· 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel...

12
www.thahameso.com

Transcript of  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel...

Page 1:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

www.thahameso.com

Page 2:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

3

We create and maintain viable production processes by consulting

drawings, specications, process manuals to enable production to build high quality products cost

effectively with specic emphasis on safety critical processes including

torque specications and weld

“”

Table of Contents

Executive Summary

Mission

Specialization Fields

Projects

xx

xx

xx

xx

Page 3:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

54

Mission

ExecutiveSummaryThahameso Civil and Project Management is a construction and project management rm that was formed in June 2012. The company started to operate in July 2012. The word Mphago, which means Provision for Future Supplies, is committed to deliver excellent service to its clients.

Thahameso Civil and Project Management is a multi-disciplinary 100 % Black owned undertaking, Including Highly Disadvantaged Individuals as shareholders to provide professional services in the Civil Engineering, Construction Management and Project Management Environment. The success of Thahameso Civil and Project Management future in civil engineering and construction management will depend increasingly on the capability to adapt to the unique, changing and often challenging development needs of South Africa.

The successful understanding and management of diversity are integral to the operating formula required in these areas.

The members of Thahameso Civil and Project Management have all been well exposed to such unique conditions, challenges and various aspects of managing diering cultures and the necessary people required.

To provide a professional service to clients by delivering projects within budget, time and quality specications, whilst contributing towards the socio-economic advancement

of previously disadvantaged individuals and communities.

Thahameso Civil and Project Management endeavours to:• Create as many job opportunities on projects, with particular focus on rural

development strategies;• Ensure that there is a transfer of skills in all areas of construction;• Assist emerging enterprises to become sustainable in the construction industry;• Conduct business in a manner which is responsible to the environment and society

as a whole;• Be courteous and considerate to clients at all times;• Utilise the best possible methods or technologies in the execution of every project

in order to improve results; and to• Encourage innovative thinking and new ideas to keep ahead with this changing

environment.

Ntsikoe MoseboDirectorThahameso Civil and Project Management

Page 4:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

76

• Determine and develop tooling requirement to enable

the production of motor vehicles.

• Finalise component development by advising product

engineering on achieving capable component quality and

functional acceptability.

• Determine process capability of planned process by

initiating and supervising vehicle pilot build.

• Train production and quality personnel to master

n new processes to ensure quality build.

• Train material handling personnel in parts

identication to ensure correct part deliveries to

the production line.

• Resolve process capability problems during production

to ensure minimum production loss.

• Ensure that process methods and equipment enable opti-

mum manpower utilization.

Thahameso Civil and ProjeCT managemenT sPeCializes in:

• Construction Management

• Managing Construction Projects

• Training in Construction Management

• Civil Engineering Construction

• Construction of Roads

• Construction of Buildings

• Civil Engineering Services

• Concrete works and Structures

SpecialisationFields

Key Experience

Page 5:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

98

CLIENT : Fabricated Concrete

CLIENTS REP : RICKY (0828918178)

ENGINEERS NAME : de REUK & ASSOCIATES CONSULTING ENGINEERS : B DE REUCKl

ENGINEERS CONTACTS : O117942299

PROJECT VALUE : R 2 202 730,00 EXC VAT

COMPLETION : 11-Jul-16

Construction of slip lane and access road at klip rivier

Civil EngineeringProjects

Construction of BRT infrastructure on line 1A-WP5:PAUL KRUGER

CLIENT : City of Tshwane

CLIENTS REP : Likano Pitso (O123587798)

ENGINEERS NAME : Nico Conradie

CONSULTING ENGINEERS : ILLISO consulting

ENGINEERS CONTACTS : Siphelele Mhlongo (0725278000)

PROJECT VALUE : R 8 524 646,63 EXC VAT

COMPLETION : 13-Apr-16

Page 6:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

1 11 0

CLIENT : City of tshwane

CLIENTS REP : Remed Namanyana (0826784610)

ENGINEERS NAME : Tshepega Engineers

CONSULTING ENGINEERS : Mike Mtshall

ENGINEERS CONTACTS : 0724172424

PROJECT VALUE : R 700 000,00 EXC VAT

Construction of roads and storm water in Mamelodi

CLIENT : Department of Agriculture

CLIENTS REP : Oberon

ENGINEERS NAME : Endecon Ubuntu

CONSULTING ENGINEERS : Nico Conradide

ENGINEERS CONTACTS : 0833041479

PROJECT VALUE : R 3 754 000,00 EXC VAT

Construction of parking bays and roads

Page 7:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

1 31 2

CLIENT : City of Tshwane

CLIENTS REP : Remed Namanyane

ENGINEERS NAME : Themba Mthembu

CONSULTING ENGINEERS : Baitseanape Consulting Enginners

ENGINEERS CONTACTS : 012 644 1728

PROJECT VALUE : R 13 155 250,25 EXC VAT

Upgrading of Road and stormwater system in Shanguve block GG

CLIENT : City of Tshwane

Main Contractor : Phagama Civil and Management

ENGINEERS NAME : Bigen Africa

CONSULTING ENGINEERS : Regina

ENGINEERS CONTACTS : 084733638

PROJECT VALUE : R 16 174 258.53 EXC VAT

Construction of K97 between Lavendar and lenveld

Page 8:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

1 51 4

CLIENT : Development Bank of Southern Africa

CLIENTS REP : Nondumiso Sangweni (0767490961)

ENGINEERS NAME : CSM

CONSULTING ENGINEERS : Markus Meyer

ENGINEERS CAONTACTS : 0782511000

PROJECT VALUE : R 17 200 000,00 EXC VAT

COMPLETION : 29-May-2019

Upgrade of waterproofing for DOH Pretoria, Civitas building.

CLIENT : Mapitsi Cvil works

CLIENTS REP : Sipho Mhlongo (0113957343) ENGINEERS NAME : EDS

CONSULTING ENGINEERS : Christo

ENGINEERS CONTACTS : 0129921205

PROJECT VALUE : R 12 000 000,00 EXC VAT

COMPLETION : Jun-2018

Tshwane bus rapid transit project, con-struction of line 2b : Atterbury road be-tween Louis Avenue and January Masilela drive

Bulding EngineeringProjects

Page 9:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

1 71 6

CLIENT : DBSA

CLIENTS REP : Tebogo Seshibei (072 282 3321)

PROJECT VALUE : R 6.117.676.51 EXC VAT

COMPLETION : 17-March-2017

Construction of storm dam-aged schools in Kwazulu Natal (Work Package 10)

CLIENT : DBSA

CLIENTS REP : Issac Matsoari (072 133 7813) ENGINEERS NAME : Wanhla Artihects

ENGINEERS CONTACTS :

PROJECT VALUE : R 25 552 920,77 EXC VAT

COMPLETION : Jun-2018

Repair and Upgrade of storm damaged school in Limpopo (Cluster 6)

Page 10:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

1 91 8

CLIENT : Ramotshere Moila Local municipality

CONTRACTORS : Letlapa Borwa

COTRACTORS CONTACTS : Lerato Makaleng

PROJECT VALUE : R875 951.12 EXC VAT

COMPLETION : May-2015

Constraction of New Mike Matladi MultI purpose cen-tre Phase2 Development Zeerust

CLIENT : Public Works

CONTRACTORS : Letlapa Borwa

COTRACTORS CONTACTS : Lerato Makaleng

PROJECT VALUE : R 41 714 591.14 EXC VAT

COMPLETION : Jun-2018

Heiderberg Army Gymnasium:repair and Renovation to military house

Page 11:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

T H A H A M E S O C I V I L A N D P R O J E C T M A N A G E M E N T100% BLACK OWNED // LEVEL 1 BBBEE CONTIBUTOR

CO

MP

AN

Y P

RO

FIL

E

2 12 0

CLIENT : Department of road and stomwater

Main Contractor : Phagama Civil and Management

ENGINEERS NAME : GMH Tswelelo Consult ing engineers

CONSULTING ENGINEERS : Rida Jaffer

ENGINEERS CONTACTS : 076 250 1970

PROJECT VALUE : R 17 607 760.47

Upgrading of Road D4016 to R71 to Ga-rankuwa

[email protected]

5th FloorHatfield PlazaHatfieldPretoria0002

012 352 0103086 540 1199

Page 12:  · 2019. 7. 18. · n new processes to ensure quality build. • Train material handling personnel in parts identication to ensure correct part deliveries to the production line.

CO

MP

AN

Y P

RO

FIL

E

2 2