2018-2021 STIP - October Amendments · KK RIVER TRAIL-20TH & 20TH-LAYTON 1009-01-11 MILWAUKEE...
Transcript of 2018-2021 STIP - October Amendments · KK RIVER TRAIL-20TH & 20TH-LAYTON 1009-01-11 MILWAUKEE...
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 1October Amendments
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 1October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
8995-00-03 ASHLAND NON-HWY 290 $0 - $99,999 $100,000 - $249,999 01/25/19 C ASHLAND, VARIOUS LOCATIONS Advanced
DESIGN/BIKE PED TRAIL IMPRVMNTS/TAP
BIKE & PED FACILITY IMPROVEMENTS
8995-00-04 ASHLAND NON-HWY 290 $0 - $99,999 $750,000 - $999,999 01/25/21 C ASHLAND, VARIOUS LOCATIONS Advanced
CONSTR/BIKE PED TRAIL IMPRVMNTS/TAP
BIKE & PED FACILITY IMPROVEMENTS
8347-01-00 BAYFIELD NON-HWY 290 $0 - $99,999 $100,000 - $249,999 11/25/18 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced
DESIGN/PEDESTRIAN IMPRVMNTS/TAP
USH 2 AND BOHN STREET SIDEWALKS
8347-01-70 BAYFIELD NON-HWY 290 $0 - $99,999 $500,000 - $749,999 01/25/21 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced
CONSTR/PEDESTRIAN IMPRVMNTS/TAP
USH 2 AND BOHN STREET SIDEWALKS
4579-01-00 BROWN STH-096 290 $0 - $99,999 $0 - $99,999 01/25/19 V OF ALLOUEZ, LONGVIEW AVE Advanced
DOTY SCHOOL SRTS
HOFFMAN RD - SOUTH VILLAGE LIMIT
9269-08-71 BROWN STH-096 290 $0 - $99,999 $750,000 - $999,999 01/25/21 V OF HOWARD, VELP AVE TRAIL Advanced
MULTI-MODAL TRAIL, PHASE 1
GLENDALE AVE - MOUNTAIN BAY TRAIL
7160-04-75 BUFFALO STH-035 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 12/13/22 12/08/20 TREMPEALEAU - FOUNTAIN CITY Advanced
CONSTRUCT/BRRPL B-06-0201,0204,0206
MISSISSIPPI RVR TRIBUTARY/3 BRIDGES
1009-89-11 CHIPPEWA CTH-M 207 $0 - $99,999 $100,000 - $249,999 06/25/19 V NEW AUBURN, CTH M/MAIN ST Advanced
RR OPS/SAFETY/OCR/SIGNALS
PGR X-ING 186030G
6020-04-02 COLUMBIA USH-051 303 $0 - $99,999 $250,000 - $499,999 01/01/18 DEFOREST - PORTAGE Advanced
PE/MILL & OVERLAY
TOMLINSON ROAD TO ONTARIO STREET
5992-09-42 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred
UTILITY OPS/WATER MAIN
MONONA DRIVE TO STOUGHTON ROAD
5992-09-43 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred
UTILITY OPS/SANITARY SEWER
MONONA DRIVE TO STOUGHTON ROAD
1007-10-05 DANE IH -039 302 $3,000,000 - $3,999,999 $3,000,000 - $3,999,999 12/25/18 ILLINOIS STATE LINE - MADISON Advanced
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 2October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
FINAL DESIGN/RECSTE
USH 12/18 INTERCHANGE
1007-11-26 DANE IH -039 302 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 06/25/19 ILLINOIS STATE LINE - MADISON Advanced
R/E AQUISITION/BELTLINE INTERCHANGE
USH 12/18 INTERCHANGE
1007-12-77 DANE IH -039 302 $3,000,000 - $3,999,999 $3,000,000 - $3,999,999 12/10/19 ILLINOIS STATE LINE - MADISON Advanced
CONST OPS/RECSTE/IMPRVMTS/PATCHING
USH 12/18 INTCHG/PENNITO BOX EXT
1007-12-78 DANE IH -039 302 $13,000,000 - $13,999,999 $13,000,000 - $13,999,999 12/10/19 ILLINOIS STATE LINE - MADISON Advanced
CONST OPS/RESCTE/EARLY STR AND FILL
USH 12/18 INTCHG/CORE NB/EARLY WORK
1007-12-79 DANE IH -039 302 $17,000,000 - $19,999,999 $17,000,000 - $19,999,999 12/08/20 06/09/20 ILLINOIS STATE LINE - MADISON Advanced
CONST OPS/RECSTE/SB
USH 12/18 INTCHG/CORE SB
1007-12-80 DANE IH -039 302 $20,000,000 - $24,999,999 $20,000,000 - $24,999,999 12/08/20 06/09/20 ILLINOIS STATE LINE - MADISON Advanced
CONST OPS/RECSTE
USH 12/18 INTCHG/CORE NB/FINAL WORK
1007-12-82 DANE IH -039 302 $0 - $99,999 $0 - $99,999 06/25/20 ILLINOIS STATE LINE - MADISON Advanced
ITS PO ITEMS FOR 1007-12-75/FY 2020
CTH AB TO USH 12/18 INTCHG
3625-00-04 DANE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 COTTAGE GROVE,GLACIAL DRUMLIN TRAIL Advanced
PE/PEDESTRIAN-BICYCLE TRAIL
VILAS ROAD TO MAIN STREET
3625-00-05 DANE NON-HWY 290 $0 - $99,999 $500,000 - $749,999 03/25/21 COTTAGE GROVE,GLACIAL DRUMLIN TRAIL Advanced
CONST OPS/PEDESTRIAN-BICYCLE TRAIL
VILAS ROAD TO MAIN STREET
5992-08-35 DANE NON-HWY 206 $0 - $99,999 $0 - $99,999 09/25/18 PEDESTRIAN BIKE SAFETY EDUCATION Deferred
FUNDING FOR CALENDAR YEAR 2018
CITY OF MADISON
5155-00-27 DANE USH-014 303 $0 - $99,999 $0 - $99,999 07/25/19 MADISON - EVANSVILLE Advanced
RE OPS/
STH 92 INTERSECTION
5310-00-10 DANE USH-014 303 $0 - $99,999 $0 - $99,999 01/01/18 SPRING GREEN - MADISON Advanced
DESIGN/OFFSET RIGHT TURN LANE
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 3October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
STH 19/STH 78/WOLF RD INTERSECTION
5410-00-74 DANE USH-051 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 12/14/21 12/13/22 MADISON - DEFOREST Deferred
CONST/ REPLACE PAVEMENT NB
USH 151 TO PIERSTORFF STREET
5845-01-00 DANE USH-051 303 $0 - $99,999 $250,000 - $499,999 01/01/18 STOUGHTON - MADISON Advanced
DESIGN/INTERSECTION SAFETY/RAB
CTH B/CTH AB INTERSECTION
5400-00-03 DANE USH-151 303 $0 - $99,999 $100,000 - $249,999 01/01/18 C MADISON, BLAIR ST/E WASHINGTON AV Advanced
PE/REPAIR AND OVERLAY
E WILSON ST TO BLOUNT ST
5400-00-73 DANE USH-151 303 $0 - $99,999 $750,000 - $999,999 11/10/20 C MADISON, BLAIR ST/E WASHINGTON AV Advanced
CONST/ REPAIR AND OVERLAY
E WILSON ST TO BLOUNT ST
8766-00-60 DOUGLAS CTH-D 206 $0 - $99,999 $0 - $99,999 10/25/18 CTH B - POPLAR Advanced
CONST/ER/FLD 06-17-2018/EMRGNCY RPR
CTH B TO USH 2(WI-18-071)
5205-03-70 GRANT STH-133 305 $0 - $99,999 $100,000 - $249,999 10/25/18 GRANT COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIRS
07-19-2017 ST HWY FLOOD EVENT SITES
1650-06-40 GRANT USH-061 303 $0 - $99,999 $0 - $99,999 11/25/18 02/25/26 DICKEYVILLE - LANCASTER Deferred
UTL OPS/ LOE
HICKORY LANE TO ALONA LANE
5940-02-70 IOWA STH-133 303 $0 - $99,999 $0 - $99,999 10/25/18 IOWA COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIR
BIGLOW HILL RD TO STH130(WI-17-076)
3500-00-06 JEFFERSON NON-HWY 290 $0 - $99,999 $0 - $99,999 01/01/18 JEFFERSON COUNTY, INTERURBAN TRAIL Advanced
PE/PLAN CHECK REVIEW/BIKE PED TRAIL
RIVER ROAD TO CTH F
3500-00-76 JEFFERSON NON-HWY 290 $0 - $99,999 $1,000,000 - $1,999,999 10/25/21 JEFFERSON COUNTY, INTERURBAN TRAIL Advanced
CONST OPS/BIKE PEDESTRIAN TRAIL
RIVER ROAD TO CTH F
3575-02-22 JEFFERSON USH-012 303 $0 - $99,999 $0 - $99,999 08/25/20 C FORT ATKINSON, WHITEWATER AVENUE Advanced
RE OPS
MADISON AVENUE TO CTH M
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 4October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
5040-09-70 JUNEAU STH-033 305 $0 - $99,999 $0 - $99,999 10/25/18 JUNEAU COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIR
07-19-2017 ST HWY FLOOD EVENT
3736-06-71 KENOSHA NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 07/25/20 CTH C SHARED USE PATH Advanced
CONST/PATH
114TH AVE-100' E OF DES PLAINES RVR
7141-02-60 LA CROSSE STH-035 303 $500,000 - $749,999 $500,000 - $749,999 11/08/22 01/08/19 LA CROSSE - TREMPEALEAU Advanced
CONST/ MILL AND OVERLAY
USH 53 TO WEST COUNTY LINE
5120-06-75 LA CROSSE STH-162 305 $0 - $99,999 $100,000 - $249,999 10/25/18 LACROSSE COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIR
07-19-2017 ST HWY FLOOD EVENT SITES
9140-12-62 LANGLADE STH-064 303 $100,000 - $249,999 $100,000 - $249,999 08/12/25 05/14/19 ANTIGO - LANGLADE Advanced
CONST/MISC FAST TRACK
5TH AVENUE ROAD TO CTH P CULVERTS
9140-12-72 LANGLADE STH-064 303 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 08/12/25 05/14/19 ANTIGO - LANGLADE Advanced
CONST/RESURF10 FAST TRACK
5TH AVENUE ROAD TO CTH P
4100-21-60 MANITOWOC USH-151 303 $0 - $99,999 $0 - $99,999 01/25/19 VALDERS - MANITOWOC Advanced
CCO 1 AGAINST 4100-21-71
JACKSON STREET - IH 43 SB RAMPS
6600-00-72 MARATHON STH-153 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 08/13/24 05/14/19 MOSINEE - ELDERON Advanced
CONST/RESURFACE FAST TRACK
ANDRYS LN TO CTH J (N)
1228-18-91 MILWAUKEE IH -043 303 $250,000 - $499,999 $100,000 - $249,999 09/25/42 05/25/20 NORTH-SOUTH FREEWAY Advanced
TRAFFIC MITIGATION ID 1228-18-70
BENDER RD TO COUNTY LINE ROAD
2984-17-01 MILWAUKEE LOC-STR 290 $100,000 - $249,999 $100,000 - $249,999 04/25/19 E/W WASHINGTON ST & W SCOTT ST Advanced
PE/PED/BIKE FACILITIES
KK RIVER TRAIL-20TH & 20TH-LAYTON
1009-01-11 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 07/25/20 MPS/ BIKE FED SRTS PROGRAM Advanced
Milwaukee Public Schools Program
SFY 2019 (YR1 OF 2)
1009-01-12 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 07/25/21 MPS/ BIKE FED SRTS PROGRAM Advanced
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 5October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
Milwaukee Public Schools Program
SFY 2019 (YR1 OF 2)
2967-01-03 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 HISTORIC LAKE PARK RAVINE BRIDGE Advanced
PE/BRIDGE REPLACEMENT
OVER RAVINE ROAD
2967-01-05 MILWAUKEE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 LITTLE MENOMONEE RIVER PARKWAY Advanced
PE/TRAIL RELOCATION
OAK LEAF TRAIL RELOCATION
2967-01-75 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 10/25/21 LITTLE MENOMONEE RIVER PARKWAY Advanced
CONST/TRAIL RELOCATION
OAK LEAF TRAIL RELOCATION
2984-13-03 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 04/25/19 SRTS IMPLEMENTATION PHASE I Advanced
PE/SAFE ROUTE TO SCHOOL PROGRAM
CITY OF MILWAUKEE
2984-13-83 MILWAUKEE NON-HWY 290 $500,000 - $749,999 $500,000 - $749,999 03/25/21 SRTS IMPLEMENTATION PHASE I Advanced
CONST/SAFE ROUTE TO SCHOOL PROGRAM
CITY OF MILWAUKEE
2984-18-03 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 04/25/19 PEDESTRIAN & TRANSIT INTS IMPRVMNTS Advanced
PE/PED & TRANSIT IMPROVEMENTS
8 LOCAL INTERSECTIONS
2984-18-73 MILWAUKEE NON-HWY 290 $500,000 - $749,999 $500,000 - $749,999 03/25/21 PEDESTRIAN & TRANSIT INTS IMPRVMNTS Advanced
CONST/PED & TRANSIT IMPROVEMENTS
8 LOCAL INTERSECTIONS
2984-19-02 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 07/25/20 MILWAUKEE COMPLETE STREETS HANDBOOK Advanced
PE/STREETS HANDBOOK
CITY OF MILWAUKEE
2994-00-02 MILWAUKEE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 WAUWATOSA BIKE SHARE III Advanced
PE/BIKE/PED
VARIOUS LOCATIONS
2994-00-72 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 03/25/21 WAUWATOSA BIKE SHARE III Advanced
CONST/BIKE/PED
VARIOUS LOCATIONS
2994-00-82 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 08/25/20 WAUWATOSA BIKE SHARE III Advanced
CONST/BIKE/PED
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 6October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
VARIOUS LOCATIONS
1000-13-71 MILWAUKEE VAR-HWY 305 $0 - $99,999 $2,000,000 - $2,999,999 05/14/19 SE REGION - MILWAUKEE COUNTY Advanced
CONST/LIGHTING
HWY LIGHTING 2019
5122-02-71 MONROE STH-027 305 $0 - $99,999 $0 - $99,999 10/25/18 MONROE COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIR
07-19-2017 ST HWY FLOOD EVENT SITES
1009-47-61 NORTH CENTRAL REGION WIDE VAR-HWY 303 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 08/13/24 05/14/19 REGIONWIDE BRIDGE POLYMER OVERLAYS Advanced
CONST/POLYMER OVERLAYS/FAST TRACK
LINCOLN/MARATHON BRIDGES
4075-23-71 OUTAGAMIE STH-096 290 $0 - $99,999 $100,000 - $249,999 01/25/20 C KAUKAUNA, PLANK / GREEN BAY ROAD Advanced
CONSTRUCT BIKE LANES
LAWE STREET - CLARIBEL STREET
1228-18-72 OZAUKEE IH -043 303 $9,000,000 - $9,999,999 $5,000,000 - $5,999,999 04/09/19 04/09/19 NORTH SOUTH FREEWAY Decrease
CONST/BRIDGE REHABILITATION
PORT WASH AND CNTY LN RD BRIDGES
6350-01-63 PORTAGE USH-010 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 08/13/24 05/14/19 MARSHFIELD TO STEVENS POINT Advanced
CONSTR/SHRM POLYMER OVERLAY
US 10 BRIDGE POLYMER OVERLAYS
5733-01-72 RICHLAND STH-056 305 $0 - $99,999 $0 - $99,999 10/25/18 RICHLAND COUNTY, 2017 FLOOD EVENT Advanced
CONST/2017 FLOOD/EMERGENCY REPAIRS
07-19-2017 ST HWY FLOOD EVENT SITES
1005-12-47 ROCK IH -039 302 $250,000 - $499,999 $250,000 - $499,999 01/25/19 11/25/18 ILLINOIS STATE LINE - MADISON Advanced
UTL OPS/1005-10-78/PARCEL 253
KENNEDY ROAD TO KNUTSON ROAD
5989-00-76 ROCK LOC-STR 290 $0 - $99,999 $0 - $99,999 01/01/18 TOWN OF BELOIT, INMAN PARKWAY Advanced
PE/PLAN CHECK REVIEW/SIDEWALK
USH 51 TO CTH G
5989-00-77 ROCK LOC-STR 290 $0 - $99,999 $500,000 - $749,999 11/25/20 TOWN OF BELOIT, INMAN PARKWAY Advanced
CONST OPS / SIDEWALK
USH 51 TO CTH G
5050-01-06 SAUK STH-023 303 $0 - $99,999 $100,000 - $249,999 01/01/18 REEDSBURG - WISCONSIN DELLS Advanced
DESIGN/INTERSECTION IMPROVEMENT/RAB
STH 136 INTERSECTION
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 7October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
1009-47-62 SHAWANO VAR-HWY 303 $500,000 - $749,999 $500,000 - $749,999 08/13/24 05/14/19 REGIONWIDE BRIDGE POLYMER OVERLAYS Advanced
CONST/POLYMER OVERLAYS/FAST TRACK
SHAWANO CO BRIDGE POLYMER OVERLAYS
1009-12-91 SOUTHWEST REGION WIDE VAR-HWY 305 $0 - $99,999 $250,000 - $499,999 04/09/19 SW REGION PVMT MARKING EASTERN CTYS Advanced
CONST/EPOXY PAVT MARKING 2019
STN LOCATIONS PER ANNUAL PLAN
1009-12-92 SOUTHWEST REGION WIDE VAR-HWY 305 $0 - $99,999 $500,000 - $749,999 04/09/19 SW REGION PVMT MARKING WESTERN CTYS Advanced
CONST/EPOXY PAVT MARKING 2019
STN LOCATIONS PER ANNUAL PLAN
8940-00-16 ST. CROIX NON-HWY 290 $0 - $99,999 $100,000 - $249,999 01/25/19 C NEW RICHMOND, CTH A BIKE TRAIL Advanced
DESIGN/PAVED BIKE PED TRAIL/TAP
W RICHMOND WAY TO W 4TH STREET
1000-20-77 STATEWIDE VAR-HWY 305 $0 - $99,999 $1,000,000 - $1,999,999 05/14/19 STATEWIDE TYPE 1 SIGN REPLACEMENT Advanced
CONSTRUCTION/SIGN REPLACEMENTS
LOCATIONS ON STN PER ANNUAL PLAN
5100-01-30 VERNON STH-033 303 $0 - $99,999 $500,000 - $749,999 01/01/18 CASHTON - HILLSBORO Advanced
PE/ MILL & OVERLAY
KICKAPOO R BR TO C HILLSBORO LIMIT
5867-01-70 VERNON STH-162 305 $0 - $99,999 $100,000 - $249,999 10/25/18 VERNON COUNTY, 2017 FLOOD EVENT Advanced
CONST/FLOOD 2017/EMERGENCY REPAIR
07-19-2017 ST HWY FLOOD REPAIR
5488-00-20 VERNON USH-014 303 $0 - $99,999 $0 - $99,999 09/25/18 LA CROSSE - WESTBY Advanced
RE OP/RW PURCHASE FROM FLOOD REPAIR
HOHLFELD ROAD TO CTH GG
1107-00-71 WASHINGTON USH-041 303 $20,000,000 - $24,999,999 $20,000,000 - $24,999,999 09/10/24 07/09/19 USH 41 Advanced
CONST/RESURFACE
USH 41/45 SPLIT TO DODGE CO LINE
2783-05-70 WAUKESHA LOC-STR 206 $9,000,000 - $9,999,999 $15,000,000 - $16,999,999 12/08/20 12/08/20 CALHOUN RD Increase
CONST/RECONST W/ADDED CAPACITY
CTH M TO STH 190
2718-14-01 WAUKESHA NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 PEWAUKEE TO BROOKFIELD FACILITY Advanced
PE/PED/BIKE
RIVER RD TO S OF WATERTOWN ROAD
2967-01-04 WAUKESHA NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 GREENFIELD PARK OAK LEAF TRAIL Advanced
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased
Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period
2018-2021 STIP 8October Amendments
Project County Hwy Prg Orig Estimate Curr EstimateOrig
SchedCurrSched Title/Concept/Limit Reason
PE/RECONSTRUCTION
124TH ST TO WEST ALLIS TRAIL CON
2967-01-74 WAUKESHA NON-HWY 290 $0 - $99,999 $0 - $99,999 03/25/21 GREENFIELD PARK OAK LEAF TRAIL Advanced
CONST/RECONSTRUCTION
124TH ST TO WEST ALLIS TRAIL CON
6420-00-22 WAUPACA STH-049 303 $0 - $99,999 $0 - $99,999 06/25/21 WAUPACA - NORTHLAND Advanced
REAL ESTATE/RESURF
NORTH STREET TO DEPOT STREET
6420-00-73 WAUPACA STH-049 303 $500,000 - $749,999 $500,000 - $749,999 08/13/24 05/14/19 WAUPACA - NORTHLAND Advanced
CONST/RESURFACE FAST TRACK
ANDERSON RD TO PETERSON RD
4994-12-71 WINNEBAGO LOC-STR 290 $0 - $99,999 $250,000 - $499,999 02/25/21 C OF OSHKOSH Advanced
MULTI-MODAL TRAIL
TRIBAL HERITAGE CROSSING - STH 21
1009-01-09 WINNEBAGO VAR-HWY 290 $0 - $99,999 $250,000 - $499,999 07/25/20 ECWRPC SRTS PROGRAMMING Advanced
NONINFRASTRUCTURE PROGRAMMING
SFY 2021 (YR1 OF 2)
1009-01-10 WINNEBAGO VAR-HWY 290 $0 - $99,999 $250,000 - $499,999 07/25/21 ECWRPC SRTS PROGRAMMING Advanced
NONINFRASTRUCTURE PROGRAMMING
SFY 2022 (YR2 OF 2)
2018-2021 STIP
October Amendments
Project County Hwy Prg Orig Estimate Curr Estimate Orig Sched Curr Sched Title/Limit/Concept Reason
1706-00-00 Grant STH-011 303 $250 000 - $499 999 $250 000 - $499 999 11/1/2018
DUBUQUE-SHULLSBURG.3 MI E STH 35 TO V HZEL GRNDESIGN/PAVEMENT REPLACE Advanced
1000-20-77 Statewide Non Hwy DTSD $1 000 000 - $1 999 999 $1 000 000 - $1 999 999 2/1/2019
TYPE 1 SIGN REPLACEMENTLOC ON STN PER ANNUAL PLNCONST/SIGN REPLACEMENTS Advanced
2018 RTP Statewide Non Hwy DNR $2 800 000 - $3 400 000 11/20192018 DNR RECREATIONAL TRAILS PROGRAM (RTP) Advanced
Advanced: Project moved into STIP PeriodDeferred: Project moved out of STIP Period Increase: Project Estimate IncreasedDecrease: Project Estimate Decreased
WisDOT / Division of Transportation Investment Management
www.dot.wisconsin.gov
October 22, 2018 SUBJECT: Wisconsin Transportation Improvement Programs update The section labeled Tab 4 – Individual MPO TIP Approvals has been updated to include by reference Wisconsin Department of Transportation’s approval of the Dubuque MPO 2019 – 2022 TIP. The following update occurred:
14. East Central Intergovernmental Association (Dubuque, IA/IL/WI MPO); phone 563.556.4166; 2019-2022 TIP as amended on July 12, 2018 for the 2045 long-range plan and approved by WisDOT on October 18, 2018.
2018 – 2021 Statewide Transportation Improvement Program 4 – 1
Transportation Improvement Program Approvals
WisDOT Secretary Dave Ross, under authority delegated by Governor Scott Walker, has approved all the following Transportation Improvement Programs (TIPs) and/or TIP Amendments for the Metropolitan Planning Organizations (MPOs):
1. State Line Area Transportation Study (Beloit, WI-IL MPO); phone 608.364.6690; 2018 – 2021 TIP as adopted on October 23, 2017 by Resolution No. 2017 – 4 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.
2. West Central Wisconsin Regional Planning Commission (Chippewa-Eau Claire MPO); phone 715.836.2918; 2018 – 2022 TIP as adopted on October 11, 2017 by Resolution No. 17 – 04 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.
3. East Central Wisconsin Regional Planning Commission (Fond du Lac MPO); phone 920.751.4770; 2018 – 2021 TIP as amended on December 11, 2017 by Resolution No. 07 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
4. East Central Wisconsin Regional Planning Commission (Fox Cities MPO); phone 920.751.4770; 2018 – 2021 TIP as adopted on October 27, 2017 by Resolution No. 19 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
5. Brown County Planning Commission (Green Bay MPO); phone 920.448.6480; 2018 – 2022 TIP as amended on December 6, 2017 by Resolution No. 2017 – 14 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.
6. Janesville Metropolitan Planning Organization (Janesville MPO); phone 608.755.3095;
2018 – 2023 TIP as adopted on November 29, 2017 by Resolution No. 2017 – 06 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
7. La Crosse Area Planning Committee (La Crosse, WI-MN MPO); phone 608.785.5977; 2018 – 2020 TIP as adopted on November 15, 2017 by Resolution No. 8 – 2017 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.
8. Madison Area Transportation Planning Board (Madison MPO); phone 608.266.4518; 2018 – 2022 TIP as adopted on October 4, 2017 by Resolution TPB No. 131 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
2018 – 2021 Statewide Transportation Improvement Program 4 – 2
9. East Central Wisconsin Regional Planning Commission (Oshkosh MPO); phone 920.751.4770; 2018 – 2021 TIP as adopted on October 27, 2017 by Resolution No. 20 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
10. Southeastern Wisconsin Regional Planning Commission (Milwaukee, Racine, Kenosha, and Wisconsin portions of Round Lake Beach MPOs); phone 262.547.6721; 2017 – 2020 TIP as adopted on November 17, 2016 by Resolution No. 2016 – 13 for the 2050 long-range plan and approved by WisDOT on January 6, 2017.
11. Bay-Lake Regional Planning Commission (Sheboygan MPO); phone 920.448.2820;
2018 – 2021 TIP as adopted on October 27, 2017 by Resolution 14 – 2017 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.
12. Duluth-Superior Metropolitan Interstate Council, (Duluth-Superior MPO);
phone 218.529.7506; 2018 – 2021 TIP as adopted on October 18, 2017 by Resolution No. 17 – 10 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.
13. Marathon County Metropolitan Planning Commission (Wausau MPO); phone 715.261.6043; 2018 - 2021TIP as adopted on November 14, 2017 by Resolution No. 7 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.
14. East Central Intergovernmental Association (Dubuque, IA/IL/WI MPO); phone 563.556.4166; 2019-2022 TIP as amended on July 12, 2018 for the 2045 long-range plan and approved by WisDOT on October 18, 2018.
15. Metropolitan Council (Twin Cities MPO); phone 651.602.1000; 2018 – 2021 TIP as adopted on September 28, 2017 by Business Item 2017 – 196 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.
Transit Funds Sections 5303, 5304, 5311, 5314, 5316 and 5317, are reflected in individual TIPs and are administered by WisDOT. Transit Funds Sections 5307, 5309, 5310 and 5339, are reflected in individual TIPs and can be administered by WisDOT or directly between FTA and the urbanized area transit operator.