2013.07.04 - Collation of Pendulum Assembly Certification ... · 2013.07.04 - Collation of Pendulum...
Transcript of 2013.07.04 - Collation of Pendulum Assembly Certification ... · 2013.07.04 - Collation of Pendulum...
Bundesanstalt für StraßenwesenBundesanstalt für Straßenwesen(Federal Highway Research Institute)
Collation of
FlexPLI
Pendulum Certification Test Results
Revision 1 - disclosing Information on Master Legs and Pass/Fail Ratio -
Bundesanstalt für Straßenwesen(Federal Highway Research Institute)
- disclosing Information on Master Legs and Pass/Fail Ratio -
7th Meeting of Informal Group GTR9 Phase 2July 3rd, 2013
Oliver ZanderBundesanstalt für Straßenwesen
GTR9-7-16r1
Dataset
• 12 impactors
� 1 prototype (leg 4)� 11 serial production legs
leg1: Master Leg SN01leg 2: Master Leg SN03leg 3: Master Leg E-Leg
• 9 test labs
Oliver Zander Slide No. 2July 3rd, 2013
• 9 test labs
• 119 tests
� 3 tests w/ prototype� 116 tests w/ serial production legs
GTR9-7-16r1
Results Overview - Pendulum Tests T1
Oliver Zander Slide No. 3July 3rd, 2013
GTR9-7-16r1
Results Tibia 1 - Pendulum Tests
Oliver Zander Slide No. 4July 3rd, 2013
GTR9-7-16r1
Results Tibia 1 - Pendulum Tests
Oliver Zander Slide No. 5July 3rd, 2013
GTR9-7-16r1
Results Tibia 1 - Pendulum Tests
Oliver Zander Slide No. 6July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests T2
Oliver Zander Slide No. 7July 3rd, 2013
GTR9-7-16r1
Results Tibia 2 - Pendulum Tests
Oliver Zander Slide No. 8July 3rd, 2013
GTR9-7-16r1
Results Tibia 2 - Pendulum Tests
Oliver Zander Slide No. 9July 3rd, 2013
GTR9-7-16r1
Results Tibia 2 - Pendulum Tests
Oliver Zander Slide No. 10July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests T3
Oliver Zander Slide No. 11July 3rd, 2013
GTR9-7-16r1
Results Tibia 3 - Pendulum Tests
Oliver Zander Slide No. 12July 3rd, 2013
GTR9-7-16r1
Results Tibia 3 - Pendulum Tests
Oliver Zander Slide No. 13July 3rd, 2013
GTR9-7-16r1
Results Tibia 3 - Pendulum Tests
Oliver Zander Slide No. 14July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests T4
Oliver Zander Slide No. 15July 3rd, 2013
GTR9-7-16r1
Results Tibia 4 - Pendulum Tests
Oliver Zander Slide No. 16July 3rd, 2013
GTR9-7-16r1
Results Tibia 4 - Pendulum Tests
Oliver Zander Slide No. 17July 3rd, 2013
GTR9-7-16r1
Results Tibia 4 - Pendulum Tests
Oliver Zander Slide No. 18July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests ACL
Oliver Zander Slide No. 19July 3rd, 2013
GTR9-7-16r1
Results ACL - Pendulum Tests
Oliver Zander Slide No. 20July 3rd, 2013
GTR9-7-16r1
Results ACL - Pendulum Tests
Oliver Zander Slide No. 21July 3rd, 2013
GTR9-7-16r1
Results ACL - Pendulum Tests
Oliver Zander Slide No. 22July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests PCL
Oliver Zander Slide No. 23July 3rd, 2013
GTR9-7-16r1
Results PCL - Pendulum Tests
Oliver Zander Slide No. 24July 3rd, 2013
GTR9-7-16r1
Results PCL - Pendulum Tests
Oliver Zander Slide No. 25July 3rd, 2013
GTR9-7-16r1
Results PCL - Pendulum Tests
Oliver Zander Slide No. 26July 3rd, 2013
GTR9-7-16r1
Results Overview - Pendulum Tests MCL
Oliver Zander Slide No. 27July 3rd, 2013
GTR9-7-16r1
Results MCL - Pendulum Tests
Oliver Zander Slide No. 28July 3rd, 2013
GTR9-7-16r1
Results MCL - Pendulum Tests
Oliver Zander Slide No. 29July 3rd, 2013
GTR9-7-16r1
Results MCL - Pendulum Tests
Oliver Zander Slide No. 30July 3rd, 2013
GTR9-7-16r1
Mean Values - Pendulum Tests
Oliver Zander Slide No. 31July 3rd, 2013
GTR9-7-16r1
Mean Values - Pendulum Tests
Oliver Zander Slide No. 32July 3rd, 2013
GTR9-7-16r1
Summary
• Tibia 1: 5 * not met – 114 * met
� Serial production legs: 5 * not met
(defect in tibia 1 detected)
• Tibia 2: 1 * not met – 118 * met
� Serial production legs: 1 * not met
• Tibia 3: all met
• Tibia 4: all met
Summary:
• 105 tests passed pendulum requirements
� 102 w/ serial production legs
� 3 w / prototypes
• 14 tests failed pendulum requirements
(due to one or more segments not
meeting the corresponding corridor)
Oliver Zander Slide No. 33July 3rd, 2013
• Tibia 4: all met
• ACL: all met
• PCL: 9 * not met – 110 * met
� Serial production legs: 9 * not met
• MCL: all met
� 14 w/ serial production legs
� 0 w/ prototypes
• Pass / fail ratio
� 88 % for all legforms
� 88 % for serial production legs
� 100 % for prototypes