2011 Trevi Towers

download 2011 Trevi Towers

of 32

Transcript of 2011 Trevi Towers

  • 8/4/2019 2011 Trevi Towers

    1/32

  • 8/4/2019 2011 Trevi Towers

    2/32

  • 8/4/2019 2011 Trevi Towers

    3/32

    EDSA

    ARNAIZ AVENUE (PASAY ROAD)

    MRT STATION

    (MAGALLANES)

    MRT STATION

    (AYALA)

  • 8/4/2019 2011 Trevi Towers

    4/32

    5,000 sqm

  • 8/4/2019 2011 Trevi Towers

    5/32

    Masterplanned by the world-renowned design firm,

    PROJECT CONCEPT

    ISO 9001 AND ISO 14001 Certified

    TUV (Germany) Certified

    Awardee, BD Magazine Top 200 Architectural Firms in the

    World

  • 8/4/2019 2011 Trevi Towers

    6/32

    Three residential towers on top of a five-levelcommercial structure

    5-level parking complex 5-level mall and shopping center 5,000 sqm state-of-the art Amenities & Garden

    Complex

    PROJECT CONCEPT

    A mix-use development in Makati with completefeatures and amenities offered at affordable prices

    MAIN FEATURES

  • 8/4/2019 2011 Trevi Towers

    7/32

    Tower 1 378 units ( 28 floors )Tower 2 540 units ( 37 floors )Tower 3 306 units ( 24 floors )

    Height ofTower 1 96.00mTower 2 125.00mTower 3 83.00m

    * From road line

    SouthExpress

    way

    ChinoR

    oces(Paso

    ngTamo)

  • 8/4/2019 2011 Trevi Towers

    8/32

    What are the amenities that canbe enjoyed?

    health club, swimming pool, outdoorfitness center, garden patio, childrens

    playground, function areas

    > Pool size - 100.00sqm

  • 8/4/2019 2011 Trevi Towers

    9/32

    Amenities & Garden Center

  • 8/4/2019 2011 Trevi Towers

    10/32

  • 8/4/2019 2011 Trevi Towers

    11/32

    STRUCTURAL MEASUREMENTS

    Distance between buildings: 7.50m - 8.50m

    Vertical ClearanceGround-4.0m2nd-5th 3.5m

  • 8/4/2019 2011 Trevi Towers

    12/32

    slab soffitbeam soffit

    FLOOR-TO-CEILING HEIGHT

    Floor to slab - 2.80mFloor to Beam - 2.40m

  • 8/4/2019 2011 Trevi Towers

    13/32

    TOWER 1

    378 Units2 passenger elevators

    18 units per floor

    South

    Expressw

    ay

  • 8/4/2019 2011 Trevi Towers

    14/32

    TOWER 2

    540 Units3 passenger elevators

    18 units per level

    SouthExpressway

  • 8/4/2019 2011 Trevi Towers

    15/32

    18 units per level

    Tower 3

    306 Units3 Passenger elevators

    ChinoRoc

    es(Pasong

    Tamo)

  • 8/4/2019 2011 Trevi Towers

    16/32

    Typical20.40sqm (middle unit)

    What are the different types andaverage sizes of the units?

  • 8/4/2019 2011 Trevi Towers

    17/32

    Typical21.00sqm (studio unit)

  • 8/4/2019 2011 Trevi Towers

    18/32

    Typical31.23sqm (corner unit)

  • 8/4/2019 2011 Trevi Towers

    19/32

    UNIT DELIVERY

    Ceramic Floor Tiles

    Unglazed Ceramic floor tiles @ T&B Painted Finish Walls Granite Counter @ Kitchen w/ under counter

    built-in cabinet Sliding Flush Door @ Bedroom

    ACU Provision only Aluminum Sliding Window Individual electric meter per unit (located at the

    electrical room near fire exit)

    Individual water meter per unit (located alongthe corridor)

  • 8/4/2019 2011 Trevi Towers

    20/32

    CHB between units,Dry wall w/in unit

    What kind of materials is used forthe walls in between rooms and inbetween units?

  • 8/4/2019 2011 Trevi Towers

    21/32

    COMMERCIAL UNITS

    TOWER 3

  • 8/4/2019 2011 Trevi Towers

    22/32

    Tower 3Ground FloorTotal Units = 21

    ( Pasong Tamo Entrance)

    Suggested type of store:-fastfood chain,

    -banks,-convenient store

  • 8/4/2019 2011 Trevi Towers

    23/32

    Tower 3Second FloorTotal Units = 25

    Suggested type of store:-fastfood chain,

    -book store

  • 8/4/2019 2011 Trevi Towers

    24/32

    Tower 33rd FloorTotal Units = 25

    Suggested type of store:-dry goods,-music store,-internet/computer shop

  • 8/4/2019 2011 Trevi Towers

    25/32

    Tower 34th FloorTotal Units = 25

    Suggested type of store:-office space

  • 8/4/2019 2011 Trevi Towers

    26/32

    FREQUENTLY ASKED

    QUESTIONS

  • 8/4/2019 2011 Trevi Towers

    27/32

    Does a unit comes with air-conditioningunits?

    No, provisions only.

    Covered with Ficemboardwindow type

    Is there exhaust for kitchen?

  • 8/4/2019 2011 Trevi Towers

    28/32

    Is there exhaust for kitchen?Is it ducted?

    Ducted Kitchen exhaustlocated above the

    counter

    Yes

    Granite Color type

    Kitchen counter

  • 8/4/2019 2011 Trevi Towers

    29/32

    Is there a power backup?

    Yes, generator will be utilized as astandby power source. Common

    areas have 100% power while eachresidential unit will provide limitedpower for basic appliances.

    Where will be the water tank

    located? Located at the roof deck of every

    building

    What are the safety features of the

    building? Fire Detection & Alarm System Fire Escape Stairs Fire Rated Residential Floors Sprinkler System at common areas

  • 8/4/2019 2011 Trevi Towers

    30/32

    When is the completion of theproject?

    Dec 2010-Tower 1 Dec 2013-Tower 2 1st Half 2014-Tower 3

    How much is the Reservation Fee? Parking 10,000 Below 3M 25,000 3M to 6M 40,000

  • 8/4/2019 2011 Trevi Towers

    31/32

    PAYMENT TERMS

    Payment Term - 20% Equity, 80% Balance20% - payable in 36 months, 0% interest80% - payable thru Bank / In-House Financing

    TOWER 2

  • 8/4/2019 2011 Trevi Towers

    32/32

    PAYMENT SCHEMES

    TOWER 3

    Payment Term - 40% Equity, 60% Balance40% - payable in 48 months, 0% interest60% - payable thru Bank / In-House Financing