2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor...
Transcript of 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor...
![Page 1: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/1.jpg)
2020-21 Calendar Drafts Review Dr. Sharon E. Pope, Chief Academic Officer
Presented to CCPS School Board * October 7, 2019
![Page 2: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/2.jpg)
● Requirements Review● Feedback Gathering● Draft 1 & 2 Review
○ Continued Features
2
2020-21 Calendar Drafts Review
![Page 3: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/3.jpg)
Vision: Creating a Better Tomorrow
Mission: Igniting passion through authentic and captivating experiences
Values: Integrity, Equity, Teamwork, Ingenuity
3
Our Daily Work -- Creating a Better Tomorrow
![Page 4: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/4.jpg)
Requirements Review
Expectations in Virginia § VAC 20-131-80, § VAC 20-131-90, § VAC 20-131-110, § VAC 20-131-140
● 990 hours of elementary instruction ● 560 hours of middle instruction in 4 core● 140 hours for a “standard credit” ● Reasonable efforts to make up lost time
4
![Page 5: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/5.jpg)
Feedback Gathering
Regional● Surveying regional calendar drafts ● Engaging in conversations with neighboring divisions
Local● Superintendent’s Leadership Team and K-12 principals● Advisory Council of Teachers and Staff (ACTS)
5
![Page 6: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/6.jpg)
Two Drafts
● Draft #1: Pre-Labor Day Start (HERE)
● Draft #2: Traditional Post-Labor Day Start (HERE)
6
![Page 7: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/7.jpg)
● Site-based PD on early-release Fridays
● Early-release teacher workdays
● Thanksgiving week with Parent-Teacher Conferences
and without students
● Winter break length two weeks
● Spring break as the first full week in April
7
Continued Features
![Page 8: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/8.jpg)
Draft #1 Pre-Labor Day Start
8
Instructionally Better for Students● AP students will receive 2 more weeks of instruction before testing● Added instructional weeks prior to 8th-12th grade December winter exams/MAPS testing● DE schedules align better with CCPS start● Summer learning loss (12-week slide) will be reduced in 2020-21
Also,● August athletics start up and school start will align better● Early June vacation rates for families are lower● Summer length only decreases by one week when going to Pre-Labor Day start in 2020-21
But,● Smaller neighboring districts have gone/will go in this direction before larger ones● Graduation dates are confirmed late fall and may occur after school ends ● Require shifts in CCPS operations and some contract timelines
![Page 9: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/9.jpg)
9
Post-Labor Day Start 2019-20
June 14 Last Day of 2018-19August 19 New Teachers ReportAugust 26 Teachers ReportSeptember 3 1st Day of School 1/2K, 1st-5th, 6th, 9thJune 12 Student Last Day June 13 Teacher Last Day
2019 Summer Break 11 weeks for students
Pre-Labor Day Start 2020-21
June 12 Last Day of 2019-20August 10 New Teachers ReportAugust 17 Teachers ReportAugust 24 1st Day of School 1/2K, 1st-5th, 6th, 9thJune 4 Student Last DayJune 5 Teacher Last Day
2020 Summer Break 10 weeks for students
Draft #1 Draft #2
Post-Labor Day Start 2020-21
June 12 Last Day of 2019-20August 24 New Teachers ReportAugust 31 Teachers ReportSeptember 8 1st Day of School 1/2K,1st-5th, 6th, 9thJune 18 Student Last DayJune 19 Teacher Last Day
2020 Summer Break 12 weeks for students
Current
![Page 10: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/10.jpg)
10
Post-Labor Day Start 2019-20
June 14 Last Day of 2018-19August 19 New Teachers ReportAugust 26 Teachers ReportSeptember 3 1st Day of School 1/2K, 1st-5th, 6th, 9thJune 12 Student Last Day June 13 Teacher Last Day
2019 Summer Break 11 weeks for students
Post-Labor Day Start 2020-21
June 12 Last Day of 2019-20August 24 New Teachers ReportAugust 31 Teachers ReportSeptember 8 1st Day of School 1/2K,1st-5th, 6th, 9thJune 18 Student Last DayJune 19 Teacher Last Day
2020 Summer Break 12 weeks for students
Current
Pre-Labor Day Start 2021-22
June 18 Last Day of 2020-21August 9 New Teachers ReportAugust 16 Teachers ReportAugust 23 1st Day of School 1/2K, 1st-5th, 6th, 9thJune 2 Student Last DayJune 3 Teacher Last Day
2020 Summer Break 9 weeks for students
A One Year Delay in Pre-Labor Day Start
![Page 11: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/11.jpg)
Feedback Preference
11
Superintendent’s Leadership Team (9.16)n = 22 members
73% prefer Pre-Labor Day
K-12 Principals (9.18)n = 42 principals
98% prefer Pre-Labor Day
Advisory Council of Teachers & Staff (ACTS) (9.23)n = 39 schools represented
95% prefer Pre-Labor Day
N = 102 91% in favor of Pre-Labor Day Start
![Page 12: 2020-21 Calendar Drafts Review - BoardDocs, a Diligent Brand€¦ · Draft #1 Draft #2 Post-Labor Day Start 2020-21 June 12 Last Day of 2019-20 August 24 New Teachers Report August](https://reader034.fdocuments.us/reader034/viewer/2022050517/5fa151da341fdf40734ab490/html5/thumbnails/12.jpg)
2020-21 Calendar Drafts Review Dr. Sharon E. Pope, Chief Academic Officer
Presented to CCPS School Board * October 7, 2019