Arizona Public Service Solar O&M
Jim Hansen
![Page 2: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/2.jpg)
![Page 3: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/3.jpg)
APS solar sites under O&M
• AZ Sun – (9) utility scale sites, 170 MWAC – Allowed by utility commission
• Schools & Government – (59), 12 MWAC – Allowed by utility commission
• Legacy – (41), 4 MWAC – 5 to 15 years old
• Residential – (129), 1 MWAC – Special DOE project
![Page 4: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/4.jpg)
Solar O&M – AZ Sun Sites
• Operations (O) – Monitoring site: real time data, alarms, check
against estimated performance, security, 24/7 – “Smart” meter data for smaller sites
• Maintenance (M) – PM=Preventive Maintenance
• Weekly, semi-annual, annual – CM=Corrective Maintenance
• Equipment down, soiling, erosion
![Page 5: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/5.jpg)
Solar O&M Options
• Utility owned sites – Contract w/original EPC on each site for O&M
• Can be expensive over life of plant • Multiple contracts to manage
– Contract w/one supplier on all O&M • Problems with communications, multiple parties • Terms of contract are critical
– In-house O&M • Some problems w/warranty response of EPC • Could be most cost effective
![Page 6: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/6.jpg)
Utility Scale Solar Sites
• Biggest impacts on energy production – Switchgear, single point of failure
• Long lead time replacements • MV fuses, early degradation
– Inverters, most events/issues • Could be 1% to 11% impact for 1 inverter down
![Page 7: 2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Service Solar O&M](https://reader034.fdocuments.us/reader034/viewer/2022051818/5495ccd4b47959564d8b4e18/html5/thumbnails/7.jpg)
Thank You, any questions?