Woden Town Centre andMawson Group Centre
Draft Master PlansFebruary 2015
Introduction
Update on the master plans
revisit findings from stage 1 community engagement
Talk through structure of the draft plans and what they contain
How you can provide input
Woden and Mawson master plans
Stage 1 Community Engagement
Community input:
278 feedback forms completed166 completed for Woden126 completed for Mawson
14 detailed submissions (via post or email)
Approximately 314 at the ‘meet the planner’ sessions139 people at Woden (over 2 sessions)175 people at Mawson (1 session)
55 people attended the lessee and traders meetings39 people at Woden16 people at Mawson
Stage 1 Community Engagement
www.act.gov.au/wodenandmawson
Woden Master Plan Main messages from Stage 1 Engagement:
• Improvement in parking, traffic and congestion
• Pedestrian and cycle connectivity
• Good facilities exist, but generally underutilised due to poor connections, lack of green spaces and poor public domain amenity
• The centre requires more vibrancy and activation, particularly after-hours and on weekends
• Generally good support for high-density, mixed use (but should contribute to public realm)
• Mixed views on:
Building heights
Future of the Athllon Drive corridor
Residential development in the Phillip service trades area
Mawson Master Plan Main messages from Stage 1 Engagement:
• The centre provides convenient shopping
• Looks tired, untidy and dated
• Public realm needs improvement
• Safety and night time lighting needs improvement
• Pedestrian and cycle connectivity needs improvement
• Improve traffic management
• General support for more residential and mixed-use development (outside of core)
• Mixed views on:
Future of Athllon Drive
Future of open/space/ovals
What is the purpose of the master plans ?
Guide the growth and development of the centres over time.
Identify the land use, economic, social and environmental opportunities and challenges.
Investigate opportunities for residential development to support public transport, including the rapid public transport route along Athllon Drive.
Stage 2 Community EngagementDraft Master Plans
Vision for Mawson Place
Structure of the plans
Spatial Framework - Woden Draft Master Plan
Text
Strategies that can help to guide growth and development over the long term
Key strategies include:
• New planning controls to inform the Territory Plan
• More activity for the streets and public spaces
• Improvements to cycle and pedestrian connections
• Short and long term parking management
• Simplifying planning controls in the Phillip service trades area to encourage residential development
• Residential development close to bus stops, including sections along Athllon Drive.
Spatial Framework - Mawson Draft Master Plan
Strategies that can help to guide growth and development over the long term
Key strategies include:
• Increased building heights in some parts of the centre to encourage mixed-use development
• ‘Marker buildings’ at key locations
• Allowing for an additional second supermarket in the long term
• Establishment of the centre as a public transport hub close to Athllon Drive
• Improvements to cycle and pedestrian connections
• Improvements to the public domain
• Management of parking to maintain the centre’s convenience and accessibility.
Stage 2 Community EngagementDraft Master Plans
Draft master plans released for 6 weeks until Sunday 15 March 2015.
Seeking your input on the draft master plans.
Several ways to have your say:
On-line feedback forms – www.timetotalk.act.gov.au
Feedback forms at the Woden Library
Email - [email protected] or [email protected]
Phone Canberra Connect - 13 22 81
‘Meet the Planners’ sessions at the centres
Stage 2 Community EngagementDraft Master Plans
‘Meet the Planners’
Westfield Woden: Wed 25 February 2015, 11.30am to 1.30pm
Sat 28 February 2015, 10am to 2pm
Southlands: Sat 21 February 2015, 11.30am to 1.30pm
Thur 5 March 2015, 1pm to 4pm
Stage 2 Community EngagementDraft Master Plans
Poster Displays
Woden Library: up to Sun 15 March 2015
Southlands: up to Sun 15 March 2015
Westfield Woden: Mon 23 February to
Sun 1 March 2015
Comment on or get more information:
Visit: www.act.gov.au/wodenandmawson
Feedback forms: www.timetotalk.act.gov.au
Email: [email protected]
Call: Canberra Connect 13 22 81
Next steps...
1. Come back to WVCC in March
2. Community feedback will be
considered in the preparation of the
final master plans.
3. A new community engagement
report will be prepared and made
available.
4. Once finalised, the master plans will
be given statutory effect through
the establishment of a Precinct
Code into the Territory Plan.
Vision for Callam Street
Thank you.