2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot
-
Upload
quon-barnes -
Category
Documents
-
view
26 -
download
3
description
Transcript of 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot
![Page 1: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/1.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
![Page 2: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/2.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
• Working with the FRA to determine if a state can have a value-added role in providing shortline railroads better access to RRIF Financing.
• Partnership is the result of comments by Administrator Szabo expressing a desire to get better utilization of the RRIF.
• Began conversations in Summer ’12.
• FRA-ORDC MOU signed March 2013.
![Page 3: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/3.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
Why the Pilot?
• ORDC has a loan and grant program, but the rail infrastructure needs far exceeds our financial capacity.
• We have believed there is a role for states beyond providing funding for the credit risk premium.
• Overall, ORDC thinks we can be value-added to both the shortline railroads and the FRA.
![Page 4: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/4.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
How is ORDC value-added?
• For the FRA: ORDC has a good working relationship and a solid knowledge base of Ohio railroads and rail lines, giving us an advantage over the FRA’s Independent Financial Advisors. We can do a lot of screening before the railroads submit the application.
• For Railroads: ORDC already has an organizational structure in place for project and financial reviews, as well as NEPA.
![Page 5: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/5.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
Project Status:
• ORDC has completed our “State Advisor Report”.
• Ashland Railway submitted its draft application to the FRA on Friday.
![Page 6: 2013 SCORT – Ohio Session RRIF: FRA – ORDC Pilot](https://reader036.fdocuments.us/reader036/viewer/2022082818/568132d7550346895d999b32/html5/thumbnails/6.jpg)
2013 SCORT – Ohio SessionRRIF: FRA – ORDC Pilot
Next Steps:
• ORDC will continue to work with Ashland and FRA for loan approval.
• ORDC will identify opportunities to improve process.