2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

20
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering

Transcript of 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Page 1: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

2014 SCAPA Summer Conference

Christy A. Hall, P.E.

Deputy Secretary for Engineering

Page 2: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Current Workload 100 Active Asphalt Projects

$300 Million In Active Asphalt Projects (Excluding Widening, Intersection Improvements, etc.)

Page 3: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Six Month Look Ahead

Letting MonthNo. of Asphalt

Projects Number of Roads Totals Districts

August 15 80+ $45 M 1, 2, 3, 4, 5, 6, 7

September 30 70+ $20 M 1, 2, 3, 4, 5, 6, 7

October 15 120+ ?? 1, 2, 3, 4, 5, 6, 7

November 9 1, 2, 3, 5, 7

December 0

January 7 2, 3, 5

Page 4: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Upcoming Project TypesLetting Month Source

August 13 - ACT 98 Projects

September 25 - $37 M Additional Funds, 2 - FDP Contracts

October 9 - ACT 98 Projects, 1 - $37M Additional Funds Project

November FA ResurfacingDecember None

January FA Resurfacing

Page 5: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Vision for Engineering

Safety Relationships Responsiveness Proactive Performance Management

Page 6: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Interstate System (Federal-Aid Eligible )

Source: Road Inventory Management System (RIMS) as of January 2014

System Pavement Condition

61% Good29% Fair

10%Poor

Total of 851 miles:

• All on the National Highway System

• Interstate system is over 50 years old

• Nearly 29% of all roadway travel in SC occurs on the interstates

• Trucks account for nearly 13% of all Interstate traffic

• 113 miles of interstate are high usage, carrying over 70,000 vehicles per day

6

Page 7: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

2008 2009 2010 2011 2012 2013

58% 59% 59% 62% 67%61%

26% 26% 27%30% 24%

29%

16% 15% 14%8% 9% 10%

Good Fair Poor

Interstate System (Federal-Aid Eligible)

$83M annual investment

level by SCDOT

+ $53M via ARRA

7

Page 8: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Source: Road Inventory Management System (RIMS) as of January 2014

System Pavement Condition

16%Good

38% Fair46% Poor

Primary System (Federal-Aid Eligible)

Total of 9,472 miles:

• Comprised of US and SC routes

• Includes routes on the National Highway System (NHS)

• 47% of travel occurs on the primary system

8

Page 9: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

2013

2008 2009 2010 2011 2012 2013

26% 29% 30%18% 17% 16%

43% 35% 33%43% 39% 38%

31% 36% 37% 39% 44% 46%

Good Fair Poor

$116M annual

investment by SCDOT on Federal aid eligible

primary and secondary

system

+ $150M via ARRA

Primary System (Federal-Aid Eligible )

9

Page 10: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

20%Good

37% Fair

43% Poor

Secondary System (Federal-Aid Eligible)

Total of 10,270 miles:

• Consists of secondary routes classified as federally eligible

• 17% of travel occurs on the federal aid secondary system

Page 11: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

2008 2009 2010 2011 2012 2013

19% 19% 14% 16% 17% 20%

50%44%

46% 43% 42% 37%

31% 37% 40% 41% 41% 43%

Good Fair Poor

Secondary System (Federal-Aid Eligible)

11

$116M annual

investment by SCDOT on Federal aid eligible

primary and secondary

system

+ $150M via ARRA

Page 12: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

10%Good

40% Fair50% Poor

Secondary System (Non Federal-Aid Eligible)

Total of 20,821 miles:

• Comprised secondary routes not eligible for federal funding

• 7% of travel occurs on the non federal aid secondary system

Page 13: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

System Pavement Condition

2008 2009 2010 2011 2012 2013

14% 12% 14% 13% 13% 10%

53% 53%42% 41% 42%

40%

33% 35%44% 46% 45% 50%

Good Fair Poor

Secondary System (Non Federal-Aid Eligible)

$34M annual investment by SCDOT

ACT 98 of 2013

doubled the annual

investment level

Page 14: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Pavement Performance

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5G

ood

Fair

Poor

Untreated Condition

Age in Years

Page 15: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Cost of Delay

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

15

PreservationRehab

Reconstruction

Time

Costs

Page 16: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Pavement Performance

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 300

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5G

ood

Fair

Poor

Preservation & Rehabilitation

Untreated Condition

Age in Years

Page 17: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

$1 Million will Fund

Series10

10

20

30

40

50

60 51.2

8.1 5.4

Preservation Rehabilitation Reconstruction

Lane

Mile

s Cost per Lane Mile for Pri-

mary Routes

Preservation: $19,520Rehabilitation: $122,725Reconstruction: $183,675

10x

Page 18: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Way Ahead Migrate to Performance Management with our

assets Innovation Deliver ACT 98 projects Tell our story

Page 19: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

Call to Action Strengthen our already excellent working

relationship

Delivery of ACT 98 Projects

Help tell our story

Page 20: 2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.

2014 SCAPA Summer Conference

Christy A. Hall, P.E.

Deputy Secretary for Engineering