2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 *...

217
Jan 2, 2015 7:08 AM Rpt# TIP240 2015 STIP Highway & Bridge Projects 1 / 217 * Includes Conversion Amount FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. Project Project Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals Adams 101393 Adams RBR Initiative C BRDG 581 1,800,000 1,800,000 1,800,000 Adams 101393 Adams RBR Initiative C BRDG 581 1,800,000 1,800,000 1,800,000 Adams 102142 Roadway Maint Line Item C HRST 409 2,095,185 2,095,185 2,095,185 Adams 102142 Roadway Maint Line Item C HRST 409 200,000 200,000 200,000 Adams 102142 Roadway Maint Line Item C HRST 409 310,000 310,000 310,000 Adams 102142 Roadway Maint Line Item C HRST 409 3,010,000 3,010,000 3,010,000 Adams 87792 Bridge Reserve C BRDG 185 106,872 106,872 106,872 Adams 87792 Bridge Reserve C BRDG 185 150,000 150,000 150,000 Adams 87792 Bridge Reserve C BRDG 185 20,630 20,630 20,630 Adams 87793 Highway Reserve C HRST STP 652,091 581 550,405 1,202,496 1,202,496 Adams 87793 Highway Reserve C HRST NHPP 346,912 346,912 346,912 Adams 87793 Highway Reserve C HRST NHPP 358,000 358,000 358,000 Adams 87793 Highway Reserve C HRST STP 357,094 357,094 357,094 Adams 87793 Highway Reserve C HRST 581 468,054 468,054 468,054 Adams 87794 CMAQ Line Item C SAMI CAQ 35,264 35,264 35,264 Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000 Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000 Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000 Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000 Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000 Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000 Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000 Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000 Adams 95724 Gettysburg Inner Loop TRL C SAMI CAQ 591,755 591,755 591,755 Adams 95724 Gettysburg Inner Loop TRL C SAMI CAQ 591,163 591,163 591,163 Adams RRX 94743 Pond Street RR Crossing C SAMI RRX 59,225 59,225 59,225 Adams RRX 94743 Pond Street RR Crossing C SAMI RRX 59,225 59,225 59,225 Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 58,078 58,078 58,078 Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 58,658 58,658 58,658 Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 59,245 59,245 59,245 Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 59,837 59,837 59,837 Adams RWY 58137 Eisenhower Blvd Extension P HCON 581 1,841,053 1,841,053 1,841,053 Adams RWY 58137 Eisenhower Blvd Extension P HCON 581 1,358,947 1,358,947 1,358,947 Adams 15 038 102333 US-15 Safety Improvements C SAMI HSIP 710,500 710,500 710,500 Adams 15 039 58136 US-15/US-30 Interchange P HCON SXF 2,000,000 2,000,000 2,000,000 Adams 15 039 58136 US-15/US-30 Interchange F HCON SXF 1,800,000 1,800,000 1,800,000 Adams 15 039 58136 US-15/US-30 Interchange +U HCON NHPP 1,000,000 1,000,000 1,000,000 Adams 15 039 58136 US-15/US-30 Interchange R HCON NHPP 306,000 306,000 306,000 Adams 15 039 58136 US-15/US-30 Interchange R HCON SXF 194,000 194,000 194,000 Adams 15 040 99724 US 15 Bridge PM P BRDG 185 100,000 100,000 100,000 Adams 15 040 99724 US 15 Bridge PM F BRDG 185 150,000 150,000 150,000 Adams 15 040 99724 US 15 Bridge PM U BRDG 185 25,000 25,000 25,000 Adams 15 041 99727 US 15 Bridge PM#2 P BRDG 185 75,000 75,000 75,000

Transcript of 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 *...

Page 1: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

1 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Adams 101393Adams RBR Initiative C BRDG 581 1,800,000 1,800,000 1,800,000

Adams 101393Adams RBR Initiative C BRDG 581 1,800,000 1,800,000 1,800,000

Adams 102142Roadway Maint Line Item C HRST 409 2,095,185 2,095,185 2,095,185

Adams 102142Roadway Maint Line Item C HRST 409 200,000 200,000 200,000

Adams 102142Roadway Maint Line Item C HRST 409 310,000 310,000 310,000

Adams 102142Roadway Maint Line Item C HRST 409 3,010,000 3,010,000 3,010,000

Adams 87792 Bridge Reserve C BRDG 185 106,872 106,872 106,872

Adams 87792 Bridge Reserve C BRDG 185 150,000 150,000 150,000

Adams 87792 Bridge Reserve C BRDG 185 20,630 20,630 20,630

Adams 87793 Highway Reserve C HRST STP 652,091 581 550,405 1,202,496 1,202,496

Adams 87793 Highway Reserve C HRST NHPP 346,912 346,912 346,912

Adams 87793 Highway Reserve C HRST NHPP 358,000 358,000 358,000

Adams 87793 Highway Reserve C HRST STP 357,094 357,094 357,094

Adams 87793 Highway Reserve C HRST 581 468,054 468,054 468,054

Adams 87794 CMAQ Line Item C SAMI CAQ 35,264 35,264 35,264

Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000

Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000

Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000

Adams 87807 Delivery / Consult Assist P PRA 581 400,000 400,000 400,000

Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000

Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000

Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000

Adams 87807 Delivery / Consult Assist C PRA 581 200,000 200,000 200,000

Adams 95724 Gettysburg Inner Loop TRL C SAMI CAQ 591,755 591,755 591,755

Adams 95724 Gettysburg Inner Loop TRL C SAMI CAQ 591,163 591,163 591,163

Adams RRX 94743 Pond Street RR Crossing C SAMI RRX 59,225 59,225 59,225

Adams RRX 94743 Pond Street RR Crossing C SAMI RRX 59,225 59,225 59,225

Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 58,078 58,078 58,078

Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 58,658 58,658 58,658

Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 59,245 59,245 59,245

Adams RSP 82372 SRTP Rideshare Program P IMOD CAQ 59,837 59,837 59,837

Adams RWY 58137 Eisenhower Blvd Extension P HCON 581 1,841,053 1,841,053 1,841,053

Adams RWY 58137 Eisenhower Blvd Extension P HCON 581 1,358,947 1,358,947 1,358,947

Adams 15 038 102333US-15 Safety Improvements C SAMI HSIP 710,500 710,500 710,500

Adams 15 039 58136 US-15/US-30 Interchange P HCON SXF 2,000,000 2,000,000 2,000,000

Adams 15 039 58136 US-15/US-30 Interchange F HCON SXF 1,800,000 1,800,000 1,800,000

Adams 15 039 58136 US-15/US-30 Interchange +U HCON NHPP 1,000,000 1,000,000 1,000,000

Adams 15 039 58136 US-15/US-30 Interchange R HCON NHPP 306,000 306,000 306,000

Adams 15 039 58136 US-15/US-30 Interchange R HCON SXF 194,000 194,000 194,000

Adams 15 040 99724 US 15 Bridge PM P BRDG 185 100,000 100,000 100,000

Adams 15 040 99724 US 15 Bridge PM F BRDG 185 150,000 150,000 150,000

Adams 15 040 99724 US 15 Bridge PM U BRDG 185 25,000 25,000 25,000

Adams 15 041 99727 US 15 Bridge PM#2 P BRDG 185 75,000 75,000 75,000

Page 2: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

2 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Adams 15 041 99727 US 15 Bridge PM#2 F BRDG 185 50,000 50,000 50,000

Adams 15 041 99727 US 15 Bridge PM#2 U BRDG 185 10,000 10,000 10,000

Adams 15 042 99736 US 15 Brdg over PA 116 PM P BRDG 185 75,000 75,000 75,000

Adams 15 042 99736 US 15 Brdg over PA 116 PM F BRDG 185 100,000 100,000 100,000

Adams 15 043 99739 US 15 Bridge over CSX RR P BRDG 185 61,600 61,600 61,600

Adams 15 043 99739 US 15 Bridge over CSX RR P BRDG 185 13,400 13,400 13,400

Adams 15 043 99739 US 15 Bridge over CSX RR F BRDG 185 150,000 150,000 150,000

Adams 15 043 99739 US 15 Bridge over CSX RR U BRDG 185 15,000 15,000 15,000

Adams 30 070 82983 East King Street Bridge +C BRDG NHPP 481,088 481,088 481,088

Adams 30 070 82983 East King Street Bridge +C BRDG NHPP 1,664,000 1,664,000 1,664,000

Adams 30 109 90990 US-30 Resurfacing No.3 C HRST NHPP 1,664,000 1,664,000 1,664,000

Adams 30 109 90990 US-30 Resurfacing No.3 C HRST NHPP 836,000 836,000 836,000

Adams 30 111 101095Gettysburg Crossing C HCON 581 3,000,000 3,000,000 3,000,000

Adams 30 115 101480US 30 Resurfacing #4 C HRST 409 2,500,000 2,500,000 2,500,000

Adams 34 038 87416 S Main St Bridge C BRDG 581 412,000 412,000 412,000

Adams 34 040 87417 Carlisle Road Bridge P BRDG 581 42 42 42

Adams 34 RRX 92391 Biglerville Road RR +C SAMI RRX* 75,000 75,000 75,000

Adams 34 RRX 92391 Biglerville Road RR +C SAMI RRX* 75,000 75,000 75,000

Adams 94 025 94894 94 & 394 Intersection Imp C SAMI HSIP 740,500 740,500 740,500

Adams 94 025 94894 94 & 394 Intersection Imp C SAMI HSIP 294,500 294,500 294,500

Adams 94 026 94897 94 & 234 Intersection Imp +F SAMI CAQ 150,000 150,000 150,000

Adams 94 026 94897 94 & 234 Intersection Imp +U SAMI CAQ 30,000 30,000 30,000

Adams 94 026 94897 94 & 234 Intersection Imp +R SAMI CAQ 50,000 50,000 50,000

Adams 94 026 94897 94 & 234 Intersection Imp +C SAMI CAQ 362,922 362,922 362,922

Adams 94 026 94897 94 & 234 Intersection Imp +C SAMI CAQ 557,078 557,078 557,078

Adams 94 029 78672 PA 94 and Berlin Road P HCON 581 400,000 400,000 400,000

Adams 94 029 78672 PA 94 and Berlin Road F HCON 581 250,000 250,000 250,000

Adams 94 029 78672 PA 94 and Berlin Road U HCON 581 100,000 100,000 100,000

Adams 94 029 78672 PA 94 and Berlin Road R HCON 581 450,000 450,000 450,000

Adams 94 029 78672 PA 94 and Berlin Road C HCON 581 3,304,000 3,304,000 3,304,000

Adams 97 008 98168 Baltimore Pike Rsf 2 C HRST 582 495,185 495,185 495,185

Adams 97 008 98168 Baltimore Pike Rsf 2 C HRST 582 100,000 100,000 100,000

Adams 116 030 85652 PA 116 and Oxford Ave F SAMI HSIP 90,000 581 15,000 105,000 105,000

Adams 116 030 85652 PA 116 and Oxford Ave F SAMI STP 45,000 45,000 45,000

Adams 116 030 85652 PA 116 and Oxford Ave U SAMI HSIP 45,000 581 5,000 50,000 50,000

Adams 116 030 85652 PA 116 and Oxford Ave R SAMI HSIP 45,000 581 5,000 50,000 50,000

Adams 116 030 85652 PA 116 and Oxford Ave +C SAMI HSIP 676,500 676,500 676,500

Adams 116 030 85652 PA 116 and Oxford Ave +C SAMI HSIP 576,500 576,500 576,500

Adams 116 032 18147 Fairfield Road Bridge 2 F BRDG 185 40,000 40,000 40,000

Adams 116 032 18147 Fairfield Road Bridge 2 F BRDG 581 160,000 160,000 160,000

Page 3: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

3 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Adams 116 032 18147 Fairfield Road Bridge 2 U BRDG 185 15,000 15,000 15,000

Adams 116 032 18147 Fairfield Road Bridge 2 R BRDG 185 15,000 15,000 15,000

Adams 116 032 18147 Fairfield Road Bridge 2 C BRDG 185 1,400,000 1,400,000 1,400,000

Adams 116 040 99181 Adams Grp F Preservations P BRDG 185 300,000 300,000 300,000

Adams 116 040 99181 Adams Grp F Preservations C BRDG 409 394,815 394,815 394,815

Adams 116 040 99181 Adams Grp F Preservations C HRST 409 1,725,185 1,725,185 1,725,185

Adams 116 042 90866 Fairfield Road Resurface C HRST 409 778,815 778,815 778,815

Adams 116 042 90866 Fairfield Road Resurface C HRST 409 200,000 200,000 200,000

Adams 134 005 99672 Taneytown Road Bridge PM P BRDG STP 80,000 185 20,000 100,000 100,000

Adams 234 020 73602 234 & 3001 Improvements F SAMI HSIP 112,500 581 12,500 125,000 125,000

Adams 234 020 73602 234 & 3001 Improvements U SAMI HSIP 18,000 581 2,000 20,000 20,000

Adams 234 020 73602 234 & 3001 Improvements R SAMI HSIP 18,000 581 2,000 20,000 20,000

Adams 234 020 73602 234 & 3001 Improvements C SAMI HSIP 428,500 581 47,611 476,111 476,111

Adams 234 020 73602 234 & 3001 Improvements C SAMI HSIP 264,500 581 29,388 293,888 293,888

Adams 234 022 87426 Heildersburg Bridge P BRDG 581 175,000 175,000 175,000

Adams 234 023 90693 PA 234 Bridge P BRDG 185 128,606 128,606 128,606

Adams 234 023 90693 PA 234 Bridge P BRDG 185 21,394 21,394 21,394

Adams 1005 009 73854 Latimore Valley Road Brg P BRDG 185 300,000 300,000 300,000

Adams 1005 009 73854 Latimore Valley Road Brg F BRDG 581 200,000 200,000 200,000

Adams 1005 009 73854 Latimore Valley Road Brg U BRDG 581 50,000 50,000 50,000

Adams 1005 009 73854 Latimore Valley Road Brg R BRDG 581 50,000 50,000 50,000

Adams 1007 016 78638 Mud Run Bridge P BRDG 185 300,000 300,000 300,000

Adams 1015 012 102975Hanover Street Crossing +C SAMI RRX 283,250 283,250 283,250

Adams 2009 011 87418 Black Lane Bridge F BRDG 185 250,000 250,000 250,000

Adams 2009 011 87418 Black Lane Bridge U BRDG 185 25,000 25,000 25,000

Adams 2009 011 87418 Black Lane Bridge R BRDG 185 25,000 25,000 25,000

Adams 2009 011 87418 Black Lane Bridge C BRDG 185 1,226,478 1,226,478 1,226,478

Adams 2009 011 87418 Black Lane Bridge C BRDG 185 300,545 300,545 300,545

Adams 2035 012 97963 Baltimore Road Resurface C HRST 582 1,500,000 1,500,000 1,500,000

Adams 3001 034 58603 Old Hbg Road Bridge 3 C BRDG 581 1,068,442 1,068,442 1,068,442

Adams 3001 034 58603 Old Hbg Road Bridge 3 C BRDG 581 731,558 731,558 731,558

Adams 3001 036 18145 Old Harrisburg Rd. Br. 1 C BRDG 581 700,000 700,000 700,000

Adams 3001 036 18145 Old Harrisburg Rd. Br. 1 C HCON 581 1,300,000 1,300,000 1,300,000

Adams 3001 037 68733 Old Hbg Road Bridge 2 C BRDG 581 700,000 700,000 700,000

Adams 3001 037 68733 Old Hbg Road Bridge 2 C BRDG 581 1,100,000 1,100,000 1,100,000

Adams 3010 011 87430 Water Street Bridge P BRDG STP 120,000 185 30,000 150,000 150,000

Adams 3015 013 87674 Fairview Road Bridge C BRDG BOF 193,000 193,000 193,000

Adams 3015 013 87674 Fairview Road Bridge C BRDG STP 326,909 326,909 326,909

Adams 4001 012 18148 Old Carlisle Rd Bridge F BRDG 185 250,000 250,000 250,000

Adams 4001 012 18148 Old Carlisle Rd Bridge U BRDG 185 15,000 15,000 15,000

Page 4: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

4 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Adams 4001 012 18148 Old Carlisle Rd Bridge R BRDG 185 15,000 15,000 15,000

Adams 4001 012 18148 Old Carlisle Rd Bridge C BRDG STP 306,295 185 76,573 382,868 382,868

Adams 4001 012 18148 Old Carlisle Rd Bridge C BRDG BOF 585,000 185 372,976 957,976 957,976

Adams 4001 012 18148 Old Carlisle Rd Bridge C BRDG STP 906,906 906,906 906,906

Adams 4010 011 74952 Shippensburg Road Bridge F BRDG BOF 200,000 185 50,000 250,000 250,000

Adams 4010 011 74952 Shippensburg Road Bridge U BRDG BOF 16,000 185 4,000 20,000 20,000

Adams 4010 011 74952 Shippensburg Road Bridge R BRDG BOF 16,000 185 4,000 20,000 20,000

Adams 4010 011 74952 Shippensburg Road Bridge C BRDG BOF 113,000 185 28,250 141,250 141,250

Adams 4010 011 74952 Shippensburg Road Bridge C BRDG BOF 585,000 185 249,676 834,676 834,676

Adams 4010 011 74952 Shippensburg Road Bridge C BRDG STP 413,705 413,705 413,705

Adams 7204 BRG 18151 Horner Rd Brg T-402 C BRDG BOF 392,000 183 78,400 19,600 490,000 490,000

Adams 7204 BRG 18151 Horner Rd Brg T-402 C BRDG BOF 240,000 183 282,000 94,000 616,000 616,000

Adams 7204 BRG 18151 Horner Rd Brg T-402 C BRDG STP 1,264,000 1,264,000 1,264,000

Adams 7204 BRG 18151 Horner Rd Brg T-402 C BRDG STP 344,000 183 59,600 26,400 430,000 430,000

Adams 7207 BRG 18049 Mengus Mill Rd Brdg P BRDG STP 240,000 183 45,000 15,000 300,000 300,000

Totals for: Adams 7,586,475 12,760,185 34,600 20,381,260 5,303,225 9,409,000 94,000 14,806,225 5,169,000 11,329,000 26,400 16,524,400 7,163,000 11,329,000 18,492,000 70,203,885

Allegheny 75341 Better. Resrv Allegheny F HRST STP 500,000 500,000 500,000

Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000 1,000,000

Allegheny 75341 Better. Resrv Allegheny F HRST STP 1,000,000 1,000,000 1,000,000

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 499,619 581 205,000 704,619 704,619

Allegheny 75341 Better. Resrv Allegheny C HRST STP 166,445 166,445 166,445

Allegheny 75341 Better. Resrv Allegheny C HRST STU 467,600 467,600 467,600

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 942,876 581 2,548,994 3,491,870 3,491,870

Allegheny 75341 Better. Resrv Allegheny C HRST STP 858,000 858,000 858,000

Allegheny 75341 Better. Resrv Allegheny C HRST STU 487,544 487,544 487,544

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 7,245,000 581 8,297,200 15,542,200 15,542,200

Allegheny 75341 Better. Resrv Allegheny C HRST STP 1,201,000 1,201,000 1,201,000

Allegheny 75341 Better. Resrv Allegheny C HRST STU 389,666 389,666 389,666

Allegheny 75341 Better. Resrv Allegheny C HRST NHPP 12,320,000 581 19,074,000 31,394,000 31,394,000

Allegheny 75341 Better. Resrv Allegheny C HRST STP 431,000 431,000 431,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 200,000

Allegheny 75669 Slide Line Item F SAMI STP 200,000 200,000 200,000

Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000 1,000,000

Allegheny 75669 Slide Line Item C SAMI STP 500,000 500,000 500,000

Allegheny 75669 Slide Line Item C SAMI STP 1,000,000 1,000,000 1,000,000

Allegheny 75669 Slide Line Item C SAMI 581 1,000,000 1,000,000 1,000,000

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 3,282,324 3,282,324 3,282,324

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000 9,506,000

Page 5: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

5 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 76430 SPC Reg. Safety Line Item C SAMI HSIP 9,506,000 9,506,000 9,506,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 500,000

Allegheny 76461 Retaining Walls - Alleg F SAMI STP 500,000 500,000 500,000

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 31,809 31,809 31,809

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000 1,744,000

Allegheny 82754 SPC Region TAP Line Item +C TENH TAU 1,744,000 1,744,000 1,744,000

Allegheny 100316PAAC-TransitSignalBRT C PT CAQ 1,565,760 391,440 1,957,200 1,957,200

Allegheny 100367PPC-Marine Eng RetrofitIV C IMOD CAQ 4,000,000 16,000,000 20,000,000 20,000,000

Allegheny 100376SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 125,000

Allegheny 100376SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 125,000

Allegheny 100376SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 125,000

Allegheny 100376SPC-CommuteInfo Individua C IMOD CAQ 100,000 25,000 125,000 125,000

Allegheny 100382SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000 625,000

Allegheny 100382SPC - Traffic Signal 4 P SAMI CAQ 500,000 125,000 625,000 625,000

Allegheny 100382SPC - Traffic Signal 4 C SAMI CAQ 3,000,000 750,000 3,750,000 3,750,000

Allegheny 100434D11 P3 Line Item P BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item P BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item P BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item P BRDG 185 1,000,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item F BRDG STP 640,000 185 160,000 800,000 800,000

Allegheny 100434D11 P3 Line Item F BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item F BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item F BRDG 185 1,000,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000 500,000

Allegheny 100434D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000 500,000

Allegheny 100434D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000 500,000

Allegheny 100434D11 P3 Line Item U BRDG STP 400,000 185 100,000 500,000 500,000

Allegheny 100434D11 P3 Line Item R BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item R BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item R BRDG 185 50,000 50,000 50,000

Allegheny 100434D11 P3 Line Item R BRDG 185 1,000,000 1,000,000 1,000,000

Allegheny 100434D11 P3 Line Item C BRDG STP 1,738,594 185 1,715,000 3,453,594 3,453,594

Allegheny 100434D11 P3 Line Item C BRDG STP 400,000 185 700,000 1,100,000 1,100,000

Allegheny 100434D11 P3 Line Item C BRDG 581 2,000,000 2,000,000 2,000,000

Allegheny 100434D11 P3 Line Item C BRDG BOF 2,000,000 185 1,000,000 3,000,000 3,000,000

Allegheny 100434D11 P3 Line Item C BRDG STU 2,000,000 2,000,000 2,000,000

Allegheny 100434D11 P3 Line Item C BRDG STP 2,000,000 185 625,500 2,625,500 2,625,500

Allegheny 28182 CBD Signals, Phase 2 C SAMI 500,000 500,000 500,000

Page 6: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

6 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 63378 CBD Signalization Upgrade C SAMI CAQ 800,000 833,366 1,633,366 1,633,366

Allegheny 63378 CBD Signalization Upgrade C SAMI STU 3,200,000 3,200,000 3,200,000

Allegheny 63378 CBD Signalization Upgrade C SAMI 166,634 166,634 166,634

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,396,800 599,200 2,996,000 2,996,000

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000 3,000,000

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000 3,000,000

Allegheny 69839 Alleg. Co Local Br. (S/L) C BRDG 183 2,400,000 600,000 3,000,000 3,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 76458 Bridge - Allegheny County F BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Allegheny 76458 Bridge - Allegheny County C BRDG BOF 9,331 185 1,495,975 1,505,306 1,505,306

Allegheny 76458 Bridge - Allegheny County C BRDG BOF 224,000 224,000 224,000

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 640,000 640,000 640,000

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 800,000 185 267,012 1,067,012 1,067,012

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 1,320,000 185 626,335 1,946,335 1,946,335

Allegheny 76458 Bridge - Allegheny County C BRDG NHPP 2,120,000 185 20,495,023 22,615,023 22,615,023

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 4,356,374 4,356,374 4,356,374

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 533,639 533,639 533,639

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 353,480 353,480 353,480

Allegheny 84078 SPC CMAQ Line Item C AIR CAQ 1,676,210 1,676,210 1,676,210

Allegheny 86487 Allegheny Cty Local Rdwy C LRST STP 1,600,000 400,000 2,000,000 2,000,000

Allegheny 86487 Allegheny Cty Local Rdwy C LRST STP 1,600,000 400,000 2,000,000 2,000,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,400,000 183 450,000 150,000 3,000,000 3,000,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 1,000,000 183 187,500 62,500 1,250,000 1,250,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,480,000 183 465,000 155,000 3,100,000 3,100,000

Allegheny 87777 Allegheny Co Loc Br Pres. C BRDG BOF 2,400,000 183 450,000 150,000 3,000,000 3,000,000

Allegheny 88424 PPC - Marine Diesel II C IMOD CAQ 355,361 355,361 355,361

Allegheny 94698 SPC Smart Tr. Initiative C TENH STU 1,500,000 375,000 1,875,000 1,875,000

Allegheny 94698 SPC Smart Tr. Initiative C TENH STU 1,500,000 375,000 1,875,000 1,875,000

Allegheny 94878 PPC-Marine Diesel Eng III C IMOD 16,000,000 16,000,000 16,000,000

Allegheny 94879 SPC - Traffic Signal 3 P SAMI CAQ 440,159 110,040 550,199 550,199

Allegheny 94879 SPC - Traffic Signal 3 P SAMI CAQ 631,961 157,990 789,951 789,951

Allegheny 94879 SPC - Traffic Signal 3 C SAMI CAQ 2,927,880 731,970 3,659,850 3,659,850

Allegheny 97843 Lower Hill Redev Interior C HCON 11,880,000 11,880,000 11,880,000

Allegheny 97844 Lower Hill Redev Exterior C HCON 9,720,000 9,720,000 9,720,000

Allegheny 99021 Bridge Wash 2016 C BRDG 185 158,994 158,994 158,994

Allegheny 99021 Bridge Wash 2016 C BRDG 581 1,041,006 1,041,006 1,041,006

Allegheny 99022 Bridge Wash 2017 C BRDG NHPP 960,000 185 240,000 1,200,000 1,200,000

Allegheny 99024 Bridge Wash 2018 C BRDG NHPP 960,000 185 240,000 1,200,000 1,200,000

Page 7: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

7 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 99647 2016 ADA Curb Ramp P HRST STP 160,000 160,000 160,000

Allegheny 99647 2016 ADA Curb Ramp C HRST STP 1,000,000 1,000,000 1,000,000

Allegheny 99648 2017 ADA Curb Ramp Projec +C HRST STP 1,000,000 1,000,000 1,000,000

Allegheny 99652 2018 ADA Curb Ramp Projec +C HRST STP 1,000,000 1,000,000 1,000,000

Allegheny 99846 S. Hills Trans. Network S HRST 581 200,000 200,000 200,000

Allegheny 014 104156Bethel Park ARLE grant C SAMI 244 264,000 264,000 264,000

Allegheny 014 104157Brentwood ARLE 2014 C SAMI 244 137,000 137,000 137,000

Allegheny 014 104159Pittsburgh ARLE grant C SAMI 244 100,000 100,000 100,000

Allegheny 014 104160Coraopolis ARLE 2014 C SAMI 244 138,000 138,000 138,000

Allegheny LOC 104228Almono - EconDev ACT 89 C HCON 581 3,500,000 3,500,000 3,500,000

Allegheny LOC 104228Almono - EconDev ACT 89 C HCON 581 1,500,000 1,500,000 1,500,000

Allegheny LOC 104229Delafield - EconDev C HCON 581 500,000 500,000 500,000

Allegheny LOC 27219 Campbell's Run Road F HCON STU 1,864,000 466,000 2,330,000 2,330,000

Allegheny LOC 27219 Campbell's Run Road U HCON STU 320,000 80,000 400,000 400,000

Allegheny LOC 27219 Campbell's Run Road R HCON STU 1,600,000 400,000 2,000,000 2,000,000

Allegheny LOC 27219 Campbell's Run Road C HCON STU 5,000,000 1,250,000 6,250,000 6,250,000

Allegheny LOC 47203 Forbes Ave Safety Improve C SAMI CAQ 1,675,000 500,000 2,175,000 2,175,000

Allegheny LOC 58561 Wenzell Av/Carnahan Rd Br C LRST STU 1,600,000 400,000 2,000,000 2,000,000

Allegheny LOC 61711 Brookline Boulevard C LRST STU 625,000 156,250 781,250 781,250

Allegheny LOC 69837 TMA Annual Funding P IMOD CAQ 480,000 120,000 600,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000 600,000

Allegheny LOC 69837 TMA Annual Funding P PRA CAQ 480,000 120,000 600,000 600,000

Allegheny LOC 83133 City of Pgh Signal Update P SAMI CAQ 144,000 36,000 180,000 180,000

Allegheny LOC 83133 City of Pgh Signal Update C SAMI CAQ 1,296,000 324,000 1,620,000 1,620,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 P LRST STU 400,000 100,000 500,000 500,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 F LRST STU 400,000 100,000 500,000 500,000

Allegheny LOC 83136 Penn Ave Resurf. Ph 2 C LRST STU 1,509,666 377,417 1,887,083 1,887,083

Allegheny LOC 84240 Diesel Switchyrd Retrofit C IMOD CAQ 2,400,000 600,000 3,000,000 3,000,000

Allegheny LOC 84241 Ultra-clean Diesel Switch C IMOD CAQ 1,200,000 3,000,000 4,200,000 4,200,000

Allegheny LOC 93908 Forbes2a/Smithfield-Grant C HCON STU 2,800,000 700,000 3,500,000 3,500,000

Allegheny LOC 93908 Forbes2a/Smithfield-Grant C HCON STU 2,800,000 700,000 3,500,000 3,500,000

Allegheny LOC 93922 AR01 - Armstrong Tunnel P LRST NHPP 160,000 40,000 200,000 200,000

Allegheny LOC 93922 AR01 - Armstrong Tunnel P LRST NHPP 529,600 132,400 662,000 662,000

Allegheny LOC 94889 Pittsburgh Route and Sign P SAMI CAQ 357,890 130,000 487,890 487,890

Allegheny LOC 94889 Pittsburgh Route and Sign C SAMI CAQ 436,102 105,998 542,100 542,100

Allegheny PT 100307PAAC-Ross PNR Expansion P PT CAQ 594,816 148,704 743,520 743,520

Allegheny PT 100307PAAC-Ross PNR Expansion R PT CAQ 125,600 31,400 157,000 157,000

Allegheny PT 100307PAAC-Ross PNR Expansion C PT CAQ 690,784 172,696 863,480 863,480

Allegheny PT 100307PAAC-Ross PNR Expansion C PT CAQ 7,356,800 1,839,200 9,196,000 9,196,000

Page 8: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

8 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny PT 77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000 325,000

Allegheny PT 77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000 325,000

Allegheny PT 77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000 325,000

Allegheny PT 77094 CommuteInfo/TMA Outreach P PRA CAQ 260,000 65,000 325,000 325,000

Allegheny PT 77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200 6,172,200

Allegheny PT 77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200 6,172,200

Allegheny PT 77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200 6,172,200

Allegheny PT 77273 PAAC Bus Procurement C PT STP 6,172,200 6,172,200 6,172,200

Allegheny RR 102758Bridge Street RR (NS) +C SAMI RRX* 250,000 250,000 250,000

Allegheny RR 102973S. 4th Street (CSX) C SAMI RRX 125,000 125,000 125,000

Allegheny RR 102973S. 4th Street (CSX) C SAMI RRX 167,632 167,632 167,632

Allegheny RRX 102720Fairview St RR GradeXing +C SAMI RRX* 250,000 250,000 250,000

Allegheny RRX 103818Locust Street Railroad +C SAMI RRX 7,500 7,500 7,500

Allegheny RRX 93682 POHC Grand Av x-ing +C SAMI RRX* 30,500 30,500 30,500

Allegheny TAP 102965Pgh Faison SR2S - TAP C TENH TAU 117,809 117,809 117,809

Allegheny TAP 102965Pgh Faison SR2S - TAP C TENH TAU 132,191 132,191 132,191

Allegheny TAP 28173 Pgh Bic Facilities - TAP C TENH TAU 350,000 350,000 350,000

Allegheny TEH 28243 Montour Trail ATA C IMOD STP 115,000 115,000 115,000

Allegheny TEH 86974 Borough of Munhall FSRTS P TENH SRTSF 200,000 200,000 200,000

Allegheny 19 0 97929 Cochran Road F HRST 581 125,000 125,000 125,000

Allegheny 19 0 97929 Cochran Road +U HRST NHPP 25,000 25,000 25,000

Allegheny 19 0 97929 Cochran Road +R HRST NHPP 50,000 50,000 50,000

Allegheny 19 0 97929 Cochran Road +C HRST NHPP 1,100,000 1,100,000 1,100,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +F XRST 581 500,000 500,000 500,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +F XRST 581 1,000,000 1,000,000 1,000,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +U XRST NHPP 50,000 50,000 50,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +R XRST NHPP 100,000 100,000 100,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +C XRST NHPP 5,000,000 5,000,000 5,000,000

Allegheny 19 A63 96562 19/WestEndbypass-PkwyWest +C XRST NHPP 2,500,000 2,500,000 2,500,000

Allegheny 19 A64 96280 PerryHwy/Glenview-Longvue C HRST 581 12,464 12,464 12,464

Allegheny 22 A32 88393 SR 22 Over Potato Garden F BRDG 185 150,000 150,000 150,000

Allegheny 22 A32 88393 SR 22 Over Potato Garden U BRDG 185 20,000 20,000 20,000

Allegheny 22 A32 88393 SR 22 Over Potato Garden R BRDG 185 30,000 30,000 30,000

Allegheny 22 A32 88393 SR 22 Over Potato Garden C BRDG NHPP 1,200,000 185 300,000 1,500,000 1,500,000

Allegheny 22 A33 91781 SR 22/ Washington/N Fay C XRST NHPP 6,000,000 185 1,500,000 7,500,000 7,500,000

Allegheny 28 A10 27180 PA 28 Widen/31st St-Millv C HRST SXF 25,000 6,250 31,250 31,250

Allegheny 28 A53 47103 PA 28 Widen/I579-E Ohio C HCON NHPP 1,800,000 1,800,000 1,800,000

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co F XRST 581 350,000 350,000 350,000

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co C XRST 581 12,000,000 12,000,000 12,000,000

Allegheny 28 A55 92277 SR 28 Russelton-Butler Co C XRST 581 4,000,000 4,000,000 4,000,000

Page 9: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

9 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 28 A56 91845 SR28,Highland Pk Br/Ramps P XRST NHPP 200,000 200,000 200,000

Allegheny 28 A56 91845 SR28,Highland Pk Br/Ramps P XRST NHPP 300,000 300,000 300,000

Allegheny 28 DSI 74980 Ravine Street DSI Removal P HRST SXF 200,000 581 50,000 250,000 250,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave F BRDG NHPP 280,000 185 70,000 350,000 350,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave U BRDG NHPP 64,000 185 16,000 80,000 80,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave R BRDG NHPP 175,000 185 35,000 210,000 210,000

Allegheny 30 A25 27267 SR 30 ov Bessemer Ave C BRDG NHPP 2,320,000 2,320,000 2,320,000

Allegheny 48 A28 28132 48/Boston Hollow Road Br F BRDG NHPP 320,000 185 80,000 400,000 400,000

Allegheny 48 A28 28132 48/Boston Hollow Road Br R BRDG NHPP 160,000 185 40,000 200,000 200,000

Allegheny 51 0 97936 SR 51, Fifth Avenue P HRST NHPP 150,000 150,000 150,000

Allegheny 51 0 97936 SR 51, Fifth Avenue C HRST 581 1,500,000 1,500,000 1,500,000

Allegheny 51 A63 28126 West Carson St. Viaduct C BRDG NHPP 612,200 612,200 612,200

Allegheny 51 A79 88335 Elizabeth Bridge F BRDG NHPP 560,000 185 140,000 700,000 700,000

Allegheny 51 A79 88335 Elizabeth Bridge U BRDG NHPP 160,000 185 40,000 200,000 200,000

Allegheny 51 A79 88335 Elizabeth Bridge R BRDG 185 200,000 200,000 200,000

Allegheny 51 A79 88335 Elizabeth Bridge C BRDG 581 8,000,000 8,000,000 8,000,000

Allegheny 51 A79 88335 Elizabeth Bridge C BRDG 581 8,000,000 8,000,000 8,000,000

Allegheny 51 A82 96076 51 Safety/Midwood-Edgebro C SAMI HSIP 1,360,000 1,360,000 1,360,000

Allegheny 51 A87 28397 Clairton Blvd/Saw Mill Rn +C HRST NHPP 13,373,000 13,373,000 13,373,000

Allegheny 51 A87 28397 Clairton Blvd/Saw Mill Rn +C HRST HSIP 2,087,000 2,087,000 2,087,000

Allegheny 51 A92 99646 2015 ADA Curb Ramp Projec C HRST STP 1,800,000 581 450,000 2,250,000 2,250,000

Allegheny 65 A52 94888 65/19, Beaver Turnaround F BRDG NHPP 160,000 185 40,000 200,000 200,000

Allegheny 65 A52 94888 65/19, Beaver Turnaround U BRDG NHPP 40,000 185 10,000 50,000 50,000

Allegheny 65 A53 92280 SR 65/Ft Duq Br-Eckert F HCON 581 250,000 250,000 250,000

Allegheny 65 A53 92280 SR 65/Ft Duq Br-Eckert U HCON 581 50,000 50,000 50,000

Allegheny 65 A53 92280 SR 65/Ft Duq Br-Eckert C HCON NHPP 4,000,000 4,000,000 4,000,000

Allegheny 65 A53 92280 SR 65/Ft Duq Br-Eckert C HCON NHPP 3,700,000 581 1,925,000 5,625,000 5,625,000

Allegheny 65 A53 92280 SR 65/Ft Duq Br-Eckert C HCON NHPP 2,875,000 2,875,000 2,875,000

Allegheny 88 A22 100967SR 88/King School & Logan P SAMI NHPP 240,000 581 60,000 300,000 300,000

Allegheny 88 A22 100967SR 88/King School & Logan R SAMI NHPP 16,000 581 4,000 20,000 20,000

Allegheny 88 A22 100967SR 88/King School & Logan C SAMI NHPP 1,920,000 581 480,000 2,400,000 2,400,000

Allegheny 88 A23 102961SR 88 &SR 3004 Widening P HRST 581 100,000 100,000 100,000

Allegheny 88 A23 102961SR 88 &SR 3004 Widening P HRST 581 300,000 300,000 300,000

Allegheny 136 0 97948 Mon City Bridge P BRDG 581 300,000 300,000 300,000

Allegheny 286 A09 26564 PA 286/US 22 -Sagamore Rd C HCON 581 200,000 200,000 200,000

Allegheny 376 0 77506 Bridge Paint Districtwide C BRDG STP 400,000 185 1,600,000 2,000,000 2,000,000

Allegheny 376 0 87383 Bridge Wash 2015 C BRDG 185 1,190,000 1,190,000 1,190,000

Allegheny 376 A49 28587 I-376/I79 - Fort Pitt Tun C IMAN NHPP 8,716,715 185 86,650 8,803,365 8,803,365

Allegheny 376 A49 28587 I-376/I79 - Fort Pitt Tun C IMAN 581 881,874 881,874 881,874

Allegheny 376 A49 28587 I-376/I79 - Fort Pitt Tun C IMAN NHPP 8,266,715 185 86,650 8,353,365 8,353,365

Page 10: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

10 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 376 A49 28587 I-376/I79 - Fort Pitt Tun C IMAN 581 831,875 831,875 831,875

Allegheny 376 A50 87775 I376/Airport - Bns 376 F IMAN 581 1,148,000 1,148,000 1,148,000

Allegheny 376 A50 87775 I376/Airport - Bns 376 F IMAN 581 500,000 500,000 500,000

Allegheny 376 A50 87775 I376/Airport - Bns 376 +C IMAN NHPP 22,947,268 22,947,268 22,947,268

Allegheny 376 A50 87775 I376/Airport - Bns 376 +C IMAN NHPP 22,947,266 22,947,266 22,947,266

Allegheny 376 A51 94651 Pkwy East Corridor Transp P SAMI NHPP 2,000,000 2,000,000 2,000,000

Allegheny 376 A51 94651 Pkwy East Corridor Transp +C SAMI CAQ 4,080,000 4,080,000 4,080,000

Allegheny 376 A52 97908 376/Fort Pitt Tunnel Repa C IMAN 581 6,871,000 6,871,000 6,871,000

Allegheny 376 A52 97908 376/Fort Pitt Tunnel Repa C IMAN 581 6,872,000 6,872,000 6,872,000

Allegheny 376 A56 87764 I376 Beaver Co- Airport C IMAN NHPP 26,522,500 26,522,500 26,522,500

Allegheny 376 A56 87764 I376 Beaver Co- Airport C IMAN NHPP 26,522,500 26,522,500 26,522,500

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum P HRST STP 200,000 200,000 200,000

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum R HRST NHPP 165,000 165,000 165,000

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum +C HCON NHPP 7,000,000 7,000,000 7,000,000

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum +C HCON HSIP 984,876 984,876 984,876

Allegheny 400 A38 79450 Bigelow/BloomfieldBr-Baum +C HCON NHPP 2,265,124 2,265,124 2,265,124

Allegheny 579 A10 97846 I-579 "Cap" Project F BRDG TIGER 1,551,632 1,551,632 1,551,632

Allegheny 837 0 98105 SR 837, Carson Street C HRST NHPP 4,000,000 4,000,000 4,000,000

Allegheny 837 A13 28544 Glenwood Bridge Ramps P BRDG NHPP 160,000 185 40,000 200,000 200,000

Allegheny 837 A13 28544 Glenwood Bridge Ramps C BRDG NHPP 5,200,000 185 1,300,000 6,500,000 6,500,000

Allegheny 837 A13 28544 Glenwood Bridge Ramps C BRDG NHPP 8,320,000 185 2,080,000 10,400,000 10,400,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood F XRST 581 800,000 800,000 800,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood U XRST 581 100,000 100,000 100,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood R XRST 581 100,000 100,000 100,000

Allegheny 837 A38 94648 837/7th Ave - Kennywood C XRST 581 8,000,000 8,000,000 8,000,000

Allegheny 837 A42 98085 837/33rd St to Smithfield P SAMI CAQ 200,000 581 50,000 250,000 250,000

Allegheny 837 A42 98085 837/33rd St to Smithfield F SAMI CAQ 400,000 581 100,000 500,000 500,000

Allegheny 837 A42 98085 837/33rd St to Smithfield R SAMI CAQ 40,000 581 10,000 50,000 50,000

Allegheny 837 A42 98085 837/33rd St to Smithfield C SAMI CAQ 4,000,000 581 1,000,000 5,000,000 5,000,000

Allegheny 910 A33 63322 SR 910 over Deer Creek F BRDG 185 250,000 250,000 250,000

Allegheny 910 A33 63322 SR 910 over Deer Creek C BRDG 581 4,900,000 4,900,000 4,900,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR F BRDG STP 400,000 185 100,000 500,000 500,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR U BRDG STP 240,000 185 60,000 300,000 300,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR R BRDG STP 80,000 185 20,000 100,000 100,000

Allegheny 1001 A37 27266 Freeport Rd Br over RR C BRDG 581 5,000,000 5,000,000 5,000,000

Allegheny 1001 TAP 102963Etna Green Stretscape2TAP C TENH TAU 350,000 350,000 350,000

Allegheny 1019 A06 63351 Days Run Bridge F BRDG BOF 120,000 185 30,000 150,000 150,000

Allegheny 1019 A06 63351 Days Run Bridge U BRDG BOF 40,000 185 10,000 50,000 50,000

Allegheny 1019 A06 63351 Days Run Bridge R BRDG BOF 40,000 185 10,000 50,000 50,000

Allegheny 1019 A06 63351 Days Run Bridge C BRDG BOF 800,000 185 200,000 1,000,000 1,000,000

Page 11: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

11 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 1020 A03 63353 Russellton-Dorseyville Br F BRDG 185 212,000 212,000 212,000

Allegheny 1020 A03 63353 Russellton-Dorseyville Br R BRDG 185 20,000 20,000 20,000

Allegheny 1028 A10 27292 Culmerville Truss Bridge P BRDG 185 300,000 300,000 300,000

Allegheny 1028 A10 27292 Culmerville Truss Bridge C BRDG STP 2,720,000 185 680,000 3,400,000 3,400,000

Allegheny 1028 A11 63356 P3-Bakerstown Road Bridge R BRDG 185 95,000 95,000 95,000

Allegheny 1031 A01 78269 1031 over Lardington Run F BRDG BOF 40,000 185 160,000 200,000 200,000

Allegheny 1031 A01 78269 1031 over Lardington Run C BRDG 185 900,000 900,000 900,000

Allegheny 1034 A07 63513 P3-Bull Creek Rd Bridge R BRDG 185 76,000 76,000 76,000

Allegheny 1038 000 63515 New Kensington Br P BRDG 581 500,000 500,000 500,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run F BRDG 185 150,000 150,000 150,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run U BRDG 185 50,000 50,000 50,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run R BRDG 185 75,000 75,000 75,000

Allegheny 2010 A04 28118 2010,LovedaleBr/Wylie Run C BRDG 185 2,000,000 2,000,000 2,000,000

Allegheny 2031 A02 61345 Lincoln Way Improvement C SAMI CAQ 450,000 450,000 450,000

Allegheny 2037 A11 28117 2037 Tri-Boro Paint C BRDG NHPP 3,548,000 185 887,000 4,435,000 4,435,000

Allegheny 2040 A10 26690 Brownsville@Broughton Rd R HRST STP 300,000 75,000 375,000 375,000

Allegheny 2040 A16 28025 2040/OlLebanon Church F HRST 581 250,000 250,000 250,000

Allegheny 2040 A16 28025 2040/OlLebanon Church +C HRST NHPP 6,000,000 6,000,000 6,000,000

Allegheny 2040 A16 28025 2040/OlLebanon Church +C HRST NHPP 7,298,400 7,298,400 7,298,400

Allegheny 2040 A18 77348 Curry Hollow Rd Br/CSX U BRDG 185 75,000 75,000 75,000

Allegheny 2082 A08 57100 Hulton Road Bridge C BRDG NHPP 7,803,500 7,803,500 7,803,500

Allegheny 2094 A04 28345 Jerome Street Bridge P BRDG 581 500,000 500,000 500,000

Allegheny 2114 000 63583 McKeesport Duq Br P BRDG 581 600,000 600,000 600,000

Allegheny 2128 A02 81750 Tenth Street Bypass +F XRST NHPP 200,000 200,000 200,000

Allegheny 2128 A02 81750 Tenth Street Bypass +U XRST NHPP 50,000 50,000 50,000

Allegheny 2128 A02 81750 Tenth Street Bypass +R XRST NHPP 50,000 50,000 50,000

Allegheny 2128 A02 81750 Tenth Street Bypass +C XRST NHPP 4,000,000 4,000,000 4,000,000

Allegheny 2128 A02 81750 Tenth Street Bypass +C XRST NHPP 3,000,000 3,000,000 3,000,000

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R F BRDG STP 240,000 185 60,000 300,000 300,000

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R R BRDG STP 40,000 185 10,000 50,000 50,000

Allegheny 2152 A01 28159 Ramp - Rodi Rd/Chalfont R C BRDG STP 960,000 185 240,000 1,200,000 1,200,000

Allegheny 3004 A12 100981McMurray - Clifton Road P SAMI STP 60,000 581 15,000 75,000 75,000

Allegheny 3004 A12 100981McMurray - Clifton Road C SAMI STP 960,000 581 240,000 1,200,000 1,200,000

Allegheny 3004 A13 100963McLaughlin Rn Rd@McMillia S HCON 581 100,000 100,000 100,000

Allegheny 3004 A13 100963McLaughlin Rn Rd@McMillia P HCON 581 60,000 60,000 60,000

Allegheny 3004 A13 100963McLaughlin Rn Rd@McMillia P HCON 581 200,000 200,000 200,000

Allegheny 3005 A05 28520 Mayview Road Bridge F BRDG 185 500,000 500,000 500,000

Allegheny 3005 A05 28520 Mayview Road Bridge U BRDG 185 100,000 100,000 100,000

Allegheny 3005 A05 28520 Mayview Road Bridge R BRDG 185 100,000 100,000 100,000

Allegheny 3005 A05 28520 Mayview Road Bridge C BRDG 185 800,000 800,000 800,000

Page 12: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

12 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 3005 A05 28520 Mayview Road Bridge C BRDG 185 1,200,000 1,200,000 1,200,000

Allegheny 3005 TAP 102964MayviewRdSidewalk-TAP C TENH TAU 334,650 334,650 334,650

Allegheny 3009 A20 1009703009/South Park @Logan Rd P HRST 581 100,000 100,000 100,000

Allegheny 3009 A20 1009703009/South Park @Logan Rd P HRST 581 300,000 300,000 300,000

Allegheny 3027 A05 28525 Smithfield St Bridge F BRDG 185 800,000 800,000 800,000

Allegheny 3027 A05 28525 Smithfield St Bridge U BRDG 185 100,000 100,000 100,000

Allegheny 3027 A05 28525 Smithfield St Bridge R BRDG 185 400,000 400,000 400,000

Allegheny 3027 A05 28525 Smithfield St Bridge C BRDG STU 4,000,000 581 6,000,000 10,000,000 10,000,000

Allegheny 3028 A02 78245 Preston Sygan ov Thoms Rn C BRDG BOF 50,000 50,000 50,000

Allegheny 3039 000 26546 3039/ConrailRR,Robinson P BRDG 581 300,000 300,000 300,000

Allegheny 3042 A06 103204Grp 111-15-7135-1 C HRST 581 300,000 300,000 300,000

Allegheny 3044 A01 81668 3044/Washington Rd- Scott F HRST 581 150,000 150,000 150,000

Allegheny 3044 A01 81668 3044/Washington Rd- Scott C HRST 581 3,000,000 3,000,000 3,000,000

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R F BRDG 185 200,000 200,000 200,000

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R U BRDG 185 50,000 50,000 50,000

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R R BRDG 185 50,000 50,000 50,000

Allegheny 3048 A17 28158 Noblestown Rd Br/Scotts R C BRDG 185 1,250,000 1,250,000 1,250,000

Allegheny 3069 0 26614 LibertyTunnel Interchange P HRST STP 150,000 150,000 150,000

Allegheny 3069 A14 74153 Liberty Tunnel Rehab Ph 4 C BRDG NHPP 1,300,000 1,300,000 1,300,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge U HRST NHPP 120,000 120,000 120,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 960,000 960,000 960,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 26,000,000 26,000,000 26,000,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 400,000 400,000 400,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 15,000,000 15,000,000 15,000,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 15,000,000 15,000,000 15,000,000

Allegheny 3069 A20 28500 SR 3069, Liberty Bridge C BRDG NHPP 21,648,000 21,648,000 21,648,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 +F BRDG NHPP 600,000 600,000 600,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 U BRDG NHPP 375,000 125,000 500,000 500,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 R BRDG NHPP 500,000 500,000 500,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 C BRDG NHPP 7,200,000 581 1,800,000 9,000,000 9,000,000

Allegheny 3069 A21 92930 Liberty Tunnel Phase 5 C BRDG NHPP 8,000,000 581 2,000,000 10,000,000 10,000,000

Allegheny 3073 0 86859 Thorn Run Rd Interchange C HCON 6,200,000 6,200,000 6,200,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert F BRDG BOF 400,000 185 100,000 500,000 500,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert U BRDG BOF 40,000 185 10,000 50,000 50,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert R BRDG BOF 80,000 185 20,000 100,000 100,000

Allegheny 3089 A14 73054 HookstownGrade &Flaughert C BRDG 185 4,400,000 4,400,000 4,400,000

Allegheny 3098 A03 27431 SR 3098/Glass Run Bridge U BRDG 185 235,000 235,000 235,000

Allegheny 3098 A03 27431 SR 3098/Glass Run Bridge C BRDG STU 800,000 800,000 800,000

Allegheny 3104 A03 28344 McKees Rocks Bridge P BRDG 581 600,000 600,000 600,000

Allegheny 3109 A12 104230RMU turnlane - EconDev C HCON 581 242,550 242,550 242,550

Page 13: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

13 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 3110 A02 28141 Shaler Street over US 19 F BRDG BOF 160,000 185 40,000 200,000 200,000

Allegheny 3110 A02 28141 Shaler Street over US 19 U BRDG BOF 40,000 185 10,000 50,000 50,000

Allegheny 3110 A02 28141 Shaler Street over US 19 R BRDG BOF 160,000 185 40,000 200,000 200,000

Allegheny 3110 A02 28141 Shaler Street over US 19 C BRDG BOF 800,000 185 200,000 1,000,000 1,000,000

Allegheny 4003 0 94658 4003McKnight Surveillance +C SAMI CAQ 640,000 640,000 640,000

Allegheny 4003 A16 78410 McKnight Rd over Pine Ck C BRDG NHPP 4,800,000 185 1,200,000 6,000,000 6,000,000

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys F BRDG NHPP 200,000 185 50,000 250,000 250,000

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys R BRDG NHPP 40,000 185 10,000 50,000 50,000

Allegheny 4009 A11 27394 4009/Babcock Blvd/Girtys C BRDG NHPP 1,600,000 185 400,000 2,000,000 2,000,000

Allegheny 4017 A03 73055 4017 ov Little Pine Creek P BRDG 581 300,000 300,000 300,000

Allegheny 4022 A09 1028744022/I79 - Arndt C HRST STU 2,000,000 2,000,000 4,000,000 4,000,000

Allegheny 4052 A09 86922 Warrendale-Bayne Impr III C SAMI D4R 557,542 1,200,000 1,757,542 1,757,542

Allegheny 4052 A09 86922 Warrendale-Bayne Impr III C SAMI STP 285,000 285,000 285,000

Allegheny 4084 A04 96561 4084/East St -Chestnut F XRST STU 874,965 874,965 874,965

Allegheny 4084 A04 96561 4084/East St -Chestnut U XRST STU 25,000 25,000 25,000

Allegheny 4084 A04 96561 4084/East St -Chestnut R XRST STU 30,000 30,000 30,000

Allegheny 4084 A04 96561 4084/East St -Chestnut C BRDG STP 800,000 183 150,000 50,000 1,000,000 1,000,000

Allegheny 4084 A04 96561 4084/East St -Chestnut C XRST STU 5,600,000 581 1,400,000 7,000,000 7,000,000

Allegheny 4084 A04 96561 4084/East St -Chestnut C XRST 581 6,000,000 6,000,000 6,000,000

Allegheny 4086 A05 102210Pine Creek Road @ SR19 C SAMI 581 1,400,000 1,400,000 1,400,000

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn P IMAN 581 500,000 500,000 500,000

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn P IMAN 581 2,500,000 2,500,000 2,500,000

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn P IMAN 581 3,895,850 3,895,850 3,895,850

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn F IMAN 581 3,500,000 3,500,000 3,500,000

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn F IMAN 581 3,602,726 3,602,726 3,602,726

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn U IMAN 581 1,014,944 1,014,944 1,014,944

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn R IMAN 581 956,682 956,682 956,682

Allegheny 6279 A07 87772 6279/279-Ft Duq /Camp Hrn C IMAN NHPP 7,012,212 7,012,212 7,012,212

Allegheny 7105 LOC 93913 Sutersville Bridge P BRDG STP 200,000 183 37,500 12,500 250,000 250,000

Allegheny 7105 LOC 93913 Sutersville Bridge P BRDG STP 440,000 183 82,500 27,500 550,000 550,000

Allegheny 7105 LOC 93913 Sutersville Bridge F BRDG STP 440,000 183 82,500 27,500 550,000 550,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. F BRDG NHPP 480,000 183 90,000 30,000 600,000 600,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. U BRDG NHPP 8,000 183 1,500 500 10,000 10,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. R BRDG NHPP 32,000 183 6,000 2,000 40,000 40,000

Allegheny 7110 LOC 78212 (OB04) Fleming Park Br. C BRDG NHPP 6,400,000 183 1,200,000 400,000 8,000,000 8,000,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 F BRDG 183 160,000 40,000 200,000 200,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 U BRDG 183 24,000 6,000 30,000 30,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 R BRDG 183 24,000 6,000 30,000 30,000

Allegheny 7116 BR 27332 Jacks Run Bridge No. 4 C BRDG 183 1,000,000 250,000 1,250,000 1,250,000

Allegheny 7118 LOC 27159 Pine Creek Br. #6 (PS06) C BRDG 183 1,200,000 300,000 1,500,000 1,500,000

Page 14: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

14 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 7119 0 88418 (RS04) Robinson Run F BRDG 183 200,000 50,000 250,000 250,000

Allegheny 7119 0 88418 (RS04) Robinson Run U BRDG 183 12,000 3,000 15,000 15,000

Allegheny 7119 0 88418 (RS04) Robinson Run R BRDG 183 24,000 6,000 30,000 30,000

Allegheny 7119 0 88418 (RS04) Robinson Run C BRDG 183 1,200,000 300,000 1,500,000 1,500,000

Allegheny 7203 0 86186 Aten Road ov Industry Dr C BRDG BOF 2,000,000 183 375,000 125,000 2,500,000 2,500,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. U BRDG 183 12,800 3,200 16,000 16,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. R BRDG 183 17,600 4,400 22,000 22,000

Allegheny 7203 LOC 81667 (MN01) Montour Run #1 Br. C BRDG 183 680,000 170,000 850,000 850,000

Allegheny 7301 0 76388 6th St Br Rehab F BRDG NHPP 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7301 0 76388 6th St Br Rehab F BRDG NHPP 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7301 0 88541 7th St Br Rehab F BRDG STU 800,000 183 150,000 50,000 1,000,000 1,000,000

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 1,409,666 183 26,431 8,810 1,444,907 1,444,907

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 4,422,544 183 829,227 276,409 5,528,180 5,528,180

Allegheny 7301 0 88541 7th St Br Rehab C BRDG STU 4,422,544 183 829,227 276,409 5,528,180 5,528,180

Allegheny 7301 0 88719 9th St Br Rehab F BRDG NHPP 560,000 183 105,000 35,000 700,000 700,000

Allegheny 7301 0 88719 9th St Br Rehab F BRDG NHPP 240,000 183 45,000 15,000 300,000 300,000

Allegheny 7301 0 88719 9th St Br Rehab C BRDG NHPP 4,000,000 183 750,000 25,000 4,775,000 4,775,000

Allegheny 7301 0 88719 9th St Br Rehab C BRDG NHPP 8,000,000 183 1,500,000 500,000 10,000,000 10,000,000

Allegheny 7301 LOC 27144 28th Street Bridge P BRDG BOF 600,000 183 112,500 37,500 750,000 750,000

Allegheny 7301 LOC 27144 28th Street Bridge F BRDG BOF 413,600 183 77,550 25,850 517,000 517,000

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. F BRDG BOF 430,000 183 80,625 26,875 537,500 537,500

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. R BRDG BOF 52,000 183 9,750 3,250 65,000 65,000

Allegheny 7301 LOC 27300 W Ohio St/Ridge Ave Br's. C BRDG BOF 3,568,000 183 669,000 223,000 4,460,000 4,460,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl F BRDG BOF 440,000 183 82,500 27,500 550,000 550,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl U BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl R BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Allegheny 7301 LOC 27462 Second Ave Bridge Repl C BRDG BOF 1,969,000 183 369,188 123,063 2,461,251 2,461,251

Allegheny 7301 LOC 27462 Second Ave Bridge Repl C BRDG BOF 2,000,000 183 375,000 125,000 2,500,000 2,500,000

Allegheny 7301 LOC 27747 Swinburne Bridge P BRDG BOF 640,000 183 120,000 40,000 800,000 800,000

Allegheny 7301 LOC 27747 Swinburne Bridge F BRDG BOF 520,000 183 97,500 32,500 650,000 650,000

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 R BRDG BOF 256,000 183 48,000 16,000 320,000 320,000

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG STU 7,052,000 183 1,322,250 440,750 8,815,000 8,815,000

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG BOF 4,381,400 183 821,513 273,838 5,476,751 5,476,751

Allegheny 7301 LOC 28258 Greenfield Ave Bridge #39 C BRDG BOF 800,000 183 150,000 50,000 1,000,000 1,000,000

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG STU 3,000,000 183 562,500 187,500 3,750,000 3,750,000

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG NHPP 7,000,000 183 1,312,500 437,500 8,750,000 8,750,000

Allegheny 7301 LOC 79881 S.10th St Br (MA11) Rehab C BRDG NHPP 8,000,000 183 1,500,000 500,000 10,000,000 10,000,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge F BRDG STU 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge F BRDG STU 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7301 LOC 83137 South Negley Ave. Bridge U BRDG STU 80,000 183 15,000 5,000 100,000 100,000

Page 15: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

15 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Allegheny 7301 LOC 83137 South Negley Ave. Bridge R BRDG STU 40,000 183 7,500 2,500 50,000 50,000

Allegheny 7415 LOC 80025 CC06 Chartiers Creek Br#6 C BRDG BOF 741,240 741,240 741,240

Allegheny 7420 LOC 28426 Coraopolis Bridge P BRDG STP 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7448 LOC 79934 HV04 Homeville Cr. Br #4 C BRDG 183 3,200 800 4,000 4,000

Allegheny 7449 LOC 76393 Dooker's Hollow Bridge F BRDG STP 560,000 183 105,000 35,000 700,000 700,000

Allegheny 7449 LOC 76393 Dooker's Hollow Bridge R BRDG STP 320,000 183 60,000 20,000 400,000 400,000

Allegheny 7449 LOC 76393 Dooker's Hollow Bridge C BRDG STP 3,000,000 183 562,500 187,500 3,750,000 3,750,000

Allegheny 7456 LOC 93915 Talbot Ave Ramp Bridge P BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7456 LOC 93915 Talbot Ave Ramp Bridge F BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge P BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7456 LOC 93917 Kenmawr Ave Ramp Bridge F BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS F BRDG NHPP 800,000 183 100,000 100,000 1,000,000 1,000,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS U BRDG NHPP 600,000 183 75,000 75,000 750,000 750,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS R BRDG NHPP 200,000 183 25,000 25,000 250,000 250,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS R BRDG NHPP 600,000 183 75,000 75,000 750,000 750,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS C BRDG NHPP 600,000 183 75,000 75,000 750,000 750,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS C BRDG NHPP 2,000,000 183 250,000 250,000 2,500,000 2,500,000

Allegheny 7463 BR 27543 Kenmawr Br ov NS C BRDG NHPP 4,600,000 183 575,000 575,000 5,750,000 5,750,000

Allegheny 7473 LOC 76447 Homeville Viaduct C BRDG NHPP 4,000,000 183 750,000 250,000 5,000,000 5,000,000

Allegheny 7473 LOC 76447 Homeville Viaduct C BRDG NHPP 4,800,000 183 900,000 300,000 6,000,000 6,000,000

Totals for: Allegheny 163,390,568 46,048,038 55,094,253 264,532,859 161,133,997 58,771,025 23,317,518 243,222,540 190,922,958 71,952,300 6,108,572 268,983,830 159,369,858 78,195,602 7,452,766 245,018,226 1,021,757,455

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG STP 100,990 183 122,700 223,690 223,690

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 185 509,287 509,287 509,287

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG STP 1,591,400 185 157,130 1,748,530 1,748,530

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG NHPP 3,278,200 185 359,600 3,637,800 3,637,800

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG STU 336,830 336,830 336,830

Armstrong 79843 SPC D-10 Hwy/Bridge Line C BRDG 185 1,316,500 1,316,500 1,316,500

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HCON 581 523,000 523,000 523,000

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HRST NHPP 1,360 1,360 1,360

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HRST NHPP 511,760 511,760 511,760

Armstrong 79843 SPC D-10 Hwy/Bridge Line C HRST NHPP 373,900 373,900 373,900

Armstrong 101886ArmstrongHwy.ResufaceLine C HRST 581 3,134,000 3,134,000 3,134,000

Armstrong 101886ArmstrongHwy.ResufaceLine C HRST 581 4,333,000 4,333,000 4,333,000

Armstrong 1018962018 Amstrong DFB Line F BRDG 185 53,100 53,100 53,100

Armstrong 1018962018 Amstrong DFB Line U BRDG 185 32,800 32,800 32,800

Armstrong 1018962018 Amstrong DFB Line R BRDG 185 11,000 11,000 11,000

Armstrong 1018962018 Amstrong DFB Line C BRDG 185 394,000 394,000 394,000

Armstrong 88779 SPC/D10 Br. PreCon Line P BRDG STP 118,740 118,740 118,740

Armstrong 88779 SPC/D10 Br. PreCon Line P BRDG STP 865,320 185 446,615 1,311,935 1,311,935

Armstrong 88779 SPC/D10 Br. PreCon Line P BRDG BOF 120,480 185 121,935 242,415 242,415

Page 16: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

16 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Armstrong 88782 Arm. Co. Local Br. Line P BRDG BOF 240,400 183 45,075 15,025 300,500 300,500

Armstrong BR 23813 T-748 Lower Pine Run Br. C BRDG BOF 25,600 179 1,600 27,200 27,200

Armstrong BR 23813 T-748 Lower Pine Run Br. C BRDG 183 4,800 4,800 4,800

Armstrong 18A 102788Jacob St Pave/Ped Improve C TENH TAU 217,297 217,297 217,297

Armstrong 28 101 91262 Hays Run 3R P HRST 581 67,065 67,065 67,065

Armstrong 28 101 91262 Hays Run 3R F HRST 581 82,335 82,335 82,335

Armstrong 28 112 69141 Goheenville Dip U HRST 581 218,600 218,600 218,600

Armstrong 28 112 69141 Goheenville Dip R HRST 581 422,300 422,300 422,300

Armstrong 28 112 69141 Goheenville Dip C HRST 581 6,000,000 6,000,000 6,000,000

Armstrong 28 168 102436SR 28 AVE Bridges C BRDG NHPP 2,250,000 2,250,000 2,250,000

Armstrong 28 1S0 103662Goheenville Slide ROW R HRST 581 12,000 12,000 12,000

Armstrong 56 153 74198 Apollo Bridge F BRDG 185 273,200 273,200 273,200

Armstrong 56 154 89973 Glorietta Bridge #1 F BRDG 185 273,200 273,200 273,200

Armstrong 56 155 90002 Glorietta Bridge #2 F BRDG 185 273,200 273,200 273,200

Armstrong 56 156 103146SR56 Apollo Group Bridges P BRDG STP 556,320 185 139,080 695,400 695,400

Armstrong 66 156 96693 Guffy Run Group Bridges F BRDG 581 618,000 618,000 618,000

Armstrong 66 156 96693 Guffy Run Group Bridges U BRDG 581 79,600 79,600 79,600

Armstrong 66 156 96693 Guffy Run Group Bridges R BRDG 581 72,100 72,100 72,100

Armstrong 66 156 96693 Guffy Run Group Bridges C BRDG STP 2,098,080 185 524,520 2,622,600 2,622,600

Armstrong 68 154 77930 Bradys Bend Bridge #2 C BRDG 185 83,000 83,000 83,000

Armstrong 68 158 24009 Bradys Bend Bridge #6 C BRDG 185 68,000 68,000 68,000

Armstrong 85 153 83200 Sunnyside Bridge #2 F BRDG 185 61,800 61,800 61,800

Armstrong 85 153 83200 Sunnyside Bridge #2 F HRST STP 247,200 247,200 247,200

Armstrong 85 153 83200 Sunnyside Bridge #2 U BRDG 581 53,100 53,100 53,100

Armstrong 85 153 83200 Sunnyside Bridge #2 R BRDG 185 10,300 10,300 10,300

Armstrong 85 153 83200 Sunnyside Bridge #2 R HRST STP 41,200 41,200 41,200

Armstrong 85 153 83200 Sunnyside Bridge #2 C BRDG 581 3,182,700 3,182,700 3,182,700

Armstrong 422 116 102366Shelocta to Whitesburg PM C HRST 581 2,953,000 2,953,000 2,953,000

Armstrong 422 199 91252 Wray Road Cut P HRST 581 40,000 40,000 40,000

Armstrong 422 199 91252 Wray Road Cut F HRST 581 438,000 438,000 438,000

Armstrong 422 199 91252 Wray Road Cut U HRST 581 710,300 710,300 710,300

Armstrong 422 199 91252 Wray Road Cut R HRST 581 1,060,900 1,060,900 1,060,900

Armstrong 422 199 91252 Wray Road Cut C HRST 581 8,391,000 8,391,000 8,391,000

Armstrong 422 199 91252 Wray Road Cut C HRST 581 8,000,000 8,000,000 8,000,000

Armstrong 422 19A 91249 Kittanning Elementary Int F SAMI 581 448,040 448,040 448,040

Armstrong 422 19A 91249 Kittanning Elementary Int U SAMI 581 67,600 67,600 67,600

Armstrong 422 19A 91249 Kittanning Elementary Int R SAMI 581 212,200 212,200 212,200

Armstrong 422 19A 91249 Kittanning Elementary Int C SAMI NHPP 3,278,200 581 819,550 4,097,750 4,097,750

Armstrong 422 19A 91249 Kittanning Elementary Int C SAMI NHPP 5,900,760 581 1,475,190 7,375,950 7,375,950

Armstrong 422 19B 85574 Margaret Rd Intersection F HCON 581 795,700 795,700 795,700

Page 17: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

17 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Armstrong 422 19B 85574 Margaret Rd Intersection +U HCON NHPP 65,600 65,600 65,600

Armstrong 422 19B 85574 Margaret Rd Intersection +R HCON NHPP 437,100 437,100 437,100

Armstrong 839 151 24085 South of Dayton Bridge U BRDG 185 50,000 50,000 50,000

Armstrong 1021 153 23765 Eddyville Bridge #2 U BRDG 185 16,900 16,900 16,900

Armstrong 1021 153 23765 Eddyville Bridge #2 C BRDG 185 1,800,900 1,800,900 1,800,900

Armstrong 1029 150 24016 Mount Zion Church Bridge F BRDG 185 25,800 25,800 25,800

Armstrong 1029 150 24016 Mount Zion Church Bridge U BRDG 185 6,200 6,200 6,200

Armstrong 1029 150 24016 Mount Zion Church Bridge R BRDG 185 11,400 11,400 11,400

Armstrong 1029 150 24016 Mount Zion Church Bridge C BRDG 185 403,200 403,200 403,200

Armstrong 1037 151 23792 Echo Bridge U BRDG 185 45,100 45,100 45,100

Armstrong 1037 151 23792 Echo Bridge C BRDG 185 1,913,400 1,913,400 1,913,400

Armstrong 1039 151 79606 South Bryan Bridge # 2 U BRDG 185 50,000 50,000 50,000

Armstrong 1040 190 102640Water & Market St. Resurf C HRST 581 300,000 300,000 300,000

Armstrong 1040 190 102640Water & Market St. Resurf C HRST 581 700,000 700,000 700,000

Armstrong 1422 0 91279 Indiana Hill PM C HRST 581 822,800 822,800 822,800

Armstrong 2027 0 91794 Fagley Run Bridge #2 F BRDG 185 51,500 51,500 51,500

Armstrong 2027 0 91794 Fagley Run Bridge #2 U BRDG 185 31,900 31,900 31,900

Armstrong 2027 0 91794 Fagley Run Bridge #2 R BRDG 185 10,700 10,700 10,700

Armstrong 2027 0 91794 Fagley Run Bridge #2 C BRDG 185 406,500 406,500 406,500

Armstrong 2029 150 94600 Logansport Bridge U BRDG 185 60,000 60,000 60,000

Armstrong 2029 150 94600 Logansport Bridge C BRDG BOF 1,600,000 185 400,000 2,000,000 2,000,000

Armstrong 3013 150 24153 Nichola Bridge #1 U BRDG 185 50,000 50,000 50,000

Armstrong 3017 152 83284 Center Hill Bridge #6 U BRDG 185 100,000 100,000 100,000

Armstrong 4002 150 74201 Queenstown Road Bridge U BRDG 185 10,600 10,600 10,600

Armstrong 4002 150 74201 Queenstown Road Bridge C BRDG 185 314,200 314,200 314,200

Armstrong 4003 150 77924 Bradys Bend Bridge #16 F BRDG 185 371,400 371,400 371,400

Armstrong 7206 0 67132 T-746 Nu Mine Bridge C BRDG BOF 206,960 206,960 206,960

Armstrong 7206 0 67132 T-746 Nu Mine Bridge C BRDG BOF 864,240 183 200,850 66,950 1,132,040 1,132,040

Armstrong 7206 0 95856 T-720 Hoosicks Bridge F BRDG BOF 247,200 183 46,350 15,450 309,000 309,000

Armstrong 7206 0 95856 T-720 Hoosicks Bridge U BRDG BOF 26,240 183 4,920 1,640 32,800 32,800

Armstrong 7206 0 95856 T-720 Hoosicks Bridge R BRDG BOF 25,520 183 4,785 1,595 31,900 31,900

Armstrong 7206 0 95856 T-720 Hoosicks Bridge C BRDG BOF 731,280 183 137,115 45,705 914,100 914,100

Armstrong 7206 0 95856 T-720 Hoosicks Bridge C BRDG BOF 580,000 183 108,750 36,250 725,000 725,000

Armstrong 8010 150 23896 Garretts Ramp Bridge C BRDG NHPP 840,000 840,000 840,000

Totals for: Armstrong 6,452,867 8,892,922 15,450 15,361,239 2,992,920 7,399,600 68,545 10,461,065 11,357,250 16,061,195 62,370 27,480,815 6,975,140 25,593,275 36,250 32,604,665 85,907,784

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000 200,000

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000 200,000

Beaver 75342 Betterment Reserve Beaver F HRST STP 200,000 200,000 200,000

Beaver 75342 Betterment Reserve Beaver C HRST STP 1,000,000 1,000,000 1,000,000

Beaver 75342 Betterment Reserve Beaver C HRST STP 2,000,000 2,000,000 2,000,000

Page 18: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

18 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Beaver 75342 Betterment Reserve Beaver C HRST STP 5,000,000 5,000,000 5,000,000

Beaver 75342 Betterment Reserve Beaver C HRST 581 5,250,000 5,250,000 5,250,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 400,000 400,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000 500,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000 500,000

Beaver 76582 Beaver - Bridge Line Item F BRDG STP 400,000 185 100,000 500,000 500,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 800,000 800,000 800,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Beaver 76582 Beaver - Bridge Line Item C BRDG STP 800,000 185 1,047,000 1,847,000 1,847,000

Beaver 76582 Beaver - Bridge Line Item C BRDG 185 1,820,000 1,820,000 1,820,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000 80,000

Beaver 76599 Beaver - Geotech. Reserve F SAMI STP 80,000 80,000 80,000

Beaver 102594Aliquippa Tin Mill Site C IMOD 581 2,487,536 2,487,536 2,487,536

Beaver LOC 102058Economy Way Extension S LRST 250,000 250,000 250,000

Beaver PT 75075 BCTA Bus Replacement C PT CAQ 1,990,400 497,600 2,488,000 2,488,000

Beaver RR 102759School House Rd (NS) C SAMI RRX 180,250 180,250 180,250

Beaver RR 102759School House Rd (NS) C SAMI RRX 180,250 180,250 180,250

Beaver 18 B45 91582 18/32nd St - SR 551 U HCON 581 150,000 150,000 150,000

Beaver 18 B45 91582 18/32nd St - SR 551 C XRST NHPP 1,000,000 1,000,000 1,000,000

Beaver 18 LOC 28898 Veterans Memorial Bridge C BRDG BOF 520,000 179 32,500 552,500 552,500

Beaver 18 LOC 28898 Veterans Memorial Bridge C BRDG 183 97,500 97,500 97,500

Beaver 30 B07 29045 TR 30 Upgrade P XRST SXF 50,000 50,000 50,000

Beaver 30 B07 29045 TR 30 Upgrade F XRST SXF 450,000 450,000 450,000

Beaver 30 B07 29045 TR 30 Upgrade R XRST SXF 500,000 500,000 500,000

Beaver 30 B07 29045 TR 30 Upgrade C XRST SXF 1,503,200 581 2,496,800 4,000,000 4,000,000

Beaver 30 B07 29045 TR 30 Upgrade C XRST 581 4,000,000 4,000,000 4,000,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr F BRDG 185 100,000 100,000 100,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr U BRDG 185 50,000 50,000 50,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr R BRDG 185 50,000 50,000 50,000

Beaver 30 B20 28953 SR 30 over Little Hill Cr C BRDG 185 1,600,000 1,600,000 1,600,000

Beaver 65 0 97910 PA 65/AlleghenyCo - SR51 C HRST 581 10,100,000 10,100,000 10,100,000

Beaver 65 B28 75773 65/Mercer & Zelienople Rd C HRST 581 6,000,000 6,000,000 6,000,000

Beaver 65 B28 75773 65/Mercer & Zelienople Rd C HRST 581 1,700,000 1,700,000 1,700,000

Beaver 65 B29 29032 65/CrowsRun-Ramp C P HRST NHPP 100,000 100,000 100,000

Beaver 68 B35 88455 68/Buffalo - B&O Rail C XRST 581 750,000 750,000 750,000

Beaver 168 B16 70797 168 Salem Church Rd Br F BRDG STP 160,000 185 40,000 200,000 200,000

Beaver 168 B16 70797 168 Salem Church Rd Br R BRDG STP 40,000 185 10,000 50,000 50,000

Beaver 168 B16 70797 168 Salem Church Rd Br +C BRDG STP 550,000 550,000 550,000

Page 19: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

19 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Beaver 251 B15 89069 PA 251 Blackhawk Road Br F BRDG 185 175,000 175,000 175,000

Beaver 251 B15 89069 PA 251 Blackhawk Road Br U BRDG 185 80,000 80,000 80,000

Beaver 251 B15 89069 PA 251 Blackhawk Road Br R BRDG 185 80,000 80,000 80,000

Beaver 251 B15 89069 PA 251 Blackhawk Road Br C BRDG 581 1,600,000 1,600,000 1,600,000

Beaver 351 B10 28734 PA 351/Koppel Bridge F BRDG STP 1,600,000 185 400,000 2,000,000 2,000,000

Beaver 351 B10 28734 PA 351/Koppel Bridge R BRDG STP 200,000 185 50,000 250,000 250,000

Beaver 351 B10 28734 PA 351/Koppel Bridge C BRDG 581 7,500,000 7,500,000 7,500,000

Beaver 376 0 101828I-376/SR 18 Interchg Proj C HCON 60,000,000 60,000,000 60,000,000

Beaver 376 B04 29162 Vanport Bridge Rehab F IMAN 185 1,287,500 1,287,500 1,287,500

Beaver 376 B04 29162 Vanport Bridge Rehab U IMAN 185 257,500 257,500 257,500

Beaver 376 B04 29162 Vanport Bridge Rehab R IMAN 185 412,000 412,000 412,000

Beaver 376 B04 29162 Vanport Bridge Rehab C IMAN 185 8,047,457 8,047,457 8,047,457

Beaver 376 B04 29162 Vanport Bridge Rehab C IMAN 185 8,047,457 8,047,457 8,047,457

Beaver 376 B07 101534376 Beaver Joint Repl C BRDG NHPP 260,000 260,000 260,000

Beaver 588 B18 91922 Stiffen Hill Road Br F BRDG STP 160,000 185 40,000 200,000 200,000

Beaver 588 B18 91922 Stiffen Hill Road Br U BRDG STP 8,000 185 2,000 10,000 10,000

Beaver 588 B18 91922 Stiffen Hill Road Br R BRDG STP 40,000 185 10,000 50,000 50,000

Beaver 588 B18 91922 Stiffen Hill Road Br C BRDG STP 1,000,000 1,000,000 1,000,000

Beaver 1016 B03 78305 Anderson, Blockhouse F BRDG BOF 320,000 185 80,000 400,000 400,000

Beaver 1016 B03 78305 Anderson, Blockhouse U BRDG BOF 10,000 185 40,000 50,000 50,000

Beaver 1016 B03 78305 Anderson, Blockhouse R BRDG BOF 80,000 185 20,000 100,000 100,000

Beaver 1016 B03 78305 Anderson, Blockhouse C BRDG 185 1,200,000 1,200,000 1,200,000

Beaver 1016 B04 29139 Tulip Drive Bridge C BRDG 185 1,500,000 1,500,000 1,500,000

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream P BRDG 185 2,156 2,156 2,156

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream F BRDG 185 300,000 300,000 300,000

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream U BRDG 185 72,844 72,844 72,844

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream R BRDG 185 45,000 45,000 45,000

Beaver 1026 B02 63341 SR 1026/Reno St ov Stream C BRDG 185 750,000 750,000 750,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON SXF 400,000 581 100,000 500,000 500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON 581 2,000,000 2,000,000 2,000,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C P HCON 581 2,000,000 2,000,000 2,000,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C F HCON 581 2,500,000 2,500,000 2,500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C F HCON 581 1,000,000 1,000,000 1,000,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C U HCON 581 2,000,000 2,000,000 2,000,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C U HCON 581 1,500,000 1,500,000 1,500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C R HCON 581 2,500,000 2,500,000 2,500,000

Beaver 2004 B06 67016 Freedom Rd Upgrade - Ph C C HCON 581 12,000,000 12,000,000 12,000,000

Beaver 2004 B08 82615 Freedom Rd Upgrade - Ph A R HRST 581 8,000,000 8,000,000 8,000,000

Beaver 2004 B08 82615 Freedom Rd Upgrade - Ph A C HCON 581 30,000,000 30,000,000 30,000,000

Beaver 2004 B09 82616 Freedom Rd Upgrade - Ph B C HCON 581 18,000,000 18,000,000 18,000,000

Page 20: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

20 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln P HRST 581 60,000 60,000 60,000

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln +C HRST STU 2,000,000 2,000,000 2,000,000

Beaver 2004 B11 29042 2004/989 to Butler Cty Ln +C HRST STU 1,000,000 1,000,000 1,000,000

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +F HRST STP 100,000 100,000 100,000

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +C HRST STP 2,000,000 2,000,000 2,000,000

Beaver 3002 B01 96713 3002/Frankfort -Broadhead +C HRST STP 1,000,000 1,000,000 1,000,000

Beaver 3016 0 102661East End Gateway, Ph 1 S LRST 100,000 100,000 100,000

Beaver 3016 B08 88373 3016/Brodhead-Sheffield C HRST 581 7,000,000 7,000,000 7,000,000

Beaver 3020 B04 28892 Service Creek Rd Bridge F BRDG BOF 80,000 185 20,000 100,000 100,000

Beaver 3020 B04 28892 Service Creek Rd Bridge U BRDG BOF 80,000 185 20,000 100,000 100,000

Beaver 3020 B04 28892 Service Creek Rd Bridge R BRDG BOF 20,000 185 5,000 25,000 25,000

Beaver 3020 B04 28892 Service Creek Rd Bridge C BRDG 185 2,250,000 2,250,000 2,250,000

Beaver 3026 B02 70798 Tomlinson Run Bridge P BRDG 185 125,000 125,000 125,000

Beaver 3026 B02 70798 Tomlinson Run Bridge F BRDG 185 125,000 125,000 125,000

Beaver 3026 B02 70798 Tomlinson Run Bridge U BRDG 185 50,000 50,000 50,000

Beaver 3026 B02 70798 Tomlinson Run Bridge R BRDG 185 50,000 50,000 50,000

Beaver 3026 B02 70798 Tomlinson Run Bridge C BRDG 185 750,000 750,000 750,000

Beaver 4020 000 29075 Dutch Ridge Rd Br/I-376 P BRDG 581 300,000 300,000 300,000

Beaver 4034 B03 89096 4034Westwood/Upper Dry Ru F BRDG 185 100,000 100,000 100,000

Beaver 4034 B03 89096 4034Westwood/Upper Dry Ru C BRDG BOF 400,000 185 100,000 500,000 500,000

Beaver 7206 LOC 92314 Lancaster Rd over Camp Rn C BRDG BOF 720,000 179 180,000 900,000 900,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 F BRDG 179 32,600 32,600 32,600

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 F BRDG 183 130,400 130,400 130,400

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 U BRDG 179 1,000 1,000 1,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 U BRDG 183 4,000 4,000 4,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 R BRDG 179 6,800 6,800 6,800

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 R BRDG 183 27,200 27,200 27,200

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 C BRDG 179 120,000 120,000 120,000

Beaver 7207 LOC 28810 CB 30, Upper Service CK 2 C BRDG 183 480,000 480,000 480,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +F BRDG BOF 168,000 179 42,000 210,000 210,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +U BRDG BOF 16,000 179 4,000 20,000 20,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +R BRDG BOF 28,000 7,000 35,000 35,000

Beaver 7216 BR 28831 CB52-McHenry Brdg #1 +C BRDG BOF 600,000 150,000 750,000 750,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. F BRDG BOF 280,000 183 52,500 17,500 350,000 350,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. R BRDG BOF 32,000 183 6,000 2,000 40,000 40,000

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG BOF 938,594 183 225,000 60,000 1,223,594 1,223,594

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG STP 261,406 261,406 261,406

Beaver 7302 LOC 89067 Henry Mancini Br. Pres. C BRDG STP 1,600,000 183 300,000 100,000 2,000,000 2,000,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge F BRDG BOF 116,000 179 29,000 145,000 145,000

Page 21: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

21 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge U BRDG BOF 120,000 179 30,000 150,000 150,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge R BRDG BOF 280,000 70,000 350,000 350,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge C BRDG BOF 480,000 120,000 600,000 600,000

Beaver 7412 LOC 28806 CB # 24 Brickyard Bridge C BRDG BOF 480,000 120,000 600,000 600,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct F BRDG 179 400,000 400,000 400,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct F BRDG 183 1,600,000 1,600,000 1,600,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct U BRDG 183 1,040,000 260,000 1,300,000 1,300,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct R BRDG 183 160,000 40,000 200,000 200,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct C BRDG STP 800,000 200,000 1,000,000 1,000,000

Beaver 7417 LOC 28899 CB-2, Homewood Viaduct C BRDG STP 2,800,000 700,000 3,500,000 3,500,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 F BRDG BOF 168,000 183 31,500 10,500 210,000 210,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 R BRDG BOF 28,000 183 5,250 1,750 35,000 35,000

Beaver 7423 BR 28904 Pittsfield Br - NB5 C BRDG BOF 640,000 183 120,000 40,000 800,000 800,000

Beaver 7424 LOC 57103 Washington Ave Br/Jordan C BRDG BOF 845,600 179 211,400 1,057,000 1,057,000

Beaver 8029 B01 95554 Ramp A Rd ov SR 65 F BRDG 185 150,000 150,000 150,000

Beaver 8029 B01 95554 Ramp A Rd ov SR 65 C BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Beaver 8031 B01 29082 RAMP C @ PA 65 F BRDG 185 150,000 150,000 150,000

Beaver 8031 B01 29082 RAMP C @ PA 65 R BRDG 185 50,000 50,000 50,000

Beaver 8031 B01 29082 RAMP C @ PA 65 C BRDG 185 1,000,000 1,000,000 1,000,000

Totals for: Beaver 12,665,600 32,812,936 60,430,000 105,908,536 12,516,650 65,125,957 608,100 78,250,707 13,345,450 40,899,507 849,750 55,094,707 4,600,000 30,790,000 860,000 36,250,000 275,503,950

Bedford BCB 95815 Osterburg Covered Bridge P BRDG HCB 640 179 160 800 800

Bedford BHT 95891 Bedford Heritage Trail C TENH SXF 427,329 427,329 427,329

Bedford BHT 95891 Bedford Heritage Trail C TENH TAP 554,471 554,471 554,471

Bedford HB2 95892 H&BT Rail Trail Ph 2 C TENH STP 50,000 50,000 50,000

Bedford RLI 72234 SA Bridge & Hwy Reserve C BRDG BOF 282,800 282,800 282,800

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST HSIP 126,900 581 14,100 141,000 141,000

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST NHPP 127,980 127,980 127,980

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST NHPP 1,083,000 1,083,000 1,083,000

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST STP 112,000 112,000 112,000

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST NHPP 98,800 581 600,000 698,800 698,800

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST STP 148,460 148,460 148,460

Bedford RLI 72234 SA Bridge & Hwy Reserve C HRST 581 10,000 10,000 10,000

Bedford 26 018 91603 PA 913 to Hunt Co Line U HRST 581 25,000 25,000 25,000

Bedford 26 018 91603 PA 913 to Hunt Co Line R HRST 581 25,000 25,000 25,000

Bedford 26 018 91603 PA 913 to Hunt Co Line C HRST 581 2,490,839 2,490,839 2,490,839

Bedford 26 018 91603 PA 913 to Hunt Co Line C HRST 581 209,161 209,161 209,161

Bedford 26 021 98773 PA26 Riddlesburg - Saxton P HRST 581 40,000 40,000 40,000

Bedford 26 021 98773 PA26 Riddlesburg - Saxton U HRST 581 100,000 100,000 100,000

Bedford 26 021 98773 PA26 Riddlesburg - Saxton R HRST 581 150,000 150,000 150,000

Page 22: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

22 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bedford 26 021 98773 PA26 Riddlesburg - Saxton C HRST STP 360,376 360,376 360,376

Bedford 26 13B 88571 PA26/36 Culvert Replcmnts +C BRDG 581 2,200,000 2,200,000 2,200,000

Bedford 26 13B 88571 PA26/36 Culvert Replcmnts +C BRDG 581 2,400,000 2,400,000 2,400,000

Bedford 26 14B 22114 PA26 Tr Yellow Crk Clvrts C BRDG 185 275,000 275,000 275,000

Bedford 26 14B 22114 PA26 Tr Yellow Crk Clvrts C BRDG 185 850,000 850,000 850,000

Bedford 26 17B 21557 Everett Truss Rehabs C HRST 581 50,000 50,000 50,000

Bedford 26 20B 22123 Everett Boro Bloody Rn Br P BRDG 185 15,000 15,000 15,000

Bedford 26 20B 22123 Everett Boro Bloody Rn Br R BRDG 185 50,000 50,000 50,000

Bedford 26 20B 22123 Everett Boro Bloody Rn Br C BRDG 185 600,000 600,000 600,000

Bedford 30 031 91605 Juniata Rvr Br to SR 2029 C HRST 581 885,000 885,000 885,000

Bedford 30 031 91605 Juniata Rvr Br to SR 2029 C HRST 581 1,440,000 1,440,000 1,440,000

Bedford 30 30M 90236 Turnpike Underpass Recon +U HRST 581 25,000 25,000 25,000

Bedford 30 30M 90236 Turnpike Underpass Recon +R HRST 581 15,000 15,000 15,000

Bedford 30 30M 90236 Turnpike Underpass Recon +C HRST NHPP 1,300,000 1,300,000 1,300,000

Bedford 30 32B 92704 US30 over Stein Rd (T466) C BRDG 185 150,000 150,000 150,000

Bedford 31 08B 21433 PA31 East Kegg Bridge F BRDG 185 230,000 230,000 230,000

Bedford 31 08B 21433 PA31 East Kegg Bridge U BRDG 185 50,000 50,000 50,000

Bedford 31 08B 21433 PA31 East Kegg Bridge R BRDG 185 55,000 55,000 55,000

Bedford 31 08B 21433 PA31 East Kegg Bridge C BRDG 185 695,900 695,900 695,900

Bedford 31 08B 21433 PA31 East Kegg Bridge C BRDG 185 1,075,000 1,075,000 1,075,000

Bedford 31 08B 21433 PA31 East Kegg Bridge C BRDG 185 929,100 929,100 929,100

Bedford 31 09B 21442 PA31 Dew Drop Bridge F BRDG 185 250,000 250,000 250,000

Bedford 31 09B 21442 PA31 Dew Drop Bridge U BRDG 185 50,000 50,000 50,000

Bedford 31 09B 21442 PA31 Dew Drop Bridge R BRDG 185 25,000 25,000 25,000

Bedford 31 09B 21442 PA31 Dew Drop Bridge C BRDG 185 605,440 605,440 605,440

Bedford 31 09B 21442 PA31 Dew Drop Bridge C BRDG 185 610,133 610,133 610,133

Bedford 31 09B 21442 PA31 Dew Drop Bridge C BRDG 185 1,081,033 1,081,033 1,081,033

Bedford 36 07S 88520 PA36 Corridor Improvement F HRST 581 412,600 412,600 412,600

Bedford 36 07S 88520 PA36 Corridor Improvement U HRST 581 175,000 175,000 175,000

Bedford 36 07S 88520 PA36 Corridor Improvement R HRST 581 100,000 100,000 100,000

Bedford 36 07S 88520 PA36 Corridor Improvement C HRST 581 712,000 712,000 712,000

Bedford 36 07S 88520 PA36 Corridor Improvement C HRST 581 3,047,161 3,047,161 3,047,161

Bedford 56 24S 88524 PA56/SR4028 Intersection +U HRST 581 700,000 700,000 700,000

Bedford 56 24S 88524 PA56/SR4028 Intersection +R HRST 581 700,000 700,000 700,000

Bedford 56 24S 88524 PA56/SR4028 Intersection C SAMI HSIP 340,300 340,300 340,300

Bedford 56 24S 88524 PA56/SR4028 Intersection C SAMI HSIP 1,266,667 1,266,667 1,266,667

Bedford 70 021 22816 Breezewood-Fulton Co Line P HRST 581 200,000 200,000 200,000

Bedford 96 022 96349 96 Mryland Ln-Washgtn St C HRST 581 2,050,000 2,050,000 2,050,000

Bedford 96 022 96349 96 Mryland Ln-Washgtn St C HRST 581 750,000 750,000 750,000

Bedford 96 19B 21422 Buffalo Run Bridge C BRDG STP 377,665 377,665 377,665

Page 23: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

23 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bedford 96 19B 21422 Buffalo Run Bridge C BRDG STP 1,253,500 1,253,500 1,253,500

Bedford 96 19B 21422 Buffalo Run Bridge C BRDG STP 263,331 263,331 263,331

Bedford 96 20B 74378 Trib Buffalo Run Culvert C BRDG STP 317,500 317,500 317,500

Bedford 96 20B 74378 Trib Buffalo Run Culvert C BRDG STP 317,500 317,500 317,500

Bedford 220 016 96520 US220 Evitts Ck - SR 4009 +C HRST NHPP 451,029 451,029 451,029

Bedford 220 016 96520 US220 Evitts Ck - SR 4009 +C HRST NHPP 1,700,000 1,700,000 1,700,000

Bedford 915 03B 91440 Hopewell Bridge Replace +F BRDG 581 400,000 400,000 400,000

Bedford 915 03B 91440 Hopewell Bridge Replace +U BRDG STP 50,000 50,000 50,000

Bedford 915 03B 91440 Hopewell Bridge Replace +R BRDG 581 75,000 75,000 75,000

Bedford 915 03B 91440 Hopewell Bridge Replace +C BRDG STP 50,000 50,000 50,000

Bedford 1001 02B 74386 Crawfords Run Culvert C BRDG 185 464,867 464,867 464,867

Bedford 1001 02B 74386 Crawfords Run Culvert C BRDG 185 285,133 285,133 285,133

Bedford 1001 04B 21425 Chalybeate Dunning Ck Reh P BRDG 185 30,000 30,000 30,000

Bedford 1001 04B 21425 Chalybeate Dunning Ck Reh R BRDG 185 75,000 75,000 75,000

Bedford 1001 04B 21425 Chalybeate Dunning Ck Reh C BRDG 185 319,743 319,743 319,743

Bedford 1002 01B 88122 Dunning Crk Trib Culvert C BRDG 185 600,000 600,000 600,000

Bedford 1003 001 96522 US30 to Lowr Snake Spr Rd C HRST 581 2,600,000 2,600,000 2,600,000

Bedford 1005 05B 21515 South Cemetery Bridge F BRDG 185 100,000 100,000 100,000

Bedford 1005 05B 21515 South Cemetery Bridge U BRDG 185 50,000 50,000 50,000

Bedford 1005 05B 21515 South Cemetery Bridge C BRDG 185 950,000 950,000 950,000

Bedford 1019 002 96524 SR 1019 - PA 26 to PA 26 C HRST 581 1,800,000 1,800,000 1,800,000

Bedford 1019 01B 88126 Ravers Run Culvert P BRDG 185 15,000 15,000 15,000

Bedford 1019 01B 88126 Ravers Run Culvert R BRDG 185 25,000 25,000 25,000

Bedford 1019 01B 88126 Ravers Run Culvert C BRDG 185 400,000 400,000 400,000

Bedford 1024 01B 21553 Jacks Corner Rd Brg Rhb 1 C BRDG 185 300,000 300,000 300,000

Bedford 1024 02B 21602 Jacks Corner Rd Brg Rhb 2 C BRDG 185 125,000 125,000 125,000

Bedford 1036 04B 21458 Defiance Six Mile Run Brg P BRDG 185 25,000 25,000 25,000

Bedford 1036 04B 21458 Defiance Six Mile Run Brg R BRDG 185 50,000 50,000 50,000

Bedford 1036 04B 21458 Defiance Six Mile Run Brg C BRDG 185 333,333 333,333 333,333

Bedford 2011 04B 103655Robinsonville Washout C BRDG 185 95,000 95,000 95,000

Bedford 2015 02B 21575 Sweet Root Creek Br P BRDG 185 15,000 15,000 15,000

Bedford 2015 02B 21575 Sweet Root Creek Br R BRDG 185 50,000 50,000 50,000

Bedford 2015 02B 21575 Sweet Root Creek Br C BRDG 185 500,000 500,000 500,000

Bedford 2026 002 96529 Ritchey Rd - E Mattie Rd C HRST 581 1,700,000 1,700,000 1,700,000

Bedford 2029 005 96530 West Mattie Rd to US 30 C HRST 581 1,600,000 1,600,000 1,600,000

Bedford 2029 04B 88128 Trb Juniata River Bridge P BRDG 185 15,000 15,000 15,000

Bedford 2029 04B 88128 Trb Juniata River Bridge R BRDG 185 50,000 50,000 50,000

Bedford 2029 04B 88128 Trb Juniata River Bridge C BRDG 185 450,000 450,000 450,000

Bedford 3019 006 96533 SR 3019 - PA 31 to US 30 C HRST 581 3,100,000 3,100,000 3,100,000

Bedford 4001 03B 21599 Burns Creek Bridge C BRDG 185 390,000 390,000 390,000

Page 24: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

24 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bedford 4007 01B 88132 Sloans Hollow Run Culvert R BRDG 185 10,000 10,000 10,000

Bedford 4007 01B 88132 Sloans Hollow Run Culvert C BRDG 185 500,000 500,000 500,000

Bedford 4009 000 101309SR 4009 Oppenheimr Run Br C BRDG 185 250,000 250,000 250,000

Bedford 4011 001 96341 Helixville Rd-Shaffer Mt C HRST 581 325,000 325,000 325,000

Bedford 4013 01B 21423 Dunnings Crk Bridge +F BRDG BOF 65,000 65,000 65,000

Bedford 4013 01B 21423 Dunnings Crk Bridge +R BRDG BOF 25,000 25,000 25,000

Bedford 4013 01B 21423 Dunnings Crk Bridge +C BRDG BOF 540,000 540,000 540,000

Bedford 4014 01M 96537 Somerst Co Line-Hoover Rd C HRST 581 1,358,666 1,358,666 1,358,666

Bedford 4026 001 96541 Dunning Crk Rd to Vlly Rd C HRST 581 950,000 950,000 950,000

Bedford 4031 03B 21609 Beaverdam Creek Br P BRDG 185 30,000 30,000 30,000

Bedford 4031 03B 21609 Beaverdam Creek Br U BRDG 185 50,000 50,000 50,000

Bedford 4031 03B 21609 Beaverdam Creek Br R BRDG 185 50,000 50,000 50,000

Bedford 4031 03B 21609 Beaverdam Creek Br +C BRDG BOF 999,267 999,267 999,267

Bedford 4036 001 96542 Buena Road to PA 31 C HRST 581 225,000 225,000 225,000

Bedford 7201 508 102552T-508 Yount Bridge C BRDG 185 296,000 74,000 370,000 370,000

Bedford 7204 376 88095 T-376 Cove Creek Bridge P BRDG BOF 130,000 183 24,375 8,125 162,500 162,500

Bedford 7204 376 88095 T-376 Cove Creek Bridge F BRDG BOF 140,000 183 26,250 8,750 175,000 175,000

Bedford 7204 376 88095 T-376 Cove Creek Bridge U BRDG BOF 12,000 183 2,250 750 15,000 15,000

Bedford 7204 376 88095 T-376 Cove Creek Bridge R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Bedford 7204 376 88095 T-376 Cove Creek Bridge C BRDG BOF 260,000 183 48,750 16,250 325,000 325,000

Bedford 7204 376 88095 T-376 Cove Creek Bridge C BRDG BOF 260,000 183 48,750 16,250 325,000 325,000

Bedford 7220 304 67128 T-304 Flintstone Creek Br C BRDG BOF 127,067 183 23,825 7,942 158,834 158,834

Bedford 7220 304 67128 T-304 Flintstone Creek Br C BRDG BOF 257,067 183 48,200 16,067 321,334 321,334

Bedford 7220 304 67128 T-304 Flintstone Creek Br C BRDG BOF 257,067 183 48,200 16,067 321,334 321,334

Totals for: Bedford 3,700,349 10,782,110 84,750 14,567,209 3,497,232 12,702,540 16,067 16,215,839 3,251,167 11,299,777 32,317 14,583,261 3,703,968 13,645,292 32,317 17,381,577 62,747,886

Berks 69335 RATS BARTA Flex C PT STU 867,000 867,000 867,000

Berks 69335 RATS BARTA Flex C PT STU 867,000 867,000 867,000

Berks 69335 RATS BARTA Flex C PT STU 867,000 867,000 867,000

Berks 69335 RATS BARTA Flex C PT STU 867,000 867,000 867,000

Berks 82791 CMAQ Reserve Line Item C SAMI CAQ 10,651 10,651 10,651

Berks 82793 TAP Reserve L I +C TENH TAU 268,000 268,000 268,000

Berks 82793 TAP Reserve L I +C TENH TAU 268,000 268,000 268,000

Berks 82793 TAP Reserve L I +C TENH TAU 268,000 268,000 268,000

Berks 82793 TAP Reserve L I +C TENH TAU 268,000 268,000 268,000

Berks 82795 Safety Reserve Line Item C SAMI HSIP 20,625 20,625 20,625

Berks 82795 Safety Reserve Line Item C SAMI HSIP 21,000 21,000 21,000

Berks 82795 Safety Reserve Line Item C SAMI HSIP 19,836 19,836 19,836

Berks 82796 Urban Reserve Line Item C HRST STU 2,551 2,551 2,551

Berks 82796 Urban Reserve Line Item C HRST STU 54,431 54,431 54,431

Berks 82796 Urban Reserve Line Item C HRST STU 13,631 13,631 13,631

Page 25: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

25 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 82796 Urban Reserve Line Item C HRST STU 13,231 13,231 13,231

Berks 102189RATS Hwy & Bridge Reserve C BRDG BOF 437,906 185 104,983 542,889 542,889

Berks 102189RATS Hwy & Bridge Reserve C BRDG 185 479,750 479,750 479,750

Berks 102189RATS Hwy & Bridge Reserve C BRDG 185 913,360 913,360 913,360

Berks 102189RATS Hwy & Bridge Reserve C BRDG 185 136,610 136,610 136,610

Berks 102189RATS Hwy & Bridge Reserve C HRST NHPP 1,250,025 581 10,426 1,260,451 1,260,451

Berks 102189RATS Hwy & Bridge Reserve C HRST NHPP 159,517 581 105,272 264,789 264,789

Berks 102189RATS Hwy & Bridge Reserve C HRST STP 2,101,760 2,101,760 2,101,760

Berks 102189RATS Hwy & Bridge Reserve C HRST NHPP 347,345 581 2,284,829 2,632,174 2,632,174

Berks 102189RATS Hwy & Bridge Reserve C HRST STP 1,104,963 1,104,963 1,104,963

Berks 102189RATS Hwy & Bridge Reserve C HRST NHPP 568,590 581 177,651 746,241 746,241

Berks 102189RATS Hwy & Bridge Reserve C HRST STP 4,980 4,980 4,980

Berks 102190RBR Initiative Line Item C BRDG 581 2,000,000 2,000,000 2,000,000

Berks 102190RBR Initiative Line Item C BRDG 581 3,300,000 3,300,000 3,300,000

Berks 95368 Local BR Initiative L I C BRDG STU 1,510,000 1,510,000 1,510,000

Berks 95368 Local BR Initiative L I C BRDG STU 3,358,800 3,358,800 3,358,800

Berks 95368 Local BR Initiative L I C BRDG STU 580,000 183 27,200 607,200 607,200

Berks 95368 Local BR Initiative L I C BRDG STU 2,300,000 183 575,000 2,875,000 2,875,000

Berks 08X 75010 Willow Street RR Upgrade +C SAMI RRX* 81,110 81,110 81,110

Berks BCS 86420 Berks Commuter Services C IMOD OTH-F 261,349 261,349 261,349

Berks BCS 86420 Berks Commuter Services C IMOD OTH-F

263,963 263,963 263,963

Berks BCS 86420 Berks Commuter Services C IMOD OTH-F

266,602 266,602 266,602

Berks BCS 86420 Berks Commuter Services C IMOD OTH-F

269,268 269,268 269,268

Berks BRC 103168Boyertown RR Connectivity P TENH 25,000 25,000 25,000

Berks CAF 97838 Construction Assistance C HRST STP 250,000 250,000 250,000

Berks CAF 97838 Construction Assistance C HRST STP 250,000 250,000 250,000

Berks CAF 97838 Construction Assistance C HRST STP 350,000 350,000 350,000

Berks CAS 97417 Construction Assistance C HRST 581 350,000 350,000 350,000

Berks CAS 97417 Construction Assistance C HRST 581 350,000 350,000 350,000

Berks DCA 83081 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Berks DCA 83081 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Berks DCA 83081 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Berks FLT 92569 Fleetwood_Main St Walkway C TENH NHPP 237,200 237,200 237,200

Berks LAC 103171Lancaster Ave Crosswalk P TENH 25,000 25,000 25,000

Berks PSC 76614 Penn St Crosswalks C TENH STP 334,800 334,800 334,800

Berks RPR 95399 Repair / Monitor Wetlands P SAMI 581 50,000 50,000 50,000

Berks RPR 95399 Repair / Monitor Wetlands P SAMI 581 50,000 50,000 50,000

Berks RSU 103165Rockland Street Upgrades P TENH 25,000 25,000 25,000

Berks SSP 92578 Sinking Spring Penn Ave C TENH STP 353,777 353,777 353,777

Berks TEM 89056 RATS Trans Management P IMOD STU 50,000 50,000 50,000

Page 26: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

26 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks TEM 89056 RATS Trans Management P IMOD STU 50,000 50,000 50,000

Berks 12 0 88781 SR 73 and SR 12 P HRST STP 200,000 581 50,000 250,000 250,000

Berks 12 0 88781 SR 73 and SR 12 P HRST STP 455,620 581 113,905 569,525 569,525

Berks 12 0 88781 SR 73 and SR 12 F HRST STP 180,080 581 45,020 225,100 225,100

Berks 12 0 88781 SR 73 and SR 12 U HRST STP 45,020 581 11,255 56,275 56,275

Berks 12 0 88781 SR 73 and SR 12 R HRST STP 45,020 581 11,255 56,275 56,275

Berks 12 0 88781 SR 73 and SR 12 C HRST 581 3,657,875 3,657,875 3,657,875

Berks 12 0 89215 PA 12 Resurfacing C HRST 581 5,000,000 5,000,000 5,000,000

Berks 12 BRM 94896 RATS BR Preserve&Repair 3 C BRDG STP 237,823 237,823 237,823

Berks 12 BRM 94896 RATS BR Preserve&Repair 3 C BRDG STP 181,177 181,177 181,177

Berks 29 03M 96372 PA 29 Resurface F HRST 581 154,500 154,500 154,500

Berks 29 03M 96372 PA 29 Resurface U HRST 581 41,200 41,200 41,200

Berks 29 03M 96372 PA 29 Resurface R HRST 581 41,200 41,200 41,200

Berks 29 03M 96372 PA 29 Resurface C HRST NHPP 1,000,000 1,000,000 1,000,000

Berks 29 03M 96372 PA 29 Resurface C HRST NHPP 2,129,655 2,129,655 2,129,655

Berks 61 13M 96376 Shoemaker Av-PottsvillePk P HRST NHPP 480,000 480,000 480,000

Berks 61 13M 96376 Shoemaker Av-PottsvillePk F HRST 581 515,000 515,000 515,000

Berks 61 13M 96376 Shoemaker Av-PottsvillePk U HRST 581 77,250 77,250 77,250

Berks 61 13M 96376 Shoemaker Av-PottsvillePk R HRST 581 128,750 128,750 128,750

Berks 61 13M 96376 Shoemaker Av-PottsvillePk +C HRST NHPP 2,442,186 2,442,186 2,442,186

Berks 61 13M 96376 Shoemaker Av-PottsvillePk +C HRST NHPP 5,842,000 5,842,000 5,842,000

Berks 61 13M 96376 Shoemaker Av-PottsvillePk +C HRST NHPP 3,385,714 3,385,714 3,385,714

Berks 61 16S 88792 SR 61 and Tuckerton Road C SAMI NHPP 1,568,000 581 100,000 1,668,000 1,668,000

Berks 61 16S 88792 SR 61 and Tuckerton Road C SAMI 581 292,000 292,000 292,000

Berks 61 BRM 101965RATS BR Preserve&Repair 4 C BRDG 185 500,127 500,127 500,127

Berks 61 BRM 101965RATS BR Preserve&Repair 4 C BRDG 185 445,155 445,155 445,155

Berks 73 05S 92921 SR 73/662 Corridor Safety F SAMI 581 679,800 679,800 679,800

Berks 73 05S 92921 SR 73/662 Corridor Safety U SAMI 581 113,300 113,300 113,300

Berks 73 05S 92921 SR 73/662 Corridor Safety R HRST 581 566,500 566,500 566,500

Berks 73 05S 92921 SR 73/662 Corridor Safety C SAMI HSIP 2,000,000 581 222,222 2,222,222 2,222,222

Berks 73 05S 92921 SR 73/662 Corridor Safety C SAMI HSIP 2,201,164 581 244,574 2,445,738 2,445,738

Berks 73 06B 86103 PA 73 ovr Manatawny Creek C BRDG STP 41,200 185 10,300 51,500 51,500

Berks 73 06B 86103 PA 73 ovr Manatawny Creek C BRDG STP 137,600 185 34,400 172,000 172,000

Berks 73 07B 91917 SR 73 Br over Furnace Ck F BRDG 185 103,000 103,000 103,000

Berks 73 07B 91917 SR 73 Br over Furnace Ck U BRDG 185 25,750 25,750 25,750

Berks 73 07B 91917 SR 73 Br over Furnace Ck R BRDG STP 20,600 185 5,150 25,750 25,750

Berks 73 07B 91917 SR 73 Br over Furnace Ck C BRDG 185 478,500 478,500 478,500

Berks 73 07B 91917 SR 73 Br over Furnace Ck C BRDG 185 500,000 500,000 500,000

Berks 78 12M 10466 Interstate 78 (12M) F IMAN NHPP 2,781,000 581 309,000 3,090,000 3,090,000

Berks 78 12M 10466 Interstate 78 (12M) U IMAN NHPP 1,599,075 581 177,675 1,776,750 1,776,750

Page 27: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

27 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 78 12M 10466 Interstate 78 (12M) R IMAN NHPP 3,708,000 581 412,000 4,120,000 4,120,000

Berks 78 12M 10466 Interstate 78 (12M) +C IMAN NHPP 34,288,000 34,288,000 34,288,000

Berks 78 12M 10466 Interstate 78 (12M) +C IMAN NHPP 34,700,000 34,700,000 34,700,000

Berks 78 12M 10466 Interstate 78 (12M) +C IMAN NHPP 40,230,000 40,230,000 40,230,000

Berks 78 13B 93494 I-78-Rt 61 Bridge Replace P HRST NHPP 80,000 80,000 80,000

Berks 78 13B 93494 I-78-Rt 61 Bridge Replace F IMAN 185 3,365,400 3,365,400 3,365,400

Berks 78 13B 93494 I-78-Rt 61 Bridge Replace F IMAN 185 3,000,000 3,000,000 3,000,000

Berks 78 13B 93494 I-78-Rt 61 Bridge Replace U IMAN 185 265,225 265,225 265,225

Berks 78 13B 93494 I-78-Rt 61 Bridge Replace R IMAN 185 530,450 530,450 530,450

Berks 78 13M 86738 I-78 Krumsville Interchng C IMAN NHPP 27,000,000 581 3,000,000 30,000,000 30,000,000

Berks 78 13M 86738 I-78 Krumsville Interchng C IMAN NHPP 9,153,000 581 1,017,000 10,170,000 10,170,000

Berks 78 20B 94011 Airport Rd (4039)ovr I-78 F IMAN 185 360,500 360,500 360,500

Berks 78 20B 94011 Airport Rd (4039)ovr I-78 U IMAN 185 37,131 37,131 37,131

Berks 78 20B 94011 Airport Rd (4039)ovr I-78 R IMAN 185 41,200 41,200 41,200

Berks 78 20B 94011 Airport Rd (4039)ovr I-78 C IMAN 185 3,182,700 3,182,700 3,182,700

Berks 78 TOC 91658 TOC Operator-Berks C IMOD CAQ 249,311 582 62,328 311,639 311,639

Berks 78 UC1 75840 Brg Underclear Ph 1 U BRDG 185 111,395 111,395 111,395

Berks 78 UC1 75840 Brg Underclear Ph 1 C IMAN 185 14,000,000 14,000,000 14,000,000

Berks 78 UC1 75840 Brg Underclear Ph 1 C IMAN 185 4,000,000 4,000,000 4,000,000

Berks 78 UC1 75840 Brg Underclear Ph 1 C IMAN 185 4,000,000 4,000,000 4,000,000

Berks 78 UC2 92806 Berks Brg Underclear Ph 2 U BRDG 185 113,800 113,800 113,800

Berks 78 UC2 92806 Berks Brg Underclear Ph 2 C IMAN 185 8,000,000 8,000,000 8,000,000

Berks 78 UC2 92806 Berks Brg Underclear Ph 2 C IMAN 185 4,000,000 4,000,000 4,000,000

Berks 78 UC2 92806 Berks Brg Underclear Ph 2 C IMAN 185 4,000,000 4,000,000 4,000,000

Berks 100 07M 96382 PA 100 Resurface F HRST 581 206,000 206,000 206,000

Berks 100 07M 96382 PA 100 Resurface U HRST 581 41,200 41,200 41,200

Berks 100 07M 96382 PA 100 Resurface R HRST 581 41,200 41,200 41,200

Berks 100 07M 96382 PA 100 Resurface +C HRST NHPP 1,000,000 1,000,000 1,000,000

Berks 100 07M 96382 PA 100 Resurface +C HRST NHPP 4,779,253 4,779,253 4,779,253

Berks 100 LBR 69991 Bridge Review Asst RATS P BRDG STP 250,000 185 62,500 312,500 312,500

Berks 183 04B 10825 Schuylkill Ave (OSA) Br C BRDG 185 100,000 100,000 100,000

Berks 183 05B 91091 Schuylkill Ave Bridge SB F BRDG STP 329,600 185 82,400 412,000 412,000

Berks 183 05B 91091 Schuylkill Ave Bridge SB U BRDG STP 41,200 185 10,300 51,500 51,500

Berks 183 05B 91091 Schuylkill Ave Bridge SB R BRDG STP 580,000 185 145,000 725,000 725,000

Berks 183 05B 91091 Schuylkill Ave Bridge SB R BRDG STP 244,000 185 61,000 305,000 305,000

Berks 183 05B 91091 Schuylkill Ave Bridge SB C BRDG STP 1,825,000 185 843,750 2,668,750 2,668,750

Berks 183 05B 91091 Schuylkill Ave Bridge SB C BRDG STP 1,994,240 185 111,060 2,105,300 2,105,300

Berks 183 07S 57840 SR 183/4016 (Schaeffers) C SAMI HSIP 1,200,000 581 133,333 1,333,333 1,333,333

Berks 183 07S 57840 SR 183/4016 (Schaeffers) C SAMI HSIP 2,000,375 581 222,264 2,222,639 2,222,639

Berks 183 10S 78528 SR 183/ 4018 Intersection C SAMI HSIP 1,010,900 1,010,900 1,010,900

Page 28: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

28 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 183 RRE 70274 River Road Extension P HCON SXF 500,000 125,000 625,000 625,000

Berks 183 RRE 70274 River Road Extension F HCON SXF 451,770 112,943 564,713 564,713

Berks 183 RRE 70274 River Road Extension U HCON SXF 250,000 62,500 312,500 312,500

Berks 222 0 97234 222 N. Kutz to Lehigh CL P HCON STP 101,400 581 412,850 514,250 514,250

Berks 222 19S 92411 SR 222 & 662 Intersection C SAMI CAQ 2,000,000 2,000,000 2,000,000

Berks 222 19S 92411 SR 222 & 662 Intersection C SAMI CAQ 542,326 542,326 542,326

Berks 222 19S 92411 SR 222 & 662 Intersection C SAMI NHPP 1,316,683 1,316,683 1,316,683

Berks 222 22S 92414 SR 222_73 & Genesis Dr C SAMI CAQ 2,424,948 2,424,948 2,424,948

Berks 222 22S 92414 SR 222_73 & Genesis Dr C SAMI CAQ 2,902,732 2,902,732 2,902,732

Berks 222 22S 92414 SR 222_73 & Genesis Dr C SAMI NHPP 9,331,070 9,331,070 9,331,070

Berks 222 23S 90569 SR 222 & Long Lane F SAMI NHPP 1,133,000 1,133,000 1,133,000

Berks 222 23S 90569 SR 222 & Long Lane U SAMI 581 206,000 206,000 206,000

Berks 222 23S 90569 SR 222 & Long Lane R SAMI 581 1,000,000 1,000,000 1,000,000

Berks 222 23S 90569 SR 222 & Long Lane R SAMI 581 750,000 750,000 750,000

Berks 222 23S 90569 SR 222 & Long Lane R SAMI 581 825,000 825,000 825,000

Berks 222 23S 90569 SR 222 & Long Lane +C SAMI 581 3,700,000 3,700,000 3,700,000

Berks 222 23S 90569 SR 222 & Long Lane +C SAMI 581 3,089,760 3,089,760 3,089,760

Berks 222 28M 61972 SR 222 Widening P HRST 581 1,500,000 1,500,000 1,500,000

Berks 222 28M 61972 SR 222 Widening F HRST 581 2,652,250 2,652,250 2,652,250

Berks 222 28M 61972 SR 222 Widening U HRST 581 1,060,900 1,060,900 1,060,900

Berks 222 28M 61972 SR 222 Widening R HRST NHPP 800,000 581 200,000 1,000,000 1,000,000

Berks 222 28M 61972 SR 222 Widening R HRST NHPP 2,170,520 581 542,630 2,713,150 2,713,150

Berks 222 ITS 81743 Route 222/422 Urban ITS C SAMI CAQ 900,000 581 225,000 1,125,000 1,125,000

Berks 222 ITS 81743 Route 222/422 Urban ITS C SAMI CAQ 2,066,400 581 516,600 2,583,000 2,583,000

Berks 345 10B 10823 PA 345 Birdsboro Bridge C BRDG STP 196,000 185 49,000 245,000 245,000

Berks 419 02M 96374 Four Points Road Resurfac C HRST STP 50,000 50,000 50,000

Berks 422 18M 89214 WernersvilleBoro toPA 724 F HRST NHPP 299,936 581 74,984 374,920 374,920

Berks 422 18M 89214 WernersvilleBoro toPA 724 U HRST NHPP 41,200 581 10,300 51,500 51,500

Berks 422 18M 89214 WernersvilleBoro toPA 724 R HRST NHPP 82,400 581 20,600 103,000 103,000

Berks 422 18M 89214 WernersvilleBoro toPA 724 +C HRST NHPP 959,186 959,186 959,186

Berks 422 18M 89214 WernersvilleBoro toPA 724 +C HRST NHPP 4,160,944 4,160,944 4,160,944

Berks 422 19M 89234 SR 422 Expressway Resurfc C HRST NHPP 1,406,575 1,406,575 1,406,575

Berks 422 20M 94857 422 Resurf-419-Wernrsvile F HRST NHPP 615,528 581 153,882 769,410 769,410

Berks 422 20M 94857 422 Resurf-419-Wernrsvile U HRST NHPP 54,750 581 13,688 68,438 68,438

Berks 422 20M 94857 422 Resurf-419-Wernrsvile R HRST NHPP 175,000 581 43,750 218,750 218,750

Berks 422 20M 94857 422 Resurf-419-Wernrsvile +C HRST NHPP 5,000,000 5,000,000 5,000,000

Berks 422 20M 94857 422 Resurf-419-Wernrsvile +C HRST NHPP 3,092,000 3,092,000 3,092,000

Berks 422 20M 94857 422 Resurf-419-Wernrsvile +C HRST NHPP 4,551,250 4,551,250 4,551,250

Berks 422 29M 72814 US 422 Reconstruction P HCON NHPP 2,686,400 581 546,600 3,233,000 3,233,000

Berks 422 29M 72814 US 422 Reconstruction P HCON NHPP 557,670 581 264,417 822,087 822,087

Page 29: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

29 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 422 29M 72814 US 422 Reconstruction P HCON NHPP 491,977 581 122,994 614,971 614,971

Berks 422 29M 72814 US 422 Reconstruction F HCON NHPP 1,067,440 581 266,860 1,334,300 1,334,300

Berks 422 29M 72814 US 422 Reconstruction U HCON NHPP 1,000,000 581 250,000 1,250,000 1,250,000

Berks 422 FSP 94900 Freeway Service Patrol C SAMI CAQ 50,000 582 12,500 62,500 62,500

Berks 422 FSP 94900 Freeway Service Patrol C SAMI CAQ 480,450 582 120,112 600,562 600,562

Berks 422 JG2 10951 Shelbourne Rd Jug SW C SAMI NHPP 40,000 581 10,000 50,000 50,000

Berks 501 04M 96375 Lancaster Ave Resurface C HRST 581 50,000 50,000 50,000

Berks 562 0 85668 SR 562 ovr Monocacy Creek P BRDG STP 218,540 185 54,635 273,175 273,175

Berks 562 0 85668 SR 562 ovr Monocacy Creek P BRDG STP 248,256 185 62,064 310,320 310,320

Berks 562 0 85668 SR 562 ovr Monocacy Creek F BRDG 581 506,475 506,475 506,475

Berks 562 0 85668 SR 562 ovr Monocacy Creek U BRDG 581 56,275 56,275 56,275

Berks 562 0 85668 SR 562 ovr Monocacy Creek R BRDG 581 112,550 112,550 112,550

Berks 562 01B 85667 SR 562 ovr Manatawny Crk F BRDG 185 154,500 154,500 154,500

Berks 562 01B 85667 SR 562 ovr Manatawny Crk U BRDG 185 51,500 51,500 51,500

Berks 562 01B 85667 SR 562 ovr Manatawny Crk R BRDG STP 41,200 185 10,300 51,500 51,500

Berks 562 01B 85667 SR 562 ovr Manatawny Crk C BRDG 185 500,000 500,000 500,000

Berks 562 01B 85667 SR 562 ovr Manatawny Crk C BRDG 185 200,000 200,000 200,000

Berks 562 02S 82021 562_Shelbourne_Oley Int C SAMI STU 350,000 350,000 350,000

Berks 645 02M 98088 SR 645 Resurface U HRST 581 5,000 5,000 5,000

Berks 645 02M 98088 SR 645 Resurface R HRST 581 15,000 15,000 15,000

Berks 645 02M 98088 SR 645 Resurface C HRST 581 1,591,350 1,591,350 1,591,350

Berks 662 0 102865Richmon St Fleetwood RRX +C SAMI RRX 273,182 273,182 273,182

Berks 662 01B 10750 Lake Ontelaunee Bridge U BRDG 185 2,000 2,000 2,000

Berks 662 01B 10750 Lake Ontelaunee Bridge C BRDG 185 2,230,000 2,230,000 2,230,000

Berks 662 01B 10750 Lake Ontelaunee Bridge C BRDG 185 2,077,200 2,077,200 2,077,200

Berks 662 01B 10750 Lake Ontelaunee Bridge C BRDG 185 1,100,300 1,100,300 1,100,300

Berks 662 05M 88385 Fleetwood Rdway Restore +C HRST STP 2,950,000 2,950,000 2,950,000

Berks 662 05M 88385 Fleetwood Rdway Restore +C HRST STP 2,750,000 2,750,000 2,750,000

Berks 662 05M 88385 Fleetwood Rdway Restore +C HRST STU 2,869,600 2,869,600 2,869,600

Berks 724 01B 78881 SR 724 over Angelica Crk. F BRDG 185 260,500 260,500 260,500

Berks 724 01B 78881 SR 724 over Angelica Crk. U BRDG 185 25,750 25,750 25,750

Berks 724 01B 78881 SR 724 over Angelica Crk. R BRDG 185 10,300 10,300 10,300

Berks 724 01B 78881 SR 724 over Angelica Crk. C BRDG STP 100,000 185 25,000 125,000 125,000

Berks 724 01B 78881 SR 724 over Angelica Crk. C BRDG STP 435,600 185 108,900 544,500 544,500

Berks 737 03B 92028 SR 737 /trib Sacony Creek F BRDG 581 103,000 103,000 103,000

Berks 737 03B 92028 SR 737 /trib Sacony Creek U BRDG 185 10,300 10,300 10,300

Berks 737 03B 92028 SR 737 /trib Sacony Creek R BRDG 185 10,300 10,300 10,300

Berks 737 03B 92028 SR 737 /trib Sacony Creek C BRDG 185 515,000 515,000 515,000

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv F BRDG STP 576,800 185 144,200 721,000 721,000

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv U BRDG STP 8,863 185 2,216 11,079 11,079

Page 30: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

30 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv U BRDG STP 114,737 185 28,684 143,421 143,421

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv R BRDG STP 174,800 185 43,700 218,500 218,500

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv R BRDG STP 72,400 185 18,100 90,500 90,500

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv C BRDG 185 4,100,000 4,100,000 4,100,000

Berks 1003 01B 79012 SR 1003 ovr Schuylkill Rv C BRDG 185 1,909,850 1,909,850 1,909,850

Berks 1003 OTB 10826 Ontelaunee (Lake) Bridge F BRDG 185 303,000 303,000 303,000

Berks 1003 OTB 10826 Ontelaunee (Lake) Bridge F BRDG 185 212,000 212,000 212,000

Berks 1003 OTB 10826 Ontelaunee (Lake) Bridge R BRDG BOF 32,000 185 8,000 40,000 40,000

Berks 1003 OTB 10826 Ontelaunee (Lake) Bridge C BRDG 581 1,000,000 1,000,000 1,000,000

Berks 1003 OTB 10826 Ontelaunee (Lake) Bridge C BRDG 581 1,130,765 1,130,765 1,130,765

Berks 1003 PCG 89231 Post & Cable Guide Rail P SAMI HSIP 10,100 10,100 10,100

Berks 1003 PCG 89231 Post & Cable Guide Rail P SAMI HSIP 114,900 114,900 114,900

Berks 1010 03B 85637 SR 1010 over Swabia Creek F BRDG STP 200,000 185 50,000 250,000 250,000

Berks 1010 03B 85637 SR 1010 over Swabia Creek U BRDG 185 25,750 25,750 25,750

Berks 1010 03B 85637 SR 1010 over Swabia Creek R BRDG STP 44,000 185 11,000 55,000 55,000

Berks 1010 03B 85637 SR 1010 over Swabia Creek C BRDG 581 848,720 848,720 848,720

Berks 1010 SBC 80070 RATS Br Review/Management P BRDG 185 250,000 250,000 250,000

Berks 1010 SBC 80070 RATS Br Review/Management P BRDG 185 100,000 100,000 100,000

Berks 1017 000 10371 Trexler Historical Bridge F BRDG 185 360,500 360,500 360,500

Berks 1017 000 10371 Trexler Historical Bridge U BRDG 185 20,600 20,600 20,600

Berks 1017 000 10371 Trexler Historical Bridge R BRDG 185 103,000 103,000 103,000

Berks 1017 000 10371 Trexler Historical Bridge C BRDG 185 500,000 500,000 500,000

Berks 1017 000 10371 Trexler Historical Bridge C BRDG 185 1,091,350 1,091,350 1,091,350

Berks 1017 03B 10588 SR 1017 over Kistlers Crk F BRDG STU 32,960 185 8,240 41,200 41,200

Berks 1017 03B 10588 SR 1017 over Kistlers Crk U BRDG 185 10,609 10,609 10,609

Berks 1017 03B 10588 SR 1017 over Kistlers Crk R BRDG 185 37,132 37,132 37,132

Berks 1017 03B 10588 SR 1017 over Kistlers Crk C BRDG 185 781,281 781,281 781,281

Berks 1018 02B 85644 SR 1018 overTrib Stony Rn F BRDG 581 628 628 628

Berks 1018 02B 85644 SR 1018 overTrib Stony Rn U BRDG 581 30,900 30,900 30,900

Berks 1018 02B 85644 SR 1018 overTrib Stony Rn C BRDG 185 750,000 750,000 750,000

Berks 1018 02B 85644 SR 1018 overTrib Stony Rn C BRDG 185 537,500 537,500 537,500

Berks 1026 02B 79008 SR 1026 Bridge Pike Twp. F BRDG STU 61,800 581 15,450 77,250 77,250

Berks 1026 02B 79008 SR 1026 Bridge Pike Twp. U BRDG 581 30,900 30,900 30,900

Berks 1026 02B 79008 SR 1026 Bridge Pike Twp. R BRDG 581 90,177 90,177 90,177

Berks 1026 02B 79008 SR 1026 Bridge Pike Twp. C BRDG 581 1,134,350 1,134,350 1,134,350

Berks 2004 02M 96379 Bingaman St Resurface F HRST 581 51,500 51,500 51,500

Berks 2004 02M 96379 Bingaman St Resurface U HRST 581 25,750 25,750 25,750

Berks 2004 02M 96379 Bingaman St Resurface R HRST 581 25,750 25,750 25,750

Berks 2004 02M 96379 Bingaman St Resurface C HRST 581 400,000 400,000 400,000

Berks 2004 02M 96379 Bingaman St Resurface C HRST 581 733,000 733,000 733,000

Page 31: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

31 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 2005 0 1021682005 Corridor Improvement P SAMI HSIP 200,000 200,000 200,000

Berks 2005 04S 92922 S 5th St & Bingaman Int C HRST 581 18,000 18,000 18,000

Berks 2005 04S 92922 S 5th St & Bingaman Int C HRST 581 177,500 177,500 177,500

Berks 2006 0 96381 SR 2006 Resurface P HRST STP 200,000 581 50,000 250,000 250,000

Berks 2006 0 96381 SR 2006 Resurface P HRST STP 360,160 581 90,040 450,200 450,200

Berks 2006 0 96381 SR 2006 Resurface F HRST STP 135,060 581 33,765 168,825 168,825

Berks 2006 0 96381 SR 2006 Resurface U HRST STP 9,004 581 2,251 11,255 11,255

Berks 2006 0 96381 SR 2006 Resurface R HRST STP 22,510 581 5,628 28,138 28,138

Berks 2006 0 96381 SR 2006 Resurface +C HRST STP 825,000 825,000 825,000

Berks 2014 0 102162SR 2014 Corridor Improvem P SAMI HSIP 200,000 200,000 200,000

Berks 2016 01B 10527 2016o/Readng/BM/Northn RR F BRDG 185 154,500 154,500 154,500

Berks 2016 01B 10527 2016o/Readng/BM/Northn RR U BRDG 185 103,000 103,000 103,000

Berks 2016 01B 10527 2016o/Readng/BM/Northn RR R BRDG 185 103,000 103,000 103,000

Berks 2016 01B 10527 2016o/Readng/BM/Northn RR C BRDG 185 1,697,440 1,697,440 1,697,440

Berks 2017 01B 78894 SR 2017 ovr Schuylkill Rv F BRDG STP 247,200 185 61,800 309,000 309,000

Berks 2017 01B 78894 SR 2017 ovr Schuylkill Rv U BRDG 185 103,000 103,000 103,000

Berks 2017 01B 78894 SR 2017 ovr Schuylkill Rv R BRDG 185 103,000 103,000 103,000

Berks 2017 01B 78894 SR 2017 ovr Schuylkill Rv C BRDG 185 3,200,000 3,200,000 3,200,000

Berks 2017 01B 78894 SR 2017 ovr Schuylkill Rv C BRDG 185 6,966,050 6,966,050 6,966,050

Berks 2021 03M 96377 Bus 422 Resurface P HRST NHPP 360,000 360,000 360,000

Berks 2021 03M 96377 Bus 422 Resurface F HRST 581 257,500 257,500 257,500

Berks 2021 03M 96377 Bus 422 Resurface U HRST 581 103,000 103,000 103,000

Berks 2021 03M 96377 Bus 422 Resurface R HRST 581 103,000 103,000 103,000

Berks 2021 03M 96377 Bus 422 Resurface C HRST NHPP 2,600,000 2,600,000 2,600,000

Berks 2021 03M 96377 Bus 422 Resurface C HRST NHPP 5,743,000 5,743,000 5,743,000

Berks 2023 01B 91932 SR 2023 ov Antietam Creek F BRDG 185 206,000 206,000 206,000

Berks 2023 01B 91932 SR 2023 ov Antietam Creek U BRDG 185 51,500 51,500 51,500

Berks 2023 01B 91932 SR 2023 ov Antietam Creek R BRDG STP 41,200 185 10,300 51,500 51,500

Berks 2023 01B 91932 SR 2023 ov Antietam Creek C BRDG 185 848,720 848,720 848,720

Berks 2033 01B 10741 Shelbourne Road Bridge F BRDG 185 51,500 51,500 51,500

Berks 2033 01B 10741 Shelbourne Road Bridge U BRDG 185 25,750 25,750 25,750

Berks 2033 01B 10741 Shelbourne Road Bridge R BRDG 185 25,750 25,750 25,750

Berks 2033 01B 10741 Shelbourne Road Bridge C BRDG 185 875,500 875,500 875,500

Berks 2041 02B 10622 Monocacy Bridge 2 F BRDG 581 283,250 283,250 283,250

Berks 2041 02B 10622 Monocacy Bridge 2 U BRDG 581 25,750 25,750 25,750

Berks 2041 02B 10622 Monocacy Bridge 2 R BRDG 581 41,200 41,200 41,200

Berks 2041 02B 10622 Monocacy Bridge 2 C BRDG 185 650,000 650,000 650,000

Berks 2041 02B 10622 Monocacy Bridge 2 C BRDG 185 637,500 637,500 637,500

Berks 2047 02B 47632 Mill Race Bridge F BRDG 185 360,500 360,500 360,500

Berks 2047 02B 47632 Mill Race Bridge U BRDG 185 26,523 26,523 26,523

Page 32: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

32 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 2047 02B 47632 Mill Race Bridge R BRDG 185 128,750 128,750 128,750

Berks 2047 02B 47632 Mill Race Bridge C BRDG 185 583,495 583,495 583,495

Berks 2049 02B 10778 Gablesville Bridge F BRDG 185 309,000 309,000 309,000

Berks 2049 02B 10778 Gablesville Bridge U BRDG 185 25,750 25,750 25,750

Berks 2049 02B 10778 Gablesville Bridge R BRDG 185 41,200 41,200 41,200

Berks 2049 02B 10778 Gablesville Bridge C BRDG 581 1,639,050 1,639,050 1,639,050

Berks 2054 01M 96378 Perkiomen Ave Resurface C HRST NHPP 1,600,000 1,600,000 1,600,000

Berks 2082 01M 102437SR 2082 Resurface P HRST 581 45,000 45,000 45,000

Berks 2087 0 91995 SR 2087 /Norfolk Southern P BRDG 185 655,620 655,620 655,620

Berks 2087 0 91995 SR 2087 /Norfolk Southern F BRDG 581 337,653 337,653 337,653

Berks 3010 01B 10752 N. Church St Bridge F BRDG BOF 247,200 185 61,800 309,000 309,000

Berks 3010 01B 10752 N. Church St Bridge U BRDG BOF 20,600 185 5,150 25,750 25,750

Berks 3010 01B 10752 N. Church St Bridge R BRDG BOF 45,320 185 11,330 56,650 56,650

Berks 3010 01B 10752 N. Church St Bridge C BRDG 581 500,000 500,000 500,000

Berks 3010 01B 10752 N. Church St Bridge C BRDG 581 1,197,440 1,197,440 1,197,440

Berks 3020 02B 10909 GAI-Tronics Bridge C BRDG 185 250,000 250,000 250,000

Berks 3020 02B 10909 GAI-Tronics Bridge C BRDG 185 213,500 213,500 213,500

Berks 3063 01B 10352 Tulpehocken Brdg SR 3063 C BRDG BOF 20,000 185 5,000 25,000 25,000

Berks 3422 03B 10740 Penn St Bridge C BRDG STP 5,000,000 5,000,000 5,000,000

Berks 3422 03B 10740 Penn St Bridge C BRDG NHPP 4,959,186 185 2,000,000 6,959,186 6,959,186

Berks 3422 03B 10740 Penn St Bridge C BRDG STP 5,000,000 5,000,000 5,000,000

Berks 4008 01B 10619 Little Swatara Creek Brg C BRDG STP 20,000 185 5,000 25,000 25,000

Berks 4008 02B 10690 SR 4008 Bridge F BRDG 185 25,750 25,750 25,750

Berks 4008 02B 10690 SR 4008 Bridge U BRDG 185 10,300 10,300 10,300

Berks 4008 02B 10690 SR 4008 Bridge R BRDG 185 10,300 10,300 10,300

Berks 4008 02B 10690 SR 4008 Bridge C BRDG 185 417,150 417,150 417,150

Berks 4015 01B 10747 SR 4015 o/Trib Irish Cr F BRDG STU 32,960 185 8,240 41,200 41,200

Berks 4015 01B 10747 SR 4015 o/Trib Irish Cr U BRDG 581 10,609 10,609 10,609

Berks 4015 01B 10747 SR 4015 o/Trib Irish Cr R BRDG 185 37,132 37,132 37,132

Berks 4015 01B 10747 SR 4015 o/Trib Irish Cr C BRDG 185 260,000 260,000 260,000

Berks 4015 01B 10747 SR 4015 o/Trib Irish Cr C BRDG 185 222,710 222,710 222,710

Berks 4025 0 10701 Shoemakersville Bridge F BRDG 581 636,540 636,540 636,540

Berks 4025 0 10701 Shoemakersville Bridge U BRDG 581 106,090 106,090 106,090

Berks 4025 0 10701 Shoemakersville Bridge R BRDG 581 318,270 318,270 318,270

Berks 4025 0 10701 Shoemakersville Bridge C BRDG 581 1,250,035 1,250,035 1,250,035

Berks 4025 0 10701 Shoemakersville Bridge C BRDG 581 1,927,930 1,927,930 1,927,930

Berks 4026 01B 10703 Mohrsville Bridge C BRDG STP 20,000 185 5,000 25,000 25,000

Berks 4028 0 10693 Mill Creek Bridge-Hamburg P BRDG STP 360,160 185 90,040 450,200 450,200

Berks 4028 0 10693 Mill Creek Bridge-Hamburg F BRDG STP 315,140 581 78,785 393,925 393,925

Berks 4028 0 10693 Mill Creek Bridge-Hamburg U BRDG STP 22,510 581 5,628 28,138 28,138

Page 33: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

33 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 4028 0 10693 Mill Creek Bridge-Hamburg R BRDG STP 45,000 581 11,250 56,250 56,250

Berks 4035 01B 47634 Trib Schuylkill Rv Br (S) F BRDG 185 360,500 360,500 360,500

Berks 4035 01B 47634 Trib Schuylkill Rv Br (S) U BRDG 185 30,900 30,900 30,900

Berks 4035 01B 47634 Trib Schuylkill Rv Br (S) R BRDG 185 77,250 77,250 77,250

Berks 4035 01B 47634 Trib Schuylkill Rv Br (S) C BRDG STP 400,000 185 100,000 500,000 500,000

Berks 4035 01B 47634 Trib Schuylkill Rv Br (S) C BRDG STP 836,000 185 209,000 1,045,000 1,045,000

Berks 4035 01M 61973 SR 4035 (4th St)Bettermnt C HRST 581 25,000 25,000 25,000

Berks 4035 02B 47635 Trib Schuylkill River (N) F BRDG 185 360,500 360,500 360,500

Berks 4035 02B 47635 Trib Schuylkill River (N) U BRDG 185 30,900 30,900 30,900

Berks 4035 02B 47635 Trib Schuylkill River (N) R BRDG 185 77,250 77,250 77,250

Berks 4035 02B 47635 Trib Schuylkill River (N) C BRDG STP 400,000 185 100,000 500,000 500,000

Berks 4035 02B 47635 Trib Schuylkill River (N) C BRDG STP 836,000 185 209,000 1,045,000 1,045,000

Berks 4044 01B 85663 SR 4044 ovr Windsor Creek F BRDG STU 32,960 185 8,240 41,200 41,200

Berks 4044 01B 85663 SR 4044 ovr Windsor Creek U BRDG 185 10,609 10,609 10,609

Berks 4044 01B 85663 SR 4044 ovr Windsor Creek R BRDG 185 37,132 37,132 37,132

Berks 4044 01B 85663 SR 4044 ovr Windsor Creek C BRDG 581 219,000 219,000 219,000

Berks 4044 01B 85663 SR 4044 ovr Windsor Creek C BRDG 581 311,450 311,450 311,450

Berks 7203 01B 103136Blacksmith Road Bridge P BRDG STU 320,000 183 60,000 20,000 400,000 400,000

Berks 7207 01B 103141Hartz Mill Bridge P BRDG STU 280,000 183 52,500 17,500 350,000 350,000

Berks 7208 01B 103152Phillips Bridge P BRDG 150,000 150,000 150,000

Berks 7214 01B 103149Harvey Ave Bridge P BRDG STU 280,000 183 52,500 17,500 350,000 350,000

Berks 7215 DCB 10579 Dreibelbis Covered Bridge +C BRDG HCB 40,000 40,000 40,000

Berks 7215 DCB 10579 Dreibelbis Covered Bridge +C BRDG HCB 1,000,000 1,000,000 1,000,000

Berks 7222 53A 10718 Schaeffer Rd Bridge F BRDG BOF 309,000 179 77,250 386,250 386,250

Berks 7222 53A 10718 Schaeffer Rd Bridge U BRDG BOF 21,218 179 5,305 26,523 26,523

Berks 7222 53A 10718 Schaeffer Rd Bridge R BRDG BOF 29,705 179 7,426 37,131 37,131

Berks 7222 53A 10718 Schaeffer Rd Bridge C BRDG BOF 300,000 179 75,000 375,000 375,000

Berks 7222 53A 10718 Schaeffer Rd Bridge C BRDG BOF 973,080 179 243,270 1,216,350 1,216,350

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br F BRDG BOF 288,400 179 72,100 360,500 360,500

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br U BRDG BOF 19,105 179 4,776 23,881 23,881

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br R BRDG BOF 47,762 179 11,940 59,702 59,702

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br C BRDG BOF 958,850 179 239,713 1,198,563 1,198,563

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br C BRDG BOF 2,317,094 179 854,273 3,171,367 3,171,367

Berks 7227 58B 10766 T-575 Fisher Mill Rd Br C BRDG STU 1,100,000 1,100,000 1,100,000

Berks 7230 558 10580 T-558 Berne Station C BRDG BOF 40,000 179 10,000 50,000 50,000

Berks 7243 01B 103135Burkeys Bridge P BRDG STU 280,000 183 52,500 17,500 350,000 350,000

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG BOF 557,235 557,235 557,235

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG BOF 1,752,480 1,752,480 1,752,480

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG NHPP 670,000 670,000 670,000

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG STP 2,533,623 2,533,623 2,533,623

Page 34: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

34 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG BOF 2,337,210 2,337,210 2,337,210

Berks 7301 BUT 10713 Buttonwood Street Bridge C BRDG BOF 823,070 823,070 823,070

Berks 7410 01B 102959Peach Street Bridge P BRDG STU 280,000 183 52,500 17,500 350,000 350,000

Totals for: Berks 80,719,374 47,476,701 440,000 128,636,075 85,510,001 40,210,375 112,943 125,833,319 78,090,413 41,128,500 62,500 119,281,413 83,097,231 34,163,280 117,260,511 491,011,318

Blair BHR 50604 Bridge & Highway Reserve C BRDG BOF 150,531 150,531 150,531

Blair BHR 50604 Bridge & Highway Reserve C HRST STP 250,000 581 66,667 316,667 316,667

Blair LBI 75709 Local Bridge Line Item C BRDG BOF 159,000 183 29,813 9,938 198,751 198,751

Blair THA 98155 Tyrone Hosptl Access Imp F HCON APL 70,000 70,000 70,000

Blair THA 98155 Tyrone Hosptl Access Imp C HCON APL 353,315 353,315 353,315

Blair 22 034 63586 Canoe Creek Intersection +C SAMI CAQ 579,949 581 563,492 1,143,441 1,143,441

Blair 22 034 63586 Canoe Creek Intersection +C SAMI NHPP 788,669 788,669 788,669

Blair 22 034 63586 Canoe Creek Intersection +C SAMI SXF 885,348 885,348 885,348

Blair 22 034 63586 Canoe Creek Intersection +C SAMI NHPP 2,490,017 581 622,504 3,112,521 3,112,521

Blair 22 034 63586 Canoe Creek Intersection +C SAMI CAQ 816,000 581 260,800 1,076,800 1,076,800

Blair 22 034 63586 Canoe Creek Intersection +C SAMI NHPP 227,200 227,200 227,200

Blair 22 40S 88539 US22/7th St Int Improvmnt +C SAMI CAQ 816,000 816,000 816,000

Blair 22 40S 88539 US22/7th St Int Improvmnt +C SAMI CAQ 236,051 236,051 236,051

Blair 22 40S 88539 US22/7th St Int Improvmnt +C SAMI CAQ 816,000 816,000 816,000

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI HSIP 992,000 581 478,583 1,470,583 1,470,583

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI NHPP 589,000 589,000 589,000

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI HSIP 992,000 581 638,800 1,630,800 1,630,800

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI NHPP 1,563,200 1,563,200 1,563,200

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI HSIP 992,000 581 248,000 1,240,000 1,240,000

Blair 22 42S 92537 US22 Frankstown Intrsctns C SAMI HSIP 992,000 581 248,000 1,240,000 1,240,000

Blair 22 43M 91614 US 22 - Brower Lee Drive +C HRST STP 20,849 20,849 20,849

Blair 22 44B 22102 Yellow Spring Bridge C BRDG NHPP 600,000 600,000 600,000

Blair 22 44B 22102 Yellow Spring Bridge C BRDG STP 750,000 750,000 750,000

Blair 22 44B 22102 Yellow Spring Bridge C BRDG STP 250,000 250,000 250,000

Blair 22 45S 99500 US22 Degol Entrance R SAMI 581 20,000 20,000 20,000

Blair 22 45S 99500 US22 Degol Entrance C SAMI 581 957,750 957,750 957,750

Blair 22 47B 22020 US22 Brush Run Bridge +F BRDG NHPP 250,000 250,000 250,000

Blair 22 47B 22020 US22 Brush Run Bridge +U BRDG NHPP 50,000 50,000 50,000

Blair 22 47B 22020 US22 Brush Run Bridge +R BRDG NHPP 50,000 50,000 50,000

Blair 22 47B 22020 US22 Brush Run Bridge +C BRDG NHPP 403,024 403,024 403,024

Blair 22 48S 98782 US22 Dville Safety Imp +P HRST NHPP 150,000 150,000 150,000

Blair 22 48S 98782 US22 Dville Safety Imp +C HRST NHPP 100,000 100,000 100,000

Blair 22 49S 98785 US22/N Juniata St Intrsct P HRST 581 555,000 555,000 555,000

Blair 22 49S 98785 US22/N Juniata St Intrsct F HRST 581 400,000 400,000 400,000

Blair 22 49S 98785 US22/N Juniata St Intrsct U HRST 581 100,000 100,000 100,000

Blair 22 49S 98785 US22/N Juniata St Intrsct R HRST 581 100,000 100,000 100,000

Page 35: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

35 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Blair 22 49S 98785 US22/N Juniata St Intrsct C HRST 581 902,404 902,404 902,404

Blair 22 50S 98783 US22/PA36 Intrsct Improve +P HRST NHPP 150,000 150,000 150,000

Blair 22 50S 98783 US22/PA36 Intrsct Improve +F HRST NHPP 100,000 100,000 100,000

Blair 36 033 103443Logan Med Center Improve C HCON APL 192,467 192,467 192,467

Blair 36 29B 21952 PA36 Brush Run Bridge F BRDG NHPP 350,000 350,000 350,000

Blair 36 29B 21952 PA36 Brush Run Bridge U BRDG NHPP 200,000 200,000 200,000

Blair 36 29B 21952 PA36 Brush Run Bridge R BRDG NHPP 200,000 200,000 200,000

Blair 36 29B 21952 PA36 Brush Run Bridge +C BRDG STP 305,849 305,849 305,849

Blair 36 29B 21952 PA36 Brush Run Bridge +C BRDG STP 624,000 624,000 624,000

Blair 36 29B 21952 PA36 Brush Run Bridge +C BRDG STP 1,228,151 1,228,151 1,228,151

Blair 36 30B 56637 Union Ave ovr Mill Run Br U BRDG 185 250,000 250,000 250,000

Blair 36 30B 56637 Union Ave ovr Mill Run Br R BRDG 185 100,000 100,000 100,000

Blair 36 30B 56637 Union Ave ovr Mill Run Br C BRDG 185 449,000 449,000 449,000

Blair 36 30B 56637 Union Ave ovr Mill Run Br C BRDG 185 1,464,687 1,464,687 1,464,687

Blair 36 30B 56637 Union Ave ovr Mill Run Br C BRDG 185 1,836,313 1,836,313 1,836,313

Blair 36 32B 88134 Union Av ovr Trib Mill Br U BRDG 185 25,000 25,000 25,000

Blair 36 32B 88134 Union Av ovr Trib Mill Br R BRDG 185 15,000 15,000 15,000

Blair 36 32B 88134 Union Av ovr Trib Mill Br C BRDG 185 600,000 600,000 600,000

Blair 453 012 95291 Janesville Pike Rockfall F HRST 581 295,000 295,000 295,000

Blair 453 012 95291 Janesville Pike Rockfall F HRST 581 5,000 5,000 5,000

Blair 453 012 95291 Janesville Pike Rockfall U HRST 581 100,000 100,000 100,000

Blair 453 012 95291 Janesville Pike Rockfall R HRST 581 100,000 100,000 100,000

Blair 764 20B 22090 PA764 Greenwood Sandy Run +C BRDG NHPP 67,131 67,131 67,131

Blair 764 20B 22090 PA764 Greenwood Sandy Run +C BRDG NHPP 228,983 228,983 228,983

Blair 764 20B 22090 PA764 Greenwood Sandy Run +C BRDG NHPP 1,888,776 1,888,776 1,888,776

Blair 1001 013 22146 Plank Road Interchange C SAMI 581 1,951,704 1,951,704 1,951,704

Blair 1001 013 22146 Plank Road Interchange C SAMI 581 2,918,296 2,918,296 2,918,296

Blair 1001 015 21891 Little Juniata Rvr Brg #1 C BRDG STP 120 185 30 150 150

Blair 1001 22B 92540 Kettle Crk Superstructure C BRDG NHPP 430,000 430,000 430,000

Blair 1001 23M 91616 Sheraton Dr to Goods I-99 C HRST 581 975,000 975,000 975,000

Blair 1003 001 103840Edgar Street to SR 1009 P HRST 581 25,000 25,000 25,000

Blair 1012 01B 21642 Tyrone E 10th Street Brdg +U BRDG BOF 75,000 75,000 75,000

Blair 1012 01B 21642 Tyrone E 10th Street Brdg +R BRDG BOF 25,000 25,000 25,000

Blair 1012 01B 21642 Tyrone E 10th Street Brdg +C BRDG BOF 354,000 354,000 354,000

Blair 1012 01B 21642 Tyrone E 10th Street Brdg +C BRDG BOF 550,000 550,000 550,000

Blair 1013 13B 92642 Sinking Run Bridge #1 U BRDG 185 25,000 25,000 25,000

Blair 1013 13B 92642 Sinking Run Bridge #1 R BRDG 185 15,000 15,000 15,000

Blair 1013 13B 92642 Sinking Run Bridge #1 C BRDG 185 406,938 406,938 406,938

Blair 1013 14B 92643 Sinking Run Bridge #3 U BRDG 185 25,000 25,000 25,000

Blair 1013 14B 92643 Sinking Run Bridge #3 R BRDG 185 15,000 15,000 15,000

Page 36: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

36 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Blair 1013 14B 92643 Sinking Run Bridge #3 C BRDG 185 366,062 366,062 366,062

Blair 1013 15B 92644 Sinking Run Bridge #5 U BRDG 185 25,000 25,000 25,000

Blair 1013 15B 92644 Sinking Run Bridge #5 R BRDG 185 15,000 15,000 15,000

Blair 1013 15B 92644 Sinking Run Bridge #5 C BRDG 185 366,062 366,062 366,062

Blair 1013 16B 93762 Sinking Run Culvert #1 U BRDG 185 50,000 50,000 50,000

Blair 1013 16B 93762 Sinking Run Culvert #1 R BRDG 185 15,000 15,000 15,000

Blair 1013 16B 93762 Sinking Run Culvert #1 C BRDG 185 155,000 155,000 155,000

Blair 1013 16B 93762 Sinking Run Culvert #1 C BRDG 185 595,000 595,000 595,000

Blair 1013 17B 93766 Sinking Run Culvert #2 U BRDG 185 50,000 50,000 50,000

Blair 1013 17B 93766 Sinking Run Culvert #2 R BRDG 185 15,000 15,000 15,000

Blair 1013 17B 93766 Sinking Run Culvert #2 C BRDG 185 190,876 190,876 190,876

Blair 1013 17B 93766 Sinking Run Culvert #2 C BRDG 185 309,124 309,124 309,124

Blair 1013 18B 93767 Sinking Run Culvert #3 U BRDG 185 50,000 50,000 50,000

Blair 1013 18B 93767 Sinking Run Culvert #3 R BRDG 185 15,000 15,000 15,000

Blair 1013 18B 93767 Sinking Run Culvert #3 C BRDG 185 162,124 162,124 162,124

Blair 1013 18B 93767 Sinking Run Culvert #3 C BRDG 185 337,876 337,876 337,876

Blair 2014 03B 22027 Loop Road Bridge C BRDG STP 96,833 96,833 96,833

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run P BRDG 185 250,000 250,000 250,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run F BRDG STP 100,000 100,000 100,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run F BRDG STP 100,000 100,000 100,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run U BRDG STP 25,000 25,000 25,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run U BRDG STP 25,000 25,000 25,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run R BRDG STP 25,000 25,000 25,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run R BRDG STP 25,000 25,000 25,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run C BRDG STP 250,000 250,000 250,000

Blair 3013 07B 22022 Newry Brdg ovr Poplar Run C BRDG STP 1,000,000 1,000,000 1,000,000

Blair 4010 11S 94670 17th/Vly View/Pleas Vly U HRST 581 150,000 150,000 150,000

Blair 4010 11S 94670 17th/Vly View/Pleas Vly R HRST 581 100,000 100,000 100,000

Blair 4010 11S 94670 17th/Vly View/Pleas Vly C HRST 581 2,172,708 2,172,708 2,172,708

Blair 4010 11S 94670 17th/Vly View/Pleas Vly C HRST 581 379,792 379,792 379,792

Blair 4010 11S 94670 17th/Vly View/Pleas Vly C HRST 581 447,500 447,500 447,500

Blair 4018 04B 21965 Sandy Run Bridge C BRDG STP 115,000 115,000 115,000

Blair 4027 05B 21895 Tyrone Westvaco Bridge C BRDG STP 905,729 905,729 905,729

Blair 4027 05B 21895 Tyrone Westvaco Bridge C BRDG STP 943,151 943,151 943,151

Blair 4027 05B 21895 Tyrone Westvaco Bridge C BRDG STP 625,000 625,000 625,000

Blair 4027 06B 22117 Olivia Vanscoyoc Run Br C BRDG 185 801,907 801,907 801,907

Blair 4027 07B 22081 Trib to Big Fill Run Brdg C BRDG STP 600,000 600,000 600,000

Blair 4027 07B 22081 Trib to Big Fill Run Brdg C BRDG STP 600,000 600,000 600,000

Blair 4029 003 97858 Clay Ave Storm Sewer C HRST STP 131,318 131,318 131,318

Blair 7202 492 102538T492 Bells Gap Run Bridge P BRDG BOF 140,000 185 26,250 8,750 175,000 175,000

Page 37: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

37 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Blair 7202 492 102538T492 Bells Gap Run Bridge F BRDG BOF 120,000 185 22,500 7,500 150,000 150,000

Blair 7202 492 102538T492 Bells Gap Run Bridge U BRDG BOF 16,000 185 3,000 1,000 20,000 20,000

Blair 7202 492 102538T492 Bells Gap Run Bridge R BRDG BOF 16,000 185 3,000 1,000 20,000 20,000

Blair 7202 492 102538T492 Bells Gap Run Bridge C BRDG BOF 53,000 183 9,938 3,313 66,251 66,251

Blair 7208 369 95932 T369 Mill Lane Bridge P BRDG BOF 28,000 185 5,250 1,750 35,000 35,000

Blair 7208 369 95932 T369 Mill Lane Bridge F BRDG BOF 28,000 185 5,250 1,750 35,000 35,000

Blair 7208 369 95932 T369 Mill Lane Bridge U BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7208 369 95932 T369 Mill Lane Bridge R BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7208 369 95932 T369 Mill Lane Bridge C BRDG BOF 220,000 185 41,250 13,750 275,000 275,000

Blair 7213 351 95935 T351 Heuston Rd Bridge P BRDG BOF 24,000 185 4,500 1,500 30,000 30,000

Blair 7213 351 95935 T351 Heuston Rd Bridge F BRDG BOF 24,000 185 4,500 1,500 30,000 30,000

Blair 7213 351 95935 T351 Heuston Rd Bridge U BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7213 351 95935 T351 Heuston Rd Bridge R BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7213 351 95935 T351 Heuston Rd Bridge C BRDG BOF 80,000 185 15,000 5,000 100,000 100,000

Blair 7301 BRB 94971 10th St over Brush Run Br P BRDG BOF 60,000 185 11,250 3,750 75,000 75,000

Blair 7301 BRB 94971 10th St over Brush Run Br F BRDG BOF 60,000 185 11,250 3,750 75,000 75,000

Blair 7301 BRB 94971 10th St over Brush Run Br U BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7301 BRB 94971 10th St over Brush Run Br R BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7301 BRB 94971 10th St over Brush Run Br C BRDG BOF 83,000 183 15,563 5,188 103,751 103,751

Blair 7301 BRB 94971 10th St over Brush Run Br C BRDG BOF 97,000 183 18,187 6,062 121,249 121,249

Blair 7301 WSA 88176 West Spruce Ave Bridge P BRDG BOF 24,000 185 4,500 1,500 30,000 30,000

Blair 7301 WSA 88176 West Spruce Ave Bridge F BRDG BOF 24,000 185 4,500 1,500 30,000 30,000

Blair 7301 WSA 88176 West Spruce Ave Bridge U BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7301 WSA 88176 West Spruce Ave Bridge R BRDG BOF 4,000 185 750 250 5,000 5,000

Blair 7301 WSA 88176 West Spruce Ave Bridge C BRDG BOF 120,000 185 22,500 7,500 150,000 150,000

Totals for: Blair 8,145,313 4,847,000 37,688 13,030,001 8,264,348 5,859,000 31,438 14,154,786 7,379,000 7,168,000 15,562 14,562,562 7,379,000 7,168,000 3,313 14,550,313 56,297,662

Bradford 104342LOA STUDY S BRDG BOF 60,000 183 11,250 3,750 75,000 75,000

Bradford 000 68018 NTIER TIP reserve D3 C BRDG BOF 56,176 185 5,000 61,176 61,176

Bradford 000 68018 NTIER TIP reserve D3 C BRDG BOF 867,840 867,840 867,840

Bradford 000 68018 NTIER TIP reserve D3 C BRDG BOF 49,572 185 58,250 107,822 107,822

Bradford 000 68018 NTIER TIP reserve D3 C BRDG BOF 328,508 185 182,745 511,253 511,253

Bradford 000 68018 NTIER TIP reserve D3 C BRDG 185 22,500 22,500 22,500

Bradford 000 68018 NTIER TIP reserve D3 C HRST NHPP 38,393 581 10,000 48,393 48,393

Bradford 000 68018 NTIER TIP reserve D3 C HRST STP 816,824 816,824 816,824

Bradford 000 68018 NTIER TIP reserve D3 C HRST NHPP 251,000 581 790,250 1,041,250 1,041,250

Bradford 000 68018 NTIER TIP reserve D3 C HRST STP 1,683,115 1,683,115 1,683,115

Bradford 000 68018 NTIER TIP reserve D3 C HRST NHPP 365,000 581 715,000 1,080,000 1,080,000

Bradford 000 68018 NTIER TIP reserve D3 C HRST STP 224,885 224,885 224,885

Bradford 000 68018 NTIER TIP reserve D3 C HRST NHPP 946,000 581 1,114,000 2,060,000 2,060,000

Bradford 000 68018 NTIER TIP reserve D3 C SAMI HSIP 361,477 361,477 361,477

Page 38: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

38 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford LBR 5164 T-712 over Cash Creek F BRDG BOF 64,000 183 12,000 4,000 80,000 80,000

Bradford LBR 5164 T-712 over Cash Creek U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Bradford LBR 5164 T-712 over Cash Creek R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Bradford LBR 5164 T-712 over Cash Creek C BRDG BOF 401,920 183 75,360 25,120 502,400 502,400

Bradford LBR 5164 T-712 over Cash Creek C BRDG BOF 248,000 183 37,200 12,400 297,600 297,600

Bradford LBR 5279 T-330 over Towanda Creek C BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Bradford LBR 57557 T-547 ov Wallace Run P BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Bradford LBR 88852 T-105 over Cayuta Creek F BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Bradford LBR 88852 T-105 over Cayuta Creek U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Bradford LBR 88852 T-105 over Cayuta Creek R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Bradford LBR 88852 T-105 over Cayuta Creek C BRDG BOF 508,508 183 95,345 31,782 635,635 635,635

Bradford LBR 88852 T-105 over Cayuta Creek C BRDG BOF 448,000 183 84,000 28,000 560,000 560,000

Bradford LBR 88852 T-105 over Cayuta Creek C BRDG BOF 1,043,492 183 195,655 65,218 1,304,365 1,304,365

Bradford RBR 103331T-850 ov Tb to BentleyCrk C BRDG 183 200,000 50,000 250,000 250,000

Bradford RBR 5281 T-807 over Beckwith Creek C BRDG 183 64,320 16,080 80,400 80,400

Bradford RBR 5281 T-807 over Beckwith Creek C BRDG 183 580,000 145,000 725,000 725,000

Bradford 6 056 97559 Tioga Co Line to Sylvania P HRST 581 50,000 50,000 50,000

Bradford 6 056 97559 Tioga Co Line to Sylvania F HRST 581 100,000 100,000 100,000

Bradford 6 056 97559 Tioga Co Line to Sylvania U HRST 581 25,000 25,000 25,000

Bradford 6 056 97559 Tioga Co Line to Sylvania C HRST 581 949,000 949,000 949,000

Bradford 6 056 97559 Tioga Co Line to Sylvania C HRST 581 2,051,000 2,051,000 2,051,000

Bradford 6 057 97579 Brdfrd Preserv P BRDG 185 10,000 10,000 10,000

Bradford 6 057 97579 Brdfrd Preserv F BRDG 185 5,000 5,000 5,000

Bradford 6 057 97579 Brdfrd Preserv C BRDG NHPP 1,250,000 1,250,000 1,250,000

Bradford 6 057 97579 Brdfrd Preserv C BRDG NHPP 650,000 650,000 650,000

Bradford 6 058 97681 Lime Hill Rd to Wyalusing F HRST 581 25,000 25,000 25,000

Bradford 6 058 97681 Lime Hill Rd to Wyalusing +C HRST NHPP 308,000 308,000 308,000

Bradford 6 060 98958 SR 187 to SR 1012 F HRST 581 20,000 20,000 20,000

Bradford 6 060 98958 SR 187 to SR 1012 C HRST 581 888,000 888,000 888,000

Bradford 6 061 99336 Old Rte 6 to Wyoming Co F HRST 581 20,000 20,000 20,000

Bradford 6 061 99336 Old Rte 6 to Wyoming Co C HRST 581 500,000 500,000 500,000

Bradford 6 061 99336 Old Rte 6 to Wyoming Co C HRST 581 750,000 750,000 750,000

Bradford 6 118 5314 US 6 over Wallace Creek C BRDG NHPP 893,000 893,000 893,000

Bradford 6 118 5314 US 6 over Wallace Creek C BRDG NHPP 57,000 57,000 57,000

Bradford 6 120 99339 FarmersValleyRd toMainSt F HRST 581 25,000 25,000 25,000

Bradford 6 120 99339 FarmersValleyRd toMainSt C HRST 581 2,000,000 2,000,000 2,000,000

Bradford 6 M35 87984 Sugar Crk to Tomjack Crk P HRST 581 20,000 20,000 20,000

Bradford 6 M35 87984 Sugar Crk to Tomjack Crk C HRST NHPP 4,500,000 4,500,000 4,500,000

Bradford 6 M36 87973 Sugar Creek to Gulf Rd P HRST 581 20,000 20,000 20,000

Bradford 6 M36 87973 Sugar Creek to Gulf Rd F HRST 581 75,000 75,000 75,000

Page 39: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

39 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford 6 M36 87973 Sugar Creek to Gulf Rd C HRST 581 700,000 700,000 700,000

Bradford 6 M36 87973 Sugar Creek to Gulf Rd C HRST 581 825,000 825,000 825,000

Bradford 6 M43 93547 US 6 / US 220 Interchange U HRST 581 30,000 30,000 30,000

Bradford 6 M43 93547 US 6 / US 220 Interchange +C HRST NHPP 1,768,000 1,768,000 1,768,000

Bradford 6 M43 93547 US 6 / US 220 Interchange +C HRST NHPP 332,000 332,000 332,000

Bradford 6 M44 93548 Plank Road to SR 2027 U HRST 581 50,000 50,000 50,000

Bradford 6 M44 93548 Plank Road to SR 2027 C HRST 581 600,000 600,000 600,000

Bradford 6 M44 93548 Plank Road to SR 2027 C HRST 581 850,000 850,000 850,000

Bradford 14 077 88915 SR 14 over Tannery Creek P BRDG 185 60,000 60,000 60,000

Bradford 14 093 94631 SR 14 over Tb South Creek P BRDG 185 60,000 60,000 60,000

Bradford 14 102 91435 SR 14 over Tb South Creek P BRDG 185 60,000 60,000 60,000

Bradford 14 103 98966 Sndkrvlle Rd to Thmpsn Rd C HRST 581 840,000 840,000 840,000

Bradford 14 104 98969 Thmpsn Hill Rd to NY Ln C HRST 581 890,000 890,000 890,000

Bradford 14 75M 87976 Canton to Alba Creek C HRST 581 250,000 250,000 250,000

Bradford 154 072 103156Grover Rd to South Ave P HRST 581 10,000 10,000 10,000

Bradford 187 029 87925 SR 187 over Tb Susq River P BRDG 185 5,000 5,000 5,000

Bradford 187 029 87925 SR 187 over Tb Susq River F BRDG 185 20,000 20,000 20,000

Bradford 187 029 87925 SR 187 over Tb Susq River U BRDG 185 15,000 15,000 15,000

Bradford 187 029 87925 SR 187 over Tb Susq River R BRDG 185 15,000 15,000 15,000

Bradford 187 029 87925 SR 187 over Tb Susq River +C BRDG STP 350,000 350,000 350,000

Bradford 187 029 87925 SR 187 over Tb Susq River +C BRDG STP 350,000 350,000 350,000

Bradford 199 010 99157 SatterleeSttoCayutaSt P HCON 581 20,000 20,000 20,000

Bradford 199 07M 87985 Main St to Satterlee St C HRST 581 1,915,000 1,915,000 1,915,000

Bradford 199 07M 87985 Main St to Satterlee St C HRST 581 135,000 135,000 135,000

Bradford 220 115 86839 Chemung River BR Paint C BRDG NHPP 825,000 825,000 825,000

Bradford 220 115 86839 Chemung River BR Paint C BRDG NHPP 1,249,000 1,249,000 1,249,000

Bradford 220 116 5325 US 220 over SR 2036 C BRDG STP 1,205,115 1,205,115 1,205,115

Bradford 220 116 5325 US 220 over SR 2036 C BRDG STP 269,885 269,885 269,885

Bradford 220 123 93736 US220/SR4018 Intersection F SAMI HSIP 45,000 45,000 45,000

Bradford 220 123 93736 US220/SR4018 Intersection +C SAMI HSIP 300,000 300,000 300,000

Bradford 220 123 93736 US220/SR4018 Intersection +C SAMI HSIP 474,200 474,200 474,200

Bradford 220 123 93736 US220/SR4018 Intersection +C SAMI HSIP 375,800 375,800 375,800

Bradford 220 161 96677 SR 220 over Cash Creek F BRDG NHPP 50,000 50,000 50,000

Bradford 220 161 96677 SR 220 over Cash Creek U BRDG NHPP 150,000 150,000 150,000

Bradford 220 161 96677 SR 220 over Cash Creek +R BRDG NHPP 1,403,000 1,403,000 1,403,000

Bradford 220 161 96677 SR 220 over Cash Creek +R HRST NHPP 1,597,000 1,597,000 1,597,000

Bradford 220 161 96677 SR 220 over Cash Creek +C BRDG NHPP 1,250,000 1,250,000 1,250,000

Bradford 220 175 99420 DunnRd to TomahawkRd F HRST 581 20,000 20,000 20,000

Bradford 220 175 99420 DunnRd to TomahawkRd C HRST 581 1,486,000 1,486,000 1,486,000

Bradford 220 175 99420 DunnRd to TomahawkRd C HRST 581 1,114,000 1,114,000 1,114,000

Page 40: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

40 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford 220 179 97972 SR220/SR2027 Intersection P SAMI HSIP 75,000 75,000 75,000

Bradford 220 180 97630 US220 & PA199 Int P SAMI HSIP 250,000 250,000 250,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk P BRDG BOF 10,000 10,000 10,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk F BRDG 185 10,000 10,000 10,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk F BRDG 185 15,000 15,000 15,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk U BRDG 185 40,000 40,000 40,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk R BRDG 185 20,000 20,000 20,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk R BRDG 185 5,000 5,000 5,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk C BRDG 185 85,000 85,000 85,000

Bradford 367 003 5091 SR 367 ov Steam Mill Crk C BRDG 185 85,000 85,000 85,000

Bradford 414 025 5048 SR 414 over Towanda Crk C BRDG STP 50,000 50,000 50,000

Bradford 414 027 82728 SR 414 ov Tb Towanda Crk F BRDG 185 1,000 1,000 1,000

Bradford 414 027 82728 SR 414 ov Tb Towanda Crk C BRDG STP 700,000 700,000 700,000

Bradford 414 027 82728 SR 414 ov Tb Towanda Crk C BRDG STP 157,000 157,000 157,000

Bradford 467 005 5240 SR467 over Johnson's Crk C BRDG STP 1,058,061 1,058,061 1,058,061

Bradford 467 005 5240 SR467 over Johnson's Crk C BRDG STP 441,939 441,939 441,939

Bradford 549 015 5328 SR 549 over Seeley Creek +C BRDG STP 400,000 400,000 400,000

Bradford 549 015 5328 SR 549 over Seeley Creek +C BRDG STP 1,500,000 1,500,000 1,500,000

Bradford 549 016 78770 SR 549 over Beckwith Crk +C BRDG STP 249,176 249,176 249,176

Bradford 549 016 78770 SR 549 over Beckwith Crk +C BRDG STP 1,688,000 1,688,000 1,688,000

Bradford 706 008 99351 Anderson Rd to Susque Co C HRST 581 563,000 563,000 563,000

Bradford 706 008 99351 Anderson Rd to Susque Co C HRST 581 437,000 437,000 437,000

Bradford 1002 011 87927 SR 1002 over Tb Fargo Crk R BRDG 185 10,000 10,000 10,000

Bradford 1002 011 87927 SR 1002 over Tb Fargo Crk C BRDG 185 28,250 28,250 28,250

Bradford 1002 011 87927 SR 1002 over Tb Fargo Crk C BRDG 185 42,750 42,750 42,750

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr P BRDG 581 50,000 50,000 50,000

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr F BRDG 185 20,000 20,000 20,000

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr U BRDG 185 50,000 50,000 50,000

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr R BRDG 185 20,000 20,000 20,000

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr C BRDG 185 47,015 47,015 47,015

Bradford 1012 008 97567 SR1012 ov Br of Rmfld Cr C BRDG 185 132,100 132,100 132,100

Bradford 1016 005 97697 Valley View Rd to SR 1035 C HRST 581 90,000 90,000 90,000

Bradford 1029 004 87967 SR1029 ov Tb Bullards Crk P BRDG 185 5,000 5,000 5,000

Bradford 1029 004 87967 SR1029 ov Tb Bullards Crk C BRDG 185 30,000 30,000 30,000

Bradford 1029 004 87967 SR1029 ov Tb Bullards Crk C BRDG 185 30,000 30,000 30,000

Bradford 1043 003 82541 SR 1043 Slide Repair C HRST 581 1,825,000 1,825,000 1,825,000

Bradford 1043 003 82541 SR 1043 Slide Repair C HRST 581 115,000 115,000 115,000

Bradford 1043 015 97701 Sheshequin to Front St C HRST 581 440,000 440,000 440,000

Bradford 1043 016 99011 SR 1041 to SR 1045 F HRST 581 20,000 20,000 20,000

Bradford 1043 016 99011 SR 1041 to SR 1045 C HRST 581 1,000,000 1,000,000 1,000,000

Page 41: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

41 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford 1043 016 99011 SR 1041 to SR 1045 C HRST 581 500,000 500,000 500,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk P BRDG 185 13,750 13,750 13,750

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk P BRDG 185 26,250 26,250 26,250

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk F BRDG 185 10,000 10,000 10,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk F BRDG 185 10,000 10,000 10,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk U BRDG 185 25,000 25,000 25,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk U BRDG 185 25,000 25,000 25,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk R BRDG 185 10,000 10,000 10,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk R BRDG 185 10,000 10,000 10,000

Bradford 1046 001 89905 SR1046 ov Tb Bullards Crk C BRDG 185 85,000 85,000 85,000

Bradford 1049 021 102032SR1049 ov Pendleton Crk P BRDG 185 20,000 20,000 20,000

Bradford 1049 021 102032SR1049 ov Pendleton Crk P BRDG 185 20,000 20,000 20,000

Bradford 1049 022 5241 SR 1049 over Cold Brook P BRDG 185 20,000 20,000 20,000

Bradford 1049 022 5241 SR 1049 over Cold Brook P BRDG 185 20,000 20,000 20,000

Bradford 1049 022 5241 SR 1049 over Cold Brook F BRDG 185 10,000 10,000 10,000

Bradford 1049 022 5241 SR 1049 over Cold Brook U BRDG 185 12,500 12,500 12,500

Bradford 1049 022 5241 SR 1049 over Cold Brook R BRDG 185 10,000 10,000 10,000

Bradford 1058 002 79248 SR1058 ovTb Satterlee Crk F BRDG 185 5,000 5,000 5,000

Bradford 1058 002 79248 SR1058 ovTb Satterlee Crk C BRDG 185 122,180 122,180 122,180

Bradford 1058 002 79248 SR1058 ovTb Satterlee Crk C BRDG 185 27,830 27,830 27,830

Bradford 1059 001 97723 Runyon Rd to Warren Ctr C HRST 581 270,000 270,000 270,000

Bradford 1069 008 99075 Elmira St to SR 1070 C HRST 581 195,000 195,000 195,000

Bradford 2010 016 5084 SR2010ovTbSugarRun P BRDG 185 20,000 20,000 20,000

Bradford 2010 016 5084 SR2010ovTbSugarRun P BRDG 185 20,000 20,000 20,000

Bradford 2010 016 5084 SR2010ovTbSugarRun F BRDG 185 10,000 10,000 10,000

Bradford 2010 016 5084 SR2010ovTbSugarRun F BRDG 185 10,000 10,000 10,000

Bradford 2010 016 5084 SR2010ovTbSugarRun U BRDG 185 12,500 12,500 12,500

Bradford 2010 016 5084 SR2010ovTbSugarRun U BRDG 185 12,500 12,500 12,500

Bradford 2010 016 5084 SR2010ovTbSugarRun R BRDG 185 10,000 10,000 10,000

Bradford 2010 016 5084 SR2010ovTbSugarRun R BRDG 185 10,000 10,000 10,000

Bradford 2010 016 5084 SR2010ovTbSugarRun C BRDG 185 500,000 500,000 500,000

Bradford 2016 016 78785 SR 2016 over King Creek P BRDG 185 5,000 5,000 5,000

Bradford 2016 016 78785 SR 2016 over King Creek F BRDG 185 5,000 5,000 5,000

Bradford 2016 016 78785 SR 2016 over King Creek C BRDG 185 30,000 30,000 30,000

Bradford 2016 016 78785 SR 2016 over King Creek C BRDG 185 30,000 30,000 30,000

Bradford 2018 013 5243 SR 2018 ov Tb Susq River P BRDG 185 20,000 20,000 20,000

Bradford 2018 013 5243 SR 2018 ov Tb Susq River P BRDG 185 20,000 20,000 20,000

Bradford 2018 013 5243 SR 2018 ov Tb Susq River F BRDG 185 10,000 10,000 10,000

Bradford 2018 013 5243 SR 2018 ov Tb Susq River U BRDG 185 12,500 12,500 12,500

Bradford 2018 013 5243 SR 2018 ov Tb Susq River R BRDG 185 10,000 10,000 10,000

Page 42: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

42 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford 2020 002 87926 SR 2020 over Bennetts Crk P BRDG 185 6,000 6,000 6,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk F BRDG 185 10,000 10,000 10,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk F BRDG 185 10,000 10,000 10,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk U BRDG 185 15,000 15,000 15,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk R BRDG 185 15,000 15,000 15,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk C BRDG 185 100,000 100,000 100,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk C BRDG 581 250,000 250,000 250,000

Bradford 2020 002 87926 SR 2020 over Bennetts Crk C BRDG 185 400,000 400,000 400,000

Bradford 2036 004 102943SR 220 to SR 6 C HRST 581 360,000 360,000 360,000

Bradford 3009 015 97693 PA 414 to Old Plank Rd C HRST 581 825,000 825,000 825,000

Bradford 3012 008 79246 SR 3012 ov Tb Towanda Crk C BRDG 185 10,750 10,750 10,750

Bradford 3012 008 79246 SR 3012 ov Tb Towanda Crk C BRDG 581 49,250 49,250 49,250

Bradford 3013 001 68004 SR 3013 ov Tb Towanda Ck P BRDG 185 20,000 20,000 20,000

Bradford 3013 001 68004 SR 3013 ov Tb Towanda Ck F BRDG 185 20,000 20,000 20,000

Bradford 3013 001 68004 SR 3013 ov Tb Towanda Ck U BRDG 185 20,000 20,000 20,000

Bradford 3013 001 68004 SR 3013 ov Tb Towanda Ck R BRDG 185 25,000 25,000 25,000

Bradford 3013 001 68004 SR 3013 ov Tb Towanda Ck C BRDG 185 85,000 85,000 85,000

Bradford 3016 008 5135 SR 3016 over Mill Creek P BRDG 581 50,000 50,000 50,000

Bradford 3016 008 5135 SR 3016 over Mill Creek F BRDG 185 10,000 10,000 10,000

Bradford 3016 008 5135 SR 3016 over Mill Creek F BRDG 185 10,000 10,000 10,000

Bradford 3016 008 5135 SR 3016 over Mill Creek U BRDG 185 25,000 25,000 25,000

Bradford 3016 008 5135 SR 3016 over Mill Creek R BRDG 185 10,000 10,000 10,000

Bradford 3016 008 5135 SR 3016 over Mill Creek R BRDG 185 10,000 10,000 10,000

Bradford 3016 008 5135 SR 3016 over Mill Creek C BRDG 185 75,000 75,000 75,000

Bradford 3016 008 5135 SR 3016 over Mill Creek C BRDG 185 75,000 75,000 75,000

Bradford 3018 08M 93549 Towanda Boro Line to US 6 F HRST 581 50,000 50,000 50,000

Bradford 3018 08M 93549 Towanda Boro Line to US 6 U HRST 581 75,000 75,000 75,000

Bradford 3018 08M 93549 Towanda Boro Line to US 6 C HRST 581 700,000 700,000 700,000

Bradford 3018 08M 93549 Towanda Boro Line to US 6 C HRST 581 1,000,000 1,000,000 1,000,000

Bradford 3021 002 87928 SR 3021 ov Tb Towanda Crk F BRDG 185 20,000 20,000 20,000

Bradford 3021 002 87928 SR 3021 ov Tb Towanda Crk U BRDG 185 15,000 15,000 15,000

Bradford 3021 002 87928 SR 3021 ov Tb Towanda Crk R BRDG 185 15,000 15,000 15,000

Bradford 3021 002 87928 SR 3021 ov Tb Towanda Crk C BRDG 185 108,465 108,465 108,465

Bradford 3021 002 87928 SR 3021 ov Tb Towanda Crk C BRDG 185 46,535 46,535 46,535

Bradford 3036 001 78795 S. Fork of Sugar Creek P BRDG 185 2,500 2,500 2,500

Bradford 3036 001 78795 S. Fork of Sugar Creek P BRDG 185 2,500 2,500 2,500

Bradford 3036 001 78795 S. Fork of Sugar Creek F BRDG 185 2,500 2,500 2,500

Bradford 3036 001 78795 S. Fork of Sugar Creek F BRDG 185 2,500 2,500 2,500

Bradford 3036 001 78795 S. Fork of Sugar Creek C BRDG 185 30,000 30,000 30,000

Bradford 3036 001 78795 S. Fork of Sugar Creek C BRDG 185 30,000 30,000 30,000

Page 43: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

43 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bradford 4013 016 5218 SR 4013 over Millers Run P BRDG 185 20,000 20,000 20,000

Bradford 4013 039 97642 SR4013 ov Three Falls Run P BRDG 185 5,000 5,000 5,000

Bradford 4013 039 97642 SR4013 ov Three Falls Run F BRDG 185 10,000 10,000 10,000

Bradford 4013 039 97642 SR4013 ov Three Falls Run C BRDG 185 75,000 75,000 75,000

Bradford 4022 003 82734 SR 4022 ov Tb Chemung Rvr U BRDG 185 48,000 48,000 48,000

Bradford 4022 003 82734 SR 4022 ov Tb Chemung Rvr C BRDG 185 626,000 626,000 626,000

Bradford 4022 003 82734 SR 4022 ov Tb Chemung Rvr C BRDG 185 274,000 274,000 274,000

Bradford 4028 001 78810 SR 4028 over Justice Run F BRDG 185 5,000 5,000 5,000

Bradford 4028 001 78810 SR 4028 over Justice Run C BRDG 185 30,000 30,000 30,000

Bradford 4028 001 78810 SR 4028 over Justice Run C BRDG 185 30,000 30,000 30,000

Bradford 4033 005 93727 Bradford Bridge Overlays F BRDG 185 5,000 5,000 5,000

Bradford 4033 005 93727 Bradford Bridge Overlays C BRDG 185 200,000 200,000 200,000

Bradford 4033 005 93727 Bradford Bridge Overlays C BRDG 185 90,000 90,000 90,000

Bradford 6006 01A 64490 Cent.Brad.Traf.Impr Rebid C HCON 581 90,000 90,000 90,000

Totals for: Bradford 14,797,409 5,532,250 87,330 20,416,989 6,644,939 10,348,500 207,902 17,201,341 5,412,261 10,917,750 40,400 16,370,411 8,611,277 8,551,000 75,218 17,237,495 71,226,236

Bucks 74827 Delaware Canal Enhance C TENH SXF 2,640,000 788,000 3,428,000 3,428,000

Bucks 75854 Dist Proj Management "A" P PRA 581 1,591,000 1,591,000 1,591,000

Bucks 75854 Dist Proj Management "A" P PRA 581 1,639,000 1,639,000 1,639,000

Bucks 75855 Dist Project Mgt "B"&"C" P PRA 581 1,591,000 1,591,000 1,591,000

Bucks 75855 Dist Project Mgt "B"&"C" P PRA 581 1,639,000 1,639,000 1,639,000

Bucks 79929 Bridge Reserve Line Item C BRDG BOF 1,534,155 179 504,800 79,925 2,118,880 2,118,880

Bucks 79929 Bridge Reserve Line Item C BRDG BOF 2,210,800 2,210,800 2,210,800

Bucks 79929 Bridge Reserve Line Item C BRDG 183 786,525 786,525 786,525

Bucks 79929 Bridge Reserve Line Item C BRDG 185 203,865 203,865 203,865

Bucks 79929 Bridge Reserve Line Item C BRDG BOF 3,809,000 179 360,000 4,169,000 4,169,000

Bucks 79929 Bridge Reserve Line Item C BRDG 183 460,725 460,725 460,725

Bucks 79929 Bridge Reserve Line Item C BRDG 185 20,750 20,750 20,750

Bucks 79929 Bridge Reserve Line Item C BRDG 179 660,000 660,000 660,000

Bucks 79929 Bridge Reserve Line Item C BRDG 183 1,937,375 1,937,375 1,937,375

Bucks 95447 County/City Brdg Reserv C BRDG BOF 2,803,000 700,500 3,503,500 3,503,500

Bucks 95447 County/City Brdg Reserv C BRDG BOF 2,000,000 2,000,000 2,000,000

Bucks 95447 County/City Brdg Reserv C BRDG BOF 2,000,000 183 242,000 559,750 2,801,750 2,801,750

Bucks 95447 County/City Brdg Reserv C BRDG 57,750 57,750 57,750

Bucks 97991 Doylestown Twp Signal Upg C SAMI 244 90,000 90,000 90,000

Bucks BNY 57639 Newtown Yardley Rd C SAMI 581 1,147,000 1,147,000 1,147,000

Bucks CB1 87088 Chalfont Boro SRS C TENH SRTSF 579,734 579,734 579,734

Bucks D10 95439 I-95 TPK Interch D10 (C) C HCON NHPP 30,000,000 11,000,000 41,000,000 41,000,000

Bucks D10 95439 I-95 TPK Interch D10 (C) C HCON NHPP 20,000,000 25,000,000 45,000,000 45,000,000

Bucks D10 95439 I-95 TPK Interch D10 (C) C HCON NHPP 20,000,000 18,000,000 38,000,000 38,000,000

Bucks D20 95444 I-95 TPK Interch D20 C HCON NHPP 10,000,000 25,000,000 35,000,000 35,000,000

Page 44: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

44 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bucks D20 95444 I-95 TPK Interch D20 C HCON NHPP 31,500,000 31,500,000 31,500,000

Bucks D20 95444 I-95 TPK Interch D20 C HCON 32,000,000 32,000,000 32,000,000

Bucks DOT 70218 Delaware Canal Tunnel +C SPFED STU 1,433,000 1,433,000 1,433,000

Bucks DOT 70218 Delaware Canal Tunnel +C SPFED SXF 700,000 700,000 700,000

Bucks SSS 79927 S T P Reserve Line Item C HRST STP 526,754 581 499,000 1,025,754 1,025,754

Bucks SSS 79927 S T P Reserve Line Item C HRST STP 15,000 15,000 15,000

Bucks SSS 79980 S T U Reserve Line Item C HRST STU 1,334,469 581 66,922 10,797 1,412,188 1,412,188

Bucks SSS 79980 S T U Reserve Line Item C HRST STU 2,434,000 78,000 2,512,000 2,512,000

Bucks SSS 79980 S T U Reserve Line Item C HRST 581 326,000 200,000 526,000 526,000

Bucks SSS 79980 S T U Reserve Line Item C HRST 581 2,328,000 2,328,000 2,328,000

Bucks SSS 84318 CMAQ Reserve Line Item C SAMI CAQ 6,919,270 6,919,270 6,919,270

Bucks SSS 84318 CMAQ Reserve Line Item C SAMI CAQ 3,494,000 3,494,000 3,494,000

Bucks SSS 84318 CMAQ Reserve Line Item C SAMI CAQ 25,000 25,000 25,000

Bucks SSS 84318 CMAQ Reserve Line Item C SAMI CAQ 1,892,000 1,892,000 1,892,000

Bucks 1 03S 13549 US1: Old Linc - PA413 F HRST NHPP 4,244,000 581 1,061,000 5,305,000 5,305,000

Bucks 1 03S 13549 US1: Old Linc - PA413 U HRST 581 4,869,000 4,869,000 4,869,000

Bucks 1 03S 13549 US1: Old Linc - PA413 R HRST 581 9,682,000 9,682,000 9,682,000

Bucks 1 03S 13549 US1: Old Linc - PA413 R HRST 581 12,282,000 12,282,000 12,282,000

Bucks 1 RC3 93446 Route 1 Impr(Frontage) U HCON NHPP 1,020,000 581 255,000 1,275,000 1,275,000

Bucks 1 RC3 93446 Route 1 Impr(Frontage) C HCON STU 14,326,500 14,326,500 14,326,500

Bucks 13 HBJ 92184 Adj Box Beam Grp (J) C BRDG 581 2,335,000 2,335,000 2,335,000

Bucks 13 HBJ 92184 Adj Box Beam Grp (J) C BRDG 581 605,000 605,000 605,000

Bucks 13 HBJ 92184 Adj Box Beam Grp (J) C BRDG 581 2,780,000 2,780,000 2,780,000

Bucks 13 HBJ 92184 Adj Box Beam Grp (J) C BRDG 581 780,000 780,000 780,000

Bucks 13 M04 47392 Bristol Pk:PA413-Levit(C) C HRST NHPP 2,000,000 2,000,000 2,000,000

Bucks 32 LG1 87744 SR32: Wall & Pav't Repair C HRST 581 4,164,000 4,164,000 4,164,000

Bucks 95 ITF 86285 Bucks County ITS PhsII(F) C SAMI STP 150,000 150,000 150,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange F HCON 3,550,000 3,550,000 3,550,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange F HCON 3,500,000 3,500,000 3,500,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange F HCON 2,500,000 2,500,000 2,500,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange R HCON 1,000,000 1,000,000 1,000,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange C HCON 20,000,000 20,000,000 20,000,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange C HCON 22,000,000 22,000,000 22,000,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange C HCON 30,000,000 30,000,000 30,000,000

Bucks 95 TPK 13347 I-95 PA Trnpk Interchange C HCON 20,000,000 20,000,000 20,000,000

Bucks 152 217 96217 Central Bucks Cong Mitiga C SAMI CAQ 230,000 58,000 288,000 288,000

Bucks 202 S01 13609 US202: E Sta St-Mchncs(C) C SAMI NHPP 1,000,000 581 4,992,524 5,992,524 5,992,524

Bucks 202 S01 13609 US202: E Sta St-Mchncs(C) C SAMI STU 2,339,726 2,339,726 2,339,726

Bucks 232 BU1 57625 PA 232 & Swamp Rd +C SAMI HSIP 2,733,000 2,733,000 2,733,000

Bucks 232 BU1 57625 PA 232 & Swamp Rd +C SAMI STU 1,093,000 1,093,000 1,093,000

Page 45: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

45 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bucks 309 PM1 86923 PA309:Sellersville Bypass P HRST NHPP 849,000 581 212,000 1,061,000 1,061,000

Bucks 309 PM1 86923 PA309:Sellersville Bypass F HRST NHPP 4,776,000 581 1,194,000 5,970,000 5,970,000

Bucks 309 PM1 86923 PA309:Sellersville Bypass U HRST NHPP 90,000 581 23,000 113,000 113,000

Bucks 309 PM1 86923 PA309:Sellersville Bypass R HRST NHPP 90,000 581 23,000 113,000 113,000

Bucks 309 PM1 86923 PA309:Sellersville Bypass C HRST NHPP 8,407,500 581 2,101,875 10,509,375 10,509,375

Bucks 309 QCL 57635 Quakertown Closed Loop C SAMI CAQ 3,695,000 3,695,000 3,695,000

Bucks 313 B02 57619 PA 313: Ferry - Broad St F SAMI STP 1,273,000 581 318,000 1,591,000 1,591,000

Bucks 313 B02 57619 PA 313: Ferry - Broad St U SAMI 581 563,000 563,000 563,000

Bucks 313 B02 57619 PA 313: Ferry - Broad St R SAMI STP 612,000 581 153,000 765,000 765,000

Bucks 313 HBK 92310 Culvert Replace Group (K) C BRDG 581 2,333,000 2,333,000 2,333,000

Bucks 313 HBK 92310 Culvert Replace Group (K) C BRDG 581 300,000 300,000 300,000

Bucks 313 HBK 92310 Culvert Replace Group (K) C BRDG 581 1,367,000 1,367,000 1,367,000

Bucks 332 0 102278NewtownByp Adapt Sgnls(C) C SAMI CAQ 62,220 62,220 62,220

Bucks 413 RLE 104163ARLE Ped Signal Upgrades C SAMI 244 157,020 157,020 157,020

Bucks 611 BC3 102375SR611/1001 Pave/recon (C) C HRST 581 100,000 100,000 100,000

Bucks 611 CCR 86860 PA 611 o/Cooks Creek F BRDG 185 1,591,000 1,591,000 1,591,000

Bucks 611 CCR 86860 PA 611 o/Cooks Creek U BRDG STU 109,000 109,000 109,000

Bucks 611 CCR 86860 PA 611 o/Cooks Creek +R BRDG STP 31,000 31,000 31,000

Bucks 611 CCR 86860 PA 611 o/Cooks Creek +R BRDG STU 33,000 33,000 33,000

Bucks 611 CCR 86860 PA 611 o/Cooks Creek C BRDG 581 8,115,000 8,115,000 8,115,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) U HRST 581 175,000 175,000 175,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) R HRST STU 1,167,000 1,167,000 1,167,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) C HRST 581 3,770,000 3,770,000 3,770,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) C HRST 185 2,775,000 2,775,000 2,775,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) C HRST 581 576,000 576,000 576,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) C HRST 185 2,775,000 2,775,000 2,775,000

Bucks 663 VY2 13440 PA 663 @ Allentown (2 Br) C HRST 581 576,000 576,000 576,000

Bucks 1012 BRC 13716 Hdquarters Rd/Tinicum Cr C BRDG STU 2,546,000 185 637,000 3,183,000 3,183,000

Bucks 2025 001 13727 Brstl Rd: Hulm-Old Linc C HRST 581 5,182,000 5,182,000 5,182,000

Bucks 2028 SP2 88083 Stoopville Phase II F SAMI 581 200,000 200,000 200,000

Bucks 2028 SP2 88083 Stoopville Phase II U SAMI 581 50,000 50,000 50,000

Bucks 2028 SP2 88083 Stoopville Phase II R SAMI 581 50,000 50,000 50,000

Bucks 2028 SP2 88083 Stoopville Phase II +C SAMI STP 1,407,000 1,407,000 1,407,000

Bucks 2033 01L 57624 Woodbourne Rd/Lincoln Hwy +C SAMI NHPP 3,382,000 3,382,000 3,382,000

Bucks 2036 BS1 64781 Swamp Rd @ Pennswood Brdg U BRDG 581 279,000 279,000 279,000

Bucks 2036 BS1 64781 Swamp Rd @ Pennswood Brdg R BRDG 581 557,000 557,000 557,000

Bucks 2036 BS1 64781 Swamp Rd @ Pennswood Brdg C BRDG 185 1,161,000 1,161,000 1,161,000

Bucks 2036 BS1 64781 Swamp Rd @ Pennswood Brdg C BRDG 581 2,517,000 2,517,000 2,517,000

Bucks 2038 M04 50634 Co. Line Rd:Resurfacing F HRST NHPP 679,000 581 170,000 849,000 849,000

Bucks 2038 M04 50634 Co. Line Rd:Resurfacing C HRST NHPP 2,788,000 581 1,947,000 4,735,000 4,735,000

Page 46: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

46 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Bucks 2038 WD2 64779 County Ln Rd: Stump -Kulp C HRST NHPP 3,100,000 581 775,000 3,875,000 3,875,000

Bucks 2038 WD2 64779 County Ln Rd: Stump -Kulp C HRST NHPP 3,187,000 581 797,000 3,984,000 3,984,000

Bucks 2038 WD2 64779 County Ln Rd: Stump -Kulp C HRST NHPP 8,989,000 581 2,247,000 11,236,000 11,236,000

Bucks 2043 BBR 78516 Brownsville Rd /Nesh Cr F BRDG 185 1,311,000 1,311,000 1,311,000

Bucks 2043 BBR 78516 Brownsville Rd /Nesh Cr C BRDG STP 3,829,000 185 1,022,000 4,851,000 4,851,000

Bucks 2047 01B 13606 Hulmeville Ave O/CONRAIL C BRDG 185 4,832,000 4,832,000 4,832,000

Bucks 2047 01B 13606 Hulmeville Ave O/CONRAIL C BRDG 185 4,186,000 4,186,000 4,186,000

Bucks 2081 BWR 12931 Worthington Mill Rd Br F HRST 185 955,000 955,000 955,000

Bucks 2081 BWR 12931 Worthington Mill Rd Br U HRST 185 219,000 219,000 219,000

Bucks 2081 BWR 12931 Worthington Mill Rd Br R HRST STP 175,000 185 44,000 219,000 219,000

Bucks 2089 RLE 104162ARLE Vid Sig Detect Upgrd C SAMI 244 48,500 48,500 48,500

Bucks 4013 BMP 92741 Main St o/Br Perkiomen Cr P BRDG 185 610,000 610,000 610,000

Bucks 4013 BMP 92741 Main St o/Br Perkiomen Cr F BRDG 185 464,000 464,000 464,000

Bucks 4013 BMP 92741 Main St o/Br Perkiomen Cr U BRDG 185 225,000 225,000 225,000

Bucks 4013 BMP 92741 Main St o/Br Perkiomen Cr R BRDG NHPP 135,000 185 34,000 169,000 169,000

Bucks 4013 BMS 13377 Main St over SEPTA P BRDG 185 398,000 398,000 398,000

Bucks 4013 BMS 13377 Main St over SEPTA F BRDG 185 437,000 437,000 437,000

Bucks 4013 BMS 13377 Main St over SEPTA U BRDG 185 450,000 450,000 450,000

Bucks 4013 BMS 13377 Main St over SEPTA R BRDG 185 225,000 225,000 225,000

Bucks 4013 BMS 13377 Main St over SEPTA C BRDG 185 4,564,000 4,564,000 4,564,000

Bucks 4013 BMS 13377 Main St over SEPTA C BRDG 581 73,000 73,000 73,000

Bucks 4033 UCB 13607 U Ridge Rd O/Unami Cr F BRDG 185 473,000 473,000 473,000

Bucks 4033 UCB 13607 U Ridge Rd O/Unami Cr C BRDG 581 2,704,000 2,704,000 2,704,000

Bucks 4101 76S 13240 Old Bethlehem Rd O/Kimple F BRDG 185 3,588,000 3,588,000 3,588,000

Bucks 4101 76S 13240 Old Bethlehem Rd O/Kimple C BRDG STU 2,976,000 185 744,000 3,720,000 3,720,000

Bucks 7009 013 13248 Walnut St O/Perkiomen Cr C BRDG BOF 4,081,000 183 765,000 255,000 5,101,000 5,101,000

Bucks 7009 021 13296 Rickert Rd O/Morris R BRDG 183 47,000 12,000 59,000 59,000

Bucks 7009 021 13296 Rickert Rd O/Morris C BRDG STU 811,000 183 152,000 50,000 1,013,000 1,013,000

Bucks 7009 045 13249 Stone Rd O/Deep (L) C BRDG 183 1,311,000 328,000 1,639,000 1,639,000

Bucks 7009 239 102666Branch Rd O/E.Br Perk. Cr P BRDG 183 8,000 2,000 10,000 10,000

Bucks 7009 239 102666Branch Rd O/E.Br Perk. Cr F BRDG 183 48,000 12,000 60,000 60,000

Bucks 7009 239 102666Branch Rd O/E.Br Perk. Cr C BRDG 183 420,000 115,000 535,000 535,000

Bucks 7009 244 102667Quarry Rd O/Morris Run P BRDG 183 4,000 1,000 5,000 5,000

Bucks 7009 244 102667Quarry Rd O/Morris Run F BRDG 183 20,000 5,000 25,000 25,000

Bucks 7009 244 102667Quarry Rd O/Morris Run C BRDG 183 268,000 67,000 335,000 335,000

Bucks 7009 30 13014 Clay Ridge Rd Br#30 U BRDG BOF 45,000 183 8,000 3,000 56,000 56,000

Bucks 7009 30 13014 Clay Ridge Rd Br#30 R BRDG BOF 50,000 183 9,000 3,000 62,000 62,000

Totals for: Bucks 68,573,128 42,126,156 35,970,472 146,669,756 45,723,000 30,217,750 83,659,500 159,600,250 52,221,000 29,146,725 76,491,000 157,858,725 69,844,000 34,841,250 20,814,750 125,500,000 589,628,731

Butler 69972 Butler Hwy.Resurface Line C HRST 581 3,134,000 3,134,000 3,134,000

Butler 69972 Butler Hwy.Resurface Line C HRST 581 4,333,000 4,333,000 4,333,000

Page 47: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

47 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Butler 1019232017 Butler DFB Line Item F BRDG 185 51,500 51,500 51,500

Butler 1019232017 Butler DFB Line Item U BRDG 185 31,900 31,900 31,900

Butler 1019232017 Butler DFB Line Item R BRDG 185 10,700 10,700 10,700

Butler 1019232017 Butler DFB Line Item C BRDG 185 382,500 382,500 382,500

Butler 1019262018 Butler DFB Line Item F BRDG 185 53,100 53,100 53,100

Butler 1019262018 Butler DFB Line Item U BRDG 185 32,800 32,800 32,800

Butler 1019262018 Butler DFB Line Item R BRDG 185 11,000 11,000 11,000

Butler 1019262018 Butler DFB Line Item C BRDG 185 394,000 394,000 394,000

Butler 103087T-451 MainStreet Crossing +C SAMI RRX 254,616 254,616 254,616

Butler 88988 B&P RR Diesel Retrofit #2 C IMOD CAQ 2,304,800 2,304,800 2,304,800

Butler 88989 Butler Multi-Modal Center C PT CAQ 2,300,000 2,300,000 2,300,000

Butler 88990 Butler Transit Service C PT CAQ 250,000 250,000 250,000

Butler 88990 Butler Transit Service C PT CAQ 250,000 250,000 250,000

Butler 88990 Butler Transit Service C PT CAQ 250,000 250,000 250,000

Butler 94877 Butler Local Bridge Line P BRDG BOF 240,400 183 45,075 15,025 300,500 300,500

Butler 8 253 83305 Harrisville Bridge U BRDG 185 25,800 25,800 25,800

Butler 8 253 83305 Harrisville Bridge C BRDG 185 1,236,000 1,236,000 1,236,000

Butler 8 257 24723 Near Stone House Bridge C BRDG NHPP 1,545,000 1,545,000 1,545,000

Butler 19 253 24677 Scholars Run Bridge U BRDG 185 445,000 445,000 445,000

Butler 19 253 24677 Scholars Run Bridge C BRDG STP 1,710,600 1,710,600 1,710,600

Butler 19 297 102171US 19/Rochester Rd. Int. C SAMI CAQ 982,030 982,030 1,964,060 1,964,060

Butler 19 299 102882ZelienopleRevital/EconDev C TENH TAU 480,000 480,000 480,000

Butler 38 000 83307 PA38TribOfConnoquenessing P BRDG STP 191,040 185 47,760 238,800 238,800

Butler 38 000 83307 PA38TribOfConnoquenessing F BRDG 185 281,400 281,400 281,400

Butler 38 254 83969 Bridge South of Hooker C BRDG 185 890,500 890,500 890,500

Butler 38 254 83969 Bridge South of Hooker C BRDG 185 500,000 500,000 500,000

Butler 38 256 24732 Greece City Bridge C BRDG 185 978,500 978,500 978,500

Butler 38 257 24736 Sandy Point Bridge C BRDG 185 978,500 978,500 978,500

Butler 38 258 24730 PA38 over Connoquenessing P BRDG STP 295,200 185 73,800 369,000 369,000

Butler 38 258 24730 PA38 over Connoquenessing F BRDG 185 337,700 337,700 337,700

Butler 58 254 24803 Blacks Creek Bridge U BRDG 185 15,500 15,500 15,500

Butler 58 254 24803 Blacks Creek Bridge R BRDG 185 138 138 138

Butler 58 254 24803 Blacks Creek Bridge +C BRDG STP 985,000 985,000 985,000

Butler 68 252 24680 Cunningham Street Bridge C BRDG NHPP 1,236,000 185 309,000 1,545,000 1,545,000

Butler 68 253 86105 Karns Crossing Bridge P BRDG 185 50,000 50,000 50,000

Butler 68 255 24806 PA 68 over Glade Run U BRDG 185 30,000 30,000 30,000

Butler 79 240 104438I-79 MM 90.5 Pipe Failure C IMAN 581 560,000 560,000 560,000

Butler 79 247 91919 I-79 Middle Section PM P IMAN 581 412,000 412,000 412,000

Butler 79 247 91919 I-79 Middle Section PM F IMAN 581 424,360 424,360 424,360

Butler 79 247 91919 I-79 Middle Section PM +C IMAN NHPP 4,068,860 4,068,860 4,068,860

Page 48: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

48 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Butler 79 248 91920 I-79 South Section PM P IMAN 581 412,000 412,000 412,000

Butler 79 248 91920 I-79 South Section PM F IMAN 581 424,360 424,360 424,360

Butler 79 248 91920 I-79 South Section PM +C IMAN NHPP 13,659,088 13,659,088 13,659,088

Butler 79 248 91920 I-79 South Section PM +C IMAN NHPP 10,000,000 10,000,000 10,000,000

Butler 228 0 92908 Mars RR Br West Expansion P HCON 581 530,500 530,500 530,500

Butler 228 270 91288 Balls Bend 3R R HRST 581 968,200 968,200 968,200

Butler 228 271 90309 Cox's Corner Intersection U SAMI 581 123,600 123,600 123,600

Butler 228 271 90309 Cox's Corner Intersection R SAMI 581 875,500 875,500 875,500

Butler 228 271 90309 Cox's Corner Intersection C SAMI STU 3,564,640 581 891,160 4,455,800 4,455,800

Butler 228 29A 91285 Pittsburgh Street Int. F SAMI 581 515,000 515,000 515,000

Butler 228 29A 91285 Pittsburgh Street Int. +U SAMI NHPP 506,500 506,500 506,500

Butler 228 29A 91285 Pittsburgh Street Int. R SAMI 581 1,803,600 1,803,600 1,803,600

Butler 228 29A 91285 Pittsburgh Street Int. C SAMI NHPP 5,807,680 581 1,451,920 7,259,600 7,259,600

Butler 228 29B 91286 3 Degree Road Int. F SAMI 581 515,000 515,000 515,000

Butler 228 29B 91286 3 Degree Road Int. R SAMI 581 1,909,700 1,909,700 1,909,700

Butler 268 0 24755 PA 268 over Lowrey Run P BRDG STP 218,560 185 54,640 273,200 273,200

Butler 268 0 24755 PA 268 over Lowrey Run F BRDG 185 281,400 281,400 281,400

Butler 268 251 24409 State Game Lands 95 Br R BRDG 185 360,600 360,600 360,600

Butler 308 255 24568 PA 308 W. Sunbury Bridge U BRDG 185 83,650 83,650 83,650

Butler 308 255 24568 PA 308 W. Sunbury Bridge R BRDG 185 1,500 1,500 1,500

Butler 308 255 24568 PA 308 W. Sunbury Bridge C BRDG 185 859,400 859,400 859,400

Butler 356 252 24667 Caldwell Drive Bridge U BRDG 185 50,000 50,000 50,000

Butler 422 205 88984 Prospect West Resurfacing C HRST 581 1,802,500 1,802,500 1,802,500

Butler 422 258 24770 Bridge SE of East Butler +U BRDG NHPP 21,900 21,900 21,900

Butler 422 258 24770 Bridge SE of East Butler C BRDG NHPP 3,378,000 3,378,000 3,378,000

Butler 422 259 83611 US 422 Shawood Pipe F BRDG 185 371,400 371,400 371,400

Butler 422 259 83611 US 422 Shawood Pipe R BRDG NHPP 180,160 185 45,040 225,200 225,200

Butler 528 258 24774 Lindsey Road Bridge C BRDG STP 1,358,000 185 339,500 1,697,500 1,697,500

Butler 1002 250 74221 Cherry Valley Bridge #4 U BRDG 185 30,900 30,900 30,900

Butler 1002 250 74221 Cherry Valley Bridge #4 R BRDG 185 11,400 11,400 11,400

Butler 1002 250 74221 Cherry Valley Bridge #4 C BRDG 185 270,600 270,600 270,600

Butler 1004 250 74225 Bruin Bridge #6 U BRDG 185 6,200 6,200 6,200

Butler 1004 250 74225 Bruin Bridge #6 C BRDG 185 365,700 365,700 365,700

Butler 1016 250 24694 Henricks Road Bridge U BRDG BOF 72,160 185 18,040 90,200 90,200

Butler 1016 250 24694 Henricks Road Bridge +C BRDG BOF 1,427,200 185 356,800 1,784,000 1,784,000

Butler 1016 250 24694 Henricks Road Bridge +C BRDG BOF 592,800 185 148,200 741,000 741,000

Butler 1019 251 24817 West Winfield Bridge #1 F BRDG 185 371,400 371,400 371,400

Butler 2002 250 78022 Herman Road Bridge P BRDG 185 28,000 28,000 28,000

Butler 2002 250 78022 Herman Road Bridge F BRDG STP 329,600 185 82,400 412,000 412,000

Butler 2002 250 78022 Herman Road Bridge U BRDG STP 63,680 185 15,920 79,600 79,600

Page 49: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

49 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Butler 2002 250 78022 Herman Road Bridge R BRDG STP 61,840 185 15,460 77,300 77,300

Butler 2002 250 78022 Herman Road Bridge C BRDG STP 1,527,760 185 381,940 1,909,700 1,909,700

Butler 2007 250 78002 Saxonburg Blvd #1 Bridge U BRDG 185 25,000 25,000 25,000

Butler 2010 252 24697 Cabot Bridge +U BRDG STP 127,400 127,400 127,400

Butler 2010 252 24697 Cabot Bridge R BRDG STP 212,000 185 53,000 265,000 265,000

Butler 2010 252 24697 Cabot Bridge +C BRDG STU 1,967,000 1,967,000 1,967,000

Butler 3007 270 103078Three Degree Rd Crossing +C SAMI RRX 200,000 200,000 200,000

Butler 3007 270 103078Three Degree Rd Crossing +C SAMI RRX 67,800 67,800 67,800

Butler 3012 250 83335 SR3012 ovr Trib Glade Run U BRDG 185 50,000 50,000 50,000

Butler 3015 254 96687 SR 3015 Group Bridges U BRDG 185 106,100 106,100 106,100

Butler 3015 254 96687 SR 3015 Group Bridges R BRDG 185 79,600 79,600 79,600

Butler 3015 254 96687 SR 3015 Group Bridges C BRDG 185 3,278,200 3,278,200 3,278,200

Butler 3015 270 90562 Mars-Evans City Rd X-ing +C SAMI RRX 283,250 283,250 283,250

Butler 3017 251 24830 Myoma Bridge #1 F BRDG 185 15,000 15,000 15,000

Butler 3017 251 24830 Myoma Bridge #1 U BRDG 185 55,000 55,000 55,000

Butler 3020 250 67185 Freedom Rd Turnpike Bridg P BRDG STP 100,000 100,000 100,000

Butler 3020 250 67185 Freedom Rd Turnpike Bridg F BRDG STP 13,890 581 106,100 119,990 119,990

Butler 3020 250 67185 Freedom Rd Turnpike Bridg F BRDG STU 410,510 410,510 410,510

Butler 3020 250 67185 Freedom Rd Turnpike Bridg R BRDG STU 1,103,360 581 275,840 1,379,200 1,379,200

Butler 3020 296 94932 Freedom Road Int. Improve C SAMI CAQ 447,915 111,979 559,894 559,894

Butler 3025 270 94601 Little Ck Road Safety Imp F SAMI 581 337,900 337,900 337,900

Butler 3025 270 94601 Little Ck Road Safety Imp U SAMI 581 123,500 123,500 123,500

Butler 3025 270 94601 Little Ck Road Safety Imp R SAMI 581 348,200 348,200 348,200

Butler 3025 270 94601 Little Ck Road Safety Imp C SAMI STU 3,059,680 581 764,920 3,824,600 3,824,600

Butler 3031 250 24793 SR 3031 Lions Road Bridge P BRDG BOF 300,000 185 75,000 375,000 375,000

Butler 4007 290 24523 Moraine State Park Access P HRST 581 178,000 178,000 178,000

Butler 4007 290 24523 Moraine State Park Access F HCON 581 360,500 360,500 360,500

Butler 4007 290 24523 Moraine State Park Access U HCON 581 82,000 82,000 82,000

Butler 4007 290 24523 Moraine State Park Access R HCON 581 106,100 106,100 106,100

Butler 4007 290 24523 Moraine State Park Access C HCON 581 4,261,700 4,261,700 4,261,700

Butler 7213 BR 77973 T-830 Rattigan Bridge F BRDG BOF 247,200 183 46,350 15,450 309,000 309,000

Butler 7213 BR 77973 T-830 Rattigan Bridge U BRDG BOF 27,040 185 5,070 1,690 33,800 33,800

Butler 7213 BR 77973 T-830 Rattigan Bridge R BRDG BOF 24,720 183 4,635 1,545 30,900 30,900

Butler 7213 BR 77973 T-830 Rattigan Bridge C BRDG BOF 1,350,640 183 253,245 84,415 1,688,300 1,688,300

Butler 7301 BR 24522 West New Castle St. Br. U BRDG 183 13,200 3,300 16,500 16,500

Butler 7301 BR 24522 West New Castle St. Br. C BRDG 183 865,200 216,300 1,081,500 1,081,500

Totals for: Butler 15,763,210 14,370,233 236,595 30,370,038 11,359,971 10,285,880 111,979 21,757,830 20,009,428 12,679,135 15,025 32,703,588 22,922,910 7,382,775 1,068,135 31,373,820 116,205,276

Cambria BHR 22437 Bridge & Highway Reserve C BRDG 625 625 625

Cambria BHR 22437 Bridge & Highway Reserve C HRST STP 48,000 48,000 48,000

Cambria BHR 22437 Bridge & Highway Reserve C HRST STP 86,677 86,677 86,677

Page 50: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

50 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cambria 36 09B 74357 Patton Chest Creek Bridge F BRDG STP 240,000 240,000 240,000

Cambria 36 09B 74357 Patton Chest Creek Bridge U BRDG STP 120,000 120,000 120,000

Cambria 36 09B 74357 Patton Chest Creek Bridge R BRDG STP 140,000 581 18,000 158,000 158,000

Cambria 36 09B 74357 Patton Chest Creek Bridge C BRDG 185 463,373 463,373 463,373

Cambria 36 09B 74357 Patton Chest Creek Bridge C BRDG 185 701,626 701,626 701,626

Cambria 36 09B 74357 Patton Chest Creek Bridge C BRDG 185 2,135,000 2,135,000 2,135,000

Cambria 53 23B 22621 N Sybrtn Clearfld Crk Br C BRDG STP 372,000 372,000 372,000

Cambria 53 23B 22621 N Sybrtn Clearfld Crk Br C BRDG STP 784,000 784,000 784,000

Cambria 53 23B 22621 N Sybrtn Clearfld Crk Br C BRDG STP 474,000 474,000 474,000

Cambria 53 24B 88595 S Ashville Clrfld Crk Br C BRDG STP 385,877 385,877 385,877

Cambria 53 24B 88595 S Ashville Clrfld Crk Br C BRDG STP 784,000 784,000 784,000

Cambria 53 24B 88595 S Ashville Clrfld Crk Br C BRDG STP 330,123 330,123 330,123

Cambria 53 26B 88695 PA53 Cassandra Culvert +P BRDG STP 250,000 250,000 250,000

Cambria 53 26B 88695 PA53 Cassandra Culvert +F BRDG STP 200,000 200,000 200,000

Cambria 53 26B 88695 PA53 Cassandra Culvert U BRDG STP 50,000 50,000 50,000

Cambria 53 26B 88695 PA53 Cassandra Culvert +R BRDG STP 50,000 50,000 50,000

Cambria 53 26B 88695 PA53 Cassandra Culvert +C BRDG STP 350,000 350,000 350,000

Cambria 53 27B 74358 PA53 Lilly Burgoon Rn Cul +P BRDG STP 250,000 250,000 250,000

Cambria 53 27B 74358 PA53 Lilly Burgoon Rn Cul +F BRDG STP 200,000 200,000 200,000

Cambria 53 27B 74358 PA53 Lilly Burgoon Rn Cul U BRDG STP 50,000 50,000 50,000

Cambria 53 27B 74358 PA53 Lilly Burgoon Rn Cul +R BRDG STP 50,000 50,000 50,000

Cambria 53 27B 74358 PA53 Lilly Burgoon Rn Cul +C BRDG STP 350,000 350,000 350,000

Cambria 56 27B 22574 St Clair Run Culvert P BRDG 185 8,500 8,500 8,500

Cambria 56 27B 22574 St Clair Run Culvert C BRDG NHPP 500,000 500,000 500,000

Cambria 56 27B 22574 St Clair Run Culvert C BRDG NHPP 500,000 500,000 500,000

Cambria 56 27B 22574 St Clair Run Culvert C BRDG NHPP 500,000 500,000 500,000

Cambria 160 12S 92748 PA756 Int Realignment U HRST 581 200,000 200,000 200,000

Cambria 160 12S 92748 PA756 Int Realignment R HRST 581 300,000 300,000 300,000

Cambria 160 12S 92748 PA756 Int Realignment C HRST 581 1,400,000 1,400,000 1,400,000

Cambria 219 045 82714 Jack Murtha Highway Rehab +C HRST NHPP 560,664 560,664 560,664

Cambria 219 045 82714 Jack Murtha Highway Rehab +C HRST NHPP 2,882,667 2,882,667 2,882,667

Cambria 219 38M 88598 US219 Smrset-Galleria Int C HRST NHPP 2,245,987 2,245,987 2,245,987

Cambria 219 38M 88598 US219 Smrset-Galleria Int C HRST NHPP 4,394,667 4,394,667 4,394,667

Cambria 219 38M 88598 US219 Smrset-Galleria Int C HRST NHPP 2,468,668 2,468,668 2,468,668

Cambria 219 39M 88256 US219/PA553 Intersection F SAMI CAQ 250,000 250,000 250,000

Cambria 219 39M 88256 US219/PA553 Intersection U SAMI CAQ 50,000 50,000 50,000

Cambria 219 39M 88256 US219/PA553 Intersection R SAMI CAQ 50,000 50,000 50,000

Cambria 219 39M 88256 US219/PA553 Intersection +C SAMI CAQ 608,000 608,000 608,000

Cambria 219 39M 88256 US219/PA553 Intersection +C SAMI CAQ 1,108,000 1,108,000 1,108,000

Cambria 219 39M 88256 US219/PA553 Intersection +C SAMI CAQ 617,000 617,000 617,000

Page 51: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

51 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cambria 219 40B 93707 W Ebensburg Brdg Presrvtn +C BRDG NHPP 500,000 500,000 500,000

Cambria 219 40B 93707 W Ebensburg Brdg Presrvtn +C BRDG NHPP 500,000 500,000 500,000

Cambria 219 44M 96488 US219 Carrolltown Improve +P HRST 581 125,000 125,000 125,000

Cambria 219 44M 96488 US219 Carrolltown Improve +F HRST 581 250,000 250,000 250,000

Cambria 219 44M 96488 US219 Carrolltown Improve +U HRST 581 50,000 50,000 50,000

Cambria 219 44M 96488 US219 Carrolltown Improve +R HRST 581 150,000 150,000 150,000

Cambria 219 44M 96488 US219 Carrolltown Improve +C HRST NHPP 500,000 500,000 500,000

Cambria 240 01B 22567 N Emeigh over W Branch Br F BRDG 185 150,281 150,281 150,281

Cambria 240 01B 22567 N Emeigh over W Branch Br U BRDG 185 25,000 25,000 25,000

Cambria 240 01B 22567 N Emeigh over W Branch Br R BRDG 185 25,000 25,000 25,000

Cambria 240 01B 22567 N Emeigh over W Branch Br C BRDG 185 50,000 50,000 50,000

Cambria 271 000 99291 Dtown Jtown Signal Imp +U HRST CAQ 50,000 50,000 50,000

Cambria 271 000 99291 Dtown Jtown Signal Imp +R HRST CAQ 100,000 100,000 100,000

Cambria 271 000 99291 Dtown Jtown Signal Imp +C HRST CAQ 491,000 491,000 491,000

Cambria 271 000 99291 Dtown Jtown Signal Imp +C HRST CAQ 1,108,000 1,108,000 1,108,000

Cambria 271 14M 91635 PA271 Menoher Resurface +C HRST NHPP 1,000,000 1,000,000 1,000,000

Cambria 271 14M 91635 PA271 Menoher Resurface +C HRST NHPP 1,000,000 1,000,000 1,000,000

Cambria 271 14M 91635 PA271 Menoher Resurface +C HRST 581 1,100,000 1,100,000 1,100,000

Cambria 271 17B 22295 Chestnut Street Bridge F BRDG 185 150,281 150,281 150,281

Cambria 271 17B 22295 Chestnut Street Bridge U BRDG 185 50,000 50,000 50,000

Cambria 271 17B 22295 Chestnut Street Bridge R BRDG 185 50,000 50,000 50,000

Cambria 271 17B 22295 Chestnut Street Bridge C BRDG 185 50,000 50,000 50,000

Cambria 403 09B 22577 PA403 Cherry Run Culvert +C BRDG NHPP 1,442,000 1,442,000 1,442,000

Cambria 403 10B 22630 Moxham Stonycreek Bridge F BRDG NHPP 320,000 320,000 320,000

Cambria 403 10B 22630 Moxham Stonycreek Bridge U BRDG NHPP 200,000 200,000 200,000

Cambria 403 10B 22630 Moxham Stonycreek Bridge R BRDG NHPP 120,000 120,000 120,000

Cambria 403 10B 22630 Moxham Stonycreek Bridge +C BRDG NHPP 985,334 985,334 985,334

Cambria 403 10B 22630 Moxham Stonycreek Bridge +C BRDG NHPP 2,097,333 2,097,333 2,097,333

Cambria 422 09M 91634 US422 Indiana to Hudson +C HRST NHPP 368,667 368,667 368,667

Cambria 422 09M 91634 US422 Indiana to Hudson +C HRST NHPP 1,191,999 1,191,999 1,191,999

Cambria 422 09M 91634 US422 Indiana to Hudson +C HRST NHPP 1,465,334 1,465,334 1,465,334

Cambria 869 04S 82887 Beaver Run Curve U SAMI HSIP 250,000 250,000 250,000

Cambria 869 04S 82887 Beaver Run Curve +C SAMI HSIP 526,000 526,000 526,000

Cambria 869 04S 82887 Beaver Run Curve +C SAMI HSIP 724,000 724,000 724,000

Cambria 1006 002 96495 Saint Mary Street - PA 53 C HRST 581 1,100,000 1,100,000 1,100,000

Cambria 1021 005 92613 SR1021 - PA36 to PA 53 P HRST 581 160,000 160,000 160,000

Cambria 1021 005 92613 SR1021 - PA36 to PA 53 C HRST 581 1,190,000 1,190,000 1,190,000

Cambria 1021 005 92613 SR1021 - PA36 to PA 53 C HRST 581 1,660,000 1,660,000 1,660,000

Cambria 1029 001 96500 PA 53 to Roseland Road C HRST 581 800,000 800,000 800,000

Cambria 2009 02B 94497 Cambria Bridge Pres #3 +C BRDG STP 500,000 500,000 500,000

Page 52: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

52 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cambria 2009 02B 94497 Cambria Bridge Pres #3 +C BRDG STP 1,000,000 1,000,000 1,000,000

Cambria 3002 01B 22634 Cheney Run Culvert C BRDG 185 1,665,000 1,665,000 1,665,000

Cambria 3006 002 91647 PA 403 to PA 56 C HRST 581 2,358,000 2,358,000 2,358,000

Cambria 3006 06B 96505 Eisenhower Blvd Culvert +U BRDG STP 50,000 50,000 50,000

Cambria 3006 06B 96505 Eisenhower Blvd Culvert +R BRDG STP 50,000 50,000 50,000

Cambria 3006 06B 96505 Eisenhower Blvd Culvert +C BRDG STP 300,000 300,000 300,000

Cambria 3006 06B 96505 Eisenhower Blvd Culvert +C BRDG STP 300,000 300,000 300,000

Cambria 3016 002 91639 PA 56 to Horner Street C HRST 581 700,000 700,000 700,000

Cambria 3016 009 94476 SR3016 Lulay St-Demuth St P HRST 581 325,000 325,000 325,000

Cambria 3016 009 94476 SR3016 Lulay St-Demuth St +F HRST 581 350,000 350,000 350,000

Cambria 3016 009 94476 SR3016 Lulay St-Demuth St +U HRST 581 300,000 300,000 300,000

Cambria 3016 009 94476 SR3016 Lulay St-Demuth St +R HRST 581 350,000 350,000 350,000

Cambria 3016 009 94476 SR3016 Lulay St-Demuth St C HRST 581 3,500,000 3,500,000 3,500,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +P SAMI HSIP 500,000 500,000 500,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +F SAMI HSIP 52,000 52,000 52,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +F SAMI HSIP 250,000 250,000 250,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +U SAMI HSIP 100,000 100,000 100,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +R SAMI HSIP 250,000 250,000 250,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +C SAMI HSIP 426,000 426,000 426,000

Cambria 3024 07S 96506 Mount Hope Intrscn Improv +C SAMI HSIP 1,026,000 1,026,000 1,026,000

Cambria 3037 05B 91685 Prospect Viaduct Pres C BRDG STP 1,000,000 1,000,000 1,000,000

Cambria 3037 05B 91685 Prospect Viaduct Pres C BRDG STP 2,000,000 2,000,000 2,000,000

Cambria 3041 005 91645 Wildcat Road to US 22 C HRST 581 903,000 903,000 903,000

Cambria 3041 005 91645 Wildcat Road to US 22 C HRST 581 1,372,000 1,372,000 1,372,000

Cambria 3041 006 104312PA 403 to Laurel Run F HRST 581 25,000 25,000 25,000

Cambria 3041 006 104312PA 403 to Laurel Run C HRST 581 500,000 500,000 500,000

Cambria 3041 03B 88140 Cooper Ave Laurel Rn Brdg C BRDG STP 632,000 632,000 632,000

Cambria 3041 03B 88140 Cooper Ave Laurel Rn Brdg C BRDG STP 1,568,000 1,568,000 1,568,000

Cambria 4017 002 96509 PA36 to Clearfield Co Ln C HRST 581 1,972,000 1,972,000 1,972,000

Cambria 4017 002 96509 PA36 to Clearfield Co Ln C HRST 581 1,010,000 1,010,000 1,010,000

Cambria 4025 001 96512 Municipal Rd-Clrfld Co Ln C HRST 581 900,000 900,000 900,000

Cambria 4025 001 96512 Municipal Rd-Clrfld Co Ln C HRST 581 1,450,000 1,450,000 1,450,000

Cambria 4027 001 96513 Phil Ave to Shawna Road C HRST 581 2,308,000 2,308,000 2,308,000

Cambria 4027 001 96513 Phil Ave to Shawna Road C HRST 581 160,000 160,000 160,000

Cambria 4031 02B 22488 R J Corman RR Trail Brdg R BRDG STP 276,000 276,000 276,000

Cambria 4031 02B 22488 R J Corman RR Trail Brdg C BRDG 185 327,500 327,500 327,500

Cambria 4031 02B 22488 R J Corman RR Trail Brdg C BRDG 185 2,051,439 2,051,439 2,051,439

Cambria 4031 02B 22488 R J Corman RR Trail Brdg C BRDG 185 2,347,502 2,347,502 2,347,502

Cambria 4031 02B 22488 R J Corman RR Trail Brdg C BRDG 185 826,020 826,020 826,020

Cambria 7202 452 22558 T-452 Wildwood Bridge F BRDG BOF 60,000 179 15,000 75,000 75,000

Page 53: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

53 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cambria 7202 452 22558 T-452 Wildwood Bridge R BRDG BOF 20,000 179 5,000 25,000 25,000

Cambria 7202 452 22558 T-452 Wildwood Bridge C BRDG BOF 330,135 179 93,834 423,969 423,969

Cambria 7202 452 22558 T-452 Wildwood Bridge C BRDG STP 45,200 45,200 45,200

Cambria 7202 452 22558 T-452 Wildwood Bridge C BRDG BOF 320,667 179 80,167 400,834 400,834

Cambria 7219 407 94973 T-407 N Br Conemaugh Rvr F BRDG BOF 43,667 183 8,188 2,104 53,959 53,959

Cambria 7219 407 94973 T-407 N Br Conemaugh Rvr F BRDG BOF 72,333 183 13,562 5,146 91,041 91,041

Cambria 7219 407 94973 T-407 N Br Conemaugh Rvr U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Cambria 7219 407 94973 T-407 N Br Conemaugh Rvr R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Cambria 7219 407 94973 T-407 N Br Conemaugh Rvr C BRDG BOF 268,000 183 50,250 16,750 335,000 335,000

Cambria 7301 DST 94804 Dellwood St Bridge Pres F BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Cambria 7301 DST 94804 Dellwood St Bridge Pres C BRDG BOF 477,000 183 89,438 29,813 596,251 596,251

Cambria 7301 DST 94804 Dellwood St Bridge Pres C BRDG BOF 597,000 183 111,938 37,313 746,251 746,251

Cambria 7301 DST 94804 Dellwood St Bridge Pres C BRDG BOF 303,198 183 56,850 18,950 378,998 378,998

Cambria 7301 HAY 22348 Haynes St Bridge C BRDG NHPP 2,786,668 183 522,500 174,166 3,483,334 3,483,334

Cambria 7301 HAY 22348 Haynes St Bridge C BRDG NHPP 1,393,334 183 261,250 87,083 1,741,667 1,741,667

Totals for: Cambria 13,876,199 7,479,000 216,479 21,571,678 14,859,000 9,180,000 124,396 24,163,396 12,859,000 11,376,000 21,679 24,256,679 12,859,000 11,375,999 22,896 24,257,895 94,249,648

Cameron 102263West Creek Rec Trail C TENH TAP 427,768 106,942 534,710 534,710

Cameron 46 A02 85085 SR 46 over North Creek P BRDG 185 273,182 273,182 273,182

Cameron 46 A04 94693 North Creek Bridge P BRDG 185 273,182 273,182 273,182

Cameron 120 404 96369 Driftwood Resurfacing P HRST 581 90,500 90,500 90,500

Cameron 120 404 96369 Driftwood Resurfacing U HRST 581 51,500 51,500 51,500

Cameron 120 404 96369 Driftwood Resurfacing R HRST 581 51,500 51,500 51,500

Cameron 120 P16 94961 2016 N. Central Br. Pres. P BRDG 185 154,500 154,500 154,500

Cameron 120 P16 94961 2016 N. Central Br. Pres. C BRDG STP 250,000 185 1,021,800 1,271,800 1,271,800

Cameron 120 P16 94961 2016 N. Central Br. Pres. C BRDG STP 850,000 850,000 850,000

Cameron 120 R98 102729Allegany Ave Warning Dev C SAMI RRX 143,435 143,435 143,435

Cameron 155 403 96368 Emporium to Potter Line P HRST 581 260,000 260,000 260,000

Cameron 155 403 96368 Emporium to Potter Line C HRST 581 7,649,089 7,649,089 7,649,089

Cameron 155 A02 2673 PA 155 Cowley Run Br P BRDG 185 360,500 360,500 360,500

Cameron 872 402 93357 Sinnemahonning North C HRST 581 175,000 175,000 175,000

Cameron 3001 A01 68860 SR 3001 Over West Creek P BRDG BOF 400,000 400,000 400,000

Cameron 3001 A01 68860 SR 3001 Over West Creek +F BRDG BOF 275,000 275,000 275,000

Cameron 3001 A01 68860 SR 3001 Over West Creek +U BRDG BOF 92,882 92,882 92,882

Cameron 3001 A01 68860 SR 3001 Over West Creek +R BRDG BOF 92,882 92,882 92,882

Cameron 3001 A01 68860 SR 3001 Over West Creek +C BRDG BOF 1,455,348 1,455,348 1,455,348

Cameron 4004 A03 2676 SR 4004 Elk Fork Bridge +P BRDG BOF 327,818 327,818 327,818

Totals for: Cameron 400,000 1,143,500 1,543,500 821,203 1,021,800 106,942 1,949,945 1,638,582 8,195,453 9,834,035 1,455,348 1,455,348 14,782,828

Carbon 82784 CMAQ Line Item Reserve C SAMI CAQ 1,137 1,137 1,137

Carbon 82784 CMAQ Line Item Reserve C SAMI CAQ 252,447 252,447 252,447

Carbon 82784 CMAQ Line Item Reserve C SAMI CAQ 11,137 11,137 11,137

Page 54: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

54 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Carbon 82784 CMAQ Line Item Reserve C SAMI CAQ 8,887 8,887 8,887

Carbon 82790 Urban Line Item Reserve C HRST STU 168,269 168,269 168,269

Carbon 82790 Urban Line Item Reserve C HRST STU 193,269 193,269 193,269

Carbon 82790 Urban Line Item Reserve C HRST STU 268,269 268,269 268,269

Carbon 102240NEPA Hwy & Bridge Reserve C BRDG BOF 378,360 185 84,000 462,360 462,360

Carbon 102240NEPA Hwy & Bridge Reserve C BRDG BOF 1,908,331 185 521,711 2,430,042 2,430,042

Carbon 102240NEPA Hwy & Bridge Reserve C BRDG STP 233,388 233,388 233,388

Carbon 102240NEPA Hwy & Bridge Reserve C BRDG BOF 1,008,198 185 1,126,605 2,134,803 2,134,803

Carbon 102240NEPA Hwy & Bridge Reserve C BRDG BOF 66,036 185 2,290,151 2,356,187 2,356,187

Carbon 102240NEPA Hwy & Bridge Reserve C HRST NHPP 74,912 581 338,579 413,491 413,491

Carbon 102240NEPA Hwy & Bridge Reserve C HRST 581 212,051 212,051 212,051

Carbon 102240NEPA Hwy & Bridge Reserve C HRST 581 770,611 770,611 770,611

Carbon 102240NEPA Hwy & Bridge Reserve C HRST 581 2,605,776 2,605,776 2,605,776

Carbon CAF 97944 Construction Assistance C HRST STP 30,000 30,000 30,000

Carbon CAS 97421 Construction Assistance C HRST 581 200,000 200,000 200,000

Carbon CAS 97421 Construction Assistance C HRST 581 250,000 250,000 250,000

Carbon DCA 83087 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Carbon DCA 83087 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Carbon DCA 83087 Delivery_Consult Assist P HRST 581 1,250,000 1,250,000 1,250,000

Carbon DCA 83087 Delivery_Consult Assist P HRST 581 750,000 750,000 750,000

Carbon NCS 102267NEPA Commuter Services C SAMI OTH-F 248,863 248,863 248,863

Carbon NCS 102267NEPA Commuter Services C SAMI OTH-F

248,863 248,863 248,863

Carbon NCS 102267NEPA Commuter Services C SAMI OTH-F

248,863 248,863 248,863

Carbon NCS 102267NEPA Commuter Services C SAMI OTH-F

248,863 248,863 248,863

Carbon TEM 89057 NEPA Trans Management P TENH STU 34,871 34,871 34,871

Carbon TEM 89057 NEPA Trans Management P TENH STU 100,000 100,000 100,000

Carbon TEM 89057 NEPA Trans Management P TENH STU 75,000 75,000 75,000

Carbon 54 0 102243RBR Initiative L I C BRDG 581 1,300,000 1,300,000 1,300,000

Carbon 54 0 102243RBR Initiative L I C BRDG 581 1,500,000 1,500,000 1,500,000

Carbon 54 0 102243RBR Initiative L I C BRDG 581 3,000,000 3,000,000 3,000,000

Carbon 54 0 102243RBR Initiative L I C BRDG 581 4,000,000 4,000,000 4,000,000

Carbon 80 BRM 94898 NEPA BR Preserve&Repair 3 C BRDG 581 3,000,000 3,000,000 3,000,000

Carbon 80 BRM 94898 NEPA BR Preserve&Repair 3 C BRDG 185 1,000,000 1,000,000 1,000,000

Carbon 209 0 101532SR 209 Resurface C HRST 581 500,000 500,000 500,000

Carbon 209 0 101532SR 209 Resurface C HRST 581 478,500 478,500 478,500

Carbon 209 10B 11080 McCall Bridge C BRDG NHPP 400,000 185 100,000 500,000 500,000

Carbon 209 11M 83085 Patterson St Resurface +C HRST 581 875,500 875,500 875,500

Carbon 209 12M 83088 Interchange Rd Resurface F HRST 581 309,000 309,000 309,000

Carbon 209 12M 83088 Interchange Rd Resurface U HRST 581 25,750 25,750 25,750

Carbon 209 12M 83088 Interchange Rd Resurface R HRST 581 25,750 25,750 25,750

Page 55: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

55 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Carbon 209 12M 83088 Interchange Rd Resurface +C HRST 581 1,000,000 1,000,000 1,000,000

Carbon 209 12M 83088 Interchange Rd Resurface +C HRST 581 236,000 236,000 236,000

Carbon 248 0 92083 PA 248 over SR 2002 P BRDG NHPP 350,200 185 87,550 437,750 437,750

Carbon 248 0 92083 PA 248 over SR 2002 F BRDG NHPP 267,800 185 66,950 334,750 334,750

Carbon 248 0 92083 PA 248 over SR 2002 U BRDG NHPP 12,360 185 3,090 15,450 15,450

Carbon 248 0 92083 PA 248 over SR 2002 R BRDG NHPP 28,840 185 7,210 36,050 36,050

Carbon 248 0 92083 PA 248 over SR 2002 C BRDG NHPP 2,333,980 185 583,495 2,917,475 2,917,475

Carbon 248 0 92083 PA 248 over SR 2002 C BRDG NHPP 250,000 185 62,500 312,500 312,500

Carbon 443 02S 66296 443 Roadway Improvements P HRST STP 50,000 50,000 50,000

Carbon 443 02S 66296 443 Roadway Improvements F HRST STP 500,000 500,000 500,000

Carbon 443 02S 66296 443 Roadway Improvements F HRST STP 560,900 560,900 560,900

Carbon 443 02S 66296 443 Roadway Improvements U HRST 581 546,364 546,364 546,364

Carbon 443 02S 66296 443 Roadway Improvements R HRST STP 500,000 500,000 500,000

Carbon 443 02S 66296 443 Roadway Improvements R HRST STP 560,900 560,900 560,900

Carbon 443 02S 66296 443 Roadway Improvements +C HRST STP 2,800,000 2,800,000 2,800,000

Carbon 534 04B 85763 SR 534 ovr Swamp Run F BRDG 185 318,563 318,563 318,563

Carbon 534 04B 85763 SR 534 ovr Swamp Run F BRDG 185 21,437 21,437 21,437

Carbon 534 04B 85763 SR 534 ovr Swamp Run U BRDG STP 41,200 185 10,300 51,500 51,500

Carbon 534 04B 85763 SR 534 ovr Swamp Run R BRDG STP 41,200 185 10,300 51,500 51,500

Carbon 534 04B 85763 SR 534 ovr Swamp Run C BRDG 581 1,999,641 1,999,641 1,999,641

Carbon 903 03B 11129 Jim Thorpe Bridge C BRDG STP* 5,000,000 5,000,000 5,000,000

Carbon 903 03B 11129 Jim Thorpe Bridge C BRDG STP* 3,000,000 3,000,000 3,000,000

Carbon 903 03B 11129 Jim Thorpe Bridge C BRDG STP* 4,000,000 4,000,000 4,000,000

Carbon 903 03B 11129 Jim Thorpe Bridge C BRDG STP* 3,228,681 3,228,681 3,228,681

Carbon 903 SBC 80074 NEPA Br Review/Mnmgt P BRDG 185 420,000 420,000 420,000

Carbon 903 SBC 80074 NEPA Br Review/Mnmgt P BRDG 185 80,000 80,000 80,000

Carbon 903 SBC 80074 NEPA Br Review/Mnmgt P BRDG 185 750,000 750,000 750,000

Carbon 903 SBC 80074 NEPA Br Review/Mnmgt P BRDG 185 650,000 650,000 650,000

Carbon 1005 02X 95270 Tannery Rd RR Crossing +C SAMI RRX 46,679 46,679 46,679

Carbon 2010 ADA 94904 Carbon ADA Ramps-2013 C HRST STU 233,398 581 58,350 291,748 291,748

Carbon 3001 02B 89629 Fritz Valley Rd Normal Ck F BRDG 185 231,750 231,750 231,750

Carbon 3001 02B 89629 Fritz Valley Rd Normal Ck U BRDG BOF 12,360 185 3,090 15,450 15,450

Carbon 3001 02B 89629 Fritz Valley Rd Normal Ck R BRDG BOF 12,360 185 3,090 15,450 15,450

Carbon 3001 02B 89629 Fritz Valley Rd Normal Ck C BRDG 581 1,134,350 1,134,350 1,134,350

Carbon 7211 LBR 69995 Bridge Review Asst NEPA P BRDG STP 170,479 185 42,620 213,099 213,099

Carbon 7211 LBR 69995 Bridge Review Asst NEPA P BRDG STP 266,612 185 66,653 333,265 333,265

Carbon 7212 447 11131 T-447, CO BR #16 C BRDG BOF 80,000 179 20,000 100,000 100,000

Totals for: Carbon 6,654,428 6,237,664 12,892,092 14,342,481 4,753,625 19,096,106 6,136,948 13,640,071 19,777,019 3,422,055 11,295,927 14,717,982 66,483,199

Central Office 10 DBE Supportive Services C PRA DBE 676,000 581 169,000 845,000 845,000

Central Office 10 DBE Supportive Services C PRA DBE 676,000 581 169,000 845,000 845,000

Page 56: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

56 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Central Office 10 DBE Supportive Services C PRA DBE 676,000 581 169,000 845,000 845,000

Central Office 10 DBE Supportive Services C PRA DBE 676,000 581 169,000 845,000 845,000

Central Office 101924Planning Reserve P PRA SPR 50,050,000 581 9,750,000 5,200,000 65,000,000 65,000,000

Central Office 101924Planning Reserve P PRA SPR 50,050,000 581 9,750,000 5,200,000 65,000,000 65,000,000

Central Office 101924Planning Reserve P PRA SPR 50,050,000 581 9,750,000 5,200,000 65,000,000 65,000,000

Central Office 101924Planning Reserve P PRA SPR 50,050,000 581 9,750,000 5,200,000 65,000,000 65,000,000

Central Office 102619Local Bridge Bundling C BRDG STP 4,605,000 4,605,000 4,605,000

Central Office 102619Local Bridge Bundling C BRDG STP 7,368,000 7,368,000 7,368,000

Central Office 102619Local Bridge Bundling C BRDG STP 3,739,000 3,739,000 3,739,000

Central Office 102619Local Bridge Bundling C BRDG STP 15,830,000 15,830,000 15,830,000

Central Office 102623RBR Reserve C BRDG 581 21,763,000 21,763,000 21,763,000

Central Office 102623RBR Reserve C HRST 581 48,237,000 48,237,000 48,237,000

Central Office 102623RBR Reserve C HRST 581 35,000,000 35,000,000 35,000,000

Central Office 102623RBR Reserve C HRST 581 35,000,000 35,000,000 35,000,000

Central Office 102883Act 89 Bonding Capacity C HRST 581 500,000,000 500,000,000 500,000,000

Central Office 102907Passive Xing Yield Signs C SAMI RRX 200,000 200,000 200,000

Central Office 102907Passive Xing Yield Signs C SAMI RRX 200,000 200,000 200,000

Central Office 102907Passive Xing Yield Signs C SAMI RRX 100,000 100,000 100,000

Central Office 104266PA UCP Database & Website P PRA STP 800,000 800,000 800,000

Central Office 1043112014 DCNR REC TRLS STIP 2 C IMOD REC 1,991,000 497,750 2,488,750 2,488,750

Central Office 1043112014 DCNR REC TRLS STIP 2 C IMOD REC 266 67 333 333

Central Office 1043162015 DCNR REC TRLS STIP 1 C IMOD REC 157,491 39,373 196,864 196,864

Central Office 104409State Bridge Inspection F HRST 581 10,000,000 10,000,000 10,000,000

Central Office 104409State Bridge Inspection F HRST 581 20,000,000 20,000,000 20,000,000

Central Office 104409State Bridge Inspection F HRST 581 21,600,000 21,600,000 21,600,000

Central Office 104409State Bridge Inspection F HRST 581 21,600,000 21,600,000 21,600,000

Central Office 104410Local Bridge Inspection F BRDG NHPP 2,400,000 1,200,000 3,600,000 3,600,000

Central Office 104410Local Bridge Inspection F BRDG STP 2,400,000 2,400,000 2,400,000

Central Office 104410Local Bridge Inspection F BRDG NHPP 2,400,000 1,200,000 3,600,000 3,600,000

Central Office 104410Local Bridge Inspection F BRDG STP 2,400,000 2,400,000 2,400,000

Central Office 104410Local Bridge Inspection F BRDG NHPP 2,400,000 1,200,000 3,600,000 3,600,000

Central Office 104410Local Bridge Inspection F BRDG STP 2,400,000 2,400,000 2,400,000

Central Office 104410Local Bridge Inspection F BRDG NHPP 2,400,000 1,200,000 3,600,000 3,600,000

Central Office 104410Local Bridge Inspection F BRDG STP 2,400,000 2,400,000 2,400,000

Central Office 104411TIIF Oversight and Mngmt P HRST STP 3,500,000 3,500,000 3,500,000

Central Office 104411TIIF Oversight and Mngmt P HRST STP 3,500,000 3,500,000 3,500,000

Central Office 104411TIIF Oversight and Mngmt P HRST STP 3,500,000 3,500,000 3,500,000

Central Office 104411TIIF Oversight and Mngmt P HRST STP 3,500,000 3,500,000 3,500,000

Central Office 104412TAP Oversight & Mngmt P HRST STP 2,310,000 2,310,000 2,310,000

Central Office 104412TAP Oversight & Mngmt P HRST STP 2,310,000 2,310,000 2,310,000

Page 57: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

57 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Central Office 59763 Transit Flex Reserve C IMOD STP 1,744,800 1,744,800 1,744,800

Central Office 59763 Transit Flex Reserve C IMOD STP 1,744,800 1,744,800 1,744,800

Central Office 59763 Transit Flex Reserve C IMOD STP 1,744,800 1,744,800 1,744,800

Central Office 59763 Transit Flex Reserve C IMOD STP 1,744,800 1,744,800 1,744,800

Central Office 60028 DCNR Rec Trails Reserve C IMOD REC 1,833,243 458,310 2,291,553 2,291,553

Central Office 60028 DCNR Rec Trails Reserve C IMOD REC 1,991,000 497,750 2,488,750 2,488,750

Central Office 60028 DCNR Rec Trails Reserve C IMOD REC 1,991,000 497,750 2,488,750 2,488,750

Central Office 60469 TIIF Reserve C HRST 581 457,450 457,450 457,450

Central Office 60469 TIIF Reserve C HRST 581 430,000 430,000 430,000

Central Office 60469 TIIF Reserve C HRST 581 22,070,000 22,070,000 22,070,000

Central Office 60469 TIIF Reserve C HRST 581 22,900,000 22,900,000 22,900,000

Central Office 60560 TAP Reserve C TENH TAP 17,423,000 17,423,000 17,423,000

Central Office 60560 TAP Reserve C TENH TAP 17,165,232 17,165,232 17,165,232

Central Office 60560 TAP Reserve C TENH TAP 17,593,000 17,593,000 17,593,000

Central Office 60560 TAP Reserve C TENH TAP 17,593,000 17,593,000 17,593,000

Central Office 74548 Pooled Fund Studies LI P PRA SPR 500,000 500,000 500,000

Central Office 74548 Pooled Fund Studies LI P PRA SPR 500,000 500,000 500,000

Central Office 74548 Pooled Fund Studies LI P PRA SPR 500,000 500,000 500,000

Central Office 74548 Pooled Fund Studies LI P PRA SPR 500,000 500,000 500,000

Central Office 75891 Interstate Contingency C IMAN NHPP 46,760,503 185 1,082,986 47,843,489 47,843,489

Central Office 75891 Interstate Contingency C IMAN 581 265,225 265,225 265,225

Central Office 75891 Interstate Contingency C IMAN NHPP 61,956,337 185 1,176,040 63,132,377 63,132,377

Central Office 75891 Interstate Contingency C IMAN 581 7,943,597 7,943,597 7,943,597

Central Office 75891 Interstate Contingency C IMAN NHPP 13,387,164 185 940,830 14,327,994 14,327,994

Central Office 75891 Interstate Contingency C IMAN 581 5,147,400 5,147,400 5,147,400

Central Office 75891 Interstate Contingency C IMAN NHPP 3,136,439 185 3,768,830 6,905,269 6,905,269

Central Office 75891 Interstate Contingency C IMAN 581 1,330,001 1,330,001 1,330,001

Central Office 76639 LTAP Line Item P PRA SPR 310,000 310,000 310,000

Central Office 76639 LTAP Line Item P PRA SPR 310,000 310,000 310,000

Central Office 76639 LTAP Line Item P PRA SPR 310,000 310,000 310,000

Central Office 76639 LTAP Line Item P PRA SPR 310,000 310,000 310,000

Central Office 77786 State Highway Reserve C HRST NHPP 9,600,000 581 5,435,800 15,035,800 15,035,800

Central Office 77786 State Highway Reserve C HRST STP 1,870,000 1,870,000 1,870,000

Central Office 77786 State Highway Reserve C HRST NHPP 9,600,000 581 5,000,000 14,600,000 14,600,000

Central Office 77786 State Highway Reserve C HRST STP 1,870,000 1,870,000 1,870,000

Central Office 77786 State Highway Reserve C HRST NHPP 9,600,000 581 3,400,000 13,000,000 13,000,000

Central Office 77786 State Highway Reserve C HRST STP 4,180,000 4,180,000 4,180,000

Central Office 77786 State Highway Reserve C HRST NHPP 9,600,000 581 3,400,000 13,000,000 13,000,000

Central Office 77786 State Highway Reserve C HRST STP 4,180,000 4,180,000 4,180,000

Central Office 79725 ROW Take-up 80/20 R HRST STP 2,400,000 581 600,000 3,000,000 3,000,000

Page 58: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

58 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Central Office 79726 ROW Take-up 90/10 R HRST STP 1,000,800 581 111,200 1,112,000 1,112,000

Central Office 82335 State Bridge Reserve C BRDG 185 9,750,800 9,750,800 9,750,800

Central Office 82335 State Bridge Reserve C BRDG 185 10,000,000 10,000,000 10,000,000

Central Office 82335 State Bridge Reserve C BRDG 185 10,000,000 10,000,000 10,000,000

Central Office 82335 State Bridge Reserve C BRDG 185 10,000,000 10,000,000 10,000,000

Central Office 84371 Bridg Insp Training LI C BRDG NHPP 480,000 185 120,000 600,000 600,000

Central Office 84371 Bridg Insp Training LI C BRDG NHPP 480,000 185 120,000 600,000 600,000

Central Office 84371 Bridg Insp Training LI C BRDG NHPP 480,000 185 120,000 600,000 600,000

Central Office 84371 Bridg Insp Training LI C BRDG NHPP 480,000 185 120,000 600,000 600,000

Central Office 84372 Federal SRTS Reserve C TENH SRTSF 1,724,611 1,724,611 1,724,611

Central Office 84372 Federal SRTS Reserve C TENH SRTSF 1,600,000 1,600,000 1,600,000

Central Office 84372 Federal SRTS Reserve C TENH SRTSF 1,000,000 1,000,000 1,000,000

Central Office 87583 Env Rev US Army Corps P HRST STP 509,280 581 127,320 636,600 636,600

Central Office 87583 Env Rev US Army Corps P HRST STP 524,480 581 131,120 655,600 655,600

Central Office 87583 Env Rev US Army Corps P HRST STP 540,240 581 135,060 675,300 675,300

Central Office 87583 Env Rev US Army Corps P HRST STP 556,480 581 139,120 695,600 695,600

Central Office 87584 Env Rev US F&WS P HRST STP 228,618 581 57,154 285,772 285,772

Central Office 87584 Env Rev US F&WS P HRST STP 235,434 581 58,859 294,293 294,293

Central Office 87584 Env Rev US F&WS P HRST STP 242,497 581 60,624 303,121 303,121

Central Office 87584 Env Rev US F&WS P HRST STP 249,771 581 62,443 312,214 312,214

Central Office 87585 Env Rev PHMC P HRST STP 264,913 581 66,228 331,141 331,141

Central Office 87585 Env Rev PHMC P HRST STP 274,508 581 68,627 343,135 343,135

Central Office 87585 Env Rev PHMC P HRST STP 282,735 581 70,684 353,419 353,419

Central Office 87585 Env Rev PHMC P HRST STP 291,226 581 72,806 364,032 364,032

Central Office 87586 Env Rev PA Fish/Boat P HRST STP 167,168 581 41,792 208,960 208,960

Central Office 87586 Env Rev PA Fish/Boat P HRST STP 172,182 581 43,046 215,228 215,228

Central Office 87586 Env Rev PA Fish/Boat P HRST STP 177,347 581 44,337 221,684 221,684

Central Office 87586 Env Rev PA Fish/Boat P HRST STP 182,667 581 45,667 228,334 228,334

Central Office 87587 Env Rev PA Game Comm P HRST STP 63,780 581 15,945 79,725 79,725

Central Office 87587 Env Rev PA Game Comm P HRST STP 63,780 581 15,945 79,725 79,725

Central Office 87587 Env Rev PA Game Comm P HRST STP 63,780 581 15,945 79,725 79,725

Central Office 87587 Env Rev PA Game Comm P HRST STP 63,780 581 15,945 79,725 79,725

Central Office 87588 Env Rev PA DEP P HRST STP 1,087,680 581 271,920 1,359,600 1,359,600

Central Office 87588 Env Rev PA DEP P HRST STP 1,120,310 581 280,078 1,400,388 1,400,388

Central Office 87588 Env Rev PA DEP P HRST STP 1,153,920 581 288,480 1,442,400 1,442,400

Central Office 87588 Env Rev PA DEP P HRST STP 1,188,538 581 297,134 1,485,672 1,485,672

Central Office 88614 179 Fund Closeout C BRDG 179 275,927 275,927 275,927

Central Office 88614 179 Fund Closeout C BRDG 179 92,500 92,500 92,500

Central Office 88614 179 Fund Closeout C BRDG 179 227,540 227,540 227,540

Central Office 88614 179 Fund Closeout C BRDG 179 84,720 84,720 84,720

Page 59: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

59 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Central Office 90085 Interstate Bridge PM C IMAN 185 10,000,000 10,000,000 10,000,000

Central Office 90085 Interstate Bridge PM C IMAN 185 30,000,000 30,000,000 30,000,000

Central Office 91407 Env Rev PA DCNR P HRST STP 59,570 581 14,893 74,463 74,463

Central Office 91407 Env Rev PA DCNR P HRST STP 61,583 581 15,396 76,979 76,979

Central Office 91407 Env Rev PA DCNR P HRST STP 65,818 581 16,455 82,273 82,273

Central Office 91407 Env Rev PA DCNR P HRST STP 68,046 581 17,012 85,058 85,058

Central Office 94921 State Inventory/Inspect F BRDG STP 1,920,000 582 480,000 2,400,000 2,400,000

Central Office 94921 State Inventory/Inspect F BRDG STP 1,920,000 582 480,000 2,400,000 2,400,000

Central Office 94921 State Inventory/Inspect F BRDG STP 1,920,000 582 480,000 2,400,000 2,400,000

Central Office 94921 State Inventory/Inspect F BRDG STP 1,920,000 582 480,000 2,400,000 2,400,000

Central Office 95633 2011B DCNR REC TRLS STIP2 C TENH REC 93,255 23,314 116,569 116,569

Central Office 98255 RRX Reserve C SAMI RRX 13,113 13,113 13,113

Central Office 98255 RRX Reserve C SAMI RRX 2,644 2,644 2,644

Central Office 98255 RRX Reserve C SAMI RRX 167,401 167,401 167,401

Central Office 98255 RRX Reserve C SAMI RRX 397,513 397,513 397,513

Central Office 98968 P3 Bridge Initiative C HRST 581 15,000,000 15,000,000 15,000,000

Central Office 99501 2013 DCNR REC TRAIL STIP2 C TENH REC 131,898 32,975 164,873 164,873

Central Office 101969HSIP Set-a-Side Reserve C SAMI HSIP 35,890,250 35,890,250 35,890,250

Central Office 101969HSIP Set-a-Side Reserve C SAMI HSIP 35,000,000 35,000,000 35,000,000

Central Office 101969HSIP Set-a-Side Reserve C SAMI HSIP 35,000,000 35,000,000 35,000,000

Central Office 101969HSIP Set-a-Side Reserve C SAMI HSIP 35,000,000 35,000,000 35,000,000

Central Office 102893Multimodal Reserves C IMOD 411 56,000,000 56,000,000 56,000,000

Central Office 102893Multimodal Reserves C IMOD 411 76,000,000 76,000,000 76,000,000

Central Office 102893Multimodal Reserves C IMOD 411 76,000,000 76,000,000 76,000,000

Central Office 102893Multimodal Reserves C IMOD 411 76,000,000 76,000,000 76,000,000

Totals for: Central Office 192,975,239 631,856,640 6,954,039 831,785,918 205,496,290 180,011,208 6,897,750 392,405,248 153,364,702 195,536,355 6,897,750 355,798,807 154,409,260 215,252,678 6,897,750 376,559,688 1,956,549,661

Centre 000 84343 SD Bridge Line Item C BRDG BOF 49,036 49,036 49,036

Centre 000 84343 SD Bridge Line Item C BRDG STP 227,140 227,140 227,140

Centre CMQ 83412 Line Item CMAQ C SAMI CAQ 465,216 465,216 465,216

Centre SAF 75808 Line Item Safety C SAMI HSIP 373,000 373,000 373,000

Centre SAF 75808 Line Item Safety C SAMI HSIP 991,000 991,000 991,000

Centre 26 A04 3117 PA 26 Lick Run Br. +P BRDG STP 371,315 371,315 371,315

Centre 26 A04 3117 PA 26 Lick Run Br. F BRDG 185 315,142 315,142 315,142

Centre 26 A04 3117 PA 26 Lick Run Br. R BRDG 185 87,675 87,675 87,675

Centre 64 A02 47617 Little Fishing Creek II +P BRDG STP 405,746 405,746 405,746

Centre 64 P15 3108 2018 Centre Br. Preserv. +C BRDG BOF 397,024 397,024 397,024

Centre 80 B34 82105 Viaduct - Yarnell Overlay P IMAN 581 212,180 212,180 212,180

Centre 80 B34 82105 Viaduct - Yarnell Overlay C IMAN 185 1,365,909 1,365,909 1,365,909

Centre 80 B34 82105 Viaduct - Yarnell Overlay C IMAN 581 17,756,814 17,756,814 17,756,814

Centre 80 B34 82105 Viaduct - Yarnell Overlay C IMAN 185 1,365,909 1,365,909 1,365,909

Page 60: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

60 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Centre 80 B34 82105 Viaduct - Yarnell Overlay C IMAN 581 17,756,814 17,756,814 17,756,814

Centre 80 B38 74912 I-80 Replace Br Struct's P IMAN 185 562,754 562,754 562,754

Centre 144 A03 82537 Bellefonte Linn St. Wall F BRDG 185 214,000 214,000 214,000

Centre 144 A03 82537 Bellefonte Linn St. Wall U BRDG 185 154,500 154,500 154,500

Centre 144 A03 82537 Bellefonte Linn St. Wall R BRDG 185 154,500 154,500 154,500

Centre 144 A11 69434 Bald Eagle Creek Bridge +U BRDG NHPP 51,500 51,500 51,500

Centre 144 A11 69434 Bald Eagle Creek Bridge +C BRDG STP 1,500,000 1,500,000 1,500,000

Centre 144 A11 69434 Bald Eagle Creek Bridge +C HRST NHPP 749,084 749,084 749,084

Centre 144 A12 99914 SEDACOG JRA Bridges F BRDG NHPP 250,000 185 75,000 325,000 325,000

Centre 144 A12 99914 SEDACOG JRA Bridges +C BRDG NHPP 1,963,996 1,963,996 1,963,996

Centre 144 A12 99914 SEDACOG JRA Bridges +C BRDG NHPP 1,641,004 1,641,004 1,641,004

Centre 144 A13 88170 South Fork Beech Creek +P BRDG STP 650,000 650,000 650,000

Centre 144 A13 88170 South Fork Beech Creek F BRDG STP 315,142 185 244,858 560,000 560,000

Centre 144 A13 88170 South Fork Beech Creek U BRDG STP 54,636 185 50,000 104,636 104,636

Centre 144 A13 88170 South Fork Beech Creek R BRDG STP 54,636 185 24,000 78,636 78,636

Centre 144 A13 88170 South Fork Beech Creek C BRDG STP 1,404,000 185 994,813 2,398,813 2,398,813

Centre 144 P14 94960 Centre 2015 Br. Preserv. C BRDG NHPP 746,469 746,469 746,469

Centre 144 P14 94960 Centre 2015 Br. Preserv. C BRDG STP 200,000 200,000 200,000

Centre 144 P14 94960 Centre 2015 Br. Preserv. C BRDG BOF 182,681 185 218,927 401,608 401,608

Centre 144 P14 94960 Centre 2015 Br. Preserv. C BRDG STP 178,685 178,685 178,685

Centre 150 CIP 75776 SR 150 CCIP U HRST CAQ 12,360 581 3,090 15,450 15,450

Centre 150 CIP 75776 SR 150 CCIP C HRST CAQ 535,600 581 133,900 669,500 669,500

Centre 322 150 93365 322 Mount Nittany Express C HRST NHPP 777,531 777,531 777,531

Centre 322 156 93255 Port Matilda Mtn P HRST 581 85,000 85,000 85,000

Centre 322 156 93255 Port Matilda Mtn C HRST 581 1,070,730 1,070,730 1,070,730

Centre 322 158 102829322 Port Matilda Mtn II P HRST 581 300,000 300,000 300,000

Centre 322 158 102829322 Port Matilda Mtn II C HRST 581 2,900,000 2,900,000 2,900,000

Centre 322 B04 96370 Overhead Bridge F HCON 581 300,000 300,000 300,000

Centre 322 B04 96370 Overhead Bridge U HCON 581 100,000 100,000 100,000

Centre 322 B04 96370 Overhead Bridge C HCON 581 3,300,000 3,300,000 3,300,000

Centre 322 B05 96819 Eastrn Interch -Access Rd F HCON STP 50,000 50,000 50,000

Centre 322 B05 96819 Eastrn Interch -Access Rd F HCON STP 600,000 600,000 600,000

Centre 322 B05 96819 Eastrn Interch -Access Rd U HCON 581 200,000 200,000 200,000

Centre 322 B05 96819 Eastrn Interch -Access Rd R HCON STP 200,000 200,000 200,000

Centre 322 B05 96819 Eastrn Interch -Access Rd R HCON STP 150,000 581 350,000 500,000 500,000

Centre 322 B05 96819 Eastrn Interch -Access Rd C HCON STP 750,000 581 2,000,000 2,750,000 2,750,000

Centre 322 B05 96819 Eastrn Interch -Access Rd C HCON STP 750,000 581 2,000,000 2,750,000 2,750,000

Centre 322 B06 96820 Western Interch -Mainline F HCON 581 2,590,000 2,590,000 2,590,000

Centre 322 B06 96820 Western Interch -Mainline F HCON 581 6,810,000 6,810,000 6,810,000

Centre 322 B06 96820 Western Interch -Mainline F HCON 581 2,900,000 2,900,000 2,900,000

Page 61: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

61 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Centre 322 B06 96820 Western Interch -Mainline U HCON 581 2,400,000 2,400,000 2,400,000

Centre 322 B06 96820 Western Interch -Mainline R HCON STP 500,000 500,000 500,000

Centre 322 B06 96820 Western Interch -Mainline R HCON 581 1,000,000 1,000,000 1,000,000

Centre 322 B06 96820 Western Interch -Mainline R HCON 581 4,500,000 4,500,000 4,500,000

Centre 322 B06 96820 Western Interch -Mainline C HCON 581 42,850,000 42,850,000 42,850,000

Centre 322 B06 96820 Western Interch -Mainline C HCON 581 28,150,000 28,150,000 28,150,000

Centre 322 N03 78994 SR 322 Safety Improvement C HRST HSIP 618,000 618,000 618,000

Centre 322 PMG 96706 Potters Mills Gap Study P HRST 581 360,000 360,000 360,000

Centre 322 PMG 96706 Potters Mills Gap Study P HRST 581 290,000 290,000 290,000

Centre 1002 A05 2944 Br. Marsh Creek Bridge +F BRDG BOF 132,613 132,613 132,613

Centre 1002 A05 2944 Br. Marsh Creek Bridge +U BRDG BOF 53,045 53,045 53,045

Centre 1002 A05 2944 Br. Marsh Creek Bridge +R BRDG BOF 53,045 53,045 53,045

Centre 1002 A05 2944 Br. Marsh Creek Bridge C BRDG BOF 276,000 185 1,201,895 1,477,895 1,477,895

Centre 1002 A05 2944 Br. Marsh Creek Bridge C BRDG STP 175,148 175,148 175,148

Centre 1002 A05 2944 Br. Marsh Creek Bridge C BRDG 185 344,858 344,858 344,858

Centre 1005 PLK 92422 CEN Bridge Planks C BRDG 185 110,728 110,728 110,728

Centre 1005 PLK 92422 CEN Bridge Planks C BRDG 185 250,000 250,000 250,000

Centre 2009 A01 69467 Br. Penns Creek BOX P BRDG 185 229,473 229,473 229,473

Centre 2009 A01 69467 Br. Penns Creek BOX U BRDG 185 28,138 28,138 28,138

Centre 2009 A01 69467 Br. Penns Creek BOX R BRDG 185 28,138 28,138 28,138

Centre 2012 A04 83122 SR 2012 Penns Creek +C BRDG BOF 676,000 676,000 676,000

Centre 2018 A01 85142 SR 2018 over Pine Creek U BRDG 185 5,000 5,000 5,000

Centre 2018 A01 85142 SR 2018 over Pine Creek R BRDG 185 5,000 5,000 5,000

Centre 2018 A01 85142 SR 2018 over Pine Creek +C BRDG 581 2,100,000 2,100,000 2,100,000

Centre 3010 155 99528 SR 3010 Oak Hall Intersct P HRST NHPP 180,500 581 50,000 230,500 230,500

Centre 3010 155 99528 SR 3010 Oak Hall Intersct +U HRST NHPP 77,250 77,250 77,250

Centre 3010 155 99528 SR 3010 Oak Hall Intersct C HRST 581 1,304,968 1,304,968 1,304,968

Centre 3011 A03 88189 Slab Cabin Run Bridge. P BRDG STP 50,000 50,000 50,000

Centre 3011 A03 88189 Slab Cabin Run Bridge. +F BRDG STP 275,834 275,834 275,834

Centre 3011 A03 88189 Slab Cabin Run Bridge. +U BRDG STP 106,090 106,090 106,090

Centre 3011 A03 88189 Slab Cabin Run Bridge. +R BRDG STP 75,000 75,000 75,000

Centre 3011 A03 88189 Slab Cabin Run Bridge. C BRDG STP 297,910 185 74,478 372,388 372,388

Centre 3011 A03 88189 Slab Cabin Run Bridge. C BRDG STP 398,692 185 99,673 498,365 498,365

Centre 3014 151 96989 Colonnade to Aaron Drive C HRST NHPP 1,597,750 1,597,750 1,597,750

Centre 3014 151 96989 Colonnade to Aaron Drive C HRST STP 203,166 203,166 203,166

Centre 3014 151 96989 Colonnade to Aaron Drive C HRST STP 450,000 450,000 450,000

Centre 3014 152 98126 Atherton Street Phase II F HRST CAQ 441,040 581 110,260 551,300 551,300

Centre 3014 152 98126 Atherton Street Phase II U HRST CAQ 989,000 581 247,250 1,236,250 1,236,250

Centre 3014 152 98126 Atherton Street Phase II R HRST CAQ 989,000 581 318,270 1,307,270 1,307,270

Centre 3014 152 98126 Atherton Street Phase II C HRST NHPP 2,487,996 581 4,169,782 6,657,778 6,657,778

Page 62: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

62 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Centre 3014 152 98126 Atherton Street Phase II C HRST CAQ 989,000 581 357,250 1,346,250 1,346,250

Centre 3014 152 98126 Atherton Street Phase II C HRST HSIP 991,000 991,000 991,000

Centre 3014 152 98126 Atherton Street Phase II C HRST NHPP 4,129,000 4,129,000 4,129,000

Centre 3014 152 98126 Atherton Street Phase II C SAMI HSIP 991,000 991,000 991,000

Centre 3014 153 101960Atherton Street Phase III P HRST 581 389,750 389,750 389,750

Centre 3014 153 101960Atherton Street Phase III U HRST 581 1,125,509 1,125,509 1,125,509

Centre 3014 153 101960Atherton Street Phase III R HRST 581 1,125,509 1,125,509 1,125,509

Centre 3014 153 101960Atherton Street Phase III C HRST 581 760,732 760,732 760,732

Centre 3025 A01 93254 Bell Hollow BOX P BRDG 185 180,000 180,000 180,000

Centre 3025 A01 93254 Bell Hollow BOX U BRDG 185 53,045 53,045 53,045

Centre 3025 A01 93254 Bell Hollow BOX R BRDG 185 53,045 53,045 53,045

Centre 3025 A01 93254 Bell Hollow BOX C BRDG 185 275,000 275,000 275,000

Centre 3034 A03 3133 SR 3034 Cold Stream Run C BRDG 185 936,705 936,705 936,705

Centre 3034 A03 3133 SR 3034 Cold Stream Run C BRDG 185 968,795 968,795 968,795

Centre 3040 A01 85143 SR 3040 over Dix Run +C BRDG NHPP 448,000 448,000 448,000

Centre 3040 A01 85143 SR 3040 over Dix Run +C BRDG NHPP 1,200,000 1,200,000 1,200,000

Centre 3042 157 1010453042 Laurel Rn-Prt Matlda +P HRST NHPP 215,920 215,920 215,920

Centre 3042 157 1010453042 Laurel Rn-Prt Matlda C HRST 581 2,353,000 2,353,000 2,353,000

Centre 3045 A01 83541 SR 3045 Waddle Road Int F BRDG 750,000 750,000 750,000

Centre 3045 A01 83541 SR 3045 Waddle Road Int U BRDG 500,000 500,000 500,000

Centre 3045 A01 83541 SR 3045 Waddle Road Int R BRDG 500,000 500,000 500,000

Centre 3045 A01 83541 SR 3045 Waddle Road Int C HRST STP 2,000,000 185 10,000,000 12,000,000 12,000,000

Centre 4004 A03 97596 Trib Bush Hollow BOX P BRDG 185 50,000 50,000 50,000

Centre 4004 A03 97596 Trib Bush Hollow BOX U BRDG 185 53,045 53,045 53,045

Centre 4004 A03 97596 Trib Bush Hollow BOX R BRDG 185 26,522 26,522 26,522

Centre 4004 A03 97596 Trib Bush Hollow BOX C BRDG 185 267,969 267,969 267,969

Centre 4004 A04 91503 SR 4004 Trib Wallace BOX P BRDG 185 206,000 206,000 206,000

Centre 4004 A04 91503 SR 4004 Trib Wallace BOX U BRDG 185 32,782 32,782 32,782

Centre 4004 A04 91503 SR 4004 Trib Wallace BOX R BRDG 185 27,319 27,319 27,319

Centre 4004 A04 91503 SR 4004 Trib Wallace BOX C BRDG 185 393,928 393,928 393,928

Centre 7202 BR 2973 T-395,Wallace Run Br. C BRDG 183 100,000 25,000 125,000 125,000

Centre 7225 000 3713 T-348 over Ardery Run F BRDG BOF 169,744 183 31,827 10,609 212,180 212,180

Centre 7225 000 3713 T-348 over Ardery Run U BRDG BOF 42,436 183 7,957 2,652 53,045 53,045

Centre 7225 000 3713 T-348 over Ardery Run R BRDG BOF 42,436 183 7,957 2,652 53,045 53,045

Centre 7225 000 3713 T-348 over Ardery Run C BRDG BOF 400,000 183 60,000 40,000 500,000 500,000

Centre 7225 000 3713 T-348 over Ardery Run C BRDG BOF 278,976 183 52,308 17,436 348,720 348,720

Totals for: Centre 13,230,392 21,887,000 1,775,000 36,892,392 8,939,000 15,291,180 15,913 24,246,093 8,939,000 81,739,723 40,000 90,718,723 8,939,000 57,802,477 17,436 66,758,913 218,616,121

Chester 102292ARLE Adap Traf Ctrl Mgmt C SAMI 244 51,000 51,000 51,000

Chester 102293ARLE Adaptv Signal System C SAMI 244 564,000 564,000 564,000

Chester 102294ARLE Adaptv Signal System C SAMI 244 445,000 445,000 445,000

Page 63: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

63 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Chester 84961 HistoricYellowSprgs Prkng C SPFED SXF 20,000 20,000 20,000

Chester 98004 E Whiteland Signal Backup C SAMI 244 10,000 10,000 10,000

Chester 284 103214Hickory Hill Grade Xing +C SAMI RRX 212,180 212,180 212,180

Chester 285 103215Chambers Rd Grade Xing +C SAMI RRX 196,266 196,266 196,266

Chester 381 103210Hillendale Rd Grade Xing +C SAMI RRX 190,550 190,550 190,550

Chester 382 103212Fairville Rd Grade Xing +C SAMI RRX 206,000 206,000 206,000

Chester 383 103213Bayard Rd Grade Xing +C SAMI RRX 206,000 206,000 206,000

Chester FCP 57659 French Creek Parkway Ph 1 +F HCON SXF 325,000 325,000 325,000

Chester FCP 57659 French Creek Parkway Ph 1 +U HCON SXF 25,000 25,000 25,000

Chester FCP 57659 French Creek Parkway Ph 1 +R HCON SXF 40,000 40,000 40,000

Chester FCP 57659 French Creek Parkway Ph 1 +C HCON STU 2,978,000 2,978,000 2,978,000

Chester FCP 57659 French Creek Parkway Ph 1 +C HCON SXF 2,817,000 2,817,000 2,817,000

Chester PAT 57684 PA 82 Trl: PA 926 -Mll Rd +U IMOD CAQ 310,000 310,000 310,000

Chester PAT 57684 PA 82 Trl: PA 926 -Mll Rd +C IMOD CAQ 1,873,000 1,873,000 1,873,000

Chester Q42 61885 Schuylkill River Trail U SAMI 64,000 64,000 64,000

Chester Q42 61885 Schuylkill River Trail R SAMI 248,000 248,000 248,000

Chester Q42 61885 Schuylkill River Trail C SAMI CAQ 765,000 191,000 956,000 956,000

Chester RLE 104165ARLE Incident Mgmt Upgrad C SAMI 244 341,507 341,507 341,507

Chester RLE 104170ARLE Traf Sig Equip Upgra C SAMI 244 72,500 72,500 72,500

Chester RLE 104171ARLE LED Traf Sig Upgrade C SAMI 244 61,250 61,250 61,250

Chester SRT 59434 Schuylkill Riv Trail +C SAMI CAQ 8,358,000 8,358,000 8,358,000

Chester WCS 77457 Church St Stscape(F) C TENH STU 130,000 130,000 130,000

Chester 1 200 14581 US 1: PA 896 - Schl Hs P HCON STU 1,200,000 581 300,000 1,500,000 1,500,000

Chester 1 H02 14541 US 1: Partnership Phs 2 C HCON 581 6,415,000 6,415,000 6,415,000

Chester 30 100 14532 US 30: PA 10 - Exton Byp S XRST SXF 1,000,000 1,000,000 1,000,000

Chester 30 100 14532 US 30: PA 10 - Exton Byp P XRST SXF 6,000,000 6,000,000 6,000,000

Chester 30 CC1 102379SR30 Resurface ChesCo (C) C HRST 581 1,800,000 1,800,000 1,800,000

Chester 30 PTC 47979 Darby Road Extension P IMOD 185 2,122,000 2,122,000 2,122,000

Chester 30 PTC 47979 Darby Road Extension F IMOD STU 2,623,000 581 656,000 3,279,000 3,279,000

Chester 30 PTC 47979 Darby Road Extension U IMOD STU 2,690,000 581 672,000 3,362,000 3,362,000

Chester 30 PTC 47979 Darby Road Extension U IMOD 581 100,000 100,000 100,000

Chester 30 PTC 47979 Darby Road Extension R IMOD 185 3,352,000 3,352,000 3,352,000

Chester 30 PTC 47979 Darby Road Extension R IMOD 185 710,000 710,000 710,000

Chester 30 PTC 47979 Darby Road Extension R IMOD 581 3,042,000 3,042,000 3,042,000

Chester 41 NPP 69918 PA 41 over Officers Run C BRDG NHPP 500,000 581 665,000 1,165,000 1,165,000

Chester 41 NPP 69918 PA 41 over Officers Run C BRDG NHPP 500,000 581 4,891,000 5,391,000 5,391,000

Chester 41 STY 14484 PA 41 Improvement Study +S HRST SXF 4,311,000 4,311,000 4,311,000

Chester 41 VCB 69917 PA 41 O/Valley Cr F BRDG 581 493,000 493,000 493,000

Chester 41 VCB 69917 PA 41 O/Valley Cr C BRDG NHPP 500,000 581 871,000 1,371,000 1,371,000

Chester 41 VCB 69917 PA 41 O/Valley Cr C BRDG NHPP 500,000 581 5,997,000 6,497,000 6,497,000

Page 64: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

64 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Chester 52 JWJ 80101 PA52/WawasetUnionvleRd(C) C HCON STU 397,000 397,000 397,000

Chester 82 HBL 92311 Culvert Replace Group (L) U BRDG 581 200,000 200,000 200,000

Chester 82 HBL 92311 Culvert Replace Group (L) C BRDG 581 487,000 487,000 487,000

Chester 82 HBL 92311 Culvert Replace Group (L) C BRDG 581 300,000 300,000 300,000

Chester 82 HBL 92311 Culvert Replace Group (L) C BRDG 581 3,960,000 3,960,000 3,960,000

Chester 82 HBL 92311 Culvert Replace Group (L) C BRDG 581 253,000 253,000 253,000

Chester 100 SIP 80042 PA 100 Crdr Sfty Imprv F HRST HSIP 477,000 477,000 477,000

Chester 100 SIP 80042 PA 100 Crdr Sfty Imprv R HRST HSIP 151,000 151,000 151,000

Chester 202 330 64498 US 202:Exton Byp-PA 29(C) C HCON NHPP* 3,803,000 3,803,000 3,803,000

Chester 202 3RR 95366 SR 202 over AMTRAK +C BRDG NHPP 4,949,000 4,949,000 4,949,000

Chester 202 3RR 95366 SR 202 over AMTRAK +C BRDG NHPP 4,643,000 4,643,000 4,643,000

Chester 202 3RR 95366 SR 202 over AMTRAK +C BRDG NHPP 7,975,000 7,975,000 7,975,000

Chester 202 CMP 84410 US 202-300 CMSEW P HCON STU 1,500,000 1,500,000 1,500,000

Chester 202 CMP 84410 US 202-300 CMSEW P HCON STU 1,550,000 1,550,000 1,550,000

Chester 202 CNM 95430 SR 202 @ SR 926 F HCON STP 525,000 581 131,000 656,000 656,000

Chester 202 CNM 95430 SR 202 @ SR 926 U HCON STP 90,000 581 23,000 113,000 113,000

Chester 202 CNM 95430 SR 202 @ SR 926 R HCON STP 45,000 581 11,000 56,000 56,000

Chester 202 CNM 95430 SR 202 @ SR 926 C HCON STP 1,113,000 581 278,000 1,391,000 1,391,000

Chester 282 CRR 81286 Creek Rd o/ E Brandywine F BRDG 185 291,000 291,000 291,000

Chester 282 CRR 81286 Creek Rd o/ E Brandywine U BRDG 185 13,000 13,000 13,000

Chester 282 CRR 81286 Creek Rd o/ E Brandywine R BRDG 185 65,000 65,000 65,000

Chester 322 CDB 92733 Dwnngtwn Pk o/EBr Brndywn P BRDG 185 106,000 106,000 106,000

Chester 322 CDB 92733 Dwnngtwn Pk o/EBr Brndywn F BRDG 185 477,000 477,000 477,000

Chester 322 CDB 92733 Dwnngtwn Pk o/EBr Brndywn U BRDG 185 281,000 281,000 281,000

Chester 322 CDB 92733 Dwnngtwn Pk o/EBr Brndywn R BRDG 185 273,000 273,000 273,000

Chester 372 LVR 69919 L Valley O/Officers Run C HRST 185 2,731,000 2,731,000 2,731,000

Chester 422 M2B 14698 422: Hanover-PA100 P HRST 581 9,796,000 9,796,000 9,796,000

Chester 896 SIP 85949 SR 896 Safety Project F SAMI HSIP 1,273,000 1,273,000 1,273,000

Chester 926 53S 14327 St Rd O/Brandywine Cr +C BRDG STU 2,086,000 581 521,000 2,607,000 2,607,000

Chester 926 53S 14327 St Rd O/Brandywine Cr +C BRDG STU 2,999,000 581 750,000 3,749,000 3,749,000

Chester 926 53S 14327 St Rd O/Brandywine Cr +C BRDG STU 7,627,000 581 1,916,000 9,543,000 9,543,000

Chester 1016 KCB 102586Knox Covered Bridge Rehab C BRDG STU 600,000 600,000 600,000

Chester 1035 HBH 89701 Bridge Rehab Group (H) C BRDG 185 4,530,000 4,530,000 4,530,000

Chester 1035 HBH 89701 Bridge Rehab Group (H) C BRDG 185 1,235,000 1,235,000 1,235,000

Chester 1035 HBH 89701 Bridge Rehab Group (H) C BRDG 185 1,385,000 1,385,000 1,385,000

Chester 1035 HBH 89701 Bridge Rehab Group (H) C BRDG 185 750,000 750,000 750,000

Chester 1049 EBR 103253Rapps Dam Bridge Repairs C BRDG STU 480,000 185 120,000 600,000 600,000

Chester 2020 241 96241 US202/Boot Rd Signals(C) C SAMI CAQ 74,752 74,752 74,752

Chester 2020 CBA 90612 Boot Road o/ Amtrak P BRDG 185 133,000 133,000 133,000

Chester 2020 CBA 90612 Boot Road o/ Amtrak F BRDG 185 535,000 535,000 535,000

Page 65: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

65 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Chester 2020 CBA 90612 Boot Road o/ Amtrak U BRDG 185 563,000 563,000 563,000

Chester 2020 CBA 90612 Boot Road o/ Amtrak R BRDG 185 281,000 281,000 281,000

Chester 3026 RLE 104164ARLE Traf Sig Head Upgrde C SAMI 244 8,500 8,500 8,500

Chester 3033 C01 57664 Newark Rd @ Hillendale Rd F SAMI STU 110,000 581 28,000 138,000 138,000

Chester 3033 C01 57664 Newark Rd @ Hillendale Rd U SAMI STU 60,000 581 16,000 76,000 76,000

Chester 3033 C01 57664 Newark Rd @ Hillendale Rd R SAMI STU 64,000 581 17,000 81,000 81,000

Chester 3033 C01 57664 Newark Rd @ Hillendale Rd C SAMI 581 2,419,000 2,419,000 2,419,000

Chester 3033 MSB 98096 PA 41 & Newark Rd Improve F SAMI SXF 100,000 100,000 100,000

Chester 3033 MSB 98096 PA 41 & Newark Rd Improve F SAMI SXF 150,000 150,000 150,000

Chester 3033 MSB 98096 PA 41 & Newark Rd Improve U SAMI SXF 50,000 50,000 50,000

Chester 3033 MSB 98096 PA 41 & Newark Rd Improve R SAMI SXF 45,000 45,000 45,000

Chester 3033 MSB 98096 PA 41 & Newark Rd Improve C SAMI SXF 1,000,000 1,000,000 1,000,000

Chester 3047 C01 14200 Speakmans Covered Br C BRDG HCB 1,442,000 1,442,000 1,442,000

Chester 3047 C01 14200 Speakmans Covered Br C BRDG STU 41,000 41,000 41,000

Chester 3047 C01 14200 Speakmans Covered Br C BRDG STU 317,000 317,000 317,000

Chester 4006 CWB 14236 Lt Wshngtn Rd O/Clbrtsn C BRDG 581 2,550,000 2,550,000 2,550,000

Chester 7015 021 86696 Watermark Rd o/ Muddy Run F BRDG BOF 282,000 183 53,000 18,000 353,000 353,000

Chester 7015 021 86696 Watermark Rd o/ Muddy Run U BRDG BOF 44,000 183 9,000 2,000 55,000 55,000

Chester 7015 021 86696 Watermark Rd o/ Muddy Run R BRDG BOF 44,000 183 9,000 2,000 55,000 55,000

Chester 7015 021 86696 Watermark Rd o/ Muddy Run C BRDG 183 2,268,000 119,000 2,387,000 2,387,000

Chester 7015 026 14351 Rudolph&Arthur CvrBrdg#26 F BRDG HCB 252,000 179 16,000 268,000 268,000

Chester 7015 026 14351 Rudolph&Arthur CvrBrdg#26 F BRDG 183 47,000 47,000 47,000

Chester 7015 026 14351 Rudolph&Arthur CvrBrdg#26 R BRDG HCB 40,000 179 2,000 42,000 42,000

Chester 7015 026 14351 Rudolph&Arthur CvrBrdg#26 R BRDG 183 8,000 8,000 8,000

Chester 7015 205 98224 Spring City Rd O/StonyRun P BRDG 183 240,000 60,000 300,000 300,000

Chester 7015 236 14251 Chandler Mill O/Red Clay F BRDG BOF 297,000 183 56,000 19,000 372,000 372,000

Chester 7015 236 14251 Chandler Mill O/Red Clay R BRDG BOF 51,000 13,000 64,000 64,000

Chester 7015 244 86064 Hadfield Rd o/Beaver Cr. R HRST BOF 44,000 183 9,000 2,000 55,000 55,000

Chester 7015 244 86064 Hadfield Rd o/Beaver Cr. C HRST BOF 927,000 183 174,000 58,000 1,159,000 1,159,000

Chester 7015 301 80049 Thompson's Brdg T-301 C BRDG STU 1,128,000 183 211,000 71,000 1,410,000 1,410,000

Chester 7015 301 80049 Thompson's Brdg T-301 C BRDG STU 520,000 183 98,000 32,000 650,000 650,000

Chester 7101 001 86698 OsborneRd o/ Beaver Creek C BRDG STU 520,000 183 98,000 32,000 650,000 650,000

Chester 7101 001 86698 OsborneRd o/ Beaver Creek C BRDG STU 520,000 183 97,000 33,000 650,000 650,000

Chester 7403 DOW 14354 Chestnut St O/AMTRAK/CONR C BRDG BOF 3,028,000 183 567,750 192,278 3,788,028 3,788,028

Chester 7403 DOW 14354 Chestnut St O/AMTRAK/CONR C BRDG BOF 3,028,000 183 567,750 192,278 3,788,028 3,788,028

Chester 7410 BRG 14134 W Bridge St O/AMTRAK F BRDG STU 217,000 217,000 217,000

Chester 7410 BRG 14134 W Bridge St O/AMTRAK R BRDG STU 20,000 20,000 20,000

Chester 7410 BRG 14134 W Bridge St O/AMTRAK C BRDG STU 3,254,000 183 610,000 203,000 4,067,000 4,067,000

Chester 7410 BRG 14134 W Bridge St O/AMTRAK C BRDG STU 2,000,000 183 375,000 125,000 2,500,000 2,500,000

Chester 7410 BRG 14134 W Bridge St O/AMTRAK C BRDG STP 1,040,000 183 195,000 65,000 1,300,000 1,300,000

Page 66: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

66 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Totals for: Chester 27,101,302 15,034,757 388,000 42,524,059 28,564,446 27,323,750 543,278 56,431,474 33,238,000 31,854,750 627,278 65,720,028 12,565,000 2,562,000 183,000 15,310,000 179,985,561

Clarion 70209 Clarion Hwy/Bridge Line C BRDG BOF 53,200 53,200 53,200

Clarion 70209 Clarion Hwy/Bridge Line C BRDG STP 4,200 4,200 4,200

Clarion 70209 Clarion Hwy/Bridge Line C BRDG STP 17,900 581 168,898 186,798 186,798

Clarion 70209 Clarion Hwy/Bridge Line C BRDG 581 239,580 239,580 239,580

Clarion 101581Clarion Hwy.Resurf.Line#1 C HRST NHPP 503,000 581 125,750 628,750 628,750

Clarion 101581Clarion Hwy.Resurf.Line#1 C HRST NHPP 923,000 581 298,335 1,221,335 1,221,335

Clarion 101581Clarion Hwy.Resurf.Line#1 C HRST STP 270,340 270,340 270,340

Clarion 101586Clarion Hwy.Resurf.Line#2 C HRST 581 4,108,590 4,108,590 4,108,590

Clarion 101586Clarion Hwy.Resurf.Line#2 C HRST 581 3,948,995 3,948,995 3,948,995

Clarion 1016832017 Clarion DFB Line F BRDG 185 51,500 51,500 51,500

Clarion 1016832017 Clarion DFB Line U BRDG 185 31,900 31,900 31,900

Clarion 1016832017 Clarion DFB Line R BRDG 185 10,700 10,700 10,700

Clarion 1016832017 Clarion DFB Line C BRDG 185 382,500 382,500 382,500

Clarion 1016862018 Clarion DFB Line F BRDG 185 53,100 53,100 53,100

Clarion 1016862018 Clarion DFB Line U BRDG 185 32,800 32,800 32,800

Clarion 1016862018 Clarion DFB Line R BRDG 185 11,000 11,000 11,000

Clarion 1016862018 Clarion DFB Line C BRDG 185 394,000 394,000 394,000

Clarion 88748 Clarion Br. PreCon Line P BRDG BOF 630,000 185 157,500 787,500 787,500

Clarion 58 356 24914 Callensburg Bridge #1 C BRDG 581 3,010,000 3,010,000 3,010,000

Clarion 58 356 24914 Callensburg Bridge #1 C BRDG 581 3,000,000 3,000,000 3,000,000

Clarion 68 0 99285 PA68RimersburgBoroSignal C HRST 581 319,300 319,300 319,300

Clarion 68 360 75962 Reidsburg Bridge Curve U BRDG 185 13,400 13,400 13,400

Clarion 68 360 75962 Reidsburg Bridge Curve R BRDG STP 172,000 185 80,000 252,000 252,000

Clarion 68 360 75962 Reidsburg Bridge Curve C BRDG SXF 408,478 581 2,243,822 2,652,300 2,652,300

Clarion 68 375 24890 PA 68/Dolby Street Inters P SAMI HSIP 204,000 581 25,750 229,750 229,750

Clarion 68 375 24890 PA 68/Dolby Street Inters P SAMI HSIP 27,750 27,750 27,750

Clarion 68 375 24890 PA 68/Dolby Street Inters F SAMI HSIP 238,770 581 26,530 265,300 265,300

Clarion 68 375 24890 PA 68/Dolby Street Inters U SAMI HSIP 368,820 581 40,980 409,800 409,800

Clarion 68 375 24890 PA 68/Dolby Street Inters R SAMI HSIP 540,900 581 60,100 601,000 601,000

Clarion 68 375 24890 PA 68/Dolby Street Inters C SAMI HSIP 1,519,470 581 168,830 1,688,300 1,688,300

Clarion 80 392 98244 I-80 Clarion County PM C IMAN 581 5,991,000 5,991,000 5,991,000

Clarion 80 392 98244 I-80 Clarion County PM C IMAN 581 5,991,000 5,991,000 5,991,000

Clarion 208 0 99276 PA208 Knox Borough Signal C SAMI 581 319,300 319,300 319,300

Clarion 208 391 95588 Shippenville - Fryburg PM C HRST 581 937,000 937,000 937,000

Clarion 322 351 25214 Day Bridge C BRDG NHPP 923,000 185 471,000 1,394,000 1,394,000

Clarion 322 351 25214 Day Bridge C BRDG NHPP 923,000 185 95,500 1,018,500 1,018,500

Clarion 322 351 25214 Day Bridge C BRDG NHPP 420,000 420,000 420,000

Clarion 322 395 100183US322Shippenville-Clarion C HRST 581 851,650 851,650 851,650

Clarion 322 395 100183US322Shippenville-Clarion C HRST 581 1,298,850 1,298,850 1,298,850

Page 67: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

67 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clarion 1007 350 83236 Stone House Bridge #1 F BRDG 185 231,750 231,750 231,750

Clarion 1007 350 83236 Stone House Bridge #1 C BRDG STP 675,360 581 168,840 844,200 844,200

Clarion 2001 354 25227 SR 2001 Piney Creek Br. +U BRDG STP 51,500 51,500 51,500

Clarion 2001 354 25227 SR 2001 Piney Creek Br. C BRDG STP 1,358,000 185 339,500 1,697,500 1,697,500

Clarion 2003 354 91811 Reids Run Bridge F BRDG 185 51,500 51,500 51,500

Clarion 2003 354 91811 Reids Run Bridge U BRDG 185 30,900 30,900 30,900

Clarion 2003 354 91811 Reids Run Bridge R BRDG 185 11,400 11,400 11,400

Clarion 2003 354 91811 Reids Run Bridge C BRDG 185 387,300 387,300 387,300

Clarion 2005 352 92622 Fenstermaker RR Br Rem U BRDG 581 37,200 37,200 37,200

Clarion 2005 352 92622 Fenstermaker RR Br Rem R BRDG 581 51,500 51,500 51,500

Clarion 2005 352 92622 Fenstermaker RR Br Rem C BRDG 581 1,909,700 1,909,700 1,909,700

Clarion 2007 353 97016 Clarion Bridges over I-80 +F BRDG STP 815,000 815,000 815,000

Clarion 2007 353 97016 Clarion Bridges over I-80 C BRDG BOF 630,000 185 497,210 1,127,210 1,127,210

Clarion 2007 353 97016 Clarion Bridges over I-80 C BRDG STP 1,429,000 1,429,000 1,429,000

Clarion 2007 353 97016 Clarion Bridges over I-80 C BRDG BOF 630,000 630,000 630,000

Clarion 2007 353 97016 Clarion Bridges over I-80 C BRDG STP 483,300 483,300 483,300

Clarion 2025 0 74289 Potter Road Bridge F IMAN 185 1,184,500 1,184,500 1,184,500

Clarion 2025 0 74289 Potter Road Bridge U IMAN 185 26,523 26,523 26,523

Clarion 2025 0 74289 Potter Road Bridge C IMAN 185 3,312,660 3,312,660 3,312,660

Clarion 2025 0 74289 Potter Road Bridge C IMAN 185 3,312,660 3,312,660 3,312,660

Clarion 3004 350 83246 Kissinger Mills Bridge #1 F BRDG 185 311,500 311,500 311,500

Clarion 3020 350 25224 Alum Rock Bridge #3 +F BRDG STP 309,000 309,000 309,000

Clarion 3020 350 25224 Alum Rock Bridge #3 +U BRDG STP 53,100 53,100 53,100

Clarion 3020 350 25224 Alum Rock Bridge #3 +R BRDG STP 77,300 77,300 77,300

Clarion 3020 350 25224 Alum Rock Bridge #3 C BRDG 185 531,490 531,490 531,490

Clarion 3020 350 25224 Alum Rock Bridge #3 C BRDG 185 1,061,000 1,061,000 1,061,000

Clarion 4005 350 25248 SR 4005 Canoe Furnace Br. C BRDG 581 1,699,500 1,699,500 1,699,500

Clarion 4035 350 83265 Eisenman Bridge C BRDG 185 288,400 288,400 288,400

Clarion 7211 BR 25023 T-442 Wildcat Run Bridge C BRDG BOF 576,800 183 108,150 36,050 721,000 721,000

Totals for: Clarion 3,186,000 12,717,500 36,050 15,939,550 3,656,998 16,402,183 20,059,181 3,891,720 12,352,660 16,244,380 4,501,470 9,040,000 13,541,470 65,784,581

Clearfield 84344 SD Bridge Line Item C BRDG STP 13,139 13,139 13,139

Clearfield 84344 SD Bridge Line Item C HRST STP 263,092 581 354,008 617,100 617,100

Clearfield 104346Act 13 SD Brdg Clearfield C BRDG 20,650 20,650 20,650

Clearfield 88619 Local Retro's C BRDG 183 750,000 750,000 750,000

Clearfield 88619 Local Retro's C BRDG 183 750,000 750,000 750,000

Clearfield 88619 Local Retro's C BRDG 183 750,000 750,000 750,000

Clearfield 88619 Local Retro's C BRDG 183 750,000 750,000 750,000

Clearfield R02 102732Riverview Rd RR Warn Dev +C SAMI RRX 196,965 196,965 196,965

Clearfield R03 102734Nichols St RR Warn Dev +C SAMI RRX 196,965 196,965 196,965

Clearfield SAF 75813 Line Item Safety C SAMI HSIP 324,234 324,234 324,234

Page 68: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

68 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clearfield SAF 75813 Line Item Safety C SAMI HSIP 80,530 80,530 80,530

Clearfield 36 A04 69431 SR 36 over Wilson Run P BRDG 185 309,000 309,000 309,000

Clearfield 36 A04 69431 SR 36 over Wilson Run +F BRDG STP 218,545 218,545 218,545

Clearfield 36 A04 69431 SR 36 over Wilson Run +U BRDG STP 59,703 59,703 59,703

Clearfield 36 A04 69431 SR 36 over Wilson Run +R BRDG STP 54,636 54,636 54,636

Clearfield 36 A04 69431 SR 36 over Wilson Run +C BRDG STP 410,121 410,121 410,121

Clearfield 36 A05 85131 SR 36 over Snyder Run P BRDG 185 309,000 309,000 309,000

Clearfield 36 A05 85131 SR 36 over Snyder Run F BRDG 185 218,545 218,545 218,545

Clearfield 36 A05 85131 SR 36 over Snyder Run U BRDG 185 65,239 65,239 65,239

Clearfield 36 A05 85131 SR 36 over Snyder Run R BRDG 185 63,339 63,339 63,339

Clearfield 36 A05 85131 SR 36 over Snyder Run C BRDG 185 844,132 844,132 844,132

Clearfield 36 A07 72461 SR 36 over Chest Creek P BRDG 185 309,000 309,000 309,000

Clearfield 36 A07 72461 SR 36 over Chest Creek F BRDG 185 218,545 218,545 218,545

Clearfield 36 A07 72461 SR 36 over Chest Creek U BRDG 185 56,275 56,275 56,275

Clearfield 36 A07 72461 SR 36 over Chest Creek R BRDG 185 54,636 54,636 54,636

Clearfield 36 A07 72461 SR 36 over Chest Creek C BRDG 185 844,132 844,132 844,132

Clearfield 36 A08 64677 2017 N. Central Br. Pres. +P BRDG STP 106,090 106,090 106,090

Clearfield 36 A08 64677 2017 N. Central Br. Pres. C BRDG STP 782,026 185 711,422 1,493,448 1,493,448

Clearfield 53 A07 69482 Branch Clearfield Ck Brdg F BRDG 185 75,000 75,000 75,000

Clearfield 53 A07 69482 Branch Clearfield Ck Brdg C BRDG 581 400,000 400,000 400,000

Clearfield 53 A07 69482 Branch Clearfield Ck Brdg C BRDG 581 700,000 700,000 700,000

Clearfield 53 A09 69370 SR 53 Maplepole Run STA F BRDG 185 276,460 276,460 276,460

Clearfield 53 A09 69370 SR 53 Maplepole Run STA U BRDG 185 56,275 56,275 56,275

Clearfield 53 A09 69370 SR 53 Maplepole Run STA R BRDG 185 54,636 54,636 54,636

Clearfield 53 A09 69370 SR 53 Maplepole Run STA C BRDG 185 765,146 765,146 765,146

Clearfield 53 A09 69370 SR 53 Maplepole Run STA C BRDG 185 360,363 360,363 360,363

Clearfield 80 B41 87729 I-80 over SR 970 BRPL P IMAN 185 546,393 546,393 546,393

Clearfield 80 B41 87729 I-80 over SR 970 BRPL F IMAN 185 562,754 562,754 562,754

Clearfield 80 B44 87694 I-80 Clearfield Culverts P IMAN 185 318,270 318,270 318,270

Clearfield 80 B44 87694 I-80 Clearfield Culverts C IMAN 185 2,185,454 2,185,454 2,185,454

Clearfield 80 B44 87694 I-80 Clearfield Culverts C IMAN 185 2,185,454 2,185,454 2,185,454

Clearfield 153 259 88302 SR 153 Paving I F HRST STP 1 1 1

Clearfield 153 259 88302 SR 153 Paving I R HRST 581 100,000 100,000 100,000

Clearfield 153 259 88302 SR 153 Paving I C HRST 581 1,278,630 1,278,630 1,278,630

Clearfield 153 259 88302 SR 153 Paving I C HRST 581 3,291,999 3,291,999 3,291,999

Clearfield 153 259 88302 SR 153 Paving I C HRST 581 250,572 250,572 250,572

Clearfield 153 266 96271 Penfield North Resurface P HRST 581 200,000 200,000 200,000

Clearfield 153 266 96271 Penfield North Resurface C HRST 581 6,000,000 6,000,000 6,000,000

Clearfield 153 266 96271 Penfield North Resurface C HRST 581 2,000,000 2,000,000 2,000,000

Clearfield 219 A05 3565 US 219/Kings Run P BRDG NHPP 300,000 300,000 300,000

Page 69: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

69 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clearfield 219 A05 3565 US 219/Kings Run +F BRDG NHPP 225,000 225,000 225,000

Clearfield 219 A05 3565 US 219/Kings Run +U BRDG NHPP 56,275 56,275 56,275

Clearfield 219 A05 3565 US 219/Kings Run +R BRDG NHPP 54,636 54,636 54,636

Clearfield 219 A05 3565 US 219/Kings Run +C BRDG NHPP 900,407 900,407 900,407

Clearfield 219 A09 88655 US 219 over Laurel Rn STA F BRDG 185 265,225 265,225 265,225

Clearfield 219 A09 88655 US 219 over Laurel Rn STA U BRDG 185 54,636 54,636 54,636

Clearfield 219 A09 88655 US 219 over Laurel Rn STA R BRDG 185 53,045 53,045 53,045

Clearfield 219 A09 88655 US 219 over Laurel Rn STA C BRDG 185 1,202,000 1,202,000 1,202,000

Clearfield 219 A16 85198 SR 219 over Martin Run +P BRDG NHPP 600,000 600,000 600,000

Clearfield 219 A16 85198 SR 219 over Martin Run +F BRDG NHPP 500,000 500,000 500,000

Clearfield 219 A16 85198 SR 219 over Martin Run +U BRDG NHPP 104,636 104,636 104,636

Clearfield 219 A16 85198 SR 219 over Martin Run +R BRDG NHPP 104,636 104,636 104,636

Clearfield 219 A16 85198 SR 219 over Martin Run +C BRDG NHPP 403,225 403,225 403,225

Clearfield 253 A02 85082 SR 253 Br Lit Mudy Rn STA F BRDG 185 50,000 50,000 50,000

Clearfield 253 A02 85082 SR 253 Br Lit Mudy Rn STA U BRDG 185 106,090 106,090 106,090

Clearfield 253 A02 85082 SR 253 Br Lit Mudy Rn STA R BRDG 185 31,827 31,827 31,827

Clearfield 253 A02 85082 SR 253 Br Lit Mudy Rn STA C BRDG 185 600,000 600,000 600,000

Clearfield 253 A02 85082 SR 253 Br Lit Mudy Rn STA C BRDG 185 566,990 566,990 566,990

Clearfield 255 A05 3407 PA 255/Tyler Run Br. STA P BRDG 185 50,000 50,000 50,000

Clearfield 255 A05 3407 PA 255/Tyler Run Br. STA U BRDG 185 103,000 103,000 103,000

Clearfield 255 A05 3407 PA 255/Tyler Run Br. STA R BRDG 185 50,000 50,000 50,000

Clearfield 255 A05 3407 PA 255/Tyler Run Br. STA C BRDG 185 1,166,990 1,166,990 1,166,990

Clearfield 322 264 102808Brewery Hill to Clfd Crk +P SAMI HSIP 315,000 315,000 315,000

Clearfield 322 267 93329 Philipsburg Add Center Ln P SAMI HSIP 334,986 581 37,221 372,207 372,207

Clearfield 322 267 93329 Philipsburg Add Center Ln F HRST CAQ 524,000 581 131,000 655,000 655,000

Clearfield 322 267 93329 Philipsburg Add Center Ln C HRST 581 6,421,000 6,421,000 6,421,000

Clearfield 322 A04 88173 US 322 ov Laurel Rn Brdg F BRDG NHPP 375,950 375,950 375,950

Clearfield 322 A04 88173 US 322 ov Laurel Rn Brdg U BRDG NHPP 106,090 106,090 106,090

Clearfield 322 A04 88173 US 322 ov Laurel Rn Brdg R BRDG NHPP 103,000 103,000 103,000

Clearfield 322 A04 88173 US 322 ov Laurel Rn Brdg +C BRDG NHPP 2,813,564 2,813,564 2,813,564

Clearfield 322 A04 88173 US 322 ov Laurel Rn Brdg +C BRDG NHPP 899,586 899,586 899,586

Clearfield 322 N30 93675 SR322 Walker's Approach F SAMI HSIP 202,500 581 47,500 250,000 250,000

Clearfield 322 N30 93675 SR322 Walker's Approach U SAMI CAQ 92,700 581 18,540 111,240 111,240

Clearfield 322 N30 93675 SR322 Walker's Approach R SAMI HSIP 45,000 581 5,000 50,000 50,000

Clearfield 322 N30 93675 SR322 Walker's Approach C HRST CAQ 431,300 431,300 431,300

Clearfield 322 N30 93675 SR322 Walker's Approach C HRST CAQ 524,000 581 131,000 655,000 655,000

Clearfield 322 N30 93675 SR322 Walker's Approach C HRST CAQ 524,000 581 131,000 655,000 655,000

Clearfield 879 A10 69465 PA 879 ov Trout Run Super F BRDG 185 256,738 256,738 256,738

Clearfield 879 A10 69465 PA 879 ov Trout Run Super U BRDG 185 53,045 53,045 53,045

Clearfield 879 A10 69465 PA 879 ov Trout Run Super R BRDG 185 53,045 53,045 53,045

Page 70: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

70 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clearfield 879 A10 69465 PA 879 ov Trout Run Super +C BRDG STP 300,000 300,000 300,000

Clearfield 879 A10 69465 PA 879 ov Trout Run Super +C BRDG STP 527,890 527,890 527,890

Clearfield 879 A10 69465 PA 879 ov Trout Run Super +C BRDG STP 1,400,000 1,400,000 1,400,000

Clearfield 970 A01 3569 Shawville Truss DB C BRDG 185 508,300 508,300 508,300

Clearfield 1001 0 92420 NC Bridge Planks C BRDG 185 120,000 120,000 120,000

Clearfield 1001 0 92420 NC Bridge Planks C BRDG 185 200,000 200,000 200,000

Clearfield 1004 263 96253 SR 1004 Woodland Rd P SAMI 581 35,000 35,000 35,000

Clearfield 1011 A03 95780 Rolling Stone Run BOX P BRDG 185 40,000 40,000 40,000

Clearfield 1011 A03 95780 Rolling Stone Run BOX U BRDG 185 26,522 26,522 26,522

Clearfield 1011 A03 95780 Rolling Stone Run BOX R BRDG 185 26,522 26,522 26,522

Clearfield 1011 A03 95780 Rolling Stone Run BOX C BRDG 185 318,270 318,270 318,270

Clearfield 2009 0 85094 SR 2009 Alexander Run BOX P BRDG 185 196,961 196,961 196,961

Clearfield 2009 0 85094 SR 2009 Alexander Run BOX U BRDG 185 28,138 28,138 28,138

Clearfield 2009 0 85094 SR 2009 Alexander Run BOX R BRDG 185 28,138 28,138 28,138

Clearfield 2009 0 85094 SR 2009 Alexander Run BOX C BRDG 185 299,000 299,000 299,000

Clearfield 2010 A01 56831 SR 2010 Beaver Run Super C BRDG 185 80,000 80,000 80,000

Clearfield 2013 BEM 96558 NC Channel Beams C BRDG 185 100,000 100,000 100,000

Clearfield 2013 BEM 96558 NC Channel Beams C BRDG 185 200,000 200,000 200,000

Clearfield 2015 A01 85096 Porter Run BOX Culvert C BRDG 185 75,000 75,000 75,000

Clearfield 2023 A01 85114 SR 2023 ov Ltl Clfd Creek +U BRDG BOF 53,045 53,045 53,045

Clearfield 2023 A01 85114 SR 2023 ov Ltl Clfd Creek +R BRDG STP 51,500 51,500 51,500

Clearfield 2023 A01 85114 SR 2023 ov Ltl Clfd Creek C BRDG BOF 454,008 581 545,992 1,000,000 1,000,000

Clearfield 2023 A01 85114 SR 2023 ov Ltl Clfd Creek C BRDG 581 750,000 750,000 750,000

Clearfield 2024 A04 85115 SR 2024 ov Simelng Rn BOX P BRDG 185 180,000 180,000 180,000

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing P HRST 581 100,000 100,000 100,000

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing U HRST 581 100,000 100,000 100,000

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing R HRST 581 106,090 106,090 106,090

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing C HRST 581 1,500,000 1,500,000 1,500,000

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing C HRST 581 4,657,431 4,657,431 4,657,431

Clearfield 2030 261 93346 Allprt Cutoff Resurfacing C HRST 581 375,000 375,000 375,000

Clearfield 2035 A01 3618 Sulphur Run Bridge C BRDG 185 50,000 50,000 50,000

Clearfield 3001 A02 69470 SR 3001 ov Deer Rn BOX P BRDG 185 180,000 180,000 180,000

Clearfield 3001 A02 69470 SR 3001 ov Deer Rn BOX U BRDG 185 28,982 28,982 28,982

Clearfield 3001 A02 69470 SR 3001 ov Deer Rn BOX R BRDG 185 28,982 28,982 28,982

Clearfield 3007 A03 98081 SR 3007 ov Big Run BOX P BRDG 185 184,500 184,500 184,500

Clearfield 3007 A03 98081 SR 3007 ov Big Run BOX U BRDG 185 26,522 26,522 26,522

Clearfield 3007 A03 98081 SR 3007 ov Big Run BOX R BRDG 185 26,522 26,522 26,522

Clearfield 3007 A03 98081 SR 3007 ov Big Run BOX C BRDG 185 300,500 300,500 300,500

Clearfield 4019 R95 102726DuBois St RR Preemption C SAMI RRX 159,135 159,135 159,135

Totals for: Clearfield 4,065,545 9,275,666 20,650 13,361,861 3,902,789 14,640,646 18,543,435 4,051,866 13,658,681 17,710,547 4,171,916 14,396,950 18,568,866 68,184,709

Page 71: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

71 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clinton 000 68128 Reserve Line Item Safety C SAMI HSIP 233,149 233,149 233,149

Clinton BPR 82367 Hwy and Bridge Line Item C BRDG STP 209,766 209,766 209,766

Clinton BPR 82367 Hwy and Bridge Line Item C BRDG BOF 966,777 966,777 966,777

Clinton BPR 82367 Hwy and Bridge Line Item C HRST NHPP 8,679,806 581 8,206,000 16,885,806 16,885,806

Clinton BPR 82367 Hwy and Bridge Line Item C HRST NHPP 1,897,717 581 8,591,283 10,489,000 10,489,000

Clinton BPR 82367 Hwy and Bridge Line Item C HRST 581 108,237 108,237 108,237

Clinton BPR 82367 Hwy and Bridge Line Item C HRST 581 1,380,511 1,380,511 1,380,511

Clinton 44 P13 69514 2015 SEDA-COG Bridge Pres P BRDG 185 100,000 100,000 100,000

Clinton 44 P13 69514 2015 SEDA-COG Bridge Pres C BRDG BOF 251,101 185 289,319 540,420 540,420

Clinton 44 P13 69514 2015 SEDA-COG Bridge Pres C BRDG STP 1,000,000 1,000,000 1,000,000

Clinton 44 P13 69514 2015 SEDA-COG Bridge Pres C BRDG BOF 277,986 185 850,000 1,127,986 1,127,986

Clinton 64 A01 81393 Fishing Creek III C BRDG STP 2,200,000 2,200,000 2,200,000

Clinton 64 A02 89985 Big Fishing Creek Br 2 P BRDG 185 200,000 200,000 200,000

Clinton 64 A02 89985 Big Fishing Creek Br 2 F BRDG 185 325,000 325,000 325,000

Clinton 64 A02 89985 Big Fishing Creek Br 2 U BRDG 185 106,090 106,090 106,090

Clinton 64 A02 89985 Big Fishing Creek Br 2 R BRDG 185 53,045 53,045 53,045

Clinton 64 A02 89985 Big Fishing Creek Br 2 C BRDG STP 1,068,749 185 100,000 1,168,749 1,168,749

Clinton 120 0 104354Group 2-15-ST92 C HRST 581 5,000,000 5,000,000 5,000,000

Clinton 120 318 3806 SR 120 Slide Safety Imprv C HRST 581 3,811,000 3,811,000 3,811,000

Clinton 120 319 99985 Bucktail Trail Hwy II P HRST 581 4,886 4,886 4,886

Clinton 120 320 93310 Paul Mack Boulevard P HRST 581 230,000 230,000 230,000

Clinton 120 320 93310 Paul Mack Boulevard P HRST 581 133,308 133,308 133,308

Clinton 120 320 93310 Paul Mack Boulevard C HRST 581 5,000,000 5,000,000 5,000,000

Clinton 120 A09 3797 PA 120/Montours Run P BRDG 185 377,000 377,000 377,000

Clinton 120 A09 3797 PA 120/Montours Run F BRDG 185 289,819 289,819 289,819

Clinton 120 A09 3797 PA 120/Montours Run U BRDG 185 115,927 115,927 115,927

Clinton 120 A09 3797 PA 120/Montours Run R BRDG 185 115,927 115,927 115,927

Clinton 120 A09 3797 PA 120/Montours Run C BRDG 185 925,000 925,000 925,000

Clinton 120 A14 69493 Mill Run Bridge P BRDG 185 377,000 377,000 377,000

Clinton 120 A14 69493 Mill Run Bridge F BRDG 185 289,819 289,819 289,819

Clinton 120 A14 69493 Mill Run Bridge U BRDG 185 115,927 115,927 115,927

Clinton 120 A14 69493 Mill Run Bridge R BRDG 185 115,927 115,927 115,927

Clinton 120 A14 69493 Mill Run Bridge C BRDG 185 925,000 925,000 925,000

Clinton 150 N33 93343 Lock Haven Signal Impmnts P SAMI 581 334,184 334,184 334,184

Clinton 150 N34 101959Lock Haven Safety Project P SAMI HSIP 334,184 581 37,132 371,316 371,316

Clinton 150 N34 101959Lock Haven Safety Project F SAMI HSIP 379,859 581 42,207 422,066 422,066

Clinton 150 N34 101959Lock Haven Safety Project U SAMI HSIP 101,296 581 11,255 112,551 112,551

Clinton 150 N34 101959Lock Haven Safety Project R SAMI HSIP 101,296 581 11,255 112,551 112,551

Clinton 150 R94 96703 Lock Haven RR Warn Dev +C SAMI RRX 707,267 707,267 707,267

Clinton 150 R94 96703 Lock Haven RR Warn Dev +C SAMI RRX 707,267 707,267 707,267

Page 72: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

72 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Clinton 150 R94 96703 Lock Haven RR Warn Dev +C SAMI RRX 707,266 707,266 707,266

Clinton 220 C08 88526 0220 Pavement Restoration C HRST NHPP 500,000 500,000 500,000

Clinton 220 N32 94746 Auction Road Phase II C SAMI HSIP 815,600 815,600 815,600

Clinton 220 N32 94746 Auction Road Phase II C SAMI NHPP 4,606,876 4,606,876 4,606,876

Clinton 220 N32 94746 Auction Road Phase II C SAMI HSIP 481,416 481,416 481,416

Clinton 220 N32 94746 Auction Road Phase II C SAMI HSIP 815,600 815,600 815,600

Clinton 1002 A01 3863 Chatham Run Bridge C BRDG 185 650,874 650,874 650,874

Clinton 1002 A01 3863 Chatham Run Bridge C BRDG 185 457,106 457,106 457,106

Clinton 1004 A01 3798 Plum Run BOX STA P BRDG 185 50,000 50,000 50,000

Clinton 1004 A01 3798 Plum Run BOX STA U BRDG 185 25,750 25,750 25,750

Clinton 1004 A01 3798 Plum Run BOX STA R BRDG 185 25,750 25,750 25,750

Clinton 1004 A01 3798 Plum Run BOX STA C BRDG 185 291,748 291,748 291,748

Clinton 1004 A02 93272 Little Plum Run BOX P BRDG 185 180,000 180,000 180,000

Clinton 1004 A02 93272 Little Plum Run BOX U BRDG 185 54,636 54,636 54,636

Clinton 1004 A02 93272 Little Plum Run BOX R BRDG 185 27,318 27,318 27,318

Clinton 1004 A02 93272 Little Plum Run BOX C BRDG 185 299,000 299,000 299,000

Clinton 1008 A02 93274 Plum Run BOX P BRDG 185 180,000 180,000 180,000

Clinton 1008 A02 93274 Plum Run BOX U BRDG 185 33,765 33,765 33,765

Clinton 1008 A02 93274 Plum Run BOX R BRDG 185 28,138 28,138 28,138

Clinton 1010 A02 93301 Mill Race BOX P BRDG 185 180,000 180,000 180,000

Clinton 1020 A01 93940 SR 1020 Mill Hall Rn BOX P BRDG 185 180,000 180,000 180,000

Clinton 1020 A01 93940 SR 1020 Mill Hall Rn BOX U BRDG 185 42,436 42,436 42,436

Clinton 1020 A01 93940 SR 1020 Mill Hall Rn BOX R BRDG 185 26,523 26,523 26,523

Clinton 1020 A01 93940 SR 1020 Mill Hall Rn BOX C BRDG 185 299,000 299,000 299,000

Clinton 2008 A01 3820 Long Run BOX P BRDG 185 50,000 50,000 50,000

Clinton 2008 A01 3820 Long Run BOX C BRDG 185 200,000 200,000 200,000

Clinton 2012 A04 4601 2018 SEDA-COG P BRDG 185 163,909 163,909 163,909

Clinton 2012 A04 4601 2018 SEDA-COG C BRDG BOF 503,412 503,412 503,412

Clinton 2012 A04 4601 2018 SEDA-COG C BRDG STP 1,000,000 1,000,000 1,000,000

Clinton 4001 0 92421 SC Bridge Channel beams C BRDG 185 100,000 100,000 100,000

Clinton 7217 0 101406T-478 Chatham Run II C BRDG 183 121,937 30,484 152,421 152,421

Totals for: Clinton 9,083,343 11,901,753 30,484 21,015,580 2,300,853 9,217,083 11,517,936 11,169,450 9,974,209 21,143,659 5,992,744 11,146,903 17,139,647 70,816,822

Columbia 104290T-406 Slate Rd ov Spr Run C BRDG 99,000 99,000 99,000

Columbia 000 68016 3-0 SD Bridge Line Item C BRDG BOF 148,000 185 8,875 156,875 156,875

Columbia 000 68016 3-0 SD Bridge Line Item C BRDG STP 90,000 185 303,250 393,250 393,250

Columbia 000 68016 3-0 SD Bridge Line Item C BRDG 185 896,750 896,750 896,750

Columbia 000 68016 3-0 SD Bridge Line Item C HRST NHPP 1,096,000 581 17,065 1,113,065 1,113,065

Columbia 000 68016 3-0 SD Bridge Line Item C HRST STP 180,260 180,260 180,260

Columbia 000 68016 3-0 SD Bridge Line Item C HRST 581 100,000 100,000 100,000

Columbia 000 68016 3-0 SD Bridge Line Item C HRST 581 450,000 450,000 450,000

Page 73: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

73 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Columbia 000 68016 3-0 SD Bridge Line Item C SAMI HSIP 652,200 652,200 652,200

Columbia 000 68016 3-0 SD Bridge Line Item C SAMI HSIP 1,223,400 1,223,400 1,223,400

Columbia LBR 5377 T-812 over Coles Creek P BRDG BOF 144,000 183 27,000 9,000 180,000 180,000

Columbia LBR 5377 T-812 over Coles Creek F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Columbia LBR 5377 T-812 over Coles Creek U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Columbia LBR 5377 T-812 over Coles Creek R BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Columbia LBR 5377 T-812 over Coles Creek C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Columbia LBR 5377 T-812 over Coles Creek C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Columbia LBR 93624 T-667 over Raven Creek P BRDG BOF 10,000 183 15,000 5,000 30,000 30,000

Columbia LBR 93624 T-667 over Raven Creek P BRDG STP 70,000 70,000 70,000

Columbia LBR 93624 T-667 over Raven Creek P BRDG STP 80,000 183 15,000 5,000 100,000 100,000

Columbia LBR 93624 T-667 over Raven Creek F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Columbia LBR 93624 T-667 over Raven Creek U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Columbia LBR 93624 T-667 over Raven Creek R BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Columbia RBR 102020T-341 Locust Twp. C BRDG 183 140,000 35,000 175,000 175,000

Columbia RBR 102020T-341 Locust Twp. C BRDG 183 140,000 35,000 175,000 175,000

Columbia RRX 90615 Scott Twp. RR Xings C SAMI RRX* 250,000 250,000 250,000

Columbia 11 114 94702 East Main St to 6th St F HCON 581 200,000 200,000 200,000

Columbia 11 114 94702 East Main St to 6th St +C HCON NHPP 591,000 591,000 591,000

Columbia 11 115 98962 6th St to Park St F HRST 581 10,000 10,000 10,000

Columbia 11 115 98962 6th St to Park St +C HRST NHPP 300,000 300,000 300,000

Columbia 42 060 5560 SR 42 over Roaring Creek P BRDG STP 25,000 25,000 25,000

Columbia 42 060 5560 SR 42 over Roaring Creek +C BRDG STP 681,500 681,500 681,500

Columbia 42 060 5560 SR 42 over Roaring Creek +C BRDG STP 781,500 781,500 781,500

Columbia 42 068 93505 SR 42 over US 11 C BRDG STR 128,000 128,000 128,000

Columbia 44 061 100406SR 42 to Fire Hall Road P HCON 581 50,000 50,000 50,000

Columbia 44 061 100406SR 42 to Fire Hall Road F HCON 581 100,000 100,000 100,000

Columbia 44 061 100406SR 42 to Fire Hall Road C HCON 581 500,000 500,000 500,000

Columbia 80 112 95174 I-80/US 11 Phase B ITS C SAMI NHPP 2,039,400 581 226,600 2,266,000 2,266,000

Columbia 80 136 93697 Paper Mill Rd to US 11 P IMAN 581 819,545 819,545 819,545

Columbia 80 136 93697 Paper Mill Rd to US 11 F IMAN 581 619,030 619,030 619,030

Columbia 93 009 87998 SR 93 over Br Briar Creek U BRDG 185 70,000 70,000 70,000

Columbia 93 009 87998 SR 93 over Br Briar Creek R BRDG 185 10,000 10,000 10,000

Columbia 93 009 87998 SR 93 over Br Briar Creek C BRDG 185 200,000 200,000 200,000

Columbia 93 009 87998 SR 93 over Br Briar Creek C BRDG 185 400,000 400,000 400,000

Columbia 93 08M 87883 US 11 to Slowick Road F HRST 581 25,000 25,000 25,000

Columbia 93 08M 87883 US 11 to Slowick Road C HRST 581 1,450,000 1,450,000 1,450,000

Columbia 93 08M 87883 US 11 to Slowick Road C HRST 581 850,000 850,000 850,000

Columbia 239 018 74029 SR 239 over West Creek +C BRDG STP 1,290,000 1,290,000 1,290,000

Columbia 254 26M 87885 Lt Fishing Crk to SR 4041 F HRST 581 30,000 30,000 30,000

Page 74: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

74 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Columbia 254 26M 87885 Lt Fishing Crk to SR 4041 C HRST 581 299,657 299,657 299,657

Columbia 339 015 5585 SR 339 over Beaver Run P BRDG 185 40,000 40,000 40,000

Columbia 339 015 5585 SR 339 over Beaver Run F HRST 185 20,000 20,000 20,000

Columbia 339 015 5585 SR 339 over Beaver Run U BRDG 185 30,000 30,000 30,000

Columbia 339 015 5585 SR 339 over Beaver Run R BRDG 185 25,000 25,000 25,000

Columbia 339 06M 87882 West St to Luzerne Co +F HRST STP 150,000 150,000 150,000

Columbia 339 06M 87882 West St to Luzerne Co U HRST 581 850,000 850,000 850,000

Columbia 339 06M 87882 West St to Luzerne Co U HRST 581 250,000 250,000 250,000

Columbia 339 06M 87882 West St to Luzerne Co R HRST 581 200,000 200,000 200,000

Columbia 339 06M 87882 West St to Luzerne Co C HRST 581 1,350,000 1,350,000 1,350,000

Columbia 339 06M 87882 West St to Luzerne Co C HRST 581 3,703,200 3,703,200 3,703,200

Columbia 339 06M 87882 West St to Luzerne Co C SAMI HSIP 1,223,400 1,223,400 1,223,400

Columbia 339 06M 87882 West St to Luzerne Co C SAMI HSIP 1,223,400 1,223,400 1,223,400

Columbia 442 008 87988 SR 442 ov West Branch Run +C BRDG STP 681,500 681,500 681,500

Columbia 442 008 87988 SR 442 ov West Branch Run +C BRDG STP 718,500 718,500 718,500

Columbia 442 022 99071 Lyc Co Line to PA 42 C HRST 581 200,000 200,000 200,000

Columbia 442 022 99071 Lyc Co Line to PA 42 C HRST 581 500,000 500,000 500,000

Columbia 487 060 88797 SR 487 ov Tb Fishing Crk +P BRDG STP 200,000 200,000 200,000

Columbia 487 060 88797 SR 487 ov Tb Fishing Crk +F BRDG STP 175,000 175,000 175,000

Columbia 487 060 88797 SR 487 ov Tb Fishing Crk +U BRDG STP 40,000 40,000 40,000

Columbia 487 060 88797 SR 487 ov Tb Fishing Crk +R BRDG STP 40,000 40,000 40,000

Columbia 487 093 99096 PA 239 to PA 118 C HRST 581 650,000 650,000 650,000

Columbia 487 093 99096 PA 239 to PA 118 C HRST 581 650,000 650,000 650,000

Columbia 487 095 97695 Hollow Rd to PA 239 F HRST 581 20,000 20,000 20,000

Columbia 487 095 97695 Hollow Rd to PA 239 C HRST 581 400,000 400,000 400,000

Columbia 487 095 97695 Hollow Rd to PA 239 C HRST 581 2,000,000 2,000,000 2,000,000

Columbia 487 096 91431 SR487 over Tb Fishing Crk +P BRDG STP 200,000 200,000 200,000

Columbia 487 096 91431 SR487 over Tb Fishing Crk +F BRDG STP 175,000 175,000 175,000

Columbia 1012 007 98396 SR 1012 ov Tb Briar Creek P BRDG 185 40,000 40,000 40,000

Columbia 1013 011 98398 SR 1013 over Strong Brook P BRDG 185 40,000 40,000 40,000

Columbia 1017 012 93579 SR 1017 over Br Briar Crk P BRDG 185 40,000 40,000 40,000

Columbia 1017 012 93579 SR 1017 over Br Briar Crk F BRDG 185 25,000 25,000 25,000

Columbia 1017 012 93579 SR 1017 over Br Briar Crk U BRDG 185 30,000 30,000 30,000

Columbia 1017 012 93579 SR 1017 over Br Briar Crk R BRDG 185 25,000 25,000 25,000

Columbia 1017 012 93579 SR 1017 over Br Briar Crk C BRDG 185 150,000 150,000 150,000

Columbia 1019 013 97754 Martzville Rd to SR 1025 +C HRST 581 400,000 400,000 400,000

Columbia 1020 006 82774 SR 1020 over Pine Creek F BRDG 185 10,000 10,000 10,000

Columbia 1020 006 82774 SR 1020 over Pine Creek R BRDG 185 20,000 20,000 20,000

Columbia 1020 006 82774 SR 1020 over Pine Creek C BRDG 185 446,125 446,125 446,125

Columbia 1020 008 88051 SR 1020 over Fishing Crk F BRDG 185 20,000 20,000 20,000

Page 75: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

75 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Columbia 1020 008 88051 SR 1020 over Fishing Crk U BRDG 185 30,000 30,000 30,000

Columbia 1020 008 88051 SR 1020 over Fishing Crk R BRDG 185 25,000 25,000 25,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk P BRDG 185 20,000 20,000 20,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk P BRDG 185 20,000 20,000 20,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk F BRDG 185 20,000 20,000 20,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk U BRDG 185 20,000 20,000 20,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk R BRDG 185 20,000 20,000 20,000

Columbia 1025 013 97557 SR 1025 ov E Br Briar Crk C BRDG 185 150,000 150,000 150,000

Columbia 1033 002 5636 SR 1033 over Pine Creek U BRDG 185 10,000 10,000 10,000

Columbia 1033 002 5636 SR 1033 over Pine Creek C BRDG 185 75,000 75,000 75,000

Columbia 1033 002 5636 SR 1033 over Pine Creek C BRDG 185 75,000 75,000 75,000

Columbia 1035 008 98404 SR 1035 over Raven Creek P BRDG 185 40,000 40,000 40,000

Columbia 2003 005 93580 SR 2003 over Mill Creek P BRDG 185 45,000 45,000 45,000

Columbia 2003 005 93580 SR 2003 over Mill Creek F BRDG 185 25,000 25,000 25,000

Columbia 2003 005 93580 SR 2003 over Mill Creek U BRDG 185 35,000 35,000 35,000

Columbia 2003 005 93580 SR 2003 over Mill Creek R BRDG 185 25,000 25,000 25,000

Columbia 2005 005 88034 SR 2005 over Roaring Crk P BRDG 185 40,000 40,000 40,000

Columbia 2005 006 5637 SR 2005 ov Tb Roaring Crk P BRDG 185 40,000 40,000 40,000

Columbia 2009 007 93522 SR2009ov Tb Catawissa Crk F BRDG 185 20,000 20,000 20,000

Columbia 2009 007 93522 SR2009ov Tb Catawissa Crk U BRDG 185 30,000 30,000 30,000

Columbia 2009 007 93522 SR2009ov Tb Catawissa Crk R BRDG 185 25,000 25,000 25,000

Columbia 2009 007 93522 SR2009ov Tb Catawissa Crk C BRDG 185 150,000 150,000 150,000

Columbia 2018 009 93515 SR2018ovTb Catawissa Crk F BRDG 185 20,000 20,000 20,000

Columbia 2018 009 93515 SR2018ovTb Catawissa Crk U BRDG 185 20,000 20,000 20,000

Columbia 2018 009 93515 SR2018ovTb Catawissa Crk R BRDG 185 20,000 20,000 20,000

Columbia 2018 009 93515 SR2018ovTb Catawissa Crk C BRDG 185 119,938 119,938 119,938

Columbia 2018 009 93515 SR2018ovTb Catawissa Crk C BRDG 185 30,062 30,062 30,062

Columbia 3014 006 93578 SR3014 over Tb Susq River P BRDG 185 40,000 40,000 40,000

Columbia 3014 006 93578 SR3014 over Tb Susq River F BRDG 185 20,000 20,000 20,000

Columbia 3014 006 93578 SR3014 over Tb Susq River U BRDG 185 30,000 30,000 30,000

Columbia 3014 006 93578 SR3014 over Tb Susq River R BRDG 185 25,000 25,000 25,000

Columbia 3014 006 93578 SR3014 over Tb Susq River C BRDG 185 150,000 150,000 150,000

Columbia 4008 009 93523 SR 4008 ov Tb Fishing Crk F BRDG 185 20,000 20,000 20,000

Columbia 4008 009 93523 SR 4008 ov Tb Fishing Crk U BRDG 185 30,000 30,000 30,000

Columbia 4008 009 93523 SR 4008 ov Tb Fishing Crk R BRDG 185 25,000 25,000 25,000

Columbia 4008 009 93523 SR 4008 ov Tb Fishing Crk C BRDG 185 104,000 104,000 104,000

Columbia 4008 009 93523 SR 4008 ov Tb Fishing Crk C BRDG 185 46,000 46,000 46,000

Columbia 4021 001 5379 SR 4021 ov Lt Fishing Crk F BRDG 185 10,000 10,000 10,000

Columbia 4036 004 97580 SR 4036 ov Hemlock Creek S BRDG 185 50,000 50,000 50,000

Columbia 4045 003 93516 SR 4045 over Green Creek F BRDG 185 20,000 20,000 20,000

Page 76: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

76 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Columbia 4045 003 93516 SR 4045 over Green Creek U BRDG 185 20,000 20,000 20,000

Columbia 4045 003 93516 SR 4045 over Green Creek R BRDG 185 20,000 20,000 20,000

Columbia 4045 003 93516 SR 4045 over Green Creek C BRDG 185 150,000 150,000 150,000

Totals for: Columbia 6,182,860 3,039,478 113,000 9,335,338 1,521,400 3,456,312 13,000 4,990,712 3,386,400 6,502,295 60,000 9,948,695 4,572,400 9,217,012 68,000 13,857,412 38,132,157

Crawford 000 170 Mead Avenue Bridge P BRDG BOF 32,000 183 8,000 40,000 40,000

Crawford 000 170 Mead Avenue Bridge F BRDG BOF 112,000 179 7,000 119,000 119,000

Crawford 000 170 Mead Avenue Bridge F BRDG 183 21,000 21,000 21,000

Crawford 000 170 Mead Avenue Bridge C BRDG BOF 1,000,000 1,000,000 1,000,000

Crawford 6 B06 78580 SR 6/Trib #4 French Ck F BRDG 185 250,000 250,000 250,000

Crawford 6 B06 78580 SR 6/Trib #4 French Ck R BRDG 185 50,000 50,000 50,000

Crawford 6 B06 78580 SR 6/Trib #4 French Ck C BRDG 185 800,000 800,000 800,000

Crawford 6 B13 573 SR 6 French Creek Br #1 P BRDG 185 250,000 250,000 250,000

Crawford 6 B17 57942 SR 6 - Smock Bridge C BRDG NHPP 2,800,000 185 700,000 3,500,000 3,500,000

Crawford 6 B17 57942 SR 6 - Smock Bridge C BRDG NHPP 2,800,000 185 700,000 3,500,000 3,500,000

Crawford 6 B18 57940 SR 6 Br over French Ck F BRDG 185 500,000 500,000 500,000

Crawford 6 B18 57940 SR 6 Br over French Ck U BRDG 185 100,000 100,000 100,000

Crawford 6 B18 57940 SR 6 Br over French Ck R BRDG 185 400,000 400,000 400,000

Crawford 6 B18 57940 SR 6 Br over French Ck C BRDG 185 2,000,000 2,000,000 2,000,000

Crawford 6 B18 57940 SR 6 Br over French Ck C BRDG 185 2,000,000 2,000,000 2,000,000

Crawford 27 0 103198Grade Crossing SR 27 +C SAMI RRX 180,250 180,250 180,250

Crawford 27 17M 99641 SR 27: Townline Rd-Brkdal C HRST 581 950,000 950,000 950,000

Crawford 27 A02 75045 PA 27/North St. Connector C HRST STP 225,000 581 25,000 250,000 250,000

Crawford 27 B04 74605 SR 27 over Oil Creek Trib P BRDG 581 200,000 200,000 200,000

Crawford 27 B04 74605 SR 27 over Oil Creek Trib F BRDG 581 100,000 100,000 100,000

Crawford 27 B04 74605 SR 27 over Oil Creek Trib U BRDG 581 25,000 25,000 25,000

Crawford 27 B04 74605 SR 27 over Oil Creek Trib R BRDG 581 25,000 25,000 25,000

Crawford 27 B04 74605 SR 27 over Oil Creek Trib C BRDG 581 700,000 700,000 700,000

Crawford 27 B07 89105 SR 27 over Lake Ck Trib P BRDG 581 200,000 200,000 200,000

Crawford 27 B07 89105 SR 27 over Lake Ck Trib F BRDG 581 100,000 100,000 100,000

Crawford 27 B07 89105 SR 27 over Lake Ck Trib U BRDG 581 25,000 25,000 25,000

Crawford 27 B07 89105 SR 27 over Lake Ck Trib R BRDG 581 25,000 25,000 25,000

Crawford 27 B07 89105 SR 27 over Lake Ck Trib C BRDG 581 700,000 700,000 700,000

Crawford 79 A17 91570 I-79: MP 140.4-MP 153.5 F IMAN 581 103,000 103,000 103,000

Crawford 79 A17 91570 I-79: MP 140.4-MP 153.5 +C IMAN NHPP 5,304,500 5,304,500 5,304,500

Crawford 79 A17 91570 I-79: MP 140.4-MP 153.5 +C IMAN NHPP 5,304,500 5,304,500 5,304,500

Crawford 173 B02 579 PA 173 Cochranton Tr Brdg C BRDG RRX 250,460 185 750,000 1,000,460 1,000,460

Crawford 173 B02 579 PA 173 Cochranton Tr Brdg C BRDG STP 3,000,000 3,000,000 3,000,000

Crawford 173 B02 579 PA 173 Cochranton Tr Brdg C BRDG STP 1,800,000 185 450,000 2,250,000 2,250,000

Crawford 198 A01 75050 PA 198 and SR 6 Inter U HRST 581 75,000 75,000 75,000

Crawford 198 A01 75050 PA 198 and SR 6 Inter C HRST 581 2,000,000 2,000,000 2,000,000

Page 77: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

77 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Crawford 198 A02 104143PA 198 and PA 86 Inter U HRST 581 15,000 15,000 15,000

Crawford 198 A02 104143PA 198 and PA 86 Inter C HRST 581 500,000 500,000 500,000

Crawford 198 A03 104144PA 198 and PA 77 Inter U HRST 581 10,000 10,000 10,000

Crawford 198 A03 104144PA 198 and PA 77 Inter C HRST 581 500,000 500,000 500,000

Crawford 198 B04 483 SR198 Brdg/French Creek C BRDG STP 2,000,000 185 500,000 2,500,000 2,500,000

Crawford 198 B04 483 SR198 Brdg/French Creek C SAMI HSIP 1,500,000 1,500,000 1,500,000

Crawford 198 B07 404 SR 198/Coneaut Ck Trib C BRDG 185 700,000 700,000 700,000

Crawford 285 03M 90277 PA 285: Steele's Corridor +C HRST STP 3,500,000 3,500,000 3,500,000

Crawford 285 03M 90277 PA 285: Steele's Corridor +C HRST STP 1,000,000 1,000,000 1,000,000

Crawford 285 B06 90045 SR 285 over Conneaut Ck P BRDG 581 250,000 250,000 250,000

Crawford 285 B06 90045 SR 285 over Conneaut Ck F BRDG 581 100,000 100,000 100,000

Crawford 285 B06 90045 SR 285 over Conneaut Ck U BRDG 581 25,000 25,000 25,000

Crawford 285 B06 90045 SR 285 over Conneaut Ck R BRDG 581 25,000 25,000 25,000

Crawford 285 B06 90045 SR 285 over Conneaut Ck C BRDG 581 700,000 700,000 700,000

Crawford 408 DOI 97865 Crawford DOI 2 Group C HRST 581 1,500,000 1,500,000 1,500,000

Crawford 408 DOI 97865 Crawford DOI 2 Group C HRST 581 600,000 600,000 600,000

Crawford 886 02M 97877 SR 886: SR 27 to Oak St C HRST 581 1,000,000 1,000,000 1,000,000

Crawford 1001 04M 32161 SR 1001: Park Avenue C HRST 581 366,000 366,000 366,000

Crawford 1007 B03 505 SR 1007: Bidley Crns Brdg P BRDG 581 200,000 200,000 200,000

Crawford 1007 B03 505 SR 1007: Bidley Crns Brdg F BRDG 581 150,000 150,000 150,000

Crawford 1007 B03 505 SR 1007: Bidley Crns Brdg U BRDG 581 25,000 25,000 25,000

Crawford 1007 B03 505 SR 1007: Bidley Crns Brdg R BRDG 581 25,000 25,000 25,000

Crawford 1007 B03 505 SR 1007: Bidley Crns Brdg C BRDG 581 600,000 600,000 600,000

Crawford 1024 01M 99644 SR 1024: Lake Road C HRST 581 650,000 650,000 650,000

Crawford 1025 01M 32158 SR 1025: Grant Street C HRST 581 125,000 125,000 125,000

Crawford 1026 01M 99643 SR 1026: Danner Drive C HRST 581 100,000 100,000 100,000

Crawford 1035 01M 99639 SR 1035: Mackey Hill Rd C HRST 581 900,000 900,000 900,000

Crawford 1037 01M 99650 SR 1037: Little Cooley Rd C HRST 581 1,100,000 1,100,000 1,100,000

Crawford 1037 B02 57974 SR 1037: Federal Run Brdg P BRDG 581 200,000 200,000 200,000

Crawford 1037 B02 57974 SR 1037: Federal Run Brdg F BRDG 581 150,000 150,000 150,000

Crawford 1037 B02 57974 SR 1037: Federal Run Brdg U BRDG 581 25,000 25,000 25,000

Crawford 1037 B02 57974 SR 1037: Federal Run Brdg R BRDG 581 25,000 25,000 25,000

Crawford 1037 B02 57974 SR 1037: Federal Run Brdg C BRDG 581 500,000 500,000 500,000

Crawford 2007 01M 32165 SR 2007:Thurston Road C HRST 581 225,000 225,000 225,000

Crawford 2008 0 103206SR 2008 Wilson Shute/Town +C SAMI RRX 159,135 159,135 159,135

Crawford 2008 0 103206SR 2008 Wilson Shute/Town +C SAMI RRX 159,135 159,135 159,135

Crawford 2012 03M 99605 SR 2012: Porter St-Barton C HRST 581 620,000 620,000 620,000

Crawford 2024 03M 99635 SR 2024:Drake St-Drake Wl C HRST 581 250,000 250,000 250,000

Crawford 2034 B02 413 SR 2034: Spring St Viadct F BRDG 185 150,000 150,000 150,000

Crawford 2039 B00 516 SR 2039: Dunham Rd Br F BRDG 185 90,000 90,000 90,000

Page 78: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

78 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Totals for: Crawford 11,099,710 5,730,000 16,829,710 13,563,635 8,550,000 22,113,635 6,463,635 5,720,000 12,183,635 7,140,000 7,140,000 58,266,980

Cumberland 101966Gettysburg Rd Realignment P HCON 150,000 150,000 150,000

Cumberland 101966Gettysburg Rd Realignment F HCON 105,000 105,000 105,000

Cumberland 101966Gettysburg Rd Realignment C HCON STU 695,361 695,361 695,361

Cumberland 101966Gettysburg Rd Realignment C HCON STU 1,207,639 1,207,639 1,207,639

Cumberland BR 18433 Wolf Bridge T-508 F BRDG STU 276,000 183 16,733 52,268 345,001 345,001

Cumberland BR 18433 Wolf Bridge T-508 U BRDG STU 36,800 183 6,900 2,300 46,000 46,000

Cumberland BR 18433 Wolf Bridge T-508 R BRDG STU 65,600 183 4,100 12,300 82,000 82,000

Cumberland BR 18433 Wolf Bridge T-508 C BRDG STU 355,000 183 66,600 22,200 443,800 443,800

Cumberland BR 18433 Wolf Bridge T-508 C BRDG STP 500,000 183 329,100 109,700 938,800 938,800

Cumberland BR 18433 Wolf Bridge T-508 C BRDG STU 1,255,200 1,255,200 1,255,200

Cumberland ENH 93175 CVRT Shippensburg Connctr +C TENH STP 600,000 600,000 600,000

Cumberland ENH 97337 Carlisle West End Trail C IMOD STP 300,379 300,379 300,379

Cumberland ENH 97337 Carlisle West End Trail C IMOD STP 99,621 99,621 99,621

Cumberland 11 064 74050 Ritner Highway Bridge 2 F BRDG 185 265,000 265,000 265,000

Cumberland 11 064 74050 Ritner Highway Bridge 2 U BRDG 185 50,000 50,000 50,000

Cumberland 11 064 74050 Ritner Highway Bridge 2 R BRDG 185 50,000 50,000 50,000

Cumberland 11 064 74050 Ritner Highway Bridge 2 C BRDG 185 1,126,890 1,126,890 1,126,890

Cumberland 11 064 74050 Ritner Highway Bridge 2 C BRDG 185 873,110 873,110 873,110

Cumberland 11 066 75017 Shippensburg Circulation +C SPFED SXF 219,600 219,600 219,600

Cumberland 11 090 87369 Ritner Highway Bridge 1 P BRDG STP 325,000 325,000 325,000

Cumberland 11 090 87369 Ritner Highway Bridge 1 F BRDG 185 250,000 250,000 250,000

Cumberland 11 090 87369 Ritner Highway Bridge 1 U BRDG 185 100,000 100,000 100,000

Cumberland 11 090 87369 Ritner Highway Bridge 1 R BRDG 185 100,000 100,000 100,000

Cumberland 11 091 96290 Enola Road Resurface C HRST 409 2,300,000 2,300,000 2,300,000

Cumberland 74 058 87662 PA 74 over Letort Spring F BRDG 185 200,000 200,000 200,000

Cumberland 74 058 87662 PA 74 over Letort Spring U BRDG 185 100,000 100,000 100,000

Cumberland 74 058 87662 PA 74 over Letort Spring R BRDG 185 100,000 100,000 100,000

Cumberland 74 058 87662 PA 74 over Letort Spring C BRDG 185 2,775,000 2,775,000 2,775,000

Cumberland 81 071 90207 I-81 SB/ PA 581 WB Merge F HCON 581 1,456,000 1,456,000 1,456,000

Cumberland 81 071 90207 I-81 SB/ PA 581 WB Merge C SAMI 581 8,339,782 8,339,782 8,339,782

Cumberland 81 071 90207 I-81 SB/ PA 581 WB Merge C SAMI 581 8,859,545 8,859,545 8,859,545

Cumberland 81 071 90207 I-81 SB/ PA 581 WB Merge C SAMI 581 11,800,673 11,800,673 11,800,673

Cumberland 114 027 97279 PA 114 Resurfacing +C HRST 409 2,500,000 2,500,000 2,500,000

Cumberland 114 028 99664 Conodogulnet Parkway Br P BRDG 185 200,000 200,000 200,000

Cumberland 114 028 99664 Conodogulnet Parkway Br U BRDG 581 10,000 10,000 10,000

Cumberland 114 028 99664 Conodogulnet Parkway Br R BRDG 185 10,000 10,000 10,000

Cumberland 114 028 99664 Conodogulnet Parkway Br C BRDG 185 1,000,000 1,000,000 1,000,000

Cumberland 114 028 99664 Conodogulnet Parkway Br C BRDG 185 750,000 750,000 750,000

Cumberland 174 016 74051 Walnut Bottom Road Bridge P BRDG 185 299,505 299,505 299,505

Page 79: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

79 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cumberland 174 016 74051 Walnut Bottom Road Bridge P BRDG 185 495 495 495

Cumberland 174 016 74051 Walnut Bottom Road Bridge +F BRDG 185 175,000 175,000 175,000

Cumberland 174 016 74051 Walnut Bottom Road Bridge U BRDG 581 50,000 50,000 50,000

Cumberland 174 016 74051 Walnut Bottom Road Bridge +R BRDG 581 50,000 50,000 50,000

Cumberland 581 013 102755Creekview Rd Interchange P HRST NHPP 150,000 150,000 150,000

Cumberland 581 013 102755Creekview Rd Interchange F HRST STU 250,000 250,000 250,000

Cumberland 581 013 102755Creekview Rd Interchange U HRST STU 25,000 25,000 25,000

Cumberland 581 013 102755Creekview Rd Interchange R HRST STU 50,000 50,000 50,000

Cumberland 581 013 102755Creekview Rd Interchange C HRST STP 99,800 99,800 99,800

Cumberland 581 013 102755Creekview Rd Interchange C HRST STU 700,200 700,200 700,200

Cumberland 581 013 102755Creekview Rd Interchange C HRST STU 400,000 400,000 400,000

Cumberland 944 020 102372PA 944 Safety Improvemnts S SAMI HSIP 700,000 700,000 700,000

Cumberland 944 021 78648 Locust Creek Bridge P BRDG 185 350,000 350,000 350,000

Cumberland 944 021 78648 Locust Creek Bridge U BRDG 185 20,000 20,000 20,000

Cumberland 944 021 78648 Locust Creek Bridge R BRDG 185 15,000 15,000 15,000

Cumberland 944 021 78648 Locust Creek Bridge C BRDG 185 500,000 500,000 500,000

Cumberland 944 021 78648 Locust Creek Bridge C BRDG 185 500,000 500,000 500,000

Cumberland 1007 012 18538 Locust Point Road Bridges C BRDG 581 4,036,930 4,036,930 4,036,930

Cumberland 1007 012 18538 Locust Point Road Bridges C BRDG 581 1,033,070 1,033,070 1,033,070

Cumberland 1025 004 18477 Erford Rd Bridge PM P BRDG NHPP 300,000 300,000 300,000

Cumberland 1025 004 18477 Erford Rd Bridge PM U BRDG NHPP 50,000 50,000 50,000

Cumberland 1025 004 18477 Erford Rd Bridge PM R BRDG NHPP 50,000 50,000 50,000

Cumberland 1025 004 18477 Erford Rd Bridge PM C BRDG NHPP 3,000,000 3,000,000 3,000,000

Cumberland 1027 004 97848 Front Street Ped Improve P SAMI 120,000 120,000 120,000

Cumberland 1027 004 97848 Front Street Ped Improve C SAMI STP 200,000 200,000 200,000

Cumberland 1027 004 97848 Front Street Ped Improve C SAMI SXF 475,885 475,885 475,885

Cumberland 2013 006 96226 York St Resurface C HRST 409 2,100,000 2,100,000 2,100,000

Cumberland 2017 0 102741Rossmoyne Roundabout C HRST STP 750,000 750,000 750,000

Cumberland 2023 003 96228 Shepherdstown Road Resurf +C HRST 409 1,000,000 1,000,000 1,000,000

Cumberland 2025 012 102976Slate Hill Road Crossing +C SAMI RRX 234,642 234,642 234,642

Cumberland 2025 012 102976Slate Hill Road Crossing +C SAMI RRX 234,642 234,642 234,642

Cumberland 2029 011 94914 St Johns Church Rd signal +C SAMI STU 300,000 300,000 300,000

Cumberland 2033 009 87413 Creek Road Bridge P BRDG STP 220,058 185 55,014 275,072 275,072

Cumberland 2033 009 87413 Creek Road Bridge F BRDG 185 250,000 250,000 250,000

Cumberland 2033 009 87413 Creek Road Bridge U BRDG 185 50,000 50,000 50,000

Cumberland 2033 009 87413 Creek Road Bridge R BRDG 185 50,000 50,000 50,000

Cumberland 2033 009 87413 Creek Road Bridge C BRDG 185 755,000 755,000 755,000

Cumberland 7103 BRG 18486 Orrs Bridge T-618 F BRDG STP 320,000 183 60,000 20,000 400,000 400,000

Cumberland 7103 BRG 18486 Orrs Bridge T-618 U BRDG STP 80,000 183 15,000 5,000 100,000 100,000

Cumberland 7103 BRG 18486 Orrs Bridge T-618 R BRDG STP 68,000 183 12,750 4,250 85,000 85,000

Page 80: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

80 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Cumberland 7103 BRG 18486 Orrs Bridge T-618 C BRDG STP 2,200,000 183 412,500 137,500 2,750,000 2,750,000

Cumberland 7212 BRG 102271Hempt Road Bridge P BRDG STP 160,000 183 30,000 10,000 200,000 200,000

Cumberland 7213 BRG 18436 Craigheads Bridge C BRDG STU 1,560,000 183 292,500 97,500 1,950,000 1,950,000

Totals for: Cumberland 5,679,722 13,142,682 454,368 19,276,772 4,787,582 12,176,097 114,250 17,077,929 3,457,281 14,813,035 32,200 18,302,516 4,589,842 15,620,383 247,200 20,457,425 75,114,642

Dauphin 84324 HATS SD Br Reserve C BRDG BOF 1,508,600 1,508,600 1,508,600

Dauphin 84324 HATS SD Br Reserve C BRDG 185 300,000 300,000 300,000

Dauphin 84324 HATS SD Br Reserve C BRDG 185 29,905 29,905 29,905

Dauphin 102146Roadway Maint Line Item C HRST 409 302,096 302,096 302,096

Dauphin 102146Roadway Maint Line Item C HRST 409 2,739,672 2,739,672 2,739,672

Dauphin 102146Roadway Maint Line Item C HRST 409 6,947,507 6,947,507 6,947,507

Dauphin 102146Roadway Maint Line Item C HRST 409 11,548,000 11,548,000 11,548,000

Dauphin 102172HBG City Street Line Item C HRST 581 2,000,000 2,000,000 2,000,000

Dauphin 102172HBG City Street Line Item C HRST 581 2,000,000 2,000,000 2,000,000

Dauphin 102172HBG City Street Line Item C HRST 581 2,000,000 2,000,000 2,000,000

Dauphin 102172HBG City Street Line Item C HRST 581 2,000,000 2,000,000 2,000,000

Dauphin 1021732015-2018 CMAQ Line Item C AIR CAQ 593,115 593,115 593,115

Dauphin 1021732015-2018 CMAQ Line Item C AIR CAQ 1,258,976 1,258,976 1,258,976

Dauphin 102733CAT Intermodal Bridge P BRDG STP 200,000 200,000 200,000

Dauphin 102733CAT Intermodal Bridge F BRDG STP 500,000 500,000 500,000

Dauphin 102733CAT Intermodal Bridge C BRDG STP 581,000 581,000 581,000

Dauphin 102733CAT Intermodal Bridge C BRDG STU 774,000 774,000 774,000

Dauphin 102733CAT Intermodal Bridge C BRDG STP 845,000 845,000 845,000

Dauphin 102736Cross River Improvements P HRST STU 60,000 60,000 60,000

Dauphin 102736Cross River Improvements C HRST STU 260,000 260,000 260,000

Dauphin 102757Greenbelt 39 to Ft Hunter P HRST STU 375,000 375,000 375,000

Dauphin 88058 TAP Line Item C TENH TAU 447,000 447,000 447,000

Dauphin 88058 TAP Line Item C TENH TAU 447,000 447,000 447,000

Dauphin 88058 TAP Line Item C TENH TAU 447,000 447,000 447,000

Dauphin 88058 TAP Line Item C TENH TAU 447,000 447,000 447,000

Dauphin 88060 HSIP Line Item C SAMI HSIP 1,732,000 1,732,000 1,732,000

Dauphin 88060 HSIP Line Item C SAMI HSIP 822,000 822,000 822,000

Dauphin 88060 HSIP Line Item C SAMI HSIP 797,000 797,000 797,000

Dauphin 88061 Highway Reserve C HRST NHPP 4,838,544 581 1,930,110 6,768,654 6,768,654

Dauphin 88061 Highway Reserve C HRST STP 36,406 36,406 36,406

Dauphin 88061 Highway Reserve C HRST STP 175,000 581 340,000 515,000 515,000

Dauphin 88061 Highway Reserve C HRST 581 2,294,328 2,294,328 2,294,328

Dauphin 88061 Highway Reserve C HRST 581 2,400,000 2,400,000 2,400,000

Dauphin 88069 Delivery/ Consult Assist P HRST 581 800,000 800,000 800,000

Dauphin 88069 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Dauphin 88069 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Page 81: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

81 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Dauphin 88069 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Dauphin 88069 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Dauphin 88069 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Dauphin 88069 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Dauphin 88069 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Dauphin 92843 Park Blvd. Bridge/Roadway C HCON STU 414,843 414,843 414,843

Dauphin 92843 Park Blvd. Bridge/Roadway C HCON STU 1,435,157 581 7,500,000 8,935,157 8,935,157

Dauphin 94635 SRTP Rideshare Prog 15-18 P IMOD CAQ 609,814 609,814 609,814

Dauphin 94635 SRTP Rideshare Prog 15-18 P SAMI CAQ 615,913 615,913 615,913

Dauphin 94635 SRTP Rideshare Prog 15-18 P SAMI CAQ 622,072 622,072 622,072

Dauphin 94635 SRTP Rideshare Prog 15-18 P SAMI CAQ 628,292 628,292 628,292

Dauphin 94636 2015-18 CAT Annual CMAQ C PT CAQ 2,118,000 2,118,000 2,118,000

Dauphin 94636 2015-18 CAT Annual CMAQ C PT CAQ 2,118,000 2,118,000 2,118,000

Dauphin 94636 2015-18 CAT Annual CMAQ C PT CAQ 2,118,000 2,118,000 2,118,000

Dauphin 94636 2015-18 CAT Annual CMAQ C PT CAQ 2,118,000 2,118,000 2,118,000

Dauphin 97260 Industrial Road P HRST NHPP 150,000 150,000 150,000

Dauphin 97260 Industrial Road +F HRST STP 100,000 100,000 100,000

Dauphin 97260 Industrial Road +C HRST NHPP 630,000 630,000 630,000

Dauphin 97260 Industrial Road +C HRST STP 83,423 83,423 83,423

Dauphin 97260 Industrial Road +C HRST STU 2,800,000 2,800,000 2,800,000

Dauphin BR 18900 Duke Street Bridge C BRDG STU 2,840,000 183 532,500 177,500 3,550,000 3,550,000

Dauphin 22 053 94724 US 22 & PA39 Intersection F SAMI CAQ 150,000 150,000 150,000

Dauphin 22 053 94724 US 22 & PA39 Intersection F SAMI STP 100,000 100,000 100,000

Dauphin 22 053 94724 US 22 & PA39 Intersection U SAMI CAQ 50,000 50,000 50,000

Dauphin 22 053 94724 US 22 & PA39 Intersection R SAMI CAQ 40,000 40,000 40,000

Dauphin 22 053 94724 US 22 & PA39 Intersection +C SAMI CAQ 1,009,535 1,009,535 1,009,535

Dauphin 22 053 94724 US 22 & PA39 Intersection +C SAMI CAQ 1,036,050 1,036,050 1,036,050

Dauphin 22 053 94724 US 22 & PA39 Intersection +C SAMI CAQ 169,415 169,415 169,415

Dauphin 22 059 93178 Clarks Ferry Bridge PM F BRDG 185 375,000 375,000 375,000

Dauphin 22 059 93178 Clarks Ferry Bridge PM F BRDG 185 303,750 303,750 303,750

Dauphin 22 059 93178 Clarks Ferry Bridge PM F BRDG 581 71,250 71,250 71,250

Dauphin 22 064 97407 Cameron St Low Cost Safe C SAMI HSIP 350,000 350,000 350,000

Dauphin 22 072 97030 HATS Low Cost Safety C SAMI HSIP 450,000 450,000 450,000

Dauphin 81 070 90204 I-81/I-83 NB Merge Lane F IMAN 581 1,030,000 1,030,000 1,030,000

Dauphin 81 070 90204 I-81/I-83 NB Merge Lane +C IMAN NHPP 5,265,000 5,265,000 5,265,000

Dauphin 81 070 90204 I-81/I-83 NB Merge Lane +C IMAN NHPP 5,735,000 5,735,000 5,735,000

Dauphin 83 043 70024 I-83 East Shore Section 1 U IMAN 581 500,000 500,000 500,000

Dauphin 83 043 70024 I-83 East Shore Section 1 U IMAN 581 500,000 500,000 500,000

Dauphin 83 043 70024 I-83 East Shore Section 1 R IMAN 581 5,000,000 5,000,000 5,000,000

Dauphin 83 043 70024 I-83 East Shore Section 1 R IMAN 581 5,000,000 5,000,000 5,000,000

Page 82: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

82 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Dauphin 83 043 70024 I-83 East Shore Section 1 C IMAN 581 30,000,000 30,000,000 30,000,000

Dauphin 83 072 92145 Eisenhower Intrchng Br PM C IMAN 185 3,330,000 3,330,000 3,330,000

Dauphin 83 072 92145 Eisenhower Intrchng Br PM C IMAN 185 8,000,000 8,000,000 8,000,000

Dauphin 83 078 92931 Eisenhower Interchange P IMAN 581 4,000,000 4,000,000 4,000,000

Dauphin 83 078 92931 Eisenhower Interchange P IMAN 581 4,000,000 4,000,000 4,000,000

Dauphin 83 078 92931 Eisenhower Interchange F IMAN 581 15,000,000 15,000,000 15,000,000

Dauphin 83 079 97828 I-83 East Shore Section 3 P IMAN 581 2,000,000 2,000,000 2,000,000

Dauphin 83 I43 82356 I83 East Shore Overpasses C IMAN 581 15,000,000 15,000,000 15,000,000

Dauphin 83 I43 82356 I83 East Shore Overpasses C IMAN 581 15,500,000 15,500,000 15,500,000

Dauphin 147 014 80697 North River Road Bridge F BRDG STP 160,000 185 40,000 200,000 200,000

Dauphin 147 014 80697 North River Road Bridge U BRDG 185 10,000 10,000 10,000

Dauphin 147 014 80697 North River Road Bridge R BRDG 185 30,000 30,000 30,000

Dauphin 147 014 80697 North River Road Bridge +C BRDG STU 1,822,616 1,822,616 1,822,616

Dauphin 147 015 88954 PA 147 Rock Fence U SAMI 581 10,000 10,000 10,000

Dauphin 147 015 88954 PA 147 Rock Fence R SAMI 581 50,000 50,000 50,000

Dauphin 147 015 88954 PA 147 Rock Fence C HRST 581 174,986 174,986 174,986

Dauphin 147 015 88954 PA 147 Rock Fence C HRST 581 2,395,014 2,395,014 2,395,014

Dauphin 147 017 90772 Market Street Bridge P BRDG 581 200,000 200,000 200,000

Dauphin 147 017 90772 Market Street Bridge F BRDG 185 150,000 150,000 150,000

Dauphin 147 017 90772 Market Street Bridge U BRDG 185 50,000 50,000 50,000

Dauphin 147 017 90772 Market Street Bridge R BRDG 185 50,000 50,000 50,000

Dauphin 147 017 90772 Market Street Bridge C BRDG 185 375,000 375,000 375,000

Dauphin 147 018 96301 South River Road Resurf C HRST 409 776,904 776,904 776,904

Dauphin 147 018 96301 South River Road Resurf C HRST 409 2,294,328 2,294,328 2,294,328

Dauphin 225 022 90773 PA 225 Bridge P BRDG STP 150,000 581 37,500 187,500 187,500

Dauphin 225 022 90773 PA 225 Bridge F BRDG 185 150,000 150,000 150,000

Dauphin 225 022 90773 PA 225 Bridge U BRDG 185 50,000 50,000 50,000

Dauphin 225 022 90773 PA 225 Bridge R BRDG 185 50,000 50,000 50,000

Dauphin 225 022 90773 PA 225 Bridge C BRDG 185 375,000 375,000 375,000

Dauphin 230 023 74519 Harrisburg Pike Bridge U BRDG 185 25,000 25,000 25,000

Dauphin 230 023 74519 Harrisburg Pike Bridge C BRDG NHPP 4,300,000 4,300,000 4,300,000

Dauphin 230 032 97392 Greenbelt Safety Imprvmts +C SAMI NHPP 453,072 453,072 453,072

Dauphin 230 032 97392 Greenbelt Safety Imprvmts +C SAMI NHPP 206,928 206,928 206,928

Dauphin 230 032 97392 Greenbelt Safety Imprvmts +C SAMI STU 125,000 125,000 125,000

Dauphin 283 008 84548 PA-283/I-76 Interchange P HRST 581 353,000 353,000 353,000

Dauphin 283 008 84548 PA-283/I-76 Interchange F HRST 581 645,000 645,000 645,000

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST NHPP 12,628,195 581 3,351,820 15,980,015 15,980,015

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST STP 139,777 139,777 139,777

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST STU 639,308 639,308 639,308

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST NHPP 13,604,000 581 4,291,327 17,895,327 17,895,327

Page 83: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

83 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST STP 419,000 419,000 419,000

Dauphin 300 008 19016 PA 283 Reconstruction 3 C HRST STU 3,142,308 3,142,308 3,142,308

Dauphin 322 038 19150 US 322/422 Expressway PM +F HRST NHPP 300,000 300,000 300,000

Dauphin 322 038 19150 US 322/422 Expressway PM +U HRST NHPP 10,000 10,000 10,000

Dauphin 322 038 19150 US 322/422 Expressway PM R HRST NHPP 10,000 10,000 10,000

Dauphin 322 038 19150 US 322/422 Expressway PM +C HRST NHPP 345,805 345,805 345,805

Dauphin 322 038 19150 US 322/422 Expressway PM +C XRST NHPP 10,397,072 10,397,072 10,397,072

Dauphin 322 038 19150 US 322/422 Expressway PM +C XRST STP 257,123 257,123 257,123

Dauphin 322 045 96198 US 322 Ramp Ext P SAMI STP 143,563 581 50,000 193,563 193,563

Dauphin 322 045 96198 US 322 Ramp Ext P SAMI STU 306,437 306,437 306,437

Dauphin 422 031 99899 Choc Ave over Spring Cr P BRDG 185 350,000 350,000 350,000

Dauphin 422 031 99899 Choc Ave over Spring Cr U BRDG 185 50,000 50,000 50,000

Dauphin 422 031 99899 Choc Ave over Spring Cr C BRDG 185 1,025,000 1,025,000 1,025,000

Dauphin 422 031 99899 Choc Ave over Spring Cr C BRDG 581 975,000 975,000 975,000

Dauphin 422 031 99899 Choc Ave over Spring Cr C BRDG 581 1,000,000 1,000,000 1,000,000

Dauphin 441 028 87456 Canal Street Bridge P BRDG 185 250,000 250,000 250,000

Dauphin 441 028 87456 Canal Street Bridge F BRDG 581 200,000 200,000 200,000

Dauphin 441 028 87456 Canal Street Bridge U BRDG 581 50,000 50,000 50,000

Dauphin 441 028 87456 Canal Street Bridge R BRDG 581 50,000 50,000 50,000

Dauphin 441 028 87456 Canal Street Bridge C BRDG 581 880,000 880,000 880,000

Dauphin 443 013 80977 Fishing Creek Val Bridge F BRDG 185 350,000 350,000 350,000

Dauphin 443 013 80977 Fishing Creek Val Bridge U BRDG 185 10,000 10,000 10,000

Dauphin 443 013 80977 Fishing Creek Val Bridge R BRDG 185 15,000 15,000 15,000

Dauphin 443 013 80977 Fishing Creek Val Bridge C BRDG 185 68,208 68,208 68,208

Dauphin 443 013 80977 Fishing Creek Val Bridge C BRDG 581 19,942 19,942 19,942

Dauphin 443 013 80977 Fishing Creek Val Bridge C BRDG 185 1,111,850 1,111,850 1,111,850

Dauphin 743 023 82439 Cocoa Avenue Resurfacing C HRST 409 700,000 700,000 700,000

Dauphin 743 028 87455 Park Ave over Spring Crk F BRDG 581 262,000 262,000 262,000

Dauphin 743 028 87455 Park Ave over Spring Crk C BRDG 185 1,417,388 1,417,388 1,417,388

Dauphin 1010 025 102756W Shore Connection Bridge P BRDG STU 250,000 250,000 250,000

Dauphin 1010 025 102756W Shore Connection Bridge F BRDG STU 350,000 350,000 350,000

Dauphin 1010 025 102756W Shore Connection Bridge C BRDG STU 1,400,000 1,400,000 1,400,000

Dauphin 2003 026 85335 Middletown Road Rt. Lane P SAMI CAQ 200,000 581 50,000 250,000 250,000

Dauphin 2003 026 85335 Middletown Road Rt. Lane F SAMI CAQ 120,000 581 30,000 150,000 150,000

Dauphin 2003 026 85335 Middletown Road Rt. Lane U SAMI CAQ 40,000 581 10,000 50,000 50,000

Dauphin 2003 026 85335 Middletown Road Rt. Lane R SAMI CAQ 40,000 581 10,000 50,000 50,000

Dauphin 2003 026 85335 Middletown Road Rt. Lane C SAMI CAQ 600,000 581 150,000 750,000 750,000

Dauphin 2017 012 19106 Manada Bottom Rd Br 1 U BRDG 185 10,000 10,000 10,000

Dauphin 2017 012 19106 Manada Bottom Rd Br 1 R BRDG 185 25,000 25,000 25,000

Dauphin 2017 012 19106 Manada Bottom Rd Br 1 C BRDG BOF 693,000 185 173,250 866,250 866,250

Page 84: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

84 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Dauphin 2017 012 19106 Manada Bottom Rd Br 1 C BRDG BOF 185,972 185 46,493 232,465 232,465

Dauphin 2019 016 85337 Milroy Road Underpass P HCON 581 1,250,000 1,250,000 1,250,000

Dauphin 2019 016 85337 Milroy Road Underpass P SAMI 581 1,250,000 1,250,000 1,250,000

Dauphin 2019 016 85337 Milroy Road Underpass F SAMI 581 1,000,000 1,000,000 1,000,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety P SAMI HSIP 400,000 400,000 400,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety F SAMI HSIP 300,000 300,000 300,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety U SAMI HSIP 100,000 100,000 100,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety R SAMI HSIP 100,000 100,000 100,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety C SAMI HSIP 650,000 650,000 650,000

Dauphin 2019 017 47521 Nyes/Dvnshre Hts Safety C SAMI HSIP 650,000 650,000 650,000

Dauphin 3006 016 96286 Pine Street Resurface +C HRST 582 517,500 517,500 517,500

Dauphin 3007 015 96285 S 19th Street Resurface +C HRST 582 979,000 979,000 979,000

Dauphin 3007 015 96285 S 19th Street Resurface +C HRST 582 521,000 521,000 521,000

Dauphin 3009 017 102785E Shore Connection Bridge P HRST STU 212,828 212,828 212,828

Dauphin 3009 017 102785E Shore Connection Bridge F HRST STU 310,374 310,374 310,374

Dauphin 3009 017 102785E Shore Connection Bridge C HRST STP 355,000 355,000 355,000

Dauphin 3009 017 102785E Shore Connection Bridge C HRST STU 695,361 695,361 695,361

Dauphin 3009 017 102785E Shore Connection Bridge C HRST STU 200,000 200,000 200,000

Dauphin 3012 023 96939 Derry Street Resurface +C HRST 582 540,500 540,500 540,500

Dauphin 3012 025 102378Derry Street Safety Imprv P SAMI HSIP 350,000 350,000 350,000

Dauphin 3012 026 93176 Market St Bridge West P BRDG 581 500,000 500,000 500,000

Dauphin 3012 026 93176 Market St Bridge West P BRDG 581 1,000,000 1,000,000 1,000,000

Dauphin 3013 004 82449 29th Street Resurfacing C HRST STP 150,000 150,000 150,000

Dauphin 3018 001 74517 Paxton Creek Bridge U BRDG 185 20,000 20,000 20,000

Dauphin 3018 001 74517 Paxton Creek Bridge R BRDG 185 10,000 10,000 10,000

Dauphin 3018 001 74517 Paxton Creek Bridge C BRDG NHPP 1,200,000 185 300,000 1,500,000 1,500,000

Dauphin 3019 011 96300 Mountain Road Resurface C HRST 409 1,067,287 1,067,287 1,067,287

Dauphin 3019 011 96300 Mountain Road Resurface C HRST 409 1,432,713 1,432,713 1,432,713

Dauphin 3020 011 94759 Union Deposit Road Safety C SAMI HSIP 702,000 702,000 702,000

Dauphin 3022 005 74521 Maclay Street Bridge P BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Dauphin 3022 005 74521 Maclay Street Bridge F BRDG 581 170,000 170,000 170,000

Dauphin 3022 005 74521 Maclay Street Bridge U BRDG 185 50,000 50,000 50,000

Dauphin 3022 005 74521 Maclay Street Bridge R BRDG 185 20,000 20,000 20,000

Dauphin 7208 BRG 18998 Red Top Road Bridge P BRDG STP 200,000 183 37,500 12,500 250,000 250,000

Dauphin 7208 BRG 18998 Red Top Road Bridge F BRDG STP 80,000 183 15,000 5,000 100,000 100,000

Dauphin 7208 BRG 18998 Red Top Road Bridge U BRDG STP 12,000 183 2,250 750 15,000 15,000

Dauphin 7208 BRG 18998 Red Top Road Bridge R BRDG STP 8,000 183 1,500 500 10,000 10,000

Dauphin 7208 BRG 92841 Jonestown Road Bridge P BRDG BOF 86,400 183 16,200 5,400 108,000 108,000

Dauphin 7208 BRG 92841 Jonestown Road Bridge F BRDG BOF 132,568 183 24,856 8,286 165,710 165,710

Dauphin 7208 BRG 92841 Jonestown Road Bridge U BRDG BOF 43,200 183 8,100 2,700 54,000 54,000

Page 85: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

85 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Dauphin 7208 BRG 92841 Jonestown Road Bridge R BRDG BOF 25,920 183 4,860 1,620 32,400 32,400

Dauphin 7208 BRG 92841 Jonestown Road Bridge C BRDG BOF 950,400 183 178,200 59,400 1,188,000 1,188,000

Dauphin 7211 BRG 19131 Potato Valley Rd Bridge P BRDG STP 80,000 183 15,000 5,000 100,000 100,000

Totals for: Dauphin 24,686,442 23,500,046 195,400 48,381,888 24,335,893 59,449,381 12,606 83,797,880 31,153,471 40,463,890 5,000 71,622,361 32,958,576 72,266,277 65,650 105,290,503 309,092,632

Delaware 17928 Ozone Action Program P IMOD CAQ 100,000 25,000 125,000 125,000

Delaware 17928 Ozone Action Program P IMOD CAQ 100,000 25,000 125,000 125,000

Delaware 48202 Regional GIS Support P SAMI STU 350,000 350,000 350,000

Delaware 48202 Regional GIS Support P SAMI STU 350,000 350,000 350,000

Delaware 47147 Third St Dam Repair (L) F BRDG 183 244,000 61,000 305,000 305,000

Delaware 47147 Third St Dam Repair (L) U BRDG 183 36,000 9,000 45,000 45,000

Delaware 47147 Third St Dam Repair (L) R BRDG 183 35,000 9,000 44,000 44,000

Delaware 47147 Third St Dam Repair (L) C BRDG 183 2,782,000 696,000 3,478,000 3,478,000

Delaware 47986 Chester Cr Ped Trail C TENH STU 5,500,000 5,500,000 5,500,000

Delaware 48201 DVRPC CMAQ Program C IMOD CAQ 809,000 809,000 809,000

Delaware 48201 DVRPC CMAQ Program C IMOD CAQ 1,075,000 1,075,000 1,075,000

Delaware 48201 DVRPC CMAQ Program C IMOD CAQ 21,802,000 21,802,000 21,802,000

Delaware 210 98216 Michigan Av O/Little Crum P BRDG 183 201,000 50,250 251,250 251,250

Delaware 210 98216 Michigan Av O/Little Crum P BRDG 183 14,000 3,500 17,500 17,500

Delaware 210 98216 Michigan Av O/Little Crum P BRDG 183 65,000 16,250 81,250 81,250

Delaware 382 103216Jansen Ave Grade Xing +C SAMI RRX 273,182 273,182 273,182

Delaware DT2 70219 PA 291E.Coast Greenway C IMOD CAQ 413,000 413,000 413,000

Delaware DT2 70219 PA 291E.Coast Greenway C IMOD STU 766,000 766,000 766,000

Delaware NPT 87119 Nether Providence Twp SRS +C TENH SRTSF 239,000 239,000 239,000

Delaware RID 17900 Mobility Alt Programs MAP P IMOD CAQ 644,000 581 50,000 109,000 803,000 803,000

Delaware RID 17900 Mobility Alt Programs MAP P IMOD CAQ 644,000 581 50,000 109,000 803,000 803,000

Delaware RID 17900 Mobility Alt Programs MAP P IMOD CAQ 644,000 581 50,000 109,000 803,000 803,000

Delaware RID 17900 Mobility Alt Programs MAP P IMOD CAQ 644,000 581 50,000 109,000 803,000 803,000

Delaware TMA 48199 Transp Managemnt Assoc P IMOD CAQ 922,000 230,000 1,152,000 1,152,000

Delaware TMA 48199 Transp Managemnt Assoc P IMOD CAQ 922,000 230,000 1,152,000 1,152,000

Delaware TMA 48199 Transp Managemnt Assoc P IMOD CAQ 922,000 230,000 1,152,000 1,152,000

Delaware TMA 48199 Transp Managemnt Assoc P IMOD CAQ 922,000 230,000 1,152,000 1,152,000

Delaware UDT 87120 Upper Darby Twp SRS C TENH SRTSF 191,000 191,000 191,000

Delaware 1 RLE 104172ARLE Ped Facilities Imprv C SAMI 244 33,150 33,150 33,150

Delaware 95 CCP 102276I-476/I-95IntrchngPkgB(C) C HRST NHPP 40,000 581 128,346 168,346 168,346

Delaware 95 CCP 102276I-476/I-95IntrchngPkgB(C) C HRST STU 467,119 467,119 467,119

Delaware 95 CCP 102276I-476/I-95IntrchngPkgB(C) C HRST NHPP 500,000 581 55,556 555,556 555,556

Delaware 95 TWU 88407 I-95 Overhead Bridges F BRDG NHPP 195,000 185 49,000 244,000 244,000

Delaware 95 TWU 88407 I-95 Overhead Bridges U BRDG NHPP 200,000 185 50,000 250,000 250,000

Delaware 95 TWU 88407 I-95 Overhead Bridges C BRDG 185 16,536,000 16,536,000 16,536,000

Delaware 95 TWU 88407 I-95 Overhead Bridges C BRDG 185 11,602,000 11,602,000 11,602,000

Page 86: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

86 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Delaware 202 LPR 95429 SR202/SR1 Loop Rd System F HCON STP 699,000 581 175,000 874,000 874,000

Delaware 202 LPR 95429 SR202/SR1 Loop Rd System U HCON STP 135,000 581 34,000 169,000 169,000

Delaware 202 LPR 95429 SR202/SR1 Loop Rd System R HCON STP 270,000 581 68,000 338,000 338,000

Delaware 202 LPR 95429 SR202/SR1 Loop Rd System C HCON STP 3,246,000 581 811,000 4,057,000 4,057,000

Delaware 252 LEG 96946 Ellis Town Center C HCON 581 4,000,000 1,680,000 5,680,000 5,680,000

Delaware 322 101 69816 US 322: US 1 - Featherbd C HCON NHPP 10,927,000 581 2,732,000 13,659,000 13,659,000

Delaware 322 101 69816 US 322: US 1 - Featherbd C HCON STU 7,602,000 7,602,000 7,602,000

Delaware 322 101 69816 US 322: US 1 - Featherbd C HCON NHPP 31,047,000 581 5,902,000 36,949,000 36,949,000

Delaware 322 101 69816 US 322: US 1 - Featherbd C HCON STU 1,685,000 1,685,000 1,685,000

Delaware 322 102 69817 US 322: Fthrbd - I-95 R HCON SXF 480,000 581 120,000 600,000 600,000

Delaware 322 MIT 69815 US 322: Enviro Mitigation C HCON NHPP 5,941,000 581 1,485,000 7,426,000 7,426,000

Delaware 352 US1 15251 US 1/PA 352 Interchange F SAMI NHPP 4,668,000 581 1,167,000 5,835,000 5,835,000

Delaware 352 US1 15251 US 1/PA 352 Interchange F SAMI NHPP 4,668,000 581 1,167,000 5,835,000 5,835,000

Delaware 352 US1 15251 US 1/PA 352 Interchange F SAMI NHPP 4,668,000 581 1,167,000 5,835,000 5,835,000

Delaware 352 US1 15251 US 1/PA 352 Interchange R SAMI 581 14,695,000 14,695,000 14,695,000

Delaware 420 DFA 64791 Kedron Ave @ Franklin F SAMI 53,000 53,000 53,000

Delaware 420 DFA 64791 Kedron Ave @ Franklin U SAMI 28,000 28,000 28,000

Delaware 420 DFA 64791 Kedron Ave @ Franklin R SAMI CAQ 109,000 109,000 109,000

Delaware 420 DFA 64791 Kedron Ave @ Franklin +C SAMI CAQ 766,000 766,000 766,000

Delaware 420 DWD 92323 Wanamaker Ave o/ Darby Ck F BRDG NHPP 339,000 185 85,000 424,000 424,000

Delaware 420 DWD 92323 Wanamaker Ave o/ Darby Ck U BRDG NHPP 270,000 185 68,000 338,000 338,000

Delaware 420 DWD 92323 Wanamaker Ave o/ Darby Ck R BRDG NHPP 262,000 185 66,000 328,000 328,000

Delaware 420 DWD 92323 Wanamaker Ave o/ Darby Ck C BRDG 185 4,057,000 4,057,000 4,057,000

Delaware 452 03S 15406 Market St Over AMTRAK C BRDG NHPP 2,534,000 581 1,308,000 3,842,000 3,842,000

Delaware 452 03S 15406 Market St Over AMTRAK C BRDG STP 2,700,000 2,700,000 2,700,000

Delaware 452 03S 15406 Market St Over AMTRAK C BRDG NHPP 5,234,000 581 1,308,000 6,542,000 6,542,000

Delaware 452 03S 15406 Market St Over AMTRAK C BRDG NHPP 5,234,000 581 1,308,000 6,542,000 6,542,000

Delaware 1002 MRR 15368 Manoa Rd:Brg O/ Ck P BRDG STP 204,000 185 51,000 255,000 255,000

Delaware 1002 MRR 15368 Manoa Rd:Brg O/ Ck F BRDG STP 525,000 185 131,000 656,000 656,000

Delaware 1002 MRR 15368 Manoa Rd:Brg O/ Ck U BRDG STP 45,000 185 11,000 56,000 56,000

Delaware 1002 MRR 15368 Manoa Rd:Brg O/ Ck R BRDG STP 90,000 185 23,000 113,000 113,000

Delaware 1002 MRR 15368 Manoa Rd:Brg O/ Ck C BRDG STP 1,433,000 185 358,000 1,791,000 1,791,000

Delaware 1015 RAD 14891 Darby Paoli O/L Darby Cr C BRDG STU 3,206,000 581 801,000 4,007,000 4,007,000

Delaware 1015 RAD 14891 Darby Paoli O/L Darby Cr C BRDG STU 3,206,000 581 801,000 4,007,000 4,007,000

Delaware 1015 RAD 14891 Darby Paoli O/L Darby Cr C BRDG STU 3,206,000 581 801,000 4,007,000 4,007,000

Delaware 1018 HAV 15225 Ardmore Ave O/SEPTA R BRDG STU 696,000 174,000 870,000 870,000

Delaware 1018 HAV 15225 Ardmore Ave O/SEPTA C BRDG STU 4,808,000 581 1,202,000 6,010,000 6,010,000

Delaware 1018 HAV 15225 Ardmore Ave O/SEPTA C BRDG STU 4,808,000 581 1,202,000 6,010,000 6,010,000

Delaware 1026 CAS 75800 College Ave O/SEPTA P&W U BRDG STU 1,313,000 1,313,000 1,313,000

Delaware 1026 CAS 75800 College Ave O/SEPTA P&W R BRDG 581 891,000 891,000 891,000

Page 87: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

87 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Delaware 1026 CAS 75800 College Ave O/SEPTA P&W C BRDG 581 7,175,000 7,175,000 7,175,000

Delaware 1034 S23 15438 Goshen @ Darby-PaoliRd(F) F HRST HSIP 3,000 581 1,000 4,000 4,000

Delaware 2005 383 103217Main Street Grade Xing P SAMI 581 750,000 750,000 750,000

Delaware 2005 383 103217Main Street Grade Xing +C SAMI RRX 337,653 337,653 337,653

Delaware 2006 476 70228 I-476 MacDade Boulevard C SAMI 581 3,768,000 3,768,000 3,768,000

Delaware 2006 DMS 64790 MacDade Blvd:South Ave F SAMI CAQ 250,000 250,000 250,000

Delaware 2006 DMS 64790 MacDade Blvd:South Ave C SAMI CAQ 6,010,000 6,010,000 6,010,000

Delaware 2025 M01 57757 Morton Ave: 9th - Swrthmr C SAMI CAQ 3,278,000 3,278,000 3,278,000

Delaware 2028 013 70245 Chestnut St./Morton Ave. U SAMI STP 171,000 581 43,000 214,000 214,000

Delaware 2028 013 70245 Chestnut St./Morton Ave. R SAMI STP 281,000 581 70,000 351,000 351,000

Delaware 2028 013 70245 Chestnut St./Morton Ave. C SAMI 581 4,637,000 4,637,000 4,637,000

Delaware 2031 DBR 15306 Sellers Ave O/AMTRAK C BRDG STU 5,771,000 185 1,154,000 6,925,000 6,925,000

Delaware 3007 DCB 15468 ConcordRd O/Baldwin Rn(F) R BRDG STU 15,000 581 3,750 18,750 18,750

Delaware 3101 DRB 69665 S.Creek Rd O/Brandywine F BRDG STU 637,000 185 159,000 796,000 796,000

Delaware 3101 DRB 69665 S.Creek Rd O/Brandywine U BRDG STU 90,000 185 23,000 113,000 113,000

Delaware 3101 DRB 69665 S.Creek Rd O/Brandywine R BRDG STU 219,000 185 55,000 274,000 274,000

Delaware 7023 006 57772 Cnvnt Rd O/Chester Cr (L) C BRDG BOF 3,315,000 179 718,000 4,033,000 4,033,000

Delaware 7023 006 57772 Cnvnt Rd O/Chester Cr (L) C BRDG 179 111,000 111,000 111,000

Delaware 7023 007 47992 New Rd O/Chester Cr C BRDG STU 2,546,000 183 478,000 159,000 3,183,000 3,183,000

Delaware 7023 009 86368 Mount Alverno Rd/ChestrCk U BRDG STP 42,000 179 11,000 53,000 53,000

Delaware 7023 009 86368 Mount Alverno Rd/ChestrCk C BRDG STU 1,923,000 179 481,000 2,404,000 2,404,000

Delaware 7023 073 80051 Rosemont Av O/Br Drby Crk C BRDG STP 2,273,000 179 568,000 2,841,000 2,841,000

Delaware 7023 186 47993 7th St O/Chester Cr C BRDG STU 4,923,000 179 1,230,750 6,153,750 6,153,750

Delaware 7023 234 15183 Station Rd Brg/Chstr #234 F BRDG STP 310,000 179 77,000 387,000 387,000

Delaware 7023 234 15183 Station Rd Brg/Chstr #234 U BRDG STP 45,000 179 11,000 56,000 56,000

Delaware 7023 234 15183 Station Rd Brg/Chstr #234 R BRDG BOF 46,000 179 12,000 58,000 58,000

Delaware 7023 237 86370 TribettAve/HermesprotaCk U BRDG STP 44,000 179 11,000 55,000 55,000

Delaware 7023 237 86370 TribettAve/HermesprotaCk C BRDG STU 1,873,000 179 468,000 2,341,000 2,341,000

Delaware 7301 LYD 57773 Lloyd St O/AMTRAK F BRDG BOF 891,000 183 194,000 55,000 1,140,000 1,140,000

Delaware 7301 LYD 57773 Lloyd St O/AMTRAK U BRDG 581 2,235,000 117,000 2,352,000 2,352,000

Delaware 7301 LYD 57773 Lloyd St O/AMTRAK R BRDG 581 1,204,000 63,000 1,267,000 1,267,000

Delaware 7410 FOL 15008 Folcroft Ave O/AMTRAK(H) U BRDG 581 2,203,000 116,000 2,319,000 2,319,000

Delaware 7410 FOL 15008 Folcroft Ave O/AMTRAK(H) R BRDG BOF 54,000 183 10,000 3,000 67,000 67,000

Totals for: Delaware 45,099,119 21,206,996 2,596,250 68,902,365 40,491,000 8,123,556 467,500 49,082,056 42,093,182 26,826,000 468,000 69,387,182 64,322,653 51,731,000 1,167,250 117,220,903 304,592,506

Elk 104347Act 13 SD Brdg Elk C BRDG 40,000 40,000 40,000

Elk 66 A01 85150 Wolf Run BOX Culvert P BRDG 185 50,000 50,000 50,000

Elk 66 A01 85150 Wolf Run BOX Culvert R BRDG 185 26,522 26,522 26,522

Elk 66 A01 85150 Wolf Run BOX Culvert C BRDG 185 285,000 285,000 285,000

Elk 66 N29 93587 SR 66/948 Intchg Improve F SAMI HSIP 270,450 581 30,050 300,500 300,500

Elk 66 N29 93587 SR 66/948 Intchg Improve U SAMI HSIP 49,172 581 5,464 54,636 54,636

Page 88: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

88 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Elk 66 N29 93587 SR 66/948 Intchg Improve R SAMI HSIP 49,172 581 5,464 54,636 54,636

Elk 66 N29 93587 SR 66/948 Intchg Improve C SAMI HSIP 1,600,000 581 177,778 1,777,778 1,777,778

Elk 66 N29 93587 SR 66/948 Intchg Improve C SAMI HSIP 1,245,850 581 138,428 1,384,278 1,384,278

Elk 120 817 72776 Ridgway to St. Marys C HRST 581 446,361 446,361 446,361

Elk 219 A06 82030 SR 219 Elk Creek C BRDG NHPP 500,000 500,000 500,000

Elk 219 A06 82030 SR 219 Elk Creek C BRDG NHPP 1,250,000 1,250,000 1,250,000

Elk 219 A06 82030 SR 219 Elk Creek C BRDG NHPP 400,000 400,000 400,000

Elk 255 A02 85153 SR 255 over Silver Run P BRDG 185 265,225 265,225 265,225

Elk 255 A02 85153 SR 255 over Silver Run F BRDG 185 225,102 225,102 225,102

Elk 255 A02 85153 SR 255 over Silver Run U BRDG 185 84,413 84,413 84,413

Elk 255 A02 85153 SR 255 over Silver Run R BRDG 185 84,413 84,413 84,413

Elk 555 A02 85154 SR 555 over Kersey Run C BRDG STP 931,135 931,135 931,135

Elk 555 A02 85154 SR 555 over Kersey Run C BRDG 581 600,000 600,000 600,000

Elk 555 A03 91251 SR 555 Trout Run Brig STA +U BRDG STP 82,400 82,400 82,400

Elk 555 A03 91251 SR 555 Trout Run Brig STA +U BRDG STP 84,872 84,872 84,872

Elk 555 A03 91251 SR 555 Trout Run Brig STA R BRDG 185 145,000 145,000 145,000

Elk 555 A03 91251 SR 555 Trout Run Brig STA C BRDG STP 527,605 581 372,395 900,000 900,000

Elk 555 A03 91251 SR 555 Trout Run Brig STA C BRDG 581 1,200,000 1,200,000 1,200,000

Elk 3002 A02 69062 SR 3002 Big Mill Creek +C BRDG STP 887,452 887,452 887,452

Elk 3002 A02 69062 SR 3002 Big Mill Creek +C BRDG BOF 466,773 466,773 466,773

Elk 3002 A02 69062 SR 3002 Big Mill Creek +C BRDG BOF 633,227 633,227 633,227

Elk 3002 A03 82041 SR 3002 Millstone Creek +C BRDG BOF 871,605 871,605 871,605

Elk 3002 A03 82041 SR 3002 Millstone Creek +C BRDG BOF 1,000,000 1,000,000 1,000,000

Totals for: Elk 2,710,251 2,793,861 40,000 5,544,112 5,860,385 815,398 6,675,783 2,279,077 138,428 2,417,505 393,928 393,928 15,031,328

Erie 75532 Econ. Dev. Line Item S HRST 581 1,500,000 1,500,000 1,500,000

Erie 101041Erie Traffic Signal Line C SAMI CAQ 1,000,000 1,000,000 1,000,000

Erie 102323Erie RBR Initiative C BRDG 581 1,500,000 1,500,000 1,500,000

Erie 102323Erie RBR Initiative C BRDG 581 1,500,000 1,500,000 1,500,000

Erie 98256 Erie Local Brdg Line Item C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Erie 98256 Erie Local Brdg Line Item C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Erie 98263 Erie 2015 TIP Line Item C BRDG BOF 63,000 185 191,500 254,500 254,500

Erie 98263 Erie 2015 TIP Line Item C BRDG BOF 290,600 185 206,175 496,775 496,775

Erie 98263 Erie 2015 TIP Line Item C BRDG BOF 43,000 185 6,250 49,250 49,250

Erie 98263 Erie 2015 TIP Line Item C BRDG BOF 43,000 185 671,250 714,250 714,250

Erie 98263 Erie 2015 TIP Line Item C HRST NHPP 110,000 110,000 110,000

Erie 98263 Erie 2015 TIP Line Item C HRST STP 2,795,000 2,795,000 2,795,000

Erie 98263 Erie 2015 TIP Line Item C HRST STP 2,295,000 581 568,000 2,863,000 2,863,000

Erie 98263 Erie 2015 TIP Line Item C HRST STP 2,795,000 581 85,000 2,880,000 2,880,000

Erie 98263 Erie 2015 TIP Line Item C HRST STP 2,795,000 581 135,000 2,930,000 2,930,000

Erie 98263 Erie 2015 TIP Line Item C SAMI CAQ 102,000 102,000 102,000

Page 89: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

89 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Erie 98263 Erie 2015 TIP Line Item C SAMI HSIP 1,474,000 1,474,000 1,474,000

Erie 98263 Erie 2015 TIP Line Item C SAMI CAQ 2,000 2,000 2,000

Erie 98263 Erie 2015 TIP Line Item C SAMI HSIP 1,474,000 1,474,000 1,474,000

Erie 98263 Erie 2015 TIP Line Item C SAMI CAQ 2,000 2,000 2,000

Erie 98263 Erie 2015 TIP Line Item C SAMI HSIP 1,474,000 1,474,000 1,474,000

Erie 98263 Erie 2015 TIP Line Item C SAMI CAQ 802,000 802,000 802,000

Erie 98263 Erie 2015 TIP Line Item C SAMI HSIP 1,474,000 1,474,000 1,474,000

Erie 98810 2018 Betterment Line Item +C HRST NHPP 2,738,000 2,738,000 2,738,000

Erie L00 1180 Niemeyer Road (T-463) Br C BRDG SXF 950,000 179 237,500 1,187,500 1,187,500

Erie L00 58232 McBride Viaduct F BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Erie L00 58232 McBride Viaduct U BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Erie L00 58232 McBride Viaduct R BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Erie L00 58232 McBride Viaduct C BRDG BOF 900,000 183 168,750 56,250 1,125,000 1,125,000

Erie L00 58232 McBride Viaduct C BRDG BOF 900,000 183 168,750 56,250 1,125,000 1,125,000

Erie L00 853 Kane Hill Road Br T-609 R BRDG BOF 12,000 183 2,250 750 15,000 15,000

Erie L00 880 N. Mill St. Br. T-726 C BRDG BOF 388,000 183 72,750 24,250 485,000 485,000

Erie L00 880 N. Mill St. Br. T-726 C BRDG BOF 892,400 183 167,325 55,775 1,115,500 1,115,500

Erie 5 13M 96310 SR 5: Pgh to Greengarden +C HRST NHPP 1,472,000 1,472,000 1,472,000

Erie 5 13M 96310 SR 5: Pgh to Greengarden +C HRST NHPP 3,422,000 3,422,000 3,422,000

Erie 5 13M 96310 SR 5: Pgh to Greengarden +C HRST NHPP 3,422,000 3,422,000 3,422,000

Erie 5 13M 96310 SR 5: Pgh to Greengarden +C HRST NHPP 684,000 684,000 684,000

Erie 5 14M 97884 SR 5: East Lake Road C HRST 581 1,840,000 1,840,000 1,840,000

Erie 5 16M 98020 SR 5: Grngarden-Chestnut C HRST NHPP 1,840,000 581 460,000 2,300,000 2,300,000

Erie 5 17M 98021 SR 5: Chestnut-Bayfront C HRST 581 622,000 622,000 622,000

Erie 5 17M 98021 SR 5: Chestnut-Bayfront C HRST 581 778,000 778,000 778,000

Erie 5 19M 99730 SR 5: Maple Ave-Avonia C HRST 581 1,300,000 1,300,000 1,300,000

Erie 5 AD1 102740SRs 5 and 20 ADA Ramps +C HRST STP 500,000 500,000 500,000

Erie 6 GRP 95613 Erie Preserve Br Group C BRDG 185 1,000,000 1,000,000 1,000,000

Erie 19 S03 91394 N Waterford Improvements F SAMI CAQ 600,000 600,000 600,000

Erie 19 S03 91394 N Waterford Improvements U SAMI CAQ 100,000 100,000 100,000

Erie 19 S03 91394 N Waterford Improvements R SAMI CAQ 600,000 600,000 600,000

Erie 19 S03 91394 N Waterford Improvements C SAMI CAQ 400,000 400,000 400,000

Erie 19 S03 91394 N Waterford Improvements C SAMI CAQ 1,800,000 1,800,000 1,800,000

Erie 19 S03 91394 N Waterford Improvements C SAMI CAQ 1,800,000 1,800,000 1,800,000

Erie 20 20M 99711 SR 20: Brlet - Moorehdvil C HRST 581 1,000,000 1,000,000 1,000,000

Erie 20 20M 99711 SR 20: Brlet - Moorehdvil C HRST 581 200,000 200,000 200,000

Erie 20 24M 99759 SR 20: Broad-Cumberland C HRST 581 700,000 700,000 700,000

Erie 20 27M 100295SR 20: Buffalo Road C HRST 581 1,700,000 1,700,000 1,700,000

Erie 20 27M 100295SR 20: Buffalo Road C HRST 581 300,000 300,000 300,000

Erie 89 B04 72506 Lake St Br/SR 89/16 Mi Ck C BRDG 185 985,000 985,000 985,000

Page 90: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

90 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Erie 90 A28 99054 I-90: Milepost 23 to 35.5 F IMAN 581 103,000 103,000 103,000

Erie 90 A28 99054 I-90: Milepost 23 to 35.5 +C IMAN NHPP 20,600,000 20,600,000 20,600,000

Erie 90 A29 102031Interstate 90 Section 1 P IMAN 581 1,236,000 1,236,000 1,236,000

Erie 90 A29 102031Interstate 90 Section 1 F IMAN 581 1,966,909 1,966,909 1,966,909

Erie 90 A29 102031Interstate 90 Section 1 U IMAN 581 56,276 56,276 56,276

Erie 90 A29 102031Interstate 90 Section 1 R IMAN 581 168,827 168,827 168,827

Erie 90 A30 102039Interstate 90 Section 2 P IMAN 581 1,273,080 1,273,080 1,273,080

Erie 90 A30 102039Interstate 90 Section 2 F IMAN 581 2,025,916 2,025,916 2,025,916

Erie 90 A31 102040Interstate 90 Section 3 P IMAN 581 1,639,090 1,639,090 1,639,090

Erie 90 A32 102041Interstate 90 Section 4 P IMAN 581 1,575,712 1,575,712 1,575,712

Erie 90 CMB 102176I-90 Cable Median C SAMI HSIP 20,550 20,550 20,550

Erie 98 03M 99733 SR 98: Sterrettania-Lake C HRST 581 1,300,000 1,300,000 1,300,000

Erie 197 B01 93187 SR 197/Fr Ck S. Branch P BRDG 185 200,000 200,000 200,000

Erie 197 B01 93187 SR 197/Fr Ck S. Branch F BRDG 185 50,000 50,000 50,000

Erie 197 B01 93187 SR 197/Fr Ck S. Branch U BRDG 185 25,000 25,000 25,000

Erie 197 B01 93187 SR 197/Fr Ck S. Branch R BRDG 185 25,000 25,000 25,000

Erie 197 B01 93187 SR 197/Fr Ck S. Branch C BRDG 185 726,000 726,000 726,000

Erie 290 01M 89219 SR 290: The Bayfront C HRST 581 2,700,000 2,700,000 2,700,000

Erie 290 01M 89219 SR 290: The Bayfront C HRST 581 500,000 500,000 500,000

Erie 290 B03 97201 SR 290 Br/CSX RR & Limco F BRDG 185 50,000 50,000 50,000

Erie 426 B02 72614 SR 426 Brdg 1/Hare Creek P BRDG 185 200,000 200,000 200,000

Erie 426 B02 72614 SR 426 Brdg 1/Hare Creek F BRDG 185 50,000 50,000 50,000

Erie 426 B02 72614 SR 426 Brdg 1/Hare Creek U BRDG 185 25,000 25,000 25,000

Erie 426 B02 72614 SR 426 Brdg 1/Hare Creek R BRDG 185 25,000 25,000 25,000

Erie 426 B02 72614 SR 426 Brdg 1/Hare Creek C BRDG 185 561,000 561,000 561,000

Erie 699 01M 99694 SR 699: Old ST Rd-McKean C HRST 581 1,100,000 1,100,000 1,100,000

Erie 699 02M 99718 SR 699: McKean-Intchng Rd C HRST 581 1,700,000 1,700,000 1,700,000

Erie 699 B01 47505 SR 699: Ednbro Rd/I-90 Br F BRDG 185 200,000 200,000 200,000

Erie 699 B01 47505 SR 699: Ednbro Rd/I-90 Br R BRDG 185 50,000 50,000 50,000

Erie 699 B01 47505 SR 699: Ednbro Rd/I-90 Br C BRDG 185 1,000,000 1,000,000 1,000,000

Erie 832 04M 99713 SR 832: I-90 to Grubb Rd C HRST 581 1,200,000 1,200,000 1,200,000

Erie 832 05M 99716 SR 832: Grubb Rd -26th St C HRST 581 600,000 600,000 600,000

Erie 955 01M 99700 SR 955: Iroquois Avenue C HRST 581 900,000 900,000 900,000

Erie 955 02M 99732 SR 955: Lake Rd-Nagle Rd C HRST 581 550,000 550,000 550,000

Erie 1005 B00 78829 SR 1005 ov Le Boeuf Ck C BRDG 185 330,000 330,000 330,000

Erie 2006 B01 88462 SR 2006 over French Creek F BRDG 185 150,000 150,000 150,000

Erie 2006 B01 88462 SR 2006 over French Creek R BRDG 185 10,000 10,000 10,000

Erie 3014 B01 82120 SR 3014/Little Elk Creek C BRDG 185 525,000 525,000 525,000

Erie 3103 B00 82925 Sanford Road/I-90 F BRDG BOF 360,000 185 90,000 450,000 450,000

Erie 3103 B00 82925 Sanford Road/I-90 U BRDG 185 25,000 25,000 25,000

Page 91: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

91 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Erie 3103 B00 82925 Sanford Road/I-90 R BRDG BOF 80,000 185 20,000 100,000 100,000

Erie 3103 B00 82925 Sanford Road/I-90 C BRDG 185 1,000,000 1,000,000 1,000,000

Erie 3103 B00 82925 Sanford Road/I-90 C BRDG 185 1,500,000 1,500,000 1,500,000

Erie 4010 A01 102074Hamot Rd Widening U HCON 581 25,000 25,000 25,000

Erie 4010 A01 102074Hamot Rd Widening R HCON 581 50,000 50,000 50,000

Erie 4010 A01 102074Hamot Rd Widening R HCON 581 70,000 70,000 70,000

Erie 4010 A01 102074Hamot Rd Widening C HCON 581 100,000 100,000 100,000

Erie 4010 A01 102074Hamot Rd Widening C HCON 581 250,000 250,000 250,000

Erie 4010 A02 102075SR 699 & Hershey Road P HCON 581 100,000 100,000 100,000

Erie 4010 A02 102075SR 699 & Hershey Road F HCON 581 50,000 50,000 50,000

Erie 4010 A02 102075SR 699 & Hershey Road F HCON 581 100,000 100,000 100,000

Erie 4010 A02 102075SR 699 & Hershey Road U HCON 581 25,000 25,000 25,000

Erie 4010 A02 102075SR 699 & Hershey Road R HCON 581 100,000 100,000 100,000

Erie 4010 A02 102075SR 699 & Hershey Road R HCON 581 600,000 600,000 600,000

Erie 4010 A02 102075SR 699 & Hershey Road C HCON 581 300,000 300,000 300,000

Erie 4010 A02 102075SR 699 & Hershey Road C HCON 581 580,000 580,000 580,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr F HRST 581 500,000 500,000 500,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr U HRST 581 50,000 50,000 50,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr R HRST 581 1,000,000 1,000,000 1,000,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr C HRST 581 4,000,000 4,000,000 4,000,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr C HRST 581 4,000,000 4,000,000 4,000,000

Erie 4012 A00 95558 SR 4012: Intrchng Rd Impr C HRST 581 4,000,000 4,000,000 4,000,000

Erie 4012 B01 58229 SR 4012 Br over I-79 C BRDG 185 1,125,000 1,125,000 1,125,000

Erie 4016 L00 88716 Millfair Road Project +C HCON STP 1,000,000 1,000,000 1,000,000

Erie 4016 L00 88716 Millfair Road Project +C HCON STP 6,000,000 6,000,000 6,000,000

Erie 4016 L00 88716 Millfair Road Project +C HCON STP 4,000,000 4,000,000 4,000,000

Totals for: Erie 32,456,550 12,185,000 52,500 44,694,050 17,786,000 13,817,080 65,775 31,668,855 14,836,000 18,695,999 81,250 33,613,249 10,836,000 18,086,731 81,250 29,003,981 138,980,135

Fayette 101968D12 Pvmt Presv Design P HRST 581 250,000 250,000 250,000

Fayette 101968D12 Pvmt Presv Design P HRST 581 250,000 250,000 250,000

Fayette 102034Fayette DFB-2015 C BRDG 581 150,000 150,000 150,000

Fayette 102034Fayette DFB-2015 C BRDG 581 150,000 150,000 150,000

Fayette 102812Univ Bus Park Access Road C HCON APL 500,000 500,000 500,000

Fayette 103118D12 Stormwater Management C HRST NHPP 1,000,000 1,000,000 1,000,000

Fayette 81229 D12 Bridge Preservation F BRDG 185 200,000 200,000 200,000

Fayette 81229 D12 Bridge Preservation F BRDG 185 200,000 200,000 200,000

Fayette 81229 D12 Bridge Preservation C BRDG 581 4,000,000 4,000,000 4,000,000

Fayette 81229 D12 Bridge Preservation C BRDG 185 1,000,000 1,000,000 1,000,000

Fayette 81229 D12 Bridge Preservation C BRDG 581 3,000,000 3,000,000 3,000,000

Fayette 97978 D12 Wetland/Steam Monitor C HRST 581 10,000 10,000 10,000

Fayette BMR 96657 Bruceton Mills Rd. T-311 P HRST STP 140,000 140,000 140,000

Page 92: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

92 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Fayette BMR 96657 Bruceton Mills Rd. T-311 +C HRST STP 3,000,000 3,000,000 3,000,000

Fayette DTB 98239 Dunbar Twp Business Park C HCON APL 300,000 250,000 550,000 550,000

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 5,637 185 2,250,820 2,256,457 2,256,457

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 2,760,980 185 1,841,944 4,602,924 4,602,924

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 2,228,272 185 1,154,709 3,382,981 3,382,981

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C BRDG BOF 1,312,982 185 5,717,637 7,030,619 7,030,619

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 1,716,160 581 1,810,466 3,526,626 3,526,626

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST NHPP 1,875,712 581 1,574,059 3,449,771 3,449,771

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 763,506 763,506 763,506

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 231,885 581 371,873 603,758 603,758

Fayette RLI 76508 Dist12 Hwy/Brdg Line Item C HRST STP 382,096 581 9,838,460 10,220,556 10,220,556

Fayette 21 0 94953 FACO Signals-1 P SAMI CAQ 80,000 581 20,000 100,000 100,000

Fayette 21 0 94953 FACO Signals-1 U SAMI CAQ 80,000 581 20,000 100,000 100,000

Fayette 21 0 94953 FACO Signals-1 R SAMI CAQ 82,500 581 27,500 110,000 110,000

Fayette 21 0 94953 FACO Signals-1 C SAMI CAQ 1,172,000 581 293,000 1,465,000 1,465,000

Fayette 21 0 98144 12-14-RPM C HRST 581 330,000 330,000 330,000

Fayette 40 0 98418 US 40: US 119 to SR 4039 +C HRST NHPP 2,253,749 2,253,749 2,253,749

Fayette 40 10B 75056 US 40/PA 381 Intersection C HRST NHPP 1,378,578 581 736,984 2,115,562 2,115,562

Fayette 40 10B 75056 US 40/PA 381 Intersection C HRST SXF 1,569,359 1,569,359 1,569,359

Fayette 40 136 29949 Torchlight Intersection C SAMI HSIP 3,191,173 3,191,173 3,191,173

Fayette 51 0 98145 12-14-LCSIP C HRST 581 400,000 400,000 400,000

Fayette 51 24R 87370 PA 51 Uniontown to Bitner +C HRST NHPP 3,933,817 3,933,817 3,933,817

Fayette 119 20K 96661 McClure Road Intersection P HCON 581 1,000,000 1,000,000 1,000,000

Fayette 119 20K 96661 McClure Road Intersection P HCON 581 500,000 500,000 500,000

Fayette 166 03R 99535 PA 166: PA 21 to SR 4002 +C HRST STP 3,700,000 3,700,000 3,700,000

Fayette 166 04R 98423 PA 166: Nilan Rd to 3006 C HRST STP 1,000,000 1,000,000 1,000,000

Fayette 166 04R 98423 PA 166: Nilan Rd to 3006 C HRST STP 2,484,649 2,484,649 2,484,649

Fayette 166 05R 98411 PA 166: Masontown to 3006 C HRST 581 3,696,750 3,696,750 3,696,750

Fayette 381 0 98424 PA381:Kooser Rd to PA 281 +C HRST 581 2,996,667 2,996,667 2,996,667

Fayette 381 0 98425 PA 381:MillerRdtoKooserRd +C HRST 581 3,253,329 3,253,329 3,253,329

Fayette 906 0 103392PA 906 ER Slide Repair C HRST 581 700,000 700,000 700,000

Fayette 906 A10 95794 PA906 Slide & Realignment P HRST 581 850,000 850,000 850,000

Fayette 906 A10 95794 PA906 Slide & Realignment F HRST 581 250,000 250,000 250,000

Fayette 906 A10 95794 PA906 Slide & Realignment F HRST 581 250,000 250,000 250,000

Fayette 906 A10 95794 PA906 Slide & Realignment U HRST 581 437,091 437,091 437,091

Fayette 906 A10 95794 PA906 Slide & Realignment R HRST 581 218,545 218,545 218,545

Fayette 906 A10 95794 PA906 Slide & Realignment +C HRST STP 2,000,000 2,000,000 2,000,000

Fayette 906 A10 95794 PA906 Slide & Realignment +C HRST STP 1,824,545 1,824,545 1,824,545

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run P BRDG 185 327,818 327,818 327,818

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run F BRDG 185 225,102 225,102 225,102

Page 93: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

93 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run U BRDG 185 56,275 56,275 56,275

Fayette 2040 0 90993 SR 2040 ov Coal Lick Run R BRDG 185 109,273 109,273 109,273

Fayette 2040 0 93507 SR 2040 over Redstone Ck P BRDG 185 358,216 358,216 358,216

Fayette 3010 0 81935 SR 3010 over York Run +C BRDG 185 200,000 200,000 200,000

Fayette 4003 0 74344 Cast Iron Bridge P BRDG 185 470,000 470,000 470,000

Fayette 4003 0 74344 Cast Iron Bridge P BRDG 185 500,000 500,000 500,000

Fayette 4028 D10 29852 SR 4028 over Redstone Ck R BRDG 185 135,000 135,000 135,000

Fayette 4028 D10 29852 SR 4028 over Redstone Ck C BRDG 185 1,371,800 1,371,800 1,371,800

Fayette 4028 D10 29852 SR 4028 over Redstone Ck C BRDG 185 750,000 750,000 750,000

Fayette 4028 D11 79336 SR 4028 over Rowes Run R BRDG 185 50,000 50,000 50,000

Fayette 4028 D11 79336 SR 4028 over Rowes Run C BRDG 185 1,091,350 1,091,350 1,091,350

Fayette 4028 D11 79336 SR 4028 over Rowes Run C BRDG 185 500,000 500,000 500,000

Fayette 4038 0 81192 Layton Bridge P BRDG 185 1,000,000 1,000,000 1,000,000

Fayette 4038 0 81192 Layton Bridge P BRDG 185 1,000,000 1,000,000 1,000,000

Fayette 4046 D10 51494 SR 4046 o Lutz/RR C BRDG 185 1,545,000 1,545,000 1,545,000

Fayette 4046 D10 51494 SR 4046 o Lutz/RR C BRDG 185 145,000 145,000 145,000

Fayette 7206 BR 29839 Weaver Mill #95 P BRDG BOF 16,000 16,000 16,000

Fayette 7206 BR 29839 Weaver Mill #95 P HRST 179 12,000 12,000 12,000

Fayette 7206 BR 29839 Weaver Mill #95 F BRDG BOF 72,000 179 18,000 90,000 90,000

Fayette 7206 BR 29839 Weaver Mill #95 C BRDG BOF 824,000 179 206,000 1,030,000 1,030,000

Fayette 7206 102 29840 Fayette Co Bridge #102 P BRDG BOF 164,800 179 41,200 206,000 206,000

Fayette 7206 102 29840 Fayette Co Bridge #102 F BRDG BOF 174,836 43,709 218,545 218,545

Fayette 7206 102 29840 Fayette Co Bridge #102 U BRDG BOF 8,000 2,000 10,000 10,000

Fayette 7206 102 29840 Fayette Co Bridge #102 R BRDG BOF 8,000 2,000 10,000 10,000

Fayette 7206 162 29980 Mountain Creek 162 F BRDG 183 45,600 45,600 45,600

Fayette 7206 162 29980 Mountain Creek 162 F HRST 179 11,400 11,400 11,400

Fayette 7206 162 29980 Mountain Creek 162 C BRDG BOF 906,400 179 220,000 1,126,400 1,126,400

Fayette 7224 0 101958Fayette County #43 P BRDG BOF 180,000 45,000 225,000 225,000

Fayette 7224 0 101958Fayette County #43 F BRDG BOF 180,000 45,000 225,000 225,000

Fayette 7224 0 101958Fayette County #43 U BRDG BOF 8,000 2,000 10,000 10,000

Fayette 7224 0 101958Fayette County #43 R BRDG BOF 8,000 2,000 10,000 10,000

Fayette 7224 0 101958Fayette County #43 C BRDG BOF 800,000 200,000 1,000,000 1,000,000

Totals for: Fayette 14,660,107 11,686,470 250,000 26,596,577 10,484,198 8,755,789 45,000 19,284,987 14,481,708 8,151,900 296,709 22,930,317 4,691,623 31,544,709 36,236,332 105,048,213

Forest 36 13M 97891 SR 36: Col Drake Hwy 1 C HRST 581 2,150,000 2,150,000 2,150,000

Forest 62 08M 97900 SR 62:Tionesta-W. Hickory C HRST NHPP 600,000 600,000 600,000

Forest 62 08M 97900 SR 62:Tionesta-W. Hickory C HRST NHPP 2,200,000 2,200,000 2,200,000

Forest 62 08M 97900 SR 62:Tionesta-W. Hickory C HRST NHPP 200,000 200,000 200,000

Forest 62 B01 1343 Hunter Station Br - US 62 F BRDG NHPP 880,000 185 220,000 1,100,000 1,100,000

Forest 62 B01 1343 Hunter Station Br - US 62 U BRDG NHPP 48,000 185 12,000 60,000 60,000

Forest 62 B01 1343 Hunter Station Br - US 62 R BRDG NHPP 1,600,000 185 400,000 2,000,000 2,000,000

Page 94: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

94 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Forest 62 B01 1343 Hunter Station Br - US 62 +C BRDG NHPP 4,000,000 4,000,000 4,000,000

Forest 62 B01 1343 Hunter Station Br - US 62 +C BRDG NHPP 5,500,000 5,500,000 5,500,000

Forest 62 B01 1343 Hunter Station Br - US 62 +C BRDG STP 5,000,000 5,000,000 5,000,000

Forest 62 B01 1343 Hunter Station Br - US 62 +C BRDG NHPP 5,500,000 5,500,000 5,500,000

Forest 62 B01 1343 Hunter Station Br - US 62 +C BRDG STP 5,000,000 5,000,000 5,000,000

Forest 66 09M 99074 PA 66: Birch St-Blue Jay C HRST 581 2,200,000 2,200,000 2,200,000

Forest 227 DOI 96883 Forest DOI Group C HRST 581 364,400 364,400 364,400

Forest 666 WA1 97040 SR 666 Retaining Wall #1 C HRST 581 1,000,000 1,000,000 1,000,000

Forest 666 WA2 97041 SR 666 Retaining Wall #2 C HRST 581 1,500,000 1,500,000 1,500,000

Forest 899 01M 97895 SR 899: Jfsn/Frst-SR 66 C HRST 581 5,000,000 5,000,000 5,000,000

Forest 948 03M 97893 SR 948: Elk Co-Warren Co C HRST 581 1,500,000 1,500,000 1,500,000

Forest 1003 B03 1414 Blue Jay Ck Br #2 P BRDG 581 200,000 200,000 200,000

Forest 1003 B03 1414 Blue Jay Ck Br #2 F BRDG 581 150,000 150,000 150,000

Forest 1003 B03 1414 Blue Jay Ck Br #2 U BRDG 581 25,000 25,000 25,000

Forest 1003 B03 1414 Blue Jay Ck Br #2 R BRDG 581 25,000 25,000 25,000

Forest 1003 B03 1414 Blue Jay Ck Br #2 C BRDG 581 700,000 700,000 700,000

Forest 3003 01M 99849 SR 3003: Waltonbaugh Rd C HRST 581 300,000 300,000 300,000

Forest 3004 01M 99851 SR 3004: Lil Hickory Road C HRST 581 850,000 850,000 850,000

Forest 3005 01M 99853 SR 3005: Clarion-Golinza C HRST 581 525,000 525,000 525,000

Forest 4002 01M 99823 SR 4002: Dawson Road C HRST 581 625,000 625,000 625,000

Forest 4008 01M 99825 SR 4008: Grange Hall Road C HRST 581 310,000 310,000 310,000

Totals for: Forest 3,128,000 3,146,400 6,274,400 6,200,000 8,900,000 15,100,000 10,700,000 2,700,000 13,400,000 10,500,000 3,310,000 13,810,000 48,584,400

Franklin 101395Franklin RBR Initiative C BRDG 581 1,000,000 1,000,000 1,000,000

Franklin 102147Roadway Maint Line Item C HRST 409 1,620,000 1,620,000 1,620,000

Franklin 102147Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Franklin 102147Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Franklin 102147Roadway Maint Line Item C HRST 409 2,823,999 2,823,999 2,823,999

Franklin 102384Franklin Signal Improvemt +P SAMI CAQ 250,000 250,000 250,000

Franklin 102384Franklin Signal Improvemt F SAMI CAQ 200,000 200,000 200,000

Franklin 102384Franklin Signal Improvemt +C SAMI CAQ 864,727 864,727 864,727

Franklin 102384Franklin Signal Improvemt +C SAMI CAQ 863,764 863,764 863,764

Franklin 87804 Franklin Bridge Reserve C BRDG STP 134,127 185 127,776 261,903 261,903

Franklin 87804 Franklin Bridge Reserve C BRDG STP 552,836 185 78,209 631,045 631,045

Franklin 87804 Franklin Bridge Reserve C BRDG 185 60,051 60,051 60,051

Franklin 87805 Highway Reserve C HRST NHPP 750,000 750,000 750,000

Franklin 87808 CMAQ Line Item C SAMI CAQ 616,623 616,623 616,623

Franklin 87808 CMAQ Line Item C SAMI CAQ 665,680 665,680 665,680

Franklin 87810 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Franklin 87810 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Franklin 87810 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Page 95: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

95 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Franklin 87810 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Franklin 87810 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Franklin 87810 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Franklin 87810 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Franklin 87810 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Franklin 87816 HSIP Line Item C SAMI HSIP 1,110,616 1,110,616 1,110,616

Franklin 88666 SRTP Rideshare Program P IMOD CAQ 94,377 94,377 94,377

Franklin 88666 SRTP Rideshare Program P IMOD CAQ 95,320 95,320 95,320

Franklin 88666 SRTP Rideshare Program P IMOD CAQ 96,273 96,273 96,273

Franklin 88666 SRTP Rideshare Program P IMOD CAQ 97,236 97,236 97,236

Franklin RPM 96928 Dist AWPM SFY 2013-2014 C HRST STP 40,000 40,000 40,000

Franklin RRX 102974South Third St Crossing +C SAMI RRX 133,900 133,900 133,900

Franklin RRX 102974South Third St Crossing +C SAMI RRX 133,900 133,900 133,900

Franklin SXF 84433 Martin's Mill Bridge C BRDG HCB 704,000 704,000 704,000

Franklin SXF 84433 Martin's Mill Bridge C BRDG SXF 245,000 245,000 245,000

Franklin 11 065 74894 Philadelphia Ave Bridge F BRDG NHPP 240,000 185 60,000 300,000 300,000

Franklin 11 065 74894 Philadelphia Ave Bridge U BRDG NHPP 12,000 185 3,000 15,000 15,000

Franklin 11 065 74894 Philadelphia Ave Bridge R BRDG NHPP 12,000 185 3,000 15,000 15,000

Franklin 11 065 74894 Philadelphia Ave Bridge +C BRDG NHPP 852,000 852,000 852,000

Franklin 11 065 74894 Philadelphia Ave Bridge +C BRDG NHPP 1,808,000 1,808,000 1,808,000

Franklin 11 075 86970 US11 & PA997 Intersection F SAMI HSIP 153,226 153,226 153,226

Franklin 11 075 86970 US11 & PA997 Intersection U SAMI HSIP 200,000 200,000 200,000

Franklin 11 075 86970 US11 & PA997 Intersection R SAMI HSIP 768,774 768,774 768,774

Franklin 11 075 86970 US11 & PA997 Intersection R SAMI STP 131,226 131,226 131,226

Franklin 11 075 86970 US11 & PA997 Intersection +C SAMI HSIP 1,122,000 1,122,000 1,122,000

Franklin 11 075 86970 US11 & PA997 Intersection +C SAMI HSIP 1,122,000 1,122,000 1,122,000

Franklin 11 075 86970 US11 & PA997 Intersection +C SAMI HSIP 11,384 11,384 11,384

Franklin 11 093 87446 US 11 Conococheague Cr Br P BRDG 185 75,000 75,000 75,000

Franklin 11 094 87680 Falling Spring Run Bridge +P BRDG STP 350,000 350,000 350,000

Franklin 11 094 87680 Falling Spring Run Bridge F BRDG STP 200,000 200,000 200,000

Franklin 11 094 87680 Falling Spring Run Bridge U BRDG STP 75,000 75,000 75,000

Franklin 11 094 87680 Falling Spring Run Bridge R BRDG STP 75,000 75,000 75,000

Franklin 11 095 19304 West King Street Bridge P BRDG STP 167,335 185 41,833 209,168 209,168

Franklin 16 037 74889 PA-16 Memorial Bridge C BRDG 185 60,000 60,000 60,000

Franklin 16 037 74889 PA-16 Memorial Bridge C BRDG 581 990,800 990,800 990,800

Franklin 16 037 74889 PA-16 Memorial Bridge C BRDG 581 1,469,200 1,469,200 1,469,200

Franklin 16 040 90914 Buchanan Trail West C HRST STP 160,000 160,000 160,000

Franklin 16 045 100009PA 16 over Conococheague P BRDG 185 100,000 100,000 100,000

Franklin 16 045 100009PA 16 over Conococheague +F BRDG STP 150,000 150,000 150,000

Franklin 16 045 100009PA 16 over Conococheague +U BRDG STP 50,000 50,000 50,000

Page 96: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

96 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Franklin 16 045 100009PA 16 over Conococheague +R BRDG STP 50,000 50,000 50,000

Franklin 16 045 100009PA 16 over Conococheague +C BRDG STP 700,000 700,000 700,000

Franklin 16 046 90813 Marsh Run Road P BRDG 581 150,000 150,000 150,000

Franklin 16 046 90813 Marsh Run Road F BRDG 185 200,000 200,000 200,000

Franklin 16 046 90813 Marsh Run Road U BRDG 185 50,000 50,000 50,000

Franklin 16 046 90813 Marsh Run Road R BRDG 185 50,000 50,000 50,000

Franklin 30 103 90839 Rocky Mountain Creek Br U BRDG 185 50,000 50,000 50,000

Franklin 30 103 90839 Rocky Mountain Creek Br R BRDG 185 50,000 50,000 50,000

Franklin 30 103 90839 Rocky Mountain Creek Br +C BRDG NHPP 1,544,000 1,544,000 1,544,000

Franklin 30 103 90839 Rocky Mountain Creek Br +C BRDG NHPP 956,000 956,000 956,000

Franklin 30 116 100046US 30 over Campbell Run P BRDG 185 200,000 200,000 200,000

Franklin 30 117 100051US30 over trib of Back Cr P BRDG 185 150,000 150,000 150,000

Franklin 30 118 100237US30 over Conococheague P BRDG 581 100,000 100,000 100,000

Franklin 30 118 100237US30 over Conococheague U BRDG 185 15,000 15,000 15,000

Franklin 30 118 100237US30 over Conococheague R BRDG 185 15,000 15,000 15,000

Franklin 30 118 100237US30 over Conococheague C BRDG 185 300,000 300,000 300,000

Franklin 30 119 90322 Lincoln Highway Bridge 1 P BRDG 185 185,224 185,224 185,224

Franklin 30 119 90322 Lincoln Highway Bridge 1 F BRDG 185 125,000 125,000 125,000

Franklin 30 119 90322 Lincoln Highway Bridge 1 U BRDG 185 50,000 50,000 50,000

Franklin 30 119 90322 Lincoln Highway Bridge 1 R BRDG 185 50,000 50,000 50,000

Franklin 30 119 90322 Lincoln Highway Bridge 1 +C BRDG NHPP 750,000 750,000 750,000

Franklin 30 120 90323 Lincoln Highway Bridge 2 P BRDG 185 175,000 175,000 175,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 P BRDG 581 175,000 175,000 175,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 F BRDG 185 125,000 125,000 125,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 U BRDG 185 50,000 50,000 50,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 R BRDG 185 50,000 50,000 50,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 +C BRDG NHPP 308,000 308,000 308,000

Franklin 30 121 90324 Lincoln Highway Bridge 3 +C BRDG STP 345,000 345,000 345,000

Franklin 75 008 86886 Path Valley Road C HRST 582 1,520,000 1,520,000 1,520,000

Franklin 75 011 90997 Path Valley Road 2 C HRST 409 1,255,000 1,255,000 1,255,000

Franklin 75 011 90997 Path Valley Road 2 C HRST 409 545,001 545,001 545,001

Franklin 75 012 99180 Frkln Grp G Preservations C BRDG 581 705,000 705,000 705,000

Franklin 81 068 95498 Leitersburg Rd/I-81 Brdgs C BRDG STP 821,647 821,647 821,647

Franklin 81 075 93055 I-81 New Interchange P HCON 581 2,500,000 2,500,000 2,500,000

Franklin 81 075 93055 I-81 New Interchange P HCON 581 1,250,000 1,250,000 1,250,000

Franklin 81 075 93055 I-81 New Interchange P HCON 581 250,000 250,000 250,000

Franklin 81 075 93055 I-81 New Interchange F HCON 581 2,457,800 2,457,800 2,457,800

Franklin 233 017 96291 PA 233 Resurface C HRST 409 375,999 375,999 375,999

Franklin 233 017 96291 PA 233 Resurface C HRST 409 3,374,000 3,374,000 3,374,000

Franklin 233 017 96291 PA 233 Resurface C HRST 409 650,001 650,001 650,001

Page 97: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

97 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Franklin 233 018 100149PA233 over Rocky Mtn Crk P BRDG 185 78,614 78,614 78,614

Franklin 233 018 100149PA233 over Rocky Mtn Crk P BRDG 185 121,386 121,386 121,386

Franklin 416 004 82978 Mercersburg Rd Bridge C BRDG 581 1,301,800 1,301,800 1,301,800

Franklin 416 004 82978 Mercersburg Rd Bridge C BRDG 581 1,198,200 1,198,200 1,198,200

Franklin 416 005 96367 Mercersburg Rd Resurf #1 C HRST 409 2,100,000 2,100,000 2,100,000

Franklin 456 002 78691 Little Cove Road Bridge P BRDG 581 250,000 250,000 250,000

Franklin 456 002 78691 Little Cove Road Bridge U BRDG 581 20,000 20,000 20,000

Franklin 456 002 78691 Little Cove Road Bridge R BRDG 581 100,000 100,000 100,000

Franklin 456 002 78691 Little Cove Road Bridge C BRDG 581 965,000 965,000 965,000

Franklin 533 004 82979 Orrstown Rd Bridge 2 F BRDG 185 150,000 150,000 150,000

Franklin 533 004 82979 Orrstown Rd Bridge 2 R BRDG 185 50,000 50,000 50,000

Franklin 533 004 82979 Orrstown Rd Bridge 2 C BRDG 185 1,143,541 1,143,541 1,143,541

Franklin 533 004 82979 Orrstown Rd Bridge 2 C BRDG 185 106,387 106,387 106,387

Franklin 997 026 87444 PA997 Over Conodoguinet 2 F BRDG 185 200,000 200,000 200,000

Franklin 997 026 87444 PA997 Over Conodoguinet 2 U BRDG 185 15,000 15,000 15,000

Franklin 997 026 87444 PA997 Over Conodoguinet 2 R BRDG 185 15,000 15,000 15,000

Franklin 997 026 87444 PA997 Over Conodoguinet 2 C BRDG 581 3,177,000 3,177,000 3,177,000

Franklin 997 027 87682 Cumberland Highway Bridge F BRDG 185 200,000 200,000 200,000

Franklin 997 027 87682 Cumberland Highway Bridge U BRDG 185 15,000 15,000 15,000

Franklin 997 027 87682 Cumberland Highway Bridge R BRDG 185 15,000 15,000 15,000

Franklin 997 027 87682 Cumberland Highway Bridge C BRDG STP 1,128,665 185 282,166 1,410,831 1,410,831

Franklin 997 033 100003Black Gap Road over NS P BRDG 581 150,000 150,000 150,000

Franklin 997 033 100003Black Gap Road over NS U BRDG 185 15,000 15,000 15,000

Franklin 997 033 100003Black Gap Road over NS R BRDG 185 15,000 15,000 15,000

Franklin 997 034 90856 W Branch of Antietam Ck P BRDG 185 75,000 75,000 75,000

Franklin 997 035 99971 Black Gap Rd bridge PM P BRDG STP 168,164 168,164 168,164

Franklin 997 035 99971 Black Gap Rd bridge PM F BRDG 185 75,000 75,000 75,000

Franklin 997 035 99971 Black Gap Rd bridge PM U BRDG 581 15,000 15,000 15,000

Franklin 997 035 99971 Black Gap Rd bridge PM R BRDG 581 15,000 15,000 15,000

Franklin 1006 005 79700 Main Street-Scotland P HCON 581 432,000 432,000 432,000

Franklin 1006 005 79700 Main Street-Scotland P HCON 581 18,000 18,000 18,000

Franklin 1006 005 79700 Main Street-Scotland F HCON 581 350,000 350,000 350,000

Franklin 1006 005 79700 Main Street-Scotland U HCON 581 350,000 350,000 350,000

Franklin 1006 005 79700 Main Street-Scotland R HCON 581 350,000 350,000 350,000

Franklin 1006 005 79700 Main Street-Scotland C HCON 581 2,622,000 2,622,000 2,622,000

Franklin 2016 013 63179 SR 2016/I-81 Bridge P BRDG 185 50,000 50,000 50,000

Franklin 2031 013 93208 Mont Alto Road Bridge P BRDG 581 75,000 75,000 75,000

Franklin 2031 013 93208 Mont Alto Road Bridge F BRDG 185 50,000 50,000 50,000

Franklin 2031 013 93208 Mont Alto Road Bridge U BRDG 185 15,000 15,000 15,000

Franklin 2031 013 93208 Mont Alto Road Bridge R BRDG 185 25,000 25,000 25,000

Page 98: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

98 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Franklin 3002 010 19411 Williamson Road Bridge P BRDG 581 250,000 250,000 250,000

Franklin 3002 010 19411 Williamson Road Bridge U BRDG 581 20,000 20,000 20,000

Franklin 3002 010 19411 Williamson Road Bridge R BRDG 581 20,000 20,000 20,000

Franklin 3002 010 19411 Williamson Road Bridge C BRDG 581 901,200 901,200 901,200

Franklin 3012 027 90969 Jack Road Bridge 2 P BRDG 185 250,000 250,000 250,000

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br F BRDG BOF 120,000 179 7,500 127,500 127,500

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br F BRDG 183 22,500 22,500 22,500

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br U BRDG BOF 20,000 179 1,250 21,250 21,250

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br U BRDG 183 3,750 3,750 3,750

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br R BRDG BOF 20,000 179 1,250 21,250 21,250

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br R BRDG 183 3,750 3,750 3,750

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br C BRDG BOF 224,000 179 42,000 266,000 266,000

Franklin 4004 BRG 63180 Lower Horse Valley Rd Br C BRDG 183 14,000 14,000 14,000

Franklin 4010 010 19373 Edenville Road Bridge F BRDG STP 160,000 185 40,000 200,000 200,000

Franklin 4010 010 19373 Edenville Road Bridge U BRDG STP 12,000 185 3,000 15,000 15,000

Franklin 4010 010 19373 Edenville Road Bridge R BRDG STP 12,000 185 3,000 15,000 15,000

Franklin 4010 010 19373 Edenville Road Bridge C BRDG BOF 187,000 185 152,750 339,750 339,750

Franklin 4010 010 19373 Edenville Road Bridge C BRDG STP 424,000 424,000 424,000

Franklin 4010 010 19373 Edenville Road Bridge C BRDG BOF 611,000 185 165,000 776,000 776,000

Franklin 4010 010 19373 Edenville Road Bridge C BRDG STP 49,000 49,000 49,000

Franklin 7202 BRG 92542 Store Lane Bridge C BRDG BOF 451,000 179 37,500 488,500 488,500

Franklin 7202 BRG 92542 Store Lane Bridge C BRDG 183 112,500 112,500 112,500

Franklin 7202 BRG 92542 Store Lane Bridge C BRDG STP 149,000 149,000 149,000

Franklin 7209 BRG 92543 Heisey Road T330 CO#121 P BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Franklin 7209 BRG 92543 Heisey Road T330 CO#121 F BRDG BOF 120,000 183 7,500 22,500 150,000 150,000

Franklin 7209 BRG 92543 Heisey Road T330 CO#121 U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Franklin 7209 BRG 92543 Heisey Road T330 CO#121 R BRDG BOF 24,000 183 7,500 1,500 33,000 33,000

Franklin 7209 BRG 92543 Heisey Road T330 CO#121 C BRDG BOF 451,000 183 84,563 28,188 563,751 563,751

Totals for: Franklin 7,204,900 10,237,000 17,441,900 6,130,900 10,554,000 12,500 16,697,400 5,997,000 12,956,000 18,953,000 5,997,000 12,956,000 53,188 19,006,188 72,098,488

Fulton 522 015 92619 Webster Mills-Hoke Run Br U HRST 581 100,000 100,000 100,000

Fulton 522 015 92619 Webster Mills-Hoke Run Br R HRST 581 250,000 250,000 250,000

Fulton 522 015 92619 Webster Mills-Hoke Run Br C HRST 581 3,965,000 3,965,000 3,965,000

Fulton 522 16B 98776 US 522 Hoke Run Bridge P BRDG STP 250,000 250,000 250,000

Fulton 522 16B 98776 US 522 Hoke Run Bridge +F BRDG STP 250,000 250,000 250,000

Fulton 522 16B 98776 US 522 Hoke Run Bridge +U BRDG STP 50,000 50,000 50,000

Fulton 522 16B 98776 US 522 Hoke Run Bridge +R BRDG STP 50,000 50,000 50,000

Fulton 522 16B 98776 US 522 Hoke Run Bridge +C BRDG STP 1,000,000 1,000,000 1,000,000

Fulton 655 05B 98775 PA655 Sideling Hill Creek P BRDG 185 25,000 25,000 25,000

Fulton 655 05B 98775 PA655 Sideling Hill Creek R BRDG 185 50,000 50,000 50,000

Fulton 655 05B 98775 PA655 Sideling Hill Creek C BRDG 185 400,000 400,000 400,000

Page 99: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

99 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Fulton 913 02B 22833 PA 913 Roaring Rn Bridge P BRDG 185 25,000 25,000 25,000

Fulton 913 02B 22833 PA 913 Roaring Rn Bridge R BRDG 185 50,000 50,000 50,000

Fulton 913 02B 22833 PA 913 Roaring Rn Bridge C BRDG 185 800,000 800,000 800,000

Fulton 928 02B 22785 Big Cove Tannery Bridge C BRDG BOF 206,467 206,467 206,467

Fulton 928 02B 22785 Big Cove Tannery Bridge C BRDG BOF 851,000 851,000 851,000

Fulton 928 02B 22785 Big Cove Tannery Bridge C BRDG BOF 142,533 142,533 142,533

Fulton 1011 01B 22698 Fort Littleton Bridge C BRDG 185 500,000 500,000 500,000

Fulton 3005 01B 22838 2015 DF Fulton GRS Bridge C BRDG 185 230,000 230,000 230,000

Fulton 4001 001 96556 Black Bear Rd to US 30 C HRST 581 2,000,000 2,000,000 2,000,000

Fulton 4007 002 96566 US 30 to North Hess Road C HRST 581 1,405,000 1,405,000 1,405,000

Fulton 7203 344 22795 T-344 Barnetts Run Bridge F BRDG BOF 140,000 183 26,250 8,750 175,000 175,000

Fulton 7203 344 22795 T-344 Barnetts Run Bridge U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Fulton 7203 344 22795 T-344 Barnetts Run Bridge R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Fulton 7203 344 22795 T-344 Barnetts Run Bridge C BRDG BOF 280,000 183 52,500 17,500 350,000 350,000

Fulton 7203 344 22795 T-344 Barnetts Run Bridge C BRDG BOF 280,000 183 52,500 17,500 350,000 350,000

Fulton 7401 NTS 102551North Third Street Bridge C BRDG 183 250,000 62,500 312,500 312,500

Totals for: Fulton 624,467 2,466,500 73,000 3,163,967 1,201,000 2,350,000 3,551,000 422,533 152,500 17,500 592,533 1,280,000 5,217,500 17,500 6,515,000 13,822,500

Greene 102035Greene DFB-2015 C BRDG 581 150,000 150,000 150,000

Greene 102035Greene DFB-2015 C BRDG 581 150,000 150,000 150,000

Greene 86903 D12 Open Plan Agreement P HRST 581 50,000 50,000 50,000

Greene 91258 GRCO Airport Access Rd C HCON APL 800,000 250,000 1,050,000 1,050,000

Greene BR 30079 County Bridge #78 U BRDG 179 2,000 2,000 2,000

Greene BR 30079 County Bridge #78 U BRDG 183 8,000 8,000 8,000

Greene BR 30079 County Bridge #78 R BRDG 179 5,000 5,000 5,000

Greene BR 30079 County Bridge #78 R BRDG 183 20,000 20,000 20,000

Greene BR 30079 County Bridge #78 C BRDG 179 150,000 150,000 150,000

Greene BR 30079 County Bridge #78 C BRDG 183 600,000 600,000 600,000

Greene 18 0 73513 PA 18: PA 21 to Browns Ck C HRST 581 2,000,000 2,000,000 2,000,000

Greene 18 0 73513 PA 18: PA 21 to Browns Ck C HRST 581 2,400,000 2,400,000 2,400,000

Greene 18 0 94683 Brdg Preserve 2014-1 C BRDG 185 701,700 701,700 701,700

Greene 18 0 98406 PA 18: PA 21 to Co Line +C HRST STP 6,947,200 6,947,200 6,947,200

Greene 19 P02 30272 US 19 Safety Improvements C HRST NHPP 2,708,516 2,708,516 2,708,516

Greene 21 10D 84234 Bailey's Crossroads F HRST STP 40,000 581 10,000 50,000 50,000

Greene 21 10D 84234 Bailey's Crossroads R HRST 581 400,000 400,000 400,000

Greene 21 10D 84234 Bailey's Crossroads C HRST SXF 1,068,200 581 267,050 1,335,250 1,335,250

Greene 21 10D 84234 Bailey's Crossroads C HRST STP 2,651,800 581 662,950 3,314,750 3,314,750

Greene 21 15R 82914 PA21:Ridge Rd to Gwynn Rd C HRST NHPP 2,000,000 2,000,000 2,000,000

Greene 79 0 94685 D12 Expansion Dam 2014 C HRST 185 300 300 300

Greene 79 0 95358 D12 Slides 2012-2 P HRST 581 50,000 50,000 50,000

Greene 79 0 95358 D12 Slides 2012-2 C HRST 581 400,000 400,000 400,000

Page 100: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

100 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Greene 218 0 100284PA218:Bluff Ridge to Cook +C HRST STP 4,112,083 4,112,083 4,112,083

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +P BRDG BOF 206,000 206,000 206,000

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 F BRDG BOF 265,225 265,225 265,225

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +U BRDG BOF 53,045 53,045 53,045

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +R BRDG BOF 79,568 79,568 79,568

Greene 1016 A10 76039 1016 ov Ltl Whiteley Ck-2 +C BRDG BOF 2,000,000 2,000,000 2,000,000

Greene 2003 0 96659 Sugar Run Road Intersect P HRST 581 400,000 400,000 400,000

Greene 2003 0 96659 Sugar Run Road Intersect F HRST 581 477,406 477,406 477,406

Greene 2003 0 96659 Sugar Run Road Intersect U HRST 581 159,135 159,135 159,135

Greene 2003 0 96659 Sugar Run Road Intersect R HRST 581 159,135 159,135 159,135

Greene 2003 0 96659 Sugar Run Road Intersect +C HRST 581 2,000,000 2,000,000 2,000,000

Greene 2003 03M 76032 Greene Metal Pipe Pres C BRDG 185 500,000 500,000 500,000

Greene 3001 01A 30134 SR 3001 over Wheeling Ck P BRDG 185 309,000 309,000 309,000

Greene 3001 01A 30134 SR 3001 over Wheeling Ck F BRDG STP 236,494 185 59,123 295,617 295,617

Greene 3001 01A 30134 SR 3001 over Wheeling Ck U BRDG 185 51,500 51,500 51,500

Greene 3001 01A 30134 SR 3001 over Wheeling Ck R BRDG 185 77,250 77,250 77,250

Greene 3001 01A 30134 SR 3001 over Wheeling Ck C BRDG 185 1,000,000 1,000,000 1,000,000

Greene 7203 C15 51393 County Bridge #15 F BRDG BOF 132,000 179 33,000 165,000 165,000

Greene 7203 C15 51393 County Bridge #15 U BRDG BOF 12,000 179 3,000 15,000 15,000

Greene 7203 C15 51393 County Bridge #15 R BRDG BOF 40,000 179 10,000 50,000 50,000

Greene 7203 C15 51393 County Bridge #15 C BRDG BOF 480,000 120,000 600,000 600,000

Greene 7205 0 96658 Cook Ave. (T-529) P HRST STP 250,000 250,000 250,000

Greene 7205 0 96658 Cook Ave. (T-529) F BRDG 185 212,180 212,180 212,180

Greene 7205 0 96658 Cook Ave. (T-529) U BRDG 185 218,545 218,545 218,545

Greene 7205 0 96658 Cook Ave. (T-529) R BRDG 185 106,090 106,090 106,090

Greene 7205 0 96658 Cook Ave. (T-529) C BRDG STP 2,318,549 2,318,549 2,318,549

Greene 7207 C55 93247 County Bridge #55 F BRDG BOF 140,000 179 35,000 175,000 175,000

Greene 7207 C55 93247 County Bridge #55 U BRDG BOF 8,000 179 2,000 10,000 10,000

Greene 7207 C55 93247 County Bridge #55 R BRDG BOF 20,000 179 5,000 25,000 25,000

Greene 7207 C55 93247 County Bridge #55 C BRDG BOF 480,000 120,000 600,000 600,000

Greene 7213 0 86232 Burson Brdg Greene Co #99 C BRDG 183 240,000 240,000 240,000

Greene 7213 0 86232 Burson Brdg Greene Co #99 C HRST 179 60,000 60,000 60,000

Greene 7219 0 86236 County Bridge #36 U BRDG 179 2,000 2,000 2,000

Greene 7219 0 86236 County Bridge #36 U BRDG 183 8,000 8,000 8,000

Greene 7219 0 86236 County Bridge #36 R BRDG 179 5,000 5,000 5,000

Greene 7219 0 86236 County Bridge #36 R BRDG 183 20,000 20,000 20,000

Greene 7219 0 86236 County Bridge #36 C BRDG 179 120,200 120,200 120,200

Greene 7219 0 86236 County Bridge #36 C BRDG 183 480,800 480,800 480,800

Greene 7219 0 86236 County Bridge #36 C BRDG 179 65,182 65,182 65,182

Greene 7219 0 86236 County Bridge #36 C BRDG 183 260,728 260,728 260,728

Page 101: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

101 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Greene 7220 0 96660 Whiteley Creek Bridge F BRDG 185 212,180 212,180 212,180

Greene 7220 0 96660 Whiteley Creek Bridge U BRDG 185 106,090 106,090 106,090

Greene 7220 0 96660 Whiteley Creek Bridge R BRDG 185 106,090 106,090 106,090

Greene 7220 0 96660 Whiteley Creek Bridge +C BRDG BOF 2,251,018 2,251,018 2,251,018

Totals for: Greene 7,424,716 4,120,410 250,000 11,795,126 7,581,532 4,892,614 12,474,146 5,131,800 5,517,610 120,000 10,769,410 9,161,650 1,000,000 120,000 10,281,650 45,320,332

Huntingdon LTF 95897 Lower Trl Fld Protection C TENH STP 54,000 54,000 54,000

Huntingdon 22 31M 91660 22 Wtr St Resurf/Rvr Int C HRST NHPP* 446,364 446,364 446,364

Huntingdon 22 32M 98770 US22/4th St Int Improve P XRST NHPP 200,000 200,000 200,000

Huntingdon 22 32M 98770 US22/4th St Int Improve +F XRST NHPP 150,000 150,000 150,000

Huntingdon 22 32M 98770 US22/4th St Int Improve +U XRST NHPP 25,000 25,000 25,000

Huntingdon 22 32M 98770 US22/4th St Int Improve +R XRST NHPP 50,000 50,000 50,000

Huntingdon 22 32M 98770 US22/4th St Int Improve +C XRST NHPP 1,000,000 1,000,000 1,000,000

Huntingdon 22 33M 98771 US22/Penn St Int Improve P XRST NHPP 200,000 200,000 200,000

Huntingdon 22 33M 98771 US22/Penn St Int Improve +F XRST NHPP 150,000 150,000 150,000

Huntingdon 22 33M 98771 US22/Penn St Int Improve +U XRST NHPP 25,000 25,000 25,000

Huntingdon 22 33M 98771 US22/Penn St Int Improve +R XRST NHPP 150,000 150,000 150,000

Huntingdon 22 33M 98771 US22/Penn St Int Improve +C XRST NHPP 1,000,000 1,000,000 1,000,000

Huntingdon 22 34M 96567 PA26 to Million Dollar Br +C HRST NHPP 1,200,000 1,200,000 1,200,000

Huntingdon 22 36S 88516 US22/PA829 Intsctn Imp P HRST NHPP 300,000 300,000 300,000

Huntingdon 22 36S 88516 US22/PA829 Intsctn Imp +F HRST NHPP 100,000 100,000 100,000

Huntingdon 22 36S 88516 US22/PA829 Intsctn Imp +U HRST NHPP 50,000 50,000 50,000

Huntingdon 22 36S 88516 US22/PA829 Intsctn Imp +R HRST NHPP 150,000 150,000 150,000

Huntingdon 22 36S 88516 US22/PA829 Intsctn Imp +C HRST NHPP 750,000 750,000 750,000

Huntingdon 26 000 96568 US 22 to Mtn Road P HRST 581 160,000 160,000 160,000

Huntingdon 26 000 96568 US 22 to Mtn Road C HRST 581 2,850,000 2,850,000 2,850,000

Huntingdon 26 000 96568 US 22 to Mtn Road C HRST 581 400,000 400,000 400,000

Huntingdon 26 016 50725 Jackson Corner Slide F SAMI 581 300,000 300,000 300,000

Huntingdon 26 016 50725 Jackson Corner Slide U SAMI 581 200,000 200,000 200,000

Huntingdon 26 016 50725 Jackson Corner Slide R SAMI 581 200,000 200,000 200,000

Huntingdon 26 016 50725 Jackson Corner Slide C HRST 581 6,000,000 6,000,000 6,000,000

Huntingdon 26 033 88229 PA26/PA305 Intrsctn Imp +F SAMI 581 400,000 400,000 400,000

Huntingdon 26 033 88229 PA26/PA305 Intrsctn Imp +U SAMI 581 100,000 100,000 100,000

Huntingdon 26 033 88229 PA26/PA305 Intrsctn Imp +R SAMI 581 250,000 250,000 250,000

Huntingdon 26 033 88229 PA26/PA305 Intrsctn Imp +C SAMI HSIP 308,333 308,333 308,333

Huntingdon 26 035 91663 Bedford Co. Line-Mtn Rd C HRST 581 3,400,000 3,400,000 3,400,000

Huntingdon 45 01B 93706 Huntingdon Bridge Deck Pr C BRDG 185 500,000 500,000 500,000

Huntingdon 45 01B 93706 Huntingdon Bridge Deck Pr C BRDG 185 500,000 500,000 500,000

Huntingdon 305 009 96571 PA 26 to Mifflin Co Line C HRST STP* 1,085,427 1,085,427 1,085,427

Huntingdon 305 11B 56680 Greenwood Furnace Trib +R BRDG STP 25,000 25,000 25,000

Huntingdon 305 11B 56680 Greenwood Furnace Trib +C BRDG STP 500,000 500,000 500,000

Page 102: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

102 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Huntingdon 522 11M 91657 Cromwell St to Pmp Stn Rd +C HRST NHPP 2,200,000 2,200,000 2,200,000

Huntingdon 655 008 91659 Wall St to Front Mtn Road C HRST 581 1,600,000 1,600,000 1,600,000

Huntingdon 829 000 103026NS Grade Xings Improvemnt +C SAMI RRX 331,000 331,000 331,000

Huntingdon 913 05B 23053 Coalmont-Shoups Run Brdg C BRDG STP 333,333 333,333 333,333

Huntingdon 913 05B 23053 Coalmont-Shoups Run Brdg C BRDG STP 461,516 461,516 461,516

Huntingdon 913 05B 23053 Coalmont-Shoups Run Brdg C BRDG STP 1,333,334 1,333,334 1,333,334

Huntingdon 913 06B 22998 Barnettstown Bridge U BRDG 185 75,000 75,000 75,000

Huntingdon 913 06B 22998 Barnettstown Bridge R BRDG 185 75,000 75,000 75,000

Huntingdon 913 06B 22998 Barnettstown Bridge C BRDG 185 1,161,500 1,161,500 1,161,500

Huntingdon 913 06B 22998 Barnettstown Bridge C BRDG 185 638,500 638,500 638,500

Huntingdon 913 07B 22978 PA913 Shoups Run Culvert C BRDG STP 116,666 116,666 116,666

Huntingdon 913 07B 22978 PA913 Shoups Run Culvert C BRDG STP 583,334 583,334 583,334

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +F BRDG STP 175,000 175,000 175,000

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +U BRDG STP 35,000 35,000 35,000

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +R BRDG STP 35,000 35,000 35,000

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +C BRDG STP 706,501 706,501 706,501

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +C BRDG STP 1,000,000 1,000,000 1,000,000

Huntingdon 994 10B 23066 Pogue Aughwick Creek Brdg +C BRDG STP 1,593,499 1,593,499 1,593,499

Huntingdon 994 11B 23090 E. Three Springs Bridge F BRDG STP 175,000 175,000 175,000

Huntingdon 994 11B 23090 E. Three Springs Bridge U BRDG STP 35,000 35,000 35,000

Huntingdon 994 11B 23090 E. Three Springs Bridge R BRDG STP 35,000 35,000 35,000

Huntingdon 994 11B 23090 E. Three Springs Bridge +C BRDG STP 141,667 141,667 141,667

Huntingdon 994 11B 23090 E. Three Springs Bridge +C BRDG STP 429,167 429,167 429,167

Huntingdon 994 11B 23090 E. Three Springs Bridge +C BRDG STP 1,364,166 1,364,166 1,364,166

Huntingdon 994 12B 23108 PA994 Sugar Creek Bridge +C BRDG STP 429,166 429,166 429,166

Huntingdon 994 12B 23108 PA994 Sugar Creek Bridge +C BRDG STP 420,834 420,834 420,834

Huntingdon 1006 001 96577 PA305 to Cold Sprngs Road C HRST 581 1,800,000 1,800,000 1,800,000

Huntingdon 1009 003 96578 SR4007 to PA26 Resurface C HRST 581 1,100,000 1,100,000 1,100,000

Huntingdon 2001 01B 23023 Sideling Hill Crk #2 P BRDG 185 25,000 25,000 25,000

Huntingdon 2001 01B 23023 Sideling Hill Crk #2 R BRDG 185 50,000 50,000 50,000

Huntingdon 2001 01B 23023 Sideling Hill Crk #2 C BRDG 185 333,333 333,333 333,333

Huntingdon 2004 003 96581 SR2004 - PA994 to PA475 C HRST 581 1,200,000 1,200,000 1,200,000

Huntingdon 2017 01M 96583 Blcklog Mtn Rd-Juniata Co C HRST 581 944,667 944,667 944,667

Huntingdon 4009 001 96594 SR4009 - PA 305 to PA 305 C HRST 581 1,000,000 1,000,000 1,000,000

Huntingdon 7206 342 102550T-342 Three Springs Creek P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Huntingdon 7206 342 102550T-342 Three Springs Creek F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Huntingdon 7206 342 102550T-342 Three Springs Creek C BRDG BOF 176,000 183 44,000 11,579 231,579 231,579

Huntingdon 7208 548 88096 T-548 Graysville Mill Brg C BRDG BOF 394,666 183 74,000 24,667 493,333 493,333

Huntingdon 7208 548 88096 T-548 Graysville Mill Brg C BRDG BOF 394,666 183 74,000 24,667 493,333 493,333

Huntingdon 7208 548 88096 T-548 Graysville Mill Brg C BRDG BOF 394,666 183 74,000 24,667 493,333 493,333

Page 103: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

103 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Huntingdon 7220 403 102547T-403 Aughwick Crk Bridge P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Huntingdon 7220 403 102547T-403 Aughwick Crk Bridge F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Huntingdon 7220 403 102547T-403 Aughwick Crk Bridge C BRDG BOF 222,400 183 55,600 14,632 292,632 292,632

Huntingdon 7220 403 102547T-403 Aughwick Crk Bridge C BRDG BOF 222,400 183 55,600 14,632 292,632 292,632

Huntingdon 7222 308 102549T-308 Aughwick Creek Brdg P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Huntingdon 7222 308 102549T-308 Aughwick Creek Brdg F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Huntingdon 7222 308 102549T-308 Aughwick Creek Brdg C BRDG BOF 98,133 183 24,533 6,456 129,122 129,122

Huntingdon 7222 308 102549T-308 Aughwick Creek Brdg C BRDG BOF 257,067 183 64,267 16,913 338,247 338,247

Huntingdon 7225 369 102548T-369 Great Trough Crk Br P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Huntingdon 7225 369 102548T-369 Great Trough Crk Br F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Huntingdon 7225 369 102548T-369 Great Trough Crk Br C BRDG BOF 117,200 183 29,300 7,684 154,184 154,184

Huntingdon 7225 369 102548T-369 Great Trough Crk Br C BRDG BOF 117,200 183 29,300 7,684 154,184 154,184

Huntingdon 7415 OMB 67307 Old Mill Bridge F BRDG BOF 140,000 183 26,250 8,750 175,000 175,000

Huntingdon 7415 OMB 67307 Old Mill Bridge R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Huntingdon 7415 OMB 67307 Old Mill Bridge C BRDG BOF 330,000 183 61,875 20,625 412,500 412,500

Huntingdon 7415 OMB 67307 Old Mill Bridge C BRDG BOF 330,000 183 61,875 20,625 412,500 412,500

Totals for: Huntingdon 3,132,524 4,266,433 52,772 7,451,729 5,486,500 4,228,667 75,475 9,790,642 4,977,849 11,119,042 45,292 16,142,183 9,694,832 6,369,208 45,292 16,109,332 49,493,886

Indiana 69986 IndianaHwy.Resurface Line C HRST 581 2,808,230 2,808,230 2,808,230

Indiana 69986 IndianaHwy.Resurface Line C HRST 581 3,399,162 3,399,162 3,399,162

Indiana 1019372018 Indiana DFB Line F BRDG 185 53,100 53,100 53,100

Indiana 1019372018 Indiana DFB Line U BRDG 185 32,800 32,800 32,800

Indiana 1019372018 Indiana DFB Line R BRDG 185 11,000 11,000 11,000

Indiana 1019372018 Indiana DFB Line C BRDG 185 394,000 394,000 394,000

Indiana 103091BPRR Corridor +C SAMI RRX 636,540 636,540 636,540

Indiana 103091BPRR Corridor +C SAMI RRX 636,540 636,540 636,540

Indiana 88841 Indiana Local Br. Line #1 P BRDG BOF 240,400 183 45,075 15,025 300,500 300,500

Indiana 88992 IndianaBoro/White Twp Int +C SAMI CAQ 1,786,480 1,786,480 1,786,480

Indiana 473 92824 11th Street Crossing +C SAMI RRX 13,740 13,740 13,740

Indiana 56 457 83206 Brush Valley Bridge #3 F BRDG 581 515,000 515,000 515,000

Indiana 56 457 83206 Brush Valley Bridge #3 U BRDG 581 106,100 106,100 106,100

Indiana 56 457 83206 Brush Valley Bridge #3 R BRDG 581 103,000 103,000 103,000

Indiana 56 457 83206 Brush Valley Bridge #3 C BRDG 581 2,143,100 2,143,100 2,143,100

Indiana 56 470 90194 United High School Curve C SAMI HSIP 3,263,710 581 712,835 3,976,545 3,976,545

Indiana 56 470 90194 United High School Curve C SAMI HSIP 4,542,890 581 154,565 4,697,455 4,697,455

Indiana 85 450 83210 Plumville Bridge #1 P BRDG STP 14,400 185 3,600 18,000 18,000

Indiana 85 450 83210 Plumville Bridge #1 F BRDG STP 340,000 340,000 340,000

Indiana 85 450 83210 Plumville Bridge #1 +U BRDG STP 106,100 106,100 106,100

Indiana 85 450 83210 Plumville Bridge #1 R BRDG STP 592,000 592,000 592,000

Indiana 85 450 83210 Plumville Bridge #1 C BRDG STP 1,923,200 185 480,800 2,404,000 2,404,000

Indiana 119 454 25513 Home Railroad Bridge +U BRDG NHPP 159,200 159,200 159,200

Page 104: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

104 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Indiana 119 454 25513 Home Railroad Bridge C BRDG NHPP 6,362,320 185 1,590,580 7,952,900 7,952,900

Indiana 119 454 25513 Home Railroad Bridge C BRDG NHPP 3,737,520 185 934,380 4,671,900 4,671,900

Indiana 119 462 99514 US 119 Blais Bridges C BRDG 581 4,500,000 4,500,000 4,500,000

Indiana 119 463 95848 Home Bridge #3 F BRDG 185 318,300 318,300 318,300

Indiana 119 464 95847 Pollock Bridge F BRDG 185 318,300 318,300 318,300

Indiana 119 465 101483US 119 Three Bridges +F BRDG NHPP 618,000 618,000 618,000

Indiana 119 465 101483US 119 Three Bridges R BRDG NHPP 164,800 185 41,200 206,000 206,000

Indiana 119 465 101483US 119 Three Bridges C BRDG NHPP 3,528,860 185 882,215 4,411,075 4,411,075

Indiana 119 465 101483US 119 Three Bridges C BRDG NHPP 1,563,460 185 390,865 1,954,325 1,954,325

Indiana 119 495 25472 Grove Chapel Climb. Lane C HCON 581 7,432,500 7,432,500 7,432,500

Indiana 119 495 25472 Grove Chapel Climb. Lane C HCON 581 5,033,100 5,033,100 5,033,100

Indiana 119 498 91256 US 119 Homer City North F HRST NHPP 61,840 581 15,460 77,300 77,300

Indiana 119 498 91256 US 119 Homer City North U HRST 581 257,500 257,500 257,500

Indiana 119 498 91256 US 119 Homer City North C HRST 581 4,738,000 4,738,000 4,738,000

Indiana 119 498 91256 US 119 Homer City North C HRST 581 325,500 325,500 325,500

Indiana 119 499 69988 Wake Robin Curve F HCON 581 824,000 824,000 824,000

Indiana 217 452 86022 Grange Bridge F BRDG 581 412,000 412,000 412,000

Indiana 217 452 86022 Grange Bridge U BRDG 581 42,500 42,500 42,500

Indiana 217 452 86022 Grange Bridge R BRDG 581 106,100 106,100 106,100

Indiana 217 452 86022 Grange Bridge C BRDG 581 3,223,600 3,223,600 3,223,600

Indiana 286 410 100092PA286-TanomaRd.toFranklin C HRST 581 3,700,000 3,700,000 3,700,000

Indiana 286 460 25595 PA286ovrTrib.to CushCreek P BRDG STP 223,200 185 55,800 279,000 279,000

Indiana 286 460 25595 PA286ovrTrib.to CushCreek F BRDG 185 327,900 327,900 327,900

Indiana 286 462 83309 PA 286 over Horton Run P BRDG STP 223,200 185 55,800 279,000 279,000

Indiana 286 462 83309 PA 286 over Horton Run F BRDG 185 327,900 327,900 327,900

Indiana 286 471 95898 Edgewood Int. Improvement U SAMI 581 21,300 21,300 21,300

Indiana 286 471 95898 Edgewood Int. Improvement R SAMI 581 154,500 154,500 154,500

Indiana 286 471 95898 Edgewood Int. Improvement C SAMI 581 1,400,400 1,400,400 1,400,400

Indiana 286 498 103844Indiana/WhiteTrafficStudy S HRST 581 309,000 309,000 309,000

Indiana 403 454 89918 Cramer Bridge #4 U BRDG 185 13,000 13,000 13,000

Indiana 422 45A 25696 US422 Cunningham Culverts F BRDG NHPP 424,000 424,000 424,000

Indiana 422 45A 25696 US422 Cunningham Culverts U BRDG 185 218,600 218,600 218,600

Indiana 422 45A 25696 US422 Cunningham Culverts R BRDG NHPP 159,000 159,000 159,000

Indiana 422 45A 25696 US422 Cunningham Culverts +C BRDG 581 3,660,700 3,660,700 3,660,700

Indiana 422 462 25699 Ewings Mill Bridge #1 +U BRDG NHPP 82,000 82,000 82,000

Indiana 422 462 25699 Ewings Mill Bridge #1 R BRDG NHPP 53,100 53,100 53,100

Indiana 422 462 25699 Ewings Mill Bridge #1 +C BRDG NHPP 305,020 305,020 305,020

Indiana 422 462 25699 Ewings Mill Bridge #1 +C BRDG STP 1,334,080 1,334,080 1,334,080

Indiana 422 463 25693 Shelocta Bridge #1 U BRDG NHPP 51,500 51,500 51,500

Indiana 422 463 25693 Shelocta Bridge #1 C BRDG NHPP 989,920 989,920 989,920

Page 105: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

105 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Indiana 422 464 96961 US422 S.6th St. EB/WB Br U BRDG NHPP 61,840 185 15,460 77,300 77,300

Indiana 422 464 96961 US422 S.6th St. EB/WB Br C BRDG NHPP 1,142,240 185 129,360 1,271,600 1,271,600

Indiana 422 464 96961 US422 S.6th St. EB/WB Br C BRDG NHPP 2,153,760 185 547,000 2,700,760 2,700,760

Indiana 422 465 95849 US422 ov Br of Carney Run F BRDG 185 265,300 265,300 265,300

Indiana 1005 451 25546 Onberg Bridge U BRDG BOF 18,080 185 4,520 22,600 22,600

Indiana 1005 451 25546 Onberg Bridge C BRDG BOF 1,575,760 185 393,940 1,969,700 1,969,700

Indiana 1005 453 92666 Ruffner Church Bridge F BRDG 185 200 200 200

Indiana 1005 453 92666 Ruffner Church Bridge R BRDG 185 11,400 11,400 11,400

Indiana 1005 453 92666 Ruffner Church Bridge C BRDG 185 400,000 400,000 400,000

Indiana 1006 450 25782 SR 1006 over US 119 NB/SB C BRDG STP 589,120 185 147,280 736,400 736,400

Indiana 1006 450 25782 SR 1006 over US 119 NB/SB C BRDG STP 1,200,000 185 300,000 1,500,000 1,500,000

Indiana 1012 450 83369 SR 1012 over Penn Run F BRDG 185 51,500 51,500 51,500

Indiana 1012 450 83369 SR 1012 over Penn Run U BRDG 185 30,000 30,000 30,000

Indiana 1012 450 83369 SR 1012 over Penn Run R BRDG 185 10,000 10,000 10,000

Indiana 1012 450 83369 SR 1012 over Penn Run C BRDG 185 359,600 359,600 359,600

Indiana 1012 451 25588 Dixonville Bridge #1 P BRDG STP 64,000 185 16,000 80,000 80,000

Indiana 1033 450 25786 Gipsy Bridge #2 U BRDG BOF 21,600 185 5,400 27,000 27,000

Indiana 1033 450 25786 Gipsy Bridge #2 C BRDG BOF 1,400,000 1,400,000 1,400,000

Indiana 1038 450 83352 Brewer Run Bridge U BRDG 185 6,200 6,200 6,200

Indiana 1038 450 83352 Brewer Run Bridge C BRDG 185 293,600 293,600 293,600

Indiana 1045 452 25790 Upper Juneau Bridge P BRDG BOF 260,000 260,000 260,000

Indiana 1056 450 74307 Gipsy Bridge #1 U BRDG 185 28,200 28,200 28,200

Indiana 1056 450 74307 Gipsy Bridge #1 C BRDG 185 1,688,300 1,688,300 1,688,300

Indiana 2013 450 74310 Wehrum Bridge C BRDG BOF 1,282,880 185 320,720 1,603,600 1,603,600

Indiana 2013 450 74310 Wehrum Bridge C BRDG BOF 726,240 185 528,000 1,254,240 1,254,240

Indiana 2013 450 74310 Wehrum Bridge C BRDG STP 1,385,760 1,385,760 1,385,760

Indiana 2019 4S1 102115Fire Academy Road Slides R HRST 581 25,000 25,000 25,000

Indiana 3029 450 83362 Clune Bridge #1 F BRDG 185 50,000 50,000 50,000

Indiana 3035 48D 102881Main St. Enhancement C TENH TAU 502,344 502,344 502,344

Indiana 3043 491 25834 Rose Street Extension #2 U HCON 581 491,800 491,800 491,800

Indiana 3043 491 25834 Rose Street Extension #2 R HCON 581 3,978,400 3,978,400 3,978,400

Indiana 3043 491 25834 Rose Street Extension #2 C HCON STP 7,825,000 581 3,297,128 11,122,128 11,122,128

Indiana 3043 491 25834 Rose Street Extension #2 C HCON STU 5,363,510 5,363,510 5,363,510

Indiana 4035 25523 SR 4035over N.Br.Plum Cr. P BRDG STP 254,640 185 63,660 318,300 318,300

Indiana 4035 25523 SR 4035over N.Br.Plum Cr. F BRDG 185 337,700 337,700 337,700

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 F BRDG BOF 214,240 183 40,170 13,390 267,800 267,800

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 R BRDG BOF 32,960 183 6,180 2,060 41,200 41,200

Indiana 7203 BR 25419 T-460 Aultman Bridge #3 C BRDG BOF 874,240 183 163,920 54,640 1,092,800 1,092,800

Totals for: Indiana 11,427,654 11,924,445 15,450 23,367,549 20,280,290 21,553,240 41,833,530 14,594,940 18,678,670 69,665 33,343,275 14,782,350 14,442,950 29,225,300 127,769,654

Jefferson 68204 Jeff Hwy/Bridge Line Item C BRDG STP 504,395 504,395 504,395

Page 106: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

106 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Jefferson 68204 Jeff Hwy/Bridge Line Item C HRST NHPP 511,700 511,700 511,700

Jefferson 68204 Jeff Hwy/Bridge Line Item C HRST STP 10,000 10,000 10,000

Jefferson 68204 Jeff Hwy/Bridge Line Item C HRST 581 5,845,000 5,845,000 5,845,000

Jefferson 69867 Jeffrson Hwy Resurf Ln #2 C HRST STP 783,760 581 320,500 1,104,260 1,104,260

Jefferson 69867 Jeffrson Hwy Resurf Ln #2 C HRST STP 1,658,000 581 255,660 1,913,660 1,913,660

Jefferson 75503 Jeffrson Hwy Resurf Ln #1 C HRST 581 278,220 278,220 278,220

Jefferson 1018742017 Jefferson DFB Line F BRDG 185 51,500 51,500 51,500

Jefferson 1018742017 Jefferson DFB Line U BRDG 185 31,900 31,900 31,900

Jefferson 1018742017 Jefferson DFB Line R BRDG 185 10,700 10,700 10,700

Jefferson 1018742017 Jefferson DFB Line C BRDG 185 382,500 382,500 382,500

Jefferson 1018752018 Jefferson DFB Line F BRDG 185 53,100 53,100 53,100

Jefferson 1018752018 Jefferson DFB Line U BRDG 185 32,800 32,800 32,800

Jefferson 1018752018 Jefferson DFB Line R BRDG 185 11,000 11,000 11,000

Jefferson 1018752018 Jefferson DFB Line C BRDG 185 394,000 394,000 394,000

Jefferson 1018762017 Jefferson Br Preserv C BRDG 185 427,600 427,600 427,600

Jefferson 103082T-861 Old Grade Rd X-ing +C SAMI RRX 200,850 200,850 200,850

Jefferson 94738 2015 Jefferson Br Preserv C BRDG 185 2,500 2,500 2,500

Jefferson 572 95676 Horatio Street Crossing +C SAMI RRX 30,900 30,900 30,900

Jefferson 28 572 26064 PA 28/US 322 Intersection F SAMI HSIP 333,720 581 37,080 370,800 370,800

Jefferson 28 572 26064 PA 28/US 322 Intersection U SAMI HSIP 147,600 581 16,400 164,000 164,000

Jefferson 28 572 26064 PA 28/US 322 Intersection R SAMI HSIP 206,550 581 22,950 229,500 229,500

Jefferson 28 572 26064 PA 28/US 322 Intersection C SAMI HSIP 1,519,470 581 168,830 1,688,300 1,688,300

Jefferson 119 558 96755 US 119 Group Bridges +U BRDG NHPP 100,000 100,000 100,000

Jefferson 119 558 96755 US 119 Group Bridges +R BRDG NHPP 77,300 77,300 77,300

Jefferson 119 558 96755 US 119 Group Bridges +C BRDG NHPP 1,136,200 1,136,200 1,136,200

Jefferson 119 558 96755 US 119 Group Bridges +C BRDG STP 1,105,760 1,105,760 1,105,760

Jefferson 119 558 96755 US 119 Group Bridges +C BRDG NHPP 675,540 675,540 675,540

Jefferson 119 559 74335 Indiana Hill Bridge C BRDG 581 2,652,300 2,652,300 2,652,300

Jefferson 219 553 92689 US 219 over Wolf Run P BRDG NHPP 515,000 515,000 515,000

Jefferson 219 553 92689 US 219 over Wolf Run +F BRDG STP 340,000 340,000 340,000

Jefferson 219 553 92689 US 219 over Wolf Run +R BRDG NHPP 67,800 67,800 67,800

Jefferson 219 553 92689 US 219 over Wolf Run +C BRDG NHPP 528,460 528,460 528,460

Jefferson 219 553 92689 US 219 over Wolf Run +C BRDG NHPP 1,204,000 1,204,000 1,204,000

Jefferson 322 502 100240US 322 PA 36 to Segmt 300 C HRST 581 2,758,400 2,758,400 2,758,400

Jefferson 322 554 83292 US 322 ovr Trib Coder Run F BRDG 581 229,920 229,920 229,920

Jefferson 322 554 83292 US 322 ovr Trib Coder Run F BRDG 581 70,080 70,080 70,080

Jefferson 322 554 83292 US 322 ovr Trib Coder Run R BRDG 581 53,100 53,100 53,100

Jefferson 322 554 83292 US 322 ovr Trib Coder Run C BRDG STP 874,240 581 218,560 1,092,800 1,092,800

Jefferson 436 552 74336 Margiotti Bridge +F BRDG STP 60,000 60,000 60,000

Jefferson 436 552 74336 Margiotti Bridge U BRDG STP 212,240 185 53,060 265,300 265,300

Page 107: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

107 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Jefferson 436 552 74336 Margiotti Bridge R BRDG STP 1,588,000 185 412,000 2,000,000 2,000,000

Jefferson 436 552 74336 Margiotti Bridge C BRDG STP 3,000,000 3,000,000 3,000,000

Jefferson 436 552 74336 Margiotti Bridge C BRDG STP 2,845,000 581 2,105,590 4,950,590 4,950,590

Jefferson 436 552 74336 Margiotti Bridge C BRDG 581 7,940,410 7,940,410 7,940,410

Jefferson 830 552 83298 Rockdale Bridge C BRDG 581 1,854,000 1,854,000 1,854,000

Jefferson 830 592 95546 Falls Creek Intersection F SAMI 581 326,400 326,400 326,400

Jefferson 830 592 95546 Falls Creek Intersection R SAMI 581 337,700 337,700 337,700

Jefferson 949 590 95593 Sigel South PM C HRST 581 2,884,000 2,884,000 2,884,000

Jefferson 1002 551 91833 Fehley Run Bridge U BRDG 185 5,700 5,700 5,700

Jefferson 1002 551 91833 Fehley Run Bridge R BRDG 185 11,400 11,400 11,400

Jefferson 1002 551 91833 Fehley Run Bridge C BRDG 185 291,800 291,800 291,800

Jefferson 1008 551 101117Lanes Mills Bridge #4 F BRDG 185 276,440 276,440 276,440

Jefferson 1008 551 101117Lanes Mills Bridge #4 R BRDG 185 54,700 54,700 54,700

Jefferson 1008 551 101117Lanes Mills Bridge #4 C BRDG 185 1,276,000 1,276,000 1,276,000

Jefferson 1027 550 26149 SR 1027 Egypt Bridge C BRDG 185 733,600 733,600 733,600

Jefferson 1027 550 26149 SR 1027 Egypt Bridge C BRDG 185 874,000 874,000 874,000

Jefferson 1027 550 26149 SR 1027 Egypt Bridge C BRDG 185 761,400 761,400 761,400

Jefferson 2003 0 102787SR2003 Mill Road Crossing +C SAMI RRX 206,875 206,875 206,875

Jefferson 3007 550 26019 Summerville Bridge #1 C BRDG BOF 688,000 688,000 688,000

Jefferson 3007 550 26019 Summerville Bridge #1 C BRDG BOF 688,000 688,000 688,000

Jefferson 3007 550 26019 Summerville Bridge #1 C BRDG BOF 688,000 688,000 688,000

Jefferson 3007 550 26019 Summerville Bridge #1 C BRDG BOF 688,000 688,000 688,000

Jefferson 3008 0 101119Perry Street Connection C HCON 581 500,000 500,000 500,000

Jefferson 3033 0 99904 SR3033 Belgiumtown-US 322 C HRST 581 954,900 954,900 954,900

Jefferson 4005 550 83344 Blowtown Bridge #1 C BRDG 185 319,300 319,300 319,300

Totals for: Jefferson 4,619,865 6,541,000 11,160,865 6,756,875 8,358,000 15,114,875 6,749,150 10,699,000 17,448,150 5,069,470 10,699,000 15,768,470 59,492,360

Juniata BR 4101 T-359 ,Licking Cr. Br. C BRDG 183 181,949 45,487 227,436 227,436

Juniata 22 C10 91065 SR 22 Corridor Resurfacng C HRST 581 9,500,000 9,500,000 9,500,000

Juniata 35 A06 4212 Lost Creek Bridge F BRDG 185 370,800 370,800 370,800

Juniata 35 A06 4212 Lost Creek Bridge U BRDG 185 79,568 79,568 79,568

Juniata 35 A06 4212 Lost Creek Bridge R BRDG STP 103,000 103,000 103,000

Juniata 35 A06 4212 Lost Creek Bridge C BRDG STP 700,000 185 935,594 1,635,594 1,635,594

Juniata 35 A07 81405 SR 35 Cocolamus Crk P BRDG 185 40,000 40,000 40,000

Juniata 35 A07 81405 SR 35 Cocolamus Crk F BRDG STP 291,748 291,748 291,748

Juniata 35 A07 81405 SR 35 Cocolamus Crk U BRDG 185 54,636 54,636 54,636

Juniata 35 A07 81405 SR 35 Cocolamus Crk R BRDG STP 53,045 53,045 53,045

Juniata 35 A08 85172 Cocolamus Crk Br #2 STA P BRDG 185 50,000 50,000 50,000

Juniata 35 A08 85172 Cocolamus Crk Br #2 STA F BRDG 185 212,180 212,180 212,180

Juniata 35 A08 85172 Cocolamus Crk Br #2 STA U BRDG 185 54,636 54,636 54,636

Juniata 35 A08 85172 Cocolamus Crk Br #2 STA R BRDG 185 53,045 53,045 53,045

Page 108: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

108 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Juniata 35 A08 85172 Cocolamus Crk Br #2 STA C BRDG STP 1,173,875 1,173,875 1,173,875

Juniata 35 A09 82358 SR 35 East Licking Creek P BRDG 185 50,000 50,000 50,000

Juniata 35 A09 82358 SR 35 East Licking Creek F BRDG 185 327,818 327,818 327,818

Juniata 35 A09 82358 SR 35 East Licking Creek U BRDG STP 56,275 56,275 56,275

Juniata 35 A09 82358 SR 35 East Licking Creek R BRDG 185 54,636 54,636 54,636

Juniata 35 A09 82358 SR 35 East Licking Creek C BRDG 185 1,012,957 1,012,957 1,012,957

Juniata 35 A10 88175 Trib Cocolamus Crk Bridge P BRDG 185 327,817 327,817 327,817

Juniata 35 A12 93955 SR 35 Trib. Doyle Run Br P BRDG 185 1,170,432 1,170,432 1,170,432

Juniata 35 A12 93955 SR 35 Trib. Doyle Run Br P BRDG 581 454,568 454,568 454,568

Juniata 35 A12 93955 SR 35 Trib. Doyle Run Br F BRDG 185 931,955 931,955 931,955

Juniata 35 A12 93955 SR 35 Trib. Doyle Run Br U BRDG 185 200,000 200,000 200,000

Juniata 35 A12 93955 SR 35 Trib. Doyle Run Br R BRDG 185 200,000 200,000 200,000

Juniata 75 A03 4190 Bridge over NS Railroad P BRDG 185 400,000 400,000 400,000

Juniata 75 A03 4190 Bridge over NS Railroad F BRDG 185 289,819 289,819 289,819

Juniata 75 A11 97529 Delta Frame Bridge +P BRDG STP 50,000 50,000 50,000

Juniata 75 A11 97529 Delta Frame Bridge C BRDG STP 1,642,829 1,642,829 1,642,829

Juniata 75 A11 97529 Delta Frame Bridge C HRST 581 557,000 557,000 557,000

Juniata 75 A11 97529 Delta Frame Bridge C HRST 581 957,868 957,868 957,868

Juniata 75 A12 78596 2016 SEDA-COG Br. Preserv P BRDG 185 154,500 154,500 154,500

Juniata 75 A12 78596 2016 SEDA-COG Br. Preserv C BRDG BOF 1,234,775 1,234,775 1,234,775

Juniata 75 A12 78596 2016 SEDA-COG Br. Preserv C BRDG NHPP 646,537 646,537 646,537

Juniata 75 A12 78596 2016 SEDA-COG Br. Preserv C BRDG STP 1,000,000 1,000,000 1,000,000

Juniata 75 A12 78596 2016 SEDA-COG Br. Preserv C BRDG BOF 265,225 265,225 265,225

Juniata 333 A01 4191 Trib. Juniata Rv BOX P BRDG 185 200,000 200,000 200,000

Juniata 333 A01 4191 Trib. Juniata Rv BOX U BRDG 185 30,000 30,000 30,000

Juniata 333 A01 4191 Trib. Juniata Rv BOX R BRDG 185 25,000 25,000 25,000

Juniata 333 A07 69425 Trib Juniata River BOX P BRDG 185 100,000 100,000 100,000

Juniata 333 A07 69425 Trib Juniata River BOX U BRDG 185 26,523 26,523 26,523

Juniata 333 A07 69425 Trib Juniata River BOX R BRDG 185 25,750 25,750 25,750

Juniata 333 A07 69425 Trib Juniata River BOX C BRDG 185 291,748 291,748 291,748

Juniata 333 A09 81485 SR 333 Blue Spring Rn BOX P BRDG 185 190,000 190,000 190,000

Juniata 333 A09 81485 SR 333 Blue Spring Rn BOX U BRDG 185 35,000 35,000 35,000

Juniata 333 A09 81485 SR 333 Blue Spring Rn BOX R BRDG 185 25,000 25,000 25,000

Juniata 333 A09 81485 SR 333 Blue Spring Rn BOX C BRDG 185 125,903 125,903 125,903

Juniata 850 A09 85196 SR 850 over Willow Run F BRDG STP 371,315 371,315 371,315

Juniata 850 A09 85196 SR 850 over Willow Run U BRDG STP 65,564 65,564 65,564

Juniata 850 A09 85196 SR 850 over Willow Run R BRDG STP 65,564 65,564 65,564

Juniata 850 A09 85196 SR 850 over Willow Run C BRDG STP 1,071,182 185 423,073 1,494,255 1,494,255

Juniata 850 A09 85196 SR 850 over Willow Run C BRDG STP 1,151,425 1,151,425 1,151,425

Juniata 1002 A02 85184 SR 1002 Trib. Lost BOX P BRDG 185 202,592 202,592 202,592

Page 109: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

109 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Juniata 1006 A01 4169 SR 1006Horning Run Br P BRDG BOF 324,000 324,000 324,000

Juniata 1006 A01 4169 SR 1006Horning Run Br F BRDG BOF 218,545 218,545 218,545

Juniata 1006 A01 4169 SR 1006Horning Run Br U BRDG BOF 56,275 56,275 56,275

Juniata 1006 A01 4169 SR 1006Horning Run Br C BRDG BOF 1,273,313 1,273,313 1,273,313

Juniata 2017 A05 91962 Trib Cocolamus Crk BOX P BRDG 185 190,000 190,000 190,000

Juniata 2017 A05 91962 Trib Cocolamus Crk BOX U BRDG 185 37,132 37,132 37,132

Juniata 2017 A05 91962 Trib Cocolamus Crk BOX R BRDG 185 26,523 26,523 26,523

Juniata 2017 A05 91962 Trib Cocolamus Crk BOX C BRDG 185 350,000 350,000 350,000

Juniata 3002 A01 4196 Horning Run Bridge P BRDG BOF 400,000 400,000 400,000

Juniata 3002 A01 4196 Horning Run Bridge F BRDG BOF 350,000 350,000 350,000

Juniata 3002 A01 4196 Horning Run Bridge R BRDG BOF 32,453 32,453 32,453

Juniata 3002 A02 4090 Trib Locust Rn Bridge P BRDG 581 60,000 60,000 60,000

Juniata 3002 A02 4090 Trib Locust Rn Bridge U BRDG 581 50,000 50,000 50,000

Juniata 3002 A02 4090 Trib Locust Rn Bridge R BRDG 581 50,000 50,000 50,000

Juniata 3002 A02 4090 Trib Locust Rn Bridge C BRDG 581 600,000 600,000 600,000

Juniata 3002 A02 4090 Trib Locust Rn Bridge C BRDG 581 400,000 400,000 400,000

Juniata 3002 A03 85189 Trib to Juniata River BOX P BRDG 185 55,000 55,000 55,000

Juniata 3002 A03 85189 Trib to Juniata River BOX C BRDG 185 75,000 75,000 75,000

Juniata 3017 A01 85205 SR 3017 over Markee Creek P BRDG 185 180,000 180,000 180,000

Juniata 3021 A02 4164 SR 3021 ovr Warble Run U BRDG BOF 28,138 28,138 28,138

Juniata 3021 A02 4164 SR 3021 ovr Warble Run R BRDG BOF 50,000 50,000 50,000

Juniata 3021 A02 4164 SR 3021 ovr Warble Run C BRDG BOF 779,761 779,761 779,761

Juniata 3021 A02 4164 SR 3021 ovr Warble Run C BRDG BOF 320,239 320,239 320,239

Juniata 7213 0 95284 Red Rock Rd over Doe Run C BRDG 183 181,174 45,294 226,468 226,468

Totals for: Juniata 3,749,043 12,017,696 90,781 15,857,520 4,377,472 5,058,658 9,436,130 3,111,280 3,924,390 7,035,670 2,537,288 1,576,452 4,113,740 36,443,060

Lackawanna 57729 Scranton-NYC RR Line Item P IMOD STU 8,000 2,000 10,000 10,000

Lackawanna 64077 LLTS CMAQ Line Item +C SAMI CAQ 196,600 196,600 196,600

Lackawanna 64077 LLTS CMAQ Line Item +C SAMI CAQ 189,000 189,000 189,000

Lackawanna 64077 LLTS CMAQ Line Item +C SAMI CAQ 69,000 69,000 69,000

Lackawanna 64077 LLTS CMAQ Line Item +C SAMI CAQ 89,000 89,000 89,000

Lackawanna 64279 LLTS Enhancement Line C TENH TAU 384,000 384,000 384,000

Lackawanna 64279 LLTS Enhancement Line C TENH TAU 384,000 384,000 384,000

Lackawanna 64279 LLTS Enhancement Line C TENH TAU 384,000 384,000 384,000

Lackawanna 64279 LLTS Enhancement Line C TENH TAU 384,000 384,000 384,000

Lackawanna 73300 LLTS Highway Reserve C HRST NHPP 150,089 581 68,494 218,583 218,583

Lackawanna 73300 LLTS Highway Reserve C HRST STP 15,000 15,000 15,000

Lackawanna 73300 LLTS Highway Reserve C HRST NHPP 416,600 581 243,365 659,965 659,965

Lackawanna 73300 LLTS Highway Reserve C HRST STP 113,000 113,000 113,000

Lackawanna 73300 LLTS Highway Reserve C HRST NHPP 3,200,001 581 3,177 3,203,178 3,203,178

Lackawanna 73300 LLTS Highway Reserve C HRST STP 113,000 113,000 113,000

Page 110: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

110 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lackawanna 73300 LLTS Highway Reserve C HRST NHPP 3,860,001 185 840,000 4,700,001 4,700,001

Lackawanna 73300 LLTS Highway Reserve C HRST 581 52,500 52,500 52,500

Lackawanna 73300 LLTS Highway Reserve C HRST STP 33,000 33,000 33,000

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG BOF 49,560 185 200,940 250,500 250,500

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG STP 120,000 120,000 120,000

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG BOF 952,800 185 4,000 956,800 956,800

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG STP 300,000 300,000 300,000

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG BOF 751,200 185 172,750 923,950 923,950

Lackawanna 73301 LLTS Bridge Reserve Line C BRDG BOF 352,000 185 152,000 504,000 504,000

Lackawanna 73303 LLTS Urban Reserve Line C HRST STU 93,000 93,000 93,000

Lackawanna 73303 LLTS Urban Reserve Line C HRST STU 91,000 91,000 91,000

Lackawanna 73303 LLTS Urban Reserve Line C HRST STU 756,000 756,000 756,000

Lackawanna 73303 LLTS Urban Reserve Line C HRST STU 171,000 171,000 171,000

Lackawanna 75761 LLTS HSIP Line Item C SAMI HSIP 1,630,562 1,630,562 1,630,562

Lackawanna 75761 LLTS HSIP Line Item C SAMI HSIP 225,000 225,000 225,000

Lackawanna 84388 LLTS Bridge Review P BRDG 185 150,000 150,000 150,000

Lackawanna 84388 LLTS Bridge Review P BRDG 185 150,000 150,000 150,000

Lackawanna 84388 LLTS Bridge Review P BRDG 185 150,000 150,000 150,000

Lackawanna 102314LLTS 916 oversight costs P BRDG 185 20,000 20,000 20,000

Lackawanna 102314LLTS 916 oversight costs P BRDG 185 50,000 50,000 50,000

Lackawanna 102314LLTS 916 oversight costs F BRDG 185 20,000 20,000 20,000

Lackawanna 102314LLTS 916 oversight costs F BRDG 185 50,000 50,000 50,000

Lackawanna 102314LLTS 916 oversight costs C BRDG 185 50,000 50,000 50,000

Lackawanna 102314LLTS 916 oversight costs C BRDG 185 100,000 100,000 100,000

Lackawanna 102356RBR Initiative C BRDG STP 350,000 185 94,000 444,000 444,000

Lackawanna 102356RBR Initiative C BRDG 185 159,400 159,400 159,400

Lackawanna 102356RBR Initiative C BRDG 185 444,000 444,000 444,000

Lackawanna 102356RBR Initiative C BRDG 185 444,000 444,000 444,000

Lackawanna 73359 Lck Co 'K' Rts Line Item C HRST STU 100,000 25,000 125,000 125,000

Lackawanna 86914 LLTS Project Delivery P HRST 581 100,000 100,000 100,000

Lackawanna 86914 LLTS Project Delivery P HRST 581 100,000 100,000 100,000

Lackawanna 86914 LLTS Project Delivery P HRST 581 100,000 100,000 100,000

Lackawanna 86914 LLTS Project Delivery P HRST 581 100,000 100,000 100,000

Lackawanna 94832 Main St Corridor Ph III P HRST NHPP 360,000 90,000 450,000 450,000

Lackawanna 94832 Main St Corridor Ph III F HRST STU 220,000 55,000 275,000 275,000

Lackawanna 94832 Main St Corridor Ph III U HRST STU 40,000 10,000 50,000 50,000

Lackawanna 94832 Main St Corridor Ph III R HRST STU 80,000 20,000 100,000 100,000

Lackawanna 94832 Main St Corridor Ph III C HRST NHPP 2,000,000 500,000 2,500,000 2,500,000

Lackawanna IND 8343 Carbondale Ind Park (APL) C HRST APL 250,000 258,530 508,530 508,530

Lackawanna 6 214 8221 Lackawanna Trail (Bett.) C HRST NHPP 2,500,000 2,500,000 2,500,000

Page 111: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

111 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lackawanna 6 214 8221 Lackawanna Trail (Bett.) C HRST NHPP 9,500,000 9,500,000 9,500,000

Lackawanna 6 214 8221 Lackawanna Trail (Bett.) C HRST NHPP 5,000,000 5,000,000 5,000,000

Lackawanna 6 224 62960 Exit 7 Improvements C SAMI HSIP 534,938 534,938 534,938

Lackawanna 6 254 64307 US 6 Over SR 632 C BRDG NHPP 99,900 99,900 99,900

Lackawanna 6 273 8234 US 6 Bridge, La Plume C BRDG NHPP 99,900 99,900 99,900

Lackawanna 6 274 8309 Glenburn Pond Outlet C BRDG NHPP 99,900 99,900 99,900

Lackawanna 6 FP1 95435 Fed Aid Paving 4-16-FP 1 C HRST NHPP 4,000,000 4,000,000 4,000,000

Lackawanna 6 FP1 95435 Fed Aid Paving 4-16-FP 1 C HRST STU 1,000,000 1,000,000 1,000,000

Lackawanna 11 0 97220 Fed Aid Paving 4-17-FP 1 +C HRST NHPP 2,500,000 2,500,000 2,500,000

Lackawanna 11 0 97220 Fed Aid Paving 4-17-FP 1 +C HRST NHPP 2,500,000 2,500,000 2,500,000

Lackawanna 11 214 8400 Birney Plaza Signals C SAMI CAQ 640,000 640,000 640,000

Lackawanna 11 251 8252 Spruce Complex Ret Wall C BRDG 185 2,250,000 2,250,000 2,250,000

Lackawanna 11 251 8252 Spruce Complex Ret Wall C BRDG 185 1,050,000 1,050,000 1,050,000

Lackawanna 11 251 8252 Spruce Complex Ret Wall C BRDG 185 200,000 200,000 200,000

Lackawanna 11 253 83027 SR 0011 over SR 8025 C BRDG NHPP 800,000 800,000 800,000

Lackawanna 81 218 75128 Interstate 81 PM/Pav Rest C IMAN NHPP 8,140,652 185 100,413 8,241,065 8,241,065

Lackawanna 81 218 75128 Interstate 81 PM/Pav Rest C IMAN 581 804,104 804,104 804,104

Lackawanna 81 218 75128 Interstate 81 PM/Pav Rest C IMAN SXF 1,310,672 1,310,672 1,310,672

Lackawanna 81 229 95263 Drinker St NB Exit Signal C SAMI STU 70,000 581 153,000 223,000 223,000

Lackawanna 81 229 95263 Drinker St NB Exit Signal C SAMI SXF 612,000 612,000 612,000

Lackawanna 81 245 96309 Interstate Pave Pres 2013 C IMAN 581 2,000,000 2,000,000 2,000,000

Lackawanna 81 270 8229 I-81 Main Ave & River C IMAN NHPP 360,000 185 40,000 400,000 400,000

Lackawanna 84 204 91538 84 E&W Mill/Fill 2014 C IMAN 581 5,000,000 5,000,000 5,000,000

Lackawanna 106 250 8193 SR 106 ov Tunkhannock Ck C BRDG STP 640,000 185 160,000 800,000 800,000

Lackawanna 247 204 8342 Valley View Business Park P XRST SXF 10,000 10,000 10,000

Lackawanna 307 201 97839 Daleville Park & Ride R SAMI CAQ 1,102,500 1,102,500 1,102,500

Lackawanna 307 201 97839 Daleville Park & Ride R SAMI CAQ 197,500 197,500 197,500

Lackawanna 307 201 97839 Daleville Park & Ride +C SAMI CAQ 1,500,000 1,500,000 1,500,000

Lackawanna 307 252 8007 Stafford Meadow Brook Br C BRDG STP 1,384,000 185 346,000 1,730,000 1,730,000

Lackawanna 347 207 8394 Dunmore Signal Network C SAMI HSIP 1,840,062 1,840,062 1,840,062

Lackawanna 347 207 8394 Dunmore Signal Network C SAMI NHPP 1,800,000 1,800,000 1,800,000

Lackawanna 347 207 8394 Dunmore Signal Network C SAMI CAQ 3,052,500 3,052,500 3,052,500

Lackawanna 347 207 8394 Dunmore Signal Network C SAMI HSIP 109,938 109,938 109,938

Lackawanna 435 250 97930 SR 435 over Interstate 84 P BRDG 185 350,000 350,000 350,000

Lackawanna 438 250 93000 SR 438 over Elm Brook F BRDG STU 200,000 185 50,000 250,000 250,000

Lackawanna 524 251 51553 Kennedy Creek Bridge C BRDG BOF 800,000 185 200,000 1,000,000 1,000,000

Lackawanna 524 270 68828 TR 524 over Kennedy Creek F BRDG BOF 280,000 280,000 280,000

Lackawanna 524 270 68828 TR 524 over Kennedy Creek R BRDG BOF 28,000 28,000 28,000

Lackawanna 524 270 68828 TR 524 over Kennedy Creek C BRDG BOF 800,000 185 200,000 1,000,000 1,000,000

Lackawanna 632 FP1 102327Fed Aid Paving 4-18-FP 1 +C HRST NHPP 1,500,000 1,500,000 1,500,000

Page 112: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

112 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lackawanna 1012 202 57706 Kennedy Drive/County Road +C SAMI HSIP 634,500 634,500 634,500

Lackawanna 1012 202 57706 Kennedy Drive/County Road +C SAMI HSIP 1,500,000 1,500,000 1,500,000

Lackawanna 1012 202 57706 Kennedy Drive/County Road +C SAMI HSIP 1,365,501 1,365,501 1,365,501

Lackawanna 1012 T01 101922Group 4-15-ST 1 C HRST 581 6,140,400 6,140,400 6,140,400

Lackawanna 1012 T01 101922Group 4-15-ST 1 C HRST 581 159,600 159,600 159,600

Lackawanna 1013 0 101984Group 4-15-ST 7 C HRST 581 3,700,000 3,700,000 3,700,000

Lackawanna 1017 SLD 96793 SR 1017 Slide C HRST 581 350,000 350,000 350,000

Lackawanna 1018 250 102486SR 1018 ov Steery Creek S HRST STP 110,000 110,000 110,000

Lackawanna 3023 FP2 104227Fed Aid Paving 4-15-FP 2 C HRST STP 250,000 250,000 250,000

Lackawanna 3023 FP2 104227Fed Aid Paving 4-15-FP 2 C HRST NHPP 1,250,000 1,250,000 1,250,000

Lackawanna 3023 FP2 104227Fed Aid Paving 4-15-FP 2 C HRST STP 500,000 500,000 500,000

Lackawanna 4005 270 68853 SR 4005 over D&H RR F BRDG BOF 320,000 185 80,000 400,000 400,000

Lackawanna 4009 270 68856 SR 4009 over D&H Railroad P BRDG 185 402,500 402,500 402,500

Lackawanna 4032 250 8006 SR 4032 ov Summit Lake Ck C BRDG STP 1,080,000 185 270,000 1,350,000 1,350,000

Lackawanna 6006 255 8190 SR 6006 over SR 107 C BRDG NHPP 1,320,000 185 330,000 1,650,000 1,650,000

Lackawanna 6011 273 7838 Harrison Avenue Bridge C BRDG NHPP 3,799,450 185 949,862 4,749,312 4,749,312

Lackawanna 7211 EMG 67085 T437 College Av Marcomis F BRDG BOF 216,000 179 13,500 229,500 229,500

Lackawanna 7211 EMG 67085 T437 College Av Marcomis F BRDG 183 40,500 40,500 40,500

Lackawanna 7211 EMG 67085 T437 College Av Marcomis C BRDG BOF 1,200,000 179 75,000 1,275,000 1,275,000

Lackawanna 7211 EMG 67085 T437 College Av Marcomis C BRDG 183 225,000 225,000 225,000

Lackawanna 7301 BRG 8040 6th Ave.Bridge,Carbondale P BRDG STP 128,000 183 24,000 8,000 160,000 160,000

Lackawanna 7301 BRG 8040 6th Ave.Bridge,Carbondale F BRDG BOF 187,880 183 35,228 11,742 234,850 234,850

Lackawanna 7301 BRG 8040 6th Ave.Bridge,Carbondale C BRDG BOF 600,000 183 112,500 95,200 807,700 807,700

Lackawanna 7301 BRG 8040 6th Ave.Bridge,Carbondale C BRDG BOF 1,000,000 183 187,500 62,500 1,250,000 1,250,000

Lackawanna 7302 BRG 7912 Rockwell Avenue Bridge C BRDG BOF 251,020 183 47,066 15,689 313,775 313,775

Lackawanna 7410 EMG 8086 Main Street Bridge Moosic C BRDG 185 99,900 99,900 99,900

Lackawanna 8025 D50 67200 SR 8025 ov Roaring Brook P BRDG NHPP 182,999 182,999 182,999

Lackawanna 8025 D50 67200 SR 8025 ov Roaring Brook P BRDG NHPP 219,501 219,501 219,501

Totals for: Lackawanna 29,621,123 19,219,907 222,631 49,063,661 27,791,400 2,926,365 406,030 31,123,795 16,521,200 1,529,927 18,051,127 16,074,003 6,488,500 525,000 23,087,503 121,326,086

Lancaster 80932 Harrisburg Pike Reserve P SAMI 3,050,000 3,050,000 3,050,000

Lancaster 80932 Harrisburg Pike Reserve C SAMI SXF 4,000,000 4,000,000 4,000,000

Lancaster 101396Lancaster RBR Initiative C BRDG 581 1,750,000 1,750,000 1,750,000

Lancaster 101396Lancaster RBR Initiative C BRDG 581 3,500,000 3,500,000 3,500,000

Lancaster 101396Lancaster RBR Initiative C BRDG 581 3,500,000 3,500,000 3,500,000

Lancaster 101505Centerville Road Widening P HCON STP 1,600,000 400,000 2,000,000 2,000,000

Lancaster 101505Centerville Road Widening F HCON STU 2,000,000 500,000 2,500,000 2,500,000

Lancaster 102149Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Lancaster 102149Roadway Maint Line Item C HRST 409 2,670,000 2,670,000 2,670,000

Lancaster 102149Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Lancaster 102149Roadway Maint Line Item C HRST 409 8,558,250 8,558,250 8,558,250

Page 113: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

113 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 102509Non-Motorized Trans Study S IMOD STU 48,000 12,000 60,000 60,000

Lancaster 102511Bridgeport Trans Study S IMOD STU 187,200 46,800 234,000 234,000

Lancaster 102514Lititz NS Rail Relocation C HCON STU 500,000 500,000 500,000

Lancaster 102532Enola Trail Improvements C TENH TAU 404,000 404,000 404,000

Lancaster 102532Enola Trail Improvements C TENH TAU 404,000 404,000 404,000

Lancaster 102827Bicycle Sharing System C TENH STU 260,000 260,000 260,000

Lancaster 87823 TAP Line Item C TENH TAU 404,000 404,000 404,000

Lancaster 87823 TAP Line Item C TENH TAU 404,000 404,000 404,000

Lancaster 87825 HSIP Line Item C SAMI HSIP 1,403,000 1,403,000 1,403,000

Lancaster 87825 HSIP Line Item C SAMI HSIP 41,000 41,000 41,000

Lancaster 87825 HSIP Line Item C SAMI HSIP 1,471,636 1,471,636 1,471,636

Lancaster 87826 Bridge Reserve. C BRDG BOF 825,732 185 79,788 905,520 905,520

Lancaster 87826 Bridge Reserve. C BRDG STP 22,951 22,951 22,951

Lancaster 87826 Bridge Reserve. C BRDG BOF 761,468 185 319,487 1,080,955 1,080,955

Lancaster 87826 Bridge Reserve. C BRDG STP 27,808 27,808 27,808

Lancaster 87826 Bridge Reserve. C BRDG STP 634,000 185 2,000,000 2,634,000 2,634,000

Lancaster 87827 Highway Reserve C HRST NHPP 310,312 581 2,763,400 3,073,712 3,073,712

Lancaster 87827 Highway Reserve C HRST STP 482,061 482,061 482,061

Lancaster 87827 Highway Reserve C HRST 581 869,000 869,000 869,000

Lancaster 87827 Highway Reserve C HRST 581 5,909,177 5,909,177 5,909,177

Lancaster 87827 Highway Reserve C HRST 581 1,000,000 1,000,000 1,000,000

Lancaster 87832 CMAQ Line Item C AIR CAQ 100,584 100,584 100,584

Lancaster 87848 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Lancaster 87848 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Lancaster 87848 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Lancaster 87848 Delivery/ Consult Assist P PRA 581 800,000 800,000 800,000

Lancaster 87848 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Lancaster 87848 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Lancaster 87848 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Lancaster 87848 Delivery/ Consult Assist C PRA 581 400,000 400,000 400,000

Lancaster 93151 Smart Growth Program C HRST STU 279 279 279

Lancaster 93151 Smart Growth Program C HRST STU 1,955,000 1,955,000 1,955,000

Lancaster 93151 Smart Growth Program C HRST STU 1,045,000 1,045,000 1,045,000

Lancaster 94572 SRTP Rideshare Program P SAMI CAQ 326,686 326,686 326,686

Lancaster 94572 SRTP Rideshare Program P SAMI CAQ 329,953 329,953 329,953

Lancaster 94572 SRTP Rideshare Program P SAMI CAQ 333,253 333,253 333,253

Lancaster 94572 SRTP Rideshare Program P SAMI CAQ 336,586 336,586 336,586

Lancaster 95714 E-town Ped/Bike Path Ext C TENH STU 262,243 544,632 806,875 806,875

Lancaster 95717 NW Lanc Cty River Trail +C TENH STU 24,000 24,000 24,000

Lancaster BIK 102507Comprehensive Bike Plan S IMOD STU 48,000 12,000 60,000 60,000

Page 114: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

114 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster MUL 95716 Mulberry St Two-Way Conv +C SAMI STU 700,000 700,000 700,000

Lancaster RRX 103567Paradise Lane Crossing +C SAMI RRX 327,818 327,818 327,818

Lancaster RRX 96242 Greenfield Road NS X-ing +C SAMI RRX* 250,000 250,000 250,000

Lancaster RRX 96242 Greenfield Road NS X-ing +C SAMI RRX* 51,000 51,000 51,000

Lancaster RRX 97555 Diller Avenue Crossing +C SAMI RRX* 107,000 107,000 107,000

Lancaster RRX 97555 Diller Avenue Crossing +C SAMI RRX* 100,000 100,000 100,000

Lancaster RRX 98233 S Penryn Road Crossing C SAMI RRX 17,757 17,757 17,757

Lancaster STA 64830 Mount Joy Amtrak Station P HRST 581 91,000 91,000 91,000

Lancaster 23 024 89207 PA 23 TSM Improvements C HRST CAQ 927,314 927,314 927,314

Lancaster 23 024 89207 PA 23 TSM Improvements C HRST CAQ 2,134,267 2,134,267 2,134,267

Lancaster 23 024 89207 PA 23 TSM Improvements C SAMI CAQ 1,400,000 1,400,000 1,400,000

Lancaster 23 026 94912 PA 23 / PA 741 Int. Imp. F SAMI CAQ 250,000 250,000 250,000

Lancaster 23 026 94912 PA 23 / PA 741 Int. Imp. U SAMI CAQ 100,000 100,000 100,000

Lancaster 23 026 94912 PA 23 / PA 741 Int. Imp. R SAMI CAQ 1,000,000 1,000,000 1,000,000

Lancaster 23 026 94912 PA 23 / PA 741 Int. Imp. +C SAMI CAQ 863,170 863,170 863,170

Lancaster 23 026 94912 PA 23 / PA 741 Int. Imp. +C SAMI CAQ 636,830 636,830 636,830

Lancaster 23 031 94923 PA 23 over Cnestga Br Pr P BRDG 581 400,000 400,000 400,000

Lancaster 23 031 94923 PA 23 over Cnestga Br Pr C BRDG 581 4,057,754 4,057,754 4,057,754

Lancaster 30 069 83168 Gap Bottleneck Improve C HRST NHPP 1,696,570 1,696,570 1,696,570

Lancaster 30 104 91037 US30 Roadway Preservation C HRST NHPP 200,000 200,000 200,000

Lancaster 30 104 91037 US30 Roadway Preservation C HRST NHPP 150,000 150,000 150,000

Lancaster 30 108 97015 US 30 Resurface West C HRST NHPP 5,405,000 5,405,000 5,405,000

Lancaster 30 108 97015 US 30 Resurface West C HRST NHPP 4,165,000 4,165,000 4,165,000

Lancaster 30 113 97250 US 30 Improvements P SAMI 581 200,000 200,000 200,000

Lancaster 30 113 97250 US 30 Improvements F SAMI HSIP 1,250,000 1,250,000 1,250,000

Lancaster 30 122 94924 Fruitville Pike Bridge P BRDG 185 250,000 250,000 250,000

Lancaster 30 122 94924 Fruitville Pike Bridge F BRDG STP 250,000 250,000 250,000

Lancaster 30 122 94924 Fruitville Pike Bridge U BRDG 185 75,000 75,000 75,000

Lancaster 30 122 94924 Fruitville Pike Bridge C BRDG STU 5,500,000 5,500,000 5,500,000

Lancaster 72 034 80119 PA 72 Inter. Corr. Imp. +C SAMI CAQ 1,000,000 1,000,000 1,000,000

Lancaster 72 034 80119 PA 72 Inter. Corr. Imp. +C SAMI CAQ 600,376 600,376 600,376

Lancaster 72 045 89107 Lancaster TSM Corr 7-12 C SAMI CAQ 1,400,000 1,400,000 1,400,000

Lancaster 72 051 78847 PA72 over Chiques Creek P BRDG 185 75,000 75,000 75,000

Lancaster 72 051 78847 PA72 over Chiques Creek F BRDG 185 100,000 100,000 100,000

Lancaster 72 051 78847 PA72 over Chiques Creek U BRDG 185 50,000 50,000 50,000

Lancaster 72 051 78847 PA72 over Chiques Creek R BRDG 185 50,000 50,000 50,000

Lancaster 72 051 78847 PA72 over Chiques Creek C BRDG 185 1,560,000 1,560,000 1,560,000

Lancaster 72 052 102174Lebanon Road Resurface 2 C HRST 409 2,809,250 2,809,250 2,809,250

Lancaster 72 052 102174Lebanon Road Resurface 2 C HRST 409 190,750 190,750 190,750

Lancaster 72 053 91195 Lebanon Road Resurface 1 C HRST 409 2,500,000 2,500,000 2,500,000

Page 115: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

115 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 72 054 96212 Manheim Pike C HRST 409 1,360,250 1,360,250 1,360,250

Lancaster 72 054 96212 Manheim Pike C HRST 409 139,750 139,750 139,750

Lancaster 222 046 87547 Beaver Valley Pike Br. #3 F BRDG STP 95,900 185 23,975 119,875 119,875

Lancaster 222 046 87547 Beaver Valley Pike Br. #3 F BRDG STP 86,339 185 21,584 107,923 107,923

Lancaster 222 046 87547 Beaver Valley Pike Br. #3 U BRDG STP 40,000 185 10,000 50,000 50,000

Lancaster 222 046 87547 Beaver Valley Pike Br. #3 R BRDG STP 40,000 185 10,000 50,000 50,000

Lancaster 222 046 87547 Beaver Valley Pike Br. #3 +C BRDG STU 1,566,675 1,566,675 1,566,675

Lancaster 222 051 94916 US 222 Cocalico Br Preser P BRDG 581 150,000 150,000 150,000

Lancaster 222 051 94916 US 222 Cocalico Br Preser C BRDG 581 1,665,000 1,665,000 1,665,000

Lancaster 222 052 94918 Pleasant Valley Rd Bridge P BRDG 581 200,000 200,000 200,000

Lancaster 222 052 94918 Pleasant Valley Rd Bridge C BRDG 581 1,107,250 1,107,250 1,107,250

Lancaster 222 053 94925 US 222/1029/Kurtz Br Pr P BRDG 581 200,000 200,000 200,000

Lancaster 222 053 94925 US 222/1029/Kurtz Br Pr C BRDG 185 1,800,000 1,800,000 1,800,000

Lancaster 222 054 94926 US 222 over N Church St P BRDG 581 300,000 300,000 300,000

Lancaster 222 054 94926 US 222 over N Church St +C BRDG NHPP 2,223,118 2,223,118 2,223,118

Lancaster 222 059 97013 US 222 Reconstruction S HCON 581 300,000 300,000 300,000

Lancaster 222 059 97013 US 222 Reconstruction +P HCON 581 3,000,000 3,000,000 3,000,000

Lancaster 222 059 97013 US 222 Reconstruction F HCON 581 3,500,000 3,500,000 3,500,000

Lancaster 222 060 96322 Willow Street Resurface C HRST NHPP 2,200,000 2,200,000 2,200,000

Lancaster 222 060 96322 Willow Street Resurface C HRST NHPP 350,000 350,000 350,000

Lancaster 230 030 74962 North Market Street Brg F BRDG 185 250,000 250,000 250,000

Lancaster 230 030 74962 North Market Street Brg U BRDG 185 25,000 25,000 25,000

Lancaster 230 030 74962 North Market Street Brg R BRDG 185 25,000 25,000 25,000

Lancaster 230 030 74962 North Market Street Brg C BRDG 581 945,000 945,000 945,000

Lancaster 230 035 90855 Harrisburg Pike Bridge P BRDG 581 250,000 250,000 250,000

Lancaster 241 011 87503 Bainbridge Rd Bridge # 2 F BRDG 185 350,000 350,000 350,000

Lancaster 241 011 87503 Bainbridge Rd Bridge # 2 U BRDG 185 20,000 20,000 20,000

Lancaster 241 011 87503 Bainbridge Rd Bridge # 2 R BRDG 185 40,000 40,000 40,000

Lancaster 241 011 87503 Bainbridge Rd Bridge # 2 C BRDG STP 1,017,725 185 254,431 1,272,156 1,272,156

Lancaster 241 011 87503 Bainbridge Rd Bridge # 2 C BRDG STP 874,275 185 218,568 1,092,843 1,092,843

Lancaster 241 012 19978 Bainbridge Road Bridge F BRDG STP 253,600 185 63,400 317,000 317,000

Lancaster 241 012 19978 Bainbridge Road Bridge U BRDG 185 10,000 10,000 10,000

Lancaster 241 012 19978 Bainbridge Road Bridge R BRDG 185 20,000 20,000 20,000

Lancaster 241 012 19978 Bainbridge Road Bridge C BRDG STP 457,084 185 176,990 634,074 634,074

Lancaster 241 012 19978 Bainbridge Road Bridge C BRDG STU 250,876 250,876 250,876

Lancaster 272 028 74956 South Reading Rd Bridge C BRDG STP 1,411,584 185 326,664 1,738,248 1,738,248

Lancaster 272 028 74956 South Reading Rd Bridge C BRDG 581 681,336 681,336 681,336

Lancaster 272 028 74956 South Reading Rd Bridge C BRDG STU 2,620,416 2,620,416 2,620,416

Lancaster 272 037 90490 PA 272 Intersection Impvt F SAMI HSIP 400,000 400,000 400,000

Lancaster 272 037 90490 PA 272 Intersection Impvt U SAMI HSIP 100,000 100,000 100,000

Page 116: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

116 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 272 037 90490 PA 272 Intersection Impvt R SAMI HSIP 100,000 100,000 100,000

Lancaster 272 037 90490 PA 272 Intersection Impvt C SAMI HSIP 2,503,000 2,503,000 2,503,000

Lancaster 272 037 90490 PA 272 Intersection Impvt C SAMI HSIP 297,000 297,000 297,000

Lancaster 272 041 90908 Oregon Pike C HRST 409 3,168,250 3,168,250 3,168,250

Lancaster 272 041 90908 Oregon Pike C HRST 409 3,831,750 3,831,750 3,831,750

Lancaster 300 019 99179 Lanc Grp H Preservations P BRDG 581 200,000 200,000 200,000

Lancaster 300 019 99179 Lanc Grp H Preservations C BRDG 185 221,000 221,000 221,000

Lancaster 300 019 99179 Lanc Grp H Preservations C BRDG 581 1,108,823 1,108,823 1,108,823

Lancaster 300 019 99179 Lanc Grp H Preservations C BRDG 581 2,550,177 2,550,177 2,550,177

Lancaster 322 036 90491 US 322 Intsect Impvts P SAMI HSIP 500,000 500,000 500,000

Lancaster 322 036 90491 US 322 Intsect Impvts +F SAMI HSIP 350,000 350,000 350,000

Lancaster 322 036 90491 US 322 Intsect Impvts +C SAMI HSIP 565,000 565,000 565,000

Lancaster 322 036 90491 US 322 Intsect Impvts +C SAMI HSIP 1,031,364 1,031,364 1,031,364

Lancaster 372 014 63220 Christiana Pike Bridges C BRDG 185 1,857,130 1,857,130 1,857,130

Lancaster 372 014 63220 Christiana Pike Bridges C BRDG 581 30,000 30,000 30,000

Lancaster 372 016 73924 PA 372 Bridge Replacement U BRDG 581 60,000 60,000 60,000

Lancaster 372 016 73924 PA 372 Bridge Replacement R BRDG 581 60,000 60,000 60,000

Lancaster 372 016 73924 PA 372 Bridge Replacement C BRDG 581 1,200,000 1,200,000 1,200,000

Lancaster 441 022 78861 River Rd Brdg Chiques Ck P BRDG STP 19,049 185 4,762 23,811 23,811

Lancaster 441 022 78861 River Rd Brdg Chiques Ck F BRDG 185 400,000 400,000 400,000

Lancaster 441 022 78861 River Rd Brdg Chiques Ck U BRDG 185 20,000 20,000 20,000

Lancaster 441 022 78861 River Rd Brdg Chiques Ck R BRDG 185 84,000 84,000 84,000

Lancaster 441 022 78861 River Rd Brdg Chiques Ck C BRDG STP 800,000 185 670,072 1,470,072 1,470,072

Lancaster 441 022 78861 River Rd Brdg Chiques Ck C BRDG STU 1,880,288 1,880,288 1,880,288

Lancaster 441 022 78861 River Rd Brdg Chiques Ck C BRDG STP 448,000 185 112,000 560,000 560,000

Lancaster 441 029 98280 Boro Signal Coordination P SAMI STP 100,000 100,000 100,000

Lancaster 441 029 98280 Boro Signal Coordination F SAMI 581 150,000 150,000 150,000

Lancaster 441 029 98280 Boro Signal Coordination C SAMI CAQ 250,000 250,000 250,000

Lancaster 462 033 94910 Columbia Ave & Rohrstn Rd F SAMI CAQ 250,000 250,000 250,000

Lancaster 462 033 94910 Columbia Ave & Rohrstn Rd U SAMI CAQ 100,000 100,000 100,000

Lancaster 462 033 94910 Columbia Ave & Rohrstn Rd +R SAMI CAQ 1,000,000 1,000,000 1,000,000

Lancaster 462 033 94910 Columbia Ave & Rohrstn Rd C SAMI CAQ 1,680,000 1,680,000 1,680,000

Lancaster 462 038 79020 Veteran's Mem Br -Susq Rv P BRDG 581 2,328,664 2,328,664 2,328,664

Lancaster 462 038 79020 Veteran's Mem Br -Susq Rv P BRDG 185 1,471,336 1,471,336 1,471,336

Lancaster 462 038 79020 Veteran's Mem Br -Susq Rv P BRDG 581 200,000 200,000 200,000

Lancaster 462 044 99194 Columbia and Race Impvts P SAMI 581 100,000 100,000 100,000

Lancaster 462 044 99194 Columbia and Race Impvts C SAMI STU 140,000 140,000 140,000

Lancaster 472 006 19952 S Lime Street Bridge P BRDG 581 275,000 275,000 275,000

Lancaster 501 017 89198 PA 501/Oregon Pk Intsct +C SAMI CAQ 939,404 939,404 939,404

Lancaster 501 017 89198 PA 501/Oregon Pk Intsct +C SAMI CAQ 57,577 57,577 57,577

Page 117: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

117 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 501 022 96320 Furnace Hill Pike Resf C HRST 581 260,000 260,000 260,000

Lancaster 501 022 96320 Furnace Hill Pike Resf C HRST 581 1,600,000 1,600,000 1,600,000

Lancaster 501 023 96211 Lititz Pike Resurfacing 2 +C HRST 409 2,910,000 2,910,000 2,910,000

Lancaster 625 006 101124Reading Road/Conestoga P BRDG STP 62,226 62,226 62,226

Lancaster 625 006 101124Reading Road/Conestoga P BRDG STP 36,928 36,928 36,928

Lancaster 625 006 101124Reading Road/Conestoga F BRDG 581 75,000 75,000 75,000

Lancaster 625 006 101124Reading Road/Conestoga C BRDG 185 326,982 326,982 326,982

Lancaster 722 010 64829 State Road Interchange +C SAMI NHPP 8,745,000 8,745,000 8,745,000

Lancaster 722 010 64829 State Road Interchange +C SAMI NHPP 8,745,000 8,745,000 8,745,000

Lancaster 741 025 100543Millersville Rd Bridge PM P BRDG 581 300,000 300,000 300,000

Lancaster 741 026 102512PA 741 Safety Improvement C SAMI STU 397,200 397,200 397,200

Lancaster 741 027 74961 Strasburg Road Bridge P BRDG 185 300,000 300,000 300,000

Lancaster 741 027 74961 Strasburg Road Bridge F BRDG 185 250,000 250,000 250,000

Lancaster 741 027 74961 Strasburg Road Bridge U BRDG 185 10,000 10,000 10,000

Lancaster 741 027 74961 Strasburg Road Bridge R BRDG 185 20,000 20,000 20,000

Lancaster 741 027 74961 Strasburg Road Bridge C BRDG 185 750,000 750,000 750,000

Lancaster 743 024 82899 Hershey Road Bridge F BRDG 581 315,000 315,000 315,000

Lancaster 743 024 82899 Hershey Road Bridge R BRDG 185 25,000 25,000 25,000

Lancaster 743 024 82899 Hershey Road Bridge C BRDG STP 1,099,965 185 274,991 1,374,956 1,374,956

Lancaster 743 024 82899 Hershey Road Bridge C BRDG STP 1,924,275 185 481,069 2,405,344 2,405,344

Lancaster 743 033 96210 Maytown Road Resurface C HRST 409 3,200,000 3,200,000 3,200,000

Lancaster 772 034 19862 Rife Run Bridge P BRDG 185 301,964 301,964 301,964

Lancaster 772 034 19862 Rife Run Bridge F BRDG 185 300,000 300,000 300,000

Lancaster 772 034 19862 Rife Run Bridge U BRDG 581 42,319 42,319 42,319

Lancaster 772 034 19862 Rife Run Bridge R BRDG 581 65,000 65,000 65,000

Lancaster 772 034 19862 Rife Run Bridge C BRDG 581 1,100,000 1,100,000 1,100,000

Lancaster 772 037 95194 Anderson Ferry Resurf 2 +C HRST 409 1,063,750 1,063,750 1,063,750

Lancaster 772 040 95715 Mt Joy Ped Safety +C TENH STU 400,000 400,000 400,000

Lancaster 772 042 100570Newport Rd over SR 6023 P BRDG 581 341,069 341,069 341,069

Lancaster 772 043 87703 Marietta /Mt. Joy Ave Brg P BRDG 185 300,000 300,000 300,000

Lancaster 772 043 87703 Marietta /Mt. Joy Ave Brg F BRDG 185 350,000 350,000 350,000

Lancaster 772 043 87703 Marietta /Mt. Joy Ave Brg U BRDG 185 100,000 100,000 100,000

Lancaster 772 043 87703 Marietta /Mt. Joy Ave Brg R BRDG 185 100,000 100,000 100,000

Lancaster 772 043 87703 Marietta /Mt. Joy Ave Brg C BRDG 185 1,750,000 1,750,000 1,750,000

Lancaster 896 006 89185 PA 896 and Rockvale +C SAMI STP 554,416 554,416 554,416

Lancaster 896 006 89185 PA 896 and Rockvale +C SAMI SXF 225,000 225,000 225,000

Lancaster 896 006 89185 PA 896 and Rockvale +C SAMI STP 706,584 706,584 706,584

Lancaster 896 007 20115 PA 896 Shoulders & Rscf +C HRST STP 208,428 208,428 208,428

Lancaster 896 007 20115 PA 896 Shoulders & Rscf +C HRST STU 1,402,084 1,402,084 1,402,084

Lancaster 896 007 20115 PA 896 Shoulders & Rscf +C HRST STP 77,831 77,831 77,831

Page 118: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

118 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 896 007 20115 PA 896 Shoulders & Rscf +C HRST STU 2,165,836 2,165,836 2,165,836

Lancaster 896 007 20115 PA 896 Shoulders & Rscf +C HRST STU 423,325 423,325 423,325

Lancaster 896 008 75024 PA 896 Bridge Widening C SAMI STP 862,846 581 525,000 1,387,846 1,387,846

Lancaster 896 008 75024 PA 896 Bridge Widening C SAMI SXF 1,237,154 1,237,154 1,237,154

Lancaster 896 008 75024 PA 896 Bridge Widening C SAMI STP 274,400 581 68,600 343,000 343,000

Lancaster 1005 008 88944 Mt. Sidney Road Bridge C BRDG STU 448,000 185 112,000 560,000 560,000

Lancaster 1010 018 19503 Farmersvlle Rd Bridge F BRDG 185 225,000 225,000 225,000

Lancaster 1010 018 19503 Farmersvlle Rd Bridge U BRDG 185 15,000 15,000 15,000

Lancaster 1010 018 19503 Farmersvlle Rd Bridge R BRDG 185 25,000 25,000 25,000

Lancaster 1010 018 19503 Farmersvlle Rd Bridge C BRDG 185 134,065 134,065 134,065

Lancaster 1010 018 19503 Farmersvlle Rd Bridge C BRDG 581 1,140,000 1,140,000 1,140,000

Lancaster 1010 018 19503 Farmersvlle Rd Bridge C BRDG 185 1,494,935 1,494,935 1,494,935

Lancaster 1010 018 19503 Farmersvlle Rd Bridge C BRDG 581 63,000 63,000 63,000

Lancaster 1027 003 19971 Horseshoe Road Bridge F BRDG 581 250,000 250,000 250,000

Lancaster 1027 003 19971 Horseshoe Road Bridge R BRDG 581 25,000 25,000 25,000

Lancaster 1027 003 19971 Horseshoe Road Bridge C BRDG 581 500,000 500,000 500,000

Lancaster 1032 001 101015North Third Street Bridge +P BRDG 185 250,000 250,000 250,000

Lancaster 1032 001 101015North Third Street Bridge F BRDG 581 300,000 300,000 300,000

Lancaster 1032 001 101015North Third Street Bridge U BRDG 581 50,000 50,000 50,000

Lancaster 1032 001 101015North Third Street Bridge R BRDG 581 50,000 50,000 50,000

Lancaster 1032 001 101015North Third Street Bridge +C BRDG STP 540,925 540,925 540,925

Lancaster 1035 005 74959 Clay Road Bridge U BRDG 185 25,000 25,000 25,000

Lancaster 1035 005 74959 Clay Road Bridge R BRDG 185 33,000 33,000 33,000

Lancaster 1035 005 74959 Clay Road Bridge C BRDG 185 1,250,207 1,250,207 1,250,207

Lancaster 1045 007 87504 South 4th Street Bridge F BRDG STP 200,000 185 50,000 250,000 250,000

Lancaster 1045 007 87504 South 4th Street Bridge U BRDG STP 40,000 185 10,000 50,000 50,000

Lancaster 1045 007 87504 South 4th Street Bridge R BRDG STP 80,000 185 20,000 100,000 100,000

Lancaster 1045 007 87504 South 4th Street Bridge C BRDG STP 1,065,000 185 266,250 1,331,250 1,331,250

Lancaster 1045 007 87504 South 4th Street Bridge C BRDG STP 675,000 185 168,750 843,750 843,750

Lancaster 1047 003 87379 Cocalico Road Bridge F BRDG 185 250,000 250,000 250,000

Lancaster 1047 003 87379 Cocalico Road Bridge U BRDG 581 50,000 50,000 50,000

Lancaster 1047 003 87379 Cocalico Road Bridge R BRDG 581 50,000 50,000 50,000

Lancaster 1053 003 63227 Greenville Road Bridge P BRDG STP 300,000 300,000 300,000

Lancaster 1053 003 63227 Greenville Road Bridge F BRDG 185 300,000 300,000 300,000

Lancaster 1053 003 63227 Greenville Road Bridge U BRDG 185 18,606 18,606 18,606

Lancaster 1053 003 63227 Greenville Road Bridge R BRDG 185 20,000 20,000 20,000

Lancaster 1053 003 63227 Greenville Road Bridge +C BRDG STP 1,750,000 1,750,000 1,750,000

Lancaster 1059 001 73946 Muddy Creek Road Bridge F BRDG 581 200,000 200,000 200,000

Lancaster 1059 001 73946 Muddy Creek Road Bridge U BRDG 581 10,000 10,000 10,000

Lancaster 1059 001 73946 Muddy Creek Road Bridge R BRDG 581 10,000 10,000 10,000

Page 119: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

119 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 1059 001 73946 Muddy Creek Road Bridge C BRDG 185 50,000 50,000 50,000

Lancaster 1059 001 73946 Muddy Creek Road Bridge C BRDG 581 750,000 750,000 750,000

Lancaster 1068 001 94919 SR 1068 over US 222 Br Pr P BRDG 581 300,000 300,000 300,000

Lancaster 1068 001 94919 SR 1068 over US 222 Br Pr C BRDG BOF 600,000 185 150,000 750,000 750,000

Lancaster 1072 001 100539Pool Road over US 222 P BRDG 581 300,000 300,000 300,000

Lancaster 1074 001 100582Miley Road over US 222 P BRDG 581 300,000 300,000 300,000

Lancaster 1088 001 101037Bowmansville Rd/US 222 P BRDG 581 300,000 300,000 300,000

Lancaster 1090 001 101158Willow Road Bridge P BRDG 581 300,000 300,000 300,000

Lancaster 1092 001 101159Hartman Station Bridge P BRDG 581 300,000 300,000 300,000

Lancaster 2033 008 74957 Leacock Road Bridge F BRDG 581 300,000 300,000 300,000

Lancaster 2033 008 74957 Leacock Road Bridge U BRDG 185 25,000 25,000 25,000

Lancaster 2033 008 74957 Leacock Road Bridge R BRDG 185 25,000 25,000 25,000

Lancaster 2033 008 74957 Leacock Road Bridge C BRDG 581 1,232,000 1,232,000 1,232,000

Lancaster 3004 005 87497 Fishing Creek Road Bridge F BRDG 581 350,000 350,000 350,000

Lancaster 3004 005 87497 Fishing Creek Road Bridge U BRDG 185 50,000 50,000 50,000

Lancaster 3004 005 87497 Fishing Creek Road Bridge R BRDG 185 50,000 50,000 50,000

Lancaster 3004 005 87497 Fishing Creek Road Bridge C BRDG 185 1,000,000 1,000,000 1,000,000

Lancaster 3007 013 89272 Goshen Mill Road Bridge F BRDG 581 300,000 300,000 300,000

Lancaster 3007 013 89272 Goshen Mill Road Bridge U BRDG 581 10,000 10,000 10,000

Lancaster 3007 013 89272 Goshen Mill Road Bridge R BRDG 581 10,000 10,000 10,000

Lancaster 3007 013 89272 Goshen Mill Road Bridge C BRDG 581 900,000 900,000 900,000

Lancaster 3007 013 89272 Goshen Mill Road Bridge C BRDG 581 300,000 300,000 300,000

Lancaster 3017 026 101074Safe Harbor Rd Bridge PM P BRDG 581 300,000 300,000 300,000

Lancaster 3023 011 19931 Frogtown Road Bridge P BRDG 185 200,000 200,000 200,000

Lancaster 3023 011 19931 Frogtown Road Bridge F BRDG 185 250,000 250,000 250,000

Lancaster 3023 011 19931 Frogtown Road Bridge U BRDG 185 75,000 75,000 75,000

Lancaster 3023 011 19931 Frogtown Road Bridge R BRDG 185 75,000 75,000 75,000

Lancaster 3023 011 19931 Frogtown Road Bridge C BRDG 185 800,000 800,000 800,000

Lancaster 3027 004 87375 Walnut Hill Road Bridge F BRDG BOF 160,000 185 40,000 200,000 200,000

Lancaster 3027 004 87375 Walnut Hill Road Bridge U BRDG BOF 20,000 185 5,000 25,000 25,000

Lancaster 3027 004 87375 Walnut Hill Road Bridge R BRDG BOF 20,000 185 5,000 25,000 25,000

Lancaster 3027 004 87375 Walnut Hill Road Bridge C BRDG BOF 440,000 185 110,000 550,000 550,000

Lancaster 3028 003 84016 Pitney Rd over Amtrak Br C BRDG BOF 301,200 185 75,300 376,500 376,500

Lancaster 3028 003 84016 Pitney Rd over Amtrak Br C BRDG STP 1,858,800 185 464,700 2,323,500 2,323,500

Lancaster 3029 006 102513N/S Duke St Conn/Realign C HCON STU 355,857 355,857 355,857

Lancaster 3029 006 102513N/S Duke St Conn/Realign C HCON STU 141,343 141,343 141,343

Lancaster 4001 015 101144Spooky Nook Rd ovr Amtrak P BRDG 581 300,000 300,000 300,000

Lancaster 4011 015 74954 Fruitville Pike Bridge R BRDG STP 8,000 185 2,000 10,000 10,000

Lancaster 4011 015 74954 Fruitville Pike Bridge C BRDG 185 1,580,000 1,580,000 1,580,000

Lancaster 4020 009 80930 US30/Hbg Pike Interchange C HCON SXF 1,372,000 1,372,000 1,372,000

Page 120: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

120 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 4020 014 89654 Hbg. Pike/ Dillerville Rd +C SAMI NHPP 1,140,000 1,140,000 1,140,000

Lancaster 4020 014 89654 Hbg. Pike/ Dillerville Rd +C SAMI STP 1,060,000 1,060,000 1,060,000

Lancaster 4040 011 102510Doe Run Rd Ped Enh C IMOD STU 858,378 858,378 858,378

Lancaster 4057 002 64767 Centerville Rd Interchang F XRST STU 600,000 581 150,000 750,000 750,000

Lancaster 4057 002 64767 Centerville Rd Interchang U XRST STP 160,000 40,000 200,000 200,000

Lancaster 4057 002 64767 Centerville Rd Interchang R XRST STP 80,000 20,000 100,000 100,000

Lancaster 4061 001 94922 SR 4061 Bridge Preserve P BRDG 581 332,000 332,000 332,000

Lancaster 4061 001 94922 SR 4061 Bridge Preserve C BRDG 581 1,050,000 1,050,000 1,050,000

Lancaster 7101 BRG 89288 Rohrerstown Rd Bridge F BRDG BOF 81,468 183 15,275 5,092 101,835 101,835

Lancaster 7101 BRG 89288 Rohrerstown Rd Bridge F BRDG BOF 78,532 183 14,725 4,908 98,165 98,165

Lancaster 7101 BRG 89288 Rohrerstown Rd Bridge U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Lancaster 7101 BRG 89288 Rohrerstown Rd Bridge R BRDG BOF 24,000 183 4,500 1,500 30,000 30,000

Lancaster 7101 BRG 89288 Rohrerstown Rd Bridge C BRDG BOF 1,200,000 183 225,000 75,000 1,500,000 1,500,000

Lancaster 7213 BRG 19799 Conestoga Creek Rd Bridge C BRDG BOF 1,000,000 183 187,500 62,500 1,250,000 1,250,000

Lancaster 7214 BR 20053 Holland Street BR Removal P BRDG STP 160,000 183 30,000 10,000 200,000 200,000

Lancaster 7215 BRG 94753 S Ronks Rd over Pequea Cr P BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Lancaster 7215 BRG 94753 S Ronks Rd over Pequea Cr F BRDG BOF 240,000 183 45,000 15,000 300,000 300,000

Lancaster 7215 BRG 94753 S Ronks Rd over Pequea Cr U BRDG BOF 27,200 183 5,100 1,700 34,000 34,000

Lancaster 7215 BRG 94753 S Ronks Rd over Pequea Cr R BRDG BOF 24,000 183 4,500 1,500 30,000 30,000

Lancaster 7215 BRG 94753 S Ronks Rd over Pequea Cr C BRDG BOF 2,073,600 183 388,800 129,600 2,592,000 2,592,000

Lancaster 7219 BRG 94754 T-325 over Peters Creek P BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lancaster 7219 BRG 94754 T-325 over Peters Creek F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lancaster 7219 BRG 94754 T-325 over Peters Creek U BRDG BOF 3,200 183 600 200 4,000 4,000

Lancaster 7219 BRG 94754 T-325 over Peters Creek R BRDG BOF 2,800 183 525 175 3,500 3,500

Lancaster 7219 BRG 94754 T-325 over Peters Creek C BRDG BOF 344,000 183 64,500 21,500 430,000 430,000

Lancaster 7226 BRG 92395 Pequea Lane Bridge F BRDG BOF 193,600 183 36,300 12,100 242,000 242,000

Lancaster 7226 BRG 92395 Pequea Lane Bridge U BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Lancaster 7226 BRG 92395 Pequea Lane Bridge R BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lancaster 7226 BRG 92395 Pequea Lane Bridge C BRDG BOF 988,000 183 185,250 61,750 1,235,000 1,235,000

Lancaster 7226 BRG 94751 Pequea Val over Pequea Cr P BRDG BOF 100,000 183 18,750 6,250 125,000 125,000

Lancaster 7226 BRG 94751 Pequea Val over Pequea Cr F BRDG BOF 100,000 183 18,750 6,250 125,000 125,000

Lancaster 7226 BRG 94751 Pequea Val over Pequea Cr U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Lancaster 7226 BRG 94751 Pequea Val over Pequea Cr R BRDG BOF 6,000 183 1,125 375 7,500 7,500

Lancaster 7409 BRG 85394 North Locust St Bridge F BRDG BOF 135,200 183 25,350 8,450 169,000 169,000

Lancaster 7409 BRG 85394 North Locust St Bridge U BRDG BOF 72,000 183 13,500 4,500 90,000 90,000

Lancaster 7409 BRG 85394 North Locust St Bridge R BRDG BOF 56,000 183 10,500 3,500 70,000 70,000

Lancaster 7409 BRG 85394 North Locust St Bridge C BRDG BOF 1,056,000 183 198,000 66,000 1,320,000 1,320,000

Lancaster 7409 BRG 94747 Cedar St over Lititz Run P BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Lancaster 7409 BRG 94747 Cedar St over Lititz Run F BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Lancaster 7409 BRG 94747 Cedar St over Lititz Run U BRDG BOF 6,000 183 1,125 375 7,500 7,500

Page 121: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

121 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lancaster 7409 BRG 94747 Cedar St over Lititz Run R BRDG BOF 5,600 183 1,050 350 7,000 7,000

Lancaster 7409 BRG 94747 Cedar St over Lititz Run C BRDG BOF 686,400 183 128,700 42,900 858,000 858,000

Totals for: Lancaster 32,840,911 25,270,000 4,207,824 62,318,735 36,527,000 29,996,000 145,158 66,668,158 31,331,818 36,184,000 668,925 68,184,743 31,004,000 36,184,000 194,000 67,382,000 264,553,636

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000 100,000

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000 100,000

Lawrence 75348 Better. Resv Lawrence Cty F HRST STP 100,000 100,000 100,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 1,000,000 1,000,000 1,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 2,000,000 2,000,000 2,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST STP 4,000,000 4,000,000 4,000,000

Lawrence 75348 Better. Resv Lawrence Cty C HRST 581 4,000,000 4,000,000 4,000,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence F BRDG NHPP 500,000 185 100,000 600,000 600,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 200,000 1,000,000 1,000,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 300,000 1,100,000 1,100,000

Lawrence 76584 Bridge Line Item-Lawrence C BRDG NHPP 800,000 185 300,000 1,100,000 1,100,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000 60,000

Lawrence 76600 Geotechnical - Lawrence F SAMI STP 60,000 60,000 60,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000 125,000

Lawrence 94699 SPC Lawrence SINC C SAMI STU 100,000 25,000 125,000 125,000

Lawrence TEH 29491 Neshannock Creek Trail C TENH STP 280,000 70,000 350,000 350,000

Lawrence 18 L26 91595 18/SR 351 - SR 108 C HRST NHPP 2,000,000 2,000,000 2,000,000

Lawrence 18 L26 91595 18/SR 351 - SR 108 C HRST NHPP 2,000,000 2,000,000 2,000,000

Lawrence 18 L27 29441 18/Craig-Maitland Lane +C HRST NHPP 3,000,000 3,000,000 3,000,000

Lawrence 18 L28 29526 18/Mahoning Viaduct F BRDG 185 775,000 775,000 775,000

Lawrence 18 L28 29526 18/Mahoning Viaduct U BRDG 185 25,000 25,000 25,000

Lawrence 18 L28 29526 18/Mahoning Viaduct R BRDG NHPP 160,000 185 40,000 200,000 200,000

Lawrence 18 L28 29526 18/Mahoning Viaduct C BRDG NHPP 8,000,000 185 2,000,000 10,000,000 10,000,000

Lawrence 19 L05 29453 19/Br. Slippery Rock Crk F BRDG 185 300,000 300,000 300,000

Lawrence 19 L05 29453 19/Br. Slippery Rock Crk C BRDG 185 1,200,000 1,200,000 1,200,000

Lawrence 65 L25 29485 Ellwood Road ov B&O RR F BRDG 185 250,000 250,000 250,000

Lawrence 65 L25 29485 Ellwood Road ov B&O RR U BRDG 185 45,000 45,000 45,000

Lawrence 65 L25 29485 Ellwood Road ov B&O RR R BRDG 185 25,000 25,000 25,000

Lawrence 65 L25 29485 Ellwood Road ov B&O RR C BRDG STP 880,000 185 220,000 1,100,000 1,100,000

Page 122: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

122 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lawrence 208 L06 29314 Pulaski-New Bedford Br P BRDG 185 100,000 100,000 100,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br F BRDG 185 200,000 200,000 200,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br U BRDG 185 60,000 60,000 60,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br R HRST 185 75,000 75,000 75,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br C BRDG 185 500,000 500,000 500,000

Lawrence 208 L06 29314 Pulaski-New Bedford Br C BRDG 185 600,000 600,000 600,000

Lawrence 224 0 100756Fall Street Bridge P BRDG 581 300,000 300,000 300,000

Lawrence 288 L03 29301 Wampum Ave Bridge Replace C BRDG 185 6,000,000 6,000,000 6,000,000

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson P HRST STP 80,000 80,000 80,000

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson F HRST STP 120,000 120,000 120,000

Lawrence 317 L05 98203 317/OhioSt - Mt. Jackson C HRST 581 3,500,000 3,500,000 3,500,000

Lawrence 376 L05 95759 SMP-B /SR 376, 28 & 422 C SAMI NHPP 2,473,722 581 618,430 3,092,152 3,092,152

Lawrence 488 L05 91921 Portersville Rd/Slip Rock F BRDG 185 300,000 300,000 300,000

Lawrence 488 L05 91921 Portersville Rd/Slip Rock U BRDG 185 100,000 100,000 100,000

Lawrence 488 L05 91921 Portersville Rd/Slip Rock R BRDG 185 200,000 200,000 200,000

Lawrence 488 L05 91921 Portersville Rd/Slip Rock C BRDG 185 5,000,000 5,000,000 5,000,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge F BRDG 185 300,000 300,000 300,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge U BRDG 185 75,000 75,000 75,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge R BRDG 185 150,000 150,000 150,000

Lawrence 956 L08 29380 Neshannock Fall Rd Bridge C BRDG STP 1,200,000 185 300,000 1,500,000 1,500,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br F BRDG 185 250,000 250,000 250,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br U BRDG 185 50,000 50,000 50,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br R BRDG 185 80,000 80,000 80,000

Lawrence 2010 L01 73187 2010/Gardner Center Rd Br C BRDG 185 1,500,000 1,500,000 1,500,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run F BRDG 185 125,000 125,000 125,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run U BRDG 185 25,000 25,000 25,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run R BRDG 185 100,000 100,000 100,000

Lawrence 2012 L02 29388 SR 2012 over McKee Run C BRDG 185 1,250,000 1,250,000 1,250,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge F BRDG 185 300,000 300,000 300,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge U BRDG 185 200,000 200,000 200,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge R BRDG 185 200,000 200,000 200,000

Lawrence 2014 L01 29487 Hemmerle Road Bridge C BRDG 185 1,200,000 1,200,000 1,200,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge F BRDG 185 250,000 250,000 250,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge U BRDG 185 50,000 50,000 50,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge R BRDG 185 200,000 200,000 200,000

Lawrence 2020 L01 29533 SR2020 Pleasant Rd Bridge C BRDG BOF 921,000 185 230,250 1,151,250 1,151,250

Lawrence 2022 L03 29481 Heinz Camp Road Bridge C BRDG BOF 30,000 30,000 30,000

Lawrence 2030 L03 29393 Mountville Road Bridge P BRDG 185 250,000 250,000 250,000

Lawrence 2030 L03 29393 Mountville Road Bridge F BRDG 185 900,000 900,000 900,000

Lawrence 2030 L03 29393 Mountville Road Bridge R BRDG 185 300,000 300,000 300,000

Page 123: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

123 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lawrence 3001 L01 29290 East Poland Ave Bridge +C BRDG STP 2,000,000 2,000,000 2,000,000

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek F BRDG 185 100,000 100,000 100,000

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek F BRDG 185 100,000 100,000 100,000

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek R BRDG 185 50,000 50,000 50,000

Lawrence 3004 L04 89072 SR 3004/Br. Honey Creek C BRDG 581 1,400,000 1,400,000 1,400,000

Lawrence 3010 L03 73162 W.Washington St. Bridge F BRDG 185 500,000 500,000 500,000

Lawrence 3010 L03 73162 W.Washington St. Bridge U BRDG 185 200,000 200,000 200,000

Lawrence 3010 L03 73162 W.Washington St. Bridge R BRDG 185 300,000 300,000 300,000

Lawrence 3010 L03 73162 W.Washington St. Bridge C BRDG 185 3,000,000 3,000,000 3,000,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge F BRDG 185 400,000 400,000 400,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge U BRDG 185 100,000 100,000 100,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge R BRDG 185 100,000 100,000 100,000

Lawrence 4004 L02 29200 Harbor/Edinburg Bridge C BRDG 185 3,000,000 3,000,000 3,000,000

Lawrence 7202 LOC 84045 Rogers Road Bridge T-533 C BRDG BOF 320,000 183 60,000 20,000 400,000 400,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 F BRDG BOF 280,000 179 70,000 350,000 350,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 U BRDG BOF 40,000 179 10,000 50,000 50,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 R BRDG BOF 40,000 179 10,000 50,000 50,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 C BRDG BOF 400,000 100,000 500,000 500,000

Lawrence 7203 LOC 29327 Wallace Road BridgeT-356 C BRDG BOF 400,000 100,000 500,000 500,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 P BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 P BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 F BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7205 LOC 88425 Clover Lane BridgeT710 C BRDG BOF 680,000 183 127,500 42,500 850,000 850,000

Lawrence 7206 0 88721 Hickory View Drive Bridge F BRDG 183 120,000 30,000 150,000 150,000

Lawrence 7206 0 88721 Hickory View Drive Bridge U BRDG 183 20,000 5,000 25,000 25,000

Lawrence 7206 0 88721 Hickory View Drive Bridge R BRDG 183 20,000 5,000 25,000 25,000

Lawrence 7206 0 88721 Hickory View Drive Bridge C BRDG 183 680,000 170,000 850,000 850,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br F BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7206 LOC 57104 T-341 Burkey Rd Br C BRDG BOF 800,000 183 150,000 50,000 1,000,000 1,000,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 P BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 P BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lawrence 7207 LOC 78356 Barkley RdovCampRnT-351 C BRDG BOF 680,000 183 127,500 42,500 850,000 850,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 F BRDG 183 120,000 30,000 150,000 150,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 U BRDG 183 20,000 5,000 25,000 25,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 R BRDG 183 20,000 5,000 25,000 25,000

Lawrence 7209 0 88428 Coffee Run Road Br T-567 C BRDG 183 680,000 170,000 850,000 850,000

Page 124: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

124 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lawrence 7301 LOC 29278 North Street Bridge C BRDG BOF 1,053,566 179 867,500 1,921,066 1,921,066

Lawrence 7301 LOC 29278 North Street Bridge C BRDG STU 1,770,434 1,770,434 1,770,434

Lawrence 7405 LOC 78358 Oak St ov McClures Run F BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lawrence 7405 LOC 78358 Oak St ov McClures Run U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7405 LOC 78358 Oak St ov McClures Run R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Lawrence 7405 LOC 78358 Oak St ov McClures Run C BRDG BOF 680,000 183 127,500 42,500 850,000 850,000

Totals for: Lawrence 11,347,722 16,020,930 145,000 27,513,652 18,960,000 9,255,000 115,000 28,330,000 4,880,000 21,237,500 517,500 26,635,000 9,041,000 2,235,250 260,000 11,536,250 94,014,902

Lebanon 101397Lebanon RBR Initiative C BRDG 581 300,000 300,000 300,000

Lebanon 101397Lebanon RBR Initiative C BRDG 581 300,000 300,000 300,000

Lebanon 102148Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Lebanon 102148Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

Lebanon 102148Roadway Maint Line Item C HRST 409 386,439 386,439 386,439

Lebanon 102148Roadway Maint Line Item C HRST 409 2,214,000 2,214,000 2,214,000

Lebanon 87835 Bridge Reserve C BRDG STP 133,437 133,437 133,437

Lebanon 87835 Bridge Reserve C BRDG STP 260,400 185 65,100 325,500 325,500

Lebanon 87835 Bridge Reserve C BRDG 185 1,025 1,025 1,025

Lebanon 87838 Highway Reserve C HRST NHPP 201,000 581 57,414 258,414 258,414

Lebanon 87838 Highway Reserve C HRST NHPP 599,600 599,600 599,600

Lebanon 87841 CMAQ Line Item C SAMI CAQ 482,306 482,306 482,306

Lebanon 87841 CMAQ Line Item C SAMI CAQ 380,377 380,377 380,377

Lebanon 87842 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Lebanon 87842 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Lebanon 87842 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Lebanon 87842 Delivery/Consult Assist P PRA 581 400,000 400,000 400,000

Lebanon 87842 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Lebanon 87842 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Lebanon 87842 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Lebanon 87842 Delivery/Consult Assist C PRA 581 200,000 200,000 200,000

Lebanon 87847 HSIP Line Item C SAMI HSIP 198,000 198,000 198,000

Lebanon 87847 HSIP Line Item C SAMI HSIP 41,000 41,000 41,000

Lebanon 87847 HSIP Line Item C SAMI HSIP 838,000 838,000 838,000

Lebanon 88057 STU (HATS) C HRST STU 325,665 325,665 325,665

Lebanon 88057 STU (HATS) C HRST STU 325,665 325,665 325,665

Lebanon 88057 STU (HATS) C HRST STU 325,665 325,665 325,665

Lebanon 88057 STU (HATS) C HRST STU 325,665 325,665 325,665

Lebanon ENH 94706 LVR Trail Phase 9 +C TENH CAQ 400,000 400,000 400,000

Lebanon ENH 94706 LVR Trail Phase 9 +C TENH CAQ 152,590 152,590 152,590

Lebanon ENH 95824 LVRT Cornwall Trailhead C TENH STP 160,000 40,000 200,000 200,000

Lebanon LOC 94707 Cherry Street Resurface C HRST STP 42,563 42,563 42,563

Lebanon LTB 98267 LT Bus Purchase 2017-18 C IMOD CAQ 400,000 400,000 400,000

Page 125: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

125 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lebanon LTB 98267 LT Bus Purchase 2017-18 C IMOD CAQ 400,000 400,000 400,000

Lebanon RRX 102977Weber Street Crossing +C SAMI RRX 395,725 395,725 395,725

Lebanon RRX 1029785th Street Crossing +C SAMI RRX 395,544 395,544 395,544

Lebanon RSP 82375 SRTP Rideshare Program P IMOD CAQ 87,116 87,116 87,116

Lebanon RSP 82375 SRTP Rideshare Program P IMOD CAQ 87,988 87,988 87,988

Lebanon RSP 82375 SRTP Rideshare Program P IMOD CAQ 88,867 88,867 88,867

Lebanon RSP 82375 SRTP Rideshare Program P IMOD CAQ 89,756 89,756 89,756

Lebanon 22 047 87480 Elizabeth Run Bridge F BRDG 581 193,000 193,000 193,000

Lebanon 22 047 87480 Elizabeth Run Bridge U BRDG 581 15,000 15,000 15,000

Lebanon 22 047 87480 Elizabeth Run Bridge R BRDG 581 25,000 25,000 25,000

Lebanon 22 047 87480 Elizabeth Run Bridge C BRDG STP 474,800 185 118,700 593,500 593,500

Lebanon 22 047 87480 Elizabeth Run Bridge C BRDG STP 432,400 185 108,100 540,500 540,500

Lebanon 22 068 100340Allentown Blvd/Kevins Run P BRDG 581 175,000 175,000 175,000

Lebanon 22 069 100348Allentown Blvd East Brdg P BRDG 581 250,000 250,000 250,000

Lebanon 22 070 97148 Allentown Blvd over Beach P BRDG 185 60,000 60,000 60,000

Lebanon 22 070 97148 Allentown Blvd over Beach P BRDG 581 240,000 240,000 240,000

Lebanon 72 040 88741 PA72 Congested Corr Study +S SAMI CAQ 300,000 300,000 300,000

Lebanon 72 043 78735 PA 72 over Snitz Creek F BRDG NHPP 205,000 205,000 205,000

Lebanon 72 043 78735 PA 72 over Snitz Creek U BRDG NHPP 50,000 50,000 50,000

Lebanon 72 043 78735 PA 72 over Snitz Creek R BRDG NHPP 50,000 50,000 50,000

Lebanon 72 043 78735 PA 72 over Snitz Creek +C BRDG NHPP 850,000 850,000 850,000

Lebanon 72 047 95775 Rocherty Rd/PA 72 Int. C SAMI 581 3,275,000 3,275,000 3,275,000

Lebanon 72 050 96318 Ebenezer Road Resurface C HRST NHPP 500,000 500,000 500,000

Lebanon 72 055 100314Ebenezer Road Bridge P BRDG 581 200,000 200,000 200,000

Lebanon 241 015 96783 Colebrook Road Improvemt P SAMI HSIP 300,000 300,000 300,000

Lebanon 241 015 96783 Colebrook Road Improvemt F SAMI HSIP 350,000 350,000 350,000

Lebanon 241 015 96783 Colebrook Road Improvemt +U SAMI HSIP 100,000 100,000 100,000

Lebanon 241 015 96783 Colebrook Road Improvemt +R SAMI HSIP 150,000 150,000 150,000

Lebanon 341 005 82911 Colebrook Road Bridge C BRDG BOF 126,800 185 194,900 321,700 321,700

Lebanon 341 005 82911 Colebrook Road Bridge C BRDG STP 652,800 652,800 652,800

Lebanon 419 009 100292PA-419 over Hammer Cr P BRDG 581 125,000 125,000 125,000

Lebanon 422 023 87471 Cumberland St Bridge F BRDG NHPP 200,000 200,000 200,000

Lebanon 422 023 87471 Cumberland St Bridge U BRDG NHPP 15,000 15,000 15,000

Lebanon 422 023 87471 Cumberland St Bridge R BRDG NHPP 25,000 25,000 25,000

Lebanon 422 023 87471 Cumberland St Bridge +C BRDG NHPP 1,008,000 1,008,000 1,008,000

Lebanon 422 027 94936 US422 Safety Project F SAMI CAQ 200,000 200,000 200,000

Lebanon 422 027 94936 US422 Safety Project +U SAMI CAQ 100,000 100,000 100,000

Lebanon 422 027 94936 US422 Safety Project +R SAMI CAQ 50,000 50,000 50,000

Lebanon 422 027 94936 US422 Safety Project +C SAMI HSIP 541,000 541,000 541,000

Lebanon 422 027 94936 US422 Safety Project +C SAMI HSIP 209,000 209,000 209,000

Page 126: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

126 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lebanon 422 028 94937 422 & Ramona Rd Intersect P HRST HSIP 290,000 290,000 290,000

Lebanon 422 028 94937 422 & Ramona Rd Intersect F SAMI HSIP 150,000 150,000 150,000

Lebanon 422 028 94937 422 & Ramona Rd Intersect U SAMI HSIP 50,000 50,000 50,000

Lebanon 422 028 94937 422 & Ramona Rd Intersect R SAMI HSIP 100,000 100,000 100,000

Lebanon 422 028 94937 422 & Ramona Rd Intersect +C SAMI HSIP 547,000 547,000 547,000

Lebanon 422 028 94937 422 & Ramona Rd Intersect +C SAMI HSIP 488,000 488,000 488,000

Lebanon 422 032 100251US422/Main Street Rsf +C HRST NHPP 1,459,400 1,459,400 1,459,400

Lebanon 422 032 100251US422/Main Street Rsf +C HRST NHPP 2,059,000 2,059,000 2,059,000

Lebanon 422 032 100251US422/Main Street Rsf +C HRST STP 10,600 10,600 10,600

Lebanon 422 033 100342Cumberland Street Brdg 3 P BRDG 581 250,000 250,000 250,000

Lebanon 422 034 91345 US 422 Bridge P BRDG 185 200,000 200,000 200,000

Lebanon 443 010 82912 Asher Miner Rd Bridge C BRDG 185 250,000 250,000 250,000

Lebanon 443 010 82912 Asher Miner Rd Bridge C BRDG 581 1,532,000 1,532,000 1,532,000

Lebanon 443 011 74922 Mountain Road Bridge C BRDG 185 1,086,862 1,086,862 1,086,862

Lebanon 443 011 74922 Mountain Road Bridge C BRDG 185 820,138 820,138 820,138

Lebanon 501 024 96317 N College St Resurfacing C HRST 409 612,439 612,439 612,439

Lebanon 501 024 96317 N College St Resurfacing C HRST 409 217,561 217,561 217,561

Lebanon 501 028 90880 PA 501 Resurfacing C HRST 409 1,672,439 1,672,439 1,672,439

Lebanon 501 028 90880 PA 501 Resurfacing C HRST 409 1,827,561 1,827,561 1,827,561

Lebanon 501 029 91346 PA 501 Bridge P BRDG 581 250,000 250,000 250,000

Lebanon 897 032 47739 South 5th Avenue Resf C HRST 409 1,120,561 1,120,561 1,120,561

Lebanon 934 004 74923 White Oak St Brdg over NS C BRDG 185 1,083,750 1,083,750 1,083,750

Lebanon 934 004 74923 White Oak St Brdg over NS C BRDG 581 116,250 116,250 116,250

Lebanon 934 004 74923 White Oak St Brdg over NS C BRDG 185 52,250 52,250 52,250

Lebanon 934 004 74923 White Oak St Brdg over NS C BRDG 581 1,319,750 1,319,750 1,319,750

Lebanon 934 004 74923 White Oak St Brdg over NS C BRDG 581 128,000 128,000 128,000

Lebanon 934 005 82596 White Oak Street #1 C HRST 581 1,624,750 1,624,750 1,624,750

Lebanon 934 005 82596 White Oak Street #1 C HRST 581 1,197,836 1,197,836 1,197,836

Lebanon 934 009 100326Fisher Avenue/ Swatara Cr P BRDG 581 300,000 300,000 300,000

Lebanon 934 010 90999 Bellegrove Road Bridge P BRDG 581 175,000 175,000 175,000

Lebanon 1003 022 100278SR 1003 ov Little Swatara P BRDG STP 129,000 129,000 129,000

Lebanon 1003 022 100278SR 1003 ov Little Swatara P BRDG STP 40,000 40,000 40,000

Lebanon 1003 022 100278SR 1003 ov Little Swatara +F BRDG 581 200,000 200,000 200,000

Lebanon 1003 022 100278SR 1003 ov Little Swatara +U BRDG 581 50,000 50,000 50,000

Lebanon 1011 015 87487 Mt. Zion Rd Bridge 2 F BRDG 185 131,000 131,000 131,000

Lebanon 1011 015 87487 Mt. Zion Rd Bridge 2 F BRDG 185 44,000 44,000 44,000

Lebanon 1011 015 87487 Mt. Zion Rd Bridge 2 U BRDG 185 15,000 15,000 15,000

Lebanon 1011 015 87487 Mt. Zion Rd Bridge 2 R BRDG 185 25,000 25,000 25,000

Lebanon 1011 015 87487 Mt. Zion Rd Bridge 2 C BRDG 581 830,000 830,000 830,000

Lebanon 1011 018 90998 Mount Zion Road Bridge P BRDG 581 175,000 175,000 175,000

Page 127: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

127 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lebanon 1014 009 78767 Greble Rd Bridge C BRDG 581 835,000 835,000 835,000

Lebanon 1020 009 87477 East Main Street Bridge P BRDG 581 75,000 75,000 75,000

Lebanon 1022 003 100262Bohns Lane over I-81 P BRDG 581 250,000 250,000 250,000

Lebanon 2001 010 96108 CornwalI Rd and Isabel Dr C SAMI 581 1,725,000 1,725,000 1,725,000

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters P SAMI CAQ 192,884 192,884 192,884

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters P SAMI CAQ 7,116 7,116 7,116

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters +F SAMI CAQ 150,000 150,000 150,000

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters +U SAMI CAQ 10,756 10,756 10,756

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters +U SAMI CAQ 539,244 539,244 539,244

Lebanon 2001 013 99081 Cornwall & Wilhelm Inters +R SAMI CAQ 1,000 1,000 1,000

Lebanon 2009 014 91004 Market Street Bridge F BRDG 185 250,000 250,000 250,000

Lebanon 2009 014 91004 Market Street Bridge U BRDG 185 20,000 20,000 20,000

Lebanon 2009 014 91004 Market Street Bridge R BRDG 185 20,000 20,000 20,000

Lebanon 2009 014 91004 Market Street Bridge C BRDG 185 500,000 500,000 500,000

Lebanon 2011 016 100279Weaver Road over NS P BRDG 185 225,000 225,000 225,000

Lebanon 4005 012 94934 Thompson Ave Bridge U BRDG 185 20,000 20,000 20,000

Lebanon 4005 012 94934 Thompson Ave Bridge R BRDG 185 20,000 20,000 20,000

Lebanon 4005 012 94934 Thompson Ave Bridge C BRDG STP 149,200 185 37,300 186,500 186,500

Lebanon 4005 012 94934 Thompson Ave Bridge C BRDG BOF 5,800 185 42,700 48,500 48,500

Lebanon 4005 012 94934 Thompson Ave Bridge C BRDG STP 165,000 165,000 165,000

Lebanon 4007 014 78779 Ono Road Over Swatara Crk +C BRDG 185 134,751 134,751 134,751

Lebanon 4007 014 78779 Ono Road Over Swatara Crk +C BRDG 581 306,000 306,000 306,000

Lebanon 4007 014 78779 Ono Road Over Swatara Crk +C BRDG 581 1,250,000 1,250,000 1,250,000

Lebanon 4008 026 91348 Palmyra Bellegrove Road 2 P BRDG 581 200,000 200,000 200,000

Lebanon 4010 012 91350 Snyer Road Bridge P BRDG 185 200,000 200,000 200,000

Lebanon 4013 012 74924 Jonestown Road Bridge P BRDG 185 225,000 225,000 225,000

Lebanon 4017 006 100264Harrison Road over I-81 +P BRDG STP 200,000 200,000 200,000

Lebanon 4017 006 100264Harrison Road over I-81 +F BRDG STP 250,000 250,000 250,000

Lebanon 4017 006 100264Harrison Road over I-81 +U BRDG STP 50,000 50,000 50,000

Lebanon 4020 015 96319 Fisher Ave Resurface C HRST NHPP 1,014,000 1,014,000 1,014,000

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 P BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 F BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 U BRDG BOF 32,000 183 6,000 2,000 40,000 40,000

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 R BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 C BRDG BOF 542,000 183 101,625 33,875 677,500 677,500

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 C BRDG BOF 542,000 183 139,875 46,625 728,500 728,500

Lebanon 7101 BR 20392 S Spruce St Bridge A-1 C BRDG STP 204,000 204,000 204,000

Lebanon 7207 BR 20364 Yordys Road Bridge CO-22 P BRDG STP 160,000 185 40,000 200,000 200,000

Lebanon 7215 BR 20328 Inwood Iron Bridge F BRDG BOF 188,800 183 35,400 11,800 236,000 236,000

Lebanon 7215 BR 20328 Inwood Iron Bridge U BRDG BOF 22,400 183 1,400 4,200 28,000 28,000

Page 128: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

128 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lebanon 7215 BR 20328 Inwood Iron Bridge R BRDG BOF 44,000 183 8,250 2,750 55,000 55,000

Lebanon 7215 BR 20328 Inwood Iron Bridge C BRDG BOF 304,200 183 109,837 36,612 450,649 450,649

Lebanon 7215 BR 20328 Inwood Iron Bridge C BRDG STP 281,600 281,600 281,600

Lebanon 7215 BR 20328 Inwood Iron Bridge C BRDG STP 632,200 183 118,537 39,512 790,249 790,249

Totals for: Lebanon 6,151,665 5,969,000 28,750 12,149,415 6,547,209 12,090,000 91,112 18,728,321 6,547,390 8,558,000 73,387 15,178,777 6,151,665 8,558,000 46,625 14,756,290 60,812,803

Lehigh 75561 Urban Line Item C HRST STU 38,630 38,630 38,630

Lehigh 75561 Urban Line Item C HRST STU 281,156 281,156 281,156

Lehigh 82804 Corridor Signal Impr LI C SAMI CAQ 3,400 3,400 3,400

Lehigh 82806 TAP Line Item +C TENH TAU 276,000 276,000 276,000

Lehigh 82806 TAP Line Item +C TENH TAU 636,000 636,000 636,000

Lehigh 82806 TAP Line Item +C TENH TAU 636,000 636,000 636,000

Lehigh 82806 TAP Line Item +C TENH TAU 636,000 636,000 636,000

Lehigh 82807 Safety Line Item_LVTS C SAMI HSIP 24,475 24,475 24,475

Lehigh 82807 Safety Line Item_LVTS C SAMI HSIP 47,448 47,448 47,448

Lehigh 102201LVTS Highway & Bridge LI C BRDG BOF 82,200 185 821,270 903,470 903,470

Lehigh 102201LVTS Highway & Bridge LI C BRDG BOF 5,982 185 129,908 135,890 135,890

Lehigh 102201LVTS Highway & Bridge LI C BRDG 185 26,356 26,356 26,356

Lehigh 102201LVTS Highway & Bridge LI C BRDG 185 108,686 108,686 108,686

Lehigh 102201LVTS Highway & Bridge LI C HRST NHPP 61,414 581 25,600 87,014 87,014

Lehigh 102201LVTS Highway & Bridge LI C HRST NHPP 58,692 581 1,157,798 1,216,490 1,216,490

Lehigh 102201LVTS Highway & Bridge LI C HRST STP 24,372 24,372 24,372

Lehigh 102201LVTS Highway & Bridge LI C HRST 581 279,730 279,730 279,730

Lehigh 102201LVTS Highway & Bridge LI C HRST 581 426,645 426,645 426,645

Lehigh 102715SRTS-Raub,Trexler,S.Mount P TENH 10,000 10,000 10,000

Lehigh 102719Community Bike Works II P TENH 10,000 10,000 10,000

Lehigh 102868Ruppsville Rd +C SAMI RRX 270,122 270,122 270,122

Lehigh 102870Penn Ave Alburtis RRX +C SAMI RRX 281,377 281,377 281,377

Lehigh 102979Canal Rd Allentown RRX C SAMI RRX 284,109 284,109 284,109

Lehigh 94870 Low Cost Safety LI C SAMI HSIP 412,011 412,011 412,011

Lehigh 94931 LANta Hybrid Buses C IMOD CAQ 960,000 960,000 960,000

Lehigh 94931 LANta Hybrid Buses C IMOD CAQ 960,000 960,000 960,000

Lehigh 94931 LANta Hybrid Buses C IMOD CAQ 960,000 960,000 960,000

Lehigh 94931 LANta Hybrid Buses C IMOD CAQ 960,000 960,000 960,000

Lehigh 01S 94831 Basin Street Safety Imprv P SAMI HSIP 364 364 364

Lehigh CAF 97953 Construction Assistance C HRST STP 200,000 200,000 200,000

Lehigh CAF 97953 Construction Assistance C HRST STP 200,000 200,000 200,000

Lehigh CAF 97953 Construction Assistance C HRST STP 100,000 100,000 100,000

Lehigh CAF 97953 Construction Assistance C HRST STP 300,000 300,000 300,000

Lehigh CAS 97325 Construction Assistance C HRST 581 200,000 200,000 200,000

Lehigh CAS 97325 Construction Assistance C HRST 581 200,000 200,000 200,000

Page 129: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

129 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh CAS 97325 Construction Assistance C HRST 581 200,000 200,000 200,000

Lehigh CAS 97325 Construction Assistance C HRST 581 200,000 200,000 200,000

Lehigh CHW 102143Chew St-Ott to 31st +P HRST STU 76,800 19,200 96,000 96,000

Lehigh CHW 102143Chew St-Ott to 31st +U HRST STU 21,218 21,218 21,218

Lehigh CHW 102143Chew St-Ott to 31st +C HRST STU 795,675 795,675 795,675

Lehigh DCA 83086 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Lehigh DCA 83086 Delivery_Consult Assist P HRST 581 500,000 500,000 500,000

Lehigh HAM 102141Hamilton St Resurface P HRST STU 164,000 41,000 205,000 205,000

Lehigh HAM 102141Hamilton St Resurface U HRST STU 16,000 4,000 20,000 20,000

Lehigh HAM 102141Hamilton St Resurface +C HRST STU 404,800 101,200 506,000 506,000

Lehigh HAM 102141Hamilton St Resurface +C HRST STU 512,960 128,240 641,200 641,200

Lehigh HAM 102141Hamilton St Resurface +C HRST STU 886,240 221,560 1,107,800 1,107,800

Lehigh MAC 102144Mack Boulevard Resurface P HRST STU 85,600 21,400 107,000 107,000

Lehigh MAC 102144Mack Boulevard Resurface +C HRST STU 795,675 795,675 795,675

Lehigh MGB 76612 Manasses-Guth Cover Bridg +C TENH TAU 360,000 360,000 360,000

Lehigh RPR 95400 Repair / Monitor Wetlands P HRST 581 50,000 50,000 50,000

Lehigh RPR 95400 Repair / Monitor Wetlands P HRST 581 50,000 50,000 50,000

Lehigh TEM 89055 LVTS Trans Enhance Mgt P TENH STP 25,000 25,000 25,000

Lehigh TEM 89055 LVTS Trans Enhance Mgt P TENH STP 25,000 25,000 25,000

Lehigh TEM 89055 LVTS Trans Enhance Mgt P TENH STP 25,000 25,000 25,000

Lehigh TEM 89055 LVTS Trans Enhance Mgt P TENH STP 25,000 25,000 25,000

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C BRDG NHPP 15,300,000 15,300,000 15,300,000

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C BRDG NHPP 12,300,000 12,300,000 12,300,000

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C BRDG NHPP 12,000,040 12,000,040 12,000,040

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C BRDG NHPP 12,843,400 12,843,400 12,843,400

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C BRDG STU 2,000,000 2,000,000 2,000,000

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI CAQ 1,713,277 1,713,277 1,713,277

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI NHPP 1,351,711 1,351,711 1,351,711

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI STP 196,330 196,330 196,330

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI STU 370,599 370,599 370,599

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI CAQ 3,100,891 3,100,891 3,100,891

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI STU 389,281 389,281 389,281

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI CAQ 550,900 550,900 550,900

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI CAQ 1,007,570 1,007,570 1,007,570

Lehigh 22 400 57615 22 Sec 400- Ph 2 (LRB) C SAMI STP 1,394,668 1,394,668 1,394,668

Lehigh 22 WDN 96384 US 22 Widening P HCON 581 4,635,000 4,635,000 4,635,000

Lehigh 22 WDN 96384 US 22 Widening F HCON 581 1,000,000 1,000,000 1,000,000

Lehigh 22 WDN 96384 US 22 Widening F HCON 581 3,243,600 3,243,600 3,243,600

Lehigh 22 WDN 96384 US 22 Widening U HCON 581 100,000 100,000 100,000

Lehigh 22 WDN 96384 US 22 Widening U HCON 581 2,021,800 2,021,800 2,021,800

Page 130: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

130 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh 22 WDN 96384 US 22 Widening R HCON 581 100,000 100,000 100,000

Lehigh 22 WDN 96384 US 22 Widening R HCON 581 6,265,400 6,265,400 6,265,400

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek F BRDG 185 250,000 250,000 250,000

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek F BRDG 185 162,000 162,000 162,000

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek U BRDG NHPP 63,654 185 15,914 79,568 79,568

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek R BRDG NHPP 63,654 185 15,914 79,568 79,568

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek C BRDG 185 200,000 200,000 200,000

Lehigh 29 02B 85676 PA29/100 ovr Indian Creek C BRDG 185 2,425,728 2,425,728 2,425,728

Lehigh 29 07B 11419 PA 29/READING RR BR F BRDG 581 1,000,000 1,000,000 1,000,000

Lehigh 29 07B 11419 PA 29/READING RR BR F BRDG 581 545,000 545,000 545,000

Lehigh 29 07B 11419 PA 29/READING RR BR U BRDG 185 515,000 515,000 515,000

Lehigh 29 07B 11419 PA 29/READING RR BR R BRDG 185 600,000 600,000 600,000

Lehigh 29 07B 11419 PA 29/READING RR BR R BRDG 185 224,000 224,000 224,000

Lehigh 29 07B 11419 PA 29/READING RR BR C BRDG NHPP 10,000 185 900,000 910,000 910,000

Lehigh 29 07B 11419 PA 29/READING RR BR C BRDG 185 1,000,000 1,000,000 1,000,000

Lehigh 78 16M 87646 I-78 PM 2 - Lehigh P IMAN 581 257,500 257,500 257,500

Lehigh 78 16M 87646 I-78 PM 2 - Lehigh F IMAN 581 265,226 265,226 265,226

Lehigh 78 16M 87646 I-78 PM 2 - Lehigh C IMAN 581 5,463,635 5,463,635 5,463,635

Lehigh 78 16M 87646 I-78 PM 2 - Lehigh C IMAN 581 5,463,635 5,463,635 5,463,635

Lehigh 78 FSP 68190 Freeway Service Patrol C HRST STP 664,000 582 166,000 830,000 830,000

Lehigh 78 FSP 68190 Freeway Service Patrol C HRST STP 687,628 582 171,907 859,535 859,535

Lehigh 78 FSP 68190 Freeway Service Patrol C HRST STP 725,553 582 181,388 906,941 906,941

Lehigh 78 FSP 68190 Freeway Service Patrol C HRST STP 747,332 582 186,833 934,165 934,165

Lehigh 78 GSR 91957 LVTS Guidesign Replacemnt C HRST NHPP 1,644,146 1,644,146 1,644,146

Lehigh 78 GSR 91957 LVTS Guidesign Replacemnt C HRST NHPP 100,000 100,000 100,000

Lehigh 100 0 102716Macungie Main St Safety P TENH 10,000 10,000 10,000

Lehigh 100 12M 11616 SR 100 Resurf-Kernsvl-309 C HRST STP 10,000 10,000 10,000

Lehigh 100 13M 102311PA 100 Reconstruction P HCON 581 257,500 257,500 257,500

Lehigh 100 13M 102311PA 100 Reconstruction F HCON 581 424,360 424,360 424,360

Lehigh 100 13M 102311PA 100 Reconstruction U HCON 581 50,000 50,000 50,000

Lehigh 100 13M 102311PA 100 Reconstruction U HCON 581 59,270 59,270 59,270

Lehigh 100 13M 102311PA 100 Reconstruction C HCON 581 6,753,000 6,753,000 6,753,000

Lehigh 145 0 94682 Wire Mill Bridge P BRDG STU 500,000 183 93,750 31,250 625,000 625,000

Lehigh 145 0 94682 Wire Mill Bridge P BRDG STU 241,600 183 45,300 15,100 302,000 302,000

Lehigh 145 0 94682 Wire Mill Bridge F BRDG STU 32,000 183 6,000 2,000 40,000 40,000

Lehigh 145 0 94682 Wire Mill Bridge F BRDG STU 222,616 183 41,741 13,913 278,270 278,270

Lehigh 145 0 94682 Wire Mill Bridge U BRDG STU 20,000 183 3,750 1,250 25,000 25,000

Lehigh 145 0 94682 Wire Mill Bridge U BRDG STU 1,218 183 228 77 1,523 1,523

Lehigh 145 0 94682 Wire Mill Bridge R BRDG STU 20,000 183 3,750 1,250 25,000 25,000

Lehigh 145 0 94682 Wire Mill Bridge R BRDG STU 22,436 183 4,207 1,402 28,045 28,045

Page 131: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

131 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh 145 0 94682 Wire Mill Bridge C BRDG STU 3,961,760 183 742,830 247,610 4,952,200 4,952,200

Lehigh 145 001 85144 22 Sec 400_ Ph 1 (145) LI C HRST NHPP 960,000 581 240,000 1,200,000 1,200,000

Lehigh 145 12S 93139 PA 145-329-Chestnut Intr C SAMI HSIP 750,000 750,000 750,000

Lehigh 145 12S 93139 PA 145-329-Chestnut Intr C SAMI HSIP 712,600 712,600 712,600

Lehigh 145 MLT 99697 7thSt Multimodal Corridor S HRST STU 200,000 581 50,000 250,000 250,000

Lehigh 145 MLT 99697 7thSt Multimodal Corridor S HRST STU 212,000 581 53,000 265,000 265,000

Lehigh 222 0 89244 222 Median Barrier P SAMI HSIP 562,750 562,750 562,750

Lehigh 222 01S 79554 222 & Shantz & 863 Improv P SAMI HSIP 160,000 160,000 160,000

Lehigh 222 01S 79554 222 & Shantz & 863 Improv F SAMI HSIP 824,000 824,000 824,000

Lehigh 222 01S 79554 222 & Shantz & 863 Improv U SAMI HSIP 77,250 77,250 77,250

Lehigh 222 01S 79554 222 & Shantz & 863 Improv R SAMI HSIP 154,500 154,500 154,500

Lehigh 222 01S 79554 222 & Shantz & 863 Improv C SAMI HSIP 725,000 725,000 725,000

Lehigh 222 01S 79554 222 & Shantz & 863 Improv C SAMI HSIP 2,843,000 2,843,000 2,843,000

Lehigh 222 01S 79554 222 & Shantz & 863 Improv C SAMI HSIP 2,280,250 2,280,250 2,280,250

Lehigh 222 HCI 102633Hamilton Crossings C HCON 581 5,000,000 5,000,000 5,000,000

Lehigh 222 HCI 102633Hamilton Crossings C HCON 581 1,350,000 1,350,000 1,350,000

Lehigh 309 0 102160309 Center Valley IC P HRST 581 3,000,000 3,000,000 3,000,000

Lehigh 309 12M 96432 309 & Tilghman I/C Recon P HRST NHPP 1,200,000 581 300,000 1,500,000 1,500,000

Lehigh 309 12M 96432 309 & Tilghman I/C Recon F HRST 581 500,000 500,000 500,000

Lehigh 309 12M 96432 309 & Tilghman I/C Recon F HRST 581 1,621,800 1,621,800 1,621,800

Lehigh 309 12M 96432 309 & Tilghman I/C Recon U HRST NHPP 185,400 581 46,350 231,750 231,750

Lehigh 309 12M 96432 309 & Tilghman I/C Recon U HRST NHPP 2,000,000 581 500,000 2,500,000 2,500,000

Lehigh 309 12M 96432 309 & Tilghman I/C Recon R HRST NHPP 559,560 581 139,890 699,450 699,450

Lehigh 309 12M 96432 309 & Tilghman I/C Recon R HRST NHPP 2,500,000 581 625,000 3,125,000 3,125,000

Lehigh 309 14M 102312PA 309 Resurface P HRST 581 515,000 515,000 515,000

Lehigh 309 14M 102312PA 309 Resurface F HRST 581 795,675 795,675 795,675

Lehigh 309 14M 102312PA 309 Resurface U HRST 581 200,000 200,000 200,000

Lehigh 309 14M 102312PA 309 Resurface U HRST 581 50,000 50,000 50,000

Lehigh 309 14M 102312PA 309 Resurface U HRST 581 1,977,890 1,977,890 1,977,890

Lehigh 309 14M 102312PA 309 Resurface R HRST 581 750,000 750,000 750,000

Lehigh 309 14M 102312PA 309 Resurface R HRST 581 509,000 509,000 509,000

Lehigh 309 14M 102312PA 309 Resurface R HRST 581 2,029,790 2,029,790 2,029,790

Lehigh 309 14M 102312PA 309 Resurface C HRST 581 7,005,000 7,005,000 7,005,000

Lehigh 329 01B 11413 Cementon Bridge F BRDG NHPP 1,000,000 185 250,000 1,250,000 1,250,000

Lehigh 329 01B 11413 Cementon Bridge F BRDG NHPP 236,000 185 59,000 295,000 295,000

Lehigh 329 01B 11413 Cementon Bridge U BRDG 185 200,000 200,000 200,000

Lehigh 329 01B 11413 Cementon Bridge U BRDG 185 330,450 330,450 330,450

Lehigh 329 01B 11413 Cementon Bridge R BRDG 185 500,000 500,000 500,000

Lehigh 329 01B 11413 Cementon Bridge R BRDG 185 560,900 560,900 560,900

Lehigh 329 01B 11413 Cementon Bridge C BRDG 185 3,000,000 3,000,000 3,000,000

Page 132: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

132 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh 378 03M 101957378 Resurface C HRST 581 1,300,000 1,300,000 1,300,000

Lehigh 378 03M 101957378 Resurface C HRST 581 367,200 367,200 367,200

Lehigh 873 0 102714Victory Park Sidewalk P TENH 10,000 10,000 10,000

Lehigh 987 FDX 102873FedEx Roadway Improvemnts C HCON 581 5,000,000 5,000,000 5,000,000

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR P HRST NHPP 10,640 185 2,660 13,300 13,300

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG STP 5,688,000 5,688,000 5,688,000

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG NHPP 4,000,000 185 1,125,000 5,125,000 5,125,000

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG NHPP 4,097,000 185 224,250 4,321,250 4,321,250

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG STP 2,001,567 2,001,567 2,001,567

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG STU 1,113,209 1,113,209 1,113,209

Lehigh 1002 04B 11565 Tilghman St o/Lehigh & RR C BRDG NHPP 4,568,600 185 1,942,150 6,510,750 6,510,750

Lehigh 1002 08M 101488Tilghman Street Resurface C HRST 581 1,000,000 1,000,000 1,000,000

Lehigh 1002 08M 101488Tilghman Street Resurface C HRST 581 545,000 545,000 545,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn F SAMI 581 824,000 824,000 824,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn U HRST 581 30,900 30,900 30,900

Lehigh 1004 03S 57433 Lehigh Race St Intersectn U HRST 581 278,100 278,100 278,100

Lehigh 1004 03S 57433 Lehigh Race St Intersectn R HRST 581 400,000 400,000 400,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn R HRST 581 218,000 218,000 218,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn C HRST STP 100,000 100,000 100,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn C HRST STP 1,800,000 581 450,000 2,250,000 2,250,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn C SAMI SXF 880,000 581 245,000 1,125,000 1,125,000

Lehigh 1004 03S 57433 Lehigh Race St Intersectn C SAMI STP 614,880 581 153,720 768,600 768,600

Lehigh 1009 01S 98174 Schoenersville Rd Corrido P SAMI CAQ 257,500 257,500 257,500

Lehigh 1009 01S 98174 Schoenersville Rd Corrido F SAMI CAQ 100,000 100,000 100,000

Lehigh 1009 01S 98174 Schoenersville Rd Corrido F SAMI CAQ 54,500 54,500 54,500

Lehigh 1009 01S 98174 Schoenersville Rd Corrido U SAMI CAQ 26,523 26,523 26,523

Lehigh 1009 01S 98174 Schoenersville Rd Corrido R SAMI CAQ 53,045 53,045 53,045

Lehigh 1009 01S 98174 Schoenersville Rd Corrido C SAMI CAQ 1,092,700 1,092,700 1,092,700

Lehigh 1014 0 69994 Bridge Review Asst LVTS P BRDG BOF 90,000 185 22,500 112,500 112,500

Lehigh 1014 0 69994 Bridge Review Asst LVTS P BRDG BOF 20,000 185 5,000 25,000 25,000

Lehigh 1014 LSB 51568 Lehigh Street Tri-Bridges C BRDG STP 100,000 179 6,250 106,250 106,250

Lehigh 1014 LSB 51568 Lehigh Street Tri-Bridges C BRDG 183 18,750 18,750 18,750

Lehigh 1019 02B 79088 CC Blvd o/Lil Cedar Crk F BRDG 185 721,000 721,000 721,000

Lehigh 1019 02B 79088 CC Blvd o/Lil Cedar Crk U BRDG 185 206,000 206,000 206,000

Lehigh 1019 02B 79088 CC Blvd o/Lil Cedar Crk R BRDG 185 206,000 206,000 206,000

Lehigh 1019 02B 79088 CC Blvd o/Lil Cedar Crk C BRDG 581 743,600 743,600 743,600

Lehigh 1019 02B 79088 CC Blvd o/Lil Cedar Crk C BRDG 581 3,500,000 3,500,000 3,500,000

Lehigh 1027 01B 11590 Cold Springs Bridge C BRDG STU 40,000 185 10,000 50,000 50,000

Lehigh 2003 01S 10215515th Street Corridor P SAMI CAQ 309,000 309,000 309,000

Lehigh 2003 01S 10215515th Street Corridor F SAMI CAQ 100,000 100,000 100,000

Page 133: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

133 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh 2003 01S 10215515th Street Corridor F SAMI CAQ 157,500 157,500 157,500

Lehigh 2003 01S 10215515th Street Corridor U SAMI CAQ 26,523 26,523 26,523

Lehigh 2003 01S 10215515th Street Corridor R SAMI CAQ 53,045 53,045 53,045

Lehigh 2003 01S 10215515th Street Corridor C SAMI CAQ 1,685,400 1,685,400 1,685,400

Lehigh 2003 01S 10215515th Street Corridor C SAMI CAQ 500,000 500,000 500,000

Lehigh 2005 LSC 94871 Lehigh Street Corridor C SAMI CAQ 440,223 440,223 440,223

Lehigh 2026 01B 47647 2026 ovrTrib to Saucon Cr F BRDG 185 180,250 180,250 180,250

Lehigh 2026 01B 47647 2026 ovrTrib to Saucon Cr U BRDG BOF 41,200 185 10,300 51,500 51,500

Lehigh 2026 01B 47647 2026 ovrTrib to Saucon Cr R BRDG BOF 20,600 185 5,150 25,750 25,750

Lehigh 2026 01B 47647 2026 ovrTrib to Saucon Cr C BRDG 185 700,000 700,000 700,000

Lehigh 2026 01B 47647 2026 ovrTrib to Saucon Cr C BRDG 185 742,000 742,000 742,000

Lehigh 2029 01B 92032 SR 2029 /trib Saucon Crk F BRDG 185 206,000 206,000 206,000

Lehigh 2029 01B 92032 SR 2029 /trib Saucon Crk U BRDG STP 20,600 185 5,150 25,750 25,750

Lehigh 2029 01B 92032 SR 2029 /trib Saucon Crk R BRDG STP 41,200 185 10,300 51,500 51,500

Lehigh 2029 01B 92032 SR 2029 /trib Saucon Crk C BRDG 581 795,675 795,675 795,675

Lehigh 2047 SBC 80073 LVTS Br Review/Management P BRDG 185 500,000 500,000 500,000

Lehigh 2047 SBC 80073 LVTS Br Review/Management P BRDG 185 500,000 500,000 500,000

Lehigh 2055 01B 11498 8th Street Bridge C BRDG STU 1,000,000 1,000,000 1,000,000

Lehigh 3008 01M 95162 Cetronia Rd Hydrological P HRST 581 30,000 30,000 30,000

Lehigh 4018 02B 47650 Trout Creek Bridges F BRDG 185 322,595 322,595 322,595

Lehigh 4018 02B 47650 Trout Creek Bridges U BRDG STP 41,200 185 10,300 51,500 51,500

Lehigh 4018 02B 47650 Trout Creek Bridges R BRDG 185 53,045 53,045 53,045

Lehigh 4018 02B 47650 Trout Creek Bridges C BRDG 581 1,000,500 1,000,500 1,000,500

Lehigh 4018 02B 47650 Trout Creek Bridges C BRDG 581 1,439,570 1,439,570 1,439,570

Lehigh 6222 01M 94863 Hamilton Blvd Resurface C HRST STP 544,870 544,870 544,870

Lehigh 7301 0 72773 Gordon Street Bridge +P BRDG STU 90,640 90,640 90,640

Lehigh 7301 0 72773 Gordon Street Bridge +C BRDG STU 1,100,000 1,100,000 1,100,000

Lehigh 7301 0 72773 Gordon Street Bridge +C BRDG STU 2,613,150 2,613,150 2,613,150

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG BOF 400,000 179 25,000 425,000 425,000

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG 183 75,000 75,000 75,000

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG BOF 387,417 179 24,214 411,631 411,631

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG 183 72,641 72,641 72,641

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG BOF 1,884,000 179 414,350 2,298,350 2,298,350

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG 183 1,465,500 1,465,500 1,465,500

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG STU 5,932,000 5,932,000 5,932,000

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG BOF 1,000,000 179 251,829 1,251,829 1,251,829

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG 183 897,484 897,484 897,484

Lehigh 7404 07M 11614 Coplay-Northampton Bridge C BRDG STU 3,786,583 3,786,583 3,786,583

Lehigh 7408 0 94680 Walnut Street Bridge P BRDG BOF 150,000 183 28,125 9,375 187,500 187,500

Lehigh 7408 0 94680 Walnut Street Bridge P BRDG BOF 97,200 183 18,225 6,075 121,500 121,500

Page 134: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

134 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lehigh 7408 0 94680 Walnut Street Bridge F BRDG BOF 233,398 183 43,762 14,587 291,747 291,747

Lehigh 7408 0 94680 Walnut Street Bridge U BRDG BOF 21,218 183 3,978 1,326 26,522 26,522

Lehigh 7408 0 94680 Walnut Street Bridge R BRDG BOF 42,436 183 7,957 2,652 53,045 53,045

Lehigh 7408 0 94680 Walnut Street Bridge C BRDG BOF 884,000 183 165,750 55,250 1,105,000 1,105,000

Totals for: Lehigh 38,610,150 27,692,850 237,425 66,540,425 31,340,135 17,298,749 202,480 48,841,364 41,074,608 30,827,513 236,952 72,139,073 44,603,968 36,626,522 302,860 81,533,350 269,054,212

Luzerne 95494 K-Route Luzerne County C HRST STU 80,000 20,000 100,000 100,000

Luzerne 95494 K-Route Luzerne County C HRST STU 320,000 80,000 400,000 400,000

Luzerne K14 99524 Wilkes Barre K-Route 2014 C HRST STU 180,000 45,000 225,000 225,000

Luzerne K14 99524 Wilkes Barre K-Route 2014 C HRST STU 1,980,000 495,000 2,475,000 2,475,000

Luzerne LOC 8606 Chase Road (County Rd 13) C HRST STU 400,000 100,000 500,000 500,000

Luzerne LOC 8608 Hillside-Huntsville CR 16 P HRST STU 200,000 50,000 250,000 250,000

Luzerne 11 355 67434 US 11 Over RR And Mill CK F BRDG NHPP 350,000 350,000 350,000

Luzerne 11 355 67434 US 11 Over RR And Mill CK C BRDG NHPP 2,500,000 185 625,000 3,125,000 3,125,000

Luzerne 11 355 67434 US 11 Over RR And Mill CK C BRDG NHPP 780,000 185 195,000 975,000 975,000

Luzerne 11 356 84301 SR 11 over Abraham's Ck P BRDG NHPP 280,000 185 70,000 350,000 350,000

Luzerne 11 356 84301 SR 11 over Abraham's Ck F BRDG NHPP 300,000 300,000 300,000

Luzerne 11 356 84301 SR 11 over Abraham's Ck F BRDG NHPP 50,000 50,000 50,000

Luzerne 11 374 8790 SR 11 over Shickshinny Ck C BRDG 185 145,000 145,000 145,000

Luzerne 29 350 67299 SR 29 over Harveys Creek F BRDG 185 250,000 250,000 250,000

Luzerne 29 350 67299 SR 29 over Harveys Creek R BRDG 185 34,000 34,000 34,000

Luzerne 29 350 67299 SR 29 over Harveys Creek C BRDG 185 1,300,000 1,300,000 1,300,000

Luzerne 29 FP1 95434 Fed Aid Paving 4-15-FP 1 P HRST NHPP 556,240 556,240 556,240

Luzerne 29 FP1 95434 Fed Aid Paving 4-15-FP 1 F HRST NHPP 555,240 555,240 555,240

Luzerne 29 FP1 95434 Fed Aid Paving 4-15-FP 1 C HRST NHPP 4,000,000 4,000,000 4,000,000

Luzerne 29 FP1 95434 Fed Aid Paving 4-15-FP 1 C HRST STU 750,000 750,000 750,000

Luzerne 81 306 86733 I81& 924 Intrchange Study P IRST NHPP 234,498 234,498 234,498

Luzerne 81 308 85008 Blackman St SB Ramp F XRST SXF 350,000 350,000 350,000

Luzerne 81 342 102872I 80/81 Concrete Patching C HRST 581 1,000,000 1,000,000 1,000,000

Luzerne 81 357 67494 SR 0081 Bridges Laflin U IMAN 185 28,000 28,000 28,000

Luzerne 93 350 9079 SR 93 ov Nescopeck Creek F BRDG STU 325,000 185 81,250 406,250 406,250

Luzerne 115 303 9128 SR 115 over I-81 F HRST 581 1,500,000 1,500,000 1,500,000

Luzerne 115 303 9128 SR 115 over I-81 C BRDG NHPP 1,000,000 185 4,400,000 5,400,000 5,400,000

Luzerne 115 303 9128 SR 115 over I-81 C BRDG 185 2,880,000 2,880,000 2,880,000

Luzerne 115 303 9128 SR 115 over I-81 C HRST 581 4,000,000 4,000,000 4,000,000

Luzerne 115 303 9128 SR 115 over I-81 C HRST 581 10,000,000 10,000,000 10,000,000

Luzerne 115 305 62968 PA 115 Rock Fence C HRST NHPP 205,000 205,000 205,000

Luzerne 118 350 93001 SR 118 ov Harvey's Creek F BRDG 185 350,000 350,000 350,000

Luzerne 118 392 92444 Cooks Store Intersection +F SAMI HSIP 650,000 650,000 650,000

Luzerne 118 392 92444 Cooks Store Intersection +C SAMI HSIP 1,009,499 1,009,499 1,009,499

Luzerne 239 302 9214 PA239 Widening @ RR Track P HRST 581 400,000 400,000 400,000

Page 135: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

135 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Luzerne 309 309 70233 SR 309 Kingston P HRST 581 250,000 250,000 250,000

Luzerne 309 330 50800 Upper Demunds/Hildebrant +C HCON NHPP 5,400,000 5,400,000 5,400,000

Luzerne 309 333 62969 PA 309 Rock Fence C HRST STP 731,707 731,707 731,707

Luzerne 309 353 92883 SR 309 ov Railroad, Luz B C BRDG NHPP 2,900,000 2,900,000 2,900,000

Luzerne 309 354 92884 SR 0309 over SR 1013 C BRDG NHPP 300,000 185 75,000 375,000 375,000

Luzerne 309 354 92884 SR 0309 over SR 1013 C BRDG NHPP 1,438,400 185 359,600 1,798,000 1,798,000

Luzerne 309 355 93006 SR 309 over Nescopeck Ck F BRDG STU 160,000 185 40,000 200,000 200,000

Luzerne 309 355 93006 SR 309 over Nescopeck Ck C BRDG STU 500,000 185 125,000 625,000 625,000

Luzerne 309 355 93006 SR 309 over Nescopeck Ck C BRDG STU 1,700,000 185 425,000 2,125,000 2,125,000

Luzerne 309 357 97942 SR 309 over Toby Creek 1 P BRDG 185 350,000 350,000 350,000

Luzerne 309 358 97943 SR 309 over Toby Creek 2 P BRDG 185 350,000 350,000 350,000

Luzerne 309 378 89012 309 ov 2004, RR, Susq Riv C BRDG 185 4,000,000 4,000,000 4,000,000

Luzerne 309 378 89012 309 ov 2004, RR, Susq Riv C BRDG 185 3,700,000 3,700,000 3,700,000

Luzerne 309 390 80754 SR 309 Slope Repair +C HRST NHPP 981,000 981,000 981,000

Luzerne 309 390 80754 SR 309 Slope Repair +C HRST NHPP 3,133,000 3,133,000 3,133,000

Luzerne 309 390 80754 SR 309 Slope Repair +C HRST 581 1,386,000 1,386,000 1,386,000

Luzerne 309 393 64481 Butler Twp. Park & Ride F SAMI CAQ 250,000 250,000 250,000

Luzerne 309 SRS 87182 Heights Terrace SRTS C TENH SRTSF 942,000 942,000 942,000

Luzerne 415 303 70249 Dallas Int. 5 Leg C SAMI CAQ 2,500,000 2,500,000 2,500,000

Luzerne 415 303 70249 Dallas Int. 5 Leg C SAMI CAQ 1,600,000 1,600,000 1,600,000

Luzerne 415 350 8871 Harvey's Lake Inlet C BRDG STP 3,040,000 185 760,000 3,800,000 3,800,000

Luzerne 424 390 70467 Ext of 424 to SR 924 F HCON STP 520,000 581 130,000 650,000 650,000

Luzerne 424 390 70467 Ext of 424 to SR 924 R HCON STU 750,000 581 187,500 937,500 937,500

Luzerne 424 390 70467 Ext of 424 to SR 924 C HCON STP 3,200,000 581 870,000 4,070,000 4,070,000

Luzerne 424 390 70467 Ext of 424 to SR 924 C HCON STU 280,000 280,000 280,000

Luzerne 437 350 93018 SR 437 over Creasy Creek F BRDG 185 245,000 245,000 245,000

Luzerne 437 350 93018 SR 437 over Creasy Creek F BRDG 185 100,000 100,000 100,000

Luzerne 924 350 67456 TR 924 Over Conrail,Hazle F BRDG NHPP 392,000 185 98,000 490,000 490,000

Luzerne 940 391 70235 White Haven Park-n-Ride +C SAMI CAQ 870,000 870,000 870,000

Luzerne 1001 SLD 96800 SR 1001 Slide C HRST 581 300,000 300,000 300,000

Luzerne 1006 350 92882 SR 1006 over SR 309 C BRDG STP 1,084,000 185 271,000 1,355,000 1,355,000

Luzerne 1006 350 92882 SR 1006 over SR 309 C BRDG STP 300,000 185 75,000 375,000 375,000

Luzerne 1010 350 8997 SR 1010 ov Abraham's Ck C BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Luzerne 1012 370 57671 BR Harvey's Creek Bridge C BRDG 185 760,000 760,000 760,000

Luzerne 1012 SLD 96931 SR 1012 Slide C HRST 581 300,000 300,000 300,000

Luzerne 1012 SLD 96931 SR 1012 Slide C HRST 581 100,000 100,000 100,000

Luzerne 1012 SLD 96931 SR 1012 Slide C HRST 581 100,000 100,000 100,000

Luzerne 1014 370 68977 SR 1014 Overbrook ov 309 P BRDG STU 240,000 185 60,000 300,000 300,000

Luzerne 1021 352 9029 Eight St. Abrahams CK BR C BRDG STP 580,000 185 395,000 975,000 975,000

Luzerne 1021 352 9029 Eight St. Abrahams CK BR C BRDG STU 1,000,000 1,000,000 1,000,000

Page 136: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

136 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Luzerne 1021 SLD 96799 SR 1021 Slide C HRST 581 300,000 300,000 300,000

Luzerne 1021 SLD 96799 SR 1021 Slide C HRST 581 300,000 300,000 300,000

Luzerne 1025 SLD 96795 SR 1025 Slide C HRST 581 650,000 650,000 650,000

Luzerne 1040 SLD 96794 SR 1040 Slide C HRST 581 700,000 700,000 700,000

Luzerne 1061 351 9085 SR 1061 over Harvey's Ck F BRDG BOF 232,000 185 58,000 290,000 290,000

Luzerne 1061 351 9085 SR 1061 over Harvey's Ck R BRDG BOF 19,360 185 4,840 24,200 24,200

Luzerne 2002 0 74761 Nanticoke Streetscape C TENH SXF 3,953,400 3,953,400 3,953,400

Luzerne 2004 390 57728 River Street Corridor, WB C SAMI CAQ 99,900 99,900 99,900

Luzerne 2011 350 67306 Gardners CK, Plains TWP C BRDG STU 1,680,000 185 420,000 2,100,000 2,100,000

Luzerne 2015 350 93022 SR 2015 ov Gardner Creek F BRDG STP 100,000 185 60,000 160,000 160,000

Luzerne 2015 350 93022 SR 2015 ov Gardner Creek F BRDG STU 140,000 140,000 140,000

Luzerne 2017 350 93025 SR 2017 over SR 2021 F BRDG STU 240,000 185 60,000 300,000 300,000

Luzerne 2019 0 101928Group 4-15-ST 2 C HRST 581 1,700,000 1,700,000 1,700,000

Luzerne 2019 0 101928Group 4-15-ST 2 C HRST 581 2,000,000 2,000,000 2,000,000

Luzerne 2035 350 9009 SR 2035 Ov. Brnch Meadow C BRDG 185 90,000 90,000 90,000

Luzerne 2035 351 93027 SR 2035 over Meadow Run F BRDG BOF 247,200 185 61,800 309,000 309,000

Luzerne 2035 352 93032 SR 2035 over Mud Run Cr F BRDG 185 390,000 390,000 390,000

Luzerne 2035 RRX 103196CP Pittston / Dupont Corr +C SAMI RRX 262,255 262,255 262,255

Luzerne 2035 RRX 103196CP Pittston / Dupont Corr +C SAMI RRX 262,254 262,254 262,254

Luzerne 2036 350 93033 SR 2036 over Mill Creek P BRDG 185 246,960 246,960 246,960

Luzerne 2036 350 93033 SR 2036 over Mill Creek F BRDG 185 346,000 346,000 346,000

Luzerne 2036 350 93033 SR 2036 over Mill Creek F BRDG 185 184,000 184,000 184,000

Luzerne 2036 350 93033 SR 2036 over Mill Creek C BRDG 185 1,700,000 1,700,000 1,700,000

Luzerne 2037 ENH 57521 Kennedy and Riverfront Pk C TENH STU 250,000 250,000 250,000

Luzerne 2041 ENH 103211SR 2041 Middleburg Road +C SAMI RRX 154,500 154,500 154,500

Luzerne 2047 351 67310 SR 2047 Ov. Henry Drive C BRDG BOF 800,000 185 200,000 1,000,000 1,000,000

Luzerne 3001 370 8864 SR 3001 ov SB Newport Ck C BRDG STP 800,000 185 200,000 1,000,000 1,000,000

Luzerne 3004 352 67396 SR 3004 over Forge Creek C BRDG 185 300,000 300,000 300,000

Luzerne 3004 352 67396 SR 3004 over Forge Creek C BRDG 185 700,000 700,000 700,000

Luzerne 3006 350 93035 SR 3006 over Pond Creek P BRDG 185 287,500 287,500 287,500

Luzerne 3007 390 50703 Dorrance Park & Ride C SAMI CAQ 1,400,000 1,400,000 1,400,000

Luzerne 3014 370 8868 Nescopeck Creek Bridge P BRDG BOF 84,589 185 21,147 105,736 105,736

Luzerne 3014 370 8868 Nescopeck Creek Bridge C BRDG BOF 1,840,000 185 460,000 2,300,000 2,300,000

Luzerne 3020 350 9015 SR 3020 Ov Branch Blck Ck C BRDG 185 110,000 110,000 110,000

Luzerne 3021 350 67343 SR 3021 ov Nescopeck Ck +F BRDG STU 500,000 500,000 500,000

Luzerne 3021 352 67344 SR 3021 ov Nescopeck Cr C BRDG STU 1,400,000 1,400,000 1,400,000

Luzerne 3026 301 50714 Hazleton Airport Rd C HRST STP 1,170,024 581 292,506 1,462,530 1,462,530

Luzerne 3034 350 93040 SR 3034 over Nescopeck Cr F BRDG 185 272,757 272,757 272,757

Luzerne 3034 351 8434 SR 3034 ov Nescopeck Ck F BRDG STU 160,000 185 40,000 200,000 200,000

Luzerne 3046 301 9234 South Valley Parkway F HCON SXF 638,400 581 159,600 798,000 798,000

Page 137: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

137 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Luzerne 3046 301 9234 South Valley Parkway +C HCON STP 700,000 581 13,393,035 14,093,035 14,093,035

Luzerne 3046 301 9234 South Valley Parkway +C HCON STU 800,000 800,000 800,000

Luzerne 3046 301 9234 South Valley Parkway +C HCON SXF 5,180,142 5,180,142 5,180,142

Luzerne 3046 301 9234 South Valley Parkway +C HCON STP 5,500,000 581 15,426,823 20,926,823 20,926,823

Luzerne 3046 301 9234 South Valley Parkway +C HCON STU 2,750,000 2,750,000 2,750,000

Luzerne 3046 301 9234 South Valley Parkway +C HCON STP 2,900,000 581 7,000,000 9,900,000 9,900,000

Luzerne 3046 301 9234 South Valley Parkway +C HCON STU 3,950,000 3,950,000 3,950,000

Luzerne 4007 350 9026 SR 4007 ov Shickshinny Ck F BRDG BOF 200,000 185 50,000 250,000 250,000

Luzerne 4016 350 93041 SR 4016 ov Shickshinny Ck F BRDG 185 220,000 220,000 220,000

Luzerne 4016 370 8983 SR 4016 ov Shickshinny Ck C BRDG 185 100,000 100,000 100,000

Luzerne 4020 350 93019 SR 4020 over Pine Creek F BRDG 185 220,000 220,000 220,000

Luzerne 4024 352 93043 SR 4024 ov Huntington Ck F BRDG 185 234,000 234,000 234,000

Luzerne 4037 350 93045 SR 4037 over Salem Creek F BRDG 185 200,000 200,000 200,000

Luzerne 4037 350 93045 SR 4037 over Salem Creek F BRDG 185 142,000 142,000 142,000

Luzerne 4037 350 93045 SR 4037 over Salem Creek C BRDG 185 500,000 500,000 500,000

Luzerne 7211 BRG 8776 Mary St Br T-439 Fairview C BRDG BOF 399,200 99,800 499,000 499,000

Luzerne 7211 BRG 8776 Mary St Br T-439 Fairview C BRDG BOF 240,800 60,200 301,000 301,000

Luzerne 7220 BRG 8920 Old Rte11 Brg.Kingston Tw C BRDG BOF 1,092,000 179 68,250 1,160,250 1,160,250

Luzerne 7220 BRG 8920 Old Rte11 Brg.Kingston Tw C BRDG 183 204,750 204,750 204,750

Luzerne 7220 BRG 9165 Cnty Rd 16 Brg 1,Kingston C BRDG STU 1,280,000 179 80,000 1,360,000 1,360,000

Luzerne 7220 BRG 9165 Cnty Rd 16 Brg 1,Kingston C BRDG 183 240,000 240,000 240,000

Luzerne 8017 370 102609I-81 off Ramp @ Exit 175 C HCON NHPP 800,000 800,000 800,000

Totals for: Luzerne 30,215,560 12,160,610 45,000 42,421,170 17,568,742 23,884,135 594,800 42,047,677 23,321,055 31,289,073 130,200 54,740,328 23,768,251 26,330,500 180,000 50,278,751 189,487,926

Lycoming 102876Lycoming Cable Guiderail P SAMI HSIP 60,000 60,000 60,000

Lycoming 102876Lycoming Cable Guiderail F SAMI HSIP 60,000 60,000 60,000

Lycoming 102876Lycoming Cable Guiderail U SAMI HSIP 25,000 25,000 25,000

Lycoming 102876Lycoming Cable Guiderail R SAMI HSIP 10,000 10,000 10,000

Lycoming 102876Lycoming Cable Guiderail C SAMI HSIP 175,000 175,000 175,000

Lycoming 102876Lycoming Cable Guiderail C SAMI HSIP 175,000 175,000 175,000

Lycoming 000 68713 WATS TIP Reserve C BRDG BOF 227,000 185 5,500 232,500 232,500

Lycoming 000 68713 WATS TIP Reserve C BRDG STP 59,000 59,000 59,000

Lycoming 000 68713 WATS TIP Reserve C BRDG BOF 169,000 185 249,059 418,059 418,059

Lycoming 000 68713 WATS TIP Reserve C BRDG BOF 85,000 185 25,625 110,625 110,625

Lycoming 000 68713 WATS TIP Reserve C BRDG BOF 199,000 185 55,000 254,000 254,000

Lycoming 000 68713 WATS TIP Reserve C HRST NHPP 3,950 581 985,250 989,200 989,200

Lycoming 000 68713 WATS TIP Reserve C HRST STP 829,000 581 1,755,750 2,584,750 2,584,750

Lycoming 000 68713 WATS TIP Reserve C HRST NHPP 8,000 581 322,000 330,000 330,000

Lycoming 000 68713 WATS TIP Reserve C HRST STP 366,000 366,000 366,000

Lycoming 000 68713 WATS TIP Reserve C HRST STP 3,642 581 252,000 255,642 255,642

Lycoming LBR 5891 T-665 ovr Pleasant Stream P BRDG BOF 60,000 183 11,250 3,750 75,000 75,000

Page 138: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

138 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming LBR 6138 T-398ov WhiteDeerHole Crk F BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Lycoming LBR 6138 T-398ov WhiteDeerHole Crk R BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Lycoming LBR 6138 T-398ov WhiteDeerHole Crk C BRDG BOF 522,000 183 97,875 32,625 652,500 652,500

Lycoming LBR 6138 T-398ov WhiteDeerHole Crk C BRDG BOF 174,000 183 32,625 10,875 217,500 217,500

Lycoming LBR 6262 T-665 over Lycoming Creek P BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Lycoming LBR 6262 T-665 over Lycoming Creek F BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Lycoming LBR 6262 T-665 over Lycoming Creek U BRDG BOF 60,000 183 11,250 3,750 75,000 75,000

Lycoming LBR 6262 T-665 over Lycoming Creek R BRDG BOF 28,000 183 5,250 1,750 35,000 35,000

Lycoming LBR 6262 T-665 over Lycoming Creek C BRDG BOF 640,000 183 120,000 40,000 800,000 800,000

Lycoming LBR 6262 T-665 over Lycoming Creek C BRDG BOF 640,000 183 120,000 40,000 800,000 800,000

Lycoming RBR 93947 Jersey Shore Culvert C BRDG 183 78,000 19,500 97,500 97,500

Lycoming RRX 103192T-532 Brick Church Rd RRX +C SAMI RRX 142,055 142,055 142,055

Lycoming RRX 103192T-532 Brick Church Rd RRX +C SAMI RRX 142,054 142,054 142,054

Lycoming RRX 90591 Montoursville RR Xing +C SAMI RRX 131,127 131,127 131,127

Lycoming RRX 90599 Piatt Twp Railroad Xing C SAMI RRX* 61,000 61,000 61,000

Lycoming 14 076 88746 SR 14 over Grays Run P BRDG 185 20,000 20,000 20,000

Lycoming 14 076 88746 SR 14 over Grays Run P BRDG 185 20,000 20,000 20,000

Lycoming 14 076 88746 SR 14 over Grays Run F BRDG 185 20,000 20,000 20,000

Lycoming 14 076 88746 SR 14 over Grays Run +U BRDG 185 25,000 25,000 25,000

Lycoming 14 076 88746 SR 14 over Grays Run R BRDG 185 15,000 15,000 15,000

Lycoming 14 076 88746 SR 14 over Grays Run +C BRDG STP 800,000 800,000 800,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek P BRDG 185 75,000 75,000 75,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek P BRDG 185 75,000 75,000 75,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek F BRDG 185 100,000 100,000 100,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek U BRDG 185 40,000 40,000 40,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek U BRDG 185 35,000 35,000 35,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek R BRDG 185 20,000 20,000 20,000

Lycoming 14 101 102022SR 14 ov Lycoming Creek C BRDG 185 645,500 645,500 645,500

Lycoming 15 175 104345Trout Run Bridge Deck P BRDG NHPP 50,000 50,000 50,000

Lycoming 15 175 104345Trout Run Bridge Deck F BRDG NHPP 50,000 50,000 50,000

Lycoming 15 175 104345Trout Run Bridge Deck C BRDG NHPP 800,000 800,000 800,000

Lycoming 15 175 104345Trout Run Bridge Deck C BRDG NHPP 800,000 800,000 800,000

Lycoming 15 M58 87953 Union Co to SR 54 C HRST 581 190,000 190,000 190,000

Lycoming 15 M59 87969 Buttonwood to Tioga Co +C HRST NHPP 1,464,000 1,464,000 1,464,000

Lycoming 15 M59 87969 Buttonwood to Tioga Co +C HRST NHPP 2,404,000 2,404,000 2,404,000

Lycoming 44 058 97698 Rattling Camp Rn to PA654 F HRST 581 15,000 15,000 15,000

Lycoming 44 058 97698 Rattling Camp Rn to PA654 C HRST 581 565,000 565,000 565,000

Lycoming 44 059 99280 PA 880 to SR 3003 F HRST 581 15,000 15,000 15,000

Lycoming 44 059 99280 PA 880 to SR 3003 C HRST 581 700,000 700,000 700,000

Lycoming 44 059 99280 PA 880 to SR 3003 C HRST 581 800,000 800,000 800,000

Page 139: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

139 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 44 060 97776 Ramsey Rn to SR 4001 C HRST 581 50,000 50,000 50,000

Lycoming 44 064 87918 Substructure Contract Lyc P BRDG 185 40,000 40,000 40,000

Lycoming 44 064 87918 Substructure Contract Lyc F BRDG 185 20,000 20,000 20,000

Lycoming 44 064 87918 Substructure Contract Lyc U BRDG 185 35,000 35,000 35,000

Lycoming 44 064 87918 Substructure Contract Lyc R BRDG 185 25,000 25,000 25,000

Lycoming 44 064 87918 Substructure Contract Lyc C BRDG 185 325,000 325,000 325,000

Lycoming 44 064 87918 Substructure Contract Lyc C BRDG 185 125,000 125,000 125,000

Lycoming 54 082 97777 Brouse Rd to Main Street C HRST 581 125,000 125,000 125,000

Lycoming 118 07M 87861 Spruce St to Muncy Creek F XRST 581 50,000 50,000 50,000

Lycoming 118 07M 87861 Spruce St to Muncy Creek U HCON 581 30,000 30,000 30,000

Lycoming 118 07M 87861 Spruce St to Muncy Creek R HCON 581 20,000 20,000 20,000

Lycoming 118 07M 87861 Spruce St to Muncy Creek C XRST 581 698,750 698,750 698,750

Lycoming 118 07M 87861 Spruce St to Muncy Creek C XRST 581 801,250 801,250 801,250

Lycoming 180 084 95185 I180/US15/US220 Pha B ITS C SAMI NHPP 3,244,500 581 360,500 3,605,000 3,605,000

Lycoming 180 112 96579 I-180 ov Lyco Valley RR F BRDG 185 100,000 100,000 100,000

Lycoming 180 112 96579 I-180 ov Lyco Valley RR R BRDG 185 36,050 36,050 36,050

Lycoming 180 112 96579 I-180 ov Lyco Valley RR +C IMAN NHPP 3,000,000 3,000,000 3,000,000

Lycoming 180 112 96579 I-180 ov Lyco Valley RR +C IMAN NHPP 3,000,000 3,000,000 3,000,000

Lycoming 180 120 97671 Cemetery Road to SR 2014 P HRST 581 5,000 5,000 5,000

Lycoming 180 120 97671 Cemetery Road to SR 2014 F HRST 581 25,000 25,000 25,000

Lycoming 180 120 97671 Cemetery Road to SR 2014 +C HRST NHPP 1,596,000 1,596,000 1,596,000

Lycoming 180 120 97671 Cemetery Road to SR 2014 +C HRST NHPP 1,604,000 1,604,000 1,604,000

Lycoming 180 121 97672 SR 2049 to SR 2014 F HRST 581 25,000 25,000 25,000

Lycoming 180 124 98987 I-180 EB/WB over SR 2045 P BRDG 185 10,000 10,000 10,000

Lycoming 180 124 98987 I-180 EB/WB over SR 2045 +C BRDG NHPP 575,000 575,000 575,000

Lycoming 220 106 82869 Martins RdtoChristians Rd P SAMI HSIP 60,000 60,000 60,000

Lycoming 220 106 82869 Martins RdtoChristians Rd F SAMI HSIP 40,000 40,000 40,000

Lycoming 220 117 87006 US 220 Sign Installation +C HRST NHPP 261,050 261,050 261,050

Lycoming 220 119 6000 US 220/4th St Interchange S XRST 581 250,000 250,000 250,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +P SAMI HSIP 688,000 688,000 688,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +P SAMI HSIP 12,000 12,000 12,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +F SAMI HSIP 451,000 451,000 451,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +F SAMI HSIP 99,000 99,000 99,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +U SAMI HSIP 150,000 150,000 150,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +U SAMI HSIP 350,000 350,000 350,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +R SAMI HSIP 199,000 199,000 199,000

Lycoming 220 122 93732 Wmspt. to Jersey Shore +R SAMI HSIP 113,000 113,000 113,000

Lycoming 220 160 95770 Picture Rocks Drainage P HRST 581 25,000 25,000 25,000

Lycoming 220 160 95770 Picture Rocks Drainage F HRST 581 10,000 10,000 10,000

Lycoming 220 160 95770 Picture Rocks Drainage U HRST 581 40,000 40,000 40,000

Page 140: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

140 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 220 160 95770 Picture Rocks Drainage R HRST 581 20,000 20,000 20,000

Lycoming 220 160 95770 Picture Rocks Drainage C HRST 581 260,000 260,000 260,000

Lycoming 220 166 99003 Water Street to Muncy Cr P HRST 581 10,000 10,000 10,000

Lycoming 220 166 99003 Water Street to Muncy Cr F HRST 581 40,000 40,000 40,000

Lycoming 220 166 99003 Water Street to Muncy Cr C HRST 581 750,000 750,000 750,000

Lycoming 220 173 97700 Main St to Water St F HRST 581 20,000 20,000 20,000

Lycoming 220 173 97700 Main St to Water St C HRST 581 600,000 600,000 600,000

Lycoming 220 174 98924 Muncy Crk to Main St F HRST 581 10,000 10,000 10,000

Lycoming 220 174 98924 Muncy Crk to Main St C HRST 581 425,000 425,000 425,000

Lycoming 220 181 102641US 220 SHOULDERS RDIP P SAMI HSIP 100,000 100,000 100,000

Lycoming 220 181 102641US 220 SHOULDERS RDIP F SAMI HSIP 50,000 50,000 50,000

Lycoming 220 181 102641US 220 SHOULDERS RDIP U SAMI HSIP 25,000 25,000 25,000

Lycoming 220 181 102641US 220 SHOULDERS RDIP R SAMI HSIP 40,000 40,000 40,000

Lycoming 220 181 102641US 220 SHOULDERS RDIP C SAMI HSIP 350,000 350,000 350,000

Lycoming 220 M19 92849 SR 2036 to Achmuty Road C HRST 581 200,000 200,000 200,000

Lycoming 284 009 98927 SR 287 to Flooks Run P HRST 581 15,000 15,000 15,000

Lycoming 284 009 98927 SR 287 to Flooks Run C HRST 581 562,500 562,500 562,500

Lycoming 287 132 87915 SR 287 over Funston Run C BRDG STP 450,000 450,000 450,000

Lycoming 287 132 87915 SR 287 over Funston Run C BRDG STP 225,000 225,000 225,000

Lycoming 287 133 87919 SR 287 over Lawshe Run C BRDG STP 500,000 500,000 500,000

Lycoming 287 133 87919 SR 287 over Lawshe Run C BRDG STP 282,000 282,000 282,000

Lycoming 287 137 96791 SR 287/SR 184 I/S Improv. C BRDG 185 150,000 150,000 150,000

Lycoming 287 137 96791 SR 287/SR 184 I/S Improv. C BRDG 185 300,000 300,000 300,000

Lycoming 405 082 87913 SR 405 over Turkey Run F BRDG 185 40,000 40,000 40,000

Lycoming 405 082 87913 SR 405 over Turkey Run U BRDG 185 64,934 64,934 64,934

Lycoming 405 082 87913 SR 405 over Turkey Run U BRDG 185 135,066 135,066 135,066

Lycoming 405 082 87913 SR 405 over Turkey Run R BRDG 185 55,000 55,000 55,000

Lycoming 405 082 87913 SR 405 over Turkey Run +C BRDG STP 600,000 600,000 600,000

Lycoming 405 082 87913 SR 405 over Turkey Run +C BRDG STP 700,000 700,000 700,000

Lycoming 405 089 97702 Muncy Crk to Hughesvile F HRST 581 20,000 20,000 20,000

Lycoming 405 089 97702 Muncy Crk to Hughesvile C HRST 581 850,000 850,000 850,000

Lycoming 405 090 97785 Brick Chrch Rd to Susq Rv C HRST 581 343,750 343,750 343,750

Lycoming 414 055 98089 Cedar Run Slide (2013) F HRST 581 50,000 50,000 50,000

Lycoming 414 055 98089 Cedar Run Slide (2013) U HRST 581 25,000 25,000 25,000

Lycoming 414 055 98089 Cedar Run Slide (2013) R HRST 581 25,000 25,000 25,000

Lycoming 414 055 98089 Cedar Run Slide (2013) C HRST 581 1,000,000 1,000,000 1,000,000

Lycoming 414 055 98089 Cedar Run Slide (2013) C HRST 581 1,500,000 1,500,000 1,500,000

Lycoming 414 057 88967 Bluestone Run Bridge +P BRDG STP 80,000 80,000 80,000

Lycoming 554 002 87887 SR 554 over Hagermans Run U BRDG 185 50,000 50,000 50,000

Lycoming 554 002 87887 SR 554 over Hagermans Run C BRDG 185 75,000 75,000 75,000

Page 141: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

141 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 554 002 87887 SR 554 over Hagermans Run C BRDG 185 75,000 75,000 75,000

Lycoming 654 022 83486 SR 654 over Benders Run C BRDG 185 214,816 214,816 214,816

Lycoming 654 023 6125 SR 654 over Mosquito Crk C BRDG STP 591,000 591,000 591,000

Lycoming 864 016 97789 PA 87 to Mill Creek C HRST 581 141,750 141,750 141,750

Lycoming 973 031 99411 Long Run to Lyc Crk Rd F XRST 581 15,000 15,000 15,000

Lycoming 973 031 99411 Long Run to Lyc Crk Rd C XRST 581 575,000 575,000 575,000

Lycoming 973 032 98935 SR 1017 to SR 2029 F HRST 581 15,000 15,000 15,000

Lycoming 973 032 98935 SR 1017 to SR 2029 C HRST 581 1,000,000 1,000,000 1,000,000

Lycoming 973 032 98935 SR 1017 to SR 2029 C HRST 581 1,100,000 1,100,000 1,100,000

Lycoming 973 033 98934 SR 44 to SR 287 C HRST 581 500,000 500,000 500,000

Lycoming 1006 026 99013 SR 1006 over Slacks Run P BRDG 185 20,000 20,000 20,000

Lycoming 1006 026 99013 SR 1006 over Slacks Run P BRDG 185 25,000 25,000 25,000

Lycoming 1006 026 99013 SR 1006 over Slacks Run F BRDG 185 25,000 25,000 25,000

Lycoming 1006 026 99013 SR 1006 over Slacks Run U BRDG 185 10,000 10,000 10,000

Lycoming 1006 026 99013 SR 1006 over Slacks Run R BRDG 185 10,000 10,000 10,000

Lycoming 1010 008 99027 SR 1010 ov Little Elk Run P BRDG 185 25,000 25,000 25,000

Lycoming 1010 008 99027 SR 1010 ov Little Elk Run P BRDG 185 20,000 20,000 20,000

Lycoming 1017 009 88160 SR 1017 ov Lycoming Creek F BRDG 185 10,000 10,000 10,000

Lycoming 1017 009 88160 SR 1017 ov Lycoming Creek F BRDG 185 10,000 10,000 10,000

Lycoming 1017 009 88160 SR 1017 ov Lycoming Creek +C BRDG STP 800,000 800,000 800,000

Lycoming 2001 002 6032 SR2001 over Br Spring Crk C BRDG 185 425,000 425,000 425,000

Lycoming 2001 009 6056 SR2001 over Br Spring Crk C BRDG 185 500,000 500,000 500,000

Lycoming 2001 07M 80739 SR 2001 ov Black Hole Crk C BRDG BOF 50,000 50,000 50,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck F BRDG 185 10,000 10,000 10,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck F BRDG 185 10,000 10,000 10,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck U BRDG 185 15,000 15,000 15,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck U BRDG 185 50,000 50,000 50,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck R BRDG 185 35,000 35,000 35,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck C BRDG 185 75,000 75,000 75,000

Lycoming 2004 003 88745 SR2004 over Trb Spring Ck C BRDG 185 75,000 75,000 75,000

Lycoming 2004 007 99032 SR 2004 ov Tr Spring Cr P BRDG 185 20,000 20,000 20,000

Lycoming 2004 007 99032 SR 2004 ov Tr Spring Cr P BRDG 185 25,000 25,000 25,000

Lycoming 2004 007 99032 SR 2004 ov Tr Spring Cr F BRDG 185 15,000 15,000 15,000

Lycoming 2004 007 99032 SR 2004 ov Tr Spring Cr U BRDG 185 25,000 25,000 25,000

Lycoming 2004 007 99032 SR 2004 ov Tr Spring Cr R BRDG 185 10,000 10,000 10,000

Lycoming 2005 004 6142 SR 2005 ov Black Hole Crk C BRDG BOF 92,000 92,000 92,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run F BRDG 185 20,000 20,000 20,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run F BRDG 185 10,000 10,000 10,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run U BRDG 185 20,000 20,000 20,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run U BRDG 185 15,000 15,000 15,000

Page 142: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

142 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 2013 007 93679 SR 2013 over Lauren Run R BRDG 185 10,000 10,000 10,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run R BRDG 185 15,000 15,000 15,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run C BRDG 185 75,000 75,000 75,000

Lycoming 2013 007 93679 SR 2013 over Lauren Run C BRDG 185 75,000 75,000 75,000

Lycoming 2014 093 97607 Halls Station Roundabout S HCON 581 90,000 90,000 90,000

Lycoming 2014 098 98938 Shadduck Rd to SR 405 F HRST 581 15,000 15,000 15,000

Lycoming 2014 098 98938 Shadduck Rd to SR 405 C HRST 581 400,000 400,000 400,000

Lycoming 2014 104 5678 SR 2014 over Lycoming Crk +C BRDG NHPP 2,900,000 2,900,000 2,900,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 F XRST 581 308,000 308,000 308,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 U XRST 581 500,000 500,000 500,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 U XRST 581 250,000 250,000 250,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 R XRST 581 150,000 150,000 150,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 C HCON 581 2,183,000 2,183,000 2,183,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 C HCON 581 2,831,000 2,831,000 2,831,000

Lycoming 2014 83M 87986 Hillside Ave to US 15 C HCON 581 2,286,000 2,286,000 2,286,000

Lycoming 2014 84M 87987 Campbell St to Basin St P XRST 581 450,000 450,000 450,000

Lycoming 2014 84M 87987 Campbell St to Basin St F HCON 581 200,000 200,000 200,000

Lycoming 2014 84M 87987 Campbell St to Basin St U XRST 581 250,000 250,000 250,000

Lycoming 2014 84M 87987 Campbell St to Basin St C HCON 581 1,202,500 1,202,500 1,202,500

Lycoming 2016 017 102133SR2016 at RiverAve Signal P SAMI HSIP 80,000 80,000 80,000

Lycoming 2016 017 102133SR2016 at RiverAve Signal F SAMI HSIP 40,000 40,000 40,000

Lycoming 2016 017 102133SR2016 at RiverAve Signal U SAMI HSIP 50,000 50,000 50,000

Lycoming 2016 017 102133SR2016 at RiverAve Signal R SAMI HSIP 300,000 300,000 300,000

Lycoming 2016 017 102133SR2016 at RiverAve Signal C SAMI HSIP 250,000 250,000 250,000

Lycoming 2018 012 97797 Northway Rd to SR 2039 C HRST 581 600,000 600,000 600,000

Lycoming 2018 07M 87970 Almond St to Northway Rd C HRST 581 1,000 1,000 1,000

Lycoming 2019 004 74021 SR 2019 over German Run C BRDG 185 50,000 50,000 50,000

Lycoming 2019 004 74021 SR 2019 over German Run C BRDG 185 100,000 100,000 100,000

Lycoming 2024 003 78913 SR 2024 over Millers Run C BRDG 185 30,000 30,000 30,000

Lycoming 2024 003 78913 SR 2024 over Millers Run C BRDG 185 30,000 30,000 30,000

Lycoming 2027 011 97799 Four Mile Dr to SR 2024 C HRST 581 343,500 343,500 343,500

Lycoming 2029 005 98948 SR 2014 to SR 2024 F HRST 581 10,000 10,000 10,000

Lycoming 2029 005 98948 SR 2014 to SR 2024 C HRST 581 825,000 825,000 825,000

Lycoming 2044 002 78916 SR 2044 over Glade Run P BRDG 185 5,000 5,000 5,000

Lycoming 2044 002 78916 SR 2044 over Glade Run C BRDG 185 30,000 30,000 30,000

Lycoming 2044 002 78916 SR 2044 over Glade Run C BRDG 185 30,000 30,000 30,000

Lycoming 2045 03L 98166 Fairfield Crossing C HCON 581 3,000,000 3,000,000 3,000,000

Lycoming 2056 002 97803 Northway Rd to SR 2016 F HRST 581 15,000 15,000 15,000

Lycoming 2056 002 97803 Northway Rd to SR 2016 C HRST 581 60,000 60,000 60,000

Lycoming 2060 02M 81897 Via Bella Dr to Third St P HRST 581 45,000 45,000 45,000

Page 143: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

143 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 2060 02M 81897 Via Bella Dr to Third St F HRST 581 25,000 25,000 25,000

Lycoming 2060 02M 81897 Via Bella Dr to Third St U HRST 581 75,000 75,000 75,000

Lycoming 2060 02M 81897 Via Bella Dr to Third St C HRST 581 250,000 250,000 250,000

Lycoming 2061 005 93677 SR 2061 over Tb Sugar Rn F BRDG 185 20,000 20,000 20,000

Lycoming 2061 005 93677 SR 2061 over Tb Sugar Rn U BRDG 185 25,000 25,000 25,000

Lycoming 2061 005 93677 SR 2061 over Tb Sugar Rn R BRDG 185 20,000 20,000 20,000

Lycoming 2061 005 93677 SR 2061 over Tb Sugar Rn C BRDG 185 150,000 150,000 150,000

Lycoming 2061 08S 99372 SR 2061Slide Repair P XRST 581 30,000 30,000 30,000

Lycoming 2061 08S 99372 SR 2061Slide Repair P XRST 581 70,000 70,000 70,000

Lycoming 2061 08S 99372 SR 2061Slide Repair F XRST 581 200,000 200,000 200,000

Lycoming 2061 08S 99372 SR 2061Slide Repair U XRST 581 25,000 25,000 25,000

Lycoming 2061 08S 99372 SR 2061Slide Repair R XRST 581 25,000 25,000 25,000

Lycoming 2064 004 5740 SR 2064 - Arch St. Bridge U BRDG STP 500,000 500,000 500,000

Lycoming 2067 001 101970Lyc Substr Contr 2 P BRDG 185 35,000 35,000 35,000

Lycoming 2067 001 101970Lyc Substr Contr 2 F BRDG 185 20,000 20,000 20,000

Lycoming 2067 001 101970Lyc Substr Contr 2 U BRDG 185 15,000 15,000 15,000

Lycoming 2067 001 101970Lyc Substr Contr 2 R BRDG 185 35,000 35,000 35,000

Lycoming 2067 001 101970Lyc Substr Contr 2 +C BRDG 185 350,000 350,000 350,000

Lycoming 2067 001 101970Lyc Substr Contr 2 +C BRDG 185 150,000 150,000 150,000

Lycoming 2069 001 5943 SR 2069 ov Lt Muncy Creek F BRDG BOF 125,000 125,000 125,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 P BRDG 185 15,000 15,000 15,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 P BRDG 185 20,000 20,000 20,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 F BRDG 185 25,000 25,000 25,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 U BRDG 185 50,000 50,000 50,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 R BRDG 185 15,000 15,000 15,000

Lycoming 2069 004 101971SR 2069 ov Broad Run - #2 C BRDG 185 175,000 175,000 175,000

Lycoming 3003 021 97704 Nelson St to PA 44 F HRST 581 15,000 15,000 15,000

Lycoming 3003 021 97704 Nelson St to PA 44 C HRST 581 175,000 175,000 175,000

Lycoming 3004 018 97806 Mtn Rd to Mosquito Creek C HRST 581 500,000 500,000 500,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run P BRDG 185 15,000 15,000 15,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run P BRDG 185 20,000 20,000 20,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run F BRDG 185 25,000 25,000 25,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run U BRDG 185 50,000 50,000 50,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run R BRDG 185 15,000 15,000 15,000

Lycoming 3007 015 99036 SR 3007 ov Pine Run C BRDG 185 175,000 175,000 175,000

Lycoming 3011 004 78924 SR 3011 over Pine Run P BRDG 185 5,000 5,000 5,000

Lycoming 3011 004 78924 SR 3011 over Pine Run C BRDG 185 20,000 20,000 20,000

Lycoming 3011 004 78924 SR 3011 over Pine Run C BRDG 185 40,000 40,000 40,000

Lycoming 3018 006 87914 SR3018 ov Fork Larrys Crk F BRDG 185 10,000 10,000 10,000

Lycoming 3018 006 87914 SR3018 ov Fork Larrys Crk R BRDG 185 10,000 10,000 10,000

Page 144: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

144 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Lycoming 3018 006 87914 SR3018 ov Fork Larrys Crk C BRDG 185 30,000 30,000 30,000

Lycoming 3018 006 87914 SR3018 ov Fork Larrys Crk C BRDG 185 210,000 210,000 210,000

Lycoming 3018 012 6106 SR 3018 ov 1stFrkLarrysCr P BRDG 185 35,000 35,000 35,000

Lycoming 4001 003 88743 SR 4001 over Lt Pine Crk P BRDG 185 10,000 10,000 10,000

Lycoming 4001 003 88743 SR 4001 over Lt Pine Crk F BRDG 185 20,000 20,000 20,000

Lycoming 4001 003 88743 SR 4001 over Lt Pine Crk +C BRDG STP 520,000 520,000 520,000

Lycoming 4001 004 88744 SR 4001 over Love Run P BRDG 581 40,000 40,000 40,000

Lycoming 4001 004 88744 SR 4001 over Love Run F BRDG 185 30,000 30,000 30,000

Lycoming 4001 004 88744 SR 4001 over Love Run U BRDG 185 50,000 50,000 50,000

Lycoming 4001 004 88744 SR 4001 over Love Run R BRDG 185 15,000 15,000 15,000

Lycoming 4001 004 88744 SR 4001 over Love Run C BRDG 185 230,000 230,000 230,000

Lycoming 4001 004 88744 SR 4001 over Love Run C BRDG 185 270,000 270,000 270,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +P BRDG STP 106,000 106,000 106,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +P BRDG STP 40,000 40,000 40,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +F BRDG STP 80,000 80,000 80,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +F BRDG STP 40,000 40,000 40,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +U BRDG STP 50,000 50,000 50,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +R BRDG STP 20,000 20,000 20,000

Lycoming 4001 020 6209 SR 4001 ov Lt Pine Creek +C BRDG STP 732,358 732,358 732,358

Lycoming 4002 008 97664 SR 4002 over Trout Run P BRDG 185 20,000 20,000 20,000

Lycoming 4002 008 97664 SR 4002 over Trout Run P BRDG 185 25,000 25,000 25,000

Lycoming 4002 008 97664 SR 4002 over Trout Run F BRDG 185 25,000 25,000 25,000

Lycoming 4002 008 97664 SR 4002 over Trout Run U BRDG 185 6,750 6,750 6,750

Lycoming 4002 008 97664 SR 4002 over Trout Run U BRDG 185 18,250 18,250 18,250

Lycoming 4002 008 97664 SR 4002 over Trout Run R BRDG 185 50,000 50,000 50,000

Lycoming 4002 008 97664 SR 4002 over Trout Run C BRDG 185 175,000 175,000 175,000

Totals for: Lycoming 12,553,500 7,918,800 35,500 20,507,800 9,347,000 12,392,000 45,625 21,784,625 9,620,182 11,928,000 50,875 21,599,057 6,489,054 11,928,000 43,750 18,460,804 82,352,286

McKean 102261Elm/Davis St Phase III C TENH TAP 170,000 42,500 212,500 212,500

McKean 98131 Lewis Run Industrial Park C HRST APL 150,000 150,000 150,000

McKean 6 530 93354 Kane Boro Reconstruct P HRST 581 200,000 200,000 200,000

McKean 6 530 93354 Kane Boro Reconstruct C HRST NHPP 1,434,142 1,434,142 1,434,142

McKean 6 530 93354 Kane Boro Reconstruct C HRST NHPP 2,721,086 581 1,000,000 3,721,086 3,721,086

McKean 6 533 96265 Lntz Corners to Mt Jewett P HRST 581 200,000 200,000 200,000

McKean 6 533 96265 Lntz Corners to Mt Jewett C HRST 581 1,007,911 1,007,911 1,007,911

McKean 6 533 96265 Lntz Corners to Mt Jewett C HRST 581 9,000,000 9,000,000 9,000,000

McKean 6 A08 88177 Lillibridge Creek Bridge F BRDG 185 75,000 75,000 75,000

McKean 6 A08 88177 Lillibridge Creek Bridge C BRDG NHPP 1,554,682 1,554,682 1,554,682

McKean 6 A08 88177 Lillibridge Creek Bridge C BRDG STP 159,089 159,089 159,089

McKean 6 A08 88177 Lillibridge Creek Bridge C BRDG 581 1,300,000 1,300,000 1,300,000

McKean 6 A09 88624 Ostrander Hollow Brdg F BRDG NHPP 257,500 257,500 257,500

Page 145: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

145 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

McKean 6 A09 88624 Ostrander Hollow Brdg U BRDG NHPP 53,045 53,045 53,045

McKean 6 A09 88624 Ostrander Hollow Brdg R BRDG NHPP 51,500 51,500 51,500

McKean 6 A09 88624 Ostrander Hollow Brdg +C BRDG NHPP 473,080 473,080 473,080

McKean 6 A09 88624 Ostrander Hollow Brdg +C BRDG NHPP 800,000 800,000 800,000

McKean 6 A10 85213 SR 6 over Long Brook +F BRDG NHPP 291,748 291,748 291,748

McKean 6 A10 85213 SR 6 over Long Brook +U BRDG NHPP 54,636 54,636 54,636

McKean 6 A10 85213 SR 6 over Long Brook +R BRDG NHPP 106,090 106,090 106,090

McKean 6 A10 85213 SR 6 over Long Brook +C BRDG NHPP 687,272 687,272 687,272

McKean 6 A10 85213 SR 6 over Long Brook +C BRDG NHPP 497,182 497,182 497,182

McKean 6 A13 85212 SR 6 ov Kane Br of Marvin +P BRDG NHPP 325,000 325,000 325,000

McKean 6 A13 85212 SR 6 ov Kane Br of Marvin +F BRDG NHPP 325,000 325,000 325,000

McKean 6 A13 85212 SR 6 ov Kane Br of Marvin +U BRDG NHPP 56,275 56,275 56,275

McKean 6 A13 85212 SR 6 ov Kane Br of Marvin +R BRDG NHPP 56,275 56,275 56,275

McKean 46 A08 69392 Pigeon Hollow Rn Brdg STA P BRDG 185 50,000 50,000 50,000

McKean 46 A08 69392 Pigeon Hollow Rn Brdg STA F BRDG 185 281,377 281,377 281,377

McKean 46 A08 69392 Pigeon Hollow Rn Brdg STA U BRDG 185 54,636 54,636 54,636

McKean 46 A08 69392 Pigeon Hollow Rn Brdg STA R BRDG 185 53,045 53,045 53,045

McKean 46 A08 69392 Pigeon Hollow Rn Brdg STA C BRDG 185 819,545 819,545 819,545

McKean 46 R96 102727Kendall Ave BPRR Upgrade C SAMI RRX 164,440 164,440 164,440

McKean 59 A02 4463 SR 59 over Blacksmith Run F BRDG 185 291,748 291,748 291,748

McKean 59 A02 4463 SR 59 over Blacksmith Run +U BRDG STP 109,273 109,273 109,273

McKean 59 A02 4463 SR 59 over Blacksmith Run R BRDG 185 106,090 106,090 106,090

McKean 59 A02 4463 SR 59 over Blacksmith Run +C BRDG STP 410,121 410,121 410,121

McKean 59 A05 88180 SR 59 Blacksmith Run II F BRDG 185 291,748 291,748 291,748

McKean 59 A05 88180 SR 59 Blacksmith Run II +U BRDG STP 109,273 109,273 109,273

McKean 59 A05 88180 SR 59 Blacksmith Run II +R BRDG STP 106,090 106,090 106,090

McKean 59 A05 88180 SR 59 Blacksmith Run II +C BRDG STP 410,122 410,122 410,122

McKean 66 A01 85258 SR 66 ov Wind Rn BOX P BRDG 185 247,612 247,612 247,612

McKean 155 532 93364 Keating to Port Allegheny P HRST 581 212,180 212,180 212,180

McKean 155 532 93364 Keating to Port Allegheny C HRST 581 4,072,397 4,072,397 4,072,397

McKean 155 532 93364 Keating to Port Allegheny C HRST 581 2,470,000 2,470,000 2,470,000

McKean 155 A05 85216 SR 155 over Birch Rn P BRDG 185 218,545 218,545 218,545

McKean 219 A08 68941 Bridge Over Lewis Run +F BRDG NHPP 291,748 291,748 291,748

McKean 219 A08 68941 Bridge Over Lewis Run +U BRDG NHPP 54,636 54,636 54,636

McKean 219 A08 68941 Bridge Over Lewis Run +R BRDG NHPP 53,045 53,045 53,045

McKean 219 A08 68941 Bridge Over Lewis Run +C BRDG NHPP 1,021,545 1,021,545 1,021,545

McKean 219 A08 68941 Bridge Over Lewis Run +C BRDG NHPP 1,000,000 1,000,000 1,000,000

McKean 219 C09 4481 Bradford Bypass C HRST 581 90,000 90,000 90,000

McKean 246 A02 88631 Tributary Knapp Creek BOX P BRDG 185 45,000 45,000 45,000

McKean 246 A02 88631 Tributary Knapp Creek BOX U BRDG 185 53,045 53,045 53,045

Page 146: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

146 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

McKean 246 A02 88631 Tributary Knapp Creek BOX R BRDG 185 26,522 26,522 26,522

McKean 246 A02 88631 Tributary Knapp Creek BOX C BRDG 185 299,000 299,000 299,000

McKean 246 A03 88638 Branch Baker Rn BOX P BRDG 185 179,108 179,108 179,108

McKean 246 A03 88638 Branch Baker Rn BOX U BRDG 185 27,500 27,500 27,500

McKean 246 A03 88638 Branch Baker Rn BOX R BRDG 185 27,500 27,500 27,500

McKean 246 A03 88638 Branch Baker Rn BOX C BRDG 185 299,000 299,000 299,000

McKean 321 A02 85230 SR 321 over Four Mile Run P BRDG 185 281,377 281,377 281,377

McKean 346 A07 81396 Br. Foster Brook Bridge C BRDG 185 40,000 40,000 40,000

McKean 346 A09 85232 Gates Hollow BOX P BRDG 185 180,000 180,000 180,000

McKean 346 A09 85232 Gates Hollow BOX U BRDG 185 28,138 28,138 28,138

McKean 346 A09 85232 Gates Hollow BOX R BRDG 185 28,138 28,138 28,138

McKean 446 R99 102730State Line Rd Warning Dev +C SAMI RRX 54,636 54,636 54,636

McKean 646 A02 4338 Pennbrook Run Bridge F BRDG STP 265,225 265,225 265,225

McKean 646 A02 4338 Pennbrook Run Bridge U BRDG STP 87,418 87,418 87,418

McKean 646 A02 4338 Pennbrook Run Bridge R BRDG STP 53,045 53,045 53,045

McKean 646 A02 4338 Pennbrook Run Bridge +C BRDG STP 756,849 756,849 756,849

McKean 646 A02 4338 Pennbrook Run Bridge +C BRDG STP 527,605 527,605 527,605

McKean 646 A02 4338 Pennbrook Run Bridge +C BRDG STP 300,000 300,000 300,000

McKean 646 P12 3624 2015 N. Central Br. Pres. P BRDG 185 40,000 40,000 40,000

McKean 646 P12 3624 2015 N. Central Br. Pres. C BRDG STP 1,770,101 185 857,184 2,627,285 2,627,285

McKean 646 P12 3624 2015 N. Central Br. Pres. C BRDG STP 850,000 850,000 850,000

McKean 770 A01 4337 Minard Run Bridge #I C BRDG 185 168,000 168,000 168,000

McKean 770 A04 4465 SR 770 Minard Run II C BRDG 185 175,000 175,000 175,000

McKean 1002 R01 102731Champlin RR Warning Dev +C SAMI RRX 191,227 191,227 191,227

McKean 1011 A02 4464 Meeks Run Bridge C BRDG 185 40,000 40,000 40,000

McKean 1011 A03 85240 Taylor Brook BOX Culvert C BRDG 185 75,000 75,000 75,000

McKean 3009 A01 4497 Kinzua Creek Bridge +F BRDG BOF 265,225 265,225 265,225

McKean 3009 A01 4497 Kinzua Creek Bridge +U BRDG BOF 54,636 54,636 54,636

McKean 3009 A01 4497 Kinzua Creek Bridge +R BRDG BOF 54,636 54,636 54,636

McKean 3009 A01 4497 Kinzua Creek Bridge +C BRDG BOF 1,000,000 1,000,000 1,000,000

McKean 4001 A02 93327 Bear Run BOX STA P BRDG 185 190,962 190,962 190,962

McKean 4001 A02 93327 Bear Run BOX STA U BRDG 185 57,964 57,964 57,964

McKean 4001 A02 93327 Bear Run BOX STA R BRDG 185 57,964 57,964 57,964

McKean 4001 A02 93327 Bear Run BOX STA C BRDG 185 299,000 299,000 299,000

McKean 4002 R97 102728Owens Hwy RR Warning Dev +C SAMI RRX 164,440 164,440 164,440

McKean 4004 A01 4376 Tunungwant Ck. Br. I +F BRDG STP 337,663 337,663 337,663

McKean 4004 A01 4376 Tunungwant Ck. Br. I +U BRDG STP 57,964 57,964 57,964

McKean 4004 A01 4376 Tunungwant Ck. Br. I +R BRDG STP 90,041 90,041 90,041

McKean 4004 A01 4376 Tunungwant Ck. Br. I C BRDG STP 197,301 197,301 197,301

McKean 4004 A01 4376 Tunungwant Ck. Br. I C BRDG STP 2,239,281 185 972,996 3,212,277 3,212,277

Page 147: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

147 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

McKean 4007 A01 85251 SR 4007 Toad Hollw STA P BRDG 185 281,377 281,377 281,377

Totals for: McKean 4,431,142 2,326,039 42,500 6,799,681 4,251,482 7,141,367 11,392,849 5,408,782 5,165,565 10,574,347 9,179,782 12,138,638 21,318,420 50,085,297

Mercer 102324Mercer RBR Initiative C BRDG 581 2,000,000 2,000,000 2,000,000

Mercer 102324Mercer RBR Initiative C BRDG 581 2,000,000 2,000,000 2,000,000

Mercer 93237 STU Line Item 2015 - SVTS C HRST STU 195,000 160,750 355,750 355,750

Mercer 93238 STU Line Item 2016 - SVTS C HRST STU 643,000 160,750 803,750 803,750

Mercer 98261 Mercer Local Brdg Line C BRDG BOF 800,000 183 200,000 1,000,000 1,000,000

Mercer 98261 Mercer Local Brdg Line C BRDG BOF 800,000 183 200,000 1,000,000 1,000,000

Mercer 98261 Mercer Local Brdg Line C BRDG BOF 800,000 183 200,000 1,000,000 1,000,000

Mercer 98261 Mercer Local Brdg Line C BRDG 183 385,250 385,250 385,250

Mercer 98264 Mercer 2015 TIP Line Item C BRDG BOF 945,000 185 41,000 986,000 986,000

Mercer 98264 Mercer 2015 TIP Line Item C BRDG BOF 245,000 185 430,000 675,000 675,000

Mercer 98264 Mercer 2015 TIP Line Item C BRDG BOF 745,000 185 1,578,000 2,323,000 2,323,000

Mercer 98264 Mercer 2015 TIP Line Item C BRDG BOF 745,000 185 683,000 1,428,000 1,428,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST NHPP 1,607,000 581 677,800 2,284,800 2,284,800

Mercer 98264 Mercer 2015 TIP Line Item C HRST STP 356,000 356,000 356,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST NHPP 267,000 581 1,164,000 1,431,000 1,431,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST STP 191,000 191,000 191,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST NHPP 167,000 581 439,000 606,000 606,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST STP 91,000 91,000 91,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST NHPP 1,667,000 581 139,000 1,806,000 1,806,000

Mercer 98264 Mercer 2015 TIP Line Item C HRST STP 91,000 91,000 91,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI CAQ 9,000 9,000 9,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI HSIP 687,000 687,000 687,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI CAQ 9,000 9,000 9,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI HSIP 1,057,000 1,057,000 1,057,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI CAQ 9,000 9,000 9,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI HSIP 1,057,000 1,057,000 1,057,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI CAQ 749,000 749,000 749,000

Mercer 98264 Mercer 2015 TIP Line Item C SAMI HSIP 1,057,000 1,057,000 1,057,000

Mercer 98275 Mercer STU Line Item 2017 C HRST STU 643,000 160,750 803,750 803,750

Mercer 98276 Mercer STU Line Item 2018 C HRST STU 643,000 160,750 803,750 803,750

Mercer 98277 Mercer TA Line Item 2017 +C TENH TAU 40,000 40,000 40,000

Mercer 98278 Mercer TA Line Item 2018 +C TENH TAU 40,000 40,000 40,000

Mercer L00 1746 Race Street Bridge F BRDG BOF 100,000 179 6,250 106,250 106,250

Mercer L00 1746 Race Street Bridge F BRDG 183 18,750 18,750 18,750

Mercer L00 1887 Oak Hill Road (T-955) Br F BRDG 179 24,000 24,000 24,000

Mercer L00 1887 Oak Hill Road (T-955) Br F BRDG 183 96,000 96,000 96,000

Mercer STU 102682West Ridge Avenue +C HRST STU 400,000 400,000 400,000

Mercer T17 102674Kidd's Mill Covered Brdg +C TENH STU 48,000 48,000 48,000

Page 148: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

148 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Mercer T17 102674Kidd's Mill Covered Brdg +C TENH TAU 40,000 40,000 40,000

Mercer T17 102674Kidd's Mill Covered Brdg +C TENH TAU 40,000 40,000 40,000

Mercer 18 21M 99878 SR 18: Roman to Wilson C HRST 581 1,500,000 1,500,000 1,500,000

Mercer 18 B07 97272 SR 18 Br/Sheng River Trib F BRDG 185 50,000 50,000 50,000

Mercer 18 B07 97272 SR 18 Br/Sheng River Trib C BRDG 185 300,000 300,000 300,000

Mercer 19 B06 68685 Perry Hwy over Black Run C BRDG 185 1,125,000 1,125,000 1,125,000

Mercer 19 B11 90031 SR 19 ov Otter Ck Trib P BRDG 185 200,000 200,000 200,000

Mercer 19 B11 90031 SR 19 ov Otter Ck Trib F BRDG 185 50,000 50,000 50,000

Mercer 19 B11 90031 SR 19 ov Otter Ck Trib R BRDG 185 50,000 50,000 50,000

Mercer 19 B11 90031 SR 19 ov Otter Ck Trib C BRDG 185 760,000 760,000 760,000

Mercer 19 B15 97322 SR 19 Bridge/Munnel Run P BRDG 185 200,000 200,000 200,000

Mercer 19 B15 97322 SR 19 Bridge/Munnel Run F BRDG 185 150,000 150,000 150,000

Mercer 19 B15 97322 SR 19 Bridge/Munnel Run R BRDG 185 50,000 50,000 50,000

Mercer 19 B15 97322 SR 19 Bridge/Munnel Run C BRDG 185 550,000 550,000 550,000

Mercer 19 B15 97322 SR 19 Bridge/Munnel Run C BRDG 185 550,000 550,000 550,000

Mercer 19 S01 95568 SR 19: 5 Leg Intersection C SAMI HSIP* 370,000 370,000 370,000

Mercer 58 12M 89171 SR 58: Jmstwn-Grnvil C HRST 581 2,900,000 2,900,000 2,900,000

Mercer 62 B07 88486 SR 62 Br over Spring Ck F BRDG 185 50,000 50,000 50,000

Mercer 62 B07 88486 SR 62 Br over Spring Ck R BRDG 185 10,000 10,000 10,000

Mercer 62 B07 88486 SR 62 Br over Spring Ck C BRDG 185 200,000 200,000 200,000

Mercer 208 07M 98030 State Route 208 C HRST 581 2,500,000 2,500,000 2,500,000

Mercer 208 B01 90033 SR 208 Br over Black Run F BRDG 185 250,000 250,000 250,000

Mercer 208 B01 90033 SR 208 Br over Black Run R BRDG 185 50,000 50,000 50,000

Mercer 208 B01 90033 SR 208 Br over Black Run C BRDG 185 680,000 680,000 680,000

Mercer 318 B00 1923 W. Middlesex Viaduct C BRDG STP 2,500,000 185 625,000 3,125,000 3,125,000

Mercer 718 A04 69966 Broadway Avenue - Ph 2 +C HRST CAQ 740,000 740,000 740,000

Mercer 718 A04 69966 Broadway Avenue - Ph 2 +C HRST STP 2,235,000 2,235,000 2,235,000

Mercer 718 A04 69966 Broadway Avenue - Ph 2 +C HRST STP 3,425,000 3,425,000 3,425,000

Mercer 718 A04 69966 Broadway Avenue - Ph 2 +C HRST STP 2,600,000 2,600,000 2,600,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST CAQ 740,000 740,000 740,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST STP 2,400,000 2,400,000 2,400,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST STP 1,075,000 1,075,000 1,075,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST CAQ 740,000 740,000 740,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST STP 2,500,000 2,500,000 2,500,000

Mercer 718 A05 104111Broadway Avenue - Ph 3 C HRST STP 925,000 925,000 925,000

Mercer 718 B02 1828 PA 718 Br over Big Run U HRST 581 7,200 7,200 7,200

Mercer 760 01M 98022 SR 760: Beaver Vly Expwy C HRST 581 2,600,000 2,600,000 2,600,000

Mercer 760 01M 98022 SR 760: Beaver Vly Expwy C HRST 581 100,000 100,000 100,000

Mercer 846 SLD 97667 SR 846 Slide C HRST 581 900,000 900,000 900,000

Mercer 1001 B01 78923 SR 1001 Brdg/Lil Shen Riv F BRDG 185 50,000 50,000 50,000

Page 149: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

149 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Mercer 1008 B00 1463 SR 1008 Brdg/Otter Ck F BRDG 185 50,000 50,000 50,000

Mercer 1008 B00 1463 SR 1008 Brdg/Otter Ck C BRDG 185 150,000 150,000 150,000

Mercer 1014 B00 82938 Georgetown Rd/I-79 C BRDG 185 500,000 500,000 500,000

Mercer 1014 B00 82938 Georgetown Rd/I-79 C BRDG 185 1,295,000 1,295,000 1,295,000

Mercer 1015 B00 1528 Carlton Rd Br/New Lebanon +C SAMI RRX* 97,000 97,000 97,000

Mercer 2019 B01 82939 SR 2019 over I-79 C BRDG BOF 500,000 185 125,000 625,000 625,000

Mercer 2019 B01 82939 SR 2019 over I-79 C BRDG BOF 500,000 185 125,000 625,000 625,000

Mercer 2102 B00 88482 Clintvill Rd Br over I-79 F BRDG 185 100,000 100,000 100,000

Mercer 2102 B00 88482 Clintvill Rd Br over I-79 R BRDG 185 10,000 10,000 10,000

Mercer 2102 B01 88483 Clntville Rd Br 2 ov I-79 F BRDG 185 100,000 100,000 100,000

Mercer 2102 B01 88483 Clntville Rd Br 2 ov I-79 R BRDG 185 10,000 10,000 10,000

Mercer 3006 01M 98026 SR 3006: Roemer Blvd C HRST 581 1,100,000 1,100,000 1,100,000

Mercer 3008 A00 96362 SR 3008: State St Stscp F HRST NHPP 200,000 581 50,000 250,000 250,000

Mercer 3008 A00 96362 SR 3008: State St Stscp U HRST NHPP 80,000 581 20,000 100,000 100,000

Mercer 3008 A00 96362 SR 3008: State St Stscp R HRST NHPP 80,000 581 20,000 100,000 100,000

Mercer 3008 A00 96362 SR 3008: State St Stscp C HRST NHPP 1,600,000 581 400,000 2,000,000 2,000,000

Mercer 3008 A00 96362 SR 3008: State St Stscp C HRST NHPP 1,600,000 581 400,000 2,000,000 2,000,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +P HRST NHPP 200,000 200,000 200,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +F HRST NHPP 200,000 200,000 200,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +U HRST NHPP 50,000 50,000 50,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +R HRST NHPP 50,000 50,000 50,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +C HRST NHPP 400,000 400,000 400,000

Mercer 3008 A02 102554SR 3008: Kerrwood/Ellis +C HRST NHPP 500,000 500,000 500,000

Mercer 3012 01M 98025 SR 3012:Clark Street C HRST 581 450,000 450,000 450,000

Mercer 3016 01M 98024 SR 3016: Hazen Road C HRST 581 750,000 750,000 750,000

Mercer 4002 B01 97276 SR 4002 Brdg/Booth Run F BRDG 185 100,000 100,000 100,000

Mercer 4002 B01 97276 SR 4002 Brdg/Booth Run R BRDG 185 10,000 10,000 10,000

Mercer 4002 B01 97276 SR 4002 Brdg/Booth Run C BRDG 185 750,000 750,000 750,000

Mercer 4002 B02 1475 SR 4002: Coal Hill Rd Br F BRDG 185 50,000 50,000 50,000

Mercer 4002 B02 1475 SR 4002: Coal Hill Rd Br C BRDG 185 150,000 150,000 150,000

Mercer 4016 B00 74687 SR 4016-Kennard Rd. Br. C BRDG 185 550,000 550,000 550,000

Totals for: Mercer 12,314,000 6,696,250 160,750 19,171,000 12,467,000 7,974,000 160,750 20,601,750 9,717,000 9,667,000 160,750 19,544,750 8,792,000 9,667,000 160,750 18,619,750 77,937,250

Mifflin 102439Roundhouse Rd Reconstruct C HCON APL 410,000 410,000 410,000

Mifflin BR 4605 T-737,Jacks Creek Br. C BRDG 183 180,174 45,044 225,218 225,218

Mifflin IND 74974 Loop Road Phase I C HRST SXF 501,171 125,293 626,464 626,464

Mifflin 22 A12 4600 Messer Run Bridge P BRDG NHPP 309,000 309,000 309,000

Mifflin 22 A12 4600 Messer Run Bridge F BRDG NHPP 265,225 265,225 265,225

Mifflin 22 A12 4600 Messer Run Bridge U BRDG NHPP 53,045 53,045 53,045

Mifflin 22 A12 4600 Messer Run Bridge R BRDG NHPP 106,090 106,090 106,090

Mifflin 22 A12 4600 Messer Run Bridge C BRDG NHPP 1,092,727 1,092,727 1,092,727

Page 150: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

150 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Mifflin 322 715 93312 Reedsville to Burnham P HRST NHPP 400,000 400,000 400,000

Mifflin 322 715 93312 Reedsville to Burnham F HRST NHPP 275,000 275,000 275,000

Mifflin 322 715 93312 Reedsville to Burnham C HRST NHPP 8,591,283 8,591,283 8,591,283

Mifflin 322 716 93311 Seven Mtns. Paving P HRST 581 200,000 200,000 200,000

Mifflin 322 716 93311 Seven Mtns. Paving C HRST 581 5,000,000 5,000,000 5,000,000

Mifflin 322 717 104261Seven Mountains ITS P HCON NHPP 200,000 200,000 200,000

Mifflin 322 717 104261Seven Mountains ITS U SAMI NHPP 300,000 300,000 300,000

Mifflin 322 717 104261Seven Mountains ITS C SAMI NHPP 958,533 958,533 958,533

Mifflin 322 717 104261Seven Mountains ITS C SAMI NHPP 441,467 441,467 441,467

Mifflin 1005 A05 81517 Laurel Run P BRDG 185 50,000 50,000 50,000

Mifflin 1005 A05 81517 Laurel Run F BRDG STP 245,500 245,500 245,500

Mifflin 1005 A05 81517 Laurel Run U BRDG STP 53,045 53,045 53,045

Mifflin 1005 A05 81517 Laurel Run R BRDG STP 53,045 53,045 53,045

Mifflin 1005 A05 81517 Laurel Run C BRDG STP 1,382,719 185 706,558 2,089,277 2,089,277

Mifflin 1005 A05 81517 Laurel Run C BRDG STP 556,973 556,973 556,973

Mifflin 2001 A03 81423 Trib Jacks Creek Bridge P BRDG 185 325,000 325,000 325,000

Mifflin 2001 A03 81423 Trib Jacks Creek Bridge F BRDG 185 300,000 300,000 300,000

Mifflin 2001 A03 81423 Trib Jacks Creek Bridge U BRDG 185 54,636 54,636 54,636

Mifflin 2001 A03 81423 Trib Jacks Creek Bridge R BRDG 185 54,636 54,636 54,636

Mifflin 2001 A03 81423 Trib Jacks Creek Bridge C BRDG 185 900,407 900,407 900,407

Mifflin 2002 A01 4643 Kish Creek Bridge F BRDG STP 318,270 318,270 318,270

Mifflin 2002 A01 4643 Kish Creek Bridge +U BRDG 185 109,273 109,273 109,273

Mifflin 2002 A01 4643 Kish Creek Bridge R BRDG STP 106,090 106,090 106,090

Mifflin 2004 A01 4719 Jacks Creek Bridge P BRDG 185 425,000 425,000 425,000

Mifflin 2004 A01 4719 Jacks Creek Bridge F BRDG 185 325,000 325,000 325,000

Mifflin 2004 A01 4719 Jacks Creek Bridge U BRDG 185 54,636 54,636 54,636

Mifflin 2004 A01 4719 Jacks Creek Bridge R BRDG 185 54,636 54,636 54,636

Mifflin 3001 A01 91609 SR 3001 Kish Creek Br P BRDG STP 360,500 360,500 360,500

Mifflin 3001 A01 91609 SR 3001 Kish Creek Br F BRDG STP 286,970 185 40,848 327,818 327,818

Mifflin 3001 A01 91609 SR 3001 Kish Creek Br U BRDG STP 112,551 112,551 112,551

Mifflin 3001 A01 91609 SR 3001 Kish Creek Br R BRDG 185 54,636 54,636 54,636

Mifflin 3001 A01 91609 SR 3001 Kish Creek Br C BRDG 185 1,751,238 1,751,238 1,751,238

Mifflin 3002 A01 4585 2017 SEDA-COG Br. Preserv P BRDG STP 106,000 106,000 106,000

Mifflin 3002 A01 4585 2017 SEDA-COG Br. Preserv C BRDG STP 1,000,000 185 428,100 1,428,100 1,428,100

Mifflin 3002 A01 4585 2017 SEDA-COG Br. Preserv C BRDG STP 700,000 700,000 700,000

Mifflin 3017 A03 93308 Tr. Juniata River BOX P BRDG 185 180,000 180,000 180,000

Mifflin 3017 A03 93308 Tr. Juniata River BOX U BRDG 185 66,500 66,500 66,500

Mifflin 3017 A03 93308 Tr. Juniata River BOX U BRDG 185 53,045 53,045 53,045

Mifflin 3017 A03 93308 Tr. Juniata River BOX R BRDG 185 25,000 25,000 25,000

Mifflin 3017 A03 93308 Tr. Juniata River BOX C BRDG 185 316,227 316,227 316,227

Page 151: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

151 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Mifflin 4013 A04 4538 Strodes Run BOX P BRDG 185 55,000 55,000 55,000

Mifflin 4013 A04 4538 Strodes Run BOX C BRDG 185 225,000 225,000 225,000

Totals for: Mifflin 2,332,261 1,731,674 170,337 4,234,272 3,795,972 6,075,830 9,871,802 3,653,137 1,476,401 5,129,538 9,403,834 2,651,645 12,055,479 31,291,091

Monroe 33 0 96414 PA 33 Median Barrier P SAMI 581 437,091 437,091 437,091

Monroe 33 0 96414 PA 33 Median Barrier F SAMI 581 281,377 281,377 281,377

Monroe 33 02B 84047 SR 33 over Pocono Creek C HCON NHPP* 4,672,000 4,672,000 4,672,000

Monroe 80 05S 57921 I-80/Exit 308 Realignment F IMAN 581 2,813,772 2,813,772 2,813,772

Monroe 80 05S 57921 I-80/Exit 308 Realignment U IMAN 581 562,754 562,754 562,754

Monroe 80 05S 57921 I-80/Exit 308 Realignment R IMAN 581 1,591,350 1,591,350 1,591,350

Monroe 80 05S 57921 I-80/Exit 308 Realignment +C IMAN NHPP 2,947,267 2,947,267 2,947,267

Monroe 80 05S 57921 I-80/Exit 308 Realignment +C IMAN NHPP 22,947,267 22,947,267 22,947,267

Monroe 80 17M 76357 I-80 Recnstruction-Monroe F IMAN 581 10,000,000 10,000,000 10,000,000

Monroe 80 PHB 93387 SR 80-PHB ITS Monroe C SAMI NHPP 2,085,750 581 231,750 2,317,500 2,317,500

Monroe 80 WAY 76443 I-80 Wayfinding C SPFED SXF 328,590 82,148 410,738 410,738

Monroe 115 02M 11645 PA 115 Widening P HRST 581 40,000 40,000 40,000

Monroe 115 02M 11645 PA 115 Widening F HRST 581 250,000 250,000 250,000

Monroe 115 02M 11645 PA 115 Widening F HRST 581 265,000 265,000 265,000

Monroe 115 02M 11645 PA 115 Widening U HRST 581 25,750 25,750 25,750

Monroe 115 02M 11645 PA 115 Widening R HRST 581 515,000 515,000 515,000

Monroe 115 02M 11645 PA 115 Widening C HRST 581 5,000,000 5,000,000 5,000,000

Monroe 115 02M 11645 PA 115 Widening C HRST 581 1,000,000 1,000,000 1,000,000

Monroe 115 02M 11645 PA 115 Widening C HRST 581 1,426,300 1,426,300 1,426,300

Monroe 115 ARC 102578SR115 Arcadia Development R HCON 581 5,000 5,000 5,000

Monroe 115 ARC 102578SR115 Arcadia Development C HCON 581 1,495,000 1,495,000 1,495,000

Monroe 191 03B 11784 Stites Bridge C BRDG STP 112,000 185 28,000 140,000 140,000

Monroe 191 04B 11872 Stites Tunnel Bridge F BRDG 185 386,250 386,250 386,250

Monroe 191 04B 11872 Stites Tunnel Bridge U BRDG 185 86,000 86,000 86,000

Monroe 191 04B 11872 Stites Tunnel Bridge U BRDG 185 120,000 120,000 120,000

Monroe 191 04B 11872 Stites Tunnel Bridge R BRDG 185 131,000 131,000 131,000

Monroe 191 04B 11872 Stites Tunnel Bridge R BRDG 185 75,000 75,000 75,000

Monroe 191 04B 11872 Stites Tunnel Bridge C BRDG 185 1,250,000 1,250,000 1,250,000

Monroe 191 04B 11872 Stites Tunnel Bridge C BRDG 185 4,134,068 4,134,068 4,134,068

Monroe 209 0 95517 SR 209 Frable to Lesh Rd F SAMI 581 819,525 819,525 819,525

Monroe 209 0 95518 SR 209 Gilbert to Leslie F SAMI 581 874,160 874,160 874,160

Monroe 209 0 95518 SR 209 Gilbert to Leslie U SAMI 581 327,810 327,810 327,810

Monroe 209 0 95518 SR 209 Gilbert to Leslie R SAMI 581 5,167,638 5,167,638 5,167,638

Monroe 209 0 95574 Hamilton West Resurface P HRST 581 250,000 250,000 250,000

Monroe 209 15S 88934 209/715 Int Imp - Phase 1 C SAMI CAQ 980,000 980,000 980,000

Monroe 209 15S 88934 209/715 Int Imp - Phase 1 C SAMI NHPP 243,372 243,372 243,372

Monroe 209 15S 88934 209/715 Int Imp - Phase 1 C SAMI CAQ 250,000 250,000 250,000

Page 152: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

152 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Monroe 209 15S 88934 209/715 Int Imp - Phase 1 C SAMI NHPP 216,628 216,628 216,628

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 F SAMI CAQ 280,000 280,000 280,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 F SAMI NHPP 250,000 250,000 250,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 F SAMI CAQ 500,000 500,000 500,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 U SAMI CAQ 58,690 58,690 58,690

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 U SAMI NHPP 480,000 480,000 480,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 R SAMI CAQ 200,000 200,000 200,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 R SAMI CAQ 1,100,000 1,100,000 1,100,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 R SAMI CAQ 852,250 852,250 852,250

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 R SAMI NHPP 500,000 500,000 500,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 C SAMI CAQ 150,000 150,000 150,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 C SAMI NHPP 2,036,880 2,036,880 2,036,880

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 C SAMI CAQ 400,000 400,000 400,000

Monroe 209 16S 88935 209/115 Int. Imp - Phase2 C SAMI NHPP 2,386,000 2,386,000 2,386,000

Monroe 209 ERL 101967Early Action 209&2012 Cor C SAMI 581 50,000 50,000 50,000

Monroe 380 TOC 91624 TOC Operator - NEPA C SAMI NHPP 127,308 582 31,827 159,135 159,135

Monroe 390 01B 76369 PA 390 o Leavitts Branch F BRDG 185 360,500 360,500 360,500

Monroe 390 01B 76369 PA 390 o Leavitts Branch U BRDG STP 41,200 185 10,300 51,500 51,500

Monroe 390 01B 76369 PA 390 o Leavitts Branch R BRDG STP 82,400 185 20,600 103,000 103,000

Monroe 390 01B 76369 PA 390 o Leavitts Branch C BRDG 581 201,368 201,368 201,368

Monroe 390 01B 76369 PA 390 o Leavitts Branch C BRDG 581 2,000,000 2,000,000 2,000,000

Monroe 402 02S 92001 SR 402 & Oak Grove Dr Int U HCON 581 21,855 21,855 21,855

Monroe 402 02S 92001 SR 402 & Oak Grove Dr Int R HCON 581 38,245 38,245 38,245

Monroe 402 02S 92001 SR 402 & Oak Grove Dr Int C HCON 581 1,092,727 1,092,727 1,092,727

Monroe 423 01B 11727 Warnertown Bridge R BRDG STP 33,012 185 8,253 41,265 41,265

Monroe 447 05B 79160 SR 447 over Brodhead Crk. P BRDG BOF 300,000 300,000 300,000

Monroe 447 05B 79160 SR 447 over Brodhead Crk. F BRDG BOF 329,600 185 82,400 412,000 412,000

Monroe 447 05B 79160 SR 447 over Brodhead Crk. U BRDG BOF 49,440 185 12,360 61,800 61,800

Monroe 447 05B 79160 SR 447 over Brodhead Crk. R BRDG BOF 123,600 185 30,900 154,500 154,500

Monroe 447 05B 79160 SR 447 over Brodhead Crk. C BRDG BOF 350,000 185 87,500 437,500 437,500

Monroe 447 05B 79160 SR 447 over Brodhead Crk. C BRDG BOF 450,000 185 112,500 562,500 562,500

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI HSIP 1,268,500 1,268,500 1,268,500

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI STP 6,096,909 6,096,909 6,096,909

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI HSIP 1,173,500 1,173,500 1,173,500

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI STP 2,330,000 2,330,000 2,330,000

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI HSIP 18,500 18,500 18,500

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI STP 2,479,519 2,479,519 2,479,519

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI HSIP 1,688,072 1,688,072 1,688,072

Monroe 611 04S 11817 Scotrun - Swiftwater +C SAMI STP 4,000,000 4,000,000 4,000,000

Monroe 611 11M 74979 611 /715 Improvements F HRST SXF 1,095,314 97,500 1,192,814 1,192,814

Page 153: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

153 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Monroe 611 11M 74979 611 /715 Improvements U HRST SXF 800,000 200,000 1,000,000 1,000,000

Monroe 611 11M 74979 611 /715 Improvements R HRST SXF 2,000,000 500,000 2,500,000 2,500,000

Monroe 611 11M 74979 611 /715 Improvements +C SAMI SXF 14,335,121 14,335,121 14,335,121

Monroe 611 14B 79162 SR 611 over Pocono Creek C BRDG 185 200,000 200,000 200,000

Monroe 715 0 102423715o'r McMichael's Crk II P BRDG BOF 226,600 185 56,650 283,250 283,250

Monroe 715 0 102423715o'r McMichael's Crk II C BRDG 185 795,675 795,675 795,675

Monroe 715 01B 79163 SR 715 over Pocono Creek F BRDG BOF 288,400 185 72,100 360,500 360,500

Monroe 715 01B 79163 SR 715 over Pocono Creek U BRDG BOF 20,600 185 5,150 25,750 25,750

Monroe 715 01B 79163 SR 715 over Pocono Creek R BRDG BOF 82,400 185 20,600 103,000 103,000

Monroe 715 03S 79473 SR 715/ 611 Intersection F SAMI 581 500,000 500,000 500,000

Monroe 715 03S 79473 SR 715/ 611 Intersection F SAMI 581 560,900 560,900 560,900

Monroe 715 03S 79473 SR 715/ 611 Intersection U SAMI 581 546,350 546,350 546,350

Monroe 715 03S 79473 SR 715/ 611 Intersection R SAMI 581 921,350 921,350 921,350

Monroe 1007 0 89615 SR 1007 over Marshalls Cr P BRDG 185 562,754 562,754 562,754

Monroe 1007 0 93635 SR1007 Trb Marshalls Ck 2 P BRDG 185 562,754 562,754 562,754

Monroe 1010 01B 11737 Stony Creek Bridge F BRDG BOF 264,000 185 66,000 330,000 330,000

Monroe 1010 01B 11737 Stony Creek Bridge U BRDG BOF 16,480 185 4,120 20,600 20,600

Monroe 1010 01B 11737 Stony Creek Bridge R BRDG BOF 20,600 185 5,150 25,750 25,750

Monroe 1010 01B 11737 Stony Creek Bridge C BRDG BOF 400,000 185 100,000 500,000 500,000

Monroe 1010 01B 11737 Stony Creek Bridge C BRDG BOF 1,000,388 185 250,097 1,250,485 1,250,485

Monroe 2003 01B 11760 Cherry Creek Bridge I U BRDG BOF 61,800 185 15,450 77,250 77,250

Monroe 2003 01B 11760 Cherry Creek Bridge I R BRDG BOF 123,600 185 19,776 143,376 143,376

Monroe 2003 01B 11760 Cherry Creek Bridge I C BRDG BOF 482,669 185 120,667 603,336 603,336

Monroe 2003 01B 11760 Cherry Creek Bridge I C BRDG BOF 400,000 185 100,000 500,000 500,000

Monroe 2009 01B 76368 Bridge Street Bridge-P3 R BRDG 185 199,200 199,200 199,200

Monroe 2011 01B 11726 2011 over Big Meadow F BRDG 185 318,180 318,180 318,180

Monroe 2011 01B 11726 2011 over Big Meadow U BRDG 185 31,827 31,827 31,827

Monroe 2011 01B 11726 2011 over Big Meadow R BRDG 185 53,045 53,045 53,045

Monroe 2011 01B 11726 2011 over Big Meadow C BRDG 581 1,639,090 1,639,090 1,639,090

Monroe 2012 0 85882 209 Bus over Kettle Creek P BRDG 185 272,936 272,936 272,936

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport P SAMI HSIP 360,000 360,000 360,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport P SAMI HSIP 350,000 350,000 350,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport P SAMI HSIP 460,000 460,000 460,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport F SAMI HSIP 350,000 350,000 350,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport F SAMI HSIP 165,000 165,000 165,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport U SAMI 581 100,000 100,000 100,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport U SAMI 581 157,500 157,500 157,500

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport R SAMI 581 815,000 815,000 815,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport R SAMI 581 1,042,000 1,042,000 1,042,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport C SAMI HSIP 290,000 290,000 290,000

Page 154: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

154 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport C SAMI HSIP 1,500,000 1,500,000 1,500,000

Monroe 2012 03S 95398 SR2012 Mt Tom to Airport C SAMI HSIP 290,428 290,428 290,428

Monroe 2022 03B 79154 SR 2022 over Brodhead Crk C BRDG 185 4,154,500 4,154,500 4,154,500

Monroe 2023 0 47668 Hollow Rd Br P BRDG 581 478,341 478,341 478,341

Monroe 2030 02B 11851 SR 2030/I-80 BR F BRDG 185 562,754 562,754 562,754

Monroe 2030 02B 11851 SR 2030/I-80 BR U BRDG 581 154,500 154,500 154,500

Monroe 2030 02B 11851 SR 2030/I-80 BR R BRDG 581 103,000 103,000 103,000

Monroe 2030 02B 11851 SR 2030/I-80 BR C BRDG 185 4,243,520 4,243,520 4,243,520

Monroe 3003 01B 85813 SR 3003 over Chapple Crk P BRDG 185 39,139 39,139 39,139

Monroe 3003 01B 85813 SR 3003 over Chapple Crk F BRDG BOF 247,200 185 61,800 309,000 309,000

Monroe 3003 01B 85813 SR 3003 over Chapple Crk U BRDG BOF 41,200 185 10,300 51,500 51,500

Monroe 3003 01B 85813 SR 3003 over Chapple Crk R BRDG BOF 41,200 185 10,300 51,500 51,500

Monroe 3003 01B 85813 SR 3003 over Chapple Crk C BRDG BOF 320,000 185 80,000 400,000 400,000

Monroe 3003 01B 85813 SR 3003 over Chapple Crk C BRDG BOF 320,000 185 80,000 400,000 400,000

Monroe 3010 01B 85818 SR 3010 over Pohopoco Crk P BRDG BOF 112,551 185 450,204 562,755 562,755

Monroe 4003 01B 51582 Thornhurst Bridge U BRDG BOF 64,000 185 16,000 80,000 80,000

Monroe 4008 01B 102216Tobyhanna Crk Br II P BRDG 185 40,000 40,000 40,000

Monroe 4008 01B 102216Tobyhanna Crk Br II F BRDG 185 51,500 51,500 51,500

Monroe 4008 01B 102216Tobyhanna Crk Br II U BRDG 185 10,300 10,300 10,300

Monroe 4008 01B 102216Tobyhanna Crk Br II R BRDG 185 10,300 10,300 10,300

Monroe 4008 01B 102216Tobyhanna Crk Br II C BRDG BOF 832,414 185 208,104 1,040,518 1,040,518

Monroe 4008 01B 102216Tobyhanna Crk Br II C BRDG BOF 681,186 185 170,296 851,482 851,482

Monroe 8024 01B 76371 I-80 BridgeRamp toSR 8024 F BRDG NHPP 412,000 185 103,000 515,000 515,000

Monroe 8024 01B 76371 I-80 BridgeRamp toSR 8024 U BRDG NHPP 127,308 185 31,827 159,135 159,135

Monroe 8024 01B 76371 I-80 BridgeRamp toSR 8024 R BRDG NHPP 84,872 185 21,218 106,090 106,090

Monroe 8024 01B 76371 I-80 BridgeRamp toSR 8024 C BRDG NHPP 1,932,040 185 483,010 2,415,050 2,415,050

Monroe 8024 01B 76371 I-80 BridgeRamp toSR 8024 C BRDG NHPP 1,750,000 185 437,500 2,187,500 2,187,500

Totals for: Monroe 21,341,767 10,764,520 179,648 32,285,935 10,325,975 21,517,662 700,000 32,543,637 29,992,129 12,285,222 42,277,351 35,607,754 21,309,260 56,917,014 164,023,937

Montgomery 102105Municipal Brdg Line Item C BRDG 183 2,000,000 500,000 2,500,000 2,500,000

Montgomery 102105Municipal Brdg Line Item C BRDG 183 2,000,000 500,000 2,500,000 2,500,000

Montgomery 102105Municipal Brdg Line Item C BRDG 183 2,000,000 500,000 2,500,000 2,500,000

Montgomery 102118Intersectn Safety Imp.(C) C HRST HSIP 1,003,840 1,003,840 1,003,840

Montgomery 102298ARLE Sig Syst Modernizatn C SAMI 244 180,000 180,000 180,000

Montgomery 102665Signal Upgrade Line Item C SAMI CAQ 1,000,000 1,000,000 1,000,000

Montgomery 74813 Ambler Borough Street Imp C TENH SXF 355,000 355,000 355,000

Montgomery 213 96213 Manayunk Bridge Trail(C) C TENH CAQ* 500,000 500,000 500,000

Montgomery BCP 16577 Ridge Pk: Butler-Crescent F HCON 1,000,000 1,000,000 1,000,000

Montgomery BCP 16577 Ridge Pk: Butler-Crescent R HCON 1,000,000 1,000,000 1,000,000

Montgomery BOP 87097 Pottstown Boro SRS C TENH STP 275,000 275,000 275,000

Montgomery C30 16705 Chester Valley Trail Ext R TENH CAQ 294,000 294,000 294,000

Page 155: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

155 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montgomery C30 16705 Chester Valley Trail Ext C TENH CAQ 2,000,000 2,000,000 2,000,000

Montgomery C30 16705 Chester Valley Trail Ext C TENH CAQ 4,644,000 4,644,000 4,644,000

Montgomery C30 16705 Chester Valley Trail Ext C TENH CAQ 2,644,000 2,644,000 2,644,000

Montgomery MG2 48175 Ridge Pk:Norris-Butler(W) F HCON STU 849,000 212,000 1,061,000 1,061,000

Montgomery MG2 48175 Ridge Pk:Norris-Butler(W) U HCON STU 424,000 106,000 530,000 530,000

Montgomery MG2 48175 Ridge Pk:Norris-Butler(W) R HCON STU 1,018,000 255,000 1,273,000 1,273,000

Montgomery MG3 92839 Ridge Pike/two RR Bridges C BRDG STU 6,492,000 183 1,217,000 406,000 8,115,000 8,115,000

Montgomery RLE 104175ARLE Signal System Upgrad C SAMI 244 202,000 202,000 202,000

Montgomery SSI 74815 Upper Gwynedd Street Impr C HCON SXF 300,000 300,000 300,000

Montgomery TOW 92182 Expwy Ptrl 2013-16 Suburb C SAMI NHPP 1,804,000 1,804,000 1,804,000

Montgomery TOW 92182 Expwy Ptrl 2013-16 Suburb C SAMI NHPP 1,804,000 1,804,000 1,804,000

Montgomery UGT 87099 NorthWalesBoro Imp.(SRTS) C TENH SRTSF 1,047,000 1,047,000 1,047,000

Montgomery 23 2NG 66952 PA23/US422 Int & N Gulph U HCON SXF 2,251,000 581 563,000 2,814,000 2,814,000

Montgomery 23 2NG 66952 PA23/US422 Int & N Gulph R HCON SXF 80,000 581 22,000 102,000 102,000

Montgomery 23 TCB 48172 23: Moore to Geerdes P HCON 775,000 775,000 775,000

Montgomery 29 BRR 57849 Main St O/Reading RR F BRDG 581 538,000 538,000 538,000

Montgomery 29 BRR 57849 Main St O/Reading RR R BRDG 581 105,000 105,000 105,000

Montgomery 29 BRR 57849 Main St O/Reading RR C BRDG 581 2,251,000 2,251,000 2,251,000

Montgomery 29 RLE 104173ARLE Traf Sig Safe Upgrd C SAMI 244 35,000 35,000 35,000

Montgomery 29 RLE 104174ARLE Traf Signal Imprvmnt C SAMI 244 82,000 82,000 82,000

Montgomery 63 220 96220 Lower Salford Signal Impr C SAMI CAQ 731,000 185,000 916,000 916,000

Montgomery 73 04N 16334 Church Rd:Greenwd-Rice's +R HRST CAQ 530,000 530,000 530,000

Montgomery 73 04N 16334 Church Rd:Greenwd-Rice's +C HRST CAQ 4,164,000 4,164,000 4,164,000

Montgomery 73 MS2 92807 Skippack Pk o/Skippack Cr F BRDG NHPP 424,000 185 106,000 530,000 530,000

Montgomery 76 MCR 91571 I76 o/ Mill Cr & Mill Rd P IMAN 185 566,500 566,500 566,500

Montgomery 76 MCR 91571 I76 o/ Mill Cr & Mill Rd F IMAN 185 1,021,700 1,021,700 1,021,700

Montgomery 76 MCR 91571 I76 o/ Mill Cr & Mill Rd U IMAN 185 109,272 109,272 109,272

Montgomery 76 MCR 91571 I76 o/ Mill Cr & Mill Rd R IMAN 185 109,272 109,272 109,272

Montgomery 76 PCC 80093 I-76 Regional Travel Info C IMOD CAQ 975,000 581 564,000 1,539,000 1,539,000

Montgomery 76 PCC 80093 I-76 Regional Travel Info C IMOD SXF 1,042,000 1,042,000 1,042,000

Montgomery 76 RFR 90099 I-76 o/ Righters Ferry Rd P IMAN 185 463,500 463,500 463,500

Montgomery 76 RFR 90099 I-76 o/ Righters Ferry Rd F IMAN 185 835,937 835,937 835,937

Montgomery 76 RFR 90099 I-76 o/ Righters Ferry Rd U IMAN 185 109,272 109,272 109,272

Montgomery 76 RFR 90099 I-76 o/ Righters Ferry Rd R IMAN 185 109,272 109,272 109,272

Montgomery 76 WAV 90100 I-76 o/ Waverly Road P IMAN 185 360,500 360,500 360,500

Montgomery 76 WAV 90100 I-76 o/ Waverly Road F IMAN 185 650,172 650,172 650,172

Montgomery 76 WAV 90100 I-76 o/ Waverly Road U IMAN 185 109,272 109,272 109,272

Montgomery 76 WAV 90100 I-76 o/ Waverly Road R IMAN 185 109,272 109,272 109,272

Montgomery 202 500 16665 US 202: Markley St (SB) F HCON 581 15,000 15,000 15,000

Montgomery 202 500 16665 US 202: Markley St (SB) U HCON NHPP 911,000 581 228,000 1,139,000 1,139,000

Page 156: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

156 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montgomery 202 500 16665 US 202: Markley St (SB) R HCON NHPP 2,686,000 581 672,000 3,358,000 3,358,000

Montgomery 202 61N 63490 US202:Swede-Morris #2 U HCON NHPP 849,000 581 212,000 1,061,000 1,061,000

Montgomery 202 61N 63490 US202:Swede-Morris #2 R HCON STU 1,273,000 581 318,000 1,591,000 1,591,000

Montgomery 202 61N 63490 US202:Swede-Morris #2 C HCON 581 14,704,000 14,704,000 14,704,000

Montgomery 202 61N 63490 US202:Swede-Morris #2 C HCON 581 20,774,000 20,774,000 20,774,000

Montgomery 202 61S 63486 US202:Johnson-Swede #4 U HCON NHPP 1,678,000 581 420,000 2,098,000 2,098,000

Montgomery 202 61S 63486 US202:Johnson-Swede #4 R HCON NHPP 4,170,000 581 1,043,000 5,213,000 5,213,000

Montgomery 202 65S 63491 US202:Morris-Swedesfd #3 U HCON NHPP 1,748,000 581 437,000 2,185,000 2,185,000

Montgomery 202 65S 63491 US202:Morris-Swedesfd #3 R HCON NHPP 1,146,000 581 286,000 1,432,000 1,432,000

Montgomery 263 YHS 74817 York Rd: Horsham - Summit C TENH SXF 1,000,000 1,000,000 1,000,000

Montgomery 309 71A 63493 PA309: 5 Pts Intersectn F HRST 581 212,000 212,000 212,000

Montgomery 309 71A 63493 PA309: 5 Pts Intersectn U HRST 581 2,185,000 2,185,000 2,185,000

Montgomery 309 71A 63493 PA309: 5 Pts Intersectn C HRST 581 5,628,000 5,628,000 5,628,000

Montgomery 309 MIT 98706 309Environmntl Mitigation C HRST 581 650,000 650,000 650,000

Montgomery 422 PM2 86924 US 422:WofRoysfd-WofSntga F HRST STU 150,000 150,000 150,000

Montgomery 422 PM2 86924 US 422:WofRoysfd-WofSntga +C HRST NHPP 9,386,000 9,386,000 9,386,000

Montgomery 422 PM2 86924 US 422:WofRoysfd-WofSntga +C HRST NHPP 9,386,000 9,386,000 9,386,000

Montgomery 422 SRB 70197 US 422 Betzwood Bridge F BRDG STU 360,000 581 90,000 450,000 450,000

Montgomery 422 SRB 70197 US 422 Betzwood Bridge C BRDG NHPP 24,161,000 185 6,290,000 30,451,000 30,451,000

Montgomery 422 SRB 70197 US 422 Betzwood Bridge C BRDG NHPP 34,161,000 185 8,290,000 42,451,000 42,451,000

Montgomery 422 SRB 70197 US 422 Betzwood Bridge C BRDG NHPP 29,061,000 185 7,265,000 36,326,000 36,326,000

Montgomery 611 0 102139Route 611 Studies MontCo. S HRST 581 150,000 150,000 150,000

Montgomery 611 MBR 16214 PA611 - Old York Rd/SEPTA C BRDG NHPP 3,071,000 185 767,000 3,838,000 3,838,000

Montgomery 611 MBR 16214 PA611 - Old York Rd/SEPTA C BRDG NHPP 1,626,000 185 442,000 2,068,000 2,068,000

Montgomery 611 MBR 16214 PA611 - Old York Rd/SEPTA C BRDG 581 5,022,000 5,022,000 5,022,000

Montgomery 611 MC1 102376SR0611 Resurfacing MontCo C HRST 581 7,000,000 7,000,000 7,000,000

Montgomery 663 MKM 78736 E King St O/Manatawney Cr F BRDG NHPP 112,000 185 28,000 140,000 140,000

Montgomery 663 MKM 78736 E King St O/Manatawney Cr R BRDG NHPP 115,000 185 29,000 144,000 144,000

Montgomery 1006 MFB 16658 Old Forty Foot/Skippack F BRDG STU 393,000 185 98,000 491,000 491,000

Montgomery 1006 MFB 16658 Old Forty Foot/Skippack U BRDG STU 245,000 185 61,000 306,000 306,000

Montgomery 1006 MFB 16658 Old Forty Foot/Skippack R BRDG STU 185,000 185 46,000 231,000 231,000

Montgomery 1050 MC1 86336 Congo Rd o/ Middle Creek F BRDG BOF 87,000 185 350,000 437,000 437,000

Montgomery 1050 MC1 86336 Congo Rd o/ Middle Creek U BRDG BOF 123,000 185 30,000 153,000 153,000

Montgomery 1050 MC1 86336 Congo Rd o/ Middle Creek R BRDG BOF 123,000 185 30,000 153,000 153,000

Montgomery 2004 HAT 74807 N Broad St Improvmnt +C TENH SXF 100,148 42,000 142,148 142,148

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd U BRDG STU 526,000 526,000 526,000

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd R BRDG STU 318,000 318,000 318,000

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd C BRDG STP 764,000 764,000 764,000

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd C BRDG STU 521,000 521,000 521,000

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd C BRDG STP 175,000 175,000 175,000

Page 157: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

157 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd C BRDG STU 750,000 750,000 750,000

Montgomery 2034 MEY 16484 Edgehill Rd over York Rd C BRDG STU 1,599,000 1,599,000 1,599,000

Montgomery 2034 MG1 57865 Edge Hill Rd & Tyson Av F HRST STU 424,000 106,000 530,000 530,000

Montgomery 2034 MG1 57865 Edge Hill Rd & Tyson Av R HRST STU 900,000 200,000 1,100,000 1,100,000

Montgomery 2040 MWB 16726 WarminsterRd/Pennypack Ck F BRDG STP 446,000 185 111,000 557,000 557,000

Montgomery 2040 MWB 16726 WarminsterRd/Pennypack Ck U BRDG STP 232,000 185 58,000 290,000 290,000

Montgomery 2040 MWB 16726 WarminsterRd/Pennypack Ck R BRDG STP 232,000 185 58,000 290,000 290,000

Montgomery 2040 MWB 16726 WarminsterRd/Pennypack Ck C BRDG 185 549,000 549,000 549,000

Montgomery 2040 MWB 16726 WarminsterRd/Pennypack Ck C BRDG 581 2,197,000 2,197,000 2,197,000

Montgomery 3016 218 96218 Fayette St. Signal Interc C SAMI CAQ 568,000 142,000 710,000 710,000

Montgomery 3020 510 80021 202-510 Markley St South C HCON STU 9,616,000 581 2,404,000 12,020,000 12,020,000

Montgomery 3020 510 80021 202-510 Markley St South C HCON STU 9,616,000 581 2,404,000 12,020,000 12,020,000

Montgomery 3039 SGR 48187 S.Gulph & Henderson P HCON 450,000 450,000 450,000

Montgomery 3045 MRH 104153Rock Hill Rd Advance ROW R HCON 581 248,000 248,000 248,000

Montgomery 3045 MRH 64795 Rock Hil Rd@Belmont Av(H) F SAMI 1,000,000 1,000,000 1,000,000

Montgomery 3053 WS2 74937 Ridge Pike & Joshua Rd +C SAMI SXF 640,000 640,000 640,000

Montgomery 4031 PSS 48186 Pottstown Sgnl System C SAMI CAQ 6,561,000 6,561,000 6,561,000

Montgomery 4031 PSS 48186 Pottstown Sgnl System C SAMI CAQ 5,943,000 5,943,000 5,943,000

Montgomery 4031 PSS 48186 Pottstown Sgnl System C SAMI CAQ 639,000 639,000 639,000

Montgomery 4044 MG1 57851 Plank/Otts/Meyers/Seitz U SAMI CAQ 141,000 141,000 141,000

Montgomery 4044 MG1 57851 Plank/Otts/Meyers/Seitz R SAMI CAQ 141,000 141,000 141,000

Montgomery 7046 0 104183Rittenhouse Rd O/Skippack P BRDG 25,000 25,000 25,000

Montgomery 7046 0 104183Rittenhouse Rd O/Skippack F BRDG 70,000 70,000 70,000

Montgomery 7046 0 104183Rittenhouse Rd O/Skippack R BRDG 5,000 5,000 5,000

Montgomery 7046 0 104183Rittenhouse Rd O/Skippack C BRDG 500,000 500,000 500,000

Montgomery 7046 0 104184Old Reading Pk O/Yergers P BRDG 25,000 25,000 25,000

Montgomery 7046 0 104184Old Reading Pk O/Yergers F BRDG 50,000 50,000 50,000

Montgomery 7046 0 104184Old Reading Pk O/Yergers R BRDG 5,000 5,000 5,000

Montgomery 7046 0 104184Old Reading Pk O/Yergers C BRDG 400,000 400,000 400,000

Montgomery 7046 0 104185Easton Rd O/Br Tacony Cr P BRDG 100,000 100,000 100,000

Montgomery 7046 0 104185Easton Rd O/Br Tacony Cr F BRDG 200,000 200,000 200,000

Montgomery 7046 0 104185Easton Rd O/Br Tacony Cr R BRDG 25,000 25,000 25,000

Montgomery 7046 0 104185Easton Rd O/Br Tacony Cr C BRDG 1,500,000 1,500,000 1,500,000

Montgomery 7046 027 80052 Fttrs Mll O/Pnnpck Cr F BRDG STP 318,000 183 60,000 20,000 398,000 398,000

Montgomery 7046 027 80052 Fttrs Mll O/Pnnpck Cr R BRDG STP 96,000 183 17,000 7,000 120,000 120,000

Montgomery 7046 027 80052 Fttrs Mll O/Pnnpck Cr C BRDG STU 1,981,000 185 371,000 124,000 2,476,000 2,476,000

Montgomery 7046 059 72355 Valley Green Rd Brg O/Wis P BRDG STP 93,000 183 83,000 28,000 204,000 204,000

Montgomery 7046 059 72355 Valley Green Rd Brg O/Wis P BRDG STU 352,000 352,000 352,000

Montgomery 7046 059 72355 Valley Green Rd Brg O/Wis F BRDG STP 470,000 183 88,000 29,000 587,000 587,000

Montgomery 7046 059 72355 Valley Green Rd Brg O/Wis U BRDG STP 28,000 185 5,000 2,000 35,000 35,000

Page 158: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

158 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montgomery 7046 059 72355 Valley Green Rd Brg O/Wis R BRDG STP 37,000 183 7,000 2,000 46,000 46,000

Montgomery 7046 190 83742 Keim St o/Schuylkll Riv F BRDG STP 774,000 183 145,000 48,000 967,000 967,000

Montgomery 7046 190 83742 Keim St o/Schuylkll Riv U BRDG STP 45,000 183 8,000 3,000 56,000 56,000

Montgomery 7046 232 16408 Fruitville Rd O/Perkiomen F BRDG BOF 467,000 183 88,000 29,000 584,000 584,000

Montgomery 7046 232 16408 Fruitville Rd O/Perkiomen U BRDG 2,000 2,000 2,000

Montgomery 7046 237 80053 Knight Rd O/Green Ln C BRDG STP 1,716,000 183 322,000 107,000 2,145,000 2,145,000

Montgomery 7102 ARB 16610 Ashmead Rd over Tacony Cr U BRDG STP 85,000 185 16,000 5,000 106,000 106,000

Montgomery 7102 ARB 16610 Ashmead Rd over Tacony Cr C BRDG STP 2,419,000 185 454,000 151,000 3,024,000 3,024,000

Montgomery 7102 CHE 16150 Tokany Pkwy/Jenkintown Cr F BRDG STP 25,000 183 4,000 2,000 31,000 31,000

Montgomery 7102 CHE 16150 Tokany Pkwy/Jenkintown Cr U BRDG STP 42,000 183 8,000 2,000 52,000 52,000

Montgomery 7102 CHE 16150 Tokany Pkwy/Jenkintown Cr C BRDG STP 962,000 183 180,000 60,000 1,202,000 1,202,000

Montgomery 7103 0 98226 MapleAveO/Neshaminy Creek F BRDG 183 114,400 28,600 143,000 143,000

Montgomery 7103 0 98226 MapleAveO/Neshaminy Creek C BRDG 183 345,600 86,400 432,000 432,000

Montgomery 7104 BR 16216 Pennswood Rd O/AMTRAK U BRDG STU 640,000 183 120,000 40,000 800,000 800,000

Montgomery 7104 BR 16216 Pennswood Rd O/AMTRAK R BRDG STP 32,000 183 6,000 2,000 40,000 40,000

Montgomery 7104 BR 16216 Pennswood Rd O/AMTRAK C BRDG 581 4,152,000 219,000 4,371,000 4,371,000

Montgomery 7104 UAS 16248 Union Ave O/SEPTA C BRDG BOF 5,340,000 183 1,114,000 371,000 6,825,000 6,825,000

Montgomery 7104 UAS 16248 Union Ave O/SEPTA C BRDG BOF 526,000 526,000 526,000

Montgomery 7220 0 98227 Allendale RdO/AbramsCreek F BRDG 183 280,000 70,000 350,000 350,000

Montgomery 7220 0 98227 Allendale RdO/AbramsCreek C BRDG 183 520,000 130,000 650,000 650,000

Montgomery 7220 MCR 16396 E Church Rd O/SEPTA U BRDG STP 446,000 183 84,000 28,000 558,000 558,000

Montgomery 7220 MCR 16396 E Church Rd O/SEPTA C BRDG STP 3,366,000 183 631,000 210,000 4,207,000 4,207,000

Montgomery 7412 NNA 64798 N Narberth Ave O/AMTRAK U HRST STP 1,748,000 183 328,000 109,000 2,185,000 2,185,000

Montgomery 7412 NNA 64798 N Narberth Ave O/AMTRAK R HRST STP 849,000 183 159,000 53,000 1,061,000 1,061,000

Montgomery 7412 NNA 64798 N Narberth Ave O/AMTRAK C HRST STP 773,000 183 145,000 48,000 966,000 966,000

Montgomery 7412 NNA 64798 N Narberth Ave O/AMTRAK C HRST STP 4,773,000 183 895,000 298,000 5,966,000 5,966,000

Montgomery 9102 MG1 57858 Lafayette St:Ford - Consh F HCON STU 849,000 212,000 1,061,000 1,061,000

Montgomery 9102 MG1 57858 Lafayette St:Ford - Consh R HCON STU 2,546,000 637,000 3,183,000 3,183,000

Montgomery 9102 MGL 87392 LafayetteSt OffsiteImp(C) C HCON STU 856,000 1,089,000 1,945,000 1,945,000

Montgomery 9102 MGL 87392 LafayetteSt OffsiteImp(C) C HCON STU 856,000 1,089,000 1,945,000 1,945,000

Montgomery 9102 MGN 79864 Lafayette St(Brbds-Frd(2) C HCON STU 12,056,000 3,014,000 15,070,000 15,070,000

Totals for: Montgomery 48,292,988 17,391,500 7,824,000 73,508,488 65,474,000 21,423,000 4,387,000 91,284,000 71,355,000 47,825,441 2,204,000 121,384,441 66,153,000 32,330,000 4,224,000 102,707,000 388,883,929

Montour LBR 6339 T-325ov Chillisquaque Crk C BRDG BOF 160,000 183 105,000 35,000 300,000 300,000

Montour LBR 6339 T-325ov Chillisquaque Crk C BRDG STP 400,000 400,000 400,000

Montour LBR 6340 T-417 over Beaver Run P BRDG STP 54,000 183 9,125 3,375 66,500 66,500

Montour LBR 6340 T-417 over Beaver Run F BRDG STP 96,000 183 18,000 6,000 120,000 120,000

Montour LBR 6340 T-417 over Beaver Run U BRDG STP 32,000 183 6,000 2,000 40,000 40,000

Montour LBR 6340 T-417 over Beaver Run R BRDG STP 16,000 183 3,000 1,000 20,000 20,000

Montour LBR 6340 T-417 over Beaver Run C BRDG STP 320,000 183 60,000 20,000 400,000 400,000

Montour LBR 6340 T-417 over Beaver Run C BRDG BOF 320,000 183 60,000 20,000 400,000 400,000

Page 159: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

159 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montour LBR 88528 T-361 ov Md Br Chill Crk F BRDG BOF 72,000 183 13,500 4,500 90,000 90,000

Montour LBR 88528 T-361 ov Md Br Chill Crk U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Montour LBR 88528 T-361 ov Md Br Chill Crk R BRDG BOF 12,000 183 2,250 750 15,000 15,000

Montour LBR 88528 T-361 ov Md Br Chill Crk C BRDG STP 240,000 183 45,000 15,000 300,000 300,000

Montour LBR 88528 T-361 ov Md Br Chill Crk C BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Montour RBR 47939 T-347 over Chill. Creek C BRDG 183 40,000 10,000 50,000 50,000

Montour RBR 93124 Co Br #21 Mahoning Creek C BRDG 183 64,000 16,000 80,000 80,000

Montour 11 M09 84853 Clinic Rd to Columbia Co F HRST 581 25,000 25,000 25,000

Montour 11 M09 84853 Clinic Rd to Columbia Co +C HRST NHPP 1,800,000 1,800,000 1,800,000

Montour 54 075 91643 SR54/3009 Int Improvement C SAMI HSIP 71,200 71,200 71,200

Montour 54 076 93524 SR 54 over Stony Brook P BRDG STP 40,000 40,000 40,000

Montour 54 076 93524 SR 54 over Stony Brook F BRDG 185 20,000 20,000 20,000

Montour 54 076 93524 SR 54 over Stony Brook U BRDG 185 75,000 75,000 75,000

Montour 54 076 93524 SR 54 over Stony Brook R BRDG 185 25,000 25,000 25,000

Montour 54 076 93524 SR 54 over Stony Brook C BRDG 185 300,000 300,000 300,000

Montour 54 090 103853SR 54 Corridor Study S SAMI HSIP 200,000 200,000 200,000

Montour 54 89R 103036Continental Blvd RRX +C SAMI RRX 370,800 370,800 370,800

Montour 80 137 98433 I-80 Wbl ov Mahoning Crk +P BRDG NHPP 150,000 150,000 150,000

Montour 80 137 98433 I-80 Wbl ov Mahoning Crk +F BRDG NHPP 100,000 100,000 100,000

Montour 80 M21 87569 SR 54 to Columbia Co P HRST 581 800,000 800,000 800,000

Montour 80 M21 87569 SR 54 to Columbia Co C HRST 581 4,726,657 4,726,657 4,726,657

Montour 80 M21 87569 SR 54 to Columbia Co C HRST 581 4,323,343 4,323,343 4,323,343

Montour 80 M21 87569 SR 54 to Columbia Co C HRST 581 1,950,000 1,950,000 1,950,000

Montour 254 033 93525 SR 254 over Mud Creek F BRDG 185 20,000 20,000 20,000

Montour 254 033 93525 SR 254 over Mud Creek U BRDG 185 25,000 25,000 25,000

Montour 254 033 93525 SR 254 over Mud Creek R BRDG 185 15,000 15,000 15,000

Montour 254 033 93525 SR 254 over Mud Creek C BRDG 185 85,000 85,000 85,000

Montour 254 033 93525 SR 254 over Mud Creek C BRDG 185 65,000 65,000 65,000

Montour 254 043 98438 SR 254 ov Tb Mud Creek P BRDG 185 40,000 40,000 40,000

Montour 254 27M 88939 Cromley Dr to Columbia Co F HRST 581 20,000 20,000 20,000

Montour 254 27M 88939 Cromley Dr to Columbia Co C HRST 581 575,000 575,000 575,000

Montour 254 28M 88940 Northd Co to Laidacker Rd F HRST 581 25,000 25,000 25,000

Montour 254 28M 88940 Northd Co to Laidacker Rd C HRST 581 20,000 20,000 20,000

Montour 642 021 93608 SR 642 ov Tb Mahoning Crk P BRDG 185 40,000 40,000 40,000

Montour 642 021 93608 SR 642 ov Tb Mahoning Crk F BRDG 185 25,000 25,000 25,000

Montour 642 021 93608 SR 642 ov Tb Mahoning Crk U BRDG 185 35,000 35,000 35,000

Montour 642 021 93608 SR 642 ov Tb Mahoning Crk R BRDG 185 25,000 25,000 25,000

Montour 642 021 93608 SR 642 ov Tb Mahoning Crk C BRDG 185 150,000 150,000 150,000

Montour 642 025 98510 SR 642 over Beaver Run P BRDG 185 40,000 40,000 40,000

Montour 642 16M 87898 Northd Co to SR 45 F HRST 581 25,000 25,000 25,000

Page 160: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

160 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Montour 642 16M 87898 Northd Co to SR 45 C HRST 581 250,000 250,000 250,000

Montour 642 16M 87898 Northd Co to SR 45 C HRST 581 1,000,000 1,000,000 1,000,000

Montour 642 17M 87901 SR 54 to Diehl Road P HRST 581 20,000 20,000 20,000

Montour 642 17M 87901 SR 54 to Diehl Road F HRST 581 25,000 25,000 25,000

Montour 642 17M 87901 SR 54 to Diehl Road C HRST 581 900,000 900,000 900,000

Montour 642 17M 87901 SR 54 to Diehl Road C HRST 581 1,000,000 1,000,000 1,000,000

Montour 642 18M 87903 Diehl Road to Columbia Co C HRST 581 450,000 450,000 450,000

Montour 1003 031 98525 SR 44 to Lycoming Co. Ln C HRST 581 450,000 450,000 450,000

Montour 1003 031 98525 SR 44 to Lycoming Co. Ln C HRST 581 400,000 400,000 400,000

Montour 2102 001 87999 SR 2102 ov Tb Susq River U BRDG 185 20,000 20,000 20,000

Montour 2102 001 87999 SR 2102 ov Tb Susq River C BRDG 185 75,000 75,000 75,000

Montour 2102 001 87999 SR 2102 ov Tb Susq River C BRDG 185 75,000 75,000 75,000

Montour 3007 013 93650 SR 3007 ov Tb Mauses Crk P BRDG 185 40,000 40,000 40,000

Montour 3007 013 93650 SR 3007 ov Tb Mauses Crk F BRDG 185 25,000 25,000 25,000

Montour 3007 013 93650 SR 3007 ov Tb Mauses Crk R BRDG 185 25,000 25,000 25,000

Totals for: Montour 1,690,000 5,720,532 79,625 7,490,157 2,460,000 6,678,343 35,000 9,173,343 440,000 5,342,500 27,500 5,810,000 940,000 940,000 23,413,500

Northampton 102213RBR Initiative Line Item C BRDG 185 1,000,000 1,000,000 1,000,000

Northampton 102213RBR Initiative Line Item C BRDG 185 257,500 257,500 257,500

Northampton 102223Easton Two Way St convers P SAMI CAQ 515,000 515,000 515,000

Northampton 102223Easton Two Way St convers F SAMI CAQ 159,135 159,135 159,135

Northampton 102223Easton Two Way St convers U SAMI CAQ 53,045 53,045 53,045

Northampton 102223Easton Two Way St convers R SAMI CAQ 53,045 53,045 53,045

Northampton 102223Easton Two Way St convers C SAMI CAQ 1,688,250 1,688,250 1,688,250

Northampton 102717Sitgreaves Alley Conversn P TENH 10,000 10,000 10,000

Northampton 102718Easton Bike Education K-8 P TENH 10,000 10,000 10,000

Northampton 102722S. Bethlehem Pedstrn Impr P TENH 10,000 10,000 10,000

Northampton 102723Expansn Shared Lane Mrkng P TENH 10,000 10,000 10,000

Northampton 94895 LVTS BR Preserve&Repair 3 C BRDG 185 2,150,000 2,150,000 2,150,000

Northampton 94895 LVTS BR Preserve&Repair 3 C BRDG 185 2,595,000 2,595,000 2,595,000

Northampton 94895 LVTS BR Preserve&Repair 3 C BRDG 185 1,950,000 1,950,000 1,950,000

Northampton CRD 94603 SR 412 Connector Road C HCON STP 412,000 412,000 412,000

Northampton RND 102221LVTS Roundabout Study S SAMI CAQ 250,000 250,000 250,000

Northampton 145 01M 101556River View Dr Resurface P HRST 581 50,000 50,000 50,000

Northampton 191 01B 12105 Ackermanville Bridge C BRDG 185 15,000 15,000 15,000

Northampton 191 04X 98094 Broad St Nazareth RRX +C SAMI RRX 212,180 212,180 212,180

Northampton 191 04X 98094 Broad St Nazareth RRX +C SAMI RRX 212,180 212,180 212,180

Northampton 248 02S 93116 SR 248/946 Intersctn Impr F SAMI HSIP 255,000 255,000 255,000

Northampton 248 02S 93116 SR 248/946 Intersctn Impr U SAMI HSIP 61,800 61,800 61,800

Northampton 248 02S 93116 SR 248/946 Intersctn Impr R SAMI HSIP 123,600 123,600 123,600

Northampton 248 02S 93116 SR 248/946 Intersctn Impr C SAMI HSIP 901,765 901,765 901,765

Page 161: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

161 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Northampton 248 03S 94864 SR 248 and Walnut Drive C SAMI HSIP 456,187 456,187 456,187

Northampton 248 04S 94872 Northampton ST Corridor C SAMI CAQ 35,000 35,000 35,000

Northampton 248 05S 86853 Route 248 Realignment C HCON SXF 570,000 570,000 570,000

Northampton 248 06B 85939 SR 248 ovr Hokendauqua Cr F BRDG 185 309,000 309,000 309,000

Northampton 248 06B 85939 SR 248 ovr Hokendauqua Cr U BRDG NHPP 20,600 185 5,150 25,750 25,750

Northampton 248 06B 85939 SR 248 ovr Hokendauqua Cr R BRDG NHPP 41,200 185 10,300 51,500 51,500

Northampton 248 06B 85939 SR 248 ovr Hokendauqua Cr C BRDG 185 740,000 740,000 740,000

Northampton 248 06B 85939 SR 248 ovr Hokendauqua Cr C BRDG 185 426,990 426,990 426,990

Northampton 248 07B 92062 PA 248 /E Br Monocacy Crk P BRDG 185 350,000 350,000 350,000

Northampton 248 07B 92062 PA 248 /E Br Monocacy Crk P BRDG 185 136,000 136,000 136,000

Northampton 248 07B 92062 PA 248 /E Br Monocacy Crk U HRST 581 25,000 25,000 25,000

Northampton 248 07B 92062 PA 248 /E Br Monocacy Crk R BRDG 581 50,000 50,000 50,000

Northampton 248 07B 92062 PA 248 /E Br Monocacy Crk C BRDG 185 917,500 917,500 917,500

Northampton 248 08B 91992 248/Hokendauqua C -Moore P BRDG 185 350,000 350,000 350,000

Northampton 248 08B 91992 248/Hokendauqua C -Moore P BRDG 185 136,000 136,000 136,000

Northampton 248 08B 91992 248/Hokendauqua C -Moore U BRDG 581 25,000 25,000 25,000

Northampton 248 08B 91992 248/Hokendauqua C -Moore R BRDG 581 50,000 50,000 50,000

Northampton 248 08B 91992 248/Hokendauqua C -Moore C BRDG 185 825,000 825,000 825,000

Northampton 412 001 12327 SR 412 Improvement C HRST STU 1,000,000 581 250,000 1,250,000 1,250,000

Northampton 412 001 12327 SR 412 Improvement C HRST STU 3,000,000 581 750,000 3,750,000 3,750,000

Northampton 512 03X 95405 SR 512-Walnut St- RR Xing C SAMI RRX 41,800 41,800 41,800

Northampton 512 09M 94862 SR 512-Wind Gap to Bangor C HRST 581 4,150,000 4,150,000 4,150,000

Northampton 611 09B 12209 PA 611 Bushkill Creek Br. C BRDG STP 50,000 50,000 50,000

Northampton 946 02M 101548SR 946 Resurface C HRST 581 600,000 600,000 600,000

Northampton 946 02M 101548SR 946 Resurface C HRST 581 300,000 300,000 300,000

Northampton 1002 01M 101543SR 1002 Resurface C HRST 581 925,000 925,000 925,000

Northampton 1018 02B 12097 Messinger Street Bridge C BRDG STP 2,000,000 2,000,000 2,000,000

Northampton 1018 02B 12097 Messinger Street Bridge C BRDG STP 2,480,000 2,480,000 2,480,000

Northampton 1032 01B 85935 SR 1032 o/Jacoby Cr -Mill F BRDG 185 50,000 50,000 50,000

Northampton 1032 01B 85935 SR 1032 o/Jacoby Cr -Mill F BRDG 185 104,500 104,500 104,500

Northampton 1032 01B 85935 SR 1032 o/Jacoby Cr -Mill U BRDG BOF 12,731 185 3,183 15,914 15,914

Northampton 1032 01B 85935 SR 1032 o/Jacoby Cr -Mill R BRDG BOF 21,218 185 5,305 26,523 26,523

Northampton 1032 01B 85935 SR 1032 o/Jacoby Cr -Mill C BRDG 581 1,201,970 1,201,970 1,201,970

Northampton 1042 01B 89617 Kromer Road Bridge F BRDG 185 55,000 55,000 55,000

Northampton 1042 01B 89617 Kromer Road Bridge F BRDG 185 202,500 202,500 202,500

Northampton 1042 01B 89617 Kromer Road Bridge U BRDG 185 26,523 26,523 26,523

Northampton 1042 01B 89617 Kromer Road Bridge R BRDG 185 53,045 53,045 53,045

Northampton 1042 01B 89617 Kromer Road Bridge C BRDG 185 1,200,000 1,200,000 1,200,000

Northampton 1042 01B 89617 Kromer Road Bridge C BRDG 185 2,078,100 2,078,100 2,078,100

Northampton 2020 0 102156Easton Ave Corridor Imprv P SAMI CAQ 309,000 309,000 309,000

Page 162: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

162 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Northampton 2020 0 102156Easton Ave Corridor Imprv F SAMI CAQ 212,180 212,180 212,180

Northampton 2020 0 102156Easton Ave Corridor Imprv U SAMI CAQ 26,523 26,523 26,523

Northampton 2020 0 102156Easton Ave Corridor Imprv R SAMI CAQ 53,045 53,045 53,045

Northampton 2020 0 102156Easton Ave Corridor Imprv C SAMI CAQ 700,000 700,000 700,000

Northampton 2020 0 102156Easton Ave Corridor Imprv C SAMI CAQ 829,780 829,780 829,780

Northampton 2023 01B 92018 Third St o/ Bushkill Crk U BRDG NHPP 4,000 4,000 4,000

Northampton 2023 01B 92018 Third St o/ Bushkill Crk R BRDG NHPP 80,000 80,000 80,000

Northampton 2023 01B 92018 Third St o/ Bushkill Crk C BRDG 185 400,000 400,000 400,000

Northampton 2023 01B 92018 Third St o/ Bushkill Crk C BRDG 185 939,000 939,000 939,000

Northampton 3004 01B 89641 3004 ov Saucon Ck F BRDG 185 257,500 257,500 257,500

Northampton 3004 01B 89641 3004 ov Saucon Ck U BRDG STP 20,600 185 5,150 25,750 25,750

Northampton 3004 01B 89641 3004 ov Saucon Ck R BRDG STP 41,200 185 10,300 51,500 51,500

Northampton 3004 01B 89641 3004 ov Saucon Ck C BRDG 581 200,000 200,000 200,000

Northampton 3004 01B 89641 3004 ov Saucon Ck C BRDG 581 860,900 860,900 860,900

Northampton 3011 02B 93632 Fahy Bridge Rehab C BRDG NHPP 1,600,000 185 775,000 2,375,000 2,375,000

Northampton 3011 02B 93632 Fahy Bridge Rehab C BRDG STU 4,700,000 4,700,000 4,700,000

Northampton 3011 02B 93632 Fahy Bridge Rehab C BRDG NHPP 5,100,000 185 1,275,000 6,375,000 6,375,000

Northampton 3011 02B 93632 Fahy Bridge Rehab C BRDG NHPP 5,080,000 185 2,070,000 7,150,000 7,150,000

Northampton 3011 04M 96429 Center Street Resurface F HRST 581 15,914 15,914 15,914

Northampton 3011 04M 96429 Center Street Resurface U HRST 581 5,305 5,305 5,305

Northampton 3011 04M 96429 Center Street Resurface R HRST 581 26,523 26,523 26,523

Northampton 3011 04M 96429 Center Street Resurface C HRST 581 2,000,000 2,000,000 2,000,000

Northampton 3011 04M 96429 Center Street Resurface C HRST 581 725,675 725,675 725,675

Northampton 3015 0 102864Bethlehem Corr. Saftey +C SAMI RRX 546,364 546,364 546,364

Northampton 3015 0 102864Bethlehem Corr. Saftey +C SAMI RRX 546,363 546,363 546,363

Northampton 4020 03B 94349 SR4020 ovr Bertsch Creek C BRDG 581 1,591,350 1,591,350 1,591,350

Northampton 7209 436 12211 T-436 County BR 102 C BRDG BOF 1,100,000 183 206,250 68,750 1,375,000 1,375,000

Northampton 7209 436 12211 T-436 County BR 102 C BRDG BOF 1,042,400 183 195,450 65,150 1,303,000 1,303,000

Northampton 7301 BR 12080 High Street Bridge-Beth +C BRDG STU 381,060 381,060 381,060

Northampton 7301 BR 12080 High Street Bridge-Beth +C BRDG STU 619,090 619,090 619,090

Northampton 7301 LYN 12111 Lynn Ave Bridge C BRDG STU 2,000,000 2,000,000 2,000,000

Northampton 7301 LYN 12111 Lynn Ave Bridge C BRDG STU 1,920,000 1,920,000 1,920,000

Totals for: Northampton 15,041,860 6,773,650 98,750 21,914,260 16,892,544 13,550,598 75,150 30,518,292 6,538,544 10,759,860 17,298,404 3,064,393 4,803,775 7,868,168 77,599,124

Northumberland 09R 103043Rose Rd (T-768) RRX +C SAMI RRX 7,956 7,956 7,956

Northumberland 10R 103150Pottsville Street RRX +C SAMI RRX 164,800 164,800 164,800

Northumberland LBR 93642 T-802ovSBr RoaringCrk P BRDG STP 64,000 183 12,000 4,000 80,000 80,000

Northumberland LBR 93642 T-802ovSBr RoaringCrk P BRDG BOF 64,000 183 12,000 4,000 80,000 80,000

Northumberland LBR 93642 T-802ovSBr RoaringCrk F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Northumberland RBR 88853 T-608 over Warrior Run C BRDG 183 400,000 100,000 500,000 500,000

Northumberland 11 113 97653 Brg Ave to Old DanvilleRd F HCON NHPP 200,000 200,000 200,000

Page 163: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

163 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Northumberland 11 113 97653 Brg Ave to Old DanvilleRd U HCON 581 200,000 200,000 200,000

Northumberland 11 113 97653 Brg Ave to Old DanvilleRd C HCON 581 600,000 600,000 600,000

Northumberland 11 126 102632US 11 Soil Slide Repair C HCON NHPP 336,000 336,000 336,000

Northumberland 44 051 88796 SR 44 over Dry Run R BRDG 185 18,000 18,000 18,000

Northumberland 44 051 88796 SR 44 over Dry Run +C BRDG STP 262,000 262,000 262,000

Northumberland 44 051 88796 SR 44 over Dry Run +C BRDG STP 638,000 638,000 638,000

Northumberland 44 65R 103151SR 44 & Center St. RRX +C SAMI RRX 164,800 164,800 164,800

Northumberland 44 65R 103151SR 44 & Center St. RRX +C SAMI RRX 164,800 164,800 164,800

Northumberland 45 033 6754 SR45 ov Chillisquaque Crk +C BRDG STP 730,000 730,000 730,000

Northumberland 54 074 88778 SR 54 over Diebler Creek P BRDG STP 150,000 150,000 150,000

Northumberland 54 70M 87907 Boyd Station to Elysburg F HRST 581 30,000 30,000 30,000

Northumberland 54 70M 87907 Boyd Station to Elysburg C HRST 581 750,000 750,000 750,000

Northumberland 54 70M 87907 Boyd Station to Elysburg C HRST 581 1,750,000 1,750,000 1,750,000

Northumberland 54 71M 87909 Montour Co toBoyd Station F HRST 581 50,000 50,000 50,000

Northumberland 54 71M 87909 Montour Co toBoyd Station C HRST 581 200,000 200,000 200,000

Northumberland 61 103 87993 Northd Co Brg Painting C BRDG NHPP 180,000 180,000 180,000

Northumberland 61 115 96593 SR 61 ov Susquehanna Rvr P BRDG NHPP 60,000 60,000 60,000

Northumberland 61 115 96593 SR 61 ov Susquehanna Rvr F SAMI NHPP 50,000 50,000 50,000

Northumberland 61 115 96593 SR 61 ov Susquehanna Rvr C SAMI HSIP 300,000 300,000 300,000

Northumberland 61 115 96593 SR 61 ov Susquehanna Rvr C SAMI NHPP 1,500,000 1,500,000 1,500,000

Northumberland 61 97M 86882 Seventh St to SR 147 F HRST 581 20,000 20,000 20,000

Northumberland 61 97M 86882 Seventh St to SR 147 C HRST NHPP 700,000 700,000 700,000

Northumberland 61 M01 87905 Weigh Scales to Paxinos F HRST 581 25,000 25,000 25,000

Northumberland 61 M01 87905 Weigh Scales to Paxinos +C HRST NHPP 1,300,000 1,300,000 1,300,000

Northumberland 61 M01 87905 Weigh Scales to Paxinos +C HRST NHPP 900,000 900,000 900,000

Northumberland 61 M02 87910 Uniontown to Weigh Scales U HRST 581 50,000 50,000 50,000

Northumberland 61 M02 87910 Uniontown to Weigh Scales C HRST 581 1,309,657 1,309,657 1,309,657

Northumberland 61 M02 87910 Uniontown to Weigh Scales C HRST 581 5,440,343 5,440,343 5,440,343

Northumberland 125 015 88028 SR125 ovTb Mahantango Crk C BRDG 185 60,000 60,000 60,000

Northumberland 125 14M 87911 Burnside Rd to SR 61 F HRST 581 25,000 25,000 25,000

Northumberland 125 14M 87911 Burnside Rd to SR 61 +C HRST STP 1,000,000 1,000,000 1,000,000

Northumberland 125 14M 87911 Burnside Rd to SR 61 +C HRST STP 200,000 200,000 200,000

Northumberland 147 076 85623 SR 147 over Tb Susq River +P BRDG NHPP 50,000 50,000 50,000

Northumberland 147 110 96678 Packer IslandBr to 8th St P HCON 581 65,000 65,000 65,000

Northumberland 147 110 96678 Packer IslandBr to 8th St +F HCON NHPP 300,000 300,000 300,000

Northumberland 147 110 96678 Packer IslandBr to 8th St U HCON 581 250,000 250,000 250,000

Northumberland 147 110 96678 Packer IslandBr to 8th St +R HCON NHPP 150,000 150,000 150,000

Northumberland 147 110 96678 Packer IslandBr to 8th St C HCON 581 1,684,657 1,684,657 1,684,657

Northumberland 147 110 96678 Packer IslandBr to 8th St C HCON 581 5,815,343 5,815,343 5,815,343

Northumberland 147 80M 87908 SR 4020 to SR 4018 F HRST 581 25,000 25,000 25,000

Page 164: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

164 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Northumberland 147 80M 87908 SR 4020 to SR 4018 C HRST 581 400,000 400,000 400,000

Northumberland 147 80M 87908 SR 4020 to SR 4018 C HRST 581 2,000,000 2,000,000 2,000,000

Northumberland 147 81M 87947 SR 45 to Muddy Run F HRST 581 40,000 40,000 40,000

Northumberland 147 81M 87947 SR 45 to Muddy Run C HRST 581 600,000 600,000 600,000

Northumberland 147 81M 87947 SR 45 to Muddy Run C HRST 581 3,500,000 3,500,000 3,500,000

Northumberland 890 007 88798 Substructure Contract +P BRDG STP 100,000 100,000 100,000

Northumberland 890 007 88798 Substructure Contract +F BRDG STP 50,000 50,000 50,000

Northumberland 890 007 88798 Substructure Contract +U BRDG STP 20,000 20,000 20,000

Northumberland 890 007 88798 Substructure Contract +R BRDG STP 15,000 15,000 15,000

Northumberland 1005 017 87994 SEDA-COG Scour Contract F BRDG 185 5,000 5,000 5,000

Northumberland 1005 017 87994 SEDA-COG Scour Contract U BRDG 185 40,000 40,000 40,000

Northumberland 1005 017 87994 SEDA-COG Scour Contract R BRDG 185 40,000 40,000 40,000

Northumberland 1005 017 87994 SEDA-COG Scour Contract C BRDG 185 210,000 210,000 210,000

Northumberland 1005 017 87994 SEDA-COG Scour Contract C BRDG 185 190,000 190,000 190,000

Northumberland 1007 011 98531 SR1007ovBr Warrior Rn Crk P BRDG 185 40,000 40,000 40,000

Northumberland 1007 017 88776 SR1007 ov TbWarrior Rn Ck P BRDG 185 40,000 40,000 40,000

Northumberland 1007 017 88776 SR1007 ov TbWarrior Rn Ck F BRDG 185 20,000 20,000 20,000

Northumberland 1007 017 88776 SR1007 ov TbWarrior Rn Ck U BRDG 185 30,000 30,000 30,000

Northumberland 1007 017 88776 SR1007 ov TbWarrior Rn Ck R BRDG 185 25,000 25,000 25,000

Northumberland 1007 017 88776 SR1007 ov TbWarrior Rn Ck C BRDG 185 75,000 75,000 75,000

Northumberland 1016 003 82778 SR 1016 ov Tb Muddy Run F BRDG 185 20,000 20,000 20,000

Northumberland 1016 003 82778 SR 1016 ov Tb Muddy Run U BRDG 185 50,000 50,000 50,000

Northumberland 1016 003 82778 SR 1016 ov Tb Muddy Run R BRDG 185 25,000 25,000 25,000

Northumberland 1016 003 82778 SR 1016 ov Tb Muddy Run C BRDG 185 80,000 80,000 80,000

Northumberland 1016 003 82778 SR 1016 ov Tb Muddy Run C BRDG 185 70,000 70,000 70,000

Northumberland 2008 005 87990 SR2008 ov Tb Shamokin Crk P BRDG 185 60,000 60,000 60,000

Northumberland 2008 005 87990 SR2008 ov Tb Shamokin Crk F BRDG 185 20,000 20,000 20,000

Northumberland 2008 005 87990 SR2008 ov Tb Shamokin Crk U BRDG 185 30,000 30,000 30,000

Northumberland 2008 005 87990 SR2008 ov Tb Shamokin Crk R BRDG 185 25,000 25,000 25,000

Northumberland 2019 005 98538 SR 2019 over Quaker Run P BRDG 185 40,000 40,000 40,000

Northumberland 2022 005 6766 SR2022 ov Tb Shamokin Crk P BRDG 185 40,000 40,000 40,000

Northumberland 2022 005 6766 SR2022 ov Tb Shamokin Crk F BRDG 185 25,000 25,000 25,000

Northumberland 2022 005 6766 SR2022 ov Tb Shamokin Crk U BRDG 185 35,000 35,000 35,000

Northumberland 2022 005 6766 SR2022 ov Tb Shamokin Crk R BRDG 185 25,000 25,000 25,000

Northumberland 2034 008 98713 SR 61 to SR 54 C HRST 581 300,000 300,000 300,000

Northumberland 3018 002 79049 SR 3018 ov Mahantango Crk F BRDG 185 10,000 10,000 10,000

Northumberland 3018 002 79049 SR 3018 ov Mahantango Crk F BRDG 185 15,000 15,000 15,000

Northumberland 3018 002 79049 SR 3018 ov Mahantango Crk U BRDG 185 35,000 35,000 35,000

Northumberland 3018 002 79049 SR 3018 ov Mahantango Crk R BRDG 185 25,000 25,000 25,000

Northumberland 3018 002 79049 SR 3018 ov Mahantango Crk +C BRDG STP 500,000 500,000 500,000

Page 165: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

165 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Northumberland 3024 002 88801 SR3024ovTb Mahantango Crk P BRDG 185 40,000 40,000 40,000

Northumberland 3024 002 88801 SR3024ovTb Mahantango Crk F BRDG 185 25,000 25,000 25,000

Northumberland 3024 002 88801 SR3024ovTb Mahantango Crk U BRDG 185 35,000 35,000 35,000

Northumberland 3024 002 88801 SR3024ovTb Mahantango Crk R BRDG 185 25,000 25,000 25,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk P BRDG 185 40,000 40,000 40,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk F BRDG 185 20,000 20,000 20,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk U BRDG 185 30,000 30,000 30,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk R BRDG 185 25,000 25,000 25,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk C BRDG 185 85,000 85,000 85,000

Northumberland 4002 007 93603 SR 4002 ov Tb Wilson Crk C BRDG 185 65,000 65,000 65,000

Northumberland 4004 011 98722 Mile Post Rd to SR 4006 C HCON 581 200,000 200,000 200,000

Northumberland 4004 012 98540 SR4004ov Tb N Br Susq Rvr P BRDG 185 40,000 40,000 40,000

Northumberland 4009 014 97713 PA 61 to State Route 4012 C HRST 581 200,000 200,000 200,000

Northumberland 4018 015 93649 SR 4018 ov S Br Plum Crk P BRDG 185 40,000 40,000 40,000

Northumberland 4018 015 93649 SR 4018 ov S Br Plum Crk F BRDG 185 20,000 20,000 20,000

Northumberland 4018 015 93649 SR 4018 ov S Br Plum Crk U BRDG 185 30,000 30,000 30,000

Northumberland 4018 015 93649 SR 4018 ov S Br Plum Crk R BRDG 185 25,000 25,000 25,000

Northumberland 4018 015 93649 SR 4018 ov S Br Plum Crk C BRDG 185 150,000 150,000 150,000

Northumberland 4018 018 98921 SR4018ovTbIndianSprngCrk P BRDG 185 10,000 10,000 10,000

Northumberland 4018 018 98921 SR4018ovTbIndianSprngCrk C BRDG 185 50,000 50,000 50,000

Northumberland 4019 002 98542 SR4019ovTb Lt Mahanoy Crk P BRDG 185 40,000 40,000 40,000

Northumberland 4020 010 93526 SR4020 over Hallowing Run F BRDG 185 20,000 20,000 20,000

Northumberland 4020 010 93526 SR4020 over Hallowing Run U BRDG 185 30,000 30,000 30,000

Northumberland 4020 010 93526 SR4020 over Hallowing Run R BRDG 185 25,000 25,000 25,000

Northumberland 4020 010 93526 SR4020 over Hallowing Run C BRDG 185 150,000 150,000 150,000

Northumberland 4026 010 100502SR 890 to SR 61 C HRST 581 450,000 450,000 450,000

Totals for: Northumberland 4,705,600 2,463,000 100,000 7,268,600 3,098,756 4,456,657 4,000 7,559,413 1,152,000 10,702,000 4,000 11,858,000 1,461,000 11,243,343 6,000 12,710,343 39,396,356

Perry BRG 20494 T-405 Laurel Run Br No.3 P BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Perry BRG 20494 T-405 Laurel Run Br No.3 F BRDG BOF 120,000 183 22,500 7,500 150,000 150,000

Perry BRG 20494 T-405 Laurel Run Br No.3 U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Perry BRG 20494 T-405 Laurel Run Br No.3 R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Perry BRG 88807 Pine Hill Road Bridge C BRDG 183 340,000 85,000 425,000 425,000

Perry BRG 88807 Pine Hill Road Bridge C BRDG 183 69,600 17,400 87,000 87,000

Perry 11 040 69796 US 11/15 Rock Slope F HRST STP 164,000 581 41,000 205,000 205,000

Perry 11 040 69796 US 11/15 Rock Slope C SAMI 581 5,485,680 5,485,680 5,485,680

Perry 11 081 88922 West Main Street Bridge C BRDG NHPP 1,142,384 581 285,596 1,427,980 1,427,980

Perry 17 012 20581 Sunbury Path Bridge F BRDG 185 230,000 230,000 230,000

Perry 17 012 20581 Sunbury Path Bridge U BRDG 185 12,000 12,000 12,000

Perry 17 012 20581 Sunbury Path Bridge U BRDG 581 13,000 13,000 13,000

Perry 17 012 20581 Sunbury Path Bridge R BRDG 185 28,000 28,000 28,000

Page 166: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

166 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Perry 17 012 20581 Sunbury Path Bridge C BRDG STP 1,920,000 581 480,000 2,400,000 2,400,000

Perry 17 014 90887 Sunbury Path Resurfacing C HRST 581 418,864 418,864 418,864

Perry 17 015 96942 Sunbury Path Resurface 2 C HRST 409 2,090,493 2,090,493 2,090,493

Perry 17 016 100167Raccoon Val Rd over Juni P BRDG 185 286,295 286,295 286,295

Perry 17 016 100167Raccoon Val Rd over Juni P BRDG 581 13,705 13,705 13,705

Perry 17 016 100167Raccoon Val Rd over Juni +F BRDG 581 200,000 200,000 200,000

Perry 17 016 100167Raccoon Val Rd over Juni U BRDG 409 25,000 25,000 25,000

Perry 17 016 100167Raccoon Val Rd over Juni R BRDG 581 25,000 25,000 25,000

Perry 17 017 73959 Marsh Run Rd Bridge P BRDG 581 220,000 220,000 220,000

Perry 17 017 73959 Marsh Run Rd Bridge F BRDG 185 190,660 190,660 190,660

Perry 17 017 73959 Marsh Run Rd Bridge F BRDG 185 59,340 59,340 59,340

Perry 17 017 73959 Marsh Run Rd Bridge U BRDG 185 50,000 50,000 50,000

Perry 17 017 73959 Marsh Run Rd Bridge R BRDG 185 50,000 50,000 50,000

Perry 17 017 73959 Marsh Run Rd Bridge C BRDG 185 400,000 400,000 400,000

Perry 22 071 89276 US 22 Bridges over PA 34 +P BRDG 185 250,000 250,000 250,000

Perry 22 071 89276 US 22 Bridges over PA 34 F BRDG 581 300,000 300,000 300,000

Perry 22 071 89276 US 22 Bridges over PA 34 U BRDG 581 15,000 15,000 15,000

Perry 22 071 89276 US 22 Bridges over PA 34 R BRDG 581 15,000 15,000 15,000

Perry 22 071 89276 US 22 Bridges over PA 34 C BRDG STP 1,000,000 1,000,000 1,000,000

Perry 34 035 85655 PA 34 & PA 850 Intersect. U SAMI HSIP 45,000 581 5,000 50,000 50,000

Perry 34 035 85655 PA 34 & PA 850 Intersect. R SAMI HSIP 45,000 581 5,000 50,000 50,000

Perry 34 035 85655 PA 34 & PA 850 Intersect. C SAMI HSIP 1,175,000 1,175,000 1,175,000

Perry 34 039 94325 Newport Park & Ride C IMOD CAQ 200,000 200,000 200,000

Perry 34 039 94325 Newport Park & Ride C IMOD CAQ 650,000 650,000 650,000

Perry 34 042 97406 PA 34 Low Cost Safety C SAMI HSIP 1,120,000 1,120,000 1,120,000

Perry 34 044 100011Shermansdale Park-n-Ride P IMOD CAQ 200,000 200,000 200,000

Perry 34 044 100011Shermansdale Park-n-Ride F IMOD CAQ 250,000 250,000 250,000

Perry 849 015 63085 Buffalo Creek Bridge 4 P BRDG BOF 352 352 352

Perry 849 015 63085 Buffalo Creek Bridge 4 P BRDG STP 49,594 49,594 49,594

Perry 849 015 63085 Buffalo Creek Bridge 4 F BRDG BOF 304,000 185 76,000 380,000 380,000

Perry 849 015 63085 Buffalo Creek Bridge 4 U BRDG 185 5,000 5,000 5,000

Perry 849 015 63085 Buffalo Creek Bridge 4 R BRDG 185 110,000 110,000 110,000

Perry 849 015 63085 Buffalo Creek Bridge 4 C BRDG BOF 1,719,000 185 485,000 2,204,000 2,204,000

Perry 849 015 63085 Buffalo Creek Bridge 4 C BRDG STP 221,000 221,000 221,000

Perry 849 016 63087 Buffalo Creek Bridge 3 F BRDG BOF 297,648 185 74,412 372,060 372,060

Perry 849 016 63087 Buffalo Creek Bridge 3 R BRDG BOF 77,600 185 19,400 97,000 97,000

Perry 849 016 63087 Buffalo Creek Bridge 3 C BRDG STP 1,595,456 581 398,864 1,994,320 1,994,320

Perry 849 018 96293 Buffalo Trace Rd Resurf C HRST 409 2,200,000 2,200,000 2,200,000

Perry 849 019 90715 Creek Road Bridge P BRDG 185 100,000 100,000 100,000

Perry 849 019 90715 Creek Road Bridge F BRDG 581 75,000 75,000 75,000

Page 167: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

167 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Perry 849 019 90715 Creek Road Bridge U BRDG 185 10,000 10,000 10,000

Perry 849 019 90715 Creek Road Bridge R BRDG 581 10,000 10,000 10,000

Perry 849 019 90715 Creek Road Bridge C BRDG 581 500,000 500,000 500,000

Perry 850 013 92351 Fort Robinson Road 3 C HRST 409 2,207,220 2,207,220 2,207,220

Perry 850 013 92351 Fort Robinson Road 3 C HRST 409 892,780 892,780 892,780

Perry 850 014 99175 Perry Grp J Preservations C BRDG 185 699,986 699,986 699,986

Perry 850 014 99175 Perry Grp J Preservations C BRDG 581 200,014 200,014 200,014

Perry 1010 004 74507 Wildcat Creek Bridge F BRDG BOF 260,000 185 65,000 325,000 325,000

Perry 1010 004 74507 Wildcat Creek Bridge U BRDG 185 10,000 10,000 10,000

Perry 1010 004 74507 Wildcat Creek Bridge R BRDG 185 10,000 10,000 10,000

Perry 1010 004 74507 Wildcat Creek Bridge C BRDG STP 873,200 185 218,300 1,091,500 1,091,500

Perry 1015 013 100007Millerstown Park-n-Ride P IMOD CAQ 200,000 200,000 200,000

Perry 1015 013 100007Millerstown Park-n-Ride F IMOD CAQ 250,000 250,000 250,000

Perry 1015 014 87463 Juniata Parkway Bridge P BRDG 185 250,000 250,000 250,000

Perry 1015 014 87463 Juniata Parkway Bridge F BRDG 581 275,000 275,000 275,000

Perry 1015 014 87463 Juniata Parkway Bridge U BRDG 581 50,000 50,000 50,000

Perry 1015 014 87463 Juniata Parkway Bridge R BRDG 581 50,000 50,000 50,000

Perry 1015 014 87463 Juniata Parkway Bridge C BRDG 185 500,000 500,000 500,000

Perry 1023 003 87493 Creek Road Bridge # 2 F BRDG 185 200,000 200,000 200,000

Perry 1023 003 87493 Creek Road Bridge # 2 U BRDG 185 10,000 10,000 10,000

Perry 1023 003 87493 Creek Road Bridge # 2 R BRDG 185 50,000 50,000 50,000

Perry 1023 003 87493 Creek Road Bridge # 2 C BRDG 185 850,000 850,000 850,000

Perry 2003 021 87464 Mountain View Road Bridge P BRDG BOF 256,000 185 64,000 320,000 320,000

Perry 2003 021 87464 Mountain View Road Bridge F BRDG BOF 160,000 185 40,000 200,000 200,000

Perry 2003 021 87464 Mountain View Road Bridge U BRDG BOF 20,000 185 5,000 25,000 25,000

Perry 2003 021 87464 Mountain View Road Bridge R BRDG BOF 20,000 185 5,000 25,000 25,000

Perry 7203 BRG 20546 Dix Hill Br T-422 F BRDG BOF 100,000 183 18,750 6,250 125,000 125,000

Perry 7203 BRG 20546 Dix Hill Br T-422 U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Perry 7203 BRG 20546 Dix Hill Br T-422 R BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Perry 7203 BRG 20546 Dix Hill Br T-422 C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Perry 7212 BR 20503 Linton Hill Road Bridge P BRDG STP 140,000 183 26,250 8,750 175,000 175,000

Perry 7221 BRG 63069 T-506 Sulphur Spgs Rd BR C BRDG BOF 735,340 183 150,000 50,000 935,340 935,340

Perry 7221 BRG 63069 T-506 Sulphur Spgs Rd BR C BRDG STP 64,600 64,600 64,600

Totals for: Perry 3,615,578 5,478,272 85,000 9,178,850 4,604,596 6,848,522 88,650 11,541,768 4,400,000 8,474,075 8,750 12,882,825 3,435,000 1,864,340 35,000 5,334,340 38,937,783

Philadelphia 48195 Tyson Ave Signal Impr +C SAMI CAQ 4,196,000 1,243,000 5,439,000 5,439,000

Philadelphia 48195 Tyson Ave Signal Impr +C SAMI STU 777,000 777,000 777,000

Philadelphia 48195 Tyson Ave Signal Impr +C SAMI STU 1,583,000 396,000 1,979,000 1,979,000

Philadelphia 57902 City 3R Bttrmnts Line Itm P HRST STP 600,000 150,000 750,000 750,000

Philadelphia 57902 City 3R Bttrmnts Line Itm P HRST STP 200,000 50,000 250,000 250,000

Philadelphia 57902 City 3R Bttrmnts Line Itm F HRST STP 600,000 150,000 750,000 750,000

Page 168: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

168 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia 57902 City 3R Bttrmnts Line Itm F HRST STP 200,000 50,000 250,000 250,000

Philadelphia 57902 City 3R Bttrmnts Line Itm C HRST STP 9,200,000 2,904,000 12,104,000 12,104,000

Philadelphia 57902 City 3R Bttrmnts Line Itm C HRST STU 2,417,000 2,417,000 2,417,000

Philadelphia 57902 City 3R Bttrmnts Line Itm C HRST STP 2,000,000 500,000 2,500,000 2,500,000

Philadelphia 57927 Regional Safety Initiativ +C SAMI HSIP 3,495,160 3,495,160 3,495,160

Philadelphia 57927 Regional Safety Initiativ +C SAMI HSIP 9,125,000 9,125,000 9,125,000

Philadelphia 57927 Regional Safety Initiativ +C SAMI HSIP 11,858,000 11,858,000 11,858,000

Philadelphia 57927 Regional Safety Initiativ +C SAMI HSIP 11,858,000 11,858,000 11,858,000

Philadelphia 65109 Transit Flex - SEPTA P PT CAQ 17,083,000 17,083,000 17,083,000

Philadelphia 65109 Transit Flex - SEPTA P PT CAQ 17,083,000 17,083,000 17,083,000

Philadelphia 65109 Transit Flex - SEPTA P PT CAQ 17,083,000 17,083,000 17,083,000

Philadelphia 65109 Transit Flex - SEPTA P PT CAQ 17,083,000 17,083,000 17,083,000

Philadelphia 72597 DRPA B Frnkln Sfy Imp +F SPFED STU 400,000 400,000 400,000

Philadelphia 72597 DRPA B Frnkln Sfy Imp +C SPFED STU 3,350,000 3,350,000 3,350,000

Philadelphia 74822 N Dela Av Ext Phs 2 Stdy S PRA SXF 400,000 100,000 500,000 500,000

Philadelphia 74822 N Dela Av Ext Phs 2 Stdy P PRA SXF 400,000 106,000 506,000 506,000

Philadelphia 74822 N Dela Av Ext Phs 2 Stdy F PRA SXF 202,000 57,000 259,000 259,000

Philadelphia 74822 N Dela Av Ext Phs 2 Stdy U PRA SXF 400,000 116,000 516,000 516,000

Philadelphia 74822 N Dela Av Ext Phs 2 Stdy R PRA SXF 400,000 116,000 516,000 516,000

Philadelphia 74828 American Cities Earmark F TENH SXF 320,000 80,000 400,000 400,000

Philadelphia 74828 American Cities Earmark C TENH SXF 2,560,000 679,000 3,239,000 3,239,000

Philadelphia 74841 South Phila Access Rd U SAMI SXF 40,000 11,000 51,000 51,000

Philadelphia 74841 South Phila Access Rd R SAMI SXF 40,000 11,000 51,000 51,000

Philadelphia 74841 South Phila Access Rd C SAMI SXF 3,494,000 955,000 4,449,000 4,449,000

Philadelphia 82216 N H P P Reserve Item C HRST NHPP 385,000 581 1,444 386,444 386,444

Philadelphia 82216 N H P P Reserve Item C HRST NHPP 754,000 581 1,041,000 1,795,000 1,795,000

Philadelphia 82216 N H P P Reserve Item C HRST NHPP 50,000 581 254,125 304,125 304,125

Philadelphia 82216 N H P P Reserve Item C HRST 581 1,176,458 1,722,000 2,898,458 2,898,458

Philadelphia 102274Schuylkill R. Swing Brdg +P IMOD CAQ 424,000 424,000 424,000

Philadelphia 102280Broad St Ped Safety Imprv F SAMI 244 400,000 400,000 400,000

Philadelphia 102280Broad St Ped Safety Imprv C SAMI 244 800,000 800,000 800,000

Philadelphia 102281LED St. Liting Imprv Prgm F SAMI 244 260,000 260,000 260,000

Philadelphia 102281LED St. Liting Imprv Prgm C SAMI 244 590,000 590,000 590,000

Philadelphia 102305I-95 DELETE +C IMAN NHPP 6,365,400 6,365,400 6,365,400

Philadelphia 102309I-95 Corridor (D) C IMAN 581 5,463,636 5,463,636 5,463,636

Philadelphia 104275GHG/Energy Analysis S HRST SXF 80,000 20,000 100,000 100,000

Philadelphia 46958 Naval Base Access Rd F HCON SXF 552,000 138,000 690,000 690,000

Philadelphia 46958 Naval Base Access Rd C HCON SXF 2,405,847 581 2,100,000 601,462 5,107,309 5,107,309

Philadelphia 46958 Naval Base Access Rd C HCON 581 2,100,000 2,100,000 2,100,000

Philadelphia 48197 CSX Trenton Line C SAMI CAQ 1,350,000 1,350,000 1,350,000

Page 169: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

169 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia 48197 CSX Trenton Line C SAMI SXF 17,201 17,201 17,201

Philadelphia 84457 Signal re-timing Prog P SAMI CAQ 350,000 350,000 350,000

Philadelphia 84457 Signal re-timing Prog P SAMI CAQ 350,000 350,000 350,000

Philadelphia 86077 Travel Simulation Model P PRA STU 455,000 455,000 455,000

Philadelphia 86077 Travel Simulation Model P PRA STU 455,000 455,000 455,000

Philadelphia 87107 Philadelphia SRS C TENH SRTSF 1,000,000 1,000,000 1,000,000

Philadelphia 90482 ECG:Del/Alleg/LewTIGER(C) C TENH CAQ* 500,000 500,000 500,000

Philadelphia 96109 City ADA Ramps Project F HRST STP 467,000 117,000 584,000 584,000

Philadelphia 96109 City ADA Ramps Project C HRST STP 1,171,000 293,000 1,464,000 1,464,000

Philadelphia 96109 City ADA Ramps Project C HRST STP 3,200,000 800,000 4,000,000 4,000,000

Philadelphia 97311 TCDI Administration P HRST STU 100,000 100,000 100,000

Philadelphia 97311 TCDI Administration P HRST STU 100,000 100,000 100,000

Philadelphia 000 17891 RideECO Marketing PR P IMOD CAQ 160,000 40,000 200,000 200,000

Philadelphia 000 17891 RideECO Marketing PR P IMOD CAQ 160,000 40,000 200,000 200,000

Philadelphia 000 46956 Del Ave Ext/Bridesburg(C) F HCON STU 424,000 106,000 530,000 530,000

Philadelphia 000 46956 Del Ave Ext/Bridesburg(C) R HCON STU 874,000 219,000 1,093,000 1,093,000

Philadelphia 002 103218Ashton Rd Grade Xing +C SAMI RRX 213,847 213,847 213,847

Philadelphia 003 103219Blue Grass Rd Grade Xing +C SAMI RRX 213,847 213,847 213,847

Philadelphia 102 74859 City Wide 3R 102 C HRST STU 3,800 3,800 3,800

Philadelphia 223 96223 Philadelphia Signal Retim C SAMI CAQ 1,000,000 1,000,000 2,000,000 2,000,000

Philadelphia BKP 70243 American St Stscapes P SAMI STU 240,000 60,000 300,000 300,000

Philadelphia BKP 70243 American St Stscapes F SAMI STU 93,000 23,000 116,000 116,000

Philadelphia BKP 70243 American St Stscapes C SAMI STU 2,396,000 598,500 2,994,500 2,994,500

Philadelphia CEM 66461 CMAQ Proj Engr/Mgmt P IMOD CAQ 88,000 581 22,000 110,000 110,000

Philadelphia CEM 66461 CMAQ Proj Engr/Mgmt P IMOD CAQ 88,000 581 22,000 110,000 110,000

Philadelphia ELC 102399Phila TOC Electrical (C) C SAMI STU 264,690 66,173 330,863 330,863

Philadelphia LEG 72738 ITS Study-RIMIS P IMOD CAQ 560,000 581 140,000 700,000 700,000

Philadelphia LEG 72738 ITS Study-RIMIS P IMOD CAQ 560,000 581 140,000 700,000 700,000

Philadelphia LNE 64984 TAP/HTS/SR2S Line Item C TENH TAU 3,782,000 3,782,000 3,782,000

Philadelphia LNE 64984 TAP/HTS/SR2S Line Item C TENH TAU 3,782,000 3,782,000 3,782,000

Philadelphia LNE 64984 TAP/HTS/SR2S Line Item C TENH TAU 3,782,000 3,782,000 3,782,000

Philadelphia LNE 64984 TAP/HTS/SR2S Line Item C TENH CAQ 1,000,000 1,000,000 1,000,000

Philadelphia LNE 64984 TAP/HTS/SR2S Line Item C TENH TAU 3,782,000 3,782,000 3,782,000

Philadelphia MCR 77452 Manayunk Canal Rest (C) C TENH STU 249,730 237,067 486,797 486,797

Philadelphia MEC 102400Phila TOC Mechanical (C) C SAMI STU 45,665 11,416 57,081 57,081

Philadelphia PLU 102401Phila TOC Plumbing (C) C SAMI STU 21,455 5,364 26,819 26,819

Philadelphia RLE 104176ARLE FiberOpt Network Exp C SAMI 244 500,000 500,000 500,000

Philadelphia RLE 104177ARLE Phila Intersec Upgrd C SAMI 244 1,000,000 1,000,000 1,000,000

Philadelphia RLE 104178ARLE Phila Roundabouts C SAMI 244 1,000,000 1,000,000 1,000,000

Philadelphia RLE 104179ARLE Phila Traffic Calm C SAMI 244 1,000,000 1,000,000 1,000,000

Page 170: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

170 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia SC2 61712 K&T Trail Sec 2 F TENH SXF 75,000 75,000 75,000

Philadelphia SC2 61712 K&T Trail Sec 2 C TENH SXF 4,000,000 4,000,000 4,000,000

Philadelphia SC2 61712 K&T Trail Sec 2 C TENH SXF 4,000,000 4,000,000 4,000,000

Philadelphia SC2 61712 K&T Trail Sec 2 C TENH SXF 3,431,000 3,431,000 3,431,000

Philadelphia SC2 61712 K&T Trail Sec 2 C TENH CAQ 1,000,000 1,000,000 1,000,000

Philadelphia SPB 91573 South St PedestrianRmp(C) C SAMI CAQ* 1,000,000 1,000,000 1,000,000

Philadelphia SRG 68067 Brdwlk:Locust-So TIGER(C) C SAMI CAQ* 2,500,000 2,500,000 2,500,000

Philadelphia TCD 64652 Trans&Comm Dev Init(TCDI) P IMOD STU 1,200,000 300,000 1,500,000 1,500,000

Philadelphia TEM 66460 TAP Project Engr/Mgment P TENH STU 480,000 581 120,000 600,000 600,000

Philadelphia TEM 66460 TAP Project Engr/Mgment P TENH STU 480,000 581 120,000 600,000 600,000

Philadelphia TOW 91490 Expwy Ptrl 2011-14 Phila C HRST NHPP 2,334,000 2,334,000 2,334,000

Philadelphia VAR 91837 CityWide Resurfcng103B(C) C HRST STU 1,086,610 271,653 1,358,263 1,358,263

Philadelphia 1 PC1 102388Roosevelt Blvd Resurfc(C) C HRST 581 4,500,000 4,500,000 4,500,000

Philadelphia 1 PCS 17511 City Ave o/ SEPTA P BRDG NHPP 412,000 185 103,000 515,000 515,000

Philadelphia 1 PCS 17511 City Ave o/ SEPTA F BRDG NHPP 450,000 185 113,000 563,000 563,000

Philadelphia 1 WAV 83736 Rsvlt Blvd o/Wayne Junc P BRDG NHPP 170,000 185 42,000 212,000 212,000

Philadelphia 1 WAV 83736 Rsvlt Blvd o/Wayne Junc F BRDG 581 3,183,000 3,183,000 3,183,000

Philadelphia 1 WAV 83736 Rsvlt Blvd o/Wayne Junc U BRDG NHPP 990,000 185 248,000 1,238,000 1,238,000

Philadelphia 1 WAV 83736 Rsvlt Blvd o/Wayne Junc R BRDG NHPP 481,000 185 120,000 601,000 601,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch P BRDG STU 340,000 185 85,000 425,000 425,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch F BRDG NHPP 5,135,000 185 1,464,000 6,599,000 6,599,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch F BRDG STU 720,000 720,000 720,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch U BRDG NHPP 2,885,000 185 721,000 3,606,000 3,606,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch R BRDG NHPP 962,000 185 240,000 1,202,000 1,202,000

Philadelphia 3 CH1 17816 Chestnut St@30th St o/Sch C BRDG NHPP 10,302,000 185 2,576,000 12,878,000 12,878,000

Philadelphia 13 RBR 92809 Roosevelt Blvd Exit P BRDG 185 232,000 232,000 232,000

Philadelphia 30 PGC 78764 W Girard Ave O/CSX F BRDG STU 36,000 185 9,000 45,000 45,000

Philadelphia 30 PGC 78764 W Girard Ave O/CSX R BRDG BOF 36,000 185 9,000 45,000 45,000

Philadelphia 30 PGC 78764 W Girard Ave O/CSX C BRDG BOF 771,000 185 193,000 964,000 964,000

Philadelphia 76 PC2 102389I-76/I-76Ramp Resurfac(C) C IMAN 581 750,000 750,000 750,000

Philadelphia 95 AFC 47813 I-95: Ann St - Wheatsheaf P IMAN 581 3,500,000 3,500,000 3,500,000

Philadelphia 95 BR0 79903 I-95: Betsy Ross Ramps(C) C IMAN NHPP 1,200,228 1,200,228 1,200,228

Philadelphia 95 BR0 79903 I-95: Betsy Ross Ramps(C) C IMAN NHPP 54,440,550 54,440,550 54,440,550

Philadelphia 95 BR0 79903 I-95: Betsy Ross Ramps(C) C IMAN NHPP 54,635,000 54,635,000 54,635,000

Philadelphia 95 BR0 79903 I-95: Betsy Ross Ramps(C) C IMAN NHPP 30,000,000 30,000,000 30,000,000

Philadelphia 95 BR0 79903 I-95: Betsy Ross Ramps(C) C IMAN NHPP 30,000,000 30,000,000 30,000,000

Philadelphia 95 BRI 47812 I-95: BetsyRoss Design F IMAN NHPP 2,400,000 581 600,000 3,000,000 3,000,000

Philadelphia 95 BRI 47812 I-95: BetsyRoss Design F IMAN NHPP 3,200,000 581 800,000 4,000,000 4,000,000

Philadelphia 95 BRI 47812 I-95: BetsyRoss Design R IMAN NHPP* 5,635,323 581* 626,147 6,261,470 6,261,470

Philadelphia 95 BS1 79908 I-95: Kennedy-Levick +C IMAN NHPP 29,351,567 29,351,567 29,351,567

Page 171: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

171 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia 95 BS1 79908 I-95: Kennedy-Levick +C IMAN NHPP 29,351,567 29,351,567 29,351,567

Philadelphia 95 BS1 79908 I-95: Kennedy-Levick +C IMAN NHPP 29,351,566 29,351,566 29,351,566

Philadelphia 95 BS2 79910 I-95: Margaret-Kennedy +C IMAN NHPP 39,611,354 39,611,354 39,611,354

Philadelphia 95 BS2 79910 I-95: Margaret-Kennedy +C IMAN NHPP 39,611,354 39,611,354 39,611,354

Philadelphia 95 BSR 47811 I-95: Bridge St Design F IMAN NHPP* 7,830,000 581* 870,000 8,700,000 8,700,000

Philadelphia 95 BSR 47811 I-95: Bridge St Design F IMAN NHPP 5,400,000 581 600,000 6,000,000 6,000,000

Philadelphia 95 BSR 47811 I-95: Bridge St Design U IMAN NHPP 4,726,946 581 525,217 5,252,163 5,252,163

Philadelphia 95 BSR 47811 I-95: Bridge St Design U IMAN NHPP 4,726,946 581 525,216 5,252,162 5,252,162

Philadelphia 95 BSR 47811 I-95: Bridge St Design U IMAN NHPP 4,726,946 581 525,216 5,252,162 5,252,162

Philadelphia 95 BSR 47811 I-95: Bridge St Design R IMAN NHPP 4,514,786 581 501,644 5,016,430 5,016,430

Philadelphia 95 BSR 47811 I-95: Bridge St Design R IMAN NHPP 4,514,786 581 501,643 5,016,429 5,016,429

Philadelphia 95 CAP 104243I-95 Conceptual Study S HRST NHPP 2,000,000 2,000,000 4,000,000 4,000,000

Philadelphia 95 CMP 98207 I-95 Congestion Managemnt P PRA NHPP 18,300,000 18,300,000 18,300,000

Philadelphia 95 CMP 98207 I-95 Congestion Managemnt P PRA NHPP 5,100,000 5,100,000 5,100,000

Philadelphia 95 CP2 17918 I-95: Trans Improve C IMOD STU 470,000 117,000 587,000 587,000

Philadelphia 95 CP2 17918 I-95: Trans Improve C IMOD STP 494,000 123,000 617,000 617,000

Philadelphia 95 CP2 79685 Cttmn-Prnc Main Ln Rmp(C) C IMAN NHPP 6,300,000 581 700,000 7,000,000 7,000,000

Philadelphia 95 CP2 79685 Cttmn-Prnc Main Ln Rmp(C) C IMAN NHPP 6,300,000 581 700,000 7,000,000 7,000,000

Philadelphia 95 CPR 47394 I-95: Levick St - Bleigh U IMAN NHPP* 1,800,000 581* 200,000 2,000,000 2,000,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann F XRST NHPP 16,000,000 581 4,000,000 20,000,000 20,000,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann F XRST NHPP 16,000,000 581 4,000,000 20,000,000 20,000,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann U XRST NHPP 2,000,000 581 500,000 2,500,000 2,500,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann U XRST NHPP 2,000,000 581 500,000 2,500,000 2,500,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann U XRST NHPP 2,000,000 581 500,000 2,500,000 2,500,000

Philadelphia 95 GIR 17821 I-95: Shackamaxon - Ann U XRST NHPP 2,000,000 581 500,000 2,500,000 2,500,000

Philadelphia 95 GR1 79686 I-95: Columbia - Ann(C) +R IRST NHPP 2,500,000 2,500,000 2,500,000

Philadelphia 95 GR1 79686 I-95: Columbia - Ann(C) C IRST NHPP 2,666,000 581 667,000 3,333,000 3,333,000

Philadelphia 95 GR1 79686 I-95: Columbia - Ann(C) C IRST NHPP 2,666,000 581 667,000 3,333,000 3,333,000

Philadelphia 95 GR1 79686 I-95: Columbia - Ann(C) C IRST NHPP 2,667,000 581 667,000 3,334,000 3,334,000

Philadelphia 95 GR2 79825 I-95 ShackamxnColumbia(C) U HCON STU 1,000,000 1,000,000 1,000,000

Philadelphia 95 GR2 83640 I-95 Shackama-Columbia(C) C IMAN NHPP 4,500,000 185 250,000 4,750,000 4,750,000

Philadelphia 95 GR2 83640 I-95 Shackama-Columbia(C) C IMAN 581 250,000 250,000 250,000

Philadelphia 95 GR3 79826 I-95N:Columbia-AnnSt N(C) C IMAN NHPP* 55,000,000 55,000,000 55,000,000

Philadelphia 95 GR3 79826 I-95N:Columbia-AnnSt N(C) C IMAN NHPP* 40,000,000 40,000,000 40,000,000

Philadelphia 95 GR3 79826 I-95N:Columbia-AnnSt N(C) C IMAN NHPP* 30,000,000 30,000,000 30,000,000

Philadelphia 95 GR3 79826 I-95N:Columbia-AnnSt N(C) C IMAN NHPP* 22,129,629 22,129,629 22,129,629

Philadelphia 95 GR4 79827 I-95S: Columbia-Ann St N U IMAN NHPP 4,296,645 581 477,405 4,774,050 4,774,050

Philadelphia 95 GR4 79827 I-95S: Columbia-Ann St N U IMAN NHPP 4,296,645 581 477,405 4,774,050 4,774,050

Philadelphia 95 GR4 79827 I-95S: Columbia-Ann St N +C IMAN NHPP 10,000,000 10,000,000 10,000,000

Philadelphia 95 GR5 79828 I-95: Race - Shackamaxon R IMAN NHPP* 3,960,000 581* 440,000 4,400,000 4,400,000

Page 172: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

172 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia 95 GR5 79828 I-95: Race - Shackamaxon R IMAN NHPP* 3,960,000 581* 440,000 4,400,000 4,400,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 U BRDG STU 710,000 179 45,000 755,000 755,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 U BRDG 183 133,000 133,000 133,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 R BRDG STU 354,000 179 22,000 376,000 376,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 R BRDG 183 67,000 67,000 67,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG NHPP 8,303,000 8,303,000 8,303,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG STU 8,158,000 8,158,000 8,158,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG BOF 1,138,000 1,138,000 1,138,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG STU 4,624,000 4,624,000 4,624,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG BOF 2,049,000 2,049,000 2,049,000

Philadelphia 676 PAA 88767 Vine Brdgs:21st & 22nd #1 C BRDG STU 8,505,000 8,505,000 8,505,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr P BRDG NHPP 300,000 300,000 300,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr P BRDG STU 140,000 140,000 140,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr P BRDG STU 300,000 300,000 300,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr F BRDG NHPP 265,000 185 141,000 406,000 406,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr U BRDG NHPP 296,000 296,000 296,000

Philadelphia 1002 PAT 17622 Adams Ave over Tacony Cr R BRDG NHPP 296,000 185 148,000 444,000 444,000

Philadelphia 1004 SIP 85419 Erie Av: Broad St. - K St C SAMI HSIP 4,500,000 4,500,000 4,500,000

Philadelphia 1011 PWB 69909 Willits Road Bridge F BRDG 185 700,000 700,000 700,000

Philadelphia 1011 PWB 69909 Willits Road Bridge U BRDG 185 292,000 292,000 292,000

Philadelphia 1011 PWB 69909 Willits Road Bridge R BRDG 185 292,000 292,000 292,000

Philadelphia 1011 PWB 69909 Willits Road Bridge C BRDG 185 3,005,000 3,005,000 3,005,000

Philadelphia 1026 H03 17782 Adams Av/Aramingo Connctr F HCON STU 127,000 581 32,000 159,000 159,000

Philadelphia 1026 H03 17782 Adams Av/Aramingo Connctr U HCON STU 1,801,000 581 450,000 2,251,000 2,251,000

Philadelphia 1026 H03 17782 Adams Av/Aramingo Connctr R HCON 581 2,122,000 2,122,000 2,122,000

Philadelphia 2001 E1B 102102Delaware Ave Trail Ext 1B C HCON STP 4,502,000 1,126,000 5,628,000 5,628,000

Philadelphia 2016 SIP 85417 AlleghnyAv:Ridge-Aramingo F SAMI HSIP 955,000 955,000 955,000

Philadelphia 3009 PAR 92554 Ridge Ave o/ AMTRAK F BRDG STU 656,000 185 164,000 820,000 820,000

Philadelphia 3010 MSB 69828 Market Street Bridge F BRDG NHPP 3,268,000 185 817,000 4,085,000 4,085,000

Philadelphia 3010 MSB 69828 Market Street Bridge C BRDG 581 9,768,000 9,768,000 9,768,000

Philadelphia 3010 MSB 69828 Market Street Bridge C BRDG 581 14,094,000 14,094,000 14,094,000

Philadelphia 3011 22S 16944 29th St Br/Amtrak (F) R HRST STU 1,000 1,000 1,000

Philadelphia 3013 TF2 17697 Islnd Ave: Elmwd - Suflk P SAMI CAQ 80,000 20,000 100,000 100,000

Philadelphia 3013 TF2 17697 Islnd Ave: Elmwd - Suflk F SAMI CAQ 170,000 42,000 212,000 212,000

Philadelphia 3013 TF2 17697 Islnd Ave: Elmwd - Suflk C SAMI CAQ 8,104,000 2,026,000 10,130,000 10,130,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge F BRDG NHPP 424,000 424,000 424,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge U BRDG 185 106,000 106,000 106,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge C BRDG NHPP 6,666,000 185 1,667,000 8,333,000 8,333,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge C BRDG NHPP 6,666,000 185 1,667,000 8,333,000 8,333,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge C BRDG NHPP 6,666,000 185 1,917,000 8,583,000 8,583,000

Page 173: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

173 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge C BRDG STU 1,000,000 1,000,000 1,000,000

Philadelphia 3019 PDB 62694 Passyunk Ave Drawbridge C BRDG NHPP 1,000,000 185 250,000 1,250,000 1,250,000

Philadelphia 3021 GFB 69913 Grays Ferry Ave O/Schuylk U BRDG 185 656,000 656,000 656,000

Philadelphia 3021 GFB 69913 Grays Ferry Ave O/Schuylk R BRDG 185 265,000 265,000 265,000

Philadelphia 3021 GFB 69913 Grays Ferry Ave O/Schuylk +C BRDG 581 7,883,000 7,883,000 7,883,000

Philadelphia 3037 JFK 78758 JFK Blvd o/21st 22nd 23rd C BRDG 581 13,659,000 13,659,000 13,659,000

Philadelphia 4003 14B 48193 Allens Lane O/SEPTA C BRDG 581 5,464,000 5,464,000 5,464,000

Philadelphia 4007 CL1 69664 Clarissa St O/CONRAIL(C) C BRDG STU 73,736 73,736 73,736

Philadelphia 4013 0 57901 Lincoln: Ridge -Wissa C HRST STP 5,304,000 1,326,000 6,630,000 6,630,000

Philadelphia 4013 0 57901 Lincoln: Ridge -Wissa C HRST STP 1,583,000 396,000 1,979,000 1,979,000

Philadelphia 4013 WLB 92376 Walnut Lane o/Wissahickon C BRDG NHPP* 3,000,000 3,000,000 3,000,000

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK F BRDG BOF 339,200 179 21,200 360,400 360,400

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK F BRDG 183 63,600 63,600 63,600

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK U BRDG STP 849,000 179 53,000 902,000 902,000

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK U BRDG 183 159,000 159,000 159,000

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK C BRDG STP 4,808,000 179 600,000 5,408,000 5,408,000

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK C BRDG 183 902,000 902,000 902,000

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK C BRDG STU 3,602,000 183 675,375 4,277,375 4,277,375

Philadelphia 7301 185 57276 Montgmry Av O/AMTRAK C BRDG STU 1,206,000 183 226,625 1,432,625 1,432,625

Philadelphia 7301 606 56768 41st St O/AMTRAK C BRDG STU 3,562,000 179 786,000 4,348,000 4,348,000

Philadelphia 7301 606 56768 41st St O/AMTRAK C BRDG 183 780,750 780,750 780,750

Philadelphia 7301 606 56768 41st St O/AMTRAK C BRDG STU 6,424,000 183 1,204,500 7,628,500 7,628,500

Philadelphia 7301 606 56768 41st St O/AMTRAK C BRDG STU 2,502,000 183 372,150 2,874,150 2,874,150

Philadelphia 7301 624 76870 Wllw Grv Av O/SEPTA (C) U BRDG BOF 247,000 179 62,000 309,000 309,000

Philadelphia 7301 GAV 88085 Byberry Road/ CSX P BRDG STU 40,000 581 10,000 50,000 50,000

Philadelphia 7301 GAV 88085 Byberry Road/ CSX F BRDG STP 2,037,000 581 509,000 2,546,000 2,546,000

Philadelphia 7301 GAV 88085 Byberry Road/ CSX U BRDG 581 900,000 900,000 900,000

Philadelphia 7301 GAV 88085 Byberry Road/ CSX R BRDG STP 87,000 581 22,000 109,000 109,000

Philadelphia 7301 GAV 88085 Byberry Road/ CSX C BRDG STP 3,204,000 581 801,000 4,005,000 4,005,000

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 U BRDG NHPP 2,122,000 2,122,000 2,122,000

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 C BRDG NHPP 20,434,000 20,434,000 20,434,000

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 C BRDG NHPP 27,288,000 27,288,000 27,288,000

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 C BRDG NHPP 22,988,000 22,988,000 22,988,000

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 C BRDG NHPP 23,336,500 23,336,500 23,336,500

Philadelphia 7301 PAB 80054 Vine Brs:20,BnFrkPr,Lib#3 C BRDG STU 1,903,500 1,903,500 1,903,500

Totals for: Philadelphia 289,757,134 33,208,799 8,436,673 331,402,606 303,575,344 38,355,209 3,792,000 345,722,553 270,389,512 26,957,782 7,359,000 304,706,294 238,916,036 33,801,966 1,931,962 274,649,964 1,256,481,417

Pike 73295 NEPA 4-0 Highway Line Itm C HRST STP 310,000 581 170,000 480,000 480,000

Pike 73295 NEPA 4-0 Highway Line Itm C HRST STP 18,800 581 17,200 36,000 36,000

Pike 73295 NEPA 4-0 Highway Line Itm C HRST 581 200,000 200,000 200,000

Pike 84386 NEPA 4-0 Bridge Review P BRDG 185 25,000 25,000 25,000

Page 174: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

174 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Pike 84386 NEPA 4-0 Bridge Review P BRDG 185 25,000 25,000 25,000

Pike 84386 NEPA 4-0 Bridge Review P BRDG 185 50,000 50,000 50,000

Pike 102316Pike 916 oversight costs C BRDG 185 50,000 50,000 50,000

Pike 102357RBR Initiative C BRDG 185 95,500 95,500 95,500

Pike 102357RBR Initiative C BRDG 185 95,500 95,500 95,500

Pike 102357RBR Initiative C BRDG 185 95,500 95,500 95,500

Pike 102357RBR Initiative C BRDG 185 95,500 95,500 95,500

Pike 86916 NEPA 4-0 Project Delivery P BRDG 185 50,000 50,000 50,000

Pike 86916 NEPA 4-0 Project Delivery P HRST 581 50,000 50,000 50,000

Pike 0 73296 NEPA 4-0 Bridge Line Item C BRDG BOF 385,000 185 192,500 577,500 577,500

Pike 0 73296 NEPA 4-0 Bridge Line Item C BRDG 185 45,250 45,250 45,250

Pike 0 73296 NEPA 4-0 Bridge Line Item C BRDG 185 196,250 196,250 196,250

Pike 0 73296 NEPA 4-0 Bridge Line Item C BRDG 185 121,250 121,250 121,250

Pike 6 408 57765 Milford to Matamoras Bet +C HRST NHPP 253,000 253,000 253,000

Pike 6 408 57765 Milford to Matamoras Bet +C HRST NHPP 253,000 253,000 253,000

Pike 6 408 57765 Milford to Matamoras Bet +C HRST NHPP 253,000 253,000 253,000

Pike 6 408 57765 Milford to Matamoras Bet +C HRST NHPP 253,000 253,000 253,000

Pike 84 417 98237 I-84 WB Mill/Fill 2014-15 C IMAN 581 6,000,000 6,000,000 6,000,000

Pike 84 449 76860 Pike I-84 I4R E34 - MP 40 R IMAN NHPP 42,642 581 4,738 47,380 47,380

Pike 84 449 76860 Pike I-84 I4R E34 - MP 40 +C IMAN NHPP 27,000,000 27,000,000 27,000,000

Pike 84 449 76860 Pike I-84 I4R E34 - MP 40 +C IMAN NHPP 47,000,000 47,000,000 47,000,000

Pike 84 449 76860 Pike I-84 I4R E34 - MP 40 +C IMAN NHPP 7,000,000 7,000,000 7,000,000

Pike 84 450 76861 I-84 E&W I-4R Wayne - E26 F IMAN NHPP 1,390,500 581 154,500 1,545,000 1,545,000

Pike 84 450 76861 I-84 E&W I-4R Wayne - E26 F IMAN NHPP 1,390,500 581 154,500 1,545,000 1,545,000

Pike 84 450 76861 I-84 E&W I-4R Wayne - E26 R IMAN NHPP 47,741 581 5,304 53,045 53,045

Pike 84 450 76861 I-84 E&W I-4R Wayne - E26 +C IMAN NHPP 26,717,722 26,717,722 26,717,722

Pike 84 450 76861 I-84 E&W I-4R Wayne - E26 +C IMAN NHPP 26,717,722 26,717,722 26,717,722

Pike 84 494 85766 I-84 E&W I-4R MP 40 - E46 F IMAN NHPP 2,864,430 581 318,270 3,182,700 3,182,700

Pike 84 494 85766 I-84 E&W I-4R MP 40 - E46 R IMAN NHPP 47,741 581 5,305 53,046 53,046

Pike 84 494 85766 I-84 E&W I-4R MP 40 - E46 +C IMAN NHPP 7,932,598 7,932,598 7,932,598

Pike 84 495 87795 I-84 E&W I-4R E26 to E34 F IMAN 581 1,182,700 1,182,700 1,182,700

Pike 84 495 87795 I-84 E&W I-4R E26 to E34 F IMAN 581 2,000,000 2,000,000 2,000,000

Pike 390 473 68833 Fairview outlet Bridge C BRDG 185 690,000 690,000 690,000

Pike 434 SLD 96802 SR 434 Slide C HRST 581 725,000 725,000 725,000

Pike 507 451 93932 SR 507 ov E Br Wallen Cr C BRDG 185 870,000 870,000 870,000

Pike 507 451 93932 SR 507 ov E Br Wallen Cr C BRDG 185 200,000 200,000 200,000

Pike 590 401 57769 SR 590 Pipes R HRST STP 80,000 581 20,000 100,000 100,000

Pike 590 401 57769 SR 590 Pipes C HRST STP 320,000 581 80,000 400,000 400,000

Pike 590 401 57769 SR 590 Pipes C HRST STP 920,000 581 230,000 1,150,000 1,150,000

Pike 590 401 57769 SR 590 Pipes C HRST STP 731,200 581 182,800 914,000 914,000

Page 175: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

175 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +F SAMI HSIP 464,500 464,500 464,500

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +F SAMI HSIP 247,500 247,500 247,500

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +U SAMI HSIP 40,000 40,000 40,000

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS R SAMI HSIP 155,000 155,000 155,000

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +C SAMI HSIP 95,000 95,000 95,000

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +C SAMI HSIP 459,500 459,500 459,500

Pike 739 ELR 92900 SR 0739 Shld Widen / ELRS +C SAMI HSIP 344,000 344,000 344,000

Pike 739 WID 94686 SR 739 Should / Widening +F SAMI HSIP 122,000 122,000 122,000

Pike 739 WID 94686 SR 739 Should / Widening +F SAMI HSIP 200,000 200,000 200,000

Pike 739 WID 94686 SR 739 Should / Widening +F SAMI HSIP 315,500 315,500 315,500

Pike 739 WID 94686 SR 739 Should / Widening U SAMI HSIP 40,000 40,000 40,000

Pike 739 WID 94686 SR 739 Should / Widening R SAMI HSIP 155,000 155,000 155,000

Pike 1003 450 89014 SR1003 ov Lackwaxen River C BRDG 185 850,000 850,000 850,000

Pike 1003 450 89014 SR1003 ov Lackwaxen River C BRDG 185 900,000 900,000 900,000

Pike 1007 P51 96726 SR 1007 ov Twin Lakes Cr U BRDG 185 125,000 125,000 125,000

Pike 1011 470 9329 Pond Eddy Crossing C BRDG BOF 585,000 185 146,250 2,231,250 2,962,500 2,962,500

Pike 1011 470 9329 Pond Eddy Crossing C BRDG STP 1,500,000 1,500,000 1,500,000

Pike 1011 470 9329 Pond Eddy Crossing C BRDG BOF 585,000 185 146,250 2,231,250 2,962,500 2,962,500

Pike 1011 470 9329 Pond Eddy Crossing C BRDG STP 1,500,000 1,500,000 1,500,000

Pike 1011 470 9329 Pond Eddy Crossing C BRDG BOF 585,000 185 146,250 731,250 1,462,500 1,462,500

Pike 1013 SLD 96807 SR 1013 Slide C HRST 581 900,000 900,000 900,000

Pike 1014 RRX 103207SR 1014 Corridor C SAMI RRX 386,250 386,250 386,250

Pike 1014 RRX 103207SR 1014 Corridor C SAMI RRX 386,250 386,250 386,250

Pike 1014 SLD 96808 SR 1014 Slide C HRST 581 280,000 280,000 280,000

Pike 1017 REP 96803 SR 1017 Slide C HRST 581 850,000 850,000 850,000

Pike 2001 402 9397 Milford - Bushkill #2 +C HRST STP 600,000 581 530,000 1,130,000 1,130,000

Pike 2001 402 9397 Milford - Bushkill #2 +C HRST STP 230,000 581 1,347,000 1,577,000 1,577,000

Pike 2001 402 9397 Milford - Bushkill #2 +C HRST STP 480,000 581 4,139,000 4,619,000 4,619,000

Pike 2001 402 9397 Milford - Bushkill #2 +C HRST STP 5,284,000 5,284,000 5,284,000

Pike 2001 402 9397 Milford - Bushkill #2 +C HRST STP 1,230,000 581 4,139,000 5,369,000 5,369,000

Pike 2002 SLD 96806 SR 2002 Slide C HRST 581 225,000 225,000 225,000

Pike 2004 SLD 96805 SR 2004 Slide C HRST 581 250,000 250,000 250,000

Pike 7206 450 85707 T-301 ov Little Bushkill P BRDG BOF 200,000 50,000 250,000 250,000

Totals for: Pike 31,546,892 9,897,238 50,000 41,494,130 55,964,162 6,170,079 2,231,250 64,365,491 43,229,222 7,652,000 2,231,250 53,112,472 37,377,820 5,652,000 731,250 43,761,070 202,733,163

Potter 104348Act 13 SD Brdg Potter C BRDG 80,000 80,000 80,000

Potter BR 4861 T-487 Iva-Jen Bridge F BRDG BOF 115,360 183 21,630 7,210 144,200 144,200

Potter BR 4861 T-487 Iva-Jen Bridge U BRDG BOF 7,957 183 2,732 42,436 53,125 53,125

Potter BR 4861 T-487 Iva-Jen Bridge R BRDG BOF 8,487 183 1,591 530 10,608 10,608

Potter BR 4861 T-487 Iva-Jen Bridge C BRDG BOF 934,101 183 175,144 58,381 1,167,626 1,167,626

Potter 6 620 92993 SR 6 Betterment +F HRST NHPP 89,568 89,568 89,568

Page 176: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

176 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Potter 6 620 92993 SR 6 Betterment +U HRST NHPP 350,000 350,000 350,000

Potter 6 620 92993 SR 6 Betterment +R HRST NHPP 93,045 93,045 93,045

Potter 6 620 92993 SR 6 Betterment +C HRST NHPP 2,621,755 2,621,755 2,621,755

Potter 6 620 92993 SR 6 Betterment +C HRST NHPP 1,558,590 1,558,590 1,558,590

Potter 6 A02 85487 SR 6 Lehman Run +P BRDG NHPP 325,000 325,000 325,000

Potter 6 A02 85487 SR 6 Lehman Run +F BRDG NHPP 325,000 325,000 325,000

Potter 6 A02 85487 SR 6 Lehman Run +U BRDG NHPP 56,275 56,275 56,275

Potter 6 A02 85487 SR 6 Lehman Run +R BRDG NHPP 56,275 56,275 56,275

Potter 44 625 100584Coneville to County Line P HRST 581 200,000 200,000 200,000

Potter 44 625 100584Coneville to County Line C HRST 581 3,530,000 3,530,000 3,530,000

Potter 44 625 100584Coneville to County Line C HRST 581 3,000,000 3,000,000 3,000,000

Potter 44 A06 69466 SR 44 S. Br. Oswayo Creek +C BRDG STP 2,525,000 2,525,000 2,525,000

Potter 244 A04 4896 SR 244 Ellisburg Creek F BRDG STP 318,270 318,270 318,270

Potter 244 A04 4896 SR 244 Ellisburg Creek C BRDG 581 600,000 600,000 600,000

Potter 244 A04 4896 SR 244 Ellisburg Creek C BRDG 581 300,000 300,000 300,000

Potter 244 A08 82038 SR 244 Cryder Creek +F BRDG STP 344,792 344,792 344,792

Potter 244 A08 82038 SR 244 Cryder Creek +U BRDG STP 79,568 79,568 79,568

Potter 244 A08 82038 SR 244 Cryder Creek +R BRDG STP 26,523 26,523 26,523

Potter 244 A08 82038 SR 244 Cryder Creek C BRDG STP 820,967 820,967 820,967

Potter 244 A08 82038 SR 244 Cryder Creek C BRDG STP 2,132,487 185 802,699 2,935,186 2,935,186

Potter 449 A02 82037 SR 449 Pine Creek C BRDG STP 1,220,035 1,220,035 1,220,035

Potter 449 A03 85317 PA 449 Trib to Pine Crk P BRDG 185 75,000 75,000 75,000

Potter 449 A03 85317 PA 449 Trib to Pine Crk F BRDG 185 218,545 218,545 218,545

Potter 449 A03 85317 PA 449 Trib to Pine Crk U BRDG 185 112,551 112,551 112,551

Potter 449 A03 85317 PA 449 Trib to Pine Crk R BRDG 185 109,273 109,273 109,273

Potter 449 A03 85317 PA 449 Trib to Pine Crk C BRDG 185 956,682 956,682 956,682

Potter 449 A04 81408 PA 449 Middle Br Gen Rv P BRDG 185 79,289 79,289 79,289

Potter 449 A04 81408 PA 449 Middle Br Gen Rv F BRDG 185 218,545 218,545 218,545

Potter 449 A04 81408 PA 449 Middle Br Gen Rv U BRDG 185 112,551 112,551 112,551

Potter 449 A04 81408 PA 449 Middle Br Gen Rv R BRDG 185 109,273 109,273 109,273

Potter 449 A04 81408 PA 449 Middle Br Gen Rv C BRDG 185 956,682 956,682 956,682

Potter 449 A05 85502 SR 449 ov Trib Genesee P BRDG 185 275,000 275,000 275,000

Potter 449 A05 85502 SR 449 ov Trib Genesee F BRDG 185 225,000 225,000 225,000

Potter 449 A05 85502 SR 449 ov Trib Genesee U BRDG 185 56,275 56,275 56,275

Potter 449 A05 85502 SR 449 ov Trib Genesee R BRDG 185 56,275 56,275 56,275

Potter 449 A06 85501 Cushing Creek III Bridge +P BRDG STP 318,270 318,270 318,270

Potter 449 A06 85501 Cushing Creek III Bridge +F BRDG STP 225,102 225,102 225,102

Potter 449 A06 85501 Cushing Creek III Bridge +U BRDG STP 56,275 56,275 56,275

Potter 449 A06 85501 Cushing Creek III Bridge +R BRDG STP 56,275 56,275 56,275

Potter 1001 A03 85386 SR 1001 BOX Culvert C BRDG 185 75,000 75,000 75,000

Page 177: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

177 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Potter 1001 A04 82191 Cushing Creek II +P BRDG BOF 327,818 327,818 327,818

Potter 1001 A04 82191 Cushing Creek II +F BRDG BOF 225,102 225,102 225,102

Potter 1001 A04 82191 Cushing Creek II +U BRDG BOF 56,275 56,275 56,275

Potter 1001 A04 82191 Cushing Creek II +R BRDG BOF 56,275 56,275 56,275

Potter 1003 A05 85387 SR 1003 ov Calif Crk BOX P BRDG 185 185,400 185,400 185,400

Potter 1005 A02 69049 SR 1005 Laurel Run BOX P BRDG 185 40,000 40,000 40,000

Potter 1005 A02 69049 SR 1005 Laurel Run BOX C BRDG 185 75,000 75,000 75,000

Potter 1018 A01 83049 Mid. Br. Genesee River DB C BRDG 185 180,000 180,000 180,000

Potter 3001 A02 4903 SR 3001 E Fork Sinnem. Ck C BRDG 581 3,100,000 3,100,000 3,100,000

Potter 3004 A03 89980 SR 3004 BOX P BRDG 185 191,227 191,227 191,227

Potter 3004 A03 89980 SR 3004 BOX U BRDG 185 56,275 56,275 56,275

Potter 3004 A03 89980 SR 3004 BOX R BRDG 185 56,275 56,275 56,275

Potter 3004 A03 89980 SR 3004 BOX C BRDG 185 299,000 299,000 299,000

Potter 4003 A01 4808 SR 4003 over Clara Creek U BRDG BOF 53,045 53,045 53,045

Potter 4003 A01 4808 SR 4003 over Clara Creek R BRDG BOF 53,045 53,045 53,045

Potter 4003 A01 4808 SR 4003 over Clara Creek +C BRDG BOF 469,260 469,260 469,260

Potter 4003 A01 4808 SR 4003 over Clara Creek +C BRDG BOF 1,000,000 1,000,000 1,000,000

Potter 4003 A06 46938 SR 4003 Fishing Creek +C BRDG BOF 822,198 822,198 822,198

Potter 4005 A01 85513 East Br Fishing Crk BOX P BRDG 185 196,691 196,691 196,691

Potter 4005 A01 85513 East Br Fishing Crk BOX U BRDG 185 28,138 28,138 28,138

Potter 4005 A01 85513 East Br Fishing Crk BOX R BRDG 185 28,138 28,138 28,138

Potter 4023 A01 91626 SR 4023 Eleven Mile BOX P BRDG 185 50,000 50,000 50,000

Potter 4023 A01 91626 SR 4023 Eleven Mile BOX U BRDG 185 25,622 25,622 25,622

Potter 4023 A01 91626 SR 4023 Eleven Mile BOX R BRDG 185 25,622 25,622 25,622

Potter 4023 A01 91626 SR 4023 Eleven Mile BOX C BRDG 185 299,000 299,000 299,000

Potter 4031 A01 85516 SR 4031 ov Lyman Cr BOX P BRDG 185 179,180 179,180 179,180

Potter 4031 A01 85516 SR 4031 ov Lyman Cr BOX U BRDG 185 32,782 32,782 32,782

Potter 4031 A01 85516 SR 4031 ov Lyman Cr BOX R BRDG 185 27,318 27,318 27,318

Potter 4031 A01 85516 SR 4031 ov Lyman Cr BOX C BRDG 185 299,000 299,000 299,000

Totals for: Potter 9,189,951 4,727,934 87,740 14,005,625 4,030,784 1,128,059 42,436 5,201,279 3,394,406 5,771,720 58,381 9,224,507 1,112,854 6,016,692 7,129,546 35,560,957

Schuylkill ORW 86979 Orwigsburg Safe Routes P TENH SRTSF 23,900 23,900 23,900

Schuylkill ORW 86979 Orwigsburg Safe Routes F TENH SRTSF 14,900 14,900 14,900

Schuylkill ORW 86979 Orwigsburg Safe Routes +U TENH SRTSF 20,000 20,000 20,000

Schuylkill ORW 86979 Orwigsburg Safe Routes R TENH SRTSF 10,000 10,000 10,000

Schuylkill ORW 86979 Orwigsburg Safe Routes C TENH SRTSF 230,185 230,185 230,185

Schuylkill 61 0 96565 61 Recon Haven-St. Clair P HCON NHPP 437,080 581 109,270 546,350 546,350

Schuylkill 61 0 96565 61 Recon Haven-St. Clair F HCON 581 337,653 337,653 337,653

Schuylkill 61 0 96565 61 Recon Haven-St. Clair U HCON 581 112,551 112,551 112,551

Schuylkill 61 11M 12694 Port Clinton C HRST NHPP 221,500 221,500 221,500

Schuylkill 61 11S 12613 Deer Lake North C HCON NHPP 40,000 581 10,000 50,000 50,000

Page 178: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

178 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Schuylkill 61 13M 91112 SR 61 Rest SR 2014-PSU P HRST 581 450,204 450,204 450,204

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville P HRST 581 1,250,000 1,250,000 1,250,000

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville F HRST NHPP 778,500 581 194,625 973,125 973,125

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville F HRST NHPP 1,487,500 581 371,875 1,859,375 1,859,375

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville U HRST NHPP 254,616 581 63,654 318,270 318,270

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville R HRST NHPP 1,697,440 581 424,360 2,121,800 2,121,800

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville C HCON NHPP 2,500,000 581 625,000 3,125,000 3,125,000

Schuylkill 61 14M 96470 61 Recon St.Cl-Frackville C HCON NHPP 3,000,000 581 1,750,000 4,750,000 4,750,000

Schuylkill 61 15B 12631 Mady's Bridges C BRDG NHPP 400,000 185 100,000 500,000 500,000

Schuylkill 61 16S 72451 61 Safety Imp_Sch. Haven C SAMI NHPP* 180,028 180,028 180,028

Schuylkill 81 12M 89230 I81 Fountain_Highridge Rd C IMAN 581 1,575,000 1,575,000 1,575,000

Schuylkill 81 21M 76372 I-81 Leb. Co. to Pine Gve C IMAN NHPP 26,883,000 581 2,987,000 29,870,000 29,870,000

Schuylkill 81 21M 76372 I-81 Leb. Co. to Pine Gve C IMAN NHPP 26,883,000 581 2,987,000 29,870,000 29,870,000

Schuylkill 209 02B 85842 SR 209 over Reading N RR F BRDG 185 453,200 453,200 453,200

Schuylkill 209 02B 85842 SR 209 over Reading N RR U BRDG 185 103,000 103,000 103,000

Schuylkill 209 02B 85842 SR 209 over Reading N RR R BRDG 185 154,500 154,500 154,500

Schuylkill 209 02B 85842 SR 209 over Reading N RR C BRDG 581 1,000,000 1,000,000 1,000,000

Schuylkill 209 02B 85842 SR 209 over Reading N RR C BRDG 581 4,665,000 4,665,000 4,665,000

Schuylkill 209 05S 97267 SR 209-SR 901 Intersectn F HRST 581 257,500 257,500 257,500

Schuylkill 209 05S 97267 SR 209-SR 901 Intersectn U HRST 581 103,000 103,000 103,000

Schuylkill 209 05S 97267 SR 209-SR 901 Intersectn R HRST 581 51,500 51,500 51,500

Schuylkill 209 05S 97267 SR 209-SR 901 Intersectn C HRST 581 400,000 400,000 400,000

Schuylkill 209 05S 97267 SR 209-SR 901 Intersectn C HRST 581 1,509,620 1,509,620 1,509,620

Schuylkill 209 08B 99705 SR 209 ov Wabash Ck Arch P BRDG 185 40,000 40,000 40,000

Schuylkill 209 08B 99705 SR 209 ov Wabash Ck Arch F BRDG 185 257,500 257,500 257,500

Schuylkill 209 08B 99705 SR 209 ov Wabash Ck Arch U BRDG 185 159,135 159,135 159,135

Schuylkill 209 08B 99705 SR 209 ov Wabash Ck Arch R BRDG 185 106,090 106,090 106,090

Schuylkill 209 08B 99705 SR 209 ov Wabash Ck Arch C BRDG 185 995,675 995,675 995,675

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp P HRST NHPP 288,400 581 72,100 360,500 360,500

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp F HRST NHPP 200,000 581 50,000 250,000 250,000

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp F HRST NHPP 80,000 581 20,000 100,000 100,000

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp U HRST NHPP 25,461 581 6,365 31,826 31,826

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp R HRST NHPP 16,975 581 4,245 21,220 21,220

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp C HRST 581 2,000,000 2,000,000 2,000,000

Schuylkill 309 0 96484 PA 309 - Rush_ Kline Twp C HRST 581 2,721,005 2,721,005 2,721,005

Schuylkill 309 04B 81675 Snyders Bridge Replace C BRDG 185 10,000 10,000 10,000

Schuylkill 309 05B 85743 SR 309 over Back Channel F BRDG 185 283,250 283,250 283,250

Schuylkill 309 05B 85743 SR 309 over Back Channel U BRDG 185 25,750 25,750 25,750

Schuylkill 309 05B 85743 SR 309 over Back Channel R BRDG 185 25,750 25,750 25,750

Schuylkill 309 05B 85743 SR 309 over Back Channel C BRDG 581 1,517,475 1,517,475 1,517,475

Page 179: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

179 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Schuylkill 309 05B 85743 SR 309 over Back Channel C BRDG 581 1,400,000 1,400,000 1,400,000

Schuylkill 339 01B 12710 Catawissa Creek Bridge-P3 R BRDG 185 25,000 25,000 25,000

Schuylkill 443 04X 95262 MainSt SchuylkillHaven RR +C SAMI RRX 57,289 57,289 57,289

Schuylkill 895 04B 12714 Auburn Arch C BRDG STP 121,600 185 30,400 152,000 152,000

Schuylkill 901 01B 85828 PA 901 over Schuylkill Rr F BRDG 185 437,901 437,901 437,901

Schuylkill 901 01B 85828 PA 901 over Schuylkill Rr U BRDG 185 51,500 51,500 51,500

Schuylkill 901 01B 85828 PA 901 over Schuylkill Rr R BRDG 185 103,000 103,000 103,000

Schuylkill 901 01B 85828 PA 901 over Schuylkill Rr C BRDG 185 1,000,000 1,000,000 1,000,000

Schuylkill 901 01B 85828 PA 901 over Schuylkill Rr C BRDG 185 2,151,425 2,151,425 2,151,425

Schuylkill 924 06M 93710 Gold Star HighwyResurface P HCON 581 1,030,000 1,030,000 1,030,000

Schuylkill 924 06M 93710 Gold Star HighwyResurface F HCON 581 218,180 218,180 218,180

Schuylkill 924 06M 93710 Gold Star HighwyResurface U HCON 581 16,391 16,391 16,391

Schuylkill 924 06M 93710 Gold Star HighwyResurface R HCON 581 38,245 38,245 38,245

Schuylkill 924 06M 93710 Gold Star HighwyResurface C HCON 581 5,000,000 5,000,000 5,000,000

Schuylkill 924 RSM 104236Rock Slide Mitigation C HRST 581 700,000 700,000 700,000

Schuylkill 1002 01B 12665 Pottsville St Br Replacem C BRDG STP 40,000 185 10,000 50,000 50,000

Schuylkill 1021 0 85750 SR 1021 over Railroad P BRDG BOF 450,204 185 112,550 562,754 562,754

Schuylkill 2003 0 89618 SR 2003 ov Pine Ck P BRDG BOF 450,203 185 112,550 562,753 562,753

Schuylkill 3005 01B 91997 SR 3005 o/WB Schuylkill P BRDG BOF 180,000 185 45,000 225,000 225,000

Schuylkill 3005 01B 91997 SR 3005 o/WB Schuylkill F BRDG BOF 164,800 185 41,200 206,000 206,000

Schuylkill 3005 01B 91997 SR 3005 o/WB Schuylkill U BRDG BOF 41,200 185 10,300 51,500 51,500

Schuylkill 3005 01B 91997 SR 3005 o/WB Schuylkill R BRDG BOF 41,200 185 10,300 51,500 51,500

Schuylkill 3005 01B 91997 SR 3005 o/WB Schuylkill C BRDG BOF 1,800,820 185 450,205 2,251,025 2,251,025

Schuylkill 4011 03B 12713 Pine Creek Bridge F BRDG 581 240,706 240,706 240,706

Schuylkill 4011 03B 12713 Pine Creek Bridge U BRDG 581 10,300 10,300 10,300

Schuylkill 4011 03B 12713 Pine Creek Bridge R BRDG 581 25,750 25,750 25,750

Schuylkill 4011 03B 12713 Pine Creek Bridge C BRDG 185 477,405 477,405 477,405

Schuylkill 4022 02B 12707 Mahantango Creek Trib P HRST 581 2,000 2,000 2,000

Schuylkill 4022 02B 12707 Mahantango Creek Trib F BRDG 581 412,000 412,000 412,000

Schuylkill 4022 02B 12707 Mahantango Creek Trib U BRDG 581 51,500 51,500 51,500

Schuylkill 4022 02B 12707 Mahantango Creek Trib R BRDG 581 103,000 103,000 103,000

Schuylkill 4022 02B 12707 Mahantango Creek Trib C BRDG 185 1,432,215 1,432,215 1,432,215

Schuylkill 7233 01B 95374 Rock Covered Bridge C BRDG HCB 10,000 10,000 10,000

Totals for: Schuylkill 29,259,028 12,158,766 41,417,794 31,132,466 14,304,589 45,437,055 2,937,080 8,152,707 11,089,787 5,701,227 11,472,813 17,174,040 115,118,676

Snyder 7588 Cent. Susq. Val. Sty F HCON SXF 3,750,000 581 1,351,482 5,101,482 5,101,482

Snyder 7588 Cent. Susq. Val. Sty F HCON SXF 1,250,000 581 2,285,945 3,535,945 3,535,945

Snyder 7588 Cent. Susq. Val. Sty F HCON 581 2,329,567 2,329,567 2,329,567

Snyder 7588 Cent. Susq. Val. Sty F HCON 581 2,262,446 2,262,446 2,262,446

Snyder 7588 Cent. Susq. Val. Sty U HCON 581 4,150,000 4,150,000 4,150,000

Snyder 7588 Cent. Susq. Val. Sty U HCON 581 5,100,000 5,100,000 5,100,000

Page 180: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

180 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Snyder 7588 Cent. Susq. Val. Sty U HCON 581 3,125,000 3,125,000 3,125,000

Snyder 7588 Cent. Susq. Val. Sty U HCON 581 3,750,000 3,750,000 3,750,000

Snyder 7588 Cent. Susq. Val. Sty R HCON SXF 600,000 581 3,600,000 4,200,000 4,200,000

Snyder 7588 Cent. Susq. Val. Sty R HCON 581 975,000 975,000 975,000

Snyder 7588 Cent. Susq. Val. Sty R HCON 581 1,625,000 1,625,000 1,625,000

Snyder 7588 Cent. Susq. Val. Sty R HCON 581 1,625,000 1,625,000 1,625,000

Snyder LBR 6846 T-469 over Swift Run P BRDG STP 64,000 183 12,000 4,000 80,000 80,000

Snyder LBR 6846 T-469 over Swift Run P BRDG BOF 64,000 183 12,000 4,000 80,000 80,000

Snyder LBR 6846 T-469 over Swift Run F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Snyder 11 M06 87896 SR 522 to Roosevelt Ave F HRST 581 25,000 25,000 25,000

Snyder 11 M06 87896 SR 522 to Roosevelt Ave +C HRST NHPP 550,000 550,000 550,000

Snyder 11 M06 87896 SR 522 to Roosevelt Ave +C HRST NHPP 550,000 550,000 550,000

Snyder 15 145 93506 US 15 Bridge Preservation F BRDG NHPP 100,000 100,000 100,000

Snyder 15 145 93506 US 15 Bridge Preservation U BRDG 185 20,000 20,000 20,000

Snyder 15 145 93506 US 15 Bridge Preservation R BRDG NHPP 25,000 25,000 25,000

Snyder 15 145 93506 US 15 Bridge Preservation +C BRDG NHPP 497,000 497,000 497,000

Snyder 15 145 93506 US 15 Bridge Preservation +C BRDG NHPP 403,000 403,000 403,000

Snyder 15 88D 76401 CSVT Earthwork South Sec C HCON 581 28,857,699 28,857,699 28,857,699

Snyder 104 16M 87889 Perry Twp to Reliance Ave F HRST 581 20,000 20,000 20,000

Snyder 104 16M 87889 Perry Twp to Reliance Ave C HRST 581 746,800 746,800 746,800

Snyder 235 16M 87893 Juniata Co to Mitchel Run C HRST 581 800,000 800,000 800,000

Snyder 235 16M 87893 Juniata Co to Mitchel Run C HRST 581 1,500,000 1,500,000 1,500,000

Snyder 522 063 6874 US 522 over Middle Creek U BRDG 185 350,000 350,000 350,000

Snyder 522 063 6874 US 522 over Middle Creek +C BRDG NHPP 2,594,000 2,594,000 2,594,000

Snyder 522 063 6874 US 522 over Middle Creek +C BRDG NHPP 3,106,000 3,106,000 3,106,000

Snyder 522 068 94712 SnyderCnty MembraneGroup4 C BRDG 185 100,000 100,000 100,000

Snyder 522 068 94712 SnyderCnty MembraneGroup4 C BRDG 185 125,000 125,000 125,000

Snyder 522 071 6872 SR 522 over Beaver Creek +P BRDG NHPP 200,000 200,000 200,000

Snyder 522 071 6872 SR 522 over Beaver Creek +F BRDG NHPP 150,000 150,000 150,000

Snyder 522 072 6886 SR 522 over Tb Middle Crk +P BRDG NHPP 100,000 100,000 100,000

Snyder 522 073 6899 US 522 over Beaver Creek +P BRDG NHPP 200,000 200,000 200,000

Snyder 522 60M 87850 Elm St to Kern Run C HRST 581 300,000 300,000 300,000

Snyder 522 70M 95905 Greenhouse Rd to Essex Rd C HRST 581 150,000 150,000 150,000

Snyder 1010 006 88013 SR 1010 over Tb Penns Crk U BRDG 185 65,000 65,000 65,000

Snyder 1010 006 88013 SR 1010 over Tb Penns Crk C BRDG 185 150,000 150,000 150,000

Snyder 1013 008 88016 SR 1013 over Tb Penns Crk F BRDG 185 20,000 20,000 20,000

Snyder 1013 008 88016 SR 1013 over Tb Penns Crk U BRDG 185 20,000 20,000 20,000

Snyder 1013 008 88016 SR 1013 over Tb Penns Crk R BRDG 185 20,000 20,000 20,000

Snyder 1013 008 88016 SR 1013 over Tb Penns Crk C BRDG 185 125,000 125,000 125,000

Snyder 1013 008 88016 SR 1013 over Tb Penns Crk C BRDG 185 25,000 25,000 25,000

Page 181: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

181 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Snyder 1017 007 6877 SR1017ov Rolling Green Rn U BRDG STP 15,000 15,000 15,000

Snyder 1023 09M 81509 From US 11/15 to SR 61 C HRST STR 311,740 581 77,935 389,675 389,675

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk P BRDG 185 25,000 25,000 25,000

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk P BRDG 185 20,000 20,000 20,000

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk F BRDG 185 20,000 20,000 20,000

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk U BRDG 185 50,000 50,000 50,000

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk R BRDG 185 30,000 30,000 30,000

Snyder 2006 013 93606 SR 2006 ov Tb Chapman Crk C BRDG 185 85,000 85,000 85,000

Snyder 2006 018 98888 Orchard Hill Rd to SR 11 C HRST 581 750,000 750,000 750,000

Snyder 2006 019 98554 SR 2006 ov Tb Chapman Crk P BRDG 185 40,000 40,000 40,000

Snyder 2006 019 98554 SR 2006 ov Tb Chapman Crk F BRDG 185 25,000 25,000 25,000

Snyder 2006 019 98554 SR 2006 ov Tb Chapman Crk U BRDG 185 35,000 35,000 35,000

Snyder 2006 019 98554 SR 2006 ov Tb Chapman Crk R BRDG 185 25,000 25,000 25,000

Snyder 2007 012 93607 SR 2007 ov Tb Middle Crk P BRDG 185 40,000 40,000 40,000

Snyder 2007 012 93607 SR 2007 ov Tb Middle Crk F BRDG 185 20,000 20,000 20,000

Snyder 2007 012 93607 SR 2007 ov Tb Middle Crk U BRDG 185 75,000 75,000 75,000

Snyder 2007 012 93607 SR 2007 ov Tb Middle Crk R BRDG 185 25,000 25,000 25,000

Snyder 2007 012 93607 SR 2007 ov Tb Middle Crk C BRDG 185 150,000 150,000 150,000

Snyder 2007 013 93648 SR2007 over Tb Middle Crk P BRDG 185 45,000 45,000 45,000

Snyder 2010 015 98577 SR2010 over Tb Middle Crk P BRDG 185 40,000 40,000 40,000

Snyder 2017 14M 88942 Sand Hill Rd to SR 522 F HRST 581 20,000 20,000 20,000

Snyder 2017 14M 88942 Sand Hill Rd to SR 522 +C HRST NHPP 1,350,000 1,350,000 1,350,000

Snyder 2017 14M 88942 Sand Hill Rd to SR 522 +C HRST NHPP 450,000 450,000 450,000

Snyder 3006 015 93527 SR3006ovTb Mahantango Crk F BRDG 185 20,000 20,000 20,000

Snyder 3006 015 93527 SR3006ovTb Mahantango Crk U BRDG 185 30,000 30,000 30,000

Snyder 3006 015 93527 SR3006ovTb Mahantango Crk R BRDG 185 25,000 25,000 25,000

Snyder 3006 015 93527 SR3006ovTb Mahantango Crk C BRDG 185 80,000 80,000 80,000

Snyder 3006 015 93527 SR3006ovTb Mahantango Crk C BRDG 185 70,000 70,000 70,000

Snyder 3008 013 98892 SR 3010 to SR 3009 C HRST 581 500,000 500,000 500,000

Snyder 3010 017 98578 SR3010 ov Middleworth Run P BRDG 185 40,000 40,000 40,000

Snyder 3012 010 98598 SR3012 over Tb Middle Crk P BRDG 185 40,000 40,000 40,000

Snyder 3016 006 93528 SR 3016 over Aline Creek P BRDG 185 20,000 20,000 20,000

Snyder 3016 006 93528 SR 3016 over Aline Creek F BRDG 185 20,000 20,000 20,000

Snyder 3016 006 93528 SR 3016 over Aline Creek U BRDG 185 20,000 20,000 20,000

Snyder 3016 006 93528 SR 3016 over Aline Creek R BRDG 185 20,000 20,000 20,000

Snyder 3016 006 93528 SR 3016 over Aline Creek C BRDG 185 150,000 150,000 150,000

Snyder 4003 010 94710 SnyderCnty MembraneGroup2 C BRDG 185 83,375 83,375 83,375

Snyder 4003 010 94710 SnyderCnty MembraneGroup2 C BRDG 185 41,625 41,625 41,625

Snyder 4012 024 88015 SR4012 ov Tb Ulsh Gap Run U BRDG 185 10,000 10,000 10,000

Snyder 4012 024 88015 SR4012 ov Tb Ulsh Gap Run C BRDG 185 124,000 124,000 124,000

Page 182: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

182 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Snyder 4012 024 88015 SR4012 ov Tb Ulsh Gap Run C BRDG 185 26,000 26,000 26,000

Snyder 4016 002 98661 SR4016ovTbN BrMiddle Crk P BRDG 185 40,000 40,000 40,000

Snyder 4016 002 98661 SR4016ovTbN BrMiddle Crk F BRDG 185 25,000 25,000 25,000

Snyder 4016 002 98661 SR4016ovTbN BrMiddle Crk U BRDG 185 35,000 35,000 35,000

Snyder 4016 002 98661 SR4016ovTbN BrMiddle Crk R BRDG 185 25,000 25,000 25,000

Totals for: Snyder 4,801,740 12,083,417 16,885,157 2,011,000 10,868,945 4,000 12,883,945 5,311,000 7,749,942 4,000 13,064,942 4,302,000 37,981,570 6,000 42,289,570 85,123,614

Somerset 103035CSX Grade Xing Improvemnt +C SAMI RRX 562,755 562,755 562,755

Somerset 30 016 96599 PA 160 to Bedford Co Line P HRST 581 32,000 32,000 32,000

Somerset 30 016 96599 PA 160 to Bedford Co Line C HRST 581 1,300,000 1,300,000 1,300,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp P SAMI HSIP 79,200 581 8,800 88,000 88,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp F SAMI HSIP 198,900 581 22,100 221,000 221,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp R SAMI HSIP 720,000 581 80,000 800,000 800,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp +C SAMI HSIP 696,000 696,000 696,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp +C SAMI HSIP 1,575,000 1,575,000 1,575,000

Somerset 31 014 88523 PA31 W Somrst Corridr Imp +C SAMI HSIP 1,234,700 1,234,700 1,234,700

Somerset 31 17B 23583 PA31 Deeter's Gap Bridge P BRDG 185 15,000 15,000 15,000

Somerset 31 17B 23583 PA31 Deeter's Gap Bridge R BRDG 185 50,000 50,000 50,000

Somerset 31 17B 23583 PA31 Deeter's Gap Bridge C BRDG 185 450,000 450,000 450,000

Somerset 31 18B 92703 PA31 Trb Stnycrk Culv 2 P BRDG 185 15,000 15,000 15,000

Somerset 31 18B 92703 PA31 Trb Stnycrk Culv 2 R BRDG 185 50,000 50,000 50,000

Somerset 31 18B 92703 PA31 Trb Stnycrk Culv 2 C BRDG 185 450,000 450,000 450,000

Somerset 40 002 92711 Addison Resurface P HRST 581 56,000 56,000 56,000

Somerset 56 003 92616 Cambria Co Line to SR1033 +C HRST NHPP 3,026,333 3,026,333 3,026,333

Somerset 219 034 91671 Brotherton Rd to Craig Rd +C HRST NHPP 3,733,000 3,733,000 3,733,000

Somerset 219 034 91671 Brotherton Rd to Craig Rd +C HRST NHPP 534,200 534,200 534,200

Somerset 219 20C 75362 US 219 Garrett Bridges C HCON APD 46,000,000 46,000,000 46,000,000

Somerset 219 20C 75362 US 219 Garrett Bridges C HCON APD 46,000,000 46,000,000 46,000,000

Somerset 219 20D 75357 US 219 Garrett Paving C HCON APD 26,500,000 26,500,000 26,500,000

Somerset 219 20D 75357 US 219 Garrett Paving C HCON APD 26,500,000 26,500,000 26,500,000

Somerset 281 020 96606 Welsh Hill Rd - E Main St U HRST 581 25,000 25,000 25,000

Somerset 281 020 96606 Welsh Hill Rd - E Main St R HRST 581 25,000 25,000 25,000

Somerset 281 020 96606 Welsh Hill Rd - E Main St C HRST 581 1,800,000 1,800,000 1,800,000

Somerset 281 020 96606 Welsh Hill Rd - E Main St C HRST 581 600,000 600,000 600,000

Somerset 281 023 96605 Gilmore to Welsh Hill Rd U HRST 581 25,000 25,000 25,000

Somerset 281 023 96605 Gilmore to Welsh Hill Rd R HRST 581 25,000 25,000 25,000

Somerset 281 023 96605 Gilmore to Welsh Hill Rd C HRST 581 1,000,000 1,000,000 1,000,000

Somerset 281 023 96605 Gilmore to Welsh Hill Rd C HRST 581 1,000,000 1,000,000 1,000,000

Somerset 281 024 96603 Humbert Rd to Handwork Rd U HRST 581 25,000 25,000 25,000

Somerset 281 024 96603 Humbert Rd to Handwork Rd R HRST 581 25,000 25,000 25,000

Somerset 281 024 96603 Humbert Rd to Handwork Rd C HRST 581 800,000 800,000 800,000

Page 183: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

183 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Somerset 281 13M 90237 Handwork Rd to Ling Rd U HRST 581 25,000 25,000 25,000

Somerset 281 13M 90237 Handwork Rd to Ling Rd R HRST 581 25,000 25,000 25,000

Somerset 281 13M 90237 Handwork Rd to Ling Rd C HRST 581 2,000,000 2,000,000 2,000,000

Somerset 281 13M 90237 Handwork Rd to Ling Rd C HRST 581 1,000,000 1,000,000 1,000,000

Somerset 281 22B 101315PA281 Casslmn Rvr Br Pres C BRDG 185 318,175 318,175 318,175

Somerset 403 11B 23568 PA 403/Pokeytown Run +F BRDG 185 100,000 100,000 100,000

Somerset 403 11B 23568 PA 403/Pokeytown Run +U BRDG 185 40,000 40,000 40,000

Somerset 403 11B 23568 PA 403/Pokeytown Run +R BRDG 581 25,000 25,000 25,000

Somerset 403 12B 23449 Fallen Timber Run Br +F BRDG 185 100,000 100,000 100,000

Somerset 403 12B 23449 Fallen Timber Run Br +U BRDG 185 50,000 50,000 50,000

Somerset 403 12B 23449 Fallen Timber Run Br +R BRDG 581 50,000 50,000 50,000

Somerset 403 13B 74440 PA403 Dixie Run Culvert +F BRDG 185 100,000 100,000 100,000

Somerset 403 13B 74440 PA403 Dixie Run Culvert +U BRDG 185 50,000 50,000 50,000

Somerset 403 13B 74440 PA403 Dixie Run Culvert +R BRDG 581 50,000 50,000 50,000

Somerset 403 14B 23585 Stonycreek Trib. Bridge R BRDG 185 20,000 20,000 20,000

Somerset 985 015 96615 PA 601 to Acosta Road C HRST STP* 1,425,456 1,425,456 1,425,456

Somerset 985 015 96615 PA 601 to Acosta Road C HRST STP* 357,044 357,044 357,044

Somerset 985 016 91668 US 30 to SR 4031 C HRST STP* 1,229,376 1,229,376 1,229,376

Somerset 985 016 91668 US 30 to SR 4031 C HRST STP* 665,624 665,624 665,624

Somerset 985 13M 91669 Saylor Schl Rd-Cam Co Ln C HRST STP* 517,021 517,021 517,021

Somerset 985 MC1 96616 Acosta MC Resurface C HRST STP* 1,258,000 1,258,000 1,258,000

Somerset 1008 01B 23429 Mostoller Stonycreek Br C BRDG BOF 249,600 581 62,400 312,000 312,000

Somerset 1039 01B 92724 12th St Paint Crk Bridge C BRDG 185 400,000 400,000 400,000

Somerset 2004 005 96346 PA 523 to Platter Hollow C HRST 581 1,054,667 1,054,667 1,054,667

Somerset 2004 006 96630 Plattr Hllw Rd- Savage Rd C HRST 581 1,000,000 1,000,000 1,000,000

Somerset 2004 04B 23573 Fair Grounds Bridge C BRDG BOF 349,400 349,400 349,400

Somerset 2025 02B 23397 Blue Lick Creek Culvert C BRDG STP 43,576 43,576 43,576

Somerset 2025 02B 23397 Blue Lick Creek Culvert C BRDG STP 985,000 985,000 985,000

Somerset 2025 02B 23397 Blue Lick Creek Culvert C BRDG STP 206,817 206,817 206,817

Somerset 2047 01B 23572 SR 2047 Bluelick Creek Br C BRDG STP 390,676 390,676 390,676

Somerset 2047 01B 23572 SR 2047 Bluelick Creek Br C BRDG STP 400,000 400,000 400,000

Somerset 2047 01B 23572 SR 2047 Bluelick Creek Br C BRDG STP 328,000 185 82,000 410,000 410,000

Somerset 2047 02B 88163 Myersdale Flaugherty Crk +P BRDG STP 325,000 325,000 325,000

Somerset 2047 02B 88163 Myersdale Flaugherty Crk +F BRDG STP 250,000 250,000 250,000

Somerset 2047 02B 88163 Myersdale Flaugherty Crk +U BRDG STP 50,000 50,000 50,000

Somerset 2047 02B 88163 Myersdale Flaugherty Crk +R BRDG STP 50,000 50,000 50,000

Somerset 2047 02B 88163 Myersdale Flaugherty Crk +C BRDG STP 50,000 50,000 50,000

Somerset 3010 004 21592 Mud Pike Rd Improvements U HRST 581 50,000 50,000 50,000

Somerset 3010 004 21592 Mud Pike Rd Improvements R HRST 581 50,000 50,000 50,000

Somerset 3010 004 21592 Mud Pike Rd Improvements C HRST 581 3,860,839 3,860,839 3,860,839

Page 184: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

184 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Somerset 3010 004 21592 Mud Pike Rd Improvements C HRST 581 5,373,000 5,373,000 5,373,000

Somerset 3023 01B 23193 Bridge Over Coxes Cr C BRDG 185 718,317 718,317 718,317

Somerset 3023 01B 23193 Bridge Over Coxes Cr C BRDG 185 29,100 29,100 29,100

Somerset 3025 04B 23457 S Somerset CSX RR Bridge P BRDG STP* 68,000 68,000 68,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge F BRDG STP 300,000 300,000 300,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge U BRDG STP 50,000 50,000 50,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge R BRDG STP 50,000 50,000 50,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge +C BRDG STP 350,000 350,000 350,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge +C BRDG STP 300,000 300,000 300,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge +C BRDG STP 1,050,000 1,050,000 1,050,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge +C BRDG STP 500,000 500,000 500,000

Somerset 3025 04B 23457 S Somerset CSX RR Bridge +C BRDG STP 147,000 147,000 147,000

Somerset 4001 03B 23553 Kooser Run Bridge C BRDG 185 1,068,293 1,068,293 1,068,293

Somerset 4013 02B 23599 N Quemahoning Ck Br C BRDG 185 1,000,000 1,000,000 1,000,000

Somerset 4016 01B 56649 SR 4016 Bens Creek Bridge C BRDG 185 1,300,000 1,300,000 1,300,000

Somerset 4021 002 96651 US30-Quemahoning Twp Line C HRST 581 1,300,000 1,300,000 1,300,000

Somerset 7201 310 96050 T-310 Camp Grnd Rd Bridge P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Somerset 7201 310 96050 T-310 Camp Grnd Rd Bridge F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Somerset 7201 310 96050 T-310 Camp Grnd Rd Bridge C BRDG BOF 100,000 183 25,000 6,579 131,579 131,579

Somerset 7201 310 96050 T-310 Camp Grnd Rd Bridge C BRDG BOF 100,000 183 25,000 6,579 131,579 131,579

Somerset 7214 495 96055 T-495 Gary Rd Brdg Rehab P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Somerset 7214 495 96055 T-495 Gary Rd Brdg Rehab F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Somerset 7214 495 96055 T-495 Gary Rd Brdg Rehab C BRDG BOF 129,600 183 32,400 8,526 170,526 170,526

Somerset 7214 495 96055 T-495 Gary Rd Brdg Rehab C BRDG BOF 129,600 183 32,400 8,526 170,526 170,526

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge P BRDG BOF* 115,000 115,000 115,000

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge +F BRDG BOF 140,000 140,000 140,000

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge +U BRDG BOF 20,000 179 5,000 25,000 25,000

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge +R BRDG BOF 20,000 179 5,000 25,000 25,000

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge +C BRDG BOF 313,934 179 78,484 392,418 392,418

Somerset 7217 RFB 23360 T-816 Roaring Fork Bridge +C BRDG BOF 280,000 179 70,000 350,000 350,000

Somerset 7219 625 73026 T-625 Beaver Dam Run Br P BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Somerset 7219 625 73026 T-625 Beaver Dam Run Br F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Somerset 7219 625 73026 T-625 Beaver Dam Run Br C BRDG BOF 124,800 183 31,200 8,211 164,211 164,211

Somerset 7411 FCB 96061 Flaugherty Creek Br Rehab P BRDG BOF 11,200 183 2,100 700 14,000 14,000

Somerset 7411 FCB 96061 Flaugherty Creek Br Rehab F BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

Somerset 7411 FCB 96061 Flaugherty Creek Br Rehab C BRDG BOF 171,200 183 42,800 11,263 225,263 225,263

Totals for: Somerset 57,720,338 3,738,117 28,805 61,487,260 78,336,268 7,075,793 34,579 85,446,640 33,538,451 10,712,165 44,250,616 1,573,955 8,043,000 9,616,955 200,801,471

Sullivan LBR 6995 T-309 over Rock Run F BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Sullivan LBR 6995 T-309 over Rock Run U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Sullivan LBR 6995 T-309 over Rock Run R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Page 185: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

185 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Sullivan LBR 6995 T-309 over Rock Run C BRDG BOF 300,000 183 56,250 18,750 375,000 375,000

Sullivan LBR 6995 T-309 over Rock Run C BRDG BOF 340,000 183 63,750 21,250 425,000 425,000

Sullivan RBR 6955 T-364 Rock Run Bridge C BRDG 183 20,000 5,000 25,000 25,000

Sullivan 42 087 32766 Lyco Co Line to SR220 C HRST 581 530,000 530,000 530,000

Sullivan 87 064 7022 SR 87 over Lick Run U BRDG 185 20,000 20,000 20,000

Sullivan 87 064 7022 SR 87 over Lick Run R BRDG 185 20,000 20,000 20,000

Sullivan 87 064 7022 SR 87 over Lick Run R BRDG 185 17,000 17,000 17,000

Sullivan 87 064 7022 SR 87 over Lick Run +C BRDG STP 336,061 336,061 336,061

Sullivan 87 064 7022 SR 87 over Lick Run +C BRDG STP 1,363,939 1,363,939 1,363,939

Sullivan 87 107 97645 Dutch Mtn Rd to KnellerRd P HRST 581 20,000 20,000 20,000

Sullivan 87 107 97645 Dutch Mtn Rd to KnellerRd C HRST 581 1,450,000 1,450,000 1,450,000

Sullivan 87 107 97645 Dutch Mtn Rd to KnellerRd C HRST 581 625,000 625,000 625,000

Sullivan 87 65S 96157 Forksville to T-444 Slide C HRST 581 25,000 25,000 25,000

Sullivan 87 69M 87974 SR 4017 to Wampole Run Rd P HRST 581 20,000 20,000 20,000

Sullivan 87 69M 87974 SR 4017 to Wampole Run Rd C HRST 581 600,000 600,000 600,000

Sullivan 87 69M 87974 SR 4017 to Wampole Run Rd C HRST 581 700,000 700,000 700,000

Sullivan 154 040 87924 SR 154 ov Pole Bridge Run +C BRDG STP 350,000 350,000 350,000

Sullivan 154 040 87924 SR 154 ov Pole Bridge Run +C BRDG STP 650,000 650,000 650,000

Sullivan 154 064 99111 Cotts Rd to Piatt C HRST 581 520,000 520,000 520,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch P BRDG 185 20,000 20,000 20,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch P BRDG 581 10,000 10,000 10,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch P BRDG 185 20,000 20,000 20,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch F BRDG 185 10,000 10,000 10,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch F BRDG 185 10,000 10,000 10,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch U BRDG 185 12,500 12,500 12,500

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch U BRDG 185 12,500 12,500 12,500

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch R BRDG 185 10,000 10,000 10,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch R BRDG 185 10,000 10,000 10,000

Sullivan 154 065 6930 SR 154 ovr Hoagland Brnch C BRDG 185 85,000 85,000 85,000

Sullivan 154 071 103153SR 4001 to SR 4003 P HRST 581 100,000 100,000 100,000

Sullivan 154 38M 86819 Forksville- Lincoln Falls C HRST 581 450,000 450,000 450,000

Sullivan 154 63S 96679 SR 154 Soil Slide Repair F HCON 581 100,000 100,000 100,000

Sullivan 154 63S 96679 SR 154 Soil Slide Repair U HCON 581 25,000 25,000 25,000

Sullivan 154 63S 96679 SR 154 Soil Slide Repair C HCON 581 1,500,000 1,500,000 1,500,000

Sullivan 220 177 99105 US220ovTbLtLoyalsockCrk P BRDG 185 60,000 60,000 60,000

Sullivan 220 177 99105 US220ovTbLtLoyalsockCrk F BRDG 185 20,000 20,000 20,000

Sullivan 220 177 99105 US220ovTbLtLoyalsockCrk U BRDG 185 25,000 25,000 25,000

Sullivan 220 177 99105 US220ovTbLtLoyalsockCrk R BRDG 185 20,000 20,000 20,000

Sullivan 220 91M 68610 MainSt to Loyalsock Creek P HRST 581 20,000 20,000 20,000

Sullivan 220 91M 68610 MainSt to Loyalsock Creek C HRST 581 500,000 500,000 500,000

Page 186: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

186 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Sullivan 220 M16 87948 Sonestown to Old US 220 C HRST 581 1,300,000 1,300,000 1,300,000

Sullivan 487 097 97651 MehoopanyC toMattichakRd F HRST 581 20,000 20,000 20,000

Sullivan 487 097 97651 MehoopanyC toMattichakRd C HRST 581 1,007,500 1,007,500 1,007,500

Sullivan 487 097 97651 MehoopanyC toMattichakRd C HRST 581 2,150,000 2,150,000 2,150,000

Sullivan 487 098 97668 Luzerne Co to Forestry Rd F HRST 581 20,000 20,000 20,000

Sullivan 487 098 97668 Luzerne Co to Forestry Rd C HRST 581 2,328,500 2,328,500 2,328,500

Sullivan 487 098 97668 Luzerne Co to Forestry Rd C HRST 581 696,500 696,500 696,500

Sullivan 487 099 99384 Connells Dam Rd to PA 87 F HRST 581 20,000 20,000 20,000

Sullivan 487 099 99384 Connells Dam Rd to PA 87 C HRST 581 600,000 600,000 600,000

Sullivan 487 099 99384 Connells Dam Rd to PA 87 C HRST 581 200,000 200,000 200,000

Sullivan 1002 016 94803 SR 1002 ov Pigeon Creek F BRDG 185 20,000 20,000 20,000

Sullivan 1002 016 94803 SR 1002 ov Pigeon Creek U BRDG 185 25,000 25,000 25,000

Sullivan 1002 016 94803 SR 1002 ov Pigeon Creek R BRDG 185 20,000 20,000 20,000

Sullivan 1002 016 94803 SR 1002 ov Pigeon Creek C BRDG 185 85,000 85,000 85,000

Sullivan 1002 016 94803 SR 1002 ov Pigeon Creek C BRDG 185 85,000 85,000 85,000

Sullivan 1002 019 99124 SR 1013 to Black Ln Rd C HRST 581 166,000 166,000 166,000

Sullivan 1004 025 7018 SR 1004 over Lopez Creek F BRDG 185 10,000 10,000 10,000

Sullivan 1004 025 7018 SR 1004 over Lopez Creek U BRDG 185 20,000 20,000 20,000

Sullivan 1004 025 7018 SR 1004 over Lopez Creek R BRDG 185 20,000 20,000 20,000

Sullivan 1004 025 7018 SR 1004 over Lopez Creek C BRDG 185 187,500 187,500 187,500

Sullivan 1004 025 7018 SR 1004 over Lopez Creek C BRDG 185 200,000 200,000 200,000

Sullivan 1004 025 7018 SR 1004 over Lopez Creek C BRDG 185 112,500 112,500 112,500

Sullivan 2002 021 97568 SR2002 ov Long Brook P BRDG 581 50,000 50,000 50,000

Sullivan 2002 021 97568 SR2002 ov Long Brook F BRDG 185 20,000 20,000 20,000

Sullivan 2002 021 97568 SR2002 ov Long Brook U BRDG 185 25,000 25,000 25,000

Sullivan 2002 021 97568 SR2002 ov Long Brook R BRDG 185 20,000 20,000 20,000

Sullivan 2002 021 97568 SR2002 ov Long Brook C BRDG 185 85,000 85,000 85,000

Sullivan 2002 021 97568 SR2002 ov Long Brook C BRDG 185 85,000 85,000 85,000

Sullivan 3009 016 99126 High Knob Rd to SR 154 C HRST 581 520,000 520,000 520,000

Sullivan 4006 013 99363 SR4006ovPorterCreek P BRDG 185 20,000 20,000 20,000

Sullivan 4006 013 99363 SR4006ovPorterCreek P BRDG 185 20,000 20,000 20,000

Sullivan 4006 013 99363 SR4006ovPorterCreek F BRDG 185 20,000 20,000 20,000

Sullivan 4006 013 99363 SR4006ovPorterCreek U BRDG 185 25,000 25,000 25,000

Sullivan 4006 013 99363 SR4006ovPorterCreek R BRDG 185 20,000 20,000 20,000

Sullivan 4006 013 99363 SR4006ovPorterCreek C BRDG 185 85,000 85,000 85,000

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek F BRDG 185 10,000 10,000 10,000

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek U BRDG 185 10,000 10,000 10,000

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek U BRDG 185 15,000 15,000 15,000

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek R BRDG 185 20,000 20,000 20,000

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek C BRDG 185 85,000 85,000 85,000

Page 187: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

187 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Sullivan 4008 019 103518SR 4008 ov Tb Elk Creek C BRDG 185 85,000 85,000 85,000

Sullivan 4012 031 7011 SR4012ovLoyalsockCrk P BRDG 581 20,000 20,000 20,000

Sullivan 4012 031 7011 SR4012ovLoyalsockCrk C BRDG 581 120,500 120,500 120,500

Sullivan 4012 031 7011 SR4012ovLoyalsockCrk C BRDG 581 79,500 79,500 79,500

Totals for: Sullivan 4,600,000 4,600,000 1,082,061 3,672,250 24,750 4,779,061 2,353,939 6,226,250 21,250 8,601,439 3,960,000 5,000 3,965,000 21,945,500

Susquehanna 84389 N Tier Bridge Review P BRDG 185 50,000 50,000 50,000

Susquehanna 84389 N Tier Bridge Review P BRDG 185 50,000 50,000 50,000

Susquehanna 84389 N Tier Bridge Review P BRDG 185 50,000 50,000 50,000

Susquehanna 102317NTIER 916 oversight costs P BRDG 185 20,000 20,000 20,000

Susquehanna 102317NTIER 916 oversight costs C BRDG 185 20,000 20,000 20,000

Susquehanna 102360RBR Initiative C BRDG STP 400,000 185 118,000 518,000 518,000

Susquehanna 102360RBR Initiative C BRDG STP 400,000 185 443,000 843,000 843,000

Susquehanna 102360RBR Initiative C BRDG STP 45,000 185 798,000 843,000 843,000

Susquehanna 102360RBR Initiative C BRDG 185 158,000 158,000 158,000

Susquehanna 86915 N Tier Project Delivery P HRST 581 100,000 100,000 100,000

Susquehanna 86915 N Tier Project Delivery P HRST 581 100,000 100,000 100,000

Susquehanna 0 73299 N Tier D4 Bridge Reserve C BRDG BOF 86,200 185 20,300 106,500 106,500

Susquehanna 0 73299 N Tier D4 Bridge Reserve C BRDG BOF 46,000 185 9,500 55,500 55,500

Susquehanna 0 73299 N Tier D4 Bridge Reserve C BRDG BOF 52,000 52,000 52,000

Susquehanna 0 73299 N Tier D4 Bridge Reserve C BRDG 185 3,500 3,500 3,500

Susquehanna 364 83013 Carmalt Rd Brg T-695 C BRDG 185 150,000 37,500 187,500 187,500

Susquehanna 364 83013 Carmalt Rd Brg T-695 C BRDG 185 170,000 42,500 212,500 212,500

Susquehanna 11 503 70163 US 11/171 P HRST 581 250,000 250,000 250,000

Susquehanna 11 550 9672 SR 11 over Salt Lick Ck C BRDG STP 640,000 185 160,000 800,000 800,000

Susquehanna 11 ERS 94737 SR 11 Shoulders / ELRS F SAMI HSIP 325,000 325,000 325,000

Susquehanna 11 ERS 94737 SR 11 Shoulders / ELRS F SAMI HSIP 85,500 85,500 85,500

Susquehanna 11 ERS 94737 SR 11 Shoulders / ELRS C SAMI HSIP 575,200 575,200 575,200

Susquehanna 29 592 88584 SR 29 Slides, Phase 2 C HRST STP 1,750,000 1,750,000 1,750,000

Susquehanna 29 LEE 94630 SR 29 Emergency Slide C HRST FFL 3,400,000 582 1,000,000 600,000 5,000,000 5,000,000

Susquehanna 81 511 75917 NTier Interstate 4R F IMAN NHPP 1,928,624 581 214,292 2,142,916 2,142,916

Susquehanna 81 511 75917 NTier Interstate 4R F IMAN NHPP 1,928,623 581 214,291 2,142,914 2,142,914

Susquehanna 81 511 75917 NTier Interstate 4R U IMAN NHPP 47,741 581 5,305 53,046 53,046

Susquehanna 81 511 75917 NTier Interstate 4R R IMAN NHPP 381,924 581 42,436 424,360 424,360

Susquehanna 81 511 75917 NTier Interstate 4R +C IMAN NHPP 50,000,000 50,000,000 50,000,000

Susquehanna 81 511 75917 NTier Interstate 4R +C IMAN NHPP 67,000,000 67,000,000 67,000,000

Susquehanna 81 590 75976 I-81 Exit 219 F IMAN NHPP 1,854,000 581 206,000 2,060,000 2,060,000

Susquehanna 81 590 75976 I-81 Exit 219 U IMAN NHPP 139,050 581 15,450 154,500 154,500

Susquehanna 81 590 75976 I-81 Exit 219 R IMAN NHPP 611,820 581 67,980 679,800 679,800

Susquehanna 81 590 75976 I-81 Exit 219 +C IMAN NHPP 6,840,770 6,840,770 6,840,770

Susquehanna 81 590 75976 I-81 Exit 219 +C IMAN NHPP 10,000,000 10,000,000 10,000,000

Page 188: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

188 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Susquehanna 81 590 75976 I-81 Exit 219 +C IMAN NHPP 10,000,000 10,000,000 10,000,000

Susquehanna 92 SLD 96812 SR 92 Slide +C HRST 581 1,375,000 1,375,000 1,375,000

Susquehanna 167 SLD 96814 SR 167 Slide +C HRST STP 425,000 425,000 425,000

Susquehanna 171 0 101932Group 4-15-ST 4 C HRST 581 1,500,000 1,500,000 1,500,000

Susquehanna 171 0 101932Group 4-15-ST 4 C HRST 581 6,000,000 6,000,000 6,000,000

Susquehanna 171 502 47034 Main St., Jail Hill C HRST 581 1,600,000 1,600,000 1,600,000

Susquehanna 171 570 9637 Drinkers Cr Brg Susq Depo C BRDG STP 200,000 200,000 200,000

Susquehanna 171 SLD 96811 SR 171 Slide C HRST 581 700,000 700,000 700,000

Susquehanna 171 T02 101982Group 4-15-ST 6 C HRST 581 4,850,000 4,850,000 4,850,000

Susquehanna 171 T02 101982Group 4-15-ST 6 C HRST 581 2,650,000 2,650,000 2,650,000

Susquehanna 267 0 102008Group 4-16-ST 10 C HRST NHPP 500,000 581 6,000,000 6,500,000 6,500,000

Susquehanna 367 550 9709 SR 367 ov Br Tuscarora Cr P BRDG 185 400,000 400,000 400,000

Susquehanna 492 SLD 96809 SR 492 Slide C HRST 581 300,000 300,000 300,000

Susquehanna 706 501 9745 Bradford to Rush R HRST STP 600,000 600,000 600,000

Susquehanna 706 501 9745 Bradford to Rush C HRST 581 5,000,000 5,000,000 5,000,000

Susquehanna 706 501 9745 Bradford to Rush C HRST 581 6,000,000 6,000,000 6,000,000

Susquehanna 706 501 9745 Bradford to Rush C HRST 581 6,150,000 6,150,000 6,150,000

Susquehanna 706 502 47123 Rush to Fairdale P HRST 581 1,500,000 1,500,000 1,500,000

Susquehanna 706 504 47125 W.Montrose to Tiffany C HRST STR 300,000 300,000 300,000

Susquehanna 848 574 9651 SR 848 ov Butler Creek F BRDG 185 230,000 230,000 230,000

Susquehanna 858 552 88613 SR 0858, Br Ov Summers Cr P BRDG BOF 98,800 185 24,700 123,500 123,500

Susquehanna 858 552 88613 SR 0858, Br Ov Summers Cr C BRDG 185 430,000 430,000 430,000

Susquehanna 858 552 88613 SR 0858, Br Ov Summers Cr C BRDG 185 170,000 170,000 170,000

Susquehanna 1009 572 85730 SR 1009 ov Starrucca Ck F BRDG 185 287,500 287,500 287,500

Susquehanna 1010 501 9572 SR 1010 over Lewis Creek F BRDG BOF 185,000 185 45,000 230,000 230,000

Susquehanna 1010 SLD 96816 SR 1010 Slide C HRST 581 215,000 215,000 215,000

Susquehanna 1016 570 9580 New Milford RR Bridge C BRDG BOF 600,000 185 150,000 750,000 750,000

Susquehanna 1016 570 9580 New Milford RR Bridge C BRDG BOF 1,000,000 185 250,000 1,250,000 1,250,000

Susquehanna 1016 571 9525 Meylert Creek Bridge C BRDG 185 207,500 207,500 207,500

Susquehanna 1016 571 9525 Meylert Creek Bridge C BRDG 185 1,187,500 1,187,500 1,187,500

Susquehanna 1016 571 9525 Meylert Creek Bridge C BRDG 185 920,000 920,000 920,000

Susquehanna 1016 571 9525 Meylert Creek Bridge C BRDG 185 785,000 785,000 785,000

Susquehanna 1021 REP 96813 SR 1021 Slide C HRST 581 152,000 152,000 152,000

Susquehanna 1022 SLD 96815 SR 1022 Slide C HRST 581 425,000 425,000 425,000

Susquehanna 1033 551 83062 SR 1033 over Dubois Creek C BRDG 185 150,000 150,000 150,000

Susquehanna 1033 553 9707 1033 over Susq River Trib F BRDG STP 184,000 185 46,000 230,000 230,000

Susquehanna 2008 P50 96727 SR 2008 ov Dundaff Creek U BRDG 185 35,000 35,000 35,000

Susquehanna 2012 572 69015 SR 2012 ov Tinker Brook P BRDG 185 116,500 116,500 116,500

Susquehanna 2021 570 9642 SR 2021 ov Trib Tunk Cr P BRDG 185 250,000 250,000 250,000

Susquehanna 3037 550 96717 SR 3037 ov Wyalusing Ck +P BRDG STP 300,000 300,000 300,000

Page 189: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

189 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Susquehanna 4004 D50 79590 SR 4004 ov McCormick Run P BRDG 185 250,000 250,000 250,000

Susquehanna 7409 551 65189 Church Street Bridge P BRDG 183 160,000 40,000 200,000 200,000

Totals for: Susquehanna 8,832,624 9,840,792 600,000 19,273,416 11,644,428 12,609,962 37,500 24,291,890 63,096,000 16,022,500 42,500 79,161,000 79,357,200 16,474,500 40,000 95,871,700 218,598,006

Tioga 82736 NTIER CMAQ Line Item C IMOD CAQ 270,000 270,000 270,000

Tioga 82736 NTIER CMAQ Line Item C IMOD CAQ 270,000 270,000 270,000

Tioga 82736 NTIER CMAQ Line Item C IMOD CAQ 270,000 270,000 270,000

Tioga 82736 NTIER CMAQ Line Item C IMOD CAQ 270,000 270,000 270,000

Tioga 104341Tioga County Bridge Study S BRDG BOF 75,000 75,000 75,000

Tioga 47714 CO #6 ov Elkhorn Crk P BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Tioga LBR 7291 T-450 over Marsh Creek P BRDG BOF 165,440 165,440 165,440

Tioga LBR 7291 T-450 over Marsh Creek F BRDG BOF 80,000 183 15,000 5,000 100,000 100,000

Tioga LBR 7291 T-450 over Marsh Creek U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Tioga LBR 7291 T-450 over Marsh Creek R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Tioga LBR 7291 T-450 over Marsh Creek C BRDG BOF 144,000 183 27,000 9,000 180,000 180,000

Tioga LBR 7291 T-450 over Marsh Creek C BRDG BOF 656,000 183 123,000 41,000 820,000 820,000

Tioga LBR 7365 T-402 over Cowanesque Rvr C BRDG BOF 38,720 38,720 38,720

Tioga RBR 88612 Parallel Culvert Liberty C BRDG 183 355,250 88,813 444,063 444,063

Tioga RBR 88612 Parallel Culvert Liberty C BRDG 183 16,750 4,187 20,937 20,937

Tioga RBR 93129 T-920 over Porter Creek C BRDG 183 4,000 1,000 5,000 5,000

Tioga RRX 103193NTIER RRX Upgrade +C SAMI RRX 309,000 309,000 309,000

Tioga 6 062 99160 Potter County to Long Run F HRST 581 20,000 20,000 20,000

Tioga 6 062 99160 Potter County to Long Run C HRST 581 900,000 900,000 900,000

Tioga 6 062 99160 Potter County to Long Run C HRST 581 650,000 650,000 650,000

Tioga 6 064 99386 Long Run to Colton Rd F HRST 581 20,000 20,000 20,000

Tioga 6 064 99386 Long Run to Colton Rd C HRST 581 2,600,000 2,600,000 2,600,000

Tioga 6 065 99387 Dantz Run to PA 287 P HRST 581 50,000 50,000 50,000

Tioga 6 065 99387 Dantz Run to PA 287 F HRST 581 100,000 100,000 100,000

Tioga 6 065 99387 Dantz Run to PA 287 C HRST 581 2,100,000 2,100,000 2,100,000

Tioga 6 065 99387 Dantz Run to PA 287 C HRST 581 1,575,000 1,575,000 1,575,000

Tioga 6 066 102014US6 ov Morris Branch P BRDG 185 80,000 80,000 80,000

Tioga 6 066 102014US6 ov Morris Branch F BRDG 185 36,000 36,000 36,000

Tioga 6 066 102014US6 ov Morris Branch U BRDG 185 50,000 50,000 50,000

Tioga 6 066 102014US6 ov Morris Branch R BRDG 185 50,000 50,000 50,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk P BRDG 185 40,000 40,000 40,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk P BRDG 581 10,000 10,000 10,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk F BRDG 185 60,000 60,000 60,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk U BRDG 185 25,000 25,000 25,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk R BRDG 185 25,000 25,000 25,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk +C BRDG NHPP 518,000 518,000 518,000

Tioga 6 108 87923 US6 ov Tb Charleston Crk +C BRDG NHPP 382,000 382,000 382,000

Page 190: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

190 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Tioga 6 109 87980 N-Tier Sbstructure Cntrct P BRDG 185 30,000 30,000 30,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct F BRDG 185 20,000 20,000 20,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct U BRDG 185 80,000 80,000 80,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct R BRDG 185 50,000 50,000 50,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct C BRDG NHPP 150,000 185 100,000 250,000 250,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct C BRDG STP 250,000 250,000 250,000

Tioga 6 109 87980 N-Tier Sbstructure Cntrct C BRDG STP 250,000 185 131,000 381,000 381,000

Tioga 6 110 88875 US 6 Center Turn Lane +C SAMI HSIP 493,077 493,077 493,077

Tioga 6 110 88875 US 6 Center Turn Lane +C SAMI HSIP 562,800 562,800 562,800

Tioga 6 110 88875 US 6 Center Turn Lane +C SAMI HSIP 388,600 388,600 388,600

Tioga 6 110 88875 US 6 Center Turn Lane +C SAMI HSIP 125,523 125,523 125,523

Tioga 6 M27 82984 Queen St to Woodland Ave C HRST STP 108,000 108,000 108,000

Tioga 15 159 102016SR15 Brg Preservation F BRDG 185 5,000 5,000 5,000

Tioga 15 159 102016SR15 Brg Preservation C BRDG NHPP 501,000 501,000 501,000

Tioga 15 159 102016SR15 Brg Preservation C BRDG NHPP 999,000 999,000 999,000

Tioga 15 M60 87971 SR 660 to SR 6 F HRST 581 20,000 20,000 20,000

Tioga 49 068 98825 Signal Intersection NTier S HRST 581 10,000 10,000 10,000

Tioga 249 023 90007 SR 249 over TbCrookedCrk F BRDG 185 20,000 20,000 20,000

Tioga 249 023 90007 SR 249 over TbCrookedCrk R BRDG 185 24,000 24,000 24,000

Tioga 249 023 90007 SR 249 over TbCrookedCrk C BRDG 185 200,000 400,000 600,000 600,000

Tioga 287 092 7322 SR 287 over Norris Brook C BRDG 185 700,000 700,000 700,000

Tioga 287 092 7322 SR 287 over Norris Brook C BRDG 185 700,000 700,000 700,000

Tioga 287 142 97719 Cole Rd to State Rte 4024 F HRST 581 20,000 20,000 20,000

Tioga 287 142 97719 Cole Rd to State Rte 4024 C HRST 581 500,000 500,000 500,000

Tioga 287 142 97719 Cole Rd to State Rte 4024 C HRST 581 725,000 725,000 725,000

Tioga 287 80S 95646 SR 287 Morris Twp Slide C HRST 581 175,000 175,000 175,000

Tioga 328 028 97773 PA 287 to Button Hill Rd C HRST 581 835,000 835,000 835,000

Tioga 328 029 99151 Button Hill Rd to SR 1013 C HRST 581 675,000 675,000 675,000

Tioga 328 030 99152 SR 1013 to Bradford Co Ln C HRST 581 705,000 705,000 705,000

Tioga 328 GRP 82371 Tioga Bridge Painting P BRDG 185 5,000 5,000 5,000

Tioga 328 GRP 82371 Tioga Bridge Painting F BRDG 185 5,000 5,000 5,000

Tioga 328 GRP 82371 Tioga Bridge Painting C BRDG 185 200,000 200,000 200,000

Tioga 328 GRP 82371 Tioga Bridge Painting C BRDG 185 100,000 100,000 100,000

Tioga 349 007 99153 Elk Lick Run to Mill Crk C HRST 581 20,000 20,000 20,000

Tioga 349 008 99171 Ladd Rd to SR 49 P HCON 581 100,000 100,000 100,000

Tioga 349 008 99171 Ladd Rd to SR 49 F HCON 581 150,000 150,000 150,000

Tioga 349 008 99171 Ladd Rd to SR 49 U HCON 581 25,000 25,000 25,000

Tioga 349 008 99171 Ladd Rd to SR 49 C HCON 581 585,000 585,000 585,000

Tioga 414 058 97772 Water St to Blockhouse Cr F HRST 581 15,000 15,000 15,000

Tioga 414 058 97772 Water St to Blockhouse Cr C HRST 581 500,000 500,000 500,000

Page 191: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

191 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Tioga 414 059 99173 SR15 to SR2005 P HRST 581 50,000 50,000 50,000

Tioga 414 059 99173 SR15 to SR2005 F HRST 581 75,000 75,000 75,000

Tioga 414 059 99173 SR15 to SR2005 C HRST 581 1,800,000 1,800,000 1,800,000

Tioga 414 30M 87879 SR 414 Slide Morris Twp C HRST 581 2,193,000 2,193,000 2,193,000

Tioga 414 30M 87879 SR 414 Slide Morris Twp C HRST 581 807,000 807,000 807,000

Tioga 549 013 7329 SR 549 over Elk Run C BRDG 581 1,900,000 1,900,000 1,900,000

Tioga 549 022 83655 SR 549 over Seely Creek +C BRDG STP 350,000 350,000 350,000

Tioga 549 022 83655 SR 549 over Seely Creek +C BRDG STP 650,000 650,000 650,000

Tioga 660 009 99154 SR 4002 to Spencer Rd C HRST 581 775,000 775,000 775,000

Tioga 660 010 99161 Spencer Rd to SR 2005 F HRST 581 20,000 20,000 20,000

Tioga 660 010 99161 Spencer Rd to SR 2005 C HRST 581 1,075,000 1,075,000 1,075,000

Tioga 660 010 99161 Spencer Rd to SR 2005 C HRST 581 800,000 800,000 800,000

Tioga 1003 021 87951 SR 1003 over Mill Creek P BRDG 185 5,000 5,000 5,000

Tioga 1003 021 87951 SR 1003 over Mill Creek F BRDG 185 5,000 5,000 5,000

Tioga 1003 021 87951 SR 1003 over Mill Creek C BRDG 185 30,000 30,000 30,000

Tioga 1003 021 87951 SR 1003 over Mill Creek C BRDG 185 30,000 30,000 30,000

Tioga 1013 012 99365 SR1013 ov Hammond Creek P BRDG 185 20,000 20,000 20,000

Tioga 1013 012 99365 SR1013 ov Hammond Creek P BRDG 185 20,000 20,000 20,000

Tioga 1013 013 99366 SR1013 ov Hammond Creek P BRDG 185 20,000 20,000 20,000

Tioga 1013 013 99366 SR1013 ov Hammond Creek P BRDG 185 20,000 20,000 20,000

Tioga 1022 024 97571 SR1022 ov Allen Cr P BRDG 185 20,000 20,000 20,000

Tioga 1022 024 97571 SR1022 ov Allen Cr P BRDG 185 20,000 20,000 20,000

Tioga 1022 024 97571 SR1022 ov Allen Cr F BRDG 185 10,000 10,000 10,000

Tioga 1022 024 97571 SR1022 ov Allen Cr F BRDG 185 10,000 10,000 10,000

Tioga 1022 024 97571 SR1022 ov Allen Cr U BRDG 185 25,000 25,000 25,000

Tioga 1022 024 97571 SR1022 ov Allen Cr R BRDG 185 10,000 10,000 10,000

Tioga 1022 024 97571 SR1022 ov Allen Cr R BRDG 185 10,000 10,000 10,000

Tioga 1022 024 97571 SR1022 ov Allen Cr C BRDG 185 85,000 85,000 85,000

Tioga 1022 025 99367 SR1022 ov Allen Creek P BRDG 185 20,000 20,000 20,000

Tioga 1022 025 99367 SR1022 ov Allen Creek P BRDG 185 20,000 20,000 20,000

Tioga 1022 025 99367 SR1022 ov Allen Creek F BRDG 185 10,000 10,000 10,000

Tioga 1022 025 99367 SR1022 ov Allen Creek U BRDG 185 12,500 12,500 12,500

Tioga 1022 025 99367 SR1022 ov Allen Creek R BRDG 185 10,000 10,000 10,000

Tioga 1028 002 87931 SR 1028 over Smith Creek C BRDG 185 75,000 75,000 75,000

Tioga 1028 002 87931 SR 1028 over Smith Creek C BRDG 185 95,000 95,000 95,000

Tioga 2022 006 99192 SR 2020 to SR 2005 C HRST 581 720,000 720,000 720,000

Tioga 2022 007 78954 SR 2022 over Gaffers Crk P BRDG 185 2,500 2,500 2,500

Tioga 2022 007 78954 SR 2022 over Gaffers Crk P BRDG 185 2,500 2,500 2,500

Tioga 2022 007 78954 SR 2022 over Gaffers Crk F BRDG 185 2,500 2,500 2,500

Tioga 2022 007 78954 SR 2022 over Gaffers Crk F BRDG 185 2,500 2,500 2,500

Page 192: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

192 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Tioga 2022 007 78954 SR 2022 over Gaffers Crk C BRDG 185 30,000 30,000 30,000

Tioga 3001 008 87934 SR 3001 over Cedar Run C BRDG 185 30,000 30,000 30,000

Tioga 3001 008 87934 SR 3001 over Cedar Run C BRDG 185 30,000 30,000 30,000

Tioga 3001 009 87945 SR 3001 over Elk Run C BRDG 185 30,000 30,000 30,000

Tioga 3001 009 87945 SR 3001 over Elk Run C BRDG 185 30,000 30,000 30,000

Tioga 3007 016 99201 Tdghtn Hill Rd to Sty Frk C HRST 581 360,000 360,000 360,000

Tioga 3009 017 99377 SR3009ovCharlestonCreek P BRDG 185 7,500 7,500 7,500

Tioga 3009 017 99377 SR3009ovCharlestonCreek F BRDG 185 5,000 5,000 5,000

Tioga 3009 017 99377 SR3009ovCharlestonCreek U BRDG 185 12,500 12,500 12,500

Tioga 3023 002 7083 SR 3023 over Heise Run C BRDG 185 75,000 75,000 75,000

Tioga 3023 002 7083 SR 3023 over Heise Run C BRDG 185 75,000 75,000 75,000

Tioga 3024 009 7084 SR 3024 ovr Straight Run P BRDG 185 5,000 5,000 5,000

Tioga 3024 009 7084 SR 3024 ovr Straight Run F BRDG 185 5,000 5,000 5,000

Tioga 3024 009 7084 SR 3024 ovr Straight Run C BRDG 185 30,000 30,000 30,000

Tioga 3024 009 7084 SR 3024 ovr Straight Run C BRDG 185 30,000 30,000 30,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr F BRDG 185 10,000 10,000 10,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr F BRDG 185 10,000 10,000 10,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr U BRDG 185 25,000 25,000 25,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr R BRDG 185 10,000 10,000 10,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr R BRDG 185 10,000 10,000 10,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr C BRDG 185 75,000 75,000 75,000

Tioga 3098 002 97573 SR3098ovTbEBrStFkCr C BRDG 185 75,000 75,000 75,000

Tioga 4001 026 97574 SR4001 ovTb Wattles Run P BRDG 185 20,000 20,000 20,000

Tioga 4001 026 97574 SR4001 ovTb Wattles Run P BRDG 185 20,000 20,000 20,000

Tioga 4001 026 97574 SR4001 ovTb Wattles Run F BRDG 185 10,000 10,000 10,000

Tioga 4001 026 97574 SR4001 ovTb Wattles Run U BRDG 185 12,500 12,500 12,500

Tioga 4001 026 97574 SR4001 ovTb Wattles Run R BRDG 185 10,000 10,000 10,000

Tioga 4001 027 99415 SR4001 ov Potter Brook P BRDG 185 20,000 20,000 20,000

Tioga 4001 027 99415 SR4001 ov Potter Brook P BRDG 185 20,000 20,000 20,000

Tioga 4009 013 95548 SR 4009 ov Troups Cr C BRDG 185 1,168,500 1,168,500 1,168,500

Tioga 4009 013 95548 SR 4009 ov Troups Cr C BRDG 185 171,500 171,500 171,500

Tioga 4017 016 7346 SR 4017 over Holden Creek C BRDG BOF 50,000 50,000 50,000

Tioga 4017 022 96354 Tioga Brg Deck Joints 2 C BRDG BOF 45,000 45,000 45,000

Tioga 4017 024 97575 SR4017 ov Losey Creek F BRDG 185 10,000 10,000 10,000

Tioga 4017 024 97575 SR4017 ov Losey Creek F BRDG 185 10,000 10,000 10,000

Tioga 4017 024 97575 SR4017 ov Losey Creek U BRDG 185 25,000 25,000 25,000

Tioga 4017 024 97575 SR4017 ov Losey Creek R BRDG 185 10,000 10,000 10,000

Tioga 4017 024 97575 SR4017 ov Losey Creek R BRDG 185 10,000 10,000 10,000

Tioga 4017 024 97575 SR4017 ov Losey Creek C BRDG 185 75,000 75,000 75,000

Tioga 4017 024 97575 SR4017 ov Losey Creek C BRDG 185 75,000 75,000 75,000

Page 193: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

193 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Tioga 4017 23S 98117 SR 4017 Slide P HRST 581 50,000 50,000 50,000

Tioga 4017 23S 98117 SR 4017 Slide F HRST 581 100,000 100,000 100,000

Tioga 4017 23S 98117 SR 4017 Slide U HRST 581 25,000 25,000 25,000

Tioga 4017 23S 98117 SR 4017 Slide R HRST 581 25,000 25,000 25,000

Tioga 4017 23S 98117 SR 4017 Slide C HRST 581 2,000,000 2,000,000 2,000,000

Tioga 4023 001 7269 SR 4023 overTb Camp Brook C BRDG 185 500,000 500,000 500,000

Tioga 4023 001 7269 SR 4023 overTb Camp Brook C BRDG 185 500,000 500,000 500,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk P BRDG 185 20,000 20,000 20,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk F BRDG 185 10,000 10,000 10,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk F BRDG 185 10,000 10,000 10,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk U BRDG 185 25,000 25,000 25,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk R BRDG 185 10,000 10,000 10,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk R BRDG 185 10,000 10,000 10,000

Tioga 4027 005 102033SR4027ovTrbCrookedCrk C BRDG 185 85,000 85,000 85,000

Tioga 4039 005 87933 SR 4039 over Tb Hills Crk F BRDG 185 20,000 20,000 20,000

Tioga 4039 005 87933 SR 4039 over Tb Hills Crk U BRDG 185 15,000 15,000 15,000

Tioga 4039 005 87933 SR 4039 over Tb Hills Crk R BRDG 185 10,000 10,000 10,000

Tioga 4039 005 87933 SR 4039 over Tb Hills Crk C BRDG 185 75,000 75,000 75,000

Tioga 4039 005 87933 SR 4039 over Tb Hills Crk C BRDG 185 75,000 75,000 75,000

Tioga 4039 006 98515 SR4039 ov Hills Creek P BRDG 185 2,500 2,500 2,500

Tioga 4039 006 98515 SR4039 ov Hills Creek F BRDG 185 2,500 2,500 2,500

Tioga 4039 007 99214 SR 4037 to Reese Hill Rd C HRST 581 580,000 580,000 580,000

Totals for: Tioga 2,055,237 5,701,750 489,813 8,246,800 2,471,800 6,201,250 19,187 8,692,237 2,432,600 8,727,000 41,000 11,200,600 1,587,523 13,360,000 10,000 14,957,523 43,097,160

Union LBR 72351 T-321 ov Sweitzers Run P BRDG STP 64,000 183 12,000 4,000 80,000 80,000

Union LBR 72351 T-321 ov Sweitzers Run P BRDG STP 64,000 183 12,000 4,000 80,000 80,000

Union LBR 72351 T-321 ov Sweitzers Run F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Union LBR 72351 T-321 ov Sweitzers Run U BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Union LBR 72351 T-321 ov Sweitzers Run R BRDG BOF 16,000 183 3,000 1,000 20,000 20,000

Union LBR 72532 T-526-White Deer Hole Crk P BRDG STP 128,000 183 24,000 8,000 160,000 160,000

Union LBR 72532 T-526-White Deer Hole Crk F BRDG BOF 96,000 183 18,000 6,000 120,000 120,000

Union LBR 72532 T-526-White Deer Hole Crk U BRDG BOF 20,000 183 3,750 1,250 25,000 25,000

Union LBR 72532 T-526-White Deer Hole Crk R BRDG BOF 48,000 183 9,000 3,000 60,000 60,000

Union LBR 7498 T-309 over Penns Creek C BRDG BOF 318,000 183 195,000 65,000 578,000 578,000

Union LBR 7498 T-309 over Penns Creek C BRDG STP 722,000 722,000 722,000

Union LBR 7498 T-309 over Penns Creek C BRDG BOF 342,000 183 105,000 35,000 482,000 482,000

Union LBR 7498 T-309 over Penns Creek C BRDG STP 218,000 218,000 218,000

Union LBR 7500 Idding Br 14 ov Buffalo C C BRDG BOF 672,000 168,000 840,000 840,000

Union LBR 7540 T-450 over Buffalo Creek C BRDG BOF 400,000 183 75,000 25,000 500,000 500,000

Union LBR 7540 T-450 over Buffalo Creek C BRDG BOF 880,000 183 165,000 55,000 1,100,000 1,100,000

Union LBR 88515 T-404 ov Lt Buffalo Crk C BRDG STP 160,000 183 30,000 10,000 200,000 200,000

Page 194: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

194 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Union LBR 88515 T-404 ov Lt Buffalo Crk C BRDG STP 352,000 183 66,000 22,000 440,000 440,000

Union LBR 93615 T-359 ov N Br Buffalo Crk P BRDG STP 119,000 183 22,312 7,437 148,749 148,749

Union LBR 93615 T-359 ov N Br Buffalo Crk P BRDG STP 9,000 183 1,688 563 11,251 11,251

Union LBR 93615 T-359 ov N Br Buffalo Crk F BRDG STP 96,000 185 18,000 6,000 120,000 120,000

Union LBR 93615 T-359 ov N Br Buffalo Crk U BRDG BOF 16,000 185 3,000 1,000 20,000 20,000

Union LBR 93615 T-359 ov N Br Buffalo Crk R BRDG STP 16,000 183 3,000 1,000 20,000 20,000

Union LBR 93615 T-359 ov N Br Buffalo Crk C BRDG BOF 314,000 183 58,875 19,625 392,500 392,500

Union 15 158 99242 SR15 Nbl Soil SlideRepair F HCON 581 100,000 100,000 100,000

Union 15 158 99242 SR15 Nbl Soil SlideRepair +C HCON NHPP 200,000 200,000 200,000

Union 15 88A 76397 CSVT River Bridge C HCON APD 8,883,871 581 748,518 9,632,389 9,632,389

Union 15 88A 76397 CSVT River Bridge C HCON APD 44,419,353 581 3,742,589 48,161,942 48,161,942

Union 15 88A 76397 CSVT River Bridge C HCON APD 44,419,353 581 3,742,590 48,161,943 48,161,943

Union 15 88A 76397 CSVT River Bridge C HCON APD 44,419,353 581 3,742,589 48,161,942 48,161,942

Union 15 88B 76398 CSVT Earthwork North Sec C HCON 581 16,848,867 16,848,867 16,848,867

Union 15 88B 76398 CSVT Earthwork North Sec C HCON 581 28,081,445 28,081,445 28,081,445

Union 15 88B 76398 CSVT Earthwork North Sec C HCON 581 33,697,734 33,697,734 33,697,734

Union 15 M55 87968 Furnace Rd to SR 192 F HRST 581 15,000 15,000 15,000

Union 15 M55 87968 Furnace Rd to SR 192 C HRST 581 500,000 500,000 500,000

Union 15 M55 87968 Furnace Rd to SR 192 C HRST 581 770,000 770,000 770,000

Union 15 M56 87972 Martin St to SR 192 F HRST 581 15,000 15,000 15,000

Union 15 M56 87972 Martin St to SR 192 C HRST 581 500,000 500,000 500,000

Union 15 M56 87972 Martin St to SR 192 C HRST 581 550,000 550,000 550,000

Union 44 052 94711 Union Cnty MembraneGroup3 C BRDG 185 83,375 83,375 83,375

Union 44 052 94711 Union Cnty MembraneGroup3 C BRDG 185 41,625 41,625 41,625

Union 45 20M 87859 Swengel Rd to SR 104 C HRST 581 28,343 28,343 28,343

Union 80 138 98705 Union Co Bridge Overlays F BRDG NHPP 50,000 50,000 50,000

Union 80 138 98705 Union Co Bridge Overlays +C BRDG NHPP 1,300,000 1,300,000 1,300,000

Union 80 139 98685 I-80 Wbl over SR 1010 +P BRDG NHPP 250,000 250,000 250,000

Union 80 139 98685 I-80 Wbl over SR 1010 +F BRDG NHPP 150,000 150,000 150,000

Union 80 M23 87572 Gray Hill Rd to SR 1011 +C IMAN NHPP 1,601,000 1,601,000 1,601,000

Union 80 M25 87574 White Deer Pk to SR 1011 +C IMAN NHPP 1,766,000 1,766,000 1,766,000

Union 192 25M 88937 Forestry Rd to SR 2001 C HRST 581 600,000 600,000 600,000

Union 192 25M 88937 Forestry Rd to SR 2001 C HRST 581 600,000 600,000 600,000

Union 235 017 93646 SR 235 over Tb Laurel Run P BRDG 185 40,000 40,000 40,000

Union 235 017 93646 SR 235 over Tb Laurel Run F BRDG 185 20,000 20,000 20,000

Union 235 017 93646 SR 235 over Tb Laurel Run U BRDG 185 40,000 40,000 40,000

Union 235 017 93646 SR 235 over Tb Laurel Run R BRDG 185 25,000 25,000 25,000

Union 304 012 88030 SR 304 over Tb Penns Crk U BRDG 185 20,000 20,000 20,000

Union 304 012 88030 SR 304 over Tb Penns Crk C BRDG 185 80,000 80,000 80,000

Union 304 012 88030 SR 304 over Tb Penns Crk C BRDG 185 70,000 70,000 70,000

Page 195: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

195 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Union 1003 032 98755 SR1003 ov TbLt BuffaloCrk P BRDG 185 40,000 40,000 40,000

Union 1003 033 98772 SR1003ovTbLt Buffalo Crk P BRDG 185 40,000 40,000 40,000

Union 1011 020 99249 High St to SR 1010 F HRST 581 20,000 20,000 20,000

Union 1011 020 99249 High St to SR 1010 C HRST 581 400,000 400,000 400,000

Union 1011 021 99141 SR1011over Tb Susq River +P BRDG STP 150,000 150,000 150,000

Union 1011 022 78979 SR 1011 ov White Deer Crk +P BRDG STP 150,000 150,000 150,000

Union 1014 012 98777 SR 1014 over South Creek P BRDG 185 40,000 40,000 40,000

Union 2001 011 88025 SR 2001 over Beaver Run F BRDG 185 5,000 5,000 5,000

Union 2001 011 88025 SR 2001 over Beaver Run U BRDG 185 25,000 25,000 25,000

Union 2001 011 88025 SR 2001 over Beaver Run R BRDG 185 45,000 45,000 45,000

Union 2001 011 88025 SR 2001 over Beaver Run C BRDG 185 150,000 150,000 150,000

Union 2003 012 98786 SR 2003 ov Tb Buffalo Crk P BRDG 185 40,000 40,000 40,000

Union 2007 011 88032 SR 2007 over Mill Race U BRDG 185 10,000 10,000 10,000

Union 2007 011 88032 SR 2007 over Mill Race C BRDG 185 85,000 85,000 85,000

Union 2007 011 88032 SR 2007 over Mill Race C BRDG 185 65,000 65,000 65,000

Union 2009 008 93614 SR 2009 over Tb Susq. Rvr P BRDG 185 40,000 40,000 40,000

Union 2009 008 93614 SR 2009 over Tb Susq. Rvr F BRDG 185 25,000 25,000 25,000

Union 2009 008 93614 SR 2009 over Tb Susq. Rvr U BRDG 185 65,000 65,000 65,000

Union 2009 008 93614 SR 2009 over Tb Susq. Rvr R BRDG 185 25,000 25,000 25,000

Union 2009 008 93614 SR 2009 over Tb Susq. Rvr C BRDG 185 150,000 150,000 150,000

Union 3001 010 93644 SR 3001 over Tb Penns Crk P BRDG 185 40,000 40,000 40,000

Union 3001 010 93644 SR 3001 over Tb Penns Crk F BRDG 185 20,000 20,000 20,000

Union 3001 010 93644 SR 3001 over Tb Penns Crk U BRDG 185 30,000 30,000 30,000

Union 3001 010 93644 SR 3001 over Tb Penns Crk R BRDG 185 25,000 25,000 25,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn P BRDG 185 40,000 40,000 40,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn F BRDG 185 20,000 20,000 20,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn U BRDG 185 30,000 30,000 30,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn R BRDG 185 25,000 25,000 25,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn C BRDG 185 104,000 104,000 104,000

Union 3002 012 93610 SR3002 ov Tb Whitehorn Rn C BRDG 185 46,000 46,000 46,000

Union 3003 022 97744 PA 45 to SR 3005 C HRST 581 400,000 400,000 400,000

Union 3003 022 97744 PA 45 to SR 3005 C HRST 581 400,000 400,000 400,000

Union 3004 016 7427 SR 3004 over Cedar Run F BRDG 185 20,000 20,000 20,000

Union 3004 016 7427 SR 3004 over Cedar Run U BRDG 185 50,000 50,000 50,000

Union 3004 016 7427 SR 3004 over Cedar Run R BRDG 185 30,000 30,000 30,000

Union 3004 016 7427 SR 3004 over Cedar Run C BRDG 185 80,000 80,000 80,000

Union 3005 014 93529 SR 3005 ov Tb Buffalo Crk F BRDG 185 20,000 20,000 20,000

Union 3005 014 93529 SR 3005 ov Tb Buffalo Crk U BRDG 185 60,000 60,000 60,000

Union 3005 014 93529 SR 3005 ov Tb Buffalo Crk R BRDG 185 30,000 30,000 30,000

Union 3005 014 93529 SR 3005 ov Tb Buffalo Crk C BRDG 185 127,000 127,000 127,000

Page 196: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

196 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Union 3005 015 93530 SR 3005 ov Tb Buffalo Crk F BRDG 185 20,000 20,000 20,000

Union 3005 015 93530 SR 3005 ov Tb Buffalo Crk U BRDG 185 25,000 25,000 25,000

Union 3005 015 93530 SR 3005 ov Tb Buffalo Crk R BRDG 185 20,000 20,000 20,000

Union 3005 015 93530 SR 3005 ov Tb Buffalo Crk C BRDG 185 150,000 150,000 150,000

Totals for: Union 13,651,871 1,919,173 210,437 15,781,481 48,192,353 22,800,144 154,563 71,147,060 45,571,353 34,082,410 47,000 79,700,763 45,525,353 39,828,573 37,875 85,391,801 252,021,105

Venango 102325Northwest RBR Initiative C BRDG 185 3,000,000 3,000,000 3,000,000

Venango 102325Northwest RBR Initiative C BRDG 185 3,000,000 3,000,000 3,000,000

Venango 98262 NW Local Brdg Line Item C BRDG BOF 1,357,000 183 371,000 1,728,000 1,728,000

Venango 98262 NW Local Brdg Line Item C BRDG BOF 1,600,000 183 400,000 2,000,000 2,000,000

Venango 98262 NW Local Brdg Line Item C BRDG BOF 1,600,000 183 400,000 2,000,000 2,000,000

Venango 98262 NW Local Brdg Line Item C BRDG BOF 1,600,000 183 400,000 2,000,000 2,000,000

Venango 98265 NWRPO 2015 TIP Line Item C BRDG BOF 24,000 24,000 24,000

Venango 98265 NWRPO 2015 TIP Line Item C BRDG BOF 224,000 185 1,061,000 1,285,000 1,285,000

Venango 98265 NWRPO 2015 TIP Line Item C BRDG BOF 904,000 185 1,807,000 2,711,000 2,711,000

Venango 98265 NWRPO 2015 TIP Line Item C BRDG BOF 544,000 185 2,727,000 3,271,000 3,271,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST NHPP 89,000 581 158,000 247,000 247,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST STP 180,000 180,000 180,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST NHPP 17,000 581 111,000 128,000 128,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST STP 105,000 105,000 105,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST NHPP 17,000 581 471,000 488,000 488,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST STP 405,000 405,000 405,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST NHPP 17,000 581 1,291,000 1,308,000 1,308,000

Venango 98265 NWRPO 2015 TIP Line Item C HRST STP 405,000 405,000 405,000

Venango 98265 NWRPO 2015 TIP Line Item C SAMI HSIP 1,437,480 1,437,480 1,437,480

Venango 98265 NWRPO 2015 TIP Line Item C SAMI HSIP 794,280 794,280 794,280

Venango 98265 NWRPO 2015 TIP Line Item C SAMI HSIP 184,530 184,530 184,530

Venango 98808 2017 Betterment Line Item +C HRST NHPP 3,300,000 3,300,000 3,300,000

Venango 98808 2017 Betterment Line Item +C HRST STP 4,000,000 4,000,000 4,000,000

Venango 98809 2018 Betterment Line Item +C HRST NHPP 3,500,000 3,500,000 3,500,000

Venango 98809 2018 Betterment Line Item +C HRST STP 5,000,000 5,000,000 5,000,000

Venango T20 104245OC&T RR HVAC C IMOD TAP 13,800 13,800 13,800

Venango 8 15M 100148SR 8: Cross Ck-Sopher Rd C HRST 581 1,000,000 1,000,000 1,000,000

Venango 38 06M 89186 SR 38: Bell Rd - SR 322 C HRST 581 1,700,000 1,700,000 1,700,000

Venango 38 07M 100089SR 308: Emlnton-Bell Rd C HRST 581 400,000 400,000 400,000

Venango 38 B02 90028 SR 38 over Richey Run P BRDG 581 200,000 200,000 200,000

Venango 38 B02 90028 SR 38 over Richey Run F BRDG 581 100,000 100,000 100,000

Venango 38 B02 90028 SR 38 over Richey Run U BRDG 581 25,000 25,000 25,000

Venango 38 B02 90028 SR 38 over Richey Run R BRDG 581 25,000 25,000 25,000

Venango 38 B02 90028 SR 38 over Richey Run C BRDG 581 700,000 700,000 700,000

Venango 62 0 103201RR - SR62 Petroleum St +C SAMI RRX 309,000 309,000 309,000

Page 197: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

197 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Venango 62 10M 97915 SR 62:Henrys Bend-Forest +C HRST NHPP 3,000,000 3,000,000 3,000,000

Venango 157 04M 100152SR 157: SR 62-Co Line Rd C HRST 581 2,500,000 2,500,000 2,500,000

Venango 157 B00 89112 SR 157 ov Wolf Ck Trib P BRDG 581 200,000 200,000 200,000

Venango 157 B00 89112 SR 157 ov Wolf Ck Trib F BRDG 581 100,000 100,000 100,000

Venango 157 B00 89112 SR 157 ov Wolf Ck Trib U BRDG 581 25,000 25,000 25,000

Venango 157 B00 89112 SR 157 ov Wolf Ck Trib R BRDG 581 25,000 25,000 25,000

Venango 157 B00 89112 SR 157 ov Wolf Ck Trib C BRDG 581 800,000 800,000 800,000

Venango 208 B02 93161 SR 208 over McKees Run P BRDG 581 200,000 200,000 200,000

Venango 208 B02 93161 SR 208 over McKees Run F BRDG 581 100,000 100,000 100,000

Venango 208 B02 93161 SR 208 over McKees Run U BRDG 581 25,000 25,000 25,000

Venango 208 B02 93161 SR 208 over McKees Run R BRDG 581 25,000 25,000 25,000

Venango 208 B02 93161 SR 208 over McKees Run C BRDG 581 700,000 700,000 700,000

Venango 257 01M 100155SR 257: SR 322-Innis St C HRST 581 2,200,000 2,200,000 2,200,000

Venango 268 01M 100082SR 268: Butler to SR 38 C HRST 581 250,000 250,000 250,000

Venango 322 B00 58255 SR 322 Sugar Ck Bridge R BRDG 581 50,000 50,000 50,000

Venango 322 B00 58255 SR 322 Sugar Ck Bridge C BRDG 581 1,000,000 1,000,000 1,000,000

Venango 322 B00 58255 SR 322 Sugar Ck Bridge C BRDG 581 2,500,000 2,500,000 2,500,000

Venango 3021 01M 100141SR 3021: SR 8-Liberty St C HRST 581 900,000 900,000 900,000

Venango 4006 B01 58275 SR 4006: Patchell Run Br F BRDG 581 100,000 100,000 100,000

Venango 4006 B01 58275 SR 4006: Patchell Run Br C BRDG 581 350,000 350,000 350,000

Venango 4010 B00 2298 SR 4010 over Sugar Creek F BRDG 185 200,000 200,000 200,000

Venango 4010 B00 2298 SR 4010 over Sugar Creek R BRDG 185 100,000 100,000 100,000

Venango 4010 B00 2298 SR 4010 over Sugar Creek C BRDG 185 2,000,000 2,000,000 2,000,000

Venango 6008 01M 100067SR 6008: Center Street C HRST 581 400,000 400,000 400,000

Venango 6008 B00 84949 SR 6008 over Oil Creek C BRDG 185 1,220,000 1,220,000 1,220,000

Venango 6008 B00 84949 SR 6008 over Oil Creek C BRDG 185 420,000 420,000 420,000

Totals for: Venango 4,972,800 4,099,000 9,071,800 3,383,480 5,542,000 8,925,480 11,020,280 11,578,000 22,598,280 11,250,530 14,518,000 25,768,530 66,364,090

Warren 000 79268 T-444 Irvine Rn Rd Bridge P BRDG BOF 99,000 99,000 99,000

Warren 6 21M 95579 SR 6: Resurfacing C HRST 581 700,000 700,000 700,000

Warren 6 22M 95580 SR 6: Con Ptch & Nova Chp C HRST 581 1,100,000 1,100,000 1,100,000

Warren 6 23M 95581 SR 6: SR 62 Intchg to PSP C HRST 581 1,700,000 1,700,000 1,700,000

Warren 6 23M 95581 SR 6: SR 62 Intchg to PSP C HRST 581 300,000 300,000 300,000

Warren 6 25M 100006SR 6: SR 59-Claredon Hgts C HRST 581 1,500,000 1,500,000 1,500,000

Warren 6 B10 90023 SR 6/Swamp Run Branch P BRDG 581 200,000 200,000 200,000

Warren 6 B10 90023 SR 6/Swamp Run Branch F BRDG 581 100,000 100,000 100,000

Warren 6 B10 90023 SR 6/Swamp Run Branch U BRDG 581 25,000 25,000 25,000

Warren 6 B10 90023 SR 6/Swamp Run Branch R BRDG 581 25,000 25,000 25,000

Warren 6 B10 90023 SR 6/Swamp Run Branch C BRDG 581 700,000 700,000 700,000

Warren 426 B02 2523 SR 426 Br/Brokenstraw Ck. F BRDG 185 50,000 50,000 50,000

Warren 666 B01 90149 SR 666/Dodge Run P BRDG 581 200,000 200,000 200,000

Page 198: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

198 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Warren 666 B01 90149 SR 666/Dodge Run F BRDG 581 150,000 150,000 150,000

Warren 666 B01 90149 SR 666/Dodge Run U BRDG 581 25,000 25,000 25,000

Warren 666 B01 90149 SR 666/Dodge Run R BRDG 581 25,000 25,000 25,000

Warren 666 B01 90149 SR 666/Dodge Run C BRDG 581 700,000 700,000 700,000

Warren 1007 01M 100442SR 1007: Dutch Hill Road C HRST 581 525,000 525,000 525,000

Warren 1009 DOI 97871 Warren DOI Group 2 C HRST 581 2,100,000 2,100,000 2,100,000

Warren 1012 B02 2479 SR 1012: Priest Hlw Rd Br R BRDG 581 100,000 100,000 100,000

Warren 1012 B02 2479 SR 1012: Priest Hlw Rd Br C BRDG 581 4,250,000 4,250,000 4,250,000

Warren 1021 01M 100498SR 1021: Jackson Avenue C HRST 581 310,000 310,000 310,000

Warren 1021 02M 100526SR 1021: Cnwgo Ave-Scndia C HRST 581 675,000 675,000 675,000

Warren 1021 B00 93158 SR 1021 over Macks Run P BRDG 581 200,000 200,000 200,000

Warren 1021 B00 93158 SR 1021 over Macks Run F BRDG 581 100,000 100,000 100,000

Warren 1021 B00 93158 SR 1021 over Macks Run U BRDG 581 25,000 25,000 25,000

Warren 1021 B00 93158 SR 1021 over Macks Run R BRDG 581 25,000 25,000 25,000

Warren 1021 B00 93158 SR 1021 over Macks Run C BRDG 581 550,000 550,000 550,000

Warren 1025 01M 100453SR 1025: Page Hollow Rd C HRST 581 600,000 600,000 600,000

Warren 2003 01M 100501SR 2003: Mohawk Avenue C HRST 581 775,000 775,000 775,000

Warren 2010 B00 2545 Browns Run Road Bridge P BRDG BOF 160,000 185 40,000 200,000 200,000

Warren 2010 B00 2545 Browns Run Road Bridge F BRDG BOF 120,000 185 30,000 150,000 150,000

Warren 2010 B00 2545 Browns Run Road Bridge R BRDG 185 50,000 50,000 50,000

Warren 2010 B00 2545 Browns Run Road Bridge C BRDG BOF 480,000 185 120,000 600,000 600,000

Warren 3002 01M 100472SR 3002: Enterprise Road C HRST 581 610,000 610,000 610,000

Warren 3004 01M 100478SR 3004: Selkirk Road C HRST 581 1,350,000 1,350,000 1,350,000

Warren 3008 01M 100485SR 3008: Sundback Road C HRST 581 625,000 625,000 625,000

Warren 3016 01M 100490SR 3016: Couvers Xing Rd C HRST 581 620,000 620,000 620,000

Warren 3022 B03 2542 Old Rt 6/Irvine Run Br R BRDG 185 50,000 50,000 50,000

Warren 3022 B03 2542 Old Rt 6/Irvine Run Br C BRDG BOF 640,000 185 160,000 800,000 800,000

Warren 4025 01M 100494SR 4025: Old Pine Vly Rd C HRST 581 280,000 280,000 280,000

Warren 6006 B02 2480 SR 6006: Penn Ave Bridge C BRDG 185 726,000 726,000 726,000

Warren 6006 B02 2480 SR 6006: Penn Ave Bridge C HRST 581 269,600 269,600 269,600

Totals for: Warren 99,000 6,545,600 6,644,600 800,000 1,050,000 1,850,000 120,000 10,020,000 10,140,000 480,000 5,050,000 5,530,000 24,164,600

Washington 102036Washington DFB-2015 C HRST 581 150,000 150,000 150,000

Washington 102036Washington DFB-2015 C HRST 581 150,000 150,000 150,000

Washington 102154D12 Construction Mgt C BRDG 581 500,000 500,000 500,000

Washington 102154D12 Construction Mgt C BRDG 581 500,000 500,000 500,000

Washington 102993Cal Tech Park Access Rd C HCON APL 300,000 300,000 300,000

Washington 103183Monongahela Corridor +C SAMI RRX 506,479 506,479 506,479

Washington 103185SR 1006 Grade Crossing +C SAMI RRX 136,591 136,591 136,591

Washington 103185SR 1006 Grade Crossing +C SAMI RRX 136,591 136,591 136,591

Washington 103186Dunlevy Corridor +C SAMI RRX 546,364 546,364 546,364

Page 199: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

199 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Washington 103186Dunlevy Corridor +C SAMI RRX 546,363 546,363 546,363

Washington 103187Besco St. Grade Crossing +C SAMI RRX 281,377 281,377 281,377

Washington 95056 D12 Utility Agreement U HRST 581 150,000 150,000 150,000

Washington 95056 D12 Utility Agreement U HRST 581 150,000 150,000 150,000

Washington 18 0 98368 PA 18:McJ Dr to Maiden St C HRST 581 1,379,170 1,379,170 1,379,170

Washington 18 T10 88829 PA 18 Signal Upgrades F SAMI CAQ 460,000 581 115,000 575,000 575,000

Washington 18 T10 88829 PA 18 Signal Upgrades U SAMI CAQ 1,391,129 581 347,782 1,738,911 1,738,911

Washington 18 T10 88829 PA 18 Signal Upgrades R SAMI CAQ 1,350,611 581 337,653 1,688,264 1,688,264

Washington 18 T10 88829 PA 18 Signal Upgrades C SAMI CAQ 2,628,000 581 657,000 3,285,000 3,285,000

Washington 19 19R 94729 US19:Walnut St to Mall Rd +C HRST NHPP 2,408,573 2,408,573 2,408,573

Washington 19 19R 94729 US19:Walnut St to Mall Rd +C HRST NHPP 3,819,971 3,819,971 3,819,971

Washington 40 0 98362 US 40:PA 917 to Maiden St +C HRST NHPP 4,243,600 4,243,600 4,243,600

Washington 40 0 98363 US 40: US 19 to Chestnut C HRST NHPP 2,970,520 2,970,520 2,970,520

Washington 70 10J 47022 I-70 @ PA 481 Interchange +C IMAN NHPP 23,508,000 23,508,000 23,508,000

Washington 70 10J 47022 I-70 @ PA 481 Interchange +C IMAN NHPP 4,292,000 4,292,000 4,292,000

Washington 70 21H 70047 Bentleyville Interchange P IMAN NHPP 49,500 581 5,500 55,000 55,000

Washington 70 21H 70047 Bentleyville Interchange F HRST 581 100,000 100,000 100,000

Washington 70 21H 70047 Bentleyville Interchange +C IMAN NHPP 18,035,300 18,035,300 18,035,300

Washington 70 21H 70047 Bentleyville Interchange +C IMAN NHPP 18,035,300 18,035,300 18,035,300

Washington 70 21H 70047 Bentleyville Interchange +C IMAN NHPP 18,035,300 18,035,300 18,035,300

Washington 70 22M 94684 Belle Vernon Brdg Preserv F BRDG 185 500,000 500,000 500,000

Washington 70 22M 94684 Belle Vernon Brdg Preserv U BRDG 185 50,000 50,000 50,000

Washington 70 22M 94684 Belle Vernon Brdg Preserv C BRDG NHPP 8,848,531 581 2,000,000 10,848,531 10,848,531

Washington 70 22M 94684 Belle Vernon Brdg Preserv C BRDG NHPP 16,781,719 16,781,719 16,781,719

Washington 70 T10 73514 I70: 79-S to SR 136 Intch +C IMAN NHPP 7,378,980 7,378,980 7,378,980

Washington 70 T10 73514 I70: 79-S to SR 136 Intch +C IMAN NHPP 16,000,000 16,000,000 16,000,000

Washington 70 T10 73514 I70: 79-S to SR 136 Intch +C IMAN NHPP 16,000,000 16,000,000 16,000,000

Washington 70 T20 87236 I70: I79N to SR 136 Intch C IMAN NHPP* 8,512,188 581* 995,798 9,507,986 9,507,986

Washington 70 T20 87236 I70: I79N to SR 136 Intch C IMAN NHPP* 8,512,189 581* 995,799 9,507,988 9,507,988

Washington 70 W31 75950 South Junction to SR 519 F IMAN NHPP 756,000 581 84,000 840,000 840,000

Washington 70 W31 75950 South Junction to SR 519 U IMAN NHPP 343,800 581 38,200 382,000 382,000

Washington 70 W31 75950 South Junction to SR 519 R IMAN NHPP 687,600 581 76,400 764,000 764,000

Washington 70 W31 75950 South Junction to SR 519 +C IMAN NHPP 7,514,500 7,514,500 7,514,500

Washington 70 W31 75950 South Junction to SR 519 +C IMAN NHPP 15,000,000 15,000,000 15,000,000

Washington 70 W31 75950 South Junction to SR 519 +C IMAN NHPP 15,000,000 15,000,000 15,000,000

Washington 79 20H 31182 I-79/I-70 Interchange C HRST NHPP 1,800,000 581 200,000 2,000,000 2,000,000

Washington 88 0 103184SR 0088 Grade Xing +C SAMI RRX 132,612 132,612 132,612

Washington 88 0 103184SR 0088 Grade Xing +C SAMI RRX 132,612 132,612 132,612

Washington 88 127 47432 PA 88 & 837 Carroll Twp F HRST 581 400,000 400,000 400,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp U HRST 581 115,000 115,000 115,000

Page 200: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

200 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Washington 88 127 47432 PA 88 & 837 Carroll Twp R HRST 581 600,000 600,000 600,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp C HRST 581 1,060,000 1,060,000 1,060,000

Washington 88 127 47432 PA 88 & 837 Carroll Twp C HRST 581 1,000,000 1,000,000 1,000,000

Washington 88 SIP 96936 WashCo Surface Impvmt-14 C HRST 581 2,000,000 2,000,000 2,000,000

Washington 136 G10 30749 B&O Railroad Bridge U HRST STP 94,760 94,760 94,760

Washington 136 G10 30749 B&O Railroad Bridge R HRST STP 140,080 140,080 140,080

Washington 136 G10 30749 B&O Railroad Bridge C BRDG 185 2,000,000 2,000,000 2,000,000

Washington 136 G10 30749 B&O Railroad Bridge C BRDG 185 3,304,500 3,304,500 3,304,500

Washington 519 138 30949 PA 519/SR 1055 Intersect. C SAMI HSIP 1,803,027 1,803,027 1,803,027

Washington 519 K20 57201 SR 519 at SR 980 and I-79 F SAMI 581 1,957,000 1,957,000 1,957,000

Washington 519 K20 57201 SR 519 at SR 980 and I-79 U SAMI 581 530,450 530,450 530,450

Washington 519 K20 57201 SR 519 at SR 980 and I-79 R SAMI 581 1,591,350 1,591,350 1,591,350

Washington 519 K20 57201 SR 519 at SR 980 and I-79 C SAMI 581 14,000,000 14,000,000 14,000,000

Washington 519 K20 57201 SR 519 at SR 980 and I-79 C SAMI 581 11,735,278 11,735,278 11,735,278

Washington 837 0 98364 PA837:SecondSt to ScottSt C HRST NHPP 2,156,419 2,156,419 2,156,419

Washington 837 09R 95287 Donora/Webster Area Roads C HRST STP 100,000 100,000 100,000

Washington 980 139 31194 PA 980 Approach To PA 50 R HRST 581 250,000 250,000 250,000

Washington 980 139 31194 PA 980 Approach To PA 50 C HRST 581 2,700,000 2,700,000 2,700,000

Washington 980 B02 30746 Chartiers Creek Bridge U BRDG 185 125,000 125,000 125,000

Washington 980 B02 30746 Chartiers Creek Bridge C BRDG 185 1,250,000 1,250,000 1,250,000

Washington 980 B02 30746 Chartiers Creek Bridge C BRDG 185 1,700,000 1,700,000 1,700,000

Washington 1002 0 98344 SR1002: Aphea Dr to US 19 C HRST 581 1,592,708 1,592,708 1,592,708

Washington 1006 K10 48137 Venetia Road Bridge C BRDG 185 2,288,790 2,288,790 2,288,790

Washington 1006 K10 48137 Venetia Road Bridge C BRDG 185 1,000,000 1,000,000 1,000,000

Washington 1009 000 30687 SR 1009 over Chartiers Ck P BRDG 185 327,818 327,818 327,818

Washington 1009 000 30687 SR 1009 over Chartiers Ck F BRDG 185 441,799 441,799 441,799

Washington 1009 000 30687 SR 1009 over Chartiers Ck U BRDG 185 89,554 89,554 89,554

Washington 1009 000 30687 SR 1009 over Chartiers Ck R BRDG 185 149,257 149,257 149,257

Washington 1009 187 83446 SR 1009 Signal Upgrades +C SAMI CAQ 1,054,319 1,054,319 1,054,319

Washington 1009 C10 77383 SR 1009/4049 Intersection C HRST 581 325,000 325,000 325,000

Washington 1010 149 48483 Valleybrook @ Bebout Rd S HRST 581 200,000 200,000 200,000

Washington 1059 B10 83445 SR 1059 over Mingo Creek P BRDG 185 218,545 218,545 218,545

Washington 1059 B10 83445 SR 1059 over Mingo Creek F BRDG 185 225,102 225,102 225,102

Washington 1059 B10 83445 SR 1059 over Mingo Creek U BRDG 185 56,275 56,275 56,275

Washington 1059 B10 83445 SR 1059 over Mingo Creek R BRDG 185 168,826 168,826 168,826

Washington 2027 0 98291 SR 2027 over I-70 P BRDG 185 500,000 500,000 500,000

Washington 2027 0 98291 SR 2027 over I-70 F BRDG 185 400,000 400,000 400,000

Washington 2027 0 98291 SR 2027 over I-70 F BRDG 185 400,000 400,000 400,000

Washington 2027 0 98291 SR 2027 over I-70 U BRDG 185 100,000 100,000 100,000

Washington 2027 0 98291 SR 2027 over I-70 R BRDG 185 100,000 100,000 100,000

Page 201: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

201 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Washington 2073 0 100447SR 2073 & 2083 Resurface C HRST STP 600,000 600,000 600,000

Washington 3003 0 97454 SR 3003 Brdg Preservation C HRST 581 1,000,000 1,000,000 1,000,000

Washington 3003 0 97454 SR 3003 Brdg Preservation C HRST 581 300,000 300,000 300,000

Washington 4007 C10 76073 SR 4007 over US 22 P BRDG 185 609,219 609,219 609,219

Washington 4007 C10 76073 SR 4007 over US 22 P BRDG 185 600,000 600,000 600,000

Washington 4007 C10 76073 SR 4007 over US 22 F BRDG 185 1,240,424 1,240,424 1,240,424

Washington 4007 C10 76073 SR 4007 over US 22 U BRDG 185 109,273 109,273 109,273

Washington 4007 C10 76073 SR 4007 over US 22 R BRDG 185 273,181 273,181 273,181

Washington 4007 C10 76073 SR 4007 over US 22 C BRDG 581 2,000,000 2,000,000 2,000,000

Washington 4007 C10 76073 SR 4007 over US 22 C BRDG 581 3,000,000 3,000,000 3,000,000

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 P BRDG 185 327,818 327,818 327,818

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 F BRDG 185 327,818 327,818 327,818

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 U BRDG 185 28,138 28,138 28,138

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 R BRDG 185 57,964 57,964 57,964

Washington 4012 G10 76074 SR 4012 ov Robinson Run-2 C BRDG 185 1,842,876 1,842,876 1,842,876

Washington 4018 E10 76075 SR 4018 over Cross Creek C BRDG 185 1,500,000 1,500,000 1,500,000

Washington 4018 E10 76075 SR 4018 over Cross Creek C BRDG 185 685,454 685,454 685,454

Washington 4029 0 88074 4029 ov Br North Fk Cross P BRDG 185 337,653 337,653 337,653

Washington 7202 0 73024 Buffalo Creek #29 P BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Washington 7202 0 73024 Buffalo Creek #29 F BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Washington 7202 0 73024 Buffalo Creek #29 U BRDG BOF 8,000 183 1,500 500 10,000 10,000

Washington 7202 0 73024 Buffalo Creek #29 R BRDG BOF 8,000 183 1,500 500 10,000 10,000

Washington 7202 0 73024 Buffalo Creek #29 C BRDG BOF 800,000 183 150,000 50,000 1,000,000 1,000,000

Washington 7206 0 70284 Millers Run #3 F BRDG STP 148,000 183 27,750 9,250 185,000 185,000

Washington 7206 0 70284 Millers Run #3 U BRDG STP 24,000 183 4,500 1,500 30,000 30,000

Washington 7206 0 70284 Millers Run #3 R BRDG STP 16,000 183 3,000 1,000 20,000 20,000

Washington 7206 0 70284 Millers Run #3 C BRDG STP 880,000 183 165,000 55,000 1,100,000 1,100,000

Washington 7220 0 95829 Chartiers Creek #12 P BRDG BOF 200,000 50,000 250,000 250,000

Washington 7220 0 95829 Chartiers Creek #12 F BRDG BOF 200,000 50,000 250,000 250,000

Washington 7220 0 95829 Chartiers Creek #12 U BRDG BOF 8,000 2,000 10,000 10,000

Washington 7220 0 95829 Chartiers Creek #12 R BRDG BOF 8,000 2,000 10,000 10,000

Washington 7220 0 95829 Chartiers Creek #12 C BRDG BOF 1,600,000 183 300,000 100,000 2,000,000 2,000,000

Washington 7302 C61 30995 Chartier's Creek #61 F BRDG 183 170,000 38,018 208,018 208,018

Washington 7302 C61 30995 Chartier's Creek #61 C BRDG STP 960,000 183 180,000 60,000 1,200,000 1,200,000

Washington 8042 0 81650 SR 8042 over US 40 P BRDG 185 300,000 300,000 300,000

Washington 8042 0 81650 SR 8042 over US 40 F BRDG 185 355,136 355,136 355,136

Washington 8042 0 81650 SR 8042 over US 40 U BRDG 185 54,636 54,636 54,636

Washington 8042 0 81650 SR 8042 over US 40 R BRDG 185 109,273 109,273 109,273

Washington 8042 0 81650 SR 8042 over US 40 C BRDG 185 2,315,142 2,315,142 2,315,142

Totals for: Washington 49,971,486 17,796,685 227,268 67,995,439 67,332,139 15,974,479 50,000 83,356,618 59,476,780 26,004,175 17,500 85,498,455 61,510,500 23,061,470 150,000 84,721,970 321,572,482

Page 202: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

202 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Wayne 102313Wayne Co Bridge Review P BRDG 185 25,000 25,000 25,000

Wayne 102313Wayne Co Bridge Review P BRDG 185 50,000 50,000 50,000

Wayne 102313Wayne Co Bridge Review P BRDG 185 50,000 50,000 50,000

Wayne 102322Wayne 916 oversight costs P BRDG 185 10,000 10,000 10,000

Wayne 102322Wayne 916 oversight costs F BRDG 185 10,000 10,000 10,000

Wayne 102322Wayne 916 oversight costs C BRDG 185 25,000 25,000 25,000

Wayne 102363RBR Initiative C BRDG 185 311,500 311,500 311,500

Wayne 102363RBR Initiative C BRDG 185 311,500 311,500 311,500

Wayne 102363RBR Initiative C BRDG 185 311,500 311,500 311,500

Wayne 102363RBR Initiative C BRDG 185 311,500 311,500 311,500

Wayne 98210 Wayne County Reserve Line C BRDG BOF 31,100 185 33,924 65,024 65,024

Wayne 98210 Wayne County Reserve Line C BRDG BOF 297,000 185 53,000 350,000 350,000

Wayne 98210 Wayne County Reserve Line C BRDG BOF 274,600 185 99,900 374,500 374,500

Wayne 98210 Wayne County Reserve Line C BRDG BOF 28,600 185 166,650 195,250 195,250

Wayne 98210 Wayne County Reserve Line C HRST NHPP 1,000 581 792,600 793,600 793,600

Wayne 98210 Wayne County Reserve Line C HRST STP 535,000 535,000 535,000

Wayne 98210 Wayne County Reserve Line C HRST NHPP 1,000 581 1,531,000 1,532,000 1,532,000

Wayne 98210 Wayne County Reserve Line C HRST STP 305,000 305,000 305,000

Wayne 98210 Wayne County Reserve Line C HRST NHPP 1,000 581 267,000 268,000 268,000

Wayne 98210 Wayne County Reserve Line C HRST STP 103,000 103,000 103,000

Wayne 98210 Wayne County Reserve Line C HRST NHPP 1,000 581 158,000 159,000 159,000

Wayne 98210 Wayne County Reserve Line C HRST STP 355,000 355,000 355,000

Wayne 98210 Wayne County Reserve Line C SAMI HSIP 9,000 9,000 9,000

Wayne 98210 Wayne County Reserve Line C SAMI HSIP 94,000 94,000 94,000

Wayne 6 0 102010Group 4-16-ST 11 C HRST 581 2,500,000 2,500,000 2,500,000

Wayne 6 0 102010Group 4-16-ST 11 C HRST 581 3,900,000 3,900,000 3,900,000

Wayne 6 607 62912 SR 6 H'dle to Texas Twp C HRST STP 376,195 376,195 376,195

Wayne 191 610 47625 191/196 & T367, Salem Twp P SAMI HSIP 700,000 700,000 700,000

Wayne 191 610 47625 191/196 & T367, Salem Twp +F SAMI HSIP 400,000 400,000 400,000

Wayne 191 610 47625 191/196 & T367, Salem Twp +C HRST HSIP 709,000 581 4,791,000 5,500,000 5,500,000

Wayne 191 652 85787 SR 0191 ov Manny Run C BRDG 185 408,500 408,500 408,500

Wayne 191 652 85787 SR 0191 ov Manny Run C BRDG 185 161,500 161,500 161,500

Wayne 191 653 89022 SR 191 ov Dyberry Creek F BRDG STP 272,000 272,000 272,000

Wayne 191 653 89022 SR 191 ov Dyberry Creek F HRST 185 68,000 68,000 68,000

Wayne 191 REP 96908 SR 191 Slide C HRST 581 1,374,400 1,374,400 1,374,400

Wayne 191 REP 96908 SR 191 Slide C HRST 581 300,000 300,000 300,000

Wayne 191 SLD 96818 SR 191 Slide C HRST 581 702,000 702,000 702,000

Wayne 296 SAF 102329SR 296 Safety Enhancement C SAMI HSIP 309,000 309,000 309,000

Wayne 370 SLD 96904 SR 370 Slide C HRST 581 141,000 141,000 141,000

Wayne 371 0 102066Group 4-17-ST 9 C HRST 581 6,000,000 6,000,000 6,000,000

Page 203: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

203 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Wayne 371 651 10042 SR 371 ov Delaware River P BRDG STP 200,000 200,000 400,000 400,000

Wayne 371 651 10042 SR 371 ov Delaware River +C BRDG STP 350,000 350,000 700,000 700,000

Wayne 371 651 10042 SR 371 ov Delaware River +C BRDG STP 1,350,000 1,350,000 2,700,000 2,700,000

Wayne 371 674 68891 SR 371 Ov. WB Lackawaxen P BRDG 185 20,000 20,000 20,000

Wayne 371 674 68891 SR 371 Ov. WB Lackawaxen F BRDG 185 50,000 50,000 50,000

Wayne 371 674 68891 SR 371 Ov. WB Lackawaxen +C BRDG STP 1,500,000 1,500,000 1,500,000

Wayne 371 674 68891 SR 371 Ov. WB Lackawaxen +C BRDG STP 880,000 880,000 880,000

Wayne 590 0 101997Group 4-15-ST 11 C HRST 581 4,500,000 4,500,000 4,500,000

Wayne 590 0 101997Group 4-15-ST 11 C HRST 581 2,500,000 2,500,000 2,500,000

Wayne 590 603 57868 Hamlin Corners R HRST STP 400,000 581 100,000 500,000 500,000

Wayne 590 603 57868 Hamlin Corners C HRST 581 1,344,000 1,344,000 1,344,000

Wayne 652 659 83052 Ov. Delaware, Narrowsburg P BRDG STP 228,604 228,604 457,208 457,208

Wayne 652 659 83052 Ov. Delaware, Narrowsburg F BRDG STP 150,000 150,000 300,000 300,000

Wayne 652 659 83052 Ov. Delaware, Narrowsburg +C BRDG STP 100,000 100,000 200,000 200,000

Wayne 652 ELS 102326SR 0652 Shoulders / ELRS +C SAMI HSIP 615,000 615,000 615,000

Wayne 652 SLD 96817 SR 652 Slide C HRST 581 351,000 351,000 351,000

Wayne 1004 SLD 96905 SR 1004 Slide C HRST 581 700,000 700,000 700,000

Wayne 1004 SLD 96905 SR 1004 Slide C HRST 581 666,000 666,000 666,000

Wayne 1018 675 95289 SR 1018 S. Br Equinunk Ck F BRDG 185 315,000 315,000 315,000

Wayne 1018 675 95289 SR 1018 S. Br Equinunk Ck C BRDG BOF 300,000 185 56,250 356,250 356,250

Wayne 1018 675 95289 SR 1018 S. Br Equinunk Ck C BRDG BOF 400,000 185 712,750 1,112,750 1,112,750

Wayne 1023 650 92892 SR 1023 over So. Equ Crk F BRDG 185 287,500 287,500 287,500

Wayne 1023 650 92892 SR 1023 over So. Equ Crk C BRDG BOF 300,000 185 75,000 375,000 375,000

Wayne 2007 P50 68927 SR 2007 over Holbert Cr U BRDG 185 60,000 60,000 60,000

Wayne 2008 670 9833 Carley Brook Brg. 2 C BRDG 185 500,000 500,000 500,000

Wayne 3004 651 89021 3004 ov WB Wallenpaupack F BRDG BOF 262,400 185 65,600 328,000 328,000

Wayne 3019 670 9882 Jones Creek Bridge F BRDG 185 275,000 275,000 275,000

Wayne 3019 670 9882 Jones Creek Bridge C BRDG 185 308,250 308,250 308,250

Wayne 3019 670 9882 Jones Creek Bridge C BRDG 185 788,500 788,500 788,500

Wayne 3019 670 9882 Jones Creek Bridge C BRDG 185 505,750 505,750 505,750

Wayne 3028 SLD 96821 SR 3028 Slide C HRST 581 211,000 211,000 211,000

Wayne 4006 650 68970 SR 4006 Ov Dyberry Creek C BRDG BOF 88,000 185 22,000 110,000 110,000

Wayne 4014 SLD 96881 SR 4014 Slide C HRST 581 400,000 400,000 400,000

Wayne 4017 670 9834 SR 4017 ov Dyberry Creek +C BRDG BOF 368,400 185 92,100 460,500 460,500

Wayne 7202 BRG 9849 T-603 Factory Bridge #5 P BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Wayne 7216 BRG 64824 Wangum Bridge #29, T-367 F BRDG BOF 65,900 183 16,475 82,375 82,375

Wayne 7216 BRG 64824 Wangum Bridge #29, T-367 C BRDG BOF 327,201 179 20,450 347,651 347,651

Wayne 7216 BRG 64824 Wangum Bridge #29, T-367 C BRDG 183 61,351 61,351 61,351

Totals for: Wayne 3,212,000 7,220,450 378,604 10,811,054 3,212,000 9,160,000 12,372,000 3,212,000 11,759,000 560,000 15,531,000 3,212,000 11,759,000 1,450,000 16,421,000 55,135,054

Westmoreland 102037Westmoreland DFB- 2015 C BRDG 581 150,000 150,000 150,000

Page 204: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

204 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Westmoreland 102037Westmoreland DFB- 2015 C BRDG 581 150,000 150,000 150,000

Westmoreland 103188Sutersville Corridor +C SAMI RRX 257,500 257,500 257,500

Westmoreland 103188Sutersville Corridor +C SAMI RRX 257,500 257,500 257,500

Westmoreland 103189Eureka Hill Rd Grade Xing +C SAMI RRX 132,613 132,613 132,613

Westmoreland 103189Eureka Hill Rd Grade Xing +C SAMI RRX 132,612 132,612 132,612

Westmoreland 103190Vine Street Grade Xing +C SAMI RRX 281,377 281,377 281,377

Westmoreland 103911Irwin Phase 2- PA Avenue C TENH TAU 221,900 221,900 221,900

Westmoreland 103912HeritageTrail Ph3 C TENH TAU 750,000 750,000 750,000

Westmoreland 104331DistrictWide Tree Triming C HRST 581 50,000 50,000 50,000

Westmoreland 31918 East Hillis Street P BRDG BOF 200,000 183 37,500 12,500 250,000 250,000

Westmoreland 94945 Transit Commuter Center C PT CAQ 2,400,000 600,000 3,000,000 3,000,000

Westmoreland BR 31669 Fairwood Manor Br P BRDG STP 200,000 183 37,500 12,500 250,000 250,000

Westmoreland LBS 77374 Westmoreland Loc Br Line P BRDG BOF 20,000 183 60,000 320,000 400,000 400,000

Westmoreland LBS 77374 Westmoreland Loc Br Line P BRDG 37,500 37,500 37,500

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG BOF 584,000 183 109,500 36,500 730,000 730,000

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG STP 600,000 183 112,500 37,500 750,000 750,000

Westmoreland LBS 77374 Westmoreland Loc Br Line C BRDG STP 800,000 275,000 1,075,000 1,075,000

Westmoreland SCT 87086 Scottdale SRTS C TENH SRTSF 32,500 32,500 32,500

Westmoreland 22 15R 101370US 22 Concrete Patching C HRST NHPP 2,000,000 2,000,000 2,000,000

Westmoreland 30 0 101493Jeanette/Hempfield CMAQ P SAMI CAQ 400,000 581 100,000 500,000 500,000

Westmoreland 30 0 101493Jeanette/Hempfield CMAQ R SAMI CAQ 120,000 581 30,000 150,000 150,000

Westmoreland 30 134 31872 Jeannette - Amos K Bypass C HRST STP 300,000 300,000 300,000

Westmoreland 30 28R 91083 BeattyCrossrds-St.Vincent C HRST NHPP 3,605,000 3,605,000 3,605,000

Westmoreland 30 A10 32040 US 30 Corridor Impvmts P HRST 581 1,000,000 1,000,000 1,000,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int F HRST 581 400,000 400,000 400,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int F HRST 581 400,000 400,000 400,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int U HRST 581 206,000 206,000 206,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int R HRST 581 1,545,000 1,545,000 1,545,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int C HRST 581 10,000,000 10,000,000 10,000,000

Westmoreland 31 X10 57452 PA31:Donegal- 381/711 Int C HRST 581 10,000,000 10,000,000 10,000,000

Westmoreland 51 0 98300 PA 51: PA 201 to Co Line +C HRST NHPP 4,370,908 4,370,908 4,370,908

Westmoreland 56 04M 96123 PA 56 Metal Culvrt Preser C BRDG 185 300,000 300,000 300,000

Westmoreland 56 22R 93072 PA 56, Poplar St to River C HRST NHPP 335,000 335,000 335,000

Westmoreland 56 B10 76089 PA 56 over Little Pucketa R BRDG 185 24,320 24,320 24,320

Westmoreland 66 24R 94852 PA66 :Mamont Dr to PA 366 +C HRST 581 2,000,000 2,000,000 2,000,000

Westmoreland 66 24R 94852 PA66 :Mamont Dr to PA 366 +C HRST 581 700,000 700,000 700,000

Westmoreland 70 0 31894 I-70 @ PA 31 Interchange P IMAN 185 580,875 580,875 580,875

Westmoreland 70 0 31894 I-70 @ PA 31 Interchange F IMAN 185 2,652,250 2,652,250 2,652,250

Westmoreland 70 0 31894 I-70 @ PA 31 Interchange U IMAN 185 1,060,900 1,060,900 1,060,900

Westmoreland 70 0 31894 I-70 @ PA 31 Interchange R IMAN 185 2,121,800 2,121,800 2,121,800

Page 205: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

205 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Westmoreland 70 0 31894 I-70 @ PA 31 Interchange +C IMAN NHPP 8,289,518 8,289,518 8,289,518

Westmoreland 70 0 75978 I-70 @ PA 51 Interchange P IMAN 185 3,278,181 3,278,181 3,278,181

Westmoreland 70 D10 88508 I-70 Arnold City Interch P IMAN 185 400,000 400,000 400,000

Westmoreland 70 D10 88508 I-70 Arnold City Interch P IMAN 185 1,191,350 1,191,350 1,191,350

Westmoreland 70 D10 88508 I-70 Arnold City Interch F IMAN 185 1,688,263 1,688,263 1,688,263

Westmoreland 70 D10 88508 I-70 Arnold City Interch U IMAN 185 2,251,018 2,251,018 2,251,018

Westmoreland 70 D10 88508 I-70 Arnold City Interch R IMAN 185 2,251,018 2,251,018 2,251,018

Westmoreland 70 L10 31895 I-70 @ Yukon Interchange F IMAN 185 3,000,000 3,000,000 3,000,000

Westmoreland 70 L10 31895 I-70 @ Yukon Interchange U IMAN 185 1,133,000 1,133,000 1,133,000

Westmoreland 70 L10 31895 I-70 @ Yukon Interchange R IMAN 185 3,090,000 3,090,000 3,090,000

Westmoreland 70 L10 31895 I-70 @ Yukon Interchange +C IMAN NHPP 7,756,814 7,756,814 7,756,814

Westmoreland 70 L10 31895 I-70 @ Yukon Interchange +C IMAN NHPP 17,756,814 17,756,814 17,756,814

Westmoreland 70 Q10 32032 New Stanton Intrchng F IMAN NHPP 450,000 581 50,000 500,000 500,000

Westmoreland 70 Q10 32032 New Stanton Intrchng +C IMAN NHPP 15,364,865 89,000 15,453,865 15,453,865

Westmoreland 70 Q10 32032 New Stanton Intrchng +C IMAN NHPP 15,453,865 15,453,865 15,453,865

Westmoreland 70 Q10 32032 New Stanton Intrchng +C IMAN NHPP 15,453,865 15,453,865 15,453,865

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST NHPP 590,334 581 2,405,903 2,996,237 2,996,237

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST STU 9,033,280 9,033,280 9,033,280

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST NHPP 18,023,610 581 6,405,903 24,429,513 24,429,513

Westmoreland 119 A03 91038 US119:CoLine-Crossover Rd C HRST STU 7,600,004 7,600,004 7,600,004

Westmoreland 130 182 57455 PA 130 @ Pleasant Valley C HRST SXF 2,303,652 581 575,913 2,879,565 2,879,565

Westmoreland 136 0 98299 PA136: PA201 to PA 31 C HRST 581 2,167,248 2,167,248 2,167,248

Westmoreland 136 29R 98298 PA 136: US 30 to SR 3099 +C HRST STP 1,092,727 1,092,727 1,092,727

Westmoreland 217 E10 74251 Derry Borough Bridge F BRDG 185 8,000 8,000 8,000

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 1,121,800 1,121,800 1,121,800

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 2,000,000 2,000,000 2,000,000

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STU 553,280 553,280 553,280

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 4,000,000 4,000,000 4,000,000

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 1,339,000 1,339,000 1,339,000

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STP 6,463,000 6,463,000 6,463,000

Westmoreland 217 E10 74251 Derry Borough Bridge C BRDG STU 1,433,276 1,433,276 1,433,276

Westmoreland 259 D11 31601 PA 259 over Coalpit Run R BRDG 185 37,808 37,808 37,808

Westmoreland 356 F10 96654 PA 356 Safety Improvement P SAMI 581 2,832,500 2,832,500 2,832,500

Westmoreland 356 F10 96654 PA 356 Safety Improvement F SAMI 581 1,909,620 1,909,620 1,909,620

Westmoreland 356 F10 96654 PA 356 Safety Improvement U SAMI 581 530,450 530,450 530,450

Westmoreland 356 F10 96654 PA 356 Safety Improvement R SAMI 581 2,121,800 2,121,800 2,121,800

Westmoreland 356 F10 96654 PA 356 Safety Improvement C SAMI 581 10,000,000 10,000,000 10,000,000

Westmoreland 356 F10 96654 PA 356 Safety Improvement C SAMI 581 6,390,905 6,390,905 6,390,905

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln P SAMI 581 1,000,000 1,000,000 1,000,000

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln F SAMI 581 1,166,990 1,166,990 1,166,990

Page 206: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

206 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln U SAMI 581 530,450 530,450 530,450

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln R SAMI 581 2,121,800 2,121,800 2,121,800

Westmoreland 356 J10 70100 PA 356 Truck Climbing Ln C SAMI NHPP 4,370,908 581 1,092,727 5,463,635 5,463,635

Westmoreland 366 0 76115 SR 366 over Pucketa Ck P BRDG 185 207,635 207,635 207,635

Westmoreland 366 0 76115 SR 366 over Pucketa Ck F BRDG 185 230,000 230,000 230,000

Westmoreland 366 20R 98449 PA 366: Merwin to SR 400 +C HRST NHPP 2,372,049 2,372,049 2,372,049

Westmoreland 366 20R 98449 PA 366: Merwin to SR 400 +C HRST NHPP 1,828,111 1,828,111 1,828,111

Westmoreland 366 21R 101813PA 366: SR 4085-SR 4032 C HRST NHPP 2,124,375 2,124,375 2,124,375

Westmoreland 381 M11 31826 PA 381 over Linn Run R BRDG 185 82,183 82,183 82,183

Westmoreland 381 Q10 31614 PA 381/Laughlintown Run R BRDG 185 19,994 19,994 19,994

Westmoreland 711 R10 76122 PA 711 over Mill Creek #2 R BRDG 185 115,443 115,443 115,443

Westmoreland 819 M10 31756 PA 819 Sewickley Ck Br C BRDG STP 120,000 185 30,000 150,000 150,000

Westmoreland 906 07R 103360Dist12 Concrete Patching C HRST 581 1,000,000 1,000,000 1,000,000

Westmoreland 906 07R 103360Dist12 Concrete Patching C HRST 581 1,000,000 1,000,000 1,000,000

Westmoreland 981 0 88073 SR 981 over Unity Run P BRDG 185 150,000 150,000 150,000

Westmoreland 981 0 88073 SR 981 over Unity Run P BRDG 185 300,000 300,000 300,000

Westmoreland 981 0 88073 SR 981 over Unity Run F BRDG 185 500,000 500,000 500,000

Westmoreland 981 0 88073 SR 981 over Unity Run U BRDG 185 75,000 75,000 75,000

Westmoreland 981 0 88073 SR 981 over Unity Run R BRDG 185 250,000 250,000 250,000

Westmoreland 981 0 88073 SR 981 over Unity Run C BRDG 185 1,450,000 1,450,000 1,450,000

Westmoreland 981 0 94952 PA 981 Signals - Latrobe P SAMI CAQ 200,000 581 50,000 250,000 250,000

Westmoreland 981 0 94952 PA 981 Signals - Latrobe F SAMI CAQ 240,000 581 60,000 300,000 300,000

Westmoreland 981 0 94952 PA 981 Signals - Latrobe U SAMI CAQ 40,000 581 10,000 50,000 50,000

Westmoreland 981 0 94952 PA 981 Signals - Latrobe R SAMI CAQ 80,000 581 20,000 100,000 100,000

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck F BRDG 185 400,000 400,000 400,000

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck U BRDG 185 281,377 281,377 281,377

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck R BRDG 185 131,377 131,377 131,377

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck C BRDG 185 2,000,000 2,000,000 2,000,000

Westmoreland 981 10F 83443 PA 981 over Loyalhanna Ck C BRDG 185 2,834,950 2,834,950 2,834,950

Westmoreland 981 TIP 31828 Laurel Vly Trans Imp Proj S HCON 581 2,000,000 2,000,000 2,000,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal U HRST STP 1,800,000 581 200,000 2,000,000 2,000,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal R HRST STP 1,800,000 581 200,000 2,000,000 2,000,000

Westmoreland 981 V10 47478 PA 981 @ Kennametal C HRST STU 8,000,000 581 2,000,000 10,000,000 10,000,000

Westmoreland 982 N10 69256 PA 982 over US 30 C BRDG 185 4,120,000 4,120,000 4,120,000

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +P BRDG BOF 100,000 100,000 100,000

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +F BRDG BOF 152,982 152,982 152,982

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +U BRDG BOF 81,955 81,955 81,955

Westmoreland 1012 000 32070 SR 1012/Br of Mcgee Run +R BRDG BOF 81,955 81,955 81,955

Westmoreland 1017 B00 31611 SR 1017 over Mill Creek R BRDG 185 104,591 104,591 104,591

Westmoreland 1034 02S 31304 SR 1034 over Beaver Run R BRDG 185 37,658 37,658 37,658

Page 207: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

207 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Westmoreland 1060 A20 81747 Salina Bridge +P BRDG 185 1,500,000 1,500,000 1,500,000

Westmoreland 1060 A20 81747 Salina Bridge +F BRDG 185 1,748,364 1,748,364 1,748,364

Westmoreland 1060 A20 81747 Salina Bridge U BRDG 185 327,818 327,818 327,818

Westmoreland 1060 A20 81747 Salina Bridge R BRDG 185 327,818 327,818 327,818

Westmoreland 2013 B10 79418 SR 2013 over Slate Creek R BRDG 185 37,808 37,808 37,808

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ P SAMI CAQ 640,000 581 160,000 800,000 800,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ F SAMI CAQ 368,000 581 92,000 460,000 460,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ U SAMI CAQ 200,000 581 50,000 250,000 250,000

Westmoreland 3026 190 94893 WECO Signal Upgrades-CMAQ R SAMI CAQ 240,000 581 60,000 300,000 300,000

Westmoreland 3073 G01 31622 SR 3073 over Buffalo Run P BRDG 185 150,000 150,000 150,000

Westmoreland 3073 G01 31622 SR 3073 over Buffalo Run F BRDG 185 155,227 155,227 155,227

Westmoreland 3093 F10 31929 SR 3093 ov RR/Sewickly Ck +C BRDG STP 4,900,666 185 1,225,166 6,125,832 6,125,832

Westmoreland 3101 0 74434 SR 3101 over Jacks Run F BRDG 185 95,100 95,100 95,100

Westmoreland 3101 0 74434 SR 3101 over Jacks Run C BRDG 185 500,000 500,000 500,000

Westmoreland 3101 0 74434 SR 3101 over Jacks Run C BRDG 185 1,466,556 1,466,556 1,466,556

Westmoreland 4019 0 89066 SR 4019 over Brush Creek P BRDG BOF 450,000 450,000 450,000

Westmoreland 4019 0 89066 SR 4019 over Brush Creek F BRDG BOF 450,000 450,000 450,000

Westmoreland 4019 0 89066 SR 4019 over Brush Creek U BRDG BOF 100,000 100,000 100,000

Westmoreland 4019 0 89066 SR 4019 over Brush Creek +R BRDG BOF 150,000 150,000 150,000

Westmoreland 4019 C11 31550 Bridge over Conrail RR +C BRDG BOF 2,731,818 2,731,818 2,731,818

Westmoreland 4019 C11 31550 Bridge over Conrail RR +C BRDG BOF 461,182 461,182 461,182

Westmoreland 4022 0 76096 SR 4022 over Brush Run P BRDG 185 250,000 250,000 250,000

Westmoreland 4022 0 76096 SR 4022 over Brush Run F BRDG 185 247,612 247,612 247,612

Westmoreland 4022 0 76096 SR 4022 over Brush Run U BRDG 185 32,619 32,619 32,619

Westmoreland 4022 0 76096 SR 4022 over Brush Run R BRDG 185 65,239 65,239 65,239

Westmoreland 4022 0 76096 SR 4022 over Brush Run C BRDG 185 2,595,230 2,595,230 2,595,230

Westmoreland 4028 A10 32018 SR 4028 over Steels Run P BRDG 185 375,000 375,000 375,000

Westmoreland 4028 A10 32018 SR 4028 over Steels Run F BRDG 185 218,545 218,545 218,545

Westmoreland 4028 A10 32018 SR 4028 over Steels Run U BRDG 185 56,275 56,275 56,275

Westmoreland 4028 A10 32018 SR 4028 over Steels Run R BRDG 185 168,826 168,826 168,826

Westmoreland 4028 A10 32018 SR 4028 over Steels Run C BRDG 185 1,264,464 1,264,464 1,264,464

Westmoreland 4048 01M 10336212-5 Metal Culvert Prev C BRDG 185 500,000 500,000 500,000

Westmoreland 4053 A10 91189 SR 4053 over Turtle Creek R BRDG 185 107,947 107,947 107,947

Westmoreland 7214 0 101917West Co #14- Beaver Run P BRDG STP 240,000 183 45,000 15,000 300,000 300,000

Westmoreland 7214 0 101917West Co #14- Beaver Run F BRDG STP 200,000 183 37,500 12,500 250,000 250,000

Westmoreland 7214 0 101917West Co #14- Beaver Run U BRDG STP 8,000 183 1,500 500 10,000 10,000

Westmoreland 7214 0 101917West Co #14- Beaver Run R BRDG STP 8,000 183 1,500 500 10,000 10,000

Westmoreland 7214 0 101917West Co #14- Beaver Run C BRDG STP 1,200,000 183 225,000 75,000 1,500,000 1,500,000

Westmoreland 7302 BR 31508 Alley #1 Bridge C BRDG BOF 699,345 183 131,127 43,709 874,181 874,181

Westmoreland 7421 0 31554 Fourth Street Br P BRDG BOF 240,000 183 45,000 15,000 300,000 300,000

Page 208: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

208 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Totals for: Westmoreland 20,007,438 25,553,608 723,709 46,284,755 36,176,941 37,795,581 459,000 74,431,522 54,162,390 38,955,132 50,000 93,167,522 80,413,191 25,279,120 350,000 106,042,311 319,926,110

Wyoming 73298 NTier D4 Hwy Reserve C HRST NHPP 69,000 581 410,000 479,000 479,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST STP 650,000 650,000 650,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST CAQ 182,000 581 19,000 201,000 201,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST NHPP 769,000 769,000 769,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST STP 6,000 6,000 6,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST NHPP 269,000 581 529,000 798,000 798,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST STP 146,000 146,000 146,000

Wyoming 73298 NTier D4 Hwy Reserve C HRST 581 272,000 272,000 272,000

Wyoming 73298 NTier D4 Hwy Reserve C SAMI CAQ 182,000 182,000 182,000

Wyoming 73298 NTier D4 Hwy Reserve C SAMI CAQ 182,000 182,000 182,000

Wyoming 73298 NTier D4 Hwy Reserve C SAMI CAQ 182,000 182,000 182,000

Wyoming BR 10150 E Lemon Rd/T-416 Br C BRDG 185 100,000 25,000 125,000 125,000

Wyoming BR 10150 E Lemon Rd/T-416 Br C BRDG 185 80,000 20,000 100,000 100,000

Wyoming 6 712 75718 Lackawanna Trail (Bett.) C HRST NHPP 318,000 318,000 318,000

Wyoming 6 712 75718 Lackawanna Trail (Bett.) C HRST NHPP 482,000 482,000 482,000

Wyoming 6 775 10204 US 6 over SR 1017 C BRDG NHPP 99,900 99,900 99,900

Wyoming 6 SLD 96910 SR 6 Slide C HRST STP 500,000 500,000 500,000

Wyoming 11 752 10211 SR 11 over SR 92 +F BRDG STP 300,000 300,000 300,000

Wyoming 11 752 10211 SR 11 over SR 92 +C BRDG STP 2,000,000 2,000,000 2,000,000

Wyoming 11 771 10197 US 11 Over US 6 Bridge C BRDG STP 99,900 99,900 99,900

Wyoming 29 791 94688 SR 29/3003 Sugar Hollow F SAMI HSIP 250,200 250,200 250,200

Wyoming 29 791 94688 SR 29/3003 Sugar Hollow C SAMI HSIP 489,700 489,700 489,700

Wyoming 29 791 94688 SR 29/3003 Sugar Hollow C SAMI HSIP 575,200 575,200 575,200

Wyoming 29 REP 96688 SR 29 Slide F HRST 581 225,000 225,000 225,000

Wyoming 29 REP 96688 SR 29 Slide C HRST 581 450,000 450,000 450,000

Wyoming 29 RP1 97847 SR 29 Slide Repair F HRST 581 120,000 120,000 120,000

Wyoming 29 RP1 97847 SR 29 Slide Repair C HRST 581 500,000 500,000 500,000

Wyoming 87 755 10225 SR 87 over Miller Brook F BRDG STP 160,000 185 40,000 200,000 200,000

Wyoming 87 REP 96909 SR 87 Slide C HRST 581 725,000 725,000 725,000

Wyoming 87 SLD 96683 SR 87 Slide C HRST STP 2,150,000 2,150,000 2,150,000

Wyoming 1009 771 68797 Oxbow Creek Bridge F BRDG 185 287,500 287,500 287,500

Wyoming 1009 772 10077 SR 1009 over Meshoppen Cr F BRDG 185 287,500 287,500 287,500

Wyoming 1014 750 10186 SR 1014 ov Lake Sheridan C BRDG 185 100,000 100,000 100,000

Wyoming 1017 751 10205 SR 1017 ov Tunkhannock Cr +F BRDG STP 225,000 225,000 225,000

Wyoming 1017 751 10205 SR 1017 ov Tunkhannock Cr +C BRDG 185 525,000 525,000 525,000

Wyoming 1017 751 10205 SR 1017 ov Tunkhannock Cr +C BRDG 185 325,000 325,000 325,000

Wyoming 1029 770 10113 Tunkhannock Creek Bridge C BRDG BOF 1,052,000 185 242,500 1,294,500 1,294,500

Wyoming 1029 770 10113 Tunkhannock Creek Bridge C BRDG BOF 1,237,000 185 332,500 1,569,500 1,569,500

Wyoming 1029 770 10113 Tunkhannock Creek Bridge C BRDG BOF 591,000 185 145,000 736,000 736,000

Page 209: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

209 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

Wyoming 3001 776 10191 3001 ov Lil Mehoopany Cr F BRDG 185 273,900 273,900 273,900

Wyoming 3001 776 10191 3001 ov Lil Mehoopany Cr R BRDG 185 13,600 13,600 13,600

Wyoming 3001 RRX 103197Laceyville Lights & Gates +C SAMI RRX 190,035 190,035 190,035

Wyoming 3002 750 10192 SR 3002 ov Bowmans Creek P BRDG 185 316,000 316,000 316,000

Wyoming 3002 750 10192 SR 3002 ov Bowmans Creek P BRDG 185 86,500 86,500 86,500

Wyoming 3002 770 68874 SR 3002 ov Stone Run P BRDG 185 400,000 400,000 400,000

Wyoming 3007 750 83059 SR 3007 Ov. RBMN RR C BRDG 185 600,000 600,000 600,000

Wyoming 4001 FLD 74735 SR 4001 Slope Repairs C HRST 581 710,000 710,000 710,000

Wyoming 7207 BRG 56761 Church Rd T-404, Eaton C HRST STP 650,000 650,000 650,000

Totals for: Wyoming 4,342,035 2,759,500 25,000 7,126,535 3,909,700 1,872,500 20,000 5,802,200 2,508,200 1,967,500 4,475,700 3,247,000 1,515,500 4,762,500 22,166,935

York 101398York RBR Initiative C BRDG 581 800,000 800,000 800,000

York 101398York RBR Initiative C BRDG 581 1,600,000 1,600,000 1,600,000

York 101398York RBR Initiative C BRDG 581 1,600,000 1,600,000 1,600,000

York 102151Roadway Maint Line Item C HRST 409 3,161,000 3,161,000 3,161,000

York 102151Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

York 102151Roadway Maint Line Item C HRST 409 100,000 100,000 100,000

York 102151Roadway Maint Line Item C HRST 409 6,608,258 6,608,258 6,608,258

York 102260Louck Mill Trail Connectr C TENH TAU 77,144 77,144 77,144

York 102260Louck Mill Trail Connectr C TENH TAU 26,824 26,824 26,824

York 102398I-83 Study Implementation P HCON STU 500,000 500,000 500,000

York 102398I-83 Study Implementation F HCON NHPP 1,534,687 1,534,687 1,534,687

York 102398I-83 Study Implementation F HCON STU 715,313 715,313 715,313

York 102398I-83 Study Implementation F HCON NHPP 1,094,500 1,094,500 1,094,500

York 102398I-83 Study Implementation F HCON STP 250,000 250,000 250,000

York 102398I-83 Study Implementation F HCON STU 1,155,500 1,155,500 1,155,500

York 87946 Bridge Reserve C BRDG 185 53,063 53,063 53,063

York 87952 Highway Reserve C HRST STP 672,199 672,199 672,199

York 87952 Highway Reserve C HRST STP 113,920 581 582,841 696,761 696,761

York 87952 Highway Reserve C HRST 581 1,837,371 1,837,371 1,837,371

York 87952 Highway Reserve C HRST 581 430,000 430,000 430,000

York 87957 CMAQ Line Item C SAMI CAQ 2,207,865 2,207,865 2,207,865

York 87958 Delivery/Consult Assist P PRA 581 800,000 800,000 800,000

York 87958 Delivery/Consult Assist P PRA 581 800,000 800,000 800,000

York 87958 Delivery/Consult Assist P PRA 581 800,000 800,000 800,000

York 87958 Delivery/Consult Assist P PRA 581 800,000 800,000 800,000

York 87958 Delivery/Consult Assist C PRA 581 400,000 400,000 400,000

York 87958 Delivery/Consult Assist C PRA 581 400,000 400,000 400,000

York 87958 Delivery/Consult Assist C PRA 581 400,000 400,000 400,000

York 87958 Delivery/Consult Assist C PRA 581 400,000 400,000 400,000

York 87960 TAP Line Item C TENH TAU 206,545 206,545 206,545

Page 210: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

210 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 87960 TAP Line Item C TENH TAU 233,369 233,369 233,369

York 87960 TAP Line Item C TENH TAU 233,369 233,369 233,369

York 87963 HSIP Line Item C SAMI HSIP 361,000 361,000 361,000

York 87963 HSIP Line Item C SAMI HSIP 356,800 356,800 356,800

York 87963 HSIP Line Item C SAMI HSIP 852,000 852,000 852,000

York 88055 York STU (HATS) C HRST STU 666,484 666,484 666,484

York 88055 York STU (HATS) C HRST STU 170,827 170,827 170,827

York 88055 York STU (HATS) C HRST STU 1,561,201 1,561,201 1,561,201

York 88055 York STU (HATS) C HRST STU 1,188,799 1,188,799 1,188,799

York 95357 CMP Signal Timing C SAMI CAQ 500,000 500,000 500,000

York 95357 CMP Signal Timing C SAMI CAQ 500,000 500,000 500,000

York 95357 CMP Signal Timing C SAMI CAQ 500,000 500,000 500,000

York 95357 CMP Signal Timing C SAMI CAQ 500,000 500,000 500,000

York BKL 102397York City Bike Lanes C TENH TAU 147,624 147,624 147,624

York ENH 77325 Heritage Trail Phase II C TENH TAU 8,601 8,601 8,601

York LOC 85391 Market Street (York City) C HRST NHPP 1,866,000 1,866,000 1,866,000

York LOC 85391 Market Street (York City) C HRST NHPP 934,000 934,000 934,000

York PT 95325 Rabbit Trans Bus Replacmt C PT CAQ 2,577,132 2,577,132 2,577,132

York PT 95325 Rabbit Trans Bus Replacmt C PT CAQ 422,868 422,868 422,868

York RRX 102969Eberts Lane Crossing +C SAMI RRX 75,932 75,932 75,932

York RRX 102969Eberts Lane Crossing +C SAMI RRX 114,618 114,618 114,618

York RRX 102972Amabu Road Crossing +C SAMI RRX 195,206 195,206 195,206

York RRX 98150 N Franklin St Crossing +C SAMI RRX* 105,000 105,000 105,000

York RRX 98150 N Franklin St Crossing +C SAMI RRX* 105,000 105,000 105,000

York RSP 82376 SRTP Rideshare Program P IMOD CAQ 275,868 275,868 275,868

York RSP 82376 SRTP Rideshare Program P IMOD CAQ 278,627 278,627 278,627

York RSP 82376 SRTP Rideshare Program P IMOD CAQ 281,413 281,413 281,413

York RSP 82376 SRTP Rideshare Program P SAMI CAQ 284,227 284,227 284,227

York RWY 58125 Center Street Upgrade C HRST STU 80,000 20,000 100,000 100,000

York 15 030 94911 Yellow Breeches bridge +F BRDG STU 300,000 300,000 300,000

York 15 030 94911 Yellow Breeches bridge +U BRDG STU 50,000 50,000 50,000

York 15 030 94911 Yellow Breeches bridge +R BRDG STU 50,000 50,000 50,000

York 15 030 94911 Yellow Breeches bridge +C BRDG NHPP 1,979,000 1,979,000 1,979,000

York 15 030 94911 Yellow Breeches bridge +C BRDG STU 2,721,000 2,721,000 2,721,000

York 15 030 94911 Yellow Breeches bridge +C BRDG STU 300,000 300,000 300,000

York 15 031 94942 BlueGray Adaptive Signals F SAMI STU 125,000 125,000 125,000

York 15 031 94942 BlueGray Adaptive Signals U SAMI 581 50,000 50,000 50,000

York 15 031 94942 BlueGray Adaptive Signals R SAMI 581 50,000 50,000 50,000

York 15 031 94942 BlueGray Adaptive Signals +C SAMI STU 500,000 500,000 500,000

York 15 034 94950 US15:Golf Course to Adams +F HRST STU 500,000 500,000 500,000

Page 211: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

211 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 15 034 94950 US15:Golf Course to Adams U HRST STU 100,000 100,000 100,000

York 15 034 94950 US15:Golf Course to Adams +R HRST STU 500,000 500,000 500,000

York 15 034 94950 US15:Golf Course to Adams +C HRST NHPP 4,500,000 4,500,000 4,500,000

York 15 034 94950 US15:Golf Course to Adams +C HRST NHPP 5,000,000 5,000,000 5,000,000

York 15 035 95098 US15/Franklin Cross Study +S SAMI STU 300,000 300,000 300,000

York 15 035 95098 US15/Franklin Cross Study P SAMI NHPP 1,534,687 1,534,687 1,534,687

York 15 035 95098 US15/Franklin Cross Study P SAMI STU 715,313 715,313 715,313

York 15 035 95098 US15/Franklin Cross Study F SAMI NHPP 1,094,500 1,094,500 1,094,500

York 15 035 95098 US15/Franklin Cross Study F SAMI STP 250,000 250,000 250,000

York 15 035 95098 US15/Franklin Cross Study F SAMI STU 1,155,500 1,155,500 1,155,500

York 15 037 92920 US-15 J-Turns/Jughandles P SAMI NHPP 500,000 500,000 500,000

York 15 037 92920 US-15 J-Turns/Jughandles C SAMI HSIP 1,491,000 1,491,000 1,491,000

York 15 037 92920 US-15 J-Turns/Jughandles C SAMI HSIP 1,159,000 1,159,000 1,159,000

York 15 044 92923 Blue-Gray Highwy Reconst P HCON 581 540,459 540,459 540,459

York 15 044 92923 Blue-Gray Highwy Reconst P HCON 581 7,500,000 7,500,000 7,500,000

York 24 022 93171 Mount Zion Rd Improvement P HRST HSIP 40,500 581 4,500 45,000 45,000

York 24 022 93171 Mount Zion Rd Improvement F SAMI HSIP 125,000 125,000 125,000

York 24 022 93171 Mount Zion Rd Improvement U SAMI HSIP 10,000 10,000 10,000

York 24 022 93171 Mount Zion Rd Improvement C SAMI HSIP 650,000 650,000 650,000

York 24 023 90913 Cape Horn Rd Resurfacing +C HRST 409 2,850,000 2,850,000 2,850,000

York 30 084 83420 Paradise Creek Bridge R BRDG STP 24,000 185 6,000 30,000 30,000

York 30 084 83420 Paradise Creek Bridge +C BRDG NHPP 1,623,000 1,623,000 1,623,000

York 30 085 83421 Lincoln Highway Bridge 1 C BRDG 581 2,601,000 2,601,000 2,601,000

York 30 085 83421 Lincoln Highway Bridge 1 C BRDG 581 647,000 647,000 647,000

York 30 124 100239US 30 Safety Study S SAMI NHPP 400,000 400,000 400,000

York 74 056 87495 Little Conewago Creek Br F BRDG 581 350,000 350,000 350,000

York 74 056 87495 Little Conewago Creek Br U BRDG 581 100,000 100,000 100,000

York 74 056 87495 Little Conewago Creek Br R BRDG 581 100,000 100,000 100,000

York 74 056 87495 Little Conewago Creek Br C BRDG 581 1,682,700 1,682,700 1,682,700

York 74 056 87495 Little Conewago Creek Br C BRDG 581 3,000,000 3,000,000 3,000,000

York 74 060 95320 S Queen St / Rathton Road F SAMI CAQ 100,000 100,000 100,000

York 74 060 95320 S Queen St / Rathton Road U SAMI CAQ 60,000 60,000 60,000

York 74 060 95320 S Queen St / Rathton Road R SAMI CAQ 150,000 150,000 150,000

York 74 060 95320 S Queen St / Rathton Road +C SAMI CAQ 605,505 605,505 605,505

York 74 060 95320 S Queen St / Rathton Road +C SAMI CAQ 594,495 594,495 594,495

York 74 062 99326 PA 74 Additional CMP P SAMI 581 118,000 118,000 118,000

York 74 062 99326 PA 74 Additional CMP P SAMI 581 82,000 82,000 82,000

York 74 062 99326 PA 74 Additional CMP C SAMI 581 1,000,000 1,000,000 1,000,000

York 74 063 87543 Trib Doe Run Bridge P BRDG 581 250,000 250,000 250,000

York 74 063 87543 Trib Doe Run Bridge F BRDG 581 150,000 150,000 150,000

Page 212: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

212 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 74 063 87543 Trib Doe Run Bridge U BRDG 185 50,000 50,000 50,000

York 74 063 87543 Trib Doe Run Bridge R BRDG 185 50,000 50,000 50,000

York 74 063 87543 Trib Doe Run Bridge C BRDG 185 400,000 400,000 400,000

York 83 040 62880 I-83 Exit 18 C IMAN NHPP 54,913,616 54,913,616 54,913,616

York 83 040 62880 I-83 Exit 18 C IMAN SXF 6,226,155 6,226,155 6,226,155

York 83 070 92924 North York Widening P IMAN 581 3,000,000 3,000,000 3,000,000

York 83 070 92924 North York Widening P IMAN 581 3,000,000 3,000,000 3,000,000

York 83 070 92924 North York Widening F IMAN 581 11,600,000 11,600,000 11,600,000

York 83 070 92924 North York Widening F IMAN 581 850,000 850,000 850,000

York 83 070 92924 North York Widening U IMAN 581 4,500,000 4,500,000 4,500,000

York 83 070 92924 North York Widening R IMAN 581 6,250,000 6,250,000 6,250,000

York 83 071 92230 I-83 Newberrytown C IMAN 581 3,000,000 3,000,000 3,000,000

York 83 074 89917 I-83 Exit 4 F IMAN NHPP 200,000 581 50,000 250,000 250,000

York 83 074 89917 I-83 Exit 4 U IMAN NHPP 100,000 581 25,000 125,000 125,000

York 83 074 89917 I-83 Exit 4 R IMAN NHPP 676,000 581 169,000 845,000 845,000

York 83 074 89917 I-83 Exit 4 +C IMAN NHPP 619,626 619,626 619,626

York 83 074 89917 I-83 Exit 4 +C IMAN SXF 2,804,130 2,804,130 2,804,130

York 83 080 100235I-83 Exit 24-28 Study S IMAN 581 618,000 618,000 618,000

York 83 080 100235I-83 Exit 24-28 Study P IMAN 581 2,701,221 2,701,221 2,701,221

York 83 081 21151 Shrewsbury PM & Bridges P IMAN 581 318,270 318,270 318,270

York 83 081 21151 Shrewsbury PM & Bridges F IMAN 581 901,500 901,500 901,500

York 83 081 21151 Shrewsbury PM & Bridges +C IMAN NHPP 6,260,644 6,260,644 6,260,644

York 83 082 104155Cross Pipe Sliplining 2 C HRST 581 1,700,000 1,700,000 1,700,000

York 94 027 90947 Carlisle St/Elm Ave Rsf C HRST 409 1,600,000 1,600,000 1,600,000

York 114 021 87544 Cedar Run Bridge F BRDG 581 175,000 175,000 175,000

York 114 021 87544 Cedar Run Bridge U BRDG 581 15,000 15,000 15,000

York 114 021 87544 Cedar Run Bridge R BRDG 581 15,000 15,000 15,000

York 114 021 87544 Cedar Run Bridge C BRDG 581 1,200,000 1,200,000 1,200,000

York 116 041 102971PA 116 York Rd Crossing +C SAMI RRX 244,007 244,007 244,007

York 124 014 87546 East Prospect Bridge P BRDG STU 175,000 175,000 175,000

York 124 014 87546 East Prospect Bridge F BRDG 581 200,000 200,000 200,000

York 124 014 87546 East Prospect Bridge U BRDG 581 20,000 20,000 20,000

York 124 014 87546 East Prospect Bridge R BRDG 581 20,000 20,000 20,000

York 124 014 87546 East Prospect Bridge C BRDG 581 300,000 300,000 300,000

York 182 008 83419 Indian Rock Dam Rd Br C BRDG 581 1,355,000 1,355,000 1,355,000

York 182 009 90932 Indian Rock Dam Road C HRST 409 3,000,000 3,000,000 3,000,000

York 194 018 74945 Bermudian Creek Bridge F BRDG STP 325,000 325,000 325,000

York 194 018 74945 Bermudian Creek Bridge U BRDG STP 25,000 25,000 25,000

York 194 018 74945 Bermudian Creek Bridge R BRDG STP 25,000 25,000 25,000

York 194 018 74945 Bermudian Creek Bridge C BRDG STP 2,204,000 2,204,000 2,204,000

Page 213: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

213 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 194 019 87494 Mud Run Bridge F BRDG 581 250,000 250,000 250,000

York 194 019 87494 Mud Run Bridge U BRDG 581 15,000 15,000 15,000

York 194 019 87494 Mud Run Bridge R BRDG 581 15,000 15,000 15,000

York 194 019 87494 Mud Run Bridge C BRDG 581 4,141,000 4,141,000 4,141,000

York 194 020 96230 PA 194 Resurface #1 C HRST 581 400,000 400,000 400,000

York 216 014 63120 Sticks Road Bridge C BRDG 185 230,000 230,000 230,000

York 216 015 88968 Blooming Grove Road Br 1 F BRDG 581 200,000 200,000 200,000

York 216 015 88968 Blooming Grove Road Br 1 U BRDG 581 15,000 15,000 15,000

York 216 015 88968 Blooming Grove Road Br 1 R BRDG 581 15,000 15,000 15,000

York 216 015 88968 Blooming Grove Road Br 1 C BRDG 581 1,417,000 1,417,000 1,417,000

York 216 015 88968 Blooming Grove Road Br 1 C BRDG 581 1,418,000 1,418,000 1,418,000

York 216 016 83423 Pierceville Run Bridge F BRDG 581 200,000 200,000 200,000

York 216 016 83423 Pierceville Run Bridge U BRDG 581 15,000 15,000 15,000

York 216 016 83423 Pierceville Run Bridge R BRDG 581 15,000 15,000 15,000

York 216 016 83423 Pierceville Run Bridge +C BRDG 581 1,200,000 1,200,000 1,200,000

York 216 017 96231 Blooming Grove Rd Resurf C HRST 581 500,000 500,000 500,000

York 216 018 100099Blooming Grove Rd Resf 2 C HRST 409 474,000 474,000 474,000

York 216 018 100099Blooming Grove Rd Resf 2 C HRST 409 1,626,000 1,626,000 1,626,000

York 216 019 102970Main Street Crossing +C SAMI RRX 78,791 78,791 78,791

York 216 019 102970Main Street Crossing +C SAMI RRX 117,476 117,476 117,476

York 216 020 90321 Pierceville Run Tributary P BRDG STP 329,801 329,801 329,801

York 216 020 90321 Pierceville Run Tributary F BRDG 185 300,000 300,000 300,000

York 216 020 90321 Pierceville Run Tributary U BRDG 185 75,000 75,000 75,000

York 216 020 90321 Pierceville Run Tributary R BRDG 185 53,272 53,272 53,272

York 216 020 90321 Pierceville Run Tributary C BRDG 581 928,131 928,131 928,131

York 238 010 94933 Church Road over I-83 C BRDG 185 600,000 600,000 600,000

York 382 004 90921 Lewisberry Road +C HRST 582 3,061,000 3,061,000 3,061,000

York 382 005 96948 Lewisberry Road Resurface C HRST 409 1,026,000 1,026,000 1,026,000

York 382 005 96948 Lewisberry Road Resurface C HRST 409 1,325,742 1,325,742 1,325,742

York 392 005 102404Yocumtown Rd Bridge P BRDG 581 75,000 75,000 75,000

York 392 006 87692 Old Trail Bridge P BRDG STU 250,000 250,000 250,000

York 392 006 87692 Old Trail Bridge F BRDG 581 300,000 300,000 300,000

York 392 006 87692 Old Trail Bridge U BRDG 581 30,000 30,000 30,000

York 392 006 87692 Old Trail Bridge R BRDG 581 25,000 25,000 25,000

York 392 006 87692 Old Trail Bridge C BRDG STU 792,028 792,028 792,028

York 425 007 93168 Bridgeville Rd Shoulders F SAMI HSIP 100,000 100,000 100,000

York 425 007 93168 Bridgeville Rd Shoulders U SAMI HSIP 100,000 100,000 100,000

York 425 007 93168 Bridgeville Rd Shoulders C SAMI HSIP 200,000 200,000 200,000

York 425 007 93168 Bridgeville Rd Shoulders C SAMI HSIP 763,700 763,700 763,700

York 425 008 87700 Furnace Run Road Bridge P BRDG 581 50,000 50,000 50,000

Page 214: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

214 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 425 008 87700 Furnace Run Road Bridge F BRDG 581 75,000 75,000 75,000

York 425 008 87700 Furnace Run Road Bridge U BRDG 581 10,000 10,000 10,000

York 425 008 87700 Furnace Run Road Bridge R BRDG 581 10,000 10,000 10,000

York 425 008 87700 Furnace Run Road Bridge C BRDG 185 200,000 200,000 200,000

York 425 009 90320 Woodbine Road Bridge P BRDG 581 90,000 90,000 90,000

York 425 009 90320 Woodbine Road Bridge P BRDG 581 60,000 60,000 60,000

York 425 009 90320 Woodbine Road Bridge F BRDG 581 150,000 150,000 150,000

York 425 009 90320 Woodbine Road Bridge U BRDG 581 20,000 20,000 20,000

York 425 009 90320 Woodbine Road Bridge R BRDG 581 20,000 20,000 20,000

York 425 010 90936 Woodbine Road C HRST 409 5,000,000 5,000,000 5,000,000

York 425 011 91071 Woodbine Road Bridge 2 P BRDG 581 250,000 250,000 250,000

York 425 011 91071 Woodbine Road Bridge 2 F BRDG 581 250,000 250,000 250,000

York 425 011 91071 Woodbine Road Bridge 2 C BRDG STP 674,500 674,500 674,500

York 462 031 90029 Market/Highland Signal P SAMI STU 120,000 581 30,000 150,000 150,000

York 462 031 90029 Market/Highland Signal F SAMI 581 200,000 200,000 200,000

York 462 031 90029 Market/Highland Signal U SAMI 581 50,000 50,000 50,000

York 462 031 90029 Market/Highland Signal R SAMI 581 50,000 50,000 50,000

York 462 031 90029 Market/Highland Signal C SAMI STU 500,000 500,000 500,000

York 462 032 91069 Market St West Resurface C HRST STU 375,342 375,342 375,342

York 462 034 83424 Codorus Creek Trib Bridge F BRDG STP 320,000 581 80,000 400,000 400,000

York 462 034 83424 Codorus Creek Trib Bridge U BRDG 581 20,000 20,000 20,000

York 462 034 83424 Codorus Creek Trib Bridge R BRDG 581 20,000 20,000 20,000

York 462 034 83424 Codorus Creek Trib Bridge C BRDG 581 750,000 750,000 750,000

York 462 034 83424 Codorus Creek Trib Bridge C BRDG 581 750,000 750,000 750,000

York 462 037 95740 E Phila RR Crossing C SAMI RRX 19,343 19,343 19,343

York 462 040 97974 Market St East Resurface +C HRST HSIP 100,000 100,000 100,000

York 462 040 97974 Market St East Resurface +C HRST NHPP 1,500,000 1,500,000 1,500,000

York 462 041 91046 Lincoln Highway Bridge P BRDG 185 225,000 225,000 225,000

York 462 041 91046 Lincoln Highway Bridge P BRDG 581 125,000 125,000 125,000

York 462 041 91046 Lincoln Highway Bridge F BRDG 185 75,000 75,000 75,000

York 462 041 91046 Lincoln Highway Bridge U BRDG 185 50,000 50,000 50,000

York 462 041 91046 Lincoln Highway Bridge R BRDG 185 50,000 50,000 50,000

York 462 041 91046 Lincoln Highway Bridge C BRDG 185 97,025 97,025 97,025

York 462 041 91046 Lincoln Highway Bridge C BRDG 185 602,975 602,975 602,975

York 462 045 91356 Lincoln Highway Bridge 2 P BRDG 581 200,000 200,000 200,000

York 462 045 91356 Lincoln Highway Bridge 2 F BRDG 581 240,000 240,000 240,000

York 462 046 99506 PA462 Signal Improvements P SAMI HSIP 125,000 125,000 125,000

York 462 046 99506 PA462 Signal Improvements F SAMI HSIP 100,000 100,000 100,000

York 462 046 99506 PA462 Signal Improvements U SAMI HSIP 50,000 50,000 50,000

York 462 046 99506 PA462 Signal Improvements R SAMI HSIP 50,000 50,000 50,000

Page 215: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

215 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 462 046 99506 PA462 Signal Improvements C SAMI HSIP 620,000 620,000 620,000

York 616 007 89270 Glen Rock Road Bridge U BRDG 581 20,000 20,000 20,000

York 616 007 89270 Glen Rock Road Bridge R BRDG 581 20,000 20,000 20,000

York 616 007 89270 Glen Rock Road Bridge C BRDG 581 700,000 700,000 700,000

York 616 008 102952Seven Vally Road Crossing C SAMI RRX 154,500 154,500 154,500

York 616 009 87698 Glen Rock Road Bridge 2 P BRDG 185 250,000 250,000 250,000

York 616 009 87698 Glen Rock Road Bridge 2 F BRDG 581 86,000 86,000 86,000

York 616 009 87698 Glen Rock Road Bridge 2 F BRDG 581 264,000 264,000 264,000

York 616 009 87698 Glen Rock Road Bridge 2 U BRDG 581 20,000 20,000 20,000

York 616 009 87698 Glen Rock Road Bridge 2 R BRDG 581 20,000 20,000 20,000

York 616 009 87698 Glen Rock Road Bridge 2 C BRDG 185 800,000 800,000 800,000

York 851 019 78865 Steltz Road Bridge F BRDG STP 160,000 185 40,000 200,000 200,000

York 851 019 78865 Steltz Road Bridge U BRDG 185 20,000 20,000 20,000

York 851 019 78865 Steltz Road Bridge R BRDG 185 20,000 20,000 20,000

York 851 019 78865 Steltz Road Bridge C BRDG 185 900,000 900,000 900,000

York 2008 009 63097 Libhart Mill Road Bridge C BRDG 185 1,662,000 1,662,000 1,662,000

York 2012 006 81014 Bull Run Road Bridge C BRDG 581 850,000 850,000 850,000

York 2013 005 87509 Tributary Kreutz Creek Br P BRDG 581 250,000 250,000 250,000

York 2013 005 87509 Tributary Kreutz Creek Br U BRDG 581 20,000 20,000 20,000

York 2013 005 87509 Tributary Kreutz Creek Br R BRDG 581 20,000 20,000 20,000

York 2013 005 87509 Tributary Kreutz Creek Br C BRDG 185 400,000 400,000 400,000

York 2021 006 81041 Ducktown Road Bridge C BRDG 185 915,317 915,317 915,317

York 2021 006 81041 Ducktown Road Bridge C BRDG 185 1,584,683 1,584,683 1,584,683

York 2033 010 87597 Snyder Corner Rd Bridge P BRDG 581 300,000 300,000 300,000

York 2033 010 87597 Snyder Corner Rd Bridge F BRDG 581 350,000 350,000 350,000

York 2033 010 87597 Snyder Corner Rd Bridge U BRDG 581 75,000 75,000 75,000

York 2033 010 87597 Snyder Corner Rd Bridge R BRDG 581 75,000 75,000 75,000

York 2033 010 87597 Snyder Corner Rd Bridge C BRDG 581 1,700,000 1,700,000 1,700,000

York 2046 001 87498 High Rock Road Bridge F BRDG BOF 80,000 80,000 80,000

York 2046 001 87498 High Rock Road Bridge F BRDG STP 170,000 170,000 170,000

York 2046 001 87498 High Rock Road Bridge U BRDG STP 15,000 15,000 15,000

York 2046 001 87498 High Rock Road Bridge R BRDG STP 15,000 15,000 15,000

York 2046 001 87498 High Rock Road Bridge C BRDG BOF 836,000 185 350,950 1,186,950 1,186,950

York 2046 001 87498 High Rock Road Bridge C BRDG STP 564,000 564,000 564,000

York 2046 001 87498 High Rock Road Bridge C BRDG BOF 404,000 185 101,000 505,000 505,000

York 2060 001 91364 Rippling Run Road Bridge P BRDG 185 220,951 220,951 220,951

York 2060 001 91364 Rippling Run Road Bridge P BRDG 185 102,233 102,233 102,233

York 2060 001 91364 Rippling Run Road Bridge F BRDG 581 250,000 250,000 250,000

York 2060 001 91364 Rippling Run Road Bridge U BRDG 581 20,000 20,000 20,000

York 2060 001 91364 Rippling Run Road Bridge R BRDG 581 20,000 20,000 20,000

Page 216: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

216 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 2060 001 91364 Rippling Run Road Bridge C BRDG 581 700,000 700,000 700,000

York 2069 005 96243 Brogue Road Resurface C HRST 409 1,591,258 1,591,258 1,591,258

York 2069 005 96243 Brogue Road Resurface C HRST 409 1,408,742 1,408,742 1,408,742

York 2071 001 81039 York Grp K Preservations P BRDG 581 200,000 200,000 200,000

York 2071 001 81039 York Grp K Preservations C BRDG 185 1,000,000 1,000,000 1,000,000

York 2087 001 74947 Iron Stone Hill Rd Brg F BRDG BOF 60,000 185 35,000 95,000 95,000

York 2087 001 74947 Iron Stone Hill Rd Brg F BRDG STP 80,000 80,000 80,000

York 2087 001 74947 Iron Stone Hill Rd Brg U BRDG BOF 12,000 185 3,000 15,000 15,000

York 2087 001 74947 Iron Stone Hill Rd Brg R BRDG BOF 12,000 185 3,000 15,000 15,000

York 2087 001 74947 Iron Stone Hill Rd Brg C BRDG 581 929,869 929,869 929,869

York 3053 001 91371 Colonial Valley Rd Bridge P BRDG 581 284,129 284,129 284,129

York 3053 001 91371 Colonial Valley Rd Bridge F BRDG 581 175,000 175,000 175,000

York 3053 001 91371 Colonial Valley Rd Bridge U BRDG 581 25,000 25,000 25,000

York 3053 001 91371 Colonial Valley Rd Bridge R BRDG 581 25,000 25,000 25,000

York 3053 001 91371 Colonial Valley Rd Bridge C BRDG 581 500,000 500,000 500,000

York 3053 002 83425 Colonial Valley Rd Brdg 2 U BRDG 581 20,000 20,000 20,000

York 3053 002 83425 Colonial Valley Rd Brdg 2 R BRDG 581 20,000 20,000 20,000

York 3053 002 83425 Colonial Valley Rd Brdg 2 C BRDG 581 750,000 750,000 750,000

York 3053 002 83425 Colonial Valley Rd Brdg 2 C BRDG 581 750,000 750,000 750,000

York 3054 007 86887 George St Improvements F SAMI CAQ 250,000 250,000 250,000

York 3054 007 86887 George St Improvements +U SAMI CAQ 281,000 281,000 281,000

York 3054 007 86887 George St Improvements +R SAMI CAQ 705,000 705,000 705,000

York 3054 007 86887 George St Improvements +R SAMI CAQ 700,000 700,000 700,000

York 3054 007 86887 George St Improvements +C SAMI CAQ 1,277,092 1,277,092 1,277,092

York 3054 007 86887 George St Improvements +C SAMI CAQ 360,908 360,908 360,908

York 4001 014 93172 Bull Road Improvement F SAMI HSIP 175,000 175,000 175,000

York 4001 014 93172 Bull Road Improvement U SAMI HSIP 75,000 75,000 75,000

York 4001 014 93172 Bull Road Improvement R SAMI HSIP 190,000 190,000 190,000

York 4001 014 93172 Bull Road Improvement C SAMI HSIP 750,000 750,000 750,000

York 4009 011 87496 Little Conewgo Crk Bridge U BRDG 581 20,000 20,000 20,000

York 4009 011 87496 Little Conewgo Crk Bridge R BRDG 581 20,000 20,000 20,000

York 4009 011 87496 Little Conewgo Crk Bridge C BRDG 581 1,000,000 1,000,000 1,000,000

York 4009 011 87496 Little Conewgo Crk Bridge C BRDG 581 1,000,000 1,000,000 1,000,000

York 4014 006 20968 Harmony Grove Road Bridge R BRDG 185 10,000 10,000 10,000

York 4016 003 87499 Kise Mill Rd Bridge F BRDG 581 150,000 150,000 150,000

York 4016 003 87499 Kise Mill Rd Bridge U BRDG 581 15,000 15,000 15,000

York 4016 003 87499 Kise Mill Rd Bridge R BRDG 581 15,000 15,000 15,000

York 4016 003 87499 Kise Mill Rd Bridge C BRDG 581 1,044,000 1,044,000 1,044,000

York 4016 003 87499 Kise Mill Rd Bridge C BRDG 581 1,044,000 1,044,000 1,044,000

York 7204 BRG 88952 Mill Cr Rd CO#187 Replace F BRDG BOF 160,000 183 30,000 10,000 200,000 200,000

Page 217: 2015 STIP 1 / 217 FFY 2015 Costs FFY 2016 Costs FFY 2017 ... · Highway & Bridge Projects 1 / 217 * Includes Conversion Amount ... Adams 87807Delivery / Consult Assist P PRA 581 400,000

Jan 2, 2015 7:08 AMRpt# TIP240

2015 STIPHighway & Bridge Projects

217 / 217

* Includes Conversion Amount

FFY 2015 Costs FFY 2016 Costs FFY 2017 Costs FFY 2018 Costs County S.R. Sec. ProjectProject Title Ph Area Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Fed. Federal St. State Local Total Totals

York 7204 BRG 88952 Mill Cr Rd CO#187 Replace U BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

York 7204 BRG 88952 Mill Cr Rd CO#187 Replace R BRDG BOF 40,000 183 7,500 2,500 50,000 50,000

York 7204 BRG 88952 Mill Cr Rd CO#187 Replace C BRDG STP 1,214,080 183 227,640 1,441,720 1,441,720

York 7230 BRG 88961 Hull Dr Bridge CO#226 P BRDG STP 417,000 179 26,063 443,063 443,063

York 7230 BRG 88961 Hull Dr Bridge CO#226 P BRDG 183 78,187 78,187 78,187

York 7230 BRG 88961 Hull Dr Bridge CO#226 F BRDG BOF 150,000 179 10,000 160,000 160,000

York 7230 BRG 88961 Hull Dr Bridge CO#226 F BRDG 183 30,000 30,000 30,000

York 7230 BRG 88961 Hull Dr Bridge CO#226 F BRDG STP 10,000 10,000 10,000

York 7230 BRG 88961 Hull Dr Bridge CO#226 U BRDG BOF 12,000 179 750 12,750 12,750

York 7230 BRG 88961 Hull Dr Bridge CO#226 U BRDG 183 2,250 2,250 2,250

York 7230 BRG 88961 Hull Dr Bridge CO#226 R BRDG BOF 12,000 179 750 12,750 12,750

York 7230 BRG 88961 Hull Dr Bridge CO#226 R BRDG 183 2,250 2,250 2,250

York 7230 BRG 88961 Hull Dr Bridge CO#226 C BRDG STP 1,600,000 183 300,000 1,900,000 1,900,000

York 7230 BRG 91469 Bentz Mill Road CO#233 F BRDG BOF 134,000 179 33,500 167,500 167,500

York 7230 BRG 91469 Bentz Mill Road CO#233 U BRDG BOF 16,000 179 4,000 20,000 20,000

York 7230 BRG 91469 Bentz Mill Road CO#233 R BRDG BOF 16,000 179 4,000 20,000 20,000

York 7230 BRG 91469 Bentz Mill Road CO#233 C BRDG BOF 656,000 179 40,000 696,000 696,000

York 7230 BRG 91469 Bentz Mill Road CO#233 C BRDG 183 120,000 120,000 120,000

York 7230 BRG 91472 Bermudian Church CO#221 F BRDG BOF 164,000 179 10,250 174,250 174,250

York 7230 BRG 91472 Bermudian Church CO#221 F BRDG 183 30,750 30,750 30,750

York 7230 BRG 91472 Bermudian Church CO#221 U BRDG BOF 24,000 179 1,500 25,500 25,500

York 7230 BRG 91472 Bermudian Church CO#221 U BRDG 183 4,500 4,500 4,500

York 7230 BRG 91472 Bermudian Church CO#221 R BRDG BOF 16,000 179 1,000 17,000 17,000

York 7230 BRG 91472 Bermudian Church CO#221 R BRDG 183 3,000 3,000 3,000

York 7230 BRG 91472 Bermudian Church CO#221 C BRDG BOF 346,000 183 263,025 87,675 696,700 696,700

York 7230 BRG 91472 Bermudian Church CO#221 C BRDG STP 1,753,500 1,753,500 1,753,500

York 7301 BRG 87750 PhiladelphiaSt Brdg/CO#77 C BRDG STU 1,600,001 1,600,001 1,600,001

York 7410 BRG 88953 Valley St CO#114 Replace F BRDG BOF 140,000 179 35,000 175,000 175,000

York 7410 BRG 88953 Valley St CO#114 Replace U BRDG BOF 40,000 179 10,000 50,000 50,000

York 7410 BRG 88953 Valley St CO#114 Replace R BRDG BOF 40,000 179 10,000 50,000 50,000

York 7410 BRG 88953 Valley St CO#114 Replace C BRDG BOF 598,000 179 149,500 747,500 747,500

Totals for: York 79,397,742 31,197,264 35,000 110,630,006 18,345,818 27,866,270 46,212,088 25,134,802 42,594,620 67,729,422 28,868,840 44,532,221 87,675 73,488,736 298,060,252

Overall Totals: 1,720,175,814 1,457,832,055 190,991,150 3,368,999,019 1,745,726,560 1,135,165,232 130,642,397 3,011,534,189 1,686,123,361 1,346,153,530 107,000,939 3,139,277,830 1,641,640,594 1,373,708,756 50,106,908 3,065,456,258 12,585,267,296