2011_15_Details
1
Department of Electronics and Communication Engineering Date:________ STUDENT DETAIL: 2011 – 15 BATCH Name: Roll Number: CB.EN.U4. E________ 1. PLACEMENT DETAILS Company - 1 Company - 2 Company - 3 Company - 4 Company Name/ CTC Indicate the Company you intend to join 2. HIGHER STUDIES DETAILS TEST NAME SCORE RANK PERCENTILE GATE 2015 CAT 2014 GRE TOEFEL GMAT MAT IELTS * * *Any other test, make use of the last two rows. 3. INTERNSHIPS UNDER TAKEN 4. Paper Presentation (Other than the B.Tech Project related publication)/Awards Obtained 5. Admit Received from Universities for Higher Studies(Indicate Course) 6. Any other detail you wish to furnish Signature of the Student:
Transcript of 2011_15_Details
-
Department of Electronics and Communication Engineering Date:________
STUDENT DETAIL: 2011 15 BATCH
Name: Roll Number:
CB.EN.U4. E________
1. PLACEMENT DETAILS
Company -1
Company -2
Company -3
Company - 4
Company Name/ CTC
Indicate the Company you intend to join
2. HIGHER STUDIES DETAILS
TEST NAME SCORE RANK PERCENTILE GATE 2015 CAT 2014 GRE TOEFEL GMAT MAT IELTS *
*
*Any other test, make use of the last two rows.
3. INTERNSHIPS UNDER TAKEN
4. Paper Presentation (Other than the B.Tech Project related publication)/Awards Obtained
5. Admit Received from Universities for Higher Studies(Indicate Course)
6. Any other detail you wish to furnish
Signature of the Student: