COGENERATION “CCHP”REVENUE GENERATING RESILIENCY
FOR CRITICAL FACILITIESCASE STUDIES IN FLORIDA, MARYLAND / WASHINGTON
DC AND NEW YORKOCTOBER 2015
DOUGLAS DAVIS – DIRECTOR BROAD [email protected]
201 951 5713
![Page 2: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/2.jpg)
OVERVIEW OF WHAT WE WILL COVERModern Absorption applied in Cogen or CHP or “CCHP”
Focus on “Modern Absorption Applications” that yield the following benefits
Lower Operating CostLower Carbon FootprintsResiliency improvementsReduced use of Fossil FuelsSimple “ways to design” CHP
2
![Page 3: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/3.jpg)
Is My Building a Good Candidate for CHP?
Are average electricity rates more than $.07/ kWh (including generation, transmission and distribution)?
Is there a need to reduce energy costs or minimize exposure to possible increases in electricity rates?
Is the building located in a deregulated electricity market? Is power reliability a concern? Would there be a substantial business, safety, or health impact if
power went out? Does the building operate for more than 5,000 hours/year? Are there thermal loads throughout the year (including steam, hot water, chilled water and hot air)?
"Yes" answers to any of these questions suggest the building may be a good candidate for CHP.
Combined Heat and Power: Taking Energy Efficiency to the Next Level Gary McNeil, Communications Director for U.S. EPA’s Combined Heat and Power Partnership
In case you missed the CHPA & EPA WEBINAR: Scoring LEED Points with CHP and Modern AbsorptionJuly 22, 2:00 PM - 3:00 PM EDT ( watch the video )https://www.youtube.com/watch?v=DaQkYPwjWmY&feature=youtu.beOn Wednesday, July 22, the EPA CHP Partnership (CHPP) and the CHP Association (CHPA) will co-host a webinar about
LEED® point impact CHP can have on buildings seeking LEED® certification.
![Page 4: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/4.jpg)
MODERN ABSORPTION CHILLERS
Thermally driven non‐electric chillers 30‐3,300 ton indoor or outdoor packages
Two primary markets HVAC
“Typical” utility natural gas pressure
Waste heat recovery co‐generation CCHPExhaust, Jacket ‐ hot water with Natural Gas
4
![Page 5: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/5.jpg)
THE ABSORPTION CYCLE
5
![Page 6: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/6.jpg)
ABSORPTION CYCLE
CONDENSER
EVAPORATOR
GENERATOR
ABSORBER
HEAT
ENER
GY
REJECT
HEAT
ABSO
RBHEAT
REJECT
HEAT
EXPANSION DEVICE PUMP
HIGH SIDE
LOW SIDE
‐14.6 psig6 mm
‐13.6 psig57 mm
6
![Page 7: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/7.jpg)
ABSORPTION COOLING THEORY
Evaporator with water as a refrigerant Refrigerant water sprays on copper tubes of chilled water systemChanges state (boils) and absorbs large amounts of energyWater evaporates at 212°F at 14.7 psiaWater evaporates at 40°F at 0.118 psia
CONDENSER
EVAPORATOR
GENERATOR
ABSORBER
HEA
TEN
ERG
Y
REJ
ECT
HEA
TAB
SOR
BH
EAT
REJ
ECT
HEA
T
EXPANSION DEVICE PUMPCFC refrigerant changes state and absorbs large amounts of energy for ex. R134 evaporates at 40º at 35 psig
7
![Page 8: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/8.jpg)
REFRIGERANT H2ONO ODP/GWP - PHASE OUTDATE
Distilled water Stable Nontoxic Low cost Readily available Environmentally friendly High latent heat of
vaporization R718 = H2O http://www.r718.com/ LEED POINT = 1
![Page 9: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/9.jpg)
SINGLE EFFECT ( UP TO 0.8 COP)
TO T
OW
ER
TO T
OW
ER
CONDENSER
ABSORBEREVAPORATOR
TO L
OA
D
STRONGSOLUTION
WEAKSOLUTION
WATERVAPOR
WATERVAPOR
GENERATOR
FRO
M B
OIL
ER
EXPANSION DEVICE
PUMP
HEATEXCHANGER
WATER
100°40°
200°
PUMP
9
![Page 10: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/10.jpg)
DOUBLE EFFECT ( UP TO 1.5 COP)
TO T
OW
ER
EVAPORATOR
TO L
OAD
WATERVAPOR
WATERVAPOR
EXPANSION DEVICE
PUMP
WATER
40°
CONDENSER
TO T
OW
ERABSORBER
STRONGSOLUTION
WEAKSOLUTION
LOW TEMP HEATEXCHANGER100°
200°PUMP
LOW TEMPGENERATOR
STRONGSOLUTION
WEAKSOLUTION
FRO
M B
OIL
ER
HIGH TEMP HEATEXCHANGER
310°PUMP
HIGH TEMPGENERATOR
WATER
110°
100°
10
![Page 11: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/11.jpg)
RAPID EVOLUTION OF TECHNOLOGY
Evolution of Absorption chillers 10 models improvements in 25 years
11
![Page 12: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/12.jpg)
SIMULTANEOUS CHW, HW & DHW Typically a lower capital cost system Offers Better “System Efficiency” Up to three energy inputs…great for simple CCHP integration with hvac
12
![Page 13: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/13.jpg)
COGENERATION IN A HEALTHCAREUPPER CHESAPEAKE MEDICAL CENTERBEL AIR MARYLAND – “THIRD PARTYOWNERSHIP MODEL”
![Page 14: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/14.jpg)
WHY THIRD PARTY? ALL THE BENEFITSWITH NONE OF THE HEADACHES
![Page 15: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/15.jpg)
CCHP SYSTEM OVERVIEW
![Page 16: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/16.jpg)
HEAT RECOVERY METHOD @ UCMC
![Page 17: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/17.jpg)
PPA…HOW DOES IT WORK IN THIS CASE?
![Page 18: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/18.jpg)
HOW IS IT PERFORMING? AS EXPECTED!
![Page 19: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/19.jpg)
WHAT GOOD IS HOSPITAL IF THEY CANNOTSERVE THE COMMUNITY DURING A CRISIS?
![Page 20: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/20.jpg)
ONE BOX UNIT COOLING
![Page 21: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/21.jpg)
MGM NATIONAL HARBOR CASINOCOGENERATION SYSTEM DC METRO AREA
![Page 22: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/22.jpg)
CCHP SUMMARY:2 MEGAWATT RECIPROCATING ENGINEBROAD MULTI ENERGY ABSORBER
![Page 23: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/23.jpg)
UNITS IS PERFORMANCE TESTED IN THEFACTORY AT JOB SITE CONDITIONS
![Page 24: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/24.jpg)
FAT “FACTORY ACCEPTANCE TESTING”MAKE FOR SIMPLE START UPS.PROTECTS THE OWNERONLY THE WAY TO GUARANTY COP!
![Page 25: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/25.jpg)
RESILIENT STORE DESIGN NYC
Big Box Retail “CCHP”
![Page 26: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/26.jpg)
MODERN CCHP SYSTEMS
26
![Page 27: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/27.jpg)
CHILLER/HEATER OPERATING MODES
Cooling only Heating only Simultaneous cooling/heating Domestic Hot Water Great for System COP! Great for reducing capital costs Eliminates or reduces the need for separate dedicated
cw/hw/dhw systems Reduces MER size
![Page 28: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/28.jpg)
BIG BOX RETAIL CCHP
![Page 29: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/29.jpg)
“GROCERY STORE CCHP PACKAGED PLANT”
29
Model: BZHE and BZCooling Capacity: 260 RTEnergy Source: Natural Gas & Waste Heat from recip150 KW CHP250 KW of demand response
![Page 30: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/30.jpg)
PRE-PACKAGED AND TESTED CCHP WAITING TO GO OVER THE GOVERNOR’SFAVORITE BRIDGE IN FORT LEE NJ
![Page 31: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/31.jpg)
CO2 LOW AND MEDIUM TEMPREFRIGERATIONSUB COOLED BY CCHP ( ADDITIONAL HEATSINK)
![Page 32: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/32.jpg)
GROCERY STORE SUMMARY
Brooklyn NY (USA) Store can operate in a Black Out / “Black Start” 150 kw of CCHP / 250 kw of “Demand Response” 100 & 168 tons of Chiller /Heaters/DHW Solar PV with rain water capture 350 KW No man made chemical refrigerants CO2 low temperature refrigeration Sub cooling low temp via CCHP NYSERDA incentive participant (six figures) LEED - Platinum!
![Page 33: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/33.jpg)
STORE DESIGN CONSIDERATIONS
All Mechanical equipment on roof ( resiliency ) Gowanus canal “water management” “Beckwith relay” does not allow exporting power Transfer switches allow store to shed non-critical
loads during a “island mode operation” System was “pre-packaged and tested” FAT! FAT Made for a simple start up 24/7/365 monitoring via store BMS and CCHP
suppliers PLCs and internet. Grid independence - run business with or
without grid – product loss mitigation – keep the register ringing – be an asset to the community they serve.
![Page 34: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/34.jpg)
BIRDS EYE VIEW OF THE NEW PLANT(S) THAT GREW IN BROOKLYNNYC ( YES THEY GROW ORGANIC VEGETABLE ON THE ROOF FOR SALEIN THEIR STORES IN NYC )GREENHOUSE PRODUCES THEEQUIVINANT OF 40 ACRES.
![Page 35: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/35.jpg)
INSIDE ELECTRICAL ROOM PRE-PACKAGED MERBOX( BECKWITH RELAY )
![Page 36: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/36.jpg)
STORE OPENS ON SCHEDULE AND ITWORKS! DECEMBER 20TH 2013
![Page 37: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/37.jpg)
CCHP TURNS ON 2/20/2014 Hi folks, Congratulations to everyone on 2 huge milestones today: we got
National Grid’s sign off and passed ConEdison’s witness test! The generators started up successfully, and we will be working tomorrow to dial in synchronicity on all systems. I appreciate everyone’s hard work to get to this point. Please let me know if you have any questions.
Thanks! J'aime Mitchell, LEED Green Associate Associate Coordinator of Construction | Green Mission Specialist
56,000-square-foot structure is 60 percent more energy efficient than the building code requires. That's right: 60 percent more efficient, making it one of the most energy efficient supermarkets in the nation, Whole Foods says.( source greenbiz.com )
![Page 38: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/38.jpg)
SOLAR PV CANOPY FOR PARKING ANDRAIN WATER CAPTURE SYSTEM
![Page 39: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/39.jpg)
PLC CONTROLS RECIPROCATING ENGINE
![Page 40: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/40.jpg)
THE CCHP “PRIME MOVER” 150 KW RECIPROCATING ENGINE / QUIET BYDESIGN OF PRE-PACKED BOX
![Page 41: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/41.jpg)
PLC CONTROLS ON CCHP PLANT PLC Touch screens easy owner interface
![Page 42: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/42.jpg)
PLC 27/7/365 MONITORING OF THE CHILLERSFROM ANY PC OR SMART PHONE IN THE WORLDVIA THE INTERNET
Exhaust temp. 820/266 ,maintain chilled water delta T 2.5~3 only by Exhaust.Regards
Bill HuangTechnical managerBroad USA Inc.
![Page 43: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/43.jpg)
EASY TO COMMISSION VIA FACTORYTESTING
![Page 44: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/44.jpg)
![Page 45: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/45.jpg)
LEED PLATINUM!
![Page 46: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/46.jpg)
MIAMI DADE WASTE WATERTREATMENT PLANT….GOT METHANE?THE SUNSHINE STATES OTHER“SUSTAINABLE” FORM OF ENERGY
![Page 47: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/47.jpg)
FLORIDA IS A GREAT PLACE TO APPLYCOGEN! Please stop by our Booth # 903 Our Local Partner in the State of
Florida, Indiana and Ohio.
Florida Offices1059 Mailtand Center Commons Blvd Suite 100Maitland, FL 32751
or6706 Benjamin Rd Suite 200Tampa, FL 33634
Phone: 407-900-1VCS (1827)
Indianapolis, IN Office905 North Capitol AvenueSuite 200Indianapolis, IN 46204Phone: 317-259-7604
Ohio Office3004 Paxton Knoll LaneCincinnati, OH 45802Phone: 513-919-3328
![Page 48: 2015 weec broadusa](https://reader034.fdocuments.us/reader034/viewer/2022051301/5a6d01aa7f8b9ab8418b4df3/html5/thumbnails/48.jpg)
Questions?
48