STH 042 V HOWARDS GROVE, STH 42 $500,000 - $749,999

PIGEON RIVER - N VILLAGE LIMITS

CONST OPS/RSRF

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4015-22-21 03/25/2022 303 R/E RSRF20 9.020 STH 057 RANDOM LAKE-WALDO $0 - $99,999

SCL-STH 28

RE ACQUISTION/ROW RSRF

STATE 3R NON-FEDERAL

2023 4015-22-22 08/25/2023 303 R/E RSRF20 16.050 STH 057 WALDO - KIEL $0 - $99,999

STH 28 - NCL

RE OPS/RW RSRF

STATE 3R NON-FEDERAL

2025 4015-22-71 11/11/2025 303 LET RSRF20 8.260 STH 057 RANDOM LAKE-WALDO $8,000,000 - $8,999,999

SCL-STH 28

CONST/MILL/OVERLAY

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4759-98-22 01/25/2022 305 MIS TOPM 0.000 VARHWY

SHEBOYGAN COUNTY PAVEMENTMARKING

$0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

Page 240: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 202Northeast Region

SHEBOYGAN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM HWY INFRA COVID SUPP

Page 241: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 203Northeast Region

WAUPACA

2022-2025 FINAL STIP Project Listing 203Northeast Region

WAUPACA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 6528-07-52 05/25/2023 302 R/R MISC 0.000 USH 045 STH 15-NEW LONDON $100,000 - $249,999

USH 45, WCL XING SURFACE 693839C

CONST/MISC RR 693839C SURFACE

MAJORS NATIONAL HIGHWAY PERF FAST

2023 6528-07-53 05/25/2023 302 R/R MISC 0.000 USH 045 STH 15-NEW LONDON $250,000 - $499,999

USH 45, WCL XING SIG/GATES 693839C

CONST/MISC RR SIG/GATES 693839C

MAJORS NATIONAL HIGHWAY PERF FAST

Page 242: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 204Northeast Region

WINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 4636-05-72 01/09/2024 206 LET RECST 0.520 CTH I C OSHKOSH, CTH I $1,000,000 - $1,999,999

W RIPPLE AVE - W WAUKAU AVE

CONST OPS/RECST

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2024 4646-02-71 12/10/2024 206 LET RECST 1.450 CTH P C MENASHA, CTH P $6,000,000 - $6,999,999

STH 47 TO MIDWAY ROAD

CONSTR OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

1120-63-00 303 I/E MISC 0.590 IH 041 OSHKOSH - APPLETON $250,000 - $499,999

IH 41 LAKE BUTTE DES MORTS

DSN/FULL PSE/MISC APPROACH SLABS

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1120-57-60 11/14/2023 303 LET PSRS20 9.650 IH 041 NEENAH-APPLETON $12,000,000 - $12,999,999

BREEZEWOOD-STH 15

CONST/JOINT,APPROACH DECK REPAIR

BACKBONE NATIONAL HIGHWAY PERF PLAN

2024 1120-63-71 03/12/2024 303 LET MISC 0.590 IH 041 OSHKOSH - APPLETON $2,000,000 - $2,999,999

IH 41 LAKE BUTTE DES MORTS

CONST OPS/MISC APPROACH SLABS

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 4992-00-60 12/10/2024 206 LET RECST 0.740 LOC STR C MENASHA, RACINE STREET $4,000,000 - $4,999,999

THIRD STREET TO NINTH STREET

CONST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

2025 4993-01-01 01/14/2025 206 LET RECST 1.470 LOC STR C NEENAH, COMMERCIAL STREET $7,000,000 - $7,999,999

STANLEY STREET TO TYLER STREET

CNST OPS/RECST

STP URBAN OVER 200,000 STBG-URBANIZED >200K FAST

Page 243: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 205Northeast Region

WINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 4994-07-21 03/25/2025 303 R/E BRRPL 0.124 LOCSTR

OREGON/JACKSON ST, C OF OSHKOSH $750,000 - $999,999

FOX RIVER BRIDGE AND APPROACHES

DSGN/BRIDGE REPLACE

SHR LARGE BRIDGES NON-FEDERAL

6180-26-00 303 I/E RSRF20 7.050 STH 021 REDGRANITE-OMRO $100,000 - $249,999

WCL-STH 116

DESIGN/FULL PSE/RESURF

STATE 3R NATIONAL HIGHWAY PERFFAST

6180-28-00 303 I/E BRRHB 0.143 STH 021 CONGRESS AVENUE, CITY OF OSHKOSH $100,000 - $249,999

FOX RIVER BRIDGE B-70-0091

DSGN/FULL PSE/BR REHAB-GRID DECK

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 6180-30-21 02/25/2023 303 R/E RSRF10 6.310 STH 021 OMRO - OSHKOSH $0 - $99,999

STH 116 - LEONARD POINT ROAD

RE ACQUSITION/ ROW/RSRF

STATE 3R NON-FEDERAL

6110-25-00 303 I/E PSRS20 0.900 STH 044 RIPON - OSHKOSH $0 - $99,999

STH 91 - IH 41

DSGN/FULL PSE/PSRS

STATE 3R SURFACE TRANSP BLOCKGRTS-

4660-08-00 303 I/E RSRF20 1.110 STH 047 APPLETON ROAD, CITY OF MENASHA $100,000 - $249,999

9TH ST - CTH AP

DESIGN/FULL PSE/RESURF

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 244: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 206Northeast Region

WINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

6430-21-00 303 I/E RSRF30 4.390 STH 076 OSHKOSH - GREENVILLE $100,000 - $249,999

MURDOCK AVENUE - GREEN HILL CT

DSGN/FULL PSE/RSRF

STATE 3R SURFACE TRANSP BLOCKGRTS-

2023 6540-08-50 01/25/2023 303 R/R RSRF30 0.039 STH 091 STH 91 & CLAIRVILLE RD XING SURFACE $100,000 - $249,999

WSOR RR 387462L

RR CROSSING XING SURFACE

STATE 3R STBG <5K POP FAST

2023 6540-10-71 05/09/2023 303 LET BRRHB 0.060 STH 091 BERLIN - OSHKOSH $250,000 - $499,999

WAUKAU CREEK STRUCTURE

CONST/BRRHB B-70-0039

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2023 6540-11-71 05/09/2023 303 LET BRRPL 0.031 STH 091 BERLIN - OSHKOSH $500,000 - $749,999

JAMES ROAD - CLAIRVILLE ROAD

CONST/BRRPL B-70-0326

SHR BRIDGES SURFACE TRANSP BLOCKGRTS-

2024 6540-08-71 11/12/2024 303 LET RSRF30 14.780 STH 091 BERLIN-OSHKOSH $9,000,000 - $9,999,999

WCL-STH 44

CONST/RESURF MILL/OVERLAY HSIP

STATE 3R STBG 5-200K POP FAST EXT

2022 3700-30-41 07/25/2022 305 MIS TOSIG 0.060 STH 114 C MENASHA, WASHINGTON ST $100,000 - $249,999

RIVER ST INTERSECTION SIGNAL REHAB

TRF DSN/OPS TOSIG NE2305L

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 4065-17-21 01/25/2024 303 R/E RECST 0.841 STH 114 PLANK ROAD, CITY OF MENASHA $100,000 - $249,999

Page 245: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 207Northeast Region

WINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

MANITOWOC STREET-MELISSA STREET

RE ACQUISTION/ROW RECST

STATE 3R NON-FEDERAL

2024 4065-18-21 01/25/2024 303 R/E RECST 1.048 STH 114 MENASHA-SHERWOOD $100,000 - $249,999

MELISSA STREET-USH 10

RE ACQUISTION/ROW RECST

STATE 3R NON-FEDERAL

2025 4065-17-40 07/25/2025 303 UTL RECST 0.841 STH 114 PLANK ROAD, CITY OF MENASHA $0 - $99,999

MANITOWOC STREET - MELISSA STREET

UTL RELOCATION/ RECST

STATE 3R NON-FEDERAL

2025 4065-18-40 07/25/2025 303 UTL RECST 1.048 STH 114 MENASHA-SHERWOOD $0 - $99,999

MELISSA STREET-USH 10

UTL RELOCATION OPS/ RECST

STATE 3R NON-FEDERAL

6190-18-00 303 I/E RSRF10 4.510 STH 116 OMRO - WINNECONNE $100,000 - $249,999

N VILLAGE LIMITS - S VILLAGE LIMITS

DSGN/FULL PSE/RSRF

STATE 3R STBG <5K POP FAST

2025 6190-26-71 01/14/2025 303 LET RSRF30 1.870 STH 116 WINNECONNE-USH 45 $1,000,000 - $1,999,999

EAST VILLAGE LIMITS-USH 45

CONST OPS/RESURFACE

STATE 3R SURFACE TRANSP BLOCK GRTS-

1517-12-00 303 I/E RSRF20 16.950 USH 010 WAUPACA-MENASHA $250,000 - $499,999

NCL-STH 441

DSN FULL PSE/PATCH/OVERLAY ASPHALT

BACKBONE NATIONAL HWY PERF PROGRAM

2023 1517-14-71 11/14/2023 303 LET MISC 0.051 USH 010 V FOX CROSSING, USH 10 $100,000 - $249,999

Page 246: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 208Northeast Region

WINNEBAGO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

COLD SPRING RD N-70-0009

CONST OPS/MISC NOISE WALL N700009

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1500-48-60 11/12/2024 303 LET PSRS20 16.102 USH 010 WAUPACA-MENASHA $6,000,000 - $6,999,999

NCL-STH 441

CONST/PSRS/RDMTN RW-NO

BACKBONE STP NON-URBAN

2022 4110-32-21 03/25/2022 303 R/E RSRF20 7.130 USH 045 FOND DU LAC-OSHKOSH $0 - $99,999

SCL-SCPL OSHKOSH

RE/ REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2024 4110-32-71 11/12/2024 303 LET RSRF20 7.160 USH 045 FOND DU LAC-OSHKOSH $4,000,000 - $4,999,999

SCL-SCPL OSHKOSH

CONST/RSRF HSIP-RUMBLE STRIPS

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 4110-33-71 11/11/2025 303 LET BRRHB 0.117 USH 045 MAIN STREET, CITY OF OSHKOSH $5,000,000 - $5,999,999

BRIDGE DECK GRATES

CONST OPS/BRRHB B-70-56-0001-3

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2025 6200-19-71 03/11/2025 303 LET MISC 0.162 USH 045 OSHKOSH - WINCHESTER $750,000 - $999,999

BROOKS ROAD OVERPASS, R-70-0007

CONST OPS/MISC

BACKBONE STBG 5-200K POP FASTG

Page 247: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

North Central Region Projects

Page 248: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 209North Central Region

ADAMS

2022-2025 FINAL STIP Project Listing 209North Central Region

ADAMS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated

Funding

6140-00-18 303 I/E RSRF30 3.470 STH 013 ADAMS - WISCONSIN RAPIDS $100,000 - $249,999

MOUNDVIEW DRIVE TO STH 21

DESIGN/FULL PSE/RESURFACE

STATE 3R STBG <5K POP FAST

2022 6140-01-26 04/25/2022 303 R/E RSRF10 0.660 STH 013 V OF FRIENDSHIP $0 - $99,999

NORTH ST TO MOUND VIEW DR

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2025 6140-01-66 11/11/2025 303 LET RSRF10 0.660 STH 013 V OF FRIENDSHIP $750,000 - $999,999

NORTH ST TO MOUND VIEW DR

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2022 4701-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY ADAMS CO PAVEMENT MARKING TMA'S $100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS-PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

Page 249: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 210North Central Region

FLORENCE

2022-2025 FINAL STIP Project Listing 210North Central Region

FLORENCE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 9911-00-70 04/12/2022 206 LET BRRPL 0.000 LOC STR T FENCE, ROCK CREEK BRIDGE $250,000 - $499,999

ROCK CREEK ROAD; FR 2383

CONST/FLAP PROG REPLACEMENT

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2022 9100-05-22 03/25/2022 303 R/E RSRF20 12.536 STH 070 TIPLER - FLORENCE $100,000 - $249,999

FOREST ROAD 2154 TO USH 2

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2023 9120-09-21 02/25/2023 303 R/E RSRF25 1.230 USH 002 BRULE RIVER - IRON MOUNTAIN $0 - $99,999

PEWABIC STREET TO CTH NN

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2025 9120-09-71 12/09/2025 303 LET RSRF25 1.230 USH 002 BRULE RIVER - IRON MOUNTAIN $500,000 - $749,999

PEWABIC STREET TO CTH NN

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 250: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 211North Central Region

FOREST

2022-2025 FINAL STIP Project Listing 211North Central Region

FOREST

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 9330-01-70 03/14/2023 206 LET BRRPL 0.033 CTH C T WABENO, SOPER STREET $1,000,000 - $1,999,999

N BR OCONTO RIVER BRIDGE

CONST/FLAP PROG REPLACEMENT

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2023 9815-00-70 12/12/2023 205 LET BRRPL 0.000 LOC STR T HILES, WEST PINE LAKE ROAD $250,000 - $499,999

WOLF RIVER BRIDGE P-21-0905

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 9813-02-70 04/25/2024 290 LLC MISC 0.000 NON HWY USH 8 SHARED PATHWAY PHASE 1 $750,000 - $999,999

FIREKEEPER ROAD TO LOVE KNOT LANE

CONST/PHASE 1/MISC

TAP < 5,000 TRANS ALTERN 5K AND UNDER

2022 9130-00-70 09/13/2022 303 LET RSRF10 4.079 STH 032 MOUNTAIN - WABENO $2,000,000 - $2,999,999

OCONTO COUNTY LINE TO CTH C

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 9260-00-21 11/25/2022 303 R/E PVRPLA 0.570 STH 032 C CRANDON, LAKE AVENUE $100,000 - $249,999

USH 8 TO CRANDON RR OVERHEAD

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

2024 9130-03-72 08/13/2024 303 LET PVRPLA 1.123 STH 032 WABENO - CRANDON $2,000,000 - $2,999,999

CTH C TO FOREST AVENUE

CONST/PVRPLA

STATE 3R STBG <5K POP FAST

2025 9260-00-71 02/11/2025 303 LET PVRPLA 0.570 STH 032 C CRANDON, LAKE AVENUE $2,000,000 - $2,999,999

USH 8 TO CRANDON RR OVERHEAD

CONST/PVRPLA

STATE 3R STBG 5-200K POP FASTG

Page 251: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 212North Central Region

FOREST

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 9165-13-71 02/14/2023 303 LET COLD10 5.790 STH 055 ARGONNE - NELMA $3,000,000 - $3,999,999

STH 70 TO MICHIGAN STATE LINE

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 1590-18-22 11/25/2022 303 R/E RSRF25 5.050 USH 008 MONICO - LAONA $100,000 - $249,999

STH 55 SOUTH TO OTTER CREEK ROAD

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 1590-18-72 09/10/2024 303 LET RSRF10 0.240 USH 008 C CRANDON, W GLEN STREET $250,000 - $499,999

BOULEVARD AVENUE TO LAKE AVENUE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1590-18-70 02/11/2025 303 LET RSRF10 0.490 USH 008 C CRANDON, LAKE AVENUE $250,000 - $499,999

GLEN STREET TO PIONEER STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1590-18-71 02/11/2025 303 LET RSRF25 5.050 USH 008 MONICO - LAONA $6,000,000 - $6,999,999

STH 55 SOUTH TO OTTER CREEK ROAD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1590-18-81 09/09/2025 303 LET RSRF25 6.320 USH 008 MONICO - LAONA $3,000,000 - $3,999,999

OTTER CREEK ROAD TO STH 32 SOUTH

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1590-18-82 02/11/2025 303 LET MISC 0.000 USH 008 MONICO - LAONA $0 - $99,999

MULTI MODAL TUNNEL

CONST/MISC

STATE 3R NON-FEDERAL

Page 252: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 213North Central Region

GREEN LAKE

2022-2025 FINAL STIP Project Listing 213North Central Region

GREEN LAKE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1430-08-79 12/13/2022 303 LET RSRF10 2.580 STH 023 PRINCETON - RIPON $1,000,000 - $1,999,999

CTH T TO CTH A (N)

CONST/RESURF10

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1430-08-81 02/13/2024 303 LET RECST 0.057 STH 023 PRINCETON - RIPON $750,000 - $999,999

STH 73/PYE ALLEY ROAD INTERSECTION

CONST/RECONSTRUCT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 6100-00-20 06/25/2022 303 R/E RSRF10 7.430 STH 044 MANCHESTER - RIPON $0 - $99,999

GRAND RIVER BR TO FOND DU LAC CL

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 6630-01-73 09/10/2024 303 LET BRRHB 0.000 STH 044 PARDEEVILLE - MANCHESTER $500,000 - $749,999

BRIDGE OVERLAY B-24-0019

CONST/BRIDGE OVERLAY

SHR BRIDGES STBG <5K POP FAST

2022 6530-01-72 03/08/2022 303 LET RSRF10 0.670 STH 073 PRINCETON - PLAINFIELD $250,000 - $499,999

FOX RIVER BRIDGE TO CTH J

CONSTR/RESURFACE

STATE 3R NON-FEDERAL

2024 6640-00-70 09/10/2024 303 LET RSRF10 9.920 STH 073 COLUMBUS - PRINCETON $3,000,000 - $3,999,999

N JCT STH 44 TO S JCT STH 23

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 1009-46-62 12/13/2022 303 LET PSRS20 0.115 VAR HWY GREEN LAKE CO WIDE CULVERT RPLMT $250,000 - $499,999

STH 44 AND STH 73

CONSTR/PSRS20

STATE 3R NON-FEDERAL

Page 253: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 214North Central Region

IRON

2022-2025 FINAL STIP Project Listing 214North Central Region

IRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 9250-12-61 02/14/2023 303 LET PSRS40 7.055 STH 077 MELLEN - HURLEY $2,000,000 - $2,999,999

ASHLAND CO LINE TO UPSON LAKE ROAD

CONST/PREV MAINT APPRVL 2/10/15

STATE 3R STP <5K POP - MAP 21

2024 1185-02-71 08/13/2024 303 LET RSRF20 8.480 USH 002 ASHLAND - SAXON $3,000,000 - $3,999,999

ASHLAND COUNTY LINE TO CTH B

DESIGN/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1185-03-60 12/10/2024 303 LET BRRHB 0.000 USH 002 CITY OF HURLEY $500,000 - $749,999

WI/MI BORDER BRIDGE B-26-0008

CONST/REHAB/CONCRETE OVERLAY

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2022 1175-19-21 08/25/2022 303 R/E BRRHB 0.000 USH 051 MANITOWISH - HURLEY $0 - $99,999

TURTLE RIVER BRIDGE B-26-0016

REAL ESTATE/REHAB/DECK REPLACEMENT

SHR BRIDGES NON-FEDERAL

2022 1175-21-20 05/25/2022 303 R/E RSRF30 1.520 USH 051 MANITOWISH - HURLEY $100,000 - $249,999

IRON STREET TO USH 2

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2023 1175-18-74 08/08/2023 303 LET RSRF10 7.036 USH 051 MANITOWISH - HURLEY $2,000,000 - $2,999,999

VILAS COUNTY LINE TO BEACHWAY DRIVE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1175-19-72 08/08/2023 303 LET RSRF10 3.490 USH 051 MANITOWISH - HURLEY $1,000,000 - $1,999,999

CTH J TO WEBER CREEK BRIDGE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 254: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 215North Central Region

IRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1175-19-71 12/10/2024 303 LET BRRHB 0.000 USH 051 MANITOWISH - HURLEY $750,000 - $999,999

TURTLE RIVER BRIDGE B-26-0016

CONST/REHAB/DECK REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2025 1175-21-70 09/09/2025 303 LET PVRPLA 1.520 USH 051 MANITOWISH - HURLEY $1,000,000 - $1,999,999

IRON STREET TO USH 2

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF PLAN

Page 255: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 216North Central Region

LANGLADE

2022-2025 FINAL STIP Project Listing 216North Central Region

LANGLADE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 9835-00-71 01/09/2024 205 LET BRRPL 0.000 LOC STR C ANTIGO, 4TH AVENUE $750,000 - $999,999

SPRINGBROOK CREEK BRIDGE P-34-0701

CONST/REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 9835-04-70 01/09/2024 206 LET PVRPLA 0.360 LOC STR C ANTIGO, CLERMONT STREET $500,000 - $749,999

10TH AVENUE TO 7TH AVENUE

CONST/PVRPLA

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2024 9835-05-70 01/09/2024 206 LET PVRPLA 0.190 LOC STR C ANTIGO, 7TH AVENUE $250,000 - $499,999

DORR STREET TO CLERMONT STREET

CONST/PVRPLA

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2024 9835-02-71 04/25/2024 290 LLC MISC 0.000 NONHWY

SPRINGBROOK BIKE/PEDESTRIAN TRAIL $750,000 - $999,999

CITY OF ANTIGO

CONST/MISC

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

2024 9155-05-71 12/10/2024 303 LET BRRPL 0.000 STH 055 LANGLADE - PICKEREL $750,000 - $999,999

NINE MILE CREEK B-34-0010

CONST/REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

9140-12-11 303 I/E BRRPL 0.000 STH 064 ANTIGO - LANGLADE $250,000 - $499,999

WOLF RIVER BRIDGE B-34-0838

DESIGN/FULL PSE/REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

2022 1602-10-21 02/25/2022 303 R/E PVRPLA 0.666 USH 045 T ELCHO, ANTIGO STREET $0 - $99,999

CLINIC STREET TO OTTER LAKE LANE

REAL ESTATE/PAVEMENT REPLACEMENT

Page 256: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 217North Central Region

LANGLADE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2024 1602-10-71 09/10/2024 303 LET PVRPLA 0.666 USH 045 T ELCHO, ANTIGO STREET $2,000,000 - $2,999,999

CLINIC STREET TO OTTER LAKE LANE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4734-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY LANGLADE CO PAVEMENT MARKINGTMA'S

$500,000 - $749,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS-PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

Page 257: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 218North Central Region

LINCOLN

2022-2025 FINAL STIP Project Listing 218North Central Region

LINCOLN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 9431-00-70 03/12/2024 205 LET BRRPL 0.000 CTH X T PINE RIVER, CTH X $250,000 - $499,999

LITTLE OXBO CREEK BRIDGE P-35-0046

CONST/REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2022 9305-09-61 09/13/2022 303 LET PSRS20 0.014 STH 107 MERRILL - TOMAHAWK $750,000 - $999,999

CULVERT REPLACEMENT & REPAIR

CONST/RDMTN/SHRM

SHR BRIDGES NON-FEDERAL

2022 9305-09-62 09/13/2022 303 LET PSRS20 0.076 STH 107 MERRILL - TOMAHAWK $100,000 - $249,999

SMALL CULVERT REPLACEMENTS

CONST/RDMTN/SHRM

SHR BRIDGES NON-FEDERAL

2022 1580-30-74 05/10/2022 303 LET BRRPL 0.000 USH 008 PRENTICE - BRADLEY $500,000 - $749,999

SCOTT CREEK BOX CULVERT B-35-167

CONST/REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2023 1580-30-71 11/14/2023 303 LET COLD10 3.970 USH 008 PRENTICE - BRADLEY $2,000,000 - $2,999,999

CTH YY TO TRACY ROAD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1590-14-26 10/25/2023 303 R/E RSRF10 0.290 USH 008 PRENTICE - BRADLEY $0 - $99,999

CTH A INTERSECTION

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 1590-14-52 03/25/2024 303 R/R RSRF10 0.000 USH 008 PRENTICE - BRADLEY $100,000 - $249,999

MCCORD ROAD TO CTH L

RR OPS/XING SURFACE 855242H

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 258: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 219North Central Region

LINCOLN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1590-14-72 08/13/2024 303 LET RSRF10 9.230 USH 008 PRENTICE - BRADLEY $2,000,000 - $2,999,999

MCCORD ROAD TO CTH L

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

1176-21-32 303 I/E PSRS30 14.850 USH 051 MERRILL - TOMAHAWK $100,000 - $249,999

CTH K TO CTH S, NB

DESIGN/JOINT REPAIRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1176-22-93 08/25/2022 303 SFA PVRPLA 0.000 USH 051 MARATHON COUNTY LINE TO CTH K $0 - $99,999

WAUSAU - MERRILL

TRAFFIC MITIGATION 1176-22-72/73

BACKBONE NON-FEDERAL

2025 1176-23-65 09/09/2025 303 LET BRRHB 0.000 USH 051 TOMAHAWK - MINOCQUA $1,000,000 - $1,999,999

STRUCTURE B-35-0059

CONST/DECK OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 259: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 220North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

6999-10-11 303 I/E RSRF25 2.020 BUS 051 V ROTHSCHILD, GRAND AVENUE $250,000 - $499,999

EAGLE NEST BLVD TO EVEREST DRIVE

DESIGN/FULL PSE/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 6999-10-25 02/25/2023 303 R/E PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $100,000 - $249,999

EVEREST DRIVE TO SCHOFIELD AVENUE

REAL ESTATE/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

2025 6999-10-80 09/09/2025 303 LET PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999

EVEREST DRIVE TO SCHOFIELD AVENUE

CONST/LOCAL UTILITY/ROTHSCHILD

STATE 3R NON-FEDERAL

2025 6999-10-85 09/09/2025 303 LET PVRPLA 0.917 BUS 051 ROTHSCHILD - SCHOFIELD $4,000,000 - $4,999,999

EVEREST DRIVE TO SCHOFIELD AVENUE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 6999-10-86 09/09/2025 303 LET PVRPLA 0.210 BUS 051 ROTHSCHILD - SCHOFIELD $2,000,000 - $2,999,999

STH 29 EB RAMP TO STH 29 WB RAMP

CONST/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 6999-10-87 11/11/2025 303 LET PVRPLA 0.580 BUS 051 ROTHSCHILD - SCHOFIELD $3,000,000 - $3,999,999

E GRAND AVE TO EAU CLAIRE RVR BRDGE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 6999-10-88 11/11/2025 303 LET PVRPLA 0.580 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999

E GRAND AVE TO EAU CLAIRE RVR BRDGE

CONST/LOCAL UTILITIES/SCHOFIELD

STATE 3R NON-FEDERAL

Page 260: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 221North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 6999-10-89 09/09/2025 303 LET PVRPLA 1.250 BUS 051 ROTHSCHILD - SCHOFIELD $0 - $99,999

EVEREST DRIVE TO SCHOFIELD AVENUE

CONST/LOCAL UTILITIES/WESTON

STATE 3R NON-FEDERAL

2024 6653-00-71 01/09/2024 206 LET PVRPLA 6.770 CTH C CTH J - STH 49 $2,000,000 - $2,999,999

CTH J TO CTH I

CONST/PVRPLA

STP RURAL STBG <5K POP FAST

2023 9491-06-70 01/10/2023 206 LET RCND20 8.500 CTH K WAUSAU - MERRILL $3,000,000 - $3,999,999

DECATOR DRIVE TO LINCOLN CO LINE

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2023 9491-06-71 01/10/2023 206 LET RCND20 7.360 CTH K WAUSAU - MERRILL $1,000,000 - $1,999,999

FALCON DRIVE TO LINCOLN COUNTY LINE

CONST/RECONDITION

STP RURAL STBG <5K POP FAST

2024 9478-06-70 03/12/2024 205 LET BRRPL 0.000 CTH L T BERN, CTH L $500,000 - $749,999

BLACK CREEK BRIDGE P-37-0163

CONST/REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 6664-00-70 01/09/2024 205 LET BRRPL 0.000 CTH O T BERGEN, CTH O $1,000,000 - $1,999,999

LITTLE EAU PLEINE RVR BR B370047

CONST/REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

1166-09-32 303 I/E PSRS30 4.580 IH 039 USH 51/STH 29 CORRIDOR-WAUSAU $100,000 - $249,999

FOXGLOVE RD TO BIG RIB RVR BRDGE NB

DESIGN/JOINT REPAIRS

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 261: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 222North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1166-00-83 03/12/2024 303 LET RSRF10 9.397 IH 039 STEVENS POINT - WAUSAU $3,000,000 - $3,999,999

PORTAGE CO LN TO MAPLE RIDGE RD, NB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1166-00-66 09/09/2025 303 LET BRPVTV 0.000 IH 039 STEVENS POINT - WAUSAU $500,000 - $749,999

IH 39 BRIDGE POLYMER OVERLAYS

CONST/BRIDGE PREVENTIVE

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1166-01-84 09/09/2025 303 LET RSRF10 1.706 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999

BUSINESS 51 TO FOXGLOVE ROAD

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1166-05-81 09/09/2025 303 LET RSRF10 4.473 IH 039 STEVENS POINT - WAUSAU $4,000,000 - $4,999,999

BULL JUNIOR CREEK TO BUSINESS 51

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1166-05-85 09/09/2025 303 LET RSRF10 5.620 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999

STH 34 TO BULL JUNIOR CREEK, SB

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 6678-01-70 01/10/2023 205 LET BRRPL 0.000 LOC STR T EAU PLEINE, EQUITY STREET $500,000 - $749,999

NOISY CREEK BRIDGE P-37-0301

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 6688-00-70 02/14/2023 205 LET BRRPL 0.000 LOC STR T GREEN VALLEY, RANGELINE ROAD $750,000 - $999,999

LITTLE EAU PLEINE RVR BR P370360

CONST/REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

Page 262: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 223North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 9525-01-70 03/14/2023 205 LET BRRPL 0.000 LOC STR T RIB FALLS, JERSEY FALLS TRAIL $500,000 - $749,999

PINE CREEK BRIDGE P370194

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 9526-00-70 03/14/2023 205 LET BRRPL 0.000 LOC STR T STETTIN, STETTIN DRIVE $500,000 - $749,999

ARTUS CREEK BRIDGE P-37-0203

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2023 9526-00-71 02/14/2023 205 LET BRRPL 0.000 LOC STR T STETTIN, HIGHLAND DRIVE $500,000 - $749,999

ARTUS CREEK BRIDGE P-37-0204

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 6999-09-72 02/13/2024 206 LET RECST 1.510 LOC STR C WAUSAU, STEWART AVENUE $5,000,000 - $5,999,999

S 72ND AVENUE TO S 48TH AVENUE

CONST/RECONSTRUCT

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2024 6999-16-73 02/13/2024 206 LET PVRPLA 1.350 LOC STR C MOSINEE, MAIN STREET $500,000 - $749,999

4TH STREET TO RANGELINE ROAD

CONST/PVRPLA

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2022 6999-14-73 07/25/2022 290 LLC MISC 0.000 NON HWY ROTHSCHILD-SCHOFIELD BUS 51 TRAIL $500,000 - $749,999

LILI LANE TO SCHOFIELD AVENUE

CONST/TAP

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

2022 6999-18-79 04/25/2022 290 LLC MISC 1.030 NON HWY BUSINESS CAMPUS TRAIL - 72ND AVENUE $500,000 - $749,999

PACKER DRIVE TO INTERNATIONALDRIVE

CONST/TAP

Page 263: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 224North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TAP 50,000 - 200,000 TRANS ALTERNATIVES 5-200K

2022 1620-00-61 11/08/2022 303 LET PSRS40 0.750 STH 013 MARSHFIELD - ABBOTSFORD $500,000 - $749,999

SOUTH CTH N TO NORTH STREET

CONSTR/PM APPROVED 6.6.16

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1620-03-73 11/08/2022 303 LET RSRF10 0.770 STH 013 C OF ABBOTSFORD $500,000 - $749,999

LINDEN ST TO PINE ST

CONSTR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1620-03-74 11/08/2022 303 LET RSRF10 1.988 STH 013 C OF COLBY; C OF ABBOTSFORD $1,000,000 - $1,999,999

NORTH ST TO LINDEN ST

CONSTR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1620-03-72 08/08/2023 303 LET RSRF10 4.200 STH 013 MARSHFIELD - ABBOTSFORD $1,000,000 - $1,999,999

26TH ROAD TO STH 98

CONSTR/RSRF10

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1620-01-62 01/09/2024 303 LET PSRS20 10.240 STH 013 MARSHFIELD - ABBOTSFORD $7,000,000 - $7,999,999

STH 98 TO SOUTH JUNCTION CTH N

CONSTR/PREV MAINT APPRVL 3/25/15

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1620-01-63 01/09/2024 303 LET BRRHB 0.000 STH 013 REGIONWIDE CONCRETE OVERLAYS $250,000 - $499,999

MARATHON CO B-37-0184; B-37-0185

CONSTR/CONCRETE OVERLAY

STATE 3R STBG <5K POP FAST

1053-02-07 303 I/E PVRPLA 2.450 STH 029 ABBOTSFORD - WAUSAU $100,000 - $249,999

PURPLE MARTIN LANE TO 152ND AVE

DESIGN/PAVEMENT REPLACEMENT

Page 264: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 225North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERF FAST

1053-02-09 303 I/E RECST 1.340 STH 029 WAUSAU - WITTENBERG $500,000 - $749,999

US 51 TO BUS 51, WB

DESIGN, RECONSTRUCT

BACKBONE NATIONAL HIGHWAY PERF FAST

1053-04-10 303 I/E RECST 1.630 STH 029 MARATHON CITY - WAUSAU $100,000 - $249,999

STH 107 TO 128TH AVENUE SOUTH

DESIGN/RECONSTRUCT

BACKBONE NATIONAL HIGHWAY PERF FAST

1053-04-14 303 I/E RSRF10 5.960 STH 029 ABBOTSFORD - WAUSAU $250,000 - $499,999

PURPLE MARTIN LN TO LITTLE RIB RVR

DESIGN/FULL PSE/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

1053-07-07 303 I/E PSRS30 9.140 STH 029 ABBOTSFORD - WAUSAU $250,000 - $499,999

CLARK CO LINE TO CTH E SOUTH, WB

DESIGN/FULL PSE/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1053-07-75 12/13/2022 303 LET PVRPLA 8.640 STH 029 ABBOTSFORD - WAUSAU $13,000,000 - $13,999,999

CTH E TO CTH H, EB

CONST/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1053-07-76 12/13/2022 303 LET RSRF10 0.047 STH 029 WAUSAU - WITTENBERG $2,000,000 - $2,999,999

BASS LAKE ROAD TO CTH D, WB

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1053-07-30 06/25/2023 303 C/E PSRS30 2.770 STH 029 WAUSAU - WITTENBERG $100,000 - $249,999

CTH D TO CTH OO

DESIGN/FULL PSE/PREV MAINTENANCE

Page 265: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 226North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1053-02-83 11/11/2025 303 LET PSRS20 4.420 STH 029 ABBOTSFORD - WAUSAU $3,000,000 - $3,999,999

CTH H TO PURPLE MARTIN LANE, EB

CONST/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1053-07-85 11/11/2025 303 LET PSRS20 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999

CTH E SOUTH TO STH 97, WB

CONST/PSRS

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1053-07-86 11/11/2025 303 LET PVRPLA 0.000 STH 029 ABBOTSFORD - WAUSAU $12,000,000 - $12,999,999

STH 97 TO PHEASANT FALLS ROAD, WB

CONST/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1053-07-87 11/11/2025 303 LET RSRF30 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999

PHEASANT FALLS TO PURPLE MARTIN, WB

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 6610-04-70 05/10/2022 303 LET PVRPLA 0.049 STH 034 RUDOLPH - KNOWLTON $2,000,000 - $2,999,999

STH 34 & CTH DB/OLD 51 INTERSECTION

CONST/PAVEMENT REPLACEMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2025 6610-00-51 08/25/2025 303 R/R RSRF25 0.000 STH 034 RUDOLPH - KNOWLTON $250,000 - $499,999

HOSTA RD CN RR XING SIGNALS MP71.82

RAIL CROSSING SIGNALS/392768B

STATE 3R STBG <5K POP FAST

2025 6270-00-75 09/09/2025 303 LET BRRHB 0.000 STH 049 NORTHLAND - STH 29 $250,000 - $499,999

LITTLE WOLF RIVER BRIDGE B-37-0428

CONST/DECK REPLACEMENT

Page 266: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 227North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SHR BRIDGES STBG <5K POP FAST

2022 6380-00-62 05/10/2022 303 LET RSRF10 8.702 STH 097 MARSHFIELD - STRATFORD $6,000,000 - $6,999,999

NORTHRIDGE ST TO REFLECTION ST

CONSTR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 9535-05-72 09/09/2025 303 LET BRRHB 0.000 STH 097 STRATFORD - GOODRICH $500,000 - $749,999

BRIDGE OVERLAY B-37-0548

CONST/POLYMER OVERLAY/JOINT/PAINT

SHR BRIDGES STBG <5K POP FAST

2023 7040-05-51 05/25/2023 207 R/R MISC 0.000 STH 098 VILLAGE OF SPENCER, STH 98 EAST $100,000 - $249,999

RAIL-HWY CROSSING REPAIR

XING REPAIR 689933J MILE POST 289.8

RAILROAD CROSSING REPAIR NON-FEDERAL

2023 1009-46-64 02/14/2023 303 LET BRRHB 0.000 STH 107 REGIONWIDE CONCRETE OVERLAYS $750,000 - $999,999

MARATHON COUNTY BRIDGE OVERLAYS

CONSTR/CONCRETE OVERLAY/JOINTS

STATE 3R STBG <5K POP FAST

2023 6360-05-70 02/14/2023 303 LET RSRF10 0.566 STH 107 V MARATHON CITY, MAIN STREET $250,000 - $499,999

NORTH STREET TO MARATECH AVENUE

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2025 6360-05-25 11/25/2025 303 R/E RSRF10 0.493 STH 107 V MARATHON CITY, MAIN STREET $0 - $99,999

CTH B TO NORTH STREET

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2025 6360-05-75 12/09/2025 303 LET RSRF10 0.493 STH 107 V MARATHON CITY, MAIN STREET $250,000 - $499,999

CTH B TO NORTH STREET

CONST/RESURFACE

Page 267: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 228North Central Region

MARATHON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R STBG <5K POP FAST

6370-00-03 303 I/E RSRF10 0.515 STH 153 STRATFORD - ELDERON $100,000 - $249,999

WISCONSIN RIVER BRIDGE TO OLD 51 RD

DESIGN/FULL PSE/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

6600-00-01 303 I/E PVRPLA 1.337 STH 153 MOSINEE - ELDERON $250,000 - $499,999

OLD 51 TO EAST VIEW DRIVE

DESIGN/FULL PSE/PVRPLA

STATE 3R STBG 5-200K POP FASTG

2022 6370-00-72 09/13/2022 303 LET RSRF10 5.900 STH 153 STRATFORD - MOSINEE $2,000,000 - $2,999,999

STH 107 TO RANGELINE RD

CONST/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2023 6370-01-77 02/14/2023 303 LET RSRF25 10.950 STH 153 STH 13 - STRATFORD $5,000,000 - $5,999,999

STH 13 TO STAINLESS AVENUE

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2023 1170-01-76 09/12/2023 303 LET RSRF10 8.720 USH 051 WAUSAU - MERRILL $6,000,000 - $6,999,999

DECATOR DRIVE TO LINCOLN CO LINE

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

6999-19-00 303 I/E MISC 6.030 VAR HWY WAUSAU AREA VARIOUS STREETS $2,000,000 - $2,999,999

BUS 51/STH52 CURB RAMP IMPROVEMENTS

PER WISDOT ADA TRANS PLAN 975 RAMPS

CURB RAMP STANDALONE NON-FEDERAL

Page 268: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 229North Central Region

MARQUETTE

2022-2025 FINAL STIP Project Listing 229North Central Region

MARQUETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 6748-02-70 03/14/2023 205 LET BRRPL 0.000 CTH CX T OXFORD, CTH CX $500,000 - $749,999

CHAPMAN CREEK BRIDGE B-39-0013

CONST/REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2025 1166-04-84 11/11/2025 303 LET RSRF30 0.000 IH 039 PORTAGE - COLOMA $7,000,000 - $7,999,999

COLUMBIA CO LINE TO FAWN COURT,SB

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1166-04-85 11/11/2025 303 LET RSRF30 0.000 IH 039 PORTAGE - COLOMA $7,000,000 - $7,999,999

FAWN COURT TO WAUSHARA CO LINE,SB

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 6744-02-70 03/14/2023 205 LET BRRPL 0.000 LOC STR V WESTFIELD, MAIN STREET $500,000 - $749,999

WESTFIELD CREEK BRIDGE B-39-0977

CONST/REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2023 6750-00-70 02/14/2023 205 LET BRRPL 0.000 LOC STR T MONTELLO, 14TH ROAD $1,000,000 - $1,999,999

UP RAILROAD BRIDGE, P-39-0040

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

6150-01-34 303 I/E PSRS40 0.190 STH 022 C OF MONTELLO, E MONTELLO STREET $0 - $99,999

N JCT STH 23 TO FERN DRIVE

DESIGN, PREVENTATIVE MAINTENANCE

STATE 3R NON-FEDERAL

2023 1430-02-73 05/09/2023 303 LET COLD20 7.040 STH 023 ENDEAVOR - PRINCETON $4,000,000 - $4,999,999

8TH COURT TO MORNINGSIDE COURT

CONSTR/COLD20

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 269: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 230North Central Region

MARQUETTE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6530-01-71 03/08/2022 303 LET RSRF10 8.780 STH 073 PRINCETON - PLAINFIELD $2,000,000 - $2,999,999

CTH J TO WHITE RIVER BRIDGE

CONSTR/RESURFACE

STATE 3R NON-FEDERAL

Page 270: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 231North Central Region

MENOMINEE

2022-2025 FINAL STIP Project Listing 231North Central Region

MENOMINEE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

9660-01-04 206 I/E RECST 0.144 CTH M SHAWANO - LANGLADE $100,000 - $249,999

STH 55 AND CTH M (E) INTERSECTION

DESIGN/RECONSTRUCT/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 9660-01-74 11/11/2025 206 LET RECST 0.144 CTH M SHAWANO - LANGLADE $500,000 - $749,999

STH 55 AND CTH M (E) INTERSECTION

CONST/RECONSTRUCT/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 1009-43-69 09/09/2025 303 LET PSRS20 3.407 STH 047 MENOMINEE CO CULVERT REPLACEMENT $750,000 - $999,999

STH 47 COUNTYWIDE

CONST/CULVERT

STATE 3R STBG <5K POP FAST

2025 1009-43-68 09/09/2025 303 LET PSRS20 0.701 STH 055 MENOMINEE CO CULVERT REPLACEMENT $500,000 - $749,999

STH 55 COUNTYWIDE

CONSTR/CULVERT

STATE 3R STBG <5K POP FAST

Page 271: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 232North Central Region

NORTH CENTRAL REGION WIDE

2022-2025 FINAL STIP Project Listing 232North Central Region

NORTH CENTRAL REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1009-42-26 305 I/E TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

DESIGN/TRF OPS- PAVMT MARKING

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1009-42-28 305 I/E TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $0 - $99,999

LOCATIONS ON STN PER ANNUAL PLAN

DESIGN/TRF OPS- PAVMT MARKING

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2022 1009-42-27 01/11/2022 305 LET TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $1,000,000 - $1,999,999

LOCATIONS ON STN PER ANNUAL PLAN

REGION WIDE/TRF OPS- PAVMT MARKING

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

2022 1009-42-92 02/25/2022 303 SFA MISC 0.000 VAR HWY BIANNUAL TUB GIRDER INSPECTIONS $0 - $99,999

USH 51/STH 29 SYSTEM INTERCHANGE

TRAFFIC MITIGATION

BACKBONE NON-FEDERAL

2022 3700-40-34 11/25/2022 305 MIS TOSIG 0.000 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999

NC REGIONWIDE VARIOUS LOCATIONS

ITS/TRAFFIC/STANDALONE PROGRAM

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL

2023 1009-42-29 05/09/2023 305 LET TOPM 0.000 VAR HWY NC REGION, EPOXY PAVEMENT MARKING $750,000 - $999,999

LOCATIONS ON STN PER ANNUAL PLAN

REGION WIDE/TRF OPS- PAVMT MARKING

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

2023 3700-40-35 11/25/2023 305 MIS TOSIG 0.000 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999

NC REGIONWIDE VARIOUS LOCATIONS

ITS/TRAFFIC/STANDALONE PROGRAM

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL

Page 272: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 233North Central Region

NORTH CENTRAL REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1009-47-63 12/10/2024 303 LET BRRHB 0.000 VAR HWY REGIONWIDE BRIDGE REPAIR $250,000 - $499,999

B-37-0097 AND B-71-0002

CONST/REHAB/BOX CULVERT REPAIR

SHR BRIDGES STBG 5-200K POP FASTG

2024 3700-40-36 11/25/2024 305 MIS TOSIG 0.020 VAR HWY LED SIGNAL HEAD REPLACEMENTS $0 - $99,999

NC REGIONWIDE VARIOUS LOCATIONS

ITS/TRAFFIC/STANDALONE PROGRAM

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) NON-FEDERAL

Page 273: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 234North Central Region

ONEIDA

2022-2025 FINAL STIP Project Listing 234North Central Region

ONEIDA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 9040-03-71 12/13/2022 303 LET PVRPLA 3.196 STH 017 RHINELANDER - EAGLE RIVER $7,000,000 - $7,999,999

USH 8 TO STEVENS STREET

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 9040-02-71 08/13/2024 303 LET PVRPLA 1.067 STH 017 RHINELANDER - EAGLE RIVER $1,000,000 - $1,999,999

STEVENS STREET TO POLLYANNA ROAD

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG 5-200K POP FASTG

2022 9050-03-71 03/08/2022 303 LET RSRF10 11.940 STH 047 RHINELANDER - WOODRUFF $4,000,000 - $4,999,999

KILDEER ROAD TO VILAS COUNTY LINE

CONST/RESURF10 FAST TRACK

STATE 3R NON-FEDERAL

9070-03-03 303 I/E RSRF30 6.926 STH 070 FIFIELD - WOODRUFF $100,000 - $249,999

CTH F TO MORGAN ROAD

DESIGN/RSRF30

STATE 3R NON-FEDERAL

2022 1580-30-75 05/10/2022 303 LET BRRPL 0.000 USH 008 PRENTICE - BRADLEY $1,000,000 - $1,999,999

LITTLE SOMO RIVER BRIDGE B-35-157

CONST/REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2022 1590-12-73 12/13/2022 303 LET PVRPLA 0.077 USH 008 RHINELANDER - MONICO $1,000,000 - $1,999,999

USH 8 AND USH 45 SOUTH INTERSECTION

CONST/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1590-12-74 08/09/2022 303 LET RSRF25 8.397 USH 008 RHINELANDER - MONICO $4,000,000 - $4,999,999

CTH P TO USH 45 NORTH

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 274: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 235North Central Region

ONEIDA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1580-30-72 11/14/2023 303 LET COLD10 3.032 USH 008 PRENTICE - BRADLEY $1,000,000 - $1,999,999

TRACY ROAD TO NORTH MCCORD ROAD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1595-09-73 08/08/2023 303 LET PVRPLA 3.200 USH 008 BRADLEY - RHINELANDER $4,000,000 - $4,999,999

NORTH RIFLE ROAD TO STH 47

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1590-12-75 09/09/2025 303 LET PVRPLA 5.990 USH 008 RHINELANDER - MONICO $10,000,000 - $10,999,999

STH 47 TO CTH P

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1600-14-70 09/10/2024 303 LET PVRPLA 5.680 USH 045 ANTIGO - MONICO $2,000,000 - $2,999,999

LCL TO CTH B & CTH Q TO USH 8 SOUTH

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1600-14-71 09/10/2024 303 LET PVRPLA 1.750 USH 045 ANTIGO - MONICO $1,000,000 - $1,999,999

CTH B TO CTH Q

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1170-19-23 03/25/2023 303 R/E PSRS20 0.387 USH 051 MINOCQUA - MANITOWISH $0 - $99,999

MINOCQUA BRIDGE TO FRONT STREET

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2023 1170-19-72 11/14/2023 303 LET PVRPLA 0.429 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999

MANITOU PARK TO MINOCQUA LK BRIDGE

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 275: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 236North Central Region

ONEIDA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1174-10-74 08/13/2024 303 LET RSRF10 1.740 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999

FRONT STREET - 3RD AVENUE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1170-19-61 09/09/2025 303 LET PSRS20 0.387 USH 051 MINOCQUA - MANITOWISH $500,000 - $749,999

MINOCQUA BRIDGE TO FRONT STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 276: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 237North Central Region

OUTAGAMIE

2022-2025 FINAL STIP Project Listing 237North Central Region

OUTAGAMIE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1140-00-06 303 I/E PVRPLA 7.080 USH 045 WINCHESTER - NEW LONDON $1,000,000 - $1,999,999

CTH W TO CTH D

DESIGN/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1140-00-26 06/25/2025 303 R/E PVRPLA 7.080 USH 045 WINCHESTER - NEW LONDON $100,000 - $249,999

CTH W TO CTH D

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

Page 277: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 238North Central Region

PORTAGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

6414-00-12 303 I/E RECST 0.000 BUS 051 VILLAGE OF PLOVER, POST ROAD $0 - $99,999

CTH B TO GREEN DRIVE

DESIGN/RECONSTRUCT

STATE 3R NON-FEDERAL

2024 6767-01-71 02/13/2024 206 LET RECST 0.680 CTH B V PLOVER, CTH B $4,000,000 - $4,999,999

WISCONSIN AVENUE TO HOOVER AVENUE

CONST/RECONSTRUCT

STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG

2024 6767-02-71 02/13/2024 206 LET PVRPLA 0.450 CTH B V PLOVER, CTH B $2,000,000 - $2,999,999

HOOVER AVENUE TO IH 39 INTERCHANGE

CONST/PVRPLA

STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG

1166-05-36 303 I/E PSRS30 8.940 IH 039 STEVENS POINT - WAUSAU $100,000 - $249,999

USH 10 TO STH 34, SB

DESIGN/FULL PSE/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

1166-13-01 303 I/E RECSTE 11.130 IH 039 PLAINFIELD - STEVENS POINT $2,000,000 - $2,999,999

STH 54 TO N 2ND STREET

DESIGN/RECONSTRUCTION

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1166-00-81 04/12/2022 303 LET RSRF10 5.900 IH 039 STEVENS POINT - WAUSAU $2,000,000 - $2,999,999

CTH X TO MARATHON COUNTY LINE, NB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1166-05-84 08/13/2024 303 LET BRRHB 0.000 IH 039 PLAINFIELD - STEVENS POINT $750,000 - $999,999

CTH HH BRIDGE, B-49-0021

CONSTR/BRIDGE PAINTING

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 278: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 239North Central Region

PORTAGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1166-12-78 12/10/2024 303 LET RSRF10 11.130 IH 039 PLAINFIELD - STEVENS POINT $8,000,000 - $8,999,999

STH 54 TO N 2ND STREET

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 6340-00-24 03/25/2023 303 R/E PVRPLA 6.444 STH 013 RUDOLPH - MARSHFIELD $0 - $99,999

2ND STREET NORTH TO CTH P

REAL ESTATE/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

2025 6340-00-74 03/11/2025 303 LET PVRPLA 6.444 STH 013 RUDOLPH - MARSHFIELD $6,000,000 - $6,999,999

2ND STREET NORTH TO CTH P

CONST/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 6610-00-66 09/09/2025 303 LET BRPVTV 0.000 STH 034 RUDOLPH - KNOWLTON $100,000 - $249,999

LITTLE EAU PLEINE RIVER B-49-0092

CONST/BRIDGE PREVENTIVE

SHR BRIDGES STBG <5K POP FAST

2022 1520-01-20 02/25/2022 303 R/E PSRS20 12.992 STH 054 WISCONSIN RAPIDS - PLOVER $100,000 - $249,999

26TH STREET NORTH TO CTH B

REAL ESTATE/PSRS20

STATE 3R NON-FEDERAL

2023 1009-40-68 06/25/2023 303 MIS MISC 0.000 STH 054 PLOVER - WAUPACA $100,000 - $249,999

MAPLE DRIVE INTERSECTION

MAINTENANCE TRANSFER PAYMENT

STATE 3R NON-FEDERAL

2024 1520-01-53 08/25/2024 303 R/R PSRS20 0.000 STH 054 WISCONSIN RAPIDS - PLOVER $100,000 - $249,999

26TH STREET NORTH TO CTH B

PLOVER WCL XING SURFACE 693765M

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 279: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 240North Central Region

PORTAGE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 6414-01-74 07/08/2025 303 LET PVRPLA 1.660 STH 054 PLOVER - WAUPACA $1,000,000 - $1,999,999

MAPLE DRIVE TO I-39

CONSTR/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 6280-00-60 01/10/2023 303 LET PSRS40 10.480 STH 066 STEVENS POINT - ROSHOLT $2,000,000 - $2,999,999

NORTH CTH J TO STH 49

CONSTR/PM APPROVED 6.6.16

STATE 3R STBG <5K POP FAST

2023 6998-15-20 09/25/2023 303 R/E MISC 4.770 STH 066 C STEVENS POINT, VARIOUS STREETS $100,000 - $249,999

US10/STH66 CURB RAMP IMPROVEMENTS

PER WISDOT ADA TRANS PLAN 303 RAMPS

CURB RAMP STANDALONE NON-FEDERAL

6290-05-30 303 I/E PSRS30 3.970 USH 010 STEVENS POINT - WAUPACA $100,000 - $249,999

IH 39 TO CTH J

DESIGN/FULL PSE/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 4749-98-22 10/25/2022 305 MIS TOPM 0.000 VAR HWY PORTAGE CO PAVEMENT MARKING TMA'S $250,000 - $499,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS-PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

Page 280: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 241North Central Region

PRICE

2022-2025 FINAL STIP Project Listing 241North Central Region

PRICE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1610-41-70 04/12/2022 303 LET RSRF10 14.066 STH 013 MEDFORD - PRENTICE $4,000,000 - $4,999,999

TAYLOR COUNTY LINE TO CTH A NORTH

CONST/RESURFACE

STATE 3R HWY INFRA COVID SUPP

2024 1610-44-71 01/09/2024 303 LET PVRPLA 1.999 STH 013 C PHILLIPS, LAKE STREET $2,000,000 - $2,999,999

CTH D TO CTH F

CONST/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 9931-02-72 12/10/2024 303 LET RSRF10 1.920 STH 013 CITY OF PARK FALLS $750,000 - $999,999

N FORK FLAMBEAU RVR BRDG - 5TH ST N

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1580-30-70 11/14/2023 303 LET COLD10 6.500 USH 008 PRENTICE - BRADLEY $3,000,000 - $3,999,999

LUSTILA ROAD TO CTH YY

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 281: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 242North Central Region

SHAWANO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 6997-05-00 05/25/2023 206 C/E RECST 0.302 LOC STR C SHAWANO, W GREEN BAY STREET $250,000 - $499,999

BARTLETT STREET TO MAIN STREET

DESIGN/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2024 6997-04-70 01/09/2024 206 LET RECST 0.361 LOC STR C SHAWANO, E FIFTH STREET $750,000 - $999,999

N MAIN STREET TO N HAMLIN STREET

CONST/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2025 6997-05-70 02/11/2025 206 LET RECST 0.302 LOC STR C SHAWANO, W GREEN BAY STREET $1,000,000 - $1,999,999

BARTLETT STREET TO MAIN STREET

CONST/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

9180-23-03 303 I/E PVRPLA 1.000 STH 022 C SHAWANO, SOUTH MAIN STREET $250,000 - $499,999

ZINGLER AVENUE TO GREEN BAY STREET

DESIGN/FULL PSE/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 9180-17-71 11/12/2024 303 LET COLD20 5.810 STH 022 SHAWANO - GILLETT $4,000,000 - $4,999,999

CTH BE TO CTH R

CONST/RESURFACE

STATE 3R STBG 5-200K POP FASTG

2024 9180-17-72 11/12/2024 303 LET COLD20 5.920 STH 022 SHAWANO - GILLETT $4,000,000 - $4,999,999

CTH R TO OCONTO COUNTY LINE

CONST/RESURFACE

STATE 3R STBG 5-200K POP FASTG

2025 9180-23-23 03/25/2025 303 R/E PVRPLA 1.000 STH 022 C SHAWANO, SOUTH MAIN STREET $0 - $99,999

ZINGLER AVENUE TO GREEN BAY STREET

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

Page 282: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 243North Central Region

SHAWANO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1058-22-30 06/25/2023 303 C/E PSRS30 19.710 STH 029 WITTENBERG - SHAWANO $500,000 - $749,999

CTH J TO CTH M

DESIGN/FULL PSE/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1058-25-30 06/25/2023 303 C/E PSRS30 11.590 STH 029 SHAWANO - GREEN BAY $500,000 - $749,999

CTH M TO SOUTH HIGHLINE ROAD

DESIGN/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1058-23-72 09/10/2024 303 LET RECST 0.084 STH 029 WITTENBERG - SHAWANO $2,000,000 - $2,999,999

CTH MMM/CLARK DRIVE INTERSECTION

CONST/RECONSTRUCT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2025 1058-25-62 11/11/2025 303 LET BRRHB 0.000 STH 029 SHAWANO - GREEN BAY $1,000,000 - $1,999,999

SLOPE STABILIZATION B-58-0075

CONST/REHAB

BACKBONE NATIONAL HIGHWAY PERFFAST

9180-23-04 303 I/E PVRPLA 0.260 STH 047 C SHAWANO, NORTH MAIN STREET $100,000 - $249,999

GREEN BAY STREET TO SHAWANO CREEK

DESIGN/FULL PSE/PVRPLA

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 6243-05-73 09/12/2023 303 LET RSRF10 9.420 STH 047 BLACK CREEK - BONDUEL $2,000,000 - $2,999,999

OUTAGAMIE CO LINE TO STH 29

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 283: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 244North Central Region

SHAWANO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 9180-23-24 03/25/2025 303 R/E PVRPLA 0.260 STH 047 C SHAWANO, NORTH MAIN STREET $0 - $99,999

GREEN BAY STREET TO SHAWANO CREEK

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

2023 9220-04-72 09/12/2023 303 LET PVRPLA 1.110 STH 117 BONDUEL - CECIL $1,000,000 - $1,999,999

EXPRESS WAY TO MUTZY LANE

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2023 9220-04-82 09/12/2023 303 LET PVRPLA 0.000 STH 117 BONDUEL - CECIL $500,000 - $749,999

EXPRESS WAY TO MUTZY LANE

LOCAL UTILITY/PVRPLA

STATE 3R NON-FEDERAL

2022 6580-10-22 02/25/2022 303 R/E MISC 0.005 STH 156 CLINTONVILLE - HOWARD $0 - $99,999

HERMAN CREEK GUARDRAILRESTORATION

REAL ESTATE/REPLACEMENT

STATE 3R NON-FEDERAL

2023 6580-10-61 09/12/2023 303 LET MISC 0.005 STH 156 CLINTONVILLE - HOWARD $100,000 - $249,999

HERMAN CREEK GUARDRAILRESTORATION

CONST/MISC

STATE 3R STBG <5K POP FAST

2022 1600-02-20 12/25/2022 303 R/E RSRF10 15.330 USH 045 WITTENBERG - ANTIGO $0 - $99,999

STH 29 TO LANGLADE COUNTY LINE

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2023 1600-02-70 11/14/2023 303 LET RSRF10 15.330 USH 045 WITTENBERG - ANTIGO $6,000,000 - $6,999,999

STH 29 TO LANGLADE COUNTY LINE

Page 284: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 245North Central Region

SHAWANO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4758-98-22 10/25/2022 305 MIS TOPM 0.000 VARHWY

SHAWANO CO PAVEMENT MARKING TMA'S $100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

TRF OPS-PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

Page 285: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 246North Central Region

VILAS

2022-2025 FINAL STIP Project Listing 246North Central Region

VILAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

9493-00-00 206 I/E RCND20 5.300 CTH A T PHELPS, CTH A $250,000 - $499,999

STH 17 TO EAGLE FARM ROAD

DESIGN/FULL PSE/FLAP RECONDITION

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2023 9493-00-70 05/09/2023 206 LET RCND20 5.300 CTH A T PHELPS, CTH A $1,000,000 - $1,999,999

STH 17 TO EAGLE FARM ROAD

CONST/FLAP PROG RECONDITION

FOREST HWYS/PUBLIC LANDS/FLAP FEDERAL LAND ACCESS PROGRA

2022 9513-00-70 11/08/2022 206 LET RECST 3.260 CTH S CTH K - CTH B $3,000,000 - $3,999,999

CTH K TO N FLOWAGE LAKE ROAD

CONST/RECONSTRUCT

STP RURAL STBG <5K POP FAST

2025 1009-43-66 09/09/2025 303 LET PSRS20 0.541 STH 017 VILAS COUNTY CULVERT REPLACEMENT $500,000 - $749,999

STH 17 COUNTYWIDE

CONST/CULVERTS

STATE 3R STBG <5K POP FAST

2022 9231-07-72 12/13/2022 303 LET MISC 0.069 STH 047 WOODRUFF - LAC DU FLAMBEAU $500,000 - $749,999

STORMWATER DRAINAGE IMPROVEMENTS

CONST/MISC

STATE 3R STBG <5K POP FAST

2022 9205-03-20 04/25/2022 303 R/E RSRF10 6.940 STH 155 SAINT GERMAIN - SAYNER $0 - $99,999

STH 70 TO LAKE STREET

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 9205-03-60 09/10/2024 303 LET RSRF10 6.940 STH 155 SAINT GERMAIN - SAYNER $2,000,000 - $2,999,999

STH 70 TO LAKE STREET

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 286: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 247North Central Region

VILAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1170-20-60 08/08/2023 303 LET PSRS40 15.310 USH 051 MINOCQUA - MANITOWISH $4,000,000 - $4,999,999

CTH M TO CTH W

CONST/PREVENTIVE MAINTENANCE

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 1175-18-75 08/08/2023 303 LET RSRF10 2.090 USH 051 MANITOWISH - HURLEY $500,000 - $749,999

CTH W TO IRON COUNTY LINE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1170-22-70 12/10/2024 303 LET BRRPL 0.040 USH 051 MINOCQUA - MANITOWISH $1,000,000 - $1,999,999

MANITOWISH RIVER BRIDGE, B-63-0003

CONST/BRIDGE REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

Page 287: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 248North Central Region

WAUPACA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 6996-04-72 01/09/2024 206 LET RECST 0.280 CTH D C NEW LONDON, N WATER STREET $3,000,000 - $3,999,999

SHAWANO STREET TO N PEARL STREET

CONST/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2023 6844-01-71 01/10/2023 206 LET MISC 6.810 CTH E WAUPACA - OGDENSBURG $500,000 - $749,999

CONSTANCE ROAD TO FULTON STREET

CONST/HRRRP/MISC

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2024 6838-00-00 05/25/2024 206 C/E PVRPLA 4.580 CTH W WINNEBAGO CO LINE - NEW LONDON $100,000 - $249,999

STH 96 TO CUT OFF ROAD

DESIGN/PVRPLA

STP RURAL STBG <5K POP FAST

2025 6838-00-70 01/14/2025 206 LET PVRPLA 4.580 CTH W WINNEBAGO CO LINE - NEW LONDON $1,000,000 - $1,999,999

STH 96 TO CUT OFF ROAD

CONST/PVRPLA

STP RURAL STBG <5K POP FAST

2022 6250-02-23 03/25/2022 303 R/E COLD30 4.420 STH 022 CLINTONVILLE - SHAWANO $0 - $99,999

STH 156 TO LAKE WAGNER ROAD

REAL ESTATE/PAVEMENT REPLACEMENT

STATE 3R NON-FEDERAL

2023 6590-01-24 02/25/2023 303 R/E RSRF25 3.480 STH 022 WAUPACA - CLINTONVILLE $100,000 - $249,999

STH 54 TO S JCT CTH B

REAL ESTATE/RESURF

STATE 3R NON-FEDERAL

2024 6220-01-76 03/12/2024 303 LET RSRF10 1.800 STH 022 CITY OF WAUPACA $750,000 - $999,999

USH 10 RAMPS TO WCL RR BRIDGE

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 288: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 249North Central Region

WAUPACA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 6250-02-73 02/11/2025 303 LET COLD30 4.420 STH 022 CLINTONVILLE - SHAWANO $3,000,000 - $3,999,999

STH 156 TO LAKE WAGNER ROAD

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG 5-200K POP FASTG

2025 6590-01-74 09/09/2025 303 LET RSRF25 3.480 STH 022 WAUPACA - CLINTONVILLE $2,000,000 - $2,999,999

STH 54 TO S JCT CTH B

CONSTR/RESURF

STATE 3R STBG <5K POP FAST

2022 6270-00-63 03/08/2022 303 LET PSRS40 4.320 STH 049 WAUPACA - NORTHLAND $1,000,000 - $1,999,999

DEPOT STREET TO S JCT STH 161

CONST/SHRM STATE FUND APRVL 10/6/11

STATE 3R NON-FEDERAL

2023 6420-00-72 09/12/2023 303 LET RSRF10 7.875 STH 049 WAUPACA - NORTHLAND $3,000,000 - $3,999,999

NORTH STREET TO DEPOT STREET

CONSTR/RESURF

STATE 3R STBG 5-200K POP FASTG

2025 6220-04-76 11/11/2025 303 LET PVRPLA 0.917 STH 054 NEW LONDON - BLACK CREEK $2,000,000 - $2,999,999

W JEANNE STREET TO CTH S

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 6991-00-74 03/11/2025 303 LET RSRF10 4.650 STH 054 PLOVER - WAUPACA $1,000,000 - $1,999,999

PORTAGE CO LINE TO FOXFIRE DRIVE

CONST/RESURFACE

STATE 3R STBG 5-200K POP FASTG

2023 6518-00-70 11/14/2023 303 LET COLD20 0.510 STH 076 GREENVILLE - BEAR CREEK $500,000 - $749,999

OUTAGAMIE COUNTY LINE TO USH 45

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 289: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 250North Central Region

WAUPACA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 4075-00-71 09/09/2025 303 LET RSRF10 5.540 STH 096 FREMONT - APPLETON $1,000,000 - $1,999,999

STH 110 TO USH 45

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2023 6590-02-28 05/25/2023 303 R/E RSRF10 1.159 STH 110 C MARION, MAIN STREET $0 - $99,999

BERTRAM STREET TO USH 45

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 6590-01-53 04/25/2024 303 R/R RSRF10 0.000 STH 110 FREMONT - MARION $250,000 - $499,999

CN RR TO S JCT STH 22

RAILROAD CROSSING/SURFACE 692-450F

STATE 3R STBG <5K POP FAST

2025 6590-01-73 09/09/2025 303 LET RSRF10 4.090 STH 110 FREMONT - MARION $1,000,000 - $1,999,999

CN RR TO S JCT STH 22

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2025 6590-02-72 09/09/2025 303 LET RSRF10 6.951 STH 110 FREMONT - MARION $2,000,000 - $2,999,999

STH 161 TO W JCT CTH C

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2025 6590-02-73 09/09/2025 303 LET RSRF10 5.176 STH 110 FREMONT - MARION $1,000,000 - $1,999,999

W JCT CTH C TO BERTRAM STREET

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2025 6590-02-78 09/09/2025 303 LET RSRF10 1.159 STH 110 C MARION, MAIN STREET $1,000,000 - $1,999,999

BERTRAM STREET TO USH 45

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 290: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 251North Central Region

WAUPACA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1510-01-31 303 I/E PSRS30 4.950 USH 010 STEVENS POINT - WAUPACA $100,000 - $249,999

ANDERSON ROAD TO APPLETREE LANE WB

DESIGN/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

1510-02-30 303 I/E PSRS30 8.960 USH 010 WAUPACA - APPLETON $100,000 - $249,999

APPLETREE LANE TO OLD STH 49, EB

DESIGN/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

1510-02-32 303 I/E PSRS30 6.890 USH 010 WAUPACA - APPLETON $100,000 - $249,999

OLD STH 49 TO WINNEBAGO CO LINE WB

DESIGN/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

6290-05-31 303 I/E PSRS30 5.680 USH 010 STEVENS POINT - WAUPACA $250,000 - $499,999

PORTAGE CO LINE TO ANDERSON ROAD

DESIGN/FULL PSE/PREV MAINTENANCE

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1600-15-20 05/25/2023 303 R/E PVRPLA 8.030 USH 045 CLINTONVILLE - WITTENBERG $0 - $99,999

CTH C TO GOLLNOW ROAD

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

2023 1600-15-70 05/09/2023 303 LET PVRPLA 8.030 USH 045 CLINTONVILLE - WITTENBERG $11,000,000 - $11,999,999

CTH C TO GOLLNOW ROAD

CONST/PVRPLA

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1140-00-77 11/11/2025 303 LET PVRPLA 7.490 USH 045 MANCHESTER - CLINTONVILLE $8,000,000 - $8,999,999

GIVENS ROAD TO CHURCH ROAD

CONST/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 291: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 252North Central Region

WAUSHARA

2022-2025 FINAL STIP Project Listing 252North Central Region

WAUSHARA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6987-00-73 05/10/2022 206 LET PVRPLA 5.210 CTH E CTH M - WAUPACA COUNTY LINE $2,000,000 - $2,999,999

CTH E TO CTH AE

CONST/PVRPLA

STP RURAL STBG <5K POP FAST

2022 1166-05-77 09/13/2022 303 LET RSRF20 13.940 IH 039 PACKWAUKEE - PLAINFIELD $7,000,000 - $7,999,999

MARQUETTE COUNTY LINE TO CTH O, NB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1166-07-79 03/08/2022 303 LET PVRPLA 7.470 IH 039 COLOMA - PLAINFIELD $6,000,000 - $6,999,999

COTTONVILLE AVENUE TO CTH O, SB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1166-07-80 11/08/2022 303 LET RSRF20 5.540 IH 039 COLOMA - STEVENS POINT $2,000,000 - $2,999,999

CTH O TO PORTAGE COUNTY LINE, SB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1166-07-99 02/25/2022 303 SFA PVRPLA 7.420 IH 039 COTTONVILLE AVENUE TO CTH O, SB $0 - $99,999

COLOMA - PLAINFIELD

TRAFFIC MITIGATION 1166-07-79

BACKBONE NON-FEDERAL

2022 1166-08-79 03/08/2022 303 LET RSRF20 5.860 IH 039 PACKWAUKEE - COLOMA $3,000,000 - $3,999,999

MARQUETTE C L TO COTTONVILLE AVE,SB

CONSTR/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 6871-00-70 03/12/2024 205 LET BRRPL 0.000 LOC STR T SAXEVILLE, 29TH DRIVE $250,000 - $499,999

Page 292: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 253North Central Region

WAUSHARA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

AUSTIN CREEK BRIDGE P-69-0012

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2022 6170-00-70 12/13/2022 303 LET PVRPLA 12.990 STH 021 COLOMA - WAUTOMA $10,000,000 - $10,999,999

MADISON STREET TO STH 22

CONST/RECONDITION

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 6170-00-74 12/13/2022 303 LET PVRPLA 0.482 STH 021 COLOMA - WAUTOMA $750,000 - $999,999

MADISON STREET TO STH 22

CONST/HSIP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMPPROG-FA

2025 6180-00-60 08/12/2025 303 LET PSRS20 0.046 STH 021 REDGRANITE - OSHKOSH $250,000 - $499,999

FREDERICKS CREEK CULVERT C-69-9000

CONST/CULVERT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

2025 6180-00-71 08/12/2025 303 LET RSRF10 4.990 STH 021 REDGRANITE - OSHKOSH $4,000,000 - $4,999,999

STH 49 TO WINNEBAGO COUNTY LINE

CONSTR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 6866-06-70 02/14/2023 303 LET RSRF10 7.040 STH 152 WAUTOMA - MT MORRIS $2,000,000 - $2,999,999

NORTH TOWNLINE ROAD TO CTH G

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 4769-98-22 10/25/2022 305 MIS TOPM 0.000 VARHWY

WAUSHARA CO PAVEMENT MARKINGTMA'S

$100,000 - $249,999

LOCATIONS ON STN PER ANNUAL PLAN

Page 293: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 254North Central Region

WAUSHARA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

TRF OPS-PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM STBG <5K POP FAST

Page 294: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 255North Central Region

WOOD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6999-11-78 04/12/2022 206 LET RECST 0.389 LOC STR C WISCONSIN RAPIDS, W JACKSON ST $3,000,000 - $3,999,999

W RIVERVIEW EXP TO JACKSON ST BRDGE

CONST/RECONSTRUCT

STP URBAN 20,000 - 50,000 STBG 5-200K POP FASTG

2023 7397-01-70 03/14/2023 205 LET BRRPL 0.009 LOC STR T ROCK, LYNN LINE ROAD $250,000 - $499,999

EAST FORK BLACK RIVER BRIDGE

CONST/REPLACEMENT

LOCAL BRIDGES STBG FAST OFF-SYSTEM BRIDG

2024 6995-12-70 01/09/2024 206 LET RECST 0.240 LOC STR C MARSHFIELD, S LINCOLN AVENUE $1,000,000 - $1,999,999

WEST 5TH STREET TO ADLER ROAD

CONST/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2023 6995-12-01 05/25/2023 290 M/E MISC 0.000 NON HWY ADLER ROAD TRAIL EXTENSION $0 - $99,999

CITY OF MARSHFIELD

DESIGN/MISC

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

2024 6995-12-71 04/25/2024 290 LLC MISC 0.000 NON HWY ADLER ROAD TRAIL EXTENSION $250,000 - $499,999

CITY OF MARSHFIELD

CONST/MISC

TAP 5,000 - 50,000 TRANS ALTERNATIVES 5-200K

6340-00-05 303 I/E PVRPLA 0.891 STH 013 WISCONSIN RAPIDS - MARSHFIELD $0 - $99,999

EDGEWOOD PL TO STH 66

DESIGN/PAVEMENT REPLACMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 6950-04-22 03/25/2022 303 R/E RSRF20 3.950 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $100,000 - $249,999

SWANSON ROAD TO SENECA ROAD

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

Page 295: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 256North Central Region

WOOD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1520-01-52 08/25/2024 303 R/R PSRS20 0.000 STH 054 WISCONSIN RAPIDS - PLOVER $250,000 - $499,999

26TH STREET NORTH TO CTH B

BIRON WCL XING SIGNALS 281612V

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6950-04-72 02/13/2024 303 LET RSRF20 3.950 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $3,000,000 - $3,999,999

SWANSON ROAD TO SENECA ROAD

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 6950-04-73 02/13/2024 303 LET RSRF10 1.090 STH 054 DEXTERVILLE - WISCONSIN RAPIDS $500,000 - $749,999

CTH G TO SWANSON ROAD

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 1520-00-24 02/25/2022 303 R/E PVRPLA 0.032 STH 073 C OF PITTSVILLE $0 - $99,999

STH 73 AND STH 80 INTERSECTION

REAL ESTATE/PVRPLA

STATE 3R NON-FEDERAL

2022 6320-00-25 05/25/2022 303 R/E RSRF20 2.080 STH 073 PLAINFIELD - WISCONSIN RAPIDS $0 - $99,999

STH 173 TO STH 54

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2022 6320-00-56 04/25/2022 303 R/R RSRF20 0.000 STH 073 PLAINFIELD - WISCONSIN RAPIDS $0 - $99,999

STH 173 TO STH 54

RR CROSSING SWITCH/TRACK 392709Y

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1520-00-74 02/13/2024 303 LET PVRPLA 0.032 STH 073 C OF PITTSVILLE $1,000,000 - $1,999,999

STH 73 AND STH 80 INTERSECTION

CONSTR/PVRPLA

STATE 3R STBG 5-200K POP FASTG

Page 296: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 257North Central Region

WOOD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1520-00-77 02/13/2024 303 LET PVRPLA 5.860 STH 073 WISCONSIN RAPIDS - PITTSVILLE $4,000,000 - $4,999,999

INDUSTRIAL STREET TO STH 186

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG 5-200K POP FASTG

2024 6320-00-75 02/13/2024 303 LET RSRF20 2.080 STH 073 PLAINFIELD - WISCONSIN RAPIDS $1,000,000 - $1,999,999

STH 173 TO STH 54

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1620-02-27 02/25/2022 303 R/E RSRF20 1.617 STH 080 C OF PITTSVILLE $0 - $99,999

POPLAR ST TO STH 73

REAL ESTATE/RESURFACE

STATE 3R NON-FEDERAL

2024 1620-02-77 02/13/2024 303 LET RSRF20 1.617 STH 080 C OF PITTSVILLE $1,000,000 - $1,999,999

POPLAR STREET TO STH 73

CONSTR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1620-02-87 02/13/2024 303 LET RSRF20 1.617 STH 080 C OF PITTSVILLE $100,000 - $249,999

POPLAR STREET TO STH 73

CONSTR/LOCAL UTILITY

STATE 3R NON-FEDERAL

2025 1620-02-76 09/09/2025 303 LET PVRPLA 4.710 STH 080 NECEDAH - BABCOCK $5,000,000 - $5,999,999

JUNEAU CO LINE TO STH 173 N

CONSTR/PAVEMENT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 6933-00-21 06/25/2022 303 R/E PSRS20 0.035 STH 173 BABCOCK - NEKOOSA $0 - $99,999

CULVERT REPLACEMENT

REAL ESTATE/PSRS20

STATE 3R NON-FEDERAL

Page 297: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 258North Central Region

WOOD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 6933-00-57 11/25/2022 303 R/R COLD10 0.000 STH 173 BABCOCK - NEKOOSA $100,000 - $249,999

STH 80 NB TO CRANBERRY BRIDGE

RAIL CROSSING SIGNALS 392695T

STATE 3R STBG <5K POP FAST

2022 7020-00-71 04/12/2022 303 LET RSRF30 4.157 STH 173 WYEVILLE - BABCOCK $2,000,000 - $2,999,999

JUNEAU CO LN TO STH 80

CONSTR/RESURFACE

STATE 3R STBG <5K POP FAST

2024 6933-00-61 09/10/2024 303 LET PSRS20 0.035 STH 173 BABCOCK - NEKOOSA $250,000 - $499,999

CULVERT REPLACEMENT

CONST/PSRS20

STATE 3R STBG <5K POP FAST

2024 6933-00-77 09/10/2024 303 LET RSRF15 5.230 STH 173 BABCOCK - NEKOOSA $2,000,000 - $2,999,999

STH 80 NB TO CRANBERRY BRIDGE

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2025 6999-21-20 03/25/2025 303 R/E MISC 10.300 VAR HWY C WISCONSIN RAPIDS, VARIOUS STREETS $100,000 - $249,999

STH 13/54/73 CURB RAMP IMPROVEMENTS

PER WISDOT ADA TRANS PLAN 412 RAMPS

CURB RAMP STANDALONE NON-FEDERAL

Page 298: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program

Northwest Region Projects

Page 299: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 259Northwest Region

ASHLAND

2022-2025 FINAL STIP Project Listing 259Northwest Region

ASHLAND

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 8895-00-14 03/12/2024 206 LET RECST 0.350 LOC STR C ASHLAND, PRENTICE AVE $1,000,000 - $1,999,999

11TH STREET E TO 6TH STREET E

CONSTRUCTION/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2024 9955-00-70 01/09/2024 205 LET BRRPL 0.011 LOC STR C MELLEN, E TYLER AVE $500,000 - $749,999

BAD RIVER BRIDGE B-02-0073

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1610-01-12 303 I/E RSRF10 18.070 STH 013 PARK FALLS - MELLEN $100,000 - $249,999

PRICE CO LN TO MORSE RD

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1610-00-27 05/25/2022 303 R/E RSRF20 3.680 STH 013 MELLEN - ASHLAND $0 - $99,999

BUTTERWORTH RD TO USH 2

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 1610-00-56 08/25/2022 303 R/R MISC 0.000 STH 013 C MELLEN, MAIN STREET $250,000 - $499,999

WISCONSIN CENTRAL LTD RR 699392L

RR/UPGRADE RAIL CROSSING

STATE 3R SURFACE TRANSP BLOCK GRTS-

2022 1610-00-57 08/25/2022 303 R/R MISC 0.000 STH 013 C MELLEN, MAIN STREET $250,000 - $499,999

WISCONSIN CENTRAL LTD RR 699392L

RR/INSTALL FLASHING LIGHTS & GATES

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1610-00-76 01/10/2023 303 LET PVRPLA 2.980 STH 013 MELLEN - ASHLAND $5,000,000 - $5,999,999

JEFFERSON AVE TO GOLF COURSE ROAD

CONSTRUCTION/RESURFACING

Page 300: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 260Northwest Region

ASHLAND

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1610-00-78 01/10/2023 303 LET MISC 0.960 STH 013 MELLEN - ASHLAND $1,000,000 - $1,999,999

JEFFERSON AVE TO GOLF COURSE ROAD

CONSTRUCTION/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2023 1610-00-86 01/10/2023 303 LET MISC 2.978 STH 013 MELLEN - ASHLAND $0 - $99,999

JEFFERSON AVE TO GOLF COURSE ROAD

CONSTRUCTION/SAFETY/RUMBLE STRIPS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1610-00-77 11/12/2024 303 LET RSRF20 3.680 STH 013 MELLEN - ASHLAND $5,000,000 - $5,999,999

BUTTERWORTH RD TO USH 2

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 1610-00-80 11/12/2024 303 LET MISC 2.680 STH 013 MELLEN - ASHLAND $500,000 - $749,999

BUTTERWORTH RD TO USH 2

CONSTRUCTION/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2024 9925-00-70 11/12/2024 303 LET RSRF20 10.290 STH 169 MELLEN - USH 2 $4,000,000 - $4,999,999

STH 13 TO ASHLAND/IRON CO LN

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

1189-01-02 303 I/E BRRHB 0.000 USH 002 ASHLAND - SAXON $0 - $99,999

BEARTRAP CREEK BRIDGE B-02-0014

DESIGN - FULL PS&E BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2023 1180-44-70 11/14/2023 303 LET RSRF20 9.000 USH 002 ODANAH - SAXON $4,000,000 - $4,999,999

Page 301: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 261Northwest Region

ASHLAND

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

GOVERNMENT ROAD TO EAST COUNTYLINE

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

Page 302: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 262Northwest Region

BARRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8833-00-71 05/10/2022 206 LET RCND20 4.170 CTH A DALLAS - CTH SS $3,000,000 - $3,999,999

CTH U TO CTH I

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP FAST

2025 8798-00-73 11/11/2025 303 LET BRRHB 0.157 CTH D C CHETEK, SUMNER AVE $1,000,000 - $1,999,999

LAKE CHETEK BRIDGE B-03-0036

CONSTRUCTION/CONCRETE OVERLAY

STATE 3R STBG <5K POP - FAST EXT

2023 8829-00-01 05/25/2023 206 C/E MISC 0.036 CTH O DALLAS - RICE LAKE $100,000 - $249,999

DECKER DRIVE INTERSECTION

DESIGN - FULL PS&E SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2023 8829-00-71 11/14/2023 206 LET MISC 0.036 CTH O DALLAS - RICE LAKE $250,000 - $499,999

DECKER DRIVE INTERSECTION

CONSTR/SFTY/INTERSECTION IMPRVMNTS

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 8953-00-71 12/13/2022 205 LET BRRHB 0.022 CTH SS NEW AUBURN - CHETEK $500,000 - $749,999

CHETEK RIVER BRIDGE B-03-0725

CONSTRUCTION/BRRHB

LOCAL BRIDGES STBG <5K POP - FAST EXT

2022 8335-00-70 03/08/2022 205 LET BRRPL 0.026 LOC STR T VANCE CREEK, 5TH ST & 1/2 AVE $250,000 - $499,999

VANCE CREEK BRIDGE B-03-0210

CONSTRUCTION/BRRPL

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

8570-00-01 303 I/E BRRHB 0.000 STH 048 RICE LAKE - BIRCHWOOD $0 - $99,999

RED CEDAR RIVER BRIDGE B-03-0096

DESIGN - FULL PSE&E BRRHB

SHR BRIDGES STBG <5K POP - FAST EXT

Page 303: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 263Northwest Region

BARRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8120-00-70 11/08/2022 303 LET MISC 0.500 STH 048 C RICE LAKE, HAMMOND AVENUE $1,000,000 - $1,999,999

DRAINAGE WAY CULVERT C-03-0063

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG 5-200K POP FAST EXT

2022 8120-07-70 05/10/2022 303 LET RSRF20 3.850 STH 048 MCKINLEY - RICE LAKE $2,000,000 - $2,999,999

STH 25 TO WEST AVENUE

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

2024 8120-02-66 02/13/2024 303 LET MISC 9.120 STH 048 MCKINLEY - RICE LAKE $250,000 - $499,999

USH 63 NORTH TO STH 25

CONS/SFTY/WIDN PAVD SHLDR/RUMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2024 8120-02-76 02/13/2024 303 LET COLD20 9.120 STH 048 MCKINLEY - RICE LAKE $5,000,000 - $5,999,999

USH 63 NORTH TO STH 25

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1195-05-02 303 I/E BRRHB 0.000 USH 053 NEW AUBURN - RICE LAKE $0 - $99,999

CTH W BRIDGE B-03-0039 & B-03-0040

DESIGN - FULL PS&E BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

1195-06-33 303 I/E BRPVTV 0.336 USH 053 NEW AUBURN - SPOONER $0 - $99,999

BRDG PAINT B-03-0037,0038,0047,0057

DESIGN/BRIDGE PAINTS

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1196-04-98 03/25/2022 303 SFA MISC 8.350 USH 053 CTH I TO USH 8 (NB) $0 - $99,999

NEW AUBURN - RICE LAKE

TRF MITIFGATION(CONS ID 1196-04-78)

BACKBONE NON-FEDERAL

Page 304: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 264Northwest Region

BARRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1196-05-97 03/25/2022 303 SFA MISC 7.650 USH 053 CHIPPEWA CO LINE TO CHETEK RIVER $0 - $99,999

NEW AUBURN - RICE LAKE

TRAFFIC MITIGATION 1196-05-77

BACKBONE NON-FEDERAL

2023 1196-04-77 11/14/2023 303 LET RSRF20 16.630 USH 053 NEW AUBURN - RICE LAKE $12,000,000 - $12,999,999

CHIPPEWA COUNTY LINE - USH 8 (SB)

CONSTR/RESURFACE/BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1196-04-97 03/25/2023 303 SFA MISC 0.000 USH 053 CHIPPEWA COUNTY LINE TO USH 8 (SB) $0 - $99,999

NEW AUBURN - RICE LAKE

TRF MITIGATION CONSTR ID 1196-04-77

BACKBONE NON-FEDERAL

2023 1198-10-77 12/12/2023 303 LET PVRPLA 7.830 USH 053 RICE LAKE - SPOONER $20,000,000 - $24,999,999

26TH AVE TO PINE GROVE RD (NB & SB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1198-10-78 12/12/2023 303 LET MISC 1.100 USH 053 RICE LAKE - SPOONER $100,000 - $249,999

26TH AVENUE TO 27TH AVENUE

CONSTR/SAFETY/CABLE BARRIER

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2024 1195-05-60 11/12/2024 303 LET BRRHB 0.050 USH 053 RICE LAKE - SPOONER $250,000 - $499,999

OAKLAWN RD/22ND 1/2 AVE SB B030050

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1195-06-60 11/12/2024 303 LET BRRHB 0.050 USH 053 RICE LAKE - SPOONER $250,000 - $499,999

OAKLAWN RD/22ND 1/2 AVE NB B030051

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 305: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 265Northwest Region

BARRON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1550-04-22 09/25/2022 303 R/E MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $0 - $99,999

BEAVER DAM LAKE C-03-1459

REAL ESTATE ACQUISTION/1550-04-79

STATE 3R NON-FEDERAL

2022 1550-04-24 11/25/2022 303 R/E RSRF20 2.330 USH 063 C CUMBERLAND, ELM STR AND 2ND AVE $0 - $99,999

WEST JUNCTION STH 48 TO CHARRIE LN

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 1550-04-27 11/25/2023 303 R/E RSRF20 0.000 USH 063 CUMBERLAND - SPOONER $0 - $99,999

CHARRIE LN TO BARRON/WASHBURN CO LN

REAL ESTATE ACQUISTION

STATE 3R NON-FEDERAL

2024 1550-04-74 11/12/2024 303 LET RSRF20 2.303 USH 063 C CUMBERLAND, ELM STR AND 2ND AVE $2,000,000 - $2,999,999

WEST JUNCTION STH 48 TO CHARRIE LN

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 1550-04-79 11/12/2024 303 LET MISC 0.154 USH 063 C CUMBERLAND, SUPERIOR AVENUE $1,000,000 - $1,999,999

BEAVER DAM LAKE C-03-0066

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R NON-FEDERAL

2025 1550-04-77 11/11/2025 303 LET RSRF20 6.517 USH 063 CUMBERLAND - SPOONER $4,000,000 - $4,999,999

CHARRIE LN TO BARRON/WASHBURN CO LN

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 306: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 266Northwest Region

BAYFIELD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1560-00-08 303 I/E MISC 0.016 LOCSTR

DRUMMOND - USH 2 $0 - $99,999

20 MILE CREEK CULVERT C-04-0001

DESIGN - FULL PSE&E, CULVERT

STATE 3R NATIONAL HIGHWAY PERFFAST

8510-00-06 303 I/E MISC 0.022 STH 013 PORT WING - SUPERIOR $100,000 - $249,999

.05 MILES W OF AIRPORT RD

DESIGN/SHORELINE RPR WAYSIDE OVLK

ROADSIDE FACILITIES SURFACE TRANSP BLOCK GRTS-

2022 8160-00-23 11/25/2022 303 R/E BRRPL 0.000 STH 013 ASHLAND - BAYFIELD $0 - $99,999

LITTLE WHITTLESEY CREEK B-04-0037

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2022 8160-00-25 05/25/2022 303 R/E MISC 1.100 STH 013 C WASHBURN, BAYFIELD STREET $0 - $99,999

THOMPSON CREEK TO WASHINGTON AVE

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 8510-03-72 11/08/2022 303 LET MISC 21.520 STH 013 CORNUCOPIA - SUPERIOR $1,000,000 - $1,999,999

BARK POINT ROAD TO CTH H

CONSTRUCTUCTION/MISC/SMALLCULVERTS

STATE 3R STBG <5K POP FAST

2023 8160-00-26 11/25/2023 303 R/E PVRPLA 2.080 STH 013 C WASHBURN, BAYFIELD STREET $0 - $99,999

WASHINGTON AVE TO SUPERIOR AVE

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8160-00-75 12/12/2023 303 LET PVRPLA 1.100 STH 013 C WASHBURN, BAYFIELD STREET $5,000,000 - $5,999,999

THOMPSON CREEK TO WASHINGTON AVE

Page 307: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 267Northwest Region

BAYFIELD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2023 8160-00-78 12/12/2023 303 LET MISC 0.875 STH 013 C WASHBURN, BAYFIELD STREET $1,000,000 - $1,999,999

THOMPSON CREEK TO WASHINGTON AVE

CONSTR/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2024 8510-00-72 09/10/2024 303 LET BRRHB 0.011 STH 013 BAYFIELD - CORNUCOPIA $100,000 - $249,999

SAND RIVER BRIDGE B-04-0011

CONSTRUCTION/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP - FAST EXT

2024 8510-02-77 12/10/2024 303 LET COLD20 7.389 STH 013 CORNUCOPIA - PORT WING $3,000,000 - $3,999,999

BARK POINT ROAD TO CTH A

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2025 8160-00-73 09/09/2025 303 LET BRRPL 0.004 STH 013 ASHLAND - BAYFIELD $750,000 - $999,999

LITTLE WHITTLESEY CREEK B-04-0126

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2025 8160-00-76 12/09/2025 303 LET PVRPLA 1.030 STH 013 C WASHBURN, BAYFIELD STREET $5,000,000 - $5,999,999

WASHINGTON AVE TO SUPERIOR AVE

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEX E

2025 8160-00-77 12/09/2025 303 LET MISC 1.030 STH 013 C WASHBURN, BAYFIELD STREET $1,000,000 - $1,999,999

WASHINGTON AVE TO SUPERIOR AVE

CONSTRUCTION/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2025 8510-00-71 11/11/2025 303 LET MISC 0.564 STH 013 CORNUCOPIA - PORT WING $1,000,000 - $1,999,999

LOST CREEK CULVERTS C-04-0070,71,72

Page 308: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 268Northwest Region

BAYFIELD

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTRUCTION/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2024 8150-00-70 09/10/2024 303 LET BRRPL 0.003 STH 027 HAYWARD - BRULE $500,000 - $749,999

OUNCE RIVER BRIDGE B-04-0125

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2025 1180-00-79 09/09/2025 303 LET BRRHB 0.024 USH 002 INO - ASHLAND $750,000 - $999,999

N FISH CREEK BRIDGE B-04-0022

CONSTR/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP FAST

2022 1560-02-24 05/25/2022 303 R/E MISC 0.380 USH 063 DRUMMOND - USH 2 $0 - $99,999

MILL POND DAM

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 1560-02-74 12/12/2023 303 LET MISC 0.380 USH 063 DRUMMOND - USH 2 $1,000,000 - $1,999,999

MILL POND DAM

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 309: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 269Northwest Region

BUFFALO

2022-2025 FINAL STIP Project Listing 269Northwest Region

BUFFALO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7317-00-70 03/08/2022 205 LET BRRPL 0.026 CTH J STH 37 - CTH JJ $250,000 - $499,999

TIFFANY CREEK BRIDGE B-06-0195

CONSTRUCTION/BRRPL

LOCAL BRIDGES SURFACE TRANS BLOCK-FLEX E

2023 7170-00-76 11/14/2023 303 LET RSRF20 13.560 STH 025 WABASHA - DURAND $7,000,000 - $7,999,999

STH 35 N TO PLEASANT RIDGE RD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 7160-04-75 12/13/2022 303 LET BRRPL 0.470 STH 035 TREMPEALEAU - FOUNTAIN CITY $3,000,000 - $3,999,999

MISSISSIPPI RVR TRIBUTARY/3 BRIDGES

CONSTRUCT/BRRPL B-06-0201,0204,0206

SHR BRIDGES STBG <5K POP - FAST EXT

2025 7160-00-72 09/09/2025 303 LET BRRHB 0.064 STH 035 FOUNTAIN CITY - ALMA $500,000 - $749,999

WAUMANDEE CREEK BRIDGE B-06-0059

CONSTRUCTION/BRRHB/CONCRETEOVERLAY

SHR BRIDGES STBG <5K POP - FAST EXT

2025 7160-04-56 10/25/2025 303 R/R RSRF20 0.029 STH 035 TREMPEALEAU - ALMA $250,000 - $499,999

BNSF R/R X-ING 079923U

RR OPS - SIGNALS

STATE 3R STBG <5K POP - FAST EXT

2025 7160-04-76 11/11/2025 303 LET RSRF20 8.489 STH 035 TREMPEALEAU - ALMA $5,000,000 - $5,999,999

OLD STH 35 TO INDIAN CREEK RD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 7125-00-20 05/25/2022 303 R/E PVRPLA 3.470 STH 037 ALMA - MONDOVI $100,000 - $249,999

STH 88 TO USH 10

Page 310: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 270Northwest Region

BUFFALO

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 7125-00-71 11/08/2022 303 LET BRRPL 0.147 STH 037 ALMA - MONDOVI $1,000,000 - $1,999,999

BRANCH TROUT CREEK BRIDGE B-06-0207

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2024 7125-00-70 11/12/2024 303 LET PVRPLA 3.470 STH 037 ALMA - MONDOVI $7,000,000 - $7,999,999

STH 88 TO USH 10

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2024 7125-00-72 11/12/2024 303 LET MISC 1.300 STH 037 ALMA - MONDOVI $750,000 - $999,999

STH 88 TO USH 10

CONSTRUCTION/LOCAL UTILITIES

STATE 3R NON-FEDERAL

2025 7550-00-76 11/11/2025 303 LET RSRF20 0.710 STH 054 WINONA - GALESVILLE $250,000 - $499,999

MN/WI STATE LINE TO STH 35

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1530-05-04 303 I/E PVRPLA 1.480 USH010

DURAND - OSSEO $100,000 - $249,999

CTH A TO STH 37 N

DESIGN - FULL PS&E PVRPLA

STATE 3R STBG <5K POP - FAST EXT

Page 311: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 271Northwest Region

BURNETT

2022-2025 FINAL STIP Project Listing 271Northwest Region

BURNETT

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8841-00-20 08/25/2022 206 R/E RCND10 3.650 CTH D GRANTSBURG - STH 35 $0 - $99,999

N WILLIAMS ROAD TO CTH M

REAL ESTATE ACQUISITION

STP RURAL STBG <5K POP FAST

2022 8841-00-70 03/08/2022 206 LET RCND10 3.636 CTH D GRANTSBURG - STH 35 $1,000,000 - $1,999,999

N WILLIAMS ROAD TO CTH M

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP - FAST EXT

2022 8377-00-70 03/08/2022 205 LET BRRPL 0.054 LOC STR T UNION, YELLOW LAKE ROAD $500,000 - $749,999

YELLOW LAKE BRIDGE B-07-0060

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

8010-00-06 303 I/E PSRS40 21.270 STH 035 DANBURY - DAIRLAND $100,000 - $249,999

YELLOW RVR UNDER TO BURN/DOUG CO LN

DESIGN - FULL PS&E PSRS40

STATE 3R STBG <5K POP - FAST EXT

2022 8010-01-20 12/25/2022 303 R/E RSRF20 2.560 STH 035 SIREN - DANBURY $0 - $99,999

LANQUIST ST TO STH 70 E

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2025 8010-01-79 11/11/2025 303 LET RSRF20 2.560 STH 035 SIREN - DANBURY $6,000,000 - $6,999,999

LANQUIST ST TO STH 70 E

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

8040-00-01 303 I/E RSRF30 4.690 STH 070 ST. CROIX RIVER - GRANTSBURG $100,000 - $249,999

MN/WI STATE LN TO STH 48

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 312: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 272Northwest Region

BURNETT

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8040-01-74 09/13/2022 303 LET BRRHB 0.050 STH 070 ST CROIX RIVER - GRANTSBURG $1,000,000 - $1,999,999

ST CROIX RIVER BRIDGE B-07-0020

CONST/BRRHB/WI LEAD/COST SHARE MN

SHR BRIDGES NON-FEDERAL

2022 8560-01-73 05/10/2022 303 LET BRRHB 0.030 STH 077 ST CROIX RIVER - DANBURY $750,000 - $999,999

ST CROIX RIVER BRIDGE B-07-0006

CONST/BRRHB/WI LEAD/COST SHARE MN

SHR BRIDGES NON-FEDERAL

2024 8560-01-24 11/25/2024 303 R/E PSRS40 3.960 STH 077 ST CROIX RIVER - DANBURY $0 - $99,999

MN/WI STATE LN TO STH 35 S

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

Page 313: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 273Northwest Region

CHIPPEWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 8902-05-70 11/14/2023 205 LET BRRPL 0.027 CTH G STH 29 - STH 64 $1,000,000 - $1,999,999

YELLOW RIVER BRIDGE B-09-0394

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 8996-01-07 01/09/2024 206 LET RECST 0.338 CTH J CHIPPEWA FALLS - CTH K $1,000,000 - $1,999,999

CTH J & 50TH AVE INTERSECTION

CONSTRUCTION/RECONSTRUCT

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2022 8953-04-72 03/08/2022 206 LET PVRPLA 3.139 CTH SS BLOOMER - NEW AUBURN $2,000,000 - $2,999,999

83RD STREET TO CTH Q

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP - FAST EXT

2023 8919-03-75 11/14/2023 206 LET PVRPLA 3.290 CTH X CHIPPEWA FALLS - CADOTT $3,000,000 - $3,999,999

197TH ST TO CTH XX

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2023 8915-00-71 01/10/2023 205 LET BRRPL 0.010 LOC STR T ARTHUR, 155TH AVE $250,000 - $499,999

LITTLE DRYWOOD CREEK BRIDGE B090395

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 7862-00-70 02/13/2024 205 LET BRRPL 0.010 LOC STR T SIGEL, 240TH STREET $250,000 - $499,999

PAINT CREEK BRIDGE B-09-0393

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 7863-00-72 01/09/2024 290 LET MISC 0.000 OFF SYS CHIPPEWA COUNTY, 50TH AVE TRAIL $1,000,000 - $1,999,999

STILLSON SCHOOL TO CTH J

CONSTR/TAP/SHARED USE PATH

BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E

Page 314: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 274Northwest Region

CHIPPEWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

8180-00-03 303 I/E RSRF30 2.400 STH 027 CORNELL - LADYSMITH $0 - $99,999

JOHNSON ROAD TO STH 64 E

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2023 7070-06-72 02/14/2023 303 LET COLD20 5.520 STH 027 AUGUSTA - CADOTT $3,000,000 - $3,999,999

EAU CLAIRE/CHIPPEWA CO LN TO STH 29

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2024 8200-00-21 09/25/2024 303 R/E RSRF20 15.560 STH 027 CADOTT - CORNELL $0 - $99,999

STH 29 TO JOHNSON ROAD

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2025 8200-00-71 09/09/2025 303 LET RSRF20 15.420 STH 027 CADOTT - CORNELL $8,000,000 - $8,999,999

STH 29 TO JOHNSON ROAD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1050-00-12 303 I/E BRRPL 0.040 STH 029 CHIPPEWA FALLS - THORP $100,000 - $249,999

CTH X/37TH AVE BRIDGE B-09-0030

DESIGN - FULL PS&E BRRPL

BACKBONE NATIONAL HIGHWAY PERF FAST

1050-00-13 303 I/E BRRHB 0.000 STH 029 CHIPPEWA FALLS - THORP $0 - $99,999

CTH X BRIDGE B-09-0022

DESIGN - FULL PS&E BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

1050-00-33 303 I/E PSRS30 13.232 STH 029 MENOMONIE - CHIPPEWA FALLS $500,000 - $749,999

CTH T TO STILLSON CREEK (E & W BD)

DESIGN/MAINLINE&RAMP/JOINT REPAIRS

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 315: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 275Northwest Region

CHIPPEWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1050-00-30 06/25/2022 303 C/E RSRF20 14.065 STH 029 CHIPPEWA FALLS - ABBOTSFORD $1,000,000 - $1,999,999

320TH ST TO KOSER AVE EB & WB

DESIGN/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1050-01-20 01/25/2022 303 R/E BRRPL 0.036 STH 029 CHIPPEWA FALLS - CADOTT $0 - $99,999

50TH AVENUE BRIDGE B-09-0033

REAL ESTATE ACQUISITION

BACKBONE NON-FEDERAL

2023 1050-00-81 02/14/2023 303 LET BRPVTV 0.000 STH 029 NW REGION, STH 29 BRDG DECK SEALING $100,000 - $249,999

BRIDGE DECK SEALING (VAR)

CONSTRUCTION/BRIDGE DECK SEALING

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1050-01-79 01/09/2024 303 LET BRRPL 0.050 STH 029 CHIPPEWA FALLS - CADOTT $3,000,000 - $3,999,999

50TH AVENUE BRIDGE B-09-0309

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 8190-01-72 12/10/2024 303 LET PSRS40 9.150 STH 064 CORNELL - GILMAN $2,000,000 - $2,999,999

STH 27 N TO CTH H

CONSTRUCTION/HOT IN PLACE RECYCLING

STATE 3R STBG <5K POP - FAST EXT

2023 7255-00-71 11/14/2023 303 LET RSRF20 2.900 STH 124 LAKE HALLIE - CHIPPEWA FALLS $4,000,000 - $4,999,999

1500FT N CTHOO - 1300FT S BUS STH29

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 8610-02-74 02/13/2024 303 LET RSRF20 0.820 STH 124 C CHIPPEWA FALLS, BAY STREET $1,000,000 - $1,999,999

Page 316: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 276Northwest Region

CHIPPEWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

HIGH STREET TO BRIDGE STREET

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 8610-08-72 02/13/2024 303 LET RSRF20 10.610 STH 124 CHIPPEWA FALLS - BLOOMER $6,000,000 - $6,999,999

CTH S TO STH 64

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

2024 8610-08-73 02/13/2024 303 LET RSRF20 1.870 STH 124 CHIPPEWA FALLS - BLOOMER $1,000,000 - $1,999,999

ELM STREET TO CTH S

CONSTRUCTION/RESURFACING/RSRF20

STATE 3R NATIONAL HIGHWAY PERFFAST

8600-00-02 303 I/E RSRF20 3.640 STH 178 CHIPPEWA FALLS - CORNELL $100,000 - $249,999

STH 29 TO CTH S

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG 5-200K POP FAST EXT

8600-08-04 303 I/E BRRPL 0.000 STH 178 CHIPPEWA FALLS - CORNELL $100,000 - $249,999

ONEIL CREEK BRIDGE B-09-0010

DESIGN/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

1190-04-04 303 I/E BRRHB 0.000 USH 053 CHIPPEWA FALLS - NEW AUBURN $0 - $99,999

RHEINGAN CREEK BRIDGE B-09-0069

DESIGN - FULL PS&E BRRHB

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1190-08-79 12/12/2023 303 LET PVRPLA 7.595 USH 053 CHIPPEWA FALLS - NEW AUBURN $35,000,000 - $39,999,999

40TH AVENUE - CTH B (NB & SB)

Page 317: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 277Northwest Region

CHIPPEWA

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTRUCTION/PAVEMENTREPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1190-01-85 02/13/2024 303 LET BRPVTV 0.000 USH 053 NW REGION, USH 53 BRDG DECK SEALING $100,000 - $249,999

BRIDGE DECK SEALING (VAR)

CONSTRUCTION/BRIDGE DECK SEALING

BACKBONE NATIONAL HIGHWAY PERFFAST

8610-00-04 303 I/E BRPVTV 0.021 VARHWY

NW REGION, VARIOUS HIGHWAYS $0 - $99,999

THIN POLYMER DECK OVERLAYS

DESIGN - FULL PS&E BRPVTV

SHR BRIDGES SURFACE TRANS BLOCK-FLEX E

Page 318: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 278Northwest Region

CLARK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7840-03-73 11/08/2022 205 LET BRRPL 0.054 CTH G USH 10 - GREENWOOD $2,000,000 - $2,999,999

BLACK RIVER BRIDGE B-10-0398

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP - FAST EXT

2024 7839-03-71 11/12/2024 205 LET BRRPL 0.038 CTH M CTH I - THORP $1,000,000 - $1,999,999

S FORK EAU CLAIRE RVR BRDG B100397

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2022 7849-03-73 12/13/2022 206 LET PVRPLA 4.010 CTH Y USH 10 - STH 98 $1,000,000 - $1,999,999

USH 10 TO CTH H

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

2022 7854-00-72 04/12/2022 205 LET BRRPL 0.027 LOC STR T PINE VALLEY, FAIRGROUND AVE $250,000 - $499,999

JACK CREEK BRIDGE B-10-0400

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP - FAST EXT

2023 7859-00-71 02/14/2023 205 LET BRRPL 0.006 LOC STR T WASHBURN, CARDINAL AVE $250,000 - $499,999

ROCK CREEK BRIDGE B-10-0401

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 7839-00-70 02/13/2024 205 LET BRRPL 0.020 LOC STR T MEAD, STARKS ROAD $500,000 - $749,999

S FORK EAU CLAIRE RVR BRDG B100396

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 7850-00-71 03/12/2024 205 LET BRRPL 0.006 LOC STR T YORK, ROMADKA AVE $250,000 - $499,999

MIDDLE BR ONEILL CREEK BRDG B100399

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

Page 319: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 279Northwest Region

CLARK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1610-02-23 11/25/2023 303 R/E BRRPL 0.000 STH 013 ABBOTSFORD - MEDFORD $0 - $99,999

PORKY CREEK B-10-0240 & B-10-0241

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2025 1610-02-73 07/08/2025 303 LET BRRPL 0.040 STH 013 ABBOTSFORD - MEDFORD $750,000 - $999,999

PORKY CREEK B-10-0250 & B-10-0251

CONSTRUCTION/BRIDGE REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERFFAST

1050-01-04 303 I/E RSRF20 24.155 STH 029 THORP - ABBOTTSFORD $750,000 - $999,999

CTH D TO STH 13

DESIGN/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1050-00-62 12/10/2024 303 LET RSRF20 15.130 STH 029 CHIPPEWA FALLS - ABBOTSFORD $20,000,000 - $24,999,999

KOSER AVE TO CTH D EB & WB

CONSTRUCTION/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 7050-00-22 05/25/2022 303 R/E PVRPLA 12.590 STH 073 NEILLSVILLE - THORP $0 - $99,999

ROCK CREEK BRIDGE TO HUNT STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2024 7050-00-72 11/12/2024 303 LET RSRF20 11.710 STH 073 NEILLSVILLE - THORP $5,000,000 - $5,999,999

HUNT STREET TO STH 29 E

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2024 7050-00-73 11/12/2024 303 LET RSRF20 0.880 STH 073 NEILLSVILLE - THORP $500,000 - $749,999

ROCK CREEK BRIDGE TO HUNT STREET

Page 320: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 280Northwest Region

CLARK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP FAST

7520-00-10 303 I/E PSRS40 14.380 STH 095 MERRILLAN - NEILLSVILLE $100,000 - $249,999

CTH K TO STH 73 S

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2025 7040-00-72 09/09/2025 303 LET PSRS30 4.590 STH 098 GREENWOOD - SPENCER $2,000,000 - $2,999,999

STH 73 TO HELM STREET

CONSTRUCTION - ROADWAYMAINTENANCE

STATE 3R STBG <5K POP - FAST EXT

1520-02-03 303 I/E RSRF20 7.800 USH 010 FAIRCHILD - NEILLSVILLE $250,000 - $499,999

BACHELORS AVE TO STH 73 S

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1520-02-72 12/13/2022 303 LET COLD20 8.805 USH 010 OSSEO - NEILLSVILLE $4,000,000 - $4,999,999

USH 12 EAST JCT TO BACHELORS AVENUE

CONSTRUCTION/CIR/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 1520-00-63 01/25/2022 303 LFA MISC 0.000 VARHWY

NW REGION, CULVERT LINE & REPLACE $100,000 - $249,999

VARIOUS HIGHWAYS

CONSTR - LFA/CULVERTS

STATE 3R NON-FEDERAL

Page 321: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 281Northwest Region

DOUGLAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 8758-00-72 12/12/2023 206 LET RECST 3.580 CTH C MN STATE LINE - STH 35 $4,000,000 - $4,999,999

MN STATE LINE TO BARNES ROAD

CONSTRUCTION/RECONSTRUCT

STP RURAL STBG <5K POP FAST

2024 8758-00-52 05/25/2024 207 R/R MISC 0.000 CTH C DEWEY - STH 35 $250,000 - $499,999

BNSF RR XING 086402V

R/R OPS/SAFETY RAIL WARNING DEVICES

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

2024 8759-00-50 05/25/2024 207 R/R MISC 0.000 CTH W FOXBORO - DEWEY $250,000 - $499,999

BNSF RR XING 061443D

R/R OPS/SAFETY RAIL WARNING DEVICES

SAFETY - RAILROAD WARNING DEVICES RAIL HWY PROTECT DEV FAST

8998-00-35 206 I/E RECST 0.500 LOCSTR

C SUPERIOR, HAMMOND AVE $0 - $99,999

N 21ST STREET TO N 28TH STREET

DESIGN/RECONSTRUCTION

STP URBAN 50,000 - 200,000 NON-FEDERAL

2022 8381-00-50 01/25/2022 207 MIS MISC 0.000 LOCSTR

T AMNICON, LUNDEEN ROAD $0 - $99,999

RR CROSSING CLOSURE WCL 186114C

RR XING CLOSURE INCENTIVE PAYMENT

SAFETY - RAILROAD, ELIMINATION OFHAZARDS

RAIL HWY CRS HAZ ELM FAST

2023 8386-00-72 02/14/2023 205 LET BRRPL 0.016 LOCSTR

T GORDON, WEST MAIL ROAD $500,000 - $749,999

ST CROIX RIVER BRIDGE B-16-0147

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES NON-FEDERAL

Page 322: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 282Northwest Region

DOUGLAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 8998-00-36 12/12/2023 206 LET RECST 0.500 LOC STR C SUPERIOR, HAMMOND AVE $1,000,000 - $1,999,999

N 21ST STREET TO N 28TH STREET

CONSTRUCTION/RECONSTRUCTION

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

8998-00-37 290 I/E MISC 0.000 OFF SYS C SUPERIOR, VARIOUS LOCATIONS $0 - $99,999

BUS STOP IMPROVEMENTS

DESIGN/BUS STOP IMPRVMTS/TAP

TAP 50,000 - 200,000 NON-FEDERAL

2023 8998-00-38 02/25/2023 290 LLC MISC 0.000 OFF SYS C SUPERIOR, VARIOUS LOCATIONS $250,000 - $499,999

BUS STOP IMPROVEMENTS

CONSTR/BUS STOP IMPRVMTS/TAP

TAP 50,000 - 200,000 TRANS ALTERN >200K FAST EX

2022 8510-01-70 11/08/2022 303 LET RSRF20 15.790 STH 013 PORT WING - SUPERIOR $9,000,000 - $9,999,999

CTH H TO ENGDAHL ROAD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 8010-00-03 10/25/2022 303 C/E RSRF20 4.050 STH 035 C SUPERIOR, TOWER AVENUE $250,000 - $499,999

64TH STREET TO BELKNAP STREET

DESIGN/RESURFACE/CONCRETE REPAIR

STATE 3R NATIONAL HIGHWAY PERF FAST

1180-00-31 303 I/E PSRS20 6.520 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999

53RD AVE E TO CTH C

DESIGN/JOINT REPAIR

BACKBONE NON-FEDERAL

1180-01-02 303 I/E RSRF10 5.150 USH 002 SUPERIOR - WENTWORTH $100,000 - $249,999

USH 53 S TO CTH D

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 323: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 283Northwest Region

DOUGLAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1180-05-24 11/25/2022 303 R/E MISC 0.005 USH 002 WENTWORTH - BRULE $0 - $99,999

C-16-0100

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2024 1180-05-74 09/10/2024 303 LET MISC 0.005 USH 002 WENTWORTH - BRULE $500,000 - $749,999

BAYFIELD RD TO CTH D

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 1195-03-70 11/11/2025 303 LET BRRHB 0.000 USH 002 SUPERIOR - WENTWORTH $1,000,000 - $1,999,999

STH 13 BRIDGE B-16-0024

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE STBG 5-200K POP FASTG

1198-00-09 303 I/E MISC 0.160 USH 053 SOLON SPRINGS - SUPERIOR $0 - $99,999

USH 2 INTERCHANGE

DESIGN - FULL PS&E SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1198-03-23 05/25/2022 303 R/E RSRF20 1.556 USH 053 C SUPERIOR, EAST SECOND STREET $100,000 - $249,999

2ND AVENUE EAST TO HUGHITT AVENUE

REAL ESTATE ACQUISITION

BACKBONE NON-FEDERAL

2023 1198-00-79 11/14/2023 303 LET MISC 0.160 USH 053 SOLON SPRINGS - SUPERIOR $500,000 - $749,999

USH 2 INTERCHANGE

CONSTR - FULL PS&E SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1198-03-73 11/12/2024 303 LET RSRF20 1.552 USH 053 C SUPERIOR, EAST SECOND STREET $2,000,000 - $2,999,999

2ND AVENUE EAST TO HUGHITT AVENUE

CONSTRUCTION/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 324: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 284Northwest Region

DOUGLAS

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1198-03-80 11/12/2024 303 LET MISC 0.008 USH 053 C SUPERIOR, EAST SECOND STREET $750,000 - $999,999

E STREET INTERSECTION

CONSTRUCTION/SAFETY IMPROVEMENT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 325: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 285Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7996-00-43 02/14/2023 206 LET RECST 1.200 CTH B C MENOMONIE, CTH B $4,000,000 - $4,999,999

USH 12 TO EB IH-94 RAMPS

CONSTRUCTION/RECONSTRUCTION

STP URBAN 5,000 - 20,000 STBG 5-200K POP FASTG

2022 8923-09-70 05/10/2022 206 LET MISC 1.970 CTH BB USH 12 - CEDAR FALLS $250,000 - $499,999

USH 12 TO STH 25

CONSTR/HRRR/SAFETY TREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMP PROG-FA

2024 7879-03-74 01/09/2024 205 LET BRRPL 0.009 CTH C DOWNSVILLE - EAST COUNTY LINE $500,000 - $749,999

MUDDY CREEK BRIDGE B-17-0234

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2024 7881-05-73 11/12/2024 206 LET RCND20 1.560 CTH D SCL - STH 25 $2,000,000 - $2,999,999

CTH K TO 420TH STREET

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP FAST

2022 7880-07-73 03/08/2022 206 LET PVRPLA 2.539 CTH H CARYVILLE - CTH M $2,000,000 - $2,999,999

CTH HH TO CTH M

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP - FAST EXT

1020-05-33 303 I/E PSRS20 2.900 IH 094 MENOMONIE - EAU CLAIRE $250,000 - $499,999

WILSON CREEK - RED CEDAR RIVER

DESIGN - FULL PS&E CONCRETE REPAIR

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1021-01-25 02/25/2022 303 R/E BRRPL 0.009 IH 094 BALDWIN - MENOMONIE $0 - $99,999

HALL ESTATE RD/160TH ST B-17-0020

REAL ESTATE ACQUISITION

BACKBONE NON-FEDERAL

Page 326: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 286Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1022-05-70 11/12/2024 303 LET RSRF30 8.589 IH 094 MENOMONIE - EAU CLAIRE $13,000,000 - $13,999,999

RED CEDAR RIVER TO USH 12 (EB & WB)

CONSTRUCTION/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1022-07-78 12/10/2024 303 LET RSRF30 7.327 IH 094 MENOMONIE - EAU CLAIRE $13,000,000 - $13,999,999

USH 12/STH 29 TO STH 312 (EB & WB)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1020-00-81 02/11/2025 303 LET BRPVTV 0.000 IH 094 NW REGION, IH94 BRIDGE DECK SEALING $250,000 - $499,999

BRIDGE DECK SEALING (VAR)

CONSTRUCTION/BRIDGE DECK SEALING

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1021-01-78 11/11/2025 303 LET BRRHB 0.000 IH 094 BALDWIN - MENOMONIE $750,000 - $999,999

EAST BR WILSON CR BRIDGE B-17-0051

CONSTR/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1021-01-79 11/11/2025 303 LET BRRPL 0.030 IH 094 BALDWIN - MENOMONIE $2,000,000 - $2,999,999

HALL ESTATE RD/160TH ST B-17-0216

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1021-01-99 09/25/2025 303 SFA MISC 0.030 IH 094 HALL ESTATE RD/160TH ST B-17-0216 $0 - $99,999

BALDWIN - MENOMONIE

TRF MIT 1021-01-79

BACKBONE NON-FEDERAL

7220-00-09 303 I/E RSRF20 0.500 STH 025 DURAND - MENOMONIE $0 - $99,999

12TH AVE TO USH 12 E

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 327: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 287Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7220-00-78 03/08/2022 303 LET RSRF20 6.273 STH 025 DURAND - MENOMONIE $4,000,000 - $4,999,999

RED CEDAR RIVER TO 490TH STREET

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 8090-00-73 05/10/2022 303 LET MISC 0.040 STH 025 MENOMONIE - RIDGELAND $750,000 - $999,999

S FORK LOWER PINE CREEK C-17-0049

CONSTRUCTION/2-CELL BOX CULVERT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2025 8100-01-72 12/09/2025 303 LET COLD20 4.800 STH 025 MENOMONIE - RIDGELAND $4,000,000 - $4,999,999

IH 94 TO CTH D

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 7610-00-08 02/25/2022 303 C/E RSRF20 0.190 STH 029 SPRING VALLEY - MENOMONIE $0 - $99,999

STH 25 S TO USH 12 E

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 7610-00-77 09/09/2025 303 LET BRRHB 0.000 STH 029 SPRING VALLEY - MENOMONIE $250,000 - $499,999

RED CEDAR RIVER BRIDGE B-17-0005

CONSTRUCTION/BRIDGE REHABILITATION

SHR BRIDGES SURFACE TRANS BLOCK-FLEX E

2023 8620-00-25 11/25/2023 303 R/E RSRF20 8.900 STH 040 ELK MOUND - BLOOMER $0 - $99,999

USH 12 TO CTH M

REAL ESTATE ACQUISTION

STATE 3R NON-FEDERAL

2024 8620-00-74 09/10/2024 303 LET MISC 0.050 STH 040 ELK MOUND - BLOOMER $250,000 - $499,999

BRANCH SINKING CREEK C-17-1124

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R SURFACE TRANS BLOCK-FLEX E

Page 328: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 288Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2025 8620-00-54 08/25/2025 303 R/R MISC 0.000 STH 040 ELK MOUND - BLOOMER $250,000 - $499,999

WCL RR XING 692959P

R/R OPS - SIGNAL REPLACEMENT

STATE 3R STBG <5K POP - FAST EXT

2025 8620-00-55 08/25/2025 303 R/R MISC 0.000 STH 040 ELK MOUND - BLOOMER $100,000 - $249,999

WCL RR XING 692959P

R/R OPS - R/R XING SURFACE

STATE 3R STBG <5K POP - FAST EXT

2025 8620-00-75 12/09/2025 303 LET RSRF20 9.078 STH 040 ELK MOUND - BLOOMER $5,000,000 - $5,999,999

USH 12 TO CTH M

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2024 8110-01-72 09/10/2024 303 LET BRRHB 12.390 STH 064 CONNORSVILLE - BLOOMER $1,000,000 - $1,999,999

CTH O TO NORTH JCT CTH W

CONSTRUCTION/BRIDGE REHAB

STATE 3R STBG <5K POP - FAST EXT

2024 8110-01-78 12/10/2024 303 LET PSRS40 12.390 STH 064 CONNORSVILLE - BLOOMER $2,000,000 - $2,999,999

CTH O TO NORTH JCT CTH W

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

8640-00-02 303 I/E BRRHB 0.000 STH 079 MENOMONIE - CONNORSVILLE $0 - $99,999

S FK HAY RIVER BRIDGE B-17-0014

DESIGN - FULL PS&E BRRHB

SHR BRIDGES STBG <5K POP - FAST EXT

2024 8640-00-71 09/10/2024 303 LET BRRPL 0.201 STH 079 MENOMONIE - BOYCEVILLE $1,000,000 - $1,999,999

COON CREEK BRIDGE B-17-0368

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

Page 329: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 289Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 8640-00-73 09/10/2024 303 LET BRRPL 0.180 STH 079 MENOMONIE - CONNORSVILLE $1,000,000 - $1,999,999

CLACK CREEK BRIDGE B-17-0369

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

7120-00-06 303 I/E BRRPL 0.000 STH 085 DURAND - EAU CLAIRE $0 - $99,999

BR CHIPPEWA RIVER BRIDGE B-17-0131

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

2024 7120-00-74 09/10/2024 303 LET COLD20 9.692 STH 085 DURAND - EAU CLAIRE $2,000,000 - $2,999,999

CTH O TO 1010TH STREET

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2025 8630-00-70 11/11/2025 303 LET BRRHB 0.120 STH 170 GLENWOOD CITY - COLFAX $1,000,000 - $1,999,999

RED CEDAR RIVER BRIDGE B-17-0002

CONSTR/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP - FAST EXT

7600-00-03 303 I/E RSRF20 0.687 USH 012 MENOMONIE - EAU CLAIRE $100,000 - $249,999

RED CEDAR RIVER TO 6TH ST E

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

8949-00-08 303 I/E BRRPL 0.000 USH 012 BALDWIN - MENOMONIE $0 - $99,999

WILSON CREEK BRIDGE B-17-0979

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

2022 7600-01-75 05/10/2022 303 LET MISC 1.070 USH 012 C MENOMONIE, STOUT ROAD $1,000,000 - $1,999,999

6TH STREET TO 21ST STREET

CONST/SAFETY/TWO WAY LEFT TURN LANE

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 330: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 290Northwest Region

DUNN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 8949-00-70 05/14/2024 303 LET MISC 0.038 USH 012 BALDWIN - MENOMONIE $1,000,000 - $1,999,999

WILSON CREEK TRIB CULVERT C-17-0048

CONST/MISC/CULVERT REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2024 8949-00-77 09/10/2024 303 LET MISC 0.015 USH 012 C MENOMONIE, USH 12/PINE AVE E $750,000 - $999,999

STH 25 INTERSECTION

CONSTRUCTION/SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2025 7600-00-52 08/25/2025 303 R/R RSRF20 0.000 USH 012 MENOMONIE - EAU CLAIRE $0 - $99,999

UNION PACIFIC RR XING 411776X

RR OPS/CROSSING SURFACE UPGRADES

STATE 3R STBG <5K POP - FAST EXT

2025 7600-00-72 12/09/2025 303 LET RSRF20 1.238 USH 012 MENOMONIE - EAU CLAIRE $1,000,000 - $1,999,999

STH 29 TO PRINCETON DRIVE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2025 8949-00-76 12/09/2025 303 LET RSRF20 0.597 USH 012 BALDWIN - MENOMONIE $250,000 - $499,999

IH 94 TO STH 25 N

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 331: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 291Northwest Region

EAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7823-07-73 03/08/2022 206 LET RCND10 3.698 CTH D FALL CREEK - NCL $1,000,000 - $1,999,999

CTH XX TO STH 27

CONSTRUCTION/RECONDITION

STP RURAL STBG <5K POP - FAST EXT

2024 7995-02-63 03/12/2024 206 LET RECST 0.660 CTH F C EAU CLAIRE, STATE ST/CTH F $750,000 - $999,999

HEATHER ROAD TO HAMILTON AVE

CONSTRUCTION/RECONSTRUCT

STP URBAN 50,000 - 200,000 STBG 5-200K POP FAST EXT

2023 7831-06-70 02/14/2023 206 LET PVRPLA 2.600 CTH M SCL - USH 12 $1,000,000 - $1,999,999

SCL TO LANGE ROAD

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP FAST

1022-00-04 303 I/E BRRHB 0.148 IH 094 MENOMONIE - EAU CLAIRE $100,000 - $249,999

CHIPPEWA RIVER B-18-23,24,44,45

DESIGN - FULL PS&E BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1022-08-74 05/10/2022 303 LET PVRPLA 5.914 IH 094 MENOMONIE - EAU CLAIRE $20,000,000 - $24,999,999

STH 312/CTH EE TO STH 37

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-00-80 12/12/2023 303 LET BRRHB 0.228 IH 094 MENOMONIE - EAU CLAIRE $500,000 - $749,999

LOWES CREEK BRIDGE B-18-0228

CONSTRUCTION - BRRHB

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-00-90 12/25/2023 303 SFA MISC 0.036 IH 094 LOWES CREEK BRIDGE B-18-0228 $0 - $99,999

MENOMONIE - EAU CLAIRE

TRF MIT 1021-00-80

BACKBONE NON-FEDERAL

Page 332: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 292Northwest Region

EAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1021-03-71 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999

CTH J BRIDGE B-18-0212 (WEST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-03-72 09/12/2023 303 LET BRRPL 0.052 IH 094 EAU CLAIRE - OSSEO $4,000,000 - $4,999,999

CTH D BRIDGE B-18-0213 (EAST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-03-73 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $2,000,000 - $2,999,999

CTH J BRIDGE B-18-0211 (EAST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1021-03-91 11/25/2023 303 SFA MISC 0.000 IH 094 CTH J BRIDGE B-18-0212 (WEST BOUND) $100,000 - $249,999

EAU CLAIRE - OSSEO

TRF MITIGATION CONST ID 1021-03-71

BACKBONE NON-FEDERAL

2023 1022-08-94 03/25/2023 303 SFA MISC 5.840 IH 094 STH 312/CTH EE TO STH 37 $100,000 - $249,999

MENOMONIE - EAU CLAIRE

TRF MITIGATION/CONSTR ID 1022-08-74

BACKBONE NON-FEDERAL

2023 1022-09-74 09/12/2023 303 LET BRRPL 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999

CTH D BRIDGE B-18-0214 (WEST BOUND)

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

2023 1022-09-78 09/12/2023 303 LET PVRPLA 9.395 IH 094 EAU CLAIRE - OSSEO $50,000,000 - $59,999,999

USH 53 TO MALLARD ROAD (EB & WB)

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 333: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 293Northwest Region

EAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 1021-03-80 07/09/2024 303 LET BRRHB 0.050 IH 094 EAU CLAIRE - OSSEO $1,000,000 - $1,999,999

STH-93 BRIDGES B-18-0034, B-18-0119

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1022-09-98 03/25/2024 303 SFA MISC 0.000 IH 094 USH 53 TO MALLARD ROAD (EB & WB) $100,000 - $249,999

EAU CLAIRE - OSSEO

TRF MITIGATION/CONSTR ID 1022-09-78

BACKBONE NON-FEDERAL

2022 7995-02-61 05/10/2022 206 LET RECST 1.020 LOC STR C EAU CLAIRE, JEFFERS ROAD $1,000,000 - $1,999,999

STH 312 TO COUNTY LINE ROAD

CONSTRUCTION/RECST

STP URBAN 50,000 - 200,000 HWY INFRA 5K-200K POP

2023 7829-00-70 02/14/2023 205 LET BRRPL 0.016 LOC STR T CLEAR CREEK, E BUNTING ROAD $250,000 - $499,999

PINE CREEK BRIDGE B-18-0242

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2023 7995-02-59 02/14/2023 206 LET RECST 0.500 LOC STR C EAU CLAIRE, FAIRFAX STREET $1,000,000 - $1,999,999

S HASTINGS WAY TO SPOONER AVENUE

CONSTRUCTION/RECST

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2023 7995-02-65 02/14/2023 206 LET RECST 0.930 LOC STR C EAU CLAIRE, S HASTINGS WAY $1,000,000 - $1,999,999

GATEWAY DRIVE TO PINE LODGE ROAD

CONSTRUCTION/RECONSTRUCT

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

2024 7995-02-20 02/25/2024 303 R/E MISC 0.000 LOC STR C EAU CLAIRE, VARIOUS HIGHWAYS $0 - $99,999

STH 93, 312 & USH 12 CURB RAMPS

REAL ESTATE ACQUISITION/7995-02-72

CURB RAMP STANDALONE NON-FEDERAL

Page 334: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 294Northwest Region

EAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7995-02-69 07/25/2023 290 LLC MISC 0.000 OFF SYS C EAU CLAIRE, HALF MOON TRAIL $750,000 - $999,999

MADISON STREET TO FOLSOM STREET

CONSTRUCTION/TAP/BIKE PED TRAIL

BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E

2022 7070-00-20 06/25/2022 303 R/E MISC 0.065 STH 027 AUGUSTA - CADOTT $0 - $99,999

DARROW CREEK CULVERT C-18-1864

REAL ESTATE/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

2024 7590-00-73 09/10/2024 303 LET RSRF20 8.370 STH 093 ELEVA - EAU CLAIRE $5,000,000 - $5,999,999

SOUTH COUNTY LINE TO CEDAR ROAD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

7080-00-06 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $0 - $99,999

FIRST TRESTLE CREEK B-18-0073

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

7080-00-07 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $0 - $99,999

DIAMOND VALLEY CREEK B-18-0074

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

7090-00-07 303 I/E BRRHB 0.000 USH 012 C EAU CLAIRE, CLAIREMONT AVE $0 - $99,999

CHIPPEWA RIVER BRIDGE B-18-0114

DESIGN - FULL PS&E BRRHB

SHR BRIDGES STBG 5-200K POP FAST EXT

7090-00-08 303 I/E BRRHB 0.000 USH 012 C EAU CLAIRE, CLAIREMONT AVE $0 - $99,999

CHIPPEWA RIVER BRIDGE B-18-0171

DESIGN - FULL PS&E BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

Page 335: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 295Northwest Region

EAU CLAIRE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

7090-00-09 303 I/E BRRPL 0.000 USH 012 EAU CLAIRE - FAIRCHILD $100,000 - $249,999

OTTER CREEK BRIDGE B-18-0113

DESIGN - FULL PS&E BRRPL

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2024 7080-01-73 12/10/2024 303 LET RSRF20 6.835 USH 012 EAU CLAIRE - FAIRCHILD $4,000,000 - $4,999,999

INDUSTRIAL DR TO FALL CREEK UNDER

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1190-03-03 303 I/E RSRF20 0.530 USH 053 OSSEO - EAU CLAIRE $100,000 - $249,999

KEYSTONE CROSSING TO GOLF ROAD

DESIGN - FULL PS&E RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 1190-01-89 09/10/2024 303 LET BRPVTV 0.048 USH 053 EAU CLAIRE - CHIPPEWA FALLS $500,000 - $749,999

THIN POLYMER OVERLAY, VAR HWYS

CONSTRUCTION/THIN POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2025 1190-06-61 09/09/2025 303 LET PSRS20 9.830 USH 053 EAU CLAIRE - CHIPPEWA FALLS $7,000,000 - $7,999,999

GOLF ROAD TO 40TH AVENUE

CONSTRUCTION/CONCRETE REPAIR

BACKBONE NATIONAL HIGHWAY PERF FAST

7995-02-66 206 I/E MISC 0.000 VAR HWY C EAU CLAIRE, VARIOUS LOCATIONS $0 - $99,999

CITY TRANSIT STOP IMPROVEMENTS

DESIGN/MISCELLANEOUS

STP URBAN 50,000 - 200,000 NON-FEDERAL

2024 7995-02-67 01/09/2024 206 LET MISC 0.000 VAR HWY C EAU CLAIRE, VARIOUS LOCATIONS $250,000 - $499,999

CITY TRANSIT STOP IMPROVEMENTS

CONSTRUCTION/MISCELLANEOUS

STP URBAN 50,000 - 200,000 STBG 5-200K POP FASTG

Page 336: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 296Northwest Region

JACKSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7027-00-71 11/08/2022 206 LET MISC 0.097 CTH O MILLSTON - CTH HH $250,000 - $499,999

MCKENNA ROAD INTERSECTION

CONSTRUCTION/SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 7244-00-70 02/13/2024 205 LET BRRPL 0.029 CTH Z STH 54 - NORTH COUNTY LINE $250,000 - $499,999

HAY CREEK BRIDGE B-27-0176

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

1023-06-08 303 I/E RSRF30 7.440 IH 094 BLACK RIVER FALLS - TOMAH $250,000 - $499,999

CTH O TO CTH EW (EB)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

2022 1023-00-89 02/25/2022 303 MIS MISC 4.550 IH 094 BLACK RIVER FALLS - TOMAH $0 - $99,999

BLACK RIVER - PERRY CREEK

ITEMS FOR CONST ID 1023-00-79

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1023-00-99 02/25/2022 303 SFA MISC 0.000 IH 094 BLACK RIVER - PERRY CREEK (EB & WB) $0 - $99,999

BLACK RIVER FALLS - TOMAH

TRF MITIGATION CONST ID 1023-00-79

BACKBONE NON-FEDERAL

2022 1024-01-90 02/25/2022 303 SFA MISC 2.374 IH 094 CTH F TO BLACK RIVER (EAST/WEST BD) $0 - $99,999

OSSEO - BLACK RIVER FALLS

TRAFFIC MITIGATION 1024-01-75

BACKBONE NON-FEDERAL

2023 1023-01-74 05/09/2023 303 LET BRRHB 0.000 IH 094 BLACK RIVER FALLS - TOMAH $5,000,000 - $5,999,999

B-27-039 & 043 EB/B-27-040 & 044 WB

CONSTRUCTION/BRIDGE REHABILITATION

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 337: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 297Northwest Region

JACKSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1023-01-94 05/25/2023 303 SFA MISC 0.000 IH 094 B-27-039 & 043 EB/B-27-040 & 044 WB $0 - $99,999

BLACK RIVER FALLS - TOMAH

TRF MITIGATION/CONSTR ID 1023-01-74

BACKBONE NON-FEDERAL

2024 1023-00-71 12/10/2024 303 LET RSRF30 7.930 IH 094 BLACK RIVER FALLS - TOMAH $13,000,000 - $13,999,999

PERRY CREEK TO CTH O (EB & WB)

CONSTRUCTION/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 7249-00-70 04/12/2022 205 LET BRRPL 0.114 LOC STR T GARFIELD, MOE ROAD (EAST) $500,000 - $749,999

NF BUFFALO RIVER BRIDGE B-27-0174

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7550-00-25 06/25/2022 303 R/E BRRPL 0.004 STH 054 GALESVILLE - MELROSE $0 - $99,999

WILSON CR & MILL CR BR B270233,0018

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2024 7550-00-75 11/12/2024 303 LET BRRPL 0.004 STH 054 GALESVILLE - MELROSE $2,000,000 - $2,999,999

WILSON CR & MILL CR BR B270175,0235

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2022 7710-00-71 04/12/2022 303 LET RSRF20 1.360 STH 071 MELROSE - SPARTA $1,000,000 - $1,999,999

STH 54 TO STH 108

CONSTRUCTION/RESURFACE

STATE 3R HWY INFRA COVID SUPP

2023 7710-00-70 03/14/2023 303 LET BRRHB 0.132 STH 071 MELROSE - SPARTA $250,000 - $499,999

BLACK RIVER BRIDGE B-27-0074

CONSTR/BRRHB/JOINT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

Page 338: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 298Northwest Region

JACKSON

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7520-00-27 01/25/2022 303 R/E BRRPL 0.071 STH 095 MERRILLAN - NEILLSVILLE $0 - $99,999

E FK HALLS CREEK BRIDGE B-27-0147

REAL ESTATE/BRIDGE REPLACEMENT

SHR BRIDGES NON-FEDERAL

2022 7520-00-77 12/13/2022 303 LET BRRPL 0.070 STH 095 MERRILLAN - NEILLSVILLE $750,000 - $999,999

E FK HALLS CREEK BRIDGE B-27-0238

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2023 7520-00-78 01/10/2023 303 LET BRRPL 0.060 STH 095 BLAIR - MERRILLAN $1,000,000 - $1,999,999

HALLS CREEK BRIDGE B-27-0168

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2023 7520-00-79 01/10/2023 303 LET BRRPL 0.028 STH 095 BLAIR - MERRILLAN $500,000 - $749,999

CISNA CREEK BRIDGE B-27-0169

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2024 7560-05-74 01/09/2024 303 LET RSRF20 10.070 STH 095 BLAIR - MERRILLAN $4,000,000 - $4,999,999

TREMPEALEAU/JACKSON CO LN TO IH 94

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 7930-00-71 04/12/2022 303 LET RSRF20 2.662 STH 108 WEST SALEM - MELROSE $1,000,000 - $1,999,999

LA CROSSE/JACKSON CO LN TO STH 71 N

CONSTRUCTION/RESURFACE

STATE 3R HWY INFRA COVID SUPP

Page 339: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 299Northwest Region

NORTHWEST REGION WIDE

2022-2025 FINAL STIP Project Listing 299Northwest Region

NORTHWEST REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

1000-18-58 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2023 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

DESIGN/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-60 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2024 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

DESIGN/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-62 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2025 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-64 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2026 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

DESIGN/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-66 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2027 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

DESIGN/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

1000-18-68 305 I/E TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2028 $0 - $99,999

VARIOUS HIGHWAYS, NW REGION WIDE

DESIGN/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM NON-FEDERAL

9227-01-29 303 I/E MISC 0.000 VAR HWY NW REGION,CULV PIPE & MIS STRC INSP $100,000 - $249,999

VAR HWY CULV PIPE/MIS STRC INSP

PE/INSPECTION/LOC ON STN ANNUAL PLN

STATE 3R NON-FEDERAL

Page 340: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 300Northwest Region

NORTHWEST REGION WIDE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1000-18-49 05/25/2022 303 C/E MISC 0.000 VAR HWY NW REGION, MATERIALS CERTIFICATION $100,000 - $249,999

MATERIALS CERTIFICATION SERVICES

REDISTRIBUTION CONTRACT SFY2021

STATE 3R NON-FEDERAL

2023 1000-18-59 05/09/2023 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2023 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

2024 1000-18-61 05/14/2024 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2024 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

2025 1000-18-63 05/13/2025 305 LET TOPM 0.000 VAR HWY NW REGION, PAVEMENT MARKING 2022 $1,000,000 - $1,999,999

VARIOUS HIGHWAYS, NW REGION WIDE

CONST/TRF/PVMT MRK/STN ANNUAL PLN

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANSP BLOCK GRTS-

Page 341: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 301Northwest Region

PEPIN

2022-2025 FINAL STIP Project Listing 301Northwest Region

PEPIN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7180-00-77 11/14/2023 303 LET RSRF20 4.486 STH 035 PEPIN - HAGER CITY $3,000,000 - $3,999,999

WALNUT ST TO PEPIN/PIERCE CO LINE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1530-07-05 303 I/E RECST 0.060 USH 010 ELLSWORTH - DURAND $0 - $99,999

STH 25 NORTH JUNCTION INTERSECTION

DESIGN/RECONSTRUCTION

STATE 3R NON-FEDERAL

Page 342: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 302Northwest Region

PIERCE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7994-00-50 08/25/2022 206 R/E RECST 0.710 LOC STR C RIVER FALLS, S WASSON LANE $100,000 - $249,999

830TH AVE TO E CASCADE AVE

REAL ESTATE ACQUISITION

STP URBAN 5,000 - 20,000 STBG 5-200K POP FAST EXT

2023 7994-00-51 12/12/2023 206 LET RECST 0.710 LOC STR C RIVER FALLS, S WASSON LANE $3,000,000 - $3,999,999

830TH AVE TO E CASCADE AVE

CONSTRUCTION/RECONSTRUCT

STP URBAN 5,000 - 20,000 STBG 5-200K POP FAST EXT

2022 7994-00-35 01/25/2022 290 C/E MISC 0.000 NON HWY C RIVER FALLS, VARIOUS LOCATIONS $0 - $99,999

BICYCLE AND PEDESTRIAN PLAN

PLANNING/BIKE & PEDESTRIAN PLAN/TAP

TAP 5,000 - 50,000 TAP AREAS 5K-200K MAP21-EX

7630-00-04 303 I/E PSRS40 5.770 STH 029 RIVER FALLS - SPRING VALLEY $0 - $99,999

USH 63 S TO CTH CC S

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

7180-00-10 303 I/E RSRF20 0.980 STH 035 HAGER CITY - PRESCOTT $0 - $99,999

WACOTA ST TO USH 10

DESIGN - FULL PS&E RESURFACE

STATE 3R NON-FEDERAL

2022 7180-00-28 05/25/2022 303 R/E MISC 0.097 STH 035 PEPIN - HAGER CITY $0 - $99,999

GREEN STREET TO PARK STREET

REAL ESTATE ACQUISTION

STATE 3R NON-FEDERAL

2023 7180-00-78 11/14/2023 303 LET MISC 0.097 STH 035 PEPIN - HAGER CITY $2,000,000 - $2,999,999

GREEN STREET TO PARK STREET

CONSTR/REPLACE RETAINING WALLS

STATE 3R STBG <5K POP - FAST EXT

Page 343: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 303Northwest Region

PIERCE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7180-00-79 05/09/2023 303 LET MISC 0.058 STH 035 PEPIN - HAGER CITY $500,000 - $749,999

USH 63 INTERSECTION

CONSTR/CULVERT REPAIR & REPLACEMENT

STATE 3R STBG <5K POP - FAST EXT

2023 7180-02-72 11/14/2023 303 LET BRRHB 0.002 STH 035 HAGER CITY - PRESCOTT $750,000 - $999,999

BIG RIVER BRIDGE B-47-0042

CONST/BRIDGE REHABILITATION/REDECK

SHR BRIDGES STBG <5K POP - FAST EXT

2022 1540-00-23 11/25/2022 303 R/E MISC 0.162 STH 065 ELLSWORTH - RIVER FALLS $0 - $99,999

CULVERT C-47-0002 & C-47-0005

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2024 1540-00-73 11/12/2024 303 LET MISC 0.162 STH 065 ELLSWORTH - RIVER FALLS $250,000 - $499,999

CULVERTS C-47-0063 & C-47-0005

CONSTR/MISC/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2023 7105-00-23 11/25/2023 303 R/E COLD20 10.940 STH 072 ELLSWORTH - DOWNSVILLE $0 - $99,999

CTH BB TO CTH G

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

1530-00-11 303 I/E MISC 0.050 USH 010 PRESCOTT - ELLSWORTH $0 - $99,999

CTH E INTERSECTION

DESIGN - FULL PS&E SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 1530-01-26 11/25/2022 303 R/E MISC 0.048 USH 010 ELLSWORTH - DURAND $0 - $99,999

CULVERTS C-47-0062 & C-47-0236

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

Page 344: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 304Northwest Region

PIERCE

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 1530-00-79 01/10/2023 303 LET MISC 0.136 USH 010 PRESCOTT - ELLSWORTH $1,000,000 - $1,999,999

SPRING CR CULVERTS C-47-0060 & 0061

CONSTR/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2023 1530-02-70 01/10/2023 303 LET RSRF20 13.777 USH 010 PRESCOTT - ELLSWORTH $10,000,000 - $10,999,999

STH 29 TO SOUTH JUNCTION USH 63

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2023 1530-02-80 01/10/2023 303 LET MISC 13.777 USH 010 PRESCOTT - ELLSWORTH $500,000 - $749,999

STH 29 TO SOUTH JUNCTION USH 63

CONSTR/SFTY/WDN PVD SHLDRS/RMBLSTRP

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1530-00-81 11/12/2024 303 LET MISC 0.050 USH 010 PRESCOTT - ELLSWORTH $500,000 - $749,999

CTH E INTERSECTION

CONSTR/SFTY/INTERSECTION MOD

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 1530-01-76 11/12/2024 303 LET MISC 0.048 USH 010 ELLSWORTH - DURAND $250,000 - $499,999

CULVERTS C-47-0062 & C-47-0236

CONSTRUCTION/CULVERTS

SHR BRIDGES STBG <5K POP - FAST EXT

Page 345: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 305Northwest Region

POLK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8857-00-70 12/13/2022 205 LET BRRPL 0.006 CTH B STH 87 - CTH Z $250,000 - $499,999

TRADE RIVER BRIDGE B-48-0058

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2022 8142-00-70 03/08/2022 206 LET PVRPLA 2.475 CTH F STH 35 - CLEAR LAKE $1,000,000 - $1,999,999

CTH PP TO PONDHURST DRIVE

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP - FAST EXT

2022 8397-00-70 12/13/2022 205 LET BRRPL 0.010 CTH K CTH M - CTH PP $250,000 - $499,999

WAPOGASSET BRANCH BRIDGE B-48-0057

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

2023 8010-01-24 11/25/2023 303 R/E MISC 2.040 STH 035 LUCK - SIREN $0 - $99,999

STH 48 E TO POLK STREET

REAL ESTATE ACQ/CURB RAMP UPGRADES

STATE 3R NON-FEDERAL

8030-00-01 303 I/E RSRF30 6.930 STH 046 AMERY - MILLTOWN $100,000 - $249,999

YORK PARK ENTRANCE TO USH 8

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2025 8030-00-70 12/09/2025 303 LET COLD20 11.420 STH 046 AMERY - MILLTOWN $7,000,000 - $7,999,999

USH 8 TO STH 35

CONSTRUCTION/CIR/RESURFACING

STATE 3R STBG FAST OFF-SYS BRIDGE E

2023 8820-00-20 11/25/2023 303 R/E MISC 11.140 STH 048 FREDERIC - MCKINLEY $0 - $99,999

STH 35 TO BASS LAKE LANE

REAL ESTATE ACQ/CURB UPGRADES

STATE 3R NON-FEDERAL

Page 346: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 306Northwest Region

POLK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8865-00-24 01/25/2022 303 R/E RSRF20 14.880 STH 065 NEW RICHMOND - USH 8 $100,000 - $249,999

NORTH JCT JEWELL STREET TO USH 8

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8865-00-74 02/14/2023 303 LET RSRF20 14.880 STH 065 NEW RICHMOND - USH 8 $8,000,000 - $8,999,999

NORTH JCT JEWELL STREET TO USH 8

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2023 8840-00-20 11/25/2023 303 R/E RSRF20 1.110 STH 087 ST. CROIX FALLS - GRANTSBURG $0 - $99,999

USH 8 TO 240' N OF MINNESOTA ST

REAL ESTATE ACQ/CIR/RESURFACE

STATE 3R NON-FEDERAL

8417-00-07 303 I/E RSRF20 0.210 STH 243 ST CROIX RIVER - OSCEOLA $0 - $99,999

ST CROIX RIVER TO STH 35

DESIGN/RESURFACE

STATE 3R STBG <5K POP FAST

2024 8417-00-76 12/25/2024 303 OST BRRPL 0.000 STH 243 ST CROIX RIVER - OSCEOLA $4,000,000 - $4,999,999

ST CROIX RIVER BRIDGE B-48-0NEW

CONSTRUCTION/BRRPL(MNDOT LEAD)

SHR BRIDGES SURFACE TRANSP BLOCK GRTS-

2024 8417-00-77 12/25/2024 303 OST RSRF20 0.210 STH 243 ST CROIX RIVER - OSCEOLA $100,000 - $249,999

ST CROIX RIVER TO STH 35

CONSTR/REIMBURSEMENT TO MINNESOTA

STATE 3R STBG <5K POP FAST

2025 1570-00-78 12/09/2025 303 LET RSRF20 9.620 USH 008 ST CROIX FALLS - TURTLE LAKE $7,000,000 - $7,999,999

STH 35 N TO STH 46 S

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 347: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 307Northwest Region

POLK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1550-02-76 09/13/2022 303 LET RSRF20 8.400 USH 063 BALDWIN - CUMBERLAND $4,000,000 - $4,999,999

ST CROIX/POLK CO LN TO CTH J

CONSTRUCTION/CIR/RESURFACING

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1550-04-76 09/13/2022 303 LET RECST 0.019 USH 063 CLEAR LAKE - CUMBERLAND $100,000 - $249,999

60TH AVENUE INTERSECTION

CONSTRUCTION/SFTY/REALIGNMENT

SAFETY (REGULAR HSIP) HIGHWAY SAFETY IMP PROG-FA

2022 1550-06-75 09/13/2022 303 LET MISC 0.003 USH 063 BALDWIN - CLEAR LAKE $500,000 - $749,999

PEDESTRIAN TRAIL C-48-0025

CONSTR/MISC/CULVERT REPLACEMENT

STATE 3R STBG <5K POP FAST

Page 348: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 308Northwest Region

RUSK

2022-2025 FINAL STIP Project Listing 308Northwest Region

RUSK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 8793-00-73 01/10/2023 205 LET BRRPL 0.015 CTH B SOUTH COUNTY LINE - GLEN FLORA $500,000 - $749,999

MAIN CREEK BRIDGE B-54-0140

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

8798-00-04 303 I/E BRRHB 0.000 CTH D CTH E - STH 27 $0 - $99,999

CHIPPEWA RIVER BRIDGE B-54-0018

DESIGN - FULL PS&E BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2023 8436-00-70 01/10/2023 205 LET BRRPL 0.005 LOC STR T RUSK, HORSESHOE LAKE ROAD $250,000 - $499,999

MCDERMOTT CREEK BRIDGE B-54-0139

CONSTRUCTION/BRIDGE REPLACEMENT

LOCAL BRIDGES STBG <5K POP FAST

8210-01-02 303 I/E BRRPL 0.000 STH 073 THORP - INGRAM $0 - $99,999

CRAZY HORSE CREEK BRIDGE B-54-0744

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

2022 1570-06-22 01/25/2022 303 R/E RSRF20 9.150 USH 008 CAMERON - LADYSMITH $0 - $99,999

CEDAR SWAMP ROAD TO CHIPPEWA RIVER

REAL ESTATE ACQUISITION/RESURFACE

STATE 3R NON-FEDERAL

2022 1580-04-22 01/25/2022 303 R/E RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $0 - $99,999

RIVER AVENUE TO PRENTICE STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 1580-04-23 01/25/2022 303 R/E RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $0 - $99,999

PRENTICE STREET TO RUSK/PRICE CO LN

REAL ESTATE ACQUISITION

Page 349: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 309Northwest Region

RUSK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NON-FEDERAL

2023 1570-06-72 11/14/2023 303 LET RSRF20 9.150 USH 008 CAMERON - LADYSMITH $5,000,000 - $5,999,999

CEDAR SWAMP ROAD TO CHIPPEWA RIVER

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1580-04-54 02/25/2023 303 R/R MISC 0.000 USH 008 LADYSMITH - PRENTICE $250,000 - $499,999

BRADLEY SUB XING 691304W

RR OPS/RAIL UPGRADES

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 1580-04-72 12/12/2023 303 LET RSRF20 10.571 USH 008 LADYSMITH - HAWKINS $5,000,000 - $5,999,999

RIVER AVENUE TO PRENTICE STREET

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1580-04-73 12/12/2023 303 LET RSRF20 11.142 USH 008 LADYSMITH - PRENTICE $4,000,000 - $4,999,999

PRENTICE STREET TO RUSK/PRICE CO LN

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 1580-04-74 01/10/2023 303 LET MISC 20.550 USH 008 LADYSMITH - PRENTICE $1,000,000 - $1,999,999

E 16TH ST N/OLD 8 RD TO PRICE CO LN

CONSTRUCTION/CULVERTS/WINGWALLS

STATE 3R NATIONAL HIGHWAY PERFFAST

2024 1580-00-70 07/09/2024 303 LET BRRPL 0.002 USH 008 CAMERON - LADYSMITH $1,000,000 - $1,999,999

LITTLE SOFT MAPLE CR BRG B-54-0131

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

Page 350: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 310Northwest Region

RUSK

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

8590-02-03 303 I/E BRPVTV 0.000 VARHWY

NW REGION, THIN POLYMER DECKOVRLYS

$0 - $99,999

VARIOUS HIGHWAYS, NORTH HALF

DESIGN - FULL PS&E BRPVTV

SHR BRIDGES STBG <5K POP - FAST EXT

Page 351: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 311Northwest Region

SAWYER

2022-2025 FINAL STIP Project Listing 311Northwest Region

SAWYER

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

8140-00-09 303 I/E PSRS40 5.500 STH 027 OJIBWA - STONE LAKE $0 - $99,999

STH 70 E TO STH 40

DESIGN - FULL PS&E PSRS40

STATE 3R STBG <5K POP - FAST EXT

2022 8140-00-27 12/25/2022 303 R/E RSRF20 18.040 STH 027 OJIBWA - HAYWARD $0 - $99,999

125' W OF STH 40 S TO BOYLAND RD

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8170-01-74 12/12/2023 303 LET BRNEW 0.024 STH 070 OJIBWA - OXBO $500,000 - $749,999

LOG CREEK C-57-0033

CONSTR/BRNEW/B-57-0094

STATE 3R STBG <5K POP FAST

2022 8520-01-06 06/25/2022 303 C/E PSRS40 11.360 STH 077 HAYWARD - CLAM LAKE $100,000 - $249,999

CTH OO TO HOLLYWOOD RD

DESIGN - FULL PS&E PSR40

STATE 3R STBG <5K POP - FAST EXT

2022 8520-01-25 01/25/2022 303 R/E RSRF20 4.910 STH 077 HAYWARD - CLAM LAKE $0 - $99,999

USH 63 TO CTH K

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2024 8520-01-75 12/10/2024 303 LET RSRF20 4.910 STH 077 HAYWARD - CLAM LAKE $3,000,000 - $3,999,999

USH 63 TO CTH K

CONSTRUCTION/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

2025 8520-02-71 07/08/2025 303 LET BRRHB 0.048 STH 077 HAYWARD - CLAM LAKE $100,000 - $249,999

TEAL RIVER BRIDGE B-57-0025

CONSTRUCTION/BRIDGE REHABILITATION

STATE 3R STBG <5K POP - FAST EXT

Page 352: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 312Northwest Region

SAWYER

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 1560-00-75 05/10/2022 303 LET MISC 0.060 USH 063 C HAYWARD, FIRST STREET $500,000 - $749,999

SMITH LAKE CREEK CULVERT

CONSTRUCTION/CULVERT REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

Page 353: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 313Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 8944-04-71 11/14/2023 206 LET MISC 0.058 CTH A HUDSON - NEW RICHMOND $1,000,000 - $1,999,999

MCCUTCHEON ROAD INTERSECTION

CONSTRUCTION/SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2022 8939-08-76 03/08/2022 206 LET PVRPLA 2.005 CTH E HOULTON - STH 65 $2,000,000 - $2,999,999

14TH STREET TO CTH V

CONSTRUCTION/PAVEMENT REPLACEMENT

STP RURAL STBG <5K POP - FAST EXT

2023 8939-03-78 12/12/2023 206 LET MISC 6.933 CTH I CTH A - SOMERSET $750,000 - $999,999

CTH A TO KOHLER DRIVE

CONSTRUCTION/HRRR/SAFETYTREATMENTS

SAFETY - HIGH RISK RURAL ROADS HIGHWAY SAFETY IMPPROG-FA

7994-00-52 206 I/E BRRPL 0.000 CTH MM C RIVER FALLS, POWELL AVE $0 - $99,999

KINNICKINNIC RIVER BRIDGE P-55-0148

DESIGN - FULL PS&E BRRPL

LOCAL BRIDGES NON-FEDERAL

1020-02-31 303 I/E RSRF30 4.330 IH 094 HUDSON - BALDWIN $250,000 - $499,999

STH 35 NORTH JCT TO USH 12(EB & WB)

DESIGN/RESURFACE

BACKBONE NON-FEDERAL

1020-06-04 303 I/E PVRPLA 5.630 IH 094 HUDSON - MENOMONIE $1,000,000 - $1,999,999

STH 65 TO CTH T (EAST & WESTBOUND)

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFPLAN

2023 1020-00-80 11/14/2023 303 LET BRRHB 0.500 IH 094 HUDSON - BALDWIN $3,000,000 - $3,999,999

ST CROIX RIVER B-55-0061, B-55-0126

Page 354: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 314Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTRUCTION/POLYMER OVERLAY

BACKBONE NATIONAL HIGHWAY PERFFAST

2023 1021-00-96 07/25/2023 303 SFA MISC 0.000 IH 094 RUSH RIVER BRIDGE WB B-55-0262 $0 - $99,999

HUDSON - BALDWIN

TRF MITIGATION CONSTR ID 1021-00-76

BACKBONE NON-FEDERAL

2023 1021-00-97 07/25/2023 303 SFA MISC 0.000 IH 094 RUSH RIVER BRIDGE EB B-55-0045 $0 - $99,999

HUDSON - BALDWIN

TRF MITIGATION CONSTR ID 1021-00-77

BACKBONE NON-FEDERAL

2024 1020-00-73 11/12/2024 303 LET RSRF30 5.814 IH 094 BALDWIN - MENOMONIE $9,000,000 - $9,999,999

CTH BB TO STH 128 (EB & WB)

CONSTRUCTION/RESURFACE

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1020-07-70 11/12/2024 303 LET RSRF30 5.790 IH 094 HUDSON - MENOMONIE $10,000,000 - $10,999,999

CTH T TO CTH BB (EB & WB)

CONSTRUCTION/RESURFACING

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1020-07-79 07/09/2024 303 LET BRRPL 0.473 IH 094 HUDSON - BALDWIN $5,000,000 - $5,999,999

KINNEY ROAD BRIDGE WB B-55-0250

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1020-07-80 07/09/2024 303 LET BRRPL 0.473 IH 094 HUDSON - BALDWIN $4,000,000 - $4,999,999

KINNEY ROAD BRIDGE EB B-55-0251

CONSTRUCTION/BRIDGE REPLACEMENT

Page 355: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 315Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1020-07-81 07/09/2024 303 LET BRRPL 0.360 IH 094 HUDSON - BALDWIN $5,000,000 - $5,999,999

100TH ST/TWIN LK RD BR WB B-55-0252

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

2024 1020-07-82 07/09/2024 303 LET BRRPL 0.360 IH 094 HUDSON - BALDWIN $4,000,000 - $4,999,999

100TH ST/TWIN LK RD BR EB B-55-0253

CONSTRUCTION/BRIDGE REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 8940-00-17 01/25/2022 290 LLC MISC 0.000 NONHWY

C NEW RICHMOND, CTH A BIKE TRAIL $750,000 - $999,999

W RICHMOND WAY TO W 4TH STREET

CONSTR/PAVED BIKE PED TRAIL/TAP

BICYCLE AND PEDESTRIAN FACILITIES STBG 5-200K POP FAST EXT

2023 8080-00-72 07/25/2023 290 LLC MISC 0.000 OFF SYS ST CROIX COUNTY, HWY 35 TRAIL $250,000 - $499,999

SOMMERS STREET TO OLD HWY 35

CONSTR/TAP/BIKE PED TRAIL

BICYCLE AND PEDESTRIAN FACILITIES TRANS ALTERN 5-200K FAST E

2022 8060-00-20 01/25/2022 303 R/E PVRPLA 1.227 STH 035 SOMERSET - ST CROIX FALLS $0 - $99,999

CTH C TO LASER DRIVE

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8060-00-70 02/14/2023 303 LET PVRPLA 1.228 STH 035 SOMERSET - ST CROIX FALLS $4,000,000 - $4,999,999

CTH C TO LASER DRIVE

CONSTRUCTION/PAVEMENTREPLACEMENT

Page 356: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 316Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R NATIONAL HIGHWAY PERF FAST

2023 8060-00-72 02/14/2023 303 LET MISC 1.227 STH 035 SOMERSET - ST CROIX FALLS $1,000,000 - $1,999,999

CTH C TO LASER DRIVE

CONSTR/SANITARY SEWER & WATER MAIN

STATE 3R NON-FEDERAL

2024 8080-08-75 12/10/2024 303 LET PSRS30 6.510 STH 035 HUDSON - SOMERSET $3,000,000 - $3,999,999

150TH AVE TO CTH C

CONSTR/CONCRETE REPAIR & REPLACEMNT

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 8110-00-79 12/10/2024 303 LET PSRS30 6.689 STH 064 STILLWATER - NEW RICHMOND $2,000,000 - $2,999,999

STH 35 TO 142ND STREET

CONSTR/CONCRETE REPAIR & REPLACEMNT

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1540-02-26 01/25/2022 303 R/E RSRF20 2.119 STH 065 RIVER FALLS - NEW RICHMOND $0 - $99,999

70TH AVE TO USH 12 WEST

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 8650-00-23 06/25/2022 303 R/E COLD10 6.140 STH 128 ELMWOOD - STH 64 $0 - $99,999

STH 170 TO STH 64

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 7620-00-21 07/25/2023 303 R/E COLD10 5.830 STH 128 ELMWOOD - STH 64 $0 - $99,999

STH 29 TO USH 12

REAL ESTATE/CIR/RESURFACE

STATE 3R NON-FEDERAL

2023 7620-00-70 02/14/2023 303 LET RSRF20 5.830 STH 128 ELMWOOD - STH 64 $3,000,000 - $3,999,999

STH 29 TO USH 12

CONSTRUCTION/RESURFACE

Page 357: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 317Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

STATE 3R STBG <5K POP - FAST EXT

2023 7620-00-73 09/12/2023 303 LET MISC 0.038 STH 128 ELMWOOD - STH 64 $100,000 - $249,999

IH94 (KWIK TRIP) INTERSECTION

CONSTRUCTION/SAFETY

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

2024 8650-00-50 10/25/2024 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $250,000 - $499,999

WCL RR XING 693015C MP 396.24

RR OPS/INSTALL SIGNALS AND GATES

STATE 3R STBG <5K POP FAST

2024 8650-00-51 10/25/2024 303 R/R COLD10 0.000 STH 128 ELMWOOD - STH 64 $0 - $99,999

WCL RR XING 693015C MP 396.24

RR OPS/INSTALL NEW CROSSING SURFACE

STATE 3R STBG <5K POP FAST

2024 8650-00-72 11/12/2024 303 LET MISC 0.027 STH 128 GLENWOOD CITY - STH 64 $500,000 - $749,999

CULVERTS C-55-0NEW AND C-55-0037

CONSTRUCTION/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2024 8650-00-73 11/12/2024 303 LET COLD10 6.140 STH 128 ELMWOOD - STH 64 $3,000,000 - $3,999,999

STH 170 TO STH 64

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2025 8650-00-74 12/09/2025 303 LET COLD20 7.810 STH 128 ELMWOOD - STH 64 $4,000,000 - $4,999,999

USH 12 TO STH 170

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

1000-18-81 303 I/E BRRHB 0.000 USH 010 NW REGION, WINGWALL REPAIRS $0 - $99,999

VAR HWYS, MULTIPLE STRUCTURES

DESIGN - FULL PS&E BRRHB

Page 358: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 318Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SHR BRIDGES SURFACE TRANS BLOCK-FLEX E

2025 8949-00-73 11/11/2025 303 LET BRRHB 0.064 USH 012 HUDSON - BALDWIN $1,000,000 - $1,999,999

CNW RR BRIDGE B-55-0076

CONSTR/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP - FAST EXT

1550-02-09 303 I/E BRRPL 0.000 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999

RUSH RIVER BRIDGE B-55-0609

DESIGN - FULL PS&E BRRPL

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

7210-04-03 303 I/E RSRF20 2.060 USH 063 ELLSWORTH - BALDWIN $100,000 - $249,999

IH 94 TO USH 12 E

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 1550-02-23 11/25/2022 303 R/E BRRPL 0.211 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999

BRANCH RUSH RIVER BRIDGE B-55-0636

REAL ESTATE ACQUISTION

SHR BRIDGES NON-FEDERAL

2023 1550-02-27 09/25/2023 303 R/E MISC 0.009 USH 063 BALDWIN - CLEAR LAKE $0 - $99,999

SPRUCE STREET INTERSECTION

REAL ESTATE ACQUISITION

SAFETY (REGULAR HSIP) NON-FEDERAL

2024 1550-02-73 09/10/2024 303 LET BRRPL 0.324 USH 063 BALDWIN - CLEAR LAKE $1,000,000 - $1,999,999

BRANCH RUSH RIVER BRIDGE B-55-0289

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

2024 1550-02-75 09/10/2024 303 LET BRRHB 0.003 USH 063 BALDWIN - CLEAR LAKE $250,000 - $499,999

BR WILLOW RIVER BRIDGE B-55-0055

CONSTR/BRIDGE REHABILITATION

Page 359: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 319Northwest Region

ST. CROIX

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

SHR BRIDGES STBG <5K POP - FAST EXT

2024 1550-02-77 09/10/2024 303 LET MISC 0.009 USH 063 BALDWIN - CLEAR LAKE $250,000 - $499,999

SPRUCE STREET INTERSECTION

CONSTR/SAFETY/INTERSECTION IMPRVMNT

SAFETY (REGULAR HSIP) HIGHWAY SFTY IMP PRG FAST

Page 360: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 320Northwest Region

TAYLOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 8888-08-76 11/08/2022 206 LET RECST 1.030 CTH O STH 64 - ECL $2,000,000 - $2,999,999

GIBSON STREET TO STH 13

CONSTRUCTION/RECONSTRUCTION

STP RURAL STBG <5K POP FAST

2022 1610-01-26 11/25/2022 303 R/E RSRF20 1.570 STH013

ABBOTSFORD - MEDFORD $0 - $99,999

CTH O TO TAYLOR STREET

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 3700-50-61 12/13/2022 305 LET TOSIG 0.330 STH013

C MEDFORD, STH 13 $1,000,000 - $1,999,999

PERKINS STREET TO CLARK STREET

CONSTRUCTION/SIGNAL RECONSTRUCTION

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 1610-01-76 11/14/2023 303 LET RSRF20 1.580 STH013

ABBOTSFORD - MEDFORD $1,000,000 - $1,999,999

CTH O TO TAYLOR STREET

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

2023 3700-50-62 03/25/2023 305 MIS TOSIG 0.330 STH013

C MEDFORD, STH 13 $0 - $99,999

PERKINS STREET TO CLARK STREET

CONSTRUCTION/MISCELLANEOUS

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2023 3700-50-79 11/14/2023 305 LET TOSIG 0.019 STH013

C MEDFORD, STH 13 $500,000 - $749,999

STH 64 INTERSECTION

CONSTRUCTION/SIGNAL RECONSTRUCTION

Page 361: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 321Northwest Region

TAYLOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

2024 1610-02-72 09/10/2024 303 LET BRRHB 0.011 STH013

ABBOTSFORD - MEDFORD $750,000 - $999,999

LITTLE BLACK RIVER BRIDGE B-60-0012

CONSTRUCTION/BRRHB/DECK REPLACEMENT

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2024 3700-50-80 03/25/2024 305 MIS TOSIG 0.019 STH013

C MEDFORD, STH 13 $0 - $99,999

STH 64 INTERSECTION

MISCELLANEOUS/SIGNAL RECONSTRUCTION

INTELLIGENT TRANSPORTATION SYSTEMS(ITS)

NON-FEDERAL

8220-00-02 303 I/E PSRS40 8.770 STH064

GILMAN - MEDFORD $100,000 - $249,999

STH 73 TO COYOTE DRIVE

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

9000-00-06 303 I/E PSRS40 14.350 STH064

MEDFORD - MERRILL $100,000 - $249,999

STH 13 TO LINCOLN COUNTY LINE

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 8220-00-26 05/25/2022 303 R/E RSRF20 1.105 STH064

GILMAN - MEDFORD $0 - $99,999

NATIONAL AVE TO STH 13

REAL ESTATE ACQUISTION

STATE 3R NON-FEDERAL

2022 8220-00-71 04/12/2022 303 LET RSRF20 4.434 STH064

GILMAN - MEDFORD $2,000,000 - $2,999,999

Page 362: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 322Northwest Region

TAYLOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CTH B TO STH 73 S

CONSTRUCTION/RESURFACE

STATE 3R HWY INFRA COVID SUPP

2022 9000-00-24 11/25/2022 303 R/E MISC 0.044 STH 064 MEDFORD - MERRILL $0 - $99,999

CULVERT C-60-1096

REAL ESTATE ACQUISITION

SHR BRIDGES NON-FEDERAL

2022 9000-00-25 11/25/2022 303 R/E MISC 0.017 STH 064 MEDFORD - MERRILL $0 - $99,999

WATERWAY CULVERT C-60-1352

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8220-00-56 09/25/2023 303 R/R MISC 0.005 STH 064 GILMAN - MEDFORD $250,000 - $499,999

WISCONSIN CENTRAL LTD 699488B

RR OPS/SIGNAL UPGRADE & INSTALL

STATE 3R STBG <5K POP FAST

2023 8220-00-57 09/25/2023 303 R/R MISC 0.005 STH 064 GILMAN - MEDFORD $0 - $99,999

WISCONSIN CENTRAL LTD 699488B

RR OPS/CROSSING SURFACEREPLACEMENT

STATE 3R STBG <5K POP FAST

2023 8220-00-70 11/14/2023 303 LET BRRHB 0.020 STH 064 GILMAN - MEDFORD $1,000,000 - $1,999,999

BLACK RIVER BRIDGE B-60-0001

CONSTRUCTION/BRIDGE REHABILITATION

SHR BRIDGES STBG <5K POP FAST

2023 8220-00-76 11/14/2023 303 LET RSRF20 1.105 STH 064 GILMAN - MEDFORD $750,000 - $999,999

NATIONAL AVE TO STH 13

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 363: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 323Northwest Region

TAYLOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2024 9000-00-74 11/12/2024 303 LET MISC 0.044 STH 064 MEDFORD - MERRILL $250,000 - $499,999

CULVERT C-60-0020

CONSTR/CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2024 9000-00-75 11/12/2024 303 LET MISC 0.017 STH 064 MEDFORD - MERRILL $250,000 - $499,999

WATERWAY CULVERT C-60-0021

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R STBG <5K POP - FAST EXT

8210-08-06 303 I/E MISC 0.013 STH 073 THORP - INGRAM $0 - $99,999

FISHER RIVER CULVERT C-60-0803

DESIGN - FULL PS&E CULVERT REPLACE

SHR BRIDGES STBG <5K POP - FAST EXT

2023 8210-00-51 08/25/2023 303 R/R RSRF20 0.000 STH 073 THORP - INGRAM $100,000 - $249,999

WCL RR XING 697265D

RR OPS/CROSSING SURFACEREPLACEMENT

STATE 3R SURFACE TRANSP BLOCKGRTS-

2023 8210-00-71 11/14/2023 303 LET RSRF20 11.506 STH 073 THORP - INGRAM $6,000,000 - $6,999,999

PARK ST TO STH 64 E

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2024 8210-00-72 11/12/2024 303 LET RSRF20 9.250 STH 073 THORP - INGRAM $3,000,000 - $3,999,999

STH 64 W TO CTH M WEST JCT

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2022 9225-00-03 05/25/2022 303 C/E PSRS40 7.420 STH 102 CHELSEA - SPIRIT $100,000 - $249,999

CTH D TO PRICE COUNTY LINE

Page 364: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 324Northwest Region

TAYLOR

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 4760-98-22 06/25/2022 305 MIS TOPM 0.000 VAR HWY TAYLOR COUNTY PAVEMENT MARKING $500,000 - $749,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE

Page 365: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 325Northwest RegionTREMPEALEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7146-00-72 03/08/2022 205 LET BRRPL 0.030 CTH D ETTRICK - WHITEHALL $750,000 - $999,999

IRVIN CREEK BRIDGE B-61-0247

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

1021-01-10 303 I/E BRPVTV 0.000 IH 094 BALDWIN - OSSEO $0 - $99,999

B-55-259, B-61-216,218,215,217

DESIGN - FULL PS&E BRPVTV

BACKBONE NATIONAL HIGHWAY PERF FAST

2022 1022-00-79 04/12/2022 303 LET PVRPLA 3.560 IH 094 EAU CLAIRE - OSSEO $20,000,000 - $24,999,999

CTH NN TO EAST COUNTY LINE

CONSTRUCTION/PAVEMENT REPLACEMENT

BACKBONE NON-FEDERAL

2022 1022-00-99 07/25/2022 303 SFA MISC 0.000 IH 094 CTH NN TO EAST COUNTY LINE $100,000 - $249,999

EAU CLAIRE - OSSEO

TRF MITIGATION CONSTR ID 1022-00-79

BACKBONE NON-FEDERAL

2022 7276-00-74 12/13/2022 205 LET BRRPL 0.006 LOC STR T ARCADIA, RAINEY VALLEY ROAD $100,000 - $249,999

RAINEY VALLEY CREEK BRIDGE B610244

CONSTRUCTION/BRRPL

LOCAL BRIDGES NON-FEDERAL

2022 7281-00-73 03/08/2022 205 LET BRRPL 0.031 LOC STR T ETTRICK, JOE COULEE ROAD $250,000 - $499,999

NF BEAVER CREEK BRIDGE B-61-0245

CONSTRUCTION/BRRPL

LOCAL BRIDGES STBG <5K POP - FAST EXT

2022 7281-00-74 03/08/2022 205 LET BRRPL 0.034 LOC STR T ETTRICK, HAGESTAD ROAD $250,000 - $499,999

NF BEAVER CREEK BRIDGE B-61-0246

CONSTRUCTION/BRRPL

LOCAL BRIDGES STBG <5K POP - FAST EXT

Page 366: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 326Northwest RegionTREMPEALEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2022 7160-04-41 05/25/2022 303 UTL BRRPL 0.000 STH 035 TREMPEALEAU - FOUNTAIN CITY $0 - $99,999

TREMP RVR E CHANNEL BRG B-61-0029

UTL/INT 201/CENTURYLINK/7160-04-72

SHR BRIDGES NON-FEDERAL

2023 7140-00-70 02/14/2023 303 LET COLD20 6.140 STH 035 LA CROSSE - TREMPEALEAU $4,000,000 - $4,999,999

LA CROSSE/TREMP CO LN TO 10TH ST

CONSTRUCTION/CIR/RESURFACE

STATE 3R SURFACE TRANS BLOCK-FLEX E

2023 7150-00-70 02/14/2023 303 LET RSRF20 4.900 STH 035 TREMPEALEAU - FOUNTAIN CITY $2,000,000 - $2,999,999

STH 93 TO BUFFALO/TREMP COUNTY LINE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2025 7140-00-71 09/09/2025 303 LET BRRPL 0.165 STH 035 LA CROSSE - TREMPEALEAU $2,000,000 - $2,999,999

TANK CREEK BRIDGE B-61-0288

CONSTRUCT/BRIDGE REPLACEMENT

STATE 3R STBG <5K POP - FAST EXT

2022 7550-00-23 01/25/2022 303 R/E RSRF20 10.210 STH 054 WINONA - GALESVILLE $0 - $99,999

BUFFALO/TREMP CO LN TO WINNEBAGO RD

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 7550-00-73 02/14/2023 303 LET RSRF20 5.310 STH 054 WINONA - GALESVILLE $2,000,000 - $2,999,999

STH 93 TO WINNEBAGO ROAD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2025 7130-08-74 09/09/2025 303 LET BRRPL 0.011 STH 093 INDEPENDENCE - ELEVA $1,000,000 - $1,999,999

TROUT CREEK BRIDGE B-61-0287

CONSTRUCTION/BRIDGE REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

Page 367: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 327Northwest RegionTREMPEALEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

2023 7720-00-21 11/25/2023 303 R/E RSRF20 2.003 STH 095 C ARCADIA, MAIN STREET $0 - $99,999

CTH A TO 250' W OF STH 93

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2025 7720-00-71 11/11/2025 303 LET RSRF20 2.004 STH 095 C ARCADIA, MAIN STREET $2,000,000 - $2,999,999

CTH A TO 250' W OF STH 93

CONSTRUCTION/RESURFACING

STATE 3R SURFACE TRANS BLOCK-FLEXE

2025 7720-00-81 11/11/2025 303 LET MISC 2.003 STH 095 C ARCADIA, MAIN STREET $100,000 - $249,999

CTH A TO 250' W OF STH 93

CONSTRUCTION/CITY UTILITIES

STATE 3R NON-FEDERAL

1520-00-09 303 I/E RSRF10 2.110 USH 010 OSSEO - FAIRCHILD $0 - $99,999

IH 94 TO TREMP/JACKSON COUNTY LINE

DESIGN - FULL PS&E RESURFACE

STATE 3R NATIONAL HIGHWAY PERFFAST

1530-06-00 303 I/E BRRHB 0.000 USH 010 MONDOVI - OSSEO $0 - $99,999

BUFFALO RIVER BRIDGE B-61-0283

DESIGN - FULL PS&E BRRHB

SHR BRIDGES STBG <5K POP - FAST EXT

1530-06-03 303 I/E BRRHB 0.000 USH 010 MONDOVI - OSSEO $0 - $99,999

LINDSAY CREEK BRIDGE B-61-0882

DESIGN - FULL PS&E BRRHB

SHR BRIDGES STBG <5K POP - FAST EXT

2022 1530-06-22 11/25/2022 303 R/E MISC 13.208 USH 010 MONDOVI - OSSEO $0 - $99,999

HUNT LANE TO NELSON ROAD

Page 368: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 328Northwest RegionTREMPEALEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 1535-07-23 01/25/2022 303 R/E PVRPLA 1.141 USH 010 MONDOVI - OSSEO $0 - $99,999

NELSON ROAD TO IH 94

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 1535-07-73 11/14/2023 303 LET PVRPLA 1.310 USH 010 MONDOVI - OSSEO $3,000,000 - $3,999,999

NELSON RD TO IH 94 EB RAMPS

CONSTRUCTION/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP - FAST EXT

2023 1535-07-74 11/14/2023 303 LET MISC 1.141 USH 010 MONDOVI - OSSEO $1,000,000 - $1,999,999

NELSON RD TO IH 94

CONST/SANITARY SEWER AND WATER MAIN

STATE 3R NON-FEDERAL

1630-00-06 303 I/E BRRHB 0.000 USH 053 GALESVILLE - WHITEHALL $0 - $99,999

BR N FK BEAVER CREEK B-61-0101

DESIGN - FULL PS&E BRRHB

SHR BRIDGES STBG <5K POP - FAST EXT

1630-00-07 303 I/E BRRPL 0.024 USH 053 GALESVILLE - WHITEHALL $0 - $99,999

BEAVER CREEK BRIDGE B-61-0751

DESIGN - FULL PS&E BRRPL

SHR BRIDGES STBG <5K POP - FAST EXT

2022 1630-00-22 12/25/2022 303 R/E RSRF20 13.950 USH 053 GALESVILLE - WHITEHALL $0 - $99,999

BEAVER CR TO STH 95 W

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2022 1630-00-71 04/12/2022 303 LET BRNEW 0.090 USH 053 GALESVILLE - WHITEHALL $1,000,000 - $1,999,999

CULVERTS B-61-0290 & B-61-0289

Page 369: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 329Northwest RegionTREMPEALEAU

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

CONSTR/CULVERT REPLACEMENT

SHR BRIDGES NON-FEDERAL

2022 1632-03-20 01/25/2022 303 R/E RSRF20 0.015 USH 053 LA CROSSE - GALESVILLE $0 - $99,999

SOUTH COUNTY LINE TO HARRIS ROAD

REAL ESTATE/RESURFACING

STATE 3R NON-FEDERAL

2023 1632-03-70 02/14/2023 303 LET RSRF20 3.534 USH 053 LA CROSSE - GALESVILLE $3,000,000 - $3,999,999

SOUTH COUNTY LINE TO HARRIS ROAD

CONSTRUCTION/RESURFACING

STATE 3R NATIONAL HIGHWAY PERFFAST

2022 4761-98-22 06/25/2022 305 MIS TOPM 0.000 VARHWY

TREMPEALEAU COUNTY PAVEMENTMARKING

$500,000 - $749,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEXE

Page 370: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 330Northwest Region

WASHBURN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

8130-00-03 303 I/E PSRS40 5.880 STH 070 SPOONER - STONE LAKE $0 - $99,999

CTH B W TO STH 27 N

DESIGN - FULL PS&E RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 8050-00-22 02/25/2022 303 R/E RSRF20 2.603 STH 070 SIREN - STONE LANE $0 - $99,999

AUTO LANE TO USH 53

REAL ESTATE ACQUISITION

STATE 3R NON-FEDERAL

2023 8550-00-70 11/14/2023 303 LET COLD10 5.840 STH 077 MINONG - HAYWARD $3,000,000 - $3,999,999

CTH G TO CTH M

CONSTRUCTION/RESURFACE/COLD10

STATE 3R STBG <5K POP - FAST EXT

2023 8550-02-72 11/14/2023 303 LET COLD20 6.930 STH 077 MINONG - HAYWARD $4,000,000 - $4,999,999

CTH I TO CTH G

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP FAST

2025 8550-00-71 09/09/2025 303 LET BRRHB 0.018 STH 077 MINONG - HAYWARD $250,000 - $499,999

SOO LINE BRIDGE B-65-0006

CONSTR/BRRHB/JOINT REPLACEMENT

SHR BRIDGES STBG <5K POP FAST

1196-01-02 303 I/E PVRPLA 4.890 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999

BUS 53 (MINONG) TO CTH T (NB)

DESIGN/PAVEMENT REPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

1196-02-00 303 I/E RSRF20 0.000 USH 053 SPOONER - MINONG $100,000 - $249,999

WHALEN LAKE RD TO BUS 53 (SB)

DESIGN/RESURFACING

Page 371: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 331Northwest Region

WASHBURN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

BACKBONE NATIONAL HIGHWAY PERFFAST

1198-02-35 303 I/E PSRS30 6.620 USH 053 SPOONER - MINONG $0 - $99,999

CTH H TO WHALEN LAKE ROAD (NB & SB)

DESIGN/RDMTN/CONCRETE REPAIRS

BACKBONE NON-FEDERAL

2022 1196-00-62 11/08/2022 303 LET PSRS20 3.040 USH 053 MINONG - SOLON SPRINGS $1,000,000 - $1,999,999

BUS 53 (MINONG) TO LAKESIDE RD (NB)

CONST/CONCRETE/JOINT REPAIR

BACKBONE NATIONAL HIGHWAY PERFFAST

2022 1197-00-40 06/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $0 - $99,999

TREGO INTERCHANGE

UTILITY/LEVEL-OF-EFFORT

BACKBONE NON-FEDERAL

2022 1197-00-41 05/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $100,000 - $249,999

TREGO INTERCHANGE

UTL/INT 34/WE ENERGIES/1197-00-70

BACKBONE NON-FEDERAL

2022 1197-00-42 05/25/2022 303 UTL BRNEW 1.600 USH 053 SPOONER - MINONG $0 - $99,999

TREGO INTERCHANGE

UTL/INT XX/WE ENERGIES/1197-00-70

BACKBONE NON-FEDERAL

2022 1197-18-77 04/12/2022 303 LET PVRPLA 5.954 USH 053 NEW AUBURN - SPOONER $17,000,000 - $19,999,999

PINE GROVE RD TO WILDCAT RD (NB&SB)

CONSTRUCTION/PAVEMENTREPLACEMENT

BACKBONE NON-FEDERAL

2023 1197-18-78 12/12/2023 303 LET PVRPLA 6.470 USH 053 NEW AUBURN - SPOONER $20,000,000 - $24,999,999

Page 372: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL STIP Project Listing 332Northwest Region

WASHBURN

Year Project Schd Dt PgmContract

Type CONCEPTNet

Miles RouteProject DescriptionWISDOT Program

EstimateAnticipated Funding

WILDCAT RD TO CTH A (NB & SB)

CONSTRUCTION/PAVEMENTREPLACEMENT

BACKBONE NATIONAL HIGHWAY PERFFAST

1550-04-14 303 I/E BRRHB 0.000 USH 063 CUMBERLAND - SPOONER $0 - $99,999

YELLOW RIVER BRIDGE B-65-0014

DESIGN - FULL PS&E BRRHB

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2025 1560-00-73 12/09/2025 303 LET BRRPL 0.028 USH 063 SPOONER - HAYWARD $1,000,000 - $1,999,999

NAMEKAGON RIVER BRIDGE B-65-0061

CONSTRUCTION/BRRPL

SHR BRIDGES NATIONAL HIGHWAY PERFFAST

2022 4765-98-22 06/25/2022 305 MIS TOPM 0.000 VARHWY

WASHBURN COUNTY PAVEMENT MARKING $500,000 - $749,999

LOCATIONS ON STH PER ANNUAL PLAN

TRF OPS- PAVEMENT MARKING TMAS CY22

STATE HIGHWAY OPERATIONS PROGRAM SURFACE TRANS BLOCK-FLEX E

Page 373: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 8

Backlog

Advanceable

Pilot

Program

Page 374: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement 8 – 1

Backlog-Advanceable Pilot Program

For calendar year 2022, WisDOT and FHWA have agreed to a Backlog-Advanceable Pilot Program. Backlog-Advanceable projects are in the Wisconsin State Highway Rehabilitation (SHR) program [identified in non-MPA areas (rural)] and are outside of the STIP four-year period. If additional federal funding becomes available during a Federal Fiscal Year (FFY), Backlog-Advanceable projects will be advanced into the 4-year STIP period to authorize the additional federal funds within that FFY. Backlog-Advanceable projects are listed separately in this tab in the 2022 STIP. The annual STIP public comment period will serve to meet the federally required 30-day comment process for these projects. The Backlog-Advanceable project list is updated on an annual basis. Backlog-Advanceable Pilot projects are screened and identified to have low levels of environmental impacts and use WisDOT Categorical Exclusion Checklist (CEC) environmental documentation. The project candidate list screening process will not allow any project requiring conformity determination. The Backlog-Advanceable pilot program funding amounts are capped at no more than 15% of the annual Wisconsin State Highway Rehabilitation (SHR) program funding. As part of the pilot program process, the Backlog-Advanceable project list will remain static and no projects will be added until developing the listing for the next annual STIP update.

Backlog-Advanceable projects can move into any part of the four-year period without an amendment to the STIP, provided they comply with the fiscal constraint of the STIP. Backlog-Advanceable projects moved into the four-year STIP period will be included in the fiscal constraint determination of the next monthly STIP amendment.

The goal of the Backlog-Advanceable Pilot Program is to provide a list of projects that are included in the STIP so these projects are eligible for further planning development and design engineering. This eligible project planning development and design engineering will enable projects to be ready for advancement if funding becomes available without disrupting the current programmed projects. Funding for the Backlog-Advanceable projects is anticipated to be available based on historical project letting cost savings and FHWA August redistribution of unused federal obligation authority.

The enclosed Backlog-Advanceable projects have been identified with Early Let (ELET) dates to which the project could be advanced for letting once available funding is identified. The let date is the date the project is scheduled to be awarded to the successful bidding contractor to perform the work associated with the project. These Backlog-Advanceable projects have ELET dates within the 2022 – 2025 STIP calendar years.

The calendar year (CY) for the ELET (move to CY) and the CY for the current scheduled Let date (move from CY) are included in the following 2022 – 2025 Backlog-Advanceable Pilot Program STIP project listing.

Page 375: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 1Southwest Region

COLUMBIA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 1Southwest Region

COLUMBIA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 1161-00-78 303 LET PSRS20 0.000 IH 039 PORTAGE - PACKWAUKEE $2,000,000 - $2,999,999

STH 78 TO USH 51

CONST/REPAIR SB RDWY/PSRS20

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 376: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 2Southwest Region

CRAWFORD

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 2Southwest Region

CRAWFORD

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 5180-00-62 303 LET RSRF30 2.010 STH 060 BRIDGEPORT - BOSCOBEL $1,000,000 - $1,999,999

USH 18 TO E JCT OLD HWY 60

CONST/MILL & O'LAY/B-12-26/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 2027 5780-03-63 303 LET RSRF10 0.525 STH 131 WAUZEKA - SOLDIERS GROVE $250,000 - $499,999

KICKAPOO RIVER B-12-172 TO USH 61

CONST/MILL & OVERLAY/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 2027 5790-02-72 303 LET RSRF20 11.690 STH 171 FERRYVILLE - ROLLING GROUND $5,000,000 - $5,999,999

STH 27 TO USH 61

CONST/MILL & O'LAY/B-12-137/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 377: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 3Southwest Region

DODGE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 3Southwest Region

DODGE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 1370-00-75 303 LET RSRF20 2.900 STH 016 WATERTOWN - WAUKESHA $1,000,000 - $1,999,999

CTH L/ BUS 26 TO E MAIN STREET

CONST/ MILL AND OVERLAY

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 2028 3042-01-62 303 LET PVRPLA 5.000 STH 060 LOWELL - HARTFORD $4,000,000 - $4,999,999

STH 67 TO WASHINGTON CO LINE

CONST/ PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 2027 3030-02-66 303 LET RSRF30 7.180 STH 067 OCONOMOWOC - MAYVILLE $3,000,000 - $3,999,999

STH 60 TO W JCT CTH S

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

2023 2027 3364-00-75 303 LET RSRF25 3.510 STH 067 MAYVILLE - CAMPBELLSPORT $2,000,000 - $2,999,999

STH 28 TO STH 175

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 378: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 4Southwest Region

GRANT

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 4Southwest Region

GRANT

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 5215-03-61 303 LET RSRF10 2.560 STH 081 CASSVILLE - LANCASTER $500,000 - $749,999

SCHOOL STREET TO CTH Y

CONST/MILL & O'LAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 379: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 5Southwest Region

GREEN

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 5Southwest Region

GREEN

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 5590-05-71 303 LET RSRF20 6.320 STH 078 ARGYLE - MT HOREB $2,000,000 - $2,999,999

LIEN COURT TO NORTH JUNCTION CTH H

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 380: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 6Southwest Region

IOWA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 6Southwest Region

IOWA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2028 5939-00-63 303 LET RSRF10 8.821 STH 080 COBB - AVOCA $2,000,000 - $2,999,999

CTH I TO STH 133

CONST/ RSRF10/ B-25-176

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 381: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 7Southwest Region

JEFFERSON

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 7Southwest Region

JEFFERSON

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2021 2027 1067-01-88 303 LET BRRHB 0.001 IH 094 LAKE MILLS - OCONOMOWOC $250,000 - $499,999

CTH F STRUCTURE B-28-0050

CONST/CONCRETE BRIDGE DECK O'LAY

BACKBONE NATIONAL HIGHWAY PERF FAST

2024 2027 3050-01-77 303 LET RSRF30 5.285 STH 019 SUN PRAIRIE - WATERTOWN $3,000,000 - $3,999,999

CRAWFISH RIVER BRIDGE TO GYPSY ROAD

CONST/ MILL AND OVERLAY

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 382: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 8Southwest Region

MONROE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 8Southwest Region

MONROE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 5120-05-65 303 LET PVRPLA 8.480 STH 033 LACROSSE - CASHTON $2,000,000 - $2,999,999

LA CROSSE CO LINE TO STH 27

CONST/MILL & OVERLAY/PVRPLA

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 383: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 9Southwest Region

RICHLAND

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 9Southwest Region

RICHLAND

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 1640-03-78 303 LET RSRF20 0.650 USH 014 C RICHLAND CENTER, USH 14 $1,000,000 - $1,999,999

STH 80 TO BOHMAN DRIVE

CONST/MILL & OVERLAY/RSRF

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 384: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 10Southwest Region

VERNON

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 10Southwest Region

VERNON

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 5820-01-68 303 LET RSRF20 4.050 STH 162 COON VALLEY - BANGOR $2,000,000 - $2,999,999

USH 14 TO STH 33/B-62-XXX,-XXX

CONST/MILL & O'LAY/RPL BRDGS/RSRF

STATE 3R SURFACE TRANSP BLOCK GRTS-

Page 385: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 11Northeast Region

DOOR

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 11Northeast Region

DOOR

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 4150-14-71 303 LET RSRF25 1.460 STH 057 SUMMIT RD - BAILEYS HARBOR $1,000,000 - $1,999,999

SUMMIT RD - CTH Q

CONST OPS/RSRF

STATE 3R STBG <5K POP FAST

Page 386: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 12Northeast Region

MARINETTE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 12Northeast Region

MARINETTE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated

Funding

2025 2027 9160-21-71 303 LET PSRS40 1.290 STH 064 MOUNTAIN - POUND $500,000 - $749,999

N 17TH RD - USH 141

CONST/PSRS MILL & OVERLAY

STATE 3R STBG <5K POP FAST

Page 387: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 13North Central Region

FLORENCE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 13North Central Region

FLORENCE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 9100-05-71 303 LET RSRF20 8.155 STH 070 TIPLER - FLORENCE $3,000,000 - $3,999,999

STH 139 SOUTH TO FOREST ROAD 2154

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2023 2028 9100-05-72 303 LET RSRF20 12.536 STH 070 TIPLER - FLORENCE $4,000,000 - $4,999,999

FOREST ROAD 2154 TO USH 2

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 388: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 14North Central Region

FOREST

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 14North Central Region

FOREST

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 9165-13-70 303 LET RSRF10 15.830 STH 055 ARGONNE - NELMA $4,000,000 - $4,999,999

SCOTT LAKE ROAD TO STH 70

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 389: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 15North Central Region

GREEN LAKE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 15North Central Region

GREEN LAKE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 6100-00-70 303 LET RSRF10 7.430 STH 044 MANCHESTER - RIPON $3,000,000 - $3,999,999

GRAND RIVER BR TO FOND DU LAC CL

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 390: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 16North Central Region

IRON

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 16North Central Region

IRON

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 9303-03-71 303 LET PVRPLA 9.680 STH 122 UPSON - MONTREAL RIVER $3,000,000 - $3,999,999

STH 77 TO SOUTH JUNCTION CTH B

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

2023 2028 9303-03-72 303 LET PVRPLA 4.712 STH 122 UPSON - MONTREAL RIVER $2,000,000 - $2,999,999

WEST MILL STREET TO MI STATE LINE

CONST/PAVEMENT REPLACEMENT

STATE 3R STBG <5K POP FAST

Page 391: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 17North Central Region

LANGLADE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 17North Central Region

LANGLADE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2028 9140-12-75 303 LET PSRS40 5.750 STH 064 ANTIGO - LANGLADE $2,000,000 - $2,999,999

CLOVER ROAD TO FIFTH AVENUE ROAD

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

Page 392: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 18North Central Region

MARATHON

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 18North Central Region

MARATHON

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 1053-00-71 303 LET BRRHB 0.000 STH 029 ABBOTSFORD - WAUSAU $2,000,000 - $2,999,999

BRIDGE OVERLAYS B-37-0116, 0287

CONST/CONCRETE OVERLAY

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 393: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 19North Central Region

MARQUETTE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 19North Central Region

MARQUETTE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 1430-01-66 303 LET RSRF25 10.438 STH 023 ENDEAVOR - PRINCETON $5,000,000 - $5,999,999

CTH C TO CANAL STREET

CONSTR/PREV MAINT APPRVL 3/25/15

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 394: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 20North Central Region

ONEIDA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 20North Central Region

ONEIDA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2021 2029 1170-16-63 303 LET BRRHB 0.000 USH 051 TOMAHAWK - MINOCQUA $250,000 - $499,999

LAKE KATHERINE CROSSING B-43-0021

CONST/PREV MAINT APPRVL 11/3/2016

SHR BRIDGES NATIONAL HIGHWAY PERF FAST

Page 395: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 21North Central Region

PORTAGE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 21North Central Region

PORTAGE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2028 6270-00-66 303 LET BRRHB 0.004 STH 049 NORTHLAND - STH 29 $100,000 - $249,999

HOLT CREEK BRIDGE B-49-527

CONSTR/PM APPR 11.3.16

SHR BRIDGES STBG <5K POP FAST

2024 2028 1520-01-60 303 LET PSRS20 12.992 STH 054 WISCONSIN RAPIDS - PLOVER $6,000,000 - $6,999,999

26TH STREET NORTH TO CTH B

CONST/PSRS20

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 2028 6280-02-76 303 LET BRRHB 0.000 STH 066 STEVENS POINT - ROSHOLT $250,000 - $499,999

BRIDGE OVERLAYS B-49-0073, 0074

CONST/CONCRETE OVERLAY

SHR BRIDGES STBG <5K POP FAST

2024 2028 6280-02-77 303 LET RSRF25 6.010 STH 066 STEVENS POINT - ROSHOLT $4,000,000 - $4,999,999

STEVENS PT AIRPORT TO E JCT CTH J

CONST/RESURFACE

STATE 3R STBG 5-200K POP FASTG

Page 396: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 22North Central Region

PRICE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 22North Central Region

PRICE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 1610-44-72 303 LET RSRF20 12.310 STH 013 PRENTICE - PARK FALLS $6,000,000 - $6,999,999

CTH F TO WALNUT STREET

CONST/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 397: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 23North Central Region

WAUPACA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 23North Central Region

WAUPACA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2028 6210-01-74 303 LET RSRF25 1.340 STH 049 AURORAVILLE - FREMONT $750,000 - $999,999

ARNDT ROAD TO USH 10

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2022 2028 6590-02-77 303 LET RSRF10 3.090 STH 110 FREMONT - MARION $2,000,000 - $2,999,999

USH 10 TO STH 96

CONST/RESURFACE

STATE 3R STBG <5K POP FAST

2023 2028 1510-02-74 303 LET RSRF25 0.430 USH 010 WAUPACA - APPLETON $500,000 - $749,999

STH 49/STH 110 INTERCHANGE

CONST/RESURFACE

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 398: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 24North Central Region

WAUSHARA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 24North Central Region

WAUSHARA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated

Funding

2025 2028 6150-00-62 303 LET BRRHB 0.021 STH 022 MONTELLO - WAUTOMA $100,000 - $249,999

W BR WHITE RIVER B-69-41

CONSTR/PM APPR 11.3.16

SHR BRIDGES STBG <5K POP FAST

2025 2028 6210-00-66 303 LET BRRHB 0.000 STH 049 AURORAVILLE - FREMONT $100,000 - $249,999

PINE RIVER CROSSING B-69-26,27

CONSTR/PM APPR 11.3.16 ON B-69-26

SHR BRIDGES STBG <5K POP FAST

Page 399: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 25North Central Region

WOOD

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 25North Central Region

WOOD

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated

Funding

2025 2027 6340-00-62 303 LET BRRHB 0.000 VAR HWY WISCONSIN RAPIDS - MARSHFIELD $500,000 - $749,999

WIS 13 & 80 BRIDGES B-71-62,79

CONSTR/PM APPR 11.3.16

SHR BRIDGES STBG <5K POP FAST

Page 400: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 26Northwest Region

ASHLAND

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 26Northwest Region

ASHLAND

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 8520-00-71 303 LET RSRF20 5.710 STH 077 MELLEN - HURLEY $3,000,000 - $3,999,999

STH 13 TO EAST COUNTY LINE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 401: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 27Northwest Region

BARRON

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 27Northwest Region

BARRON

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 1550-04-78 303 LET RSRF20 10.889 USH 063 CLEAR LAKE - CUMBERLAND $7,000,000 - $7,999,999

USH 8 E TO STH 48 W

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 402: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 28Northwest Region

BAYFIELD

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 28Northwest Region

BAYFIELD

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2022 2027 8510-00-75 303 LET RSRF20 7.290 STH 013 CORNUCOPIA - PORT WING $3,000,000 - $3,999,999

OLD 13 RD TO BARK POINT RD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

2023 2027 8731-00-70 303 LET RSRF20 4.770 STH 137 USH 2 - ASHLAND $2,000,000 - $2,999,999

USH 2 TO STH 112

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 403: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 29Northwest Region

BUFFALO

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 29Northwest Region

BUFFALO

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 7170-00-75 303 LET RSRF20 2.034 STH 025 WABASHA - DURAND $1,000,000 - $1,999,999

MN/WI ST LN TO 100' S OF STH 35 S

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2022 2027 7720-00-72 303 LET RSRF20 8.650 STH 095 FOUNTAIN CITY - ARCADIA $3,000,000 - $3,999,999

0.2 MI N OF JEFFERSON ST TO CTH G

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2022 2027 1530-06-79 303 LET RSRF20 5.217 USH 010 DURAND - MONDOVI $2,000,000 - $2,999,999

PEPIN COUNTY LINE TO CTH A

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 404: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 30Northwest Region

CHIPPEWA

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 30Northwest Region

CHIPPEWA

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 8580-00-72 303 LET COLD20 15.046 STH 040 BLOOMER - BRUCE $7,000,000 - $7,999,999

STH 64 E TO CHIPPEWA/RUSK CO LN

CONSTRUCTION/CIR/RESURFACING

STATE 3R STBG <5K POP - FAST EXT

Page 405: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 31Northwest Region

DOUGLAS

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 31Northwest Region

DOUGLAS

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 1196-00-60 303 LET RSRF30 0.000 USH 053 MINONG - SOLON SPRINGS $2,000,000 - $2,999,999

CTH Y TO CTH M (SB)

CONSTR/RSRF30

BACKBONE NATIONAL HIGHWAY PERF FAST

2021 2027 1196-00-61 303 LET RSRF10 8.090 USH 053 MINONG - SOLON SPRINGS $5,000,000 - $5,999,999

CTH M TO WIS CENTRAL LTD RR

CONST/RESURFACE AND JOINT REPAIRS

BACKBONE NATIONAL HIGHWAY PERF FAST

Page 406: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 32Northwest Region

DUNN

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 32Northwest Region

DUNN

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 7105-00-74 303 LET RSRF20 10.084 STH 072 ELLSWORTH - DOWNSVILLE $5,000,000 - $5,999,999

PIERCE/DUNN COUNTY LINE TO STH 25

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 407: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 33Northwest Region

EAU CLAIRE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 33Northwest Region

EAU CLAIRE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 7070-00-70 303 LET MISC 0.065 STH 027 AUGUSTA - CADOTT $250,000 - $499,999

DARROW CREEK CULVERT C-18-0053

CONSTRUCTION - CULVERT REPLACEMENT

SHR BRIDGES STBG <5K POP - FAST EXT

2023 2027 7070-00-71 303 LET COLD20 7.982 STH 027 AUGUSTA - CADOTT $5,000,000 - $5,999,999

BLACK BEAR RD TO NORTH COUNTY LINE

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 408: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 34Northwest Region

PEPIN

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 34Northwest Region

PEPIN

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 1530-05-73 303 LET RSRF20 8.191 USH 010 ELLSWORTH - DURAND $4,000,000 - $4,999,999

PIERCE/PEPIN COUNTY LINE TO CTH P

CONSTRUCTION/RESURFACE/RSRF20

STATE 3R STBG <5K POP FAST

2023 2027 1530-05-83 303 LET RSRF20 0.180 USH 010 DURAND - MONDOVI $0 - $99,999

DURAND ST TO 950' EAST OF DURAND ST

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 409: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 35Northwest Region

PIERCE

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 35Northwest Region

PIERCE

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 7105-00-73 303 LET COLD20 10.860 STH 072 ELLSWORTH - DOWNSVILLE $6,000,000 - $6,999,999

CTH BB TO CTH G

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2024 2027 7210-00-80 303 LET RSRF20 11.643 USH 063 RED WING - ELLSWORTH $6,000,000 - $6,999,999

MN/WI STATE LINE TO USH 10

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 410: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 36Northwest Region

POLK

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 36Northwest Region

POLK

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2025 2027 8840-00-71 303 LET COLD20 13.530 STH 087 ST. CROIX FALLS - GRANTSBURG $8,000,000 - $8,999,999

240' N OF MINNESOTA ST TO 270TH AVE

CONSTRUCTION/CIR/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2024 2027 8840-02-70 303 LET MISC 14.670 STH 087 ST CROIX FALLS - GRANTSBURG $2,000,000 - $2,999,999

USH 8 TO 270TH AVE

CONSTRUCTION/CULVERT REPLACEMENT

STATE 3R SURFACE TRANSP BLOCK GRTS-

2024 2027 1570-00-79 303 LET RSRF20 2.191 USH 008 ST CROIX FALLS - TURTLE LAKE $2,000,000 - $2,999,999

MN/WI STATE LINE TO GLACIER ROAD

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

2024 2027 1570-00-80 303 LET MISC 2.191 USH 008 ST CROIX FALLS - TURTLE LAKE $250,000 - $499,999

MN/WI STATE LINE TO GLACIER ROAD

CONSTR/SFTY/INTERSECTION IMPRVMNT

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 411: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 37Northwest Region

RUSK

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 37Northwest Region

RUSK

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 8210-00-73 303 LET RSRF20 9.430 STH 073 THORP - INGRAM $4,000,000 - $4,999,999

TAYLOR/RUSK CO LN TO USH 8

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP FAST

Page 412: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 38Northwest Region

SAWYER

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 38Northwest Region

SAWYER

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 8140-00-77 303 LET RSRF20 18.040 STH 027 OJIBWA - HAYWARD $9,000,000 - $9,999,999

125' W OF STH 40 S TO BOYLAND RD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2023 2027 8140-00-78 303 LET RSRF20 8.850 STH 027 STONE LAKE - HAYWARD $4,000,000 - $4,999,999

BOYLAN RD TO 700FT N OF CAROL DR

CONSTRUCTION - RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 413: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 39Northwest Region

ST. CROIX

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 39Northwest Region

ST. CROIX

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2023 2027 8110-01-77 303 LET RSRF20 6.315 STH 064 NEW RICHMOND - CONNORSVILLE $3,000,000 - $3,999,999

142ND ST TO USH 63 S

CONSTRUCTION/RESURFACE

STATE 3R NATIONAL HIGHWAY PERF FAST

Page 414: 2022-2025 Draft Statewide Transportation Improvement Program

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 40Northwest RegionTREMPEALEAU

2022-2025 FINAL Backlog Advanceable Pilot Program STIP Project Listing 40Northwest RegionTREMPEALEAU

ToCY

FromCY Project Pgm

ContractType CONCEPT

NetMiles Route

Project DescriptionWISDOT Program

EstimateAnticipated Funding

2024 2027 1530-06-80 303 LET RSRF20 13.208 USH 010 MONDOVI - OSSEO $7,000,000 - $7,999,999

HUNT LANE TO NELSON ROAD

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

2023 2027 1630-00-72 303 LET RSRF20 13.950 USH 053 GALESVILLE - WHITEHALL $8,000,000 - $8,999,999

BEAVER CR TO STH 95 W

CONSTRUCTION/RESURFACE

STATE 3R STBG <5K POP - FAST EXT

Page 415: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 9

Federal

Lands

Transportation

Improvement

Programs

Page 416: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 9 – 1

Federal Lands Transportation Improvement Program FHWA has “established a coordinated Federal lands highways program that … appl[ies] to public lands highways, park roads and parkways, refuge roads, and Indian reservation roads and bridges” (23 USC 204 (a)(1)). The Federal lands highway projects are to be included in the state’s STIP for the projects located within the state. Current projects from the Eastern Federal Lands Highway Division and Indian Reservation Roads Programs are included within the following pages. The project listings are updated as made available from FHWA. A listing of tribal contacts is also included for informational purposes.

Page 417: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 9 – 2

Tribal Contacts: Honorable Mike Wiggins, Jr. Chair, Bad River Band of Lake Superior Chippewa PO Box 39 Odanah, WI 54861

Honorable Shannon Holsey President, Stockbridge-Munsee Band of Mohican Indians PO Box 70 Bowler, WI 54416

Honorable Ned Daniels, Jr. Chair, Forest County Potawatomi Community PO Box 340 Crandon, WI 54520

Honorable Tehassi Hill Chair, Oneida Nation of Wisconsin PO Box 365 Oneida, WI 54155-0365

Honorable Marlon WhiteEagle President, Ho-Chunk Nation PO Box 667 Black River Falls, WI 54615

Honorable Chris Boyd Chair, Red Cliff Band of Lake Superior Chippewa 88385 Pike Rd, Hwy 13 Bayfield, WI 54814

Honorable Louis Taylor, Sr. Chair, Lac Courte Oreilles Band of Lake Superior Chippewa Tribal Governing Board 13394 West Trepenia Road Hayward, WI 54843

Honorable William Reynolds Chair, St. Croix Chippewa Community 24663 Angeline Avenue Webster, WI 54893

Honorable John Johnson President, Lac du Flambeau Band of Lake Superior Chippewa PO Box 67 Lac du Flambeau, WI 54538

Honorable Robert VanZile, Jr. Tribal Chair, Sokaogon Chippewa Community (Mole Lake Band of Lake Superior Chippewa Indians) 3051 Sand Lake Road Crandon, WI 54520

Honorable Gunnar Peters Chair, Menominee Nation Tribal Legislature PO Box 910 Keshena, WI 54135-0910

Page 418: 2022-2025 Draft Statewide Transportation Improvement Program

Tribal Transportation Program Transportation Improvement Program

2021

Tribal Transporation Program

Transportation Improvement Program

State of

This report includes all construction projects on current approved Tribal TIPs in this State.

Wisconsin

Page 419: 2022-2025 Draft Statewide Transportation Improvement Program

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all three reservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how to read subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

Page 420: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 3 of 34

F5543001

F5543010

F5543011

F5543012

F5543013

F5543014

3,000

80,000

5,000

0

0

0

3,000

370,000

1,000

12,000

0

0

3,000

11,000

0

380,000

12,000

7,000

0

0

0

0

0

0

12,000

473,000

9,000

398,000

12,000

7,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

1,000 1,000 1,000

0

20,000 60,000

0 0

0 1,000 4,000

0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

10,000 340,000 20,000

0

0 0

1,000 0

10,000 1,000 1,000

0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 1,000

10,000 0

0 0 0 0

15,000 350,000 15,000

0

10,000 1,000 1,000

0

5,000 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

4,000 4,000 4,000

0

40,000 402,000 31,000

0

0 1,000 8,000

0

30,000 352,000 16,000

0

10,000 1,000 1,000

0

5,000 1,000 1,000

0

BAD RIVER SAFETY PROJECT

OLD ODANAH ROAD

CEMETERY ROAD

BAD RIVER WALKING TRAIL

WEST FIRE LANE

CNW TRAIL

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

SAFETY

REHAB

REHAB

WALKWY

RECONS

WALKWY

O

R

R

R

R

R

P2

7

3

7

3

3

55 - WisconsinState F55430 - Bad River

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 617,877

FIRST PAGE FOR CSTIPF55430 - BAD RIVER BANDEntity Name

1,000 1,000 1,000

0

10,000 1,000 1,000

0

0 0

3,000 0

5,000 1,000

0 0

0 0 0 0

0 0 0 0

3,000

12,000

3,000

6,000

0

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

24-MAY-21FHWA Approved Date

Page 421: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 4 of 34

F5543015

F5543016

F5543017

F5543018

F5543019

F5543020

26,000

0

0

25,000

7,000

17,000

1,000

2,000

3,000

0

25,000

7,000

0

3,000

7,000

0

5,000

0

0

0

0

0

0

0

43,000

5,000

13,000

31,000

362,000

36,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

5,000 1,000

20,000 0

0 0 0 0

0 0 0 0

0 10,000 15,000

0

7,000 0 0 0

1,000 1,000

15,000 0

0 0

1,000 0

1,000 1,000

0 0

1,000 1,000 1,000

0

0 0 0 0

0 10,000 15,000

0

1,000 1,000 5,000

0

0 0 0 0

1,000 1,000 1,000

0

5,000 1,000 1,000

0

0 0 0 0

0 0

5,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

10,000 2,000

31,000 0

2,000 2,000 1,000

0

9,000 2,000 2,000

0

0 11,000 20,000

0

27,000 310,000 25,000

0

3,000 3,000

30,000 0

BAD RIVER ERFO

HISTORICAL PRESERVATION PROJECT

NEW HOUSING DEVELOPMENT

Headstart Access Road

Maple Street Rehabilitation

2018 ERFO

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

ERFO

NEWCON

NEWCON

NEWCON

RECONS

ERFO

R

R

R

R

R

R

C3

7

7

7

D1

D1

55 - WisconsinState F55430 - Bad River

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 617,877

F55430 - BAD RIVER BANDEntity Name

5,000 1,000

10,000 0

0 0 0 0

3,000 0 0 0

0 1,000 5,000

0

20,000 300,000

5,000 0

1,000 1,000

10,000 0

16,000

0

3,000

6,000

325,000

12,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

24-MAY-21

Page 422: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 5 of 34

F5543021

F5543022

F5543023

F55430RI

F55430RM

F55430TP

37,000

11,000

159,877

1,000

200,000

45,000

5,000

0

2,000

1,000

150,000

40,000

0

0

0

1,000

150,000

40,000

0

0

0

0

0

0

67,000

20,000

171,877

4,000

650,000

170,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

7,000 25,000

5,000 0

10,000 1,000

0 0

8,000 149,877

2,000 0

1,000 0 0 0

0 0 0

200,000

45,000 0 0 0

0 0

5,000 0

0 0 0 0

0 0

2,000 0

1,000 0 0 0

0 0 0

150,000

40,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 0 0 0

0 0 0

150,000

40,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

7,000 35,000 25,000

0

13,000 2,000 5,000

0

9,000 150,877 12,000

0

4,000 0 0 0

0 0 0

650,000

170,000 0 0 0

Boat Landing Acces Road

Bad River Roads Rehab (BUILD)

Tobie Can/Wake House Road

Bad River Road Inventory Project

Bad River Road Maintenance Project

Bad RiverTransportation Planning

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

RECONS

PLANING

PLANING

PLANING

R

R

R

O

O

O

7

7

7

P8

P10

P9

55 - WisconsinState F55430 - Bad River

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

003 - Ashland

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 617,877

F55430 - BAD RIVER BANDEntity Name

0 10,000 15,000

0

3,000 1,000 5,000

0

1,000 1,000 8,000

0

1,000 0 0 0

0 0 0

150,000

45,000 0 0 0

25,000

9,000

10,000

1,000

150,000

45,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

24-MAY-21

Page 423: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 6 of 34

617,877 627,000 623,000 620,000 0 2,487,877 2,487,877

617,877 627,000 623,000 620,000 0 2,487,877

F55430TR

1,000 1,000 1,000 0 4,000

PECONS

CEZ

0 0

1,000 0

0 0

1,000 0

0 0

1,000 0

0 0 0 0

0 0

4,000 0

Bad River Transit

TotalPhase

617,877 627,000 623,000 620,000

TRANSIT

O

T2

55 - WisconsinState F55430 - Bad River

003 - AshlandNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 617,877

F55430 - BAD RIVER BANDEntity Name

0

0 0

1,000 0

1,000Total

FY 2021 ($) FY 2022 ($) FY 2023 ($) FY 2024 ($) FY 2025 ($)

24-MAY-21

Page 424: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 7 of 34

F5543417

F5543423

F5543424

F5543425

F5543426

F5543427

2,000

1,000

1,000

1,000

1,000

50,000

251,000

0

1,000

1,000

0

0

251,000

0

1,000

0

0

0

0

0

0

0

0

0

755,000

2,000

4,000

3,000

2,000

55,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

1,000 1,000

0 0

1,000 0 0 0

1,000 0 0 0

1,000 0 0 0

1,000 0 0 0

50,000 0 0 0

1,000 240,000 10,000

0

0 0 0 0

1,000 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

1,000 240,000 10,000

0

0 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

4,000 721,000 30,000

0

2,000 0 0 0

4,000 0 0 0

3,000 0 0 0

2,000 0 0 0

55,000 0 0 0

FCPC HOUSING ROADS

EVERYBODY'S ROAD (MISH KO SWEN

Roadway Drainage Improvements

County Road Improvements

Town Road Resurfacings

US 8 Corridor Safety and Connectivity Im

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

WALKWY

RECONS

REHAB

REHAB

SAFETY

R

R

R

R

R

R

7

F1

7

7

7

SP

55 - WisconsinState F55434 - Forest County Potawatomi

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 258,825

FIRST PAGE FOR CSTIPF55434 - FOREST COUNTY POTAWATOMI COMMUNITYEntity Name

1,000 240,000 10,000

0

1,000 0 0 0

1,000 0 0 0

1,000 0 0 0

1,000 0 0 0

5,000 0 0 0

251,000

1,000

1,000

1,000

1,000

5,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

17-JUN-21FHWA Approved Date

Page 425: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 8 of 34

258,825 270,000 257,000 256,000 0 1,041,825 1,041,825

258,825 270,000 257,000 256,000 0 1,041,825

F5543428

F5543429

F55434RI

F55434RM

F55434SA

F55434TP

1,000

1,000

4,265

152,560

5,000

39,000

0

1,000

1,000

1,000

0

1,000

0

1,000

1,000

1,000

0

1,000

0

0

0

0

0

0

2,000

4,000

7,265

155,560

10,000

42,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

1,000 0 0 0

1,000 0 0 0

4,265 0 0 0

0 0 0

152,560

5,000 0 0 0

39,000 0 0 0

0 0 0 0

1,000 0 0 0

1,000 0 0 0

0 0 0

1,000

0 0 0 0

1,000 0 0 0

0 0 0 0

1,000 0 0 0

1,000 0 0 0

0 0 0

1,000

0 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2,000 0 0 0

4,000 0 0 0

7,265 0 0 0

0 0 0

155,560

10,000 0 0 0

42,000 0 0 0

Carter Roads

Sugarbush Lane

TTP ROAD INVENTORY PROJECT

TTP ROAD MAINTENANCE PROJECT

FCP Safety

TTP TRANSPORTATION PLANNING PRO

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

258,825 270,000 257,000 256,000

REHAB

NEWCON

PLANING

PLANING

SAFETY

PLANING

R

R

O

O

O

O

7

7

P8

P10

ST

P9

55 - WisconsinState F55434 - Forest County Potawatomi

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 258,825

F55434 - FOREST COUNTY POTAWATOMI COMMUNITYEntity Name

0

1,000 0 0 0

1,000 0 0 0

1,000 0 0 0

0 0 0

1,000

5,000 0 0 0

1,000 0 0 0

1,000

1,000

1,000

1,000

5,000

1,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

17-JUN-21

Page 426: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 9 of 34

F5543903

F5543950

F5543952

F5543983

F5543985

F5543986

5,000

0

0

0

0

3,000

427,000

0

0

0

0

0

0

3,000

3,000

3,000

415,000

0

0

0

0

0

0

0

887,000

3,000

3,000

3,000

415,000

5,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

5,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

12,000 400,000 15,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

1,000 1,000 1,000

0

1,000 1,000 1,000

0

5,000 400,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

37,000 825,000 25,000

0

1,000 1,000 1,000

0

1,000 1,000 1,000

0

1,000 1,000 1,000

0

5,000 400,000 10,000

0

1,000 2,000 2,000

0

Winneshiek Property (Winnebago Height

Wazee North and South

Little Blackhawk

Ho Chunk Village - Parcels 11 & 12

East Colley Road

Well #5 Mortensen

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

NEWCON

NEWCON

NEWCON

REHAB

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

053 - Jackson

053 - Jackson

053 - Jackson

111 - Sauk

105 - Rock

111 - Sauk

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

FIRST PAGE FOR CSTIPF55439 - Ho-Chunk NationEntity Name

20,000 425,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 1,000 1,000

0

455,000

0

0

0

0

2,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21FHWA Approved Date

Page 427: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 10 of 34

F5543995

F5543996

F5543997

F55439D4

F55439D7

F55439E8

0

6,000

0

0

0

0

0

0

425,000

0

3,000

7,000

3,000

0

21,000

3,000

3,000

7,000

0

0

0

0

0

0

3,000

10,000

449,000

3,000

6,000

14,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

0 1,000 5,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

20,000 385,000 20,000

0

0 0 0 0

1,000 1,000 1,000

0

5,000 1,000 1,000

0

1,000 1,000 1,000

0

0 0 0 0

0 1,000

20,000 0

1,000 1,000 1,000

0

1,000 1,000 1,000

0

5,000 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 2,000 8,000

0

23,000 386,000 40,000

0

1,000 1,000 1,000

0

2,000 2,000 2,000

0

10,000 2,000 2,000

0

Christensen Property

Lowe Avenue

Mortensen Property

Mo Ra Je Ga Road

District 1 Walking Trail

Willowbrook Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

NEWCON

RECONS

NEWCON

RECONS

WALKWY

REHAB

R

R

R

R

R

R

7

7

7

7

F1

7

55 - WisconsinState F55439 - Ho-Chunk Nation

053 - Jackson

053 - Jackson

141 - Wood

115 - Shawano

053 - Jackson

105 - Rock

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 0 0 0

0 1,000 3,000

0

3,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0

4,000

3,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 428: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 11 of 34

F55439F7

F55439F8

F55439G2

F55439G3

F55439G4

F55439G6

6,000

0

0

10,000

0

12,000

0

0

3,000

0

3,000

0

0

3,000

2,000

0

2,000

0

0

0

0

0

0

0

7,000

3,000

7,000

12,000

5,000

15,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 1,000 5,000

0

0 0 0 0

0 0 0 0

0 5,000 5,000

0

0 0 0 0

1,000 1,000

10,000 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 0 0 0

1,000 1,000 1,000

0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 1,000 1,000

0

0 0 0 0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 1,000 6,000

0

1,000 1,000 1,000

0

2,000 3,000 2,000

0

0 6,000 6,000

0

1,000 2,000 2,000

0

1,000 2,000

12,000 0

STH 21 Turn Lanes

Potch Cha Chee

Ho Chunk Village Walking Trail - Sauk Co

Mission Road

Sand Pillow Trail

Mission Road Community Overlays

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

WALKWY

REHAB

WALKWY

REHAB

R

R

O

R

O

R

7

7

F1

7

F1

7

55 - WisconsinState F55439 - Ho-Chunk Nation

081 - Monroe

115 - Shawano

111 - Sauk

053 - Jackson

053 - Jackson

053 - Jackson

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 0

1,000 0

0 0 0 0

1,000 1,000

0 0

0 1,000 1,000

0

0 0 0 0

0 1,000 2,000

0

1,000

0

2,000

2,000

0

3,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 429: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 12 of 34

F55439G7

F55439H1

F55439H2

F55439H4

F55439H6

F55439H8

2,000

21,000

0

2,000

2,000

2,000

0

0

10,000

0

0

0

0

0

445,000

0

0

0

0

0

0

0

0

0

4,000

27,000

455,000

3,000

3,000

2,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 1,000 1,000

0

1,000 10,000 10,000

0

0 0 0 0

0 1,000 1,000

0

0 1,000 1,000

0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

10,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

10,000 425,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 2,000 2,000

0

1,000 11,000 15,000

0

20,000 425,000 10,000

0

0 1,000 2,000

0

0 1,000 2,000

0

0 1,000 1,000

0

CTH HH - Juneau County

Blue Wing Village

Sandpillow West

CTH Y Richland County

CTH A Jackson County

Lynn Hill Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

WALKWY

NEWCON

RECONS

REHAB

RECONS

R

O

R

R

R

R

7

F1

7

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

057 - Juneau

081 - Monroe

053 - Jackson

103 - Richland

053 - Jackson

141 - Wood

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 1,000 1,000

0

0 1,000 5,000

0

0 0 0 0

0 0

1,000 0

0 0

1,000 0

0 0 0 0

2,000

6,000

0

1,000

1,000

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 430: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 13 of 34

F55439H9

F55439I3

F55439I4

F55439I6

F55439I7

F55439I8

3,000

2,000

5,000

449,346

525,000

0

5,000

0

2,000

0

0

3,000

0

0

0

0

0

2,000

0

0

0

0

0

0

173,000

2,000

12,000

474,346

555,000

5,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

3,000 0 0 0

0 1,000 1,000

0

3,000 1,000 1,000

0

20,000 419,346 10,000

0

15,000 500,000 10,000

0

0 0 0 0

0 0

5,000 0

0 0 0 0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

13,000 150,000 10,000

0

0 1,000 1,000

0

4,000 3,000 5,000

0

20,000 429,346 25,000

0

15,000 510,000 30,000

0

1,000 2,000 2,000

0

Ho Chunk Road

CTH D Wood County

Hwy 12 Access to Badger Ammunition

Old 54

Bartos Road

River Drive

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

REHAB

RECONS

REHAB

REHAB

REHAB

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

115 - Shawano

141 - Wood

111 - Sauk

053 - Jackson

053 - Jackson

053 - Jackson

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

10,000 150,000

5,000 0

0 0 0 0

1,000 1,000 3,000

0

0 10,000 15,000

0

0 10,000 20,000

0

0 0 0 0

165,000

0

5,000

25,000

30,000

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 431: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 14 of 34

F55439I9

F55439J1

F55439J2

F55439J3

F55439J4

F55439J5

2,000

0

291,000

21,000

6,000

220,000

0

11,000

3,000

0

10,000

0

0

0

25,000

0

0

0

0

0

0

0

0

0

2,000

405,000

325,000

27,000

606,000

240,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 1,000 1,000

0

0 0 0 0

15,000 275,000

1,000 0

10,000 1,000

10,000 0

5,000 1,000

0 0

15,000 200,000

5,000 0

0 0 0 0

0 1,000

10,000 0

1,000 1,000 1,000

0

0 0 0 0

0 10,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 10,000 15,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 1,000 1,000

0

5,000 385,000 15,000

0

16,000 287,000 22,000

0

10,000 2,000

15,000 0

10,000 591,000

5,000 0

15,000 210,000 15,000

0

CTH J Lacrosse County

Hemlock Road

Tribal Courts Walking Trail (Executive)

Elder Circle

Ho Chunk Madison Gaming

White Eagle Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

REHAB

WALKWY

RECONS

RECONS

REHAB

R

R

O

R

R

R

7

7

F1

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

053 - Jackson

141 - Wood

053 - Jackson

053 - Jackson

025 - Dane

111 - Sauk

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 0 0 0

5,000 384,000

5,000 0

0 1,000 5,000

0

0 1,000 5,000

0

5,000 580,000

5,000 0

0 10,000 10,000

0

0

394,000

6,000

6,000

590,000

20,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 432: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 15 of 34

F55439J6

F55439J7

F55439J8

F55439J9

F55439K1

F55439K2

3,000

15,000

2,000

2,000

6,000

425,000

0

0

0

0

5,000

0

0

0

0

0

0

0

0

0

0

0

0

0

5,000

475,000

4,000

4,000

17,000

429,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

1,000 1,000 1,000

0

15,000 0 0 0

0 1,000 1,000

0

0 1,000 1,000

0

5,000 1,000

0 0

10,000 400,000 15,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

5,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 2,000 2,000

0

20,000 450,000

5,000 0

0 2,000 2,000

0

0 2,000 2,000

0

5,000 2,000

10,000 0

10,000 401,000 18,000

0

Wazee Road Phase III

White Hawk Road

CTH N Shawano County

CTH XX LaCrosse County

Reedsburg BD Road

Allen Property

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

RECONS

SAFETY

RECONS

SAFETY

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

053 - Jackson

053 - Jackson

115 - Shawano

063 - La Crosse

111 - Sauk

111 - Sauk

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 1,000 1,000

0

5,000 450,000

5,000 0

0 1,000 1,000

0

0 1,000 1,000

0

0 1,000 5,000

0

0 1,000 3,000

0

2,000

460,000

2,000

2,000

6,000

4,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 433: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 16 of 34

F55439K3

F55439K4

F55439K5

F55439K6

F55439K7

F55439K8

0

413,000

0

705,000

0

207,000

13,000

0

30,000

0

510,000

0

0

0

0

0

0

0

0

0

0

0

0

0

273,000

424,000

645,000

711,000

510,000

211,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

10,000 400,000

3,000 0

0 0 0 0

0 700,000

5,000 0

0 0 0 0

2,000 200,000

5,000 0

0 10,000

3,000 0

0 0 0 0

0 10,000 20,000

0

0 0 0 0

0 500,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 260,000 13,000

0

10,000 401,000 13,000

0

0 615,000 30,000

0

0 701,000 10,000

0

0 500,000 10,000

0

2,000 201,000

8,000 0

Garfield Town Road

South Yellow Thunder Road

Oak Ridge Road

CTH X Wood County

CTH N Jackson County

Egret Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

RECONS

RECONS

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55439 - Ho-Chunk Nation

053 - Jackson

111 - Sauk

053 - Jackson

141 - Wood

053 - Jackson

081 - Monroe

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 250,000 10,000

0

0 1,000

10,000 0

0 605,000 10,000

0

0 1,000 5,000

0

0 0 0 0

0 1,000 3,000

0

260,000

11,000

615,000

6,000

0

4,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 434: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 17 of 34

F55439K9

F55439L1

F55439L2

F55439L3

F55439L4

F55439PA

0

0

0

0

0

1,295,000

335,000

900,000

0

0

0

1,800,000

4,000

4,000

212,000

870,000

300,000

2,000,000

0

0

0

0

0

0

339,000

904,000

212,000

870,000

300,000

6,595,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,295,000 0 0 0

25,000 300,000 10,000

0

20,000 870,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

1,800,000 0 0 0

0 1,000 3,000

0

0 1,000 3,000

0

10,000 200,000

2,000 0

0 850,000 20,000

0

0 300,000

0 0

2,000,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

25,000 301,000 13,000

0

20,000 871,000 13,000

0

10,000 200,000

2,000 0

0 850,000 20,000

0

0 300,000

0 0

6,595,000 0 0 0

Chahk Hah Chee Village

West Clay School Road

Indian Heights

CTH Z Wood County

CTH D Shawano County

TTP Administration - Ho-Chunk

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

SAFETY

RECONS

SAFETY

RECONS

REHAB

PLANING

R

R

R

R

R

O

P6

7

P6

7

7

P9

55 - WisconsinState F55439 - Ho-Chunk Nation

141 - Wood

053 - Jackson

057 - Juneau

141 - Wood

115 - Shawano

053 - Jackson

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,500,000 0 0 0

0

0

0

0

0

1,500,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 435: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 18 of 34

5,957,346 5,984,000 6,006,000 5,951,000 0 23,898,346 23,898,346

5,957,346 5,984,000 6,006,000 5,951,000 0 23,898,346

F55439RI

F55439RM

F55439RW

F55439TP

F55439TR

2,000

1,000,000

0

287,000

0

2,000

1,210,000

1,000

287,000

1,000

2,000

1,331,000

1,000

287,000

0

0

0

0

0

0

8,000

4,641,000

2,000

1,148,000

1,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

2,000 0 0 0

0 0 0

1,000,000

0 0 0 0

287,000 0 0 0

0 0 0 0

2,000 0 0 0

0 0 0

1,210,000

1,000 0 0 0

287,000 0 0 0

0 0

1,000 0

2,000 0 0 0

0 0 0

1,331,000

1,000 0 0 0

287,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

8,000 0 0 0

0 0 0

4,641,000

2,000 0 0 0

1,148,000 0 0 0

0 0

1,000 0

TTP Road Inventory Project - Ho Chunk

TTP Road Maintenance - Ho Chunk

TTP ROW Acquisition - Ho Chunk

TTP Transportation Planning - Ho Chunk

TTP Transit - Ho Chunk

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

5,957,346 5,984,000 6,006,000 5,951,000

PLANING

SAFETY

PLANING

PLANING

TRANSIT

O

O

O

O

O

P8

3

P9

P9

T1

55 - WisconsinState F55439 - Ho-Chunk Nation

081 - Monroe

081 - Monroe

081 - Monroe

081 - Monroe

081 - Monroe

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

0

2,000 0 0 0

0 0 0

1,100,000

0 0 0 0

287,000 0 0 0

0 0 0 0

2,000

1,100,000

0

287,000

0

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

28-JAN-21

Page 436: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 19 of 34

F5543111

F5543115

F5543116

F5543117

F5543118

F5543119

1,000

4,000

1,000

4,000

1,000

1,000

0

0

0

0

0

135,000

0

0

0

0

0

20,000

0

0

0

0

0

0

1,000

5,000

1,000

5,000

1,000

166,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0

1,000 0

0 2,000 2,000

0

0 0

1,000 0

0 2,000 2,000

0

0 0

1,000 0

1,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

5,000 125,000

5,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 10,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

1,000 0

0 2,000 3,000

0

0 0

1,000 0

0 2,000 3,000

0

0 0

1,000 0

16,000 135,000 15,000

0

WATER TOWER CONNECTOR

LCO TRAIL

POPPLE TOWN ROAD

VETERAN'S MEMORIAL PARKING

TREPANIA ROAD

CASINO RV PARK ROAD

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

NEWCON

WALKWY

NEWCON

RECONS

RECONS

NEWCON

R

R

R

R

R

R

7

7

7

7

7

3

55 - WisconsinState F55431 - Lac Courte Oreilles

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 474,254

FIRST PAGE FOR CSTIPF55431 - LAC COURTE OREILLES BANDEntity Name

0 0 0 0

0 0

1,000 0

0 0 0 0

0 0

1,000 0

0 0 0 0

10,000 0 0 0

0

1,000

0

1,000

0

10,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

14-JAN-21FHWA Approved Date

Page 437: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 20 of 34

F5543120

F5543121

F5543123

F5543124

F5543125

F5543126

30,000

183,254

0

11,000

52,000

1,000

6,000

6,000

135,000

0

0

6,000

0

0

3,000

0

0

0

0

0

0

0

0

0

56,000

381,254

149,000

13,000

55,000

65,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

5,000 10,000 15,000

0

5,000 170,254

8,000 0

0 0 0 0

0 10,000

1,000 0

1,000 50,000

1,000 0

1,000 0 0 0

0 1,000 5,000

0

0 1,000 5,000

0

5,000 120,000 10,000

0

0 0 0 0

0 0 0 0

0 1,000 5,000

0

0 0 0 0

0 0 0 0

0 1,000 2,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

5,000 21,000 30,000

0

7,000 346,254 28,000

0

15,000 122,000 12,000

0

0 11,000

2,000 0

2,000 51,000

2,000 0

6,000 51,000

8,000 0

ADMINISTRATION ROAD

C-STORE PARKING LOT

GRINDSTONE SPRINGS ROAD

CTH E Bridge

CTH B Rehab Project

CTH H Landing

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

RECONS

RECONS

REPLACE

REHAB

RECONS

R

R

R

B

R

R

7

7

7

SD

7

7

55 - WisconsinState F55431 - Lac Courte Oreilles

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 474,254

F55431 - LAC COURTE OREILLES BANDEntity Name

0 10,000 10,000

0

2,000 175,000 15,000

0

10,000 1,000

0 0

0 1,000 1,000

0

1,000 1,000 1,000

0

5,000 50,000

3,000 0

20,000

192,000

11,000

2,000

3,000

58,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

14-JAN-21

Page 438: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 21 of 34

474,254 476,000 467,000 486,000 0 1,903,254 1,903,254

474,254 476,000 467,000 486,000 0 1,903,254

F5543127

F55431RI

F55431RM

F55431TP

F55431TR

F5560604

0

10,000

100,000

35,000

40,000

0

0

1,000

100,000

35,000

40,000

3,000

215,000

1,000

170,000

35,000

40,000

2,000

0

0

0

0

0

0

215,000

13,000

470,000

140,000

160,000

7,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

10,000 0 0 0

0 0 0

100,000

35,000 0 0 0

0 0

40,000 0

0 0 0 0

0 0 0 0

1,000 0 0 0

0 0 0

100,000

35,000 0 0 0

0 0

40,000 0

1,000 1,000 1,000

0

10,000 200,000

5,000 0

1,000 0 0 0

0 0 0

170,000

35,000 0 0 0

0 0

40,000 0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

10,000 200,000

5,000 0

13,000 0 0 0

0 0 0

470,000

140,000 0 0 0

0 0

160,000 0

2,000 3,000 2,000

0

Blueberry Firelane Road

TTP ROAD INVENTORY PROJECT

TTP ROAD MAINTENANCE PROJECT

TTP TRANSPORTATION PLANNING PRO

LCO TRANSIT PROJECT

LARSON ROAD NORTH

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

474,254 476,000 467,000 486,000

RECONS

PLANING

PLANING

PLANING

TRANSIT

RECONS

R

O

O

O

O

R

7

P8

P10

P9

T2

7

55 - WisconsinState F55431 - Lac Courte Oreilles

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

113 - Sawyer

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 474,254

F55431 - LAC COURTE OREILLES BANDEntity Name

0

0 0 0 0

1,000 0 0 0

0 0 0

100,000

35,000 0 0 0

0 0

40,000 0

1,000 1,000

0 0

0

1,000

100,000

35,000

40,000

2,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

14-JAN-21

Page 439: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 22 of 34

F5844003

F5844006

F5844009

F5844010

F5844011

F5844028

70,000

0

30,000

470,000

45,000

40,000

0

215,000

20,000

285,000

60,000

100,000

0

0

100,000

395,000

60,000

125,000

0

0

0

0

0

0

120,000

255,000

170,000

1,610,000

225,000

315,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

15,000 40,000 15,000

0

0 0 0 0

0 30,000

0 0

35,000 405,000 30,000

0

10,000 35,000

0 0

5,000 30,000

5,000 0

0 0 0 0

25,000 180,000 10,000

0

0 20,000

0 0

40,000 225,000 20,000

0

10,000 50,000

0 0

15,000 75,000 10,000

0

0 0 0 0

0 0 0 0

0 100,000

0 0

40,000 335,000 20,000

0

10,000 50,000

0 0

15,000 100,000 10,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

20,000 80,000 20,000

0

35,000 205,000 15,000

0

0 170,000

0 0

155,000 1,365,000

90,000 0

40,000 185,000

0 0

40,000 245,000 30,000

0

Tower Road

Ponfil Road

Street Lighting Iniative and Repair

Parking Lot/Sidewalk Initiative

Road/Trail Initiative and Repair

STH 47/55

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

NEWCON

REHAB

SAFETY

WALKWY

WALKWY

RECONS

R

R

O

O

O

R

7

7

P6

F1

F1

7

55 - WisconsinState F58440 - Menominee

078 - Menominee

078 - Menominee

078 - Menominee

078 - Menominee

078 - Menominee

078 - Menominee

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 1,277,742

FIRST PAGE FOR CSTIPF58440 - MENOMINEE INDIAN TRIBEEntity Name

5,000 40,000

5,000 0

10,000 25,000

5,000 0

0 20,000

0 0

40,000 400,000 20,000

0

10,000 50,000

0 0

5,000 40,000

5,000 0

50,000

40,000

20,000

460,000

60,000

50,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

14-JAN-21FHWA Approved Date

Page 440: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 23 of 34

1,277,742 1,277,742 1,277,742 1,277,742 0 5,110,968 5,110,968

1,277,742 1,277,742 1,277,742 1,277,742 0 5,110,968

F58440RM

F58440TP

F58440TR

500,000

83,592

39,150

500,000

57,742

40,000

500,000

57,742

40,000

0

0

0

2,000,000

256,818

159,150

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0

500,000

83,592 0 0 0

0 0

39,150 0

0 0 0

500,000

57,742 0 0 0

0 0

40,000 0

0 0 0

500,000

57,742 0 0 0

0 0

40,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

2,000,000

256,818 0 0 0

0 0

159,150 0

TTP Road Maintenance Project

TTP Transportation Planning

TTP Transit Project

Total

Total

Total

Phase

Phase

Phase

1,277,742 1,277,742 1,277,742 1,277,742

PLANING

PLANING

TRANSIT

O

O

O

P10

P9

T2

55 - WisconsinState F58440 - Menominee

078 - Menominee

078 - Menominee

078 - Menominee

Name

Name

Name

County

County

County

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 1,277,742

F58440 - MENOMINEE INDIAN TRIBEEntity Name

0

0 0 0

500,000

57,742 0 0 0

0 0

40,000 0

500,000

57,742

40,000

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

14-JAN-21

Page 441: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 24 of 34

F5543315

F5543318

F5543326

F5543328

F5543330

F5543331

407,500

155,000

0

0

0

429,000

0

300,300

240,000

278,700

230,000

0

0

0

0

744,000

0

0

0

0

0

0

0

0

407,500

884,300

240,000

1,022,700

230,000

1,079,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

30,000 376,000

1,500 0

10,000 140,000

5,000 0

0 0 0 0

0 0 0 0

0 0 0 0

24,000 400,000

5,000 0

0 0 0 0

5,000 290,300

5,000 0

30,000 200,000 10,000

0

5,000 268,700

5,000 0

15,000 200,000 15,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

50,000 644,000 50,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

30,000 376,000

1,500 0

115,000 734,300 35,000

0

30,000 200,000 10,000

0

55,000 912,700 55,000

0

15,000 200,000 15,000

0

74,000 950,000 55,000

0

Smit Farm (Peter Hill Lane/Bread Creek V

Manders Court (Metoxen Lane / Uskah V

Minoka Hill Drive

Seminary Road

Sand Hill Court

O-NA-STE Trail (Maple Leaf West)

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

RECONS

NEWCON

RECONS

REHAB

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55433 - Oneida Nation - Wisconsin

009 - Brown

087 - Outagamie

087 - Outagamie

087 - Outagamie

087 - Outagamie

009 - Brown

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 1,205,457

FIRST PAGE FOR CSTIPF55433 - ONEIDA TRIBE OF INDIANS (WI)Entity Name

0 0 0 0

100,000 304,000 25,000

0

0 0 0 0

0 0 0 0

0 0 0 0

50,000 550,000 50,000

0

0

429,000

0

0

0

650,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

17-JUN-21FHWA Approved Date

Page 442: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 25 of 34

1,205,457 1,205,457 1,205,457 1,205,457 0 4,821,828 4,821,828

1,205,457 1,205,457 1,205,457 1,205,457 0 4,821,828

F55433RM

F55433T1

F55433TP

50,000

100,000

63,957

106,000

0

50,457

81,000

330,000

50,457

0

0

0

313,000

430,000

215,328

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0

50,000

10,000 90,000

0 0

0 0 0

63,957

0 0 0

106,000

0 0 0 0

0 0 0

50,457

0 0 0

81,000

30,000 300,000

0 0

0 0 0

50,457

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

313,000

40,000 390,000

0 0

0 0 0

215,328

TPP Road Maintenance Project

Oneida - Pedestrian Infrastructure Projec

TPP Transportation Planning

Total

Total

Total

Phase

Phase

Phase

1,205,457 1,205,457 1,205,457 1,205,457

PLANING

WALKWY

PLANING

O

O

O

P10

F1

P9

55 - WisconsinState F55433 - Oneida Nation - Wisconsin

087 - Outagamie

085 - Oneida

087 - Outagamie

Name

Name

Name

County

County

County

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 1,205,457

F55433 - ONEIDA TRIBE OF INDIANS (WI)Entity Name

0

0 0 0

76,000

0 0 0 0

0 0 0

50,457

76,000

0

50,457

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

17-JUN-21

Page 443: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 26 of 34

F5543506

F5543508

F5543512

F5543523

F5543524

F5543525

2,000

3,000

1,000

2,000

0

1,000

0

0

3,000

16,000

2,000

2,000

0

0

3,000

0

2,000

2,000

0

0

0

0

0

0

2,000

4,000

10,000

24,000

4,000

5,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 1,000 1,000

0

1,000 1,000 1,000

0

1,000 0 0 0

1,000 1,000

0 0

0 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

3,000 10,000

3,000 0

0 1,000 1,000

0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 0 0 0

0 1,000 1,000

0

0 1,000 1,000

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 1,000 1,000

0

1,000 1,000 2,000

0

4,000 3,000 3,000

0

9,000 12,000

3,000 0

0 2,000 2,000

0

1,000 2,000 2,000

0

COMMUNITY DRIVE

ROWLEY ROAD

BRADUM DEVELOPMENT

BISHOP LANE LOOP

SUPPORTIVE HOUSING PROJECT

LITTLE SAND BAY ROAD

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

RECONS

NEWCON

RECONS

NEWCON

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55435 - Red Cliff

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 460,966

FIRST PAGE FOR CSTIPF55435 - RED CLIFF BANDEntity Name

0 0 0 0

0 0

1,000 0

1,000 1,000 1,000

0

5,000 1,000

0 0

0 0 0 0

0 0 0 0

0

1,000

3,000

6,000

0

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

11-FEB-21FHWA Approved Date

Page 444: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 27 of 34

F5543526

F5543527

F55435ER

F55435RI

F55435RM

F55435TP

76,000

11,000

6,000

1,000

172,966

35,000

0

3,000

0

1,000

320,000

35,000

0

0

0

1,000

340,000

35,000

0

0

0

0

0

0

86,000

19,000

9,000

4,000

1,152,966

140,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

8,000 60,000

8,000 0

10,000 1,000

0 0

0 1,000 5,000

0

1,000 0 0 0

0 0 0

172,966

35,000 0 0 0

0 0 0 0

1,000 1,000 1,000

0

0 0 0 0

1,000 0 0 0

0 0 0

320,000

35,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1,000 0 0 0

0 0 0

340,000

35,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

9,000 65,000 12,000

0

14,000 3,000 2,000

0

0 2,000 7,000

0

4,000 0 0 0

0 0 0

1,152,966

140,000 0 0 0

Dock Road

Red Cliff Rehab Projects

RED CLIFF ERFO PROJECT

TTP INVENTORY PROJECT

TTP ROAD MAINTENANCE PROJECT

TTP TRANSPORTATION PLANNING PRO

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

ERFO

PLANING

PLANING

PLANING

R

R

O

O

O

O

7

7

D1

P8

P9

P9

55 - WisconsinState F55435 - Red Cliff

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

007 - Bayfield

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 460,966

F55435 - RED CLIFF BANDEntity Name

1,000 5,000 4,000

0

3,000 1,000 1,000

0

0 1,000 2,000

0

1,000 0 0 0

0 0 0

320,000

35,000 0 0 0

10,000

5,000

3,000

1,000

320,000

35,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

11-FEB-21

Page 445: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 28 of 34

460,966 464,000 462,000 463,000 0 1,849,966 1,849,966

460,966 464,000 462,000 463,000 0 1,849,966

F55435TR

150,000 80,000 80,000 0 390,000

PECONS

CEZ

0 0

150,000 0

0 0

80,000 0

0 0

80,000 0

0 0 0 0

0 0

390,000 0

RED CLIFF TRANSIT

TotalPhase

460,966 464,000 462,000 463,000

TRANSIT

O

T2

55 - WisconsinState F55435 - Red Cliff

007 - BayfieldNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 460,966

F55435 - RED CLIFF BANDEntity Name

0

0 0

80,000 0

80,000Total

FY 2021 ($) FY 2022 ($) FY 2023 ($) FY 2024 ($) FY 2025 ($)

11-FEB-21

Page 446: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 29 of 34

F5543605

F5543606

F5543609

F5543613

F5543617

F5543618

3,000

2,000

120,799

13,000

0

3,000

95,000

45,000

1,000

6,000

32,000

0

2,000

7,000

0

0

31,000

0

0

0

0

0

0

0

136,000

85,000

136,799

104,000

63,000

3,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

3,000 0 0 0

2,000 0 0 0

3,000 115,799

2,000 0

5,000 5,000 3,000

0

0 0 0 0

0 1,000 2,000

0

0 90,000

5,000 0

0 40,000

5,000 0

0 0

1,000 0

0 1,000 5,000

0

5,000 25,000

2,000 0

0 0 0 0

0 1,000 1,000

0

0 5,000 2,000

0

0 0 0 0

0 0 0 0

1,000 25,000

5,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

8,000 121,000

7,000 0

7,000 70,000

8,000 0

3,000 120,799 13,000

0

5,000 81,000 18,000

0

6,000 50,000

7,000 0

0 1,000 2,000

0

2-1/8 STREET

2-5/8 STREET

SHORT ROAD

2-1/2 STREET

CLIFFORD LANDING

HERTEL FRONTAGE ROAD

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

REHAB

REHAB

RECONS

RECONS

NEWCON

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55436 - St. Croix

095 - Polk

095 - Polk

095 - Polk

095 - Polk

095 - Polk

013 - Burnett

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 279,799

FIRST PAGE FOR CSTIPF55436 - ST. CROIX CHIPPEWA INDIANSEntity Name

5,000 30,000

1,000 0

5,000 25,000

1,000 0

0 5,000

10,000 0

0 75,000 10,000

0

0 0 0 0

0 0 0 0

36,000

31,000

15,000

85,000

0

0

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

09-APR-21FHWA Approved Date

Page 447: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 30 of 34

279,799 288,000 287,000 292,000 0 1,146,799 1,146,799

279,799 288,000 287,000 292,000 0 1,146,799

F5543621

F5543622

F5543623

F55436RM

F55436SA

F55436TP

18,000

0

15,000

70,000

5,000

30,000

0

3,000

3,000

70,000

2,000

30,000

0

152,000

0

70,000

0

30,000

0

0

0

0

0

0

30,000

155,000

24,000

280,000

10,000

120,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

2,000 1,000

15,000 0

0 0 0 0

5,000 5,000 5,000

0

0 0 0

70,000

1,000 1,000 3,000

0

30,000 0 0 0

0 0 0 0

3,000 0 0 0

0 0

3,000 0

0 0 0

70,000

0 1,000 1,000

0

30,000 0 0 0

0 0 0 0

7,000 140,000

5,000 0

0 0 0 0

0 0 0

70,000

0 0 0 0

30,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,000 2,000

25,000 0

10,000 140,000

5,000 0

5,000 6,000

13,000 0

0 0 0

280,000

1,000 3,000 6,000

0

120,000 0 0 0

2019 ERFO

West Minerva Dam Road

St. Croix Safety Project Round Lake

St. Croix Road Maintenance Project

DANBURY PEDESTRIAN TRAIL

St. Croiix Transportation Planning

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

279,799 288,000 287,000 292,000

ERFO

RECONS

SAFETY

PLANING

SAFETY

PLANING

R

R

R

O

O

O

7

7

7

P10

F1

P9

55 - WisconsinState F55436 - St. Croix

095 - Polk

013 - Burnett

095 - Polk

013 - Burnett

013 - Burnett

013 - Burnett

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 279,799

F55436 - ST. CROIX CHIPPEWA INDIANSEntity Name

0

1,000 1,000

10,000 0

0 0 0 0

0 1,000 5,000

0

0 0 0

70,000

0 1,000 2,000

0

30,000 0 0 0

12,000

0

6,000

70,000

3,000

30,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

09-APR-21

Page 448: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 31 of 34

F5543702

F5543704

F5543708

F5543710

F5543711

F5543712

2,000

0

1,000

0

0

4,000

2,000

1,000

65,000

1,000

1,000

5,000

0

3,000

6,000

1,000

1,000

0

0

0

0

0

0

0

6,000

4,000

74,000

2,000

2,000

73,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

1,000 0

1,000 0

0 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

3,000 1,000

0 0

1,000 0

1,000 0

1,000 0 0 0

3,000 60,000

2,000 0

1,000 0 0 0

1,000 0 0 0

0 1,000 4,000

0

0 0 0 0

1,000 1,000 1,000

0

1,000 1,000 4,000

0

1,000 0 0 0

1,000 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

3,000 0

3,000 0

2,000 1,000 1,000

0

7,000 61,000

6,000 0

2,000 0 0 0

2,000 0 0 0

5,000 62,000

6,000 0

POW WOW GROUNDS ROAD

COMMUNITY DRIVE

ACKLEY CIRCLE

VANZILE ROAD

MCGESHICK ROAD

CONNECTOR ROAD (BLACK LANE)

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

OVRLAY

REHAB

RECONS

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55437 - Sokaogon Chippewa Community

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 192,990

FIRST PAGE FOR CSTIPF55437 - SOKAOGON CHIPPEWA COMMUNITYEntity Name

1,000 0

1,000 0

0 0 0 0

2,000 0 0 0

0 0 0 0

0 0 0 0

2,000 60,000

2,000 0

2,000

0

2,000

0

0

64,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

25-FEB-21FHWA Approved Date

Page 449: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 32 of 34

192,990 193,000 191,000 199,000 0 775,990 775,990

192,990 193,000 191,000 199,000 0 775,990

F5543713

F55437RI

F55437RM

F55437TP

F55437TR

0

1,000

180,990

3,000

1,000

1,000

1,000

110,000

3,000

1,000

83,000

1,000

100,000

3,000

1,000

0

0

0

0

0

84,000

4,000

510,990

12,000

4,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

0 0 0 0

1,000 0 0 0

0 0 0

180,990

3,000 0 0 0

0 0

1,000 0

1,000 0 0 0

1,000 0 0 0

0 0 0

110,000

3,000 0 0 0

0 0

1,000 0

5,000 75,000

3,000 0

1,000 0 0 0

0 0 0

100,000

3,000 0 0 0

0 0

1,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

6,000 75,000

3,000 0

4,000 0 0 0

0 0 0

510,990

12,000 0 0 0

0 0

4,000 0

INDIAN SETTLEMENT

TTP ROAD INVENTORY PROJECT

TTP ROAD MAINTENANCE PROJECT

TTP TRANSPORTATION PLANNING PRO

TTP TRIBAL TRANSIT

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

192,990 193,000 191,000 199,000

REHAB

RECONS

PLANING

PLANING

TRANSIT

R

O

O

O

O

7

P8

P10

P9

T4

55 - WisconsinState F55437 - Sokaogon Chippewa Community

041 - Forest

041 - Forest

041 - Forest

041 - Forest

041 - Forest

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 192,990

F55437 - SOKAOGON CHIPPEWA COMMUNITYEntity Name

0

0 0 0 0

1,000 0 0 0

0 0 0

120,000

3,000 0 0 0

0 0

1,000 0

0

1,000

120,000

3,000

1,000

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

25-FEB-21

Page 450: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 33 of 34

F5543809

F5543813

F5543815

F5543820

F5543821

F5543822

50,000

5,000

5,000

5,000

60,000

180,000

160,000

5,000

5,000

5,000

110,000

60,000

15,000

105,000

200,000

185,000

15,000

15,000

0

0

0

0

0

0

325,000

120,000

215,000

200,000

295,000

315,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

5,000 45,000

0 0

5,000 0 0 0

5,000 0 0 0

5,000 0 0 0

10,000 50,000

0 0

30,000 150,000

0 0

5,000 155,000

0 0

5,000 0 0 0

5,000 0 0 0

5,000 0 0 0

10,000 100,000

0 0

10,000 50,000

0 0

5,000 10,000

0 0

5,000 100,000

0 0

5,000 195,000

0 0

5,000 180,000

0 0

5,000 10,000

0 0

5,000 10,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

20,000 305,000

0 0

20,000 100,000

0 0

20,000 195,000

0 0

20,000 180,000

0 0

35,000 260,000

0 0

55,000 260,000

0 0

School House Road

Hillside Drive

Maple Road

North Branch Road

Moh He Con Nuck Road and Circle Subd

Little Road

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

REHAB

REHAB

REHAB

RECONS

RECONS

R

R

R

R

R

R

7

7

7

7

7

7

55 - WisconsinState F55438 - Stockbridge Munsee Community

115 - Shawano

115 - Shawano

115 - Shawano

115 - Shawano

115 - Shawano

115 - Shawano

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 590,554

FIRST PAGE FOR CSTIPF55438 - STOCKBRIDGE MUNSEE COMMUNITYEntity Name

5,000 95,000

0 0

5,000 0 0 0

5,000 0 0 0

5,000 0 0 0

10,000 100,000

0 0

10,000 50,000

0 0

100,000

5,000

5,000

5,000

110,000

60,000

Total

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

23-DEC-20FHWA Approved Date

Page 451: 2022-2025 Draft Statewide Transportation Improvement Program

Indian Reservation Roads ProgramsFederal Lands Highway

15-OCT-2021

REPORT FILTERS:

Location = F-**-***

program_class_code = 6K1

CSTIP Type = TIPAny level TIP/EIP Report

Reporting each CSTIP that meets the filter.

Page 34 of 34

590,554 590,554 590,554 590,554 0 2,362,216 2,362,216

590,554 590,554 590,554 590,554 0 2,362,216

F5543823

F5543824

F5543825

F55438RM

F55438TP

60,000

60,000

140,000

10,554

15,000

110,000

110,000

0

10,554

15,000

15,000

15,000

0

10,554

15,000

0

0

0

0

0

305,000

295,000

190,000

42,216

60,000

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

PECONS

CEZ

10,000 50,000

0 0

10,000 50,000

0 0

0 140,000

0 0

0 0 0

10,554

0 0 0

15,000

10,000 100,000

0 0

10,000 100,000

0 0

0 0 0 0

0 0 0

10,554

0 0 0

15,000

5,000 10,000

0 0

5,000 10,000

0 0

0 0 0 0

0 0 0

10,554

0 0 0

15,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

35,000 270,000

0 0

35,000 260,000

0 0

0 190,000

0 0

0 0 0

42,216

0 0 0

60,000

River Road/West Town Hall Road

Town Hall Road

CTH A

TTP Road Maintenance

TTP Transportation Planning

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

590,554 590,554 590,554 590,554

RECONS

RECONS

RECONS

PLANING

PLANING

R

R

R

O

O

7

7

7

P10

P9

55 - WisconsinState F55438 - Stockbridge Munsee Community

115 - Shawano

115 - Shawano

115 - Shawano

115 - Shawano

115 - Shawano

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State SubtotalCSTIP Subtotal

6K1Program Class CodeCSTIP Type Fiscal YearTIP 2021

Funding Amount 590,554

F55438 - STOCKBRIDGE MUNSEE COMMUNITYEntity Name

0

10,000 110,000

0 0

10,000 100,000

0 0

0 50,000

0 0

0 0 0

10,554

0 0 0

15,000

120,000

110,000

50,000

10,554

15,000

Total

Total

Total

Total

Total

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2021 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2022 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2023 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2024 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

FY 2025 ($)

23-DEC-20

Page 452: 2022-2025 Draft Statewide Transportation Improvement Program

���������������� ���������������������������������������������� �!"#$%�&�'�(")"*+��+",)-�*+��)������� �.�)�*�!"#$%�&�/"0"*",) .�*+�1�")+��2�345645758

1�#��59�,:�;5 '<<�,0� �*"#)�+=���"*�*$,%)�,)�:"�*+�<�#��<�>?�+�,) &@�A$�� "*+")#���: �>+*�� �)�% &�"��)+":"����)��<�,#��((����)�4,��(,�":"���<�,B�>+*��*�,:�C�&�56D�5758@�

�EFGHI �EFJEK����LIKM��HKE LKH IF�N� �KEOP�EH��JHP��FEHL�FE�FQHE��KENHERKJHNI� SHLIE���FN ��H�F��TFEO �E��KE����NS�LF�EIH �FKM��EFJEK��HS�K�F�N� ��NSL��EF���MH SHM�UHEHS�V� LK�L IFNJEHLL�FNKM�S�LE�I �M�K�EHJ�FNWX�YA�67Z85[ 5758 WX Y+@�\�,"] \$�"*+"�)*+��4������"?*+���'��� �$�_@��("�,:�a=��)�C��&�!%&@�:��Y=))&�X* ��X)+@D�\$�"*+"�)*+���+,�!�))�$b*��*+�X)+@D�������"?*+�� ;.cd 1 �'YA �e��������857D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA� `Z8;3[ 5758 WX Y+@�\�,"] \$�"*+"�)*+���'��� X(<�0()+*�+,�+��63j�Zk")#�\�,**�Y+[D�+��63�-@�Zk")#�Y+[��)��63�l@�Z\,(<�)&�Y+[@ ;. -XCd �e�����;D777D777@77� i+$�� -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAmZ775[�YAAZ77j[ 5758 WX Y+@�m,$)�4�Y+@�A$,(�* h4' 5786�-(��#�)>&�� "�:D�Y+@�m,$)*�1�,B�>+�5D�Y+@�A$,(�*�1�,B�>+�j@ .Yc;! /iA �e�����6D56jD777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAAZ773[ 5758 WX Y+@�A$,(�* h4' -(_�)?(�)+�*+�_" "n�+",)��)�����")�#����<�"��:,��+�;;fY$"_="@ .Yc;! /iA �e�����5Dj77D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�;9Z5[�\5 5755 WX Y+@�A$,(�* oY�W"�#")�X* �)�*�/�<��+(�)+�,:�1=_ ">�l,�?* �<$=)��!" ����)��A�;98�")+��*�>+",)�"(<�,0�(�)+*�f�\,)+��>+�5 h-l A- �!lp�e�����jD677D777@77�A"+ ��5; -�.!/ X)�/�*"#) WXf'+.��#� gch'ciA!WX�;9Z5[�\; 5755 WX Y+@�A$,(�* oY�W"�#")�X* �)�*�/�<��+(�)+�,:�1=_ ">�l,�?* �<$=)��!" ���%"��)�q�"(<�,0��_�+%��)�+$��\,)+�>+�8��)��5�Z7@6�(" �[ ;! A- �!lp�e���59D377D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�/1\�';jZ8[�\,)+��>+�5 5755 WX Y+@�A$,(�* o@Y@�W"�#")�X* �)�*D�/�<��+(�)+�,:�1=_ ">�l,�?*�ZWX/1l[ W�+���)b*�/�"0�D�1$�*��5 ;!ch-l -XCd �e�873D777D777@77� i+$�� -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAAZ77r[ 5755 WX Y+@�A$,(�* oYWX�/�<��+(�)+�,:�1=_ ">�l,�?* �<�"��+��::">�*"#)� *��+�9�")+��*�>+",)*�,)�W�+���)*�/�"0���)��,+$����,��*@ CXY\ -�i �e�����5D777D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!WX�YA�-�YAgZ77j[ 5755 WX Y+@�\�,"] oYWX�/�<��+(�)+�,:�1=_ ">�l,�?* �<�"��+��::">�*"#)� *��+�r�")+��*�>+",)*�,)�C� 0")�!@�-0�)*�!"#$%�&�q�d�**")�A�"�)# �@ CXY\ -�i �e�����5D777D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� gch'ciA!h1�WXXY�877Z;[�875Z8[�-A\ 575j WX Ad/ W"�#")�X* �)�*�h�+",)� �1��? Y>,<")#�+�"<���<,�+���<�"��.&)��!,=*��'>>�**��D�.�(�*$=���D�Y� +�1,)���D����)>"*�d�&��41��?")#�' ;. �.A1 �e��������537D777@77�A"+ ��5; -�.!/ 1 �))�� WXf'+.��#� h1YT� s�� ��lX�-�i��Y�578rf8Zr[ 5757 lX d�&:"� �D�Y�%&�� \$�t=�(�#,)�h">, �+�h�+",)� ��,��*+ ��;9;�Y)�?��,���/�>,(("**",)")#@ ;! -�i �e��������r8D63j@;j�A"+ ��5; -�.!/ X)�/�*"#) lXf76 oY�YlX�-�i��Y�578rf8Zr[ 5757 lX d�&:"� �D�Y�%&�� \$�t=�(�#,)�h">, �+�h�+",)� ��,��*+ ��;9;�Y)�?��,���/�>,(("**",)")#@ ;! -�i r8D63j@;je��������� A"+ ��5; -�.!/ X)�/�*"#) lXf76 oY�YlX��.'1�d�./�\A!CZ5[ 5757 lX d�&:"� � �,��*+�Y��0">��4�\$�t=�(�#,)fh">, �+�h�+",)� ��,��*+ �$�_" "+�+",)�,:�\A!C ;. �.'1 �e�����8D567D777@77�A"+ ��5; YA'A- o)����\,)*+�=>+",) lXf76 oY�Y

Page 453: 2022-2025 Draft Statewide Transportation Improvement Program

���������������� ���������������������������������������������� �!"#$%�&�'�(")"*+��+",)-�*+��)������� �.�)�*�!"#$%�&�/"0"*",) .�*+�1�")+��2�345645758

1�#��59�,:�;5 '<<�,0� �*"#)�+=���"*�*$,%)�,)�:"�*+�<�#��<�>?�+�,) &@�A$�� "*+")#���: �>+*�� �)�% &�"��)+":"����)��<�,#��((����)�4,��(,�":"���<�,B�>+*��*�,:�C�&�56D�5758@�

�EFGHI �EFJEK����LIKM��HKE LKH IF�N� �KEOP�EH��JHP��FEHL�FE�FQHE��KENHERKJHNI� SHLIE���FN ��H�F��TFEO �E��KE����NS�LF�EIH �FKM��EFJEK��HS�K�F�N� ��NSL��EF���MH SHM�UHEHS�V� LK�L IFNJEHLL�FNKM�S�LE�I �M�K�EHJ�FNWX��.'1�YZ[.�.[\Y]8 5757 WX \�&:"� � _1[D�'<,*+ ��X* �)�*�_�+",)� �.�?�*$,�� Y,��%�&���$�D�%"��)")#D�*$,= ����>,)*+�=>+",)D����")�#��"(<�,0�(�)+*D��)��("*>� �)�,=*�%,�?@ ;Y!a;Y. �.'1 �b��������c3;D777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 _1[WX��.'1�YZ[.�fd!g]8 5757 WX \�&:"� � _1[D�'<,*+ ��X* �)�*�_�+",)� �.�?�*$,�� Y,��%�&���$�D�%"��)")#D�*$,= ����>,)*+�=>+",)D����")�#��"(<�,0�(�)+*D��)��("*>� �)�,=*�%,�? ;Y!a;Y. �.'1 �b�����5D;h3D665@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 _1[WX��.'1�AYX11��YiW]8 5757 WX \�&:"� � X�,)�Y"0���_�+",)� ��"*$�!�+>$��& Y�>,)*+�=>+",)�,:�8�(" ��,:���"�0"�%�Y,���")�A�"<<�A,%)*$"<D�WX@ ;Y! �.'1 �b��������;63D5;7@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 �W[WX��.'1�'[!��!;5]8 5758 WX '*$ �)� �,��*+�[��0">�4�d$�j=�(�#,)e�_">, �+�_�+",)� ��,��*+ C" ")#��)����*=�:�>")#�9@5�(" �*�,:��,��*+�!"#$%�&�;5�+$�,=#$�d$�j=�(�#,)e_">, �+�_�@ ;Y. �.'1 �b�����8D567D777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 Z[�[WX��.'1��-_d�58c;]8 5758 WX � ,��)>� Z[��,��*+�[��0">�D�d$�j=�(�#,)e_">, �+�_�+",)� ��,��*+ Y,>?�d���?�\�"�#��Y�< �>�(�)+�1e89e7975D�*,=+$�,:�1,<< ��Y"0��@ \YY1 �.'1 �b��������;66D377@77�A"+ ��5; [A'A- X)�/�*"#) WXe76 Z[�[WX��.'1�W'[!�586c]8 5758 WX i" �* �,��*+�[��0">�D�d$�j=�(�#,)e�_">, �+�_�+",)� ��,��*+ Y�*=�:�>")#D�%"��)")#D�")>���*���*$,= ����%"�+$�k�"(<�,0��*�:�+&�,)�C" "+��&�Y,���]YA�586c ;Y. �.'1 �b��������cllD777@77�A"+ ��5; [A'A- Z)����d,)*+�=>+",) WXe76 Z[�[WX��.A1��W�Z1.'�]8 5758 WX .��d�,**� Z<<���C"**@�_Wk�Y�e�.��d�,**��/"*+�">+ i"*"+,��d�)+���1��?")#�.,+�<�+>$")#D�*+�"<")#D���<�"�* ;Y �.A1 �b��������837D777@77�A"+ ��5; �W[ X)�/�*#") WXe7; �W[�W�AY-C�87]8 5755 WX \=::� , A��(<�� ��=�_�+",)� �W" � ":��Y�:=#� [�:�+&�"(<�,0�(�)+*�:,��-)+��)>��Y,���]Y,=+��87 ;Y. �.A1 �b�����5Dh77D777@77�A"+ ��5; -�.!/ X)�/�*"#) WXe7; �W[[+,>?:��(�\�"�#��Y�< �>�(�)+ 5755 WX '*$ �)� d$�j=�(�#,)e_">, �+�_� Y�< �>�(�)+�,:���h;e&����, �D�*�0�)e*<�)D�*")# �� �)�D�+"( ����"�#��%"+$�)�%D�+$���e*<�)D�5e �)��+"( ����"�#�@ \YY1 �.A1 �b�����8Dl77D777@77�A"+ ��5; Z[�[ 1 �))�� WXe76 Z[�[WX��.A1��W�.-f1�]8 575l WX d, =( "� .�,<, ��WC/ !m�*"+��<��?")#�"(<�,0�(�)+*�1$�*��8 CX[d �.A1 �b��������537D777@77�A"+ ��5; �W[ 1 �))�� WXe7h �W[T� ��U������Wi�-Y�f��[�578he8]5 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ -(��#�)>&���<�"�*�,)��[ech�:�,(�(" �<,*+�83@8�+,�8c@l@ ;Y! -Y�f �b�����;D697D963@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[Wi�-Y�f��[�578he8]3 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ -(��#�)>&���<�"�*�,)��[ech�:�,(�(" �<,*+�7@5�+,�6@5@ ;Y! -Y�f �b�����;D3lcD6c;@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[Wi�-Y�f��[�578he8]h 5757 Wi 1,>�$,)+�*D�Y�)�, <$D�n���)�"�� C,),)#�$� ��_�+",)� ��,��*+ /�>,(("**",)")#�,:��[e689��)����$�" "+�+",)�,:�)�%�*�#(�)+@ Y!a.[Ya\YY -Y�f �b�����;D;75Dh95@77�A"+ ��5; -�.!/ X)�/�*"#) Wie75 Z[�[

Page 454: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 10

Public

Involvement

Page 455: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 10 – 1

Public Involvement Current federal legislation requires the Governor to ensure that WisDOT and the MPOs develop plans to actively involve the public in the development of the STIP. WisDOT uses an ongoing STIP public involvement plan that includes:

• 30-day written comment period on the STIP (yearly) • State Trunk Highway System project development and Six-Year Highway Program

hearings (ongoing) • MPO public hearings on TIPs (yearly) • Local government hearings on transit projects for smaller systems (ongoing) • Local government hearings on local road projects (ongoing)

The focus of this plan is on maximizing public involvement at the state, MPO, and local levels—on an ongoing basis—when initial project decisions are presented and made. WisDOT published its first STIP Public Involvement Plan in November of 1993. The STIP Public Involvement Plan (PIP), which was updated in November 2016, continues to focus on the public involvement processes used on various types of transportation projects. The 2016 update of the STIP PIP includes public involvement aspects of new legislation; Public Law 112 – 141 Moving Ahead for Progress in the 21st Century Act along with Public Law 114 – 357 Fixing America’s Surface Transportation Act (FAST). In April 2021, the STIP PIP was incorporated into WisDOT’s Coordination Document and is available at https://wisconsindot.gov/Documents/doing-bus/local-gov/plning-orgs/coordination.pdf#page=20. Although the STIP Public Involvement Plan does not require any public hearings, WisDOT may agree to have a public hearing if one is requested. The STIP Public Involvement Plan will continue to rely on written comments from the public regarding the draft STIP. The legal notice advertising the draft STIP was published on November 2, 2021. A copy of the notice is presented below.

LEGAL NOTICE

The Wisconsin Department of Transportation announces the availability of its draft multimodal 2022-2025 Statewide Transportation Improvement Program (STIP). The draft STIP is available from the State Transportation Improvement Program website: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/stip.aspx. The comprehensive improvement program includes all federally funded highway, transit, bike and pedestrian projects to be undertaken in Wisconsin during the 2022-2025 timeframe. The draft STIP is subject to a 30-day public comment period. The final STIP will be issued in January 2022. Inquiries about the draft STIP and written comments on the improvement program should be directed, before December 2, 2021, to the Wisconsin Department of Transportation’s Division of Transportation Investment Management, Bureau of Planning and Economic Development, P.O. Box 7913, Madison, WI 53707-7913; comments by phone at 608-266-3662 or comments by email at [email protected].

Page 456: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 11

Performance

Measures

Page 457: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 1

Performance Measures

Introduction MAP-21 and the FAST ACT requires the incorporation of Performance-Based Planning and Programming (PBPP) in the development of the State’s Long-Range Transportation Plans (LRTP) and Statewide Transportation Improvement Plans (STIP). The incorporation of PBPP in the STIP contributes to the achievement of National Performance goals (23 USC 150). The Statewide and Nonmetropolitan Transportation Planning; Metropolitan Transportation Planning; Final Rule further defined that the STIP shall include, to the maximum extent practicable, a description of the anticipated effect of the STIP toward achieving the performance measures targets identified in the statewide transportation or State Performance-based plan(s), linking investment priorities to those performance targets (23 CFR 450.218(q)). 23 USC 150: National Performance Measure Goals are:

• Safety - To achieve a significant reduction in traffic fatalities and serious injuries on all public roads

• Infrastructure Condition - To maintain the highway infrastructure asset system in a state of good repair

• Congestion Reduction - To achieve a significant reduction in congestion on the National Highway System

• System Reliability - To improve the efficiency of the surface transportation system • Freight Movement and Economic Vitality - To improve the national freight network,

strengthen the ability of rural communities to access national and international trade markets, and support regional economic development

• Environmental Sustainability - To enhance the performance of the transportation system while protecting and enhancing the natural environment

• Reduced Project Delivery Delays - To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices FHWA - About Transportation Performance Management

WisDOT Performance-Based Planning and Programming Processes

MAPSS Performance Improvement

WisDOT has utilized the MAPSS Performance Improvement Program since January 2012 to measure transportation performance across Wisconsin. MAPSS is organized around five strategic department goal areas: Mobility, Accountability, Preservation, Safety, and Service. Many of the MAPSS performance measures are closely related to the MAP-21/FAST Act performance measures. Preservation performance measures include State Highway Pavement Condition and State Bridge Condition. Safety performance measures include the number of Traffic Fatalities and Serious Injuries. Additional performance measures are included within each of the MAPSS goal areas. Measures are posted on the WisDOT MAPSS internet site: MAPSS Performance Improvement Program.

Page 458: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 2

WisDOT Data-Driven Project Development WisDOT has embraced a “data-driven” asset management approach to achieve the goals for projects and programs. In conjunction with a strong reliance on data for decision-making, WisDOT has committed to a process of continual data quality improvement (e.g. standards for collection and storage, leverage of technology, integration strategies, etc.). WisDOT has developed a comprehensive set of data and analysis tools for developing and managing the Six-Year Highway Improvement Program. The primary components of the dataset include a geographically integrated set of databases (using specialized tools) representing:

• Pavement and bridge condition • Six-Year Program information • Highway geometric and attribute information • Highway crashes, highway capacity, etc. • Pavement and bridge deterioration and improvement models • Analysis models for evaluating alternatives, costing, priorities, and budget constraints

The data is used to:

• Identify, scope, and prioritize projects • Evaluate program performance (e.g. before/after analyses) • Estimate future conditions and needs • Establish program goals • Allocate resources for programs and WisDOT transportation regions

A data-driven project development approach identifies condition, needs, and priorities related to the Wisconsin State Trunk Highway System. Efforts enhance statewide program development consistency by facilitating an improved understanding of how program goals and performance measures.

MAP-21/FAST Act Performance Measures MAP-21/Fast Act Performance Measures are established in 49 USC 625 and 23 CFR 490. State Department of Transportations (DOTs) and Metropolitan Planning Organizations (MPOs) are currently required to establish targets for the following federal performance measures:

• Transit Asset Management o Rolling Stock: The percentage of revenue vehicles (by type) that exceed the

useful life benchmark (ULB) o Equipment: The percentage of non-revenue service vehicles (by type) that exceed

the ULB o Facilities: The percentage of facilities (by group) that are rated less than 3.0

(adequate) out of 5 (excellent) on the Transit Economic Requirements Model (TERM) Scale

o Infrastructure: The percentage of track segments (by mode) that have performance restrictions. Track segments are measured to the nearest 0.01 of a mile

Page 459: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 3

• Safety o Number of fatalities o Fatalities per 100 million vehicle miles traveled o Number of serious injuries o Serious injuries per 100 million vehicle miles traveled o Number of non-motorized fatalities and non-motorized serious injuries

• Infrastructure

o Percentage of pavements of the Interstate System in Good condition o Percentage of pavements of the Interstate System in Poor condition o Percentage of pavements of the non-Interstate NHS in Good condition o Percentage of pavements of the non-Interstate NHS in Poor condition o Percentage of NHS bridges classified as in Good condition o Percentage of NHS bridges classified as in Poor condition

• System Performance on NHS

o Interstate Travel Time Reliability Measure: The percent of person-miles traveled on the Interstate that are reliable

o Non-Interstate Travel Time Reliability Measure: The percent of person-miles traveled on the non-Interstate NHS that are reliable

• Freight Movement

o Freight Reliability Measure: Interstate Truck Travel Time Reliability (TTTR) Index

• Congestion Mitigation and Air Quality (CMAQ) - Congestion Reduction

o Peak Hour Excessive Delay (PHED) Measure: Annual Hours of Peak Hour Excessive Delay (PHED) Per Capita

o Non-Single Occupancy Vehicle Travel (SOV) Measure: Percent of Non-Single Occupancy Vehicle (SOV) Travel

o Emissions Measure: Total Emission Reductions These performance measures have been established within a series of FHWA and FTA rulemaking regulations. The performance measure targets have been established based on the final rules for the measures and are included in the Statewide Transportation Improvement Program (STIP). A description of the Transit, Safety, Infrastructure, System Performance, Freight Movement, and CMAQ - Congestion Reduction performance measure targets and methodologies are included in the following discussions.

Page 460: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 4

2022 Transit Performance Target of Capital Assets In accordance with 49 CFR Parts 625 and 630 for Transit Asset Management (TAM), the Wisconsin Department of Transportation (WisDOT), is the TAM sponsor for all Section 5311 Formula Grants for Rural Areas, Section 5310 Enhanced Mobility for Seniors and Individuals with Disabilities, and some Section 5307 Formula Grants for Urbanized Areas sub-recipients. Methodology WisDOT provided an opt-in opportunity for all Section 5311 Formula Grants for Rural Areas, Section 5310 Enhanced Mobility for Seniors and Individuals with Disabilities, and some Section 5307 Formula Grants for Urbanized Areas sub-recipients to be included in the WisDOT TAM Plan. WisDOT worked with sub-recipients to update the inventory information of federally funded vehicles, equipment, and facilities in its BlackCat web-based grants management system. In early 2018, WisDOT staff presented the TAM targets and a draft TAM Plan at a WisDOT Planning Section meeting with representatives from the state Metropolitan Planning Organizations (MPOs) and Regional Planning Commissions (RPCs). WisDOT staff fielded questions from attendees, provided them with a PowerPoint presentation about the federal TAM initiative, and a copy of the draft plan. Vehicles WisDOT evaluated the inventory of its sub-recipient vehicle capital items and used FTA’s Useful Life Age Benchmark (ULB) set in FTA 5010.1D, page IV-7 to determine if the vehicles were beyond their useful life. WisDOT and its sub-recipients have set the following TAM performance targets: Rolling Stock – Acceptable percentage of revenue vehicle fleet that is past its useful life

Equipment – Acceptable percentage of non-revenue vehicle fleet that is past its useful life Performance Measure 2021 Target (%) 2022 Target (%) Automobiles 33 33 Trucks or other Tiered Vehicles 29 29

Performance Measure 2021 Target (%) 2022 Target (%) AO – Automobile 77 77 BU – Bus 44 44 CU – Cutaway 47 47 SB – School Bus 100 0 MV – Minivan n/a 51 VN – Van 27 27

Page 461: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 5

Facility Targets WisDOT evaluated the condition of the facilities in its sponsored TAM plan FTA's Transit Economic Requirements Model (TERM) as a guide. This scale has the following values:

• 5 – Excellent • 4 – Good • 3 – Adequate • 2 – Marginal • 1 – Poor

Facility – Acceptable percentage of facilities that are rated below a “3” on the TERM guide Performance Measure 2021 Target (%) 2022 Target (%) Administrative/Maintenance Facilities 10 10 Most transit facilities in WisDOT’s sponsored TAM Plan are relatively new and in excellent condition. None of the facilities are beyond their useful life of 40 years or below adequate condition (rated below a 3 on the condition scale). WisDOT and its sub-recipients set the TAM performance target to allow up to 10 percent of the facilities to be rated below a “3 – Adequate” on the condition scale. Next Steps for the TAM and Transit Targets Funding is dedicated to replacing priority vehicles within the TAM Plan, as transit providers continue to operate services with aging fleets.. There will be a growing financial gap from year to year associated with the number of vehicles due for replacement to meet the established TAM targets and the funding levels for vehicles that are currently available. WisDOT will assist transit providers the use of the useful life benchmarks established in the TAM Plan to prioritize their vehicle requests at the time of grant application and is working to share best practices on vehicle maintenance across agencies and organizations. WisDOT will also continue to work closely with its sub-recipients and FTA on any additional asset management requirements or changes, and will update the TAM targets and plan as necessary.

Public Transit Agency Safety Plans (PTASP) On July 19, 2018, FTA published the Public Transportation Agency Safety Plan (PTASP) Final Rule, which requires certain operators of public transportation systems that receive federal funds under FTA's Urbanized Area Formula Grants to develop safety plans that include the processes and procedures to implement Safety. Management Systems (SMS).

Page 462: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 6

• The PTASP rule became effective on July 19, 2019. • FTA published a Notice of Enforcement Discretion on April 22, 2020 effectively extending

the PTASP compliance deadline from July 20, 2020 to December 31, 2020. The plan must include safety performance targets. Find additional guidance on planning and target setting on FTA's Performance-Based Planning pages. Transit operators also must certify that they have a safety plan in place meeting the requirements of the rule by December 31, 2020. The plan must be annually updated and certified by the transit agency. The rule applies to all operators of public transportation systems that are recipients and sub-recipients of federal financial assistance under the Urbanized Area Formula Program (49 U.S.C. § 5307). WisDOT worked with a number of large urban systems to create a task group to develop a compliant PTASP template that larger systems could use for their own plan or that smaller systems could use if they decided to have WisDOT write their PTASP. The template was completed in early CY2020 and sent out to all of the public transit systems that received FTA 5307 funds. WisDOT also sent letters asking systems to either “opt-out” and develop their own plan, or to “opt-in” in having WisDOT craft their plan. WisDOT staff have also communicated with MPO staff on their adoption of PTASP targets into the TIPs. The deadline was pushed back until June 30, 2021 due to COVID-19 (or 180 days after the public transit agencies need to finalize their plans). FTA would not approve TIP or TIP amendments if the PTASP targets were include after the deadline. All Wisconsin transit operators and MPOs met the June 30, 2021 deadline. WisDOT will assist any agency that needs help with their plans, but the certification of each plan is done by the transit agency, their accountable executive, and the board of directors through their individual FTA Certifications and Assurances process each year. WisDOT has no oversight of these plans and is only responsible for the creation of them.

Page 463: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 7

Highway Safety Improvement Program Performance Measures

National Performance Management Measures First Performance Measure Rule (PM1) The Highway Safety Improvement Program (HSIP) is a core Federal-aid program with the purpose of achieving a significant reduction in fatalities and serious injuries on all public roads. As per 23 U.S.C. 148(h) and 23 CFR 924.15, states are required to report annually on the progress being made to advance HSIP implementation and evaluation efforts. HSIP Project Prioritization Wisconsin evaluates potential HSIP projects by comparing the estimated crash reduction benefits expected from the project with the cost of that project. Crash reduction benefits are estimated by multiplying up to two crash modification factors (CMF) by five years of observed crash data. CMFs and target crashes are identified by the safety analyst and a spreadsheet tool is used to calculate the estimated crash reduction benefits. The spreadsheet tool incorporates the WisDOT CMF Table and logic described in our statewide policy at the following link:

Crash Modification Factor Policy A key component in the development of the HSIP is the Project Evaluation Factor (PEF). The PEF is a measurement that is used to evaluate and compare proposed projects. It provides a comparison of the estimated crash reduction potential of a proposed improvement with the cost of the project. Although it has similarities to a benefit/cost analysis, it does not include all the elements of a traditional benefit/cost analysis tool for ranking the relative merits of a group of projects and should not be compared to a benefit/cost analysis. Internal and External Coordination The HSIP Program is managed by WisDOT's Division of Transportation Investment Management (DTIM) and the Bureau of State of Highway Programs (BSHP). DTIM/BSHP makes all final application approvals or denials and related project change or cost increase requests. However, DTIM/BSHP coordinates its efforts with several internal partners that both, directly and indirectly, influence the decision-making process. Below is a summary of these partners and their role in the program: - Traffic Safety Council (TSC): The TSC is comprised of representatives from the Division of Transportation System Development (DTSD), DTIM, DMV, Division of State Patrol (DSP), and various Executive Offices within WisDOT. Among this group's responsibilities is developing and maintaining the Wisconsin Strategic Highway Safety Plan (SHSP), which helps guide the safety efforts of the HSIP Program. - Traffic Safety Engineering Workgroup (TSEWG): TSEWG is comprised of the State HSIP Coordinator, State Traffic Safety Engineer, and the Regional Traffic Safety Engineers. In some cases, the Regional HSIP Coordinators also participate. This group identifies and evaluates potential safety initiatives both within and outside of the HSIP Program, provides peer support, and reviews proposed HSIP projects. After a group evaluation, a recommendation to approve or not approve is forwarded to the State HSIP Coordinator for final review

Page 464: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 8

- State Project Oversight Engineers: The State Project Oversight Engineers are a critical component of the joint process with the TSEWG for application review and approval. The DTSD State Project Oversight Engineers, Regional Traffic Safety Engineers, the State Traffic Safety Engineer, and the State HSIP Coordinator provide a consensus approval or disapproval of HSIP funding after a comprehensive in-person peer review. Each Region has one Project Oversight Engineer. State Project Oversight Engineers only review applications originating from the Region in which they are assigned. This consensus approval or disapproval is advisory to DTIM/BSHP. The HSIP is fully coordinated and integrated with the work of other organizations, associations, and stakeholders (e.g., law enforcement, academia, local governments, and MPOs) that play a role in reducing fatalities and serious injuries. One of the basic foundations of the HSIP is the direct linkage between the data-driven priorities established in the Strategic Highway Safety Plan (SHSP) and the identification, development, and implementation of HSIP projects. Local and regional governments both contribute towards achieving the goals and objectives of the SHSP and help guide program decisions and project selections. More specifically, where there is a high percentage of crashes that occur off the state system, WisDOT works with local jurisdictions to help them develop and implement HSIP projects that address priority safety issues on locally-owned roadways. This is either done by locals doing work as local force accounts or they are let by WisDOT. Stakeholders will continue to contribute to and support the goals established in the SHSP. This in turn encourages safety projects that meet established safety performance targets. Coordination with MPOs and RPCs on safety targets were part of multiple quarterly Directors meetings in recent years. Starting with the Notice of Proposed Rulemaking, Final Rule publication and establishment of WisDOT and MPO safety targets. WisDOT continues coordinating with individual MPOs as they establish their planning area safety targets. Calendar Year 2022 Targets Safety Targets are calculated as five-year rolling averages for each performance measure.

Measure 2016 - 2020

Baseline Averages1

2022 Safety Targets1

Number of Fatalities 596.6 584.7

Rate of Fatalities per 100 million VMT 0.938 0.919

Number of Serious Injuries 3056.6 2995.5

Rate of Serious Injury per 100 million VMT 4.808 4.712

Number of Non-Motorized Fatalities and Serious Injuries 365.8 358.5 11 Final 2020 FARS data was not available at the time of target setting. The historical difference between state fatality data and FARS data was used to adjust 2020 state fatalities data in calculating the fatalities baselines and targets.

Page 465: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 9

HSIP projects are included in the STIP. In addition, safety is a major consideration in the scoping, prioritization, selection, and development of all WisDOT state and local projects. The efforts made toward addressing safety within the HSIP and all projects will continue to impact how progress is made toward achieving Highway Safety Improvement Program performance measure targets.

Page 466: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 10

Pavement and Bridge Condition Performance Measures National Performance Management Measures Second Performance Measure Rule (PM2) Pursuant to the regulations promulgated by the U.S. Department of Transportation Federal Highway Administration (FHWA), the Wisconsin Department of Transportation (WisDOT) has established statewide targets for federal performance measures intended to assess pavement and bridge conditions on the National Highway System (NHS). The 2019 and 2021 NHS pavement condition targets are identified in Exhibit A. The 2019 and 2021 NHS bridge condition targets are identified in Exhibit B. Exhibit A Wisconsin Department of Transportation NHS Pavement Condition Targets

Measure 2-Year

Target (2019) 4-Year Target

(2021) Interstate – Percentage pavements in “Good” condition NA* ≥ 45% Interstate – Percentage pavements in “Poor” condition NA* < 5% Non-Interstate NHS – Percentage pavements in “Good” condition ≥ 20% ≥ 20% Non-Interstate NHS – Percentage pavements in “Poor” condition < 12% < 12%

* Targets not required per rule. Exhibit B Wisconsin Department of Transportation NHS Bridge Condition Targets

Measure 2-Year Target

(2019) 4-Year Target

(2021) Percentage of NHS bridges by deck area in “Good” condition ≥ 50% ≥ 50% Percentage of NHS bridges by deck area in “Poor” condition < 3% < 3%

As part of FHWA’s Transportation Performance Management program, state DOT’s were required to submit a 2020 Mid Performance Period (MPP) progress report. The 2-year conditions reported for PM2 pavement performance on the Interstate and non-Interstate NHS using full distress plus International Roughness Index (IRI) metrics and NHS bridges were within established targets. Wisconsin’s State Highway Infrastructure Report can be found on FHWA’s State Performance Dashboard website. Wisconsin’s State Trunk Highway (STH) system continues to support the state’s economy, the mobility needs of Wisconsin citizens and the broader public good. The WisDOT owned STH System encompasses 11,742 center-line miles and 5,328 bridges. The NHS is a high priority subset of the STH system, representing nearly 45% of STH center-line miles and carrying 80% of STH vehicle miles. The state-owned STH system includes approximately 5,318 NHS center-line miles along with 3,260 NHS bridges. There are also 650 NHS center-line miles and 312 NHS bridges under the jurisdiction of local governments in Wisconsin. WisDOT manages and prioritizes investments of the roadway and bridges using data-driven analysis with the goal of allocating funding to the “right” place, at the “right” time and for the “right” type of improvements. Flexible and responsive planning, budgeting and project delivery

Page 467: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 11

processes ensure WisDOT makes the best possible use of the resources available. By implementing the data-driven set of NHS infrastructure investments, WisDOT fully expects its NHS pavement and bridge condition targets will be met. Federal law requires each state DOT to document its 10-year investment plan for the NHS in a Transportation Asset Management Plan (TAMP). The NHS investment plan presented in the TAMP must be constrained by the level of funding expected to be reasonably available. Each state DOT must also develop targets for NHS pavement and bridge conditions, demonstrate that their NHS investment plan was developed using sound asset management processes, and document whether the plan will allow their NHS pavement and bridge targets to be met. Wisconsin’s TAMP can be found on the WisDOT internet site: Transportation Asset Management Plan (TAMP) There is a direct relationship between the TAMP and the STIP, with the STIP providing further assurance that the TAMP will be implemented over time.

Page 468: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 12

System Performance, Freight Movement, and Congestion Management Air Quality Performance Measures

National Performance Management Measures Third Performance Measure Rule (PM3) Pursuant to the regulations promulgated by the U.S. Department of Transportation Federal Highway Administration (FHWA), the Wisconsin Department of Transportation (WisDOT) has established statewide targets for the federal performance measures intended to assess the performance of the National Highway System, freight movement on the Interstate System and Congestion Mitigation and Air Quality (CMAQ) Improvement Program. WisDOT and the Southeastern Wisconsin Regional Planning Commission (SEWRPC) collectively agreed to unified targets for the Peak Hour Excessive Delay (PHED) measure and the Non-Single Occupancy Vehicles (Non-SOV) measure for the Milwaukee urbanized area. The 2019 and 2021 targets for the six performance measures are identified in Exhibits C and D Additionally, WisDOT coordinated with the Minnesota Department of Transportation (MnDOT) and the Metropolitan Council (Council), the Minneapolis-St. Paul metropolitan area MPO, to establish PHED and Non- SOV performance measures. The PHED and Non-SOV targets that MnDOT, WisDOT, and the Council collectively established are included in Exhibit D. The system performance, freight movement and CMAQ measures were analyzed with the establishment of a PM3 Workgroup consisting of WisDOT (central office), Region, and SEWRPC staff members. The PM3 Workgroup then provided target recommendations to WisDOT management for input and approval. The reliability measure uses the National Performance Management Research Data Set (NPMRDS). Due to a new data provider and methodologies, only one year of NPMRDS data was available at the time the PM3 measures were required to be established. The PM3 workgroup continues to monitor and analyze the PM3 measures and targets as NPMRDS data becomes available. The reliability measures are based on the following metrics:

• Travel Reliability Metric: 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝑜𝑜𝑜𝑜 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿 𝑅𝑅𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅𝑇𝑇𝐿𝐿𝑇𝑇𝑅𝑅𝑅𝑅 (𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅) = the 80𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿 divided by the 50𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿. Road segments with a LOTTR less than 1.5 were deemed reliable. • Freight Reliability Metric: 𝑇𝑇𝑇𝑇𝑇𝑇𝑝𝑝𝑇𝑇 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑇𝑇𝑇𝑇𝑇𝑇𝐿𝐿 𝑅𝑅𝐿𝐿𝐿𝐿𝑇𝑇𝑇𝑇𝑅𝑅𝑇𝑇𝐿𝐿𝑇𝑇𝑅𝑅𝑅𝑅 (𝑇𝑇𝑇𝑇𝑇𝑇𝑅𝑅) = 95𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿 divided by 50𝑅𝑅ℎ 𝑝𝑝𝐿𝐿𝑇𝑇𝑝𝑝𝐿𝐿𝑝𝑝𝑅𝑅𝑇𝑇𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿𝐿𝐿𝐿𝐿 𝑅𝑅𝑇𝑇𝑇𝑇𝐿𝐿. Lower TTTRs relate to being more reliable.

The PHED targets were established as required using the following datasets: NPMRDS, Highway Performance Management System (HPMS), WisDOT travel data, posted speeds, and SEWRPC modeling data. As part of FHWA’s Transportation Performance Management program, state DOT’s were required to submit a Mid Performance Period (MPP) progress report in 2020. The 2-year conditions reported for Travel Reliablity on the Interstate and non-Interstate NHS, Freight Reliability on the Interstate, and Peak Hours Excessive Delay for the Milwaukee and Minneapolis-St. Paul Urbanized Areas were all within established targets. Full performance period targets (to be reported in 2022) are on

Page 469: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 13

track to be met. Wisconsin’s State Highway Reliabilty report can be found on FHWA’s State Performance Dashboard website.

Exhibit C

Wisconsin Department of Transportation Measure 2017

Results

2-Year Target (2019)

4-Year Target (2021)

Travel Reliability 1) Percent of person-miles traveled that are reliable on the Interstate

97.9%

94.0%

90.0%

2) Percent of person-miles traveled that are reliable on Non-Interstate NHS 93.9% NA* 86.0% Freight Reliability 3) Truck Travel Time Reliability Index on the Interstate

1.16

1.40

1.60

Peak Hour Excessive Delay 4) Annual Hours of Peak Hour Excessive Delay per Capita on NHS routes in the

Milwaukee Urbanized Area

8.96

Hours per capita

NA*

8.6 Hours per capita

Non-SOV Travel 5) Percent of Non-SOV Travel on NHS routes in the Milwaukee Urbanized Area 20.3%

(2016) 20.2% 20.1%

Emission Reductions 6) Total Emissions Reductions in nonattainment or maintenance areas for:

• VOC • NOx • PM2.5

41.754 Kgs 89.747Kgs 5.287 Kgs

12.154 Kgs 90.354 Kgs 9.043 Kgs

30.123 Kgs 150.388 Kgs 13.820 Kgs

Exhibit D Minneapolis-St. Paul-MN-WI Urbanized Area Measure

2017 Results

2-Year Target (2019)

4-Year Target (2021)

Peak Hour Excessive Delay 4) Annual Hours of Peak Hour Excessive Delay per Capita on NHS routes in the

Minneapolis-St. Paul Urbanized Area

8.65

Hours per capita

NA*

8.50

Hours per capita

Non-SOV Travel 5) Percent of Non-SOV Travel on NHS routes in the Minneapolis/St. Paul Urbanized Area

23.2% (2016)

25.0% 25.0%

* Targets not required per rule

The Non-SOV targets were established using the U.S. Census Non-SOV data and analyzing the previous five years of Non-SOV percentages for the Milwaukee and Minneapolis/St. Paul urbanized areas. CMAQ Public Access System data was used to determine the Emission Reduction targets. The Public Access System data includes estimated emission reductions for projects funded by the FHWA CMAQ program. FHWA CMAQ funding is limited to projects that are within an air quality non-attainment or maintenance area.

Page 470: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 11 – 14

Two-year results for Non-SOV Travel and Emission Reductions submitted in 2020 as part of the Mid-Period Performance Progress Report were generally in line with targets, and 4-year targets are on track to be met. WisDOT will continue to monitor all PM3 measures and use the results to include project development and strategies to meet the established targets.

WisDOT’s Federal Performance Measure Webpage More information on WisDOT’s Federal Performance Measures can be found at: WisDOT - Federal Transportation Performance Measures

Page 471: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 12

Summary

of

Public

Comments

Page 472: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 12 - 1

Summary of Public Comments WisDOT received one comment on the Draft 2022 – 2025 STIP during the public comment period. Summary of the comment and WisDOT’s response are listed below. Comment: Staff member at the Brown County Planning Commision/Green Bay MPO inquired why the Oneida Public Transit was not shown on the Wisconsin Transit Systems mapping (page 5-3).

WisDOT’s Response: Thank you for the comment. The STIP transit map only reflects current recipients of funding (Federal and/or state) through WisDOT. The Oneida Nation did not apply for funding through WisDOT in 2021. While the Oneida Nation has applied for funding through WisDOT previously, they are also eligible to receive funding directly from FTA. Direct FTA recipients are not included to increase the transparency [i.e.clarity] of the mapping.

Page 473: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program Tab 13

Amendments

Page 474: 2022-2025 Draft Statewide Transportation Improvement Program

2022 – 2025 Statewide Transportation Improvement Program 13 – 1

STIP Amendments The STIP is approved by WisDOT, FHWA, and FTA. Throughout the year, it may be necessary to amend the 2022 – 2025 STIP to incorporate projects not included in the original project listing. The following are changes that may necessitate a STIP amendment:

• significant change in the scope and/or cost of a project, • changing the letting date of a project beyond the four year STIP period, • adding/advancing a project to the STIP, etc.

All such amendments will be added to the STIP webpage for record-keeping purposes: https://wisconsindot.gov/Pages/doing-bus/local-gov/astnce-pgms/highway/stip.aspx.