2017 Hurricane Harvey -...
Transcript of 2017 Hurricane Harvey -...
2017 Hurricane Harvey
Bret Burford, PEAEP Transmission Technical Support
Corpus Christi, TX
Texas A&M Relay ConferenceCollege Station, TX
March 27-29, 2018
Presentation Assistance
I would like to Thank:
Everyone at AEP that supplied information & pictures.
AEP Transmission
David Solis
Matthew Estrada
Jimmy Emmert, Jr.
Alfredo Flores
Gerardo Trevino
David Browning
AEP Texas
Tomas Cardenas
Timothy Heard
2017 Hurricane Harvey
• Hurricane Harvey Statistics
• Sequence of Outages during the Storm
• Transmission Line Damage
• Substation Damage
• Distribution Damage
• Sequence of Transmission Restoration
• Interesting Fault Cases
Hurricane Harvey Statistics
• First Category 4 hurricane to impact the Coastal Bend area
since Celia in 1970
• 61 Transmission circuits outaged
• 68 Substations outaged
• 270 Distribution circuits outaged
• 176 Transmission outage entries logged by Transmission
Operators (Momentary & Permanent)
• 1st Transmission outage was Friday 8/25/2017 @ 15:56 CDT
• Last Transmission outage was Saturday 8/26/2017 @ 14:22
CDT
• 95 Transmission Faults Recorded by a single device at DuPont
Switch Ingleside across roughly 9 hours
Sequence of Outages (Hour 1-4)
Legend:Solid – In Service
Dashed - OUT
Airco-Rincon 138kV
Nueces Bay-White Point 138kV
Blessing-Celanese 138kV
Barney Davis 138kV Bus #2
Airline-Pharaoh-Barney Davis 138kV
Airline-Wooldridge-Barney Davis 138kV
Lon Hill-Sinton 69kV
Carbide-Victoria 69kV
Aransas Pass-Port Aransas 69kV
Beeville-Goliad 69kV
DuPont Ingleside-Hecker #1 138kV
Barney Davis-Holly 138kV
Refugio-Tatton 69kV
Gila-White Point 138kV
Barney Davis 138kV Bus #1
Airline-Barney Davis 138kV
Naval Base-Port Aransas 69kV
Fulton-Rockport 69kV
Fulton-Live Oak-Rockport 69kV
Sequence of Outages (Hour 1-8)
Legend:Solid – In Service
Dashed - OUT
Gregory-Rincon 69kV
DuPont Ingleside-White Point 138kV
Blessing-El Campo 69kV
Aransas Pass-Gregory 69kV
Big 3-DuPont Victoria 138kV
DuPont Ingleside 138kV Bus #2
Aransas Pass-DuPont Ingleside 138kV
DuPont Ingleside-Rincon #2 138kV
DuPont Ingleside-Ingleside Cogen #1 138kV
DuPont Ingleside-GPP #2 138kV
DuPont Ingleside-Ingleside Cogen #2 138kV
DuPont Ingleside-OxyChem 138kV
Aransas Pass-Rockport 138kV
Lon Hill-STEC Warburton 138kV
Rincon-White Point 69kV
Lon Hill-Pelican 138kV
Refugio-Rincon 69kV
Rincon-Rockport 138kV
Refugio-Victoria 69kV
Lon Hill-North Edinburg 345kV
Big 3-Vistron 138kV
Sequence of Outages (Hour 1-12)
Legend:Solid – In Service
Dashed - OUT
Rincon-White Point 138kV
Goliad-Victoria 69kV
DuPont Victoria-Joslin 138kV
Carbide-Port Lavaca 69kV
STP-White Point 345kV
Carbide-Joslin 138kV
Coleto Creek-Lon Hill 345kV
Lon Hill-White Point 345kV
Pelican-White Point 138kV
DuPont Ingleside-Rincon #1 138kV
Victoria-STEC Warburton 138kV
Carbide-Vistron 138kV
Port Lavaca-Victoria 69kV
Victoria-Magruder 138kV
Magruder-Thomaston 138kV
Coleto Creek-Kenedy Switch 138kV
Blessing-Bay City 69kV
Victoria #1 138-69kV Auto
Airco-Carbide 138kV
Sequence of Outages (Hour 1-23)
Legend:Solid – In Service
Dashed - OUT
Blessing-Lolita 138kV
Victoria 138-69kV Auto #2
Coleto Creek-Victoria South 138kV
El Campo-Victoria 138kV
Cantwell-Weil Tract 138kV
Cantwell-Citgo NOP 138kV
Blessing-Port Lavaca 69kV
Transmission Line Damage
• 549 Transmission structures down
• 217 Transmission structures with other damage
• Insulators, Static wire, Conductor, X-arm, X-brace, etc.
• 4 - 345kV lines outaged
• STP-White Point line: 120 structures down (H-frame, steel lattice)
• 37 - 138kV lines outaged
• Airco-Rincon line: 90 structures down (H-frame, wood)
• Lon Hill-Warburton line: 16 structures down (H-frame, wood)
• DuPont Victoria-Joslin line: 13 structures down (H-frame, wood)
• Aransas Pass-DuPont Ingleside line: 4 structures down (H-frame,
wood)
• Aransas Pass-Rockport line: 3 structures down (1-pole, wood)
• DuPont PP1-DuPont Ingleside line: 3 structures down (1-pole, wood)
Transmission Line Damage
• 20 - 69kV lines outaged
• Live Oak-Rockport line: 98 structures down (1-pole, wood)
• Refugio-Rincon line: 65 structures down (H-frame & 1-pole, wood)
• Gregory-Rincon line: 50 structures down (1-pole, wood)
• Refugio-Tatton line: 27 structures down (H-frame, wood)
• Fulton-Live Oak line: 20 structures down (1-pole, wood)
• Refugio-Victoria line: 12 structures down (H-frame, wood)
• Port Aransas-Seawall line: 11 structures down (1-pole, wood)
• Port Aransas Ship Channel: UG cable potheads damaged (both ends)
• Blessing-El Campo line: 6 structures down (1-pole, wood)
Substation Damage
• Carbide 69kV metering CT damaged
• O’Connor 69kV switch damaged
• Rockport 69kV Control house roof leak
• 18 station battery banks replaced (during / afterwards)
• 2 Distribution circuit breakers failed (during)
• Port Lavaca 69-12 kV transformer failed (afterwards)
• More damage on next slides
Distribution Damage
Areas impacted by Hurricane Harvey included: Corpus Christi, Port Aransas,
Aransas Pass, Rockport , Fulton, Refugio, Port Lavaca, Bay City and Victoria.
Non-ping meters Pole damage
Transmission Restoration
• Restored the system from “Outside => In”
• Barney Davis – Replacement CBs were already on-hand for
planned replacement project
• Tatton – Temporary 69-12kV station built
• Live Oak – Temporary control cubicle was available/used
• Fulton – New roof and dried out the old EM relays
Transmission Restoration (Day 1-3)
Legend:Solid – In Service
Dashed - OUT
Day 1:
Naval Base-North Padre 69kV
Lon Hill-North Edinburg 345kV
Barney Davis 138kV Bus #2
Barney Davis 138kV Bus #1
Airline-Wooldridge-Barney Davis 138kV
Cantwell-Citgo NOP 138kV
Coleto Creek-Lon Hill 345kV
Cantwell-Weil Tract 138kV
Victoria 138-69kV Auto #1
Victoria 138-69kV Auto #2
Magruder-Victoria 69kV
Goliad-Victoria 69kV
Day 2:
Blessing-Palacios 69kV
DuPont Ingleside-White Point 138kV
DuPont Ingleside 138kV Bus #2
Magruder-Victoria 138kV
Day 3:
Nueces Bay-White Point 138kV
Big 3-DuPont Victoria 138kV
Transmission Restoration (Day 4)
Legend:Solid – In Service
Dashed - OUT
Day 4:
Lon Hill-Pelican 138kV
Pelican-White Point 138kV
Lon Hill-Sinton 69kV
Coleto Creek-Victoria South 138kV
Gila-White Point 138kV
Rincon-White Point 138kV
Magruder-Thomaston 138kV
Rincon-White Point 69kV
DuPont Ingleside-Ingleside 138kV
Rincon-Rockport 138kV
Lon Hill-White Point 345kV
DuPont Ingleside-OxyChem 138kV
Transmission Restoration (Day 5)
Legend:Solid – In Service
Dashed - OUT
Day 5:
Edna-Victoria 138kV
Palacios-Brookhollow 69kV
Barney Davis-Holly 138kV
DuPont Ingleside-Rincon #2 138kV
Big 3-Vistron 138kV
DuPont Ingleside-Rincon #1 138kV
Carbide-Vistron 138kV
Carbide 138-69kV Auto #1
Blessing-Lolita 138kV
Mustang Island-North Padre 69kV
Brookhollow-Port Lavaca 69kV
Transmission Restoration (Day 6-7)
Legend:Solid – In Service
Dashed - OUT
Day 6:
Mustang Island-Port Aransas 69kV
DuPont Ingleside-GPP #1 138kV
DuPont Ingleside-GPP #2 138kV
Blessing-Celanese 138kV
Carbide-Victoria 69kV
Carbide-Joslin 138kV
Aransas Pass-Rockport 138kV
Aransas Pass-Gregory 69kV
Airco-Carbide 138kV
Day 7:
Aransas Pass-DuPont Ingleside 138kV
DuPont Ingleside-Ingleside Cogen #1 138kV
Blessing-Bay City 69kV
Aransas Pass-Seawall 69kV
DuPont Ingleside-Ingleside Cogen #2 138kV
Cuero-Thomaston 138kV
Airline-Pharaoh-Barney Davis 138kV
Airline-Barney Davis West 138kV
Edna-El Campo 138kV
Carbide-Port Lavaca 69kV
Beeville-Goliad 69kV
Lon Hill-Medio Creek 138kV
Transmission Restoration (Day 8-18)
Legend:Solid – In Service
Dashed - OUT
Day 8:
DuPont Ingleside-Hecker #1 138kV
Port Lavaca-Victoria 69kV
Coleto Creek-Kenedy Switch 138kV
Victoria-STEC Warburton 138kV
Day 9:
DuPont Victoria-Joslin 138kV
Blessing-El Campo 69kV
Refugio-Victoria 69kV
Bonnieview-Refugio 69kV
Day 11:
Medio Creek-STEC Warburton 138kV
Day 12:
Fulton-Rockport 69kV
Fulton-Live Oak 69kV
Day 13:
Gregory-Rincon 69kV
Day 14:
Refugio-Tatton 69kV
Day 18:
Bonnieview-Rincon 69kV
Interesting Fault Case 1
DuPont Switch-Rincon #2 138kV line Faults:
33 cycle LG to LLG fault duration – Why so long?
DuPont end tripped at 28.5 cycles
Rincon end tripped at 33 cycles
DCB Blocking present until 26 cycles – Why?
Fault cause = broken jumper on C phase at DuPont end.
Thus, no current on C phase at DuPont end until fault
flashes over at that end.
Non-directional 3I0 DCB Start at DuPont end caused
Blocking and delayed Rincon end trip.
Fault clears at
Rincon
Fault clears at
DuPont SwitchFault now flashes at
DuPont Switch end
C ph = 0 amps
Fault starts
Interesting Fault Case 2Lon Hill-White Point 345kV line Faults:
Initial CG fault clears by 87L in 2 cycles.
Note all currents “in-phase” like a GSU with no
Generation output. This occurred when the only
true source to White Point was the Beeville 69kV
source.
Fault cause = Static wire down near White Point end.
Auto-reclose from this weak source end with fault present
eventually trips by Line Pickup in 13.5 cycles.
Line Pickup OP
Interesting Fault Case 2Lon Hill-White Point 345kV line Faults:
Auto-reclose from this weak source end with fault
not present until a short time later.
Fault is now below the 87L pickup and Line Pickup is
disabled and the fault is not consistently there.
Fault finally produces a Z1G element trip at 1.74 seconds
after the fault first re-appeared.
Fault re-appears
Z1G trip