Lac qui Parle County Highway Department
5-Year Construction Plan2014-2018
APPROVED: August 20, 2013
Lac qui Parle County Highway Department 5 – Year Highway Plan
Back ground:The 5 – Year Highway Plan is developed by the County Engineer and Highway Department Staff to aid with budgeting, planning, programming, and construction of roadways and bridge improvement projects.
The 5 – Year Highway Plan is presented at a public meeting and to the County Board for review and approval.
What factors go into the Plan:
Several factors are considered when developing the 5 – Year Highway Plan, below are the most essential:
- Life Cycle: Currently basing on a 85 Year life cycle- Pavement Quality Index (PQI): PQI below acceptable level typically receive higher priority- Traffic Volume (ADT = Average Daily Traffic): The higher ADT route typically receive higher priority- Sufficiency Rating (SR): Used for rating bridges. Lower rating receive higher priority- Accident Data, Alignment, County Roadway Safety Requirements and Funding Availability are other
consideration taken when creating the Plan
Is this 5 – Year Highway Plan “Set in Stone”?
No – This is only a plan; funding level changes, County Board directives changes, etc. It is the goal of the Lac qui Parle Highway Department to maintain this schedule to the best of our ability with the resources given to us.
2013Road Project
Number Number From to Work Type Length
CSAH 20 37-620- CSAH 48 E Co Line Grading 4.9 Miles
Br 90207 (Part of the grading project) Bridge Replacement
CSAH 20 37-620-010 Br 4955 Bridge Replacement
CSAH 19 37-619-018 Br 93764 Bridge Replacement
CSAH 39 37-639-004 Br 90241 Bridge Replacement
Twp. Bridge 37-599-105 Br 90240 (T-89C) Bridge Replacement
Twp. Bridge 37-599-106 Br 92415 (T-71C) Bridge Replacement
Twp. Bridge 37-599-104 Br 384 (Walter Twp) Bridge Replacement
2014Road Project
Number Number From to Work Type Length
CSAH 19 37-619 CR 26 RR Tracks Bit Overlay 8.0 Mile
CSAH 19 37-619 RR Tracks CR 38 Bit Surf, C & G 0.2 Mile
CSAH 20 37-620-019 CSAH 48 E Co Line Bit Surfacing 4.9 Miles
CSAH 20 37-070-004 CSAH 48 E Co Line HSIP 4.9 Miles
CSAH 21 37-621 1 mi S of CR 34 CR 34 Bit Overlay 1.0 Miles
CSAH 22 37-622 TH 75 CR 19 Bit Overlay 0.5 Miles
CSAH 34 37-634- W Jct of CR 19 TH 119 Bit Overlay 5.4 Miles
CSAH 38 37-638- TH 75 CR 19 Bit Overlay 6.7 Miles
CSAH 203 37-803- Bellingham Bit Overlay 0.28 Mile
CSAH 207 37-807 Bellingham Bit Overlay 0.6 Mile
2015Road Project
Number Number From to Work Type Length
CSAH 37 37-637- E of City Limits CR 37 Heading South Grading 1.0 Miles
Twp Bridge 37-599- Br 5941 (T-52C) Bridge Replacement
CSAH 12 37-612- Br 92527 Bridge Replacement
CSAH 13 37-613- Br 90196 Bridge Replacement
Twp Bridge 37-599- Br L9550 (Baxter) Bridge Replacement
Twp Bridge 37-599- Br L7789 (Baxter) Bridge Replacement
Twp Bridge 37-599- Br 90228 (T-53C) Bridge Replacement
2016Road Project
Number Number From to Work Type Length
CSAH 2 37-602- CR 23 CR 29 Bit Overlay 7.0 Miles
CSAH 29 37-629- S Co Line TH 275 Bit Overlay 3.5 Mile
CSAH 37 37-637- E of City Limits CR 37 Heading South Bit Surfacing 1.0 Mile
CSAH 23 37-623- CR 10 Spruce Street Bit Overlay 0.4 Miles
CSAH 205 37-805- Dawson Bit Overlay 0.4 Miles
2017Road Project
Number Number From to Work Type Length
CSAH 15 37-615- 1.5 Mi S of CR 40 N Co Line Bit Overlay/Surfacing 4.0 Miles
CSAH 40 37-640- W Co Line CR 15 Bit Overlay 5.6 Mile
CSAH 24 37-624 W Co Line CR 7 Bit Overlay 1.8 Miles
Road Project
Number Number From to Work Type Length
CSAH 7 37-607- Br 7178 Bridge Replacement
2018