THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL ENGINEERING SERVICES TO REHABILITATE TWO (2) BRIDGES AND RECONSTRUCT ONE (1) STRUCTURAL CULVERT CONTRACT #2018-PW-007 ADDENDUM NO. 2 Page 1 of 3 THIS ADDENDUM SHALL BE INCORPORATED INTO THE RFP PACKAGE AND SHALL FORM A PART OF THE CONTRACT DOCUMENTS Date Issued: June 4, 2018 Issued By: Amanda Mabo, Clerk Please note the following changes, corrections, additions, deletions, information and/or instructions in connection with the RFP Package. Failure to acknowledge receipt of this Addendum as per Part “A” – Information to Bidders may render your submission non- responsive. This addendum is to address the following question(s) and clarification(s): Question 1: Would you confirm the location of the culvert to be replaced in 2018? Answer 1: The Culvert is 800 metres east of Menzies Munro Side Road and 700 metres west of Noonan Side Road. The location noted in the RFP and in the OSIM report is incorrect. See attached map. Question 2: Could the OSIM data associated with the three sites be made available? Answer 2: See attached 2016 inspections for the three sites. Question 3: Please clarify hours to be included for the Contract Administration and Site Inspection services during construction. Please confirm that the 20 hours per week per site (8 week duration for each bridge and 3 week duration for the culvert) is only for site inspection services and that additional hours are to be included to cover additional tasks listed for Construction.

Transcript of 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge...

Page 1: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL

ENGINEERING SERVICES

TO REHABILITATE TWO (2) BRIDGES AND RECONSTRUCT ONE (1) STRUCTURAL CULVERT

CONTRACT #2018-PW-007

ADDENDUM NO. 2

Page 1 of 3

THIS ADDENDUM SHALL BE INCORPORATED INTO THE RFP PACKAGE AND SHALL FORM A PART OF THE CONTRACT DOCUMENTS

Date Issued: June 4, 2018 Issued By: Amanda Mabo, Clerk

Please note the following changes, corrections, additions, deletions, information and/or instructions in connection with the RFP Package. Failure to acknowledge receipt of this Addendum as per Part “A” – Information to Bidders may render your submission non-responsive. This addendum is to address the following question(s) and clarification(s): Question 1: Would you confirm the location of the culvert to be replaced in 2018? Answer 1: The Culvert is 800 metres east of Menzies Munro Side Road and 700 metres west of Noonan Side Road. The location noted in the RFP and in the OSIM report is incorrect. See attached map. Question 2: Could the OSIM data associated with the three sites be made available? Answer 2: See attached 2016 inspections for the three sites. Question 3: Please clarify hours to be included for the Contract Administration and Site Inspection services during construction. Please confirm that the 20 hours per week per site (8 week duration for each bridge and 3 week duration for the culvert) is only for site inspection services and that additional hours are to be included to cover additional tasks listed for Construction.

Page 2: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL

ENGINEERING SERVICES

TO REHABILITATE TWO (2) BRIDGES AND RECONSTRUCT ONE (1) STRUCTURAL CULVERT

CONTRACT #2018-PW-007

ADDENDUM NO. 2

Page 2 of 3

Question 3: Yes, additional hours are to be included to cover the additional tasks listed for construction. Question 4: Please clarify if we are to include materials testing costs during construction. Answer 4: The Consultant will be required to obtain three quotes for material testing however the Township can be directly invoiced for the testing services and therefore testing costs should not be included in the submission. Question 5: Please confirm construction staging assumptions for completion of the work. i.e. will full road closures be permitted with implementation of a detour Answer 5: It is assumed that Noonan Side Road Bridge and Upper Scotch Line Culvert may be full road closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk [email protected]

Page 3: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

THE CORPORATION OF TAY VALLEY TOWNSHIP REQUEST FOR PROPOSAL

ENGINEERING SERVICES

TO REHABILITATE TWO (2) BRIDGES AND RECONSTRUCT ONE (1) STRUCTURAL CULVERT

CONTRACT #2018-PW-007

ADDENDUM NO. 2

Page 3 of 3

SITE

Page 4: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Bridge Inspection Report

Tay Valley Township

Site ID 15-094

Glen Tay Road

Built 1979

Spans 1

Length 18.75 m

Width 9.8 m

Glen Tay Road Bridge

October 11, 2016

Slab on Prestress Girder

Skew 0 ° Orient N-S

Lanes 2

AADT 2000

0.9km south of County Road 6,

crossing Tay River

Inspector Steve Reid, C.E.T.

Assistant John Landry, EIT

Weather Mostly Sunny

Low/High 4 °c 17 °c

Span Arrangement (m's) 1 @ 18.5

Longitude -76.30380800

Latitude 44.87626540Insp Date

District

Speed 80 km/h

Truck

Road Width 8.1 m

Load Posting

Feature Under Water

Tay River

Component Inspection Information

0.0%

0.0%

None

No evidence of any damage occurring on the deck top. Evidence of recent deck condition survey. Wearing surface condition is poor.

Deck Surface

Length: 18.75 m

Width: 8.1 m

Height: 0.2 m

Protected ECRC Deck (1) Defects

Damage

Maintenance

Capital Rec. None

0

Partial Inspection

0.0%

0.0%

None

Good condition.

Deck Soffit

Length: 18.75 m

Width: 10.5 m

Height:

Soffit (1) Defects

Damage

Maintenance

Capital Rec. None

0

Page 1 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 5: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

15.0%

12.0%

None

Moderate to major cracking throughout. Areas of severe raveling throughout deck. Various minor potholes in southbound lane near the deck end. Patching of the wearing surface near the end dams. Debris accumulation along curb line.

Wear Surface

Length: 18.75 m

Width: 8.1 m

Height:

Asphalt Wear Surf (1) Defects

Damage

Major Ravelling

Minor Potholing, Moderate Cracking

Maintenance

Capital Rec. Replace in 2 years

2

Perf Def: Leaking

10.0%

5.0%

None

The joints require replacement. Damage to north abutment wall do to leaking joint. Spalling along the end dams and ballast walls both joints. Missing piece of armouring north joint. Joints are filled with debris.

Expansion Joints

Length: 8.1 m

Width:

Height:

X- Joint Conventional (2) Defects

Damage

Moderate Detatched Seal, Major Scaling/Abrasion

Moderate Plow Gouging, Minor End Dam Breakage

Maintenance

Capital Rec. Replace in 2 years

3

0.0%

0.0%

Unplug Scuppers

Build-up of debris near drain pipes. West drain completely covered by debris.

Deck Drains

Length:

Width:

Height:

Scupper & Pipe (2) Defects

Damage

Maintenance

Capital Rec. None

0

1.0%

0.5%

None

Light scaling throughout. Light spalls on fascia above SE deck drain. Buildup of debris on sidewalk.

Curbs

Length: 18.75 m

Width: 0.9 m

Height: 0.16 m

Conc Curb (2) Defects

Damage

Minor Scaling

Minor Spalling

Maintenance

Capital Rec. None

2

5.0%

0.5%

None

Light scaling and light spalling.

Approach Curb

Length: 6 m

Width: 0.15 m

Height: 0.17 m

Conc Curb (4) Defects

Damage

Minor Scaling, Moderate Abrasion

Minor Spalling

Maintenance

Capital Rec. None

2

Page 2 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 6: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

10.0%

15.0%

None

Barrier end treatments do not meet current roadside safety standards. Many timber posts have moderate to major decay. Light checks and splits noted in barrier posts. Minor impact damage and plow damage at NE and SE.

Approach Barrier

Length: 20 m

Width:

Height: 0.7 m

Timber Post & Guiderail (4) Defects

Damage

Moderate Checking

Major Decay, Moderate Impact

Maintenance

Capital Rec. Replace in 2 years

4

0.0%

0.0%

None

Some minor impact scrapes, overall satisfactory condition.

Barrier

Length: 25 m

Width:

Height: 1 m

Alum Stanchion & Pipe (2) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

0.0%

None

Good condition.

Girders

Length: 18.75 m

Width: 0.55 m

Height: 1.2 m

Concrete-Prestressed (4) Defects

Damage

Maintenance

Capital Rec. None

0

5.0%

5.0%

None

Delamination and spalling on north abutment center diaphragm.

Diaphragms

Length: 2.3 m

Width:

Height: 1.25 m

RC Diaphragm (6) Defects

Damage

Minor Scaling

Minor Delamination, Minor Spalling

Maintenance

Capital Rec. Repair in 2 years

2

5.0%

3.0%

None

Hairline to narrow vertical cracking under all girders at the south end. Delamination in the middle bay at the north end of the abutment wall face and bearing seat. Rust staining at SW above bearing seat. Exposed rebar and spall on NE abutment wall above bearing seat. Hairline vertical crack at middle of West girder.

Abutment Stem

Length:

Width: 9.2 m

Height: 1.25 m

RC Abutment Wall (2) Defects

Damage

Moderate Rust Staining

Moderate Delamination, Minor Cracking

Maintenance

Capital Rec. Repair in 2 years

3

0.0%

0.0%

None

Satisfactory condition.

Wing Walls

Length: 3 m

Width:

Height: 1 m

RC Wing Walls (4) Defects

Damage

Maintenance

Capital Rec. None

0

Page 3 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 7: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

0.0%

0.0%

None

Unclear if approach slabs are present.

Approach Slab

Length: 6 m

Width: 8.1 m

Height: 0.25 m

Approach Slab (2) Defects

Damage

Maintenance

Capital Rec. None

0

Partial Inspection

2.0%

0.0%

None

Satisfactory condition.

Abutment Bearings

Length:

Width:

Height:

Laminated Rubber Brg (8) Defects

Damage

Minor Weathering

Maintenance

Capital Rec. None

0

0.0%

0.0%

None

No performance deficiencies detected.

Abutment Foundation

Length:

Width:

Height:

Spread Footing (2) Defects

Damage

Maintenance

Capital Rec. None

0

Not Inspected

0.0%

0.0%

None

Well centered under bridge. Some rock debris upstream.

Channel

Water Channel (1) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

0.0%

Remove Brush/Trees

Satisfactory condition, tree growth at all corners.

Embankment

Embankment (4) Defects

Damage

Maintenance

Capital Rec. None

0

Page 4 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 8: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Bridge Condition Index: 73.1 Straight Line Depreciation: 40.3Parabolic Depreciation: 60.7 %%

Estimated Replacement Value: $798,000 Estimated Remaining Service Life: 53 Years

Capital Needs Cost Estimate Break-Down

$0

$0

$15,000

Structural Items Subtotal $139,000

Contract Admin & Contingencies 20% $34,000

Total Rehabilitation Cost Estimate $202,000

$0

$0

$45,938

$0

$58,800

Item Req'd Units Quantity Estimated Cost

m

Count

m

Unit Price $

20.0

183.8

42.8

19.6

183.8

$500

8.0

$10,000

$24,00080.0

80.0

m

$350

$2,000

$1,500

$3,000

$250

$5,000

$200

$14,000

Misc Concrete Repairs

Deck Concrete Overlay

Deck Replacement

Barrier Wall Replacement

Expansion Joint

Waterproof & Pave

Bearing Replacement

Approach Guiderail

Recommended Capital Year 2018

Other Work

Estimated Traffic Management & Civil Items

Mobilization General Sitework 10%

Rec'd Investigations

Deck Condion Survey

Enhanced Inspection

Structure Evaluation

Underwater Investigation

Ice Inspection

Load Posting

Planning Study

Boat Inspection

Recommended Capital Work Summary

Misc concrete repairs, WP&P, X-jnt, Approach GR,

Inspection Comments

The bridge is in good condition with the exception of the expansion joints. Leaking joints are beginning to cause damage to substructure. Recommend replacing joints, (consider semi-integral) patch abutment and deck, waterproof and pave.

Page 5 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 9: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

East elevation

Image 101

Text0

G:\TayValle

North approach

Image 93

Text0

G:\TayValle

South approach

Image 94

Text0

G:\TayValle

South expansion joint

Image 95

Text0

G:\TayValle

North expansion joint

Image 96

Text0

G:\TayValle

Damaged armouring in south expansion joint

Image 97

Page 6 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 10: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

Typ wearing surface

Image 98

Text0

G:\TayValle

Typ east curb and railing

Image 99

Text0

G:\TayValle

Pothole in at south expansion on east side

Image 100

Text0

G:\TayValle

South abutment wall

Image 102

Text0

G:\TayValle

Typ soffit detail

Image 103

Text0

G:\TayValle

West elevation

Image 104

Page 7 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 11: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

North abutment wall

Image 105

Text0

G:\TayValle

Delamination in north abutment and spall on diaphragm

Image 106

Text0

G:\TayValle

Northwest wing wall

Image 107

Text0

G:\TayValle

Upstream channel west

Image 109

Text0

G:\TayValle

Downstream channel east

Image 110

Text0

G:\TayValle

Decay in northwest approach railing post

Image 111

Page 8 of 8

Glen Tay Road Bridge15-094Keystone Bridge Management Corp.

Page 12: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Bridge Inspection Report

Tay Valley Township

Site ID 15-091

Noonan Road

Built 1967

Spans 1

Length 10 m

Width 9.1 m

Noonan’s Side Road Bridge

August 31, 2016

Concrete Rigid Frame CIP

Skew 0 ° Orient E-W

Lanes 2

AADT 5

1.2 km North of Upper Scotch

Line Road

Inspector Harold Kleywegt, P.Eng.

Assistant Steve Reid, C.E.T.

Weather Mostly Mixed Sun & Cloud

Low/High 20 °c 26 °c

Span Arrangement (m's) 1 @ 8.8

Longitude -76.33460700

Latitude 44.84155400Insp Date

District

Speed 80 km/h

Truck

Road Width 7.3 m

Load Posting

Feature Under Navigable Channel

Tay River

Component Inspection Information

2.0%

5.0%

None

Scattered delamination noted. Tining mostly abraded. Evidence of deck condition survey.

Deck Surface

Length: 10 m

Width: 7.3 m

Height:

Protected BSRC Deck (1) Defects

Damage

Major Scaling, Minor Abrasion

Minor Delamination, Minor Spalling

Maintenance

Capital Rec. Repair in 5 years

2

Partial Inspection

0.0%

0.1%

None

Fascia on north side has two small impact spalls of unknown origin.

Deck Soffit

Length: 8.8 m

Width: 9.1 m

Height:

Soffit (1) Defects

Damage

Minor Spalling

Maintenance

Capital Rec. None

2

0.0%

0.0%

None

Gravel approaches. Generally in good condition.

Wear Surface

Length: 30 m

Width: 7.7 m

Height:

Asphalt Wear Surf (1) Defects

Damage

Maintenance

Capital Rec. None

0

Page 1 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 13: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

0.0%

0.0%

Unplug Scuppers

Filled with debris at the time of inspection. PN

Deck Drains

Length:

Width:

Height:

Scupper & Pipe (2) Defects

Damage

Maintenance

Capital Rec. None

0

1.0%

0.1%

None

Minor plow abrasions along curb face. Spall at northwest corner. PN

Curbs

Length: 18.7 m

Width: 0.58 m

Height: 0.165 m

Conc Curb (2) Defects

Damage

Minor Scaling

Minor Spalling

Maintenance

Capital Rec. None

2

0.0%

0.0%

None

No concerns noted.

Barrier

Length: 18.7 m

Width: 0.245 m

Height: 0.61 m

RC Parapet (2) Defects

Damage

Maintenance

Capital Rec. None

0

10.0%

1.0%

None

Impact damage at north rail. End cap missing at southeast. PN

Railings

Length: 18.7 m

Width:

Height:

Twin Pipe Hand Rail (2) Defects

Damage

Minor Deformation, Moderate Tarnishing

Minor Impact

Maintenance

Capital Rec. None

2

50.0%

0.0%

None

Lower 1.2 m has uniform prominent scaling.

Abutment Stem

Length:

Width: 8 m

Height: 1.5 m

RC Abutment Wall (2) Defects

Damage

Moderate Scaling

Maintenance

Capital Rec. None

0

30.0%

0.0%

None

Lower 1 m has uniform prominent scaling.

Wing Walls

Length: 5 m

Width:

Height: 1.25 m

RC Wing Walls (4) Defects

Damage

Moderate Scaling

Maintenance

Capital Rec. None

0

Page 2 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 14: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

0.0%

0.0%

None

Not visible at the time of inspection. No evidence of geotechnical instability. Assumed to be generally in good condition. PN

Abutment Foundation

Length:

Width:

Height:

Spread Footing (2) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

2.0%

None

Some scour to 0.5 m depth noted along east abutment. Otherwise stable stream bottom. Remnants of beaver dam downstream.

Channel

Water Channel (1) Defects

Damage

Minor Bank/Channel Scour

Maintenance

Capital Rec. None

2

0.0%

0.0%

None

Some erosion evident but not a concern at this time.

Embankment

Embankment (4) Defects

Damage

Maintenance

Capital Rec. None

0.0%

0.0%

None

Review warrant for guide rail.

Signs

Length:

Width:

Height:

Delineator (4) Defects

Damage

Maintenance

Capital Rec. None

0

Page 3 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 15: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Bridge Condition Index: 68.8 Straight Line Depreciation: 12.8Parabolic Depreciation: 29.7 %%

Estimated Replacement Value: $791,000 Estimated Remaining Service Life: 51 Years

Capital Needs Cost Estimate Break-Down

$0

$0

$15,000

Structural Items Subtotal $67,000

Contract Admin & Contingencies 20% $18,000

Total Rehabilitation Cost Estimate $110,000

$0

$31,850

$22,750

$0

$0

Item Req'd Units Quantity Estimated Cost

m

Count

m

Unit Price $

25.0

91.0

34.0

18.2

91.0

$500

0.0

$12,500

$080.0

80.0

m

$350

$2,000

$1,500

$3,000

$250

$5,000

$200

$10,000

Misc Concrete Repairs

Deck Concrete Overlay

Deck Replacement

Barrier Wall Replacement

Expansion Joint

Waterproof & Pave

Bearing Replacement

Approach Guiderail

Recommended Capital Year 2017

Other Work

Estimated Traffic Management & Civil Items

Mobilization General Sitework 10%

Rec'd Investigations

Deck Condion Survey

Enhanced Inspection

Structure Evaluation

Underwater Investigation

Ice Inspection

Load Posting

Planning Study

Boat Inspection

Recommended Capital Work Summary

Misc concrete repairs, O'Lay, WP&P,

Inspection Comments

Deck surface requires rehabilitation within the next few years. Ideally this should happen in 2017.

Page 4 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 16: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

North elevation

Image 70

Text0

G:\TayValle

West approach

Image 64

Text0

G:\TayValle

Upstream channel south

Image 65

Text0

G:\TayValle

Downstream channel north

Image 66

Text0

G:\TayValle

East approach

Image 67

Text0

G:\TayValle

Typ exposed deck condition

Image 68

Page 5 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 17: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

Typ curb & parapet wall north shown

Image 69

Text0

G:\TayValle

East abutment wall

Image 71

Text0

G:\TayValle

West abutment wall

Image 72

Text0

G:\TayValle

Small spalls north fascia

Image 73

Text0

G:\TayValle

Typ soffit detail

Image 74

Text0

G:\TayValle

SW wing wall & abutment wall scaling

Image 75

Page 6 of 6

Noonan’s Side Road Bridge15-091Keystone Bridge Management Corp.

Page 18: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Culvert Inspection Report

Tay Valley Township

Site ID Found 1

Upper Scotch Line

Built 1980

Spans 1

Length 17.2 m

Width 3.5 m

Found Culvert

August 31, 2016

Soil-Steel Structure

Skew 0 ° Orient N-S

Lanes 2

AADT 200

1.3km east of Menzies Munro Sideroad

Inspector Harold Kleywegt, P.Eng.

Assistant Steve Reid, C.E.T.

Weather Mostly Mixed Sun & Cloud

Low/High 20 °c 26 °c

Longitude -76.33468041

Latitude 44.83212812Insp Date

District

Speed 0 km/h

Truck

Road Width 6.7 m

Load Posting

Feature Through Water

Tributary - Tay Snye

Fill 1 m H2O Depth 0.5 m

Component Inspection Information

Perf Def: Insufficient Barrel Length

0.0%

20.0%

None

Year of installation estimated. Bottom of culvert is severely perforated and substantially corroded. Inlet end is deformed and slightly obstructing channel, see image.

Conduit

Length: 17.2 m

Width: 3.5 m

Height: 2 m

CS Plate Pipe Arch (1) Defects

Damage

Major Perforation, Minor Deformation/Bulging

Maintenance

Capital Rec. Replace in 3 years

4

0.0%

0.0%

None

Tar and chip surface.

Wear Surface

Length: 30 m

Width: 6.5 m

Height:

Asphalt Wear Surf (1) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

0.0%

None

Fair condition.

Barrier

Length: 20 m

Width:

Height: 0.7 m

Timber Post & Cable (2) Defects

Damage

Maintenance

Capital Rec. None

0

Page 1 of 6Found CulvertFound 1Keystone Bridge Management Corp.

Page 19: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Component Inspection Information

0.0%

0.0%

None

Some rocky debris has washed into inlet end. Opening appears adequate.

Channel

Water Channel (1) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

0.0%

None

Some erosion noted at culvert inlet. Well vegetated.

Embankment

Embankment (2) Defects

Damage

Maintenance

Capital Rec. None

0

0.0%

0.0%

None

Located in NE and SW.

Signs

Length:

Width:

Height:

Delineator (2) Defects

Damage

Maintenance

Capital Rec. None

0

Page 2 of 6Found CulvertFound 1Keystone Bridge Management Corp.

Page 20: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Bridge Condition Index: 59.9 Straight Line Depreciation: 0.0Parabolic Depreciation: 0.0 %%

Estimated Replacement Value: $196,000 Estimated Remaining Service Life: 0 Years

Capital Needs Cost Estimate Break-Down

$0

Structural Items Subtotal $113,000

Contract Admin & Contingencies 20% $33,000

Total Rehabilitation Cost Estimate $196,000

$0

$0

$0

$0

$0

Item Req'd Units Quantity Estimated Cost

m

Count

m

Unit Price $

0.0

60.2

41.2

7.0

60.2

$500

0.0

$0

$080.0

80.0

m

$350

$2,000

$1,500

$3,000

$250

$5,000

$200

Misc Concrete Repairs

Deck Concrete Overlay

Deck Replacement

Barrier Wall Replacement

Expansion Joint

Waterproof & Pave

Bearing Replacement

Approach Guiderail

New Steel Culvert

Recommended Capital Year 2018

$30,000

$20,000

Estimated Traffic Management & Civil Items

Mobilization General Sitework 10%

Rec'd Investigations

Deck Condion Survey

Enhanced Inspection

Structure Evaluation

Underwater Investigation

Ice Inspection

Load Posting

Planning Study

Boat Inspection

Recommended Capital Work Summary

New Steel culvert

Inspection Comments

Found culvert 2016, date of construction estimated. Culvert is at end of service life and should be replaced within two years. Capital estimate is for a steel culvert replacement. A concrete culvert will have at least twice the service life as a steel culvert, and should be considered.

Cost of existing structure removal: $6,000

Instalation Cost for Similar Size Steel: $19,000

Cost of excavation: $11,000

Cost of asphalt removal: $2,600

Cost of road replace: $17,000

Cost of waterproofing: $0

Cost of SBGR: 0

Cost of dewatering: $41,000

Cost erosion control: $15,000

Cost for seeding: $1,000

Page 3 of 6Found CulvertFound 1Keystone Bridge Management Corp.

Page 21: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

North elevation

Image 92

Text0

G:\TayValle

South elevation

Image 87

Text0

G:\TayValle

Perforations on west wall south end

Image 88

Text0

G:\TayValle

Typ corrosion in walls

Image 89

Text0

G:\TayValle

Small perforations in east wall

Image 90

Text0

G:\TayValle

Typ through barrel

Image 91

Page 4 of 6Found CulvertFound 1Keystone Bridge Management Corp.

Page 22: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Text0

G:\TayValle

West approach

Image 93

Text0

G:\TayValle

Downstream channel north

Image 94

Text0

G:\TayValle

Upstream channel south

Image 95

Text0

G:\TayValle

East approach

Image 96

Page 5 of 6Found CulvertFound 1Keystone Bridge Management Corp.

Page 23: 2018-PW-007 - Engineering Services - Rehab of Bridges ... closures and Glen Tay Side Road Bridge will have to be staged construction. Amanda Mabo, Clerk clerk@tayvalleytwp.ca THE CORPORATION

Page 6 of 6Found CulvertFound 1Keystone Bridge Management Corp.