2018-2021 STIP - October Amendments · KK RIVER TRAIL-20TH & 20TH-LAYTON 1009-01-11 MILWAUKEE...

13
Increase: Project Estimate Increased, Decrease: Project Estimate Decreased Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period 2018-2021 STIP 1 October Amendments Increase: Project Estimate Increased, Decrease: Project Estimate Decreased Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period 2018-2021 STIP 1 October Amendments Project County Hwy Prg Orig Estimate Curr Estimate Orig Sched Curr Sched Title/Concept/Limit Reason 8995-00-03 ASHLAND NON-HWY 290 $0 - $99,999 $100,000 - $249,999 01/25/19 C ASHLAND, VARIOUS LOCATIONS Advanced DESIGN/BIKE PED TRAIL IMPRVMNTS/TAP BIKE & PED FACILITY IMPROVEMENTS 8995-00-04 ASHLAND NON-HWY 290 $0 - $99,999 $750,000 - $999,999 01/25/21 C ASHLAND, VARIOUS LOCATIONS Advanced CONSTR/BIKE PED TRAIL IMPRVMNTS/TAP BIKE & PED FACILITY IMPROVEMENTS 8347-01-00 BAYFIELD NON-HWY 290 $0 - $99,999 $100,000 - $249,999 11/25/18 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced DESIGN/PEDESTRIAN IMPRVMNTS/TAP USH 2 AND BOHN STREET SIDEWALKS 8347-01-70 BAYFIELD NON-HWY 290 $0 - $99,999 $500,000 - $749,999 01/25/21 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced CONSTR/PEDESTRIAN IMPRVMNTS/TAP USH 2 AND BOHN STREET SIDEWALKS 4579-01-00 BROWN STH-096 290 $0 - $99,999 $0 - $99,999 01/25/19 V OF ALLOUEZ, LONGVIEW AVE Advanced DOTY SCHOOL SRTS HOFFMAN RD - SOUTH VILLAGE LIMIT 9269-08-71 BROWN STH-096 290 $0 - $99,999 $750,000 - $999,999 01/25/21 V OF HOWARD, VELP AVE TRAIL Advanced MULTI-MODAL TRAIL, PHASE 1 GLENDALE AVE - MOUNTAIN BAY TRAIL 7160-04-75 BUFFALO STH-035 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 12/13/22 12/08/20 TREMPEALEAU - FOUNTAIN CITY Advanced CONSTRUCT/BRRPL B-06-0201,0204,0206 MISSISSIPPI RVR TRIBUTARY/3 BRIDGES 1009-89-11 CHIPPEWA CTH-M 207 $0 - $99,999 $100,000 - $249,999 06/25/19 V NEW AUBURN, CTH M/MAIN ST Advanced RR OPS/SAFETY/OCR/SIGNALS PGR X-ING 186030G 6020-04-02 COLUMBIA USH-051 303 $0 - $99,999 $250,000 - $499,999 01/01/18 DEFOREST - PORTAGE Advanced PE/MILL & OVERLAY TOMLINSON ROAD TO ONTARIO STREET 5992-09-42 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred UTILITY OPS/WATER MAIN MONONA DRIVE TO STOUGHTON ROAD 5992-09-43 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred UTILITY OPS/SANITARY SEWER MONONA DRIVE TO STOUGHTON ROAD 1007-10-05 DANE IH -039 302 $3,000,000 - $3,999,999 $3,000,000 - $3,999,999 12/25/18 ILLINOIS STATE LINE - MADISON Advanced

Transcript of 2018-2021 STIP - October Amendments · KK RIVER TRAIL-20TH & 20TH-LAYTON 1009-01-11 MILWAUKEE...

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 1October Amendments

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 1October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

8995-00-03 ASHLAND NON-HWY 290 $0 - $99,999 $100,000 - $249,999 01/25/19 C ASHLAND, VARIOUS LOCATIONS Advanced

DESIGN/BIKE PED TRAIL IMPRVMNTS/TAP

BIKE & PED FACILITY IMPROVEMENTS

8995-00-04 ASHLAND NON-HWY 290 $0 - $99,999 $750,000 - $999,999 01/25/21 C ASHLAND, VARIOUS LOCATIONS Advanced

CONSTR/BIKE PED TRAIL IMPRVMNTS/TAP

BIKE & PED FACILITY IMPROVEMENTS

8347-01-00 BAYFIELD NON-HWY 290 $0 - $99,999 $100,000 - $249,999 11/25/18 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced

DESIGN/PEDESTRIAN IMPRVMNTS/TAP

USH 2 AND BOHN STREET SIDEWALKS

8347-01-70 BAYFIELD NON-HWY 290 $0 - $99,999 $500,000 - $749,999 01/25/21 T IRON RIVER, PEDESTRIAN IMPRVMNTS Advanced

CONSTR/PEDESTRIAN IMPRVMNTS/TAP

USH 2 AND BOHN STREET SIDEWALKS

4579-01-00 BROWN STH-096 290 $0 - $99,999 $0 - $99,999 01/25/19 V OF ALLOUEZ, LONGVIEW AVE Advanced

DOTY SCHOOL SRTS

HOFFMAN RD - SOUTH VILLAGE LIMIT

9269-08-71 BROWN STH-096 290 $0 - $99,999 $750,000 - $999,999 01/25/21 V OF HOWARD, VELP AVE TRAIL Advanced

MULTI-MODAL TRAIL, PHASE 1

GLENDALE AVE - MOUNTAIN BAY TRAIL

7160-04-75 BUFFALO STH-035 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 12/13/22 12/08/20 TREMPEALEAU - FOUNTAIN CITY Advanced

CONSTRUCT/BRRPL B-06-0201,0204,0206

MISSISSIPPI RVR TRIBUTARY/3 BRIDGES

1009-89-11 CHIPPEWA CTH-M 207 $0 - $99,999 $100,000 - $249,999 06/25/19 V NEW AUBURN, CTH M/MAIN ST Advanced

RR OPS/SAFETY/OCR/SIGNALS

PGR X-ING 186030G

6020-04-02 COLUMBIA USH-051 303 $0 - $99,999 $250,000 - $499,999 01/01/18 DEFOREST - PORTAGE Advanced

PE/MILL & OVERLAY

TOMLINSON ROAD TO ONTARIO STREET

5992-09-42 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred

UTILITY OPS/WATER MAIN

MONONA DRIVE TO STOUGHTON ROAD

5992-09-43 DANE CTH-AB 206 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 03/13/19 C OF MADISON, BUCKEYE ROAD (CTH AB) Deferred

UTILITY OPS/SANITARY SEWER

MONONA DRIVE TO STOUGHTON ROAD

1007-10-05 DANE IH -039 302 $3,000,000 - $3,999,999 $3,000,000 - $3,999,999 12/25/18 ILLINOIS STATE LINE - MADISON Advanced

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 2October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

FINAL DESIGN/RECSTE

USH 12/18 INTERCHANGE

1007-11-26 DANE IH -039 302 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 06/25/19 ILLINOIS STATE LINE - MADISON Advanced

R/E AQUISITION/BELTLINE INTERCHANGE

USH 12/18 INTERCHANGE

1007-12-77 DANE IH -039 302 $3,000,000 - $3,999,999 $3,000,000 - $3,999,999 12/10/19 ILLINOIS STATE LINE - MADISON Advanced

CONST OPS/RECSTE/IMPRVMTS/PATCHING

USH 12/18 INTCHG/PENNITO BOX EXT

1007-12-78 DANE IH -039 302 $13,000,000 - $13,999,999 $13,000,000 - $13,999,999 12/10/19 ILLINOIS STATE LINE - MADISON Advanced

CONST OPS/RESCTE/EARLY STR AND FILL

USH 12/18 INTCHG/CORE NB/EARLY WORK

1007-12-79 DANE IH -039 302 $17,000,000 - $19,999,999 $17,000,000 - $19,999,999 12/08/20 06/09/20 ILLINOIS STATE LINE - MADISON Advanced

CONST OPS/RECSTE/SB

USH 12/18 INTCHG/CORE SB

1007-12-80 DANE IH -039 302 $20,000,000 - $24,999,999 $20,000,000 - $24,999,999 12/08/20 06/09/20 ILLINOIS STATE LINE - MADISON Advanced

CONST OPS/RECSTE

USH 12/18 INTCHG/CORE NB/FINAL WORK

1007-12-82 DANE IH -039 302 $0 - $99,999 $0 - $99,999 06/25/20 ILLINOIS STATE LINE - MADISON Advanced

ITS PO ITEMS FOR 1007-12-75/FY 2020

CTH AB TO USH 12/18 INTCHG

3625-00-04 DANE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 COTTAGE GROVE,GLACIAL DRUMLIN TRAIL Advanced

PE/PEDESTRIAN-BICYCLE TRAIL

VILAS ROAD TO MAIN STREET

3625-00-05 DANE NON-HWY 290 $0 - $99,999 $500,000 - $749,999 03/25/21 COTTAGE GROVE,GLACIAL DRUMLIN TRAIL Advanced

CONST OPS/PEDESTRIAN-BICYCLE TRAIL

VILAS ROAD TO MAIN STREET

5992-08-35 DANE NON-HWY 206 $0 - $99,999 $0 - $99,999 09/25/18 PEDESTRIAN BIKE SAFETY EDUCATION Deferred

FUNDING FOR CALENDAR YEAR 2018

CITY OF MADISON

5155-00-27 DANE USH-014 303 $0 - $99,999 $0 - $99,999 07/25/19 MADISON - EVANSVILLE Advanced

RE OPS/

STH 92 INTERSECTION

5310-00-10 DANE USH-014 303 $0 - $99,999 $0 - $99,999 01/01/18 SPRING GREEN - MADISON Advanced

DESIGN/OFFSET RIGHT TURN LANE

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 3October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

STH 19/STH 78/WOLF RD INTERSECTION

5410-00-74 DANE USH-051 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 12/14/21 12/13/22 MADISON - DEFOREST Deferred

CONST/ REPLACE PAVEMENT NB

USH 151 TO PIERSTORFF STREET

5845-01-00 DANE USH-051 303 $0 - $99,999 $250,000 - $499,999 01/01/18 STOUGHTON - MADISON Advanced

DESIGN/INTERSECTION SAFETY/RAB

CTH B/CTH AB INTERSECTION

5400-00-03 DANE USH-151 303 $0 - $99,999 $100,000 - $249,999 01/01/18 C MADISON, BLAIR ST/E WASHINGTON AV Advanced

PE/REPAIR AND OVERLAY

E WILSON ST TO BLOUNT ST

5400-00-73 DANE USH-151 303 $0 - $99,999 $750,000 - $999,999 11/10/20 C MADISON, BLAIR ST/E WASHINGTON AV Advanced

CONST/ REPAIR AND OVERLAY

E WILSON ST TO BLOUNT ST

8766-00-60 DOUGLAS CTH-D 206 $0 - $99,999 $0 - $99,999 10/25/18 CTH B - POPLAR Advanced

CONST/ER/FLD 06-17-2018/EMRGNCY RPR

CTH B TO USH 2(WI-18-071)

5205-03-70 GRANT STH-133 305 $0 - $99,999 $100,000 - $249,999 10/25/18 GRANT COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIRS

07-19-2017 ST HWY FLOOD EVENT SITES

1650-06-40 GRANT USH-061 303 $0 - $99,999 $0 - $99,999 11/25/18 02/25/26 DICKEYVILLE - LANCASTER Deferred

UTL OPS/ LOE

HICKORY LANE TO ALONA LANE

5940-02-70 IOWA STH-133 303 $0 - $99,999 $0 - $99,999 10/25/18 IOWA COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIR

BIGLOW HILL RD TO STH130(WI-17-076)

3500-00-06 JEFFERSON NON-HWY 290 $0 - $99,999 $0 - $99,999 01/01/18 JEFFERSON COUNTY, INTERURBAN TRAIL Advanced

PE/PLAN CHECK REVIEW/BIKE PED TRAIL

RIVER ROAD TO CTH F

3500-00-76 JEFFERSON NON-HWY 290 $0 - $99,999 $1,000,000 - $1,999,999 10/25/21 JEFFERSON COUNTY, INTERURBAN TRAIL Advanced

CONST OPS/BIKE PEDESTRIAN TRAIL

RIVER ROAD TO CTH F

3575-02-22 JEFFERSON USH-012 303 $0 - $99,999 $0 - $99,999 08/25/20 C FORT ATKINSON, WHITEWATER AVENUE Advanced

RE OPS

MADISON AVENUE TO CTH M

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 4October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

5040-09-70 JUNEAU STH-033 305 $0 - $99,999 $0 - $99,999 10/25/18 JUNEAU COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIR

07-19-2017 ST HWY FLOOD EVENT

3736-06-71 KENOSHA NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 07/25/20 CTH C SHARED USE PATH Advanced

CONST/PATH

114TH AVE-100' E OF DES PLAINES RVR

7141-02-60 LA CROSSE STH-035 303 $500,000 - $749,999 $500,000 - $749,999 11/08/22 01/08/19 LA CROSSE - TREMPEALEAU Advanced

CONST/ MILL AND OVERLAY

USH 53 TO WEST COUNTY LINE

5120-06-75 LA CROSSE STH-162 305 $0 - $99,999 $100,000 - $249,999 10/25/18 LACROSSE COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIR

07-19-2017 ST HWY FLOOD EVENT SITES

9140-12-62 LANGLADE STH-064 303 $100,000 - $249,999 $100,000 - $249,999 08/12/25 05/14/19 ANTIGO - LANGLADE Advanced

CONST/MISC FAST TRACK

5TH AVENUE ROAD TO CTH P CULVERTS

9140-12-72 LANGLADE STH-064 303 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 08/12/25 05/14/19 ANTIGO - LANGLADE Advanced

CONST/RESURF10 FAST TRACK

5TH AVENUE ROAD TO CTH P

4100-21-60 MANITOWOC USH-151 303 $0 - $99,999 $0 - $99,999 01/25/19 VALDERS - MANITOWOC Advanced

CCO 1 AGAINST 4100-21-71

JACKSON STREET - IH 43 SB RAMPS

6600-00-72 MARATHON STH-153 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 08/13/24 05/14/19 MOSINEE - ELDERON Advanced

CONST/RESURFACE FAST TRACK

ANDRYS LN TO CTH J (N)

1228-18-91 MILWAUKEE IH -043 303 $250,000 - $499,999 $100,000 - $249,999 09/25/42 05/25/20 NORTH-SOUTH FREEWAY Advanced

TRAFFIC MITIGATION ID 1228-18-70

BENDER RD TO COUNTY LINE ROAD

2984-17-01 MILWAUKEE LOC-STR 290 $100,000 - $249,999 $100,000 - $249,999 04/25/19 E/W WASHINGTON ST & W SCOTT ST Advanced

PE/PED/BIKE FACILITIES

KK RIVER TRAIL-20TH & 20TH-LAYTON

1009-01-11 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 07/25/20 MPS/ BIKE FED SRTS PROGRAM Advanced

Milwaukee Public Schools Program

SFY 2019 (YR1 OF 2)

1009-01-12 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 07/25/21 MPS/ BIKE FED SRTS PROGRAM Advanced

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 5October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

Milwaukee Public Schools Program

SFY 2019 (YR1 OF 2)

2967-01-03 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 HISTORIC LAKE PARK RAVINE BRIDGE Advanced

PE/BRIDGE REPLACEMENT

OVER RAVINE ROAD

2967-01-05 MILWAUKEE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 LITTLE MENOMONEE RIVER PARKWAY Advanced

PE/TRAIL RELOCATION

OAK LEAF TRAIL RELOCATION

2967-01-75 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 10/25/21 LITTLE MENOMONEE RIVER PARKWAY Advanced

CONST/TRAIL RELOCATION

OAK LEAF TRAIL RELOCATION

2984-13-03 MILWAUKEE NON-HWY 290 $0 - $99,999 $100,000 - $249,999 04/25/19 SRTS IMPLEMENTATION PHASE I Advanced

PE/SAFE ROUTE TO SCHOOL PROGRAM

CITY OF MILWAUKEE

2984-13-83 MILWAUKEE NON-HWY 290 $500,000 - $749,999 $500,000 - $749,999 03/25/21 SRTS IMPLEMENTATION PHASE I Advanced

CONST/SAFE ROUTE TO SCHOOL PROGRAM

CITY OF MILWAUKEE

2984-18-03 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 04/25/19 PEDESTRIAN & TRANSIT INTS IMPRVMNTS Advanced

PE/PED & TRANSIT IMPROVEMENTS

8 LOCAL INTERSECTIONS

2984-18-73 MILWAUKEE NON-HWY 290 $500,000 - $749,999 $500,000 - $749,999 03/25/21 PEDESTRIAN & TRANSIT INTS IMPRVMNTS Advanced

CONST/PED & TRANSIT IMPROVEMENTS

8 LOCAL INTERSECTIONS

2984-19-02 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 07/25/20 MILWAUKEE COMPLETE STREETS HANDBOOK Advanced

PE/STREETS HANDBOOK

CITY OF MILWAUKEE

2994-00-02 MILWAUKEE NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 WAUWATOSA BIKE SHARE III Advanced

PE/BIKE/PED

VARIOUS LOCATIONS

2994-00-72 MILWAUKEE NON-HWY 290 $100,000 - $249,999 $100,000 - $249,999 03/25/21 WAUWATOSA BIKE SHARE III Advanced

CONST/BIKE/PED

VARIOUS LOCATIONS

2994-00-82 MILWAUKEE NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 08/25/20 WAUWATOSA BIKE SHARE III Advanced

CONST/BIKE/PED

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 6October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

VARIOUS LOCATIONS

1000-13-71 MILWAUKEE VAR-HWY 305 $0 - $99,999 $2,000,000 - $2,999,999 05/14/19 SE REGION - MILWAUKEE COUNTY Advanced

CONST/LIGHTING

HWY LIGHTING 2019

5122-02-71 MONROE STH-027 305 $0 - $99,999 $0 - $99,999 10/25/18 MONROE COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIR

07-19-2017 ST HWY FLOOD EVENT SITES

1009-47-61 NORTH CENTRAL REGION WIDE VAR-HWY 303 $1,000,000 - $1,999,999 $1,000,000 - $1,999,999 08/13/24 05/14/19 REGIONWIDE BRIDGE POLYMER OVERLAYS Advanced

CONST/POLYMER OVERLAYS/FAST TRACK

LINCOLN/MARATHON BRIDGES

4075-23-71 OUTAGAMIE STH-096 290 $0 - $99,999 $100,000 - $249,999 01/25/20 C KAUKAUNA, PLANK / GREEN BAY ROAD Advanced

CONSTRUCT BIKE LANES

LAWE STREET - CLARIBEL STREET

1228-18-72 OZAUKEE IH -043 303 $9,000,000 - $9,999,999 $5,000,000 - $5,999,999 04/09/19 04/09/19 NORTH SOUTH FREEWAY Decrease

CONST/BRIDGE REHABILITATION

PORT WASH AND CNTY LN RD BRIDGES

6350-01-63 PORTAGE USH-010 303 $2,000,000 - $2,999,999 $2,000,000 - $2,999,999 08/13/24 05/14/19 MARSHFIELD TO STEVENS POINT Advanced

CONSTR/SHRM POLYMER OVERLAY

US 10 BRIDGE POLYMER OVERLAYS

5733-01-72 RICHLAND STH-056 305 $0 - $99,999 $0 - $99,999 10/25/18 RICHLAND COUNTY, 2017 FLOOD EVENT Advanced

CONST/2017 FLOOD/EMERGENCY REPAIRS

07-19-2017 ST HWY FLOOD EVENT SITES

1005-12-47 ROCK IH -039 302 $250,000 - $499,999 $250,000 - $499,999 01/25/19 11/25/18 ILLINOIS STATE LINE - MADISON Advanced

UTL OPS/1005-10-78/PARCEL 253

KENNEDY ROAD TO KNUTSON ROAD

5989-00-76 ROCK LOC-STR 290 $0 - $99,999 $0 - $99,999 01/01/18 TOWN OF BELOIT, INMAN PARKWAY Advanced

PE/PLAN CHECK REVIEW/SIDEWALK

USH 51 TO CTH G

5989-00-77 ROCK LOC-STR 290 $0 - $99,999 $500,000 - $749,999 11/25/20 TOWN OF BELOIT, INMAN PARKWAY Advanced

CONST OPS / SIDEWALK

USH 51 TO CTH G

5050-01-06 SAUK STH-023 303 $0 - $99,999 $100,000 - $249,999 01/01/18 REEDSBURG - WISCONSIN DELLS Advanced

DESIGN/INTERSECTION IMPROVEMENT/RAB

STH 136 INTERSECTION

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 7October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

1009-47-62 SHAWANO VAR-HWY 303 $500,000 - $749,999 $500,000 - $749,999 08/13/24 05/14/19 REGIONWIDE BRIDGE POLYMER OVERLAYS Advanced

CONST/POLYMER OVERLAYS/FAST TRACK

SHAWANO CO BRIDGE POLYMER OVERLAYS

1009-12-91 SOUTHWEST REGION WIDE VAR-HWY 305 $0 - $99,999 $250,000 - $499,999 04/09/19 SW REGION PVMT MARKING EASTERN CTYS Advanced

CONST/EPOXY PAVT MARKING 2019

STN LOCATIONS PER ANNUAL PLAN

1009-12-92 SOUTHWEST REGION WIDE VAR-HWY 305 $0 - $99,999 $500,000 - $749,999 04/09/19 SW REGION PVMT MARKING WESTERN CTYS Advanced

CONST/EPOXY PAVT MARKING 2019

STN LOCATIONS PER ANNUAL PLAN

8940-00-16 ST. CROIX NON-HWY 290 $0 - $99,999 $100,000 - $249,999 01/25/19 C NEW RICHMOND, CTH A BIKE TRAIL Advanced

DESIGN/PAVED BIKE PED TRAIL/TAP

W RICHMOND WAY TO W 4TH STREET

1000-20-77 STATEWIDE VAR-HWY 305 $0 - $99,999 $1,000,000 - $1,999,999 05/14/19 STATEWIDE TYPE 1 SIGN REPLACEMENT Advanced

CONSTRUCTION/SIGN REPLACEMENTS

LOCATIONS ON STN PER ANNUAL PLAN

5100-01-30 VERNON STH-033 303 $0 - $99,999 $500,000 - $749,999 01/01/18 CASHTON - HILLSBORO Advanced

PE/ MILL & OVERLAY

KICKAPOO R BR TO C HILLSBORO LIMIT

5867-01-70 VERNON STH-162 305 $0 - $99,999 $100,000 - $249,999 10/25/18 VERNON COUNTY, 2017 FLOOD EVENT Advanced

CONST/FLOOD 2017/EMERGENCY REPAIR

07-19-2017 ST HWY FLOOD REPAIR

5488-00-20 VERNON USH-014 303 $0 - $99,999 $0 - $99,999 09/25/18 LA CROSSE - WESTBY Advanced

RE OP/RW PURCHASE FROM FLOOD REPAIR

HOHLFELD ROAD TO CTH GG

1107-00-71 WASHINGTON USH-041 303 $20,000,000 - $24,999,999 $20,000,000 - $24,999,999 09/10/24 07/09/19 USH 41 Advanced

CONST/RESURFACE

USH 41/45 SPLIT TO DODGE CO LINE

2783-05-70 WAUKESHA LOC-STR 206 $9,000,000 - $9,999,999 $15,000,000 - $16,999,999 12/08/20 12/08/20 CALHOUN RD Increase

CONST/RECONST W/ADDED CAPACITY

CTH M TO STH 190

2718-14-01 WAUKESHA NON-HWY 290 $250,000 - $499,999 $250,000 - $499,999 04/25/19 PEWAUKEE TO BROOKFIELD FACILITY Advanced

PE/PED/BIKE

RIVER RD TO S OF WATERTOWN ROAD

2967-01-04 WAUKESHA NON-HWY 290 $0 - $99,999 $0 - $99,999 04/25/19 GREENFIELD PARK OAK LEAF TRAIL Advanced

Increase: Project Estimate Increased, Decrease: Project Estimate Decreased

Advanced: Project moved into STIP Period, Deferred: Project moved out of STIP Period

2018-2021 STIP 8October Amendments

Project County Hwy Prg Orig Estimate Curr EstimateOrig

SchedCurrSched Title/Concept/Limit Reason

PE/RECONSTRUCTION

124TH ST TO WEST ALLIS TRAIL CON

2967-01-74 WAUKESHA NON-HWY 290 $0 - $99,999 $0 - $99,999 03/25/21 GREENFIELD PARK OAK LEAF TRAIL Advanced

CONST/RECONSTRUCTION

124TH ST TO WEST ALLIS TRAIL CON

6420-00-22 WAUPACA STH-049 303 $0 - $99,999 $0 - $99,999 06/25/21 WAUPACA - NORTHLAND Advanced

REAL ESTATE/RESURF

NORTH STREET TO DEPOT STREET

6420-00-73 WAUPACA STH-049 303 $500,000 - $749,999 $500,000 - $749,999 08/13/24 05/14/19 WAUPACA - NORTHLAND Advanced

CONST/RESURFACE FAST TRACK

ANDERSON RD TO PETERSON RD

4994-12-71 WINNEBAGO LOC-STR 290 $0 - $99,999 $250,000 - $499,999 02/25/21 C OF OSHKOSH Advanced

MULTI-MODAL TRAIL

TRIBAL HERITAGE CROSSING - STH 21

1009-01-09 WINNEBAGO VAR-HWY 290 $0 - $99,999 $250,000 - $499,999 07/25/20 ECWRPC SRTS PROGRAMMING Advanced

NONINFRASTRUCTURE PROGRAMMING

SFY 2021 (YR1 OF 2)

1009-01-10 WINNEBAGO VAR-HWY 290 $0 - $99,999 $250,000 - $499,999 07/25/21 ECWRPC SRTS PROGRAMMING Advanced

NONINFRASTRUCTURE PROGRAMMING

SFY 2022 (YR2 OF 2)

2018-2021 STIP

October Amendments

Project County Hwy Prg Orig Estimate Curr Estimate Orig Sched Curr Sched Title/Limit/Concept Reason

1706-00-00 Grant STH-011 303 $250 000 - $499 999 $250 000 - $499 999 11/1/2018

DUBUQUE-SHULLSBURG.3 MI E STH 35 TO V HZEL GRNDESIGN/PAVEMENT REPLACE Advanced

1000-20-77 Statewide Non Hwy DTSD $1 000 000 - $1 999 999 $1 000 000 - $1 999 999 2/1/2019

TYPE 1 SIGN REPLACEMENTLOC ON STN PER ANNUAL PLNCONST/SIGN REPLACEMENTS Advanced

2018 RTP Statewide Non Hwy DNR $2 800 000 - $3 400 000 11/20192018 DNR RECREATIONAL TRAILS PROGRAM (RTP) Advanced

Advanced: Project moved into STIP PeriodDeferred: Project moved out of STIP Period Increase: Project Estimate IncreasedDecrease: Project Estimate Decreased

WisDOT / Division of Transportation Investment Management

www.dot.wisconsin.gov

October 22, 2018 SUBJECT: Wisconsin Transportation Improvement Programs update The section labeled Tab 4 – Individual MPO TIP Approvals has been updated to include by reference Wisconsin Department of Transportation’s approval of the Dubuque MPO 2019 – 2022 TIP. The following update occurred:

14. East Central Intergovernmental Association (Dubuque, IA/IL/WI MPO); phone 563.556.4166; 2019-2022 TIP as amended on July 12, 2018 for the 2045 long-range plan and approved by WisDOT on October 18, 2018.

2018 – 2021 Statewide Transportation Improvement Program 4 – 1

Transportation Improvement Program Approvals

WisDOT Secretary Dave Ross, under authority delegated by Governor Scott Walker, has approved all the following Transportation Improvement Programs (TIPs) and/or TIP Amendments for the Metropolitan Planning Organizations (MPOs):

1. State Line Area Transportation Study (Beloit, WI-IL MPO); phone 608.364.6690; 2018 – 2021 TIP as adopted on October 23, 2017 by Resolution No. 2017 – 4 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.

2. West Central Wisconsin Regional Planning Commission (Chippewa-Eau Claire MPO); phone 715.836.2918; 2018 – 2022 TIP as adopted on October 11, 2017 by Resolution No. 17 – 04 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.

3. East Central Wisconsin Regional Planning Commission (Fond du Lac MPO); phone 920.751.4770; 2018 – 2021 TIP as amended on December 11, 2017 by Resolution No. 07 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

4. East Central Wisconsin Regional Planning Commission (Fox Cities MPO); phone 920.751.4770; 2018 – 2021 TIP as adopted on October 27, 2017 by Resolution No. 19 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

5. Brown County Planning Commission (Green Bay MPO); phone 920.448.6480; 2018 – 2022 TIP as amended on December 6, 2017 by Resolution No. 2017 – 14 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.

6. Janesville Metropolitan Planning Organization (Janesville MPO); phone 608.755.3095;

2018 – 2023 TIP as adopted on November 29, 2017 by Resolution No. 2017 – 06 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

7. La Crosse Area Planning Committee (La Crosse, WI-MN MPO); phone 608.785.5977; 2018 – 2020 TIP as adopted on November 15, 2017 by Resolution No. 8 – 2017 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.

8. Madison Area Transportation Planning Board (Madison MPO); phone 608.266.4518; 2018 – 2022 TIP as adopted on October 4, 2017 by Resolution TPB No. 131 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

2018 – 2021 Statewide Transportation Improvement Program 4 – 2

9. East Central Wisconsin Regional Planning Commission (Oshkosh MPO); phone 920.751.4770; 2018 – 2021 TIP as adopted on October 27, 2017 by Resolution No. 20 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

10. Southeastern Wisconsin Regional Planning Commission (Milwaukee, Racine, Kenosha, and Wisconsin portions of Round Lake Beach MPOs); phone 262.547.6721; 2017 – 2020 TIP as adopted on November 17, 2016 by Resolution No. 2016 – 13 for the 2050 long-range plan and approved by WisDOT on January 6, 2017.

11. Bay-Lake Regional Planning Commission (Sheboygan MPO); phone 920.448.2820;

2018 – 2021 TIP as adopted on October 27, 2017 by Resolution 14 – 2017 for the 2045 long-range plan and approved by WisDOT on January 5, 2018.

12. Duluth-Superior Metropolitan Interstate Council, (Duluth-Superior MPO);

phone 218.529.7506; 2018 – 2021 TIP as adopted on October 18, 2017 by Resolution No. 17 – 10 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.

13. Marathon County Metropolitan Planning Commission (Wausau MPO); phone 715.261.6043; 2018 - 2021TIP as adopted on November 14, 2017 by Resolution No. 7 – 17 for the 2050 long-range plan and approved by WisDOT on January 5, 2018.

14. East Central Intergovernmental Association (Dubuque, IA/IL/WI MPO); phone 563.556.4166; 2019-2022 TIP as amended on July 12, 2018 for the 2045 long-range plan and approved by WisDOT on October 18, 2018.

15. Metropolitan Council (Twin Cities MPO); phone 651.602.1000; 2018 – 2021 TIP as adopted on September 28, 2017 by Business Item 2017 – 196 for the 2040 long-range plan and approved by WisDOT on January 5, 2018.

Transit Funds Sections 5303, 5304, 5311, 5314, 5316 and 5317, are reflected in individual TIPs and are administered by WisDOT. Transit Funds Sections 5307, 5309, 5310 and 5339, are reflected in individual TIPs and can be administered by WisDOT or directly between FTA and the urbanized area transit operator.

2018 – 2021 Statewide Transportation Improvement Program 4 – 3