Public Hearing and Budget AdoptionRalph Fortunato, CSBSDirector of Fiscal ServicesAugust 27, 2014Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.us1School District BudgetSLIDE 2There are 5 distinct funds in the budget General Fund-provides for the daily operations of the school district
Capital Project Fund-receives bond sale/state match revenue for school construction and technology levy revenue for technology program
Debt Service Fund-receives tax collections sufficient to pay back or servicethe principal and interest from bonds approved by the board and/or the voters
Transportation Vehicle Fund-receives state depreciation revenue for purchase of busses; all driver pay, fuel, repairs, etc. is paid from the General Fund
ASB Fund-accounts for all revenue and expenditures made by the schools Associated Student Body activities
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.us2Budget Adoption ProcessSLIDE 3By law, all school districts in Washington must formally adopt a budget by August 31st of each yearAll school systems must use the same format (F-195);The formal approval of the budget is by Board ResolutionThe Board, upon passage of the resolution, is approving the amount of authorized expenditures for each fundSchool districts may not expend greater than the original authorized expenditure amount without a budget extension, approved by Board resolution.Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usKent School District Budget Summary 2014-2015SLIDE 4
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.us
SLIDE 5Kent School District Budget Summary 2014-2015Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.us5SLIDE 6General FundSuccessfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2013-14 ESTIMATESLIDE 7
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15SLIDE 8
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15SLIDE 9
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 Enrollment
SLIDE 10Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 StaffingSLIDE 11
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 RevenuesSLIDE 12
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 RevenuesSLIDE 13Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 ExpendituresSLIDE 14
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usSLIDE 15General Fund 2014-15 Expenditures:By ActivitySuccessfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund 2014-15 Expenditures:By ObjectSLIDE 16Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund Ending Fund Balances 2012-13 to 2014-15
SLIDE 17Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usGeneral Fund Projections 2015-16 to 2017-18SLIDE 18
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usOther Funds 2014-15SLIDE 19
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usCapital Projects Fund 2014-15
SLIDE 20Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usCapital Project Fund 2014-15SLIDE 21
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usCapital Project Fund 2014-15SLIDE 22
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usCapital Project Fund 2014-15SLIDE 23
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usDebt Service Fund 2014-15
SLIDE 24Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usASB Fund 2014-15
SLIDE 25Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usTransportation Vehicle Fund 2014-15SLIDE 26
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.us2014-15 Levy Amounts
SLIDE 27Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usKent School District Budget Summary 2014-2015SLIDE 28
Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usNext Steps:Formal Adoption of budget August 27, 2014
Monitor start of school for enrollment and staffing
Close 2013-14 fiscal year and produce Annual Financial Report (F-196) by October 25, 2014
Monitor 2015 legislative sessions (state funding) and federal reauthorizations for possible budget revisions
Determine priorities for 2015-2016 budget
SLIDE 29Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usQuestions/Comments
SLIDE 30Successfully Preparing All Students For Their Futures12033 SE 256th Street, kent, wa 98030 | www.kent.k12.wa.usBudget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated(MILLION $)2008-092009-102010-112011-122012-132013-14Beginning Fund Balance 18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: (in millions)2012-132013-142014-15
Local Taxes (Levy)$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Special Purpose29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
13-14 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800EXPENDITURESTech Levy6,019,200Tech Levy Projects$7,000,000TOTAL AVAILABLE$17,929,333Video Surveillance Cameras2,626,616Intruder Locks1,517,057EXPENDITURES Portables1,500,000Expenditures$16,081,370Access Control Projects1,285,572Covington ES Replacement690,000Transfers Out0.0Administration400,000Fairwood ES Parking Lot303,063Ending Fund Balance$1,847,963Contingency300,000Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$16,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Transportation Levy???
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated(MILLION $)2008-092009-102010-112011-122012-132013-14Beginning Fund Balance 18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget(MILLION $)2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: (in millions)2012-132013-142014-15
Local EP&O Levy$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Grants29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
14-15 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800Capital ProjectsTech Levy6,019,200Video Surveillance Cameras2,626,616TOTAL AVAILABLE$17,929,333Intruder Locks1,517,057Portables1,500,000EXPENDITURES Access Control Projects1,285,572Expenditures$16,081,370Covington ES Replacement690,000Administration400,000Transfers Out0.0Fairwood ES Parking Lot303,063Contingency300,000Ending Fund Balance$1,847,963Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$9,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated2008-092009-102010-112011-122012-132013-14Beginning Fund Balance18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: (in millions)2012-132013-142014-15
Local Taxes (Levy)$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Special Purpose29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
13-14 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800EXPENDITURESTech Levy6,019,200Tech Levy Projects$7,000,000TOTAL AVAILABLE$17,929,333Video Surveillance Cameras2,626,616Intruder Locks1,517,057EXPENDITURES Portables1,500,000Expenditures$16,081,370Access Control Projects1,285,572Covington ES Replacement690,000Transfers Out0.0Administration400,000Fairwood ES Parking Lot303,063Ending Fund Balance$1,847,963Contingency300,000Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$16,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Transportation Levy???
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated(MILLION $)2008-092009-102010-112011-122012-132013-14Beginning Fund Balance 18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget(MILLION $)2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated FTE1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified FTE974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative FTE106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: (in millions)2012-132013-142014-15
Local EP&O Levy$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Grants29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
14-15 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800Capital ProjectsTech Levy6,019,200Video Surveillance Cameras2,626,616TOTAL AVAILABLE$17,929,333Intruder Locks1,517,057Portables1,500,000EXPENDITURES Access Control Projects1,285,572Expenditures$16,081,370Covington ES Replacement690,000Administration400,000Transfers Out0.0Fairwood ES Parking Lot303,063Contingency300,000Ending Fund Balance$1,847,963Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$9,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated(MILLION $)2008-092009-102010-112011-122012-132013-14Beginning Fund Balance 18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget(MILLION $)2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated FTE1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified FTE974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative FTE106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: 2012-132013-142014-15
Local EP&O Levy$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Grants29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
14-15 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800Capital ProjectsTech Levy6,019,200Video Surveillance Cameras2,626,616TOTAL AVAILABLE$17,929,333Intruder Locks1,517,057Portables1,500,000EXPENDITURES Access Control Projects1,285,572Expenditures$16,081,370Covington ES Replacement690,000Administration400,000Transfers Out0.0Fairwood ES Parking Lot303,063Contingency300,000Ending Fund Balance$1,847,963Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$9,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated(MILLION $)2008-092009-102010-112011-122012-132013-14Beginning Fund Balance 18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget(MILLION $)2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated FTE1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified FTE974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative FTE106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: 2012-132013-142014-15
Local EP&O Levy$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Grants29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
14-15 Exp by ActExpenditures ActualF-195 BudgetF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800Capital ProjectsTech Levy6,019,200Video Surveillance Cameras2,626,616TOTAL AVAILABLE$17,929,333Intruder Locks1,517,057Portables1,500,000EXPENDITURES Access Control Projects1,285,572Expenditures$16,081,370Covington ES Replacement690,000Administration400,000Transfers Out0.0Fairwood ES Parking Lot303,063Contingency300,000Ending Fund Balance$1,847,963Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$9,081,370
Tech Levy ProjectsProject2014-15BudgetUnits1:1 Initiative$3.5million2,500 unitsPara-Educator Laptops$0.5million 300 unitsTech. Refresh$2.0million2,000 unitsElem. Mobile Devices$1.0million3,000 unitsTotal Tech Levy Budget$7.0million7,800 units2015-2018 Technology Levy Project PlanProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Budget SummaryKent School District Budget Summary 2014-2015General FundCapitalProjects FundDebtService FundASB FundTransportationVehicle FundTotalAll BudgetsBeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977Revenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
Total Funds Available325,739,48717,929,33339,764,4006,232,7221,091,101390,757,043
Expenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
Transfers In/(Out)(7,067)0.07,0670.00.00.0
Ending Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comp
Comparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund BudgetObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
13-14 UpdateGeneral Fund 2013-2014 UpdateActualActualActualActualActualEstimated2008-092009-102010-112011-122012-132013-14Beginning Fund Balance18.29122.64819.60322.49227.13830.006
Total Revenues248.941246.100248.177246.308252.491273.620
Total Available267.232268.748267.780268.800279.629303.626
Total Expenditures244.547249.13245.272241.662249.623273.964
Total Ending Fund Balance22.64819.60322.49227.13830.00629.662Restricted (restricted, assigned, committed)9.285.379.28412.06111.3448.088Unrestricted ( 5% Min Fund Balance and unassigned)13.36814.23313.20715.07718.66221.574
Revenue-To-Expenditure Imbalance4.394-3.0302.9054.6462.868-0.344
% Total Ending Fund Balance9.26%7.87%9.17%11.23%12.02%10.83%% Unrestricted Ending Fund Balance5.47%5.71%5.38%6.24%7.48%7.87%
GF 14-15General Fund 2014-2015 ActualEstimatedF-195 Budget2012-132013-142014-15Beginning Fund Balance27.13830.00629.662
Actual Revenues252.491273.62296.078
Total Available279.629303.626325.740
Actual Expenditures & Transfers Out249.623273.964306.147
Total Ending Fund Balance30.00629.66219.593 Restricted (restricted, assigned, committed)11.3448.0883.400 Unrestricted(Min Fund Balance and unassigned)18.66221.57416.193
Revenue to Expenditure Imbalance2.868-0.344-10.069
% Total Ending Fund Balance12.02%10.83%6.40%% Unrestricted Ending Fund Balance7.48%7.87%5.29%
GF EnrollmentActualActualBudget2012-132013-142014-15K-12 FTE Enrollment25,290.0025,605.0025,620.00Change from Prior Yearn/a315.0015.00% change from Prior Yearn/a1.25%0.06%
Running Start586.68610.93625.00Change from Prior Yearn/a24.2514.07% Change from Prior Yearn/a4.13%2.30%I-Grad FTE Enrollment385.43445.28460.00ALE Programs FTE Enrollment167.90196.38225.00Change from Prior Yearn/a88.3343.34% change from Prior Yearn/a15.96%6.75%
GF Staffing
2012-132013-142014-15BASIC EDUCATION PERSONNEL FUNDINGBudgetBudgetBudgetCertificated1589.51614.981735.99Basic Education StaffTotal for 2014-15Basic EdFormula FundedAbove FormulaStaffEP&O FundedChange from Prior Yearn/a25.48121.01Certificated Instructional Staff1,410.6381,259.920150.718% Change from Prior Yearn/a1.60%7.49%Certificated Administrative Staff108.834103.4905.344Classified Staff589.939441.660148.279Classified974.26997.491039.08Total Basic Education Staff2,109.4111,805.070304.341Change from Prior Yearn/a23.2341.59% Change from Prior Yearn/a2.38%4.17%
Administrative106.56121.99138.56Change from Prior Yearn/a15.4316.57% Change from Prior Yearn/a14.48%13.58%
Total FTE2670.322734.462913.63Change from Prior Yearn/a64.14179.17% Change from Prior Yearn/a2.40%6.55%
14-15 RevenuesActualEstimatedF-195 BudgetRevenues: (in millions)2012-132013-142014-15
Local Taxes (Levy)$59,011,066$60,200,354$63,803,88721.55%Local Non Tax6,782,7836,134,5156,997,0392.36%State Apportionment135,586,753148,659,250156,730,35052.94%State Special Purpose29,611,70035,120,81041,865,38914.14%Federal Grants21,220,67423,304,68725,891,6188.74%All Other278,327200,000790,0000.27%Total Revenues$252,491,303$273,619,616$296,078,283100.00%Less: Expenditures 249.623273.964306.147Revenue/Exp Imbalance2.868-0.344-10.069
13-14 Exp by ActExpenditures ActualEstimatedF-195 BudgetActivity2012-132013-142014-15%Teaching Activities$148,754,472$177,767,210$185,543,23660.61%Teaching Support26,435,48327,957,39733,223,00610.85%Other Supportive Activities43,847,51349,796,79149,982,53916.33%Building Administration17,211,34719,018,06720,626,4996.74%Central Adminstration13,028,90612,985,94416,764,5125.48%Total Expenditures$249,277,721$287,525,409$306,139,792100.00%
13-14 Exp By ProgramRegular Instruction173,061,14956.53%Federal Stimulus2,619,0440.86%Special Education37,044,87712.10%Vocational 7,818,5682.55%Compensatory Instruction20,841,3366.81%Other Instructional5,486,7811.79%Community services327,7780.11%Districtwide Support39,125,95912.78%Food Service11,382,9653.72%Transportation8,431,3552.75%306,139,812100.00%
14-15 by ObjectExpenditures (Net of Expansion Contingency)Certificated Salaries135,612,20144.30%Classified Salaries50,415,69416.47%Employee Benefits64,411,00821.04%Supplies and Materials17,272,3295.64%Purchashed Services37,150,06012.13%Travel564,1510.18%Capital Outlay714,3490.23%306,139,792100.00%
Fund Balance
ActualEstimatedEstimated2012-132013-142014-15Total Ending Fund Balance-$30.00629.66119.593Total Expenditures-$249.623270.857300.140
NonSpendable-Inventory0.5250.5000.500Restricted Fund Balance: Grants, Special Projects, Encumbrances0.9312.8250.900 Self Insurance(w/c & unemployment)1.1881.2631.250
Assigned Fund Balance:Contingencies8.7003.5000.750
Committed Fund Balance: Committed to Min. Fund Balance Policy12.46413.54315.007
Unreserved/Unrestricted Fund Balance6.1988.0311.186Total Min. Fund Balance & Unrestricted Fund Balance18.66221.57416.193Total Min. Fund Balance & Unrestricted Fund Balance %7.48%7.96%5.40%5% Board Policy 5.0%5.00%5.00%Difference in %2.48%2.96%0.40%
2015-16 to 2017-18
2015-162016-172017-18Beginning Fund Balance19.59319.59319.593
Estimated Revenues321.245348.551378.178
Expenditures:Certificated Salaries142.31244.30%154.40844.30%167.53344.30%Classified Salaries52.90916.47%57.40616.47%62.28616.47%Payroll Taxes and Other Benefits67.59021.04%73.33521.04%79.56921.04%Supplies18.1185.64%19.6585.64%21.3295.64%Contract Services38.96712.13%42.27912.13%45.87312.13%Travel0.5780.18%0.6280.18%0.6800.18%Capital Outlay0.7710.24%0.8370.24%0.9080.24%Total Expenditures321.245100.00%348.551100.00%378.178100.00%
Ending Fund Balance19.59319.59319.5935% Min. Fund Blance Policy16.06217.42818.909Remaining Fund Balance3.5312.1650.684
Levy AmountsVoter ApprovedGeneral Fund:Levy AmountRoll BackNet Levy AmountCollection %Amount Budgeted
Fall 2014$64,000,000$2,867,097$61,132,90347.01%$28,738,578
Spring 2015$79,000,000$12,094,240$66,905,76052.41%$35,065,309Total Levy for 2014-1599.42%$63,803,887
Captial Projects: Technology LevyFall 2014$5,000,0000.0$5,000,00047.01%$2,350,500
Spring 2015$7,000,0000.0$7,000,00052.41%$3,668,700Total Levy for 2014-1599.42%$6,019,200Debt Service:Fall 2014$27,500,0000.0$27,500,00047.01%$12,927,750
Spring 2015$26,000,0000.0$26,000,00052.41%$13,626,600Total Levy for 2014-1599.42%$26,554,350
Capital Project Project ListCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800EXPENDITURESTech Levy6,019,200Tech Levy Projects$7,000,000TOTAL AVAILABLE$17,929,333Video Surveillance Cameras2,626,616Intruder Locks1,517,057EXPENDITURES Portables1,500,000Expenditures$16,081,370Access Control Projects1,285,572Covington ES Replacement690,000Transfers Out0.0Administration400,000Fairwood ES Parking Lot303,063Ending Fund Balance$1,847,963Contingency300,000Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$16,081,370Tech Levy ProjectsProject2014-15Budget1:1 Initive$3.5millionParaeducator Laptops$0.5millionTech. Refresh$2.0millionElem. Mobile Devices$1.0millionTotal Tech Levy Budget$7.0million
ProjectsCalendar Year2015201620172018Project TotalElementary Computer Refresh$1,750,000$1,750,000$1,750,000$1,750,000$7,000,000Teacher Laptop Refresh$700,000$700,000$1,400,000One-to-One Middle School Refresh$2,800,000$2,800,000$5,600,000One-to-One High School Refresh$2,800,000$2,800,000$2,800,000$2,800,000$11,200,000Add Elementary One-to-One Mobile Devices$1,650,000$1,650,000$1,650,000$1,650,000$6,600,000Total:$6,200,000$9,700,000$9,700,000$6,200,000$31,800,000
Debt ServiceDEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
ASBASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
TVF
REVENUEEXPENDITURESBeginning Fund Balance$400,000Expenditures$1,050,000Revenue691,101TOTAL AVAILABLE$1,091,101Transfers Out0.0
Ending Fund Balance$41,101
Expenditure of $1,050,000 to purchase approximately 8 buses
Transportation Levy???
Budget Summary2014-2015 DISTRICT BUDGETSKent School DistrictBUDGET SUMMARYGeneralFundCapital ProjectDebtServiceASBTransp.VehicleTotalAll FundsABeginning Fund Balance$29,661,204$10,289,333$12,339,228$1,338,212$400,000$54,027,977
BRevenues296,078,2837,640,00027,425,1724,894,510691,101$336,729,066
CTransfers In0.00.07,0670.00.0$7,067
DTotal Available325,739,48717,929,33339,771,4676,232,7221,091,101$390,764,110
EExpenditures306,139,79216,081,37027,217,3844,894,8151,050,000$355,383,361
FTransfers Out7,0670.00.00.00.0$7,067
GEnding Fund Balance$19,592,628$1,847,963$12,554,083$1,337,907$41,101$35,373,682
Budget Comparison2014-2015 DISTRICT BUDGETSKent School DistrictComparison of the proposed budgets for 2014-2015 to 2013-2014 shows:GeneralCapital Debt Trans.FundProjects*ServiceASBVehicleTotal2014-2015$306,139,792$16,081,370$27,217,384$4,894,815$1,050,000$355,383,3612013-2014$287,525,409$21,071,030$32,134,349$5,039,159$950,000$346,719,947Difference$18,614,383($4,989,660)($4,916,965)($144,344)$100,000$8,663,414* Capital Projects budget was amended in May 2014 to $21,071,030 from $17,971,030
Comparison between 2013-2014 and 2014-2015 F-195 General Fund Budget
ObjectDescription13-14Budget% toTotal14-15Budget% to TotalDifferencefrom13-14% Change2Certificated Salaries$126,232,47843.90%$135,612,20144.30%$9,379,7237.43%3Classified Salaries46,475,07016.16%50,415,69416.47%$3,940,6248.48%4Payroll Taxes and Other Benefits57,809,24320.11%64,411,00821.04%$6,601,76511.42%Total Personnel$230,516,79180.17%$250,438,90381.81%$19,922,1128.64%
5Supplies$17,486,5736.08%$17,272,3295.64%($214,244)-1.23%7Contract Services37,991,12813.21%37,150,06012.13%($841,068)-2.21%8Travel535,8190.19%564,1510.18%$28,3325.29%9Capital Outlay995,0980.35%714,3490.23%($280,749)-28.21%Total MSOC$57,008,61819.83%$55,700,88918.19%($1,307,729)-2.29%
Total Budget$287,525,409100.00%$306,139,792100.00%$18,614,3836.47%
REV_Exp FB Other Funds2014-2015 DISTRICT BUDGETSKent School District
GENERAL FUND
Col. ACol. BCol. CCol. DCol. ECol. FREVENUEBASIC EDUCATIONEncroachmentBasicInclusiveGrantsNutritionalEducationEducationTransportationCategoricalServicesTotalState Basic Education146,451,089146,451,089Levy Equalization 5,082,7461,147,6536,230,399M & O Levy51,861,99810,808,5591,133,33063,803,887Local Non-Tax Revenue4,245,0002,752,0396,997,039Inclusive Ed. State Basic Ed..4,048,8624,048,862Inclusive Education State15,000,80115,000,801Sp. Education Federal6,039,0026,039,002Transportation-State7,698,0057,698,005Trans. McKinney Vento0.0Grants/Categorical State12,991,69712,991,697Grants/Categorical Federal20,00010,935,79010,955,790Nutritional Services State174,886174,886Nutritional Services Federal8,896,8268,896,826Other Revenue790,000790,000Contingency Reserve6,000,0006,000,000TOTAL REVENUE208,450,83337,044,8778,831,33529,927,48711,823,751296,078,283
2014-2015 DISTRICT BUDGETSKent School District
GENERAL FUND
Col. ACol. BCol. CCol. DCol. ECol. FPERSONNELBASIC EDUCATIONEncroachmentBasicInclusiveGrantsNutritionalEducationEducationTransportationCategoricalServicesTotalSalaries: Certificated87,428,50313,067,9915,547,379106,043,873Certificated TRI/Stipends19,048,1114,521,0833,154,24426,723,438Certificated Extracurricular350,740350,740Salaries: Classified27,722,1346,789,1094,709,8464,099,8492,752,07546,073,013Classified Effective Ed.246,11761,65824,158331,933Substitutes2,149,139392,040383,100166,4219,3003,100,000Overtime/Other Pay/Stipends2,920,607182,8060.0301,4853,404,898Statutory Benefits27,582,9213,273,4841,264,2761,676,8521,431,45935,228,992Health & Welfare Benefits19,440,3323,971,257895,5831,823,561721,30926,852,042Retiree Insurance1,686,854344,58977,710158,23262,5892,329,974TOTAL PERSONNEL188,575,45832,604,0177,330,51516,952,1814,976,732250,438,903
2014-2015 DISTRICT BUDGETSKent School District
GENERAL FUND
Col. ACol. BCol. CCol. DCol. ECol. FMaterial, Supplies andBASIC EDUCATIONOperating Costs (MSOC)EncroachmentBasicInclusiveGrantsNutritionalEducationEducationTransportationCategoricalServicesTotalSchool Allocations2,206,9062,206,906Department Allocations8,230,3901,100,8209,331,210Textbooks/Consumables1,100,0001,100,000District Operational6,527,1536,527,153Utilities5,844,000111,4005,955,400Inclusive Education4,440,8600.04,440,860Transportation0.0Trans. McKinney Vento400,000400,000Grants/Categorical7,975,3067,975,306Nutritional Services6,406,2336,406,233Other5,357,8215,357,821Contingency Reserve1,000,0005,000,0006,000,000TOTAL NON-PERSONNEL30,266,2704,440,8601,500,82012,975,3066,517,63355,700,889
TOTAL GENERAL FUND218,841,72837,044,8778,831,33529,927,48711,494,365306,139,792EXPENDITURESPERSONNEL PLUSNON-PERSONNEL
2014-2015 DISTRICT BUDGETSKent School District
GENERAL FUND
Col. ACol. BCol. CCol. DCol. ECol. FBASIC EDUCATIONEncroachmentBasicInclusiveGrantsNutritionalEducationEducationTransportationCategoricalServicesTotalTOTAL GENERAL FUND218,841,72837,044,8778,831,33529,927,48711,494,365306,139,792EXPENDITURESPERSONNEL PLUSNON-PERSONNEL
CASH: REVENUE TO EXPENDITURESCol. ACol. BCol. CCol. DCol. ECol. FBASIC EDUCATIONEncroachmentBasicInclusiveGrantsNutritionalEducationEducationTransportationCategoricalServicesTotalRevenue208,450,83337,044,8778,831,33529,927,48711,823,751296,078,283Expenditures218,841,72837,044,8778,831,33529,927,48711,494,365306,139,792Revenue to Expenditures(10,390,895)0.00.00.0329,386(10,061,509)
2014-2015 DISTRICT BUDGETSKent School District
ESTIMATED ENDING FUND BALANCE
GENERAL FUNDAugust 31, 2015Ending Fund Balance ClassificationsAmountClassification ExplanationsNonSpendable Fund Balance500,000Represents those amounts of the fund balance that cannot be spent either because they are not in a spendable form, such as nutritional service orwarehouse inventories, or are legally required to bemaintained intact.Restricted Fund BalanceRepresents those amounts that, except for theGrant Carryover, Special Projects,400,000items reported as items NonSpendable, are restrictedOutstanding PO's, Encumbrancesto a specific purpose. These restrictions are imposed bylaw, regulation, creditors or contributors, and Nutrition Service (USDA Requirement)500,000include self-insurance reserves for workerscompensation and unemployment, reservations forRestricted for Self Insurance1,250,000future losses not covered by insurance and grantcarryovers.Committed Fund BalanceRepresents those amounts that can only be used (1) General Fund Budget15,006,990for the specific purposes approved by the Board ofDirectors. (1) The General Fund Committed FundBalance is the amount that at the end of the fiscalyear should be sufficient to compensate for economicuncertainties in the new fiscal year and will betargeted at a minimum of five percent (5%) of theprevious fiscal years actual General Fundexpenditures. (2) The Food Services Committed FundBalance will be the difference between the previousfiscal year actual revenue less actual expenditures.
2013-2014 DISTRICT BUDGETSKent School District
ESTIMATED ENDING FUND BALANCE
GENERAL FUND
Ending Fund Balance ClassificationsAmountClassification ExplanationsAssigned Fund BalanceRepresents those amounts that are constrained by the "Green School "Site Preparation0.0the district's intent to be used for specific purpose butProject Carryovers750,000are neither restricted nor committed. Included in this Federal/State Grant Changes0.0portion of the fund balance can be reservations to covercontingencies such as unanticipated changes in taxand spending policies of the Federal and State governments, court decisions, financial impacts oflabor agreements, natural disasters, unexpected oremergency capital expenditures and special projects.Unassigned Fund Balance1,185,638This is the residual fund balance designation andrepresents that amount of fund balance that isspendable because the amount has not beendesignated as NonSpendable or been restricted,committed or assigned for specific purposes.TOTAL ENDING FUND BALANCE19,592,628
2014-2015 DISTRICT BUDGETSKent School DistrictCAPITAL PROJECT FUND
REVENUE Beginning Fund Balance$10,289,333Revenues1,620,800EXPENDITURESTech Levy6,019,200Tech Levy Projects$7,000,000TOTAL AVAILABLE$17,929,333Video Surveillance Cameras2,626,616Intruder Locks1,517,057EXPENDITURES Portables1,500,000Expenditures$16,081,370Access Control Projects1,285,572Covington ES Replacement690,000Transfers Out0.0Administration400,000Fairwood ES Parking Lot303,063Ending Fund Balance$1,847,963Contingency300,000Gun Shot Sensors100,000Neely-O'Brien ES Parking Lot75,174Kent Valley Early Learn. Ctr.50,000Property Management45,100Scenic Hill ES Restrooms41,510Admin. Ctr. Gate and Fencing28,063Horizon ES Parking Lot24,075French Field Restrooms23,720Domestic Water Backflow Projects21,348Park Orchard19,656Kentlake HS Readerboard18,800Kentridge HS Plumbing7,116Kentridge HS Parking Lot4,500Total Expenditures$16,081,370
2014-2015 DISTRICT BUDGETSKent School District
DEBT SERVICE FUND
REVENUEEXPENDITURESBeginning Fund Balance$12,339,228Expenditures$27,217,384Revenues27,425,172Transfers In7,067Ending Fund Balance$12,554,083TOTAL AVAILABLE$39,771,467
2014-2015 DISTRICT BUDGETSKent School DistrictASB FUND
REVENUEEXPENDITURESBeginning Fund Balance$1,338,212Expenditures$4,894,815Revenues4,894,510TOTAL AVAILABLE$6,232,722Ending Fund Balance$1,337,907
2014-2015 DISTRICT BUDGETSKent School DistrictTRANSPORTATION VEHICLE FUND