Technical drawings Technical data S4 Statens vegvesen Submerged floating tunnel Lavik - Oppedal Parcel: Feasibility study for crossing the Sognefjord Project: Kvinnherad Municipality Region West 1. Draft November 2012 0 - 4083 : From - to profile : Sizing class: 80 km/t : Speed limit 4000 year 2032 Traffic basis (ADT) : Oppedal Lavik E 39 Sognefjorden 2000m 0 2000m 4000m 1:200000 Scale N

Transcript of 2011145371-ROO-R-01 Feasibility Study for Crossing the Sognefjord - Submerged Floating Tunnel -...

  • Technical drawings

    Technical data

    S4

    Statens vegvesen

    Submerged floating tunnel Lavik - OppedalParcel:Feasibility study for crossing the SognefjordProject:

    Kvinnherad Municipality

    Region West1. Draft November 2012

    0 - 4083:From - to profile

    :Sizing class:

    80 km/t:Speed limit

    4000 year 2032Traffic basis (ADT) :Oppedal

    LavikE 39

    Sognefjorden

    2000m 0 2000m 4000m

    1:200000Scale

    N

  • Page 1 of 2

    Tegn.nr.Revision

    Date

    1

    28.11.2012

    List no.

    RevisionStatens vegvesenSFT Lavik - OppedalConcept development of submerged floating tunnel Feasibility study for crossing the Sognejord Project:

    Drawing list

    RemarksIndexdate

    DrawingTitle

    Construction sequences - Pontoon installationY105Construction sequences - Towing of tunnelY104Construction sequences - Jointing of elements 2Y103Construction sequences - Jointing of elements 1Y102Construction sequence - Jointing of elements - Jetty and outrigger supportY101

    Submerged floating tunnel - Floating sequencesK211

    Submerged floating tunnel - Tunnel element n 1 - Isometric viewK203Submerged floating tunnel - Landfall element Lavik - Isometric viewK202Submerged floating tunnel - Element key planK201

    Concrete tubes - Element jointsK143Concrete tubes - Post tensioning - Landfall sectionK142Concrete tubes - Post tensioning - Typical sectionsK141

    Concrete tubes - Reinforcement layout - Bracings and cross tunnelsK133Concrete tubes - Reinforcement layout - Landfall sectionK132Concrete tubes - Reinforcement layout - Typical sectionsK131

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnnel - Landfall Lavik - Elevation and sectionsK113Submerged floating tunnnel - Landfall LavikK112Submerged floating tunnnel - Mid spanK111

    Submerged floating tunnnel - Typical sectionsK102Submerged floating tunnnel - General plan and elevationK101

    Normal profiles - Landfalls - Typical sectionsF102Normal profiles - Submerged floating tunnel - Typical sectionsF101

    Sognefjord SFT crossing - Navigation channelB102Sognefjord SFT crossing - OverviewB101

    Drawing listA102FrontpageA101

    A28.11.2012A28.11.2012A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012

    A28.11.2012A28.11.2012

    A28.11.2012A28.11.2012A28.11.2012A28.11.2012

  • Sea bed equidistance: 200mOverviewSognefjord SFT crossing

    B101

    Sognefjorden

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A1

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    OppedalLavik

    N250mHorizontal Scale

    0 500m 1000m

    1:25000

  • Sea bed equidistance: 200m

    B102

    Navigation channelSognefjord SFT crossing

    Suggested main ship routing based on Norvegian Coastal Directorates fairlead recommendations.

    Sognefjorden

    R = 3000

    m

    2400

    m

    (20)#

    3183

    .

    24

    m

    30

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A1

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    OppedalLavik

    N250mHorizontal Scale

    0 500m 1000m

    1:25000

  • F101

    2.

    1.

    REMARKS:

    3.

    4.

    5. Post - cladding fire protection

    6. Bridge railing (strength class H2)

    Wearing layer (75 mm)

    2

    Net cross - sectional area Ac = 37,4 m Submerged floating tunnel - General plan and elevation

    Submerged floating tunnel - Mid spanK110.

    Normal profilesSubmerged floating tunnelTypical sections

    Water ballast compartment

    Solid ballast compartment

    K111

    K101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    R 5500

    565

    517

    12600

    1:100

    Tunnel section 1

    200

    3003000300

    380050003800

    4 33

    5

    2 3.0%

    1550

    6

    3 000

    Cross tunnel

    = 8 m

    1:100

    3 000

    800

    R 6300

    4600

  • 5 582 5 582

    F102

    Typical sections

    2.

    1.

    REMARKS:

    3.

    4.

    5.

    Solid ballast compartment

    Water ballast compartment

    Post - cladding fire protection

    6. Bridge railing (strength class H2)

    Wearing layer (75 mm)

    2

    Net cross - sectional area Ac = 37,4 m Submerged floating tunnel - General plan and elevationK110.

    Normal profilesLandfalls

    K101

    K112 Submerged floating tunnel - Landfall Lavik

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    2 000

    End section

    6 000

    2 000

    500

    1:100

    4 530

    12101000 10001126

    300

    Grouted

    4600 565

    462

    450050004500

    14000

    1:100

    5

    2

    3 3

    3.0%

    1750350035001750

    6

    1550

    1000

    6000

    R

    7000

    R

    Tunnel section 2

    4

    3 000

    300 300

  • Horizontal scale

    200m 0 200m 400m

    1: 10000

    K101

    General plan and elevationSubmerged floating tunnel

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    Submerged floating tunnel - Mid spanK111

    Submerged floating tunnel - Landfall LavikK112

    11

    Lavik Oppedal

    MSL

    Elevation

    -20 m-12 m

    1:10000

    12 13 14 15 16 1710987654321 18

    1:10000

    Horizontal bracing

    Closure joints

    Plan

    Closure joints

    R

    =

    2682

    m

    Steel pontoon

    Concrete tube

    A

    AB

    B

    C

    C

    430150

    205205

    150205

    205

    205205

    205

    205

    150

    500

    205

    205

    150

    500

    740

    3700

    N

  • K102

    Typical sectionsSubmerged floating tunnel

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K102 - Submerged floating tunnel - Typical sections.dgn

    06:2

    3:5

    4

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    Section A - A Section B - B

    1 : 750Sections

    Section C - C

    Plan CPlan B

    1 : 750Plans

    Plan A

    Submerged floating tunnel - General plan and elevationK101

    MSL MSL MSL

    C CB BAA

  • K111

    Submerged floating tunnel

    Plan and elevationMid span

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    430

    150 150

    118 10

    26400 (min)26

    Steel shaft

    Concrete tube

    Steel pontoon

    9

    1:2000Elevation

    Ship channel

    MSL

    Min -20 m

    Plan 1:2000

    Concrete bracing

    80

    40

    12.6

    5

  • K112

    1:1000PlanPlanLandfall LavikSubmerged floating tunnel

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K112 - Submerged floating tunnel - Landfall Lavik - Plan.dgn

    06:0

    8:5

    0

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    1

    3

    20

    7

    5

    2

    142

    H

    14

    12,6

    D

    E

    F

    G

    F

    G

    H3

    50,5

    1

    1:250Detail H

    Closure joint

    Temp. support

    14

    12,6

    E

    D

  • Submerged floating tunnel

    K113

    Elevation and sectionsLandfall Lavik

    1. Temporary jacking point for positioning and locking during grouting

    K112 Submerged floating tunnel - Landfall Lavik - PlanK101 Submerged floating tunnel - General plan and elevation F102 Normal profiles - Landfalls - Typical sections

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    Section E - ESection F - F Section D -D1Section G - G

    DF E

    G

    G

    E DF

    Grouted

    Monolitic end joint

    Longitudinal section

    1:500

    Rock cut

    11

    tunnel

    Prefab. landfall element

    Temporary bulkhead

    M.S.L.

    CL

    1

    1:500

    Different cross sections

    Detail

    1:50

  • 10 638629

    5 000

    K121

    REMARKS:

    K110.

    1:100 1:100

    Axis 1+150 m to 18-150 m

    General tube section

    Axis 1 to 1+150 m / 17 to 18-150 m

    Landfall section

    Concrete tubesForm

    Typical sections

    Concrete tubes - Post-tensioning - Typical sectionsK141

    Concrete tubes - Reinforcement layout - Typical sectionsK131

    Submerged floating tunnel - Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    3 134

    1 000 500

    300

    1 000

    200

    1 104

    200

    5 060

    4 741

    6 30

    0

    R 5 500

    R

    800

    800

    300

    517

    500 5002 000500

    300 300

    500500 5002 000

    300 300

    CL tu

    nnel

    CL

    road

    COG

    (var.)

    (var.)

    VAR.

    6 00

    0

    R

    7 00

    0

    R

    CL tu

    nnel

    CL

    road

    520

    1 0001 000

    500

    300

    3 695

    5 000

    COG

    11 669

    1 000

    200

    1 258

    517

    1 000

    300 200

    VAR.

  • K131

    REMARKS:

    K110.

    1:100 1:100

    Lap splices to be fully staggered.Min. lap length for longitudinal reinforcement 32 is 1 200 mm.2.

    mm80: Inner face ballast compartments-mm45: Inner face main compartment)-mm70: Outer face-

    Concrete cover:1.

    kg/m3175: Type 2-kg/m3245: Type 1-

    Average reinforcement intensity:3.

    Concrete tubesReinforcement layoutTypical sections

    Axis 3 to 7 / 12 to 16

    Reinforcement layout - Type 2

    Axis 1+150 m to 3 / 7 to 12 / 16 to 18 -150 m

    Reinforcement layout - Type 1

    Concrete tubes - Post-tensioning - Typical sectionsK141

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnel - Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    16c200 BS

    232c200

    16c20016c20016c20016c200

    16c200

    16c200

    20c200

    25c200

    20c200

    16c200

    16c200

    16c200

    16c200T-head

    716c65

    20c200 16c400c40016c200c200

    Headed stirrups

    16c400c400

    25c200

    232c200

    16c200T-head

    16c200 BS

    32c200

    25c200

    32c200

    16c400c400

    20c200

    16c20016c20016c20016c200

    16c20016c200

    20c200

    25c200

    16c200

    16c200

    16c200

    16c200T-head

    716c65

    20c200 16c400c40016c200c200

    Headed stirrups

    16c200T-head

  • K132

    REMARKS:

    K110.

    1:100

    Lap splices to be fully staggered.Min. lap length for longitudinal reinforcement 32 is 1 200 mm.2.

    mm80: Inner face ballast compartments-mm45: Inner face main compartment)-mm70: Outer face-

    Concrete cover:1.

    Concrete tubesReinforcement layout

    kg/m3215: Landfall elements-Average reinforcement intensity:3.

    Reinforcement layout - Landfall elements

    Landfall section

    Concrete tubes - Post-tensioning - Landfall sectionK142

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnel - Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    16c200 BS

    232c200

    25c200

    16c400c400

    25c200

    232c200

    16c200 16c200 16c200 16c20016c200

    16c200

    16c200T-head

    16c20016c200

    16c200

    20c20020c200

    16c200T-head

    25c200

    16c200c200Headed stirrups16c400c40020c200

    716c65

  • K141

    REMARKS:

    K110.

    1:100 1:100

    Concrete tubes

    Typical sections

    Axis 1+150 m to 3 / 7 to 12 / 16 to 18-150 m

    Post-tensioning layout - Type 1

    Axis 3 to 7 / 12 to 16

    Post-tensioning layout - Type 2

    over 3 segment joints, average cable length is 90 m.using fixed multiplane coulpers. The couplers are staggered Longituinal cables are contiuous and stressed from one end 2.

    mm110:- 6-31 tendonsmm 90:- 6-19 tendons

    Sheat inner diameter ID:Metal sheats complying with EN 523 shall be used.1.

    kN4 210: 6-31 tendons-kN6 860: 6-19 tendons-

    exceed 0.95 x Fp0,1k:Maximum stressing force during stressing shall not 4.

    Hoop cables are stressed from both ends.3.

    1:50

    Post-tensioning layout

    Detail coupling of longitudinal PT

    Concrete tubes - Reinforcement layout - Typical sectionsK131

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnel - Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    712

    PT 6-31

    PT 6-19 c 1000

    R

    6

    005

    R

    6

    005

    R 68 040

    R 68 040 Active 6-19 multiplane anchorActive 6-19 multiplane anchor

    1 157

    PT 6-31

    PT 6-19 c 1000

    Active 6-19 multiplane anchorActive 6-19 multiplane anchor

    R

    6

    005

    R

    6

    005

    R 68 040

    R 68 040

    Segment / casting joint

    800

    Segment i+1Segment i

    Outer face 6-19 hoop tendons

    Fixed multiplane coupler6-31 tendon

    400

    288

    112

  • K142

    REMARKS:

    K110.

    1:100

    Concrete tubes

    Landfall sectionPost-tensioning

    over 3 segment joints, average cable length is 90 m.using fixed multiplane coulpers. The couplers are staggered Longituinal cables are contiuous and stressed from one end 2.

    mm110:- 6-31 tendonsmm 90:- 6-19 tendons

    Sheat inner diameter ID:Metal sheats complying with EN 523 shall be used.1.

    kN4 210: 6-31 tendons-kN6 860: 6-19 tendons-

    exceed 0.95 x Fp0,1k:Maximum stressing force during stressing shall not 4.

    Hoop cables are stressed from both ends.3.

    Post-tensioning layout - Landfall elements

    Concrete tubes - Reinforcement layout - Landfall sectionK132

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnel - Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    567

    PT 6-19 c 1000

    PT 6-31

    Active 6-19 multiplane anchor

    R

    6

    605

    R

    6

    605

    Active 6-19 multiplane anchor

    R 19 072

    R 19 072

  • K143

    REMARKS:

    K110.

    Concrete tubesPost-tensioning

    over 3 segment joints, average cable length is 90 m.using fixed multiplane coulpers. The couplers are staggered Longituinal cables are contiuous and stressed from one end 2.

    mm110:- 6-31 tendonsmm 90:- 6-19 tendons

    Sheat inner diameter ID:Metal sheats complying with EN 523 shall be used.1.

    kN4 210: 6-31 tendons-kN6 860: 6-19 tendons-

    exceed 0.95 x Fp0,1k:Maximum stressing force during stressing shall not 4.

    Hoop cables are stressed from both ends.3.

    Element joints

    1:100

    Section - Element joint

    Longitundinal section - Element joint

    1:50

    Concrete tubes - Post-tensioning - Typical sectionsK141

    Concrete tubes - Reinforcement layout - Typical sectionsK131

    Concrete tubes - Form - Typical sectionsK121

    Submerged floating tunnel -Typical sectionsK102

    Submerged floating tunnel - General plan and elevationK101

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    Element i+1Element i

  • Submerged floating tunnel

    F101

    Tunnel section 1

    K110.

    Pivot launching sequence

    = 0.5qStart rotation 1 = 0.2qApproaching 2 = 0qFinal position 3 Continuity cast4

    1: 2000

    1: 5000

    Element key plan

    P Permanent shaft

    T Temporary shaft

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    P

    T

    P

    P

    P

    P

    P

    PP

    P

    T

    T

    T

    T

    T

    T

    T

    T

    T

    P

    P

    P

    P

    P

    P

    P

    PP

    Tunnel elem

    ent n

    1

    Tunnel ele

    ment n

    2

    Tunnel elem

    ent n

    3

    Tunnel ele

    ment

    n 4

    Tunnel ele

    ment n

    5

    Tunnel element n

    6Tunnel element n 7

    L =

    268,17

    m

    L =

    308,7

    3 m

    L =

    308,73

    m

    L =

    264,66

    m

    L = 308,73

    m

    L = 308,73 m

    L = 264,74 m

    L =

    228,45

    m

    Landfall ele

    ment

  • 2. Temporary bulkhead

    1. Temporary shaft OD 8000mm

    3. Sliding support beam (pivot launching)

    K202

    Isometric viewLandfall element LavikSubmerged floating tunnel

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K202 Submerged floating tunnel - Landfall element Lavik - Isometric view.dgn

    03:4

    1:4

    3

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    2

    2 3

    1

    1

    1

    1

  • 2. Temporary bulkhead

    1. Temporary shaft OD 8000mm

    3. Sliding support beam (pivot launching)

    4. Access / escape tunnel

    K203

    Isometric viewTunnel element N 1Submerged floating tunnel

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\K203 - Submerged floating tunnel - Tunnel element no 1 - Isometric view.dgn

    03:4

    3:3

    3

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    1

    2

    2

    3

    1

    1

    1

  • Floating sequencesSubmerged floating tunnel

    K211

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Floating phases.dgn

    06:12:4

    5

    H

    12

    K001 A

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744SAH

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    1. Test submergence

    Displacement : 76000 tonnesDraft : 35 metersG.M : 2.1 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    2. Tow to site

    Displacement : 71000 tonnesDraft : 2 metersG.M : 0.8 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    3. Element assembly

    Displacement : 341000 tonnesDraft : 12.6 metersG.M : 1.0 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    6. Test submergence

    Displacement : 1050000 tonnesDraft : 32 metersG.M : > 30 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    5. In place installation

    Displacement : 1050000 tonnesDraft : 32 metersG.M : > 30 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    4. Tunnel assembly

    Displacement : 353000 tonnesDraft : 32 metersG.M : 1.7 meters Solid ballast : 30 - 35 m

    2

    Water ballast : 7 m2

    Cross sections 1:750

    Submerged floating tunnel - General plan and elevationK101

    MSL MSL MSL

    MSLMSLMSL

  • Y101

    Jetty and outrigger supportJointing of elementsConstruction sequences

    1:2000Plan

    A

    A

    B

    B

    Access road

    Access road

    Barge Wire bracing

    Jetty

    1:1000Section A - A : Jetty

    MSL

    MSL

    1:1000Section B - B : Outrigger support

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y101 Construction sequences - Jointing of elements - Jety and outrigger support.dgn

    03:5

    0:0

    4

    H

    12

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

  • 1000m0 500m250m

    Horizontal Scale 1:25000

    1 2 3 4 5 6 7 8 9 10 11 12

    A

    B

    C

    D

    E

    F

    G

    H

    Plottedato:

    29.11.2

    012

    06:36:2

    1

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y102 Construction sequences - Jointing of elements 1.dgn

    1 2 3 4 5 6 7 8

    Y10210 11

    H

    12

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    A

    B

    C

    D

    E

    F

    G

    9

    Remarks

    A

    1

    2

    Tunnel, length = 1200m

    B Tunnel, length = 1200m

    Quay, see drawing Y101

    Barge, see drawing Y101

    Jointing of elements 1Construction sequences

    Step 1

    Sea Land

    1 2

    Step 2

    Sea Land

    A

    Step 3

    Sea Land

    B

    A

    N

  • 1000m0 500m250m

    Horizontal Scale 1:25000Remarks

    A

    1

    2

    Tunnel, length = 1200m

    B Tunnel, length = 1200m

    C Tunnel, length = 1200m

    Y103

    Jointing of elements 2Construction sequences

    Quay, see drawing Y101

    Barge, see drawing Y101

    Step 4

    Sea Land

    A

    C

    B

    Step 5

    Sea Land

    Tow to site

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    H

    12

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    Project no.

    Issued for client approval

    N

  • Y104

    Towing of tunnelConstruction sequences

    ASAHSAHARP

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y106 Construction - Installation.dgn

    04:2

    8:3

    8

    H

    12

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the SognefjordDrawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    1

    Oppedal

    Lavik

    Joint

    Joint

    B

    A

    2

    3

    45

    2000m0 1000m500m

    Horizontal Scale 1:50000

    N

  • 2.

    1. Pontoons are installed after the tunnel has been installed

    tonnes:Total weight of pontoon

    Y105 ASAHSAHARP

    Pontoon InstallationConstruction sequences

    1 2 3 4 5 6 7 8 9 10 11 12

    1 2 3 4 5 6 7 8 9 10 11

    A

    B

    C

    D

    E

    F

    G

    H

    A

    B

    C

    D

    E

    F

    G

    Plottedato:

    29.11.2

    012

    Filnavn: L:\offshore_industri\117xx\11744 Kryssing av Sognefjorden - Mulighetsstudie rrbru\Aktiviteter\8 Tegninger og beskrivelse\Tegninger\A3 tegninger\A3 new\Y107 Pontoon installation.dgn

    06:0

    0:26

    H

    12

    Rev. Approved Rev. date

    File no.

    Drawing date

    Project number

    PROF number

    File number

    Approved by

    A SAH 2012-11-28

    -

    -

    -

    -

    -

    -

    As shown

    11744

    Prosesskode 2, Hndbok 26 2007Hndbok 185 Eurocode ed. 2011

    B500NC (NS 3576-3)

    Y-1860-S7 (EN 10138-3)

    Standards / provisions:

    Execution class:

    Reinforcement:

    Statens vegvesen

    Lidvard Skorpa

    ARP SAH

    2011145371

    Region vest

    Feasibilitystudy for crossing the Sognefjord

    REMARKS: REFERENCES:Drawn by Checked

    Lavik - OppedalConcept development of Submerged Floating Tunnel

    Drawn by Checked by

    Scale A3

    Building code

    Originator:

    Client rep.

    Produced for

    Description

    Revision indexDrawing number /

    EXC 3

    Concrete:

    Mix specification SV-40Durability class MF40Concrete grade B55

    Post-tensioning:

    Project no.

    Issued for client approval

    1:1000Pontoon installation

    1:1000Final position

    MSL MSL

    A101 FrontpageA102 Drawing listB101 Sognefjord SFT crossing - OverviewB102 Sognefjord SFT crossing - Navigation channelF101 Normal profiles - Submerged floating tunnel - Typical sectionsF102 Normal profiles - Landfalls - Typical sectionsK101 Submerged floating tunnel - General plan and elevationK102 Submerged floating tunnel - Typical sectionsK111 Submerged floating tunnel - Mid span - Plan and elevationK112 Submerged floating tunnel - Landfall Lavik - PlanK113 Sub floating tunnel - Landfall Lavik - Elevation and sectionsK121 Concrete tubes - Form - Typical sectionsK131 Concrete tubes - Reinforcement layout - Typical sectionsK132 Concrete tubes - Reinforcement layout - Landfall sectionK141 Concrete tubes - Post-tensioning - Typical sectionsK142 Concrete tubes - Post-tensioning - Landfall sectionK143 Concrete tubes - Post-tensioning - Element jointsK201 Submerged floating tunnel - Element key planK202 Submerged floating tunnel - Landfall element Lavik - Isometric viewK203 Submerged floating tunnel - Tunnel element no 1 - Isometric viewK211 Submerged floating tunnel - Floating sequencesY102 Construction sequences - Jointing of elements 1Y103 Construction sequences - Jointing of elements 2Y104 Construction sequences - Towing of tunnelY105 Construction sequences - Pontoon Installation