Transcript of 2015 March 16 ASCE TTG - I-405 Improvement Project
![Page 1: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/1.jpg)
Interstate 405 Improvement Project
![Page 2: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/2.jpg)
Background
2
![Page 3: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/3.jpg)
Need for the Project
� The I-405 mainline GP lanes peak-period traffic demand exceeds available capacity;
� The I-405 mainline HOV lanes peak-period traffic demand exceeds available capacity;
� The I-405 mainline GP traffic lanes have operational and geometric deficiencies;
� The interchanges along I-405 within the study area have geometric, storage, and operational capacity deficiencies; and
� I-405 currently has limitations in detecting traffic incidents and providing rapid response and clearance due to lack of capacity and technological infrastructure
3
![Page 4: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/4.jpg)
Purpose of the Project
� Reduce congestion; � Enhance operations; � Increase mobility, improve trip reliability, maximize
throughput, and optimize operations; and� Minimize environmental impacts and ROW
acquisition.
4
![Page 5: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/5.jpg)
MIS Completed in 2006
5
![Page 6: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/6.jpg)
PSR/PDS Completed in 2008
6
![Page 7: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/7.jpg)
PA/ED Alternatives
7
![Page 8: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/8.jpg)
Existing Condition
8
Rendering of I-405 looking northwest at Springdale St. overcrossing
![Page 9: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/9.jpg)
9
Alternative 1 – Add 1 GP lane
![Page 10: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/10.jpg)
10
Alternative 2 – Add 2 GP lanes
![Page 11: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/11.jpg)
The project adds 1 general purpose and 1 express lane. The express lane, when combined with the existing carpool lane, creates the I-405 Express Lanes, a two-lane each direction express facility similar to the 91 Express Lanes.
Preferred Alternative (Alternative 3)
![Page 12: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/12.jpg)
Caltrans PA Recommendation
� Alternative 3 Potential for a phased approach
� Phase 1 – OCTA delivers Project K (1 GP lane in each direction
from Euclid Street to I-605)
� Phase 2 – Caltrans delivers the additional median lane and
implements HOT lanes under a separate contract
Potential for a single project
12
![Page 13: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/13.jpg)
Recent OCTA Board Actions
� December 8, 2014 Design-Build Cooperative Agreement for Phase 1
Continued
� February 9, 2015 Design-Build Cooperative Agreement for Phase 1 with
Caltrans betterment funding of $82 Million
Board directed staff to re-engage in Coop discussions with Caltrans and return to Board with option for OCTA to proceed as lead agency for the full implementation of the Caltrans Project preferred alternative
13
![Page 14: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/14.jpg)
Significant Project Features
14
� One GP lane (and potentially one median lane) in each direction between Euclid Street and I-605
� 17 or 18 structure replacements (OCs) plus new and widened structures
� Interchange reconfigurations� Auxiliary lane improvements� Arterial improvements� Drainage improvements� Anticipated 5-year design-build contract duration� Construction cost ranges from approximately $0.9 – $1.2
Billion
![Page 15: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/15.jpg)
Stakeholders
15
� Multiple City jurisdictions including Westminster, Fountain Valley, Huntington Beach, Garden Grove, Costa Mesa, and Seal Beach
� Involvement of over 40 separate utility owners� Multiple Orange County Flood Control facility impacts� Union Pacific Railroad� Army Corps of Engineers� US Navy� Caltrans oversight criteria in accordance with Assembly
Bill 401 and/or Streets and Highways Code 143 (construction inspection services)
![Page 16: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/16.jpg)
Updated Environmental and D-B Procurement Milestones
16
Description Current Schedule
Caltrans PA Recommendation July 2014
Signed Final Environmental Document March 2015
Notice of Decision/Record of Decision May 2015
Issue D-B RFQ October 2014
Issue D-B Draft RFP TBD
Issue D-B RFP TBD
D-B Award TBD
D-B Notice to Proceed TBD
Design/Construction TBD
![Page 17: 2015 March 16 ASCE TTG - I-405 Improvement Project](https://reader031.fdocuments.us/reader031/viewer/2022020218/55b79e09bb61eb58288b45b1/html5/thumbnails/17.jpg)
Upcoming OCTA Opportunities
17