2012 Cladding Brochure Locatelli LR
-
Upload
tolgay-oezer -
Category
Documents
-
view
230 -
download
0
Transcript of 2012 Cladding Brochure Locatelli LR
-
7/31/2019 2012 Cladding Brochure Locatelli LR
1/28
Faades & Cladding
Technical Innovation in
Steelwork Connections
Distributore Autorizzato
-
7/31/2019 2012 Cladding Brochure Locatelli LR
2/28
Faster installation, lower labour costsSuitable or standard beams or hollow sectionNo drilling or welding on-siteOn-site adjustability or accurate positioningCompatible with a wide range o brackets
Can be pre-assembled to minimise installation timeNo damage to steelwork or panelsOnly standard hand tools requiredIndependently approved sae working loadsAvailable in a range o materials and protective coatings
10 Reasons to use Lindapter connections
Established in 1934, Lindapter builds upon its proud history of developing innovative steel connections andapplies their proven clamping concept to the building envelope. Today, Lindapter products are used aroundthe world to connect a wide range of faade materials to various types of structures including:
Commercial Centres
Stadiums
AirportsRailway Stations
Theatre & Exhibition Centres
Hotels
Arenas
Lindapter Safely securingsteelwork for over 75 years
2 Tel: +44 (0) 1274 521444
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
3/28
Structural Steel Frames 4 Structural Hollow Section 14 Steelwork Connections 20 Project Experience 24 Project Case Study 25 Approvals 26 Technical Support 27
Contents
Whether securing precast concrete panels, glazingframes, GRC cladding or other architectural faades,
Lindapter has a proven connection solution.
As the inventor and innovator o steelwork clamping systems,Lindapters extensive experience and wide range o productsare perectly suited to xing elements o a building exterior tothe structural steel rame.
The undamental benet o a Lindapter connection is the speedand ease o installation, thus reducing the cost o labour andequipment hire. As drilling or welding is not required, potentialsaety risks are also reduced.
This brochure provides examples o cladding xing assemblies,designed or permanent applications. Please contact Lindapterto discuss your connection requirement.
DisclaimerLindapter International supplies components in good aith, on the assumption that customers ullyunderstand the loadings, saety actors and physical parameters o the products involved. Customersor users who are unaware or unsure o any details should reer to Lindapter International beore use.Responsibility or loss, damage, or other consequences o mis-use cannot be accepted. Lindaptermakes every eort to ensure that technical specications and other product descriptions are correct.Specication shall mean the specication (relating to the use o the materials) set out in thequotation given by the Seller to the Buyer. Responsibility or errors or omissions cannot be accepted.
All dimensions stated are subject to production tolerances i in doubt please check with Lindapter.
Lindapter 2012 Lindapter International Lindapter is a registered trade mark
In the interests o improving the quality and perormance o Lindapter products, we reservethe right to make specication changes without prior notice.
Online Support
Innovative Assembly Selector tool(identies a solution based on yourrequirements)
CAD DownloadsProduct specication data
Case studies and approvals
Distributor contact inormation Download or request a copy oLindapters catalogue
Comprehensive technical support rom Lindapters experiencedengineers includes a ree connection design service to assist aade
engineers through an ecient specication process, and extends tocontractors with site visits (upon request) and installation advice.The Lindapter design and support service includes:
Free design proposal
2D / 3D drawings
Quotation
Supply
Installation guidance
Ongoing support
3www.lindapter.com
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
4/28
4 Tel: +44 (0) 1274 521444
Recommended products:
Type A Type B Type LR Type AF Type CF Type LS
Please refer to the Lindapter catalogue or website for full product data
Structural Steel Frames
Hot rolled structural sections are manuactured withinevitable variations in exact dimensions, while steelerection techniques will create unavoidable tolerancesin straightness along beam length and other dimensions.
Accurate adjustability during installation is thereore anessential prerequisite o the cladding support system.
Lindapter acilitates this requirement with convenience,allowing the cladding contractor to simply slide thebracket or other xing assembly along a vertical orhorizontal structural beam with precise alignment,beore tightening the Lindapter components witha torque wrench. This method enables the rapidinstallation o large areas o cladding and signicantlyreduces the period o crane operation.
The ollowing pages provide examples o connectingaade panels to structural sections. The illustrationshighlight the many possibilities o securing panelbrackets and threaded bar xing assemblies.Please eel ree to contact Lindapters TechnicalSupport Department to discuss your specicconnection requirement.
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
5/28
5www.lindapter.com
Lindapter Type A clamps connect the stud rame o glass reinorced concrete (GRC) panels to structural steel. The Type Aholds the bolt head captive during tightening o the nut or ease o installation. The clamping arrangement allows verticaland horizontal adjustment o the panels on-site.
The xing assembly above is reproduced rom the Practical Design Guide or Glass Reinorced Concrete published by the the International GlassbreReinorced Concrete Association (GRCA). The guide is available rom the GRCA website: www.grca.org.uk/publications.
CA001
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
6/28
6 Tel: +44 (0) 1274 521444
Structural Steel Frames
CA002
Type CF high riction clamps hook around the fanges o the vertical steel section to secure the stud rame o GRC panels.The xing assembly allows vertical and horizontal adjustment o the panels on-site.
The xing assembly above is reproduced rom the Practical Design Guide or Glass Reinorced Concrete published by the the International GlassbreReinorced Concrete Association (GRCA). The guide is available rom the GRCA website: www.grca.org.uk/publications.
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
7/28
7www.lindapter.com
CA003
Lindapters stainless steel Type LS secures a metal raming section in a riction application. The clamp is sel-adjustable, allowing asingle product to t various beam thicknesses, with the tail spanning the recess o the strut to maximise the clamping range. The xingconguration acilitates adjustability on three axes.
The xing assembly above is reproduced rom the Practical Design Guide or Glass Reinorced Concrete published by the the InternationalGlassbre Reinorced Concrete Association (GRCA). The guide is available rom the GRCA website: www.grca.org.uk/publications.
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
8/28
8 Tel: +44 (0) 1274 521444
Structural Steel Frames
A GRP enclosure system is suspended below a bridge sot using Type B xings. The connection simplies lateraladjustment along the supporting steelwork.
CA004
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
9/28
9www.lindapter.com
Lindapters high perormance Type AF connects the ramework o perorated steel cladding to vertical columns. The bracketarrangement allows vertical and lateral adjustment. The Type AF perorms excellently in riction applications. Please reer to theLindapter catalogue or product specication data including sae working loads.
CA005
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
10/28
10 Tel: +44 (0) 1274 521444
Structural Steel Frames
Roong support cleats connected to a structural steel rame. The adjustable arrangement allows accurate positioningo the purlins.
CA006
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
11/28
11www.lindapter.com
CA007
Lindapters Type AF, as specied to connect roong supports to an existing structural rame. The xing system permits lateraladjustment during installation and provides a high rictional sae working load.
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
12/28
12 Tel: +44 (0) 1274 521444
Structural Steel Frames
A roo canopy rame o a sports stadium is secured to primary structural steel with sel-adjustable Type LR clamps.The xings are compatible with a range o fange thicknesses and the use o slotted location plates allows easyalignment o the sot panels.
CA008
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
13/28
13www.lindapter.com
Sandstone aced precast concrete panels are connected to the structural steel o a new retail park development. The xingassembly uses Lindapter Type CF high riction clamps, permitting simple vertical adjustment during the installation process.
CA009
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
14/28
14 Tel: +44 (0) 1274 521444
Square/rectangle Structural Hollow Section (SHS)is a popular material amongst architects, with manycontemporary designs eaturing the exposed smoothproles o the structural steel to enhance the aestheticso a building.
Responding to industry demand or a aster alternativeto welding or through-bolting, Lindapter invented theHollo-Bolt, a structural expansion bolt specicallydesigned or primary or secondary connections oSHS. The Hollo-Bolt is particularly well suited toexternal or internal glazing support rames due to itsdiscreet prole. Installation is carried out quickly andsaely by inserting the product into pre-drilled holesthen tightening to the recommended torque usingonly hand tools.
The entire Hollo-Bolt range has beenawarded CE certication, independentlyveriying product perormance in saety
critical applications. Hexagonal, Flush Fit, Countersunkand Button/Security head variants in lengths 1, 2 and3 are covered by ETA-10/0416. For more inormationvisit: www.lindapter.com/about/ce
This section o the brochure provides examples ocost ecient methods o connecting aade panelsand curtain walls to SHS. The Hollo-Bolt can be usedin a wide range o primary or secondary connections,including specialist applications such as blast resistancecladding. Please contact Lindapters Technical SupportDepartment to discuss your specic connectionrequirement.
Recommended products:
Hollo-Bolt
(Hexagon Head)
Hollo-Bolt
(Button Head)
Hollo-Bolt
(Countersunk Head)
Hollo-Bolt
(Flush Fit)
Please refer to the Lindapter catalogue or website for full product data
Structural Hollow SectionTel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
15/28
15www.lindapter.com
The Hollo-Bolt, Lindapters fagship expansion bolt, is designed to connect to SHS. In this application, a glazing system is attachedto vertical SHS columns.
CA010
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
16/28
16 Tel: +44 (0) 1274 521444
A two arm spider bracket is connected to SHS, allowing a rameless glazed atrium to be presented with style.
Structural Hollow Section
CA011
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
17/28
17www.lindapter.com
A curtain wall system is secured to horizontal SHS with the Hollo-Bolt Flush Fit. The discreet expansion bolt is concealed within thebracket and supporting steel or an aesthetically pleasing nish.
CA012
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
18/28
18 Tel: +44 (0) 1274 521444
Lindapters Hollo-Bolt connects perorated steel cladding to horizontal SHS. This arrangement allows simple vertical andlateral adjustment or precise alignment o the panels.
Structural Hollow Section
CA013
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
19/28
19www.lindapter.com
Insulated wall panels attached to SHS using a simple angle bracket and Lindapter Hollo-Bolts.
CA014
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
20/28
20 Tel: +44 (0) 1274 521444
Behind a structures aade, there is oten secondarysteel ramework, Lindapter Girder Clamps provide aaster alternative to traditional connection methods,compatible with almost any shape and size o section,in a wide variety o applications.
The Girder Clamp symbolises Lindapters philosophyperectly; boldly challenging the need to drill or weld,when a sae, high strength connection can be quicklyaccomplished by clamping two steel sections together.
Although the concept is simple, Lindapter productsundergo complex design and testing as the experiencedResearch & Development team constantly rene,improve and invent to achieve greater productperormance, veried by independent productapprovals.
The ollowing pages show typical applications. Pleasereer to the Lindapter catalogue / website or urtherexamples, or contact Lindapters Technical Supportdepartment to discuss your connection requirement.
Recommended products:
Girder Clamp Type A Type B Type LR Type AF Type CF Type LS
Please refer to the Lindapter catalogue or website for full product data
SteelworkTel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
21/28
21www.lindapter.com
GC001-1
GC001-4
GC002-3
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
22/28
22 Tel: +44 (0) 1274 521444
GC003-4
GC004-1
GC005-1
SteelworkTel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
23/28
23www.lindapter.com
GC006-1
GC006-6
GC009-1
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
24/28
24 Tel: +44 (0) 1274 521444
Project Experience
Location Project Application ProductAustralia Eureka Tower, Melbourne Exterior Sculptures HBCanada The Bow, Calgary Faade HBFrance Socit Gnrale Salle des Marchs, Paris Glazing HBGermany Esprit Arena, Dsseldor Roo HBGermany Evonik Park, Herne Faade AFGermany Federal o Ministry Transport, Berlin Glass Faade A & BGermany Furniture Store, Uelzen Glass Faade HBGermany Garmisch Partenkirchen Ski Jump, Bavaria Faade A & BGermany Gas Station, Mnster Roo Faade HBGermany HaenCity, Hamburg Glazing HBFFGermany Military Historical Museum, Dresden Glass Faade HBGermany Police Helipad, Frankurt Faade HW / HCGermany Porsche, Leipzig Faade HBGermany Seminar Centre, Duisburg Glass Faade A & BGermany Shopping Centre, Heilbronn Faade A & BGermany Sparkasse Heilbronn Exterior Sculptures HBGermany Train Station, Dresden Roo Faade HB
Germany Train Station, Wiesbaden Roo Faade HBHolland Train Station, Leiden Roo AIreland Dublin Airport Terminal 2, Dublin Aluminium Curtain Walling HBIreland Rugby Stadium, Dublin Roo Faade HBItaly Armani Hotel, Milan Cladding AItaly Progetto Portello, Comparto U3, Milan Faade ALuxembourg Swimming Pool, Luxembourg Faade HBQatar NDIA Aircrat Maintenance Hangar, Doha Aluminium Curtain Walling HBSingapore Marq Project, Singapore Curtain Walling HBSwitzerland Learning Center, Lausanne Glass Faade A & BUAE Financial Centre, Abu Dhabi Glass foor LSUAE World Trade Centre, Dubai Roo AUK Cabot Circus, Bristol Glazing HBUK Crown Square Courts, Manchester Glazing HBUK Inland Revenue, Cumbernauld Cladding LB2UK Piccadilly Station, Manchester Roo A & BUK Sainsburys, Newcastle under Lyme Glazing HBUK St Davids Shopping Centre, Cardi Faade LRUK St Pancras Station, London Glazing A & BUSA Minnesota Twins Ball Park, Minneapolis Canopy Sot LR
Experience
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
25/28
25www.lindapter.com
Project Case Study
St Davids Shopping Centre CladdingLocation: Cardiff
Lindapter Type LR clamps were used to attachthe precast concrete cladding panels to primarysteelwork as part o the 675m expansion o StDavids Shopping Centre in Cardi.
The consulting engineers invited Lindapter to designa bespoke adjustable xing system to acilitate theaccurate positioning o precast concrete claddingpanels on this major retail construction project.Lindapter proposed a solution comprising o a steelbracket with slotted holes that could be clamped to thestructural members with Type LR xings. The cladding
panels could then be lited into place and connectedback to the same steel bracket, with the xing systemproviding convenient adjustability on three axes.
The design was promptly approved and Lindaptersupplied 534 pre-assembled connection systems,tted with size M16 Type LR clamps, to secure theentire sandstone aced aade. The highly adjustablesystem not only simplied the positioning o the panels,but the sel-adjusting capability o the Lindapter Type
LR allowed this specication to be standardised toaccommodate dimensional variations o the structuralsteel.
Stephen Maddalena, Chairman and Joint M.D. o theMarble Mosaic Company, who designed, manuacturedand installed the precast cladding panels, highlights thebenets o speciying Lindapter:
Given the projects construction and programmeconstraints, the use o Lindapters connectors providedan eminently practical means o attaching the precastcladding panels to its structural steel rame and the
helpul support o Lindapters team proved to beespecially valuable in developing this solution
St Davids opened on schedule to become home to 88new stores. The clean and contemporary appearanceo this landmark British Shopping Centre has made abold contribution to the rejuvenation othe Welsh capital.
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
26/28
26 Tel: +44 (0) 1274 521444
QualityAccredited to ISO 9001 since1986, Lindapter strictly enorcesa quality management systemthat includes vigorous product
testing to ensure consistentlyhigh manuacturing standards.
EnvironmentLindapter operates an ISO14001 certied environmentalmanagement system andconstantly monitors andimproves aspects o thebusiness that may have animpact on the environment, including the use o naturalresources, the handling and treatment o waste, and energyconsumption.
ApprovalsLindapter has manuactured to the highest standard orover three quarters o a century, earning a multitude oindependent approvals and a reputation synonymouswith saety and reliability. Current accreditations include:
CE MarkingFor Lindapter products in compliance withthe provisions o the EC Construction ProductDirective 89/106/EEC, please reer to thewebsite: www.lindapter.com/about/ce
Deutsches Institut fr BautechnikDeutsches Institut r Bautechnik approvesconstruction products or use in structuraland civil engineering industries in Germany.
Lloyds Register Type ApprovedLloyds Register Type Approved productshave been subjected to tensile, rictional,shear, vibration and shock tests, witnessedand veried by Lloyds Register.
TVTV is the certiying authority or saety, qualityand environmental protection in Germany.
Det Norske VeritasDet Norske Veritas has approved the useo Lindapter products in liting applications.This includes their use on both mobile andxed oshore installations.
Factory MutualFactory Mutual, the American insuranceorganisation, oers an approval that is recognisedby the re protection industry world-wide.
Verband der Schadenversicherer e.V.Verband der Schadenversicherer e.V. is one oGermanys leading independent testing institutionsor products usedin re protection applications.
Lindapter is a member o the ollowing organisations:
Q 05143
EMS 546660
Approvals
British ConstructionalSteelwork Association
The Steel ConstructionInstitute
American Institute oSteel Construction
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
27/28
27www.lindapter.com
Technical Support
Ask Lindapter to design a solutionto your connection requirement:
Tel: +44 (0) 1274 521 444
Fax: +44 (0) 1274 521 130General Enquiries: [email protected] Support:[email protected]
TechnicalSupportExperienced engineers oer an unrivalled supportservice, including ree design and bespoke newproduct development. Lindapters philosophy is todeliver the highest quality at every stage o the service,rom initial connection design to installation guidance.
Specialist advice rom experienced engineers Free connection design based upon your
requirementsBespoke drawings delivered in 2D and interactive3D ormats
CAD les available to import into all major sotwareapplications
Contractor training and onsite visits (where
required)
EngineeredSolutions Design and development o custom products Manuactured to Lindapters exacting standards Thoroughly tested with detailed reports
Tel: +39 02 968 2161 email: [email protected] web: www.gllocatelli.it
-
7/31/2019 2012 Cladding Brochure Locatelli LR
28/28
Ask Lindapter to design a solutionto your connection requirement:
Tel: +44 (0) 1274 521 444Fax: +44 (0) 1274 521 130General Enquiries: [email protected] Support: [email protected]
Distributore Autorizzato
GL Locatelli SRL
Via Dante 66
22078 Turate (Co)
Italy
Tel: +39 02 968 2161
Fax: +39 02 968 2795
email: [email protected]
web: www.gllocatelli.it