· 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3),...

7

Transcript of  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3),...

Page 1:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 2:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 3:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 4:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 5:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 6:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,
Page 7:  · 2020. 6. 12. · (FSI), (Setback) 2. The Provisions in the G.O.(Ms). No. 17, H & UD (UI) 4(3), Department, dated 05.02.2016, relating to installation and use of Solar energy system,