2019 Traffic Volumes Report

100
MADERA COUNTY TRAFFIC MONITORING PROGRAM 2019 TRAFFIC VOLUMES REPORT NOVEMBER 2019

Transcript of 2019 Traffic Volumes Report

Page 1: 2019 Traffic Volumes Report

MADERA COUNTY TRAFFIC MONITORING PROGRAM

2019 TRAFFIC VOLUMES REPORT

NOVEMBER 2019

Page 2: 2019 Traffic Volumes Report

Madera County Traffic Monitoring Program 2019 Traffic Volume Report

November 2019 Page 2

INTRODUCTION The Madera County Transportation Commission (MCTC) is the Regional Transportation Planning Agency (RTPA) and the designated Metropolitan Planning Organization (MPO) for Madera County. The Madera metropolitan boundary covers the entire County of Madera. The MCTC is responsible for the development and adoption of the Regional Transportation Plan and Transportation Improvement Program as required by state law. The MCTC’s role is to foster intergovernmental coordination; undertake comprehensive regional planning with an emphasis on transportation issues; provide a forum for citizen input into the planning process; and to provide technical services to its member agencies. In all these activities the MCTC works to develop a consensus among its members with regards to multi- jurisdictional transportation issues. The Madera County Traffic Monitoring Program – 2019 Traffic Volume Report has been developed as part of the Fiscal Year 2019/20 Overall Work Program (OWP) of the MCTC. A traffic monitoring report is published annually to provide current traffic count information for planning and engineering projects. The objective is to maintain the Madera County Traffic Monitoring Program as a source of current traffic information for use by local agencies, Tribal Governments, and the public, and as a validation tool for the county-wide traffic model and vehicle-miles-traveled (VMT) monitoring requirements.

PURPOSE OF TRAFFIC COUNTS The MCTC’s Traffic Monitoring Program is a beneficial data source for both public and private interests. Some of the typical uses are: Air Quality Monitoring - Federal regulations require that an air quality planning program be established. Traffic counts can identify vehicle types, speeds, and volumes to aid in determining levels of pollutants and their sources. Transportation Modeling - The MCTC maintains a regional traffic simulation model to assist in air quality and transportation planning. This model is dependent upon current and accurate traffic counts to aid in future transportation and development planning. Traffic Signal Priorities and Capital Improvement Programs - Each year agencies develop budgets for projects and improvements for the next fiscal year. Since funds are limited, project priorities must be set. Traffic counts assist in setting those priorities. Other Benefits Derived from Traffic Counts - Regular monitoring of traffic volumes assists in the determination of growth rates, traffic accident rates, traffic signal and stop sign warrants, optimization of traffic signal timing, and traffic noise levels. Private Use - Traffic counts are of service to private business. Uses include determination of location and economic potential of a proposed business. Likewise, traffic count data offer substantial benefits to real estate appraisal and financing decisions.

TRAFFIC COUNTING METHOD The 2019 traffic count locations were determined by the MCTC with input from its member agencies. The 2019 traffic volumes were obtained utilizing pneumatic traffic counters installed at each count location for a continuous 24-hour period.

TRAFFIC COUNT DATA In addition to the current year 2019 traffic counts, this report also contains traffic count information dating back to 2014 obtained from previous Madera County Traffic Volume

Page 3: 2019 Traffic Volumes Report

Madera County Traffic Monitoring Program 2019 Traffic Volume Report

November 2019 Page 3

Reports. The data are attached and are separated based on the jurisdiction of the roadway. Traffic count data within the four jurisdictions listed below are included in this report:

• County of Madera• City of Madera• City of Chowchilla• State of California (Caltrans)The traffic counts presented for the County of Madera, City of Madera, and City of Chowchilla are “raw” counts. A “raw” count is recorded at a particular location on a particular day for a period of 24 hours and is not adjusted to reflect seasonal variations or daily variations normally occur. While “raw” counts provide a good measure of traffic activity at a given location, caution must be exercised in the use of this information. Also, many of the counts are “directional” (i.e. eastbound, westbound, etc.). To obtain the total traffic volume for a location, the traffic volumes in both directions must be added together. The raw traffic count data sheets for the 2019 traffic counts are attached. The Caltrans data contains the most recent (year 2017) Average Daily Traffic (ADT) counts calculated by Caltrans. Year 2018 and 2019 data have not yet been made available by Caltrans. As of the date of this report, the Caltrans traffic counts are available at the following internet address: http://dot.ca.gov/trafficops/census/

Page 4: 2019 Traffic Volumes Report

COUNTY OF MADERA TRAFFIC VOLUMES

Page 5: 2019 Traffic Volumes Report

County of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019 AVE. 7 E/O FIREBAUGH BLVD. EB 1,318 May -- -- 1,557 May -- -- E/O FIREBAUGH BLVD. WB 1,391 May -- -- 1,511 May -- --

AVE. 7 W/O RD. 35 EB 1,220 May -- -- 1,514 April -- -- W/O RD. 35 WB 947 May -- -- 1,359 April -- --

AVE. 7 E/O SR 99 EB 1,000 May -- -- 2,035 May -- -- E/O SR 99 WB 1,157 May -- -- 1,708 May -- --

AVE. 7 W/O SR 99 EB 2,196 May -- -- 3,046 April -- -- W/O SR 99 WB 2,040 May -- -- 2,980 April -- --

AVE. 7 W/O SR 145 EB -- -- 1,661 May -- -- -- W/O SR 145 WB -- -- 1,844 May -- -- --

AVE. 7 1/2 E/O RD. 9 EB -- -- 2,533 May -- -- -- E/O RD. 9 WB -- -- 2,318 May -- -- --

AVE. 9 W/O RD. 36 EB 3,985 May -- -- 5,701 April -- -- W/O RD. 36 WB 3,675 May -- -- 5,152 April -- --

AVE. 9 E/O RD. 38 EB 3,398 May -- -- 5,050 April -- -- E/O RD. 38 WB 3,156 May -- -- 4,693 April -- --

AVE. 9 E/O SR 99 EB 3,529 May -- -- 4,465 May -- -- E/O SR 99 WB 3,478 May -- -- 4,286 May -- --

AVE. 12 W/O BUS. RT. 41 EB 5,936 May -- -- 7,123 April -- -- W/O BUS. RT. 41 WB 5,767 May -- -- 6,657 April -- --

AVE. 12 E/O RD. 16 EB 1,011 May -- -- 997 May -- -- E/O RD. 16 WB 1,021 May -- -- 1,063 May -- --

AVE. 12 E/O RD. 23 EB 1,399 May -- -- 1,502 May -- -- E/O RD. 23 WB 1,395 May -- -- 1,470 May -- --

AVE. 12 E/O RD. 29 EB 4,020 May -- -- 6,448 April -- -- E/O RD. 29 WB 4,181 May -- -- 6,632 April -- --

AVE. 12 E/O RD. 36 EB 5,537 May -- -- 6,973 April -- -- E/O RD. 36 WB 5,648 May -- -- 6,749 April -- --

AVE. 12 W/O RD. 36 EB 4,128 May -- -- 4,961 April -- -- W/O RD. 36 WB 4,269 May -- -- 5,672 April -- --

AVE. 12 W/O SR 41 EB -- -- 6,169 May -- -- -- W/O SR 41 WB -- -- 6,267 May -- -- --

AVE. 12 W/O SR 145 EB -- -- 3,996 May -- -- -- W/O SR 145 WB -- -- 3,936 May -- -- --

AVE. 13 W/O RD. 29 EB 1,609 May -- -- 1,869 April -- -- W/O RD. 29 WB 1,626 May -- -- 1,945 April -- --

AVE. 14 E/O RD. 9 EB -- -- 271 May -- -- -- E/O RD. 9 WB -- -- 273 May -- -- --

AVE. 14 E/O RD. 16 EB 567 May -- -- 689 May -- -- E/O RD. 16 WB 780 May -- -- 739 May -- --

AVE. 14 W/O RD. 29 EB 721 May -- -- 343 May -- -- W/O RD. 29 WB 751 May -- -- 386 May -- --

AVE. 15 W/O RD. 29 EB 1,843 May -- -- 2,261 April -- -- W/O RD. 29 WB 1,957 May -- -- 2,363 April -- --

AVE. 15 W/O RD. 36 EB 1,710 May -- -- 1,827 April -- -- W/O RD. 36 WB 1,793 May -- -- 1,915 April -- --

AVE. 15 W/O RD. 39 1/2 EB 1,938 May -- -- 2,286 April -- -- W/O RD. 39 1/2 WB 1,827 May -- -- 2,344 April -- --

Page 6: 2019 Traffic Volumes Report

County of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

AVE. 15 W/O SR 41 EB -- -- 2,552 May -- -- -- W/O SR 41 WB -- -- 2,333 May -- -- --

AVE. 17 E/O RD. 16 EB 87 May -- -- 102 May -- -- E/O RD. 16 WB 129 May -- -- 82 May -- --

AVE. 17 W/O RD. 27 EB -- -- 2,469 May -- -- -- W/O RD. 27 WB -- -- 2,539 May -- -- --

AVE. 17 E/O SR 99 EB -- -- 4,413 May -- -- -- E/O SR 99 WB -- -- 4,994 May -- -- --

AVE. 18 1/2 W/O GOLDEN STATE BLVD. EB 1,159 May -- -- 1,046 May -- -- W/O GOLDEN STATE BLVD. WB 1,155 May -- -- 981 May -- --

AVE. 18 1/2 E/O RD. 9 EB -- -- 417 May -- -- -- E/O RD. 9 WB -- -- 375 May -- -- --

AVE. 18 1/2 E/O RD. 16 EB 550 May -- -- 477 May -- -- E/O RD. 16 WB 436 May -- -- 437 May -- --

AVE. 18 1/2 W/O RD. 27 EB -- -- 123 May -- -- -- W/O RD. 27 WB -- -- 134 May -- -- --

AVE. 18 1/2 W/O SR 99 OVERPASS EB 7,185 May -- -- 4,341 May -- -- W/O SR 99 OVERPASS WB 4,332 May -- -- 5,309 May -- --

AVE. 20 E/O RD. 16 EB 177 May -- -- 195 May -- -- E/O RD. 16 WB 276 May -- -- 199 May -- --

AVE. 21 W/O RD. 27 EB -- -- 1,124 May -- -- -- W/O RD. 27 WB -- -- 1,238 May -- -- --

AVE. 24 E/O RD. 16 EB 602 May -- -- 533 May -- -- E/O RD. 16 WB 589 May -- -- 580 May -- --

AVE. 24 W/O SR 99 EB 2,017 May -- -- 1,319 May -- -- W/O SR 99 WB 2,485 May -- -- 1,608 May -- --

AVE. 25 E/O RD. 9 EB -- -- 368 May -- -- -- E/O RD. 9 WB -- -- 361 May -- -- --

AVE. 26 E/O RD. 19 EB 386 May -- -- 622 May -- -- E/O RD. 19 WB 420 May -- -- 601 May -- --

AVE. 26 E/O RD. 26 EB -- -- 343 May -- -- -- E/O RD. 26 WB -- -- 326 May -- -- --

BUS. RT. 41 N/O AVE. 10 NB 1,730 May -- -- 2,141 April -- -- N/O AVE. 10 SB 1,593 May -- -- 2,084 April -- --

BUS. RT. 41 S/O AVE. 12 NB 768 May -- -- 1,365 April -- -- S/O AVE. 12 SB 653 May -- -- 1,185 April -- --

CHILDREN'S BLVD. W/O LANES BRIDGE RD. EB 3,943 May -- -- 8,839 April -- -- W/O LANES BRIDGE RD. WB 3,428 May -- -- 9,723 April -- --

CHILDREN'S BLVD. W/O SR 41 EB -- -- 10,317 May -- -- -- W/O SR 41 WB -- -- 9,431 May -- -- --

ELLIS ST. E/O D ST. EB -- -- 1,850 May -- -- -- E/O D ST. WB -- -- 1,924 May -- -- --

FIREBAUGH BLVD. N/O AVE. 7 NB -- -- 1,102 May -- -- -- N/O AVE. 7 SB -- -- 1,104 May -- -- --

LANES BRIDGE RD. N/O CHILDREN'S BLVD. NB 2,589 May -- -- 3,448 April -- -- N/O CHILDREN'S BLVD. SB 2,375 May -- -- 2,826 April -- --

LUCKY LN. E/O SR 41 EB 2,135 May -- -- 2,585 May -- -- E/O SR 41 WB 2,129 May -- -- 2,546 May -- --

Page 7: 2019 Traffic Volumes Report

County of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

RD. 4 N/O AVE. 18 1/2 NB -- 148 May -- -- 142 May 182 Sept.

N/O AVE. 18 1/2 SB -- 225 May -- -- 114 May 197 Sept.

RD. 9 N/O AVE. 7 1/2 NB -- -- 464 May -- -- --

N/O AVE. 7 1/2 SB -- -- 429 May -- -- --

RD. 9 S/O AVE. 14 NB -- 370 May -- -- 342 May 574 Sept.

S/O AVE. 14 SB -- 350 May -- -- 315 May 676 Sept.

RD. 9 N/O AVE. 18 1/2 NB -- 275 June -- -- 296 May 414 Sept.

N/O AVE. 18 1/2 SB -- 265 June -- -- 307 May 424 Sept.

RD. 9 S/O AVE. 25 NB -- -- 360 May -- -- --

S/O AVE. 25 SB -- -- 305 May -- -- --

RD. 9 N/O FRESNO RIVER NB -- -- 343 May -- -- --

N/O FRESNO RIVER SB -- -- 335 May -- -- --

RD. 13 S/O AVE. 25 NB -- -- 253 May -- -- --

S/O AVE. 25 SB -- -- 276 May -- -- --

RD. 16 N/O AVE. 12 NB -- 246 May -- -- 278 May 460 Sept.

N/O AVE. 12 SB -- 240 May -- -- 278 May 520 Sept.

RD. 16 N/O AVE. 14 NB 463 May -- -- 434 May -- --

N/O AVE. 14 SB 484 May -- -- 397 May -- --

RD. 16 N/O AVE. 18 1/2 NB -- 313 May -- -- 389 May 594 Sept.

N/O AVE. 18 1/2 SB -- 401 May -- -- 378 May 722 Sept.

RD. 16 N/O FRESNO RIVER NB -- -- 323 May -- -- --

N/O FRESNO RIVER SB -- -- 340 May -- -- --

RD. 19 N/O AVE. 12 NB -- 215 May -- -- 207 May 245 Sept.

N/O AVE. 12 SB -- 221 May -- -- 173 May 305 Sept.

RD. 19 S/O AVE. 25 NB -- -- 245 May -- -- --

S/O AVE. 25 SB -- -- 278 May -- -- --

RD. 22 N/O AVE. 20 1/2 NB 1,442 May -- -- 1,617 May -- --

N/O AVE. 20 1/2 SB 1,360 May -- -- 1,590 May -- --

RD. 22 N/O AVE. 24 NB -- -- 271 May -- -- --

N/O AVE. 24 SB -- -- 265 May -- -- --

RD. 23 N/O AVE. 7 NB -- -- 439 May -- -- --

N/O AVE. 7 SB -- -- 461 May -- -- --

RD. 23 N/O AVE. 12 NB -- 1,065 May -- -- 1,153 May 1,618 Sept.

N/O AVE. 12 SB -- 1,087 May -- -- 1,110 May 1,668 Sept.

RD. 23 N/O AVE. 15 1/2 NB -- -- 1,889 May -- -- --

N/O AVE. 15 1/2 SB -- -- 1,829 May -- -- --

RD. 24 N/O AVE. 12 NB -- -- 781 May -- -- --

N/O AVE. 12 SB -- -- 679 May -- -- --

RD. 25 N/O AVE. 12 NB -- -- 1,502 May -- -- --

N/O AVE. 12 SB -- -- 1,410 May -- -- --

RD. 26 N/O AVE. 12 NB -- -- 1,465 May -- -- --

N/O AVE. 12 SB -- -- 1,484 May -- -- --

RD. 26 N/O AVE. 17 NB 5,107 May -- -- 7,657 May -- --

N/O AVE. 17 SB 5,365 May -- -- 7,663 May -- --

RD. 26 S/O AVE. 17 NB 5,024 May -- -- 6,951 May -- --

S/O AVE. 17 SB 5,943 May -- -- 6,896 May -- --

RD. 26 N/O AVE. 18 1/2 NB -- 3,015 May -- -- 4,790 May 4,767 Sept.

N/O AVE. 18 1/2 SB -- 2,996 May -- -- 4,784 May 4,651 Sept.

Page 8: 2019 Traffic Volumes Report

County of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

RD. 26 N/O AVE. 24 NB -- -- 214 May -- -- --

N/O AVE. 24 SB -- -- 204 May -- -- --

RD. 26 S/O AVE. 21 NB -- 1,055 May -- -- 1,411 May 1,434 Sept.

S/O AVE. 21 SB -- 1,105 May -- -- 1,348 May 1,502 Sept.

RD. 27 N/O AVE. 18 1/2 NB -- 1,186 May -- -- -- 124 Sept.

N/O AVE. 18 1/2 SB -- 1,059 May -- -- -- 114 Sept.

RD. 27 S/O AVE. 21 NB -- 552 May -- -- 186 May --

S/O AVE. 21 SB -- 439 May -- -- 197 May --

RD. 28 N/O COTTONWOOD CREEK NB -- 2,919 June -- -- 3,067 June 4,054 Sept.

N/O COTTONWOOD CREEK SB -- 3,100 June -- -- 3,297 June 3,754 Sept.

RD. 28 N/O OLIVE AVE. NB -- -- -- -- -- --

N/O OLIVE AVE. SB -- -- -- -- -- --

RD. 28 1/2 S/O ELLIS ST. NB -- -- -- -- -- 2,539 Sept.

S/O ELLIS ST. SB -- -- -- -- -- 2,538 Sept.

RD. 29 N/O AVE. 12 NB -- -- -- -- 2,514 May 3,989 Sept.

N/O AVE. 12 SB -- -- -- -- 2,428 May 3,941 Sept.

RD. 29 N/O AVE. 15 1/2 NB -- -- 717 May -- -- --

N/O AVE. 15 1/2 SB -- -- 588 May -- -- --

RD. 32 S/O AVE. 12 NB -- -- -- -- 181 May 147 Sept.

S/O AVE. 12 SB -- -- -- -- 166 May 162 Sept.

RD. 35 N/O AVE. 7 NB -- -- 1,251 May -- -- --

N/O AVE. 7 SB -- -- 979 May -- -- --

RD. 36 N/O AVE. 12 NB -- 2,428 June -- -- 2,856 May 3,373 Sept.

N/O AVE. 12 SB -- 2,580 June -- -- 3,214 May 3,881 Sept.

RD. 36 S/O AVE. 12 NB -- 994 June -- -- 1,241 May 1,009 Sept.

S/O AVE. 12 SB -- 992 June -- -- 1,106 May 1,238 Sept.

RD. 36 N/O AVE. 15 NB -- -- 1,279 May -- -- 1,872 Sept.

N/O AVE. 15 SB -- -- 1,230 May -- -- 1,685 Sept.

RD. 200 N/O RD. 211 NB -- -- 1,326 May -- -- --

N/O RD. 211 SB -- -- 1,289 May -- -- --

RD. 200 E/O SR 41 EB -- 1,447 June -- -- 1,623 May 3,728 Sept.

E/O SR 41 WB -- 1,315 June -- -- 1,719 May 4,295 Sept.

RD. 206 N/O SAN JOAQUIN RIVER NB -- 2,007 June -- -- 2,267 May 2,382 Sept.

N/O SAN JOAQUIN RIVER SB -- 1,836 June -- -- 2,189 May 2,154 Sept.

RD. 221 N/O RD. 200 NB -- 747 June -- -- 722 May 712 Sept.

N/O RD. 200 SB -- 718 June -- -- 726 May 688 Sept.

RD. 222 N/O FRESNO COUNTY LINE NB -- 200 June -- -- 188 May 218 Sept.

N/O FRESNO COUNTY LINE SB -- 202 June -- -- 188 May 221 Sept.

RD. 222 E/O SR 41 EB -- 1,835 June -- -- 2,487 May 2,204 Sept.

E/O SR 41 WB -- 1,732 June -- -- 2,495 May 2,232 Sept.

RD. 222 S/O RD. 432 NB -- 488 June -- -- 828 May 445 Sept.

S/O RD. 432 SB -- 544 June -- -- 791 May 454 Sept.

RD. 223 N/O RD. 221 NB -- 756 June -- -- 787 May 793 Sept.

N/O RD. 221 SB -- 745 June -- -- 760 May 784 Sept.

RD. 225 W/O RD. 274 EB -- 1,384 June -- -- 1,570 May 1,748 Sept.

W/O RD. 274 WB -- 1,399 June -- -- 1,574 May 1,697 Sept.

RD. 274 E/O RD. 222 EB -- 1,103 June -- -- 1,245 May 1,053 Sept.

E/O RD. 222 WB -- 1,121 June -- -- 1,241 May 993 Sept.

RD. 274 N/O RD. 225 NB -- 663 June -- -- 732 May 647 Sept.

N/O RD. 225 SB -- 649 June -- -- 745 May 683 Sept.

Page 9: 2019 Traffic Volumes Report

County of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

RD. 400 N/O RIVER RD. NB -- -- 259 May -- -- --

N/O RIVER RD. SB -- -- 255 May -- -- --

RD. 400 N/O RD. 603 NB -- -- 270 May -- -- --

N/O RD. 603 SB -- -- 269 May -- -- --

RD. 406 W/O SR 41 EB -- -- 69 May -- -- --

W/O SR 41 WB -- -- 67 May -- -- --

RD. 415 E/O RD. 400 EB -- 1,377 June -- -- 1,680 May 1,362 Sept.

E/O RD. 400 WB -- 1,342 June -- -- 1,620 May 1,592 Sept.

RD. 415 W/O RD. 400 EB -- 758 June -- -- 930 May 818 Sept.

W/O RD. 400 WB -- 731 June -- -- 935 May 820 Sept.

RD. 415 W/O SR 41 EB -- -- 2,624 May -- -- --

W/O SR 41 WB -- -- 2,584 May -- -- --

RD. 416 W/O SR 41 EB -- 596 June -- -- 847 May 846 Sept.

W/O SR 41 WB -- 602 June -- -- 858 May 825 Sept.

RD. 417 E/O SR 41 EB -- 1,520 June -- -- 1,780 May 1,784 Sept.

E/O SR 41 WB -- 1,541 June -- -- 1,786 May 1,850 Sept.

RD. 426 S/O SR 41 NB -- 7,211 June -- -- 6,978 May 7,101 Sept.

S/O SR 41 SB -- 6,243 June -- -- 6,896 May 6,506 Sept.

RD. 426 S/O RD. 427 NB -- 3,504 May -- -- 3,324 May 3,405 Sept.

S/O RD. 427 SB -- 3,526 May -- -- 3,573 May 3,449 Sept.

RD. 427 W/O INDIAN SPRINGS RD. EB -- 1,977 May -- -- 1,926 May 1,992 Sept.

W/O INDIAN SPRINGS RD. WB -- 2,047 May -- -- 1,967 May 1,975 Sept.

RD. 432 E/O RD. 222 EB -- 570 June -- -- 590 May 643 Sept.

E/O RD. 222 WB -- 620 June -- -- 625 May 625 Sept.

RD. 434 S/O RD. 274 NB -- 761 June -- -- 766 May 714 Sept.

S/O RD. 274 SB -- 748 June -- -- 789 May 749 Sept.

RD. 600 S/O RD. 407 NB -- -- 433 May -- -- --

S/O RD. 407 SB -- -- 436 May -- -- --

RD. 600 S/O RD. 603 NB -- -- 396 May -- -- --

S/O RD. 603 SB -- -- 397 May -- -- --

RD. 600 W/O SR 49 EB -- 394 June -- -- 435 May 420 Sept.

W/O SR 49 WB -- 388 June -- -- 427 May 403 Sept.

RD. 603 W/O RD. 400 EB -- 276 June -- -- 334 May 273 Sept.

W/O RD. 400 WB -- 297 June -- -- 322 May 297 Sept.

YOSEMITE SPRINGS PK W/O SR 41 EB -- 2,130 June -- -- 2,471 May --

W/O SR 41 WB -- 2,209 June -- -- 2,467 May --

Page 10: 2019 Traffic Volumes Report

CITY OF MADERA TRAFFIC VOLUMES

Page 11: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

4th ST. E/O D ST. EB -- -- 2,910 May -- -- --

E/O D ST. WB -- -- 3,031 May -- -- --

4th ST. E/O GATEWAY DR. EB -- -- 5,837 May -- -- --

E/O GATEWAY DR. WB -- -- 5,737 May -- -- --

4th ST. W/O GATEWAY DR. EB -- -- 6,553 May -- -- --

W/O GATEWAY DR. WB -- -- 6,484 May -- -- --

4th ST. At SUNSET AVE. NB APP 2,830 May -- -- 4,024 May -- --

At SUNSET AVE. SB APP -- -- -- -- -- --

At SUNSET AVE. EB APP -- -- -- -- -- --

S/O SUNSET AVE. SB 3,069 May -- -- 3,550 May -- --

6th ST. At B ST. NB APP -- -- -- -- -- --

At B ST. SB APP -- -- -- -- -- --

At B ST. EB APP 2,250 May -- -- 2,494 April -- --

At B ST. WB APP -- -- -- -- -- --

W/O B ST. WB 2,254 May -- -- 2,394 April -- --

6th ST. At D ST. NB APP -- -- -- -- -- --

At D ST. SB APP -- -- -- -- -- --

At D ST. EB APP 2,548 May -- -- 2,843 April -- --

At D ST. WB APP -- -- -- --

W/O D ST. WB 2,637 May -- -- 2,562 April -- --

9th ST. E/O D ST. EB -- -- 2,339 May -- -- --

E/O D ST. WB -- -- 3,254 May -- -- --

9th ST. E/O GATEWAY DR. EB 2,713 May -- 2,726 May 2,663 May -- --

E/O GATEWAY DR. WB 3,318 May -- 4,050 May 3,030 May -- --

ADELL ST. W/O D ST. EB 1,166 May -- -- 1,216 May -- --

W/O D ST. WB 1,160 May -- -- 1,166 May -- --

ALMOND AVE. E/O GRANADA DR EB 1,389 May 1,741 May -- 1,478 May 1,246 May 1,580 Sept.

E/O GRANADA DR WB 1,307 May 1,756 May -- 1,378 May 1,383 May 1,487 Sept.

ALMOND AVE. E/O STADIUM RD EB -- 1,065 June -- -- 1,126 May 1,118 Sept.

E/O STADIUM RD WB -- 1,644 June -- -- 1,711 May 1,618 Sept.

ALMOND AVE. E/O SR 145 EB 3,136 May -- -- 3,663 April -- --

E/O SR 145 WB 4,124 May -- -- 4,028 April -- --

ALMOND AVE. W/O SR 145 EB -- -- 2,057 May -- -- --

W/O SR 145 WB -- -- 2,289 May -- -- --

AVE. 13 E/O SR 145 EB 4,068 May -- -- 4,291 April -- --

E/O SR 145 WB 4,232 May -- -- 4,520 April -- --

AVE. 13 W/O SR 145 EB -- -- 4,136 May -- -- --

W/O SR 145 WB -- -- 4,664 May -- -- --

AVE. 16 W/O SR 99 EB 3,538 May -- -- 4,108 May -- --

W/O SR 99 WB 3,456 May -- -- 4,370 May -- --

AVE. 16 W/O SCHNOOR EB 3,165 May -- -- -- -- --

W/O SCHNOOR WB 3,175 May -- -- -- -- --

AVE. 17 W/O SR 99 EB 3,041 May -- -- 3,383 May -- --

W/O SR 99 WB 3,052 May -- -- 3,401 May -- --

C ST. At 6th ST. NB APP -- -- -- -- -- --

At 6th ST. SB APP -- -- -- -- -- --

At 6th ST. EB APP -- -- -- -- -- --

At 6th ST. WB APP -- -- -- -- -- --

Page 12: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

C ST. At 9th ST. NB APP -- -- -- -- -- --

At 9th ST. SB APP -- -- -- -- -- --

At 9th ST. EB APP -- -- -- -- -- --

At 9th ST. WB APP -- -- -- -- -- --

W/O 9th ST. NB -- -- -- -- -- --

CENTRAL AVE. E/O D ST. EB 1,429 May -- -- 1,351 May -- --

E/O D ST. WB 1,649 May -- -- 1,555 May -- --

CENTRAL AVE. E/O GATEWAY DR. EB 1,554 May -- -- 1,619 May -- --

E/O GATEWAY DR. WB 1,733 May -- -- 1,738 May -- --

CLEVELAND AVE. E/O D ST. EB -- -- 6,173 May -- -- --

E/O D ST. WB -- -- 6,264 May -- -- --

CLEVELAND AVE. At GRANADA DR. NB APP -- -- -- -- -- --

At GRANADA DR. SB APP -- -- -- -- -- --

At GRANADA DR. EB APP -- -- -- -- -- --

At GRANADA DR. WB APP 7,093 May -- -- -- -- --

W/O GRANADA DR. EB 6,311 May -- -- -- -- --

CLEVELAND AVE. E/O GRANADA DR. EB -- -- -- 4,301 May -- --

E/O GRANADA DR. WB -- -- -- 4,725 May -- --

CLEVELAND AVE. E/O SHARON BLVD. EB -- -- 5,041 May -- -- --

E/O SHARON BLVD. WB -- -- 6,242 May -- -- --

CLEVELAND AVE. At SR 99 EB APP 11,518 May -- -- 13,753 May -- --

At SR 99 WB APP -- -- -- -- -- --

W/O SR 99 WB 11,011 May -- -- 13,585 May -- --

CLEVELAND AVE. W/O TULARE ST. EB 6,613 May -- -- 6,917 May -- --

W/O TULARE ST. WB 6,595 May -- -- 7,485 May -- --

CLEVELAND AVE. N/O YOSEMITE AVE. NB -- -- 11,695 May -- -- -- N/O YOSEMITE AVE. SB -- -- 10,682 May -- -- --

CLINTON ST. At TOZER ST. NB APP -- -- -- -- -- --

At TOZER ST. SB APP -- -- -- -- -- --

At TOZER ST. EB APP -- -- -- -- -- --

At TOZER ST. WB APP -- -- -- -- -- --

SW/O TOZER ST. NB -- 1,267 June -- -- 1,167 May 1,336 Sept.

SW/O TOZER ST. SB -- 1,272 June -- -- 1,178 May 1,516 Sept.

COUNTRY CLUB DR. N/O CLEVELAND AVE. NB -- -- 8,257 May -- -- --

N/O CLEVELAND AVE. SB -- -- 8,124 May -- -- --

COUNTRY CLUB DR. At ELLIS ST. NB APP -- -- -- -- -- --

At ELLIS ST. SB APP -- -- -- -- -- --

At ELLIS ST. EB APP -- -- -- -- -- --

At ELLIS ST. WB APP -- -- -- -- -- --

COUNTRY CLUB DR. N/O SHARON AVE. NB 7,919 May -- -- 8,852 May -- --

N/O SHARON AVE. SB 7,451 May -- -- 8,783 May -- --

D ST. N/O 4th ST. NB -- -- 3,716 May -- -- --

N/O 4th ST. SB -- -- 4,643 May -- -- --

D ST. At 6th ST. NB APP 1,633 May -- -- 1,689 April -- --

At 6th ST. SB APP -- -- -- -- -- --

At 6th ST. EB APP -- -- -- -- -- --

At 6th ST. WB APP -- -- -- -- -- --

S/O 6th ST. SB 1,861 May -- -- 1,797 April -- --

Page 13: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

D ST. At CENTRAL AVE. NB APP -- -- -- -- -- --

At CENTRAL AVE. SB APP -- -- -- -- -- --

At CENTRAL AVE. EB APP -- -- -- -- -- --

At CENTRAL AVE. WB APP -- -- -- -- -- --

N/O CENTRAL AVE. NB -- 4,608 May -- -- 4,973 May 4,912 Sept.

N/O CENTRAL AVE. SB -- 4,646 May -- -- 5,545 May 6,000 Sept.

D ST. N/O CLEVELAND AVE. NB 3,620 May -- 2,664 May -- -- --

N/O CLEVELAND AVE. SB 3,969 May -- 3,050 May -- -- --

D ST. S/O CLEVELAND AVE. NB -- -- -- 3,651 May -- --

S/O CLEVELAND AVE. SB -- -- -- 3,210 May -- --

ELLIS ST. At RD. 27 NB APP -- -- -- -- -- --

At RD. 27 SB APP -- -- -- -- -- --

At RD. 27 EB APP -- -- -- -- -- --

At RD. 27 WB APP -- -- -- -- -- --

E/O RD. 27 EB -- 2,787 May -- -- 3,196 May 3,012 Sept.

E/O RD. 27 WB -- 2,623 May -- -- 3,232 May 2,651 Sept.

ELLIS ST. E/O KENNEDY ST. EB 3,416 May -- -- 4,504 May -- --

E/O KENNEDY ST. WB 3,568 May -- -- 4,214 May -- --

GATEWAY DR. N/O 4th ST. NB -- -- 6,870 May -- -- --

N/O 4th ST. SB -- -- 5,157 May -- -- --

GATEWAY DR. S/O 4th ST. NB -- 6,377 May -- -- 6,991 May 6,712 Sept.

S/O 4th ST. SB -- 5,357 May -- -- 5,901 May 5,855 Sept.

GATEWAY DR. At CENTRAL AVE. NB APP -- -- -- -- -- --

At CENTRAL AVE. SB APP 5,506 May -- -- 5,663 May -- --

At CENTRAL AVE. EB APP -- -- -- -- -- --

At CENTRAL AVE. WB APP -- -- -- -- -- --

N/O CENTRAL AVE. NB 6,440 May -- -- 6,582 May -- --

GATEWAY DR. N/O CLEVELAND AVE. NB -- -- 2,513 May -- -- --

N/O CLEVELAND AVE. SB -- -- 2,301 May -- -- --

GATEWAY DR. S/O MADERA AVE. NB -- -- 5,036 May -- -- --

S/O MADERA AVE. SB -- -- 4,163 May -- -- --

GATEWAY DR. N/O OLIVE AVE. NB -- -- 3,618 May -- -- --

N/O OLIVE AVE. SB -- -- 2,698 May -- -- --

GRANADA DR. N/O CLEVELAND AVE. NB -- -- 2,847 May -- -- --

N/O CLEVELAND AVE. SB -- -- 2,739 May -- -- --

GRANADA DR. S/O CLEVELAND AVE. NB 4,949 May -- -- 4,895 May -- --

S/O CLEVELAND AVE. SB 5,368 May -- -- 5,274 May -- --

GRANADA DR. N/O SUNSET AVE. NB -- -- 4,339 May -- -- --

N/O SUNSET AVE. SB -- -- 4,252 May -- -- --

GRANADA DR. S/O SUNSET AVE. NB 3,635 May 3,406 May -- 3,635 May 3,796 May 3,744 Sept.

S/O SUNSET AVE. SB 3,630 May 3,379 May -- 3,891 May 3,917 May 3,778 Sept.

GRANADA DR. N/O HOWARD RD. NB -- -- 3,094 May -- -- --

N/O HOWARD RD. SB -- -- 2,978 May -- -- --

GRANADA DR. S/O HOWARD RD. NB -- 3,661 May -- -- 4,438 May 4,565 Sept.

S/O HOWARD RD. SB -- 3,723 May -- -- 5,178 May 4,787 Sept.

Page 14: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

GRANADA DR. At ALMOND AVE. NB APP -- -- -- -- -- --

At ALMOND AVE. SB APP -- -- -- -- -- --

At ALMOND AVE. EB APP -- -- -- -- -- --

At ALMOND AVE. WB APP -- -- -- -- -- --

N/O ALMOND AVE. NB -- 2,965 May -- -- 3,624 May 3,775 Sept.

N/O ALMOND AVE. SB -- 3,043 May -- -- 3,644 May 3,983 Sept.

GRANADA DR. S/O PECAN AVE. NB 1,521 May -- -- -- -- --

S/O PECAN AVE. SB 1,669 May -- -- -- -- --

HOWARD RD. At GRANADA DR. NB APP -- -- -- -- -- --

At GRANADA DR. SB APP -- -- -- -- -- --

At GRANADA DR. EB APP -- -- -- -- -- --

At GRANADA DR. WB APP -- -- -- -- -- --

HOWARD RD. W/O GRANADA DR. EB -- 3,745 May -- -- 3,846 May 4,040 Sept.

W/O GRANADA DR. WB -- 3,670 May -- -- 3,737 May 4,021 Sept.

HOWARD RD. At MAINBERRY DR. SB APP -- -- -- -- -- --

At MAINBERRY DR. EB APP -- -- -- -- -- --

At MAINBERRY DR. WB APP -- -- -- -- -- --

HOWARD RD. At WESTBERRY BLVD. NB APP -- -- -- -- -- --

At WESTBERRY BLVD. SB APP -- -- -- -- -- --

At WESTBERRY BLVD. EB APP -- -- -- -- -- --

At WESTBERRY BLVD. WB APP 3,874 May -- -- 3,584 May -- --

E/O WESTBERRY BLVD. EB 3,441 May -- -- 3,434 May -- --

HOWARD RD. At WILLIAMS AVE. SB APP -- -- -- -- -- --

At WILLIAMS AVE. EB APP -- -- -- -- -- --

At WILLIAMS AVE. WB APP -- -- -- -- -- --

I ST. At 4th ST. NB APP 3,039 May -- -- 3,565 May -- --

At 4th ST. SB APP -- -- -- -- -- --

At 4th ST. EB APP -- -- -- -- -- --

At 4th ST. WB APP -- -- -- -- -- --

S/O 4th ST. SB 2,768 May -- -- 3,153 May -- --

I ST. At YOSEMITE AVE. NB APP -- -- -- -- -- --

At YOSEMITE AVE. SB APP 2,582 May -- -- 3,331 May -- --

At YOSEMITE AVE. EB APP -- -- -- -- -- --

At YOSEMITE AVE. WB APP -- -- -- -- -- --

N/O YOSEMITE AVE. NB 2,862 May -- -- 3,078 May -- --

KENNEDY ST. At TULARE ST. NB APP -- -- -- -- -- --

At TULARE ST. EB APP 2,136 May -- -- 2,467 May -- --

At TULARE ST. WB APP -- -- -- -- -- --

W/O TULARE ST. WB 2,161 May -- -- 2,484 May -- --

LAKE ST. N/O 4th ST. NB -- -- 5,458 May -- -- --

N/O 4th ST. SB -- -- 5,666 May -- -- --

LAKE ST. S/O 4th ST. EB -- 3,343 May -- -- 4,275 May 4,342 Sept.

S/O 4th ST. WB -- 3,851 May -- -- 5,200 May 3,765 Sept.

Page 15: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

LAKE ST. At CENTRAL AVE. NB APP -- -- -- -- -- --

At CENTRAL AVE. SB APP -- -- -- -- -- --

At CENTRAL AVE. EB APP -- -- -- -- -- --

LAKE ST. N/O CLEVELAND AVE. NB -- -- 5,089 May -- -- --

N/O CLEVELAND AVE. SB -- -- 5,591 May -- -- --

LAKE ST. S/O CLEVELAND AVE. NB -- 4,405 May -- -- 5,036 May 4,905 Sept.

S/O CLEVELAND AVE. SB -- 4,354 May -- -- 4,699 May 4,579 Sept.

LAKE ST. At ELLIS ST. NB APP -- -- -- -- -- --

At ELLIS ST. SB APP -- -- -- -- -- --

At ELLIS ST. EB APP -- -- -- -- -- --

At ELLIS ST. WB APP -- -- -- -- -- --

LAKE ST. N/O ELLIS ST. NB -- 2,641 May -- -- 2,510 May 2,510 Sept.

N/O ELLIS ST. SB -- 2,644 May -- -- 2,352 May 2,889 Sept.

MERCED ST. N/O KENNEDY ST. NB -- -- -- -- -- --

N/O KENNEDY ST. SB -- -- -- -- -- --

OLIVE AVE. At 6th ST. SB APP -- -- -- -- -- --

At 6th ST. EB APP -- -- -- -- -- --

At 6th ST. WB APP -- -- -- -- -- --

OLIVE AVE. E/O GATEWAY DR. EB -- -- 6,827 May -- -- --

E/O GATEWAY DR. WB -- -- 6,889 May -- -- --

OLIVE AVE. At K ST./MONTEREY ST. NB APP -- -- -- -- -- --

At K ST./MONTEREY ST. SB APP -- -- -- -- -- --

At K ST./MONTEREY ST. EB APP -- -- -- -- -- --

At K ST./MONTEREY ST. WB APP -- -- -- -- -- --

OLIVE AVE. At RD. 28 NB APP -- -- -- -- -- --

At RD. 28 SB APP -- -- -- -- -- --

At RD. 28 EB APP -- -- -- -- -- --

At RD. 28 WB APP -- -- -- -- -- --

OLIVE AVE. At ROOSEVELT ST. NB APP -- -- -- -- -- --

At ROOSEVELT ST. SB APP -- -- -- -- -- --

At ROOSEVELT ST. EB APP -- -- -- -- -- --

At ROOSEVELT ST. WB APP -- -- -- -- -- --

W/O ROOSEVELT ST. EB -- 5,546 May -- -- 5,544 May 6,215 Sept.

W/O ROOSEVELT ST. WB -- 5,124 May -- -- 5,364 May 5,954 Sept.

OLIVE AVE. W/O SR 145 EB -- -- 6,418 May -- -- --

W/O SR 145 WB -- -- 5,867 May -- -- --

PINE ST. N/O HOWARD RD. NB -- -- 2,529 May -- -- --

N/O HOWARD RD. SB -- -- 2,390 May -- -- --

PINE ST. S/O HOWARD RD. NB -- 4,557 May -- -- 5,198 May 5,540 Sept.

S/O HOWARD RD. SB -- 3,754 May -- -- 4,470 May 4,407 Sept.

RAYMOND RD. N/O CLEVELAND AVE. NB -- -- 5,342 May -- -- --

N/O CLEVELAND AVE. SB -- -- 5,807 May -- -- --

ROOSEVELT AVE. N/O OLIVE AVE. NB -- -- 1,373 May -- -- --

N/O OLIVE AVE. SB -- -- 1,359 May -- -- --

SCHNOOR AVE. S/O AVE. 16 NB -- 4,641 June -- -- 5,506 May 5,130 Sept.

S/O AVE. 16 SB -- 3,931 June -- -- 4,477 May 4,265 Sept.

SCHNOOR AVE. N/O CLEVELAND AVE. NB -- -- 4,503 May -- -- --

N/O CLEVELAND AVE. SB -- -- 4,493 May -- -- --

Page 16: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

SCHNOOR AVE. S/O CLEVELAND AVE. NB -- 5,618 June -- 5,614 May 4,525 Sept.

S/O CLEVELAND AVE. SB -- 5,426 June -- 4,847 May 4,882 Sept.

SCHNOOR AVE. N/O HOWARD RD. NB -- -- 3,328 May -- -- --

N/O HOWARD RD. SB -- -- 3,597 May -- -- --

SCHNOOR AVE. At JEFFERSON AVE. NB APP -- -- -- -- -- --

At JEFFERSON AVE. SB APP 6,242 May -- -- 6,729 May -- --

At JEFFERSON AVE. WB APP -- -- -- -- -- --

N/O JEFFERSON AVE. NB 7,003 May -- -- 6,086 May -- --

SCHNOOR AVE. N/O SUNSET AVE. NB -- -- 5,198 May -- -- --

N/O SUNSET AVE. SB -- -- 4,526 May -- -- --

SCHNOOR AVE. S/O SUNSET AVE. NB -- 3,342 June -- -- 3,943 May 3,820 Sept.

S/O SUNSET AVE. SB -- 3,281 June -- -- 3,863 May 3,850 Sept.

SHERWOOD WAY W/O LAKE ST. EB -- -- -- 2,184 May -- --

W/O LAKE ST. WB -- -- -- 1,800 May -- --

STADIUM RD. At ALMOND AVE. NB APP -- -- -- -- -- --

At ALMOND AVE. SB APP -- -- -- -- -- --

At ALMOND AVE. WB APP -- -- -- -- -- --

N/O ALMOND AVE. NB -- 2,006 May -- -- 2,057 May 2,015 Sept.

N/O ALMOND AVE. SB -- 1,845 May -- -- 1,827 May 1,979 Sept.

STOREY RD. At SR 145 NB APP -- -- -- -- -- --

At SR 145 SB APP -- -- -- -- -- --

At SR 145 WB APP -- -- -- -- -- --

E/O SR 145 EB -- 1,365 May -- -- 2,130 May 1,416 Sept.

E/O SR 145 WB -- 1,304 May -- -- 2,247 May 1,429 Sept.

SUNRISE AVE. E/O 9th ST. EB -- -- 1,781 May -- -- --

E/O 9th ST. WB -- -- 2,197 May -- -- --

SUNRISE AVE. At RD. 28 NB APP -- -- -- -- -- --

At RD. 28 SB APP -- -- -- -- -- --

At RD. 28 EB APP -- -- -- -- -- --

At RD. 28 WB APP -- -- -- -- -- --

W/O RD. 28 EB -- 1,720 May -- -- 1,770 May 1,795 Sept.

W/O RD. 28 WB -- 1,671 May -- -- 1,764 May 1,610 Sept.

SUNSET AVE. W/O 4TH ST. EB -- 3,568 May -- -- 3,712 May 3,719 Sept.

W/O 4TH ST. WB -- 3,565 May -- -- 3,640 May 4,053 Sept.

SUNSET AVE. At GRANADA DR. NB APP -- -- -- -- -- --

At GRANADA DR. SB APP -- -- -- -- -- --

At GRANADA DR. EB APP -- -- -- -- -- --

At GRANADA DR. WB APP -- -- -- -- -- --

SUNSET AVE. At SCHNOOR AVE. NB APP -- -- -- -- -- --

At SCHNOOR AVE. SB APP -- -- -- -- -- --

At SCHNOOR AVE. EB APP -- -- -- -- -- --

At SCHNOOR AVE. WB APP -- -- -- -- -- --

SUNSET AVE. At WESTBERRY BLVD. NB APP -- -- -- -- -- --

At WESTBERRY BLVD. SB APP -- -- -- -- -- --

At WESTBERRY BLVD. EB APP -- -- -- -- -- --

At WESTBERRY BLVD. WB APP -- -- -- -- -- --

W/O WESTBERRY BLVD. EB -- 1,399 May -- -- 1,472 May 1,421 Sept.

W/O WESTBERRY BLVD. WB -- 1,341 May -- -- 1,438 May 1,380 Sept.

E/O WESTBERRY BLVD. EB -- 1,911 May -- -- 1,897 May 1,892 Sept.

E/O WESTBERRY BLVD. WB -- 1,595 May -- -- 1,653 May 1,686 Sept.

Page 17: 2019 Traffic Volumes Report

City of Madera Street Name Location Dir 2014 2015 2016 2017 2018 2019

TOZER ST. At CLINTON ST. NB APP -- -- -- -- -- --

At CLINTON ST. SB APP -- -- -- -- -- --

At CLINTON ST. EB APP -- -- -- -- -- --

At CLINTON ST. WB APP -- -- -- -- -- --

NW/O CLINTON ST. NB -- 7,175 May -- -- 6,942 May 7,282 Sept.

NW/O CLINTON ST. SB -- 7,066 May -- -- 7,011 May 7,164 Sept.

TULARE ST. S/O KENNEDY ST. NB -- 1,695 May -- -- 1,563 May 1,559 Sept.

S/O KENNEDY ST. SB -- 1,491 May -- -- 1,568 May 1,560 Sept.

YOSEMITE AVE. W/O GATEWAY DR. EB -- -- 6,043 May -- -- --

W/O GATEWAY DR. WB -- -- 6,547 May -- -- --

YOSEMITE AVE. N/O OLIVE AVE. NB -- -- 9,580 May -- -- --

N/O OLIVE AVE. SB -- -- 8,013 May -- -- --

TOZER ST. N/O ALMOND AVE. NB 2,845 May -- -- 3,176 April -- --

N/O ALMOND AVE. SB 2,840 May -- -- 3,484 April -- --

Page 18: 2019 Traffic Volumes Report

CITY OF CHOWCHILLA TRAFFIC VOLUMES

Page 19: 2019 Traffic Volumes Report

City of Chowchilla Street Name Location Dir 2014 2015 2016 2017 2018 2019

3rd. ST. N/O KINGS AVE. NB -- 1,141 May -- -- 1,391 May 1,379 Sept.

N/O KINGS AVE. SB -- 1,259 May -- -- 1,509 May 1,619 Sept.

5th ST. N/O KINGS AVE. NB -- 1,499 May -- -- 1,559 May 1,346 Sept.

N/O KINGS AVE. SB -- 1,465 May -- -- 1,470 May 1,240 Sept

5th ST. S/O SR 233 NB -- -- -- -- -- 1,706 Sept.

S/O SR 233 SB -- -- -- -- -- 1,441 Sept

11th ST. N/O KINGS AVE. NB -- 636 May -- -- 625 May 692 Sept.

N/O KINGS AVE. SB -- 615 May -- -- 728 May 694 Sept.

11th ST. S/O ROBERTSON BLVD. NB 641 May -- -- 778 April -- --

S/O ROBERTSON BLVD. SB 579 May -- -- 653 April -- --

13th ST. N/O KINGS AVE. NB 462 May -- -- 508 April -- --

N/O KINGS AVE. SB 477 May -- -- 473 April -- --

15th ST. N/O KINGS AVE. NB 1,583 May -- -- 1,587 April -- --

N/O KINGS AVE. SB 1,572 May -- -- 1,671 April -- --

15th ST. N/O SR 233 NB -- -- -- -- -- 1,660 Sept.

N/O SR 233 SB -- -- -- -- -- 1,710 Sept.

15th ST. S/O SR 233 NB -- -- -- -- -- 1,566 Sept.

S/O SR 233 SB -- -- -- -- -- 2,181 Sept.

AVE. 24 W/O UPRR EB -- -- -- -- -- --

W/O UPRR WB -- -- -- -- -- --

AVE. 24 1/2 W/O CHOWCHILLA BLVD. EB 542 May -- -- 419 April -- --

W/O CHOWCHILLA BLVD. WB 478 May -- -- 429 April -- --

AVE. 24 1/2 W/O UPRR EB 514 May -- -- 419 April -- --

W/O UPRR WB 472 May -- -- 429 April -- --

AVE. 26 E/O SR 99 EB 5,221 May -- -- 6,430 April -- --

E/O SR 99 WB 4,972 May -- -- 7,157 April -- --

AVE. 26 W/O CARLYLE WAY EB -- -- -- -- -- 6,495 Sept.

W/O CARLYLE WAY WB -- -- -- -- -- 7,140 Sept.

CHOWCHILLA BLVD. S/O ASH SLOUGH BRIDGE NB -- 1,390 May -- -- 1,392 May --

S/O ASH SLOUGH BRIDGE SB -- 2,350 May -- -- 2,320 May --

CHOWCHILLA BLVD. S/O AVE. 25 NB -- -- 528 May -- -- --

S/O AVE. 25 SB -- -- 447 May -- -- --

CHOWCHILLA BLVD. BYP. S/O ROBERTSON BLVD. NB -- 1,537 May -- -- 1,049 May --

S/O ROBERTSON BLVD. SB -- 1,079 May -- -- 1,039 May --

COLUSA AVE. W/O 2nd ST. EB 370 May -- -- 340 April -- --

W/O 2nd ST. WB 420 May -- -- 257 April -- --

COMMERCE DR. N/O AVE. 24 1/2 NB -- 113 May -- -- 138 May --

N/O AVE. 24 1/2 SB -- 108 May -- -- 138 May --

FRONT ST. S/O TRINITY AVE. NB -- 632 May -- -- 668 May --

S/O TRINITY AVE. SB -- 485 May -- -- 483 May --

HOWELL RD. W/O AUTUMN WAY EB -- -- 1,058 May -- -- --

W/O AUTUMN WAY WB -- -- 944 May -- -- --

KINGS AVE. W/O 6th ST. EB -- 590 May -- -- 765 May 767 Sept.

W/O 6th ST. WB -- 865 May -- -- 977 May 932 Sept.

MONTEREY AVE. W/O 13th ST. EB -- 214 May -- -- 230 May 225 Sept.

W/O 13th ST. WB -- 194 May\ -- -- 209 May\ 200 Sept.

RD. 15 1/2 S/O AVE. 24 1/2 NB 64 May -- -- 70 April -- --

S/O AVE. 24 1/2 SB 68 May -- -- 90 April -- --

RD. 15 1/2 S/O MARIPOSA AVE. NB 710 May -- -- 921 April -- --

S/O MARIPOSA AVE. SB 622 May -- -- 798 April -- --

RD. 16 S/O AVE. 24 1/2 NB 1,983 May -- -- 1,969 April -- 1,544 Sept.

S/O AVE. 24 1/2 SB 1,707 May -- -- 1,624 April -- 1,938 Sept.

RD. 16 S/O AVE. 25 NB -- -- 1,287 May -- -- --

S/O AVE. 25 SB -- -- 984 May -- -- --

Page 20: 2019 Traffic Volumes Report

City of Chowchilla Street Name Location Dir 2014 2015 2016 2017 2018 2019

TRINITY AVE. W/O 4th ST. EB -- 767 May -- -- 937 May --

W/O 4th ST. WB -- 866 May -- -- 1,035 May --

VENTURA AVE. W/O 6th ST. EB -- 1,773 May -- -- 1,815 May 1,789 Sept.

W/O 6th ST. WB -- 1,669 May -- -- 1,971 May 1,847 Sept.

VENTURA AVE. W/O HOWELL RD. EB 704 May -- -- 827 April -- --

W/O HOWELL RD. WB 756 May -- -- 791 April -- --

WASHINGTON RD. W/O CITY LIMITS EB -- -- -- -- -- --

W/O CITY LIMITS WB -- -- -- -- -- --

WASHINGTON RD. W/O ROBERTSON BLVD. EB -- -- 1,770 May -- -- --

W/O ROBERTSON BLVD. WB -- -- 1,942 May -- -- --

WASHINGTON RD. E/O CITY LIMITS EB -- -- 609 May -- -- --

E/O CITY LIMITS WB -- -- 582 May -- -- --

Page 21: 2019 Traffic Volumes Report

CALTRANS 2017 TRAFFIC VOLUMES

Page 22: 2019 Traffic Volumes Report

State Highways and Freeways

RTE. 49 0.000 Oakhurst, Jct. Rte. 41 -- -- -- -- -- --

1,350 14,600 13,400 1,350 14,700 13,500 4.494 County Road 600 (Road to Raymond) 710 8,500 7,600 720 8,600 7,700 640 7,900 7,000 650 8,000 7,100 5.530 County Road 628 (Road to Cedarbrook) 640 7,900 7,000 650 8,000 7,100 540 5,700 5,900 550 6,800 6,000 8.235 County Road 601 440 5,400 4,850 450 5,500 4,900 390 4,500 3,900 400 4,550 3,950 9.275 Madera-Mariposa County Line 350 3,750 3,450 350 3,800 3,500 -- -- -- -- -- --

RTE. 99 0.000 Fresno-Madera County Line -- -- -- -- -- --

6,200 82,000 75,000 6,600 85,000 81,000 0.989 Avenue 7 Interchange (Ripperdan Avenue) 6,200 82,000 75,000 6,600 85,000 81,000 5,700 73,000 69,000 5,800 76,000 73,000 3.564 Avenue 9 Interchange 5,700 73,000 69,000 5,800 76,000 73,000 6,300 81,000 75,000 6,600 83,000 80,000 7.463 Avenue 12 Interchange 6,300 81,000 75,000 6,600 83,000 80,000 6,500 80,000 78,000 6,400 82,000 79,000 9.490 Gateway Drive 6,500 80,000 78,000 6,400 82,000 79,000 5,900 76,000 73,000 6,000 78,000 75,000 10.268 Madera, Jct. Rte. 145 6,000 76,000 73,000 6,100 78,000 75,000 6,400 83,000 80,000 6,400 85,000 81,000 11.009 Madera, West Fourth Street Interchange 6,500 83,000 80,000 6,500 85,000 81,000 5,800 75,000 72,000 5,800 76,000 73,000 11.180 Madera, Second Street 5,800 75,000 72,000 5,800 76,000 73,000 6,300 82,000 78,000 6,300 83,000 79,000 12.125 Madera, Cleveland Avenue Interchange 6,300 82,000 78,000 6,300 83,000 79,000 5,500 70,000 67,000 5,400 70,000 67,000 12.752 Madera, Avenue 16 5,500 70,000 67,000 5,400 70,000 67,000 5,700 75,000 69,000 5,900 78,000 72,000 14.222 Avenue 17 Interchange 5,700 75,000 69,000 5,900 78,000 72,000 5,400 68,000 65,000 5,600 72,000 69,000 16.331 Avenue 18 1/2 Interchange 5,400 68,000 65,000 5,600 72,000 69,000 5,400 67,000 64,000 5,700 72,000 69,000 18.680 Avenue 20 Interchange 5,400 67,000 64,000 5,700 72,000 69,000 5,200 66,000 62,000 5,600 72,000 68,000 22.727 Califa, Jct. Rte. 152 West 5,200 65,000 61,000 5,800 77,000 67,000 3,900 49,500 46,500 4,200 53,000 50,000 23.770 Avenue 24 Interchange 3,900 49,500 46,500 4,200 53,000 50,000 3,900 50,000 46,500 4,200 54,000 50,000 24.430 Avenue 24 1/2 3,900 50,000 46,500 4,200 54,000 50,000 3,900 50,000 46,500 4,200 54,000 50,000

2016 2016 ADT

2016 ADT

2017 2017 ADT

2017 ADT

State Route Milepost Description Peak Hour Peak Month Annual Peak Hour Peak Month Annual

RTE. 41 0.000 Fresno-Madera County Line -- -- -- -- -- --

4,600 49,500 47,500 4,800 53,000 50,000 3.230 Avenue 12 2,700 30,500 29,000 2,700 32,000 30,000

1,800 20,900 19,600 1,800 22,600 20,200 9.250 Jct. Rte. 145 West, Madera-Friant Road 1,350 15,300 14,400 1,350 16,900 15,100

550 17,700 16,000 1,550 19,600 17,400 17.910 County Road 200 (North Fork Road) 1,500 18,300 15,800 1,450 17,900 15,800

1,300 15,100 13,300 1,250 15,100 13,300 25.000 Road 417 (Right) 1,100 12,700 11,200 1,050 12,600 11,200

1,050 12,400 11,000 1,050 12,300 11,000 35.480 Jct. Rte. 49 North 1,600 18,400 16,500 1,550 18,300 16,500

2,300 23,900 21,500 2,200 23,900 21,500 35.770 Oakhurst, County Road 426 2,300 23,900 21,500 2,200 29,000 21,500

1,250 14,900 11,100 1,200 14,900 11,100 38.889 Yosemite Forks, Bass Lake Road 1,250 14,800 11,000 1,200 15,900 11,000

830 8,900 6,400 770 8,800 6,100 45.739 Madera-Mariposa County Line 770 8,300 6,000 760 8,300 6,000

-- -- -- -- -- --

Page 23: 2019 Traffic Volumes Report

State Highways and Freeways

2016 2016 ADT 2016 ADT 2017 2017

ADT 2017 ADT

State Route Milepost Description Peak Hour Peak Month Annual Peak Hour Peak Month Annual

RTE. 99 cont. 26.576 Jct. Rte. 233 West 3,900 50,000 46,500 4,200 54,000 50,000 3,600 46,500 43,000 3,750 48,500 45,000 28.167 Minturn Road 3,600 46,500 43,000 3,750 48,500 45,000 3,600 47,000 43,500 3,750 48,500 45,000 29.359 Madera-Merced County Line (Chowchilla River) 3,650 46,500 43,500 3,750 48,000 45,000 -- -- -- -- -- --

RTE. 145 0.000 Fresno-Madera County Line -- -- -- -- -- --

620 7,300 6,800 630 7,400 6,900 7.060 Avenue 12 (Pole Line Road) 780 6,800 5,900 800 6,900 6,000 690 7,400 6,900 700 7,500 7,000 8.060 Avenue 13 1,150 12,100 11,400 1,150 12,200 11,500 1,350 14,900 14,100 1,350 15,000 14,200 8.560 Avenue 13 1/2 (Almond Avenue) 1,350 14,900 14,100 1,350 15,000 14,200 1,700 18,700 17,000 1,700 18,900 17,200 9.077 Madera, Jct. Rte. 99 1,700 18,700 17,000 1,700 18,900 17,200 1,500 17,200 15,700 1,550 17,400 15,900 9.317 Madera, F Street 1,500 17,200 15,700 1,550 17,400 15,900 1,500 17,200 15,700 1,550 17,400 15,900 9.600 Madera, Sixth Street 1,500 17,300 15,800 1,550 17,500 16,000 1,300 14,000 12,800 1,300 14,100 12,900 9.680 Madera, Yosemite Avenue 1,300 14,000 12,800 1,300 14,100 12,900 1,700 16,900 15,800 1,700 17,100 16,000 9.910 Madera, C Street 1,700 16,900 15,800 1,700 17,100 16,000 1,600 16,900 15,900 1,600 17,100 16,100 10.150 Madera, Lake Street 1,600 17,200 16,200 1,650 17,400 16,400 1,700 17,900 16,800 1,700 18,100 17,000 11.020 Madera, Tozer Street 930 11,400 10,700 940 11,500 10,800 870 10,400 9,700 870 10,500 9,800 13.660 River Road (County Road 400) 870 10,400 9,700 870 10,500 9,800 660 7,500 6,600 670 7,600 6,700 25.459 Jct. Rte. 41 550 6,300 5,500 560 6,400 5,600 -- -- -- -- -- --

RTE. 152 0.000 Merced-Madera County Line/Jct. Rte. 59 -- -- -- -- -- --

1,500 18,400 16,400 1,500 18,900 16,300 10.799 Jct. Rte. 233 Northwest 1,350 16,500 14,400 1,350 16,700 14,500 1,300 16,200 14,100 1,300 16,300 14,500 15.634 Califa, Jct. Rte. 99 1,650 18,400 16,400 1,650 18,600 16,600 -- -- -- -- -- --

RTE. 233 0.005 Jct. Rte. 152, Los Banos Road (Avenue 23) -- -- -- -- -- -- 340 3,750 3,500 350 3,800 3,550 2.390 Chowchilla, Washington Avenue (Avenue 25) 830 9,600 8,600 840 9,700 8,700 1,000 11,700 10,200 1,000 11,800 10,300 2.490 Chowchilla, 15th Street 1,000 11,700 10,200 1,000 11,800 10,300 1,050 12,400 10,600 1,050 12,500 10,700 3.090 Chowchilla, 6th Street 1,050 12,400 10,600 1,050 12,500 10,700 1,050 12,700 11,000 1,100 12,800 11,100

RTE. 233 cont. 3.290 Chowchilla, 3rd Street 1,300 15,100 12,300 1,300 15,200 13,300 1,200 14,700 12,800 1,200 14,800 12,900 3.586 Chowchilla, Chowchilla Avenue (Old U.S. 99) 1,250 13,900 12,900 1,250 14,000 13,000 1,250 14,100 13,300 1,250 14,300 13,400 3.887 Jct. Rte. 99 1,250 14,100 13,300 1,250 14,300 13,400 -- -- -- -- -- --

LEGEND

Back

Ahead

Page 24: 2019 Traffic Volumes Report

2019 TRAFFIC COUNT DATA SHEETS

Page 25: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 26 S/O Ave 21 Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_001

NB SB EB WB1,434 1,502 0 0

Total2,936DAILY TOTALS

AM Period NB SB EB WB NB SB EB WB00:00 2 0 2 11 17 28 00:15 4 2 6 23 23 4600:30 1 1 2 17 21 3800:45 1 8 2 5 3 13 18 69 18 79 36 14801:00 0 0 0 17 22 3901:15 0 0 0 21 34 5501:30 0 1 1 23 19 4201:45 0 1 2 1 2 16 77 31 106 47 18302:00 1 2 3 18 19 37 02:15 1 0 1 25 26 51 02:30 0 1 1 21 25 46 02:45 0 2 2 5 2 7 25 89 21 91 46 18003:00 0 0 0 15 19 34 03:15 1 2 3 17 48 65 03:30 1 1 2 24 70 94 03:45 8 10 3 6 11 16 26 82 38 175 64 25704:00 3 1 4 26 45 71 04:15 4 2 6 30 40 70 04:30 4 5 9 16 39 55 04:45 8 19 9 17 17 36 32 104 34 158 66 26205:00 13 8 21 26 26 52 05:15 16 12 28 23 27 50 05:30 46 8 54 36 24 60 05:45 74 149 13 41 87 190 29 114 23 100 52 21406:00 46 13 59 27 21 48 06:15 34 20 54 20 22 42 06:30 15 10 25 20 21 41 06:45 16 111 23 66 39 177 23 90 16 80 39 17007:00 13 22 35 14 11 25 07:15 21 24 45 19 12 31 07:30 15 30 45 16 13 29 07:45 11 60 30 106 41 166 11 60 11 47 22 10708:00 14 20 34 15 14 29 08:15 17 23 40 22 11 33 08:30 19 16 35 17 14 31 08:45 8 58 30 89 38 147 21 75 8 47 29 12209:00 13 15 28 17 9 26 09:15 16 16 32 12 4 16 09:30 14 15 29 9 9 18 09:45 10 53 21 67 31 120 5 43 9 31 14 7410:00 7 10 17 3 8 11 10:15 19 24 43 7 8 15 10:30 10 21 31 5 7 12 10:45 21 57 20 75 41 132 7 22 5 28 12 5011:00 15 15 30 2 8 10 11:15 13 20 33 6 0 6 11:30 20 18 38 5 2 7 11:45 20 68 13 66 33 134 1 14 5 15 6 29

TOTALS 595 545 1140 839 957 1796

SPLIT % 52.2% 47.8% 38.8% 46.7% 53.3% 61.2%

NB SB EB WB1,434 1,502 0 0

AM Peak Hour 05:30 07:00 05:30 16:45 15:15 15:30AM Pk Volume 200 106 254 117 201 299

Pk Hr Factor 0.676 0.883 0.730 0.813 0.718 0.7957 - 9 Volume 118 195 0 0 313 218 258 0 0 476

7 - 9 Peak Hour 07:15 07:00 07:00 16:45 16:00 16:007 - 9 Pk Volume 61 106 0 0 166 117 158 0 0 262

Pk Hr Factor 0.726 0.883 0.000 0.000 0.922 0.813 0.878 0.000 0.000 0.923

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

2,936

DAILY TOTALS

21:0021:15

20:30

TOTAL

23:45TOTALS

TotalDAILY TOTALS

22:1522:3022:4523:0023:1523:30

19:15

21:3021:4522:00

19:3019:4520:0020:15

18:0018:1518:3018:4519:00

17:45

15:1515:3015:4516:00

16:4517:0017:1517:30

16:1516:30

14:0014:1514:3014:4515:00

13:1513:3013:45

12:0012:1512:3012:4513:00

PM Period

Page 26: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 28½ S/O Ellis St Day: Thursday City: Madera

Date: 9/26/19 Project #: CA19_7296_002

NB SB EB WB2,539 2,538 0 0

AM Period NB SB EB WB NB SB EB WB00:00 8 3 11 40 29 69 00:15 5 8 13 30 22 5200:30 7 0 7 32 28 6000:45 5 25 1 12 6 37 31 133 31 110 62 24301:00 5 2 7 29 42 7101:15 4 4 8 29 32 6101:30 5 1 6 46 34 8001:45 3 17 2 9 5 26 37 141 30 138 67 27902:00 4 1 5 35 25 60 02:15 1 1 2 35 38 73 02:30 0 4 4 36 42 78 02:45 1 6 4 10 5 16 30 136 43 148 73 28403:00 4 3 7 48 43 91 03:15 4 3 7 40 37 77 03:30 0 5 5 69 40 109 03:45 1 9 9 20 10 29 50 207 46 166 96 37304:00 6 3 9 44 49 93 04:15 4 12 16 47 39 86 04:30 6 23 29 49 51 100 04:45 2 18 12 50 14 68 61 201 37 176 98 37705:00 3 21 24 39 29 68 05:15 11 14 25 80 43 123 05:30 10 28 38 56 38 94 05:45 24 48 25 88 49 136 57 232 47 157 104 38906:00 37 29 66 51 51 102 06:15 21 26 47 43 46 89 06:30 32 43 75 53 44 97 06:45 22 112 38 136 60 248 43 190 39 180 82 37007:00 18 56 74 35 38 73 07:15 24 66 90 60 31 91 07:30 25 90 115 41 30 71 07:45 36 103 76 288 112 391 50 186 20 119 70 30508:00 39 35 74 35 26 61 08:15 32 63 95 34 15 49 08:30 43 40 83 43 21 64 08:45 26 140 31 169 57 309 29 141 12 74 41 21509:00 28 31 59 32 12 44 09:15 22 34 56 21 15 36 09:30 30 27 57 18 15 33 09:45 29 109 40 132 69 241 25 96 19 61 44 15710:00 23 28 51 14 13 27 10:15 18 33 51 16 13 29 10:30 23 21 44 13 7 20 10:45 26 90 30 112 56 202 14 57 10 43 24 10011:00 33 27 60 11 4 15 11:15 22 29 51 8 3 11 11:30 26 40 66 8 2 10 11:45 27 108 33 129 60 237 7 34 2 11 9 45

TOTALS 785 1155 1940 1754 1383 3137

SPLIT % 40.5% 59.5% 38.2% 55.9% 44.1% 61.8%

NB SB EB WB2,539 2,538 0 0

AM Peak Hour 07:45 07:00 07:30 17:15 17:45 17:15AM Pk Volume 150 288 396 244 188 423

Pk Hr Factor 0.872 0.800 0.861 0.763 0.922 0.8607 - 9 Volume 243 457 0 0 700 433 333 0 0 766

7 - 9 Peak Hour 07:45 07:00 07:30 16:45 16:00 16:307 - 9 Pk Volume 150 288 0 0 396 236 176 0 0 389

Pk Hr Factor 0.872 0.800 0.000 0.000 0.861 0.738 0.863 0.000 0.000 0.791

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total5,077

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total5,077

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 27: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 28 N/O Cottonwood Creek Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_003

NB SB EB WB4,054 3,754 0 0

AM Period NB SB EB WB NB SB EB WB00:00 4 7 11 40 39 79 00:15 3 4 7 42 44 8600:30 3 5 8 48 37 8500:45 4 14 3 19 7 33 57 187 58 178 115 36501:00 1 4 5 54 42 9601:15 1 2 3 51 56 10701:30 5 2 7 65 67 13201:45 3 10 3 11 6 21 49 219 66 231 115 45002:00 4 2 6 61 36 97 02:15 4 2 6 51 53 104 02:30 5 6 11 60 56 116 02:45 4 17 3 13 7 30 72 244 49 194 121 43803:00 4 3 7 75 71 146 03:15 2 5 7 94 104 198 03:30 11 6 17 97 109 206 03:45 7 24 7 21 14 45 90 356 94 378 184 73404:00 5 4 9 73 87 160 04:15 17 11 28 79 72 151 04:30 13 13 26 83 85 168 04:45 20 55 20 48 40 103 82 317 81 325 163 64205:00 26 18 44 93 81 174 05:15 50 24 74 94 84 178 05:30 65 36 101 110 85 195 05:45 39 180 22 100 61 280 83 380 85 335 168 71506:00 32 22 54 76 64 140 06:15 31 16 47 74 56 130 06:30 32 31 63 78 60 138 06:45 32 127 21 90 53 217 72 300 68 248 140 54807:00 57 40 97 50 49 99 07:15 86 56 142 50 43 93 07:30 70 83 153 59 54 113 07:45 60 273 94 273 154 546 61 220 45 191 106 41108:00 72 97 169 48 39 87 08:15 59 73 132 42 41 83 08:30 64 33 97 51 42 93 08:45 45 240 38 241 83 481 39 180 47 169 86 34909:00 31 29 60 36 41 77 09:15 38 46 84 29 46 75 09:30 35 38 73 35 23 58 09:45 40 144 42 155 82 299 24 124 25 135 49 25910:00 34 24 58 28 26 54 10:15 37 38 75 14 19 33 10:30 31 35 66 18 11 29 10:45 52 154 41 138 93 292 18 78 11 67 29 14511:00 38 47 85 14 6 20 11:15 45 43 88 11 5 16 11:30 35 45 80 12 11 23 11:45 52 170 34 169 86 339 4 41 3 25 7 66

TOTALS 1408 1278 2686 2646 2476 5122

SPLIT % 52.4% 47.6% 34.4% 51.7% 48.3% 65.6%

NB SB EB WB4,054 3,754 0 0

AM Peak Hour 07:15 07:30 07:15 17:00 15:15 15:15AM Pk Volume 288 347 618 380 394 748

Pk Hr Factor 0.837 0.894 0.914 0.864 0.904 0.9087 - 9 Volume 513 514 0 0 1027 697 660 0 0 1357

7 - 9 Peak Hour 07:15 07:30 07:15 17:00 17:00 17:007 - 9 Pk Volume 288 347 0 0 618 380 335 0 0 715

Pk Hr Factor 0.837 0.894 0.000 0.000 0.914 0.864 0.985 0.000 0.000 0.917

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total7,808

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total7,808

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 28: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 36 N/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_004

NB SB EB WB3,373 3,881 0 0

AM Period NB SB EB WB NB SB EB WB00:00 5 6 11 43 40 83 00:15 5 4 9 32 91 12300:30 3 2 5 48 43 9100:45 1 14 1 13 2 27 55 178 33 207 88 38501:00 1 1 2 46 46 9201:15 4 1 5 42 57 9901:30 3 0 3 47 31 7801:45 10 18 2 4 12 22 43 178 49 183 92 36102:00 3 8 11 61 41 102 02:15 2 3 5 101 50 151 02:30 1 0 1 72 226 298 02:45 6 12 4 15 10 27 62 296 86 403 148 69903:00 2 2 4 57 45 102 03:15 7 9 16 56 51 107 03:30 1 3 4 67 56 123 03:45 2 12 7 21 9 33 63 243 43 195 106 43804:00 0 9 9 67 59 126 04:15 1 11 12 68 57 125 04:30 3 10 13 71 54 125 04:45 5 9 21 51 26 60 91 297 38 208 129 50505:00 1 18 19 95 78 173 05:15 3 20 23 108 49 157 05:30 2 20 22 105 52 157 05:45 14 20 20 78 34 98 129 437 106 285 235 72206:00 14 30 44 71 109 180 06:15 10 31 41 72 73 145 06:30 16 52 68 59 44 103 06:45 12 52 68 181 80 233 60 262 46 272 106 53407:00 26 70 96 48 43 91 07:15 40 98 138 63 33 96 07:30 114 151 265 50 47 97 07:45 150 330 269 588 419 918 46 207 44 167 90 37408:00 36 142 178 47 118 165 08:15 37 54 91 58 33 91 08:30 25 45 70 34 14 48 08:45 25 123 29 270 54 393 23 162 16 181 39 34309:00 28 46 74 44 9 53 09:15 23 41 64 37 8 45 09:30 30 40 70 19 11 30 09:45 22 103 57 184 79 287 14 114 6 34 20 14810:00 34 31 65 14 7 21 10:15 32 28 60 13 8 21 10:30 33 33 66 8 9 17 10:45 18 117 43 135 61 252 15 50 7 31 22 8111:00 28 25 53 13 2 15 11:15 30 49 79 2 0 2 11:30 22 26 48 2 6 8 11:45 36 116 54 154 90 270 6 23 13 21 19 44

TOTALS 926 1694 2620 2447 2187 4634

SPLIT % 35.3% 64.7% 36.1% 52.8% 47.2% 63.9%

NB SB EB WB3,373 3,881 0 0

AM Peak Hour 07:15 07:15 07:15 17:00 14:30 17:15AM Pk Volume 340 660 1000 437 408 729

Pk Hr Factor 0.567 0.613 0.597 0.847 0.451 0.7767 - 9 Volume 453 858 0 0 1311 734 493 0 0 1227

7 - 9 Peak Hour 07:15 07:15 07:15 17:00 17:00 17:007 - 9 Pk Volume 340 660 0 0 1000 437 285 0 0 722

Pk Hr Factor 0.567 0.613 0.000 0.000 0.597 0.847 0.672 0.000 0.000 0.768

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total7,254

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total7,254

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 29: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 36 S/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_005

NB SB EB WB1,009 1,238 0 0

AM Period NB SB EB WB NB SB EB WB00:00 6 0 6 7 12 19 00:15 0 0 0 16 10 2600:30 2 0 2 16 14 3000:45 0 8 1 1 1 9 14 53 16 52 30 10501:00 1 1 2 8 11 1901:15 1 0 1 11 23 3401:30 0 0 0 13 18 3101:45 2 4 0 1 2 5 8 40 14 66 22 10602:00 0 0 0 12 13 25 02:15 0 0 0 27 23 50 02:30 2 1 3 11 32 43 02:45 0 2 0 1 0 3 14 64 19 87 33 15103:00 0 0 0 21 17 38 03:15 1 0 1 18 18 36 03:30 1 4 5 21 22 43 03:45 1 3 4 8 5 11 25 85 17 74 42 15904:00 2 2 4 26 22 48 04:15 1 3 4 29 20 49 04:30 3 6 9 20 13 33 04:45 2 8 6 17 8 25 30 105 16 71 46 17605:00 1 7 8 25 33 58 05:15 1 10 11 49 22 71 05:30 2 15 17 33 22 55 05:45 6 10 18 50 24 60 26 133 23 100 49 23306:00 5 19 24 20 23 43 06:15 9 15 24 14 18 32 06:30 6 24 30 14 14 28 06:45 7 27 31 89 38 116 11 59 8 63 19 12207:00 16 34 50 8 11 19 07:15 25 45 70 12 12 24 07:30 37 46 83 14 10 24 07:45 45 123 46 171 91 294 5 39 8 41 13 8008:00 9 41 50 9 12 21 08:15 11 26 37 15 3 18 08:30 13 19 32 5 7 12 08:45 6 39 12 98 18 137 5 34 6 28 11 6209:00 11 17 28 7 8 15 09:15 10 13 23 8 7 15 09:30 11 15 26 3 8 11 09:45 10 42 15 60 25 102 1 19 7 30 8 4910:00 11 9 20 3 6 9 10:15 7 12 19 6 3 9 10:30 14 15 29 4 2 6 10:45 10 42 11 47 21 89 4 17 4 15 8 3211:00 15 15 30 3 1 4 11:15 9 12 21 1 0 1 11:30 8 8 16 1 4 5 11:45 12 44 24 59 36 103 4 9 4 9 8 18

TOTALS 352 602 954 657 636 1293

SPLIT % 36.9% 63.1% 42.5% 50.8% 49.2% 57.5%

NB SB EB WB1,009 1,238 0 0

AM Peak Hour 07:00 07:15 07:00 16:45 17:00 17:00AM Pk Volume 123 178 294 137 100 233

Pk Hr Factor 0.683 0.967 0.808 0.699 0.758 0.8207 - 9 Volume 162 269 0 0 431 238 171 0 0 409

7 - 9 Peak Hour 07:00 07:15 07:00 16:45 17:00 17:007 - 9 Pk Volume 123 178 0 0 294 137 100 0 0 233

Pk Hr Factor 0.683 0.967 0.000 0.000 0.808 0.699 0.758 0.000 0.000 0.820

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,247

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,247

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 30: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 36 N/O Ave 15 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_006

NB SB EB WB1,872 1,685 0 0

AM Period NB SB EB WB NB SB EB WB00:00 1 0 1 29 17 46 00:15 1 2 3 22 14 3600:30 3 0 3 20 22 4200:45 1 6 0 2 1 8 29 100 16 69 45 16901:00 1 0 1 45 24 6901:15 2 1 3 29 54 8301:30 2 0 2 24 22 4601:45 2 7 0 1 2 8 25 123 22 122 47 24502:00 1 1 2 30 25 55 02:15 0 0 0 36 41 77 02:30 2 0 2 57 28 85 02:45 1 4 0 1 1 5 51 174 16 110 67 28403:00 0 0 0 28 24 52 03:15 0 0 0 33 29 62 03:30 0 4 4 29 29 58 03:45 0 0 4 0 4 32 122 22 104 54 22604:00 0 2 2 28 20 48 04:15 2 1 3 54 21 75 04:30 1 8 9 40 34 74 04:45 1 4 5 16 6 20 36 158 39 114 75 27205:00 4 8 12 50 39 89 05:15 4 13 17 46 40 86 05:30 5 22 27 51 38 89 05:45 7 20 19 62 26 82 50 197 50 167 100 36406:00 6 12 18 50 27 77 06:15 9 15 24 33 22 55 06:30 12 34 46 29 22 51 06:45 17 44 29 90 46 134 32 144 21 92 53 23607:00 21 34 55 37 14 51 07:15 22 50 72 41 19 60 07:30 40 89 129 27 11 38 07:45 54 137 90 263 144 400 23 128 12 56 35 18408:00 40 61 101 40 13 53 08:15 23 21 44 43 6 49 08:30 15 22 37 27 11 38 08:45 15 93 14 118 29 211 18 128 10 40 28 16809:00 17 13 30 19 5 24 09:15 14 22 36 14 5 19 09:30 14 23 37 21 2 23 09:45 9 54 22 80 31 134 12 66 1 13 13 7910:00 18 12 30 5 2 7 10:15 14 18 32 2 5 7 10:30 13 12 25 8 1 9 10:45 16 61 26 68 42 129 7 22 2 10 9 3211:00 12 16 28 7 4 11 11:15 14 20 34 2 1 3 11:30 21 17 38 4 2 6 11:45 18 65 21 74 39 139 2 15 2 9 4 24

TOTALS 495 779 1274 1377 906 2283

SPLIT % 38.9% 61.1% 35.8% 60.3% 39.7% 64.2%

NB SB EB WB1,872 1,685 0 0

AM Peak Hour 07:30 07:15 07:15 17:00 17:00 17:00AM Pk Volume 157 290 446 197 167 364

Pk Hr Factor 0.727 0.806 0.774 0.966 0.835 0.9107 - 9 Volume 230 381 0 0 611 355 281 0 0 636

7 - 9 Peak Hour 07:30 07:15 07:15 17:00 17:00 17:007 - 9 Pk Volume 157 290 0 0 446 197 167 0 0 364

Pk Hr Factor 0.727 0.806 0.000 0.000 0.774 0.966 0.835 0.000 0.000 0.910

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,557

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,557

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 31: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 200 E/O SR 41 Day: Tuesday City: O’Neals

Date: 9/17/19 Project #: CA19_7296_007

NB SB EB WB0 0 3,728 4,295

AM Period NB SB EB WB NB SB EB WB00:00 2 0 2 17 26 43 00:15 1 2 3 16 27 4300:30 1 2 3 13 22 3500:45 4 8 0 4 4 12 21 67 31 106 52 17301:00 1 1 2 11 19 3001:15 0 0 0 115 24 13901:30 3 0 3 156 36 19201:45 0 4 1 2 1 6 129 411 53 132 182 54302:00 0 0 0 110 145 255 02:15 1 1 2 149 135 284 02:30 2 3 5 140 135 275 02:45 0 3 0 4 0 7 122 521 140 555 262 107603:00 4 2 6 153 129 282 03:15 1 1 2 133 132 265 03:30 1 1 2 201 157 358 03:45 0 6 0 4 0 10 129 616 179 597 308 121304:00 1 1 2 154 150 304 04:15 0 6 6 150 162 312 04:30 6 7 13 123 138 261 04:45 0 7 5 19 5 26 114 541 152 602 266 114305:00 3 7 10 104 164 268 05:15 2 7 9 107 140 247 05:30 13 8 21 128 138 266 05:45 11 29 13 35 24 64 105 444 155 597 260 104106:00 7 21 28 53 187 240 06:15 10 20 30 34 179 213 06:30 27 24 51 28 209 237 06:45 22 66 28 93 50 159 27 142 103 678 130 82007:00 27 37 64 15 31 46 07:15 35 37 72 17 24 41 07:30 32 32 64 14 14 28 07:45 58 152 50 156 108 308 19 65 9 78 28 14308:00 77 50 127 14 21 35 08:15 92 75 167 10 27 37 08:30 74 59 133 15 9 24 08:45 29 272 58 242 87 514 23 62 14 71 37 13309:00 21 31 52 7 2 9 09:15 25 37 62 14 8 22 09:30 17 25 42 10 8 18 09:45 20 83 19 112 39 195 6 37 8 26 14 6310:00 19 21 40 8 4 12 10:15 19 15 34 2 1 3 10:30 20 23 43 3 2 5 10:45 20 78 25 84 45 162 6 19 0 7 6 2611:00 21 28 49 1 5 6 11:15 17 11 28 3 0 3 11:30 27 23 50 5 3 8 11:45 18 83 21 83 39 166 3 12 0 8 3 20

TOTALS 791 838 1629 2937 3457 6394

SPLIT % 48.6% 51.4% 20.3% 45.9% 54.1% 79.7%

NB SB EB WB0 0 3,728 4,295

AM Peak Hour 07:45 08:00 07:45 15:30 17:45 15:30AM Pk Volume 301 242 535 634 730 1282

Pk Hr Factor 0.818 0.807 0.801 0.789 0.873 0.8957 - 9 Volume 0 0 424 398 822 0 0 985 1199 2184

7 - 9 Peak Hour 07:45 08:00 07:45 16:00 16:15 16:007 - 9 Pk Volume 0 0 301 242 535 0 0 541 616 1143

Pk Hr Factor 0.000 0.000 0.818 0.807 0.801 0.000 0.000 0.878 0.939 0.916

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total8,023

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total8,023

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 32: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 206 N/O San Joaquin River Day: Wednesday City: Friant

Date: 9/4/19 Project #: CA19_7296_008

NB SB EB WB2,382 2,154 0 0

AM Period NB SB EB WB NB SB EB WB00:00 7 6 13 34 28 62 00:15 9 5 14 31 30 6100:30 6 3 9 34 48 8200:45 9 31 4 18 13 49 20 119 42 148 62 26701:00 6 4 10 39 28 6701:15 6 2 8 47 37 8401:30 13 2 15 32 36 6801:45 9 34 4 12 13 46 35 153 38 139 73 29202:00 9 5 14 35 15 50 02:15 9 4 13 44 34 78 02:30 4 3 7 36 36 72 02:45 6 28 2 14 8 42 56 171 37 122 93 29303:00 6 2 8 40 36 76 03:15 7 2 9 31 27 58 03:30 7 2 9 50 44 94 03:45 4 24 4 10 8 34 50 171 36 143 86 31404:00 5 6 11 36 30 66 04:15 3 4 7 38 35 73 04:30 6 6 12 55 53 108 04:45 6 20 12 28 18 48 41 170 36 154 77 32405:00 13 12 25 55 47 102 05:15 13 16 29 54 44 98 05:30 21 22 43 45 44 89 05:45 29 76 12 62 41 138 44 198 34 169 78 36706:00 16 19 35 39 22 61 06:15 22 30 52 39 25 64 06:30 26 23 49 32 26 58 06:45 28 92 32 104 60 196 22 132 12 85 34 21707:00 42 30 72 27 25 52 07:15 52 30 82 16 19 35 07:30 25 53 78 26 21 47 07:45 25 144 33 146 58 290 20 89 24 89 44 17808:00 22 39 61 26 20 46 08:15 49 40 89 23 16 39 08:30 36 41 77 24 23 47 08:45 22 129 40 160 62 289 21 94 13 72 34 16609:00 24 36 60 23 11 34 09:15 42 22 64 16 15 31 09:30 31 37 68 14 13 27 09:45 29 126 31 126 60 252 11 64 8 47 19 11110:00 28 38 66 18 13 31 10:15 37 33 70 17 7 24 10:30 32 29 61 16 13 29 10:45 32 129 38 138 70 267 11 62 10 43 21 10511:00 32 22 54 7 6 13 11:15 19 25 44 7 8 15 11:30 22 28 50 8 3 11 11:45 24 97 31 106 55 203 7 29 2 19 9 48

TOTALS 930 924 1854 1452 1230 2682

SPLIT % 50.2% 49.8% 40.9% 54.1% 45.9% 59.1%

NB SB EB WB2,382 2,154 0 0

AM Peak Hour 06:30 07:30 06:45 16:30 16:30 16:30AM Pk Volume 148 165 292 205 180 385

Pk Hr Factor 0.712 0.778 0.890 0.932 0.849 0.8917 - 9 Volume 273 306 0 0 579 368 323 0 0 691

7 - 9 Peak Hour 07:00 07:30 07:00 16:30 16:30 16:307 - 9 Pk Volume 144 165 0 0 290 205 180 0 0 385

Pk Hr Factor 0.692 0.778 0.000 0.000 0.884 0.932 0.849 0.000 0.000 0.891

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total4,536

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total4,536

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 33: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 221 N/O Rd 200 Day: Thursday City: North Fork

Date: 9/19/19 Project #: CA19_7296_009

NB SB EB WB712 688 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 10 11 21 00:15 1 0 1 10 12 2200:30 1 0 1 16 7 2300:45 1 3 1 1 2 4 10 46 12 42 22 8801:00 0 0 0 15 12 2701:15 0 0 0 10 7 1701:30 2 1 3 9 15 2401:45 0 2 0 1 0 3 11 45 12 46 23 9102:00 0 1 1 15 17 32 02:15 0 0 0 12 8 20 02:30 0 0 0 15 15 30 02:45 0 0 1 0 1 13 55 10 50 23 10503:00 0 0 0 29 9 38 03:15 0 1 1 14 7 21 03:30 0 0 0 15 7 22 03:45 0 1 2 1 2 12 70 11 34 23 10404:00 0 0 0 19 9 28 04:15 1 3 4 13 16 29 04:30 2 0 2 11 15 26 04:45 2 5 3 6 5 11 19 62 10 50 29 11205:00 0 8 8 21 10 31 05:15 2 5 7 9 10 19 05:30 3 8 11 13 12 25 05:45 1 6 12 33 13 39 15 58 19 51 34 10906:00 4 5 9 7 9 16 06:15 2 15 17 8 10 18 06:30 5 7 12 13 7 20 06:45 8 19 9 36 17 55 9 37 4 30 13 6707:00 9 18 27 9 7 16 07:15 11 12 23 12 6 18 07:30 11 15 26 8 1 9 07:45 16 47 19 64 35 111 9 38 5 19 14 5708:00 9 9 18 10 4 14 08:15 9 13 22 5 4 9 08:30 9 11 20 11 6 17 08:45 8 35 18 51 26 86 11 37 2 16 13 5309:00 6 8 14 1 3 4 09:15 9 6 15 8 5 13 09:30 7 7 14 7 1 8 09:45 9 31 19 40 28 71 4 20 1 10 5 3010:00 11 11 22 8 4 12 10:15 2 11 13 3 4 7 10:30 10 5 15 6 0 6 10:45 8 31 12 39 20 70 1 18 1 9 2 2711:00 12 8 20 2 1 3 11:15 10 14 24 2 3 5 11:30 7 15 22 3 2 5 11:45 10 39 14 51 24 90 1 8 0 6 1 14

TOTALS 218 325 543 494 363 857

SPLIT % 40.1% 59.9% 38.8% 57.6% 42.4% 61.2%

NB SB EB WB712 688 0 0

AM Peak Hour 07:00 07:00 07:00 14:30 13:30 16:15AM Pk Volume 47 64 111 71 52 115

Pk Hr Factor 0.734 0.842 0.793 0.612 0.765 0.9277 - 9 Volume 82 115 0 0 197 120 101 0 0 221

7 - 9 Peak Hour 07:00 07:00 07:00 16:15 16:15 16:157 - 9 Pk Volume 47 64 0 0 111 64 51 0 0 115

Pk Hr Factor 0.734 0.842 0.000 0.000 0.793 0.762 0.797 0.000 0.000 0.927

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,400

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,400

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 34: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 222 N/O Fresno County Line Day: Thursday City: North Fork

Date: 9/19/19 Project #: CA19_7296_010

NB SB EB WB218 221 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 3 3 6 00:15 0 0 0 3 5 800:30 0 0 0 5 4 900:45 0 0 0 1 12 1 13 2 2501:00 0 2 2 2 6 801:15 0 0 0 6 1 701:30 0 0 0 4 2 601:45 0 0 2 0 2 5 17 6 15 11 3202:00 1 0 1 4 4 8 02:15 0 0 0 3 3 6 02:30 0 0 0 3 7 10 02:45 0 1 0 0 1 4 14 5 19 9 3303:00 0 1 1 1 3 4 03:15 0 0 0 5 4 9 03:30 1 0 1 4 4 8 03:45 1 2 0 1 1 3 6 16 3 14 9 3004:00 1 0 1 3 11 14 04:15 2 2 4 4 1 5 04:30 1 0 1 5 8 13 04:45 4 8 1 3 5 11 1 13 6 26 7 3905:00 8 1 9 9 0 9 05:15 0 1 1 3 1 4 05:30 5 4 9 2 4 6 05:45 2 15 3 9 5 24 5 19 10 15 15 3406:00 3 5 8 5 7 12 06:15 0 0 0 3 3 6 06:30 1 5 6 0 0 0 06:45 5 9 3 13 8 22 1 9 5 15 6 2407:00 7 5 12 0 1 1 07:15 6 4 10 3 3 6 07:30 3 2 5 3 5 8 07:45 2 18 1 12 3 30 3 9 1 10 4 1908:00 1 1 2 2 0 2 08:15 4 3 7 2 0 2 08:30 2 1 3 0 3 3 08:45 2 9 1 6 3 15 0 4 0 3 0 709:00 0 6 6 1 1 2 09:15 3 3 6 0 3 3 09:30 5 2 7 0 0 0 09:45 5 13 4 15 9 28 0 1 0 4 0 510:00 2 4 6 0 0 0 10:15 2 2 4 2 0 2 10:30 3 2 5 1 0 1 10:45 3 10 6 14 9 24 0 3 0 0 311:00 1 3 4 0 0 0 11:15 6 3 9 2 1 3 11:30 2 3 5 0 0 0 11:45 5 14 2 11 7 25 0 2 0 1 0 3

TOTALS 99 86 185 119 135 254

SPLIT % 53.5% 46.5% 42.1% 46.9% 53.1% 57.9%

NB SB EB WB218 221 0 0

AM Peak Hour 06:45 06:30 06:30 13:15 16:00 15:45AM Pk Volume 21 17 36 19 26 41

Pk Hr Factor 0.750 0.850 0.750 0.792 0.591 0.7327 - 9 Volume 27 18 0 0 45 32 41 0 0 73

7 - 9 Peak Hour 07:00 07:00 07:00 16:15 16:00 16:007 - 9 Pk Volume 18 12 0 0 30 19 26 0 0 39

Pk Hr Factor 0.643 0.600 0.000 0.000 0.625 0.528 0.591 0.000 0.000 0.696

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total439

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total439

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 35: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 222 E/O SR 41 Day: Tuesday City: Oakhurst

Date: 9/17/19 Project #: CA19_7296_011

NB SB EB WB0 0 2,204 2,232

AM Period NB SB EB WB NB SB EB WB00:00 3 1 4 45 27 72 00:15 0 1 1 39 38 7700:30 0 1 1 33 37 7000:45 3 6 0 3 3 9 35 152 40 142 75 29401:00 0 0 0 46 28 7401:15 0 0 0 34 34 6801:30 1 1 2 39 41 8001:45 0 1 0 1 0 2 40 159 41 144 81 30302:00 0 1 1 42 52 94 02:15 1 0 1 39 45 84 02:30 0 4 4 43 37 80 02:45 0 1 0 5 0 6 46 170 52 186 98 35603:00 0 0 0 42 29 71 03:15 2 1 3 46 37 83 03:30 0 2 2 32 51 83 03:45 2 4 1 4 3 8 51 171 37 154 88 32504:00 0 1 1 47 45 92 04:15 2 0 2 59 43 102 04:30 2 4 6 42 36 78 04:45 2 6 0 5 2 11 44 192 36 160 80 35205:00 1 6 7 46 26 72 05:15 3 6 9 71 40 111 05:30 2 22 24 52 34 86 05:45 2 8 12 46 14 54 39 208 34 134 73 34206:00 7 12 19 37 12 49 06:15 16 13 29 35 26 61 06:30 19 24 43 41 27 68 06:45 24 66 23 72 47 138 41 154 20 85 61 23907:00 16 42 58 29 26 55 07:15 26 46 72 32 21 53 07:30 26 57 83 23 22 45 07:45 32 100 54 199 86 299 22 106 20 89 42 19508:00 33 36 69 31 29 60 08:15 32 40 72 26 19 45 08:30 34 34 68 30 18 48 08:45 35 134 46 156 81 290 16 103 13 79 29 18209:00 21 37 58 18 9 27 09:15 27 52 79 15 9 24 09:30 28 44 72 5 3 8 09:45 24 100 51 184 75 284 9 47 6 27 15 7410:00 29 35 64 8 3 11 10:15 24 50 74 11 6 17 10:30 31 38 69 5 5 10 10:45 28 112 44 167 72 279 4 28 2 16 6 4411:00 33 44 77 5 2 7 11:15 41 40 81 6 3 9 11:30 44 39 83 4 2 6 11:45 37 155 40 163 77 318 6 21 4 11 10 32

TOTALS 693 1005 1698 1511 1227 2738

SPLIT % 40.8% 59.2% 38.3% 55.2% 44.8% 61.7%

NB SB EB WB0 0 2,204 2,232

AM Peak Hour 11:15 07:00 11:00 16:45 14:00 15:30AM Pk Volume 167 199 318 213 186 365

Pk Hr Factor 0.928 0.873 0.958 0.750 0.894 0.8957 - 9 Volume 0 0 234 355 589 0 0 400 294 694

7 - 9 Peak Hour 08:00 07:00 07:15 16:45 16:00 16:007 - 9 Pk Volume 0 0 134 199 310 0 0 213 160 352

Pk Hr Factor 0.000 0.000 0.957 0.873 0.901 0.000 0.000 0.750 0.889 0.863

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total4,436

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total4,436

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 36: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 222 S/O Rd 432 Day: Thursday City: Bass Lake

Date: 9/19/19 Project #: CA19_7296_012

NB SB EB WB445 454 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 13 11 24 00:15 0 1 1 6 12 1800:30 1 0 1 6 9 1500:45 0 1 0 1 0 2 10 35 9 41 19 7601:00 0 0 0 12 9 2101:15 0 1 1 10 8 1801:30 0 0 0 10 11 2101:45 0 0 1 0 1 15 47 9 37 24 8402:00 0 0 0 10 15 25 02:15 0 0 0 7 9 16 02:30 0 0 0 10 6 16 02:45 0 0 0 8 35 9 39 17 7403:00 0 0 0 11 13 24 03:15 1 0 1 7 7 14 03:30 0 0 0 10 13 23 03:45 0 1 0 0 1 11 39 15 48 26 8704:00 0 0 0 8 11 19 04:15 0 0 0 5 10 15 04:30 2 0 2 5 16 21 04:45 0 2 0 0 2 15 33 12 49 27 8205:00 0 1 1 7 4 11 05:15 1 0 1 6 8 14 05:30 2 1 3 9 7 16 05:45 1 4 1 3 2 7 4 26 5 24 9 5006:00 0 0 0 13 9 22 06:15 1 0 1 5 9 14 06:30 1 2 3 5 6 11 06:45 4 6 1 3 5 9 3 26 9 33 12 5907:00 3 1 4 5 8 13 07:15 5 3 8 7 4 11 07:30 3 5 8 3 3 6 07:45 7 18 4 13 11 31 4 19 3 18 7 3708:00 9 5 14 3 4 7 08:15 2 11 13 8 6 14 08:30 4 3 7 1 4 5 08:45 14 29 9 28 23 57 2 14 1 15 3 2909:00 7 5 12 0 2 2 09:15 7 10 17 1 0 1 09:30 8 6 14 2 1 3 09:45 16 38 7 28 23 66 3 6 3 6 6 1210:00 11 4 15 2 0 2 10:15 6 3 9 2 4 6 10:30 4 9 13 1 4 5 10:45 9 30 9 25 18 55 0 5 2 10 2 1511:00 8 8 16 0 1 1 11:15 9 7 16 0 2 2 11:30 5 6 11 0 1 1 11:45 9 31 4 25 13 56 0 3 7 3 7

TOTALS 160 127 287 285 327 612

SPLIT % 55.7% 44.3% 31.9% 46.6% 53.4% 68.1%

NB SB EB WB445 454 0 0

AM Peak Hour 09:15 11:45 11:45 13:00 15:45 13:15AM Pk Volume 42 36 70 47 52 88

Pk Hr Factor 0.656 0.750 0.729 0.783 0.813 0.8807 - 9 Volume 47 41 0 0 88 59 73 0 0 132

7 - 9 Peak Hour 08:00 08:00 08:00 16:45 16:00 16:007 - 9 Pk Volume 29 28 0 0 57 37 49 0 0 82

Pk Hr Factor 0.518 0.636 0.000 0.000 0.620 0.617 0.766 0.000 0.000 0.759

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total899

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total899

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 37: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 223 N/O Rd 221 Day: Thursday City: North Fork

Date: 9/19/19 Project #: CA19_7296_013

NB SB EB WB793 784 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 16 11 27 00:15 0 0 0 12 12 2400:30 0 1 1 13 15 2800:45 0 1 2 1 2 9 50 12 50 21 10001:00 0 0 0 14 10 2401:15 0 0 0 15 10 2501:30 2 1 3 14 13 2701:45 0 2 0 1 0 3 11 54 17 50 28 10402:00 1 0 1 9 17 26 02:15 0 0 0 17 12 29 02:30 0 0 0 25 12 37 02:45 0 1 0 0 1 17 68 16 57 33 12503:00 0 0 0 14 15 29 03:15 0 0 0 19 13 32 03:30 0 0 0 16 14 30 03:45 0 0 0 12 61 12 54 24 11504:00 0 0 0 16 7 23 04:15 1 3 4 15 22 37 04:30 2 0 2 14 23 37 04:45 2 5 4 7 6 12 22 67 14 66 36 13305:00 2 5 7 22 15 37 05:15 4 5 9 12 13 25 05:30 5 6 11 14 20 34 05:45 4 15 7 23 11 38 12 60 17 65 29 12506:00 5 3 8 12 10 22 06:15 2 10 12 12 13 25 06:30 12 5 17 10 20 30 06:45 11 30 7 25 18 55 9 43 5 48 14 9107:00 9 13 22 11 10 21 07:15 25 6 31 4 7 11 07:30 17 13 30 5 10 15 07:45 17 68 20 52 37 120 3 23 7 34 10 5708:00 12 9 21 6 5 11 08:15 10 11 21 4 7 11 08:30 13 19 32 7 5 12 08:45 17 52 11 50 28 102 4 21 2 19 6 4009:00 13 10 23 2 2 4 09:15 13 6 19 5 7 12 09:30 10 11 21 5 1 6 09:45 12 48 12 39 24 87 4 16 3 13 7 2910:00 15 14 29 5 3 8 10:15 6 14 20 1 6 7 10:30 19 10 29 0 3 3 10:45 11 51 12 50 23 101 1 7 3 15 4 2211:00 12 14 26 1 2 3 11:15 11 15 26 1 4 5 11:30 11 15 26 0 1 1 11:45 13 47 10 54 23 101 2 4 3 10 5 14

TOTALS 319 303 622 474 481 955

SPLIT % 51.3% 48.7% 39.4% 49.6% 50.4% 60.6%

NB SB EB WB793 784 0 0

AM Peak Hour 07:15 07:45 07:00 14:30 16:15 16:15AM Pk Volume 71 59 120 75 74 147

Pk Hr Factor 0.710 0.738 0.811 0.750 0.804 0.9937 - 9 Volume 120 102 0 0 222 127 131 0 0 258

7 - 9 Peak Hour 07:15 07:45 07:00 16:15 16:15 16:157 - 9 Pk Volume 71 59 0 0 120 73 74 0 0 147

Pk Hr Factor 0.710 0.738 0.000 0.000 0.811 0.830 0.804 0.000 0.000 0.993

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,577

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,577

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 38: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 225 W/O Rd 274 Day: Thursday City: North Fork

Date: 9/19/19 Project #: CA19_7296_014

NB SB EB WB0 0 1,748 1,697

AM Period NB SB EB WB NB SB EB WB00:00 0 2 2 28 22 50 00:15 1 1 2 24 23 4700:30 0 0 0 31 30 6100:45 1 2 1 4 2 6 35 118 34 109 69 22701:00 0 0 0 18 23 4101:15 2 0 2 23 34 5701:30 1 0 1 28 29 5701:45 0 3 0 0 3 29 98 24 110 53 20802:00 0 1 1 38 21 59 02:15 1 0 1 48 37 85 02:30 0 0 0 40 66 106 02:45 1 2 1 2 2 4 27 153 33 157 60 31003:00 1 0 1 22 26 48 03:15 0 1 1 45 36 81 03:30 0 0 0 34 41 75 03:45 2 3 0 1 2 4 33 134 29 132 62 26604:00 3 1 4 33 31 64 04:15 4 3 7 44 32 76 04:30 1 1 2 31 37 68 04:45 1 9 3 8 4 17 38 146 38 138 76 28405:00 6 6 12 40 42 82 05:15 10 7 17 37 24 61 05:30 5 10 15 26 34 60 05:45 9 30 2 25 11 55 28 131 22 122 50 25306:00 15 13 28 27 27 54 06:15 13 13 26 17 24 41 06:30 6 14 20 23 22 45 06:45 16 50 27 67 43 117 19 86 16 89 35 17507:00 19 23 42 18 23 41 07:15 28 20 48 17 17 34 07:30 53 45 98 19 9 28 07:45 55 155 34 122 89 277 18 72 9 58 27 13008:00 31 52 83 24 11 35 08:15 25 33 58 12 11 23 08:30 29 20 49 21 5 26 08:45 29 114 38 143 67 257 15 72 6 33 21 10509:00 26 33 59 12 8 20 09:15 28 19 47 10 13 23 09:30 18 38 56 12 5 17 09:45 20 92 15 105 35 197 7 41 3 29 10 7010:00 21 22 43 4 3 7 10:15 22 30 52 8 4 12 10:30 18 23 41 7 2 9 10:45 19 80 32 107 51 187 2 21 1 10 3 3111:00 25 29 54 4 3 7 11:15 31 26 57 4 2 6 11:30 44 31 75 5 0 5 11:45 20 120 33 119 53 239 3 16 2 7 5 23

TOTALS 660 703 1363 1088 994 2082

SPLIT % 48.4% 51.6% 39.6% 52.3% 47.7% 60.4%

NB SB EB WB0 0 1,748 1,697

AM Peak Hour 07:15 07:30 07:30 13:45 14:15 14:00AM Pk Volume 167 164 328 155 162 310

Pk Hr Factor 0.759 0.788 0.837 0.807 0.614 0.7317 - 9 Volume 0 0 269 265 534 0 0 277 260 537

7 - 9 Peak Hour 07:15 07:30 07:30 16:15 16:15 16:157 - 9 Pk Volume 0 0 167 164 328 0 0 153 149 302

Pk Hr Factor 0.000 0.000 0.759 0.788 0.837 0.000 0.000 0.869 0.887 0.921

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,445

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,445

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 39: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 274 E/O Rd 222 Day: Thursday City: Bass Lake

Date: 9/19/19 Project #: CA19_7296_015

NB SB EB WB0 0 1,053 993

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 20 22 42 00:15 0 0 0 18 12 3000:30 0 0 0 19 16 3500:45 0 1 1 1 1 19 76 18 68 37 14401:00 1 2 3 17 11 2801:15 1 0 1 26 13 3901:30 0 0 0 18 14 3201:45 0 2 1 3 1 5 21 82 15 53 36 13502:00 0 0 0 24 20 44 02:15 0 0 0 14 21 35 02:30 0 1 1 22 10 32 02:45 0 0 1 0 1 21 81 17 68 38 14903:00 0 1 1 24 24 48 03:15 0 1 1 26 21 47 03:30 3 0 3 25 23 48 03:45 0 3 0 2 0 5 27 102 20 88 47 19004:00 1 1 2 21 15 36 04:15 0 2 2 22 22 44 04:30 0 0 0 20 20 40 04:45 1 2 3 6 4 8 29 92 11 68 40 16005:00 1 4 5 18 20 38 05:15 3 3 6 21 21 42 05:30 2 12 14 39 17 56 05:45 0 6 4 23 4 29 20 98 17 75 37 17306:00 3 9 12 19 16 35 06:15 6 1 7 12 8 20 06:30 7 8 15 24 19 43 06:45 10 26 7 25 17 51 15 70 17 60 32 13007:00 4 12 16 18 5 23 07:15 9 15 24 8 5 13 07:30 18 28 46 13 7 20 07:45 14 45 20 75 34 120 6 45 7 24 13 6908:00 15 20 35 11 8 19 08:15 19 19 38 7 6 13 08:30 10 19 29 8 6 14 08:45 14 58 15 73 29 131 7 33 4 24 11 5709:00 9 9 18 4 6 10 09:15 22 20 42 10 7 17 09:30 13 28 41 1 3 4 09:45 19 63 24 81 43 144 5 20 8 24 13 4410:00 12 19 31 4 8 12 10:15 14 9 23 2 9 11 10:30 15 15 30 1 8 9 10:45 13 54 18 61 31 115 2 9 2 27 4 3611:00 13 12 25 3 1 4 11:15 18 17 35 3 4 7 11:30 18 13 31 3 1 4 11:45 25 74 11 53 36 127 3 12 4 10 7 22

TOTALS 333 404 737 720 589 1309

SPLIT % 45.2% 54.8% 36.0% 55.0% 45.0% 64.0%

NB SB EB WB0 0 1,053 993

AM Peak Hour 11:45 09:15 09:15 16:45 15:00 15:00AM Pk Volume 82 91 157 107 88 190

Pk Hr Factor 0.820 0.813 0.913 0.686 0.917 0.9907 - 9 Volume 0 0 103 148 251 0 0 190 143 333

7 - 9 Peak Hour 07:30 07:30 07:30 16:45 17:00 16:457 - 9 Pk Volume 0 0 66 87 153 0 0 107 75 176

Pk Hr Factor 0.000 0.000 0.868 0.777 0.832 0.000 0.000 0.686 0.893 0.786

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total2,046

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total2,046

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 40: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 274 N/O Rd 225 Day: Tuesday City: North Fork

Date: 9/24/19 Project #: CA19_7296_016

NB SB EB WB647 683 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 10 7 17 00:15 1 1 2 13 13 2600:30 1 4 5 10 8 1800:45 1 3 1 6 2 9 7 40 22 50 29 9001:00 1 1 2 10 9 1901:15 0 0 0 10 8 1801:30 1 0 1 7 12 1901:45 0 2 2 3 2 5 14 41 12 41 26 8202:00 1 0 1 9 10 19 02:15 2 0 2 11 12 23 02:30 0 0 0 8 12 20 02:45 1 4 1 1 2 5 7 35 8 42 15 7703:00 1 0 1 13 14 27 03:15 1 0 1 15 12 27 03:30 1 0 1 16 16 32 03:45 0 3 1 1 1 4 9 53 14 56 23 10904:00 0 2 2 11 20 31 04:15 0 1 1 17 15 32 04:30 2 1 3 15 24 39 04:45 7 9 0 4 7 13 10 53 14 73 24 12605:00 3 2 5 17 18 35 05:15 12 2 14 6 13 19 05:30 6 1 7 6 16 22 05:45 8 29 4 9 12 38 4 33 15 62 19 9506:00 8 1 9 16 7 23 06:15 8 4 12 6 12 18 06:30 10 4 14 9 10 19 06:45 8 34 10 19 18 53 8 39 15 44 23 8307:00 13 8 21 8 6 14 07:15 17 8 25 4 6 10 07:30 13 16 29 1 10 11 07:45 10 53 10 42 20 95 2 15 9 31 11 4608:00 13 8 21 4 8 12 08:15 10 7 17 3 4 7 08:30 11 7 18 2 2 4 08:45 10 44 13 35 23 79 2 11 4 18 6 2909:00 13 9 22 1 5 6 09:15 7 11 18 1 2 3 09:30 12 4 16 3 3 6 09:45 11 43 13 37 24 80 2 7 3 13 5 2010:00 12 10 22 1 2 3 10:15 11 9 20 2 1 3 10:30 7 8 15 0 3 3 10:45 12 42 11 38 23 80 4 7 2 8 6 1511:00 11 10 21 1 1 2 11:15 10 11 21 1 1 2 11:30 13 13 26 0 2 2 11:45 11 45 9 43 20 88 0 2 3 7 3 9

TOTALS 311 238 549 336 445 781

SPLIT % 56.6% 43.4% 41.3% 43.0% 57.0% 58.7%

NB SB EB WB647 683 0 0

AM Peak Hour 07:00 10:45 07:00 16:15 15:45 16:15AM Pk Volume 53 45 95 59 73 130

Pk Hr Factor 0.779 0.865 0.819 0.868 0.760 0.8337 - 9 Volume 97 77 0 0 174 86 135 0 0 221

7 - 9 Peak Hour 07:00 07:00 07:00 16:15 16:00 16:157 - 9 Pk Volume 53 42 0 0 95 59 73 0 0 130

Pk Hr Factor 0.779 0.656 0.000 0.000 0.819 0.868 0.760 0.000 0.000 0.833

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,330

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,330

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 41: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 415 E/O Rd 400 Day: Tuesday City: Coarsegold

Date: 9/17/19 Project #: CA19_7296_017

NB SB EB WB0 0 1,362 1,592

AM Period NB SB EB WB NB SB EB WB00:00 0 1 1 22 24 46 00:15 0 1 1 23 28 5100:30 0 1 1 24 28 5200:45 0 4 7 4 7 22 91 24 104 46 19501:00 0 2 2 20 29 4901:15 2 0 2 22 22 4401:30 2 0 2 17 28 4501:45 0 4 1 3 1 7 30 89 25 104 55 19302:00 0 3 3 32 25 57 02:15 0 1 1 33 39 72 02:30 0 3 3 40 40 80 02:45 2 2 3 10 5 12 23 128 34 138 57 26603:00 1 0 1 31 21 52 03:15 0 0 0 24 39 63 03:30 2 1 3 39 45 84 03:45 0 3 0 1 0 4 39 133 38 143 77 27604:00 0 0 0 35 45 80 04:15 1 0 1 36 31 67 04:30 3 1 4 41 31 72 04:45 0 4 3 4 3 8 25 137 35 142 60 27905:00 2 4 6 32 38 70 05:15 0 0 0 35 39 74 05:30 4 3 7 48 32 80 05:45 1 7 2 9 3 16 53 168 24 133 77 30106:00 8 6 14 24 32 56 06:15 4 13 17 24 42 66 06:30 9 13 22 18 32 50 06:45 8 29 15 47 23 76 13 79 20 126 33 20507:00 10 12 22 19 23 42 07:15 29 10 39 8 24 32 07:30 24 27 51 8 29 37 07:45 25 88 40 89 65 177 9 44 24 100 33 14408:00 14 16 30 10 19 29 08:15 17 15 32 7 20 27 08:30 22 14 36 3 13 16 08:45 11 64 10 55 21 119 2 22 13 65 15 8709:00 22 14 36 6 16 22 09:15 12 22 34 4 7 11 09:30 15 15 30 2 6 8 09:45 15 64 19 70 34 134 6 18 3 32 9 5010:00 19 20 39 1 6 7 10:15 19 20 39 6 6 12 10:30 22 12 34 3 5 8 10:45 19 79 27 79 46 158 3 13 5 22 8 3511:00 20 22 42 0 3 3 11:15 24 17 41 0 4 4 11:30 23 26 49 1 5 6 11:45 28 95 25 90 53 185 0 1 7 19 7 20

TOTALS 439 464 903 923 1128 2051

SPLIT % 48.6% 51.4% 30.6% 45.0% 55.0% 69.4%

NB SB EB WB0 0 1,362 1,592

AM Peak Hour 11:15 11:45 11:45 17:00 15:15 15:30AM Pk Volume 97 105 202 168 167 308

Pk Hr Factor 0.866 0.938 0.953 0.792 0.928 0.9177 - 9 Volume 0 0 152 144 296 0 0 305 275 580

7 - 9 Peak Hour 07:15 07:30 07:15 17:00 16:45 17:007 - 9 Pk Volume 0 0 92 98 185 0 0 168 144 301

Pk Hr Factor 0.000 0.000 0.793 0.613 0.712 0.000 0.000 0.792 0.923 0.941

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total2,954

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total2,954

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 42: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 415 W/O Rd 400 Day: Tuesday City: Coarsegold

Date: 9/24/19 Project #: CA19_7296_018

NB SB EB WB0 0 818 820

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 10 17 27 00:15 0 0 0 25 10 3500:30 0 0 0 13 16 2900:45 2 2 0 2 2 13 61 24 67 37 12801:00 2 1 3 13 10 2301:15 0 0 0 11 11 2201:30 0 0 0 14 12 2601:45 1 3 2 3 3 6 20 58 14 47 34 10502:00 0 0 0 11 15 26 02:15 0 0 0 10 11 21 02:30 0 1 1 11 17 28 02:45 0 0 1 0 1 11 43 14 57 25 10003:00 0 0 0 14 16 30 03:15 0 0 0 14 15 29 03:30 0 0 0 17 27 44 03:45 1 1 0 1 1 26 71 18 76 44 14704:00 0 0 0 8 30 38 04:15 2 2 4 17 24 41 04:30 1 1 2 16 18 34 04:45 3 6 1 4 4 10 18 59 15 87 33 14605:00 5 2 7 13 25 38 05:15 8 2 10 9 19 28 05:30 6 2 8 12 14 26 05:45 4 23 1 7 5 30 16 50 24 82 40 13206:00 11 5 16 12 18 30 06:15 7 6 13 12 17 29 06:30 10 5 15 9 16 25 06:45 16 44 6 22 22 66 7 40 13 64 20 10407:00 20 13 33 2 18 20 07:15 24 4 28 6 14 20 07:30 20 8 28 8 11 19 07:45 30 94 6 31 36 125 6 22 9 52 15 7408:00 22 14 36 3 10 13 08:15 17 4 21 4 20 24 08:30 21 6 27 2 6 8 08:45 9 69 8 32 17 101 3 12 8 44 11 5609:00 11 6 17 2 7 9 09:15 16 8 24 6 6 12 09:30 13 8 21 1 2 3 09:45 14 54 7 29 21 83 2 11 6 21 8 3210:00 7 9 16 1 1 2 10:15 11 9 20 4 3 7 10:30 11 11 22 2 2 4 10:45 11 40 4 33 15 73 1 8 5 11 6 1911:00 10 10 20 2 0 2 11:15 14 9 23 0 4 4 11:30 10 20 30 0 1 1 11:45 11 45 6 45 17 90 0 2 0 5 0 7

TOTALS 381 207 588 437 613 1050

SPLIT % 64.8% 35.2% 35.9% 41.6% 58.4% 64.1%

NB SB EB WB0 0 818 820

AM Peak Hour 07:15 11:30 07:15 15:00 15:30 15:30AM Pk Volume 96 53 128 71 99 167

Pk Hr Factor 0.800 0.663 0.889 0.683 0.825 0.9497 - 9 Volume 0 0 163 63 226 0 0 109 169 278

7 - 9 Peak Hour 07:15 07:15 07:15 16:15 16:00 16:007 - 9 Pk Volume 0 0 96 32 128 0 0 64 87 146

Pk Hr Factor 0.000 0.000 0.800 0.571 0.889 0.000 0.000 0.889 0.725 0.890

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,638

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,638

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 43: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 416 W/O SR 41 Day: Tuesday City: Coarsegold

Date: 9/17/19 Project #: CA19_7296_019

NB SB EB WB0 0 846 825

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 15 14 29 00:15 0 1 1 15 15 3000:30 1 1 2 16 11 2700:45 0 1 1 3 1 4 14 60 8 48 22 10801:00 1 0 1 13 16 2901:15 0 1 1 17 11 2801:30 0 0 0 13 11 2401:45 0 1 1 2 1 3 8 51 9 47 17 9802:00 0 1 1 14 20 34 02:15 4 1 5 9 12 21 02:30 1 2 3 11 9 20 02:45 0 5 0 4 0 9 9 43 15 56 24 9903:00 0 0 0 10 18 28 03:15 3 0 3 8 19 27 03:30 0 1 1 18 20 38 03:45 0 3 0 1 0 4 17 53 15 72 32 12504:00 1 1 2 14 36 50 04:15 1 0 1 14 19 33 04:30 1 1 2 16 21 37 04:45 3 6 0 2 3 8 12 56 17 93 29 14905:00 8 1 9 18 19 37 05:15 9 2 11 16 26 42 05:30 7 0 7 11 20 31 05:45 9 33 3 6 12 39 15 60 10 75 25 13506:00 13 2 15 7 21 28 06:15 16 6 22 12 24 36 06:30 21 5 26 5 20 25 06:45 16 66 5 18 21 84 11 35 15 80 26 11507:00 15 9 24 4 13 17 07:15 31 3 34 4 14 18 07:30 16 18 34 4 18 22 07:45 21 83 11 41 32 124 4 16 11 56 15 7208:00 20 5 25 5 17 22 08:15 24 5 29 5 11 16 08:30 22 4 26 2 4 6 08:45 20 86 11 25 31 111 2 14 10 42 12 5609:00 14 8 22 3 6 9 09:15 19 7 26 1 5 6 09:30 12 8 20 2 6 8 09:45 12 57 7 30 19 87 4 10 7 24 11 3410:00 10 9 19 4 2 6 10:15 9 10 19 1 5 6 10:30 15 7 22 5 4 9 10:45 17 51 12 38 29 89 3 13 1 12 4 2511:00 7 5 12 1 5 6 11:15 10 12 22 2 5 7 11:30 10 10 20 1 0 1 11:45 11 38 11 38 22 76 1 5 2 12 3 17

TOTALS 430 208 638 416 617 1033

SPLIT % 67.4% 32.6% 38.2% 40.3% 59.7% 61.8%

NB SB EB WB0 0 846 825

AM Peak Hour 07:15 11:45 07:15 15:30 16:00 15:30AM Pk Volume 88 51 125 63 93 153

Pk Hr Factor 0.710 0.850 0.919 0.875 0.646 0.7657 - 9 Volume 0 0 169 66 235 0 0 116 168 284

7 - 9 Peak Hour 07:15 07:00 07:15 16:30 16:00 16:007 - 9 Pk Volume 0 0 88 41 125 0 0 62 93 149

Pk Hr Factor 0.000 0.000 0.710 0.569 0.919 0.000 0.000 0.861 0.646 0.745

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total1,671

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total1,671

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 44: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 417 E/O SR 41 Day: Tuesday City: Coarsegold

Date: 9/17/19 Project #: CA19_7296_020

NB SB EB WB0 0 1,784 1,850

AM Period NB SB EB WB NB SB EB WB00:00 5 3 8 21 25 46 00:15 2 0 2 27 26 5300:30 2 1 3 33 26 5900:45 1 10 2 6 3 16 36 117 29 106 65 22301:00 2 1 3 26 39 6501:15 0 0 0 30 44 7401:30 2 0 2 16 31 4701:45 3 7 0 1 3 8 14 86 25 139 39 22502:00 3 2 5 24 25 49 02:15 0 0 0 23 35 58 02:30 0 0 0 39 21 60 02:45 2 5 2 4 4 9 42 128 25 106 67 23403:00 2 1 3 48 33 81 03:15 1 1 2 31 22 53 03:30 0 2 2 33 25 58 03:45 2 5 0 4 2 9 48 160 29 109 77 26904:00 2 5 7 43 37 80 04:15 0 3 3 49 24 73 04:30 0 2 2 27 24 51 04:45 2 4 9 19 11 23 38 157 16 101 54 25805:00 2 13 15 41 25 66 05:15 1 11 12 55 27 82 05:30 3 23 26 46 25 71 05:45 3 9 25 72 28 81 39 181 27 104 66 28506:00 2 29 31 46 19 65 06:15 4 35 39 40 16 56 06:30 6 26 32 46 11 57 06:45 13 25 48 138 61 163 59 191 15 61 74 25207:00 11 61 72 22 26 48 07:15 9 54 63 25 20 45 07:30 14 71 85 32 12 44 07:45 25 59 53 239 78 298 26 105 14 72 40 17708:00 35 43 78 28 8 36 08:15 22 42 64 24 9 33 08:30 15 27 42 25 9 34 08:45 11 83 28 140 39 223 14 91 8 34 22 12509:00 21 30 51 14 6 20 09:15 22 35 57 20 7 27 09:30 14 23 37 13 11 24 09:45 24 81 34 122 58 203 11 58 10 34 21 9210:00 11 31 42 12 7 19 10:15 21 29 50 10 2 12 10:30 24 24 48 8 0 8 10:45 19 75 20 104 39 179 5 35 5 14 10 4911:00 26 35 61 5 4 9 11:15 16 19 35 10 3 13 11:30 19 34 53 4 1 5 11:45 28 89 23 111 51 200 4 23 2 10 6 33

TOTALS 452 960 1412 1332 890 2222

SPLIT % 32.0% 68.0% 38.9% 59.9% 40.1% 61.1%

NB SB EB WB0 0 1,784 1,850

AM Peak Hour 11:45 07:00 07:30 18:00 12:45 15:30AM Pk Volume 109 239 305 191 143 288

Pk Hr Factor 0.826 0.842 0.897 0.809 0.813 0.9007 - 9 Volume 0 0 142 379 521 0 0 338 205 543

7 - 9 Peak Hour 07:45 07:00 07:30 17:00 17:00 17:007 - 9 Pk Volume 0 0 97 239 305 0 0 181 104 285

Pk Hr Factor 0.000 0.000 0.693 0.842 0.897 0.000 0.000 0.823 0.963 0.869

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,634

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,634

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 45: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 426 S/O SR 41 Day: Tuesday City: Oakhurst

Date: 9/17/19 Project #: CA19_7296_021

NB SB EB WB7,101 6,506 0 0

AM Period NB SB EB WB NB SB EB WB00:00 4 9 13 179 95 274 00:15 2 6 8 127 124 25100:30 4 9 13 137 106 24300:45 4 14 3 27 7 41 116 559 151 476 267 103501:00 2 4 6 130 114 24401:15 4 1 5 140 103 24301:30 2 2 4 121 123 24401:45 3 11 1 8 4 19 109 500 112 452 221 95202:00 3 2 5 119 120 239 02:15 2 3 5 157 113 270 02:30 1 1 2 171 140 311 02:45 6 12 3 9 9 21 165 612 174 547 339 115903:00 0 0 0 222 125 347 03:15 0 2 2 140 131 271 03:30 5 3 8 141 114 255 03:45 7 12 1 6 8 18 117 620 121 491 238 111104:00 3 2 5 136 143 279 04:15 10 3 13 127 119 246 04:30 13 6 19 137 136 273 04:45 18 44 4 15 22 59 127 527 148 546 275 107305:00 15 2 17 203 156 359 05:15 19 9 28 121 129 250 05:30 24 10 34 105 140 245 05:45 36 94 16 37 52 131 97 526 106 531 203 105706:00 38 24 62 100 117 217 06:15 53 26 79 94 99 193 06:30 44 34 78 70 123 193 06:45 76 211 42 126 118 337 69 333 93 432 162 76507:00 73 59 132 54 83 137 07:15 99 157 256 43 61 104 07:30 147 254 401 64 64 128 07:45 242 561 207 677 449 1238 59 220 58 266 117 48608:00 151 104 255 41 63 104 08:15 87 80 167 63 56 119 08:30 92 63 155 56 48 104 08:45 126 456 87 334 213 790 68 228 54 221 122 44909:00 112 93 205 29 34 63 09:15 104 87 191 30 30 60 09:30 96 66 162 20 16 36 09:45 120 432 108 354 228 786 12 91 26 106 38 19710:00 123 91 214 17 22 39 10:15 118 79 197 5 21 26 10:30 141 86 227 4 15 19 10:45 107 489 103 359 210 848 2 28 7 65 9 9311:00 125 87 212 4 11 15 11:15 108 105 213 2 8 10 11:30 134 95 229 6 6 12 11:45 139 506 104 391 243 897 3 15 5 30 8 45

TOTALS 2842 2343 5185 4259 4163 8422

SPLIT % 54.8% 45.2% 38.1% 50.6% 49.4% 61.9%

NB SB EB WB7,101 6,506 0 0

AM Peak Hour 07:15 07:15 07:15 14:15 16:45 14:30AM Pk Volume 639 722 1361 715 573 1268

Pk Hr Factor 0.660 0.711 0.758 0.805 0.918 0.9147 - 9 Volume 1017 1011 0 0 2028 1053 1077 0 0 2130

7 - 9 Peak Hour 07:15 07:15 07:15 16:15 16:45 16:307 - 9 Pk Volume 639 722 0 0 1361 594 573 0 0 1157

Pk Hr Factor 0.660 0.711 0.000 0.000 0.758 0.732 0.918 0.000 0.000 0.806

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total13,607

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total13,607

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 46: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 426 S/O Rd 427 Day: Thursday City: Oakhurst

Date: 9/19/19 Project #: CA19_7296_022n

NB SB EB WB3,405 3,449 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 6 9 72 59 131 00:15 2 2 4 53 57 11000:30 2 6 8 47 68 11500:45 2 9 2 16 4 25 57 229 66 250 123 47901:00 2 3 5 58 71 12901:15 1 0 1 62 55 11701:30 1 0 1 60 78 13801:45 3 7 1 4 4 11 56 236 62 266 118 50202:00 3 2 5 44 49 93 02:15 3 0 3 67 63 130 02:30 2 1 3 62 73 135 02:45 6 14 2 5 8 19 62 235 89 274 151 50903:00 0 0 0 64 82 146 03:15 0 1 1 65 60 125 03:30 5 1 6 67 68 135 03:45 4 9 1 3 5 12 52 248 78 288 130 53604:00 3 0 3 53 85 138 04:15 6 2 8 48 65 113 04:30 8 4 12 61 70 131 04:45 8 25 2 8 10 33 58 220 69 289 127 50905:00 13 0 13 63 117 180 05:15 20 4 24 47 92 139 05:30 15 3 18 50 70 120 05:45 28 76 2 9 30 85 47 207 63 342 110 54906:00 29 10 39 41 69 110 06:15 37 7 44 43 69 112 06:30 44 14 58 39 72 111 06:45 52 162 20 51 72 213 28 151 50 260 78 41107:00 59 15 74 30 61 91 07:15 73 32 105 24 36 60 07:30 92 102 194 25 40 65 07:45 139 363 57 206 196 569 19 98 43 180 62 27808:00 79 56 135 20 39 59 08:15 51 39 90 22 42 64 08:30 74 23 97 14 34 48 08:45 70 274 40 158 110 432 18 74 38 153 56 22709:00 62 30 92 12 29 41 09:15 55 38 93 11 15 26 09:30 56 26 82 9 12 21 09:45 66 239 40 134 106 373 2 34 19 75 21 10910:00 57 48 105 11 15 26 10:15 55 34 89 5 12 17 10:30 70 47 117 3 13 16 10:45 47 229 55 184 102 413 3 22 7 47 10 6911:00 59 47 106 3 9 12 11:15 55 66 121 1 3 4 11:30 70 54 124 4 6 10 11:45 50 234 60 227 110 461 2 10 2 20 4 30

TOTALS 1641 1005 2646 1764 2444 4208

SPLIT % 62.0% 38.0% 38.6% 41.9% 58.1% 61.4%

NB SB EB WB3,405 3,449 0 0

AM Peak Hour 07:15 07:30 07:15 14:45 16:30 16:30AM Pk Volume 383 254 630 258 348 577

Pk Hr Factor 0.689 0.623 0.804 0.963 0.744 0.8017 - 9 Volume 637 364 0 0 1001 427 631 0 0 1058

7 - 9 Peak Hour 07:15 07:30 07:15 16:15 16:30 16:307 - 9 Pk Volume 383 254 0 0 630 230 348 0 0 577

Pk Hr Factor 0.689 0.623 0.000 0.000 0.804 0.913 0.744 0.000 0.000 0.801

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total6,854

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total6,854

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 47: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 427 W/O Indian Springs Rd Day: Tuesday City: Oakhurst

Date: 9/17/19 Project #: CA19_7296_023e

NB SB EB WB0 0 1,992 1,975

AM Period NB SB EB WB NB SB EB WB00:00 1 0 1 19 24 43 00:15 1 0 1 30 31 6100:30 0 2 2 28 41 6900:45 0 2 1 3 1 5 43 120 20 116 63 23601:00 0 0 0 25 20 4501:15 2 0 2 15 25 4001:30 0 1 1 19 21 4001:45 0 2 0 1 0 3 27 86 25 91 52 17702:00 0 1 1 24 31 55 02:15 0 0 0 52 21 73 02:30 0 0 0 43 54 97 02:45 1 1 0 1 1 2 51 170 98 204 149 37403:00 0 0 0 50 87 137 03:15 0 0 0 50 38 88 03:30 0 0 0 38 37 75 03:45 0 1 1 1 1 34 172 36 198 70 37004:00 1 0 1 42 33 75 04:15 0 0 0 29 38 67 04:30 1 0 1 40 19 59 04:45 0 2 3 3 3 5 45 156 30 120 75 27605:00 3 3 6 30 46 76 05:15 2 1 3 36 28 64 05:30 9 6 15 51 34 85 05:45 12 26 8 18 20 44 36 153 29 137 65 29006:00 5 6 11 32 38 70 06:15 9 8 17 28 18 46 06:30 11 13 24 46 11 57 06:45 21 46 23 50 44 96 37 143 23 90 60 23307:00 20 18 38 27 21 48 07:15 85 34 119 23 22 45 07:30 204 127 331 14 46 60 07:45 132 441 109 288 241 729 19 83 29 118 48 20108:00 35 37 72 13 16 29 08:15 21 20 41 12 19 31 08:30 24 23 47 12 36 48 08:45 13 93 22 102 35 195 11 48 54 125 65 17309:00 24 27 51 2 16 18 09:15 15 22 37 2 16 18 09:30 17 16 33 6 2 8 09:45 19 75 22 87 41 162 2 12 1 35 3 4710:00 13 18 31 3 11 14 10:15 13 24 37 6 1 7 10:30 20 24 44 2 0 2 10:45 18 64 19 85 37 149 2 13 1 13 3 2611:00 10 17 27 0 1 1 11:15 24 19 43 2 1 3 11:30 25 19 44 0 1 1 11:45 22 81 31 86 53 167 1 3 0 3 1 6

TOTALS 833 725 1558 1159 1250 2409

SPLIT % 53.5% 46.5% 39.3% 48.1% 51.9% 60.7%

NB SB EB WB0 0 1,992 1,975

AM Peak Hour 07:15 07:15 07:15 14:15 14:30 14:30AM Pk Volume 456 307 763 196 277 471

Pk Hr Factor 0.559 0.604 0.576 0.942 0.707 0.7907 - 9 Volume 0 0 534 390 924 0 0 309 257 566

7 - 9 Peak Hour 07:15 07:15 07:15 16:45 16:45 16:457 - 9 Pk Volume 0 0 456 307 763 0 0 162 138 300

Pk Hr Factor 0.000 0.000 0.559 0.604 0.576 0.000 0.000 0.794 0.750 0.882

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,967

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,967

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 48: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 432 E/O Rd 222 Day: Thursday City: Bass Lake

Date: 9/19/19 Project #: CA19_7296_024

NB SB EB WB0 0 643 625

AM Period NB SB EB WB NB SB EB WB00:00 1 0 1 16 18 34 00:15 0 0 0 7 15 2200:30 1 0 1 9 12 2100:45 0 2 0 0 2 10 42 9 54 19 9601:00 1 0 1 18 12 3001:15 0 0 0 11 12 2301:30 0 1 1 8 14 2201:45 0 1 0 1 0 2 13 50 12 50 25 10002:00 0 0 0 20 14 34 02:15 0 0 0 13 12 25 02:30 0 0 0 10 14 24 02:45 0 0 0 11 54 13 53 24 10703:00 0 0 0 15 11 26 03:15 0 0 0 8 16 24 03:30 0 0 0 25 13 38 03:45 0 0 0 18 66 14 54 32 12004:00 0 0 0 15 24 39 04:15 0 0 0 8 9 17 04:30 0 0 0 13 19 32 04:45 0 0 0 17 53 7 59 24 11205:00 0 1 1 9 12 21 05:15 0 3 3 13 12 25 05:30 1 1 2 7 16 23 05:45 1 2 6 11 7 13 14 43 3 43 17 8606:00 0 3 3 14 10 24 06:15 0 2 2 7 6 13 06:30 3 2 5 14 8 22 06:45 4 7 9 16 13 23 4 39 8 32 12 7107:00 6 5 11 8 3 11 07:15 11 8 19 9 2 11 07:30 12 7 19 4 4 8 07:45 19 48 8 28 27 76 3 24 5 14 8 3808:00 17 14 31 4 2 6 08:15 9 18 27 3 4 7 08:30 8 7 15 1 2 3 08:45 14 48 10 49 24 97 5 13 2 10 7 2309:00 8 10 18 5 1 6 09:15 8 15 23 6 3 9 09:30 7 10 17 3 2 5 09:45 6 29 11 46 17 75 5 19 0 6 5 2510:00 9 7 16 6 0 6 10:15 17 17 34 1 4 5 10:30 11 10 21 1 3 4 10:45 14 51 12 46 26 97 1 9 0 7 1 1611:00 18 13 31 1 1 2 11:15 6 10 16 3 1 4 11:30 5 8 13 0 2 2 11:45 10 39 11 42 21 81 0 4 0 4 0 8

TOTALS 227 239 466 416 386 802

SPLIT % 48.7% 51.3% 36.8% 51.9% 48.1% 63.2%

NB SB EB WB0 0 643 625

AM Peak Hour 10:15 11:45 10:15 15:00 15:15 15:15AM Pk Volume 60 56 112 66 67 133

Pk Hr Factor 0.833 0.778 0.824 0.660 0.698 0.8537 - 9 Volume 0 0 96 77 173 0 0 96 102 198

7 - 9 Peak Hour 07:15 08:00 07:30 16:00 16:00 16:007 - 9 Pk Volume 0 0 59 49 104 0 0 53 59 112

Pk Hr Factor 0.000 0.000 0.776 0.681 0.839 0.000 0.000 0.779 0.615 0.718

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,268

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,268

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 49: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 434 S/O Rd 274 Day: Thursday City: Bass Lake

Date: 9/19/19 Project #: CA19_7296_025

NB SB EB WB714 749 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 12 8 20 00:15 1 0 1 12 13 2500:30 0 1 1 11 16 2700:45 2 3 0 1 2 4 10 45 12 49 22 9401:00 3 2 5 16 15 3101:15 0 1 1 12 15 2701:30 0 0 0 12 13 2501:45 1 4 0 3 1 7 17 57 17 60 34 11702:00 0 0 0 12 9 21 02:15 0 0 0 16 16 32 02:30 0 0 0 12 17 29 02:45 0 0 0 15 55 24 66 39 12103:00 0 0 0 16 10 26 03:15 0 0 0 13 21 34 03:30 0 0 0 11 13 24 03:45 0 0 0 12 52 26 70 38 12204:00 1 0 1 24 10 34 04:15 0 0 0 15 13 28 04:30 0 0 0 9 20 29 04:45 0 1 0 0 1 11 59 14 57 25 11605:00 2 1 3 13 11 24 05:15 0 1 1 9 16 25 05:30 2 2 4 9 20 29 05:45 1 5 1 5 2 10 12 43 14 61 26 10406:00 1 1 2 10 10 20 06:15 0 3 3 11 9 20 06:30 1 5 6 13 16 29 06:45 2 4 8 17 10 21 6 40 10 45 16 8507:00 8 2 10 12 17 29 07:15 4 10 14 6 11 17 07:30 8 11 19 4 11 15 07:45 10 30 5 28 15 58 10 32 6 45 16 7708:00 16 14 30 6 10 16 08:15 10 14 24 5 8 13 08:30 11 5 16 7 6 13 08:45 13 50 10 43 23 93 9 27 6 30 15 5709:00 14 10 24 9 3 12 09:15 9 11 20 7 2 9 09:30 13 14 27 9 3 12 09:45 14 50 12 47 26 97 8 33 4 12 12 4510:00 9 8 17 9 1 10 10:15 9 13 22 5 2 7 10:30 17 9 26 9 3 12 10:45 9 44 13 43 22 87 4 27 0 6 4 3311:00 14 12 26 3 2 5 11:15 8 15 23 2 0 2 11:30 11 10 21 3 2 5 11:45 11 44 19 56 30 100 1 9 1 5 2 14

TOTALS 235 243 478 479 506 985

SPLIT % 49.2% 50.8% 32.7% 48.6% 51.4% 67.3%

NB SB EB WB714 749 0 0

AM Peak Hour 08:00 11:00 11:45 15:30 14:30 15:15AM Pk Volume 50 56 102 62 72 130

Pk Hr Factor 0.781 0.737 0.850 0.646 0.750 0.8557 - 9 Volume 80 71 0 0 151 102 118 0 0 220

7 - 9 Peak Hour 08:00 07:30 08:00 16:00 16:30 16:007 - 9 Pk Volume 50 44 0 0 93 59 61 0 0 116

Pk Hr Factor 0.781 0.786 0.000 0.000 0.775 0.615 0.763 0.000 0.000 0.853

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,463

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,463

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 50: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Almond Ave E/O Granada Dr Day: Thursday City: Madera

Date: 9/5/19 Project #: CA19_7296_026

NB SB EB WB0 0 1,580 1,487

AM Period NB SB EB WB NB SB EB WB00:00 0 2 2 15 25 40 00:15 2 2 4 25 22 4700:30 0 6 6 14 30 4400:45 1 3 0 10 1 13 21 75 19 96 40 17101:00 0 2 2 36 21 5701:15 0 0 0 23 21 4401:30 0 1 1 16 27 4301:45 5 5 1 4 6 9 32 107 14 83 46 19002:00 1 1 2 19 22 41 02:15 2 3 5 28 25 53 02:30 0 0 0 18 44 62 02:45 4 7 8 12 12 19 37 102 19 110 56 21203:00 2 2 4 19 32 51 03:15 3 4 7 28 50 78 03:30 4 10 14 30 55 85 03:45 2 11 8 24 10 35 33 110 29 166 62 27604:00 4 2 6 21 43 64 04:15 3 2 5 24 30 54 04:30 18 3 21 28 54 82 04:45 29 54 18 25 47 79 25 98 37 164 62 26205:00 8 5 13 29 39 68 05:15 12 5 17 29 29 58 05:30 18 7 25 25 21 46 05:45 33 71 9 26 42 97 33 116 21 110 54 22606:00 13 7 20 22 20 42 06:15 19 8 27 14 22 36 06:30 18 9 27 16 14 30 06:45 43 93 12 36 55 129 21 73 22 78 43 15107:00 20 11 31 14 15 29 07:15 27 12 39 16 24 40 07:30 34 17 51 10 20 30 07:45 67 148 17 57 84 205 13 53 23 82 36 13508:00 33 13 46 14 14 28 08:15 55 26 81 11 14 25 08:30 23 25 48 10 18 28 08:45 23 134 19 83 42 217 10 45 13 59 23 10409:00 23 15 38 6 11 17 09:15 15 15 30 7 15 22 09:30 19 14 33 6 5 11 09:45 21 78 11 55 32 133 9 28 4 35 13 6310:00 14 15 29 4 4 8 10:15 13 6 19 1 12 13 10:30 14 7 21 7 4 11 10:45 13 54 19 47 32 101 5 17 12 32 17 4911:00 19 19 38 2 2 4 11:15 22 16 38 4 5 9 11:30 16 28 44 9 4 13 11:45 22 79 18 81 40 160 4 19 1 12 5 31

TOTALS 737 460 1197 843 1027 1870

SPLIT % 61.6% 38.4% 39.0% 45.1% 54.9% 61.0%

NB SB EB WB0 0 1,580 1,487

AM Peak Hour 07:30 11:45 07:30 17:00 15:15 15:15AM Pk Volume 189 95 262 116 177 289

Pk Hr Factor 0.705 0.792 0.780 0.879 0.805 0.8507 - 9 Volume 0 0 282 140 422 0 0 214 274 488

7 - 9 Peak Hour 07:30 08:00 07:30 17:00 16:00 16:307 - 9 Pk Volume 0 0 189 83 262 0 0 116 164 270

Pk Hr Factor 0.000 0.000 0.705 0.798 0.780 0.000 0.000 0.879 0.759 0.823

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,067

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,067

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 51: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Almond Ave E/O Stadium Rd Day: Thursday City: Madera

Date: 9/5/19 Project #: CA19_7296_027

NB SB EB WB0 0 1,118 1,618

AM Period NB SB EB WB NB SB EB WB00:00 2 1 3 18 20 38 00:15 1 4 5 23 17 4000:30 1 1 2 11 15 2600:45 0 4 2 8 2 12 16 68 25 77 41 14501:00 0 3 3 19 31 5001:15 3 0 3 12 40 5201:30 2 4 6 46 45 9101:45 1 6 2 9 3 15 24 101 35 151 59 25202:00 0 0 0 10 15 25 02:15 0 1 1 14 19 33 02:30 0 0 0 10 38 48 02:45 0 2 3 2 3 21 55 32 104 53 15903:00 1 1 2 26 52 78 03:15 0 0 0 58 48 106 03:30 1 1 2 26 40 66 03:45 0 2 3 5 3 7 23 133 27 167 50 30004:00 2 1 3 14 29 43 04:15 4 0 4 33 25 58 04:30 4 2 6 19 23 42 04:45 2 12 7 10 9 22 15 81 23 100 38 18105:00 4 7 11 13 41 54 05:15 2 10 12 21 38 59 05:30 8 10 18 23 31 54 05:45 9 23 16 43 25 66 17 74 19 129 36 20306:00 4 11 15 22 27 49 06:15 3 7 10 9 12 21 06:30 13 5 18 12 17 29 06:45 10 30 15 38 25 68 15 58 21 77 36 13507:00 11 18 29 10 11 21 07:15 20 35 55 5 8 13 07:30 31 42 73 12 5 17 07:45 20 82 58 153 78 235 15 42 11 35 26 7708:00 40 44 84 7 7 14 08:15 40 62 102 6 11 17 08:30 44 56 100 10 7 17 08:45 26 150 26 188 52 338 5 28 10 35 15 6309:00 11 11 22 3 3 6 09:15 9 19 28 4 5 9 09:30 9 15 24 4 3 7 09:45 10 39 17 62 27 101 7 18 9 20 16 3810:00 15 17 32 1 8 9 10:15 9 22 31 3 6 9 10:30 8 22 30 2 1 3 10:45 12 44 24 85 36 129 6 12 5 20 11 3211:00 15 22 37 3 5 8 11:15 10 22 32 2 0 2 11:30 14 25 39 2 2 4 11:45 9 48 22 91 31 139 1 8 1 8 2 16

TOTALS 440 695 1135 678 923 1601

SPLIT % 38.8% 61.2% 41.5% 42.3% 57.7% 58.5%

NB SB EB WB0 0 1,118 1,618

AM Peak Hour 08:00 07:45 07:45 15:00 14:45 14:45AM Pk Volume 150 220 364 133 172 303

Pk Hr Factor 0.852 0.887 0.892 0.573 0.827 0.7157 - 9 Volume 0 0 232 341 573 0 0 155 229 384

7 - 9 Peak Hour 08:00 07:45 07:45 16:00 16:45 16:457 - 9 Pk Volume 0 0 150 220 364 0 0 81 133 205

Pk Hr Factor 0.000 0.000 0.852 0.887 0.892 0.000 0.000 0.614 0.811 0.869

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,736

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,736

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 52: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Clinton St W/O Tozer St Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_028

NB SB EB WB0 0 1,336 1,516

AM Period NB SB EB WB NB SB EB WB00:00 1 4 5 11 20 31 00:15 0 3 3 12 18 3000:30 0 1 1 12 15 2700:45 3 4 1 9 4 13 21 56 19 72 40 12801:00 1 0 1 11 10 2101:15 1 2 3 23 21 4401:30 1 0 1 21 42 6301:45 1 4 0 2 1 6 14 69 28 101 42 17002:00 2 4 6 19 14 33 02:15 3 0 3 16 20 36 02:30 0 0 0 10 29 39 02:45 0 5 1 5 1 10 23 68 17 80 40 14803:00 0 0 0 18 36 54 03:15 1 1 2 39 38 77 03:30 5 1 6 31 45 76 03:45 4 10 2 4 6 14 24 112 44 163 68 27504:00 4 3 7 15 29 44 04:15 6 4 10 25 43 68 04:30 4 6 10 25 34 59 04:45 9 23 7 20 16 43 32 97 24 130 56 22705:00 9 10 19 33 42 75 05:15 16 13 29 33 37 70 05:30 18 6 24 24 40 64 05:45 10 53 4 33 14 86 30 120 27 146 57 26606:00 15 2 17 24 35 59 06:15 10 10 20 28 20 48 06:30 7 6 13 22 36 58 06:45 18 50 12 30 30 80 10 84 25 116 35 20007:00 20 13 33 21 25 46 07:15 43 29 72 19 27 46 07:30 57 37 94 10 32 42 07:45 48 168 38 117 86 285 18 68 23 107 41 17508:00 23 32 55 18 26 44 08:15 26 32 58 12 15 27 08:30 32 15 47 12 11 23 08:45 18 99 15 94 33 193 15 57 15 67 30 12409:00 16 5 21 8 13 21 09:15 11 13 24 6 15 21 09:30 7 6 13 6 11 17 09:45 13 47 10 34 23 81 3 23 6 45 9 6810:00 12 13 25 5 6 11 10:15 9 7 16 6 4 10 10:30 9 9 18 5 4 9 10:45 16 46 19 48 35 94 2 18 4 18 6 3611:00 11 19 30 5 3 8 11:15 7 6 13 4 4 8 11:30 9 16 25 4 5 9 11:45 13 40 20 61 33 101 2 15 2 14 4 29

TOTALS 549 457 1006 787 1059 1846

SPLIT % 54.6% 45.4% 35.3% 42.6% 57.4% 64.7%

NB SB EB WB0 0 1,336 1,516

AM Peak Hour 07:15 07:30 07:15 16:30 15:00 15:00AM Pk Volume 171 139 307 123 163 275

Pk Hr Factor 0.750 0.914 0.816 0.932 0.906 0.8937 - 9 Volume 0 0 267 211 478 0 0 217 276 493

7 - 9 Peak Hour 07:15 07:30 07:15 16:30 17:00 17:007 - 9 Pk Volume 0 0 171 139 307 0 0 123 146 266

Pk Hr Factor 0.000 0.000 0.750 0.914 0.816 0.000 0.000 0.932 0.869 0.887

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,852

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,852

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 53: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME D St N/O Central Ave Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_029

NB SB EB WB4,912 6,000 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 4 7 83 89 172 00:15 3 1 4 74 73 14700:30 5 0 5 70 72 14200:45 2 13 4 9 6 22 65 292 95 329 160 62101:00 0 3 3 69 88 15701:15 6 5 11 85 92 17701:30 7 2 9 100 94 19401:45 5 18 2 12 7 30 82 336 112 386 194 72202:00 1 1 2 72 92 164 02:15 0 2 2 76 95 171 02:30 1 2 3 73 93 166 02:45 1 3 2 7 3 10 99 320 114 394 213 71403:00 2 1 3 83 120 203 03:15 5 7 12 139 112 251 03:30 10 13 23 141 144 285 03:45 12 29 15 36 27 65 140 503 122 498 262 100104:00 9 29 38 93 106 199 04:15 18 26 44 128 113 241 04:30 22 39 61 99 132 231 04:45 24 73 53 147 77 220 138 458 128 479 266 93705:00 29 85 114 136 133 269 05:15 24 98 122 137 117 254 05:30 27 97 124 106 86 192 05:45 31 111 56 336 87 447 100 479 112 448 212 92706:00 21 44 65 105 95 200 06:15 14 33 47 83 105 188 06:30 16 21 37 65 115 180 06:45 21 72 40 138 61 210 79 332 90 405 169 73707:00 32 56 88 82 94 176 07:15 50 92 142 76 100 176 07:30 77 132 209 75 86 161 07:45 82 241 127 407 209 648 63 296 79 359 142 65508:00 57 97 154 69 74 143 08:15 45 84 129 46 60 106 08:30 35 70 105 53 45 98 08:45 29 166 75 326 104 492 44 212 37 216 81 42809:00 51 61 112 45 47 92 09:15 40 80 120 52 38 90 09:30 49 69 118 29 20 49 09:45 53 193 71 281 124 474 25 151 20 125 45 27610:00 63 52 115 7 14 21 10:15 56 60 116 12 8 20 10:30 55 77 132 14 13 27 10:45 65 239 67 256 132 495 12 45 6 41 18 8611:00 66 94 160 4 8 12 11:15 68 71 139 4 6 10 11:30 83 86 169 6 9 15 11:45 95 312 81 332 176 644 4 18 10 33 14 51

TOTALS 1470 2287 3757 3442 3713 7155

SPLIT % 39.1% 60.9% 34.4% 48.1% 51.9% 65.6%

NB SB EB WB4,912 6,000 0 0

AM Peak Hour 11:30 07:15 07:15 16:45 16:30 16:30AM Pk Volume 335 448 714 517 510 1020

Pk Hr Factor 0.882 0.848 0.854 0.937 0.959 0.9487 - 9 Volume 407 733 0 0 1140 937 927 0 0 1864

7 - 9 Peak Hour 07:15 07:15 07:15 16:45 16:30 16:307 - 9 Pk Volume 266 448 0 0 714 517 510 0 0 1020

Pk Hr Factor 0.811 0.848 0.000 0.000 0.854 0.937 0.959 0.000 0.000 0.948

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total10,912

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total10,912

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 54: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Ellis St E/O Rd 27 Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_030

NB SB EB WB0 0 3,012 2,651

AM Period NB SB EB WB NB SB EB WB00:00 10 5 15 24 23 47 00:15 7 2 9 37 23 6000:30 6 2 8 30 27 5700:45 5 28 5 14 10 42 24 115 22 95 46 21001:00 2 5 7 35 32 6701:15 1 2 3 47 28 7501:30 2 0 2 66 61 12701:45 1 6 0 7 1 13 47 195 41 162 88 35702:00 3 0 3 37 33 70 02:15 0 1 1 34 32 66 02:30 3 1 4 37 28 65 02:45 3 9 8 10 11 19 39 147 55 148 94 29503:00 6 1 7 53 69 122 03:15 1 8 9 121 78 199 03:30 4 6 10 87 38 125 03:45 3 14 10 25 13 39 79 340 34 219 113 55904:00 6 14 20 76 47 123 04:15 5 15 20 76 51 127 04:30 4 22 26 83 54 137 04:45 6 21 13 64 19 85 62 297 48 200 110 49705:00 8 29 37 77 42 119 05:15 13 33 46 67 54 121 05:30 12 53 65 89 53 142 05:45 14 47 42 157 56 204 65 298 52 201 117 49906:00 17 41 58 58 33 91 06:15 14 38 52 65 60 125 06:30 15 33 48 53 58 111 06:45 15 61 24 136 39 197 44 220 36 187 80 40707:00 26 32 58 46 32 78 07:15 39 49 88 48 56 104 07:30 70 67 137 55 29 84 07:45 68 203 63 211 131 414 39 188 30 147 69 33508:00 53 63 116 41 38 79 08:15 39 49 88 49 33 82 08:30 53 50 103 36 27 63 08:45 22 167 23 185 45 352 35 161 27 125 62 28609:00 17 9 26 30 24 54 09:15 19 13 32 34 23 57 09:30 19 11 30 27 20 47 09:45 16 71 15 48 31 119 28 119 11 78 39 19710:00 23 17 40 14 14 28 10:15 20 12 32 15 10 25 10:30 26 23 49 14 12 26 10:45 34 103 20 72 54 175 16 59 10 46 26 10511:00 27 32 59 13 3 16 11:15 18 17 35 13 7 20 11:30 36 28 64 7 6 13 11:45 19 100 17 94 36 194 10 43 4 20 14 63

TOTALS 830 1023 1853 2182 1628 3810

SPLIT % 44.8% 55.2% 32.7% 57.3% 42.7% 67.3%

NB SB EB WB0 0 3,012 2,651

AM Peak Hour 07:15 07:15 07:15 15:15 14:45 15:15AM Pk Volume 230 242 472 363 240 560

Pk Hr Factor 0.821 0.903 0.861 0.750 0.769 0.7047 - 9 Volume 0 0 370 396 766 0 0 595 401 996

7 - 9 Peak Hour 07:15 07:15 07:15 16:15 17:00 17:007 - 9 Pk Volume 0 0 230 242 472 0 0 298 201 499

Pk Hr Factor 0.000 0.000 0.821 0.903 0.861 0.000 0.000 0.898 0.931 0.879

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total5,663

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total5,663

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 55: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Gateway Dr N/O Almond Ave Day: Thursday City: Madera

Date: 9/10/19 Project #: CA19_7296_031

NB SB EB WB6,712 5,855 0 0

AM Period NB SB EB WB NB SB EB WB00:00 10 9 19 101 93 194 00:15 14 5 19 144 126 27000:30 13 13 26 134 108 24200:45 6 43 9 36 15 79 107 486 108 435 215 92101:00 7 10 17 102 109 21101:15 8 5 13 91 88 17901:30 5 7 12 105 100 20501:45 13 33 10 32 23 65 105 403 106 403 211 80602:00 7 9 16 115 107 222 02:15 10 8 18 100 91 191 02:30 7 2 9 116 103 219 02:45 12 36 7 26 19 62 100 431 115 416 215 84703:00 6 2 8 122 105 227 03:15 11 9 20 160 115 275 03:30 12 10 22 145 130 275 03:45 10 39 12 33 22 72 149 576 112 462 261 103804:00 7 17 24 148 131 279 04:15 19 18 37 127 108 235 04:30 18 26 44 153 122 275 04:45 26 70 17 78 43 148 137 565 120 481 257 104605:00 37 33 70 146 110 256 05:15 34 51 85 137 108 245 05:30 46 48 94 118 98 216 05:45 40 157 38 170 78 327 94 495 89 405 183 90006:00 53 26 79 112 101 213 06:15 32 25 57 101 92 193 06:30 34 32 66 96 94 190 06:45 27 146 36 119 63 265 101 410 84 371 185 78107:00 53 42 95 98 63 161 07:15 61 65 126 87 70 157 07:30 85 90 175 100 67 167 07:45 90 289 75 272 165 561 99 384 83 283 182 66708:00 82 82 164 92 55 147 08:15 75 74 149 59 69 128 08:30 86 60 146 64 49 113 08:45 90 333 71 287 161 620 55 270 45 218 100 48809:00 83 81 164 44 54 98 09:15 68 75 143 62 41 103 09:30 91 75 166 45 33 78 09:45 99 341 91 322 190 663 43 194 37 165 80 35910:00 92 101 193 29 23 52 10:15 80 84 164 25 24 49 10:30 103 99 202 27 29 56 10:45 101 376 86 370 187 746 19 100 10 86 29 18611:00 106 75 181 28 13 41 11:15 122 85 207 13 17 30 11:30 132 91 223 20 9 29 11:45 104 464 88 339 192 803 10 71 7 46 17 117

TOTALS 2327 2084 4411 4385 3771 8156

SPLIT % 52.8% 47.2% 35.1% 53.8% 46.2% 64.9%

NB SB EB WB6,712 5,855 0 0

AM Peak Hour 11:45 11:45 11:45 15:15 15:15 15:15AM Pk Volume 483 415 898 602 488 1090

Pk Hr Factor 0.839 0.823 0.831 0.941 0.931 0.9777 - 9 Volume 622 559 0 0 1181 1060 886 0 0 1946

7 - 9 Peak Hour 07:45 07:30 07:30 16:30 16:00 16:007 - 9 Pk Volume 333 321 0 0 653 573 481 0 0 1046

Pk Hr Factor 0.925 0.892 0.000 0.000 0.933 0.936 0.918 0.000 0.000 0.937

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total12,567

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total12,567

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 56: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Gateway Dr N/O Almond Ave Day: Thursday City: Madera

Date: 9/5/19 Project #: CA19_7296_032

NB SB EB WB3,775 3,983 0 0

AM Period NB SB EB WB NB SB EB WB00:00 8 8 16 50 47 97 00:15 5 6 11 56 48 10400:30 10 7 17 49 54 10300:45 3 26 2 23 5 49 52 207 49 198 101 40501:00 10 3 13 56 52 10801:15 0 7 7 41 36 7701:30 0 2 2 44 77 12101:45 3 13 3 15 6 28 51 192 46 211 97 40302:00 3 3 6 51 53 104 02:15 3 10 13 64 54 118 02:30 3 3 6 89 56 145 02:45 3 12 2 18 5 30 50 254 85 248 135 50203:00 3 8 11 77 59 136 03:15 3 3 6 105 67 172 03:30 5 6 11 110 66 176 03:45 2 13 4 21 6 34 72 364 71 263 143 62704:00 8 14 22 88 58 146 04:15 8 14 22 80 65 145 04:30 6 14 20 86 61 147 04:45 22 44 16 58 38 102 88 342 67 251 155 59305:00 9 25 34 106 64 170 05:15 10 46 56 72 88 160 05:30 14 63 77 97 79 176 05:45 21 54 59 193 80 247 80 355 88 319 168 67406:00 32 45 77 72 58 130 06:15 22 47 69 66 48 114 06:30 24 45 69 72 46 118 06:45 38 116 91 228 129 344 47 257 45 197 92 45407:00 37 63 100 44 46 90 07:15 52 89 141 46 29 75 07:30 63 96 159 54 30 84 07:45 64 216 95 343 159 559 54 198 32 137 86 33508:00 56 106 162 48 46 94 08:15 56 127 183 38 26 64 08:30 64 103 167 36 28 64 08:45 59 235 50 386 109 621 43 165 22 122 65 28709:00 32 56 88 33 20 53 09:15 29 39 68 39 25 64 09:30 41 39 80 20 33 53 09:45 38 140 50 184 88 324 26 118 27 105 53 22310:00 39 35 74 26 15 41 10:15 29 32 61 18 19 37 10:30 25 49 74 13 19 32 10:45 37 130 34 150 71 280 11 68 21 74 32 14211:00 37 44 81 22 25 47 11:15 49 44 93 16 23 39 11:30 61 38 99 11 14 25 11:45 47 194 38 164 85 358 13 62 13 75 26 137

TOTALS 1193 1783 2976 2582 2200 4782

SPLIT % 40.1% 59.9% 38.4% 54.0% 46.0% 61.6%

NB SB EB WB3,775 3,983 0 0

AM Peak Hour 07:45 07:45 07:45 15:15 17:00 17:00AM Pk Volume 240 431 671 375 319 674

Pk Hr Factor 0.938 0.848 0.917 0.852 0.906 0.9577 - 9 Volume 451 729 0 0 1180 697 570 0 0 1267

7 - 9 Peak Hour 07:45 07:45 07:45 16:45 17:00 17:007 - 9 Pk Volume 240 431 0 0 671 363 319 0 0 674

Pk Hr Factor 0.938 0.848 0.000 0.000 0.917 0.856 0.906 0.000 0.000 0.957

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total7,758

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total7,758

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 57: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Granada Dr S/O Howard Rd Day: Thursday City: Madera

Date: 9/5/19 Project #: CA19_7296_033

NB SB EB WB4,565 4,787 0 0

AM Period NB SB EB WB NB SB EB WB00:00 15 11 26 59 58 117 00:15 4 10 14 56 57 11300:30 12 7 19 57 59 11600:45 5 36 4 32 9 68 58 230 60 234 118 46401:00 11 6 17 61 69 13001:15 2 7 9 52 51 10301:30 3 4 7 62 78 14001:45 8 24 9 26 17 50 58 233 52 250 110 48302:00 3 3 6 59 54 113 02:15 3 12 15 72 53 125 02:30 6 6 12 83 59 142 02:45 3 15 6 27 9 42 65 279 89 255 154 53403:00 5 7 12 87 65 152 03:15 4 8 12 104 91 195 03:30 8 5 13 119 99 218 03:45 4 21 7 27 11 48 76 386 83 338 159 72404:00 7 12 19 99 73 172 04:15 10 17 27 78 87 165 04:30 7 20 27 106 79 185 04:45 19 43 30 79 49 122 96 379 85 324 181 70305:00 18 30 48 114 96 210 05:15 15 43 58 88 98 186 05:30 28 64 92 107 88 195 05:45 27 88 63 200 90 288 81 390 105 387 186 77706:00 41 40 81 82 75 157 06:15 28 37 65 84 76 160 06:30 43 46 89 74 60 134 06:45 58 170 91 214 149 384 59 299 60 271 119 57007:00 53 70 123 72 70 142 07:15 73 106 179 59 52 111 07:30 100 97 197 60 57 117 07:45 102 328 95 368 197 696 70 261 42 221 112 48208:00 62 122 184 56 54 110 08:15 82 129 211 53 55 108 08:30 69 118 187 42 32 74 08:45 75 288 71 440 146 728 47 198 44 185 91 38309:00 46 57 103 38 41 79 09:15 43 49 92 41 35 76 09:30 55 50 105 42 47 89 09:45 52 196 48 204 100 400 28 149 33 156 61 30510:00 51 44 95 33 26 59 10:15 46 44 90 24 28 52 10:30 32 55 87 14 23 37 10:45 48 177 47 190 95 367 12 83 28 105 40 18811:00 51 42 93 20 28 48 11:15 52 40 92 17 19 36 11:30 78 45 123 10 18 28 11:45 51 232 41 168 92 400 13 60 21 86 34 146

TOTALS 1618 1975 3593 2947 2812 5759

SPLIT % 45.0% 55.0% 38.4% 51.2% 48.8% 61.6%

NB SB EB WB4,565 4,787 0 0

AM Peak Hour 07:30 07:45 07:30 16:45 17:00 17:00AM Pk Volume 346 464 789 405 387 777

Pk Hr Factor 0.848 0.899 0.935 0.888 0.921 0.9257 - 9 Volume 616 808 0 0 1424 769 711 0 0 1480

7 - 9 Peak Hour 07:30 07:45 07:30 16:45 17:00 17:007 - 9 Pk Volume 346 464 0 0 789 405 387 0 0 777

Pk Hr Factor 0.848 0.899 0.000 0.000 0.935 0.888 0.921 0.000 0.000 0.925

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total9,352

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total9,352

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 58: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Granada Dr S/O Sunset Ave Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_034

NB SB EB WB3,744 3,778 0 0

AM Period NB SB EB WB NB SB EB WB00:00 10 3 13 48 45 93 00:15 4 2 6 37 39 7600:30 3 4 7 51 62 11300:45 1 18 2 11 3 29 54 190 50 196 104 38601:00 1 3 4 49 43 9201:15 5 4 9 56 47 10301:30 4 3 7 43 47 9001:45 0 10 2 12 2 22 44 192 45 182 89 37402:00 0 2 2 44 52 96 02:15 2 1 3 51 56 107 02:30 2 6 8 86 45 131 02:45 6 10 4 13 10 23 73 254 72 225 145 47903:00 0 1 1 61 90 151 03:15 4 2 6 116 81 197 03:30 9 5 14 109 63 172 03:45 6 19 4 12 10 31 63 349 73 307 136 65604:00 4 8 12 71 58 129 04:15 8 6 14 70 67 137 04:30 6 19 25 95 77 172 04:45 14 32 31 64 45 96 69 305 72 274 141 57905:00 11 14 25 89 57 146 05:15 8 23 31 86 79 165 05:30 16 45 61 78 60 138 05:45 23 58 54 136 77 194 84 337 77 273 161 61006:00 26 23 49 54 79 133 06:15 19 47 66 67 61 128 06:30 24 28 52 43 76 119 06:45 37 106 49 147 86 253 52 216 53 269 105 48507:00 35 42 77 70 60 130 07:15 54 81 135 51 51 102 07:30 85 61 146 76 59 135 07:45 68 242 90 274 158 516 65 262 52 222 117 48408:00 52 76 128 47 41 88 08:15 69 92 161 42 46 88 08:30 69 57 126 46 51 97 08:45 59 249 65 290 124 539 42 177 33 171 75 34809:00 38 37 75 43 38 81 09:15 44 33 77 26 41 67 09:30 26 46 72 31 28 59 09:45 45 153 34 150 79 303 31 131 21 128 52 25910:00 40 34 74 21 17 38 10:15 39 30 69 19 19 38 10:30 36 42 78 10 15 25 10:45 34 149 44 150 78 299 17 67 16 67 33 13411:00 43 34 77 10 14 24 11:15 44 43 87 6 8 14 11:30 47 37 84 12 11 23 11:45 44 178 52 166 96 344 12 40 6 39 18 79

TOTALS 1224 1425 2649 2520 2353 4873

SPLIT % 46.2% 53.8% 35.2% 51.7% 48.3% 64.8%

NB SB EB WB3,744 3,778 0 0

AM Peak Hour 07:30 07:30 07:30 14:45 15:00 14:45AM Pk Volume 274 319 593 359 307 665

Pk Hr Factor 0.806 0.867 0.921 0.774 0.853 0.8447 - 9 Volume 491 564 0 0 1055 642 547 0 0 1189

7 - 9 Peak Hour 07:30 07:30 07:30 16:30 16:30 16:307 - 9 Pk Volume 274 319 0 0 593 339 285 0 0 624

Pk Hr Factor 0.806 0.867 0.000 0.000 0.921 0.892 0.902 0.000 0.000 0.907

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total7,522

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total7,522

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 59: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Howard Rd W/O Granada Dr Day: Thursday City: Madera

NB SB EB WB0 0 4,040 4,021

AM Period NB SB EB WB NB SB EB WB00:00 7 8 15 51 64 115 00:15 11 6 17 54 64 11800:30 3 6 9 47 48 9500:45 4 25 8 28 12 53 52 204 64 240 116 44401:00 3 7 10 54 70 12401:15 5 1 6 41 75 11601:30 1 1 2 90 52 14201:45 5 14 8 17 13 31 60 245 54 251 114 49602:00 2 2 4 52 36 88 02:15 1 0 1 72 56 128 02:30 5 5 10 55 69 124 02:45 6 14 1 8 7 22 85 264 44 205 129 46903:00 5 4 9 70 57 127 03:15 5 3 8 78 110 188 03:30 1 2 3 90 100 190 03:45 4 15 3 12 7 27 87 325 90 357 177 68204:00 4 5 9 65 78 143 04:15 7 14 21 95 83 178 04:30 8 15 23 76 95 171 04:45 14 33 23 57 37 90 96 332 75 331 171 66305:00 15 19 34 77 121 198 05:15 26 29 55 79 89 168 05:30 24 30 54 74 69 143 05:45 45 110 44 122 89 232 74 304 70 349 144 65306:00 33 42 75 65 70 135 06:15 44 36 80 50 72 122 06:30 44 38 82 51 39 90 06:45 68 189 51 167 119 356 63 229 46 227 109 45607:00 77 34 111 38 57 95 07:15 92 60 152 44 37 81 07:30 84 70 154 37 57 94 07:45 125 378 77 241 202 619 45 164 62 213 107 37708:00 106 57 163 28 51 79 08:15 151 58 209 33 64 97 08:30 79 69 148 24 50 74 08:45 63 399 57 241 120 640 17 102 37 202 54 30409:00 51 43 94 10 35 45 09:15 48 38 86 16 21 37 09:30 49 42 91 18 36 54 09:45 53 201 48 171 101 372 13 57 17 109 30 16610:00 44 38 82 13 21 34 10:15 28 47 75 12 15 27 10:30 49 36 85 9 18 27 10:45 47 168 34 155 81 323 16 50 10 64 26 11411:00 43 48 91 8 17 25 11:15 55 49 104 9 10 19 11:30 62 46 108 10 11 21 11:45 25 185 59 202 84 387 6 33 14 52 20 85

TOTALS 1731 1421 3152 2309 2600 4909

SPLIT % 54.9% 45.1% 39.1% 47.0% 53.0% 60.9%

NB SB EB WB0 0 4,040 4,021

AM Peak Hour 07:30 07:15 07:30 16:15 16:30 16:15AM Pk Volume 466 264 728 344 380 718

Pk Hr Factor 0.772 0.857 0.871 0.896 0.785 0.9077 - 9 Volume 0 0 777 482 1259 0 0 636 680 1316

7 - 9 Peak Hour 07:30 07:15 07:30 16:15 16:30 16:157 - 9 Pk Volume 0 0 466 264 728 0 0 344 380 718

Pk Hr Factor 0.000 0.000 0.772 0.857 0.871 0.000 0.000 0.896 0.785 0.907

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total8,061

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total8,061

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 60: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Lake St S/O 4th St Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_036

NB SB EB WB0 0 4,342 3,765

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 66 56 122 00:15 0 0 0 60 53 11300:30 1 6 7 55 49 10400:45 4 5 2 8 6 13 70 251 45 203 115 45401:00 1 2 3 61 67 12801:15 2 3 5 68 55 12301:30 3 1 4 68 75 14301:45 2 8 3 9 5 17 77 274 65 262 142 53602:00 1 1 2 74 51 125 02:15 7 1 8 48 49 97 02:30 3 4 7 66 64 130 02:45 2 13 2 8 4 21 74 262 66 230 140 49203:00 8 4 12 92 53 145 03:15 6 7 13 76 90 166 03:30 6 9 15 89 85 174 03:45 14 34 9 29 23 63 81 338 99 327 180 66504:00 14 14 28 86 78 164 04:15 18 26 44 89 97 186 04:30 26 19 45 77 77 154 04:45 37 95 31 90 68 185 92 344 81 333 173 67705:00 34 29 63 93 87 180 05:15 51 37 88 74 83 157 05:30 48 44 92 90 80 170 05:45 39 172 25 135 64 307 89 346 60 310 149 65606:00 15 23 38 87 74 161 06:15 27 17 44 74 67 141 06:30 17 19 36 73 55 128 06:45 34 93 19 78 53 171 79 313 72 268 151 58107:00 43 30 73 73 54 127 07:15 73 31 104 68 65 133 07:30 65 53 118 57 65 122 07:45 129 310 60 174 189 484 59 257 61 245 120 50208:00 96 48 144 59 61 120 08:15 63 59 122 54 44 98 08:30 62 45 107 36 30 66 08:45 45 266 38 190 83 456 27 176 42 177 69 35309:00 48 28 76 46 39 85 09:15 35 25 60 32 34 66 09:30 35 34 69 34 30 64 09:45 51 169 33 120 84 289 25 137 25 128 50 26510:00 39 33 72 14 22 36 10:15 37 33 70 13 14 27 10:30 39 37 76 10 11 21 10:45 58 173 46 149 104 322 15 52 9 56 24 10811:00 54 51 105 10 11 21 11:15 44 50 94 10 6 16 11:30 65 47 112 7 5 12 11:45 59 222 62 210 121 432 5 32 4 26 9 58

TOTALS 1560 1200 2760 2782 2565 5347

SPLIT % 56.5% 43.5% 34.0% 52.0% 48.0% 66.0%

NB SB EB WB0 0 4,342 3,765

AM Peak Hour 07:15 07:30 07:30 16:15 15:30 15:30AM Pk Volume 363 220 573 351 359 704

Pk Hr Factor 0.703 0.917 0.758 0.944 0.907 0.9467 - 9 Volume 0 0 576 364 940 0 0 690 643 1333

7 - 9 Peak Hour 07:15 07:30 07:30 16:15 16:15 16:157 - 9 Pk Volume 0 0 363 220 573 0 0 351 342 693

Pk Hr Factor 0.000 0.000 0.703 0.917 0.758 0.000 0.000 0.944 0.881 0.931

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total8,107

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total8,107

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 61: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Lake St S/O Cleveland Ave Day: Tuesday City: Madera

Date: 9/17/19 Project #: CA19_7296_037

NB SB EB WB4,905 4,579 0 0

AM Period NB SB EB WB NB SB EB WB00:00 7 6 13 70 72 142 00:15 10 11 21 76 55 13100:30 12 5 17 66 47 11300:45 5 34 3 25 8 59 70 282 63 237 133 51901:00 5 1 6 73 58 13101:15 1 2 3 59 59 11801:30 7 2 9 70 72 14201:45 6 19 8 13 14 32 74 276 72 261 146 53702:00 5 3 8 69 66 135 02:15 3 5 8 63 58 121 02:30 4 2 6 69 68 137 02:45 7 19 5 15 12 34 78 279 75 267 153 54603:00 3 6 9 81 73 154 03:15 7 8 15 85 80 165 03:30 11 15 26 116 96 212 03:45 14 35 15 44 29 79 117 399 88 337 205 73604:00 13 19 32 123 78 201 04:15 19 18 37 93 96 189 04:30 19 24 43 120 78 198 04:45 24 75 40 101 64 176 122 458 89 341 211 79905:00 34 47 81 125 88 213 05:15 41 58 99 125 88 213 05:30 44 67 111 105 93 198 05:45 32 151 51 223 83 374 118 473 84 353 202 82606:00 29 35 64 81 84 165 06:15 23 37 60 81 82 163 06:30 16 41 57 74 67 141 06:45 24 92 52 165 76 257 90 326 74 307 164 63307:00 36 68 104 109 84 193 07:15 35 98 133 91 85 176 07:30 65 94 159 100 66 166 07:45 81 217 87 347 168 564 75 375 65 300 140 67508:00 73 69 142 71 40 111 08:15 56 53 109 45 55 100 08:30 49 58 107 52 52 104 08:45 44 222 52 232 96 454 55 223 41 188 96 41109:00 46 41 87 47 43 90 09:15 44 48 92 45 25 70 09:30 44 51 95 45 29 74 09:45 62 196 50 190 112 386 27 164 22 119 49 28310:00 45 44 89 28 16 44 10:15 39 48 87 18 20 38 10:30 45 39 84 25 13 38 10:45 60 189 55 186 115 375 10 81 20 69 30 15011:00 73 43 116 26 10 36 11:15 45 65 110 11 11 22 11:30 59 48 107 15 17 32 11:45 82 259 57 213 139 472 9 61 8 46 17 107

TOTALS 1508 1754 3262 3397 2825 6222

SPLIT % 46.2% 53.8% 34.4% 54.6% 45.4% 65.6%

NB SB EB WB4,905 4,579 0 0

AM Peak Hour 11:45 07:15 07:15 16:30 15:30 16:30AM Pk Volume 294 348 602 492 358 835

Pk Hr Factor 0.896 0.888 0.896 0.984 0.932 0.9807 - 9 Volume 439 579 0 0 1018 931 694 0 0 1625

7 - 9 Peak Hour 07:30 07:15 07:15 16:30 16:45 16:307 - 9 Pk Volume 275 348 0 0 602 492 358 0 0 835

Pk Hr Factor 0.849 0.888 0.000 0.000 0.896 0.984 0.962 0.000 0.000 0.980

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total9,484

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total9,484

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 62: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Olive Ave W/O Roosevelt Ave Day: Tuesday City: Madera

Date: 9/12/19 Project #: CA19_7296_038

NB SB EB WB2,510 2,889 0 0

AM Period NB SB EB WB NB SB EB WB00:00 4 7 11 35 15 50 00:15 4 6 10 21 35 5600:30 1 3 4 20 31 5100:45 6 15 4 20 10 35 27 103 29 110 56 21301:00 3 1 4 35 42 7701:15 5 4 9 27 43 7001:30 3 3 6 36 45 8101:45 1 12 2 10 3 22 41 139 48 178 89 31702:00 0 1 1 40 31 71 02:15 2 2 4 39 45 84 02:30 2 3 5 23 38 61 02:45 5 9 3 9 8 18 35 137 41 155 76 29203:00 1 5 6 43 60 103 03:15 4 4 8 53 116 169 03:30 7 6 13 45 111 156 03:45 7 19 6 21 13 40 46 187 100 387 146 57404:00 11 3 14 42 84 126 04:15 12 2 14 38 88 126 04:30 15 6 21 60 100 160 04:45 13 51 7 18 20 69 50 190 87 359 137 54905:00 34 13 47 54 99 153 05:15 29 22 51 53 82 135 05:30 57 15 72 41 72 113 05:45 57 177 23 73 80 250 38 186 54 307 92 49306:00 39 19 58 47 47 94 06:15 39 23 62 60 62 122 06:30 37 29 66 45 34 79 06:45 20 135 31 102 51 237 45 197 37 180 82 37707:00 17 34 51 36 33 69 07:15 23 31 54 41 38 79 07:30 29 44 73 37 42 79 07:45 45 114 50 159 95 273 29 143 27 140 56 28308:00 37 33 70 32 23 55 08:15 34 33 67 38 38 76 08:30 30 20 50 31 23 54 08:45 21 122 29 115 50 237 28 129 22 106 50 23509:00 30 14 44 28 17 45 09:15 15 19 34 43 16 59 09:30 20 21 41 23 24 47 09:45 20 85 18 72 38 157 20 114 25 82 45 19610:00 14 17 31 22 12 34 10:15 21 16 37 16 17 33 10:30 14 26 40 9 21 30 10:45 23 72 25 84 48 156 15 62 14 64 29 12611:00 21 25 46 5 9 14 11:15 21 21 42 4 9 13 11:30 32 35 67 9 5 14 11:45 16 90 22 103 38 193 4 22 12 35 16 57

TOTALS 901 786 1687 1609 2103 3712

SPLIT % 53.4% 46.6% 31.2% 43.3% 56.7% 68.8%

NB SB EB WB2,510 2,889 0 0

AM Peak Hour 05:30 07:30 07:30 16:30 15:15 15:15AM Pk Volume 192 160 305 217 411 597

Pk Hr Factor 0.842 0.800 0.803 0.904 0.886 0.8837 - 9 Volume 236 274 0 0 510 376 666 0 0 1042

7 - 9 Peak Hour 07:45 07:30 07:30 16:30 16:15 16:307 - 9 Pk Volume 146 160 0 0 305 217 374 0 0 585

Pk Hr Factor 0.811 0.800 0.000 0.000 0.803 0.904 0.935 0.000 0.000 0.914

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total5,399

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total5,399

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 63: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Olive Ave W/O Roosevelt Ave Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_039

NB SB EB WB0 0 6,215 5,954

AM Period NB SB EB WB NB SB EB WB00:00 12 6 18 78 89 167 00:15 14 7 21 67 67 13400:30 9 8 17 74 66 14000:45 11 46 5 26 16 72 88 307 84 306 172 61301:00 8 4 12 98 82 18001:15 6 4 10 94 83 17701:30 6 5 11 99 103 20201:45 5 25 3 16 8 41 98 389 107 375 205 76402:00 6 9 15 97 71 168 02:15 3 9 12 91 67 158 02:30 10 8 18 77 85 162 02:45 5 24 7 33 12 57 78 343 116 339 194 68203:00 6 7 13 124 125 249 03:15 9 18 27 141 110 251 03:30 6 19 25 164 124 288 03:45 5 26 15 59 20 85 113 542 95 454 208 99604:00 8 12 20 144 103 247 04:15 6 31 37 132 73 205 04:30 15 34 49 148 96 244 04:45 11 40 53 130 64 170 137 561 100 372 237 93305:00 28 56 84 163 110 273 05:15 20 70 90 148 86 234 05:30 29 85 114 127 82 209 05:45 22 99 74 285 96 384 116 554 75 353 191 90706:00 22 81 103 117 91 208 06:15 49 83 132 105 85 190 06:30 47 72 119 111 83 194 06:45 67 185 94 330 161 515 87 420 72 331 159 75107:00 65 99 164 112 70 182 07:15 98 140 238 81 73 154 07:30 140 159 299 82 68 150 07:45 152 455 134 532 286 987 92 367 65 276 157 64308:00 100 94 194 73 63 136 08:15 71 91 162 65 52 117 08:30 63 96 159 73 37 110 08:45 58 292 92 373 150 665 44 255 39 191 83 44609:00 54 60 114 63 42 105 09:15 53 61 114 53 37 90 09:30 58 70 128 45 34 79 09:45 78 243 72 263 150 506 42 203 27 140 69 34310:00 123 57 180 43 25 68 10:15 59 68 127 30 25 55 10:30 65 64 129 34 17 51 10:45 75 322 128 317 203 639 27 134 14 81 41 21511:00 78 97 175 28 30 58 11:15 61 75 136 23 15 38 11:30 68 68 136 17 13 30 11:45 96 303 67 307 163 610 12 80 7 65 19 145

TOTALS 2060 2671 4731 4155 3283 7438

SPLIT % 43.5% 56.5% 38.9% 55.9% 44.1% 61.1%

NB SB EB WB0 0 6,215 5,954

AM Peak Hour 07:15 07:00 07:15 16:30 14:45 15:00AM Pk Volume 490 532 1017 596 475 996

Pk Hr Factor 0.806 0.836 0.850 0.914 0.950 0.8657 - 9 Volume 0 0 747 905 1652 0 0 1115 725 1840

7 - 9 Peak Hour 07:15 07:00 07:15 16:30 16:30 16:307 - 9 Pk Volume 0 0 490 532 1017 0 0 596 392 988

Pk Hr Factor 0.000 0.000 0.806 0.836 0.850 0.000 0.000 0.914 0.891 0.905

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total12,169

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total12,169

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 64: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Pine St S/O Howard Rd Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_040

NB SB EB WB5,540 4,407 0 0

AM Period NB SB EB WB NB SB EB WB00:00 15 5 20 115 78 193 00:15 7 5 12 104 74 17800:30 15 6 21 95 56 15100:45 3 40 5 21 8 61 80 394 71 279 151 67301:00 2 3 5 92 61 15301:15 6 1 7 70 69 13901:30 2 2 4 86 62 14801:45 2 12 5 11 7 23 73 321 59 251 132 57202:00 4 3 7 88 58 146 02:15 2 1 3 97 76 173 02:30 3 1 4 134 65 199 02:45 5 14 2 7 7 21 70 389 94 293 164 68203:00 1 2 3 135 111 246 03:15 3 7 10 228 99 327 03:30 4 11 15 161 95 256 03:45 7 15 8 28 15 43 130 654 76 381 206 103504:00 4 6 10 111 76 187 04:15 7 9 16 107 52 159 04:30 7 34 41 97 91 188 04:45 3 21 50 99 53 120 103 418 86 305 189 72305:00 8 18 26 138 74 212 05:15 9 34 43 107 71 178 05:30 15 60 75 94 69 163 05:45 33 65 100 212 133 277 89 428 61 275 150 70306:00 46 33 79 66 70 136 06:15 22 31 53 67 72 139 06:30 33 44 77 74 46 120 06:45 42 143 60 168 102 311 66 273 50 238 116 51107:00 47 50 97 73 40 113 07:15 61 59 120 53 38 91 07:30 63 71 134 63 37 100 07:45 76 247 91 271 167 518 54 243 37 152 91 39508:00 118 117 235 55 28 83 08:15 138 120 258 34 31 65 08:30 205 128 333 50 23 73 08:45 123 584 83 448 206 1032 39 178 20 102 59 28009:00 81 48 129 32 23 55 09:15 87 62 149 26 15 41 09:30 84 55 139 22 14 36 09:45 77 329 79 244 156 573 16 96 18 70 34 16610:00 66 61 127 14 14 28 10:15 60 55 115 11 12 23 10:30 65 53 118 14 7 21 10:45 64 255 54 223 118 478 12 51 8 41 20 9211:00 67 56 123 10 12 22 11:15 79 58 137 10 6 16 11:30 110 66 176 13 16 29 11:45 74 330 66 246 140 576 7 40 8 42 15 82

TOTALS 2055 1978 4033 3485 2429 5914

SPLIT % 51.0% 49.0% 40.5% 58.9% 41.1% 59.5%

NB SB EB WB5,540 4,407 0 0

AM Peak Hour 08:00 07:45 08:00 15:00 14:45 15:00AM Pk Volume 584 456 1032 654 399 1035

Pk Hr Factor 0.712 0.891 0.775 0.717 0.899 0.7917 - 9 Volume 831 719 0 0 1550 846 580 0 0 1426

7 - 9 Peak Hour 08:00 07:45 08:00 16:15 16:30 16:307 - 9 Pk Volume 584 456 0 0 1032 445 322 0 0 767

Pk Hr Factor 0.712 0.891 0.000 0.000 0.775 0.806 0.885 0.000 0.000 0.904

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total9,947

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total9,947

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 65: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Schnoor Ave S/O Ave 16 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_041

NB SB EB WB5,130 4,265 0 0

AM Period NB SB EB WB NB SB EB WB00:00 9 6 15 89 81 170 00:15 6 2 8 88 58 14600:30 5 5 10 105 68 17300:45 3 23 3 16 6 39 99 381 66 273 165 65401:00 3 4 7 100 81 18101:15 2 2 4 87 65 15201:30 4 4 8 83 48 13101:45 6 15 3 13 9 28 78 348 62 256 140 60402:00 6 0 6 105 73 178 02:15 3 4 7 62 60 122 02:30 6 1 7 94 66 160 02:45 7 22 1 6 8 28 80 341 68 267 148 60803:00 4 3 7 86 93 179 03:15 4 2 6 107 78 185 03:30 5 5 10 99 94 193 03:45 7 20 3 13 10 33 85 377 100 365 185 74204:00 2 3 5 103 90 193 04:15 6 1 7 88 84 172 04:30 4 8 12 79 85 164 04:45 6 18 8 20 14 38 93 363 94 353 187 71605:00 14 10 24 116 114 230 05:15 15 11 26 121 100 221 05:30 23 14 37 101 90 191 05:45 21 73 17 52 38 125 114 452 94 398 208 85006:00 24 18 42 102 83 185 06:15 31 22 53 88 63 151 06:30 34 21 55 67 58 125 06:45 42 131 38 99 80 230 57 314 76 280 133 59407:00 39 33 72 77 62 139 07:15 57 36 93 72 40 112 07:30 99 49 148 76 69 145 07:45 78 273 79 197 157 470 85 310 59 230 144 54008:00 65 87 152 86 58 144 08:15 82 95 177 71 38 109 08:30 72 57 129 73 50 123 08:45 71 290 60 299 131 589 55 285 40 186 95 47109:00 69 49 118 56 33 89 09:15 41 50 91 42 36 78 09:30 54 37 91 33 32 65 09:45 54 218 55 191 109 409 36 167 33 134 69 30110:00 67 57 124 24 26 50 10:15 86 57 143 16 16 32 10:30 70 58 128 22 18 40 10:45 70 293 58 230 128 523 13 75 16 76 29 15111:00 65 70 135 16 13 29 11:15 81 52 133 18 8 26 11:30 73 68 141 3 12 15 11:45 79 298 83 273 162 571 6 43 5 38 11 81

TOTALS 1674 1409 3083 3456 2856 6312

SPLIT % 54.3% 45.7% 32.8% 54.8% 45.2% 67.2%

NB SB EB WB5,130 4,265 0 0

AM Peak Hour 11:45 07:45 11:45 17:00 16:45 17:00AM Pk Volume 361 318 651 452 398 850

Pk Hr Factor 0.860 0.837 0.941 0.934 0.873 0.9247 - 9 Volume 563 496 0 0 1059 815 751 0 0 1566

7 - 9 Peak Hour 07:30 07:45 07:30 17:00 16:45 17:007 - 9 Pk Volume 324 318 0 0 634 452 398 0 0 850

Pk Hr Factor 0.818 0.837 0.000 0.000 0.895 0.934 0.873 0.000 0.000 0.924

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total9,395

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total9,395

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 66: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Schnoor Ave S/O Sunset Ave Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_042

NB SB EB WB3,820 3,850 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 4 7 48 68 116 00:15 9 1 10 53 65 11800:30 5 3 8 46 66 11200:45 3 20 1 9 4 29 54 201 70 269 124 47001:00 4 3 7 60 75 13501:15 4 0 4 48 63 11101:30 4 1 5 54 53 10701:45 4 16 2 6 6 22 49 211 51 242 100 45302:00 1 3 4 53 84 137 02:15 4 3 7 56 79 135 02:30 0 3 3 50 94 144 02:45 2 7 1 10 3 17 81 240 84 341 165 58103:00 4 3 7 69 83 152 03:15 7 0 7 93 61 154 03:30 10 2 12 85 73 158 03:45 8 29 3 8 11 37 64 311 66 283 130 59404:00 7 1 8 73 73 146 04:15 9 2 11 69 73 142 04:30 8 5 13 65 66 131 04:45 17 41 7 15 24 56 78 285 69 281 147 56605:00 24 5 29 64 81 145 05:15 29 9 38 58 80 138 05:30 32 13 45 63 77 140 05:45 21 106 13 40 34 146 63 248 63 301 126 54906:00 28 14 42 51 65 116 06:15 42 15 57 52 53 105 06:30 64 14 78 48 63 111 06:45 59 193 33 76 92 269 60 211 54 235 114 44607:00 70 34 104 42 55 97 07:15 99 66 165 36 46 82 07:30 104 99 203 40 53 93 07:45 117 390 119 318 236 708 40 158 56 210 96 36808:00 86 67 153 38 41 79 08:15 65 87 152 23 45 68 08:30 87 56 143 19 38 57 08:45 70 308 42 252 112 560 25 105 27 151 52 25609:00 56 52 108 20 21 41 09:15 49 43 92 28 22 50 09:30 50 50 100 17 29 46 09:45 61 216 53 198 114 414 7 72 18 90 25 16210:00 56 47 103 16 15 31 10:15 47 52 99 11 8 19 10:30 34 42 76 4 6 10 10:45 41 178 59 200 100 378 14 45 14 43 28 8811:00 43 41 84 6 10 16 11:15 61 56 117 5 4 9 11:30 61 67 128 2 5 7 11:45 44 209 84 248 128 457 7 20 5 24 12 44

TOTALS 1713 1380 3093 2107 2470 4577

SPLIT % 55.4% 44.6% 40.3% 46.0% 54.0% 59.7%

NB SB EB WB3,820 3,850 0 0

AM Peak Hour 07:15 07:30 07:15 14:45 14:00 14:45AM Pk Volume 406 372 757 328 341 629

Pk Hr Factor 0.868 0.782 0.802 0.882 0.907 0.9537 - 9 Volume 698 570 0 0 1268 533 582 0 0 1115

7 - 9 Peak Hour 07:15 07:30 07:15 16:00 16:45 16:457 - 9 Pk Volume 406 372 0 0 757 285 307 0 0 570

Pk Hr Factor 0.868 0.782 0.000 0.000 0.802 0.913 0.948 0.000 0.000 0.969

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total7,670

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total7,670

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 67: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Stadium Rd N/O Almond Ave Day: Thursday City: Madera

Date: 9/5/19 Project #: CA19_7296_043

NB SB EB WB2,015 1,979 0 0

AM Period NB SB EB WB NB SB EB WB00:00 5 2 7 31 20 51 00:15 3 2 5 23 22 4500:30 2 1 3 24 27 5100:45 2 12 2 7 4 19 22 100 26 95 48 19501:00 1 1 2 31 37 6801:15 4 5 9 27 41 6801:30 3 1 4 44 45 8901:45 1 9 1 8 2 17 38 140 26 149 64 28902:00 1 0 1 28 17 45 02:15 3 1 4 29 25 54 02:30 2 3 5 39 28 67 02:45 2 8 2 6 4 14 24 120 48 118 72 23803:00 1 0 1 63 50 113 03:15 0 1 1 110 66 176 03:30 0 0 0 66 50 116 03:45 1 2 0 1 1 3 50 289 32 198 82 48704:00 1 3 4 41 26 67 04:15 1 1 2 35 37 72 04:30 3 8 11 43 38 81 04:45 4 9 9 21 13 30 28 147 36 137 64 28405:00 4 6 10 61 31 92 05:15 2 11 13 49 39 88 05:30 2 7 9 40 37 77 05:45 3 11 20 44 23 55 33 183 37 144 70 32706:00 7 12 19 40 35 75 06:15 5 12 17 38 35 73 06:30 10 17 27 28 19 47 06:45 12 34 16 57 28 91 29 135 22 111 51 24607:00 13 20 33 22 22 44 07:15 21 44 65 22 20 42 07:30 31 55 86 24 19 43 07:45 39 104 41 160 80 264 25 93 21 82 46 17508:00 46 61 107 18 15 33 08:15 45 63 108 14 12 26 08:30 59 77 136 20 17 37 08:45 35 185 37 238 72 423 9 61 12 56 21 11709:00 21 20 41 7 9 16 09:15 21 11 32 7 10 17 09:30 17 22 39 7 8 15 09:45 21 80 22 75 43 155 5 26 17 44 22 7010:00 19 30 49 15 3 18 10:15 18 18 36 10 8 18 10:30 30 23 53 4 7 11 10:45 27 94 27 98 54 192 6 35 4 22 10 5711:00 34 22 56 2 4 6 11:15 25 28 53 3 6 9 11:30 40 24 64 2 3 5 11:45 26 125 21 95 47 220 6 13 0 13 6 26

TOTALS 673 810 1483 1342 1169 2511

SPLIT % 45.4% 54.6% 37.1% 53.4% 46.6% 62.9%

NB SB EB WB2,015 1,979 0 0

AM Peak Hour 07:45 07:45 07:45 15:00 14:45 15:00AM Pk Volume 189 242 431 289 214 487

Pk Hr Factor 0.801 0.786 0.792 0.657 0.811 0.6927 - 9 Volume 289 398 0 0 687 330 281 0 0 611

7 - 9 Peak Hour 07:45 07:45 07:45 17:00 16:30 17:007 - 9 Pk Volume 189 242 0 0 431 183 144 0 0 327

Pk Hr Factor 0.801 0.786 0.000 0.000 0.792 0.750 0.923 0.000 0.000 0.889

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,994

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,994

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 68: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Storey Rd E/O SR 145 Day: Tuesday City: Madera

Date: 9/17/19 Project #: CA19_7296_044

NB SB EB WB0 0 1,416 1,429

AM Period NB SB EB WB NB SB EB WB00:00 1 1 2 25 20 45 00:15 2 6 8 20 16 3600:30 2 0 2 21 18 3900:45 1 6 2 9 3 15 19 85 17 71 36 15601:00 3 2 5 17 24 4101:15 1 1 2 21 21 4201:30 1 0 1 34 27 6101:45 2 7 1 4 3 11 17 89 14 86 31 17502:00 2 6 8 14 14 28 02:15 3 0 3 18 25 43 02:30 0 0 0 20 18 38 02:45 2 7 3 9 5 16 12 64 27 84 39 14803:00 0 0 0 15 23 38 03:15 1 1 2 17 16 33 03:30 1 3 4 31 36 67 03:45 2 4 4 8 6 12 20 83 26 101 46 18404:00 2 4 6 21 31 52 04:15 2 4 6 23 20 43 04:30 4 5 9 26 30 56 04:45 16 24 6 19 22 43 20 90 20 101 40 19105:00 4 4 8 20 29 49 05:15 8 9 17 32 26 58 05:30 7 6 13 39 27 66 05:45 10 29 7 26 17 55 37 128 33 115 70 24306:00 13 19 32 43 22 65 06:15 22 11 33 33 33 66 06:30 25 11 36 28 19 47 06:45 35 95 18 59 53 154 32 136 28 102 60 23807:00 10 24 34 21 38 59 07:15 19 18 37 17 39 56 07:30 23 23 46 17 41 58 07:45 18 70 19 84 37 154 19 74 27 145 46 21908:00 20 13 33 15 21 36 08:15 11 8 19 17 18 35 08:30 14 15 29 13 24 37 08:45 19 64 5 41 24 105 16 61 11 74 27 13509:00 12 10 22 12 11 23 09:15 16 15 31 17 10 27 09:30 16 20 36 7 15 22 09:45 12 56 10 55 22 111 9 45 8 44 17 8910:00 13 24 37 18 6 24 10:15 11 16 27 13 4 17 10:30 21 13 34 0 7 7 10:45 19 64 15 68 34 132 1 32 10 27 11 5911:00 17 13 30 5 5 10 11:15 18 25 43 5 4 9 11:30 27 30 57 2 4 6 11:45 28 90 15 83 43 173 1 13 1 14 2 27

TOTALS 516 465 981 900 964 1864

SPLIT % 52.6% 47.4% 34.5% 48.3% 51.7% 65.5%

NB SB EB WB0 0 1,416 1,429

AM Peak Hour 11:30 11:15 11:15 17:30 18:45 17:30AM Pk Volume 100 90 188 152 146 267

Pk Hr Factor 0.893 0.750 0.825 0.884 0.890 0.9547 - 9 Volume 0 0 134 125 259 0 0 218 216 434

7 - 9 Peak Hour 07:15 07:00 07:00 17:00 17:00 17:007 - 9 Pk Volume 0 0 80 84 154 0 0 128 115 243

Pk Hr Factor 0.000 0.000 0.870 0.875 0.837 0.000 0.000 0.821 0.871 0.868

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,845

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,845

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 69: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Sunrise Ave W/O Rd 28 Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_045

NB SB EB WB0 0 1,795 1,610

AM Period NB SB EB WB NB SB EB WB00:00 0 1 1 24 31 55 00:15 2 3 5 19 16 3500:30 2 1 3 28 15 4300:45 0 4 0 5 0 9 20 91 23 85 43 17601:00 0 3 3 18 27 4501:15 1 0 1 31 20 5101:30 1 3 4 46 25 7101:45 1 3 0 6 1 9 29 124 21 93 50 21702:00 0 0 0 27 18 45 02:15 2 0 2 18 23 41 02:30 0 2 2 22 36 58 02:45 2 4 2 4 4 8 24 91 30 107 54 19803:00 2 0 2 28 35 63 03:15 1 1 2 73 54 127 03:30 1 2 3 54 37 91 03:45 5 9 1 4 6 13 33 188 32 158 65 34604:00 3 0 3 31 38 69 04:15 2 6 8 25 38 63 04:30 5 7 12 32 32 64 04:45 9 19 11 24 20 43 34 122 26 134 60 25605:00 13 6 19 40 40 80 05:15 14 10 24 40 43 83 05:30 27 12 39 66 35 101 05:45 19 73 7 35 26 108 36 182 33 151 69 33306:00 22 6 28 38 25 63 06:15 14 4 18 26 21 47 06:30 10 8 18 20 17 37 06:45 15 61 6 24 21 85 20 104 24 87 44 19107:00 21 15 36 15 22 37 07:15 32 23 55 18 17 35 07:30 29 39 68 24 20 44 07:45 50 132 41 118 91 250 22 79 18 77 40 15608:00 37 46 83 18 23 41 08:15 38 57 95 8 18 26 08:30 42 45 87 19 18 37 08:45 18 135 23 171 41 306 16 61 13 72 29 13309:00 21 10 31 6 10 16 09:15 17 10 27 10 11 21 09:30 11 13 24 7 6 13 09:45 25 74 11 44 36 118 7 30 13 40 20 7010:00 28 16 44 8 6 14 10:15 10 15 25 3 4 7 10:30 18 15 33 2 7 9 10:45 24 80 19 65 43 145 12 25 4 21 16 4611:00 24 24 48 2 3 5 11:15 16 21 37 3 3 6 11:30 27 16 43 6 3 9 11:45 24 91 14 75 38 166 2 13 1 10 3 23

TOTALS 685 575 1260 1110 1035 2145

SPLIT % 54.4% 45.6% 37.0% 51.7% 48.3% 63.0%

NB SB EB WB0 0 1,795 1,610

AM Peak Hour 07:45 07:45 07:45 15:15 15:15 15:15AM Pk Volume 167 189 356 191 161 352

Pk Hr Factor 0.835 0.829 0.937 0.654 0.745 0.6937 - 9 Volume 0 0 267 289 556 0 0 304 285 589

7 - 9 Peak Hour 07:45 07:45 07:45 17:00 17:00 17:007 - 9 Pk Volume 0 0 167 189 356 0 0 182 151 333

Pk Hr Factor 0.000 0.000 0.835 0.829 0.937 0.000 0.000 0.689 0.878 0.824

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,405

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,405

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 70: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Sunset Ave W/O Westberry Blvd Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_046

NB SB EB WB0 0 1,421 1,380

AM Period NB SB EB WB NB SB EB WB00:00 5 0 5 15 24 39 00:15 2 1 3 17 7 2400:30 0 0 0 8 10 1800:45 1 8 2 3 3 11 15 55 16 57 31 11201:00 2 1 3 14 17 3101:15 0 0 0 9 17 2601:30 0 0 0 11 14 2501:45 2 4 1 2 3 6 11 45 30 78 41 12302:00 2 0 2 17 31 48 02:15 0 0 0 20 48 68 02:30 0 0 0 28 51 79 02:45 0 2 0 0 2 125 190 16 146 141 33603:00 0 0 0 39 16 55 03:15 0 1 1 36 31 67 03:30 1 2 3 23 29 52 03:45 1 2 1 4 2 6 37 135 23 99 60 23404:00 2 0 2 39 23 62 04:15 1 2 3 32 18 50 04:30 1 4 5 19 19 38 04:45 5 9 6 12 11 21 22 112 24 84 46 19605:00 6 9 15 23 27 50 05:15 4 6 10 18 26 44 05:30 6 9 15 21 21 42 05:45 4 20 6 30 10 50 20 82 29 103 49 18506:00 4 13 17 19 18 37 06:15 9 8 17 21 17 38 06:30 10 14 24 16 19 35 06:45 18 41 14 49 32 90 11 67 10 64 21 13107:00 11 27 38 14 19 33 07:15 55 53 108 19 12 31 07:30 64 84 148 14 19 33 07:45 115 245 94 258 209 503 20 67 16 66 36 13308:00 52 27 79 10 16 26 08:15 31 14 45 7 17 24 08:30 12 8 20 5 13 18 08:45 9 104 18 67 27 171 11 33 16 62 27 9509:00 14 16 30 3 9 12 09:15 12 10 22 10 13 23 09:30 18 5 23 5 11 16 09:45 9 53 13 44 22 97 1 19 4 37 5 5610:00 18 12 30 3 4 7 10:15 18 5 23 4 2 6 10:30 8 12 20 1 3 4 10:45 9 53 13 42 22 95 1 9 2 11 3 2011:00 10 11 21 3 5 8 11:15 12 9 21 5 2 7 11:30 13 20 33 3 3 6 11:45 19 54 9 49 28 103 1 12 3 13 4 25

TOTALS 595 560 1155 826 820 1646

SPLIT % 51.5% 48.5% 41.2% 50.2% 49.8% 58.8%

NB SB EB WB0 0 1,421 1,380

AM Peak Hour 07:15 07:00 07:15 14:30 13:45 14:15AM Pk Volume 286 258 544 228 160 343

Pk Hr Factor 0.622 0.686 0.651 0.456 0.784 0.6087 - 9 Volume 0 0 349 325 674 0 0 194 187 381

7 - 9 Peak Hour 07:15 07:00 07:15 16:00 17:00 16:007 - 9 Pk Volume 0 0 286 258 544 0 0 112 103 196

Pk Hr Factor 0.000 0.000 0.622 0.686 0.651 0.000 0.000 0.718 0.888 0.790

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total2,801

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total2,801

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 71: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Sunset Ave W/O 4th St Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_047

NB SB EB WB0 0 3,719 4,053

AM Period NB SB EB WB NB SB EB WB00:00 4 4 8 78 88 166 00:15 1 3 4 52 64 11600:30 3 3 6 45 68 11300:45 3 11 1 11 4 22 37 212 61 281 98 49301:00 4 2 6 44 63 10701:15 2 1 3 45 73 11801:30 2 3 5 44 55 9901:45 7 15 1 7 8 22 61 194 53 244 114 43802:00 2 0 2 48 66 114 02:15 0 4 4 61 50 111 02:30 0 1 1 68 80 148 02:45 1 3 2 7 3 10 68 245 114 310 182 55503:00 2 2 4 109 80 189 03:15 2 2 4 118 142 260 03:30 1 2 3 65 112 177 03:45 3 8 3 9 6 17 73 365 71 405 144 77004:00 7 1 8 79 92 171 04:15 2 1 3 61 75 136 04:30 3 2 5 78 68 146 04:45 4 16 6 10 10 26 79 297 89 324 168 62105:00 9 2 11 119 106 225 05:15 3 10 13 100 101 201 05:30 10 9 19 106 90 196 05:45 16 38 9 30 25 68 90 415 78 375 168 79006:00 10 12 22 63 54 117 06:15 18 14 32 58 62 120 06:30 17 21 38 73 58 131 06:45 24 69 19 66 43 135 62 256 60 234 122 49007:00 42 20 62 54 67 121 07:15 36 33 69 57 50 107 07:30 77 59 136 41 69 110 07:45 90 245 67 179 157 424 46 198 59 245 105 44308:00 48 86 134 47 56 103 08:15 99 66 165 53 47 100 08:30 105 97 202 48 40 88 08:45 54 306 70 319 124 625 30 178 42 185 72 36309:00 31 67 98 30 27 57 09:15 26 46 72 40 9 49 09:30 22 52 74 21 11 32 09:45 36 115 65 230 101 345 18 109 14 61 32 17010:00 25 55 80 22 14 36 10:15 38 49 87 20 8 28 10:30 31 55 86 16 6 22 10:45 36 130 59 218 95 348 14 72 5 33 19 10511:00 42 65 107 11 13 24 11:15 44 49 93 8 1 9 11:30 53 69 122 5 7 12 11:45 50 189 61 244 111 433 9 33 5 26 14 59

TOTALS 1145 1330 2475 2574 2723 5297

SPLIT % 46.3% 53.7% 31.8% 48.6% 51.4% 68.2%

NB SB EB WB0 0 3,719 4,053

AM Peak Hour 07:45 08:00 07:45 17:00 14:45 14:45AM Pk Volume 342 319 658 415 448 808

Pk Hr Factor 0.814 0.822 0.814 0.872 0.789 0.7777 - 9 Volume 0 0 551 498 1049 0 0 712 699 1411

7 - 9 Peak Hour 07:45 08:00 07:45 17:00 16:45 16:457 - 9 Pk Volume 0 0 342 319 658 0 0 415 386 790

Pk Hr Factor 0.000 0.000 0.814 0.822 0.814 0.000 0.000 0.872 0.910 0.878

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total7,772

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total7,772

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 72: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Sunset Ave E/O Westberry Blvd Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_048

NB SB EB WB0 0 1,892 1,686

AM Period NB SB EB WB NB SB EB WB00:00 5 1 6 32 33 65 00:15 2 1 3 18 14 3200:30 1 1 2 22 20 4200:45 0 8 0 3 0 11 25 97 22 89 47 18601:00 3 1 4 23 14 3701:15 0 2 2 19 17 3601:30 0 0 0 18 15 3301:45 1 4 1 4 2 8 14 74 26 72 40 14602:00 3 0 3 23 25 48 02:15 0 0 0 27 39 66 02:30 0 1 1 32 58 90 02:45 1 4 1 2 2 6 119 201 31 153 150 35403:00 1 0 1 43 18 61 03:15 2 2 4 32 36 68 03:30 1 3 4 33 35 68 03:45 2 6 1 6 3 12 44 152 31 120 75 27204:00 0 1 1 39 33 72 04:15 4 1 5 39 22 61 04:30 1 5 6 27 32 59 04:45 5 10 5 12 10 22 29 134 32 119 61 25305:00 5 9 14 31 40 71 05:15 7 7 14 28 40 68 05:30 10 8 18 28 30 58 05:45 5 27 10 34 15 61 29 116 30 140 59 25606:00 9 19 28 26 33 59 06:15 21 16 37 23 23 46 06:30 21 18 39 26 28 54 06:45 23 74 13 66 36 140 25 100 17 101 42 20107:00 25 28 53 26 24 50 07:15 61 47 108 27 20 47 07:30 85 66 151 19 27 46 07:45 108 279 64 205 172 484 15 87 18 89 33 17608:00 71 23 94 17 27 44 08:15 41 29 70 8 25 33 08:30 27 14 41 14 24 38 08:45 22 161 29 95 51 256 10 49 21 97 31 14609:00 25 24 49 10 20 30 09:15 30 13 43 13 13 26 09:30 23 20 43 9 10 19 09:45 17 95 17 74 34 169 5 37 10 53 15 9010:00 19 13 32 10 6 16 10:15 20 16 36 2 4 6 10:30 10 11 21 4 4 8 10:45 18 67 12 52 30 119 4 20 3 17 7 3711:00 16 15 31 4 5 9 11:15 19 16 35 5 3 8 11:30 22 20 42 0 5 5 11:45 23 80 16 67 39 147 1 10 3 16 4 26

TOTALS 815 620 1435 1077 1066 2143

SPLIT % 56.8% 43.2% 40.1% 50.3% 49.7% 59.9%

NB SB EB WB0 0 1,892 1,686

AM Peak Hour 07:15 07:00 07:15 14:45 14:00 14:30AM Pk Volume 325 205 525 227 153 369

Pk Hr Factor 0.752 0.777 0.763 0.477 0.659 0.6157 - 9 Volume 0 0 440 300 740 0 0 250 259 509

7 - 9 Peak Hour 07:15 07:00 07:15 16:00 16:30 16:307 - 9 Pk Volume 0 0 325 205 525 0 0 134 144 259

Pk Hr Factor 0.000 0.000 0.752 0.777 0.763 0.000 0.000 0.859 0.900 0.912

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,578

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,578

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 73: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Tozer St N/O Clinton St Day: Tuesday City: Madera

Date: 9/10/19 Project #: CA19_7296_049

NB SB EB WB7,282 7,164 0 0

AM Period NB SB EB WB NB SB EB WB00:00 13 10 23 100 119 219 00:15 9 7 16 97 89 18600:30 3 7 10 98 91 18900:45 1 26 6 30 7 56 109 404 94 393 203 79701:00 5 3 8 116 85 20101:15 2 7 9 145 91 23601:30 6 3 9 126 178 30401:45 3 16 4 17 7 33 97 484 136 490 233 97402:00 5 6 11 96 97 193 02:15 7 6 13 76 103 179 02:30 5 10 15 136 105 241 02:45 3 20 6 28 9 48 129 437 74 379 203 81603:00 2 4 6 122 126 248 03:15 9 7 16 154 162 316 03:30 13 14 27 120 153 273 03:45 11 35 12 37 23 72 144 540 149 590 293 113004:00 9 7 16 147 148 295 04:15 7 11 18 153 145 298 04:30 18 11 29 122 157 279 04:45 19 53 23 52 42 105 128 550 159 609 287 115905:00 35 30 65 152 173 325 05:15 54 42 96 165 164 329 05:30 67 48 115 140 146 286 05:45 42 198 47 167 89 365 178 635 143 626 321 126106:00 51 48 99 149 137 286 06:15 50 25 75 135 118 253 06:30 52 37 89 148 133 281 06:45 68 221 33 143 101 364 132 564 102 490 234 105407:00 105 59 164 91 123 214 07:15 177 100 277 121 101 222 07:30 257 157 414 102 130 232 07:45 195 734 169 485 364 1219 96 410 120 474 216 88408:00 137 127 264 97 106 203 08:15 96 92 188 71 89 160 08:30 102 71 173 71 86 157 08:45 81 416 59 349 140 765 61 300 100 381 161 68109:00 57 73 130 56 79 135 09:15 61 71 132 46 67 113 09:30 62 81 143 42 49 91 09:45 74 254 68 293 142 547 54 198 61 256 115 45410:00 83 49 132 33 40 73 10:15 67 61 128 30 31 61 10:30 57 82 139 21 27 48 10:45 102 309 113 305 215 614 20 104 21 119 41 22311:00 77 107 184 15 27 42 11:15 77 88 165 20 14 34 11:30 74 86 160 12 14 26 11:45 94 322 104 385 198 707 5 52 11 66 16 118

TOTALS 2604 2291 4895 4678 4873 9551

SPLIT % 53.2% 46.8% 33.9% 49.0% 51.0% 66.1%

NB SB EB WB7,282 7,164 0 0

AM Peak Hour 07:15 07:15 07:15 17:00 16:30 17:00AM Pk Volume 766 553 1319 635 653 1261

Pk Hr Factor 0.745 0.818 0.796 0.892 0.944 0.9587 - 9 Volume 1150 834 0 0 1984 1185 1235 0 0 2420

7 - 9 Peak Hour 07:15 07:15 07:15 17:00 16:30 17:007 - 9 Pk Volume 766 553 0 0 1319 635 653 0 0 1261

Pk Hr Factor 0.745 0.818 0.000 0.000 0.796 0.892 0.944 0.000 0.000 0.958

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total14,446

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total14,446

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 74: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Tulare St S/O Kennedy St Day: Thursday City: Madera

Date: 9/26/19 Project #: CA19_7296_050

NB SB EB WB1,559 1,560 0 0

AM Period NB SB EB WB NB SB EB WB00:00 1 1 2 9 10 19 00:15 4 0 4 22 18 4000:30 4 1 5 18 16 3400:45 3 12 1 3 4 15 13 62 15 59 28 12101:00 4 2 6 20 17 3701:15 4 3 7 33 21 5401:30 3 1 4 24 56 8001:45 0 11 1 7 1 18 17 94 27 121 44 21502:00 1 1 2 23 19 42 02:15 2 3 5 24 20 44 02:30 2 1 3 19 17 36 02:45 0 5 5 10 5 15 16 82 24 80 40 16203:00 1 0 1 20 17 37 03:15 0 0 0 28 37 65 03:30 2 0 2 22 41 63 03:45 8 11 4 4 12 15 29 99 27 122 56 22104:00 4 1 5 28 39 67 04:15 4 2 6 30 29 59 04:30 14 5 19 39 39 78 04:45 3 25 7 15 10 40 41 138 41 148 82 28605:00 11 12 23 35 43 78 05:15 15 17 32 33 35 68 05:30 23 11 34 33 32 65 05:45 22 71 10 50 32 121 28 129 29 139 57 26806:00 22 12 34 28 32 60 06:15 12 10 22 27 20 47 06:30 15 10 25 27 24 51 06:45 15 64 16 48 31 112 24 106 29 105 53 21107:00 15 21 36 26 27 53 07:15 21 21 42 36 28 64 07:30 45 43 88 30 23 53 07:45 43 124 40 125 83 249 24 116 19 97 43 21308:00 20 31 51 23 24 47 08:15 19 22 41 22 15 37 08:30 10 23 33 18 16 34 08:45 10 59 14 90 24 149 29 92 17 72 46 16409:00 13 7 20 24 11 35 09:15 9 10 19 8 16 24 09:30 12 7 19 13 17 30 09:45 13 47 12 36 25 83 9 54 10 54 19 10810:00 11 11 22 13 9 22 10:15 14 11 25 8 9 17 10:30 8 9 17 10 7 17 10:45 20 53 20 51 40 104 10 41 7 32 17 7311:00 13 29 42 5 3 8 11:15 10 12 22 4 5 9 11:30 7 20 27 8 6 14 11:45 12 42 13 74 25 116 5 22 4 18 9 40

TOTALS 524 513 1037 1035 1047 2082

SPLIT % 50.5% 49.5% 33.2% 49.7% 50.3% 66.8%

NB SB EB WB1,559 1,560 0 0

AM Peak Hour 07:15 07:30 07:15 16:30 16:30 16:30AM Pk Volume 129 136 264 148 158 306

Pk Hr Factor 0.717 0.791 0.750 0.902 0.919 0.9337 - 9 Volume 183 215 0 0 398 267 287 0 0 554

7 - 9 Peak Hour 07:15 07:30 07:15 16:30 16:30 16:307 - 9 Pk Volume 129 136 0 0 264 148 158 0 0 306

Pk Hr Factor 0.717 0.791 0.000 0.000 0.750 0.902 0.919 0.000 0.000 0.933

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,119

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,119

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 75: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 3rd St N/O Kings Ave Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_051

NB SB EB WB1,379 1,619 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 4 7 23 18 41 00:15 2 4 6 20 20 4000:30 2 1 3 28 24 5200:45 1 8 0 9 1 17 24 95 32 94 56 18901:00 2 1 3 21 29 5001:15 2 1 3 23 23 4601:30 0 1 1 12 18 3001:45 4 8 0 3 4 11 18 74 30 100 48 17402:00 1 0 1 22 23 45 02:15 0 1 1 22 21 43 02:30 1 0 1 26 20 46 02:45 0 2 1 2 1 4 24 94 27 91 51 18503:00 0 2 2 36 25 61 03:15 1 1 2 34 18 52 03:30 3 3 6 21 35 56 03:45 2 6 7 13 9 19 35 126 18 96 53 22204:00 4 7 11 35 16 51 04:15 1 5 6 27 19 46 04:30 3 8 11 29 20 49 04:45 2 10 8 28 10 38 21 112 22 77 43 18905:00 1 9 10 33 28 61 05:15 2 15 17 43 21 64 05:30 1 20 21 43 25 68 05:45 4 8 21 65 25 73 29 148 32 106 61 25406:00 9 24 33 39 28 67 06:15 4 23 27 33 24 57 06:30 7 22 29 20 19 39 06:45 8 28 31 100 39 128 18 110 27 98 45 20807:00 12 24 36 33 15 48 07:15 11 44 55 29 23 52 07:30 9 49 58 20 19 39 07:45 12 44 53 170 65 214 21 103 23 80 44 18308:00 27 43 70 18 13 31 08:15 20 32 52 15 14 29 08:30 14 28 42 12 17 29 08:45 14 75 23 126 37 201 25 70 5 49 30 11909:00 14 23 37 15 8 23 09:15 10 22 32 16 13 29 09:30 9 28 37 16 9 25 09:45 16 49 31 104 47 153 3 50 5 35 8 8510:00 17 10 27 7 4 11 10:15 9 9 18 10 6 16 10:30 12 21 33 10 10 20 10:45 12 50 14 54 26 104 4 31 5 25 9 5611:00 13 9 22 5 4 9 11:15 17 26 43 2 7 9 11:30 16 25 41 3 2 5 11:45 19 65 19 79 38 144 3 13 2 15 5 28

TOTALS 353 753 1106 1026 866 1892

SPLIT % 31.9% 68.1% 36.9% 54.2% 45.8% 63.1%

NB SB EB WB1,379 1,619 0 0

AM Peak Hour 11:45 07:15 07:15 17:15 17:30 17:15AM Pk Volume 90 189 248 154 109 260

Pk Hr Factor 0.804 0.892 0.886 0.895 0.852 0.9567 - 9 Volume 119 296 0 0 415 260 183 0 0 443

7 - 9 Peak Hour 08:00 07:15 07:15 17:00 17:00 17:007 - 9 Pk Volume 75 189 0 0 248 148 106 0 0 254

Pk Hr Factor 0.694 0.892 0.000 0.000 0.886 0.860 0.828 0.000 0.000 0.934

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,998

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,998

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 76: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 5th St N/O Kings Ave Day: Thursday City: Chowchilla

Date: 9/26/19 Project #: CA19_7296_052

NB SB EB WB1,346 1,240 0 0

AM Period NB SB EB WB NB SB EB WB00:00 5 1 6 23 30 53 00:15 0 0 0 18 15 3300:30 2 0 2 18 13 3100:45 3 10 0 1 3 11 13 72 20 78 33 15001:00 0 0 0 25 12 3701:15 0 1 1 26 19 4501:30 2 0 2 39 29 6801:45 0 2 0 1 0 3 33 123 41 101 74 22402:00 0 0 0 19 37 56 02:15 4 2 6 23 23 46 02:30 0 0 0 22 15 37 02:45 0 4 0 2 0 6 21 85 21 96 42 18103:00 2 2 4 15 25 40 03:15 1 1 2 28 23 51 03:30 1 2 3 42 16 58 03:45 1 5 1 6 2 11 25 110 17 81 42 19104:00 1 1 2 35 20 55 04:15 1 1 2 30 27 57 04:30 2 3 5 36 37 73 04:45 1 5 6 11 7 16 33 134 22 106 55 24005:00 2 5 7 33 27 60 05:15 2 10 12 39 16 55 05:30 1 12 13 38 23 61 05:45 5 10 16 43 21 53 31 141 20 86 51 22706:00 5 14 19 22 23 45 06:15 3 12 15 20 16 36 06:30 7 18 25 13 14 27 06:45 4 19 18 62 22 81 16 71 9 62 25 13307:00 11 17 28 20 7 27 07:15 27 23 50 17 17 34 07:30 59 40 99 18 9 27 07:45 25 122 46 126 71 248 19 74 11 44 30 11808:00 22 21 43 11 7 18 08:15 10 20 30 12 8 20 08:30 20 21 41 26 8 34 08:45 19 71 28 90 47 161 14 63 5 28 19 9109:00 13 14 27 11 10 21 09:15 14 18 32 12 10 22 09:30 13 11 24 6 6 12 09:45 14 54 23 66 37 120 5 34 2 28 7 6210:00 12 19 31 15 2 17 10:15 7 11 18 8 5 13 10:30 9 7 16 6 2 8 10:45 15 43 11 48 26 91 4 33 3 12 7 4511:00 14 12 26 5 0 5 11:15 9 8 17 1 0 1 11:30 10 18 28 0 1 1 11:45 19 52 22 60 41 112 3 9 1 2 4 11

TOTALS 397 516 913 949 724 1673

SPLIT % 43.5% 56.5% 35.3% 56.7% 43.3% 64.7%

NB SB EB WB1,346 1,240 0 0

AM Peak Hour 07:15 07:15 07:15 16:45 13:30 16:15AM Pk Volume 133 130 263 143 130 245

Pk Hr Factor 0.564 0.707 0.664 0.917 0.793 0.8397 - 9 Volume 193 216 0 0 409 275 192 0 0 467

7 - 9 Peak Hour 07:15 07:15 07:15 16:45 16:15 16:157 - 9 Pk Volume 133 130 0 0 263 143 113 0 0 245

Pk Hr Factor 0.564 0.707 0.000 0.000 0.664 0.917 0.764 0.000 0.000 0.839

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total2,586

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total2,586

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 77: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 5th St S/O SR 233 Day: Thursday City: Chowchilla

Date: 9/26/19 Project #: CA19_7296_053

NB SB EB WB1,706 1,441 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 0 3 36 27 63 00:15 2 0 2 26 21 4700:30 1 0 1 24 20 4400:45 1 7 1 1 2 8 21 107 24 92 45 19901:00 0 0 0 31 21 5201:15 0 0 0 24 21 4501:30 1 1 2 35 25 6001:45 2 3 1 2 3 5 39 129 30 97 69 22602:00 1 0 1 26 34 60 02:15 0 1 1 16 14 30 02:30 1 1 2 25 18 43 02:45 2 4 1 3 3 7 22 89 18 84 40 17303:00 1 0 1 28 23 51 03:15 1 0 1 31 38 69 03:30 1 4 5 61 25 86 03:45 4 7 2 6 6 13 28 148 28 114 56 26204:00 4 1 5 38 28 66 04:15 4 0 4 28 30 58 04:30 3 2 5 40 34 74 04:45 3 14 1 4 4 18 44 150 31 123 75 27305:00 6 4 10 32 26 58 05:15 7 8 15 34 32 66 05:30 7 7 14 38 33 71 05:45 11 31 8 27 19 58 32 136 24 115 56 25106:00 24 6 30 26 28 54 06:15 18 11 29 34 31 65 06:30 10 11 21 29 16 45 06:45 13 65 13 41 26 106 23 112 15 90 38 20207:00 20 9 29 29 13 42 07:15 37 18 55 21 20 41 07:30 27 33 60 19 17 36 07:45 30 114 30 90 60 204 26 95 18 68 44 16308:00 19 17 36 15 20 35 08:15 12 21 33 14 11 25 08:30 24 24 48 40 14 54 08:45 42 97 61 123 103 220 23 92 7 52 30 14409:00 32 18 50 18 15 33 09:15 22 25 47 9 10 19 09:30 22 18 40 8 8 16 09:45 19 95 16 77 35 172 4 39 11 44 15 8310:00 17 21 38 4 7 11 10:15 14 13 27 3 5 8 10:30 16 15 31 3 5 8 10:45 24 71 22 71 46 142 4 14 4 21 8 3511:00 20 19 39 4 3 7 11:15 11 11 22 1 5 6 11:30 24 39 63 4 3 7 11:45 22 77 11 80 33 157 1 10 5 16 6 26

TOTALS 585 525 1110 1121 916 2037

SPLIT % 52.7% 47.3% 35.3% 55.0% 45.0% 64.7%

NB SB EB WB1,706 1,441 0 0

AM Peak Hour 08:30 08:30 08:30 15:15 16:00 15:15AM Pk Volume 120 128 248 158 123 277

Pk Hr Factor 0.714 0.525 0.602 0.648 0.904 0.8057 - 9 Volume 211 213 0 0 424 286 238 0 0 524

7 - 9 Peak Hour 07:00 08:00 08:00 16:00 16:00 16:007 - 9 Pk Volume 114 123 0 0 220 150 123 0 0 273

Pk Hr Factor 0.770 0.504 0.000 0.000 0.534 0.852 0.904 0.000 0.000 0.910

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,147

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,147

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 78: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 11th St N/O Kings Ave Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_054

NB SB EB WB692 694 0 0

AM Period NB SB EB WB NB SB EB WB00:00 1 0 1 7 7 14 00:15 0 1 1 7 11 1800:30 0 0 0 10 6 1600:45 1 2 0 1 1 3 6 30 10 34 16 6401:00 0 1 1 16 8 2401:15 1 0 1 11 17 2801:30 0 0 0 8 26 3401:45 0 1 0 1 0 2 23 58 21 72 44 13002:00 2 0 2 27 11 38 02:15 0 0 0 10 5 15 02:30 0 0 0 5 4 9 02:45 0 2 0 0 2 8 50 8 28 16 7803:00 1 0 1 14 8 22 03:15 0 0 0 18 18 36 03:30 0 0 0 17 22 39 03:45 1 2 1 1 2 3 17 66 8 56 25 12204:00 1 0 1 12 10 22 04:15 1 1 2 9 9 18 04:30 3 1 4 9 13 22 04:45 1 6 2 4 3 10 11 41 9 41 20 8205:00 2 2 4 13 22 35 05:15 3 4 7 11 11 22 05:30 0 3 3 15 8 23 05:45 3 8 3 12 6 20 10 49 6 47 16 9606:00 3 5 8 9 10 19 06:15 4 4 8 9 7 16 06:30 3 5 8 5 6 11 06:45 5 15 5 19 10 34 4 27 7 30 11 5707:00 3 7 10 6 7 13 07:15 23 19 42 8 4 12 07:30 52 44 96 2 3 5 07:45 55 133 46 116 101 249 7 23 4 18 11 4108:00 23 42 65 6 7 13 08:15 9 13 22 1 5 6 08:30 4 15 19 4 3 7 08:45 8 44 11 81 19 125 3 14 1 16 4 3009:00 8 9 17 3 3 6 09:15 5 7 12 2 3 5 09:30 7 11 18 3 3 6 09:45 14 34 5 32 19 66 3 11 2 11 5 2210:00 4 8 12 3 0 3 10:15 6 11 17 0 3 3 10:30 9 6 15 1 1 2 10:45 4 23 9 34 13 57 0 4 0 4 0 811:00 13 10 23 4 0 4 11:15 8 7 15 0 2 2 11:30 10 7 17 2 1 3 11:45 12 43 9 33 21 76 0 6 0 3 0 9

TOTALS 313 334 647 379 360 739

SPLIT % 48.4% 51.6% 46.7% 51.3% 48.7% 53.3%

NB SB EB WB692 694 0 0

AM Peak Hour 07:15 07:15 07:15 13:15 13:15 13:15AM Pk Volume 153 151 304 69 75 144

Pk Hr Factor 0.695 0.821 0.752 0.639 0.721 0.8187 - 9 Volume 177 197 0 0 374 90 88 0 0 178

7 - 9 Peak Hour 07:15 07:15 07:15 16:45 16:30 16:457 - 9 Pk Volume 153 151 0 0 304 50 55 0 0 100

Pk Hr Factor 0.695 0.821 0.000 0.000 0.752 0.833 0.625 0.000 0.000 0.714

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,386

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,386

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 79: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 15th St N/O SR 233 Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_055

NB SB EB WB1,660 1,710 0 0

AM Period NB SB EB WB NB SB EB WB00:00 2 2 4 18 17 35 00:15 4 1 5 20 17 3700:30 3 4 7 13 17 3000:45 3 12 1 8 4 20 14 65 19 70 33 13501:00 5 2 7 20 13 3301:15 1 3 4 25 16 4101:30 4 1 5 33 24 5701:45 2 12 0 6 2 18 29 107 22 75 51 18202:00 2 1 3 25 45 70 02:15 2 0 2 24 25 49 02:30 1 0 1 21 26 47 02:45 1 6 1 2 2 8 27 97 23 119 50 21603:00 0 0 0 26 40 66 03:15 0 0 0 35 43 78 03:30 0 2 2 66 42 108 03:45 1 1 5 7 6 8 20 147 24 149 44 29604:00 0 4 4 29 27 56 04:15 0 3 3 29 14 43 04:30 3 4 7 32 24 56 04:45 0 3 5 16 5 19 51 141 28 93 79 23405:00 1 3 4 47 27 74 05:15 4 5 9 49 35 84 05:30 6 19 25 43 27 70 05:45 6 17 14 41 20 58 35 174 33 122 68 29606:00 5 11 16 29 28 57 06:15 2 9 11 33 34 67 06:30 4 13 17 50 33 83 06:45 5 16 15 48 20 64 36 148 35 130 71 27807:00 14 20 34 30 25 55 07:15 23 43 66 31 20 51 07:30 37 68 105 25 45 70 07:45 51 125 81 212 132 337 25 111 37 127 62 23808:00 27 28 55 35 33 68 08:15 30 21 51 31 14 45 08:30 15 21 36 16 27 43 08:45 11 83 13 83 24 166 17 99 20 94 37 19309:00 8 23 31 13 13 26 09:15 17 18 35 10 15 25 09:30 12 18 30 15 8 23 09:45 24 61 17 76 41 137 12 50 13 49 25 9910:00 19 10 29 17 8 25 10:15 12 11 23 10 13 23 10:30 15 22 37 6 10 16 10:45 22 68 19 62 41 130 5 38 3 34 8 7211:00 14 17 31 11 5 16 11:15 19 13 32 3 8 11 11:30 11 15 26 5 4 9 11:45 13 57 24 69 37 126 3 22 1 18 4 40

TOTALS 461 630 1091 1199 1080 2279

SPLIT % 42.3% 57.7% 32.4% 52.6% 47.4% 67.6%

NB SB EB WB1,660 1,710 0 0

AM Peak Hour 07:30 07:15 07:15 16:45 15:00 16:45AM Pk Volume 145 220 358 190 149 307

Pk Hr Factor 0.711 0.679 0.678 0.931 0.866 0.9147 - 9 Volume 208 295 0 0 503 315 215 0 0 530

7 - 9 Peak Hour 07:30 07:15 07:15 16:45 17:00 16:457 - 9 Pk Volume 145 220 0 0 358 190 122 0 0 307

Pk Hr Factor 0.711 0.679 0.000 0.000 0.678 0.931 0.871 0.000 0.000 0.914

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,370

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,370

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 80: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME 15th St S/O SR 233 Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_056

NB SB EB WB1,566 2,181 0 0

AM Period NB SB EB WB NB SB EB WB00:00 2 3 5 25 53 78 00:15 1 2 3 24 29 5300:30 2 0 2 21 32 5300:45 1 6 4 9 5 15 27 97 36 150 63 24701:00 1 0 1 34 35 6901:15 0 0 0 29 43 7201:30 3 1 4 21 43 6401:45 0 4 2 3 2 7 25 109 33 154 58 26302:00 0 0 0 28 28 56 02:15 0 0 0 22 22 44 02:30 1 2 3 21 35 56 02:45 0 1 1 3 1 4 22 93 36 121 58 21403:00 0 0 0 27 35 62 03:15 0 2 2 37 43 80 03:30 1 2 3 41 65 106 03:45 2 3 4 8 6 11 22 127 41 184 63 31104:00 0 2 2 26 39 65 04:15 2 0 2 19 46 65 04:30 2 4 6 17 48 65 04:45 8 12 10 16 18 28 24 86 34 167 58 25305:00 4 3 7 35 67 102 05:15 13 16 29 28 46 74 05:30 11 15 26 25 44 69 05:45 15 43 22 56 37 99 32 120 35 192 67 31206:00 14 7 21 30 22 52 06:15 9 13 22 28 29 57 06:30 13 11 24 31 36 67 06:45 13 49 18 49 31 98 26 115 35 122 61 23707:00 11 19 30 15 32 47 07:15 24 33 57 17 17 34 07:30 41 50 91 25 40 65 07:45 61 137 55 157 116 294 20 77 30 119 50 19608:00 32 36 68 23 41 64 08:15 18 29 47 22 21 43 08:30 21 29 50 11 24 35 08:45 19 90 32 126 51 216 10 66 18 104 28 17009:00 14 18 32 11 17 28 09:15 22 30 52 13 14 27 09:30 17 25 42 11 13 24 09:45 19 72 30 103 49 175 5 40 10 54 15 9410:00 22 25 47 11 12 23 10:15 20 22 42 4 3 7 10:30 22 29 51 5 7 12 10:45 29 93 43 119 72 212 2 22 3 25 5 4711:00 21 23 44 3 4 7 11:15 25 23 48 8 8 16 11:30 21 34 55 2 5 7 11:45 22 89 37 117 59 206 2 15 6 23 8 38

TOTALS 599 766 1365 967 1415 2382

SPLIT % 43.9% 56.1% 36.4% 40.6% 59.4% 63.6%

NB SB EB WB1,566 2,181 0 0

AM Peak Hour 07:15 07:15 07:15 14:45 16:15 15:15AM Pk Volume 158 174 332 127 195 314

Pk Hr Factor 0.648 0.791 0.716 0.774 0.728 0.7417 - 9 Volume 227 283 0 0 510 206 359 0 0 565

7 - 9 Peak Hour 07:15 07:15 07:15 17:00 16:15 17:007 - 9 Pk Volume 158 174 0 0 332 120 195 0 0 312

Pk Hr Factor 0.648 0.791 0.000 0.000 0.716 0.857 0.728 0.000 0.000 0.765

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,747

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,747

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 81: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Avenue 26 W/O Carlyle Way Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_057

NB SB EB WB0 0 6,495 7,140

AM Period NB SB EB WB NB SB EB WB00:00 12 12 24 126 144 270 00:15 7 11 18 88 99 18700:30 7 9 16 100 107 20700:45 3 29 4 36 7 65 110 424 145 495 255 91901:00 2 5 7 98 123 22101:15 6 9 15 88 98 18601:30 7 2 9 69 114 18301:45 6 21 8 24 14 45 91 346 92 427 183 77302:00 7 7 14 108 91 199 02:15 3 10 13 104 102 206 02:30 5 6 11 89 89 178 02:45 5 20 5 28 10 48 111 412 104 386 215 79803:00 6 10 16 123 143 266 03:15 5 7 12 103 155 258 03:30 9 4 13 140 149 289 03:45 5 25 9 30 14 55 125 491 131 578 256 106904:00 11 20 31 105 115 220 04:15 11 11 22 106 108 214 04:30 12 9 21 106 139 245 04:45 19 53 27 67 46 120 138 455 139 501 277 95605:00 36 28 64 171 146 317 05:15 40 35 75 134 160 294 05:30 46 38 84 133 122 255 05:45 58 180 39 140 97 320 125 563 138 566 263 112906:00 40 51 91 117 122 239 06:15 41 53 94 110 114 224 06:30 55 67 122 98 106 204 06:45 68 204 88 259 156 463 80 405 98 440 178 84507:00 75 114 189 75 98 173 07:15 69 103 172 81 89 170 07:30 110 148 258 92 75 167 07:45 155 409 189 554 344 963 83 331 103 365 186 69608:00 166 153 319 90 67 157 08:15 139 160 299 71 56 127 08:30 109 113 222 62 51 113 08:45 117 531 99 525 216 1056 42 265 47 221 89 48609:00 68 92 160 45 52 97 09:15 79 99 178 42 52 94 09:30 72 72 144 27 37 64 09:45 89 308 82 345 171 653 31 145 42 183 73 32810:00 77 114 191 28 28 56 10:15 77 96 173 23 27 50 10:30 79 91 170 20 24 44 10:45 90 323 98 399 188 722 15 86 19 98 34 18411:00 83 91 174 25 22 47 11:15 97 98 195 10 15 25 11:30 108 121 229 15 10 25 11:45 120 408 100 410 220 818 11 61 16 63 27 124

TOTALS 2511 2817 5328 3984 4323 8307

SPLIT % 47.1% 52.9% 39.1% 48.0% 52.0% 60.9%

NB SB EB WB0 0 6,495 7,140

AM Peak Hour 07:30 07:30 07:30 16:45 16:30 16:45AM Pk Volume 570 650 1220 576 584 1143

Pk Hr Factor 0.858 0.860 0.887 0.842 0.913 0.9017 - 9 Volume 0 0 940 1079 2019 0 0 1018 1067 2085

7 - 9 Peak Hour 07:30 07:30 07:30 16:45 16:30 16:457 - 9 Pk Volume 0 0 570 650 1220 0 0 576 584 1143

Pk Hr Factor 0.000 0.000 0.858 0.860 0.887 0.000 0.000 0.842 0.913 0.901

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total13,635

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total13,635

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 82: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Road 16 S/O Ave 24 ½ Day: Wednesday City: Chowchilla

Date: 9/18/19 Project #: CA19_7296_058

NB SB EB WB1,544 1,938 0 0

AM Period NB SB EB WB NB SB EB WB00:00 2 3 5 25 26 51 00:15 5 4 9 22 14 3600:30 1 4 5 15 27 4200:45 1 9 1 12 2 21 14 76 20 87 34 16301:00 2 4 6 12 33 4501:15 0 1 1 19 26 4501:30 1 2 3 20 33 5301:45 1 4 0 7 1 11 20 71 31 123 51 19402:00 0 1 1 21 32 53 02:15 0 1 1 20 14 34 02:30 0 2 2 19 32 51 02:45 2 2 2 6 4 8 18 78 23 101 41 17903:00 4 0 4 18 50 68 03:15 3 2 5 24 41 65 03:30 0 3 3 35 34 69 03:45 2 9 2 7 4 16 25 102 53 178 78 28004:00 5 3 8 15 46 61 04:15 1 1 2 30 36 66 04:30 9 4 13 37 30 67 04:45 5 20 5 13 10 33 31 113 52 164 83 27705:00 9 5 14 32 31 63 05:15 16 14 30 23 42 65 05:30 15 16 31 24 55 79 05:45 20 60 9 44 29 104 23 102 40 168 63 27006:00 29 26 55 19 47 66 06:15 28 21 49 19 34 53 06:30 29 20 49 17 28 45 06:45 21 107 24 91 45 198 14 69 33 142 47 21107:00 18 16 34 9 31 40 07:15 19 34 53 18 30 48 07:30 36 59 95 14 18 32 07:45 60 133 60 169 120 302 12 53 14 93 26 14608:00 37 38 75 19 14 33 08:15 20 34 54 31 9 40 08:30 17 25 42 20 8 28 08:45 27 101 23 120 50 221 33 103 14 45 47 14809:00 12 10 22 16 13 29 09:15 13 23 36 25 11 36 09:30 14 20 34 27 8 35 09:45 13 52 21 74 34 126 20 88 11 43 31 13110:00 15 14 29 19 16 35 10:15 12 26 38 9 12 21 10:30 17 16 33 10 7 17 10:45 11 55 19 75 30 130 4 42 11 46 15 8811:00 17 26 43 5 10 15 11:15 22 29 51 4 3 7 11:30 22 26 48 4 5 9 11:45 18 79 25 106 43 185 3 16 6 24 9 40

TOTALS 631 724 1355 913 1214 2127

SPLIT % 46.6% 53.4% 38.9% 42.9% 57.1% 61.1%

NB SB EB WB1,544 1,938 0 0

AM Peak Hour 07:30 07:15 07:30 16:15 17:15 16:45AM Pk Volume 153 191 344 130 184 290

Pk Hr Factor 0.638 0.796 0.717 0.878 0.836 0.8737 - 9 Volume 234 289 0 0 523 215 332 0 0 547

7 - 9 Peak Hour 07:30 07:15 07:30 16:15 16:45 16:457 - 9 Pk Volume 153 191 0 0 344 130 180 0 0 290

Pk Hr Factor 0.638 0.796 0.000 0.000 0.717 0.878 0.818 0.000 0.000 0.873

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total3,482

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total3,482

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 83: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Kings Ave W/O 6th St Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_059

NB SB EB WB0 0 767 932

AM Period NB SB EB WB NB SB EB WB00:00 1 1 2 16 17 33 00:15 1 1 2 5 12 1700:30 0 4 4 7 10 1700:45 0 2 1 7 1 9 6 34 13 52 19 8601:00 2 1 3 10 16 2601:15 1 0 1 8 25 3301:30 1 0 1 16 18 3401:45 0 4 1 2 1 6 12 46 24 83 36 12902:00 1 0 1 22 10 32 02:15 0 1 1 12 19 31 02:30 0 0 0 9 19 28 02:45 0 1 0 1 0 2 13 56 15 63 28 11903:00 0 0 0 14 11 25 03:15 0 0 0 24 18 42 03:30 1 0 1 14 20 34 03:45 0 1 2 2 2 3 12 64 25 74 37 13804:00 1 0 1 9 18 27 04:15 0 1 1 11 13 24 04:30 2 2 4 12 19 31 04:45 2 5 0 3 2 8 18 50 20 70 38 12005:00 4 1 5 20 29 49 05:15 3 2 5 15 25 40 05:30 11 4 15 19 15 34 05:45 7 25 6 13 13 38 13 67 21 90 34 15706:00 4 6 10 10 14 24 06:15 10 7 17 10 16 26 06:30 3 2 5 14 16 30 06:45 10 27 3 18 13 45 10 44 14 60 24 10407:00 3 11 14 11 9 20 07:15 10 12 22 7 11 18 07:30 32 23 55 7 8 15 07:45 26 71 45 91 71 162 6 31 10 38 16 6908:00 29 21 50 12 13 25 08:15 10 10 20 7 6 13 08:30 12 13 25 3 7 10 08:45 12 63 7 51 19 114 5 27 11 37 16 6409:00 8 7 15 4 7 11 09:15 7 9 16 4 4 8 09:30 14 10 24 3 12 15 09:45 18 47 10 36 28 83 3 14 7 30 10 4410:00 11 11 22 3 6 9 10:15 5 7 12 2 3 5 10:30 4 14 18 1 3 4 10:45 13 33 11 43 24 76 0 6 4 16 4 2211:00 10 14 24 1 2 3 11:15 8 10 18 0 1 1 11:30 16 6 22 2 5 7 11:45 12 46 12 42 24 88 0 3 2 10 2 13

TOTALS 325 309 634 442 623 1065

SPLIT % 51.3% 48.7% 37.3% 41.5% 58.5% 62.7%

NB SB EB WB0 0 767 932

AM Peak Hour 07:15 07:15 07:15 16:45 16:30 16:45AM Pk Volume 97 101 198 72 93 161

Pk Hr Factor 0.758 0.561 0.697 0.900 0.802 0.8217 - 9 Volume 0 0 134 142 276 0 0 117 160 277

7 - 9 Peak Hour 07:15 07:15 07:15 16:45 16:30 16:457 - 9 Pk Volume 0 0 97 101 198 0 0 72 93 161

Pk Hr Factor 0.000 0.000 0.758 0.561 0.697 0.000 0.000 0.900 0.802 0.821

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total1,699

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total1,699

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 84: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Monterey Ave W/O 13th St Day: Wednesday City: Chowchilla

Date: 9/4/19 Project #: CA19_7296_060

NB SB EB WB0 0 225 200

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 0 1 1 00:15 0 0 0 2 3 500:30 0 2 2 0 1 100:45 1 1 1 3 2 4 1 3 0 5 1 801:00 0 0 0 1 2 301:15 0 0 0 2 1 301:30 1 0 1 18 1 1901:45 1 2 0 1 2 9 30 5 9 14 3902:00 0 0 0 6 22 28 02:15 0 0 0 2 6 8 02:30 0 0 0 2 3 5 02:45 0 0 0 2 12 1 32 3 4403:00 0 0 0 3 6 9 03:15 0 0 0 5 4 9 03:30 0 0 0 9 4 13 03:45 0 0 0 6 23 2 16 8 3904:00 0 2 2 4 3 7 04:15 0 0 0 3 3 6 04:30 0 0 0 3 1 4 04:45 0 0 2 0 2 1 11 2 9 3 2005:00 0 0 0 1 0 1 05:15 1 0 1 1 5 6 05:30 0 0 0 1 2 3 05:45 0 1 0 0 1 4 7 4 11 8 1806:00 1 0 1 4 4 8 06:15 1 1 2 7 1 8 06:30 3 0 3 2 1 3 06:45 1 6 2 3 3 9 1 14 3 9 4 2307:00 3 1 4 5 2 7 07:15 18 8 26 3 1 4 07:30 28 17 45 1 2 3 07:45 10 59 13 39 23 98 6 15 3 8 9 2308:00 3 7 10 2 1 3 08:15 2 1 3 3 1 4 08:30 0 2 2 1 0 1 08:45 1 6 1 11 2 17 3 9 2 4 5 1309:00 0 1 1 0 3 3 09:15 1 2 3 1 4 5 09:30 2 3 5 1 1 2 09:45 1 4 1 7 2 11 1 3 2 10 3 1310:00 1 0 1 0 0 0 10:15 1 2 3 0 0 0 10:30 3 4 7 1 0 1 10:45 3 8 4 10 7 18 0 1 1 1 1 211:00 1 4 5 0 0 0 11:15 2 2 4 2 1 3 11:30 2 3 5 0 0 0 11:45 2 7 1 10 3 17 1 3 0 1 1 4

TOTALS 94 85 179 131 115 246

SPLIT % 52.5% 47.5% 42.1% 53.3% 46.7% 57.9%

NB SB EB WB0 0 225 200

AM Peak Hour 07:00 07:15 07:15 13:15 13:45 13:30AM Pk Volume 59 45 104 35 36 69

Pk Hr Factor 0.527 0.662 0.578 0.486 0.409 0.6167 - 9 Volume 0 0 65 50 115 0 0 18 20 38

7 - 9 Peak Hour 07:00 07:15 07:15 16:00 17:00 16:007 - 9 Pk Volume 0 0 59 45 104 0 0 11 11 20

Pk Hr Factor 0.000 0.000 0.527 0.662 0.578 0.000 0.000 0.688 0.550 0.714

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total425

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total425

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 85: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Ventura Ave W/O 6th St Day: Wednesday City: Chowchilla

Date: 9/18/19 Project #: CA19_7296_061

NB SB EB WB0 0 1,789 1,847

AM Period NB SB EB WB NB SB EB WB00:00 3 2 5 27 21 48 00:15 5 1 6 18 27 4500:30 4 0 4 26 26 5200:45 4 16 1 4 5 20 27 98 33 107 60 20501:00 2 1 3 25 23 4801:15 2 0 2 26 24 5001:30 3 0 3 28 35 6301:45 2 9 2 3 4 12 32 111 19 101 51 21202:00 0 4 4 20 31 51 02:15 2 0 2 23 19 42 02:30 0 0 0 34 24 58 02:45 2 4 2 6 4 10 24 101 30 104 54 20503:00 3 0 3 27 24 51 03:15 1 2 3 36 21 57 03:30 0 2 2 37 34 71 03:45 0 4 4 8 4 12 40 140 27 106 67 24604:00 2 6 8 47 34 81 04:15 2 3 5 52 35 87 04:30 3 3 6 46 34 80 04:45 3 10 14 26 17 36 51 196 30 133 81 32905:00 2 10 12 45 36 81 05:15 1 25 26 44 40 84 05:30 9 13 22 40 33 73 05:45 10 22 15 63 25 85 44 173 36 145 80 31806:00 8 26 34 39 25 64 06:15 9 23 32 30 27 57 06:30 13 26 39 30 23 53 06:45 5 35 33 108 38 143 37 136 25 100 62 23607:00 9 39 48 31 23 54 07:15 11 40 51 30 33 63 07:30 21 64 85 25 18 43 07:45 31 72 54 197 85 269 38 124 15 89 53 21308:00 32 49 81 38 24 62 08:15 27 46 73 24 13 37 08:30 17 35 52 21 15 36 08:45 17 93 31 161 48 254 16 99 9 61 25 16009:00 18 15 33 22 11 33 09:15 23 23 46 17 5 22 09:30 12 23 35 9 8 17 09:45 16 69 23 84 39 153 11 59 6 30 17 8910:00 11 20 31 18 6 24 10:15 19 18 37 11 22 33 10:30 22 21 43 7 5 12 10:45 19 71 10 69 29 140 4 40 5 38 9 7811:00 21 24 45 5 4 9 11:15 20 17 37 7 2 9 11:30 20 29 49 8 2 10 11:45 24 85 20 90 44 175 2 22 6 14 8 36

TOTALS 490 819 1309 1299 1028 2327

SPLIT % 37.4% 62.6% 36.0% 55.8% 44.2% 64.0%

NB SB EB WB0 0 1,789 1,847

AM Peak Hour 07:30 07:30 07:30 16:00 17:00 16:00AM Pk Volume 111 213 324 196 145 329

Pk Hr Factor 0.867 0.832 0.953 0.942 0.906 0.9457 - 9 Volume 0 0 165 358 523 0 0 369 278 647

7 - 9 Peak Hour 07:30 07:30 07:30 16:00 17:00 16:007 - 9 Pk Volume 0 0 111 213 324 0 0 196 145 329

Pk Hr Factor 0.000 0.000 0.867 0.832 0.953 0.000 0.000 0.942 0.906 0.945

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,636

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,636

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 86: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 4 N/O Ave 18 ½ Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_062

NB SB EB WB182 197 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 6 5 11 00:15 0 0 0 5 1 600:30 0 0 0 3 0 300:45 0 0 0 4 18 5 11 9 2901:00 0 0 0 2 3 501:15 0 0 0 0 1 101:30 0 0 0 2 2 401:45 1 1 0 1 1 1 5 4 10 5 1502:00 0 0 0 0 3 3 02:15 0 0 0 4 2 6 02:30 0 1 1 5 2 7 02:45 1 1 1 2 2 3 1 10 8 15 9 2503:00 2 2 4 2 3 5 03:15 0 1 1 2 2 4 03:30 0 2 2 1 4 5 03:45 0 2 1 6 1 8 4 9 1 10 5 1904:00 0 1 1 3 5 8 04:15 0 2 2 1 2 3 04:30 0 0 0 3 2 5 04:45 1 1 1 4 2 5 1 8 4 13 5 2105:00 0 3 3 2 3 5 05:15 1 3 4 4 0 4 05:30 3 3 6 3 4 7 05:45 2 6 5 14 7 20 3 12 4 11 7 2306:00 4 1 5 0 2 2 06:15 1 1 2 0 7 7 06:30 2 2 4 4 6 10 06:45 2 9 4 8 6 17 0 4 0 15 0 1907:00 3 4 7 7 0 7 07:15 2 4 6 4 1 5 07:30 3 0 3 0 0 0 07:45 9 17 2 10 11 27 3 14 0 1 3 1508:00 7 3 10 3 0 3 08:15 8 5 13 0 1 1 08:30 3 5 8 0 3 3 08:45 3 21 4 17 7 38 0 3 0 4 0 709:00 1 1 2 0 0 0 09:15 1 5 6 0 1 1 09:30 2 3 5 0 0 0 09:45 3 7 5 14 8 21 1 1 0 1 1 210:00 3 5 8 0 0 0 10:15 7 2 9 1 0 1 10:30 3 5 8 0 1 1 10:45 8 21 2 14 10 35 0 1 1 2 1 311:00 3 1 4 1 2 3 11:15 3 3 6 1 0 1 11:30 0 6 6 0 1 1 11:45 2 8 2 12 4 20 1 3 0 3 1 6

TOTALS 94 101 195 88 96 184

SPLIT % 48.2% 51.8% 51.5% 47.8% 52.2% 48.5%

NB SB EB WB182 197 0 0

AM Peak Hour 07:30 09:15 07:45 12:00 17:45 12:00AM Pk Volume 27 18 42 18 19 29

Pk Hr Factor 0.750 0.900 0.808 0.750 0.679 0.6597 - 9 Volume 38 27 0 0 65 20 24 0 0 44

7 - 9 Peak Hour 07:30 08:00 07:45 17:00 16:00 17:007 - 9 Pk Volume 27 17 0 0 42 12 13 0 0 23

Pk Hr Factor 0.750 0.850 0.000 0.000 0.808 0.750 0.650 0.000 0.000 0.821

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total379

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total379

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 87: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 9 S/O Ave 14 Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_063

NB SB EB WB574 676 0 0

AM Period NB SB EB WB NB SB EB WB00:00 3 2 5 5 9 14 00:15 1 1 2 3 5 800:30 1 0 1 10 7 1700:45 2 7 6 9 8 16 11 29 4 25 15 5401:00 3 0 3 5 6 1101:15 1 3 4 8 5 1301:30 1 3 4 6 9 1501:45 0 5 0 6 0 11 5 24 10 30 15 5402:00 3 1 4 8 13 21 02:15 1 4 5 8 3 11 02:30 0 2 2 12 5 17 02:45 4 8 1 8 5 16 9 37 5 26 14 6303:00 1 1 2 9 13 22 03:15 0 2 2 9 18 27 03:30 1 0 1 6 18 24 03:45 4 6 5 8 9 14 8 32 17 66 25 9804:00 2 0 2 20 20 40 04:15 1 2 3 11 16 27 04:30 3 1 4 8 12 20 04:45 8 14 11 14 19 28 12 51 15 63 27 11405:00 0 6 6 15 10 25 05:15 8 7 15 13 14 27 05:30 17 17 34 7 18 25 05:45 14 39 10 40 24 79 7 42 8 50 15 9206:00 15 16 31 16 12 28 06:15 13 10 23 3 9 12 06:30 14 13 27 6 8 14 06:45 6 48 13 52 19 100 8 33 6 35 14 6807:00 5 7 12 6 5 11 07:15 5 8 13 9 6 15 07:30 6 12 18 8 9 17 07:45 5 21 3 30 8 51 6 29 5 25 11 5408:00 4 9 13 6 2 8 08:15 7 9 16 1 6 7 08:30 11 6 17 4 4 8 08:45 8 30 10 34 18 64 2 13 7 19 9 3209:00 3 6 9 2 0 2 09:15 13 7 20 3 3 6 09:30 4 7 11 2 2 4 09:45 8 28 8 28 16 56 2 9 6 11 8 2010:00 2 10 12 1 2 3 10:15 6 9 15 0 4 4 10:30 15 7 22 6 4 10 10:45 2 25 6 32 8 57 4 11 3 13 7 2411:00 11 9 20 2 4 6 11:15 4 5 9 4 1 5 11:30 8 15 23 2 2 4 11:45 2 25 12 41 14 66 0 8 4 11 4 19

TOTALS 256 302 558 318 374 692

SPLIT % 45.9% 54.1% 44.6% 46.0% 54.0% 55.4%

NB SB EB WB574 676 0 0

AM Peak Hour 05:30 05:30 05:30 16:00 15:15 15:15AM Pk Volume 59 53 112 51 73 116

Pk Hr Factor 0.868 0.779 0.824 0.638 0.913 0.7257 - 9 Volume 51 64 0 0 115 93 113 0 0 206

7 - 9 Peak Hour 08:00 08:00 08:00 16:00 16:00 16:007 - 9 Pk Volume 30 34 0 0 64 51 63 0 0 114

Pk Hr Factor 0.682 0.850 0.000 0.000 0.889 0.638 0.788 0.000 0.000 0.713

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,250

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,250

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 88: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 9 N/O Ave 18 ½ Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_064

NB SB EB WB414 424 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 6 6 12 00:15 1 0 1 5 3 800:30 2 0 2 9 7 1600:45 0 3 0 0 3 6 26 8 24 14 5001:00 0 0 0 2 1 301:15 0 2 2 9 7 1601:30 0 0 0 5 4 901:45 0 0 2 0 2 5 21 9 21 14 4202:00 0 0 0 5 8 13 02:15 2 2 4 9 0 9 02:30 0 0 0 10 6 16 02:45 1 3 1 3 2 6 4 28 8 22 12 5003:00 0 2 2 6 17 23 03:15 2 1 3 10 7 17 03:30 0 0 0 4 8 12 03:45 2 4 0 3 2 7 8 28 8 40 16 6804:00 2 0 2 11 11 22 04:15 2 0 2 10 16 26 04:30 2 0 2 9 8 17 04:45 3 9 3 3 6 12 3 33 7 42 10 7505:00 1 5 6 7 10 17 05:15 5 5 10 8 5 13 05:30 6 8 14 15 2 17 05:45 4 16 9 27 13 43 6 36 7 24 13 6006:00 9 3 12 8 7 15 06:15 10 5 15 3 5 8 06:30 4 14 18 5 6 11 06:45 12 35 13 35 25 70 8 24 0 18 8 4207:00 5 6 11 4 4 8 07:15 5 5 10 3 3 6 07:30 5 5 10 6 3 9 07:45 7 22 7 23 14 45 3 16 2 12 5 2808:00 3 10 13 1 2 3 08:15 5 12 17 1 1 2 08:30 8 5 13 1 1 2 08:45 6 22 6 33 12 55 6 9 4 8 10 1709:00 5 4 9 2 2 4 09:15 5 4 9 3 0 3 09:30 5 2 7 2 3 5 09:45 3 18 7 17 10 35 0 7 2 7 2 1410:00 6 8 14 2 2 4 10:15 4 5 9 0 2 2 10:30 4 7 11 2 2 4 10:45 6 20 5 25 11 45 2 6 1 7 3 1311:00 4 6 10 1 0 1 11:15 13 7 20 1 1 2 11:30 4 7 11 1 1 2 11:45 3 24 6 26 9 50 1 4 0 2 1 6

TOTALS 176 197 373 238 227 465

SPLIT % 47.2% 52.8% 44.5% 51.2% 48.8% 55.5%

NB SB EB WB414 424 0 0

AM Peak Hour 06:00 06:15 06:00 15:45 15:30 15:45AM Pk Volume 35 38 70 38 43 81

Pk Hr Factor 0.729 0.679 0.700 0.864 0.672 0.7797 - 9 Volume 44 56 0 0 100 69 66 0 0 135

7 - 9 Peak Hour 07:45 07:30 07:45 17:00 16:00 16:007 - 9 Pk Volume 23 34 0 0 57 36 42 0 0 75

Pk Hr Factor 0.719 0.708 0.000 0.000 0.838 0.600 0.656 0.000 0.000 0.721

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total838

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total838

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 89: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 16 N/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_065

NB SB EB WB460 520 0 0

AM Period NB SB EB WB NB SB EB WB00:00 1 1 2 5 3 8 00:15 0 0 0 14 11 2500:30 0 0 0 6 7 1300:45 0 1 0 1 0 2 6 31 3 24 9 5501:00 0 1 1 7 3 1001:15 2 1 3 7 10 1701:30 1 0 1 7 3 1001:45 0 3 1 3 1 6 4 25 12 28 16 5302:00 0 3 3 12 11 23 02:15 2 12 14 6 7 13 02:30 1 0 1 5 8 13 02:45 2 5 3 18 5 23 8 31 5 31 13 6203:00 3 1 4 9 12 21 03:15 2 1 3 9 6 15 03:30 0 0 0 12 6 18 03:45 1 6 1 3 2 9 6 36 9 33 15 6904:00 1 5 6 12 3 15 04:15 3 1 4 4 11 15 04:30 0 3 3 8 2 10 04:45 7 11 4 13 11 24 9 33 9 25 18 5805:00 4 19 23 9 10 19 05:15 5 15 20 3 11 14 05:30 5 13 18 5 6 11 05:45 4 18 11 58 15 76 4 21 9 36 13 5706:00 12 5 17 12 7 19 06:15 5 5 10 5 5 10 06:30 8 15 23 8 6 14 06:45 7 32 6 31 13 63 5 30 3 21 8 5107:00 10 7 17 2 3 5 07:15 8 12 20 5 4 9 07:30 7 5 12 2 4 6 07:45 5 30 13 37 18 67 2 11 1 12 3 2308:00 7 8 15 1 5 6 08:15 4 4 8 2 5 7 08:30 5 8 13 3 3 6 08:45 6 22 6 26 12 48 2 8 3 16 5 2409:00 7 11 18 4 7 11 09:15 10 6 16 2 3 5 09:30 4 11 15 4 1 5 09:45 6 27 1 29 7 56 0 10 1 12 1 2210:00 9 7 16 1 1 2 10:15 11 2 13 3 3 6 10:30 5 10 15 0 2 2 10:45 3 28 10 29 13 57 3 7 2 8 5 1511:00 12 4 16 1 0 1 11:15 3 4 7 1 1 2 11:30 5 5 10 0 1 1 11:45 12 32 11 24 23 56 0 2 0 2 0 4

TOTALS 215 272 487 245 248 493

SPLIT % 44.1% 55.9% 49.7% 49.7% 50.3% 50.3%

NB SB EB WB460 520 0 0

AM Peak Hour 11:45 05:00 05:00 15:15 13:45 15:00AM Pk Volume 37 58 76 39 38 69

Pk Hr Factor 0.661 0.763 0.826 0.813 0.792 0.8217 - 9 Volume 52 63 0 0 115 54 61 0 0 115

7 - 9 Peak Hour 07:00 07:15 07:00 16:00 16:45 16:157 - 9 Pk Volume 30 38 0 0 67 33 36 0 0 62

Pk Hr Factor 0.750 0.731 0.000 0.000 0.838 0.688 0.818 0.000 0.000 0.816

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total980

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total980

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 90: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 16 N/O Ave 18 ½ Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_066

NB SB EB WB594 722 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 1 1 17 9 26 00:15 1 2 3 7 4 1100:30 1 0 1 8 10 1800:45 3 5 0 3 3 8 12 44 10 33 22 7701:00 1 0 1 8 8 1601:15 0 0 0 4 10 1401:30 1 1 2 4 10 1401:45 1 3 2 3 3 6 14 30 17 45 31 7502:00 0 1 1 7 4 11 02:15 1 1 2 16 15 31 02:30 2 0 2 5 6 11 02:45 0 3 1 3 1 6 10 38 18 43 28 8103:00 2 0 2 15 16 31 03:15 0 8 8 11 11 22 03:30 2 1 3 14 17 31 03:45 6 10 1 10 7 20 13 53 24 68 37 12104:00 3 1 4 14 28 42 04:15 3 2 5 13 23 36 04:30 1 6 7 13 20 33 04:45 2 9 7 16 9 25 12 52 16 87 28 13905:00 6 6 12 9 11 20 05:15 6 12 18 17 13 30 05:30 8 8 16 9 12 21 05:45 6 26 10 36 16 62 10 45 5 41 15 8606:00 9 12 21 8 13 21 06:15 8 13 21 9 6 15 06:30 3 10 13 11 9 20 06:45 6 26 13 48 19 74 4 32 4 32 8 6407:00 1 12 13 9 5 14 07:15 6 9 15 8 2 10 07:30 11 8 19 3 4 7 07:45 9 27 15 44 24 71 2 22 5 16 7 3808:00 9 14 23 2 0 2 08:15 8 3 11 2 3 5 08:30 12 13 25 5 2 7 08:45 6 35 7 37 13 72 0 9 6 11 6 2009:00 5 18 23 2 7 9 09:15 2 11 13 1 0 1 09:30 6 12 18 3 0 3 09:45 16 29 8 49 24 78 2 8 4 11 6 1910:00 7 6 13 0 2 2 10:15 11 12 23 3 1 4 10:30 8 12 20 5 1 6 10:45 9 35 9 39 18 74 2 10 2 6 4 1611:00 13 7 20 0 0 0 11:15 11 6 17 0 0 0 11:30 7 13 20 0 0 0 11:45 10 41 15 41 25 82 2 2 0 2 2

TOTALS 249 329 578 345 393 738

SPLIT % 43.1% 56.9% 43.9% 46.7% 53.3% 56.1%

NB SB EB WB594 722 0 0

AM Peak Hour 11:15 08:30 11:15 15:30 15:45 15:45AM Pk Volume 45 49 88 54 95 148

Pk Hr Factor 0.662 0.681 0.846 0.964 0.848 0.8817 - 9 Volume 62 81 0 0 143 97 128 0 0 225

7 - 9 Peak Hour 07:45 07:15 07:45 16:00 16:00 16:007 - 9 Pk Volume 38 46 0 0 83 52 87 0 0 139

Pk Hr Factor 0.792 0.767 0.000 0.000 0.830 0.929 0.777 0.000 0.000 0.827

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total1,316

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total1,316

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 91: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 19 N/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_067

NB SB EB WB245 305 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 5 9 14 00:15 0 0 0 4 1 500:30 0 0 0 3 4 700:45 0 0 0 2 14 8 22 10 3601:00 0 0 0 3 2 501:15 0 0 0 2 4 601:30 0 0 0 4 5 901:45 0 0 0 4 13 12 23 16 3602:00 0 0 0 3 4 7 02:15 0 0 0 3 10 13 02:30 0 0 0 5 3 8 02:45 0 1 1 1 1 6 17 4 21 10 3803:00 0 0 0 4 1 5 03:15 0 0 0 4 2 6 03:30 0 1 1 3 7 10 03:45 0 2 3 2 3 6 17 9 19 15 3604:00 0 1 1 1 8 9 04:15 0 2 2 4 4 8 04:30 1 2 3 9 8 17 04:45 2 3 2 7 4 10 8 22 5 25 13 4705:00 0 4 4 7 17 24 05:15 1 2 3 2 6 8 05:30 3 4 7 5 2 7 05:45 4 8 3 13 7 21 5 19 7 32 12 5106:00 16 3 19 2 6 8 06:15 8 7 15 6 10 16 06:30 8 7 15 1 4 5 06:45 5 37 3 20 8 57 1 10 6 26 7 3607:00 2 5 7 0 0 0 07:15 1 9 10 1 3 4 07:30 5 3 8 1 1 2 07:45 3 11 2 19 5 30 0 2 3 7 3 908:00 3 7 10 1 5 6 08:15 4 3 7 2 4 6 08:30 5 6 11 0 3 3 08:45 2 14 1 17 3 31 3 6 0 12 3 1809:00 8 1 9 2 1 3 09:15 6 1 7 0 1 1 09:30 2 3 5 0 1 1 09:45 3 19 3 8 6 27 1 3 0 3 1 610:00 10 1 11 0 0 0 10:15 3 5 8 0 1 1 10:30 2 4 6 0 0 0 10:45 2 17 5 15 7 32 0 0 1 0 111:00 3 0 3 0 1 1 11:15 2 2 4 0 0 0 11:30 2 6 8 0 0 0 11:45 6 13 2 10 8 23 0 0 1 0 1

TOTALS 122 113 235 123 192 315

SPLIT % 51.9% 48.1% 42.7% 39.0% 61.0% 57.3%

NB SB EB WB245 305 0 0

AM Peak Hour 06:00 06:30 06:00 16:15 16:30 16:15AM Pk Volume 37 24 57 28 36 62

Pk Hr Factor 0.578 0.667 0.750 0.778 0.529 0.6467 - 9 Volume 25 36 0 0 61 41 57 0 0 98

7 - 9 Peak Hour 07:30 07:15 07:15 16:15 16:30 16:157 - 9 Pk Volume 15 21 0 0 33 28 36 0 0 62

Pk Hr Factor 0.750 0.583 0.000 0.000 0.825 0.778 0.529 0.000 0.000 0.646

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total550

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total550

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 92: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 23 N/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_068

NB SB EB WB1,618 1,668 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 29 31 60 00:15 1 7 8 32 25 5700:30 3 3 6 30 26 5600:45 1 5 1 11 2 16 24 115 23 105 47 22001:00 0 5 5 22 21 4301:15 2 9 11 27 15 4201:30 4 1 5 18 29 4701:45 1 7 1 16 2 23 22 89 20 85 42 17402:00 5 4 9 38 21 59 02:15 5 1 6 39 27 66 02:30 8 2 10 26 22 48 02:45 1 19 5 12 6 31 34 137 30 100 64 23703:00 9 5 14 25 27 52 03:15 1 5 6 25 30 55 03:30 4 7 11 22 21 43 03:45 6 20 6 23 12 43 31 103 26 104 57 20704:00 7 5 12 28 12 40 04:15 3 3 6 28 34 62 04:30 12 18 30 22 30 52 04:45 8 30 25 51 33 81 27 105 22 98 49 20305:00 12 25 37 19 35 54 05:15 17 38 55 18 31 49 05:30 27 45 72 18 16 34 05:45 21 77 51 159 72 236 18 73 23 105 41 17806:00 25 45 70 22 16 38 06:15 29 29 58 17 19 36 06:30 28 23 51 27 21 48 06:45 24 106 20 117 44 223 17 83 12 68 29 15107:00 21 19 40 17 16 33 07:15 29 22 51 17 14 31 07:30 23 48 71 12 18 30 07:45 20 93 29 118 49 211 9 55 9 57 18 11208:00 33 21 54 15 14 29 08:15 19 23 42 17 16 33 08:30 29 23 52 13 15 28 08:45 19 100 19 86 38 186 7 52 17 62 24 11409:00 23 16 39 14 13 27 09:15 18 8 26 14 8 22 09:30 18 24 42 10 9 19 09:45 18 77 10 58 28 135 5 43 7 37 12 8010:00 17 18 35 16 10 26 10:15 25 25 50 12 3 15 10:30 18 19 37 8 8 16 10:45 19 79 12 74 31 153 9 45 6 27 15 7211:00 21 21 42 6 3 9 11:15 16 10 26 5 3 8 11:30 20 29 49 5 7 12 11:45 30 87 17 77 47 164 2 18 5 18 7 36

TOTALS 700 802 1502 918 866 1784

SPLIT % 46.6% 53.4% 45.7% 51.5% 48.5% 54.3%

NB SB EB WB1,618 1,668 0 0

AM Peak Hour 11:45 05:15 05:30 14:00 16:15 14:00AM Pk Volume 121 179 272 137 121 237

Pk Hr Factor 0.945 0.877 0.944 0.878 0.864 0.8987 - 9 Volume 193 204 0 0 397 178 203 0 0 381

7 - 9 Peak Hour 07:15 07:30 07:15 16:00 16:15 16:157 - 9 Pk Volume 105 121 0 0 225 105 121 0 0 217

Pk Hr Factor 0.795 0.630 0.000 0.000 0.792 0.938 0.864 0.000 0.000 0.875

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total3,286

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total3,286

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 93: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 26 N/O Ave 18 ½ Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_069

NB SB EB WB4,767 4,651 0 0

AM Period NB SB EB WB NB SB EB WB00:00 4 9 13 53 53 106 00:15 4 12 16 50 63 11300:30 1 3 4 63 64 12700:45 4 13 5 29 9 42 53 219 85 265 138 48401:00 0 5 5 64 97 16101:15 6 3 9 62 100 16201:30 4 1 5 148 67 21501:45 1 11 4 13 5 24 111 385 63 327 174 71202:00 5 3 8 67 55 122 02:15 0 3 3 67 65 132 02:30 6 2 8 61 72 133 02:45 3 14 1 9 4 23 83 278 66 258 149 53603:00 9 2 11 77 61 138 03:15 5 7 12 86 84 170 03:30 3 1 4 107 91 198 03:45 11 28 11 21 22 49 89 359 86 322 175 68104:00 3 5 8 101 92 193 04:15 9 4 13 84 105 189 04:30 20 9 29 88 91 179 04:45 21 53 8 26 29 79 122 395 100 388 222 78305:00 31 15 46 92 89 181 05:15 30 30 60 89 96 185 05:30 32 64 96 73 101 174 05:45 49 142 86 195 135 337 66 320 90 376 156 69606:00 41 65 106 73 94 167 06:15 49 52 101 61 85 146 06:30 72 27 99 65 89 154 06:45 72 234 31 175 103 409 52 251 73 341 125 59207:00 83 42 125 59 73 132 07:15 102 75 177 60 75 135 07:30 142 95 237 46 62 108 07:45 154 481 113 325 267 806 39 204 57 267 96 47108:00 165 60 225 31 61 92 08:15 102 52 154 40 64 104 08:30 66 44 110 28 61 89 08:45 59 392 43 199 102 591 26 125 69 255 95 38009:00 65 47 112 25 55 80 09:15 46 44 90 22 42 64 09:30 65 45 110 33 37 70 09:45 50 226 44 180 94 406 20 100 22 156 42 25610:00 46 40 86 17 28 45 10:15 58 50 108 20 28 48 10:30 48 32 80 14 24 38 10:45 58 210 53 175 111 385 12 63 17 97 29 16011:00 47 57 104 19 11 30 11:15 56 40 96 7 12 19 11:30 57 52 109 9 13 22 11:45 62 222 52 201 114 423 7 42 15 51 22 93

TOTALS 2026 1548 3574 2741 3103 5844

SPLIT % 56.7% 43.3% 37.9% 46.9% 53.1% 62.1%

NB SB EB WB4,767 4,651 0 0

AM Peak Hour 07:15 07:15 07:15 16:00 16:00 16:00AM Pk Volume 563 343 906 395 388 783

Pk Hr Factor 0.853 0.759 0.848 0.809 0.924 0.8827 - 9 Volume 873 524 0 0 1397 715 764 0 0 1479

7 - 9 Peak Hour 07:15 07:15 07:15 16:00 16:00 16:007 - 9 Pk Volume 563 343 0 0 906 395 388 0 0 783

Pk Hr Factor 0.853 0.759 0.000 0.000 0.848 0.809 0.924 0.000 0.000 0.882

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total9,418

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total9,418

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 94: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 27 N/O Ave 18 ½ Day: Thursday City: Madera

Date: 9/12/19 Project #: CA19_7296_070

NB SB EB WB124 114 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 0 2 2 00:15 0 0 0 2 1 300:30 1 0 1 2 0 200:45 0 1 0 0 1 3 7 2 5 5 1201:00 0 0 0 2 1 301:15 0 3 3 2 4 601:30 0 0 0 7 3 1001:45 1 1 0 3 1 4 2 13 1 9 3 2202:00 1 0 1 0 0 0 02:15 0 0 0 4 1 5 02:30 0 0 0 1 2 3 02:45 0 1 0 0 1 1 6 0 3 1 903:00 0 0 0 2 2 4 03:15 0 1 1 1 1 2 03:30 0 0 0 8 4 12 03:45 0 0 1 0 1 2 13 3 10 5 2304:00 0 0 0 0 0 0 04:15 0 0 0 3 8 11 04:30 0 0 0 2 1 3 04:45 0 0 0 7 12 3 12 10 2405:00 0 1 1 1 2 3 05:15 0 0 0 1 3 4 05:30 0 1 1 1 2 3 05:45 2 2 0 2 2 4 1 4 0 7 1 1106:00 2 1 3 3 1 4 06:15 0 3 3 1 1 2 06:30 1 1 2 1 0 1 06:45 1 4 2 7 3 11 2 7 1 3 3 1007:00 1 3 4 1 2 3 07:15 5 2 7 1 3 4 07:30 2 4 6 0 0 0 07:45 8 16 7 16 15 32 3 5 2 7 5 1208:00 4 2 6 2 1 3 08:15 5 0 5 0 1 1 08:30 1 2 3 0 0 0 08:45 1 11 0 4 1 15 1 3 0 2 1 509:00 1 3 4 0 1 1 09:15 1 2 3 0 0 0 09:30 0 0 0 3 2 5 09:45 0 2 1 6 1 8 1 4 1 4 2 810:00 2 1 3 0 0 0 10:15 3 2 5 0 0 0 10:30 2 1 3 0 1 1 10:45 1 8 2 6 3 14 0 0 1 0 111:00 0 3 3 0 0 0 11:15 1 0 1 0 0 0 11:30 2 2 4 0 0 0 11:45 0 3 1 6 1 9 1 1 0 1 1

TOTALS 49 51 100 75 63 138

SPLIT % 49.0% 51.0% 42.0% 54.3% 45.7% 58.0%

NB SB EB WB124 114 0 0

AM Peak Hour 07:15 07:00 07:15 12:45 15:30 15:30AM Pk Volume 19 16 34 14 15 28

Pk Hr Factor 0.594 0.571 0.567 0.500 0.469 0.5837 - 9 Volume 27 20 0 0 47 16 19 0 0 35

7 - 9 Peak Hour 07:15 07:00 07:15 16:15 16:15 16:157 - 9 Pk Volume 19 16 0 0 34 13 14 0 0 27

Pk Hr Factor 0.594 0.571 0.000 0.000 0.567 0.464 0.438 0.000 0.000 0.614

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total238

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total238

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 95: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 29 N/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_071

NB SB EB WB3,989 3,941 0 0

AM Period NB SB EB WB NB SB EB WB00:00 20 15 35 59 39 98 00:15 13 17 30 58 45 10300:30 21 2 23 70 61 13100:45 9 63 22 56 31 119 67 254 57 202 124 45601:00 12 31 43 40 47 8701:15 11 17 28 63 54 11701:30 18 11 29 72 48 12001:45 16 57 37 96 53 153 59 234 35 184 94 41802:00 7 12 19 40 59 99 02:15 9 21 30 100 44 144 02:30 5 13 18 69 48 117 02:45 5 26 11 57 16 83 57 266 45 196 102 46203:00 5 14 19 60 60 120 03:15 14 10 24 63 67 130 03:30 8 23 31 73 90 163 03:45 7 34 15 62 22 96 72 268 58 275 130 54304:00 9 16 25 71 62 133 04:15 8 12 20 73 49 122 04:30 7 16 23 51 58 109 04:45 9 33 25 69 34 102 74 269 69 238 143 50705:00 14 21 35 67 69 136 05:15 27 63 90 82 54 136 05:30 26 55 81 69 64 133 05:45 24 91 65 204 89 295 71 289 60 247 131 53606:00 21 47 68 46 44 90 06:15 30 50 80 49 34 83 06:30 28 40 68 58 36 94 06:45 51 130 56 193 107 323 45 198 35 149 80 34707:00 57 87 144 49 36 85 07:15 65 108 173 54 24 78 07:30 67 94 161 50 15 65 07:45 57 246 71 360 128 606 46 199 35 110 81 30908:00 39 54 93 65 37 102 08:15 29 57 86 47 38 85 08:30 32 51 83 49 25 74 08:45 46 146 76 238 122 384 43 204 30 130 73 33409:00 48 49 97 39 39 78 09:15 29 43 72 46 15 61 09:30 32 52 84 28 15 43 09:45 47 156 50 194 97 350 64 177 19 88 83 26510:00 31 57 88 75 38 113 10:15 36 51 87 44 35 79 10:30 47 60 107 42 12 54 10:45 45 159 61 229 106 388 63 224 21 106 84 33011:00 41 43 84 39 20 59 11:15 36 36 72 15 29 44 11:30 48 44 92 13 17 30 11:45 55 180 37 160 92 340 19 86 32 98 51 184

TOTALS 1321 1918 3239 2668 2023 4691

SPLIT % 40.8% 59.2% 40.8% 56.9% 43.1% 59.2%

NB SB EB WB3,989 3,941 0 0

AM Peak Hour 07:00 07:00 07:00 16:45 15:15 15:15AM Pk Volume 246 360 606 292 277 556

Pk Hr Factor 0.918 0.833 0.876 0.890 0.769 0.8537 - 9 Volume 392 598 0 0 990 558 485 0 0 1043

7 - 9 Peak Hour 07:00 07:00 07:00 16:45 16:45 16:457 - 9 Pk Volume 246 360 0 0 606 292 256 0 0 548

Pk Hr Factor 0.918 0.833 0.000 0.000 0.876 0.890 0.928 0.000 0.000 0.958

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total7,930

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total7,930

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 96: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 32 S/O Ave 12 Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_072

NB SB EB WB147 162 0 0

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 4 3 7 00:15 0 0 0 0 0 000:30 0 0 0 3 2 500:45 0 0 0 3 10 2 7 5 1701:00 0 0 0 2 1 301:15 0 0 0 0 2 201:30 0 0 0 0 3 301:45 0 0 0 0 2 4 10 4 1202:00 0 0 0 2 1 3 02:15 0 0 0 5 3 8 02:30 0 0 0 2 2 4 02:45 0 0 0 4 13 5 11 9 2403:00 0 0 0 3 3 6 03:15 0 0 0 2 3 5 03:30 0 0 0 3 7 10 03:45 0 0 0 2 10 7 20 9 3004:00 0 0 0 2 3 5 04:15 0 0 0 4 7 11 04:30 0 0 0 2 4 6 04:45 0 0 0 1 9 4 18 5 2705:00 2 0 2 5 2 7 05:15 2 0 2 2 5 7 05:30 1 1 2 4 0 4 05:45 1 6 1 2 2 8 6 17 3 10 9 2706:00 0 1 1 2 1 3 06:15 2 2 4 1 4 5 06:30 1 1 2 0 4 4 06:45 1 4 1 5 2 9 0 3 1 10 1 1307:00 2 2 4 3 1 4 07:15 3 1 4 1 2 3 07:30 6 1 7 3 4 7 07:45 1 12 3 7 4 19 0 7 1 8 1 1508:00 1 1 2 1 4 5 08:15 3 4 7 1 2 3 08:30 2 1 3 2 4 6 08:45 2 8 2 8 4 16 0 4 0 10 0 1409:00 0 1 1 0 1 1 09:15 2 2 4 2 1 3 09:30 8 0 8 1 0 1 09:45 3 13 3 6 6 19 0 3 2 4 2 710:00 2 1 3 1 0 1 10:15 4 3 7 0 0 0 10:30 2 3 5 0 1 1 10:45 3 11 2 9 5 20 0 1 1 2 1 311:00 2 1 3 1 0 1 11:15 4 4 8 0 1 1 11:30 4 5 9 1 1 2 11:45 2 12 3 13 5 25 0 2 0 2 0 4

TOTALS 66 50 116 81 112 193

SPLIT % 56.9% 43.1% 37.5% 42.0% 58.0% 62.5%

NB SB EB WB147 162 0 0

AM Peak Hour 09:30 11:15 11:15 17:00 15:30 15:30AM Pk Volume 17 15 29 17 24 35

Pk Hr Factor 0.531 0.750 0.806 0.708 0.857 0.7957 - 9 Volume 20 15 0 0 35 26 28 0 0 54

7 - 9 Peak Hour 07:00 07:30 07:30 17:00 16:00 16:157 - 9 Pk Volume 12 9 0 0 20 17 18 0 0 29

Pk Hr Factor 0.500 0.563 0.000 0.000 0.714 0.708 0.643 0.000 0.000 0.659

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total309

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total309

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 97: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 600 W/O SR 49 Day: Tuesday City: Ahwahnee

Date: 9/17/19 Project #: CA19_7296_073

NB SB EB WB0 0 420 403

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 4 10 14 00:15 0 0 0 7 2 900:30 1 0 1 8 2 1000:45 0 1 0 0 1 7 26 8 22 15 4801:00 0 0 0 9 7 1601:15 0 1 1 3 6 901:30 0 0 0 8 7 1501:45 0 0 1 0 1 9 29 4 24 13 5302:00 0 0 0 9 8 17 02:15 1 0 1 7 6 13 02:30 0 1 1 5 3 8 02:45 0 1 0 1 0 2 7 28 8 25 15 5303:00 0 0 0 5 8 13 03:15 0 0 0 9 9 18 03:30 0 0 0 7 8 15 03:45 0 0 0 8 29 14 39 22 6804:00 0 0 0 7 10 17 04:15 1 0 1 5 8 13 04:30 0 0 0 13 5 18 04:45 0 1 1 1 1 2 12 37 9 32 21 6905:00 1 0 1 5 8 13 05:15 0 2 2 12 16 28 05:30 3 2 5 6 7 13 05:45 4 8 2 6 6 14 3 26 11 42 14 6806:00 3 1 4 5 7 12 06:15 4 2 6 3 6 9 06:30 3 4 7 9 8 17 06:45 8 18 4 11 12 29 5 22 6 27 11 4907:00 5 2 7 4 4 8 07:15 15 7 22 3 4 7 07:30 15 6 21 1 7 8 07:45 7 42 7 22 14 64 2 10 6 21 8 3108:00 6 9 15 2 5 7 08:15 10 3 13 0 3 3 08:30 10 5 15 1 5 6 08:45 10 36 2 19 12 55 2 5 4 17 6 2209:00 4 10 14 1 1 2 09:15 8 9 17 0 6 6 09:30 7 2 9 1 1 2 09:45 8 27 6 27 14 54 0 2 0 8 0 1010:00 9 8 17 0 1 1 10:15 6 7 13 1 0 1 10:30 9 6 15 1 1 2 10:45 6 30 1 22 7 52 1 3 1 3 2 611:00 11 3 14 0 2 2 11:15 11 3 14 2 0 2 11:30 8 12 20 0 1 1 11:45 6 36 10 28 16 64 1 3 2 5 3 8

TOTALS 200 138 338 220 265 485

SPLIT % 59.2% 40.8% 41.1% 45.4% 54.6% 58.9%

NB SB EB WB0 0 420 403

AM Peak Hour 06:45 11:15 07:15 16:30 17:00 16:30AM Pk Volume 43 35 72 42 42 80

Pk Hr Factor 0.717 0.729 0.818 0.808 0.656 0.7147 - 9 Volume 0 0 78 41 119 0 0 63 74 137

7 - 9 Peak Hour 07:15 07:15 07:15 16:30 17:00 16:307 - 9 Pk Volume 0 0 43 29 72 0 0 42 42 80

Pk Hr Factor 0.000 0.000 0.717 0.806 0.818 0.000 0.000 0.808 0.656 0.714

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total823

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total823

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 98: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Rd 603 W/O Rd 400 Day: Tuesday City: Madera

Date: 9/24/19 Project #: CA19_7296_074

NB SB EB WB0 0 273 297

AM Period NB SB EB WB NB SB EB WB00:00 0 0 0 3 4 7 00:15 0 0 0 6 7 1300:30 0 0 0 4 4 800:45 1 1 1 1 2 2 3 16 2 17 5 3301:00 0 0 0 6 4 1001:15 0 0 0 4 2 601:30 1 2 3 2 2 401:45 0 1 0 2 0 3 1 13 1 9 2 2202:00 0 0 0 4 3 7 02:15 0 1 1 8 1 9 02:30 1 0 1 4 4 8 02:45 0 1 1 2 1 3 11 27 4 12 15 3903:00 0 0 0 6 6 12 03:15 0 0 0 10 3 13 03:30 0 1 1 10 4 14 03:45 3 3 2 3 5 6 5 31 13 26 18 5704:00 0 0 0 7 1 8 04:15 0 0 0 3 5 8 04:30 0 1 1 2 5 7 04:45 0 0 1 0 1 7 19 8 19 15 3805:00 4 3 7 3 3 6 05:15 1 3 4 6 9 15 05:30 3 3 6 4 3 7 05:45 1 9 8 17 9 26 4 17 11 26 15 4306:00 2 5 7 6 3 9 06:15 6 6 12 5 6 11 06:30 3 3 6 2 6 8 06:45 5 16 8 22 13 38 1 14 2 17 3 3107:00 6 2 8 1 2 3 07:15 5 11 16 4 2 6 07:30 6 7 13 1 3 4 07:45 6 23 6 26 12 49 1 7 7 14 8 2108:00 6 7 13 0 2 2 08:15 5 4 9 3 5 8 08:30 2 0 2 1 1 2 08:45 2 15 4 15 6 30 1 5 2 10 3 1509:00 4 5 9 1 3 4 09:15 7 2 9 0 2 2 09:30 4 2 6 0 3 3 09:45 4 19 4 13 8 32 0 1 1 9 1 1010:00 3 4 7 1 1 2 10:15 4 3 7 0 0 0 10:30 2 2 4 0 1 1 10:45 3 12 5 14 8 26 0 1 0 2 0 311:00 5 4 9 1 0 1 11:15 4 6 10 0 1 1 11:30 4 1 5 1 2 3 11:45 7 20 3 14 10 34 0 2 3 6 3 8

TOTALS 120 130 250 153 167 320

SPLIT % 48.0% 52.0% 43.9% 47.8% 52.2% 56.1%

NB SB EB WB0 0 273 297

AM Peak Hour 07:00 07:15 07:15 14:45 15:00 15:00AM Pk Volume 23 31 54 37 26 57

Pk Hr Factor 0.958 0.705 0.844 0.841 0.500 0.7927 - 9 Volume 0 0 38 41 79 0 0 36 45 81

7 - 9 Peak Hour 07:00 07:15 07:15 16:45 17:00 16:307 - 9 Pk Volume 0 0 23 31 54 0 0 20 26 43

Pk Hr Factor 0.000 0.000 0.958 0.705 0.844 0.000 0.000 0.714 0.591 0.717

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

16:4517:0017:1517:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

21:3021:4522:00

Total570

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total570

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 99: 2019 Traffic Volumes Report

Prepared by National Data & Surveying Services

VOLUME Schnoor Ave S/O Cleveland Ave Day: Wednesday City: Madera

Date: 9/4/19 Project #: CA19_7296_075

NB SB EB WB4,525 4,882 0 0

AM Period NB SB EB WB NB SB EB WB00:00 2 5 7 96 101 197 00:15 2 6 8 85 78 16300:30 3 5 8 77 81 15800:45 3 10 2 18 5 28 81 339 84 344 165 68301:00 3 4 7 69 83 15201:15 3 2 5 68 80 14801:30 5 3 8 70 73 14301:45 4 15 4 13 8 28 61 268 61 297 122 56502:00 3 3 6 85 68 153 02:15 5 4 9 80 67 147 02:30 3 1 4 71 71 142 02:45 3 14 4 12 7 26 71 307 103 309 174 61603:00 5 1 6 87 82 169 03:15 2 3 5 85 114 199 03:30 4 1 5 85 116 201 03:45 4 15 6 11 10 26 92 349 89 401 181 75004:00 1 5 6 97 96 193 04:15 3 4 7 88 82 170 04:30 7 6 13 88 83 171 04:45 10 21 14 29 24 50 106 379 96 357 202 73605:00 9 13 22 98 100 198 05:15 9 32 41 121 100 221 05:30 13 19 32 90 97 187 05:45 16 47 17 81 33 128 90 399 82 379 172 77806:00 10 20 30 76 58 134 06:15 18 36 54 86 62 148 06:30 20 33 53 79 71 150 06:45 15 63 34 123 49 186 80 321 76 267 156 58807:00 36 52 88 60 75 135 07:15 34 55 89 62 71 133 07:30 53 78 131 82 94 176 07:45 62 185 105 290 167 475 64 268 78 318 142 58608:00 63 89 152 72 62 134 08:15 71 76 147 58 48 106 08:30 62 96 158 58 53 111 08:45 73 269 92 353 165 622 49 237 60 223 109 46009:00 57 63 120 45 45 90 09:15 46 65 111 43 33 76 09:30 54 60 114 31 21 52 09:45 53 210 72 260 125 470 23 142 17 116 40 25810:00 58 56 114 25 22 47 10:15 65 71 136 17 17 34 10:30 70 61 131 14 18 32 10:45 65 258 76 264 141 522 18 74 12 69 30 14311:00 73 83 156 14 7 21 11:15 82 77 159 10 12 22 11:30 63 85 148 9 8 17 11:45 73 291 70 315 143 606 11 44 6 33 17 77

TOTALS 1398 1769 3167 3127 3113 6240

SPLIT % 44.1% 55.9% 33.7% 50.1% 49.9% 66.3%

NB SB EB WB4,525 4,882 0 0

AM Peak Hour 11:45 07:45 11:45 16:45 14:45 16:45AM Pk Volume 331 366 661 415 415 808

Pk Hr Factor 0.862 0.871 0.839 0.857 0.894 0.9147 - 9 Volume 454 643 0 0 1097 778 736 0 0 1514

7 - 9 Peak Hour 08:00 07:45 07:45 16:45 16:45 16:457 - 9 Pk Volume 269 366 0 0 624 415 393 0 0 808

Pk Hr Factor 0.921 0.871 0.000 0.000 0.934 0.857 0.983 0.000 0.000 0.914

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total9,407

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

21:3021:4522:00

Total9,407

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:1517:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:3014:4515:00

DAILY TOTALS

PM Period

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 100: 2019 Traffic Volumes Report