2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

11
2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION

Transcript of 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

Page 1: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

MAINTENANCE CENTER ALBANY

MSgt Watkins

INTRODUCTION

Page 2: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Maintenance Center Albany MFCS Management Team

Program Management Branch Head: Harold Eidson Project Section Supervisor: Blase Goodman Project Lead: Jim Clanton Planner/Estimator: Rob Tyler Industrial Engineering Tech: Keith Hamsley MFP Liaison: MSgt Watkins Assistant MFP Liaison: SSgt Collins Contractor Service Support: Kevin Adams

MCA MFCS TEAM

Page 3: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Assets Completed FY11

Mobile Facilities: (5) JU-01s (8) JF-05s – Army Assets (5) KA-31s (1) AM-01 (1) CA-01 (1) CA-04 (1) SU-03

TQGs: (28) Preserved in an ‘RFU’ status

PRODUCTION

Page 4: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Assets in Process/Scheduled FY11:

SCHEDULE

Page 5: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Assets in Process/Scheduled FY11:

TQGs: (51) Preservation for ‘RFU’ status (3) Repair

Lift-Off Hinge: (28) Cast hinges due in August Send to Marine Container for CSC testing

SCHEDULE

Page 6: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

ROC LOC REMOVAL

ROC LOC Removal/Storage Video

Page 7: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

ROC LOC INSTALL

ROC LOC Install Video

Page 8: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

LIFT-OFF HINGE VIDEO

LIFT-OFF HINGE VIDEO

Page 9: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Issues/Concerns

Parts Issues Obsolete parts No longer required items in MF configurations

Fleet Returned MFs:

• SOMFs panels need to be securely fastened

• Naval Messages need to annotate what is missing from the inventory.

Fleet Assistance:

• For information

• For missing assets

ISSUES/CONCERNS

Page 10: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

Maintenance Center Albany MFCS Team POCs

Project Lead: Jim Clanton• 229-639-7477

Planner/Estimator: Rob Tyler• 229-639-6834

Industrial Engineering Tech: Keith Hamsley• 229-639-7470

MFP Liaison: MSgt Watkins• 229-639-9060 (DSN: 567)

Assistant MFP Liaison: SSgt Collins• 229-639-7207 (DSN: 567) Contactor Service Support: Kevin Adams• 229-639-7061 (DSN: 567)

MCA MFCS TEAM POCS

Page 11: 2011 MF LRG New Orleans, LA MAINTENANCE CENTER ALBANY MSgt Watkins INTRODUCTION.

2011 MF LRG New Orleans, LA

1111

ARE THERE ANY QUESTIONS?

QUESTIONS