Connecting Columbia An Active Transportation Action Agenda Project Update Active Transportation Action Agenda Task Force April 19, 2012

Transcript of 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action...

Page 1: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Connecting ColumbiaAn Active Transportation Action Agenda

Project Update

Active Transportation Action Agenda Task ForceApril 19, 2012

Page 2: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Presentation Agenda

1. Project Status & Survey Results Update2. Primary Route Network

– Network Connectivity

3. Owen Brown Enlargement Area– Primary Routes– Local Connections

4. Intersection Improvements5. Review Project Goals, Objectives & Outcomes6. Next Steps

– Task Force Walking/Biking Tour

Page 3: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Project Status

• Kick off Meeting• Public Open Houses (2)

January 2012

February 2012• Fieldwork

March 2012• Fieldwork (cntd.)• Motorized Access Review

• Development of Recommendations• Walk/Bike Tour (4/28)• Motorized Access Review (cntd.)

April 2012

• Draft Agenda• Draft Recommendations Public

Meeting (5/23)

May 2012

• Final Agenda

June – July 2012

Page 4: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Online Survey Results Update

• 395 Responses as of April 11th

• Ages:– 19 & younger – 3 – 20-44 - 129– 45-64 – 194– 65 and above - 69

• Male 207 (52.4%) Female 188 (47.6%)

Page 5: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Primary Routes

Ceda

r Ln.

Rte.

29 S

ewer

Alig

n.

Proposed Facility

Existing Facility

Legend:

Page 6: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Major Network Gaps & Barriers

Ceda

r Ln.

Rte.

29 S

ewer

Alig

n.

Middle Patuxent Environmental

Area

Hospital / Community

College

Rte. 29 Crossing

Rte. 29 Crossing

Proposed Facility

Existing Facility

Legend:

Gap/Barrier

Rte. 175Crossing

Page 7: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Ceda

r Ln.

Rte.

29 S

ewer

Alig

n.

Proposed Path

Existing Path

Legend:

Proposed On-Road Facility

Potential On-Road Facilities

Page 8: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Ceda

r Ln.

Rte.

29 S

ewer

Alig

n.

Proposed Facility

Existing Facility

Legend:

Enlargement Area: Owen Brown

Page 9: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Local ConnectionsPreliminary Recommendations

Page 10: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Primary RouteRoute 29 Sewer Alignment

Little Patuxent Pkwy.

View Along Sewer Easement

Page 11: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Primary RouteSnowden River Parkway

View Along Snowden River Pwky.

Page 12: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Local Connections

View South Along Oakland Mills Rd.

View Towards Lake Elkhorn

Comm. Gardens

Page 13: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Local ConnectionsTamar Drive to Dobbin Center

View Along Utility Easement View Towards Utility Easement fromTamar Drive

Page 14: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Intersection Improvements

Mid-Block

Mid-Block Crossing of Old Montgomery Rd.

Mid-Block Crossing ofApril Brook Circle

(Skewed)Intersection of Columbia Rd.

@ Old Annapolis Rd.

Page 15: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Intersection ImprovementPrioritization Criteria (draft)• Intersection Type

(Standard or Mid-block)• Villages• Improvements Necessary

(Curb Ramp, Traffic Control, Signage & Crosswalk)• Number of Travel Lanes• Motor Vehicle Volumes

(High, Medium, Low)• Crash Rate (Roadway Crashes per Year)• Bus Stops within ¼ mile.• Proximity to Community Resources

(ie. Village Centers, Schools, Community Centers, Pools)

Page 16: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Project Goals, Objectives & OutcomesTo create a more interconnected bicycling and walking circulation

system in Columbia for health, recreational, and transportation purposes.

Objectives1. Increase the amount of bicycling and walking throughout Columbia

among people of all ages and abilities.2. Improve safety of the pathway system and increase connectivity to

key destinations.3. Ensure Columbia’s pathway network is easy to navigate.4. Coordinate this project with the County’s Bicycle Master Plan.

Outcomes1. Prioritized recommendations of pathway improvements.2. Programmatic/Procedural Recommendations.3. Improved Wayfinding, Maps & Digital Resources.4. Recommendations for County’s Bicycle Master Plan.5. Assessment of Motorized Use on Pathways

Page 17: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Next Steps

• Kick off Meeting• Public Open Houses (2)

January 2012

February 2012• Fieldwork

March 2012• Fieldwork (cntd.)• Motorized Access Review• Analysis of Fieldwork

• Development of Recommendations• Walk/Bike Tour (4/28)

April 2012

• Draft Agenda• Draft Recommendations Public

Meeting (5/23)

May 2012

• Final Agenda

June – July 2012

Page 18: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Tour Goals

Pathway design characteristics

Potential connections and improvements

Gain feedback on initial ideas for directional/informational signs along the pathways

Saturday April 28, 2012

Task Force Walking/Biking Tour

Draft – For Illustrative Purposes Only

Page 19: 2012-04-19-Columbia-Preliminary Recommendations Summary ...€¦ · Active Transportation Action Agenda Task Force April 19, 2012. Presentation Agenda 1. Project Status & Survey Results

Connecting ColumbiaAn Active Transportation Action Agenda

Project Update

Active Transportation Action Agenda Task ForceApril 19, 2012