2014 Annual Route Review and Analysis Report
Brown County Planning Commission/ Metropolitan Planning Organization (MPO) for the Green Bay Urbanized Area
March 2014
![Page 2: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/2.jpg)
1
The preparation of this report has been financed in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the Metropolitan Planning Program, Section 104(f) of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. On the Cover: Green Bay Metro buses line up outside Lambeau Field. Photo courtesy of Green Bay Metro.
![Page 3: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/3.jpg)
2
TABLE OF CONTENTS I. INTRODUCTION ..................................................................................................... 4
Overview ................................................................................................................. 4 2014 Operating Budget Estimate Overview ............................................................. 7 II. ROUTE MODIFICATIONS ...................................................................................... 9
III. FULL SERVICE ROUTE SYSTEM PERFORMANCE ........................................... 11
Revenue Per Hour ................................................................................................ 11 Passengers Per Hour ............................................................................................ 13 Operating Ratio ...................................................................................................... 16 Loading Standards ................................................................................................. 18 Schedule Adherence .............................................................................................. 19 Full Service Fixed Route Results and Recommendations ..................................... 20 IV. LIMITED SERVICE ROUTE (LSR) SYSTEM PERFORMANCE ........................... 21 V. PARATRANSIT PROGRAM .................................................................................. 23
Paratransit Contract Rates ..................................................................................... 24 Agency Trips .......................................................................................................... 24 Specialized Transportation Service Demand Uncertainty ...................................... 24
VI. FARE STRUCTURE .............................................................................................. 26 VII. BUS FLEET ............................................................................................................ 27
VIII. SYSTEM ENHANCEMENTS ................................................................................. 29 Paper Transfers Eliminated from Fixed Route System .......................................... 29 Google Translate .................................................................................................... 29 You Tube ............................................................................................................... 30 Green Saturday Program Grows ............................................................................ 30 U-Pass Program ..................................................................................................... 31 Green Bay Packers Game Day Service Expanded to include Residential Areas .. 31 IV. PLANS AND PROGRAMS ..................................................................................... 33
2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System .... 33 Wisconsin Dept. of Transportation (WisDOT) Independent Management Audit .... 35 Green Bay Metro Management Plan ...................................................................... 36
X. SUMMARY OF RECOMMENDATIONS ................................................................ 37
![Page 4: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/4.jpg)
3
LIST OF FIGURES
A. Green Bay Metro Full Service Routes With Paratransit Service Area...................... 6
LIST OF TABLES
1. Revenue per Hour – Weekday .............................................................................. 12 2. Passengers per Hour – Weekday ......................................................................... 14 3. Green Saturday ...................................................................................................... 15 4. Operating Ratio or Percent of Expenses Recovered – Weekday .......................... 17 5. Limited Service Routes – Passengers .................................................................. 22
APPENDICIES
A. Green Bay MPO 2010 Adjusted Urbanized Area Boundary .................................. 38
![Page 5: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/5.jpg)
4
CHAPTER ONE
Introduction
Overview
The Brown County Planning Commission and Green Bay Metro staffs conduct route reviews on a quarterly basis each year in the months of February, May, August, and November. In February of each year, a large-scale review is conducted resulting in the publication of the Green Bay Metro Annual Route Review and Analysis Report, by Brown County Planning Commission. In May, August, and November, a smaller scale route review report is issued.
For each route review, Green Bay Metro’s 14 full service routes are evaluated individually in terms of the performance standards outlined in the Green Bay Metro Policy and Procedures Manual, August 1992, as amended. In February of 2014, the annual Green Bay Metro route review was conducted. Ridership and revenue data were gathered for all full service and limited service routes on weekdays and Saturdays. A special effort was made to separate day and evening data for the full service route system. The passenger and revenue statistics contained in this report are typical of a weekday and Saturday in February. It should be noted that passenger and revenue levels fluctuate throughout the year.
![Page 6: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/6.jpg)
5
From an annual perspective, the number of unlinked passenger trips decreased 2.7% from 1,523,838 in 2012 to 1,482,429 in 2013. The graph below shows the 20-year ridership trend.
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
Un
linke
d T
rip
s
Fixed Route Ridership - Unlinked Trips
Year
Note: New farebox technology implemented in 2009.
![Page 7: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/7.jpg)
VIC
TOR
IA S
T
SH
EA
AV
OLIVIAS WY
LENWOOD AV
BE
RK
EN
CT
8TH ST
SERVAIS ST
COLLETTEAV
3RD ST
JUNIPER DR
OR
RIE
LN
NORTH RD
PADI-WOOD LN
CEDAR ST
APRIL LN
ROCKDALE ST
LOR
RIE
WY
CAROLE LN
GLEN RD
ZAK LN
PINE ST
BERNER ST
MA
LON
EY
RD
HICKORY HILL DR
KENNEY ST
S O
NE
IDA
ST
GLOBE AV
SP
ICA
LN
S L
OC
US
T S
T
BOYD ST
VANDEN BERGH PL
LAV
ER
NE
DR
KURTZ AV
HO
LMG
RE
N W
Y
FERNDALE DR
BLUE RIDGE DR
RO
BIN
ST
CADY LN
SC
OU
T W
Y
RU
TH
ST
CORMIER RD
S B
AIR
D S
T
VANDERBRAAK ST
BY
LSB
Y A
V
AN
GIE
AV
W MARHILL RD
HILLTOP DR
TAL USCI
CYPRESS RD
ST
MA
RY
S S
T
MARINALN
PAULA ST
TOR
DE
UR
LN
N F
ISK
ST
YEAGER DR
LANTERN LN
W PAULSON RD
BOSAR AV
LILYDR
HORSESHOE LN
SHARIE LN
FR
ED
ST
EL
GIN
ST
LAN
E R
D
WALLOUEZAV
8TH ST
MOHICAN CT
TR
ES
TL
E R
D
BOLAND RD
GLORY RD
OREGON ST
ELDORADO DR
VICTORY BL
RE
IME
R S
T
ASHWAUBENON ST
SMITH ST
MORROW ST
RO
Y A
V
ST FRANCIS DR
CREAMERY RD
KILLARNY TR
MC CORMICK ST
HID
DE
N V
ALL
EY
LN
MAIN ST
SCHOOL PL
ELLIS ST
WARREN CT
DOE TR
FIESTA LN
TRU
E L
N
SA
RA
TOG
A S
T
SP
EN
CE
ST
NANCY AV
GWYNN ST
EMILIE ST
AZALEATR
VANDE CT
SU
YD
AM
ST
TOWN HALL RD
ST
JU
DE
ST
JOANNES AV
WESTWAY DR
CHARLES ST
CA
MA
RO
CT
DO
LLA
R L
N
SUNRISE LN
9TH ST
SC
OT
T T
OW
ER
DR
BLUEBILL ST
ELIZA ST
EDISON ST
HOWARD ST
W MAIN AV
RUSK ST
BROADVIEW DR
NE
UF
ELD
ST
VR
OM
AN
ST
FORTUNE AV
GO
OD
ELL
ST10THST
GR
AY S
T
LINDALE LN
CR
ES
TV
IEW
LN
HAVEN PL
SMITH ST
DEBRA LN
SA
N L
UIS
PL
BRYAN ST
LEDGEVIEW RD
BR
IQU
ELE
T S
T
CL
EM
EN
T S
T
7TH ST
RADISSON ST
WAY
NELN
DE
W L
N
MA
RK
ET
ST
COMMANCHE AV
BE
LLE
VU
E S
T
MA
RLE
E L
N
FOX
RIV
ER
DR
THR
US
H S
T
PARTNERSHIP DR
E BRIAR LN
KELLOGG ST
GLE
NV
IEW
RD
FRA
NK
ST
SP
AR
TA
N R
D
MEMORIAL DR
VIEW LN
REBER ST
W BRIAR LN
SUMMER PL
WEDGEWOOD DR
FRO
NTST
CR
ES
TW
OO
D D
R
AVONDALE DR
VIEW LN
WIGGINS WY
FOR
ES
T S
T
TAFT ST
VERLIN RD
HASTINGS ST
BORVAN ST
JOY LN
PORLIER ST
BO
WE
R C
RE
EK
RD
W ROSELAWN BL
OPENGATETR
SP
AR
TA
N R
D
EISENHOWER RD
PE
TE
RS
ST
H
OLLYWY
COUNTRYSIDE DR
RUSTICWY
LARSEN RD
APACHE AV
SANDY SPRINGS RD
EU
RO
LN
TILKENS ST
LOWELL DR
LEA
F S
T
LIDA LN
FREN
CH
RD
SHIRLEY ST
SHAD
OW
CT
N J
AC
KS
ON
ST
6TH ST
SHADOW LN
THORNDALE ST
RICH
CO
RD
AUTOPLAZAWY
ELM ST
PONDEROSA AV
CHRISTIANA ST
GRIGNON ST
LA C
OU
NT
RD
OA
KT
ON
LN
KAREN LN
SAGE DR
DO
UB
LE
Q R
D
SAL ST
DAY ST
TY
RO
LIA
N D
R
S R
IDG
E R
D
AMY ST
RAVINE RD
VE
NU
S D
R
N V
AN
DE
NB
ER
G R
D
CREEKEND LN
10T
H A
V
ECHO LN
GARLAND ST
WESTMEATH AV
GARY LN
THOMAS ST
BA
RB
ER
RY
LN
DONBEA ST
LIS
A L
N
IRE
NE
ST
KLEE ST
DAUPHIN ST
CHAMPEAU RD
FINGER RD
KLAUS ST
GOLF DR
N P
LAT
TE
N S
T
ANDRAYALN
DIVISION ST
JEANST
WILLARD DR
MA
PL
E L
N
SHADY OAK DR
AUGUST ST
E ADAM DR
ORCHID LN
DUQUAINE CT
SHERWOOD DR
S T
AYLO
R S
T
S J
AC
KS
ON
ST
ALT
AIR
ST
12T
H A
V
COFRIN DR
BIEMERET ST
BLUESTONE PL
SANDIA DR
BRUCE LN
ROCKLAND RDS
CH
OE
N S
T
HIL
LTO
P D
R
SPRINGFIELD DR
PRAIRIE AV
SCHOOL PL
BUFFALO ST
LAU
RA
ST
LHOST CT
WH
ISP
ER
LN
CONRAD DR
OA
K S
T
PIO
NE
ER
DR
FLIGHTWAY DR
S Q
UIN
CY
ST
ME
AC
HA
M S
T
WES
TPLA
INDR
ROBINSON AV
N D
AN
Z A
V
SC
HW
AR
TZ S
T
WESTFIELD AV
WEST POINT RD
CONTRACT DR
EL
MV
IEW
RD
CONTINENTAL DR
MO
RR
ISO
N R
D
JUBILEE DR
SO
UT
H P
OIN
T R
D
SKYLARK LN
S MELCORN CI
FAIRVIEW AV
SHAWANO AV
11TH
AV
N G
RA
ND
VIE
W R
D
ER
NS
T D
R
DAISY LN
WIL DCAT TR
MARVELLE LN MORRIS AV
SINCLAIRDR
6TH ST
PIKE LN
BOND ST
ED
GE
WO
OD
DR
SA
ND
AC
RE
S D
R
IRE
NE
ST
MID
VALL
EY DR
LILAC LN
LIM
E K
ILN
RD
AB
RA
MS
ST
HUGUETCT
DOUSMAN ST
N M
ILIT
AR
Y A
V
GO
OD
ELL
ST
VALLEY VIEW RD
VAN DEUREN ST
HUTSON RD
PLYMROCK TE
BALS
AM
WY
VAN RD
N N
OR
TH
VIE
W R
D
FRANZ AV
EMMET ST
CRIMSON WY
E ALLOUEZ AV
ELKAY LN
KE
PL
ER
DR
NPA
CKER
LANDDR
DOLLAR RD
ED
MU
ND
RD
CA
MIL
LA L
N
10T
H A
V
N L
OC
US
T S
T
WEISE ST
RED T
AIL
RA
VIN
E W
Y
MATHER ST
SCRAY HILL RD
BAY BEACH RD
DO
RN
DR
11TH
AV
8TH ST
KLONDIKE RD
CO
UN
TR
Y C
LU
B R
D
S C
LAY
ST
LEMONLN
RANDALL AV
GEMINI RD
ST MARYS BL
HURLBUT ST
HILL DR
SCOTTWOOD DR
CRIMSON CT
LANGLADE AV
CHIP ST
N O
AK
LAN
D A
V
ANTLERTR
COPPER LN
MINTEN WY
S9T
HST
LIST CT
GR
OV
E S
T
MANCEL LN
GR
EEN
LEA
F R
D
SIMONET ST
ENGLEWOOD RD
ROCKDALE ST
O'HARE BL
KENWOOD ST
SILVER LN
PARKVIEW RD
MISTYMOONWY
CAROLINEST
LAWE ST
WOODFIELDDR
VANS LN
KALB AV
JOD
Y D
R
BURNS AV
QU
AR
RY
PA
RK
DR
SHERRY LN
7TH ST
SHA
DY
LN
LIBERTY ST
SM
APLE
AV
WO
OD
LN
E MISSION RD
ZITA ST
CREAMERY R
D
DU
RH
AM
RD
OAKWOOD DR
I43
E MASON ST
PAC
KERLA
ND
DR
ER
IER
D
EATON RD
LAW
REN
CE
DR
LIB
AL
ST
GRANT ST
HERITAGE RD
S H
UR
ON
RD
S W
EB
ST
ER
AV
ON
TA
RI O
RD
STURGEON BAY RD
SAS
HLA
ND
AV
SCHEURING RD
MA
NITO
WO
CR
D
UNIVERSITY AV
S V
AN
DE
NB
ER
G R
D
EA
ST
RIV
ER
DR
SG
RA
ND
VIE
WR
D
AIRPORT DR
BA
YS
ET
TLE
ME
NT
RD
LOMBARDI AV
13T
H A
V
SW
AN
RD
DECKNER AV
EASTMAN AV
AM
ER
ICA
NB
L
AL
PIN
ED
R
WESTERN AV
RIVERVIEW DR
S F
ISK
ST
DUTCHMAN RD
PILGRIM WY
WAUBE LN
N IR
WIN
AV
SITKA ST
ELMORE ST
NEWBERRY AV
HANSEN RD
DOTY ST
EAST SHORE DR
FARLIN AV
S E
RIE
ST
GU
NS
ST
LEBRUN ST
14T
H A
V
PH
ILLI
PS
RD
CROOKS ST
GR
OS
S A
V
HILLSIDE LN
SUS
SE
X R
D
N B
AIR
D S
T
E WALNUT ST
CHERRY ST
REED ST
CIRCLE DR
N Q
UIN
CY
ST
4TH
ST
3RD
ST
PECAN ST
S M
ON
RO
E A
V
S N
OR
TH
VIE
W R
D
SR
IDG
ERD
EL
IZA
BE
TH
ST
CHICAGO ST
JOR
DA
N R
D
HARVEY ST
BA
DE
R S
T
S CIRCLE D R
GREENBRIER RD
TIM
BE
RLN
HA
ZE
NR
D
SU
BU
RB
AN
DR
PREBLE AV
MERRILL ST
W
IETOR
DR
N H
EN
RY
ST
HOFFMAN RD
VAN BEEK RD
GREENE AV
ROSCOE ST
BETH DR
STAGEC
OAC
H R
D
CASS ST
STUART ST
ALL
IED
ST
S6
TH
ST
N T
AYLO
R S
T
5TH ST
S 7
TH
ST
MAYLINE RD
VOYAGER DR
RIDGEWAY DR
BASTEN ST
HAROLD ST
SU
PE
RIO
R R
D
N M
AP
LE A
V
ST
GE
OR
GE
ST
EN
TE
RP
RIS
E D
R
WIL
SO
N A
V
FO
RT
HO
WA
RD
AV
AT
KIN
SO
N D
R
S R
OO
SE
VE
LT S
T
E HOFFMAN RD
EM
ER
AL
D D
R
MESA DR
CO
MM
OD
ITY
LN
ESSEN RD
CLINTON ST
LONGVIEW AV
FLORAL DR
STA
TE
ST
RA
MA
DA
WY
COURIER RD
SH
OR
T R
D
OAK RIDGE CI
S A
DA
MS
ST
ME
LOD
Y D
R
JOH
N S
T
O'KEEFE RD
HE-NIS-RA LN
BAIRD
CREE
KR
D
CR
AR
YST
JAMES ST
NB
RO
ADW
AYST
S M
AD
ISO
N S
T
RO
YAL
BL
DE
LAH
AU
T S
T
MINAHAN ST
N A
SH
LAN
D A
V
SKYVIEWST
CLI
VE
ST
ST
AG
NES
DR
E CIRCLE
DR
BR
UL
E R
D
OLD
PLAN
KR
D
TER
RY
LN
OAK ST
DALY DR
SK
YL
INE
BL
CUR R YLN
FRANKLIN ST
E ST JOSEPH ST
N
CIRC LE DR
KARL ST
PARK DR
ET
HE
L AV
INDIAN
TR
IND
IA
N HILL DR
FULTON ST
NAVAJO TR
WINDLAND DR
FINCH LN
RIDGEWAY BL
SOUTHBRIDGE RD
WIR
TZ
AV
CO
LUM
BIA
AV
N8T
HS
T
COOK ST
S N
OR
WO
OD
AV
EB W MASON FRONTAGE RD
DONALD ST
HE
YR
MA
N S
T
HIN
KL
E S
T
8TH ST
LAKESIDE PL
WESTWOOD DR
BEAUPRE ST
MEADOW VIEW LN
BROOKRIDGE ST
RALEIGH ST
GR
EE
NW
ALD
ST
PARKWOOD DR
HELENA ST
LAK
E L
AR
GO
DR
MILLS ST
WIN
FO
RD
AV
VICKI LN
WIE
SN
ER
ST
RO
LAN
D L
N
BROOK PARK DR
N C
HE
STN
UT
AV
LAU
ST
CO
TT
ON
WO
OD
LN
ALICE DR
OAKDALE AV
BIG CREEK RD
DALLAS LN
AR
GO
NN
ED
R
PLE
AS
AN
TL
N
BLUE SPRUCE DR
ST ANTHONY
DR
WE
SLE
Y A
V
ARBOR LN
15T
H A
V
HO
PF
LN
HO
BA
RT
DR
LE
ON BOND D R
WA
L
L ST
OA
KW
OO
D A
V
BAETEN RD
HA
WTH
ORNE HEIGHTS DR
LORE LN
DEER TR
MT
MA
RY
DR
VANDERPERREN WY
NE
VIL
LE A
V
PION EER
DR
CO
LON
IAL
AV
AP
HR
OD
ITE
RD
WA LK ER
DR
MEMORY AV
BE
AU
MO
NT
ST
RUSSELL ST
SE
MIN
OLE TR
CH
AL
LE
NG
ER
DR
RAVINE DR
LEWIS ST
MAY LN
SS
UP
ER
IOR
ST
MAES DR
ANDERSON DR
MAPLE CT
SUN TE
RO
BE
RT
LN
N C
LAY
ST
ANGELS PATH
MA
RQ
UE
TTE
AV
MA
RS
HA
LL A
V
LOIS ST
AM
BE
RLN
DE
SP
LAIN
ER
D
KENNEDY DR
DREWS DR
CRUSADE LN
CENTURY RD
NL
IBA
LS
T
KA
SS
NE
R D
R
MAYFLOWER RD
BADGER ST
VIK
ING D R
N V
AN
BU
RE
N S
T
LA
MB
EA
US
T
HU
TH
ST
PEONIES DR
JEN RAE RD
AQUARIUS R D
PARK PL
DAVI ES AV
CONESTA DR
SHELLEYL
N
BE
EC
HT
RE
ED
R
MA
DR ID DR
IRONWOOD DR
EDINBURGH RD
ISB
ELL
ST
IVY HILL DR
HO
LZE
RS
T
MA
YW
OO
D A
V
W WALNUT ST
SIL
V
ER ST
HA
RV
ES
T R
D
REMINGTON RD
LANCE ST
RO
TH
E S
T
OT TO CT
DU
CH
AR
ME
LN
LYN
WO
OD
L N
WHITTIER DR
LA
YD
EN
DR
SM
ICH
IGA
NS
T
LAR
UE
LN
TR AILW O OD DR
BIT
TER
SW
EE
T A
V
JAC
OB
ST
GILBERT DR
BOMIER ST
LANDE ST
RA
INB
OW
AV
CR EST LN
K EN DR
N M
AD
ISO
N S
T
NM
ICH
IGA
NS
T
VA
N C
AS
TE
R D
R
S V
AN
BU
RE
N S
T
HA
RT
UN
G S
TEMIR ST
BR
OS
I GS
T
CH
AN
TE
LS
T
AM
BE
RLY
TR
GA
IL
DR
ST ANN DR
FOXFIRE
DR
HAMPTON
AV
SUNRISE CT
WARM SPRIN GS DR
BERKSHIRE DR
CAREFUL DR
TERESA DR
S O
NTA
RIO
ST
MC
KE
NZ
IELN
S B
RO
AD
WA
Y S
T
EGAN LN
MARYJODR
GAR
RE TT
ST
KE
EH
AN
LN
ALLA
RD
ST
CO
MM
ER
CE
DR
NN
OR
WO
OD
AV
ME
NLO
PA
RK
RD
AS
HLA
ND
AVA
CC
ES
SR
D
MA
HO
NC
T
ALDRIN ST
H
ILT
ON
HEAD DR
SLO
CU
ST
ST
COOLIDGE ST
SM
ITS
ST
COLLEGE PARK DR
ECL IPSE DR
S SEDON A CI
ARAPA
HO
ET
R
N SEDONA CI
NE
LSO
NST
ISL
AN
D C
T
CO
PP
EN
SR
D
SA
NTA
BA
RB
AR
AD
R
CR
OC
US
DR
S J
EF
FE
RS
ON
ST
TERRAVIEW DR
DERBY LN
WIN
DW
AR
DR D
NW
EB
ST
ER
AV
BERKLEY RD
BR
ET
CO
ED
R
MIRAMAR DR
ZEISE AV
TWILIGHT DR
COMMERCIAL WY
LON
E O
AK
RD
HIGHVIEW ST
ZE
LA
SD
R
CA
RD
INA
LS
T
LE
EA
V
LOUIS E ST
DA
NC
ING
DU
NE
SD
R
HIL
LC
RE
ST
DR
GENEVA ST
CLA
YT
ON
PL
N M
ON
RO
E A
V
PIN
ET
E
LON
D
ON
RD
WO
OD
LA
ND DR
ST CLAIR ST
WIN
D
SOR DR
R
ADINZ RD
W LAZARRE AV
MO
ON
VA
LL
EY
DR
HI L LSIDE HEIGHT S DR
KA
TH
YD
R
BAYWATCH DR
E VIS
TA C
I
S H
EN
RY
ST
ST PAUL ST
CA
NT
ER
LN
RI V
E
RPINES DR
BAY VIEW DR
KN
OLL
TE
WINDING WATER S W
Y
TO
NY
LN
VALLEY HEIGHTS DR
FR
ON
T S
T
DE
LWIC
HE
RD
CH
IEF
HIL
LD
R
LIN
CK
CT
MC
DO
NA
LD
ST
GOOSER
D
JANICE AV
S P
EA
RL
ST
SAS
HLA
ND
FRO
NTA
GE
RD
MORRIS ST
BINGHAM
DR
NOVA LN
AR
NO
LD
DR
CH
A
RLA MA R DR
KETTLEC
R
E EK DR
JOU
RD
AIN
LN
HU
DS
ON
ST
SOMERSET DR
WH
EA
T W
Y
SIE
RRA CT
NIM
ITZ
DR
TORDEUR CT
STILES RD
DE
LR
AY
DR
PATT
YLN
RED MAPLE RD
TRISSINO WY
S D
AN
Z A
V
FERN LN
CO
LLA
ER
CT
NA
DA
MS
ST
IMPERIAL LN
PALMER DR
WOLVE
RI N
ET
R
WESTMINSTER DR
WILDERS
T
PA
TR
IOT
WY
PIL
GR
IMS
T
CHOCTAWTR
ESTES DR
KAT
ER
SD
R
AUGUSTA ST
RIVERIDGE LN
BLACKWOLF RN
NE
WT
OL
S S
T
C UMBERLAND DR
PROSPER ST
AP P IAN WY
GLEN ABBEY DR
NO
OY
EN
LN
DUTTON AV
WA
UB
EN
OO
RD
R
BA
YH
AR
BOR DR
PR
OFI
T PL
MC
CASTLEN ST
KA
LAH
AR
I DR
MO
RLE
Y R
D
C REEKWO OD CI
VENT
UR
EA
V
SAN JOSE PL
W ST JOSEPH ST
FRE
DR
ICK
CT
WO
OD
RO
W W
Y
RO
SE
WO
OD
ST
SEQUOIA LN
SPYGLASS HILL DR
N R
IVE
RD
ALE
DR
NIER
CT
PE
RS
HIN
G
RD
NE
LLIE
LN
VIRGO RD
TO
MM
AR
KS
T
LOS
TLN
FAGERVILLE WY
DE
WEY
D ECKER DR
WATERFORD DR
MORAINE TE
OAKLAWN AV
COLLEGE AV
DUNBAR LN
AN
NLN
D
OL O MITE DR
RA
INB
OW
CT
GRACE ST
DO
RS
ET
DR
BUFFLEHEA D LN
STEVENS ST
NAUTICAL AV
GRAASS ST
TOM
LIN
ST
VINCENT RD
MU
SEU
MPL
H EMLOCK DR
QU
INT
ON
ST
FIR
ELA
NE
DR
POLO RUN TE
PARKSIDE CT
SYCAMO
RE
DR
SONATA DR
GRIFFITHS LN
MA
ST
ER
SL
N
VE
RC
AU
TE
RE
ND
R
S IDLEWILD CT
ALL
AR
DAV
ALL
EN
AV
HANNAH ST
BLUE MOON DR
DIS
CO
VE
RY
RD
M O
RA
INE
WY
LIN
DE
ND
R
EDGEWOOD LN
MONACO DR
EMMALAN E DR
E
MA
TT
HE
WD
R
RED OAK DR
MAYLINE DR
GU
NS
RD
MT
MA
RY
CI
OLD VAL LEY RD
NR
OO
SE
VE
LTS
T
SORENSON DR
O'H
E
ARN LN
LOR
RA
INE
LN
SURREY TR
PIN
TAIL
ST
YORKSHIRE RD
DETRIE DR
IRIS CT
FAY CT
IRV
ING
TON
ST
OA
KG
RO
VE
AV
FAW
NLN
BLU
EB
IRD
ST
LAREDO LN
MEAD
OW
CI
KIMBALL ST
GLA
CIE
RD
R
HU
BBLED
R
LL
AM
AC
T
BOARDWALK AV
EMINENCES
T
TURNBURY RD
CONCORD WY
R
EGINALD HILL
COTTONWOOD CT
DAFFODIL DR
MAIN ENTRANCEDR
FARMSTEAD RD
WOODMONT WY
HA
RR
ISO
NS
T
BRICK DR
ROSE LN
EVENINGSTAR
DR
PESO PL
SO
AK
LAN
DA
V
CENTENNIAL ST
SE
RV
AN
TW
Y
RITA LN
ORCHARD LN
ST GREGORY DR
GLEN OAKS PS
N MELCORN CI
RO
CK
LED
GE
CT
BA
RT
STA
RR
DR
ELBEN CT
SWAN RIDG
ETR
SCH
AN
OC
K D
R
VIS
TA
RD
VALIANT LN
CA
RS
TE
NS
EN
LN
SW
AN
STO
NE
CI
SUNNYMEDE LN
TIGER CT
OSLO DR
RIDGE HAVENC
T
ALLOUEZ TE
AG
AT
HA
CH
RIS
TIEAV
VA
NE
GE
RE
NL
N
LIM ESTONE TR
MARIAN LN
HE
RIT
AG
EH
EIG
HT
S
STRAWBERRY L N
MANDERLY WY
UTA
HA
V
MIT
CH
ELL
ST
DE
CU
RIA
LN
TOBERMORY DR
EMORY ST
PARISLN
EASTBREEZE LN
AU
TO
PL
AZ
A D
R
NW
AS
HIN
GTO
NS
T
LEONARD ST
MA
RY
HIL
LD
R
VA
L
LEY LN
RIVER
POINT CT
KE
LLY
JOD
R
PETERSONRD
DOVER L N
ROSEMONT DR
HEYDEN LN
COTTAGE HILL DR
TU
RQ
UO
ISE
TR
SC
OTT
DR
MT CAROL DR
FO
XH
EIG
HT
SLN
WG
ILE CI
NOEL D
R
FASCINATION DR
HILLSDALECT
DE
SC
HA
NE
PL
ME
CH
ST
LUK
ELN
PAINT HORSE TR
WILLARD TE
CA
VIL
WY
HIGH LAN D C ENTER DR
OA
K L
EA
F D
R
RIDGEVIEW CT
SW
ISS
ME
AD
OW
LN
REINHARD DR
CE
DA
RR
IDG
EC
T
AE
RTS
LN
S SUNKIST CI
STADIUM DR
CHANTILLY
RU
DE
PR
EY ST
WAYSIDE PL
SILV ER MAPLE DR
HACKBER RY CT
PHOEBE ST
OA
KR
IDG
ED
R
TU
RE
K S
T
RIVERBEND TE
PLATEAU HEIGHTS RD
TO
UC
HS
TO
NE
DR
CABOOSE LN
TENMILE DR
ARMED FORCES DR
YAHARA CI
KENSINGTON LN
SFI
FTH
ST
MILESKI LN
WILD
R OSE DR
WEXFORD LN
ME
AD
OW
WIN
D D
R
WOODRIDGE LN
SHERIDAN DR
ALLEN POND RD
LEDVINA ST
SWAN POINTETE
TRA
EG
ER
ST
LAC
ON
A C
T
WILCO
X
CT
BE
VE
RLY
RD
ED
MU
ND
DR
TAS-SHA CT
WILLOWBROOK
RD
S IR
WIN
AV
BA
CH
EL
OR
DR
MCRAEP
L
CENTRA
LD
R
CRABB CT
REGAL AV
SW
AM
PR
D
RAV
INE C T
HO
LS
CH
UH
LN
CANYONLAND DR
SATELLITE LN
NB
A
DERST
CAMELOT CT
GARDEN PARK TE
WE
BS
TE
RC
T
SHELTER CREEK CT
OLD C OACHRD
RE
DT
AIL
GLE
N
KAYLEE CI
QUINDALEE RD
FAYETTE LN
BR
IAR
WO
OD
CT
RE
DB
IRD
CI
CH
ATEA
U D
R
OAK RIDGE CT
RUSH CT
CORONIS CI
AM
ER
ICA
NC
T
CA
LA
WA
YD
R
BETHANY PL
WEBSTER HEIGHTS DR
APPLE RIDGE CT
SW
AS
HIN
GTO
NS
T
SC
HE
ST
NU
TA
V
BIT
TE
RS
CT
ASH ST
SHADOW LN
ME
AD
OW
LN
5TH ST
SHAWANO AV
JAMES ST
AM Y ST
CHICAGO ST
RIT
ALN
CHURCH RD
S C
LAY
ST
PAR
K S
T
S Q
UIN
CY
ST
S J
AC
KS
ON
ST
7TH ST
LAWE ST
NQ
UIN
CY
ST
MORRIS AV
S C
LAY
ST
HU
TH
ST
CASS ST
ORLANDO DR
CEDAR ST
S M
AP
LE A
V
SU
MA
CD
R
N W
EB
ST
ER
AV
RIV
ER
SID
E D
R
WILLIAM ST
S J
EF
FE
RS
ON
ST
N C
LAY
ST
ELM ST
ORLANDO DR
ALP
INE
DR
NA
DA
MS
ST
MA
NIT
OWOCRD
14T
H A
V
MATHER ST
COTTAGE GROVEAV
VIC
TOR
IAS
T
CASS ST
LAR
RY
LN
WEISE ST
PARK ST
WEISE ST
NC
LAY
ST
RED MAPLERD
SUE
LN
RAV
INE
WY
RE
DW
OO
DD
R 15T
HA
V
SW
EB
ST
ER
AV
CHICAGO ST
WILDWOODD
R
S R
IDG
E R
D
LIN
CO
LN S
T
POTTS AV
VIKING LN
CA
RD
INA
L L
N
MO
NR
OE
RD
ALLOUEZ AV
MAIN AV
7TH ST
N H
UR
ON
RD
S M
ILIT
AR
Y A
V
REID ST
SP
IRIT
WY
GERSHWIN DR
BROOKWOOD DR
LEO ST
N 6TH
ST
AMS
BL
LOMBARDI ACCESSRD
GLENVIEWAV
WO
OD
SID
E R
D
BAD
GERLAND DR
LAN
C
ASTER TE
N 1
0TH
ST
UL
LM
ER
CT
N B
RO
AD
WA
Y
S B
RO
AD
WAY
CORMIER RD
VELPAV
VELPAV
VELPAV
MIN
OR
CT
TR O J AN DR
CO
RN
E
LI U S DR
ALBERT DR
EA
RLYST
HANS
EN
RD
EATONRD
HUMBOLDT RD
ALGOMA RD
LUXEMBURG RD
PINE GROVE RD
KEWAUNEE RD
WILLOW RD
GL
EN
MO
RE
RD
LAR
KS
T
PLEASANT VALLE
YD
R
FINGER RD
E MASON ST
FINGER RD
CH
AR
IT
YLN
WO
O
D HALL DR
NAVI G
ATO
RW
AY
Ê0 0.5 10.25 Miles
1
1
14
14
11
11
5
7
2
7
10
8
6
5
3/4
4
3
17
17
UWGBNWTC
Map created by: Brown County Planning
Commission Staff 2/10/2014
2
5TH ST
7TH ST
N M
AP
LE A
V
9TH ST
STA
TE
ST
HOWARD ST
MC
DO
NA
LD S
T
CLINTON ST
OA
K S
T
N C
HE
STN
UT
AV
ST CLAIR ST
CHRISTIANA ST
ALL
AR
D A
V
HA
RVA
RD
ST
DENIS PL
S O
AK
LAN
D A
V
S M
AP
LE A
V
REED ST
S P
EA
RL
ST
SCHOOL PL
N R
OO
SE
VE
LT S
T
W WALNUT ST
N A
SH
LAN
D A
V
OX
FOR
D A
V
S G
RE
EN
WO
OD
AV
ARNDT ST
HUBBARD ST
JAMES ST
MU
SE
UM
PL
N J
EFF
ER
SO
N S
T
S M
AP
LE A
V
N G
RE
EN
WO
OD
AV
11T
H A
V
SEYMOURCT
SCHOOL PL
S C
HE
STN
UT
AVS
CH
ES
TNU
T AV
4TH ST
N C
HE
STN
UT
AV
S O
AK
LAN
D A
V
N N
OR
WO
OD
AV
JEFFERSON WY
FIN
K S
T
3RD STS M
AP
LE A
VS
OA
KLA
ND
AV
6TH ST
10T
H A
V
10T
H A
V
N O
AK
LAN
D A
V
LAKE ST
8TH ST
15T
H A
V
3RD ST
N C
LAY
ST
CONGRESS ST
S R
OO
SE
VE
LT S
T
N A
DA
MS
ST
S J
EF
FER
SO
N S
TN
AD
AM
S S
T
S J
EF
FER
SO
N S
T
E WALNUT ST
STUART ST
CASS ST
CROOKS ST
N W
AS
HIN
GTO
N S
T
S IR
WIN
AV
CHICAGO ST
N M
AD
ISO
N S
T
S M
AD
ISO
N S
T
CEDAR ST
N W
EB
STE
R A
V
N Q
UIN
CY
ST
UTILITY CT
DOTY ST
BODART ST
N M
ON
RO
E A
V
S Q
UIN
CY
ST
S V
AN
BU
RE
N S
T
S A
DA
MS
ST N
QU
INC
Y S
T
CHERRY ST
HOWE ST
PINE ST
DO
NA
LD D
RIV
ER
WY
VANDERBRAAK ST
ELM ST
S J
AC
KS
ON
ST
N V
AN
BU
RE
N S
T
N C
LAY
ST
S Q
UIN
CY
ST
N J
AC
KS
ON
ST
N B
RO
AD
WAY
S W
AS
HIN
GTO
N S
T
5
8
3/4
111
2
Transit CenterDowntown Inset
Legend
#1 Brown Line
#2 Orange Zippin Line
#3 Silver Line#4 Blue Line
#6 Red Line
#7 Lime Line#8 Green Line
#11 Sky Line
#14 Pink Line
#17 Brick Line
14
18
18
18
#18 Gold Line
Paratransit Service Area
#2 Orange Zippin Line Upon Request
18
6
Transit Center
6#5 Plum Line
#10 Yellow Line
8
8
10
10
3/4
8
8
5
![Page 8: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/8.jpg)
7
2014 Operating Budget Estimate Overview
Green Bay Metro’s 2014 operating budget estimate is projected at $7,847,400. Green Bay Metro receives operating assistance from a variety of sources. These include the Federal Section 5307 program, State 85.20 program, local dollars from entities participating in the system, fares, advertising revenue, and interest revenue.
A summary of the 2014 estimated Green Bay Metro budget by revenue source is below:
2014 Budget Estimate
Source: Amount Percent Federal $2,148,235 27.4% State $2,187,453 27.9% Local $2,041,562 26.0% Fares $1,370,000 17.4% Other $100,150 1.3% Total: $7,847,400 100.0%
![Page 9: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/9.jpg)
8
Local Share
The 2014 budget estimate consists of contributions from participating local entities. The sum of the contribution is projected to be $2,041,562 (26.0%) of the entire operating budget. Local entities contribute to the system based on system mileage and population. The breakdown by participating local entities is as follows:
2014 Budget Estimate – Local Contribution Analysis
Source: Amount Percent of
Local Share Percent of
Overall Budget Green Bay $1,514,044 74.2% 19.3% Ashwaubenon $223,596 11.0% 2.8% De Pere $165,310 8.0% 2.1% Allouez $97,236 4.8% 1.2% Bellevue $41,376 2.0% 0.6% Total: $2,041,562 100.0% 26.0%
![Page 10: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/10.jpg)
9
CHAPTER TWO
Route Modifications
2013 Fixed Route Service Modifications
On December 2, 2013, Green Bay Metro implemented several changes to the fixed route system. Many of the changes were necessitated as a result of the Oneida Tribe of Indians withdrawing financial participation from the system. Prior to this, the tribe contributed the local share for the #16 Shadow route. #4 Blue The #4 Blue route was modified to provide service along Velp Avenue and to allow for improved transfers at Green Bay Plaza. #5 Plum The #5 Plum replaced the #6 Red-South and provides direct service between downtown and Lombardi Middle School with a transfer opportunity at Green Bay Plaza. The #5 Plum only operates on weekdays during the morning and afternoon peaks. #6 Red The #6 Red replaced the #6 Red-North and #100 Downtown X-Press and provides direct service between downtown and NWTC with a transfer opportunity at Green Bay Plaza. Route frequency was reduced to once per hour after 6:00 p.m. on weeknights and on Saturdays. #8 Green The #8 Green (clockwise loop) and the #9 Yellow (counter-clockwise loop), which previously operated as a route pair, now operate in a clockwise direction only. The service retains the #8 Green designation and operates with 30 minute frequency during weekdays and 60 minute frequency on weekday evenings and Saturdays. #10 Yellow The #10 Yellow is a new route that replaced much of the service provided by the #16 Shadow, with the exception of the Oneida Casino (which is no longer served). Additional service is now provided on Broadway south of Cormier Road. #17 Brick The #17 Brick route no longer provides front door service to Humana in De Pere. The desired goals of improved on-time performance and timely transfers were achieved by eliminating this service. #18 Gold The #18 Gold was extended to the south to allow service to be provided to the Costco
![Page 11: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/11.jpg)
10
in Bellevue that opened in August of 2013. 2014 and Beyond Green Bay Metro staff has indicated that changes to the east side route system will be considered in 2014 or 2015.
![Page 12: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/12.jpg)
11
CHAPTER THREE
Full Service Route System Performance
According to the Green Bay Metro Policy and Procedures Manual, "…each existing bus route should be evaluated individually to determine if the service provided is attracting a desired amount of ridership and revenue." The Green Bay Metro system policy for operational evaluation of new bus routes is somewhat different from the evaluation of established bus routes. New routes are to be examined at six-month intervals and must meet minimum ridership and revenue figures or the Transit Commission will give serious consideration to abandoning or making substantial changes to routes that are chronically unproductive. The purpose of the periodic examination is to allow existing and potential riders to become familiar with the new route schedule and service area and to allow time for operational improvements before meeting system-wide standards. The policy manual outlines five performance measures to be used in the evaluation of a bus route. In some cases, the performance of a route is compared to the performance of the entire system. The criteria of revenue per hour, passengers per hour, and operating ratio use minimum measurements based on the system median. After six months of service, a new route must reach 30 percent of the median. After one year, the route should reach 60 percent, and after two years, it should reach 80 percent. The following performance standards are used to review all full service routes: Revenue Per Hour
The revenue per hour standard helps to determine the financial efficiency of a route. The revenue per hour of an established individual route should be at least 80 percent of the system median.
The system standard for weekdays is $11.65 per hour.
The #6 Red route is the strongest route in terms of revenue generated per hour at $18.42.
The lowest performing route is the #17 Brick route ($5.07).
Please see Table 1 for revenue per hour for a weekday, weekday evening, and total. There are no set standards for limited service routes. However, they generally experience much higher passenger and revenue rates than the full service routes. The intent of limited service routes is to operate at or near seated capacity.
Please see Chapter Four for an overview of the Limited Service Route System.
![Page 13: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/13.jpg)
12
RouteDaytime
TripsEvening
Trips
Route Length
(in hours)Total
Revenue
DaytimeRevenueper Hour
EveningRevenueper Hour
TotalRevenueper Hour
# 6 Red 26 3 1.0 $534.17 $18.53 $17.46 $18.42
# 3 Silver 13 0 1.0 230.27 17.71 17.71
# 4 Blue 13 3 1.0 279.44 18.38 13.52 17.47
# 2 Orange 25 7 0.5 250.25 17.81 7.88 15.64
# 5 Plum 8 0 1.0 120.00 15.00 15.00
# 8 Green 26 3 1.0 433.97 14.94 15.16 14.96
#14 Pink 13 3 1.0 233.00 15.75 9.42 14.56
#11 Sky 13 3 1.0 218.66 15.38 6.26 13.67
# 7 Lime 26 3 1.0 392.07 14.03 9.14 13.52
# 1 Brown 26 3 1.0 369.63 12.92 11.28 12.75
SYSTEM STANDARD $11.65
#18 Gold 12 3 1.0 123.24 8.79 5.92 8.22
#10 Yellow 13 3 1.0 121.41 8.58 3.29 7.59
#17 Brick 13 3 1.0 81.04 5.48 3.25 5.07
Total/System Average: $3,387.17 $14.34 $9.30 $13.66
System Median: $14.56
System Standard: $11.65
Notes:
Daytime operations are from 5:15 AM to 6:00 PM
Evening operations are from 6:00 PM to 9:45 PM
Revenue is passenger generated only. Free fare passengers are not included.
#3 Silver and #5 Plum do not operate in the evening.
Table 1Revenue per Hour
Weekday
![Page 14: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/14.jpg)
13
Passengers Per Hour
This standard evaluates the number of revenue passengers per hour. Each route should reach 80 percent of the system median of passengers per hour.
The system standard for weekdays is 15.4 passengers per hour.
On weekdays, the #3 Silver route has the highest passengers per hour rate of 23.8.
The poorest performing route is the #17 Brick carrying only 7.4 passengers per hour.
Please see Table 2 for passengers per hour for a weekday, weekday evening, and total.
Green Saturday (everyone rides free) passengers can be seen in Table 3.
![Page 15: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/15.jpg)
14
Table 2Passengers per Hour
Weekday
RouteDaytime
TripsEvening
Trips
Route Length
(in hours)Total
Passengers
DaytimePassengers
per Hour
EveningPassengers
per Hour
TotalPassengers
per Hour
# 3 Silver 13 0 1.0 309 23.8 23.8
# 4 Blue 13 3 1.0 376 25.0 17.0 23.5
# 6 Red 26 3 1.0 673 23.5 21.0 23.2
# 5 Plum 8 0 1.0 164 20.5 20.5
# 2 Orange 25 7 0.5 327 23.4 10.0 20.4
# 7 Lime 26 3 1.0 561 20.0 13.7 19.3
# 8 Green 26 3 1.0 557 19.3 18.7 19.2
#14 Pink 13 3 1.0 305 20.7 12.0 19.1
#11 Sky 13 3 1.0 299 21.2 7.7 18.7
# 1 Brown 26 3 1.0 469 16.6 12.7 16.2
SYSTEM STANDARD 15.4
#18 Gold 12 3 1.0 158 11.4 7.0 10.5
#10 Yellow 13 3 1.0 156 11.1 4.0 9.8
#17 Brick 13 3 1.0 118 8.0 4.7 7.4
Total/System Average: 4,472 19.0 11.6 18.0
System Median: 19.2
System Standard: 15.4
Notes:
Daytime operations are from 5:15 AM to 6:00 PM
Evening operations are from 6:00 PM to 9:45 PM
Revenue is passenger generated only. Free fare passengers are not included.
#3 Silver and #5 Plum do not operate in the evening.
![Page 16: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/16.jpg)
15
RouteHours of Service
per SaturdayAll Passengers
Ride FreeFree Riders
per Hour
# 1 Brown 11 231 21.0
# 2 Orange 11 245 22.3
# 3 Silver
# 4 Blue 11 418 38.0
# 5 Plum
# 6 Red 11 484 44.0
# 7 Lime 11 249 22.6
# 8 Green 11 418 38.0
#10 Yellow 11 71 6.5
#11 Sky 11 142 12.9
#14 Pink 11 330 30.0
#17 Brick 11 141 12.8
#18 Gold 11 125 11.4
Total/System Average: 121 2,854 23.6
Notes:#3 Silver and #5 Plum do not operate on Saturday.
Table 3Green Saturday
![Page 17: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/17.jpg)
16
Operating Ratio
The operating ratio of a route is determined by dividing a route's passenger revenue by the total operating expense. The standard for the operating ratio is 80 percent of the system median. The operating expense of a route is determined by multiplying the total number of system hours by the cost per hour. The Green Bay Metro System has an estimated expense of $86.95 per hour for 2014 (paratransit costs were removed from this figure starting in 2007 upon recommendation of the state).
Expenses include items such as driver wages and fringe benefits, fuel, bus maintenance, and insurance.
The operating ratio measure illustrates the percentage of revenue recovered. For example, on average the weekday full service system recovers 15.6 percent of all expenses, or 15.6 cents per every dollar spent operating the system (excluding the paratransit system).
The system standard for weekdays is 13.4 percent. The #6 Red route had the highest operating ratio at 21.2 percent. The poorest performing route is the #17 Brick route at 5.8 percent. Please see Table 4 for operating ratio comparison for a weekday, weekday evening, and total.
![Page 18: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/18.jpg)
17
RouteDaytime
TripsEvening
TripsTotalTrips
Route Length
(in hours)TotalHours
Expenseper Hour$86.95
TotalRevenue
DaytimeOperating
Ratio
EveningOperating
Ratio
TotalOperating
Ratio
# 6 Red 26 3 29 1.0 29.0 $2,521.55 $534.17 21.3% 20.1% 21.2%
# 3 Silver 13 0 13 1.0 13.0 1,130.35 230.27 20.4% 20.4%
# 4 Blue 13 3 16 1.0 16.0 1,391.20 279.44 21.1% 15.5% 20.1%
# 2 Orange 25 7 32 0.5 16.0 1,391.20 250.25 20.5% 9.1% 18.0%
# 5 Plum 8 0 8 1.0 8.0 695.60 120.00 17.3% 17.3%
# 8 Green 26 3 29 1.0 29.0 2,521.55 433.97 17.2% 17.4% 17.2%
#14 Pink 13 3 16 1.0 16.0 1,391.20 233.00 18.1% 10.8% 16.7%
#11 Sky 13 3 16 1.0 16.0 1,391.20 218.66 17.7% 7.2% 15.7%
# 7 Lime 26 3 29 1.0 29.0 2,521.55 392.07 16.1% 10.5% 15.5%
# 1 Brown 26 3 29 1.0 29.0 2,521.55 369.63 14.9% 13.0% 14.7%
SYSTEM STANDARD 13.4%
#18 Gold 12 3 15 1.0 15.0 1,304.25 123.24 10.1% 6.8% 9.4%
#10 Yellow 13 3 16 1.0 16.0 1,391.20 121.41 9.9% 3.8% 8.7%
#17 Brick 13 3 16 1.0 16.0 1,391.20 81.04 6.3% 3.7% 5.8%
Total/System Average: 248.0 $21,650.55 $3,387.17 16.4% 10.4% 15.6%
System Median: 16.7%System Standard: 13.4%
Notes:Daytime operations are from 5:15 AM to 6:00 PMEvening operations are from 6:00 PM to 9:45 PMRevenue is passenger generated only. Free fare passengers are not included.#3 Silver and #5 Plum do not operate in the evening.
Table 4Operating Ratio or Percent of Expenses Recovered
Weekday
![Page 19: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/19.jpg)
18
Loading Standards Metro service should provide adequate seating to meet passenger demand. This standard is calculated by dividing the number of passengers at the maximum load point by the number of seats available. Green Bay Metro’s buses have seating capacities of 25 to 45 passengers. Off-Peak Loading Standard The off-peak loading standard is 1.0. Factors of more than 1.0 indicate that some passengers are standing. During the off-peak periods, a seat should be provided to every passenger. Peak Loading Standard The peak loading standard should not exceed 1.25. During the peak periods, some passengers may be standing; however, passengers usually do not have to stand for long distances due to passenger turnover. Peak periods for the Green Bay Metro System are considered to begin before school starts at approximately 6:45 a.m. until 8:45 a.m. and again when school lets out at approximately 2:45 p.m. until 4:45 p.m. The off-peak and peak loading standards are nationally accepted and apply to the Green Bay Metro System. Metro operations staff monitors off-peak and peak loading conditions. When a route displays a large quantity of passengers on a particular run and passengers are forced to stand, strategies for mitigating the occurrences may be implemented, such as assigning a larger capacity bus to the route. However, it should be noted that all but one of the 40’ buses (45 seats) has been removed from service due to age and condition. Metro operations staff reports that standing occurs on a regular basis on select routes, but is not a significant issue for the system.
![Page 20: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/20.jpg)
19
Schedule Adherence The schedule adherence (on-time performance) of each route is monitored by Metro operations staff. Green Bay Metro’s guideline is zero minutes early to five minutes late under normal conditions. The goal of a transit system should be 100 percent on-time operation. However, many factors, such as traffic conditions, rail and bridge crossings, mechanical failures, and inclement weather, cause delays from time to time. Overall, schedule adherence is not a significant issue. Monitoring Schedule Adherence The Automatic Vehicle Locator (AVL) system determines the location of each bus and transmits the information back to Metro’s dispatch office where operations staff can observe on a large CAD screen whether a bus is adhering to the published schedule. Various symbols indicate if a bus is running on time, running ahead of schedule, running behind schedule, or is off its route. Equipment in the buses will also alert the driver if they are deviating from the schedule.
CAD Screen in Dispatch Office with Close-Up
Photos by Brown County Planning Commission.
![Page 21: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/21.jpg)
20
Full Service Fixed Route Results and Recommendations Overall, ridership levels have declined only slightly since the conversion to a multi-hub system in September 2011. This decline can be attributed to a modest decrease in service hours. Based on the performance evaluation and other circumstances, staff has identified the following concerns: #10 Yellow, #17 Brick, and #18 Gold Routes Ridership and revenue statistics for the #10 Yellow (portion of former #16 Shadow), #17 Brick, and #18 Gold routes show that they all fall below system performance standards for established routes. The current route structures of #10, #17, and #18 were introduced in late 2013. Metro policy is to allow new routes to be examined at six-month intervals. The purpose of the periodic examination is to allow existing and potential riders to become familiar with the new route schedule and service area before meeting system-wide standards. However, the areas served by the routes have traditionally performed at a low level. Low ridership can be attributed to low population densities in areas served by the routes and service frequency of only once per hour. National studies show that riders are more likely to ride when frequency of service is every 15 or 30 minutes. Recommendation: Staff should continue to work with the communities and businesses served by the three routes and consider any changes that may lead to increased ridership.
![Page 22: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/22.jpg)
21
CHAPTER FOUR
Limited Service Route (LSR) System Performance
Green Bay Metro operates 10 limited service routes. All limited service routes operate on regularly scheduled school days. All limited service routes are open to the general public. Service #65, #70, #71, #72, #73, #74, #75, #76, and #77 – The routes provide service in the City of Green Bay and Village of Allouez. Green Bay and Allouez share the local cost based on miles within their respective communities. Pass sales to the Green Bay School District help offset the local share. The routes are primarily used by students of the Green Bay School District who either live two or more miles away from school or have to cross a major obstacle to reach school. All routes are available to the general public. #78 – This route operates exclusively in the Village of Ashwaubenon. Local funds are provided by the village. Revenue from pass and cash fares is generated primarily by middle and high school students traveling between home and school. This route is also available to the general public.
Ridership As stated earlier, there are no set standards for limited service routes. However, LSRs generally experience high passenger per trip rates. The intent of this type of service is to operate at or near seated capacity. In February of 2014, an average of 677 one-way trips were made each day. This means that an average of 339 middle and high school students used the limited service system each day. This produced an average of 32 passengers per trip and exceeded the buses’ seating capacity in many cases. All of the routes, with the exception of Route #78, perform at a satisfactory level. Route #78, which operates in the Village of Ashwaubenon, carries an average of only two riders in the morning and 12 riders in the afternoon. The route has performed at a low level for quite some time. Brown County Planning Commission staff recommends that the Transit Commission consider this route for elimination upon completion of the current school year.
![Page 23: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/23.jpg)
22
Limited ServiceRoute Passengers
Limited ServiceRoute Passengers
#65 a.m. 42 #74 a.m. 41
#65 p.m. 47 #74 p.m. 41
#70 a.m. 41 #75 a.m. 45
#70 p.m. 50 #75 p.m. (two loops) 71
#71 a.m. 44 #76 a.m. 14
#71 p.m. 72 #76 p.m. 27
#72 a.m. 27 #77 a.m. 20
#72 p.m. 28 #77 p.m. 13
#73 a.m. 17 #78 a.m. 2
#73 p.m. 23 #78 p.m. 12
Total Passengers: 677
Average Passengers per Route: 32
Notes:
Limited Service routes are open to the general public.
Table 5Limited Service Routes
Passengers
![Page 24: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/24.jpg)
23
CHAPTER FIVE
Paratransit Program
Paratransit is an alternative to the fixed route system. It is intended for people who cannot be served by Metro’s fixed route buses due to disabilities. Service is more flexible in terms of scheduling and routing, is offered on a demand/response basis, and is usually provided by low capacity vehicles, such as vans. Paratransit is meant to be complementary to the fixed route system in terms of service area, service days and hours, and cost.
The Americans with Disabilities Act (ADA) became law on July 26, 1990. The law is intended to provide equal access rights for people with disabilities in the areas of employment, public services, public transportation, private accommodations, and telecommunications. The law requires recipients of Federal Transportation Administration (FTA) funds, such as Green Bay Metro, to prepare a program for providing transportation services to people with disabilities by using both lift-equipped fixed route service and complementary paratransit service. Individuals are eligible to use ADA public transportation service or paratransit if they satisfy disability standards established by the ADA. Metro has contracted with several private companies since 1988 to provide paratransit service. On May 2, 2011, MV Transportation began providing paratransit services. The term of the contract has been set at three years with two one-year options. The table below summarizes the number of trips and trip costs associated with the paratransit program. These data do not include Metro staff time associated with the program.
Paratransit Program 1998-2013
Year Trips Trip Costs* Cost
Increase/ Decrease
Percent Cost Increase/Decrease
1998** 69,621 $602,918 1999 81,571 $908,077 +$305,159 +51% 2000 94,057 $1,081,756 +$173,679 +19% 2001 97,000 $1,161,209 +$79,453 +7% 2002*** 98,320 $1,484,632 +$323,423 +28% 2003 96,509 $1,515,223 +$30,591 +2% 2004 100,601 $1,664,826 +$149,603 +10% 2005 96,039 $1,639,625 -$25,201 -2% 2006**** 72,979 $1,305,135 -$334,490 -20% 2007 69,499 $1,243,337 -$61,798 -5% 2008 69,140 $1,337,548 +$94,211 +8% 2009 68,868 $1,313,787 -$23,761 -2% 2010 67,384 $1,337,797 +$24,010 +2% 2011***** 63,337 $1,330,561 -$7,236 -1% 2012 59,399 $1,393,869 +$63,308 +5% 2013 55,821 $1,543,765 +$149,896 +10%
* Trip cost includes fuel escalator payments from 2006-2011. ** Under contract with Lamers, Inc. *** Start of four and one-half year contract in January with four-month extension with Medi-Vans. **** Start of four and one-half year contract in November with Medi-Vans. Service area reduction implemented. ***** Start of contract in May with MV Transportation.
![Page 25: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/25.jpg)
24
Paratransit Contract Rates The current contract allows MV to receive $23.09 per non-ambulatory passenger (requires a mobility device to board) and $18.71 per ambulatory passenger (does not require a mobility device to board) for each one-way trip in 2014. Green Bay Metro also provides the fuel to operate MV’s revenue vehicles at an average estimated rate of $3.28 per trip. The average rate is tied to service efficiencies (dispatch & trip scheduling) and fuel prices. Agency Trips Agency trip rates were approved by the Transit Commission and introduced on February 2, 2012. An agency is defined as an organization that serves persons who qualify for human service- or transportation-related programs or services due to disabilities, income, or advanced age. Many paratransit clients fall under the umbrella of a local agency. For example, a paratransit client that receives financial support from a program administered by the Brown County Human Services Department and travels to the CP Center for therapy three times per week would be charged the agency rate for the home to CP and CP to home trips. Many transit systems in Wisconsin have implemented an agency rate. Agency rates can vary from $1.50 additional per qualifying trip to the full cost of providing the trip. Green Bay Metro offers advance-purchase convenience tickets for $3.00 (regular rate) or $8.00 (agency rate). Clients may also pay cash upon boarding the paratransit vehicle. Specialized Transportation Service Demand Uncertainty 1. Wisconsin Department of Health Services (DHS)
a) Medicaid Transportation Management
The DHS has implemented a Medicaid Transportation Management Initiative that aims to improve statewide access to transportation services, reduce costs, simplify and improve customer service, and increase accountability. The initiative began on July 1, 2011. Issues such as trip shedding (dumping) onto local programs, reduced service options, and provider performance are major concerns expressed by persons with disabilities and/or their representatives. Green Bay Metro staff has noted that they receive phone calls from Medicaid clients hoping to use paratransit as an alternative. Metro staff appropriately refers the client to the proper entity. In November of 2012, citing significant financial losses, LogistiCare, the broker hired to act as the Medicaid transportation brokerage for qualifying citizens, issued a 90-day notice to terminate the contract. In response, DHS solicited proposals and hired the firm MTM with service beginning on August 1, 2013.
b) Family Care
Family Care is a program that is designed to optimize the health and independence of adults with long-term care needs through the provision of
![Page 26: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/26.jpg)
25
traditional Medicaid services such as nursing homes and non-traditional services such as home- and community-based residential living facilities. Family Care has not been implemented in Brown County. It is anticipated the demand for specialized transportation services will increase if this occurs.
2. Aging Population Increases in the number of people over the age of 65 living in the Green Bay area will result in an increased need for specialized services.
3. Veteran Population With the Milo C. Huempfner Department of Veterans Affairs Health Care Center now open, it is anticipated that specialized services will be used to transport a segment of the veteran population to and from the center. The Brown County Planning Commission staff will continue to monitor these issues.
![Page 27: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/27.jpg)
26
CHAPTER SIX
Fare Structure
Fares
Green Bay Metro’s past and present fare structures are shown below.
Fare Category
1998 2003 2005 2009 2014
Adult Cash $1.00 $1.25 $1.50 $1.50 $1.50 Day Pass* $3.00 Week Pass* $12.00 30-Day Pass $21.50 $23.00 $26.00 $35.00 $35.00
Student (K-12) Cash** $1.00 $1.25 $1.50 $1.50 $1.00 Day Pass $2.00 30-Day Pass $16.00 $16.00 $19.00 $19.00 $19.00 30-Day Pass 7/1/13 $20.00
Reduced (Age 65 or older or qualifying Disability w/ ID Card)
Cash $0.50 $0.60 $0.75 $0.75 $0.75 Day Pass $1.50 30-Day Pass $10.75 $12.25 $15.25 $25.00 $25.00
Disabled Veterans w/ Service-Connected ID Free
Green Saturday*** Free Paratransit
Origin to Destination $2.00 $2.50 $3.00 $3.00 $3.00 Agency Fare- Origin to Destination $8.00
* Day pass and week pass introduced in 2012. Paper transfers were eliminated in 2013. ** Decreased from $1.50 to $1.00 in 2011. *** Green Saturday introduced in 2011.
![Page 28: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/28.jpg)
27
CHAPTER SEVEN
Bus Fleet
Bus Fleet The table below details Green Bay Metro’s 2014 bus fleet and recent activity:
Bus Quantity Year Make Length Age of Vehicles
in Years removed 6 1982 GMC 40 0
removed 6 1986 FLXBLE 35 0
1 1995 Gillig-Phantom 40 20
removed 5 1995 Gillig-Phantom 40 0
removed 6 1998 Gillig-Phantom 40 0
3 1999 DuPont Trolleybus 34 15
9 2003 New Flyer 30 11
3 2004 New Flyer 30 10
9 2009 New Flyer 35 5
10 2011 Gillig Low Floor 35 3
3 approved 2015 TBD 40
Average Age of the active 35 buses: 7.69
Peak Bus Requirements The Green Bay Metro full service route system requires 17 buses during peak operations and an additional nine buses when the limited service routes are in operation. Although Green Bay Metro has the necessary number of buses to provide this level of service at the present time, there is a need for higher capacity buses. Bus Replacement Guidelines The Federal Transit Administration (FTA) has established a standard that each transit vehicle should be either retired and replaced or rehabilitated at the end of its normal service life. Normal service life for transit vehicles is considered to be 500,000 travel miles or 12 years for transit buses greater than or equal to 35 feet in length and 10 years for transit buses that are less than 35 feet. Green Bay Metro staff has done an excellent job maintaining vehicles for use beyond the expected life. By the time the three approved buses are delivered in 2015, it is anticipated that four will be removed from service and nine will not meet the guidelines established by the FTA.
![Page 29: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/29.jpg)
28
Bus Replacement Schedule Green Bay Metro has not been able to replace buses at the same rate of bus retirement. Metro staff will work with WisDOT and FTA staff in an effort to secure funding for additional buses in the future. It is recommended that 40’ buses be purchased as soon as possible to replace the current 40’ Gillig-Phantom and, as they reach the end of service life, the 30’ New Flyer buses. Multiple routes would benefit from the increased seating capacity the 40’ bus can offer as passengers are often required to stand for select trips.
As noted in the bus fleet table, three 40’ buses will be purchased through the Federal Surface Transportation Program – Urban (STP-U) in 2015.
![Page 30: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/30.jpg)
29
CHAPTER EIGHT
System Enhancements
Paper Transfers Eliminated From Fixed Route Bus Service In 2013, Green Bay Metro ended its long standing free-transfer policy. Instead, Metro began selling single all-day passes which allow the passenger unlimited use of the system for a full day. The price of a day pass was set at twice the single ride cash fare. This policy change has resulted in:
1.) a reduction in the misuse of expired transfers 2.) fewer passenger-driver challenges 3.) elimination of used and unused transfer card waste
For those passengers that may only travel one-way using one bus for the entire day, a single ride fare is still available.
Approximately 20 percent of all weekday trips made are with use of a day pass.
What is Google Translate? (information courtesy of Google Translate)
Google Translate is a free translation service that provides instant translations between dozens of different languages. It can translate words, sentences, and web pages between any combination of 80 supported languages.
Green Bay Metro staff has integrated Google Translate with its website at www.greenbaymetro.org. In the example below, adult bus fares have been translated into Chinese.
![Page 31: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/31.jpg)
30
What is YouTube? (information courtesy of YouTube)
YouTube is the largest video sharing site on the Web. YouTube lets anyone upload short videos for public viewing.
Green Bay Metro staff has used this free service to disseminate information about system changes. In the example below, Green Bay Metro Director Tom Wittig discusses fixed route and paratransit fare policy. To view the video go to http://www.youtube.com/watch?v=UROD0WXrZQI.
Green Saturday Program Grows
The Green Bay Transit Commission implemented Green Saturday in 2011. Green Saturday allows everyone to ride the fixed route bus system for free on Saturday. The program was designed to enable non-riders to try Green Bay Metro at no cost with the intention of converting them to fare-paying passengers on weekdays. Reaction to the program has been positive, and Saturday ridership has increased from approximately 2,000 to 2,500-3,000+ unlinked trips per Saturday.
![Page 32: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/32.jpg)
31
U-Pass Program Expanded The U-Pass (or Universal Pass) Program began on July 1, 2008. The program allows participants an unlimited number of rides on any Green Bay Metro bus by scanning an authorized identification card. Students, faculty, and staff of UW-Green Bay, Rasmussen College, and St. Norbert College may participate in the program. 2013 was the first year in which St. Norbert College participated in the program for a full year. A total of 45,501 one-way trips were made with the U-Pass in 2013.
U-Pass Participant 2013 Unlinked Trips
UW-Green Bay 37,932
Rasmussen College 1,396
St. Norbert College 6,173
Total: 45,501
Green Bay is reimbursed for the trips by the participant at an agreed upon rate. Other Opportunities Green Bay Metro is hopeful that similar arrangements can be made with other educational institutions and other local businesses and entities. Green Bay Packers Game Day Service Expands to Include More Residential Areas In 2011, Green Bay Metro began to provide game day service to and from all Packers home games. The service is free and open to the public. Route guides were produced and distributed at businesses along the routes. Area residents and visitors took advantage of the service to get to work, be part of the game day activities at businesses served by the routes, or to attend the game at Lambeau Field. In 2013, service was modified to include additional residential areas. Below are ridership data by season.
2011/2012 2012/2013 2013/2014
One-Way Trips 20,616 25,527 26,953
Eleven games each season including pre- and post-season.
The additional advertising revenue received from wrapped buses partially offset the cost of the program, which costs approximately $16,000 per year to operate.
It is anticipated that the program will continue with the 2014/2015 season.
![Page 33: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/33.jpg)
32
Bike Rack Use
In 2007, Green Bay Metro received a grant and installed bicycle racks on all buses. The addition of bike racks has expanded Metro’s service area as passengers are able to utilize biking on either end of their commute. In the photo below, Green Bay Metro passenger boards bus after loading bicycle onto front rack. The racks are easy to use and allow bicyclists to load and unload their bicycles within seconds. Metro does not charge an additional fee for bike rack use.
Photo: Brown County Planning Commission.
In 2013, with new farebox technology, planning staff requested Metro to begin tracking bike rack use.
Bike Rack Use
Month Use
September 2013 1,378
October 2013 1,607
November 2013 1,157
December 2013 510
January 2014 411
![Page 34: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/34.jpg)
33
CHAPTER NINE
Plans and Programs
2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System
In 2013, the Brown County Planning Commission staff, in conjunction with the Green Bay Metro staff and an advisory committee, prepared the 2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System. A TDP is a 5-year plan designed to evaluate route structure, fares, capital improvement projects, policies and procedures, and general operational functions for a transit system. Long-range issues beyond 2018 were also addressed. The TDP was approved by the Green Bay Transit Commission on November 25, 2013. The recommendations and implementation status are as follows:
2014-2018 TDP Recommendations and Implementation Status
Item Recommendation Status
Bus Fleet Apply for 40-foot buses to replace aging vehicles and vehicles that have been removed from service due to condition.
Three 40-foot buses have been approved through the Federal Surface Transportation Program-Urban (STP-U). Delivery is scheduled for 2015 or 2016.
Additional buses applied for through Section 5339 but not currently funded.
Regional Transportation Authority (RTA)
Establish an RTA in the area to offset the decreases in federal and state operating assistance provided to Green Bay Metro since reaching an urbanized area population of 200,000.
The state enabling legislation that is necessary to create an RTA does not exist.
Full Service Bus Routes
Green Bay Metro staff, with the assistance of the MPO, should continue to explore route restructuring options to maximize effectiveness.
Metro staff is evaluating options for an additional east side hub.
Fixed Route System Fares
Metro should continue to maintain a fare structure that is appealing to existing and potential riders.
Green Bay Metro continues to maintain fares at levels slightly lower than the average of its Wisconsin peers.
![Page 35: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/35.jpg)
34
U-Pass Program
Expand the program to include other post-secondary institutions and others. UW-Green Bay, St. Norbert, and Rasmussen College are participants.
Other entities are encouraged to participate.
Paratransit Program
Continue to study the feasibility of taking over vehicle management, dispatch and scheduling, and/or other aspects of the paratransit program with the goal of reducing the overall cost of the program.
Paratransit vehicles and software are identified in the Transportation Improvement Program (TIP), but are not funded.
MV Transportation was awarded paratransit program contract in 2011. Contract expires in 2016.
Green Bay Metro to issue Request for Proposal (RFP) for existing or reduced level of service in 2015 with service beginning May 1, 2016, if two one-year extensions are not executed.
In 2018, Brown County Planning Commission staff will prepare the 2019-2023 Transit Development Plan (TDP) for the Green Bay Metro System.
![Page 36: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/36.jpg)
35
Wisconsin Department of Transportation (WisDOT) Independent Management Audit In 2012, SRF Consulting Group was hired by WisDOT to perform management audits for several transit properties in Wisconsin, including Green Bay Metro. This review is conducted approximately every five years and addresses 10 functional areas. SRF issued its final report entitled Green Bay Metro – System Management Performance Review, in November 2012. In general, the consultants found Green Bay Metro to be operating very efficiently. Below is a list of the functional areas and SRF’s recommendations:
Functional Area Recommendation Status
1. Accounting, Finance, & Purchasing
No Recommendation
2. Personnel & Labor Relations No Recommendation
3. Transportation Operations No Recommendation
4. ADA Paratransit Service No Recommendation
5. Safety Management & Training No Recommendation
6. Long- & Short-Range Planning No Recommendation
7. Scheduling No Recommendation
8. Marketing
a. Add translation functionality to website or offer multilingual information (such as Google Translate).
a. Implemented in 2013.
9. Vehicle & Facility Maintenance
a. Purchase & install backup generator capable of powering all essential functions for transit operations.
b. Investigate the potential benefits of implementing a more advanced inventory system using barcode or other scanning technology.
a. Programmed. Metro staff to use balance of 2012 capital grant.
b. Investigated. Metro staff does not plan on implementing.
10. Information Technology No Recommendation
![Page 37: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/37.jpg)
36
Green Bay Metro Management Plan The following represents a summary of the 2014 management plan goals submitted to the Wisconsin Department of Transportation (WisDOT) by Metro staff as part of the budget process. Goals for 2014:
Implement new Policy and Procedure Manual for employees.
Continue to improve public image.
Study the feasibility of a “cross-town” route.
Continue to provide safe and convenient transportation.
Create new relationships with area businesses.
Settle union contracts.
![Page 38: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/38.jpg)
37
CHAPTER TEN
Summary of Recommendations
The Brown County Planning Commission staff recommends the following:
1. Staff should continue to closely monitor the performance of all bus routes by conducting ridership analyses on a quarterly basis.
2. The Transit Commission should consider the elimination of the #78 limited service
route due to continuously low ridership.
3. The Brown County Planning Commission staff should continue to monitor the DHS transportation brokerage for Medicaid eligible individuals, Family Care program, and local human-services transportation programs for possible impacts on the paratransit program.
4. The Transit Commission should encourage the City of Green Bay to continue to set
aside the necessary local share for future bus acquisitions and other future capital needs.
5. The Green Bay Transit Commission, Metro staff, City of Green Bay, and Brown
County Planning Commission staff should continue with the following tasks relating to the federal and state funding situation:
Monitor the progress of any legislation or activities relating to future funding for
operating and capital funding. Continue to inform elected officials and interested parties of the need for a
transit funding solution.
6. Continue to implement recommendations in the 2014-2018 TDP. 7. Continue to implement the recommendations outlined by the SFR Consulting Group
and identified in the Green Bay Metro – System Management Performance Review.
8. Implement the Management Plan goals 2014.
![Page 39: 2014 Annual Route Review and Analysis Report](https://reader033.fdocuments.us/reader033/viewer/2022042707/58a2d4481a28abf8698b692c/html5/thumbnails/39.jpg)
38