2017 (FY 21,22,23) Ohio CMAQ Project Selection...Ohio Statewide Urban CMAQ Committee (OSUCC)...
Transcript of 2017 (FY 21,22,23) Ohio CMAQ Project Selection...Ohio Statewide Urban CMAQ Committee (OSUCC)...
2017 (FY 21,22,23) Ohio CMAQ
Project SelectionExecutive Committee
September 14, 2017
Eligible Applicants• Cities
• Counties
• Port Authorities
• Transportation Improvement Districts (TID)
• Transit Authorities
• Other units of government eligible to sign contracts with ODOT
• Public Private Partnerships
Eligible Activities� FHWA capital funding program
� Must be spent on transportation projects in air quality nonattainment or maintenance areas and demonstrate emissions reduction. Air quality area includes Butler, Clermont, Hamilton and Warren
� OKI limits funding to urbanized area only
� 20% local match
� Categories
� Demand Management
� Transportation Control Measures
� Intelligent Transportation Systems
� Pedestrian and Bicycle Programs
� Shared Ride
� Traffic Flow Improvements
� Transit Improvements
� Freight/Intermodal
Ohio Statewide Urban CMAQ Committee (OSUCC)
� Statewide process for 8 largest MPO’s in Ohio
� Developed statewide process and application
� Cost effectiveness in reducing congestion and vehicle emissions is a priority
� Call for FY 2021-2023
� 14 applications received
� $34 million requested
� $35 M available based OKI annual allocation prior to statewide
program
Funding Available
OSUCC Scoring (100 points max)Criteria Max Points
Available
1 Project Type 10
2 Cost Effectiveness (per emission reduced) 20
3 Other Benefits (safety, fixed route transit, bike/ped, freight EJ) 10
4 Existing Modal Level-of-Service 15
5 Positive Impact on Level-of-Service 15
6 Status of Project 10
7 Non-Federal Match of Requested CMAQ Funds 10
8 History of Project Delivery (0, -5 or -10 point deduction) 0
9 Regional Priority 10
ScheduleDate Action
April 2017 Call for Projects
May 9, 2017 CMAQ workshop
June 30, 2017 Applications due
August 8, 2017 Prioritization subcommittee meeting
September 12, 2017 ICC Recommended Approval
September 14, 2017 Executive Committee Approval
September 15, 2017 Projects submitted to OSUCC
By November 30, 2017 OSUCC identifies the recommended program of projects
By December 31, 2017 MPO Executive Directors approve projects for funding
Application OKI Staff Scoring
Prioritization Subcommittee ICC/OKI
Board OSUCCMPO
Executive Directors
• Roundabouts at
Eastgate Square
Drive, Glen Este-
Withamsville Rd
(west) and Glen
Este-Withamsville
Rd (east)
• Amount
Requested:
$5,000,000
Clermont Co TID-Aicholtz Rd Roundabouts
• Provide new connection between Babson Place
and Hetzel Street
• Amount Requested: $2,860,000
• New capacity is not CMAQ eligible
• Not recommended
Cincinnati-Babson Extension
• Multi-modal transportation facility
with Metro fixed route bus hub with
amenities.
• Amount Requested: $6,600,000
Cincinnati-Uptown SMART Center
• Dedicated crossing for
pedestrian and bicycle
movement across River
Road and the railroads
where none exists today.
• Amount Requested:
$923,460
Cincinnati-Thornton Av Improvements
• Extend existing southbound drop
lane and add additional turn lane
for ramp to WB I-275
• Amount Requested: $784,000
Fairfield-Gilmore/I-275 Ramp
• Construct 12’ wide
multi-use trail from
the existing trail
termini north of
Beechmont
Avenue, crossing
Little Miami River
via new bridge
utilizing existing
bridge
foundations.
• Amount
Requested:
$4,320,000
Great Parks-Little Miami Trail Beechmont
• Construct a paved multi-use path from the
existing path at the intersection of Deerfield and
East St. to existing trail at the YMCA. Extend
path south to Turtlecreek Union Road and over
Byp 48 to Bike Park.
• Amount Requested: $927,755
Lebanon-Countryside YMCA Trail
• Convert two existing stop-controlled “T” intersections (US42 @ Bethany and US42 @
Mason-Morrow-Millgrove Rd) to roundabouts. Construct a multi-use path.
• Amount Requested: $2,751,535
Mason-US42 Roundabouts
• Replace the existing 4-way stop at Pfeiffer and Deerfield with a roundabout
• Amount Requested: $893,575
Montgomery-Pfeiffer Rd @Deerfield Rd Roundabout
• Upgrade traffic
signal system with
new equipment and
software.
• Amount Requested:
$923,287
Mt.Healthy-Upgrade Signals
• Add turn lanes and
upgrade signals with
interconnection at
the two
intersections of
US50 and SR132.
• Amount Requested:
$1,572,123
Owensville-SR 132 and US 50 intersections
• Segment D, Chestnut
Connector, Segment B
east and High School
Connector.
• Amount Requested:
$1,500,000
Oxford-Oxford Area Trail Phase 3
• Upgrade signals at
Highland Avenue,
Sampson Lane and
Elwynne Drive.
Retrofit signal at
Plainfield. Access
Management
improvements.
• Amount Requested:
$2,374,845
Silverton-Montgomery Road Signals
• Replacement of ten 40’
diesel buses.
• Amount Requested:
$3,103,400
SORTA-Bus Replacements
Scoring ResultsProject Name Total Points
Owensville-SR 132 and US 50 Intersection Improvements 80
SORTA-Transit Rolling Stock Replacement 77
Mt. Healthy-Signal System 66
Mason-US 42 Roundabouts 59
Fairfield-South Gilmore/I-275 Ramp "Y" Improvements 56
Montgomery-Pfeiffer Road and Deerfield Road Roundabout 56
Cincinnati-Uptown SMART Center 54
Hamilton County-Great Parks Little Miami Scenic Trail-Beechmont Connector 54
Silverton-Montgomery Road Corridor Improvements 40
Clermont County TID-Aicholtz Rd Roundabouts 37
Cincinnati-Thorton Avenue Improvements 35
Lebanon-Countryside YMCA Trail Extension and Realignment 35
Oxford-Area Trail Phase 3 31
Regional Priority (10 pts)Measure Points
First Priority Project 10
Second Priority Project 7
Third Priority Project 4
Fourth Priority Project 2
All Other 0
Draft Funding PlanProject Name Phase CMAQ $ Requested
Clermont County TID-Aicholtz Rd Roundabouts CO $5,000,000
Cincinnati-Uptown SMART Center CO $6,600,000
Cincinnati-Thornton Avenue Improvements CO $923,460
Fairfield-South Gilmore/I-275 Ramp "Y" Improvements CO$784,000
Hamilton County-Great Parks Little Miami Scenic Trail-Beechmont Connector CO$4,320,000
Lebanon-Countryside YMCA Trail Extension and Realignment CO$927,755
Mason-US 42 Roundabouts RW & CO 2,771,535
Montgomery-Pfeiffer Road and Deerfield Road Roundabout CO$893,575
Mt. Healthy-Signal System CO $923,287
Owensville-SR 132 and US 50 Intersection ImrpovementsPE, DD, RW
& CO $1,572,123
Oxford-Phase 3 Chestnut Fields Connector CO $1,500,000
Silverton-Montgomery Road Corridor Improvements RW & CO$2,374,845
SORTA-Transit Rolling Stock Replacement CO $3,103,400
TOTAL REQUEST $31,673,980