    Pile DrivingPile Driving

    EquipmentEquipment

    2011 PDCA Professor Pile Institute

    Patrick Hannigan

    GRL Engineers, Inc.

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    2/51

    Pile Driving System ComponentsPile Driving System Components

    PrimaryPrimaryComponents:Components:

    CraneCraneLeadsLeadsHammer Hammer HelmetHelmet

    CushionsCushionsPile GatePile Gate

    ComponentsComponentsRequired inRequired in

    Special Cases:Special Cases:

    TemplateTemplateFollower Follower 

    Jetting quipmentJetting quipment!rilling quipment!rilling quipmentSpudding quipmentSpudding quipment

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    3/51

    Pile

    Hammer 

    Lead

    Helmet

    "oom

    Crane

    Spotter 

    Pile Gate

    Pile Driving SystemPile Driving System

    #on$ey

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    4/51

    "oom

    Crane

    Pile

    Hammer 

    Lead

    Helmet

    Pile Gate Sta%%ingPoints

    Swinging LeadSwinging Lead

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    5/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    6/51

    uropean or Truss Leaduropean or Truss Lead

    Hammer 

    Lead

    Swinging LeadSwinging Lead

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    7/51

    Pile

    Hammer 

    Lead

    Helmet

    "oom

    Cran

    Spotter 

    Pile Gate

    Fixed LeadFixed Lead

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    8/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    9/51

    "oom

    Cra

    Pile

    Hammer 

    Lead

    Helmet

    Template "arge

    Guide

    Offshore LeadOffshore Lead

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    10/51

    TemplatesTemplates

    Pre(a%ricated or site constructed steel (ramePre(a%ricated or site constructed steel (rame

    into which piles are set to hold piles in theinto which piles are set to hold piles in the

    proper position ) alignment during dri*ing+proper position ) alignment during dri*ing+

    Typically used when o((shore leads orTypically used when o((shore leads or

    swinging leads are used o*er water+swinging leads are used o*er water+

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    11/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    12/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    13/51

    ammer Typesammer Types

    !rop!rop

    &ir &ir 

    !iesel!iesel

    HydraulicHydraulic

    !ou%le acting!ou%le acting

    Single actingSingle acting

    !i((erential acting!i((erential acting

    !ou%le acting ,closed end-!ou%le acting ,closed end-

    Single acting ,open end-Single acting ,open end-

    !ou%le acting!ou%le acting

    Single actingSingle acting

    #ost Common#ost Common

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    14/51

    Drop ammersDrop ammers

    FeaturesFeatures

    CommentsComments

    • Low equipment cost

    • Simple

    • Slow operation

    • .nconsistent stro$e

    Ram raised %y crane line

    ((iciency o( drop controlled

    %y operator and system

    l

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    15/51

    Single !"tingSingle !"ting!ir ammers!ir ammers

    FeaturesFeatures

    CommentsComments

    &ir pressure/ *olume/ and soilresistance can in(luence actual stro$e

    %y as much as 0 to 1 inches

    'ternal compressor supplies power 

    Stro$e controlled %y 2 or 3 slide %ar

    setting: 0 (t/ 0 or 4 (t/ 3 or 5 (t

    Relati*ely hea*y ram/ short stro$e

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    16/51

    Helmet Helmet 

    RamRam

    PistonPiston

    Single-Acting Air/SteamSingle-Acting Air/SteamHammer OperationHammer Operation

    PilePile

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    17/51

    Dou#le !"ting !ir ammerDou#le !"ting !ir ammer Differential !"ting !ir ammDifferential !"ting !ir amme

    l li l ! i Di l

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    18/51

    FeaturesFeatures

    CommentsComments

    Stro$e depends on:

    •  (uel input•  pile sti((ness

    •  soil resistance

    6aria%le (uel settings

     Potential energy 7 8h

    Single !"ting Diesel ammersSingle !"ting Diesel ammers

    #ost common hammer type

    Relati*ely light ram/ long stro$e

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    19/51

    Single &cting !iesel Hammer 9perationSingle &cting !iesel Hammer 9peration

    a- Trippinga- Tripping %- Fuel%- Fuel

    .nection.nection

    c- Compressic- Compressi

    ; .mpact; .mpact

    Si l & ti !i l H 9 tiSi l & ti !i l H 9 ti

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    20/51

    Single &cting !iesel Hammer 9perationSingle &cting !iesel Hammer 9peration

    d- 'plosiond- 'plosion e- 'hauste- 'haust (- Sca*enging(- Sca*enging

    F l l

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    21/51

    Controlling (uel quantity can help adust stro$e height+

    Fuel $nput ControlFuel $nput Control

    Continuously *aria%leContinuously *aria%le Fi'ed settingsFi'ed settings

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    22/51

    Ram ; stro$eRam ; stro$e

    H 2 ,1> ? "P#-H 2 ,1> ? "P#-33 @ > @ >

    D #l ! ti Di lD #l ! tin Di l

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    23/51

    Dou#le !"ting DieselDou#le !"ting Diesel

    d li d li mm

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    24/51

    FeaturesFeatures

    CommentsComments

    #ost models ha*e energy readout

    'ternal hydraulic power source

    ydrauli" ammersydrauli" ammers

    .ncreasing in usage

    Relati*ely hea*y ram/ short stro$e

    6aria%le and controlla%le stro$e

    Some models wor$ underwater 

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    25/51

    ingle Actingingle Acting Dou!le ActingDou!le Acting

    ydrauli"ydrauli"

    ammerammerS"hemati"sS"hemati"s

    d li mmydrauli" ammers

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    26/51

    9%ser*e stro$e9%ser*e stro$e

    ydrauli" ammersydrauli" ammers

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    27/51

    #ost hydraulic#ost hydraulic

    hammers ha*ehammers ha*e%uilt;in monitors%uilt;in monitors

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    28/51

    HydraulicHydraulic

    hammerhammerdesigned (ordesigned (or

    low headroomlow headroom

    operationoperation

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    29/51

    elmetselmets

    • Con(iguration and siAe depends upon theCon(iguration and siAe depends upon thelead type/ hammer type ) siAe/ as well aslead type/ hammer type ) siAe/ as well as

    the pile typethe pile type

    • Helmets should (it loosely/ appro'imatelyHelmets should (it loosely/ appro'imately3 to 4 mm ,>+2 to >+3 inches- larger than3 to 4 mm ,>+2 to >+3 inches- larger than

    pile diameter pile diameter 

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    30/51

    triker Plate

     A"a#ter 

    Hel$et

    Pile Cus%ion&concrete #ile'

      Ha$$er Cus%ion

    (o) Lea" Gui"e*a+

    elmet Componentselmet Components

    P P P l lO Pi Pi Pil l

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    31/51

    One Pie"e Pipe Pile elmetOne Pie"e Pipe Pile elmet

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    32/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    33/51

    ammer Cushionsammer Cushions

    #aterials placed %etween the pile hammer

    ram and the helmet to relie*e impact

    shoc$ and there%y protect the hammer

    while at the same time transmit consistent

    energy to the pile

    ammer Cushionsammer Cushions

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    34/51

    Con%est ,Phenolic (i%er-Con%est ,Phenolic (i%er-

    and aluminum platesand aluminum plates

    &luminum and #icarta&luminum and #icarta"lue Bylon"lue Bylon

    ammer Cushionsammer Cushions

    %pile elmet and%pile elmet and

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    35/51

    %pile elmet and pile elmet andammer Cushion Se"tionammer Cushion Se"tion

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    36/51

    Pile CushionsPile Cushions

    • Concrete piles require a pile cushion %etween theConcrete piles require a pile cushion %etween thehelmet and the pile leadhelmet and the pile lead

    • Typically made o( plywood/ hardwood/ plywood )Typically made o( plywood/ hardwood/ plywood )

    hardwood composites/ or other man;made materialshardwood composites/ or other man;made materials

    • Typical thic$ness 5 inches ,min- to 23 inches orTypical thic$ness 5 inches ,min- to 23 inches ormoremore

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    37/51

    Pile CushionsPile Cushions

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    38/51

    Can sto# "riingCan sto# "riing

    an" re#lace #ilean" re#lace #ile

    cus%ion if nee" toif nee" tocontinue "riingcontinue "riing

    Pile CushionsPile Cushions

    Pile cus%ionPile cus%ion"eteriorating after"eteriorating after

    2,000 !lo*s2,000 !lo*s

    Pile CushionsPile Cushions

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    39/51

    Bew 7 inchesBew 7 inches

    Pile CushionsPile Cushions

    25>> %lows later 25>> %lows later 

    7 4+4 inches7 4+4 inches

    Pile cushionPile cushion

    thic$ness changesthic$ness changes

    during dri*ingduring dri*ing

    Pil S l tiPil S l ti

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    40/51

    Pile ammer Sele"tionPile ammer Sele"tion

    • .mportant (or the Contractor ) ngineer to esta%lis.mportant (or the Contractor ) ngineer to esta%lisoptimumoptimum  hammer siAe (or a o% hammer siAe (or a o%

    • Too small a hammer may not %e a%le to dri*e theToo small a hammer may not %e a%le to dri*e thepile to the required capacitypile to the required capacity

    • Too large a hammer may damage the pileToo large a hammer may damage the pile

    • "est tool (or hammer selection is a wa*e equation"est tool (or hammer selection is a wa*e equationanalysis+analysis+

    $nstallation !ids$nstallation !ids

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    41/51

    $nstallation !ids$nstallation !ids

    FollowersFollowers

    JettingJetting

    PredrillingPredrilling

    SpuddingSpudding

    Dsed to sa*e pile lengthDsed to sa*e pile length

    Dsed to penetrate dense granular layersDsed to penetrate dense granular layers

    Dsed in cohesi*e soils ? em%an$mentsDsed in cohesi*e soils ? em%an$ments

    Dsed in de%ris (illsDsed in de%ris (ills

    F llF ll

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    42/51

    FollowersFollowers

    • .s a mem%er interposed %etween a pile hammer.s a mem%er interposed %etween a pile hammer

    and a pile to transmit %lows when the pile head isand a pile to transmit %lows when the pile head is

    %elow the reach o( the hammer %elow the reach o( the hammer 

    • Dse o( a (ollower is accompanied %y a loss o(Dse o( a (ollower is accompanied %y a loss o(

    energy deli*ered to the pile due to compressionenergy deli*ered to the pile due to compression

    o( the (ollower ) losses in connectiono( the (ollower ) losses in connection

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    43/51

    & tti& tti

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    44/51

    &etting&etting

    • The use o( a water or air et to (acilitateThe use o( a water or air et to (acilitatepile dri*ing %y displacing parts o( the soilpile dri*ing %y displacing parts o( the soil

    • Jetting is use(ul in dri*ing piles throughJetting is use(ul in dri*ing piles through*ery dense granular material*ery dense granular material

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    45/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    46/51

    $nternal$nternal

    PilePileCleanoutCleanout

    P d illiPredrillin

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    47/51

    PredrillingPredrilling

    • Soil augers or drills used where etting isSoil augers or drills used where etting isinappropriate ? ine((ecti*e toinappropriate ? ine((ecti*e to

    ; Penetrate o%structions/ %oulders/ de%ris (ills; Penetrate o%structions/ %oulders/ de%ris (ills

    ; Facilitate pile placement through em%an$ments; Facilitate pile placement through em%an$ments; Reduce ground mo*ements; Reduce ground mo*ements

    • Predrilled hole diameter 5 inches less thanPredrilled hole diameter 5 inches less thandiagonal o( square pile/ or 2 inch less thandiagonal o( square pile/ or 2 inch less than

    diameter o( round pilediameter o( round pile

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    48/51

    SpuddingSpudding

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    49/51

    SpuddingSpudding

    • The act o( opening a hole through denseThe act o( opening a hole through densematerial %y dri*ing or dropping a short )material %y dri*ing or dropping a short )

    strong mem%er ) then remo*ing itstrong mem%er ) then remo*ing it

    • Dsed as an alternate to etting orDsed as an alternate to etting orpredrilling in upper soil consisting o(predrilling in upper soil consisting o(

    miscellaneous (illmiscellaneous (ill

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    50/51

  • 8/18/2019 2011 Pdca Pile Driving Equipment

    51/51

    Any QuestionsAny Questions