2019SPRING MAINTENANCE BOARD REPORT
![Page 2: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/2.jpg)
MEDVEJIE HATCHERY
![Page 3: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/3.jpg)
NEW PUMP CONTROL AND PLC ALARM SYSTEM UPGRADES
Worked with Dan at Cooper Marine Services
Remote access to alarm system
VFD level tracking
Programmable level set points
![Page 4: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/4.jpg)
PROGRAMABLE SET POINTS SCREEN
![Page 5: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/5.jpg)
ELECTRIC HYDRO’S FOR THE NET WASHER AREA
• Installed electric hydraulic pack to operate the
net washer and block
• Replaced gas hydraulic pack
• Installed by hatchery staff
![Page 6: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/6.jpg)
NEW GREEN LAKE BOAT CONSTRUCTION
• Specmar 18’ Outback kit
• This replaces our old roughneck
Skiff
• Being built by hatchery staff
![Page 7: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/7.jpg)
![Page 8: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/8.jpg)
SAWMILL CREEK HATCHERY
CONSTRUCTED AN INSULATED SHED OVER THE FIRE LINE CROSSOVER TAP
BUILT BY HATCHERY STAFF
![Page 9: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/9.jpg)
GUNNUK CREEK HATCHERY TEMPORARY HYDRO INSTALL
![Page 10: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/10.jpg)
PLUMBING IS CURRENTLY BEING INSTALLED BY HATCHERY STAFF
![Page 11: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/11.jpg)
HIDDEN FALLS DOMESTIC WATER SYSTEM / CHLORINATION PUMP RE PLUMB
![Page 12: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/12.jpg)
FABRICATING NEW JUMP OUT SCREENS AND CROWDERS FOR ADULT RACEWAYS
![Page 13: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/13.jpg)
NEW ELECTRICAL RUN INSTALLED TO SEPTIC TANK
![Page 14: 2018 spring maintenance report - NSRAA](https://reader031.fdocuments.us/reader031/viewer/2022012513/618c02a4343b0a62b15b822b/html5/thumbnails/14.jpg)
SHOP ORGANIZATION AND CLEAN UP