October 2019 | Page 1 2019 Provincial Construction Program Highway & Water Management Projects The Government of Alberta is investing in highway and water management infrastructure to improve safe travel on Alberta’s highways, connect communities, and help keep Albertans working. The projects will enhance transportation safety, support major trade corridors to improve travel for commercial carriers, and provide irrigation for the agriculture sector and flood mitigation protection for Alberta communities. The 2019 Construction Program includes: Major capital projects scheduled for the next four years (2019-20 to 2022-23) Capital maintenance and renewal (bridge construction and highway rehabilitation) projects scheduled for the next three years (2019-20 to 2021-22) Water management infrastructure projects scheduled for the next three years (2019-20 to 2021-22) Slide repair projects scheduled for the next year (2019-20) This program includes planning, design and construction work to reflect the life cycle of projects. The 2019 Provincial Construction Program is subject to change. Projects may move on or off the construction program based on emerging needs, changing construction schedules, or available funding. Minor safety-related improvements may be added as identified, generally in conjunction with larger projects. The work is defined as: Planning – planning studies and the preliminary analyses completed for major capital projects Design – project management and hiring engineering consultant(s) to design the project (may include work to complete tender preparation) Construction – occurs when the project design has been completed, a tender awarded and a contractor hired to build the project

Transcript of 2019 Provincial Construction Program - Alberta...Interchange upgrade on Hwy. 1A at northwest...

  • October 2019 | Page 1

    2019 Provincial Construction Program Highway & Water Management Projects The Government of Alberta is investing in highway and water management infrastructure to improve safe travel on Alberta’s highways, connect communities, and help keep Albertans working. The projects will enhance transportation safety, support major trade corridors to improve travel for commercial carriers, and provide irrigation for the agriculture sector and flood mitigation protection for Alberta communities.

    The 2019 Construction Program includes:

    • Major capital projects scheduled for the next four years (2019-20 to 2022-23) • Capital maintenance and renewal (bridge construction and highway rehabilitation) projects scheduled for

    the next three years (2019-20 to 2021-22) • Water management infrastructure projects scheduled for the next three years (2019-20 to 2021-22) • Slide repair projects scheduled for the next year (2019-20)

    This program includes planning, design and construction work to reflect the life cycle of projects. The 2019 Provincial Construction Program is subject to change. Projects may move on or off the construction program based on emerging needs, changing construction schedules, or available funding. Minor safety-related improvements may be added as identified, generally in conjunction with larger projects.

    The work is defined as:

    • Planning – planning studies and the preliminary analyses completed for major capital projects • Design – project management and hiring engineering consultant(s) to design the project (may include

    work to complete tender preparation) • Construction – occurs when the project design has been completed, a tender awarded and a contractor

    hired to build the project

  • October 2019 | Page 2

    Glossary

    @ ................................................................... At Ave. ............................................................... Avenue Bdry. .............................................................. Boundary BF 74817 or (74817-02) .............................. Bridge File Number CNR .............................................................. Canadian National Railway CP…………………………………………... Capital Project for water management projects CPR ............................................................... Canadian Pacific Railway Cr. .................................................................. Creek Cty ................................................................. County E .................................................................... East EB or EBL ..................................................... Eastbound or Eastbound Lane ECL ............................................................... East Corporate (or City) Limit EID ................................................................ Eastern Irrigation District FN .................................................................. First Nation G/S ................................................................ Grade Separation Structure Hwy. .............................................................. Highway Incl. ................................................................ Includes Imp. ............................................................... Improvement Int. .................................................................. Intersection Intersection Improvements .......................... Adding/extending acceleration/deceleration tapers or lanes. May

    involve lighting. Jct. ................................................................. Junction LNID .............................................................. Lethbridge Northern Irrigation District LR .................................................................. Local Road N .................................................................... North NB or NBL ..................................................... Northbound or Northbound Lane NCL ............................................................... North Corporate (or City) Limit PAR ............................................................... Park Access Road Riv. ................................................................ River Rd. or Rds. .................................................... Road or Roads Repaving ....................................................... Resurfacing an existing paved road Rge. ............................................................... Range S .................................................................... South SB or SBL ..................................................... Southbound or Southbound Lane SCL ............................................................... South Corporate (or City) Limit sel. ................................................................. Selective Six-laning ...................................................... Adding two lanes to a four-lane twinned highway SMRID .......................................................... St. Mary's River Irrigation District SRA ............................................................... Safety Rest Area St. .................................................................. Street SV .................................................................. Summer Village Tr. .................................................................. Trail Twp................................................................ Township UAR ............................................................... Urban Approach Road VIS ................................................................. Vehicle Inspection Station W ................................................................... West WB or WBL ................................................... Westbound or Westbound Lane WCL .............................................................. West Corporate (or City) Limit WID ............................................................... Western Irrigation District

  • October 2019 | Page 3

    Highway Project / Location Description Status Primary Purpose

    Tributary to Bow River culvert on Hwy. 1, 2 km south of Exshaw (74661-1)

    Replace culvert Design Major trade corridor

    Jumpingpound Creek Bridge on Hwy. 1, 16 km southwest of Cochrane (74355-2)

    Bridge deck rehabilitation Design Major trade corridor

    Hwy. 40 over Hwy. 1 Interchange, at Seebe (76660-1)

    Bridge deck rehabilitation Design Major trade corridor

    WID Irrigation Canal Bridge on Hwy. 1 near Strathmore (79535-1)

    Replace bridge Design Major trade corridor, Enhance public safety

    South Saskatchewan River Bridge on Hwy. 1, at Medicine Hat (78572-1)

    Bridge deck rehabilitation Design Major trade corridor

    Between Hwy. 36 to 2 km west of Hwy. 875

    19 km of repaving Design Major trade corridor

    Between 1 km east of Hwy. 561 and Hwy. 901

    22 km of repaving Design Major trade corridor

    Wildlife overpass and fencing on Hwy. 1 west of Hwy. 1X

    Wildlife mitigation Design Enhance public safety

    Hwy. 1 and 22 interim configuration on interchange

    Intersection improvement Design Major trade corridor, Enhance public safety

    Intersection improvement at Eagle Butte Road in Dunmore

    Signalization Design Major trade corridor, Enhance public safety

    Hwy. 563 over Hwy. 1 interchange, 2 km west of Calgary (75933-1)

    Bridge deck rehabilitation Construction Major trade corridor

    WID irrigation canal bridge on Hwy.1 near Strathmore (73052-1)

    Replace bridge Construction Major trade corridor, Enhance public safety

    Interchange upgrade on Hwy. 1A at northwest boundary of Cochrane (84151-1) and bridge replacement at Bighill Creek on Hwy. 1A at north boundary of Cochrane (521-1)

    Interchange upgrade Design Enhance public safety

    Between Hwy. 1X to east of Old Fort Creek and east of Old Fort Creek to 7 km west of Hwy. 40

    30 km of widening and repaving

    Design Enhance public safety

    Various improvements on Deerfoot Trail

    Various improvements Planning Major trade corridor, Enhance public safety

    Remove and replace rocker bearing and legs (73949-1)

    Miscellaneous bridge work Design Major trade corridor

    Watercourse culvert on Hwy. 2 near Leduc (75617-1)

    Replace culvert Design Major trade corridor

  • October 2019 | Page 4

    Highway Project / Location Description Status Primary Purpose

    Hwy. 53 interchange, 5 km west of Ponoka (75651-2) (75651-1)

    Bridge deck rehabilitation Design Major trade corridor

    Little Bow River Bridge on Hwy. 2, 5 km southeast of High River (northbound lane) (9469-1) (9469-2)

    Bridge deck rehabilitation Design Major trade corridor

    Hwy. 2 Over CNR, at Morrinville (76054-1)

    Replace bridge Design Major trade corridor, Enhance public safety

    West Prairie River Bridge on Hwy. 2, at High Prairie (13821-1)

    Bridge deck rehabilitation Design Major trade corridor

    North Innisfail interchange upgrade: interchange ramps, and Bluebird/Range Road 283 service roads

    1 km of repaving Design Major trade corridor

    Install traffic signals at 88 Street in the Town of Slave Lake

    Signalization Design Major trade corridor, Enhance public safety

    Between west of Hwy. 688 to east of Peace River (East Hill)

    Repaving Design Major trade corridor

    Between Hwy. 566 to the City of Airdrie

    10 km of repaving Design Major trade corridor

    Between 14 km north of Hwy. 49 to Hwy. 49

    14 km of repaving Design Major trade corridor

    Between the US Border to 2.5 km north of Hwy. 501

    23 km of repaving Design Major trade corridor

    Between 1 km north of Hwy. 509 and 2 km south of Hwy. 511

    17 km of repaving Design Major trade corridor

    Between Hwy. 2 to Saddle River and Hwy. 43 at Hwy. 59 west of Spirit River - animal detection system

    Wildlife mitigation Design Major trade corridor, Enhance public safety

    High tension cable barrier between Red Deer and Leduc

    Cable barrier installation Design Major trade corridor, Enhance public safety

    Southbound near Wolf Creek Safety rest area Design Major trade corridor, Enhance public safety

    Northbound near Bowden Safety rest area Design Major trade corridor, Enhance public safety

    65th Avenue interchange near Leduc

    Interchange Design Major trade corridor, Enhance public safety

    Peace River Bridge on Hwy. 2 (75946-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Nine Mile Creek Bridge on Hwy. 2, 3 km southeast of Widewater (75752-1)

    Bridge deck rehabilitation Construction Major trade corridor

    Willow Creek Bridge on Hwy. 2, 8 km south of Granum (72533-2)

    Bridge deck rehabilitation Construction Major trade corridor

  • October 2019 | Page 5

    Highway Project / Location Description Status Primary Purpose

    Lethbridge Northern Irrigation District canal structure on Hwy. 2, 8 km southwest of Granum (72535-2)

    Bridge deck rehabilitation Construction Major trade corridor

    Steel crack repairs at Nisku overpass (76845-1)

    Bridge maintenance Construction Major trade corridor

    South Dunvegan station (PH035-1)

    Slide repair Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Baptiste Creek slide (NC090) Slide repair Construction Major trade corridor, Enhance public safety

    Between City of Edmonton south boundary and 1 km north of Hwy. 216

    4 km of repaving Construction Major trade corridor

    Between south of Hwy. 663 and Hwy. 55 (Athabasca) (selective)

    31 km of repaving Construction Major trade corridor

    Intersection improvement at Hwy. 2 within the Town of Athabasca

    Intersection improvement Construction Major trade corridor, Enhance public safety

    Between Hwy. 5 and 1 km north of Hwy. 505

    17 km of repaving Construction Major trade corridor

    Between Hwy. 27 and 2 km north of Town of Bowden

    18 km of repaving Construction Major trade corridor

    Between 6 km south of Hwy. 688 and Hwy. 744 (selective)

    15 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between north of Nampa and south of Hwy. 688

    2 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between 3 km north of Hwy. 633 and Hwy. 37 (selective) (including Hwy. 37 interchange)

    8 km of repaving Construction Major trade corridor

    Safety improvements at 5 locations on Hwy. 2 and Hwy. 642

    Intersection improvement Construction Major trade corridor, Enhance public safety

    Between Hwy. 37 and 2 km north of Hwy. 642

    12 km of repaving Construction Major trade corridor

    Deerfoot Trail southeast interchange upgrade and bridge related work on Hwy. 2 and 212 Avenue in Calgary (82500-1) (26296-1)

    Interchange upgrade and bridge work

    Construction Major trade corridor, Enhance public safety

  • October 2019 | Page 6

    Highway Project / Location Description Status Primary Purpose

    Peace River bridge project; road reconstruction, bridge construction (75946W-1) (75946-2), 98 Street partial interchange replacement (76059-2), CNR bridge (76060W-1) and, Hwy. 684 and CNR replacement (76061-2) (76061-1)

    Various bridge work Construction Major trade corridor, Enhance public safety

    Hwy. 2/2A/72 upgrade to existing interchange

    Interchange upgrade Construction Major trade corridor, Enhance public safety

    Watercourse culvert on Hwy. 2, 14 km northeast of Rycroft (86265-1)

    Replace culvert Construction

    Supports over-sized/over-weight corridor movement

    Illuminate at four locations along Hwy. 2

    Lighting Construction Major trade corridor

    Intersection improvements at Hwy. 2 and Hwy. 42 interchange

    Intersection improvement Construction Major trade corridor

    Gaetz Avenue/Taylor Drive roadwork and intersection improvement at Hwy. 2 and McKenzie Road

    13 km of grade, base, full pave and intersection improvement

    Construction Major trade corridor, Enhance public safety

    Blindman River Bridge on Hwy. 2A, 2 km south of Blackfalds (73496-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Between Hwy. 2 and Hwy. 49 27 km of repaving Design Supports over-sized/over-weight corridor movement

    Between the City of Red Deer and north of Central Park Road

    3 km of grade, base, full pave

    Design Supports over-sized/over-weight corridor movement

    Between east of Hwy. 587 and Hwy. 587

    1 km of repaving Construction Improve connections between communities

    Signalization at intersection of 86 Street in Coleman

    Signalization Design Major trade corridor, Enhance public safety

    Signalization at intersection of 213 Street (Bellvue and Hillcrest Access)

    Signalization Design Major trade corridor, Enhance public safety

    Continuous turn lane through Frank on Hwy. 3

    Intersection improvement Design Major trade corridor, Enhance public safety

    Rock Creek to Lundbreck fencing

    Wildlife mitigation Design Major trade corridor, Enhance public safety

    Rock Creek to Lundbreck fencing that connects to wildlife underpass (84165-1)

    Wildlife mitigation Design Major trade corridor, Enhance public safety

    Between east of Grassy Lake and west of Hwy. 885

    30 km of repaving Construction Major trade corridor

    Intersection improvement at Junction of Hwy. 3 and Range Road 105

    Intersection improvement Construction Major trade corridor, Enhance public safety

  • October 2019 | Page 7

    Highway Project / Location Description Status Primary Purpose

    Between Town of Taber and 1 km east of Hwy. 36 (selective)

    15 km of repaving Construction Major trade corridor

    Pedestrian bridge in the City of Lethbridge (84210-1)

    New bridge Construction Major trade corridor, Enhance public safety

    Between City of Lethbridge and Hwy. 3 (selective)

    10 km of repaving Design Major trade corridor

    Between 2 km west of Hwy. 820 and 3 km west of Hwy. 62

    19 km of repaving Design Improve connections between communities

    Watercourse culvert on Hwy. 6 near Twin Butte (73672-1)

    Replace culvert Design Improve connections between communities

    Between Hwy. 22 to 2 km west of Hwy. 201 (selective)

    17 km of repaving Design Improve connections between communities

    Red Deer River Bridge on Hwy. 9, at south boundary of Drumheller (6615-1)

    Bridge deck rehabilitation Design Improve connections between communities

    Between 1 km east of Hwy. 10 to Hwy. 838

    1 km of repaving Design Improve connections between communities

    Between 1 km east of Hwy. 884 and Hwy. 41

    54 km of repaving Construction Supports over-sized/over-weight corridor movement

    Rosebud River Bridge on Hwy. 10X, 3 km south of Rosedale (70512-1)

    Replace bridge Design Enhance public safety

  • October 2019 | Page 8

    Highway Project / Location Description Status Primary Purpose

    Gonika Creek culvert on Hwy. 11, 16 km southwest of Nordegg (73489-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 11 near Condor (8616-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Design and construct wildlife mitigation on Hwy. 11

    Wildlife mitigation Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Lake Abraham soil nail site - erosion

    Slide repair Construction Supports over-sized/over-weight corridor movement

    Cygnet Lake frost heave Slide repair Construction Supports over-sized/over-weight corridor movement

    Between the City of Red Deer and Hwy. 2A

    2 km of grade, base, full pave

    Design Improve connections between communities

    Medicine River Bridge on Hwy. 12, 14 km north of Eckville (1140-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Between the Town of Coronation to Hwy. 884

    23 km of repaving Design Improve connections between communities

    Between Village of Halkirk to 1 km east of Hwy. 855

    1 km of reconstruction/realignment

    Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Signalization/lighting at Hwy. 12 and Municipal Road in Stettler

    Signalization Design Enhance public safety

    Between 1 km east of Hwy. 855 and 1 km east of Hwy. 36

    23 km of repaving Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 13 near Killam (71685-1)

    Replace culvert Design Improve connections between communities

    Watercourse bridge on Hwy. 13, 4 km west of Winfield (9875-1)

    Replace bridge Construction Enhance public safety

    Between 1 km east of Hwy. 21 and City of Camrose

    4 km of repaving Construction Improve connections between communities

  • October 2019 | Page 9

    Highway Project / Location Description Status Primary Purpose

    Between 9 km east of Hwy. 870 and 4 km east of Hwy. 883

    31 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between the Town of Lamont to Hwy. 834

    10 km of widening and repaving

    Planning Supports over-sized/over-weight corridor movement

    Between Hwy. 216 to Hwy. 21

    21 km of repaving Design Supports over-sized/over-weight corridor movement

    Safety improvements to Hwy. 15/Meridian Street and Hwy. 15/28A (signals)

    Signalization Design Supports over-sized/over-weight corridor movement

    Between Hwy. 37 and west of Hwy. 21

    3 km of second stage paving

    Design Supports over-sized/over-weight corridor movement

    Second stage paving between Edmonton and Hwy. 37

    4 km of second stage paving

    Design Supports over-sized/over-weight corridor movement

    Between Hwy. 37 and west of Hwy. 21 includes new bridge over North Saskatchewan River and CNR (74452-1) (76701-1)

    3 km of grade, base, full pave

    Construction Supports over-sized/over-weight corridor movement

    Between Edmonton and Hwy. 37

    4 km of grade, base, full pave

    Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 16, 9 km west of Wildwood (71885-1)

    Replace culvert Design Major trade corridor

    Kilini Creek culvert on Hwy. 16 near Carvel (7391-1)

    Replace culvert Design Improve connections between communities

    Watercourse culvert on Hwy. 16, 7 km east of Wabamun (7408-1)

    Replace culvert Design Improve connections between communities

    Watercourse culvert on Hwy. 16 near Chip Lake (71886-1)

    Replace culvert Design Improve connections between communities

    Hwy. 43 interchange, 2 km north of Carvel (75195-1) (75195-2)

    Bridge deck rehabilitation Design Major trade corridor

    Over Mine Haul Road flyover at north boundary of Wabamun (EBL and WBL) (74978-1) (74978-2)

    Bridge removal Design Major trade corridor

    Between 7 km west of Town of Mundare and 1 km east of Hwy. 15

    9 km of repaving Construction Major trade corridor

  • October 2019 | Page 10

    Highway Project / Location Description Status Primary Purpose

    Various safety improvements on Hwy. 22 (Jct. Hwy. 621, Hwy. 624, Township Road 502 and 514) and including small segments on Hwy. 16/22 interchanges

    Intersection improvement Construction Major trade corridor, Enhance public safety

    Between 4 km west of Hwy. 897 and 5 km east of Hwy. 897

    9 km of repaving Construction Major trade corridor

    Vermilion River Bridge on Hwy. 16A, at Vegreville (229-1)

    Replace bridge Design Enhance public safety

    Between 1 km west of Hwy. 857 and Hwy. 16 (selective)

    1 km of repaving Design Improve connections between communities

    Between Hwy. 16A and Hwy. 60 new north and south bound lane structure

    Interchange upgrade Design Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 16A near Stony Plain (71097-1)

    Replace culvert Construction Improve connections between communities

    Between east of Hwy. 60 to west of Hwy. 2 and structure improvements over Whitemud Creek in Devon (85036-1)

    7 km of grade, base, full pave

    Planning Supports over-sized/over-weight corridor movement

    4-lane realignment between Hwy. 60 and 4 km east of Hwy. 60, bridge culvert work (8958-1) (8884-1) and 6-laning between 2 km west of Hwy. 2 and Hwy. 2

    Various road and bridge work

    Design Supports over-sized/over-weight corridor movement

    Frost heave near Sylvan Lake (C061-1)

    Slide repair Construction Enhance public safety

    Between Hwy. 1 and 9 km north of Rockyford

    30 km of repaving Design Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 21, 23 km northeast of Strathmore (75493-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Between Hwy. 13 and 2 km north of Hwy. 616

    15 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between 1 km north of Hwy. 27 and Huxley Approach Road

    13 km of repaving Construction Supports over-sized/over-weight corridor movement

  • October 2019 | Page 11

    Highway Project / Location Description Status Primary Purpose

    Bragg Creek roundabout at Hwy. 22 and Hwy. 758

    Intersection improvement Planning Supports over-sized/over-weight corridor movement, Enhance public safety

    Ross Creek culvert on Hwy. 22 Near Lundbreck (71283-1)

    Replace culvert Design Improve connections between communities

    Between 13 km south of Hwy. 520 and Hwy. 533

    39 km of repaving Design Improve connections between communities

    Between Hwy. 27 to Hwy. 587

    16 km of repaving Design Supports over-sized/over-weight corridor movement

    Connely Creek radar animal detection system

    Wildlife mitigation Design Enhance public safety

    Bridge replacement over pedestrian underpass near Cochrane (71937-1)

    Replace bridge Design Supports over-sized/over-weight corridor movement, Enhance public safety

    Between 2 km north of Hwy. 624 and 5 km north of Hwy. 624 (southbound lane)

    2 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between north of Drayton Valley and Hwy. 16

    38 km of repaving Construction Supports over-sized/over-weight corridor movement

    South Entwistle slide (NC074-1)

    Slide repair Construction Enhance public safety

    Between Hwy. 16 to south of Hwy. 647

    17 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between 2 km north of Hwy. 624 and 5 km north of Hwy. 624 (northbound lane)

    2 km of climbing lanes Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Little Bow River Bridge on Hwy. 23, 1 km west of Carmangay (73637-1)

    Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement

    Between 8 km north of Hwy. 529 and Hwy. 542

    30 km of repaving Construction Supports over-sized/over-weight corridor movement

    Upgrades to Hwy. 25 and Twp. Rd 92 and Coalhurst southeast area collector road intersection

    Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety

  • October 2019 | Page 12

    Highway Project / Location Description Status Primary Purpose

    Watercourse culvert on Hwy.26 18 km east of Camrose (1800-1)

    Replace culvert Construction Improve connections between communities

    Between west of Hwy. 2 and east of Hwy. 2

    1 km of repaving Design Supports over-sized/over-weight corridor movement

    Red Deer River Bridge on Hwy. 27, 12 km southwest of Morrin (9551-1)

    Replace bridge Construction Enhance public safety

    Hwy. 21 landslide (C70) Slide repair Construction Enhance public safety

    Red Deer River Bridge, near Morrin, road re-alignment and erosion repairs

    2 km of reconstruction/realignment

    Construction Enhance public safety

    Intersection improvements at Hwy. 28

    Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Illumination at Hwy. 28 and Cardiff Road

    Lighting Design Enhance public safety

    Intersection improvement at Junction of Hwy. 28 and 831 west of Waskatenau

    Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Whitford Creek Bridge on Hwy. 29, 17 km northeast of Chipman (75220-1)

    Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Climbing lanes on Hwy. 32 (southbound lane)

    Climbing lanes Construction Supports over-sized/over-weight corridor movement

    Various intersection improvements on Hwy. 32

    Intersection improvement Construction Supports over-sized/over-weight corridor movement

    North of Swan Hills (north bound)

    2 km of climbing lanes Design Enhance public safety

    Watercourse culvert on Hwy. 33 (86266-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Between Hwy. 43 and 9 km south of Hwy. 651

    19 km of repaving Construction Supports over-sized/over-weight corridor movement

  • October 2019 | Page 13

    Highway Project / Location Description Status Primary Purpose

    Between 10 km north of Hwy. 689 to Hwy. 691

    33 km of repaving Design Major trade corridor

    Watercourse culvert on Hwy. 35 near High Level (73448-1)

    Replace culvert Construction Major trade corridor

    Between 5 km south of Hwy. 12 and 2 km south of Hwy. 12

    4 km of repaving Design Supports over-sized/over-weight corridor movement

    SMRID canal site 44A on Hwy. 36, 6 km south of Taber (76410-1)

    Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement

    Between 7 km south of Hwy. 577 and Hwy. 9

    20 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Town of Taber and Hwy. 3 (selective)

    1 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between south of Hwy. 16 to Hwy. 16

    19 km of repaving Construction Supports over-sized/over-weight corridor movement

    Hwy. 36 at the Town of Vauxhall

    Safety rest area Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    Intersection improvements at Hwy. 37 and 779

    Intersection improvement Design Enhance public safety

    Major intersection improvement/realignment at Hwy. 37/825/15 (west of Fort Saskatchewan)

    Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    North Saskatchewan River (Vinca) Bridge on Hwy. 38, 13 km southeast of Redwater

    Replace bridge Design Supports over-sized/over-weight corridor movement, Enhance public safety

    Watercourse culvert on Hwy. 39 near Warburg (75629-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Modeste Creek Bridge on Hwy. 39, 25 km east of Drayton Valley (74678-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Roundabout at Hwy. 39 and Hwy. 60

    Intersection improvement Construction Supports over-sized/over-weight corridor movement, Enhance public safety

  • October 2019 | Page 14

    Highway Project / Location Description Status Primary Purpose

    Hwy. 40 twinning with associated road and bridge work

    19 km of grade, base, full pave and various bridge work

    Planning Supports over-sized/over-weight corridor movement, Enhance public safety

    Hwy. 40 grade widening project and various road and safety improvements

    Widening and repaving, and various road and safety improvements

    Design Supports over-sized/over-weight corridor movement

    Between Hwy. 16 to south of Grande Cache - animal fencing

    Wildlife mitigation Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Smoky River Bridge on Hwy. 40, 1 km north of Grande Cache (76474-1)

    Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Shand Creek culvert on Hwy.40 48 km east of Grande Cache (77278-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Between west of Forestry Trunk Road and east of Muskeg River

    3 km of repaving Construction Supports over-sized/over-weight corridor movement

    Climbing/passing lanes on Hwy. 40

    4 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between 1 km north of Hwy. 666 and 2 km north of Hwy. 668 (selective)

    6 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between south of Pinto Creek to south of Berland River

    Miscellaneous road work Construction Supports over-sized/over-weight corridor movement

    Between Wildhay River to south of Pinto Creek

    Miscellaneous road work Construction Supports over-sized/over-weight corridor movement

    Climbing/passing lanes between north of Grande Cache and south of Grande Cache

    27 km of repaving Construction Supports over-sized/over-weight corridor movement

    Intersection improvements at Teddy Lane and Archie Way/Husky

    Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety

  • October 2019 | Page 15

    Highway Project / Location Description Status Primary Purpose

    Between Kakwa River and Cutbank River

    55 km of repaving Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 40 near Grande Cache (76749-1)

    Widen bridge Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    Between Peter Lougheed Park Access to Kananaskis Village

    26 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Muskeg Cabins to east of Grande Cache (selective)

    21 km of widening and repaving

    Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    Between the Town of Wainwright to 1 km south of Hwy. 883

    19 km of repaving Design Supports over-sized/over-weight corridor movement

    Between Hwy. 13 and north boundary Canadian Forces Base in Wainwright

    23 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Hwy. 9 and 19 km north of Hwy. 9

    19 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Hwy. 570 and Hwy. 9

    25 km of repaving Construction Supports over-sized/over-weight corridor movement

    Structural steel and partial depth concrete repairs carrying Hwy. 41 over the south Saskatchewan River near Empress (75187-1)

    Bridge maintenance Construction Supports over-sized/over-weight corridor movement

    Safety rest area northwest of Hwy. 2 and Hwy. 42

    Safety rest area Construction Enhance public safety

    McLeod River Bridge on Hwy. 43, at Whitecourt (73809-1)

    Bridge deck rehabilitation Design Major trade corridor

    Roundabout at Hwy. 43 and 49

    Intersection improvement Design Major trade corridor, Enhance public safety

    Intersection improvements at Hwy. 43 (Bezanson)

    Intersection improvement Design Major trade corridor, Enhance public safety

    Two Creek Bridge on Hwy. 43, 32 km southeast of Fox Creek (73920-1)

    Miscellaneous bridge work Construction Major trade corridor

  • October 2019 | Page 16

    Highway Project / Location Description Status Primary Purpose

    Between 5 km west of Hwy. 49 and Hwy. 49 (eastbound lane & westbound lane)

    10 km of repaving Construction Major trade corridor

    Intersection improvement at Hwy. 43/22

    Intersection improvement Construction Major trade corridor, Enhance public safety

    Between 1 km east of Rochfort Bridge Access Road and 3 km east of Hwy. 757

    13 km of repaving Construction Major trade corridor

    Between 1 km east of Hwy. 22 and 3 km east of Rochfort Bridge Access Road

    10 km of repaving Construction Major trade corridor

    Between 23 km west of Hwy. 32 and 11 km west of Hwy. 32

    18 km of repaving Construction Major trade corridor

    Intersection improvements at Hwy. 18/658/751

    Intersection improvement Construction Major trade corridor, Enhance public safety

    Between Hwy. 32 and Mayerthorpe (selective)

    31 km of repaving Construction Major trade corridor

    Sturgeon Lake First Nation (between west of west boundary to east boundary)

    23 km of second stage paving

    Construction Major trade corridor

    Hwy. 43X Grande Prairie Bypass between Richmond Hill to 116 street (Range Road 63), including service road

    21 km of grade, base, full pave and second stage paving

    Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    Roundabout at Hwy. 37 and 44

    Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Between Hwy. 661 and 5 km south of Faucett Access Road

    22 km of repaving Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 45 near Bruderheim (2054-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Watercourse culvert located on Hwy. 45, 0.5 km east of Marwayne (83179-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Between the Town of Two Hills to 2 km east of Hwy. 870

    21 km of repaving Construction Supports over-sized/over-weight corridor movement

  • October 2019 | Page 17

    Highway Project / Location Description Status Primary Purpose

    Watercourse culvert on Hwy.49 near Gordondale (72877-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Between 18 km west of Hwy. 725 and 2 km west of Hwy. 727

    32 km of repaving Design Supports over-sized/over-weight corridor movement

    Between 1 km east of the Town of Spirit River to Hwy. 2

    17 km of repaving Design Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 49 3 km west of Gordondale (78868-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Watercourse bridge on Hwy.49 near Donnelly (74652-1)

    Replace bridge Construction Major trade corridor, Enhance public safety

    Between Hwy. 5 and 2 km east of Hwy. 844

    8 km of repaving Design Improve connections between communities

    Red Deer River Bridge on Hwy. 54, 3 km northwest of Innisfail (272-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Between the Town of Innisfail and 1 km west of Hwy. 2

    5 km of repaving Design Supports over-sized/over-weight corridor movement

    Between 3 km east of Hwy. 827 and Hwy. 63

    31 km of repaving Design Improve connections between communities

    Watercourse culvert on Hwy. 55 near Lac La Biche (76878-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 56, 10 km south of Stettler (146-1)

    Replace culvert Construction Improve connections between communities

    Driedmeat Creek Bridge on Hwy. 56, 14 km northeast of Edberg (444-1)

    Bridge deck rehabilitation Construction Improve connections between communities

    Between 1 km south of Hwy. 561 and Hwy. 564

    18 km of repaving Construction Supports over-sized/over-weight corridor movement

  • October 2019 | Page 18

    Highway Project / Location Description Status Primary Purpose

    Intersection improvement at Hwy. 35 and realignment for 1.5 km to the east

    Intersection improvement and 1 km of realignment

    Construction Major trade corridor, Enhance public safety

    Watercourse culvert on Hwy. 59, 4 km west of Valhalla Centre (13343-1)

    Replace culvert Construction Improve connections between communities

    North Saskatchewan River Bridge on Hwy. 60, northwest boundary of Devon (73694-1) (73694-2)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Install signals at intersection of Hwy. 60 and Township Road 523

    Signalization Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Between Hwy. 16 and Hwy. 16A (78729-1)

    4 km of grade, base, full pave

    Design Supports over-sized/over-weight corridor movement, Enhance public safety

    Intersection treatment at Hwy. 60 and proposed Champion Pet Foods Plant

    Intersection improvement Construction Supports over-sized/over-weight corridor movement

    Between east of Etzikom to west of Orion

    15 km of widening and repaving

    Design Enhance public safety

    Culvert liner carrying Hwy. 63 over watercourse, 7km northeast of Fort McKay (79444-1)

    Culvert repair Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Between Hwy. 881 and 2 km south of Hwy. 686 (selective)

    32 km of repaving Design Supports over-sized/over-weight corridor movement

    Between 2 km north of Hwy. 686 and 20 km north of Hwy. 686

    19 km of repaving Design Supports over-sized/over-weight corridor movement

    Hangingstone River Bridge replacement, 15 km south of Hwy. 881 (75907-1)

    Replace bridge Design Supports over-sized/over-weight corridor movement , Enhance public safety

  • October 2019 | Page 19

    Highway Project / Location Description Status Primary Purpose

    Watercourse Bridge on Hwy. 63, 2 km north of Boyle (70260-1)

    Replace bridge Design Supports over-sized/over-weight corridor movement

    Prairie Creek culvert on Hwy. 63, 9 km south of Fort McMurray (76001-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Between 1 km south of Hwy. 663 and Hwy. 55

    49 km of repaving Construction Supports over-sized/over-weight corridor movement

    Montagneuse River culvert on Hwy. 64, 15 km northwest of Hines Creek (71824-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 64, 13 km south of Hines Creek (78010-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

    Between 12 km west of Hwy. 717 and 6 km east of Hwy. 717

    18 km of repaving Construction Supports over-sized/over-weight corridor movement

    Second Order Tributary to Elbow River culvert on Hwy. 66, 14 km southwest of Bragg Creek (79156-1)

    Replace culvert Design Improve connections between communities

    Tributary to Elbow River culvert on Hwy. 66, 13 km southwest of Bragg Creek (79157-1)

    Replace culvert Design Improve connections between communities

    Peace River Bridge on Hwy. 88, 8 km northwest of Fort Vermilion (74227-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Lily Creek culvert on Hwy. 88 near Slave Lake (77469-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Brady Creek culvert on Hwy. 88 near Slave Lake (77470-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Between north of 16th Avenue northeast and south of 17th Avenue southeast

    7 km of 6-laning Design Major trade corridor, Enhance public safety

    Calgary Southwest Ring Road (between Macleod Trial and Hwy. 8)

    24 km of various road work Construction Major trade corridor, Enhance public safety

    West Bow River Bridge Replace bridge Construction Major trade corridor, Enhance public safety

    West Calgary Ring Road – Trans Canada Highway to Old Banff Coach Road

    Grade base full pave Construction Major trade corridor, Enhance public safety

    West Calgary Ring Road – Old Banff Coach Road to Hwy. 8

    9 km of grade, base, full pave

    Design Major trade corridor, Enhance public safety

  • October 2019 | Page 20

    Highway Project / Location Description Status Primary Purpose

    High tension cable barrier on Anthony Henday Drive

    Cable barrier installation Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Southwest Anthony Henday Drive improvements between east of 111 Street to north of Whitemud Drive

    32 km of 6-laning Construction Major trade corridor, Enhance public safety

    Watercourse culvert on Hwy. 500 near Coutts (7410-1)

    Replace culvert Design Improve connections between communities

    Robinson Coulee culvert on Hwy. 501 near Cardston (800-1)

    Replace culvert Design Improve connections between communities

    Gravel road reconstruction 13 km of grading Design Improve connections between communities

    Between east of Chain Lakes Provincial Park Access Road and west of Nanton

    18 km of repaving Design Improve connections between communities

    Between 10 km east from the Village of Longview and Hwy. 2

    19 km of repaving Construction Improve connections between communities

    Between 4 km east of Hwy. 22 to 5 km east of Hwy. 22

    1 km of repaving Construction Improve connections between communities

  • October 2019 | Page 21

    Highway Project / Location Description Status Primary Purpose

    Tongue Creek Bridge on Hwy. 543 near Hartell (913-1)

    Replace bridge Design Enhance public safety

    Watercourse culvert on Hwy. 543 near Hartell (74328-1)

    Replace culvert Construction Improve connections between communities

    WID canal site 16 on Hwy. 560, at east boundary of Calgary (873-1)

    Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement

    Roundabout at Hwy. 566 and Range Road 11 (15 Street) near Balzac

    Intersection improvement Design Major trade corridor, Enhance public safety

    Crossfield Creek Bridge on Hwy. 567 near Irricana (8677-1)

    Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Bridge rehabilitation carrying Hwy. 570 over Bullpound Creek near Sunnynook (7708-1)

    Bridge maintenance Construction Supports over-sized/over-weight corridor movement

    Kneehills Creek Bridge on Hwy. 575, 14 km south of Swalwell (6581-1)

    Bridge deck rehabilitation Construction Improve connections between communities

    Rosebud River Bridge on Hwy. 582 near Didsbury (1012-1)

    Replace bridge Design Enhance public safety

  • October 2019 | Page 22

    Highway Project / Location Description Status Primary Purpose

    Walton Creek Bridge on Hwy. 584 near Sundre (70034-1)

    Replace bridge Design Enhance public safety

    Design and construct wildlife mitigation on Hwy. 587

    Wildlife mitigation Design Enhance public safety

    Between Hwy. 2 and Hwy. 791 (including Bowden to Hwy. 2A)

    15 km of repaving Construction Improve connections between communities

    Between Hwy. 2A and Town of Innisfail (selective)

    1 km of repaving Design Improve connections between communities

    Between 14 km east of Hwy. 36 and Hwy. 872

    15 km of repaving Design Improve connections between communities

    Bridge rehabilitation carrying Hwy. 599 over Nelson Creek near Bulwark (8123-1)

    Bridge maintenance Construction Supports over-sized/over-weight corridor movement

    Watercourse culver on Hwy. 599, 16 km north of Coronation (9172-1)

    Replace culvert Construction Improve connections between communities

    Weed Creek culvert on Hwy. 616 near Thorsby (74292-1)

    Replace culvert Design Improve connections between communities

    Watercourse culvert on Hwy. 616 near Millet (1868-1)

    Replace culvert Design Improve connections between communities

    Between 3 km east of Hwy. 822 and Hwy. 21

    14 km of repaving Construction Improve connections between communities

    Between Hwy. 36 to east of Hwy. 36 (Town of Viking)

    1 km of repaving Construction Improve connections between communities

    Watercourse culvert on Hwy. 620 near Lodgepole (79385-1)

    Replace culvert Design Improve connections between communities

  • October 2019 | Page 23

    Highway Project / Location Description Status Primary Purpose

    Various intersection improvements on Hwy. 625 (between Nisku and Hwy. 21)

    Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Between 3 km east of Hwy. 2 and Hwy. 21

    17 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Town of Tofield and Hwy. 834 (south)

    2 km of repaving Design Supports over-sized/over-weight corridor movement

    Between east of Hwy. 14 to Hwy. 21

    4 km of cold mill and inlay Design Supports over-sized/over-weight corridor movement

    Between east of Hwy. 779 to east of Hwy. 60 and between west of Hwy. 60 to Edmonton west corporate limits (includes roundabout at Hwy. 60 and 628)

    28 km of road work and roundabout

    Design Enhance public safety

    Anthony Henday Drive to 3 km east of Anthony Henday Drive

    4 km of repaving Construction Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 633, 10 km southwest of Darwell (1924-1)

    Replace culvert Construction Improve connections between communities

    Watercourse Bridge on Hwy. 640 near Heinsburg (70939-1)

    Replace bridge Design Enhance public safety

    Between Hwy. 38 and Hwy. 829 and Redwater River Bridge on Hwy. 644 at east boundary of Redwater (8495-1)

    5 km of widening and repaving and replace bridge

    Design Supports over-sized/over-weight corridor movement, Enhance public safety

  • October 2019 | Page 24

    Highway Project / Location Description Status Primary Purpose

    Blue Ridge Bull Creek culvert Slide repair Construction Enhance public safety

    Between 5 km west of Hwy. 769 and Hwy. 769

    5 km of repaving Construction Improve connections between communities

    Between 5 km west of Hwy. 44 and Hwy. 44

    5 km of repaving Construction Improve connections between communities

    Between 3 km west of Hwy. 827 and Hwy. 63

    23 km of repaving Construction Improve connections between communities

    Little Smoky River Bridge on Hwy. 665 9 km southeast of Valleyview (75538-1)

    Bridge deck rehabilitation Construction Improve connections between communities

    Between Hwy. 40 and 3 km east of Hwy. 40

    3 km of repaving Construction Improve connections between communities

    Between Hwy. 49 and Hwy. 747

    23 km of repaving Design Improve connections between communities

    Watercourse bridge on Hwy. 671, 14 km northwest of Beaverlodge (13896-1)

    Replace bridge Design Enhance public safety

    Watercourse culvert on Hwy. 671, 5 km west of Goodfare (79252-1)

    Replace culvert Design Improve connections between communities

  • October 2019 | Page 25

    Highway Project / Location Description Status Primary Purpose

    Watercourse culvert on Hwy. 674 near Teepee Creek (70017-1)

    Replace culvert Construction Improve connections between communities

    Between Hwy. 2 and Hwy. 733

    24 km of repaving Construction Improve connections between communities

    Between 5 km west of Hwy. 744 to Hwy. 49

    12 km of repaving Design Improve connections between communities

    Between Hwy. 724 to Hwy. 731

    13 km of repaving Construction Improve connections between communities

    Between 7 km east of Hwy. 749 to Hwy. 750

    20 km of repaving Construction Improve connections between communities

    Culvert replacements on Hwy. 681 (75361-1)

    Replace culvert Design Improve connections between communities

    Strong Creek Bridge on Hwy. 684 near Peace River (7979-1)

    Replace bridge Construction Enhance public safety

    Brick's Hill landslide (PH009A-1)

    Slide repair Construction Enhance public safety

    Between 62 km east of Hwy. 88 to 87 km east of Hwy. 88

    25 km of grade, base, full pave

    Design Improve connections between communities

    Peerless Creek Bridge on Hwy. 686 near Trout Lake (78321-1)

    Replace bridge Design Enhance public safety

    Clearing from north of Peerless Lake to north of Trout Lake

    Clearing Design Enhance public safety

  • October 2019 | Page 26

    Highway Project / Location Description Status Primary Purpose

    Between Hwy. 2 and 3 km east of Hwy. 2

    3 km of repaving Construction Supports over-sized/over-weight corridor movement

    Between Hwy. 2 and Hwy. 986

    21 km of widening and repaving

    Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    McKinney Creek slide repair and stabilization on Hwy. 688

    Slide repair Construction Supports over-sized/over-weight corridor movement, Enhance public safety

    Beaton Creek Bridge on Hwy. 689, 7 km west of Dixonville (13892-1) (13891-1)

    Replace bridge Construction Enhance public safety

    La Crete (Tompkins) Ferry replacement (76074-1)

    Ferry replacement Design Improve connections between communities

    Hwy. 722, 30 km southwest of Beaverlodge (9908-1)

    Replace bridge Construction Enhance public safety

    Between Gas Plant and Hwy. 677

    11 km of repaving Construction Improve connections between communities

    Josephine Creek culvert on Hwy. 725, 23 km northwest of Spirit River (76664-1)

    Replace culvert Design Improve connections between communities

    Hamelin Creek at Blueberry Mountain (74227-1)

    Replace culvert Design Improve connections between communities

    Between Hwy. 49 and Hwy. 681

    23 km of repaving Design Improve connections between communities

  • October 2019 | Page 27

    Highway Project / Location Description Status Primary Purpose

    Between Hwy. 670 and 10 km north of Hwy. 674

    26 km of repaving Construction Improve connections between communities

    Willow Creek culvert on Hwy. 734, 65 km southwest of Sundre (73172-1)

    Replace culvert Design Improve connections between communities

    Side Creek culvert on Hwy. 734 near Nordegg (77593-1)

    Replace culvert Design Improve connections between communities

    Bridge culvert on Hwy. 734 near Sundre (77779-1)

    Replace culvert Design Improve connections between communities

    Various bridge work on Hwy. 734 (bearing replacement and concrete work to girders and piers) (76099-1)

    Miscellaneous bridge work Construction Improve connections between communities

    Rehabilitation bridge work on Hwy. 734

    Bridge rehabilitation Design Improve connections between communities

    Between Hwy. 685 to Hwy. 35

    24 km of repaving Construction Improve connections between communities

    Between Hwy. 49 and 10 km north of Hwy. 49

    10 km of repaving Construction Improve connections between communities

    Shaftesbury slide (GP031-1) Slide repair Construction Enhance public safety

    Watercourse culvert on Hwy. 743, 5 km north of Peace River (8889-1)

    Replace culvert Construction Improve connections between communities

  • October 2019 | Page 28

    Highway Project / Location Description Status Primary Purpose

    Drainage ditch culvert on Hwy. 749 near High Prairie (70388-1)

    Replace bridge Construction Enhance public safety

    Between Hwy. 549 to Hwy. 22

    22 km of repaving Construction Improve connections between communities

    Between intersection of Hwy. 766 and Township Road 262

    Intersection improvement Construction Enhance public safety

    Intersection improvements along Hwy. 766 (north of Hwy. 1A)

    11 km of repaving Construction Improve connections between communities

    Between Hwy. 1A and Hwy. 567

    11 km of repaving Construction Improve connections between communities

    North Saskatchewan River Bridge on Hwy. 770, 6 km northeast of Genesse (74232-1)

    Bridge deck rehabilitation Construction Improve connections between communities

    Between Hwy. 13 and Piegon Lake Park

    8 km of repaving Design Improve connections between communities

    Between south of Hwy. 628 to 47 Avenue (Town of Stony Plain)

    3 km of reconstruction/realignment

    Construction Enhance public safety

    Pipestone Creek Bridge on Hwy. 795 near Mulhurst Bay (73124-1)

    Replace bridge Construction Enhance public safety

  • October 2019 | Page 29

    Highway Project / Location Description Status Primary Purpose

    Between Hwy. 28 to 2 km north of Hwy. 28

    2 km of repaving Construction Improve connections between communities

    Athabasca River Bridge replacement and 1 km of road realignment (9905-1)

    Replace bridge and 1 km of reconstruction/realignment

    Design Enhance public safety

    Between Hwy. 623 and Hwy. 625

    10 km of repaving Construction Improve connections between communities

    Sturgeon River Bridge on Hwy. 825, 9 km southeast of Gibbons (2301-1)

    Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement

    Hwy. 825 grade widening project and various road and safety improvements

    Widening and repaving, and various road and safety improvements

    Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Between Hwy. 663 and Hwy. 55

    11 km of repaving Construction Improve connections between communities

    Between Hwy. 661 and Hwy. 63

    30 km of repaving Design Improve connections between communities

    Between Hwy. 14 and Town of Tofield

    5 km of repaving Design Supports over-sized/over-weight corridor movement

    Tofield bypass 8 km of reconstruction/realignment

    Design Supports over-sized/over-weight corridor movement, Enhance public safety

  • October 2019 | Page 30

    Highway Project / Location Description Status Primary Purpose

    1 km south of Hwy. 14 1 km of repaving Design Supports over-sized/over-weight corridor movement

    Between 1 km north of the Town of Tofield to Hwy. 16

    19 km of widening and repaving

    Design Supports over-sized/over-weight corridor movement, Enhance public safety

    Hwy. 836 slide repair (C71) Slide repair Construction Enhance public safety

    Between Hwy. 561 and Hwy. 564

    19 km of repaving Construction Improve connections between communities

    Between Hwy. 52 and 1 km north of Hwy. 52

    1 km of grade, base, full pave

    Design Improve connections between communities

    Between south of Hwy. 626 and Hwy. 16

    19 km of repaving Design Improve connections between communities

    Watercourse culvert on Hwy. 857, 5 km south of Vegreville (9953-1)

    Replace culvert Construction Improve connections between communities

    Vermilion River Bridge on Hwy. 857, at south boundary of Vegreville (102-1)

    Replace bridge Construction Enhance public safety

    Between 1 km south of Hwy. 36 (Galahad)

    1 km of repaving Design Improve connections between communities

    Between Hwy. 1 to Hwy. 544 22 km of pave gravel road Construction Enhance public safety

  • October 2019 | Page 31

    Highway Project / Location Description Status Primary Purpose

    Between the Town of Hardisty to 12 km north of Hwy. 13

    10 km of repaving Design Improve connections between communities

    Intersection reconstruction/realignment at Hwy. 858 and Hwy. 881

    Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety

    Watercourse culvert on Hwy. 881 near Myrnam (13864-1)

    Replace culvert Construction Improve connections between communities

    Between Hwy. 28 and 4 km south of Hwy. 55

    10 km of repaving Design Improve connections between communities

    Between Hwy. 16 and Hwy. 45

    29 km of repaving Design Improve connections between communities

    Between Hwy. 45 to Hwy. 646 (selective)

    18 km of repaving Construction Improve connections between communities

    Between Village of Kitscoty and Hwy. 45

    20 km of repaving Construction Supports over-sized/over-weight corridor movement

    Cattlepass culvert on Hwy. 899 near Bodo (80853-1)

    Replace culvert Design Improve connections between communities

    Slope stabilization (S055) Slide repair Construction Enhance public safety

    Culvert on Tributary to Cadotte River on Hwy. 986 northeast of Peace River (86227-1)

    Replace culvert Design Supports over-sized/over-weight corridor movement

    Watercourse culvert on Hwy. 986 near Little Buffalo (81163-1)

    Replace culvert Construction Supports over-sized/over-weight corridor movement

  • October 2019 | Page 32

    Highway Project / Location Description Status Primary Purpose

    Diashowa East Hill water well retaining wall and erosion, repair and other work (PH042-1, PH043-1)

    Slide repair Construction Supports over-sized/over-weight corridor movement , Enhance public safety

    Between Hwy. 743 and 1 km west of Hwy. 688 (selective)

    17 km of repaving Construction Supports over-sized/over-weight corridor movement

    Cavan Lake Canal Cavan Lake Canal headworks - pipe drops and canal rehabilitation. (50120-1)

    Water management Design Flood mitigation

    CP 2003-00003 Lethbridge northern headwork - division weir and fish ladder rehabilitation (50031-1)

    Water management Design Flood mitigation

    CP 2003-00007 Waterton St. Mary's headworks system - Jensen Dam - flood handling upgrades - operation spillway (50052-2)

    Water management Design Flood mitigation

    CP 2003-00007 Waterton St. Mary's River headworks systems reach 12 - Jensen Dam - flood handling upgrades - emergency spillway (50052-2)

    Water management Design Flood mitigation

    CP 2004-00010 Women's Coulee Canal rehabilitation, control system and river diversion (50111-1)

    Water management Construction Flood mitigation

    CP 2004-00015 Waterton St. Mary's headwork system structure replacement (50052-1)

    Water management Design Flood mitigation

    CP 2004-00045 Chain Lakes flood handling upgrade (50103-1)

    Water management Design Flood mitigation

    CP 2004-00060 Dickson Dam capacity enhancement project (phase 3)

    Water management Design Flood mitigation

    CP 2005-00002 Waterton St. Mary's headwork system supervisory control and data acquisition (50052-1)

    Water management Design Flood mitigation

    CP 2006-00002 Waterton reservior aquifer relief system rehabilitation (50047-2)

    Water management Design Flood mitigation

    CP 2006-00021 Carseland Bow River headworks control system upgrade (50021-1)

    Water management Design Flood mitigation

    CP 2006-00028 Kleskun Hill flood control (57108-1)

    Water management Design Flood mitigation

    CP 2006-00032 Bolloque Lake stabilization - outlet rehabilitation (55107-1)

    Water management Design Flood mitigation

  • October 2019 | Page 33

    Highway Project / Location Description Status Primary Purpose

    CP 2008-00047 Waterton St. Mary's headworks system - Belly River diversion supervisory control and data acquisition (50049-1)

    Water management Design Flood mitigation

    CP 2010-00010 Buffalo Lake - Rochon sands flood protection berm (53100-1)

    Water management Design Flood mitigation

    CP 2011-00001 St. Mary's Dam - low level outlet valve replacement

    Water management Construction Flood mitigation

    CP 2011-00001 Riparian turnout construction at St. Mary's River Dam - low level outlet

    Water management Construction Flood mitigation

    CP 2011-00001 St. Mary's Dam - low level outlet valve replacement - isolation barrier

    Water management Construction Flood mitigation

    CP 2016-00001 Deadfish pipeline replacement

    Water management Construction Flood mitigation

    CP 2016-00027 McGregor reservoir shoreline erosion program (50124-1)

    Water management Design Flood mitigation

    CP 2017-00001 Deadfish water supply system canal rehabilitation (53001-1) Woodrow and Janet Dams

    Water management Construction Flood mitigation

    CP 2018-00003 Moose Lake weir decommissioning (55116-1)

    Water management Design Flood mitigation

    Dickson Dam Dickson Dam low level outlet rehabilitation

    Water management Design Flood mitigation

    Harvie Passage Installation of hanging can line on Bow River in Calgary (Harvie Passage)

    Water management Design Flood mitigation

    Local Road Sheep River culvert on local road near Turner Valley (79501-1)

    Replace culvert Design Improve connections between communities

    Local Road Vermilion River Bridge near Bruce (2206-1)

    Replace bridge Design Enhance public safety

    Local Road Tributary to Blackmud Creek Culvert on Local Road, at north boundary of Leduc (78862-1)

    Replace culvert Design Improve connections between communities

    Local Road Irrigation canal culvert 2 km south of Mclennan (86072-1)

    Replace culvert Construction Major trade corridor, Improve connections between communities

    Local Road Spray Lakes gabions (S030-1) Slide repair Construction Enhance public safety

    Springbank Off-Stream Reservoir (SR1)

    Springbank Reservoir Off-Stream (SR1) Project

    Water management Planning Flood mitigation

    UAR 68 Between Hwy. 43 and 1 km north of Hwy. 43

    1 km of repaving Construction Improve connections between communities

    UAR 73 Between Hwy. 44 and 1 km east of Hwy. 44

    1 km of repaving Construction Improve connections between communities

  • October 2019 | Page 34

    Highway Project / Location Description Status Primary Purpose

    UAR 81 Between Hwy. 44 and 2 km east of Hwy. 44

    2 km of repaving Construction Improve connections between communities

    UAR 96 Between 3 km west of Hwy. 28 (Moose Lake) To Hwy. 28

    3 km of repaving Design Improve connections between communities

    UAR 115 Between Hwy. 16 and Hwy. 16A

    1 km of repaving Construction Improve connections between communities

    UAR 133 Between Hwy. 21 and 8 km east of Hwy. 21

    8 km of repaving Design Improve connections between communities

    UAR 137 Between Hwy. 36 to Hwy. 861

    7 km of repaving Design Improve connections between communities

    Various Upgrading existing dynamic messaging signs

    Dynamic messaging signs Design Enhance public safety

    Various Upgrading existing road weather information system towers

    Road weather information system

    Design Enhance public safety

    Various Upgrading existing road weather information system road and sub-surface components

    Road weather information system

    Design Enhance public safety

    Various Upgrading existing 511 cameras

    511 camera Design Enhance public safety

    Various LED retrofit for Edson District Lighting Design Enhance public safety

    Various LED retrofit for Red Deer District

    Lighting Design Enhance public safety

    Various LED retrofit for Hannah District

    Lighting Design Enhance public safety

    Various LED retrofit for Medicine Hat District

    Lighting Design Enhance public safety

    Various LED retrofit for Dunmore and Redcliff

    Lighting Planning Enhance public safety

    Various LED retrofit for Vermillion District

    Lighting Design Enhance public safety

    Various High tension cable barrier in southern region including Stony Trail

    Cable barrier installation Construction Enhance public safety

    Various Traffic cameras and dynamic messaging signs

    Cameras and dynamic messaging signs

    Construction Enhance public safety