20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2...

8
Relaunch Projekt 31.05.18 haar-shop.ch AG 1

Transcript of 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2...

Page 1: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Relaunch Projekt

31.05.18 haar-shop.ch AG 1

Page 2: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Relaunch Project Summary

31.05.18 2haar-shop.ch AG

PRO• Relaunch date in December 2017 (with a delay of 2 weeks)• Overall conversion rate improved

– 24% Desktop– 15% Mobile

• Not any major problem after relaunch with longer downtime• Very good support during the whole project

CONS• Less manpower after relaunch -> buglist increases, project completion

postpones, slows down internal development• External hosting partner (Not full access for cs for analyzing issues)

Page 3: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Projectplan

31.05.18 3haar-shop.ch AG

Page 4: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Projectplan

31.05.18 4haar-shop.ch AG

• The deliverables havebeen defined for eachwork package

• Detailed projectdescription(approx. 60 pages)

Page 5: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Deployment concept

31.05.18 5haar-shop.ch AG

• Automateddeployment todifferent environments

• About 200 automated tests

Page 6: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Hosting (mgt-commerce, AWS)

31.05.18 6haar-shop.ch AG

Page 7: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

Followup Project

31.05.18 7haar-shop.ch AG

• Improve overall speed• Improve mobile usability• Better onpage search• Customer email segmentation• Refer a friend module

Page 8: 20180530 Relaunch haar-shop.ch M1-M2€¦ · Relaunch Project Summary 31.05.18 haar-shop.ch AG 2 PRO • Relaunch date in December 2017 (with a delay of 2 weeks) • Overall conversion

A/B Test Elastic vs. findologic

31.05.18 8haar-shop.ch AG

• Findologic is probably the winner (probability shifted between 55-82%)

– 8kCHF/M– More functionality

• Very fast• Interface to Nosto (future)

• Google cannot index filtered resultpages

• Searchresults with additional CMS blocks not yet possible

• Feed is updated every 24h

+ -