October 2019 | Page 1
2019 Provincial Construction Program Highway & Water Management Projects The Government of Alberta is investing in highway and water management infrastructure to improve safe travel on Alberta’s highways, connect communities, and help keep Albertans working. The projects will enhance transportation safety, support major trade corridors to improve travel for commercial carriers, and provide irrigation for the agriculture sector and flood mitigation protection for Alberta communities.
The 2019 Construction Program includes:
• Major capital projects scheduled for the next four years (2019-20 to 2022-23) • Capital maintenance and renewal (bridge construction and highway rehabilitation) projects scheduled for
the next three years (2019-20 to 2021-22) • Water management infrastructure projects scheduled for the next three years (2019-20 to 2021-22) • Slide repair projects scheduled for the next year (2019-20)
This program includes planning, design and construction work to reflect the life cycle of projects. The 2019 Provincial Construction Program is subject to change. Projects may move on or off the construction program based on emerging needs, changing construction schedules, or available funding. Minor safety-related improvements may be added as identified, generally in conjunction with larger projects.
The work is defined as:
• Planning – planning studies and the preliminary analyses completed for major capital projects • Design – project management and hiring engineering consultant(s) to design the project (may include
work to complete tender preparation) • Construction – occurs when the project design has been completed, a tender awarded and a contractor
hired to build the project
-
October 2019 | Page 2
Glossary
@ ................................................................... At Ave. ............................................................... Avenue Bdry. .............................................................. Boundary BF 74817 or (74817-02) .............................. Bridge File Number CNR .............................................................. Canadian National Railway CP…………………………………………... Capital Project for water management projects CPR ............................................................... Canadian Pacific Railway Cr. .................................................................. Creek Cty ................................................................. County E .................................................................... East EB or EBL ..................................................... Eastbound or Eastbound Lane ECL ............................................................... East Corporate (or City) Limit EID ................................................................ Eastern Irrigation District FN .................................................................. First Nation G/S ................................................................ Grade Separation Structure Hwy. .............................................................. Highway Incl. ................................................................ Includes Imp. ............................................................... Improvement Int. .................................................................. Intersection Intersection Improvements .......................... Adding/extending acceleration/deceleration tapers or lanes. May
involve lighting. Jct. ................................................................. Junction LNID .............................................................. Lethbridge Northern Irrigation District LR .................................................................. Local Road N .................................................................... North NB or NBL ..................................................... Northbound or Northbound Lane NCL ............................................................... North Corporate (or City) Limit PAR ............................................................... Park Access Road Riv. ................................................................ River Rd. or Rds. .................................................... Road or Roads Repaving ....................................................... Resurfacing an existing paved road Rge. ............................................................... Range S .................................................................... South SB or SBL ..................................................... Southbound or Southbound Lane SCL ............................................................... South Corporate (or City) Limit sel. ................................................................. Selective Six-laning ...................................................... Adding two lanes to a four-lane twinned highway SMRID .......................................................... St. Mary's River Irrigation District SRA ............................................................... Safety Rest Area St. .................................................................. Street SV .................................................................. Summer Village Tr. .................................................................. Trail Twp................................................................ Township UAR ............................................................... Urban Approach Road VIS ................................................................. Vehicle Inspection Station W ................................................................... West WB or WBL ................................................... Westbound or Westbound Lane WCL .............................................................. West Corporate (or City) Limit WID ............................................................... Western Irrigation District
-
October 2019 | Page 3
Highway Project / Location Description Status Primary Purpose
Tributary to Bow River culvert on Hwy. 1, 2 km south of Exshaw (74661-1)
Replace culvert Design Major trade corridor
Jumpingpound Creek Bridge on Hwy. 1, 16 km southwest of Cochrane (74355-2)
Bridge deck rehabilitation Design Major trade corridor
Hwy. 40 over Hwy. 1 Interchange, at Seebe (76660-1)
Bridge deck rehabilitation Design Major trade corridor
WID Irrigation Canal Bridge on Hwy. 1 near Strathmore (79535-1)
Replace bridge Design Major trade corridor, Enhance public safety
South Saskatchewan River Bridge on Hwy. 1, at Medicine Hat (78572-1)
Bridge deck rehabilitation Design Major trade corridor
Between Hwy. 36 to 2 km west of Hwy. 875
19 km of repaving Design Major trade corridor
Between 1 km east of Hwy. 561 and Hwy. 901
22 km of repaving Design Major trade corridor
Wildlife overpass and fencing on Hwy. 1 west of Hwy. 1X
Wildlife mitigation Design Enhance public safety
Hwy. 1 and 22 interim configuration on interchange
Intersection improvement Design Major trade corridor, Enhance public safety
Intersection improvement at Eagle Butte Road in Dunmore
Signalization Design Major trade corridor, Enhance public safety
Hwy. 563 over Hwy. 1 interchange, 2 km west of Calgary (75933-1)
Bridge deck rehabilitation Construction Major trade corridor
WID irrigation canal bridge on Hwy.1 near Strathmore (73052-1)
Replace bridge Construction Major trade corridor, Enhance public safety
Interchange upgrade on Hwy. 1A at northwest boundary of Cochrane (84151-1) and bridge replacement at Bighill Creek on Hwy. 1A at north boundary of Cochrane (521-1)
Interchange upgrade Design Enhance public safety
Between Hwy. 1X to east of Old Fort Creek and east of Old Fort Creek to 7 km west of Hwy. 40
30 km of widening and repaving
Design Enhance public safety
Various improvements on Deerfoot Trail
Various improvements Planning Major trade corridor, Enhance public safety
Remove and replace rocker bearing and legs (73949-1)
Miscellaneous bridge work Design Major trade corridor
Watercourse culvert on Hwy. 2 near Leduc (75617-1)
Replace culvert Design Major trade corridor
-
October 2019 | Page 4
Highway Project / Location Description Status Primary Purpose
Hwy. 53 interchange, 5 km west of Ponoka (75651-2) (75651-1)
Bridge deck rehabilitation Design Major trade corridor
Little Bow River Bridge on Hwy. 2, 5 km southeast of High River (northbound lane) (9469-1) (9469-2)
Bridge deck rehabilitation Design Major trade corridor
Hwy. 2 Over CNR, at Morrinville (76054-1)
Replace bridge Design Major trade corridor, Enhance public safety
West Prairie River Bridge on Hwy. 2, at High Prairie (13821-1)
Bridge deck rehabilitation Design Major trade corridor
North Innisfail interchange upgrade: interchange ramps, and Bluebird/Range Road 283 service roads
1 km of repaving Design Major trade corridor
Install traffic signals at 88 Street in the Town of Slave Lake
Signalization Design Major trade corridor, Enhance public safety
Between west of Hwy. 688 to east of Peace River (East Hill)
Repaving Design Major trade corridor
Between Hwy. 566 to the City of Airdrie
10 km of repaving Design Major trade corridor
Between 14 km north of Hwy. 49 to Hwy. 49
14 km of repaving Design Major trade corridor
Between the US Border to 2.5 km north of Hwy. 501
23 km of repaving Design Major trade corridor
Between 1 km north of Hwy. 509 and 2 km south of Hwy. 511
17 km of repaving Design Major trade corridor
Between Hwy. 2 to Saddle River and Hwy. 43 at Hwy. 59 west of Spirit River - animal detection system
Wildlife mitigation Design Major trade corridor, Enhance public safety
High tension cable barrier between Red Deer and Leduc
Cable barrier installation Design Major trade corridor, Enhance public safety
Southbound near Wolf Creek Safety rest area Design Major trade corridor, Enhance public safety
Northbound near Bowden Safety rest area Design Major trade corridor, Enhance public safety
65th Avenue interchange near Leduc
Interchange Design Major trade corridor, Enhance public safety
Peace River Bridge on Hwy. 2 (75946-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Nine Mile Creek Bridge on Hwy. 2, 3 km southeast of Widewater (75752-1)
Bridge deck rehabilitation Construction Major trade corridor
Willow Creek Bridge on Hwy. 2, 8 km south of Granum (72533-2)
Bridge deck rehabilitation Construction Major trade corridor
-
October 2019 | Page 5
Highway Project / Location Description Status Primary Purpose
Lethbridge Northern Irrigation District canal structure on Hwy. 2, 8 km southwest of Granum (72535-2)
Bridge deck rehabilitation Construction Major trade corridor
Steel crack repairs at Nisku overpass (76845-1)
Bridge maintenance Construction Major trade corridor
South Dunvegan station (PH035-1)
Slide repair Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Baptiste Creek slide (NC090) Slide repair Construction Major trade corridor, Enhance public safety
Between City of Edmonton south boundary and 1 km north of Hwy. 216
4 km of repaving Construction Major trade corridor
Between south of Hwy. 663 and Hwy. 55 (Athabasca) (selective)
31 km of repaving Construction Major trade corridor
Intersection improvement at Hwy. 2 within the Town of Athabasca
Intersection improvement Construction Major trade corridor, Enhance public safety
Between Hwy. 5 and 1 km north of Hwy. 505
17 km of repaving Construction Major trade corridor
Between Hwy. 27 and 2 km north of Town of Bowden
18 km of repaving Construction Major trade corridor
Between 6 km south of Hwy. 688 and Hwy. 744 (selective)
15 km of repaving Construction Supports over-sized/over-weight corridor movement
Between north of Nampa and south of Hwy. 688
2 km of repaving Construction Supports over-sized/over-weight corridor movement
Between 3 km north of Hwy. 633 and Hwy. 37 (selective) (including Hwy. 37 interchange)
8 km of repaving Construction Major trade corridor
Safety improvements at 5 locations on Hwy. 2 and Hwy. 642
Intersection improvement Construction Major trade corridor, Enhance public safety
Between Hwy. 37 and 2 km north of Hwy. 642
12 km of repaving Construction Major trade corridor
Deerfoot Trail southeast interchange upgrade and bridge related work on Hwy. 2 and 212 Avenue in Calgary (82500-1) (26296-1)
Interchange upgrade and bridge work
Construction Major trade corridor, Enhance public safety
-
October 2019 | Page 6
Highway Project / Location Description Status Primary Purpose
Peace River bridge project; road reconstruction, bridge construction (75946W-1) (75946-2), 98 Street partial interchange replacement (76059-2), CNR bridge (76060W-1) and, Hwy. 684 and CNR replacement (76061-2) (76061-1)
Various bridge work Construction Major trade corridor, Enhance public safety
Hwy. 2/2A/72 upgrade to existing interchange
Interchange upgrade Construction Major trade corridor, Enhance public safety
Watercourse culvert on Hwy. 2, 14 km northeast of Rycroft (86265-1)
Replace culvert Construction
Supports over-sized/over-weight corridor movement
Illuminate at four locations along Hwy. 2
Lighting Construction Major trade corridor
Intersection improvements at Hwy. 2 and Hwy. 42 interchange
Intersection improvement Construction Major trade corridor
Gaetz Avenue/Taylor Drive roadwork and intersection improvement at Hwy. 2 and McKenzie Road
13 km of grade, base, full pave and intersection improvement
Construction Major trade corridor, Enhance public safety
Blindman River Bridge on Hwy. 2A, 2 km south of Blackfalds (73496-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Between Hwy. 2 and Hwy. 49 27 km of repaving Design Supports over-sized/over-weight corridor movement
Between the City of Red Deer and north of Central Park Road
3 km of grade, base, full pave
Design Supports over-sized/over-weight corridor movement
Between east of Hwy. 587 and Hwy. 587
1 km of repaving Construction Improve connections between communities
Signalization at intersection of 86 Street in Coleman
Signalization Design Major trade corridor, Enhance public safety
Signalization at intersection of 213 Street (Bellvue and Hillcrest Access)
Signalization Design Major trade corridor, Enhance public safety
Continuous turn lane through Frank on Hwy. 3
Intersection improvement Design Major trade corridor, Enhance public safety
Rock Creek to Lundbreck fencing
Wildlife mitigation Design Major trade corridor, Enhance public safety
Rock Creek to Lundbreck fencing that connects to wildlife underpass (84165-1)
Wildlife mitigation Design Major trade corridor, Enhance public safety
Between east of Grassy Lake and west of Hwy. 885
30 km of repaving Construction Major trade corridor
Intersection improvement at Junction of Hwy. 3 and Range Road 105
Intersection improvement Construction Major trade corridor, Enhance public safety
-
October 2019 | Page 7
Highway Project / Location Description Status Primary Purpose
Between Town of Taber and 1 km east of Hwy. 36 (selective)
15 km of repaving Construction Major trade corridor
Pedestrian bridge in the City of Lethbridge (84210-1)
New bridge Construction Major trade corridor, Enhance public safety
Between City of Lethbridge and Hwy. 3 (selective)
10 km of repaving Design Major trade corridor
Between 2 km west of Hwy. 820 and 3 km west of Hwy. 62
19 km of repaving Design Improve connections between communities
Watercourse culvert on Hwy. 6 near Twin Butte (73672-1)
Replace culvert Design Improve connections between communities
Between Hwy. 22 to 2 km west of Hwy. 201 (selective)
17 km of repaving Design Improve connections between communities
Red Deer River Bridge on Hwy. 9, at south boundary of Drumheller (6615-1)
Bridge deck rehabilitation Design Improve connections between communities
Between 1 km east of Hwy. 10 to Hwy. 838
1 km of repaving Design Improve connections between communities
Between 1 km east of Hwy. 884 and Hwy. 41
54 km of repaving Construction Supports over-sized/over-weight corridor movement
Rosebud River Bridge on Hwy. 10X, 3 km south of Rosedale (70512-1)
Replace bridge Design Enhance public safety
-
October 2019 | Page 8
Highway Project / Location Description Status Primary Purpose
Gonika Creek culvert on Hwy. 11, 16 km southwest of Nordegg (73489-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 11 near Condor (8616-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Design and construct wildlife mitigation on Hwy. 11
Wildlife mitigation Design Supports over-sized/over-weight corridor movement , Enhance public safety
Lake Abraham soil nail site - erosion
Slide repair Construction Supports over-sized/over-weight corridor movement
Cygnet Lake frost heave Slide repair Construction Supports over-sized/over-weight corridor movement
Between the City of Red Deer and Hwy. 2A
2 km of grade, base, full pave
Design Improve connections between communities
Medicine River Bridge on Hwy. 12, 14 km north of Eckville (1140-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Between the Town of Coronation to Hwy. 884
23 km of repaving Design Improve connections between communities
Between Village of Halkirk to 1 km east of Hwy. 855
1 km of reconstruction/realignment
Design Supports over-sized/over-weight corridor movement , Enhance public safety
Signalization/lighting at Hwy. 12 and Municipal Road in Stettler
Signalization Design Enhance public safety
Between 1 km east of Hwy. 855 and 1 km east of Hwy. 36
23 km of repaving Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 13 near Killam (71685-1)
Replace culvert Design Improve connections between communities
Watercourse bridge on Hwy. 13, 4 km west of Winfield (9875-1)
Replace bridge Construction Enhance public safety
Between 1 km east of Hwy. 21 and City of Camrose
4 km of repaving Construction Improve connections between communities
-
October 2019 | Page 9
Highway Project / Location Description Status Primary Purpose
Between 9 km east of Hwy. 870 and 4 km east of Hwy. 883
31 km of repaving Construction Supports over-sized/over-weight corridor movement
Between the Town of Lamont to Hwy. 834
10 km of widening and repaving
Planning Supports over-sized/over-weight corridor movement
Between Hwy. 216 to Hwy. 21
21 km of repaving Design Supports over-sized/over-weight corridor movement
Safety improvements to Hwy. 15/Meridian Street and Hwy. 15/28A (signals)
Signalization Design Supports over-sized/over-weight corridor movement
Between Hwy. 37 and west of Hwy. 21
3 km of second stage paving
Design Supports over-sized/over-weight corridor movement
Second stage paving between Edmonton and Hwy. 37
4 km of second stage paving
Design Supports over-sized/over-weight corridor movement
Between Hwy. 37 and west of Hwy. 21 includes new bridge over North Saskatchewan River and CNR (74452-1) (76701-1)
3 km of grade, base, full pave
Construction Supports over-sized/over-weight corridor movement
Between Edmonton and Hwy. 37
4 km of grade, base, full pave
Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 16, 9 km west of Wildwood (71885-1)
Replace culvert Design Major trade corridor
Kilini Creek culvert on Hwy. 16 near Carvel (7391-1)
Replace culvert Design Improve connections between communities
Watercourse culvert on Hwy. 16, 7 km east of Wabamun (7408-1)
Replace culvert Design Improve connections between communities
Watercourse culvert on Hwy. 16 near Chip Lake (71886-1)
Replace culvert Design Improve connections between communities
Hwy. 43 interchange, 2 km north of Carvel (75195-1) (75195-2)
Bridge deck rehabilitation Design Major trade corridor
Over Mine Haul Road flyover at north boundary of Wabamun (EBL and WBL) (74978-1) (74978-2)
Bridge removal Design Major trade corridor
Between 7 km west of Town of Mundare and 1 km east of Hwy. 15
9 km of repaving Construction Major trade corridor
-
October 2019 | Page 10
Highway Project / Location Description Status Primary Purpose
Various safety improvements on Hwy. 22 (Jct. Hwy. 621, Hwy. 624, Township Road 502 and 514) and including small segments on Hwy. 16/22 interchanges
Intersection improvement Construction Major trade corridor, Enhance public safety
Between 4 km west of Hwy. 897 and 5 km east of Hwy. 897
9 km of repaving Construction Major trade corridor
Vermilion River Bridge on Hwy. 16A, at Vegreville (229-1)
Replace bridge Design Enhance public safety
Between 1 km west of Hwy. 857 and Hwy. 16 (selective)
1 km of repaving Design Improve connections between communities
Between Hwy. 16A and Hwy. 60 new north and south bound lane structure
Interchange upgrade Design Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 16A near Stony Plain (71097-1)
Replace culvert Construction Improve connections between communities
Between east of Hwy. 60 to west of Hwy. 2 and structure improvements over Whitemud Creek in Devon (85036-1)
7 km of grade, base, full pave
Planning Supports over-sized/over-weight corridor movement
4-lane realignment between Hwy. 60 and 4 km east of Hwy. 60, bridge culvert work (8958-1) (8884-1) and 6-laning between 2 km west of Hwy. 2 and Hwy. 2
Various road and bridge work
Design Supports over-sized/over-weight corridor movement
Frost heave near Sylvan Lake (C061-1)
Slide repair Construction Enhance public safety
Between Hwy. 1 and 9 km north of Rockyford
30 km of repaving Design Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 21, 23 km northeast of Strathmore (75493-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Between Hwy. 13 and 2 km north of Hwy. 616
15 km of repaving Construction Supports over-sized/over-weight corridor movement
Between 1 km north of Hwy. 27 and Huxley Approach Road
13 km of repaving Construction Supports over-sized/over-weight corridor movement
-
October 2019 | Page 11
Highway Project / Location Description Status Primary Purpose
Bragg Creek roundabout at Hwy. 22 and Hwy. 758
Intersection improvement Planning Supports over-sized/over-weight corridor movement, Enhance public safety
Ross Creek culvert on Hwy. 22 Near Lundbreck (71283-1)
Replace culvert Design Improve connections between communities
Between 13 km south of Hwy. 520 and Hwy. 533
39 km of repaving Design Improve connections between communities
Between Hwy. 27 to Hwy. 587
16 km of repaving Design Supports over-sized/over-weight corridor movement
Connely Creek radar animal detection system
Wildlife mitigation Design Enhance public safety
Bridge replacement over pedestrian underpass near Cochrane (71937-1)
Replace bridge Design Supports over-sized/over-weight corridor movement, Enhance public safety
Between 2 km north of Hwy. 624 and 5 km north of Hwy. 624 (southbound lane)
2 km of repaving Construction Supports over-sized/over-weight corridor movement
Between north of Drayton Valley and Hwy. 16
38 km of repaving Construction Supports over-sized/over-weight corridor movement
South Entwistle slide (NC074-1)
Slide repair Construction Enhance public safety
Between Hwy. 16 to south of Hwy. 647
17 km of repaving Construction Supports over-sized/over-weight corridor movement
Between 2 km north of Hwy. 624 and 5 km north of Hwy. 624 (northbound lane)
2 km of climbing lanes Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Little Bow River Bridge on Hwy. 23, 1 km west of Carmangay (73637-1)
Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement
Between 8 km north of Hwy. 529 and Hwy. 542
30 km of repaving Construction Supports over-sized/over-weight corridor movement
Upgrades to Hwy. 25 and Twp. Rd 92 and Coalhurst southeast area collector road intersection
Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety
-
October 2019 | Page 12
Highway Project / Location Description Status Primary Purpose
Watercourse culvert on Hwy.26 18 km east of Camrose (1800-1)
Replace culvert Construction Improve connections between communities
Between west of Hwy. 2 and east of Hwy. 2
1 km of repaving Design Supports over-sized/over-weight corridor movement
Red Deer River Bridge on Hwy. 27, 12 km southwest of Morrin (9551-1)
Replace bridge Construction Enhance public safety
Hwy. 21 landslide (C70) Slide repair Construction Enhance public safety
Red Deer River Bridge, near Morrin, road re-alignment and erosion repairs
2 km of reconstruction/realignment
Construction Enhance public safety
Intersection improvements at Hwy. 28
Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety
Illumination at Hwy. 28 and Cardiff Road
Lighting Design Enhance public safety
Intersection improvement at Junction of Hwy. 28 and 831 west of Waskatenau
Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety
Whitford Creek Bridge on Hwy. 29, 17 km northeast of Chipman (75220-1)
Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Climbing lanes on Hwy. 32 (southbound lane)
Climbing lanes Construction Supports over-sized/over-weight corridor movement
Various intersection improvements on Hwy. 32
Intersection improvement Construction Supports over-sized/over-weight corridor movement
North of Swan Hills (north bound)
2 km of climbing lanes Design Enhance public safety
Watercourse culvert on Hwy. 33 (86266-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Between Hwy. 43 and 9 km south of Hwy. 651
19 km of repaving Construction Supports over-sized/over-weight corridor movement
-
October 2019 | Page 13
Highway Project / Location Description Status Primary Purpose
Between 10 km north of Hwy. 689 to Hwy. 691
33 km of repaving Design Major trade corridor
Watercourse culvert on Hwy. 35 near High Level (73448-1)
Replace culvert Construction Major trade corridor
Between 5 km south of Hwy. 12 and 2 km south of Hwy. 12
4 km of repaving Design Supports over-sized/over-weight corridor movement
SMRID canal site 44A on Hwy. 36, 6 km south of Taber (76410-1)
Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement
Between 7 km south of Hwy. 577 and Hwy. 9
20 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Town of Taber and Hwy. 3 (selective)
1 km of repaving Construction Supports over-sized/over-weight corridor movement
Between south of Hwy. 16 to Hwy. 16
19 km of repaving Construction Supports over-sized/over-weight corridor movement
Hwy. 36 at the Town of Vauxhall
Safety rest area Construction Supports over-sized/over-weight corridor movement, Enhance public safety
Intersection improvements at Hwy. 37 and 779
Intersection improvement Design Enhance public safety
Major intersection improvement/realignment at Hwy. 37/825/15 (west of Fort Saskatchewan)
Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety
North Saskatchewan River (Vinca) Bridge on Hwy. 38, 13 km southeast of Redwater
Replace bridge Design Supports over-sized/over-weight corridor movement, Enhance public safety
Watercourse culvert on Hwy. 39 near Warburg (75629-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Modeste Creek Bridge on Hwy. 39, 25 km east of Drayton Valley (74678-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Roundabout at Hwy. 39 and Hwy. 60
Intersection improvement Construction Supports over-sized/over-weight corridor movement, Enhance public safety
-
October 2019 | Page 14
Highway Project / Location Description Status Primary Purpose
Hwy. 40 twinning with associated road and bridge work
19 km of grade, base, full pave and various bridge work
Planning Supports over-sized/over-weight corridor movement, Enhance public safety
Hwy. 40 grade widening project and various road and safety improvements
Widening and repaving, and various road and safety improvements
Design Supports over-sized/over-weight corridor movement
Between Hwy. 16 to south of Grande Cache - animal fencing
Wildlife mitigation Design Supports over-sized/over-weight corridor movement , Enhance public safety
Smoky River Bridge on Hwy. 40, 1 km north of Grande Cache (76474-1)
Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Shand Creek culvert on Hwy.40 48 km east of Grande Cache (77278-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Between west of Forestry Trunk Road and east of Muskeg River
3 km of repaving Construction Supports over-sized/over-weight corridor movement
Climbing/passing lanes on Hwy. 40
4 km of repaving Construction Supports over-sized/over-weight corridor movement
Between 1 km north of Hwy. 666 and 2 km north of Hwy. 668 (selective)
6 km of repaving Construction Supports over-sized/over-weight corridor movement
Between south of Pinto Creek to south of Berland River
Miscellaneous road work Construction Supports over-sized/over-weight corridor movement
Between Wildhay River to south of Pinto Creek
Miscellaneous road work Construction Supports over-sized/over-weight corridor movement
Climbing/passing lanes between north of Grande Cache and south of Grande Cache
27 km of repaving Construction Supports over-sized/over-weight corridor movement
Intersection improvements at Teddy Lane and Archie Way/Husky
Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety
-
October 2019 | Page 15
Highway Project / Location Description Status Primary Purpose
Between Kakwa River and Cutbank River
55 km of repaving Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 40 near Grande Cache (76749-1)
Widen bridge Construction Supports over-sized/over-weight corridor movement, Enhance public safety
Between Peter Lougheed Park Access to Kananaskis Village
26 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Muskeg Cabins to east of Grande Cache (selective)
21 km of widening and repaving
Construction Supports over-sized/over-weight corridor movement, Enhance public safety
Between the Town of Wainwright to 1 km south of Hwy. 883
19 km of repaving Design Supports over-sized/over-weight corridor movement
Between Hwy. 13 and north boundary Canadian Forces Base in Wainwright
23 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Hwy. 9 and 19 km north of Hwy. 9
19 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Hwy. 570 and Hwy. 9
25 km of repaving Construction Supports over-sized/over-weight corridor movement
Structural steel and partial depth concrete repairs carrying Hwy. 41 over the south Saskatchewan River near Empress (75187-1)
Bridge maintenance Construction Supports over-sized/over-weight corridor movement
Safety rest area northwest of Hwy. 2 and Hwy. 42
Safety rest area Construction Enhance public safety
McLeod River Bridge on Hwy. 43, at Whitecourt (73809-1)
Bridge deck rehabilitation Design Major trade corridor
Roundabout at Hwy. 43 and 49
Intersection improvement Design Major trade corridor, Enhance public safety
Intersection improvements at Hwy. 43 (Bezanson)
Intersection improvement Design Major trade corridor, Enhance public safety
Two Creek Bridge on Hwy. 43, 32 km southeast of Fox Creek (73920-1)
Miscellaneous bridge work Construction Major trade corridor
-
October 2019 | Page 16
Highway Project / Location Description Status Primary Purpose
Between 5 km west of Hwy. 49 and Hwy. 49 (eastbound lane & westbound lane)
10 km of repaving Construction Major trade corridor
Intersection improvement at Hwy. 43/22
Intersection improvement Construction Major trade corridor, Enhance public safety
Between 1 km east of Rochfort Bridge Access Road and 3 km east of Hwy. 757
13 km of repaving Construction Major trade corridor
Between 1 km east of Hwy. 22 and 3 km east of Rochfort Bridge Access Road
10 km of repaving Construction Major trade corridor
Between 23 km west of Hwy. 32 and 11 km west of Hwy. 32
18 km of repaving Construction Major trade corridor
Intersection improvements at Hwy. 18/658/751
Intersection improvement Construction Major trade corridor, Enhance public safety
Between Hwy. 32 and Mayerthorpe (selective)
31 km of repaving Construction Major trade corridor
Sturgeon Lake First Nation (between west of west boundary to east boundary)
23 km of second stage paving
Construction Major trade corridor
Hwy. 43X Grande Prairie Bypass between Richmond Hill to 116 street (Range Road 63), including service road
21 km of grade, base, full pave and second stage paving
Construction Supports over-sized/over-weight corridor movement, Enhance public safety
Roundabout at Hwy. 37 and 44
Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety
Between Hwy. 661 and 5 km south of Faucett Access Road
22 km of repaving Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 45 near Bruderheim (2054-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Watercourse culvert located on Hwy. 45, 0.5 km east of Marwayne (83179-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Between the Town of Two Hills to 2 km east of Hwy. 870
21 km of repaving Construction Supports over-sized/over-weight corridor movement
-
October 2019 | Page 17
Highway Project / Location Description Status Primary Purpose
Watercourse culvert on Hwy.49 near Gordondale (72877-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Between 18 km west of Hwy. 725 and 2 km west of Hwy. 727
32 km of repaving Design Supports over-sized/over-weight corridor movement
Between 1 km east of the Town of Spirit River to Hwy. 2
17 km of repaving Design Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 49 3 km west of Gordondale (78868-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Watercourse bridge on Hwy.49 near Donnelly (74652-1)
Replace bridge Construction Major trade corridor, Enhance public safety
Between Hwy. 5 and 2 km east of Hwy. 844
8 km of repaving Design Improve connections between communities
Red Deer River Bridge on Hwy. 54, 3 km northwest of Innisfail (272-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Between the Town of Innisfail and 1 km west of Hwy. 2
5 km of repaving Design Supports over-sized/over-weight corridor movement
Between 3 km east of Hwy. 827 and Hwy. 63
31 km of repaving Design Improve connections between communities
Watercourse culvert on Hwy. 55 near Lac La Biche (76878-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 56, 10 km south of Stettler (146-1)
Replace culvert Construction Improve connections between communities
Driedmeat Creek Bridge on Hwy. 56, 14 km northeast of Edberg (444-1)
Bridge deck rehabilitation Construction Improve connections between communities
Between 1 km south of Hwy. 561 and Hwy. 564
18 km of repaving Construction Supports over-sized/over-weight corridor movement
-
October 2019 | Page 18
Highway Project / Location Description Status Primary Purpose
Intersection improvement at Hwy. 35 and realignment for 1.5 km to the east
Intersection improvement and 1 km of realignment
Construction Major trade corridor, Enhance public safety
Watercourse culvert on Hwy. 59, 4 km west of Valhalla Centre (13343-1)
Replace culvert Construction Improve connections between communities
North Saskatchewan River Bridge on Hwy. 60, northwest boundary of Devon (73694-1) (73694-2)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Install signals at intersection of Hwy. 60 and Township Road 523
Signalization Design Supports over-sized/over-weight corridor movement , Enhance public safety
Between Hwy. 16 and Hwy. 16A (78729-1)
4 km of grade, base, full pave
Design Supports over-sized/over-weight corridor movement, Enhance public safety
Intersection treatment at Hwy. 60 and proposed Champion Pet Foods Plant
Intersection improvement Construction Supports over-sized/over-weight corridor movement
Between east of Etzikom to west of Orion
15 km of widening and repaving
Design Enhance public safety
Culvert liner carrying Hwy. 63 over watercourse, 7km northeast of Fort McKay (79444-1)
Culvert repair Design Supports over-sized/over-weight corridor movement , Enhance public safety
Between Hwy. 881 and 2 km south of Hwy. 686 (selective)
32 km of repaving Design Supports over-sized/over-weight corridor movement
Between 2 km north of Hwy. 686 and 20 km north of Hwy. 686
19 km of repaving Design Supports over-sized/over-weight corridor movement
Hangingstone River Bridge replacement, 15 km south of Hwy. 881 (75907-1)
Replace bridge Design Supports over-sized/over-weight corridor movement , Enhance public safety
-
October 2019 | Page 19
Highway Project / Location Description Status Primary Purpose
Watercourse Bridge on Hwy. 63, 2 km north of Boyle (70260-1)
Replace bridge Design Supports over-sized/over-weight corridor movement
Prairie Creek culvert on Hwy. 63, 9 km south of Fort McMurray (76001-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Between 1 km south of Hwy. 663 and Hwy. 55
49 km of repaving Construction Supports over-sized/over-weight corridor movement
Montagneuse River culvert on Hwy. 64, 15 km northwest of Hines Creek (71824-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 64, 13 km south of Hines Creek (78010-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
Between 12 km west of Hwy. 717 and 6 km east of Hwy. 717
18 km of repaving Construction Supports over-sized/over-weight corridor movement
Second Order Tributary to Elbow River culvert on Hwy. 66, 14 km southwest of Bragg Creek (79156-1)
Replace culvert Design Improve connections between communities
Tributary to Elbow River culvert on Hwy. 66, 13 km southwest of Bragg Creek (79157-1)
Replace culvert Design Improve connections between communities
Peace River Bridge on Hwy. 88, 8 km northwest of Fort Vermilion (74227-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Lily Creek culvert on Hwy. 88 near Slave Lake (77469-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Brady Creek culvert on Hwy. 88 near Slave Lake (77470-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Between north of 16th Avenue northeast and south of 17th Avenue southeast
7 km of 6-laning Design Major trade corridor, Enhance public safety
Calgary Southwest Ring Road (between Macleod Trial and Hwy. 8)
24 km of various road work Construction Major trade corridor, Enhance public safety
West Bow River Bridge Replace bridge Construction Major trade corridor, Enhance public safety
West Calgary Ring Road – Trans Canada Highway to Old Banff Coach Road
Grade base full pave Construction Major trade corridor, Enhance public safety
West Calgary Ring Road – Old Banff Coach Road to Hwy. 8
9 km of grade, base, full pave
Design Major trade corridor, Enhance public safety
-
October 2019 | Page 20
Highway Project / Location Description Status Primary Purpose
High tension cable barrier on Anthony Henday Drive
Cable barrier installation Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Southwest Anthony Henday Drive improvements between east of 111 Street to north of Whitemud Drive
32 km of 6-laning Construction Major trade corridor, Enhance public safety
Watercourse culvert on Hwy. 500 near Coutts (7410-1)
Replace culvert Design Improve connections between communities
Robinson Coulee culvert on Hwy. 501 near Cardston (800-1)
Replace culvert Design Improve connections between communities
Gravel road reconstruction 13 km of grading Design Improve connections between communities
Between east of Chain Lakes Provincial Park Access Road and west of Nanton
18 km of repaving Design Improve connections between communities
Between 10 km east from the Village of Longview and Hwy. 2
19 km of repaving Construction Improve connections between communities
Between 4 km east of Hwy. 22 to 5 km east of Hwy. 22
1 km of repaving Construction Improve connections between communities
-
October 2019 | Page 21
Highway Project / Location Description Status Primary Purpose
Tongue Creek Bridge on Hwy. 543 near Hartell (913-1)
Replace bridge Design Enhance public safety
Watercourse culvert on Hwy. 543 near Hartell (74328-1)
Replace culvert Construction Improve connections between communities
WID canal site 16 on Hwy. 560, at east boundary of Calgary (873-1)
Bridge deck rehabilitation Construction Supports over-sized/over-weight corridor movement
Roundabout at Hwy. 566 and Range Road 11 (15 Street) near Balzac
Intersection improvement Design Major trade corridor, Enhance public safety
Crossfield Creek Bridge on Hwy. 567 near Irricana (8677-1)
Replace bridge Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Bridge rehabilitation carrying Hwy. 570 over Bullpound Creek near Sunnynook (7708-1)
Bridge maintenance Construction Supports over-sized/over-weight corridor movement
Kneehills Creek Bridge on Hwy. 575, 14 km south of Swalwell (6581-1)
Bridge deck rehabilitation Construction Improve connections between communities
Rosebud River Bridge on Hwy. 582 near Didsbury (1012-1)
Replace bridge Design Enhance public safety
-
October 2019 | Page 22
Highway Project / Location Description Status Primary Purpose
Walton Creek Bridge on Hwy. 584 near Sundre (70034-1)
Replace bridge Design Enhance public safety
Design and construct wildlife mitigation on Hwy. 587
Wildlife mitigation Design Enhance public safety
Between Hwy. 2 and Hwy. 791 (including Bowden to Hwy. 2A)
15 km of repaving Construction Improve connections between communities
Between Hwy. 2A and Town of Innisfail (selective)
1 km of repaving Design Improve connections between communities
Between 14 km east of Hwy. 36 and Hwy. 872
15 km of repaving Design Improve connections between communities
Bridge rehabilitation carrying Hwy. 599 over Nelson Creek near Bulwark (8123-1)
Bridge maintenance Construction Supports over-sized/over-weight corridor movement
Watercourse culver on Hwy. 599, 16 km north of Coronation (9172-1)
Replace culvert Construction Improve connections between communities
Weed Creek culvert on Hwy. 616 near Thorsby (74292-1)
Replace culvert Design Improve connections between communities
Watercourse culvert on Hwy. 616 near Millet (1868-1)
Replace culvert Design Improve connections between communities
Between 3 km east of Hwy. 822 and Hwy. 21
14 km of repaving Construction Improve connections between communities
Between Hwy. 36 to east of Hwy. 36 (Town of Viking)
1 km of repaving Construction Improve connections between communities
Watercourse culvert on Hwy. 620 near Lodgepole (79385-1)
Replace culvert Design Improve connections between communities
-
October 2019 | Page 23
Highway Project / Location Description Status Primary Purpose
Various intersection improvements on Hwy. 625 (between Nisku and Hwy. 21)
Intersection improvement Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Between 3 km east of Hwy. 2 and Hwy. 21
17 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Town of Tofield and Hwy. 834 (south)
2 km of repaving Design Supports over-sized/over-weight corridor movement
Between east of Hwy. 14 to Hwy. 21
4 km of cold mill and inlay Design Supports over-sized/over-weight corridor movement
Between east of Hwy. 779 to east of Hwy. 60 and between west of Hwy. 60 to Edmonton west corporate limits (includes roundabout at Hwy. 60 and 628)
28 km of road work and roundabout
Design Enhance public safety
Anthony Henday Drive to 3 km east of Anthony Henday Drive
4 km of repaving Construction Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 633, 10 km southwest of Darwell (1924-1)
Replace culvert Construction Improve connections between communities
Watercourse Bridge on Hwy. 640 near Heinsburg (70939-1)
Replace bridge Design Enhance public safety
Between Hwy. 38 and Hwy. 829 and Redwater River Bridge on Hwy. 644 at east boundary of Redwater (8495-1)
5 km of widening and repaving and replace bridge
Design Supports over-sized/over-weight corridor movement, Enhance public safety
-
October 2019 | Page 24
Highway Project / Location Description Status Primary Purpose
Blue Ridge Bull Creek culvert Slide repair Construction Enhance public safety
Between 5 km west of Hwy. 769 and Hwy. 769
5 km of repaving Construction Improve connections between communities
Between 5 km west of Hwy. 44 and Hwy. 44
5 km of repaving Construction Improve connections between communities
Between 3 km west of Hwy. 827 and Hwy. 63
23 km of repaving Construction Improve connections between communities
Little Smoky River Bridge on Hwy. 665 9 km southeast of Valleyview (75538-1)
Bridge deck rehabilitation Construction Improve connections between communities
Between Hwy. 40 and 3 km east of Hwy. 40
3 km of repaving Construction Improve connections between communities
Between Hwy. 49 and Hwy. 747
23 km of repaving Design Improve connections between communities
Watercourse bridge on Hwy. 671, 14 km northwest of Beaverlodge (13896-1)
Replace bridge Design Enhance public safety
Watercourse culvert on Hwy. 671, 5 km west of Goodfare (79252-1)
Replace culvert Design Improve connections between communities
-
October 2019 | Page 25
Highway Project / Location Description Status Primary Purpose
Watercourse culvert on Hwy. 674 near Teepee Creek (70017-1)
Replace culvert Construction Improve connections between communities
Between Hwy. 2 and Hwy. 733
24 km of repaving Construction Improve connections between communities
Between 5 km west of Hwy. 744 to Hwy. 49
12 km of repaving Design Improve connections between communities
Between Hwy. 724 to Hwy. 731
13 km of repaving Construction Improve connections between communities
Between 7 km east of Hwy. 749 to Hwy. 750
20 km of repaving Construction Improve connections between communities
Culvert replacements on Hwy. 681 (75361-1)
Replace culvert Design Improve connections between communities
Strong Creek Bridge on Hwy. 684 near Peace River (7979-1)
Replace bridge Construction Enhance public safety
Brick's Hill landslide (PH009A-1)
Slide repair Construction Enhance public safety
Between 62 km east of Hwy. 88 to 87 km east of Hwy. 88
25 km of grade, base, full pave
Design Improve connections between communities
Peerless Creek Bridge on Hwy. 686 near Trout Lake (78321-1)
Replace bridge Design Enhance public safety
Clearing from north of Peerless Lake to north of Trout Lake
Clearing Design Enhance public safety
-
October 2019 | Page 26
Highway Project / Location Description Status Primary Purpose
Between Hwy. 2 and 3 km east of Hwy. 2
3 km of repaving Construction Supports over-sized/over-weight corridor movement
Between Hwy. 2 and Hwy. 986
21 km of widening and repaving
Construction Supports over-sized/over-weight corridor movement, Enhance public safety
McKinney Creek slide repair and stabilization on Hwy. 688
Slide repair Construction Supports over-sized/over-weight corridor movement, Enhance public safety
Beaton Creek Bridge on Hwy. 689, 7 km west of Dixonville (13892-1) (13891-1)
Replace bridge Construction Enhance public safety
La Crete (Tompkins) Ferry replacement (76074-1)
Ferry replacement Design Improve connections between communities
Hwy. 722, 30 km southwest of Beaverlodge (9908-1)
Replace bridge Construction Enhance public safety
Between Gas Plant and Hwy. 677
11 km of repaving Construction Improve connections between communities
Josephine Creek culvert on Hwy. 725, 23 km northwest of Spirit River (76664-1)
Replace culvert Design Improve connections between communities
Hamelin Creek at Blueberry Mountain (74227-1)
Replace culvert Design Improve connections between communities
Between Hwy. 49 and Hwy. 681
23 km of repaving Design Improve connections between communities
-
October 2019 | Page 27
Highway Project / Location Description Status Primary Purpose
Between Hwy. 670 and 10 km north of Hwy. 674
26 km of repaving Construction Improve connections between communities
Willow Creek culvert on Hwy. 734, 65 km southwest of Sundre (73172-1)
Replace culvert Design Improve connections between communities
Side Creek culvert on Hwy. 734 near Nordegg (77593-1)
Replace culvert Design Improve connections between communities
Bridge culvert on Hwy. 734 near Sundre (77779-1)
Replace culvert Design Improve connections between communities
Various bridge work on Hwy. 734 (bearing replacement and concrete work to girders and piers) (76099-1)
Miscellaneous bridge work Construction Improve connections between communities
Rehabilitation bridge work on Hwy. 734
Bridge rehabilitation Design Improve connections between communities
Between Hwy. 685 to Hwy. 35
24 km of repaving Construction Improve connections between communities
Between Hwy. 49 and 10 km north of Hwy. 49
10 km of repaving Construction Improve connections between communities
Shaftesbury slide (GP031-1) Slide repair Construction Enhance public safety
Watercourse culvert on Hwy. 743, 5 km north of Peace River (8889-1)
Replace culvert Construction Improve connections between communities
-
October 2019 | Page 28
Highway Project / Location Description Status Primary Purpose
Drainage ditch culvert on Hwy. 749 near High Prairie (70388-1)
Replace bridge Construction Enhance public safety
Between Hwy. 549 to Hwy. 22
22 km of repaving Construction Improve connections between communities
Between intersection of Hwy. 766 and Township Road 262
Intersection improvement Construction Enhance public safety
Intersection improvements along Hwy. 766 (north of Hwy. 1A)
11 km of repaving Construction Improve connections between communities
Between Hwy. 1A and Hwy. 567
11 km of repaving Construction Improve connections between communities
North Saskatchewan River Bridge on Hwy. 770, 6 km northeast of Genesse (74232-1)
Bridge deck rehabilitation Construction Improve connections between communities
Between Hwy. 13 and Piegon Lake Park
8 km of repaving Design Improve connections between communities
Between south of Hwy. 628 to 47 Avenue (Town of Stony Plain)
3 km of reconstruction/realignment
Construction Enhance public safety
Pipestone Creek Bridge on Hwy. 795 near Mulhurst Bay (73124-1)
Replace bridge Construction Enhance public safety
-
October 2019 | Page 29
Highway Project / Location Description Status Primary Purpose
Between Hwy. 28 to 2 km north of Hwy. 28
2 km of repaving Construction Improve connections between communities
Athabasca River Bridge replacement and 1 km of road realignment (9905-1)
Replace bridge and 1 km of reconstruction/realignment
Design Enhance public safety
Between Hwy. 623 and Hwy. 625
10 km of repaving Construction Improve connections between communities
Sturgeon River Bridge on Hwy. 825, 9 km southeast of Gibbons (2301-1)
Bridge deck rehabilitation Design Supports over-sized/over-weight corridor movement
Hwy. 825 grade widening project and various road and safety improvements
Widening and repaving, and various road and safety improvements
Design Supports over-sized/over-weight corridor movement , Enhance public safety
Between Hwy. 663 and Hwy. 55
11 km of repaving Construction Improve connections between communities
Between Hwy. 661 and Hwy. 63
30 km of repaving Design Improve connections between communities
Between Hwy. 14 and Town of Tofield
5 km of repaving Design Supports over-sized/over-weight corridor movement
Tofield bypass 8 km of reconstruction/realignment
Design Supports over-sized/over-weight corridor movement, Enhance public safety
-
October 2019 | Page 30
Highway Project / Location Description Status Primary Purpose
1 km south of Hwy. 14 1 km of repaving Design Supports over-sized/over-weight corridor movement
Between 1 km north of the Town of Tofield to Hwy. 16
19 km of widening and repaving
Design Supports over-sized/over-weight corridor movement, Enhance public safety
Hwy. 836 slide repair (C71) Slide repair Construction Enhance public safety
Between Hwy. 561 and Hwy. 564
19 km of repaving Construction Improve connections between communities
Between Hwy. 52 and 1 km north of Hwy. 52
1 km of grade, base, full pave
Design Improve connections between communities
Between south of Hwy. 626 and Hwy. 16
19 km of repaving Design Improve connections between communities
Watercourse culvert on Hwy. 857, 5 km south of Vegreville (9953-1)
Replace culvert Construction Improve connections between communities
Vermilion River Bridge on Hwy. 857, at south boundary of Vegreville (102-1)
Replace bridge Construction Enhance public safety
Between 1 km south of Hwy. 36 (Galahad)
1 km of repaving Design Improve connections between communities
Between Hwy. 1 to Hwy. 544 22 km of pave gravel road Construction Enhance public safety
-
October 2019 | Page 31
Highway Project / Location Description Status Primary Purpose
Between the Town of Hardisty to 12 km north of Hwy. 13
10 km of repaving Design Improve connections between communities
Intersection reconstruction/realignment at Hwy. 858 and Hwy. 881
Intersection improvement Design Supports over-sized/over-weight corridor movement , Enhance public safety
Watercourse culvert on Hwy. 881 near Myrnam (13864-1)
Replace culvert Construction Improve connections between communities
Between Hwy. 28 and 4 km south of Hwy. 55
10 km of repaving Design Improve connections between communities
Between Hwy. 16 and Hwy. 45
29 km of repaving Design Improve connections between communities
Between Hwy. 45 to Hwy. 646 (selective)
18 km of repaving Construction Improve connections between communities
Between Village of Kitscoty and Hwy. 45
20 km of repaving Construction Supports over-sized/over-weight corridor movement
Cattlepass culvert on Hwy. 899 near Bodo (80853-1)
Replace culvert Design Improve connections between communities
Slope stabilization (S055) Slide repair Construction Enhance public safety
Culvert on Tributary to Cadotte River on Hwy. 986 northeast of Peace River (86227-1)
Replace culvert Design Supports over-sized/over-weight corridor movement
Watercourse culvert on Hwy. 986 near Little Buffalo (81163-1)
Replace culvert Construction Supports over-sized/over-weight corridor movement
-
October 2019 | Page 32
Highway Project / Location Description Status Primary Purpose
Diashowa East Hill water well retaining wall and erosion, repair and other work (PH042-1, PH043-1)
Slide repair Construction Supports over-sized/over-weight corridor movement , Enhance public safety
Between Hwy. 743 and 1 km west of Hwy. 688 (selective)
17 km of repaving Construction Supports over-sized/over-weight corridor movement
Cavan Lake Canal Cavan Lake Canal headworks - pipe drops and canal rehabilitation. (50120-1)
Water management Design Flood mitigation
CP 2003-00003 Lethbridge northern headwork - division weir and fish ladder rehabilitation (50031-1)
Water management Design Flood mitigation
CP 2003-00007 Waterton St. Mary's headworks system - Jensen Dam - flood handling upgrades - operation spillway (50052-2)
Water management Design Flood mitigation
CP 2003-00007 Waterton St. Mary's River headworks systems reach 12 - Jensen Dam - flood handling upgrades - emergency spillway (50052-2)
Water management Design Flood mitigation
CP 2004-00010 Women's Coulee Canal rehabilitation, control system and river diversion (50111-1)
Water management Construction Flood mitigation
CP 2004-00015 Waterton St. Mary's headwork system structure replacement (50052-1)
Water management Design Flood mitigation
CP 2004-00045 Chain Lakes flood handling upgrade (50103-1)
Water management Design Flood mitigation
CP 2004-00060 Dickson Dam capacity enhancement project (phase 3)
Water management Design Flood mitigation
CP 2005-00002 Waterton St. Mary's headwork system supervisory control and data acquisition (50052-1)
Water management Design Flood mitigation
CP 2006-00002 Waterton reservior aquifer relief system rehabilitation (50047-2)
Water management Design Flood mitigation
CP 2006-00021 Carseland Bow River headworks control system upgrade (50021-1)
Water management Design Flood mitigation
CP 2006-00028 Kleskun Hill flood control (57108-1)
Water management Design Flood mitigation
CP 2006-00032 Bolloque Lake stabilization - outlet rehabilitation (55107-1)
Water management Design Flood mitigation
-
October 2019 | Page 33
Highway Project / Location Description Status Primary Purpose
CP 2008-00047 Waterton St. Mary's headworks system - Belly River diversion supervisory control and data acquisition (50049-1)
Water management Design Flood mitigation
CP 2010-00010 Buffalo Lake - Rochon sands flood protection berm (53100-1)
Water management Design Flood mitigation
CP 2011-00001 St. Mary's Dam - low level outlet valve replacement
Water management Construction Flood mitigation
CP 2011-00001 Riparian turnout construction at St. Mary's River Dam - low level outlet
Water management Construction Flood mitigation
CP 2011-00001 St. Mary's Dam - low level outlet valve replacement - isolation barrier
Water management Construction Flood mitigation
CP 2016-00001 Deadfish pipeline replacement
Water management Construction Flood mitigation
CP 2016-00027 McGregor reservoir shoreline erosion program (50124-1)
Water management Design Flood mitigation
CP 2017-00001 Deadfish water supply system canal rehabilitation (53001-1) Woodrow and Janet Dams
Water management Construction Flood mitigation
CP 2018-00003 Moose Lake weir decommissioning (55116-1)
Water management Design Flood mitigation
Dickson Dam Dickson Dam low level outlet rehabilitation
Water management Design Flood mitigation
Harvie Passage Installation of hanging can line on Bow River in Calgary (Harvie Passage)
Water management Design Flood mitigation
Local Road Sheep River culvert on local road near Turner Valley (79501-1)
Replace culvert Design Improve connections between communities
Local Road Vermilion River Bridge near Bruce (2206-1)
Replace bridge Design Enhance public safety
Local Road Tributary to Blackmud Creek Culvert on Local Road, at north boundary of Leduc (78862-1)
Replace culvert Design Improve connections between communities
Local Road Irrigation canal culvert 2 km south of Mclennan (86072-1)
Replace culvert Construction Major trade corridor, Improve connections between communities
Local Road Spray Lakes gabions (S030-1) Slide repair Construction Enhance public safety
Springbank Off-Stream Reservoir (SR1)
Springbank Reservoir Off-Stream (SR1) Project
Water management Planning Flood mitigation
UAR 68 Between Hwy. 43 and 1 km north of Hwy. 43
1 km of repaving Construction Improve connections between communities
UAR 73 Between Hwy. 44 and 1 km east of Hwy. 44
1 km of repaving Construction Improve connections between communities
-
October 2019 | Page 34
Highway Project / Location Description Status Primary Purpose
UAR 81 Between Hwy. 44 and 2 km east of Hwy. 44
2 km of repaving Construction Improve connections between communities
UAR 96 Between 3 km west of Hwy. 28 (Moose Lake) To Hwy. 28
3 km of repaving Design Improve connections between communities
UAR 115 Between Hwy. 16 and Hwy. 16A
1 km of repaving Construction Improve connections between communities
UAR 133 Between Hwy. 21 and 8 km east of Hwy. 21
8 km of repaving Design Improve connections between communities
UAR 137 Between Hwy. 36 to Hwy. 861
7 km of repaving Design Improve connections between communities
Various Upgrading existing dynamic messaging signs
Dynamic messaging signs Design Enhance public safety
Various Upgrading existing road weather information system towers
Road weather information system
Design Enhance public safety
Various Upgrading existing road weather information system road and sub-surface components
Road weather information system
Design Enhance public safety
Various Upgrading existing 511 cameras
511 camera Design Enhance public safety
Various LED retrofit for Edson District Lighting Design Enhance public safety
Various LED retrofit for Red Deer District
Lighting Design Enhance public safety
Various LED retrofit for Hannah District
Lighting Design Enhance public safety
Various LED retrofit for Medicine Hat District
Lighting Design Enhance public safety
Various LED retrofit for Dunmore and Redcliff
Lighting Planning Enhance public safety
Various LED retrofit for Vermillion District
Lighting Design Enhance public safety
Various High tension cable barrier in southern region including Stony Trail
Cable barrier installation Construction Enhance public safety
Various Traffic cameras and dynamic messaging signs
Cameras and dynamic messaging signs
Construction Enhance public safety