200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date
Drawn Approved Revision DateDesigned
Brisbane Creek St. OfficePO Box 99
+ 61 7 3007 8181
Spring Hill QLD 4004Australia
MACKAY RETAIL EXPANSION85 SYDNEY STREET, MACKAY QLD 4740
GENERAL NOTES
BC_N-B1123.01 C1002 AN-B1123.01 -
PRELIMINARY
RAD JDC RADRAD
Approved Revision DateRevision Amendment
A PRELIMINARY ISSUE JDC 07.07.15
GENERAL REINFORCED CONCRETE
1. ORIGINAL SITE SURVEY PREPARED BY: WHITSUNDAY SURVEYS GROUP
DATUMS USED: AHD
VERT: PM 60575 RL 5.404
ORIGIN:
CONTOUR INTERVAL: 0.2m
REAL PROPERTY DESCRIPTION:
LOT 2 & 3 ON RP718763, LOT 1 ON RP707142 AND LOT 71 ON M918
2. CONTRACTOR MUST VERIFY ALL DIMENSIONS AND EXISTING LEVELS ON SITE
PRIOR TO COMMENCEMENT OF WORK.
3. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH
THEIR ACCURACY CANNOT BE GUARANTEED. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO ESTABLISH THE LOCATION AND LEVEL OF ALL EXISTING
SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. ANY DISCREPANCIES
SHALL BE REPORTED TO THE SUPERINTENDENT.
4. THE CONTRACTOR SHALL ARRANGE ALL SURVEY SETOUT BY A LICENSED
LAND SURVEYOR. CONFIRM SETOUT WITH ARCHITECT.
5. ALL SERVICE TRENCHES UNDER VEHICULAR PAVEMENTS SHALL BE
BACKFILLED WITH APPROVED FILL MATERIAL AND COMPACTED TO 100%
STANDARD MAXIMUM DRY DENSITY IN ACCORDANCE WITH AS 1289 E1.1.
6. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL
BE RESTORED TO ORIGINAL, INCLUDING KERBS, FOOTPATHS, CONCRETE
AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.
7. WHERE NEW WORK ABUTS EXISTING, THE CONTRACTOR SHALL ENSURE THAT
A SMOOTH EVEN PROFILE FREE FROM ABRUPT CHANGES, IS OBTAINED.
8. CARE TO BE TAKEN WHEN EXCAVATING ENERGEX, TELSTRA AND ORIGIN GAS
SERVICES. NO MECHANICAL EXCAVATION TO BE UNDERTAKEN OVER
ENERGEX, TELSTRA AND ORIGIN GAS; HAND EXCAVATE IN THESE AREAS.
LIAISE WITH RELEVANT AUTHORITY.
9. ALL WORKS SHALL BE IN ACCORDANCE WITH RELEVANT COUNCIL STANDARDS,
DETAILS SHOWN ON THE DRAWINGS, THE SPECIFICATION AND THE
DIRECTIONS OF THE ARCHITECT.
10. THE CONTRACTOR SHALL NOT DISTURB ANY EXISTING SURVEY BENCH MARKS
OR REFERENCE MARKS (UNLESS INDICATED FOR REMOVAL) WITHOUT DEPT.
OF NATURAL RESOURCES APPROVAL IN WRITING.
11. THE CONTRACTOR SHALL OBTAIN ALL RELEVANT AUTHORITIES APPROVALS.
(PRIOR TO COMMENCEMENT AND UPON COMPLETION).
12. WORK ON EXISTING EXTERNAL STORMWATER SERVICES BY CONTRACTOR
ARE SUBJECT TO INSPECTION AND APPROVAL BY COUNCIL.
13. THE CONTRACTOR SHALL LOCATE AND CONFIRM LEVELS OF ALL EXISTING
SERVICE CONNECTIONS PRIOR TO COMMENCING WORK.
14. THE CONTRACTOR SHALL REFER TO LANDSCAPE DRAWINGS FOR DETAILS OF
TREATMENT OF BATTERS, SWALE DRAINS AND ANY OTHER AREAS DISTURBED
AS PART OF CIVIL WORKS.
15. ROAD OPENINGS:
THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF
COUNCIL. WHERE THE WORK IS LOCATED IN A ROAD RESERVE OR CROSSES
THE PAVEMENT OF A PUBLIC ROADWAY OR FOOTWAY, OBTAIN A CONSENT
COVERING THE NECESSARY OPENINGS AND COMPLY WITH ALL THE
CONDITIONS COVERING THE ISSUE OF SUCH A CONSENT. A CHARGE IS MADE
FOR PERMITS ISSUED IN RESPECT OF PAVEMENT OPENINGS. CONTRACTOR TO
OBTAIN DETAILS FROM COUNCIL, MEET ALL REQUIREMENTS AND PAYMENTS,
AND CARRY OUT ALL LIAISON AT NO EXTRA COST. ALL PAVEMENT SURFACING
IS TO BE UNDERTAKEN BY THE CONTRACTOR. ALL PAVEMENT REINSTATEMENT
TO BE UNDERTAKEN BY THE CONTRACTOR.
16. REFER ALSO TO HYDRAULIC, LANDSCAPING, MECHANICAL AND ELECTRICAL
CONSULTANTS' DRAWINGS FOR ADDITIONAL SITE SERVICES TO BE
CO-ORDINATED FOR CONSTRUCTION UNDER PROPOSED CARPARK
PAVEMENTS.
17. ALL CONSTRUCTION WORK SHALL BE CARRIED OUT SO THAT AT ANY TIME
ADJOINING PROPERTY OWNERS ARE NOT DEPRIVED OF AN ALL-WEATHER
ACCESS OR SUBJECTED TO ADDITIONAL STORM WATER RUN-OFF DURING THE
PERIOD OF CONSTRUCTION.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF THE SUBDIVISION AND
DEVELOPMENT MANAGER OF COUNCIL.
19. SITE INSPECTIONS REQUIRED AS SPECIFIED.
20. FOR CIVIL SETOUT INFORMATION CONTACT OPUS PTY LTD (PH 3007 8181) AND
AN AUTOCAD DRAWING FILE WILL BE ISSUED FOR SITE SETOUT.
21. CONTRACTOR IS TO ALLOW TO INCLUDE ANY REQUIRED COUNCIL INSPECTION
AND COMPLIANCE FEES IN THE CONTRACT.
GENERAL
1. CARRY OUT ALL CONCRETE WORK IN ACCORDANCE WITH AS 3600 AND THE
SPECIFICATION. KEEP A COPY OF THE DOCUMENTS ON SITE.
2. VERIFY ALL SETTING OUT DIMENSIONS WITH THE SUPERINTENDANT AND/OR
THE SURVEYOR.
3. DO NOT OBTAIN DIMENSIONS BY SCALING THE DRAWINGS.
CONCRETE
4. ALL WORKMANSHIP AND MATERIALS SHALL COMPLY WITH AS 3600 CURRENT
EDITIONS WITH AMENDMENTS, EXCEPT WHERE VARIED BY THE CONTRACT
DOCUMENTS.
5. CONCRETE CHARACTERISTICS:
6. NO 'BRECCIA' TYPE AGGREGATE IS TO BE USED.
7. CEMENT TO BE TYPE SL TO AS 3972 U.N.O. MAX CONCRETE SHRINKAGE TO BE
600 MICRON TO AS1012.
8. NO ADMIXTURES ARE TO BE USED WITHOUT THE APPROVAL OF THE
ENGINEERS.
9. A VIBRATOR IS TO BE USED FOR THE COMPACTION OF ALL CONCRETE.
10. ALL CONCRETE PLACEMENT TO UTILISE ASPHALTIC ALCOHOL APPLIED TO THE
CONCRETE AFTER THE INITIAL SCREED CONCRETE SHALL BE CURED IN
ACCORDANCE WITH AS 3600 FOR A MINIMUM OF 7 DAYS AFTER POURING,
UTILISING AN APPROVED, NON-OIL BASED CURING COMPOUND OR THE
COVERING OF THE ENTIRE SLAB WITH A CLEAR PLASTIC SHEET.
11. CONSTRUCTION JOINTS WHERE NOT SHOWN SHALL BE LOCATED TO THE
APPROVAL OF THE ENGINEERS.
12. ALL CONCRETE SHALL BE SUBJECT TO PROJECT CONTROL SAMPLE AND
TESTING TO AS 3600.
13. THE CONTRACTOR MAY ADD AN APPROVED SUPERPLASTICISING ADMIXTURE
TO INCREASE SLUMP OF PAVEMENT CONCRETE TO NOT MORE THAN 100mm.
QUALITY AND MIXING PROCEDURE TO BE IN ACCORDANCE WITH THE
MANUFACTURERS WRITTEN INSTRUCTIONS.
14. SLIP JOINTS TO BE USED ON ALL LOAD-BEARING MASONRY WALLS. USE 2
LAYERS OF GALVANISED FLAT STEEL WITH GRAPHITE GREASE BETWEEN.
FINISHING
15. THE CONCRETE SHALL BE SCREEDED TO THE REQUIRED CROSS SECTION
PROFILE, FREE OF DEPRESSIONS AND HIGH AREAS TO SATISFY THE
REQUIREMENTS OF AN INITIAL FINISH.
16. FINAL FINISHING SHALL COMMENCE ONLY AS SOON AS THE WATER SHEEN
HAS LEFT THE PAVEMENT SURFACE AND NOT IN ANY AREA WHERE THERE IS
FREE SURFACE WATER. REFER ARCHITECTURAL SPECIFICATIONS FOR
FINISHES TO SURFACES.
REINFORCEMENT
17. COVER TO REINFORCEMENT FOR CORROSION PROTECTION SHALL BE AS
DETAILED OR AS A MINIMUM 40mm TO TOP REINFORCEMENT, 50mm TO
BOTTOM REINFORCEMENT.
18. PIPES OR CONDUITS SHALL NOT BE PLACED WITHIN THE COVER TO
REINFORCEMENT.
19. REINFORCEMENT QUALITY
19.1 BAR REINFORCEMENT
ALL BARS TO BE "N" UNLESS NOTED OTHERWISE THE NUMBER FOLLOWING
THE SYMBOL IS THE NOMINAL BAR SIZE IN mm. FOR EXAMPLE, N16 DENOTES A
DEFORMED RIBBED BAR, OF GRADE 500MPa NORMAL DUCTILE STEEL, WITH A
NOMINAL 16mm DIAMETER.
*NOTE: Y BARS MAY BE REPLACED WITH N BARS OF SAME SIZE.
19.2 MESH REINFORCEMENT
THE NUMBERS FOLLOWING THE SYMBOL DENOTE THE PRODUCT CODE. FOR
EXAMPLE, SL92 DENOTES A SQUARE MESH OF 9mm (NOMINAL DIAMETER)
DEFORMED RIBBED BARS AT 200mm CENTRES, OF GRADE 500MPa LOW
DUCTILITY STEEL.
*NOTE: F MESH MAY BE REPLACED WITH RL OR SL MESH OF THE SAME
CONFIGURATION.
20. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY; IT IS NOT
NECESSARILY SHOWN IN TRUE PROJECTION.
21. SPLICES IN REINFORCEMENT SHALL BE MADE ONLY IN THE POSITION SHOWN.
THE WRITTEN APPROVAL OF THE ENGINEER SHALL BE OBTAINED FOR ANY
OTHER SPLICE.
22. WELDING OF REINFORCEMENT WILL BE PERMITTED ONLY AFTER APPROVAL BY
THE ENGINEER.
23. SITE BENDING OF Y OR N BARS SHALL BE DONE COLD WITH POWER OR
MECHANICAL BENDING TOOLS.
24. FABRIC LAPS
25. FABRIC TO EXTEND 70 WITH A CROSSWIRE ONTO WALLS UNLESS NOTED
OTHERWISE.
1. WHERE NOMINATED, JOINTS TO BE SAWN AS SOON AS CONCRETE HAS
HARDENED SUFFICIENTLY THAT IT WILL NOT BE DAMAGED BY SAWING. IF AN
UNPLANNED CRACK OCCURS THE CONTRACTOR SHALL REPLACE WHOLE
SLABS EITHER SIDE OF THE UNPLANNED CRACK, UNLESS DIRECTED
OTHERWISE.
2. a) PROVIDE JOINTS AS DETAILED
b) ALL LONGITUDINAL JOINTS SHALL BE FORMED AND INCLUDE TIE BARS OR
DIAMOND DOWELS AS SPECIFIED. ALL TRANSVERSE CONSTRUCTION
JOINTS SHALL BE FORMED AND INCLUDE PLATES OR DIAMOND DOWELS AS
SPECIFIED.
c) UNO BOND BREAKER TO BE PROPRIETARY DANLEY PLATE AND DIAMOND
DOWEL COVERS.
3. DOWELS, PLATES AND TIE BARS SHALL BE:
STRAIGHT
TO LENGTH SPECIFIED
CLEAN AND FREE FROM MILL SCALE, RUST AND OIL
SAWN TO LENGTH NOT CROPPED
HOT DIPPED GALVANISED AFTER SAWING TO LENGTH
4. DIMENSIONS OF SEALANT RESERVOIR DEPENDANT ON THE SEALANT TYPE
ADOPTED. ENGINEERS APPROVAL TO BE OBTAINED FOR SEALANT AND
RESERVOIR DIMENSIONS AND DETAIL PROPOSED BY THE CONTRACTOR.
REFER TO DETAILS FOR TYPICAL ARRANGEMENT AND SEALANT.
5. PRIOR TO THE PLACEMENT OF CONCRETE IN THE ADJACENT SLAB, SELF 10mm
ABELFLEX WITH RIPOFF STRIP SHALL BE ADHERED TO THE ALREADY CAST
AND CLEANED CONCRETE FACE USING AN APPROVED WATERPROOF
ADHESIVE. ADHESIVE SHALL BE LIBERALLY APPLIED TO THE FULL FACE OF
THE CONCRETE SLAB TO BE COVERED BY THE FILLER, AND ON THE FULL FACE
OF THE FILLER TO BE ADHERED.
6. REFER TO EARTHWORKS NOTES FOR PREPARATION OF SUB-BASE AND
SUB-GRADE.
7. CONTRACTION, LONGITUDINAL, ISOLATION AND CONSTRUCTION JOINTS SHALL
BE LOCATED AS SPECIFIED.
8. SAWCUTTING SHALL COMMENCE AS EARLY AS POSSIBLE UTILISING SOFTCUT
TO AVOID UNCONTROLLED SHRINKAGE CRACKING, BUT NOT SO EARLY AS TO
CAUSE UNACCEPTABLE RAVELING OF JOINT EDGES. PROGRAM SITE AND TIME
OF CONCRETE POURS TO PERMIT SAWING TO BE CARRIED OUT WITHOUT
CAUSING NOISE POLLUTION.
9. CONCURRENTLY WITH THE SAWING OPERATIONS THE SAWN GROOVE SHALL
BE WASHED FREE OF MATERIAL.
10. SAWN GROOVES FORMING THE RESERVOIR FOR A JOINT SEALANT SHALL BE
FORMED IN TWO STAGES. THE SECOND SAWCUT SHALL BE MADE AS LATE AS
POSSIBLE.
CONCRETE PAVEMENT JOINT
DANLEY DOWEL JOINT
1. WHERE NOMINATED THE CONTRACTOR IS TO ALLOW FOR ALL COMPONENTS
OF DANLEY DOWEL JOINT SYSTEM INCLUDING TEMPLATES & PEGGING TO
ENSURE THAT ALL DOWEL BARS REMAIN IN THE CORRECT ALIGNMENT &
POSITION REFER DETAILS.
ASPHALTIC CONCRETE
GENERAL
1. ASPHALTIC CONCRETE MIX DESIGN, MANUFACTURE, PLACING AND
COMPACTION SHALL BE IN ACCORDANCE WITH THE SPECIFICATION FOR AC10
MIX AND AS 2734 - 1984 ASPHALT (HOT MIXED) PAVING - A GUIDE TO GOOD
PRACTICE. MINERAL FILLER TO COMPLY WITH AS 2357-1980 MINERAL FILLERS
FOR ASPHALT.
PAVEMENT PREPARATION
2. THE EXISTING SURFACE TO BE SEALED SHALL BE DRY AND BROOMED BEFORE
COMMENCEMENT OF WORK TO ENSURE COMPLETE REMOVAL OF ALL
SUPERFICIAL FOREIGN MATTER.
3. ALL DEPRESSIONS OR UNEVEN AREAS ARE TO BE TACK-COATED AND
BROUGHT UP TO GENERAL LEVEL OF PAVEMENT WITH ASPHALTIC CONCRETE
BEFORE LAYING OF MAIN COURSE.
TACK COAT
4. THE WHOLE OF THE AREA TO BE SHEETED WITH ASPHALTIC CONCRETE SHALL
BE LIGHTLY AND EVENLY COATED WITH RAPID SETTING BITUMEN.
JOINTS
5. THE NUMBER OF JOINTS BOTH LONGITUDINAL AND TRANSVERSE SHALL BE
KEPT TO A MINIMUM.
6. THE DENSITY AND SURFACE FINISH AT JOINTS SHALL BE SIMILAR TO THOSE OF
THE REMAINDER OF THE LAYER.
COMPACTION
7. ALL COMPACTION SHALL BE UNDERTAKEN USING SELF PROPELLED ROLLERS.
8. INITIAL ROLLING SHALL BE COMPLETED BEFORE THE MIX TEMPERATURE
FALLS BELOW 105°C.
9. SECONDARY ROLLING SHALL BE COMPLETED BEFORE THE MIX TEMPERATURE
FALLS BELOW 60°C.
FINISHED PAVEMENT PROPERTIES
10. FINISHED SURFACES SHALL BE SMOOTH, DENSE AND TRUE TO SHAPE AND
SHALL NOT VARY MORE THAN THE SPECIFIED TOLERANCES.
STORMWATER
1. ALL 300 DIA. DRAINAGE PIPES AND LARGER SHALL BE CLASS "3" APPROVED
SPIGOT AND SOCKET RCP PIPES WITH RUBBER RING JOINTS, (U.N.O.). ALL
DRAINAGE PIPES UP TO AND INCLUDING 225 DIA. SHALL BE SEWER GRADE
uPVC WITH SOLVENT WELD JOINTS, (U.N.O.).
2. EQUIVALENT STRENGTH FRC PIPES MAY BE USED.
3. ALL PIPE JUNCTIONS UP TO AND INCLUDING 450 DIA. AND ALL TAPERS SHALL
BE VIA PURPOSE MADE FITTINGS.
4. MINIMUM GRADE TO STORMWATER LINES TO BE 1%. (U.N.O.).
5. CONTRACTOR TO SUPPLY AND INSTALL ALL FITTINGS AND SPECIALS
INCLUDING VARIOUS PIPE ADAPTORS TO ENSURE PROPER CONNECTION TO
DISSIMILAR PIPEWORK.
6. ALL CONNECTIONS TO EXISTING DRAINAGE PITS SHALL BE MADE IN A
TRADESMAN-LIKE MANNER AND THE INTERNAL WALL OF THE PIT AT THE POINT
OF ENTRY SHALL BE CEMENT RENDERED TO ENSURE A SMOOTH FINISH.
7. WHERE SUBSOIL DRAINAGE LINES PASS UNDER FLOOR SLABS AND
VEHICULAR PAVEMENTS UNSLOTTED uPVC SEWER GRADE PIPE SHALL BE
USED.
8. PROVIDE 3.0m LENGTH OF 100 DIA. SUBSOIL DRAINAGE PIPE WRAPPED IN
FABRIC SOCK, AT UPSTREAM END OF EACH PIT.(UNO)
9. BEDDING SHALL BE TYPE HI (U.N.O.) IN ACCORDANCE WITH CURRENT
AUSTRALIAN STANDARDS.
10. AT CONNECTION TO PITS, INVERT OF SUBSOIL DRAINS TO BE ABOVE MAIN
STORMWATER PIPE OBVERT.
11. EQUIVALENT STRENGTH PRECAST STORMWATER PITS AND MANHOLES MAY BE
USED.
LINEMARKING
1. ALL LINEMARKING TO BE IN ACCORDANCE WITH AS 1742 PARTS 1 AND 2.
2. ALL INTERNAL CARPARK LINE MARKING SHALL BE 90mm WIDE UNO AND BE
COMPLETED USING WHITE REFLECTORISED PAINT UNO IN ACCORDANCE WITH
AS 1742 AND AS SPECIFIED IN THE ARCHITECTURAL SPECIFICATION.
3. THE INTERNATIONAL SYMBOL OF ACCESS SHALL BE WHITE ON A BLUE
BACKGROUND IN ACCORDANCE WITH AS 1428. THE BLUE SHALL BE B21,
ULTRAMARINE OF AS 2700, OR SIMILAR APPROVED.
EXISTING SERVICES AND FEATURES
1. THE CONTRACTOR SHALL ALLOW FOR THE CAPPING OFF, EXCAVATION AND
REMOVAL IF REQUIRED OF ALL EXISTING SERVICES IN AREAS AFFECTED BY
THE WORKS WITHIN THE CONTRACT AREA, AS SHOWN ON THE DRAWINGS
UNLESS DIRECTED OTHERWISE BY THE SUPERINTENDENT. ALL TO
REGULATORY AUTHORITY STANDARDS AND APPROVAL.
2. THE CONTRACTOR SHALL ENSURE THAT AT ALL TIMES SERVICES TO ALL
BUILDINGS NOT AFFECTED BY THE WORKS ARE NOT DISRUPTED.
3. PRIOR TO COMMENCEMENT OF ANY WORKS THE CONTRACTOR SHALL OBTAIN
THE SUPERINTENDENT'S APPROVAL FOR HIS PROGRAMME FOR THE
RELOCATION/CONSTRUCTION OF TEMPORARY SERVICES.
4. EXISTING BUILDINGS, EXTERNAL STRUCTURES, AND TREES SHOWN ON THESE
DRAWINGS ARE FEATURES EXISTING PRIOR TO ANY SEPARATE AND
PRECEDING DEMOLITION WORKS.
5. CONTRACTOR SHALL CONSTRUCT TEMPORARY SERVICES TO MAINTAIN
EXISTING SUPPLY TO BUILDINGS REMAINING IN OPERATION DURING WORKS
TO THE SATISFACTION AND APPROVAL OF THE SUPERINTENDENT. ONCE
DIVERSION IS COMPLETE AND COMMISSIONED THE CONTRACTOR SHALL
REMOVE ALL SUCH TEMPORARY SERVICES AND MAKE GOOD TO THE
SATISFACTION OF THE SUPERINTENDENT.
6. INTERRUPTION TO SUPPLY OF EXISTING SERVICES SHALL BE DONE SO AS NOT
TO CAUSE ANY INCONVENIENCE TO THE ADJACENT RESIDENCES.
CONTRACTOR TO GAIN APPROVAL OF THE SUPERINTENDENT FOR TIME OF
INTERRUPTION.
EARTHWORKS
1. FOLLOWING DEMOLITION OF EXISTING STRUCTURES, ALL VEGETATION, SOILS
CONTAINING ORGANIC AND DELETERIOUS MATERIAL, CONCRETE SLABS,
CONCRETE BUILDING FOOTINGS AND PAVEMENT AREAS SHALL BE STRIPPED
AND REMOVED FROM SITE.
2. ALL EXISTING TREE STUMPS AND ROOTS SHALL BE GRUBBED OUT TO A
MINIMUM DEPTH OF 750mm.
3. DEPRESSIONS FORMED BY REMOVAL OF UNDERGROUND ELEMENTS AND OR
WEAKENED AREAS SHOULD BE CLEANED OUT AND FILLED WITH COMPACTED
IMPORTED FILL MATERIAL.
4. EXPOSED CONSTRUCTION AREAS SHALL BE PROOF ROLLED USING A VEHICLE
WITH A TARE OF AT LEAST 5 TONNES PER AXLE IN THE PRESENCE OF THE
NOMINATED GEOTECHNICAL TESTING AUTHORITY AND A REPRESENTATIVE OF
OPUS. AREAS DEMONSTRATING EXCESSIVE MOVEMENT SHALL BE TREATED IF
POSSIBLE, OR REMOVED TO COMPETENT MATERIAL AND REPLACED WITH
COMPACTED IMPORTED FILL MATERIAL. CONTRACTOR TO ALLOW A
PROVISIONAL SUM FOR REMOVAL OF UNSUITABLE MATERIAL AND
REPLACEMENT WITH COMPACTED IMPORTED FILL MATERIAL. ALLOW A
PROVISIONAL QUANTITY OF 200m³.
5. ALL SOFT, WET OR UNSUITABLE MATERIAL IS TO BE REMOVED AND REPLACED
WITH APPROVED MATERIAL SATISFYING THE REQUIREMENTS LISTED BELOW
FOR IMPORTED FILL MATERIAL.
6. PLACE IMPORTED FILL MATERIALS SATISFYING THE REQUIREMENTS LISTED
BELOW TO NOMINATED BULK EARTHWORKS LEVELS ON BULK EARTHWORKS
PLAN.
7. ALL IMPORTED FILL MATERIAL SHALL BE FROM A SOURCE APPROVED BY THE
SUPERINTENDENT AND SHALL COMPLY WITH THE FOLLOWING:
a) FREE FROM ORGANIC AND PERISHABLE MATTER
b) MAXIMUM PARTICLE SIZE 100mm
c) PLASTICITY INDEX MAXIMUM 15%
d) LIQUID LIMIT, MAX OF 45%
e) PASSING 19mm SIEVE, MAX 80%
f) MINIMUM CBR 10%
g) SHRINK/SWELL INDEX, MAX OF 1.0%
8. CONTRACTOR TO PROVIDE CERTIFICATION TO SUPERINTENDENT FROM NATA
REGISTERED LAB THAT THE FILL MATERIAL IS FREE OF ACTUAL OR POTENTIAL
ACID SULFATE SOILS AND MEETS CURRENT DPI REGULATIONS FOR THE
CONTROL OF RED IMPORTED FIRE ANTS (RIFA).
9. ALL ENGINEERED FILL MATERIAL SHALL BE PLACED IN MAXIMUM 200mm THICK
LAYERS AND COMPACTED AT OPTIMUM MOISTURE CONTENT (+ OR - 2%) TO
ACHIEVE THE FOLLOWING MINIMUM COMPACTION VALUES:
WHERE THE ABOVE VALUES ARE DETERMINED IN ACCORDANCE WITH AS
1289.5.1.1 (STANDARD COMPACTION) FOR COHESIVE SOILS AND AS 1289.5.6.1
(STANDARD METHOD) FOR COHESIONLESS SOILS.
10. THE CONTRACTOR SHALL PROGRAMME THE EARTHWORKS OPERATION SO
THAT THE WORKING AREAS ARE ADEQUATELY DRAINED DURING THE PERIOD
OF CONSTRUCTION. THE SURFACE SHALL BE GRADED AND SEALED OFF TO
REMOVE DEPRESSIONS, ROLLER MARKS AND SIMILAR WHICH WOULD ALLOW
WATER TO POND AND PENETRATE THE UNDERLYING MATERIAL. ANY DAMAGE
RESULTING FROM THE CONTRACTOR NOT OBSERVING THESE REQUIREMENTS
SHALL BE RECTIFIED BY THE CONTRACTOR AT THEIR COST. CONTRACTOR IS
TO ALSO NOTE THAT THE EXISTING SOILS INCLUDING NATURAL SILTY SAND
AND HIGH PLASTICITY CLAYS ARE LIKELY TO BE SUSCEPTIBLE TO SOFTENING
WHEN WET, TO THE POINT WHERE THE SITE MAY BECOME INTRAFFICABLE.
THE CONTRACTOR IS TO PROVIDE TEMPORARY HAUL ROADS WHERE
NECESSARY TO ALLOW ACCESS TO THE WORKS AREAS.
11. TESTING OF THE SUBGRADE SHALL BE CARRIED OUT IN ACCORDANCE WITH
AS 3798 BY AN APPROVED NATA REGISTERED LABORATORY AT THE
CONTRACTOR'S EXPENSE.
12. ALL BASE AND SUB-BASE MATERIALS SHALL BE PLACED IN MAXIMUM 150mm
THICK LAYERS AND COMPACTED AT OPTIMUM MOISTURE CONTENT OF (+ OR -
2%) TO ACHIEVE A DRY DENSITY IN ACCORDANCE WITH AS 1289.5.2.1 OF NOT
LESS THAN THE FOLLOWING:
13. CONTRACTOR TO ENSURE VIA THE APPROPRIATE SELECTION OF FILL
MATERIAL AND EARTHWORKS THAT, UPON COMPLETION OF THE
EARTHWORKS, THAT THE BUILDING PLATFORM HAS A CLASS 'S'
CLASSIFICATION IN ACCORDANCE WITH AS 2870.
14. ANY SURPLUS EXCAVATED MATERIAL SHALL BE DISPOSED OF OFF SITE AT AN
APPROVED TIP SITE. CONTRACTOR TO ALLOW TO COMPLY WITH CURRENT DPI
REGULATIONS FOR THE CONTROL OF RED IMPORTED FIRE ANTS.
15. ANY CONTAMINATED MATERIAL SHALL BE MANAGED AND DISPOSED OF
ACCORDING TO THE CURRENT LOCAL COUNCIL AND EPA REQUIREMENTS
INCLUDING CERTIFICATION.
16. THE USE OF POTABLE WATER IS NOT PERMITTED IN ACTIVITIES ASSOCIATED
WITH ROAD AND PAVEMENT CONSTRUCTION, THE COMPACTION OF FILL
MATERIAL OR DUST SUPPRESSION CONTRACTOR TO UTILISE RECYCLED OR
SUITABLE NON POTABLE WATER FOR THESE ACTIVITIES WITHIN THE
CONTRACT. USE OF RECYCLED WATER MUST BE IN ACCORDANCE WITH THE
REQUIREMENTS OF COUNCIL.
LOCATION COHESIVE
SOILS
COHESIONLESS
SOILS
BUILDING AREAS
FOUNDATION SUPPORT
FLOOR SLABS
PAVEMENT AREAS
TOP 300mm BELOW SUBGRADE LEVEL
BELOW THE TOP 300mm
LANDSCAPE AREAS
98%
98%
98%
95%
95%
80%
80%
80%
75%
75%
LAYER MODIFIED DRY DENSITY
BASE COURSE
SUB-BASE COURSE
98% MODIFIED (AS 1289.5.2.1)
95% MODIFIED (AS 1289.5.2.1)
ELEMENT COMPRESSIVE STRENGTH
F'c - 28 DAYS (MPa)
SLUMP
(mm)
MAX AGG
SIZE (mm)
ALL KERBS, PITS ETC
FOOTPATH
CARPARK PAVEMENT
OSD TANK BASE AND LID
20
25
32
40
80
80
65
80
20
20
20
20
SYMBOL BAR SHAPE STRENGTH
GRADE
(MPa)
DUCTILITY
CLASS
TO COMPLY
WITH AUST.
STANDARD
N 500 NORMAL AS 4671DEFORMED RIBBED BAR
PLAIN ROUND BAR
DEFORMED BAR
*SEE NOTE
R
Y
250 NORMAL AS 4671
410 NORMAL AS 1302
SYMBOL DENOTES STRENGTH
GRADE
(MPa)
DUCTILITY
CLASS
TO COMPLY
WITH AUST.
STANDARD
RL 500 LOW AS 4671RECTANGULAR MESH OF
DEFORMED RIBBED BARS
SQUARE MESH OF
DEFORMED RIBBED BARS
RECTANGULAR OR
SQUARE MESH OF PLAIN
WIRE
*SEE NOTE
SL
F
500 LOW AS 4671
450 AS 1304
25mm
FABRIC LAP
SW
SW
SW
SW
E
X
5
.
1
0
0
P
5
.
2
5
0
P
5
.
2
5
0
P
5
.
2
5
0
P
5
.
2
5
0
P
5
.
2
5
0
P
5
.
2
5
0
P
5
.
2
5
0
P
4
.
9
1
0
P
5
.
2
0
0
P
5
.
1
8
0
E
X
5
.
0
0
0
E
X
5
.
3
0
0
E
X
5
.
0
6
0
E
X
5
.
1
8
0
E
X
5
.
2
8
0
E
X
4
.
9
8
0
P
5
.
0
2
0
ALFRED STREET
BR
IS
BA
NE
S
TR
EE
T
N1
SW
SW
S
UE
T
W
SD SD
LEGEND
PROPOSED PAVEMENT LEVELP12.50
PROPOSED CONCRETE PAVEMENT. REFER DETAIL ON N-B1123.01-C1401
EXISTING CONTOUR
EXISTING STORMWATER
EXISTING SEWER
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING WATER
12.5
EXISTING LEVELEX12.50
PROPOSED CONTOUR12.5
REFER NOTE 1 FOR DETAILS
PROPOSED ASPHALT PAVEMENT. REFER DETAIL ON N-B1123.01-C1401
NOTES
1. AREAS TO BE LANDSCAPED IN ACCORDANCE WITH THE LANDSCAPE ARCHITECTS PLANS.
2. GRADE LANDSCAPE AREA AT MAX 1V:3H (UNO).
3. GRADE LANDSCAPED AREAS TO DRAIN TO SURFACE INLET PITS.
4. REFER DRAWING N-B1123.01-C0301 FOR SIGNS AND LINEMARKING DETAILS.
5. TRAFFIC MANAGEMENT PLAN TO BE SUBMITTED AND APPROVED BY THE SUPERINTENDENT,
OPUS AND MACKAY REGIONAL COUNCIL PRIOR TO COMMENCING WORK.
6. CONTRACTOR TO COORDINATE STORMWATER WORKS WITH REQUIRED SERVICES, TO
ENSURE CLEARANCE TO MACKAY REGIONAL COUNCIL REQUIRMENTS.
7. CONTRACTOR TO ALLOW FOR ALL REQUIRED SHORING AND PROTECTION WHEN CARRYING
OUT EXCAVATION AND BACKFILLING FOR SPECIFIED STORMWATER PITS.
8. ALL GRATES TO BE BICYCLE SAFE.
9. SAWCUTTING TO BE PERFORMED AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY, TO
PREVENT EXCESSIVE CHIPPING, SPALLING OR TEARING REGARDLESS OF TIME OR WEATHER
CONDITIONS.
10. ANY FORM OF SLAB CRACKING OR RAIN DAMAGE SLABS OR KERBS WILL NOT BE ACCEPTED
AND SHALL BE REMOVED AND REPLACED. REFER SPECIFICATION FOR DETAILS OF SLAB
CURING, SAW CUTTING AND JOINT FINISHING.
11. DO NOT STORE MATERIALS ON NEW PAVEMENTS THAT MAY CAUSE STAINING. DO NOT
TRAFFIC PAVEMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT ALL
PAVEMENTS ARE IN AS NEW CONDITION AT TIME OF HAND OVER.
12. ALL 'SOFCUT' SAWCUTS TO BE CUT TO SPECIFIED DEPTH TO FULL WIDTH OF ALL SLABS.
13. SAWCUT EXISTING CONCRETE PAVEMENT AND MATCH NEW PAVEMENT NEATLY TO EXISTING
PAVEMENT.
14. CONSTRUCT 1.2m WIDE KERB RAMP. MAX GRADE 1:8.
15. REMOVE EXISTING LIGHT POLES.
16. REMOVE EXISTING CROSSOVER AND DRIVEWAY AND RE-INNSTATE THE KERB.
PROPOSED STORMWATER MANHOLE, DRAINAGE PIPE AND SURFACE
INLET PIT
PROPOSED LANDSCAPING. REFER ARCHITECTS DWGS FOR DETAILS
PROPOSED STORMWATER PIPE INFORMATION
PROPOSED STRUCTURE NUMBER AND TOP OF GRATE/LID LEVEL
Ø300 RCP
US IL
DS IL
LENGTH
GRADE
2.500
2.400
1.00
m
%
10.00
MH2/2
SL5.00
PROPOSED SUBSOIL HIGH END RISER, DRAINAGE LINE AND
INTERMEDIATE RISER. REFER DETAILS ON N-B1123.01-C1402
BK
PROPOSED BARRIER KERB. REFER DETAIL SHEET
IJ PROPOSED ISOLATION JOINT. REFER DETAIL SHEET
CJ PROPOSED CONTRACTION JOINT. REFER DETAIL SHEET
FK
PROPOSED FLUSH KERB. REFER DETAIL SHEET
IK
PROPOSED INTEGRAL KERB. REFER DETAIL SHEET
STRUCTURE SCHEDULE
STRUCTURE
TYPE
COVER TYPE
INTERNAL
DIMENSION
STRUCTURE No.
SURFACE INLET CLASS D GALVANISED MILD
STEEL GRATE HINGED TO
FRAME
GP1/1, GP2/1, GP1/2900 x 600
200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date
Drawn Approved Revision DateDesigned
Brisbane Creek St. OfficePO Box 99
+ 61 7 3007 8181
Spring Hill QLD 4004Australia
MACKAY RETAIL EXPANSION85 SYDNEY STREET, MACKAY QLD 4740
SITEWORKS PLAN
BC_N-B1123.01 C1201 AN-B1123.01 1:200 (A1)
PRELIMINARY
RAD JDC 07.07.15RAD
1:200
0 2 4 6 8 10 12 1614 18 20
m
@ A1
@ A31:400
Approved Revision DateRevision Amendment
A PRELIMINARY ISSUE JDC 07.07.15
N
300
300
300
UNDER PAVEMENT PIPE BEDDING
SCALE 1:20
PAVEMENT AS SPECIFIED
COMPACTED BEDDING
MATERIAL (APPROVED
SAND OR SINGLE GRADE
5mm OR 10mm CLEAN
AGGREGATE SCREENINGS)
APPROVED SELECTED FILL
COMPACTED TO 100% S.M.D.D
75 MIN COMPACTED BEDDING
MATERIAL (APPROVED SAND
OR SINGLE GRADE CLEAN
AGGREGATE)
VARIES TO SUIT
PIPE DIAMETER
10
0
MIN
FLEXIBLE ASPHALT CARPARK PAVEMENT
SCALE 1:10
125mm THICK TYPE 2.1 (CBR 80%) BASE
COMPACTED TO 98% M.D.D. (MIN)
125mm THICK TYPE 2.3 (CBR 45%) SUBBASE
COMPACTED TO 95% M.D.D. (MIN)
170mm THICK TYPE 2.5 (CBR 45%) LOWER
COURSE COMPACTED TO 95% M.D.D. (MIN)
30mm THICK AC10 DENSE GRADED
ASPHALT WEARING COURSE
PROPOSED BULK
EARTHWORKS LEVEL
45
035
0
800
350mm SUBGRADE REPLACEMENT COURSE - SELECT FILL
SUBGRADE COMPACTED TO 98%
STANDARD DRY DENSITY
BARRIER KERB (BK)
SCALE 1:10
R20
FLEXIBLE ASPHALT
PAVEMENT AS SPECIFIED
SUBBASE AS SPECIFIED
NOMINAL KERB LINE
(SETOUT REFERENCE)
300
75
MIN
150
MIN
110 40
150
REINFORCED CONCRETE CARPARK PAVEMENT
SCALE 1:10
150mm THICK CONCRETE (25MPa) WITH
SL82 MESH TOP COVER 45mm
SUBGRADE COMPACTED TO 98%
STANDARD DRY DENSITY
100mm THICK TYPE 2.3 (CBR 45%) SUBBASE
COMPACTED TO 98% M.D.D. (MIN)
NOTE: JOINTS TO BE PROVIDED AS SHOWN ON PAVEMENT PLAN.
PROPOSED BULK
EARTHWORKS LEVEL
250
550
800
550mm SUBGRADE REPLACEMENT COURSE - SELECT FILL
FLUSH KERB (FK)
SCALE 1:10
R20
NOMINAL KERB LINE
(SETOUT REFERENCE)
SUBBASE AS SPECIFIED
FLEXIBLE ASPHALT
PAVEMENT AS SPECIFIED
5mm SETDOWN FROM
FINISHED PAVEMENT LEVEL
75
MIN
150
MIN
200
150
CAR BOLLARD
SCALE 1:20
GALVANISED CAP
140Ø OD x 5.4 CHS
GALV. FILL WITH N20
CONCRETE. PAINT
PIPE YELLOW.
N20 CONCRETE
Ø600
10
06
00
10
00
ISOLATION JOINT (IJ)
SCALE 1:10
REINFORCED
CONCRETE PAVEMENT
AS SPECIFIED
SUBBASE AS
SPECIFIED
FABRIC AS SPECIFIED
10mm "ABELFLEX" WITH RIPOFF STRIP,
NO INITIAL SAWCUT REQUIRED
FOR SEALANT DETAILS
REFER DETAIL 'B'
DANLEY SQUARE DOWEL 16mm x 400 LONG
@ 450 CTS WITH 'DOWELMASTER' COVER.
HOT DIPPED GALVANISED PLACE CENTRALLY.
DRILL AND EPOXY INTO EXISTING SLAB
EXISTING
REINFORCED
CONCRETE
PAVEMENT
EXISTING
SUBBASE
1-N12 ALONGSIDE JOINT WIRED TO FABRIC
75 (TYP)
INTEGRAL KERB (IK)
SCALE 1:10
NOMINAL KERB LINE
(SETOUT REFERENCE)
R20
EXISTING CONCRETE
PAVEMENT AS SPECIFIED
REINFORCED CONCRETE
FOOTPATH PAVEMENT
AS SPECIFIED
200mm LONG Ø18 GALVANISED
DOWEL AT 1m SPACINGS.
10mm ABELFLEX OR
SIMILAR APPROVED.
110 40
15
0
CONTRACTION JOINT (CJ)
(POUR OVER)
SCALE 1:10
REINFORCED
CONCRETE PAVEMENT
AS SPECIFIED
SUBBASE AS
SPECIFIED
FABRIC AS SPECIFIED
FOR SEALANT DETAILS
REFER DETAIL 'A'
DANLEY PLATE DOWEL 6mm @
450 CTS. HOT DIPPED GALVANISED
PLACE CENTRALLY
DANLEY DOWEL
CRADLE (TYP)
CUT SHIPMENT BARS
AFTER PLACEMENT
SAWCUT 3mm WIDE WITHIN 4-6 HRS
OF PLACEMENT WITH 'SOFCUT'
REFER CONCRETE PAVEMENT NOTES
75 (TYP)
DETAIL B
-SCALE 1:1
'DOW-CORNING 888'
SILICONE SEALANT TO BE
STRICTLY IN ACCORDANCE
WITH MANUFACTURERS
INSTRUCTIONS. INSTALLED
BY A SPECIALIST
10mm "ABELFLEX"
WITH RIPOFF STRIP
BOND BREAKING STRIP
10
12
DETAIL A
-SCALE 1:1
D* =
PAVEMENT THICKNESS
4
'DOW-CORNING 888'
SILICONE SEALANT TO BE
STRICTLY IN ACCORDANCE
WITH MANUFACTURERS
INSTRUCTIONS. INSTALLED
BY A SPECIALIST
INITIAL 3mm SAWCUT
Ø8 CLOSED CELL EXPANDED
POLYETHYLENE FOAM
BACKING ROD
D*
6
16
6
WHEEL STOP ON AC PAVEMENT
SCALE 1:10
SUBBASE AS SPECIFIED
FLEXIBLE ASPHALT
PAVEMENT AS SPECIFIED
RUBBER WHEEL STOP
Ø20 HOT DIPPED
GALVANIZED SPIKE
300
REFER TO PLAN FOR DISTANCE
TO END OF PARKING BAY
HIGH END RISER
SCALE 1:10
uPVC BOLTED TRAP SCREW
IN CONCRETE SURROUND
Ø100 SUBSOIL PIPE WITH
GEOTECHNICAL SOCK SURROUNDED BY
SINGLE GRADE CLEAN AGGREGATE
(14mm NOM) AND GEOTEXTILE FABRIC
PAVEMENT
AS SPECIFIED
LANDSCAPE FSL
15
0
70
0 N
OM
10
0
INTERMEDIATE RISER
SCALE 1:10
uPVC BOLTED TRAP SCREW
IN CONCRETE SURROUND
PAVEMENT
AS SPECIFIED
LANDSCAPE FSL
FLOW
Ø100 SUBSOIL PIPE WITH
GEOTECHNICAL SOCK SURROUNDED BY
SINGLE GRADE CLEAN AGGREGATE
(14mm NOM) AND GEOTEXTILE FABRIC
15
0
70
0 N
OM
10
0
CONDUIT RISER
SCALE 1:10
PAVEMENT
AS SPECIFIED
45° BEND
uPVC BOLTED TRAP SCREW
IN CONCRETE SURROUND
LANDSCAPE FSL
2
0
0
15
03
00
SURFACE INLET/JUNCTION PIT
SCALE 1:20
FLOW
PROVIDE 3.0m LENGTH OF Ø100
SUBSOIL WRAPPED IN GEOFABRIC
SOCK AT UPSTREAM END OF PIT
SETOUT POINT
60
0 O
R A
S
SP
EC
IF
IE
D
15
01
50
C
-
SUBSOIL DRAINAGE IN
FLEXIBLE PAVEMENT
SCALE 1:10
SUBBASE AS SPECIFIED
GEOTEXTILE
FABRIC SURROUND
SINGLE GRADE CLEAN
AGGREGATE (14mm NOM)
Ø100 SUBSOIL PIPE WITH
GEOTECHNICAL SOCK
LANDSCAPING
BARRIER KERB
FLEXIBLE ASPHALT
PAVEMENT AS SPECIFIED
150
300
30
0 M
IN
70
MIN
PAVEMENT AS
SPECIFIED
SL72 CENTRALLY
LOCATED
900
OR AS SPECIFIED
40
0 L
AP
(T
YP
)
150150
DE
PT
H A
S S
PE
CIF
IE
D1
50
FLOW
MORTAR
BED (TYP)
PROPRIETARY GRATE & FRAME OR
MANHOLE COVER AS SPECIFIED.
REFER STRUCTURE SCHEDULE
SECTION C
-SCALE 1:20
200
100
5010
0mm
300
mm
ScaleProject No. Drawing No. Sheet. No.
Project
Sheet
Revision
Original Sheet Size A1 [841x594] Plot Date
Drawn Approved Revision DateDesigned
Brisbane Creek St. OfficePO Box 99
+ 61 7 3007 8181
Spring Hill QLD 4004Australia
MACKAY RETAIL EXPANSION85 SYDNEY STREET, MACKAY QLD 4740
CIVIL DETAILS
BC_N-B1123.01 C1401 AN-B1123.01 -
PRELIMINARY
RAD JDCRAD
Approved Revision DateRevision Amendment
A PRELIMINARY ISSUE JDC 07.07.15
35
9°5
6'
17
9°5
5'3
0"
134°57'
89°59'
17
9°5
5'3
0"
89°59'
44°5
7'
35
9°5
5'
269°59'
269°59'
35
9°5
5'3
0"
269°59'
35
9°5
6'
269°59'30"
269°59'269°59'
35
9°5
6'3
0"
35
9°5
6'3
0"
89°59'30"
1050
Orig PSM
Kerb Adapter
Sign
Sign
Sign
Guard Rail / Barrier
Guard Rail / Barrier
Guard Rail / BarrierGuard Rail / BarrierGuard Rail / BarrierGuard Rail / Barrier
Guard Rail / BarrierGuard Rail / Barrier
Guard Rail / Barrier
Kerb AdapterSign SignSign
SignKerb Adapter
Sign
Sign
Guard Rail / Barrier
METAL SHED COMMERCIAL BUILDING ANDASSOCIATED SERVICES TO BE DEMOLISHED
AND REMOVED FROM SITE
1 STOREY BRICK COMMERCIALBUILDING AND ASSOCIATED
SERVICES TO BE DEMOLISHEDAND REMOVED FROM SITE
2 STOREY BRICK AND CONCRETECOMMERCIAL BUILDING AND
ASSOCIATED SERVICES TO BEDEMOLISHED AND REMOVED FROM SITE
2 STOREY LIGHTWEIGHTCONSTRUCTION RESIDENCE
AND ASSOCIATED SERVICES TOBE DEMOLISHED AND REMOVED
FROM SITE
NEIGHBOURING PROPERTY
1 STOREY BRICK, COMMERCIAL
STEEL FRAMECARPORT TO BE
DEMOLISHEDAND REMOVED
FROM SITE
ADJACENT PROPERTY
2 STOREY LIGHTWEIG
HT
CONSTRUCTION COMMERCIAL
1 STOREY BRICK RESIDENCE ANDASSOCIATED SERVICES TO BE
DEMOLISHED AND REMOVED FROM SITE
1 STOREY LIGHTWEIGHTSHED TO BE DEMOLISHEDAND REMOVED FROM SITE
1 STOREY BRICK COMMERCIALBUILDING AND ASSOCIATED
SERVICES TO BE DEMOLISHEDAND REMOVED FROM SITE
TIMBER FENCE
CONCRETE PAVINGTO BE REMOVED
FROM SITE
DE
MO
LIS
H M
ET
AL
FE
NC
EA
ND
RE
MO
VE
FR
OM
SIT
E
VERANDAH TO BEDEMOLISHED AND
REMOVED FROM SITE
CONCRETE PATH
TIM
BE
R P
ICK
ET
FE
NC
E
ME
TA
L F
EN
CE
CO
NC
RE
TE
GU
TT
ER
DR
AIN
TO
BE
DE
MO
LIS
HE
D A
ND
RE
MO
VE
D F
RO
M S
ITE
BITUMEN AND GRAVEL ROAD TOBE REMOVED FROM SITE
METAL FENCE
GRAVELTURNINGCIRCLE
ADJACENTPROPERTY STEELFRAME CARPORT
REMOVE HILLSHOIST FROM SITE
CO
NC
RE
TE
DR
IVE
WA
Y T
O B
ER
EM
OV
ED
FR
OM
SIT
E
CANOPY OVERGARAGE ENTRY
CONCRETE PAVING TO BEREMOVED FROM SITE
BRICKPAVING
REFER SURVEY AND C.O.S.FOR EXTENT OF SERVICES TOENTIRE DEMOLITION ZONE
TIM
BE
R F
EN
CE
REFER DRAWING A200 FOR CONTINUATION
ALL TREES SHOWN DASHEDRED TO BE REMOVED FROMSITE, INCLUDING STUMPS
ALL TREES SHOWN DASHEDRED TO BE REMOVED FROMSITE, INCLUDING STUMPS
DEMOLISH LOW BRICK WALLAND REMOVE FROM SITE
DEMOLISH TIMBER FENCEAND REMOVE FROM SITE
CO
NC
RE
TE
GU
TT
ER
DR
AIN
TO
BE
DE
MO
LIS
HE
D A
ND
RE
MO
VE
D F
RO
M S
ITE
BIT
UM
EN
AN
D G
RA
VE
L R
OA
D T
OB
E R
EM
OV
ED
FR
OM
SIT
E
ADJACENTPROPERTY STEELFRAME CARPORT
DE
MO
LIS
H M
ET
AL
FE
NC
EA
ND
RE
MO
VE
FR
OM
SIT
E
DEMOLISH BRICK FENCEAND REMOVE FROM SITE
1 STOREY LIGHTWEIGHTSHED TO BE DEMOLISHEDAND REMOVED FROM SITE
AREAS OF CONCRETE TOBE DEMOLISHED ANDREMOVED FROM SITE
REMOVE HILLSHOIST FROM SITE
DEMOLISH EXISTING KERB
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
ALL LOOSE DEBRI, SCRAPAND RUBBISH TO BE
REMOVED FROM SITE
ALL LOOSE DEBRI, SCRAPAND RUBBISH TO BE
REMOVED FROM SITE
ALL LOOSE DEBRI, SCRAPAND RUBBISH TO BE
REMOVED FROM SITE
ALL LOOSE DEBRI, SCRAPAND RUBBISH TO BE
REMOVED FROM SITE
STORMWATER SERVICESTO BE REVIEWED BYCIVIL ENGINEER
REDUNDANT SERVICESRELATED TO COMMERCIALACTIVITY TO BE DEMOLISHEDAND REMOVED FROM SITE ORTERMINATED AND CAPPED ASAPPROPRIATE.
REFER SURVEY AND C.O.S.FOR EXTENT OF SERVICES TOENTIRE DEMOLITION ZONE
BO
UN
DA
RY
LIN
E
BO
UN
DA
RY
LIN
E
BO
UN
DA
RY
LIN
E
BO
UN
DA
RY
LIN
E
BO
UN
DA
RY
LIN
E
BO
UN
DA
RY
LIN
E
BOUNDARY LINE
BOUNDARY LINE
BOUNDARY LINE
BOUNDARY LINE
BOUNDARY LINE
BOUNDARY LINE
BOUNDARY LINE
BO
UN
DA
RY
LIN
E
DEMOLISH AND REMOVEEXISTING DRIVEWAYCROSSOVER. REFERA305 FOR NEW WORKS
SEWER SERVICES TO BEREVIEWED BY CIVIL ENGINEER
ELECTRIC SERVICES TOBE REVIEWED BYAPPROPRIATEENGINEERS ANDENERGY SUPPLIER SEWER
SERVICES TO BEREVIEWED BYCIVIL ENGINEER
SEWER SERVICES TO BEREVIEWED BY CIVIL ENGINEER
GARDEN BEDS TO BEREMOVED FROM SITE
GARDEN BEDS TO BEREMOVED FROM SITE
ELECTRIC SERVICES TO BEREVIEWED BY APPROPRIATEENGINEERS AND ENERGY SUPPLIER
1.0 The builder / contractor / Sub-contractor shall check and confirm alldimensions and levels on site prior to commencing any works, shopdrawings, fabrication, erection or installation.
2.0 Do not scale drawings. Figured dimensions take precedence.3.0 All dimensions are in millimetres, UNO.4.0 Any discrepancies shall be reported to the superintendent for action
and instruction5.0 This drawing is to be read in conjunction with all current and relevant
drawings, specifications, schedules, reports and contracts.6.0 This drawing and its contents are subject to copyright laws and
protection. Do not reproduce in full or part without prior approval.7.0 Member of the Australian Institute of Architects (AIA)
DRAWING NOTES
job no.
drawing title
project - address
dateno. ISSUE / revision by
drawnscale @ A1
issuedrawing no.
All dimensions in millimetres unless noted otherwise.Do not scale these drawings - Figured dimensions take precedence.This drawing and its contents are subject to copyright laws and protection.Do not reproduce in full or in part without approval. ©Copyright
SYDNEYSYDNEYSYDNEYSYDNEY
i2C.COM.AU
PERTHPERTHPERTHPERTH
MELBOURNEMELBOURNEMELBOURNEMELBOURNE
1800 422 533
client
Climate Zone: 2 Building Class: 6
2/07/2015 9:36:33 AM
P 1
As indicated
V11-043
ADJACENT CARPARK
DEMOLITION PLAN
MACKAY RETAIL EXPANSION85 Sydney Street, Mackay QLD4740
A202
AH
T E N D E R I S S U E
DEMOLITION PLAN - NOTES1.0 EXISTING STRUCTURE(a)Existing structure shown shaded, UNO.(b)Existing structure, materials, surfaces, finishes, equipment, fittings,
fixtures, miscellaneous items to be demolished & removed showndotted & or hatched & noted.
2.0 COMPLIANCE & REFERENCE(a) All Demolition works to be carried out in accordance with: AS 2601 - Demolition of Structures. AS 4687 - Temporary Fencing and Hoarding's. AS 2436 - Guide to Noise Control and Demolition Sites. Architectural, Structural & Services demolition documentation To the satisfaction & approval of all relevant Authorities, Local
Council, Australian Standards and Codes of Practice
3.0 REDUNDANT AND DISCONNECTED SERVICES(a)Redundant and disconnected services to be removed, capped or
terminated as noted & as required, legally, safely & to the satisfactionof the relevant authority or service provider.
(b)This includes, electrical, fire, hydraulics, mechanical, data &communication services, supplies, equipments, meters etc.
(c) Refer also Services documentation for extent, instruction & detailsof works required for water supply, storm water, sewer, electrical,communications & data, greasy waste, incoming, out going &reticulated building services.
4.0 DEMOLISHED AND OR REMOVED ITEMS AND MATERIALS(a)Shall not be incinerated, burned or buried on site under any
circumstances.
5.0 DEMOLITION RECYCLING(a)Where possible & at no additional expense or time delay to the
project & proprietor, the builder / contractor shall endeavor torecycle demolished & removed waste materials & equipmentincluding structural steel, copper, brass, aluminium, stainless steel,electrical cable, scrap steel, concrete, brick or block work, soil,glass, etc to approved recycling facilities.
6.0 DEMOLISHED MATERIALS(a)All materials, equipment, fixtures and fittings become the property
of the demolition contractor, unless noted otherwise.(b)Refer to the Demolition Schedules in the Specification & notes
regarding recovered items, recycling, items or materials to reusedor returned to the building owner.
7.0 TREES , VEGETATION, ROOTS AND STUMPS(a)The Builder, Head-Contractor & Demolition Sub-Contractor shall be responsible for the complete removal of all trees & vegetation
identified for removal inclusive of root system & stumps.8.0 THE BUILDER, HEAD-CONTRACTOR & DEMOLITION
SUB-CONTRACTOR(a)Shall ensure all reasonable & appropriate measures to secure the
building & site during demolition works & provide all protection toadjacent & or adjoining buildings.
(b)Ensure that no undue damage occurs to adjacent & or adjoiningbuildings or property during demolition works & preventdemolished materials encroaching on adjoining propertiesincluding public land, footpaths, roadways & reserves, etc.
(c) Be responsible for all Workcover, OH&S & Safety Issues during thecomplete demolition works & provide all relevant approvals,certificates & Workcover work method statements.
(d)Advise the superintendent of any additional demolition works orworks adversely affected by the demolition works for direction &instruction before proceeding further.
(e)Demolish & or remove all existing structure, materials, surfaces,finishes, equipment, fittings, fixtures, miscellaneous items to bedemolished & removed shown dotted & or hatched & notedaccordingly & transport & dispose or recycle of waste, debris,materials legally & to the satisfaction of all relevant authorities.
(f) Ensure all demolition works take into account & or are carried outwith due consideration of all existing tenants, adjoining & adjacentoccupied premises / businesses. Also any staging & or occupation &continued trading or operation.
(g)Ensure all reasonable care, protection, noise, vibration, disruption,warnings, storage, transportation, safety and security is undertakenduring Demolition works.
(h)Prepare a hazardous Materials and Substance management plan toAS 2601.
(i) Ensure any asbestos, flammable, explosive, toxic, infective, noxious,contaminated,radiation or radioactive materials/waste, sub surfacestanks, containers or storage vessels discovered during Demolitionworks are reported to the Superintendent and are safely removedfrom site, transported and disposed of in accordance with AS 2601.
(j) Advise of any additional temporary support or bracing required, notdocumented & obtain its design & installation from a certifiedprofessional Engineer. Upon completion such support or bracing shallbe completely removed from site.
(k) Advise of any permanent support or bracing required, notdocumented to the superintendent & obtain further instruction
(l) Refer to Hazardous Materials Report or Audit (HAZMAT)(m)Ensure existing items, finishes, materials & structure to remain are
appropriately protected & not disturbed or adversely affected by thedemolition works. If damage occurs rectify without cost to theproprietor or building owner.
(n)Ensure any historical, archaeological, aboriginal or indigenous,artifact or item of significant interest, importance or value arereported to the superintendent.
P 1 02.07.15 PRLIMINARY ISSUE AH
r600
NEIGHBOURING PROPERTY
1 STOREY BRICK, COMMERCIALSTEEL FRAME
CARPORT
NEIGHBOURING PROPERTY
2 STOREY LIGHTWEIG
HT
CONSTRUCTION COMMERCIAL
TIMBER FENCE
TIM
BE
R P
ICK
ET
FE
NC
E
STEEL FRAMECARPORT
BRICKPAVING
REFER SURVEY AND C.O.S.FOR EXTENT OF SERVICES
TIM
BE
R F
EN
CE
REFER DRAWING A301 FOR CONTINUATION
6887
5400
5400
6600
5400
5400
6600
5400
7201 NEW CARPARKS 6600 5400 739
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PR
OP
ER
TY
LIN
EP
RO
PE
RT
Y L
INE
PR
OP
ER
TY
LIN
EP
RO
PE
RT
Y L
INE
PR
OP
ER
TY
LIN
E
6000 NEW CARPARKS 6600
4496 NEW CARPARKS 303
TYPICAL
2600
7
13
9
10
4
4
737
4725
2190 NEW GALVANISED STEEL TROLLEYBAYS. REFER TO COLES STANDARDDRAWING SEC136-2 FOR DETAILS.
NEW GALVANISED STEEL TROLLEYBAYS. REFER TO COLES STANDARDDRAWING SEC136-2 FOR DETAILS.
NEW GALVANISED STEEL TROLLEYBAYS. REFER TO COLES STANDARDDRAWING SEC136-2 FOR DETAILS.
5200
2190
PEDESTRIAN MOVEMENT
NEW KERB. REFER TOCIVIL DOCUMENTATION
PR
OP
ER
TY
LIN
E
VACANT SITE
47 ADDITIONALCARPARKS
NEW CARPARK.REFER ALSO CIVILDOCUMENTATION
S Y
D N
E Y
S
T R
E E
T
B R
I S
B A
N E
S
T R
E E
T
A L F R E D S T R E E T
1.0 The builder / contractor / Sub-contractor shall check and confirm alldimensions and levels on site prior to commencing any works, shopdrawings, fabrication, erection or installation.
2.0 Do not scale drawings. Figured dimensions take precedence.3.0 All dimensions are in millimetres, UNO.4.0 Any discrepancies shall be reported to the superintendent for action
and instruction5.0 This drawing is to be read in conjunction with all current and relevant
drawings, specifications, schedules, reports and contracts.6.0 This drawing and its contents are subject to copyright laws and
protection. Do not reproduce in full or part without prior approval.7.0 Member of the Australian Institute of Architects (AIA)
DRAWING NOTES
job no.
drawing title
project - address
dateno. ISSUE / revision by
drawnscale @ A1
issuedrawing no.
All dimensions in millimetres unless noted otherwise.Do not scale these drawings - Figured dimensions take precedence.This drawing and its contents are subject to copyright laws and protection.Do not reproduce in full or in part without approval. ©Copyright
SYDNEYSYDNEYSYDNEYSYDNEY
i2C.COM.AU
PERTHPERTHPERTHPERTH
MELBOURNEMELBOURNEMELBOURNEMELBOURNE
1800 422 533
client
Climate Zone: 2 Building Class: 6
2/07/2015 9:36:39 AM
P 1
As indicated
V11-043
ADDITIONAL CARPARK PLAN
MACKAY RETAIL EXPANSION85 Sydney Street, Mackay QLD4740
A305
AH
T E N D E R I S S U E
• New carpark surface and substrate to be as per civil engineers details.• New linemarking to be in accordance with relevant australian
standards and applied as per local authorities requirements.• New carpark layout to be comply to relevant bca standards.• Carpark to have advisory statutory vehicle/road/speed signage in
accordance with government authorities. Speed humps to beinstalled especially near ingress/ egress for entry/exit points. Refer totraffic engineers drawings for details.
• Clear ceiling heights to the carpark to be minimum 2100mmmeasured to the underside of the sprinkler heads, light fittings andother services.
CARPARK - NOTES
GENERAL ARCHITECTURAL NOTES1.0 The ARCHITECTURAL DOCUMENTATION includes the following:(a)Architectural Drawings, Construction Schedule, incorporating Trade
Specification, Finishes, Fixture & Fittings & Signage Schedules.2.0 ARCHITECTURAL DOCUMENTATION to be read in conjunction
with:(a)All Project Consultants documentation including:
Structural, Civil, Electrical, Mechanical, Hydraulic, Fire, Heritage, DDA,ESD, Traffic, etc. drawings, specifications, reports & advice.
3.0 TENANT, RETAILER & / OR SUPERMARKET DOCUMENTATION to be referred to includes the following:
(a)Supermarket Kit, Design & Construction Briefs, Control Plans, Decor,Floor Finishes Plans, Internal Elevations & associated Details etc.
4.0 PRECAST CONCRETE(a)Refer to Structural Engineers drawings, details & notes. Read in
conjunction with Architectural drawings. Check, prior to any works onsite.
(b)Precast concrete panel dimensions, levels, details & rebates to be asper approved Precast Concrete Shop Drawings.
5.0 STRUCTURAL STEEL(a)Refer to Structural Engineers drawings, details & notes. Read in
conjunction with Architectural drawings. Check prior to any works onsite.
(b)Member, size, level & detail to be read in conjunction with approvedStructural Steel Shop Drawings.
(c) All exposed structural steelwork to be hot dipped galvanised, UNO.
(d)Any existing buildings, structure or services to be checked & confirmedon site, prior to commencing any new works.
6.0 FIRE HYDRANTS AND FIRE HOSE REELS(a)Provide drip trays below all fire hydrants & fire hose reels within
cupboards or rooms internally, UNO.7.0 FIRE EXTINGUISHERS(a)Provide suitable portable Fire Extinguishers where required adjacent
electrical switchboards, in accordance with BCA / NCC & current /relevant Australian Standards, including AS 1841, AS 1851 & AS 2444.
(b)Fire Extinguishers to be mounted at a height no higher than 1200 to top& no lower than 100 to bottom AFFL.
(c) Fire Extinguishers to be mounted no closer than 2.0M to ElectricalSwitchboards & Distribution Boards & no further than 20.0M
8.0 DRAWING / DOCUMENTATION:(a)This drawing was produced using an Architectural CAD System.
(Revit / ACAD) Do not scale drawings.(b)Figured dimensions take precedence. All dimensions are in
millimetres.(c) This Architectural CAD drawing is not to be manually altered in any
way.(d)Any discrepancies shall be reported to the superintendant/architect for
action & instruction.(e)This drawing & its contents are subject to copyright laws & protection.
Do not reproduce in full or part without prior approval.(f) Member of the Australian Institute of Architects (AIA)
9.0 SUPPLY & INSTALLATION OF ALL MATERIALS & PRODUCTS(a)All materials, products, fixtures, fittings, claddings, linings, equipment
fixings, finishes & miscellaneous items relevant to this project shall besupplied, delivered, stored & installed in full & strict accordance with allmanufacturers details, instructions & recommendations for compliance,performance & to satisfy all applicable conditions for back-up, support& nominated warranties.
P 1 02.07.15 PRLIMINARY ISSUE AH