20171018 BWRR Presentation (GBC) · The Northeast Maglev (TNEM) American company formed to support...
Transcript of 20171018 BWRR Presentation (GBC) · The Northeast Maglev (TNEM) American company formed to support...
1
2
OurVision:Fastest TraininWorld
Whoare We?
Baltimore-WashingtonRapidRail(BWRR)isaMaryland-basedfranchiserailroadaffiliatedwith:
TheNortheastMaglev(TNEM)▪ AmericancompanyformedtosupportthedeploymentofSCMAGLEVintheNortheastCorridor
CentralJapanRailwayCompany(JRCentral)▪ DeveloperofSuperconductingMaglevsystem▪ OperatorofTokaidoShinkansen“bullettrain”since1964▪ ManufacturingteamincludesMitsubishi,Sumitomo,Hitachi,NipponSteelandKyosancompanies
3
4
AdvisoryBoard
5
TheNEC:BigandGettingBigger
6
BrokenInfrastructure/GrowingProblems
7
SCMAGLEVHistory
8
HowSCMAGLEVWorks
9
TheFutureHasArrived!
10
AlignmentAlternatives
SCMAGLEV Technical Requirements
• StrictgeometryisnecessarytoensurehighestpracticalspeedcanbeattainedbySCMAGLEVtechnology
• Tunnelorviaductalignmentsallowforincreasedsafetyandminimizesdisruption
• Shiftingdirectionattopspeedmustbesafelyaccomplishedoveralongandgradualgeometrytoensurepassengercomfort
11
TypicalCrossSections
TypicalViaductSection TypicalTunnelSection
12
Baltimore-WashingtonProjectSchedule
13*Scheduleincludessecuringfinancingandprocurement
Revenue Service Begins
Design / Construction CommencesWinter 2019
EIS CompletionSummer 2019
Constructiondurationdependsonalignmentselectedandconstructionmethodology
PreparingfortheFutureSettingupprogramsandtrainingforneweratechnologycareers– andmore
14
ExpectedRegionalJobOpportunitiesConstructionandoperationoftheSCMAGLEVwillresultinincreased
demandforjobsinavarietyofsectors
15
ConstructionLogisticsAssembly
Planning & Supervision
EngineeringSoftware
Electrical & Mechanical Fire, Life, Safety
MaintenanceInspection
InfrastructureTesting
OperationsOperators
On-Board ServicesSystems Analysis
StationsTicketingCleaningSecurity
FacilitiesYard ManagementRail Control Center
Vehicle Maintenance & Repair
16
ExpectedProjectBenefits
Summary
Thefutureisunderway
SCMAGLEVisready,willingandable
Ourinfrastructureisbrokenandwehaveasolution
Welcome Aboard!
17