2017 SPLOST TRANSPORTATION IMPROVEMENT PROGRAM
CITIZENS PROJECT SELECTION COMMITTEE
AGENDA
FEBRUARY 22, 2017 I. Welcome and Introductions II. Approval of Agenda III. Approval of Minutes – January 24, 2017 IV. Public Comment
V. Old Business
A. Approval of Project Category – Road Safety & Alignment
VI. New Business
A. Presentation of Project Category – Intersections
B. Next Meeting Dates
C. Comprehensive Transportation Plan Public Meeting Schedule
VII. Public Comment VIII. Adjourn
UNOFFICIAL 2017 SPLOST Transportation Improvement Program
Citizens Project Selection Committee Minutes
February 22, 2017
Members Present: Uday Parikh, Chris Ford, Steven Douches, Laurie McClain, Joy Monroe, Charles McDaniel, Chad Lockhart, Alan Kaplan, Davida Baker, Sohum Mehta Members Absent: Sherry Ferguson Alternates Present: Piper Keairnes, Sal Pirzad, Greg Cantrell, Raymond Rodden, Darryl Franklin, Debra Pennington, Art Sheldon, Kenny King, Mark Williams Alternates Absent: Patricia Gabilondo, Erik Provitt County Staff: Alan Chapman, Lewis Cooksey, David Tucker, Edgardo Aponte, Vince Edwards, John Ray, Brittney Bulfinch, Amanda Reed, Joanna Rouse, Mark Stonecypher, Jody Woodall
I. Welcome and Introductions
Mr. Alan Kaplan called the meeting to order at 6:35pm.
II. Approval of Agenda {Action: Approved. Motion: Mehta Second: Cantrell Vote 11-0; Keairnes – Yes; Pirzad – Yes; Cantrell – Yes; Douches – Yes; McClain – Yes; Monroe – Yes; McDaniel – Yes; Lockhart – Yes; Kaplan – Yes; Baker – Yes; Mehta - Yes}
III. Approval of Minutes – January 24, 2017
Approval of Minutes – January 24, 2017 {Action: Approved. Motion: Douches Second: McClain Vote 11-0; Keairnes – Yes; Pirzad – Yes; Cantrell – Yes; Douches – Yes; McClain – Yes; Monroe – Yes; McDaniel – Yes; Lockhart – Yes; Kaplan – Yes; Baker – Yes; Mehta - Yes}
IV. Public Comment Public comment was received on Pleasant Hill Road at Satellite Boulevard, Breckinridge Boulevard at Old Norcross Road, Pleasant Hill Road at Crestwood Parkway/Koger Boulevard, Satellite Boulevard at Beaver Ruin Road, Beaver Ruin Road at I-85, Brook Hollow Parkway at Center Way, Sycamore Road, Satellite Boulevard at Old Peachtree Road, Sugarloaf Parkway at Meadow Church Road, US 29 at Luxomni Road, Luxomni Road at Cedar Road/Arcado Road.
V. Old Business A. Approval of Project Category – Road Safety and Alignment
Mr. Alan Chapman presented the Road Safety and Alignment category and allocation. {Action: Approval of the Road Safety and Alignment category as presented by staff with one change by moving $250,000 from right of way reserve to railroad crossing safety – Approved. Motion: Lockhart Second: McClain Vote 11-0; Parikh – Yes; Pirzad – Yes; Ford – Yes; Douches – Yes; McClain – Yes; Monroe – Yes; McDaniel – Yes; Lockhart – Yes; Kaplan – Yes; Baker – Yes; Mehta - Yes}
VI. New Business A. Presentation of Project Category – Intersections
Mr. Chuck Bailey presented information regarding the Intersections category. B. Next Meeting Dates
Discussion was held. The next CPSC meeting will be held March 15, 2017. VII. Public Comment
Public comment was received on Buford Highway, Jimmy Carter Boulevard, Rockbridge Road, Mountain Industrial, I-285, Holcomb Bridge Road, Killian Hill Road.
VIII. Adjourn Meeting was adjourned at 8:55pm. {Action: Approved. Motion: McClain Second: Baker Vote 11-0; Parikh – Yes; Pirzad – Yes; Ford – Yes; Douches – Yes; McClain – Yes; Monroe – Yes; McDaniel – Yes; Lockhart – Yes; Kaplan – Yes; Baker – Yes; Provitt - Yes}
TRANSPORTATIONDEPARTMENT
CPSC MeetingFebruary 22, 2017
Agenda
• Welcome and Opening Remarks• Public Comment• Old Business
• Follow-up Items• Vote on previous categories – Road Safety and Alignment
• New Business• Presentation of Intersections• Discussion of Future Meeting Schedule• Comprehensive Transportation Plan Public Meeting Schedule
• Public Comment• Adjourn
Recommended Road Safety & Alignment Projects – Turn Lanes
Webb Gin House Road from SR 20 / Grayson Highway to SR 124 / Scenic Highway
Recommended Road Safety & Alignment Projects – Turn Lanes
US 29 / SR 8 / Lawrenceville Highway near Ronald Reagan Parkway Median Opening
Recommended Road Safety & Alignment Projects – Alignment
SR 124 / Braselton Highway at Sunny Hill Road
SR 124 / Braselton Highway at Hog Mountain Church Road
Recommended Road Safety & Alignment Projects – Alignment
US 23 / SR 13 / Buford Highway (SR 378 / Beaver Ruin Road –Old Norcross Road / Langford Road)
Recommended Road Safety & Alignment Projects – Conflicting Traffic
Recommended Road Safety & Alignment Projects – Conflicting Traffic
US 23 / SR 13 / Buford Highway (SR 378 / Beaver Ruin Road –Old Norcross Road / Langford Road)
SR 124 / Braselton Highway at Huntington Hill Trace
Recommended Road Safety & Alignment Projects – Conflicting Traffic
Recommended Road Safety & Alignment Projects – Conflicting Traffic
SR 124 / Braselton Highway
CPSC Recommendations
Request approval of Road Safety and Alignment Project List
Intersections
Sources for Potential Intersections Improvements• Comprehensive Transportation Plan
• Citizen Requests
• Community Improvement District Requests
• County Staff Identified
• Citizens Project Selection Committee
Intersections
Evaluation Criteria• Congestion relief• Traffic volumes• Accident rates• Growth potential• Existing turn lanes• Other adjacent improvements• Intersection alignment• Leveraging of funds
Intersections
Types of Potential Intersection Improvements• Multi-way Intersection upgrades• Intersections of two major roadways• Intersections of one major roadway and one minor roadway• Intersections of minor roadways / “T” intersections• ATMS / ITS Improvements & Traffic Signals• Traffic Responsive / Adaptive Technology• Queuing Lanes / Quick Fix
Prior Multi-WayIntersection Improvements
Old Fountain Road at Old Peachtree Road
Lenora Church Road at Lee Road
Recommended Multi-way Intersection Improvements
North Bogan Road at Thompson Mill Road
Current Multi-way Intersection Improvements
Pharrs Road at North Road
Pharrs Road at Ridgedale Road
Ridgedale Drive at North Road
Recommended Multi-way Intersection Improvements
Recommended Multi-way Intersection Improvements
Rockbridge Road at Wydella Road
US 29 / SR 8 / Lawrenceville Highway at Pleasant Hill Road
US 29 / SR 8 / Lawrenceville Highway at SR 378 / Beaver Ruin Road
Prior Improvements at Intersections of Two Major Roadways
Prior Improvements at Intersections of Two Major Roadways
Pleasant Hill Road at Club Drive
Pleasant Hill Roadat Breckinridge Boulevard
Recommended Improvements at Intersections of Two Major Roadways
I-85 at SR 378 / Beaver Ruin Road
Recommended Improvements at Intersections of Two Major Roadways
Peachtree Industrial Boulevard at Suwanee Dam Road
Recommended Improvements at Intersections of Two Major RoadwaysPleasant Hill Road at Satellite Boulevard
Recommended Improvements at Intersections of Two Major Roadways
Satellite Boulevard at Old Peachtree Road
Recommended Improvements at Intersections of Two Major Roadways
SR 140 / Holcomb Bridge Road at Spalding Drive
Recommended Improvements at Intersections of Two Major Roadways
Spalding Drive Concept
Recommended Improvements at Intersections of Two Major Roadways
SR 316 / University Parkway at Harbins Road
Recommended Improvements at Intersections of Two Major Roadways
US 23 / SR13 / Buford Highway at SR 140 / Jimmy Carter Boulevard
Recommended Improvements at Intersections of Two Major Roadways
US 23 /SR13 / Buford Highway at SR 140 / Jimmy Carter Boulevard
Recommended Improvements at Intersections of Two Major Roadways
US 29 / SR 8 / Lawrenceville Highway at Jimmy Carter Boulevard
Recommended Improvements at Intersections of Two Major Roadways
US 29 / SR 8 / Lawrenceville Highway at Ronald Reagan Parkway
Recommended Improvements at Intersections of Two Major Roadways
US 29 / SR 8 / Lawrenceville Highway at Sugarloaf Parkway
Recommended Improvements at Intersections of Two Major Roadways
US 29 / SR 8 / Lawrenceville Highway at Sugarloaf Parkway
Prior Improvements at Intersections of One Major and One Minor Roadway
Peachtree Industrial Boulevard at South Old Peachtree Road
Old Norcross Road at Herrington Road
Recommended Improvements at Intersections of One Major and
One Minor RoadwaySR 124 / Braselton Highway at Flowery Branch Road
Recommended Improvements at Intersections of One Major and
One Minor RoadwaySugarloaf Parkway (Meadow Church Road / Satellite Boulevard)
Recommended Improvements at Intersections of One Major and
One Minor RoadwaySugarloaf Parkway at Meadow Church Road
Recommended Improvements at Intersections of One Major and
One Minor RoadwaySugarloaf Parkway at Satellite Boulevard
Old Norcross Road at West Liddell Road
Prior Improvements at Intersections of Minor Roadways / “T” Intersections
SR 120 / Abbotts Bridge Roadat Albion Farm Road
Recommended Improvements at Intersections of Minor Roadways /
“T” IntersectionsBuford Dam Road at Little Mill Road
Recommended Improvements at Intersections of Minor Roadways /
“T” IntersectionsRosebud Road at Brushy Fork Road
ATMS / ITS Improvements& Traffic Signals
Traffic Control Center
more than 260 Closed Circuit Television cameras
Staffed for workday (6:00am – 7:00pm), special event, and emergency operations
Monitor traffic conditions for real-time adjustments
Coordinate with Public Safety on incident management
Operate the GCSmartCommute website
Signal and ATMS Fiber Network
ATMS / ITS Improvements & Traffic Signals
over 220 miles offiber optic cable
____ Projects In Design____ Projects Under Construction____ Existing
ATMS / ITS Improvements & Traffic Signals
Draft Recommendations from ATMS/ITS Master Plan Update
Traffic Responsive /Adaptive Technology
Traffic Responsive Signal Operation• Alternative to traditional time of day schedule • Timing patterns change based on the current traffic
volumes• Volume information from system detectors (loops / video /
radar)• Holidays and special events do not require special setup• Setup and Implementation, Field Fine Tuning and
Monitoring
Traffic Responsive /Adaptive Technology
Existing corridors• Gwinnett Place Mall System• Peachtree Industrial
Boulevard• Lawrenceville Suwanee Road
Traffic Responsive /Adaptive Technology
Potential Expansion• SR 124 / Scenic Highway• Sugarloaf Parkway• US 29 / SR 8 / Lawrenceville
Highway• US 78 / SR 10 / Stone
Mountain Highway• SR 20 / Grayson Highway
Old Peachtree Road at SR 124 / Braselton Highway
SR 20 / Buford Driveat Satellite Boulevard
Prior Queuing Lanes /Quick Fix Projects
Prior Queuing Lanes /Quick Fix Projects
US 78 / SR 10 / East Main Streetat Abington Drive
Wisteria Driveat North Road
Next Steps
• Provide any questions or concerns to GCDOT by March 8, 2017
• Request approval of Intersection Improvements category at the meeting on March 15, 2017
CPSC Meeting Schedule
Next Meeting March 15, 2017• Committee vote on Intersections• Presentation on Major Roads
First Meeting in April 2017 (10, 11, 12 or 13)• Committee vote on Major Roads• Presentation on Sidewalks and Pedestrian Safety
Public Meetings• February 27, 2017 – 5:30pm to 7:30pm
Lilburn City Hall (Community Room)• March 2, 2017 – 5:30pm to 7:30pm
Snellville City Hall (Community Room)• March 6, 2017 – 5:30pm to 7:30pm
Gwinnett Justice & Administration Center (Conference Room C)
• March 16, 2017 – 5:30pm to 7:30pm Dacula Park (Community Room)
• March 18, 2017 – 10:00am to noon Shorty Howell Park (Activity Building)
• March 20, 2017 – 5:30pm to 7:30pm George Pierce Park (Community Room)
MetroQuest Surveydestination2040.metroquest.com
TRANSPORTATIONDEPARTMENT
Public Comment