2015-03-19 UD Mining Presentation - MECSA · This presentation has been prepared and issued by U&D...

19
MESCA Briefing For personal use only

Transcript of 2015-03-19 UD Mining Presentation - MECSA · This presentation has been prepared and issued by U&D...

  • MESCA Briefing

    For

    per

    sona

    l use

    onl

    y

  • Agenda

    Corporate Overview

    Projects Overview Mining and Exploration Tenure Project development priorities & Status (MDS & Broughton Projects)

    Supplier & Service Provider Expectations

    Contact Details & Questions

    For

    per

    sona

    l use

    onl

    y

  • This presentation has been prepared and issued by U&D Coal Limited, ACN 165 894 806 (“U&D” or“Company”) to assist it in informing interested parties about the Company. The information in thisdocument is in summary form and should not be relied upon as a complete and accurate representation of any matters that a potential investor should consider in evaluating U&D. While management has taken every effort to ensure the accuracy of the material in the presentation, neither the Company nor its advisers has verified the accuracy or completeness of the information, or any statements and opinions contained in this presentation. This presentation is provided for information purposes only, and to the maximum extent permitted by law, U&D, its officers and management exclude and disclaim any liability in respect of the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this presentation or anything done in reliance on the presentation.

    The presentation may contain forward looking statements. The words ‘anticipate’, ‘believe’, ‘expect’,‘project’, ‘forecast’, ‘estimate’, ‘likely’, ‘intend’, ‘should’, ‘could’, ‘may’, ‘target’, ‘plan’ and other similarexpressions are intended to identify forward‐looking statements. Indications of, and guidance on, futureearnings and financial position and performance are also forward‐looking statements. Forward‐lookingstatements are subject to risk factors associated with the Company’s business, many of which are beyond the control of the Company. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptionswhich could cause actual results or trends to differ materially from those expressed or implied in suchstatements. There can be no assurance that actual outcomes will not differ materially from thesestatements. You should not place undue reliance on forward‐looking statements and neither U&D norany of its directors, employees, servants, advisers or agents assume any obligation to update suchinformation

    This presentation should not be considered as an offer or invitation to subscribe for or purchase anysecurities in the Company or as an inducement to make an offer or invitation with respect to thosesecurities. No agreement to subscribe for securities in the Company will be entered into on the basis ofthis presentation. You should not act and refrain from acting in reliance on this presentation material.Nothing contained in this presentation constitutes investment, legal, tax or other advice. This overview of U&D does not purport to be all inclusive or to contain all information which its recipients may requirein order to make an informed assessment of the Company’s prospects. Before making an investmentdecision, you should conduct, with the assistance of your broker or other financial or professional adviser, your own investigation in light of your particular investment needs, objectives and financial circumstances and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation and making any investment decision. References to dollars, cents or $ in this presentation are to Australian currency, unless otherwise stated.

    DisclaimerThe information in this Presentation is extracted from the U&D Replacement Prospectus of 5 December 2013. The information that relates to Meteor Downs South coal resources (part of Orion Downs) is based on information compiled by Mr Mal Blaik of JB Mining Services. The reporting is in compliance with the 2012 JORC  Code. Mr Blaik is a qualified Geologist and a member of the Australasian Institute of Mining and Metallurgy (No 112631) .

    The information in this Presentation that relates to the Broughton coal resources is based on information compiled by Mr Phillip A J Sides of JB Mining Services. The reporting is in compliance with the 2012 JORC Code. Mr Sides is a qualified Geologist and  a member of the Australian Institute of Geoscientists.

    The information in this Presentation that relates to the Inderi coal resources (part of Orion Downs) is based on information compiled by Mr Phillip A J Sides of JB Mining Services. The reporting is in compliance with the 2004 JORC  Code. Mr Sides is a qualified Geologist and a member of the Australian Institute of Geoscientists.

    The information in this Presentation that relates to the Rockwood coal resources is basedon information compiled by Mr Phillip A J Sides of JB Mining Services. The reporting is in compliance with the 2004 JORC Code. Mr Sides is a qualified Geologist and a member of the Australian Institute of Geoscientists.

    The technical and geological related information in this Presentation is based on information compiled and reviewed by Mr Darren N Walker who is an employee of U&D Mining. Mr Walker is a qualified Geologist and a member of the Australian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy.

    The information in this Presentation that relates to Proven and Probable Reserves at U&D’s Meteor Downs South Project is based on a mine plan, a mine schedule and costs prepared by The Minserve Group Pty Ltd. Mr Jeff Jamieson was responsible for the report’s preparation and the reserve statement therein. He is both a Fellow of the Australian Institute of Mining and Metallurgy, and a Chartered Professional (Mining).

    All parties mention above are considered as Competent Persons as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, and all have given consent for their names to be included in this presentation.F

    or p

    erso

    nal u

    se o

    nly

  • U&D Coal Limited – ASX Code UND

    Listed on the ASX on 17 February 2014 Due to a dispute with its major shareholder (KQ), UND voluntarily suspended trading of its 

    shares on the ASX on 11 March 2014 On 18 August 2014, UND reached an agreement to settle the dispute with KQ, which 

    involved UND buying back and cancelling 100 million shares at $0.50 cents per share that were issued to KQ under the IPO, KQ providing a $20 million loan to UND, and UND making an offer to buy back all other shares issued under the IPO, amongst other things.

    On 21 January 2015, UND Completed the buy back process agreed under the settlement of 18 August 2014.

    The Company remains suspended on the ASX whilst the Board reviews the situation and contemplates its future funding strategy. The Board will continue to keep the market fully informed.

    The ASX have given the Company until 31 May 2015 to re‐comply with Chapters 1 and 2 of the ASX Listing rules. Failure to comply may result in UND being de‐listed.

    For

    per

    sona

    l use

    onl

    y

  • U&D Coal Limited Corporate StructureCorporate History:• IPO and Listing on ASX February 2014• Acquisition of Endocoal Ltd in May 2013• Majority Shareholder Parent Company is KQ which is 

    controlled by Henan Energy and Chemical Group – a major Chinese SOE

    • Currently under Voluntary Trading Suspension

    Shareholders Shares %

    China Kunlun 240,000,000 24%

    Golden Globe 230,000,000 23%

    Zhanjun Fei 20,000,000 2%

    KQ Controlled Shares 510,000,000 51%

    26 Independent S/hrs 241,708 0%

    1,108,557,800 100%

    Current Shareholding after Buy Back

    Australian KunqianInternational Energy Co Pty Ltd (KQ) 51%

    China Kunlun24%

    Golden Globe23%

    Zhanjun Fei 2%For

    per

    sona

    l use

    onl

    y

  • U&D Coal Limited Corporate Structure

    U & D Coal  Limited

    U&D Mining Industry Australia (Pty) Ltd

    Resource Portfolio Partners Pty Ltd 

    EndocoalPty Ltd

    Endocoal Finance Services Pty Ltd 

    Orion Downs Pty Limited

    Pretoria Hill Exploration 

    Management  Pty Ltd 

    Pretoria Hill Exploration 

    Management  Pty Ltd 

    U&D Coal Limited Board

    Non Executive Chairman – Mr Dongshen WuExecutive Director and CEO – Mr Qian YuNon Executive Director – Mr Shining HouNon Executive Director – Mr Shulong MaNon Executive Director – Mr Wenliang WangNon Executive Director – Mr Gavin HoughtonCompany Secretary – Mr Peter Edwards 

    U&D Coal Senior Executive Team

    Chief Financial Officer – Mr Peter EdwardsGM– Resource Development – Mr Darren WalkerGM – Mine Development – Mr Matthew Page

    For

    per

    sona

    l use

    onl

    y

  • Our major shareholdersOur cornerstone shareholders comprise a significant coal enterprise from China and two sophisticated international investors.

    The Henan Energy and Chemical Group:• Shareholding held through wholly owned subsidiary Australian 

    Kunquian International Energy Co. Pty Ltd • Combined annual production capacity of well over 100 million 

    tonnes• 3rd largest integrated coal enterprise in China• 40 billion tonnes of coal reserves in China• Coal mining, coal chemical and aluminium smelting, power 

    generation and cement manufacturing• 22 mines located in six provinces

    Current Shareholding after Buy Back

    Australian Kunqian International Energy Co Pty Ltd (KQ) 51%

    For

    per

    sona

    l use

    onl

    y

  • Sophisticated international Investors

    China Kunlun and Golden Globe:• Registered investment companies in the BVI with 

    professional teams specialising in extensive securities investment experience

    • Main businesses are in : Hong Kong, the U.S. and Europe • Main investment areas : mineral rights, equity and venture 

    capital 

    Current Shareholding after Buy Back

    China Kunlun24%

    Golden Globe23%

    Our two sophisticated international investors hold 47% of the shares in UND

    For

    per

    sona

    l use

    onl

    y

  • Projects Overview

    For

    per

    sona

    l use

    onl

    y

  • U&D Coal Mining and Exploration Tenure• Development and Production Focus• Majority Bowen Basin Holding• 27 Granted Tenements• 3 EPCA• 2 MLA• 1 JV ‐ Granted EPC• >5,000 Km2 area under tenure or application• Over 600 Mt JORC Resources

    For

    per

    sona

    l use

    onl

    y

  • MDS ProjectMDS PROJECT OVERVIEW

    13.0Mt Marketable Reserves

    Coal seams  at between 11m and 108m depth, with average seam thickness  of 6.9m (exceeding 9.0m thick in places); giving

    Average strip ratio of 5.8:1 bcm/t

    Rangal Coal Measures comprising 1 main D Seam and two thinner coal seams, B and C, overlying the D Seam with maximum interburden thickness of 30cm

    COAL QUALITY FOR EXPORT 

    Export‐quality direct‐ship thermal coal, not requiring  coal preparation plant beneficiation; providing

    Low Ash / Low Sulphur product coal suitable for the Asian market

    Two export product options – one assuming no removal of interburden (option A) and the option B assuming removal of high ash partings greater than 10cm 

    Property Option A Option B

    CV (Kcal/kg) (adb) 5900 6,130

    Ash (A) 10.6% 7.6%

    Inherent Moisture (adb) 11.6% 12.0%

    Sulphur (adb) 0.44% 0.45% MDS ProjectLocation

    For

    per

    sona

    l use

    onl

    y

  • MDS ProjectMETEOR DOWNS SOUTH (MDS) PROJECTEVALUATION OUTCOMES

    Project Development Overview:

    ‐ Simple open cut with 1  mining fleet

    ‐ Top‐of‐ramp ROM coal sizing plant, for road‐haul to rail load‐out facility

    ‐ Truck haul from ROM to mine gate or rail infrastructure

    ‐ Road haul from mine gate or rail transport infrastructure options

    ‐ Delivering 1.0 to 1.5Mtpa from MDS open cut mine over 9 year LOM

    ‐ Low OPEX and CAPEX

    ‐ Workforce productivity level > 20,000 t/person/year

    ‐ Development plan assumes locally based workforce and service providers

    Proposed U&D SojitzJoint Venture

    50/50 JV with Sojitz as appointed operator and U&D JV partner

    Sojitz own and operate the Minerva Mining Operations – local mining expertise and presence

    Arrangements agreement based on non binding principals with intention to enter into a binding Joint Venture and Call Option Deed

    Sojitz to provide construction capital, rail and port solution to earn 50% interest

    Capitalise on synergies between Minerva Operations and MDS Operations

    Final Federal Government Approval received

    RIDA Approval received

    Mining Lease Compensation negotiations nearly complete

    Formal ML Grant expected mid 2015

    Mining Lease Approvals

    MDS ProjectMine Infrastructure

    For

    per

    sona

    l use

    onl

    y

  • 1st Q 2015

    2nd Q 2015

    3rd Q 2015

    4th Q 2015

    1st Q 2016

    MDS Project – Project MilestonesJORC Resource and JORC Reserves

    Meteor Downs South Feasibility Study completed

    MLA Lodged April 2011

    Formal Federal Approval and RIDA Approval, Objections Completed

    Sojitz Arrangements Agreement  - Joint Venture Partner and Port/ Rail

    Final stages of Mining Lease Grant

    Mileston

    es Com

    pleted

    Mileston

    es Com

    pleted

    Upcom

    ing Mileston

    esUpcom

    ing Mileston

    es

    Mining Lease GrantMining Lease Grant

    Mine Construction

    Mine Construction

    ExportExport

    ApprovalsApprovals

    Detailed DesignDetailed Design

    For

    per

    sona

    l use

    onl

    y

  • Broughton ProjectPROJECTBACKGROUND

    Coking Coal Project

    Total of 121.0 Mt JORC Resources ‐ Open Cut and Underground 

    Project purchased in 2012 by U&D

    Pre‐Feasibility Study (PFS) being finalised

    BROUGHTON PROJECT STATUS

    16.0 Mt Measured and 10.5 Mt Indicated – Over 26 Mt Indicated or above

    PFS “base case” targeting Elphinstone and Hynd Seams

    Environmental Impact Statement baseline studies commenced

    Broughton Pre‐Feasibility Study being finalized (final draft in review)

    Drilling program planned for 3rd Quarter 2015 to increase open cut resources to measured status and increase coal quality understanding

    BROUGHTON PROJECT NEXT STEPS

    Commence detailed engineering / design, identified in PFS, of long lead items to maintain project critical path

    Complete and submit Environmental Impact Statement & continue approvals process

    Mining Lease Compensation Negotiations

    Secure port & rail capacity and infrastructure required, to suit the selected mine development option

    For

    per

    sona

    l use

    onl

    y

  • Broughton Project ‐Mine PlanBroughton Site Layout  (Year 3)

    For

    per

    sona

    l use

    onl

    y

  • Broughton Project MilestonesCurrent JORC Resource of 121.0 Mt – Over 26 Mt above Indicated

    Approvals & Environmental Impact Statement Process Commenced

    Pre-Feasibility Study being finalised

    Coal processing optimisation studies ongoing and further drilling planned

    Mileston

    es Com

    pleted

    Mileston

    es Com

    pleted

    Upcom

    ing Mileston

    esUpcom

    ing Mileston

    es

    EIS and MLA Approvals EIS and MLA Approvals 

    Mine ConstructionMine Construction

    ExportExport

    Mining Lease GrantMining Lease Grant

    Pre Feasibility Study 

    Pre Feasibility Study 

    1st Half 2015

    2nd Half 2015

    1st Half 2016

    2nd Half 2016

    1stHalf 2017

    2nd Half 2017

    Design and Engineering Design and Engineering 

    For

    per

    sona

    l use

    onl

    y

  • Exploration and Development Plan

    EPC 2253 Mt Inglis/ Galilee Basin Project

    Export Thermal Coal

    PCI Coal

    Coking Coal

    Prospective Coal Type Target

    17

    Other Granted Tenements

    Inderi34.6Mt JORC Resource

    Project Evaluation StudiesEarly Exploration Advanced Exploration Development

    Rockwood447.1Mt JORC Resource

    Meteor Downs South13.0Mt JORC Marketable 

    Reserve

    Stockyard CreekProject

    Broughton Coking Coal Project

    121Mt JORC Resource

    EPC 2596  Turrawulla

    EPC 1803 Springton/ Cooper Creek Project

    EPC1515 EssexEPC2461 12 Mile CreekEPC2283 Kola BarEPC2854 Thirty Mile CreekEPC1518 Sullivans Creek

    EPC1590 TalwoodEPC1512 Expedition PeakEPC2135 Pretoria HillEPC2857 BundarraEPC2709 Devlin CreekEPP 1182 CSG

    EPC 1517 – Orion Downs

    For

    per

    sona

    l use

    onl

    y

  • Supplier & Service Provider Expectations Safety

    Cost (including quality and overall value proposition)

    Local Presence

    Relationship • Focus on Win/Win outcomes • Risk and fit with U&D Strategy• Contract / service arrangement conditions

    Flexibility

    Demonstrated experience & technical ability

    Ability to deliver innovative solutions

    For

    per

    sona

    l use

    onl

    y

  • 19

    Contact & Questions?Contact & Questions?

    U&D Mining Industry (Australia) Pty LtdACN 152 892 638

    Level 1, 37 Brandl Street

    Eight Mile Plains, QLD 4113

    Australia

    [email protected]

    Tel:  +61 7 3188 9101   I Fax: +61 7 3188 9102

    For

    per

    sona

    l use

    onl

    y