    SUMMARY REPORT FOR

    Godawari Power & Ispat Limited, Raipur

    PROJECT UDAAN

    By

    Renoir Consulting (India) Pvt Ltd

    Project Team:

    Nilutpol Borah, Operations Manager

    Ajay Vaze, Project Manager

    Aashish Kr. Singh, Sr. Consultant

    Ashish Vashisth, Consultant

    Arpit Banga, Consultant

    Project Start: August 4, 2014

    Project Completion: February 28, 2015

    Duration: 30 weeks

    GPIL, Raipur, Confdential Page 1

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    2/101

    Executive Summary

    Background

    Godawari Power & Ispat Ltd. (GPIL) a public Ltd. Co., formally Ispat Godawari Ltd

    (IGL), a pioneer constituent belonging to HIRA Group of Industries, Raipur, C.G. was

    incorporated in 1999 to set up an integrated steel plant with captive power

    generation.GPIL is a flagship Company of Raipur-based Hira Group of Industries

    having dominant presence in the long product segment of the Steel industry, mainly

    into mild steel wire. Today, GPIL is an end-to-end manufacturer of mild steel wires. In

    the process, the company manufactures sponge iron, billets, Ferro alloys, captive

    power, wires rods (through subsidiary company), steel wires, Oxygen gas, fly ash

    bricks.

    GPIL has come a long way since it started its operation in Raipur, Chhattisgarh as a

    sponge iron manufacturer in the year 2001. Over the last few years, the company

    has scaled up its capacity five-fold and has become one of the largest players in the

    mild steel wires segment. Consistency has been a hallmark of GPILs product and in

    Steel Melting Shop convert the dream into reality by producing one of the finest

    quality of BILEETS in the Industry. This ranges from customized size of 110 x 110

    which confirms to BIS standards 2830 & 2831 to the extended range of 200 x 250

    thereby any size and composition with ease and balance.

    Billets are produced out of pellets based sponge Iron resulting significantly positive

    impact on re-rolling process due to its surface finish and chemical property which

    holds good at testing parameters. It surpasses any criticality and complexity of the

    rolling mills with extended competitive edge in such process integration.

    Billets meant for re-rolling of strips, wire, bar, hexagons and profiles, available in

    variety of sizes.

    In Aug 2014, GPILs management engaged Renoir Consulting for an Operational

    Excellence Programme christenedUdaanwith a focus to improve the output by

    GPIL, Raipur, Confdential Page 2

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    3/101

    improving the efficiency and utilisation. The duration of the project was decided as 30

    calendar weeks to identify opportunities, design the solutions, implement the same

    and ensure sustainability. A taskforce was formed consisting of GPIL employees who

    worked with Renoir Consulting to identify the opportunities and implement the

    solutions concurrently in the three areas namely Process, Maintenance and Quality.

    Department wise MATs were created which were chaired by the MAT chairman. MAT

    members having the desired skills, knowledge and experience were chosen to

    validate the studies and solutions to ensure not only the quality but also the

    acceptability of the solution.

    In SMS MAT, below are some of the issues identified and systems implemented to

    resolve them, so that the department and the company can achieve the desired

    KPIs.

    GPIL, Raipur, Confdential Page 3

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    4/101

    Management

    Action Team

    (MAT) Area

    Key Issues Systems Implemented

    Process

    Process

    Linkage of Monthly

    production plan with

    shift wise schedule

    Daily Production Planning

    Production Deviation report

    KPI Dashboard

    Lack of structured

    review mechanism

    KPI Tree

    KPI Dashboard

    Shift handover

    Daily Review Meeting

    Weekly Review Meeting Monthly Review Meeting

    Comprehensive Production logsheet

    This mentions relevant standards

    which are to be followed such as Tap

    temperature, empty ladle temperature,

    pitside temperature, Monitoring of load

    ramp up

    RACI matrix for all implemented

    systems

    KWH/MT

    Cycle Time

    Key Process

    Parameter variations

    Empty ladle temperature

    Tap temperature

    Pit side temperature

    Purging time

    Temperature at CCM

    Carbon level in bath sample

    Specific solutions themes to control the

    variations (short term and long term)

    Productivity

    Absence of information

    for evaluation of

    Critical Equipment listing

    Bad Actors identification

    Maintenance MIS (frequency, MTTR

    GPIL, Raipur, Confdential Page 4

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    5/101

    Management

    Action Team

    (MAT) Area

    Key Issues Systems Implemented

    Maintenance

    Maintenance

    Maintenance

    Performance

    etc.)

    Reliability Centred Maintenance

    Approach

    Lack of structured

    Maintenance systems

    Breakdown Management System

    PM Schedule

    Equipment History and criticality list

    Shift handover system

    Line Walk

    RCA Policy and RCA (corrective and

    preventive actions

    FGDs (Purchase)

    Lack of Review

    Mechanism

    Daily Review Meeting

    Weekly Review Meetting

    Monthly Review meeting

    Quality

    Non conformance in

    the quality standards

    Sponge pellet requirement Vs

    fulfilment

    Quality checklist in production

    Ineffective Shift

    Handovers

    Shift handover system comprising of

    all departments such as production,

    quality , maintenance, RM, CCM

    RCAs and

    enhancement of

    current systems

    RCA for quality issues

    Macro test

    In order to drive the implementation, weekly MAT meetings and fortnightly Steering

    Committee Meetings were conducted. The purpose of these meetings was to

    eliminate any impediments that the Project Team may face during implementation.

    The actions derived from these meetings were communicated to all concerned and

    GPIL, Raipur, Confdential Page 5

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    6/101

    they were directed to initiate actions, track the same and review periodically for

    achieving the desired benefits.

    Major activities carried out by the Project Udaan team were:

    1.Value Drivers mapping for key performance improvements for each plant

    2.Standard operating procedure prepared and same has been mentioned in the

    production logsheet, which is referred by the melter and shift in charge

    3.Implementation of Reliability Centred Maintenance Approach across all plants

    4.Improved daily review meeting and analysis of issues through root cause

    analysis and implementation of CAPA

    5.Interface improvements between the Power Plant and consumer departments

    for reduction in export of power

    6.Optimum utilization of resources to achieve desired level of targets

    Some of the areas, where the actions need to be fast-tracked are:

    1.Actual weighment of molten metal and charge mix added in each heat

    2.Resolution of issues in Furnace no 06

    3.Resolution of shortage and fluctuation in power supply to SMS

    Having said this, to ensure sustained implementation of above systems, a structured

    three-stage audit mechanism was implemented (Compliance, Understanding and

    Usage). The results are as of week 26

    MAT Compliance (%) Understanding (%) Usage (%)

    SMS 93% 96% 84%

    The below mentioned table enumerates the results that were achieved by the

    Management Action Teams for the period of implementation. The following were the

    results achieved as comparison between Baseline and Actuals:

    GPIL, Raipur, Confdential Page 6

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    7/101

    Target and baseline was revised considering managements decision to run only 3

    furnaces 8-10 till week 26. From week 27 onwards target and baseline were further

    revised considering operation of furnace 6-10 and 3-5(depending on power

    availability)

    Considering Revision 2 : Furnace 8-10 Week 16 to week 26

    Sr.

    No. Description

    Dec13 to

    May14

    (Baseline

    period)

    Improvement

    Target

    (Actuals)

    Annualized benefit

    based on

    comparison with

    Baseline and

    agreed evaluation

    methodology

    1.

    Production -

    Average

    production

    MT / day

    252 290 275 8370

    2. KWH/MT 925.3 87154,29,176 units

    saved

    Conclusion

    The improvement program needs to be continued with full compliance to ensure that

    the benefits are reaped on a sustainable basis. The necessitated major cultural shift

    in the way of functioning of the organization should be sustained.

    The management should drive the initiatives inspite of challenges of this industry

    such as raw material unavailability, consistency of raw material grade, changing

    market conditions (prices, demand) etc.

    GPIL, Raipur, Confdential Page 7

    880

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    8/101

    Standard Operating ProceProduction and Specifc Po!er Conu"ption

    Project UdaanGodawari Power and Ispat Limited

    It is desirable that the management takes decisive actions in a timely manner to

    improve the operations in the plant, as this will go a long way in improving the

    efficiency and utilization of SMS Plant.

    GPIL, Raipur, Confdential Page #

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    9/101

    Godawari Power and Ispat Limited

    Siltara, Raipur

    Project Udaan: Operational Excellence Manual

    Title: Standard Operating Procedure Production and Specific

    Power consumption

    Revision Number: 000

    Issue Date:

    Effective Date:

    This Copy Printed :

    Pages: !Document Reference"#i$e: %tandard &perating Procedures ' Production and %pecific Po(erconsumption

    )ocation:

    Issued by: Contro$$er to be determined by *PI)

    +pproved by: +uditor to be determined by *PI)

    GPIL, Raipur, Confdential Page $

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    10/101

    Master Revision Table

    For ISO 9001 purposes records of previous revisions are to be recorded here. The issuer of

    this document should be contacted for verification of the latest release version. All earlier

    release versions must be destroyed.

    Revision Number: Issue Date: Effective Date: Issued by: +pproved by:

    %ummary of Changes:

    Revision Number: Issue Date: Effective Date: Issued by: +pproved by:

    %ummary of Changes:

    Revision Number: Issue Date: Effective Date: Issued by: +pproved by:

    %ummary of Changes:

    Revision Number: Issue Date: Effective Date: Issued by: +pproved by:

    %ummary of Changes:

    Disclaimer

    This is a reference manual for Production and Management control systems and processes

    designed and installed in Godawari Power and Ispat Limited, Siltara, Raipur.

    These systems have been implemented after discussion and approval from the Steel Melting

    Shop Management Action Team (MAT).

    This document is a ready reckoner for all existing employees and new joinees to get a good

    view of the systems and processes used by Production team.

    GPIL, Raipur, Confdential Page 1%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    11/101

    Table of Contents

    E,ecutive summary-------------------------------../

    ac1ground---------------------------------./

    Conc$usion................................................................................................................ ...

    2aster Revision Tab$e................................................................................................................

    ac1ground...............................................................................................................................

    Pro3ect &b3ectives......................................................................................................................Pro3ect +pproach.......................................................................................................................

    Pro3ect %tructure........................................................................................................................

    #ocus Process...........................................................................................................................

    Design and Deve$opment...........................................................................................................

    %o$ution Deve$opment +pproach............................................................................................

    Imp$ementation and %ustainabi$ity.............................................................................................

    Imp$ementation ' Production and P$anning %ystems.................................................................

    %hift 4andover--------------------------------.5!Dai$y Revie( 2eeting.............................................................................................................

    6ee1$y Revie( 2eeting.........................................................................................................

    Purchase #ocus *roup Discussion........................................................................................

    +nnua$ Preventive 2aintenance Program..............................................................................

    rea1do(n %$ip......................................................................................................................

    rea1do(n 2anagement %ystem...........................................................................................

    )ine 6a$1...............................................................................................................................

    Root Cause +na$ysis..............................................................................................................

    Production Deviation sheet....................................................................................................

    efore casting chec1$ist..........................................................................................................

    Comprehensive Production )ogsheet....................................................................................

    E7uipment Critica$ity Ran1ing................................................................................................

    ua$ity Chec1$ist9ua$ity gate...............................................................................................

    C chec1$ist in production......................................................................................................

    %e7uencing bet(een CC2 and furnace.................................................................................

    %ponge pe$$et and ore re7uirement ;s #u$fi$ment...................................................................

    &perationa$ enefit Trac1er and

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    12/101

    Dai$y caster 2aintenance Chec1$ist----------------------....==

    Process 7ua$ity chec1s----------------------------..=

    Inventory Trac1ing------------------------------..85

    Too$ o, standardi>ation and +udit-----------------------.85

    ad +ctor )ist---------------------------------..8?

    %ustainabi$ity phase...................................................................................................................

    %tep by %tep Instruction-----------------------------.88

    +ppropriate 2anagement sty$e--------------------------.0

    Responsibi$ity and #re7uency--------------------------..0

    GPIL, Raipur, Confdential Page 12

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    13/101

    Background

    In /0!5@ *PI) p$anned to ta1e the ne,t $eap in throughput improvement by imp$ementingrobust systems (ith the he$p of Renoir Consu$ting. Renoir undertoo1 a dip stic1 study toidentify areas of potentia$ improvement. The ma3or areas of opportunity (ere improvement inp$ant uti$i>ation@ efficiency@ and systems for production and p$anning@ maintenance@communication and training.

    Project Objectives

    The main ob3ective (as to faci$itate an increase in production by dep$oyment of 2anagementContro$ %ystems.

    To achieve this@ a pro3ect team (as set up (hich consisted of a Pro3ect 2anager and t(oconsu$tants under the guidance of an &perations 2anager. + separate 2anagement +ctionTeam 92+T for Production and P$anning (as insta$$ed to identify gaps in the Production andP$anning areas and drive systemic changes in this function to improve the Production. The 52+T teams (ere (e$$ supported by A tas1force members (ho (ere pic1ed from therespective sections of *PI). The Pro3ect structure comprised of one 2+T at each forProduction and P$anning@ 2aintenance and Communication and Training. The 2+T (or1(as revie(ed by company $eve$ %teering Committees headed by the 2anaging Director.

    6ithin %2% 2+T the primary ob3ective (as to: Improve Production through Bti$i>ation and Efficiency

    Reduction in the %pecific Po(er consumption

    GPIL, Raipur, Confdential Page 13

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    14/101

    Project Approac

    Carry out series of studies

    Identify the gaps in performance

    uantify main areas of opportunities

    Deve$op detai$ed approach on de$ivering the resu$ts

    Identify resources@ time and cost of moving to pro3ect phase

    %et up 2anagement +ction Team for each function. %e$ect $eader for each function.

    Define ob3ective for each Team.

    Empo(er each 2+T member to $ead an ob3ective

    Define "acceptance of ro$es and responsibi$ities of each member.

    Carry out detai$ed study together (ith company staff members to ensure

    understanding on issues and opportunities of improvements

    Deve$op %o$utions to areas identified during focus process

    Prioriti>e the imp$ementation and ma1e imp$ementation p$an.

    Dry run and (et run of so$utions to be carried out

    Insta$$ so$utions in a$$ the areas

    Provide training to a$$ the emp$oyees (ith regards to the approach of so$utions

    To sustain resu$t@ conduct audit to monitor the comp$iance of ne( system 2onitor the resu$ts to see the benefits accrued

    GPIL, Raipur, Confdential Page 14

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    15/101

    Project Structure

    GPIL, Raipur, Confdential Page 15

    Consu$tant

    +rpit anga

    Pro3ect 2anager: +3ay ;a>e@ &peration 2anager: Ni$utpo$ orah

    2+T Chairman:

    2r. Raveendra

    2+T Chairman:

    2r. .

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    16/101

    Steering !ommittee

    The steering committee comprised of ED 2r. +bhishe1 +gra(a$@ and a$$ 2+Ts Chairman.During the %C2 meeting@ 2+Ts chairman updated the %C2 about the progress of their2+Ts as against the 2anagement +ction P$ans 9as fina$i>ed after the #ocus ProcessT2 .

    Management Action Teams

    The management action teams 92+Ts comprised of a 2+T Chairman 2r. * % ansa$@ ;iceChairman 2r. %an3ay 2undada and ? other team members. The primary ob3ective of the2+T (as to identify the opportunities for improvement@ design so$utions to fi$$ those gaps andimp$ement the same. The ro$e of 2+Ts a$so inc$udes coaching and mentoring the otherconcerned peop$e in the p$ant about ne( insta$$ed systems " processes.

    GPIL, Raipur, Confdential Page 16

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    17/101

    "ocus Process

    During the initia$ phase studies (ere conducted by the pro3ect team and the 2anagement+ction team to identify@ areas for improvement@ ne( systems " processes. 6e first $oo1edinto the capacity uti$i>ation. 6e ca$cu$ated the capacity of the p$ant based on the 7uarti$e ' 5

    methodo$ogy and mapped the production (hich (as achieved by the p$ant. *aps (erecategori>ed under fo$$o(ing categories :

    !. rea1do(n )osses/. %hutdo(n $osses5. Performance $osses

    ;a$ue driver tree (as envisaged to map the 3ourney to financia$ benefit. The root of the treegerminated from profitabi$ity. Three area (ere contemp$ated through (hich (e can attainbenefit as sho(n in the chart be$o( :

    In order to va$idate the gaps or opportunities (e focused on fo$$o(ing parameters:

    GPIL, Raipur, Confdential Page 17

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    18/101

    ! Data analysis (plants capacity utilization, breakup of % downtime loss, %

    performance loss, key process parameters variation analysis)

    2)Observational Studies to map the effectiveness of practices followed in the

    plant3)MCS (Management Control System) to map the effectiveness of managing the

    business by managing the activities, information and people

    4)Issue tree and probable cause analysis

    Breakdo#n $osses

    2aintenance %ystem '

    rea1do(n and shutdo(n $osses (as ana$ysed for the base$ine period and it (as found thatsame constituted to of the idea$ capacity 9ca$cu$ated on the basis of 7uarti$e F5 of theactua$ production

    GPIL, Raipur, Confdential Page 1#

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    19/101

    &

    5%,%%%

    1%%,%%%

    15%,%%%

    2%%,%%%

    25%,%%%

    121,212

    4,386 1,058

    12,$64

    102,805

    SMS Plant - Capacity Utilization - Dec' 13 - May'14

    To find the gap (e mapped the +s Is system of maintenance management as sho(n in thechart given be$o(:

    It can be seen that maintenance system (as very (ea1 and fo$$o(ing opportunities (ereevident:

    !. )ac1 of Preventive maintenancea )ac1 of effective P2 P$anb )ac1 of system for handing over of e7uipment during P2c )ac1 of standard chec1$ist

    GPIL, Raipur, Confdential Page 1$

    Illustrative

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    20/101

    %ame (as va$idated through data ana$ysis and issue tree.

    68% 32% 1%%'

    Baseline - Electrical and Mechanical Breakdown

    Mechanical Electrical

    ISSUE TREE - Electrical Breakdown - Furnaces

    Level 1 Level 2 Level 3 Level 4 Level 5 Level 6

    Electrical

    Breakdown

    in furnaces

    Bus Bar

    cooling

    tube

    leakage

    Sparkin

    g in

    Busbar

    Due to dust

    accumulation on busbar

    Panel is not dust

    proof

    Due to rupture of

    cooling pipe which

    results in leakage of

    water

    Loosing of clamp Poor maintenance

    Wear and tear in

    pipe

    Lack of periodic

    checks

    Loosening of busbar

    bolts

    Due to frequent

    cooling heating of

    busbars

    Lack of periodic

    checks for tightening

    Temperature of busbar

    should be below 65

    degree C.

    DM water inlet

    temperature should

    be less than 32degree

    Cooling tower is not

    efficient, which

    resulted in poor heatexchange and

    higher DM water

    temperature

    Brazing

    opens

    Sparking in busbar Due to dust

    accumulation on

    busbar

    Panel is not dust

    proof

    Due to rupture of

    cooling pipe which

    results in leakage of

    water

    Loosing of clamp Poor

    maintenance

    Wear and tear in

    pipe

    Lack of periodic

    checks

    Increase in busbar

    GPIL, Raipur, Confdential Page 2%

    IllustrativeIllustrative

    E$ectrica$ brea1do(ns constituted A8 (hich is 7uite high. &ver a$$ uptime of furnace(as = .

    Illustrative

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    21/101

    temp. Temperature of

    busbar should be

    below 65 degree C.

    DM water temp inc.

    beyond 38 degree,

    which should be

    below 32 degree.

    Cooling tower is

    not efficient,

    which resulted in

    poor heat

    exchange and

    higher DM water

    temperatureDue to loose nut

    bolts

    Due to frequent

    cooling heating of

    busbars

    Lack of periodic

    checks

    2ain issues (hich resu$ted in e$ectrica$ brea1do(n (ere as fo$$o(ing:

    !. )ac1 of preventive maintenance/. )ac1 of standard chec1$ist5. In effective coo$ing due to inefficient coo$ing to(er

    Per%ormance $oss& Productivity $oss 'Performance $oss (as ana$ysed for the base$ine period and it (as found that sameconstituted to of the idea$ capacity 9ca$cu$ated on the basis of 7uarti$e F5 of the actua$production

    &

    5%,%%%

    1%%,%%%

    15%,%%%

    2%%,%%%

    25%,%%%

    121,212

    4,386 1,058

    12,$64

    102,805

    SMS Plant - Capacity Utilization - Dec' 13 - May'14

    To find out the reason for the gap bet(een capacity and actua$ production (e mappedproduction management system 2C% on a bro(n paper. The 2anagement Contro$ %ystem92C% is a uni7ue 1ind of business management too$. 6hereas a norma$ process mapcata$ogues events in a chrono$ogica$ order and uncovers operationa$ inefficiency@ a 2C%cata$ogues the data f$o( of a$$ the concurrent events and identifies if the appropriateinformation is avai$ab$e to ma1e appropriate and correct business decisions.

    GPIL, Raipur, Confdential Page 21

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    22/101

    It is a t(o a,is diagram@ one a,is being a chrono$ogica$ sca$e of systems e$ements under theco$umn headings of:

    #orecast

    This is forecasting e,penses re$ated to production 9production budget

    P$an

    This invo$ves defining month$y " 7uarter$y e,penses p$an re$ated to production

    Contro$

    Coordination bet(een p$ant head@ shift managers@ production heads and operators

    Report

    o Providing numerous va$uab$e point of information in a structured manner

    o Ro$$ up operationa$ activities through (ee1$y operationa$ and month$y ba$anced

    scorecards

    The other a,is is a fre7uency sca$e of e$ements at (hich the above activities of #orecast@P$an@ Contro$ and Report shou$d be performed. The +s ' Is 2C% for Production andP$anning is depicted be$o(:

    +s ' Is 2anagement Contro$ %ystem

    GPIL, Raipur, Confdential Page 22

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    23/101

    +s Is process (as mapped and criti7uing (as done to find gaps in the present productionsystem.

    #o$$o(ing (ere critica$ points

    !. )ac1 of effective production p$an/. )ac1 of standard parameters5. )ac1 of understanding among (or1men about %&P

    As()s Management !ontrol System !riti*ues !lassi%ication( Steel Melting Sop

    Sr Critique Related to which

    MCS Element?

    Leads to

    (Impact)

    Category Priority for

    Implementat

    Approach

    Just

    Do

    Rea

    Stat

    Sys

    1 Maintenance of caster

    is to be done on daily

    basis and hence

    schedule is needed

    Control Loss in

    productivity

    System High 1

    2 Caster PM checklist to

    be revisited.

    Control Production

    loss due to

    equipment

    unavailability

    System High 1 1

    3 Role of Quality

    department to freeze

    standards and ensure

    compliance.

    Control Rejection,

    increase cycle

    time

    System High 1

    4 There is no system of

    generating Bad Actor

    list

    Report Less

    opportunity to

    review

    breakdown

    reasons

    System Medium 1

    5 Interface with Power

    department for

    availability of power

    Control Production

    loss due to

    unavailability

    of required

    power

    Medium 1

    6 Critical equipment list

    needs be refined

    (basis history of

    breakdowns, MTTR,

    MTBF, PM non

    compliance etc.)

    Plan Ineffective PM,

    repeated

    failures

    System High 1

    7 Yearly shutdown plan

    for caster to be made

    Plan Ineffective PM,

    repeated

    failures

    High 1

    GPIL, Raipur, Confdential Page 23

    Criti7ues c$assification '

    !. %ystem G ?A/. Process G ??5. ehaviour G 8

    Criti7ues formed the base$ine for theformu$ation of the so$utions and fi$$the gap of +s Is 2C%

    Illustrative

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    24/101

    8 Strict supervision

    required at caster and

    furnace to ensure

    adherence to SOPs.

    Control Production

    loss due to

    non

    compliance of

    SOP

    High 1

    9 SOPs to be refined Control Impact on

    effectivenessof jobs

    performed

    Process Medium 1

    ott$enec1 ana$ysis (as done to estimate the capacity of the process

    Through capacity estimation it (as found that furnaces are the bott$enec1 and caster need to

    subordinate furnace.

    GPIL, Raipur, Confdential Page 24

    Illustrative

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    25/101

    #urther to this@ issues pertaining to caster@ (hich resu$ted in tonnage $oss@ (ere ana$ysed.2ain reason for the same (ere as fo$$o(ing:

    !. )oss due to chemistry issue/. )oss due to non F adherence to the standard parameters5. %e7uencing issues

    . )ac1 of short interva$ contro$?. )ac1 of 7ua$ity gate

    Po#er Saving ' +,-&MT

    %pecific po(er consumption (as ana$ysed in the base$ine period and regression ana$ysis(as done to predict the specific po(er consumption at target production. *aps (ereana$ysed (hich cou$d resu$t in reduction in po(er consumption.

    !. Improvement in the productivity of furnace/. &peration of furnace at fu$$ capacity5. +dherence to standard parameters such as Tap temperature@ $ad$e preheat@ $oad

    rampup@

    . &ptimi>ed charge mi,?. %hort Interva$ Contro$A. Effective p$anning=. Revie( mechanism8. Effective se7uencing bet(een furnace and CC2

    Data ana$ysis (as done to va$idate the hypothesis. In data ana$ysis productivity of furnaces(as mapped.

    9 HH ase$ine ' Dec!5 ' 2ay!

    GPIL, Raipur, Confdential Page 25

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    26/101

    Furnace 08 Furnace 09 Furnace100

    2

    4

    6

    8

    10

    12

    14

    16

    11

    12.4 12.512

    15 15

    Productivity - MT/Heat

    Baseline Standard

    MT/heat

    There (as shortage of != in furnace and !0 and 8 in furnace 08. %imi$ar e,ercise (asdone for a$$ furnaces to estimate the potentia$ improvement in the po(er consumption.

    Regression ana$ysis (as done on e,isting

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    27/101

    %o$ution (as designed to strengthen the preventive maintenance system. #o$$o(ing systems(ere insta$$ed :

    !. Preventive maintenance system/. rea1do(n management system5. Root cause ana$ysis and C+P+. E7uipment critica$ity ran1ing?. 2onth$y bad actor $istA. )ine 6a$1

    GPIL, Raipur, Confdential Page 27

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    28/101

    GPIL, Raipur, Confdential Page 2#

    Re$iabi$ity Centred 2aintenance Phi$osophy

    Illustrative

    O/T!OME O/T!OME

    IllustrativeIllustrative

    ase$ine ' Dec!5 ' 2ay!

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    29/101

    .esign and .evelopment

    Project team started to thrash out issues identified during focus process and

    channelize substantial improvement. Steering committee was formed to guide the

    overall implementation plan. A dedicated team, comprising the task force and crossfunctional Management Action Teams', was appointed for the design and

    implementation of systems.

    The MATs started working on design and implementation as per the Management

    Action Plan. Gaps in the MCS were plugged in and new systems mapped to increase

    the effectiveness. Their progress was monitored in the Steering Committee Meeting

    every alternative week. Various systems and process changes were implemented.

    The new systems implemented have been added here as a procedure manual to

    help as future reference or training guide for new employees.

    To be MCS

    Performance )oss '

    %o$ution tree (as envisaged for reduction in the performance and boost productivity of thep$ant. This so$ution tree (as originated from the va$ue drivers

    GPIL, Raipur, Confdential Page 2$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    30/101

    GPIL, Raipur, Confdential Page 3%

    Solution Tree ' Productivity 1 Per%ormance $oss

    Illustrative

    Approac %or )mprovement

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    31/101

    As - I sM a p p i n g

    ( Pro duct io n

    ) C S * + r o ! np a p e r ( P ro c e

    ) a p p i n g*- ig- l e. e l /u+ le. e l

    Oppo r t un i ty

    I d en t i f ca t io n

    ( 0 r e a , 0 c t i. i t1a n a l 1 i ,C r i t 2 u eo n + r o ! n p a p e r) C S

    ( I d e n t i f c a t io n o 34 e 1 c o n t r i + u t o r i n . a r i a n c e 5

    ( ) e a u r i n g 4 e 1p r o c e i n d i c a t o r *S P C

    ( I n t e r . i e ! in g ,+ r a in t o r " in g ,RC 0

    ( P ro c e ) a t u r it 1/ S 1 t e "6 7 e c t i . e n e t u d ie

    To -e!"o l u t i o n# e s i g n i n g

    $( R e f n e 8 9 e . e l

    o p S t a n d a r d / :P I ;

    ( < - i t e Pa p e rP ro duct io n) C S

    ( 9 r1 ru n( 9 e . e l o p

    =er" o 3Re 3e rence ,a g e n d a e t c 5

    3 o r re. ie!" e e t i n g

    I m p l em e nta t i on

    ( R u n t ra i ni n g

    ! o r 4 - o p ( In ta l l a t i o no 3 ) C S a n dre. i edp r o c e e

    ( I" p le " e n ta n d c a c a d ein i t ia t i.e

    ( P r o d u c t i o nr e . i e !" e e t i n g

    ( Re. i eS O P ; , S = S

    " y s t emAud i t

    ( S 1 te " a n de 7 e c t i . e" e e t i n ga ud i t

    inc lud ingn o n &c o " p l i a n c erepo r t ing

    ( 0na l1 i o 3a ud i t co re

    )mplementation Pase

    KPI based operational scorecard for each MAT will ensure continuous improvement

    in operational Performance for the entire business.

    Standard Operating Procedures (SOPs) detailing new systems and streamlined

    processes are handed over to respective process owners to ensure sustainability.

    The audit system procedure has been developed to ensure the system elements.

    GPIL, Raipur, Confdential Page 31

    Illustrative

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    32/101

    GPIL, Raipur, Confdential Page 32

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    33/101

    Standard Operating Procedures Process, Maintenance and Quality

    Shift Handover Report

    Objective

    Ste"atic -ando.er o !or reponi+ilit +et!een t!o -it in c-argeto enure proper coordination +et!een inco"ing and outgoing -it inc-arge

    Responsibility

    Annotated "ormat RA!) ' Si%t -andover

    Frequency

    Every Shift changeover

    Procedure

    Below is the diagrammatic representation of shift handover process

    GPIL, Raipur, Confdential Page 33

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    34/101

    Annotated Process "lo# ' Si%t -andover Report

    Shift Handover Report (Format)

    Common Shift Handover has been implemented in SMS, wherein shift in charge ofproduction, maintenance, CCM, quality and RM will meet and carry out handover take over

    process

    Shift Handover Report

    GPIL, Raipur, Confdential Page 34

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    35/101

    Shift Details:

    A. Mention Plan vs Actual Production and actual KWH/MT

    B. Mention % scrap added

    C. Mention % PI added

    D. Any deviation in carbon bath sample and corrective action taken

    E. Any major issues in the shift pertaining to furnace, CCM or safety

    F. PM done or to be done in next shift

    G. Signature of incoming Shift in charge

    H. Any critical observation related to quality, Raw material or communication to incoming

    shift in charge

    I. Any breakdown or breakout issues in CCM and corrective action taken

    J. Status of daily PM of CCM

    K. Signature of Out going Shift in charge

    GPIL, Raipur, Confdential Page 35

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    36/101

    Implementation Production and Planning Systems

    Daily Review Meeting

    Objective

    Proper co-ordination between individual department (Mechanical, Electrical, Process, &

    Quality), Improve Productivity, Establish Standards, Reducing Shutdown and breakdown, &

    Improving Yield

    Responsibility

    RACI

    Annotated Format RACI Review Meeting

    Frequency

    Every Day

    Procedure

    Explanation and Information flow. Kind of a process flow diagram.

    GPIL, Raipur, Confdential Page 36

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    37/101

    HOD Operation

    GPIL, Raipur, Confdential Page 37

    4&D F %2%

    ua$ity2aintenanceE$ectrica$&peration4ead

    Corrective+ction+ction )ogPreparation of+ction )og

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    38/101

    Annotated Process Flow Daily Review Meeting

    Annotated Terms of Reference Daily Review Meeting

    Terms of Reference

    Daily Production and Maintenance Review Meeting SMS

    Time: 11:00 AM to 11:30 AM

    Duration: 30 minutes

    Location: Office of Sr. Vice President

    Frequency: Daily

    Objective:

    Improve Productivity

    Reduce Shutdown and breakdown

    Reduce Power consumption per Metric Ton

    Improve Quality

    Attendees:

    Operations Head Furnace

    GPIL, Raipur, Confdential Page 3#

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    39/101

    Operations Head - Caster

    Electrical Maintenance Head

    Mechanical Maintenance Head

    Manager and Deputy Manager - Production

    Quality Head

    Agenda:

    Review of previous action logs and taking corrective action for deviations

    Plan Vs actual Production and Productivity

    Raw material consumption for charge Mix

    Power consumption per Ton

    Daily production and plan

    Allotment of RCA for major loss, breakdown and quality deviation

    PM plan Vs Actual

    Availability of raw material

    Releasing equipments for PM

    Specific consumption

    Inputs:

    Production Plan Compliance

    Production Deviation Report

    Charge Mix Report

    Quality Checklist Report

    Down Time Reports

    Daily Raw Material Report

    Breakdown management system

    RCA Policy

    PM Plan

    Outputs:

    Action Log

    GPIL, Raipur, Confdential Page 3$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    40/101

    Terms of Reference

    Weekly Production and Maintenance Review Meeting SMS

    Time: 3:00 PM to 4:00 PM

    Duration: 1 Hour

    Location: Office of Sr. Vice President

    Frequency: Weekly

    Objective:

    Improve Productivity

    Reduce Shutdown and breakdown

    Reduce Power consumption per Metric Ton

    Improve Quality

    Attendees:

    Operations Head Furnace

    Operations Head - Caster

    Electrical Maintenance Head

    Mechanical Maintenance Head

    Manager and Deputy Manager - Production

    Quality Head

    Agenda:

    Review of previous action logs

    Plan Vs actual Production and Productivity. Corrective action for any deviation

    Raw material consumption for charge Mix

    Power consumption per Ton

    Daily production and plan

    Allotment of RCA for major loss, breakdown and quality deviation

    PM plan Vs Actual

    Availability of raw material

    GPIL, Raipur, Confdential Page 4%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    41/101

    Breakdown and uptime of equipments

    Conversion cost, Actual Vs Plan

    Inputs:

    Production Plan Compliance

    Production Deviation Report

    Charge Mix Report

    Quality Checklist Report

    Down Time Reports

    Daily Raw Material Report

    Breakdown management system

    RCA Policy

    PM Plan

    Outputs:

    Action Log

    Terms of Reference

    Monthly Production and Maintenance Review Meeting SMS

    Time: 3:00 PM to 4:00 PM

    Duration: 1 hour

    Location: Office of Sr. Vice President

    Frequency: Monthly

    Objective:

    Improve Productivity

    Reduce Shutdown and breakdown

    Improve Power consumption per Metric Ton

    GPIL, Raipur, Confdential Page 41

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    42/101

    Improve Quality

    Attendees:

    Operations Head Furnace

    Operations Head - Caster

    Electrical Maintenance Head

    Mechanical Maintenance Head

    Manager and Deputy Manager - Production

    Quality Head

    Agenda:

    Review of previous action logs

    Plan Vs actual Production and Productivity Raw material consumption for charge Mix

    Power consumption per Ton

    Monthly PM compliance and plan for next month

    Breakdown review, RCA and CAPA status

    Monthly breakdown management system and Bad actor list

    Availability of raw material

    Safety Review - CAPA on near miss and incident

    Quality deviations

    Udaan system compliance

    Conversion cost

    Inputs:

    Production Plan Compliance

    Production Deviation Report

    Charge Mix Report

    Quality Checklist Report

    Down Time Reports

    Daily Raw Material Report Breakdown management system

    RCA Policy

    PM Plan

    Outputs:

    Action Log

    Annotated Process Flow Daily Review Meeting

    GPIL, Raipur, Confdential Page 42

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    43/101

    Purchase Focus Group Discussion

    Objective:

    Proper co-ordination of Purchase Department & SMS Department to ensure that the critical

    spares and production consumables are available in time. Discussions between Purchase

    and SMS Department also ensures that the other issues are surfaced and thereby resolved.

    It also ensures that the SMS team plans for the spares in a proper timely and a phased

    manner.

    Responsibility:

    Representatives from SMS Team and Purchase Team

    Terms of Reference

    Purchase Focus Group Discussion SMS

    Terms of Reference

    Time: 03:00 PM to 03:30 PM

    Day: Saturday

    Duration: 30 minutes

    Location: Office of Sr. Vice President

    Frequency: Weekly

    Objective:

    Streamline Purchase activities

    Reduce instances of material stock out situation

    Reduce slow moving inventory

    Improve Quality of material purchased

    Attendees:

    Operations Head Furnace

    Operations Head - Caster

    Electrical Maintenance Head Mechanical Maintenance Head

    GPIL, Raipur, Confdential Page 43

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    44/101

    Manager and Deputy Manager - Production

    Quality Head

    Purchase Manager

    Purchase - HOD

    Agenda:

    Review of previous action logs

    Review status of open POs and PRs

    Review vendor performance

    Concern pertaining to quality of material

    Inputs:

    Details of POs and PRs

    Material quality report

    Vendor list

    Outputs:

    Action Log

    Annotated Terms of Reference Weekly Purchase meeting

    Frequency:

    Weekly once

    Procedure:

    GPIL, Raipur, Confdential Page 44

    %2%Chairman

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    45/101

    Annotated Process Flow Production Loss Book

    Annual Preventive Maintenance Program Review

    It is a tool to assess the adequacy of existing maintenance program, incorporate new

    machines and lesson learnt,

    Objective:

    To optimize the maintenance program with available resource and downtime target.

    Responsibility:

    GPIL, Raipur, Confdential Page 45

    #o$$o( up ofcritica$ items

    +ction )ogPreparation of+ction )og

    "pares

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    46/101

    Annotated Format RACI - Preventive Maintenance Program Review

    Frequency:

    Preventive maintenance program is reviewed every year in the month of March

    Procedure:

    Annotated process flow: Procedure for Preventive Maintenance Program Review

    GPIL, Raipur, Confdential Page 46

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    47/101

    An annotated format for equipment criticality ranking is outlined below

    A.Enter the serial number

    B.Enter the name of the equipment e. g. Furnace 15 T, 5.5 MW

    GPIL, Raipur, Confdential Page 47

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    48/101

    C.Enter the weighted average score from the equipment criticality ranking review

    D.Write whether PM exists, Yes/No

    E.Write PM frequency in months

    F.State whether we have checklist for PM, Yes/No

    G.State whether we are doing maintenance as per checklist, Yes/No

    H.State whether we are doing maintenance as per checklist, Yes/No

    I. Remarks, if any

    J.List down the actions identified to close the gaps

    K.Name of the person who is responsible to close the actions

    L.Date by which actions should be completed. This date must be agreed with the person

    responsible

    Annual Preventive Maintenance Schedule

    A structured approach to prepare and track the preventive maintenance of each equipment.Objective:

    To ensure timely completion of planned maintenance

    This also serves as master list of equipment under maintenance

    This also gives the visibility of maintenance due in future so that advance planning and

    preparation can be done to execute the due maintenance jobs on time

    Responsibility:

    Annotated Format RACI - Preventive Maintenance Schedule

    Frequency:

    Daily, Weekly, Monthly, Quarterly and yearly

    GPIL, Raipur, Confdential Page 4#

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    49/101

    Procedure:

    Annotated process flow : Procedure for Preventive Maintenance Schedule

    GPIL, Raipur, Confdential Page 4$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    50/101

    Standard Checklists

    GPIL, Raipur, Confdential Page 5%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    51/101

    GPIL, Raipur, Confdential Page 51

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    52/101

    Breakdown Slip

    Objective:

    1.This is the first document generated for any breakdown observed in operation. It will

    initiate the corrective action from maintenance/operation department to rectify the

    problem at the earliest.

    2.The work against breakdown slip will be carried out by technician or can be outsourced

    to the contractor. The data in the breakdown slip will form the primary information for

    breakdown management system. This document registers and communicates

    breakdowns occurring in machines.

    Frequency: Annotated Format RACI Breakdown slip

    As and when the breakdown happens

    Procedure:

    1.Breakdown of the equipment occurs on site

    2.Once the breakdown occurs, shift engineer (operations) informs the shift engineer

    (mechanical and electrical maintenance)

    3.He fills the relevant entries in the breakdown slip (before attending the breakdown)

    such as breakdown start time, machine on which the breakdown has occurred and

    problem description, section, date, shift etc.

    4.The maintenance team arrives at the site and discuss regarding the issue

    5.Details during the breakdown are written in the slip by the maintenance team (job

    start time, response time, root cause for breakdown etc.)

    GPIL, Raipur, Confdential Page 52

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    53/101

    6.Repair or replacement job is complete and plant starts

    7.Operation & responsible department having breakdown meets and fills the remaining

    details of the breakdown slip (after attending the breakdown) such as job end time,

    equipment handover condition etc.

    8.Respective section heads (operations and maintenance) review and sign thebreakdown slip

    9.Breakdown slip is sent to the IT person and details are entered in Breakdown register

    GPIL, Raipur, Confdential Page 53

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    54/101

    Annotated Process Flow Breakdown Slip

    Breakdown Slip (Format)

    GPIL, Raipur, Confdential Page 54

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    55/101

    0

    >

    C

    9

    ?

    Annotated Format Breakdown

    Slip

    A.Basic Details: Mention the basic details such as section, date, shift

    B.Before attending the breakdown: Mention the details such as breakdown start time,machine on which breakdown has occurred, problem description

    C.During Breakdown: Mention the activities done during the process of resolving the

    breakdown (job start time, response time, reason for delays, team attending the

    breakdown, root cause of the breakdown)

    D.After attending the breakdown: Mention the details of activities post repair or replacement

    by the maintenance team (job end time, equipment handover condition, details of the job

    done on the equipment, spares used.

    E.Remarks: Enter remarks, if any

    F.Signoff: Sign-off by the staff and section heads (maintenance and operations team)

    Breakdown Management System

    Objective:

    1.Enter the details of the breakdown slip in soft form. Conduct analysis of the data

    weekly and monthly and send across to the concerned stakeholders for review and

    action

    2.Review frequency of equipments, mean time taken to repair, cases of feed loss

    3.To provide relevant information related to bad actors so that the list can be looked into

    and revised, if needed

    GPIL, Raipur, Confdential Page 55

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    56/101

    0 > C 9

    Responsibility:

    Procedure

    Breakdown Management System (Format):

    Annotated Format Breakdown Management System

    A.Basic Details: Mention the basic details such as section, date, shift, slip no

    GPIL, Raipur, Confdential Page 56

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    57/101

    B.Before attending the breakdown: Mention the details such as breakdown start time,

    machine on which breakdown has occurred, problem description, breakdown category

    C.During Breakdown: Mention the activities done during the process of resolving the

    breakdown (job start time, response time, reason for delays, team attending the

    breakdown, root cause of the breakdown)D.After attending the breakdown: Mention the details of activities post repair or replacement

    by the maintenance team (job end time, equipment handover condition, details of the job

    done on the equipment, spares used.

    E.Remarks: Enter remarks, if any

    1.Production shift in charge will call maintenance staff to attend the breakdown

    2.Maintenance staff will assess the situation and inform the production shift in charge

    about the expected time to repair the machinery

    3.In case repair time is more than 15 minutes, production personnel will raisebreakdown slip

    4.On repair maintenance staff will fill the necessary details on the breakdown slip

    5.Production personnel verify the repair work and acknowledge same by counter

    signing on the slip

    6.Manager Maintenance will review the slip on the next day

    7.Manager Maintenance captures the details from slip to excel sheet.

    8.Manager maintenance to carry out analysis of MTTR, % uptime from the excel sheet

    9.In case breakdown does not lead to production loss or equipment belongs to utility,

    maintenance personnel will raise and close the breakdown ensuring all details are

    captured in the slip.

    Explanation and Information flow. Kind of a process flow diagram.

    GPIL, Raipur, Confdential Page 57

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    58/101

    GPIL, Raipur, Confdential Page 5#%eport analysed

    & correctiveaction to 'e

    Analysis o) MTT% &MT*+ , Uptime

    done 'y -ngineer

    .O# %eview & doanalysis

    rea(down slipentered in P/

    /losing'rea(down sli

    Jes

    No

    %aise t0e'rea(down in

    t0e slip

    %esolving

    rea(down

    Production shiftin charge

    %aise t0e'rea(down in t0e

    sli

    Is brea1do(n resu$ted inproduction $oss

    2aintenanceshift in charge

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    59/101

    GPIL, Raipur, Confdential Page 5$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    60/101

    Below is sample analysis

    1$5

    12%

    7%

    6%

    Breakdown(Min.) - Crane 06

    CT Motor Fault CT Power contactor issue Magnet cable cut

    LT Wheel problem

    %1%%2%%3%%4%%5%%6%%7%%#%%$%%

    %'

    2%'

    4%'

    6%'

    #%'

    1%%'

    12%'#5% #35

    47536%

    22% 2%5 17%7%27'

    53'6#'

    7$'

    Breakdown Analysis - Dec'14

    > rea do! n t i" e* )in, '

    )in

    675

    1154%2%

    Breakdown (Min.) - Furnace 10

    >u +ar pared SCR ?ault

    Po!er ca+le leaage Sparing

    7%5

    5545 3%

    Breakdown(Min.) - Crane 05

    Load gear shaft damaged Contactor broken Magnet cable cut Master controler lock broken

    GPIL, Raipur, Confdential Page 6%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    61/101

    Line Walk

    Objective:

    1.Line walk is a systematic way to identify abnormalities through observations (LLF: Look,

    Listen, Feel) through a daily walk in the plant area. First-hand information/observation

    provides great insights into the current state of various equipment and the plant

    environment.

    2.This system can potentially improve the plant reliability as it reduces the forced

    deterioration of the equipments which are major causes of failures. The abnormalities

    found can be rectified immediately by the observer or can be forwarded to maintenance

    planner for further planning.

    3.Line walk summary sheet is used to register observations during a line walk on the shop

    floor. Line walk sheet is divided into CBM (Condition based maintenance), 5S and Safety

    NMS.

    Responsibility:

    Frequency:

    As per the line walk schedule

    Procedure:

    Below is the diagrammatic representation of Line Walk system and how it is followed:

    GPIL, Raipur, Confdential Page 61

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    62/101

    Annotated Process Flow Line Walk

    Line Walk: Format

    Below is the line walk format and its description

    GPIL, Raipur, Confdential Page 62

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    63/101

    A.Basic Details: Mention the basic details such as line walker name, date and designation

    B.Department and Section: Mention the department name and section

    C.Equipment Name: Please mention the equipment name on which line walk was doneD.Code: It is essentially the category code (under which category it lies) such as 5S, safety,

    condition based monitoring, spillages/leakages etc.

    E.Observations: Mention the observation of the line walker

    F.Priority Level: Please mention the priority level (low/medium/high)

    G.Actions Required: Mention the desired actions that need to be taken

    H.Responsibility: Person responsible for taking the action

    I. Target Date: Target date by when the action needs to be completed

    J.Status: Updated status of the activity (delayed, in progress, completed, to be taken in

    shutdown)

    Root Cause Analysis

    Objective:

    1.The purpose of Why Why Analysis/ (Root Cause Analysis) (RCA) is to identify reasons

    why reactive maintenance is occurring and to instigate appropriate steps to eliminate the

    root causes. The fundamental message is that: If a business does not have a Root

    GPIL, Raipur, Confdential Page 63

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    64/101

    Cause Analysis (RCA) methodology, the business will remain in a fire fighting (reactive)

    mode.

    2.This will be conducted as a tool to arrive at a root cause in a cross functional

    (Maintenance and Production) manner as and when a breakdown occurs. The action

    plan will be made for correcting the problem identified which will have both a short term

    and a long term plan. The action plan will be reviewed in the weekly meeting for

    correctness and horizontal deployment.

    Responsibility:

    Below is the snapshot of RCA policy which should be followed for conducting a RCA. It gives

    the information on the team representation for RCA, criteria for conducting the RCA, owner

    of the RCA, lead time in hrs for first draft of RCA preparation

    Frequency:

    As per the RCA policy

    Procedure:

    Below is the diagrammatic representation of the process flow for carrying out a RCA.

    GPIL, Raipur, Confdential Page 64

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    65/101

    RCA Template (Format):

    Below is the format for the RCA (root cause analysis)

    GPIL, Raipur, Confdential Page 65

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    66/101

    A.Problem Statement: Mention the problem statement on which RCA needs to be done.

    B.1stWhy: Mention the first element of the root cause which could have led to the problem.

    C.2ndWhy: Mention the second element (2

    ndwhy) that led to occurrence of 1

    stWhy.

    D.3rdWhy: Mention the third element (3

    rdwhy) that led to the occurrence of 2

    ndWhy. Follow

    the steps along with findings/data to eliminate the probable causes and arrive at a rootcause

    GPIL, Raipur, Confdential Page 66

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    67/101

    E.Actions taken / identified: Actions taken in the form of corrective and preventive actions.

    While mentioning the CAPA, please make sure that the expected date of completion for

    corrective and preventive action is mentioned

    F.Members name: Mention the name of the members doing the RCA and sign off

    Production Deviation sheet

    It is a tool to capture actual production and highlight deviation against the target. Further to

    this, losses are categorized under various heads such as production loss, loss due to power

    shortage, loss due to breakdown loss.

    Objective:

    Tool to provide details of deviation against target production and category of losses

    Responsibility:

    Annotated Format RACI Production Deviation sheet

    Frequency:

    Daily

    Procedure:

    GPIL, Raipur, Confdential Page 67

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    68/101

    Format 1: Procedure for completing the document

    An annotated format for Production deviation sheet is outlined below

    GPIL, Raipur, Confdential Page 6#

    MIS Manager will

    collect documents

    such as production

    logsheet,

    MIS Manager

    enters the

    details in the

    HODs

    review for

    corrective

    PRODUCTION DEVIATION SHEET

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    69/101

    A : Mention plan for power availability

    B: Mention actual Heat achieved, total production of furnace 1-10, total power consumption

    by furnace only and specific power consumption without auxiliary

    C: Mention actual power consumed, Power export and specific power consumption with

    auxiliary. Particular cell will be highlighted red if SPC is greater than target value and green if

    SPC is lesser than target value

    D: Mention following details for furnace 6 -10

    i) Target productionii) Target KWH/MT

    iii) Target heat

    iv) Actual heat achieved

    v) Actual production

    vi) Actual Power consumed

    vii) Actual KWH/MT

    E: Mention Losses such as loss due to furnace /crane breakdown, loss due to CCM. Loss

    due to shortage of power and hidden loss will be calculated on its own

    F: Mention charge mix i.e. Scrap and PI

    GPIL, Raipur, Confdential Page 6$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    70/101

    G: Mention chemistry of ore, pellet and Mix

    H: Mention monthly PM of furnace and cranes

    Before casting checklist

    Objective

    To standardi>e the chec1s done before carrying out casting on CC2. +$so this (ou$d ensurethat a$$ CC2 is in desired condition to carry out casting of one campaign (ithout any issue

    Responsibility

    As per RACI

    Frequency

    Before casting

    Checklist

    GPIL, Raipur, Confdential Page 7%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    71/101

    Implementation Production and Planning Systems

    Comprehensive Production Log sheet

    Objective

    To provide standard values of parameters required to be followed in a recipe for producing

    molten metal

    To capture actual parameters and charge mix added in the recipe

    Responsibility

    GPIL, Raipur, Confdential Page 71

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    72/101

    RACI

    Annotated Format RACI Production log sheet

    Frequency

    Every Day

    Procedure

    Production log sheet has standard values of the parameters, which are must to be followed

    during melting process.

    GPIL, Raipur, Confdential Page 72

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    73/101

    ** Post installation of liquid metal weight measurement system, actual figure of

    production per heat to be noted in the log sheet.

    Melter will refer to these values while preparing recipe in a furnace.

    A: Mention the plan for number of heat, production, PI and scrap

    B: Mention pan for Simn, KWH/MT, coke and ladle preheat temperature

    C: Mention standard value of furnace temperature, Pit side temperature of transfer ladle

    and slide gate ladle, CCM temperature

    D: Mention furnace life and its condition

    E: Mention start and end time of heat

    F: Mention actual consumption of scrap and PI

    G: Mention actual temperature of empty ladle, furnace temperature and filled ladle

    temperature

    H: Mention actual value of frequency and voltage

    I: Mention load ramp up values at 30 minutes, 1.5 hours and 2.5 hours

    J: Mention production data. After installation of molten metal weighing system actualvalue of production to be mentioned

    K: Mention actual KWH and KWH/MT

    L: Name and signature of shift manager

    M: Signature of melter and in remark column any special communication which led to

    deviation from standard values

    Steps to be followed:

    GPIL, Raipur, Confdential Page 73

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    74/101

    1.Melter will charge scrap into furnace as per the plan mentioned in the log sheet.

    Melter will also mention whether he has used charge basket for charging. Melter will

    also mention the start time of the furnace

    2.Melter then add PI and DRI as per the plan given by the production planner

    3.Melter then follow the process of adding DRI and remove slag subsequently.4.Melter will write power ramp up value of furnace at 30 minutes and he will repeat

    same exercise after 1.5 hour and 2.5 hour.

    5.Melter will provide details of furnace frequency, voltage in the log sheet

    6.Melter will also mention amount of SiMn added in the recipe. For this he will refer to

    the standard value given at the top of the log sheet. For any deviation he will consult

    shift in charge and mention in remark column

    7.Melter then mention empty ladle temperature taken through temperature gun and

    ensure same is as per the standard value mentioned in the log sheet.

    8.Melter will then take the furnace temperature and if same is in the standard range, he

    will tap it into the ladle

    9.Melter will then monitor fill ladle temperature (pit side) and same must adhere to the

    standard. In case of any issue with the temperature he will consult shift supervisor

    and CCM in charge and take necessary action and mention same in the remark

    column.

    10.At the end he will mention end time of the process and production as per reading

    shown by load cell in the crane and mention unit of power consumed.

    11.Melter then signs against his column.

    Later in a shift, shift supervisor and manager will check the log sheet for any deviation.

    Necessary action to correct issues like high KWH/MT, cycle time, Si-Mn, load ramp up will betaken and they signed against their name.

    Same process to be followed in the next shift.

    Next day Production AGM and GM production will analyse the sheet for any deviation

    against the target and initiate corrective and preventive action.

    Equipment Criticality Ranking

    Objective:

    1.To rank the equipments in order of the criticality.

    2.Based on the criticality of the equipments, maintenance planning (PM, line walk) can be

    modified to suit the equipments (highly critical to be given more importance and

    attention)

    3.Also, based on the criticality, critical spares can be identified and min-max levels along

    with consumption planning can be done accordingly.

    Responsibility:

    GPIL, Raipur, Confdential Page 74

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    75/101

    Below is the RACI for preparation and review of Equipment Criticality Ranking

    Annotated Format RACI Equipment Criticality List

    Frequency:

    Prepared once and reviewed yearly or in case of installation of new equipment

    Procedure:

    GPIL, Raipur, Confdential Page 75

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    76/101

    Equipment Criticality Ranking (Template):

    Below is the sample snapshot for equipment criticality ranking sheet

    GPIL, Raipur, Confdential Page 76

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    77/101

    ** All pressure and temperature gauges to be calibrated once in a year or on need basis.

    However critical gauges to be calibrated once in six month

    A.Plant: Plant in which these equipments and sub-equipment are installed

    B.Equipment Tag No. : Equipment tag number to be mentioned

    C.Description: Equipment description such as name, make and rating to be mentioned

    D.Maintenance interval to be maintenance such as yearly, monthly

    E.Criticality Criteria: Rankings has to be done from (0-5, 5 being the highest and 0 being

    the lowest). Rankings have to be given by operations, maintenance, quality and spares

    availability)

    F.Overall Weightage: 25% weightage is given to all the four departments rankings

    (operations, maintenance, quality, safety). Based on the weighted average, one score is

    calculated

    G.Sections ranking: Based on the overall weightage, section ranking is calculated

    Quality Checklist - Quality Gate

    Objective

    Quality gate is a system which is aimed at identifying problem and stopping at that at the

    stage of identification so that it does not lead to bigger problem at later stage of a process.

    Based on this philosophy we designed quality gate templet for the molten metal by checking

    quality parameters of batch sample of a heat.

    Responsibility

    GPIL, Raipur, Confdential Page 77

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    78/101

    Format :

    Procedure:

    1.Once first batch pool is ready, melter will send the sample to quality lab. Quality lab

    person then checks the sample for carbon value and mention same on the sheet

    along with the standard range.

    2.Helper carries this sheet back to melter, who will check the sheet for carbon value. In

    case carbon value is not in the standard value, he will consult shift supervisor to

    lower the carbon and keep it within range

    3.Melter will again send second bath sample to quality along with the quality checklist.

    GPIL, Raipur, Confdential Page 7#

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    79/101

    4.Melter will refer to the standard values against each bath sample and correct the

    value before sending the molten metal to CCM

    QC Checklist in Production

    Objective:

    1.To capture the actual heat parameters

    2.To review these parameters against the standard and take necessary corrective action

    Responsibility:

    Below is the RACI for the same

    Frequency: Daily

    Format:

    Sequencing between furnace and caster

    Objective:

    1.To have effective sequencing plan, which would result in subordination of CCM to

    furnace

    2.To have sufficient time between campaign for daily caster maintenance

    3.Utilization of CCM and associated consumables at fullest to ensure reduction in cost

    GPIL, Raipur, Confdential Page 7$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    80/101

    Responsibility:

    Below is the RACI for the same

    Sequencing Plan:

    Sponge Pellet and ore Re*uirement 2s "ul%ilment

    Objective3!. To stream$ine p$anning of pe$$et and ore re7uirement

    GPIL, Raipur, Confdential Page #%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    81/101

    /. To estab$ish service $eve$ agreement bet(een %ID and %2% departments

    Responsibility3

    R+CI for the same is as be$o( :

    Format

    A: Date to be mentioned

    : Pe$$et chemistry and 7uantity to be mentioned

    C: #ines chemistry and 7uantity to be mentioned

    D: Iron ore chemistry and 7uantity to be mentioned

    E: Remar1 for any deviation

    #: This to be fi$$ed by %ID

    Operational Benefit Tracker and KPI Dashboard

    Objective:

    GPIL, Raipur, Confdential Page #1

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    82/101

    3.To review plan vs actual KPI achievement daily and week on week basis

    4.To ensure that the gaps in achieving the target production are reviewed stringently and

    action are taken to resolve the issues preventing the plant to achieve the desired KPI

    Responsibility:

    Below is the RACI for operational benefit tracker and KPI Dashboard

    RACI-Operational Benefit tracker and KPI Dashboard

    Frequency:

    Data Updation: Daily

    KPI dashboard generation and performance review: Weekly

    Procedure:

    Below is the process flow for Operational Benefit tracker and KPI dashboard

    GPIL, Raipur, Confdential Page #2

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    83/101

    O p era t o ns t e a m t opro v ide

    dai lypro duct io

    na c 0 i e v e d

    a n dr e a s o n s)o r ) eedloss + i )

    a n y

    M a i n t e n a nc e t e a m t o

    pro v idein )o o n

    )eed lo ssd u e t o

    ' r e a ( d o wns + ac t io n

    ta(en +% / A e t c 1

    2ua l i tyt e a m t opro v ided a t a w r t3ua l i ty

    p a r a m e t e rs s u c 0 a s*e!t $ + LOI

    !,$ +' la ine e tc 1

    % e c o r dt 0 e d a t a

    in t0etem pla te +p o p u l a t et 0 e 4 P I

    d a s 0 ' o a r d

    % ev ewt 0 e 4 P I

    d a s 0 ' o a r dwee(ly +

    ta(eac t io ns

    a n ds i g n o 5

    t 0 eo pera t io na l ' e n e f t

    t rac(er

    Operational Benefit tracker and KPI Dashboard (Template):

    First Sheet:Below is the snapshot of the first sheet of the template. Same template is

    followed for both the Pellet Plants (0.6 MTPA and 1.5 MTPA)

    A.Project Week: Mention the project week

    B.Date: Mention the date for which production is being tracked

    C.Baseline and target production: The cells refer to the baseline production, avg. ball mill

    feed % Fe(t) during the baseline period and target production

    D.Actual production details: Mention the actual ball mill feed Fe(t) %, baseline LOI %,actual LOI % and reported production

    E.Production improvement: Tracks the target incremental daily tonnage against the actual

    achieved incremental daily tonnage

    Second Sheet:Below is the snapshot of the second sheet of the template (weekly tracker)

    GPIL, Raipur, Confdential Page #3

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    84/101

    A.KPI: Mention the KPI being tracked

    B.KPI details: For each day, baseline production, target production, actual production,

    operational benefit, remarks for exclusion if any are being tracker

    C.Week no and its details: Mention the week no and the dates in the particular week

    D.Cumulative data for the week: Mention the cumulative production for the week afterexclusions

    E.Remarks: Mention the details of the exclusion because of which the day is not taken in

    the operational tracker

    F.Exclusion: Mention the exclusion code because of which the day is not taken in the

    operational tracker such as Planned shutdown, forced shutdown, issues faced in other

    departments hampering SMS Plants production, power supply failure etc.

    Third Sheet:Below is the snapshot of the third sheet of the template (overall weekly tracker)

    Fourth Sheet:Below is the snapshot of the KPI dashboard

    GPIL, Raipur, Confdential Page #4

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    85/101

    KPI dashboard contains:

    1)Production Furnace 6-10 and furnace 1-5. Red bar shows that production is below

    target and green shows production above the target value

    2)KWH/MT Furnace 6-10 and furnace 1-5. Red bar shows that KWH/MT is above

    target and green shows below the target

    3)Loss due to power, breakdown and production inefficiency

    4)Productivity MT/Heat

    5)Percentage heat achieved

    Process Standard operating procedure (SOP)

    Objective:

    GPIL, Raipur, Confdential Page #5

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    86/101

    To standardize the process i.e melting process, casting process, ladle preparation

    Responsibility:

    RACI has been defined in the SOP and same to be followed

    SOPs :

    1.SOP for Ladle

    2.SOP for melting process

    3.SOP for quality

    4.SOP for tundish

    5.SOP for CCM6.SOP for coil insulation

    7.SOP for attaining higher life of Ladle

    Daily Caster Maintenance Checklist

    Objective

    1.To standardize the checks on Caster

    2.To avoid breakdown in caster

    Responsibility:

    Below is the RACI for daily caster maintenance checklist

    GPIL, Raipur, Confdential Page #6

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    87/101

    Format :

    GPIL, Raipur, Confdential Page #7

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    88/101

    A : Mention date and shift in which checks were carried out

    : Chec1s@ (hich are to be referred

    C: %tandard parameters against (hich chec1s to be mapped

    D: %tatus of the e7uipment to be mentioned

    E: Remar1 to be mentione din case of any deviation

    #: Concerned person needs to sign on the sheet

    Process *uality cecks

    Objective3

    !. To meet 7ua$ity parameters as per I%

    Responsibility3

    R+CI for the same is as be$o(:

    GPIL, Raipur, Confdential Page ##

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    89/101

    Format :

    GPIL, Raipur, Confdential Page #$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    90/101

    Procedure3

    +: 2ention heat number

    : 2ention campaign number

    C: 2ention furnace number

    D: 2ention tapping time

    E: CC2 on (hich casting done

    #: 2ention chemistry in terms of Carbon@ 2n@ %i@ %u$phur and Phosphorous

    GPIL, Raipur, Confdential Page $%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    91/101

    Inventory Tracking

    Objective3

    !. To ensure smooth supp$y of ra( materia$ and avoid stoc1 out situation

    Responsibility3

    e$o( is the R+CI for the inventory trac1ing

    GPIL, Raipur, Confdential Page $1

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    92/101

    Format

    Tool Box standardization and Audit

    Objective3

    !. To ensure right too$s are avai$ab$e and to avoid time (astage in searching too$s

    Responsibility3

    GPIL, Raipur, Confdential Page $2

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    93/101

    R+CI for the Too$ o, standardi>ation and audit

    GPIL, Raipur, Confdential Page $3

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    94/101

    Format

    Bad Actor list

    Objective:

    1.To identify the bad actors affecting production (feed loss or plant hold) with frequent

    breakdowns/failures

    2.To take actions on the bad actors and do probable cause analysis to resolve the issues3.Reduction in failures of major equipments would reduce spares consumption/MT

    GPIL, Raipur, Confdential Page $4

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    95/101

    Responsibility:

    Below is the RACI for Bad Actor list preparation and probable cause analysis

    Frequency:

    Breakdown management system analysis: weekly and monthly

    Bad actor list review: Monthly

    Bad Actor List (Snapshots):

    Procedure:

    GPIL, Raipur, Confdential Page $5

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    96/101

    P e r ) o r m r e a ( d o w

    nM a n a g e m

    e n ts y s t e m

    a n a l y s i s

    P r e p a r a t i on o ) a da c to r l is t' a s e d o n

    t 0 e r e a ( d o w

    nm a n a g e m

    e n ts y s t e m

    a n a l y s i s

    % e v i e wa n d

    a p p r o v et 0 e ' a d

    a c to r l is t

    Ta (ea c t io n s o n

    t 0 e ' a da c t o r s o rc o n d u c t% / A o r

    p r o ' a ' l ec a u s e

    a n a l y s i s

    % e v i e wa n d

    u p d a t et 0 e ' a da c t o r s

    m o n t 0 onm o n t 0

    Below is the procedure for Bad Actor list preparation

    Sustainability Pase

    The System Audit is a tool to verify that all the appropriate system elements are

    being installed and to check that they continue to be pursued.

    For the purpose of the audit, every single component of a system is listed three times

    and is interrogated in different ways to assess the overall status of implementation.

    The four states that are taken into account are:

    S1 Compliance

    S2 Understanding

    S3 Usage

    S4 Culture

    Only the first three states of this model are measured since the Culture state

    already represents full ownership of the system.

    S1: Compliance. The system element has been introduced and it is being used by

    ensuring compliance. Direct supervision is required. After a few weeks no element

    should have a pending S1 status unless a very good reason is available.

    GPIL, Raipur, Confdential Page $6

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    97/101

    S2: Understanding. The system element is being used, but people in question do

    not see yet the whole benefit of using the element. If the review process was taken

    away system elements usage would probably stop. Short interval controls and

    review process are vital to ensure continuous compliance through proactive

    coaching.

    S3: Usage. People now realize the whole benefits of the system and how to use it to

    improve their performances. But they still see it as a new system and need support.

    S4: Culture. Having complied with and understood the purpose of the systems,

    people now own it. The full benefits are derived and modifications / improvements

    may also be volunteered. It can be assumed that the system element will continue tobe used. At this stage the management can begin to rely on delegation of system

    elements rather than any direct review or supervision. In this manner the risk of

    having elements dropped out is minimized as the ownership will not be lost or would

    be tackled at an inappropriate management level.

    Step by Step Instructions

    Please find below following key guidelines:

    Audited by the name of the manager who conducted the latest audit.

    A position that is being audited should be captured as appropriate.

    Status and Score the sheet is divided into 3 status sections. The scoring method is

    also indicated here.

    Audit Level Number S1, S2, S3

    System Element each system element is listed out under each section.

    Target the person/position to which the auditor should focus their investigation

    Engineer, Sr. Engineer, Manager, Sr. Manager, AGM, DGM

    Section In charge

    Shift In charge

    Supervisor

    Questions Questions that need to be asked to audit the behavioural changes.

    Score under each status the score, 0, 1 or 3 is indicated:

    GPIL, Raipur, Confdential Page $7

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    98/101

    S1: Use score 0 for not installed, not correct. Use score 1 for installed and partially

    correct. Use score 3 for installed or completely correct.

    S2 and S3: Use score 0 for not correct. Use score 1 for partially correct. Use score 3

    for completely correct.

    These cells auto-format red for score 0, yellow for score 1, green for score 3.

    P.S: If a category is not applicable then leave the cell blank so it will not be counted

    as 0.

    Weekly scores would be measured. For the system elements the audit is conducted

    on Daily basis, the Weekly Score will be the arithmetic average of Daily Scores

    Total Score the total score divided by the maximum possible score expressed as a

    percentage.

    Question for S2 and S3 in place of actions the audit questions should be closed

    ended questions.

    These questions should be updated on Quarterly basis in order to ensure overall

    system adoption.

    Annotated "ormat3 Audit Template

    Annotated "ormat3 Audit Result

    The audit scores must be reviewed on a weekly basis until a performance of S1

    ninety percent (90%) S2 eighty percent (80%) and S3 seventy percent (70%) are

    achieved. Until these performance levels are attained, the system is not fully installed

    and or in use. It is the responsibility of the associated Management Action Team

    GPIL, Raipur, Confdential Page $#

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    99/101

    (MAT) to identify any relevant problems/issues and initiate actions to resolve this as

    quickly as possible.

    GPIL, Raipur, Confdential Page $$

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    100/101

    Appropriate Management Styles

    In line with the Leader Behaviour Analysis Model, the outcome of the audit helps

    dictate the kind of actions that are required see table 1 for details.

    Table 1: Appropriate Management Styles

    %tate

    %ystem+doption

    %tate of 2ind+ppropriate2anagement%ty$e

    Re7uired Contact Time

    %! Comp$ianceBna(are andunab$e

    Direct#u$$ time or very high ' increaseattention if score is $o( or fa$$sbac1.

    %/Bnderstanding

    +(are and unab$e Coach%ignificant time ' focus onassurance and positive feedbac1.

    %5 Bsage +(are and ab$e %upport2oderate ' as %! and %/ scoresstabi$i>e step bac1 from directinvo$vement as much as possib$e.

    % Cu$tureBna(are and ab$e9ta1en forgranted

    De$egate 2inima$

    All action logs should contain the appropriate type of activities to ensure that the

    issues faced with any one particular element are addressed. Examples:

    If a previously installed element has completed dropped from usage, people need to

    be told exactly why this is wrong and what they must do (directive).

    If an installed element is not being filled out correctly, you should get the appropriate

    owner to go and invest significant time and detail in understanding why it was not

    filled out and making sure that the user understands how to use it correctly (coach).

    If the actions coming out of a meeting are not as good as they should be then the

    appropriate area owners need encouragement and support to build on the current

    status.If the system is not throwing out any concerns under S1, S2 and S3 then the results

    should be coming through. In this case the amount of time invested in the review

    process can be lessened.

    Responsibility and Frequency

    The Audit must be conducted on all MCS elements at least once a week. In the initial

    stages of roll-out audits will be conducted once per week by the consultants as wellas the taskforce members assigned and results will be forwarded to the MAT for

    GPIL, Raipur, Confdential Page 1%%

  • 7/25/2019 20150212-GPIL-SMS- SOP - Final (2)

    101/101

    review. In later stages the Team Leaders will be responsible for conducting the audit

    for their Team on all the MCS elements and forward it to their Department Head as

    well as to an auditor outside the concerned Department. Results will be reviewed

    both at the MAT meeting and Steering Committee.