2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21,...

16
WPS District Goals EOY Report Voted October 21, 2014 Strategic Plan Objectives 20142015 Goals Outcomes Notes Strategy #1: Focus on Every Child, in Every Classroom, Every Day 1) Narrow Achievement Gaps through Analysis of gaps to proficiency among various subgroups, grade levels and subject areas. Narrow the achievement gap within all subgroups by 2 percentage points on MCAS scores from 2014 to 2015. Increase the percentage scoring advanced and proficient within each subgroup by 5 percentage points. More students in subgroups enroll in the most challenging academic courses commensurate with their ability. TBD TBD TBD. SY1415 data has been collected & will be assessed against SY1516 data when scheduling is completed. 2) Increase achievement among all students through differentiated instruction and aligned curriculum in ELA, Math, Science. Increased percentage of students scoring “Advanced” from “Proficient” on MCAS to 20 percentage points above the state average districtwide in ELA, Math and Science. TBD 3) Initiate Process for a SPED 5Year Strategic Plan. Form a committee of key stakeholders to (teachers, administrators, parents, community members, service providers and school committee member). Written outline of twoyear planning process. Met. Announcement of committee formation was posted on district website and shared with the PAC President for distribution on April 29, 2015. 1

Transcript of 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21,...

Page 1: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

 

Strategic  Plan  

Objectives  2014-­‐2015  Goals   Outcomes   Notes  

Strategy  #1:  Focus  on  Every  

Child,  in  Every  

Classroom,  Every  

Day  

1)    Narrow  Achievement  Gaps  through  Analysis  of  gaps  to  proficiency  among  various  subgroups,  grade  levels  and  subject  areas.  

Narrow  the  achievement  gap  within  all  subgroups  by  2  percentage  points  on  MCAS  scores  from  2014  to  2015.    Increase  the  percentage  scoring  advanced  and  proficient  within  each  subgroup  by  5  percentage  points.    More  students  in  subgroups  enroll  in  the  most  challenging  academic  courses  commensurate  with  their  ability.  

TBD        TBD        TBD.    SY14-­‐15  data  has  been  collected  &  will  be  assessed  against  SY15-­‐16  data  when  scheduling  is  completed.  

  2)    Increase  achievement  among  all  students  through  differentiated  instruction  and  aligned  curriculum  in  ELA,  Math,  Science.  

Increased  percentage  of  students  scoring  “Advanced”  from  “Proficient”  on  MCAS  to  20  percentage  points  above  the  state  average  district-­‐wide  in  ELA,  Math  and  Science.  

 TBD  

  3)    Initiate  Process  for  a  SPED  5-­‐Year  Strategic  Plan.    

Form  a  committee  of  key  stakeholders  to  (teachers,  administrators,  parents,  community  members,  service  providers  and  school  committee  member).    Written  outline  of  two-­‐year  planning  process.  

Met.  Announcement  of  committee  formation  was  posted  on  district  website  and  shared  with  the  PAC  President  for  distribution  on  April  29,  2015.    

-­1-­  

Page 2: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

Announcements  were  provided  to  all  PTO  Presidents  at  Central  Council  on  May  6,  2015.      The  Wellesley  Townsman  tweeted  the  announcement  on  May  7,  2015.        A  deadline  of  interest  has  been  set  for  May  22,  2015.    The  first  meeting  of  the  committee  will  be  held  on  June  4,  2015  from  4-­‐6  pm.    In  Progress.  Written  outline  of  two-­‐year  planning  process.  Anticipate  committee  will  have  strategic  plan  draft  to  School  Committee  in  early  Summer  2016.      

  4)    Successfully  Meet  Requirements  of  State’s  Mid-­‐Cycle  Review  of  Prior  Special  Education  Coordinated  Program  Review  Compliance  Items.  

Completed  Self-­‐Assessment.    Written  report  from  DESE  reflecting  current  compliance  status  of  previous  non-­‐compliance  identified  during  CPR.  

 Met.  Self-­‐assessment  completed  and  submitted.    Significant  Progress.  Onsite  visit  is  set  for  June  3,  2015.    This  date  was  rescheduled  due  to  state  office  snow  day  on  original  date  of  February  3,  2015.  

-­2-­  

Page 3: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

  ELL  5)    Provide  Necessary  Supports  to  Our  Increasing  Population  of  ELL  Students.  

ELL  students  continue  to  grow,  as  evidenced  by  a  reduction  in  the  achievement  gap  of  5%  points  for  students  receiving  advanced  or  proficient  as  measured  by  MCAS.      80%  of  students  grow  at  least  one  level  per  year,  as  measured  by  ACCESS.  

 TBD          TBD    

 

Strategy  #2:  Invest  in  our  Educators  

Teacher  Evaluation  1)  Continue  to  Implement  the  WPS  Teacher  Evaluation  System.  

Implement  new  Educator  Evaluation  system  with  50%  of  instructional  staff.      Provide  PD  and  practice  on  new  system  for  remaining  50%  of  instructional  staff.    WPS  Working  Group  will  oversee  the  development  and  approval  of  District  Determined  Measures  (DDMs)  to  be  submitted  to  the  state.        WPS  Working  group  will  provide  feedback  on  new  Educator  Evaluation  system  to  district  administrators  and  WTA.  

Met.      Met.      Met.  The  Working  Group  will  have  their  final  meeting  for  the  school  year  and  will  review  DDMs.      Met.    The  Working  Group  met  today  and  provided  feedback  on  Educator  Evaluation  System.    

  Teaching  Assistants:      2)  Review  &  revise  an  evaluation  tool  that  provides  

   Launch  a  Design  Team  to  review  past  practice  and  oversee  the  development  of  more  comprehensive  

   Has  not  yet  made  progress.  The  focus  this  year  has  been  on  the  main  teacher  evaluation  process.    Evaluation  tool  for  Teaching  

-­3-­  

Page 4: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

constructive  and  productive  feedback  to  Teaching  Assistants  and  Paraprofessionals.    3)  Develop  a  manual  that  consistently  defines  the  role  and  responsibilities  of  Teaching  Assistants  across  the  District  in  order  to  enhance  service  to  students.  

evaluation  tool  to  provide  more  dynamic  feedback  improving  practice.            Construction  of  a  common  manual  outlining  expectations  and  responsibilities  for  Paraprofessional  and  Teaching  Assistants  across  the  district.      

Assistants  and  Paraprofessionals  will  occur  during  the  2015-­‐2016  school  year.          Significant  Progress.    Manual  has  been  written.  Human  Resources  and  Department  Heads  for  Special  Education  have  reviewed.  Revisions  are  being  made  in  response  to  their  review.  Next  step  is  for  Principals  to  provide  input.  Final  step  will  be  Superintendent  approval.    Manual  will  be  ready  for  application  in  September  2015.  

  4)  Implement  Novice  Teacher  Mentoring  Program  and  Evaluate  Effectiveness.    

80%  of  new  teachers  will  be  successful  in  their  first  years  in  Wellesley,  as  measured  by  Ed  Eval  ratings  of  Proficient  or  Exemplary  on  summative  evaluations.      80%  of  mentors  will  report  satisfaction  with  mentor  training,  as  measured  by  surveys.    

 Met.  Summative  evaluations  were  completed  by  May  8th        80%  of  new  teachers  were  successful  in  their  first  year  in  Wellesley.        Significant  Progress.  The  Final  survey  to  assess  mentor  training  satisfaction  will  be  administered  in  June  2015.    Initial  surveys  indicate  high  levels  of  satisfaction.    

Strategy  #2:  Invest  in  our  Educators  (cont’d)  

5)  Professional  Development  

80%  of  participant  surveys  administered  at  the  end  of  PD  opportunities  will  reflect  4  or  higher  on  a  5  point  scale.    

Significant  Progress  Toward  Goal.  To  date,  PD  Surveys  administered  for  all  district-­‐wide  PD.  (79.25%)  of  participants  reflect  a  rating  of  4  or  higher.  

-­4-­  

Page 5: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

  6)  Leadership  Development  

Feasibility  plan  to  determine  possible  charge  and  scope  of  this  work  to  be  developed  in  SY  2015-­‐2016.    

After  assessing  other  work  proceeding  for  next  year,  decision  made  to  wait  until  2016-­‐2017  school  year.    

  Hiring/Onboarding    7)  Recruit  and  hire  more  candidates  of  color  for  staff  openings.                    8)  All  educators  are  appropriately  licensed  or  on  waiver  with  the  Massachusetts  DESE.    

Increase  diversity  of  new  teacher  hires  by  20  percent  over  SY13-­‐2014.                            “Highly  Qualified”  staff  percentage  does  not  drop  below  the  state  requirement  of  97%.      

Progress  Toward  Goal.    We  are  currently  in  the  middle  of  hiring  season.    We  met  with  diversity  officers  at  Babson  on  March  2,  2015  to  analyze  diversity  hiring  plans.    We  attended  the  Greater  Boston  Network  Diversity  job  fair  on  March  21,  2015  in  addition  to  college  job  fairs  at  Bridgewater  State  University  and  Lesley  University.    Posted  advertisement  on  NENMET  Minority  Recruitment  website  to  funnel  applicants  to  Schoolspring.    Academic  council  members  have  been  instructed  on  how  to  utilize  the  Schoolspring  filters  to  screen  for  candidates  of  color.      Met.    Our  Highly  Qualified  number  did  not  drop  below  the  state  requirement  of  97%.  

  9)  Develop  an  efficient  onboarding  process  in  collaboration  with  the  Town’s  Human  Resources  

Weekly  orientation  programs  replace  individual  meetings.            

Met.      New  employee  orientation  program  has  been  developed.  New  employees  will  be  oriented  twice  a  week  in  collaboration  with  the  Town  HR  Department.      

-­5-­  

Page 6: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

Department  to  orient  new  employees  in  a  timely  and  efficient  manner.  

Streamlined    Human  Resources  Information  Process  to  efficiently  allow  new  employee  access  to  vital  systems  necessary  for  the  completion  of  their  job.                  All  new  employees  are  fingerprinted,  SORI  cleared  and  CORI  cleared.          All  employees  are  issued  an  employee  identification  badge  and  are  required  to  wear  it.  

In  Progress.    A  new  personnel  selection  form  was  created  to  streamline  the  input  of  data  into  Munis.  Met  with  the  Town  to  review  reports  that  they  utilize  from  Munis.  Goal  is  to  have  Munis  as  the  mainframe  that  feeds  the  data  to  active  directory.    This  will  allow  active  directory  to  feed  data  to  our  other  systems  such  as  email,  Powerschool,  Baseline  Edge  and  AESOP.        Met.    All  new  employees  are  fingerprinted,  SORI  cleared  and  CORI  cleared.        Met.    Multiple  vendors  are  utilized  for  ID  badges  in  WPS.    At  the  beginning  of  school  year  2015-­‐2016,    the  vendors  will  onsite  prior  to  the  start  of  school,  so  that  all  new  employees  will  not  have  to  wait  until  picture  day  to  get  their  ID  badge.  

Strategy  #2:  Invest  in  our  Educators  (cont’d)  

Employee  Contracts:    10)  Complete  committee  work  on  stipends  with  WTA.        

   A  comprehensive  list  of  stipends  is  produced,  ratified  and  amended  to  the  WTA  collective  bargaining  agreement.      

   Progress.    The  Stipend  Review  Committee  met  multiple  times  and  are  making  progress  toward  finalizing  a  list  of  stipends.    

-­6-­  

Page 7: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

11)  Finalize  the  new  WEPSA  Unit  B  contract.        Non-­‐Unit  Personnel  are  addressed.  

WEPSA  Unit  B  Contract  is  ratified.              All  non-­‐unit  personnel  have  contracts  in  a  standard  format.  

Significant  Progress.    WEPSA  negotiations  have  concluded.    The  final  contract  document  is  in  review  and  will  be  put  forth  for  ratification.      Met.    A  standard  format  has  been  developed  for  all  non-­‐unit  personnel.  

 Strategy  #3:  Provide  Broad-­‐Based  Learning  Opportunities  as  Part  of  a  World-­‐Class  School  System  

1)  Develop  ES  World  Language  Pilot.  

Prepare  Grades  K-­‐2  World  Language  pilot  for  rollout  at  two  elementary  schools  in  SY15-­‐16.  

Met.    Program  developed,  curriculum  opportunities  identified,  budget  accepted,  WEF  grant  applied  for  and  received,  positions  posted  &  hiring  expected  to  be  completed  by  mid-­‐June  2015  

  2)  Expand  Grade  9  Physics  at  WHS.  

Successful  rollout  of  Grade  9  Physics  for  all  Freshmen  at  WHS,  as  measured  by  student  and  parent  surveys  and  MCAS  scores.  

Met.  

  3)  Introduce  new  Life  Science  curricula  in  grades  K-­‐5.  

Pilot  Life  Science  Units  in  grades  K-­‐5.     Met.  

  4)  Expand  Computer  Science  Offerings.  

Implement  Exploring  Computer  Science  at  HS.   Met.  

-­7-­  

Page 8: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

  5)  Develop  Advanced  Electives  at  the  High  School.  

Expand  advanced  Science  Elective  options  in  SY15-­‐16  Course  Offerings.  

Progress:    Survey  administered  to  students  about  which  electives  they  would  like  to  see;  re-­‐aligned  with  9-­‐12  rollout  plan,  and  shifted  to  SY16-­‐17  

  6)  Establish  Superintendent’s  Advisory  Committee  for  STEAM.  

Plan  to  pilot  integrated  units  in  Visual  Arts  and  Science  in  SY15-­‐16.  

Met.  

Strategy  #3:  Provide  Broad-­‐Based  Learning  Opportunities  as  Part  of  a  World-­‐Class  School  System  (cont’d)  

7)  Rollout  and  Evaluate  1:1  Program.                                

Grade  6:  100%  of  grade  6  core  classroom  teachers  have  received  their  device  and  have  completed  training  in  teaching  in  a  1:1  environment  with  iPads.        As  of  October  14,  100%  of    students  will  be  experiencing  the  1:1  environment  in  their  core  classrooms.      Work  with  academic  council  to  ensure  electronic  resources  are  available  for  new  curriculum  rollouts  and  develop  a  plan  to  move  from  hard  copy  texts  to  online  texts.          Grade  7:  100%  of  classroom  teachers  in  cluster  M  receive  devices  and  complete  training  in  teaching  

Met.            Met.        Progress.  Implemented  Learning  Management  system  (Canvas  LMS)  and  trained  a  total  15  Pilot  teachers  from  HS  and  MS  in  using  the  LMS.  Scheduled  summer  training  to  include  teachers  at  HS  or  MS  for  developing  a  blended  course  (online  tools  and  materials  complementing  traditional  instruction)    Met.  Grade  7  Pilot  includes  Cluster  M  with  80-­‐90  students  and  4  teachers.  Teachers  are  

-­8-­  

Page 9: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

8)  Pilot  and  Evaluate  Grade  7  1:1  Program.                          9)  Plan  for  1:1  pilot  at  WHS.  

in  a  1:1  environment.  20%  of  grade  7  students  have  experienced  learning  in  a  1:1  environment.            1:1  Advisory  Committee  will  develop  surveys,  conducted  evaluation,  and  reported  out  on  successes  and  challenges  of  the  1:1  program.          WHS:  1:1  Advisory  Committee  will    explore  options  for  WHS  and  develop  plan  and  timeline  for  WHS  rollout.    

using  tools  like  Google  classroom  for  distributing  materials  and  collecting  assignments  across  the  curriculum  areas.  Students  worked  collaboratively  to  complete  I-­‐search  projects  using  the  tools  on  the  iPads.    Significant  Progress:  Teacher,  Student,  Parent  surveys  conducted  as  part  of  the  program.  Thirty-­‐three  teachers,  one  hundred  fifty  parents,  and  four  hundred  and  two  students  responded  to  the  surveys.    Will  be  presented  to  School  Committee  in  a  forthcoming  report.    Progress:    

● WPS  Advisory  team  established  and  meets  weekly  to  work  out  plan.  

● Minimum  Laptop  specs  established  through  surveying  teachers  and  software  used  at  WHS  throughout  our  classes.  

● Demo  models  (Macbook  airs  11”  and  13”’  and  macbook  Pro  13”)  selected  and  conducting  surveys  (May)on  student  preferences  

 ● Working  to  identify  pilot  cohort/class  

and  timeline  will  be  established.      

-­9-­  

Page 10: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

Strategy  #4:  Align  Resources  with  Educational  Needs  

1)  Develop  a  Five-­‐Year  Educational  Technology  Plan.  

Educational  technology  plan  for  2015-­‐2020  written  by  Technology  Committee  and  approved  by  School  Committee  and  submitted  to  DESE  (June  2016.).    Ed  Tech  plan  shared  with  community  and  potential  funding  partners  to  focus  resources  cohesively.  

Progress:  ● Tech  SAC  providing  input  on    Vision,  

Mission  for  Tech  Plan.  ● By  end  of  June  will  have  finalized  Vision  

and  Mission  and  will  establish  Student  and  staff  experiences  aligned    to  content  areas  of  tech  plan  such  as  infrastructure,  budget,  curriculum,  Professional  Development,  etc  

● Fall  -­‐draft  tech  plan  for  review  for  Tech  SAC  with  a  target  of  finalizing  for  Winter  release.  

 

  2)  Develop  a  budget  that  presents  financial  information  in  multiple  ways  to  facilitate  analysis  by  school,  by  program  area  across  all  schools,  by  categories  of  expenditure  and  other  versions  as  requested  by  the  School  Committee.  

School  Committee,  Advisory  Committee  and  Town  Meeting  are  satisfied  with  the  depth  and  breadth  of  information  presented  and  with  the  format  in  which  it  is  presented  for  analysis.  FY16  Budget  that  supports  Strategic  Plan  is  approved  at  Annual  Town  Meeting.  

Met.    The  FY16  Budget  was  approved  at  Annual  Town  Meeting  and  reflects  a  4.98%  increase  over  FY15.    The  Budget  continues  to  support  the  Strategic  Plan  and  also  included  reductions  to  existing  operations  in  order  to  do  that.    The  steps  taken  by  the  School  Committee  and  Administration  to  make  reductions  were  highlighted  as  a  significant  change  in  process  that  was  welcomed  by  the  Advisory  Committee  and  Town.  

-­10-­  

Page 11: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

  3)  Continue  to  analyze  fee-­‐based  programs  to  determine  where  fees  can  and  should  be  eliminated.  

The  FY16  Proposed  Budget  reflects  the  elimination  of  fees  and  the  incorporation  of  a  budget  to  support  the  curriculum  areas  previously  funded  or  partially  funded  by  fees.    

 While  the  proposal  was  made  to  eliminate  fees  in  specific  areas  of  the  budget,  the  overall  needs  of  the  District  and  the  fiscal  constraints  of  the  Town  did  not  support  this  for  FY16.  

  Facilities:    4)  Schofield/Fiske  Renovations      5)  Middle  School  Windows  Renovation      

   October,  2014    Special  Town  Meeting  appropriates  funding  for  the  projects  to  be  completed  over  two  summers.*    Approval  of  projects  through  successful  debt  exclusion  in  December.  MSBA  submissions  completed  on  time;  project  manager  is  assigned  by  MSBA;  and  October,  2014  Special  Town  Meeting  approves  funding    for  complete  project  (detailed  design  and  construction)  to  allow  work  to  begin  as  early  as  possible.  

   Met.    Coordination  of  the  projects  is  on-­‐going  and  construction  will  begin  on  June  22,  2015        Met.    The  project  will  begin  in  summer,  2015  as  planned  but  will  require  two  summers  to  complete  due  to  lead  time  on  the  fabrication  of  the  windows.  

Strategy  #4:  Align  Resources  with  Educational  Needs  (cont’d)  

6)  Move  Security  enhancements  forward  following  study  by  consulting  firm  and  internal  assessments  by  FMD    

               

Met.    Security  template  established  for  Schofield  and  Fiske  project.    Additional  work  underway  with  new  consultants  following  Town  Meeting  vote.            

-­11-­  

Page 12: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

7)  MOA  with  Wellesley  Police  Department.    8)  Common  Staff  Training  Protocols.    9)  Inventory  of  Needed  Equipment.  

Agreement  between  WPS  and  WPD  is  documented  regarding  information  sharing.      Protocols  developed  and  communicated  with  all  administrators  and  staff.    Based  on  the  security  assessment  performed  by  a  contracted  vendor,  and  internal  assessments,  a  list  of  equipment  is  developed  with  a  purchase/implementation  schedule.  

Met.    Awaiting  final  SC  review  as  part  of  MASC  Policy  work.        Met.    Working  with  WPD,  each  school’s  protocol  was  updated.    Met.    TSG  study  provided  initial  inventory  that  was  further  refined  in  the  Schofield/Fiske  renovation  work.    Presently  working  with  vendor  on  the  plans  for  the  remaining  schools.  

  10)  Formalize  a  Fixed  Asset  Inventory  System  to  manage  assets  and  replacement  cycles.    

Procedures  documented  for  receipt,  recording,  valuing  and  asset  tagging  of  furniture  and  equipment;  students/interns  hired  to  make  greater  progress  in  asset  tagging  and  documentation.    

Not  met.    The  implementation  of  the  online  requisition/purchase  order  process  took  priority  and  will  also  allow  the  District  to  use  features  of  the  requisitioning  system  to  flag  and  document  purchases  that  are  fixed  assets.    The  fixed  asset  inventory  system  will  be  the  next  phase.    

Other  Critical  Needs        

  11)  Complete  a  MASC  Review  of  School  Committee  Policies.  

A  current,  easily  updatable  set  of  School  Committee  policies  that  address  the  administration,  operation  and  student-­‐related  requirements  of  a  public  school  district.  

In  process.    The  School  Committee  and  Administration  have  been  engaged  with  MASC  and  has  completed  approximately  two-­‐thirds  of  the  policy  review  and  revisions.    

  12)  Enhanced  enrollment  and  registration  process  to  facilitate  stronger  

Creation  and  implementation  of    online  system  for  registration  and  enrollment  that  streamlines  information  and  provides  faster  response  to  enrollment  requests.  

Met.    All  revised  documents  are  currently  available  on  the  WPS  website  and  have  been  in  use  since  March  1,  2015.    

-­12-­  

Page 13: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

 

WPS  District  Goals  -­‐  EOY  Report Voted  October  21,  2014  

communication,  collaboration  and  efficiency.  

Internal  process  for  registration  paperwork  review  has  been  revamped  and  allows  for  efficient  processing  and  start  dates.    Three  successful  Kindergarten  Round  Up  sessions  held,  with  office  support  staff  enrolling  nearly  290  students.  All  elementary  principals  attended,  in  addition  to  nursing  staff.      Parent  feedback  all  positive.    Some  Progress.    Working  with  technology  to  identify  appropriate  platform  for  parent  sign  up  at  K  Round  Up  2015-­‐2016.    

     

-­13-­  

Page 14: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

WELLESLEY PUBLIC SCHOOLS 40 Kingsbury Street • Wellesley • Massachusetts 02481

781-446-6210

Dr. DAVID F. LUSSIER Superintendent of Schools

Dr. DEAN W. BLASE JUDITH M. BELLIVEAU Assistant Superintendent, Teaching and Learning Assistant Superintendent, Finance and Operations LORI V. CIMENO, Director of Student Services KATHLEEN F. DOOLEY, Director of Technology

www.wellesley.k12.ma.us

___________________________________________________________________________________________________

May 13, 2015 To: School Committee From: David F. Lussier, Ed.D. Date: May 12, 2015 RE: Additional Information for SY14-15 Superintendent’s Evaluation In addition to the progress toward meeting our School Committee approved goals for the District in SY 2014-2015, the Administration has also been engaged in substantive work on a number of other fronts where important progress has been made: Partnerships: A key area identified in the WPS Strategic Plan (Strategy #3) is to develop partnerships that will help the District advance its mission. In the past year, the Administration has accomplished this on multiple fronts. Superintendent Advisory Committees / WEF In partnership with the Wellesley Education Foundation, we formed four Superintendent Advisory Committees around priority areas for the organization: STEAM, World Language, District Scorecard, and District Technology Plan. The idea behind each of these Committees was to leverage the tremendous intellectual capital within our community and staff in the form of internal think tanks that would advise the District on its planning and implementation of programs. Wellesley/Babson/Olin Colleges Numerous efforts have allowed us to deepen our relationship with these local institutions of higher education. Students across the three schools partnered with WPS to assess transportation issues as well as a sustainability curriculum at WHS. We have also established a partnership with the Diversity Officers at Babson to inform our strategy for increasing the diversity of our staff. Babson is also hosting—at no charge—our leadership retreat this summer. Recreation Department We are excited to be launching a pilot program with the Rec. Dept. to manage after school enrichment programs at the elementary level. Our joint hope is that we can expand the diversity of offerings across these schools that exceeds what we have had the internal capacity to facilitate in the past.

Page 15: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

Add’l Information for SY14-15 Supt’s Eval May 13, 2015 p. 3

www.wellesley.k12.ma.us

Wellesley Media Corp After several exploratory meetings, we have submitted a grant proposal to Wellesley Media Corp that would fund staff capacity to manage student programming that may be broadcast on a newly launched education channel. Capital Projects: The Administration has been fully engaged in the extensive planning for the Fiske and Schofield renovations as well as the security project that recently passed Town Meeting. Additionally, we have been members of the School Facilities Committee, which has been mapping the District’s master plan, including the proposal for additional study of Hardy/Hunnewell/Upham (HHU) options. Finally, we submitted a Statement of Interest (SOI) to the MSBA by the spring deadline to solicit their interest in funding the HHU work. Athletics Program Review: A review committee was formed comprised of Asst.Supt (Judy Belliveau), WHS Prinicpal (Dr. Jamie Chisum), Athletic Director (John Brown), Field Hockey Coach/teacher (Erin Stickle), Girls Track Coach /PE Teacher (John Griffith), Sue Jablonsky (Parent), Annie Hall (Parent/PTSO Vice President), Margaret Breeden (Metco Parent), Michael Jennings (Parent), and Christine Goss (Parent). We have had three meetings to establish the overarching nature of the review, how we will collect data, and from whom. We established three major categories for the review: program, facilities and funding. There will be an initial survey that will go out to parents, students, and staff, and we have been working on the “big questions.” We expect the initial survey will then help us frame more specific questions to guide the review. The survey will be administered in June. Communications: We have continued to improve the look of the new WPS website with a great deal of house cleaning of old material and better organization of current material. The Superintendent began using Twitter this year to showcase examples of great practice and student accomplishment. It has also served as an effective secondary line of communication during snow emergencies. (The Superintendent now has nearly 450 followers.) Additionally, we continue to publish a weekly Superintendent’s Bulletin for staff that most PTOs also link to and which is posted on the WPS website. Finally, we continue to use SchoolMessenger as the most efficient mechanism to reach staff and parents quickly for emergency messages or school-specific communications. Switching Education Collaboratives: While time consuming given the process that had to be followed, ultimately we proposed shifting our membership from the EDCO Collaborative to the ACCEPT Collaborative that resulted in both considerable savings as well as greater access to student and professional resources. Leadership Development: A new program instituted this year is a monthly brown-bag lunch discussion between the Superintendent and Middle School Assistant Principals and High School Housemasters. These Administrators play essential roles at the secondary level and yet previously there was not a formal structure to coordinate their work or leverage their expertise as a District.

Page 16: 2014-15 EOY District Goadate.docx - Google Docs · Boston Network Diversity job fair on March 21, 2015 in addition to college job fairs at Bridgewater State University and Lesley

Add’l Information for SY14-15 Supt’s Eval May 13, 2015 p. 3

www.wellesley.k12.ma.us

Business Office Reorganization: The Administration has completed its multi-year reorganization of the Business Office through the addition of a new Director Budget Operations (starting in June) and an Admin Assistant to the Assistant Superintendent for Finance and Operations (who started last week).