2016 SALOBO ANALYST TOUR€¦ · 3 salobo analyst tour 2016 mine overview tailings dam maintenance...
Transcript of 2016 SALOBO ANALYST TOUR€¦ · 3 salobo analyst tour 2016 mine overview tailings dam maintenance...
2016 SALOBO ANALYST TOUR
PRESENTATION
MAY 13, 2016
2
SALOBO ANALYST TOUR 2016 MINE LOCATION
3
SALOBO ANALYST TOUR 2016 MINE OVERVIEW
TAILINGS DAM
MAINTENANCE AND
ADMINISTRATION FACILITIES
PRIMARY AND SECONDARY
CRUSHING
CONCENTRATION PLANT
4
SALOBO ANALYST TOUR 2016 MINE LAYOUT
5
SALOBO ANALYST TOUR 2016 REGIONAL INFRASTRUCTURE
6
SALOBO ANALYST TOUR 2016 DECEMBER 31, 2015 RESOURCES & RESERVES
7
SALOBO ANALYST TOUR 2016 DRILLING SUMMARY
8
SALOBO ANALYST TOUR 2016 SCHEMATIC GEOLOGY MODEL
9
SALOBO ANALYST TOUR 2016 COPPER MINERALIZATION
A
B
C
D
Note: Figure from SMSA/CVRD, 2003a. Copper mineralization in disseminations (A), stringers (B),
massive accumulations (C), and veins (D).
A
B
C
D
10
SALOBO ANALYST TOUR 2016 BRAZIL –GENERAL GEOLOGY
11
SALOBO ANALYST TOUR 2016 GEOLOGY –PLAN VIEW
12
SALOBO ANALYST TOUR 2016 GEOLOGY – SECTION VIEW
13
SALOBO ANALYST TOUR 2016 R&R CLASSIFICATION – TYPICAL SECTION
14
SALOBO ANALYST TOUR 2016 EXPLORATION UPSIDE
15
SALOBO ANALYST TOUR 2016 PRODUCTION PROFILE
16
SALOBO ANALYST TOUR 2016 PIT PHASES
Phase 01
Phase 02
Phase 03
Phase 04
Phase 05
Phase 06Phase 07
A
A
BC
C
B
17
SALOBO ANALYST TOUR 2016 PROCESS FLOWSHEET
18
SALOBO ANALYST TOUR 2016 ACTUAL PROCESS RECOVERIES
19
SALOBO ANALYST TOUR 2016 ACTUAL CONCENTRATE GRADE
20
SALOBO ANALYST TOUR 2016 RECONCILIATIONS