2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by...
-
Upload
annie-tubman -
Category
Documents
-
view
213 -
download
1
Transcript of 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by...
![Page 1: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/1.jpg)
2011-2015 Revitalization Plan
![Page 2: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/2.jpg)
Revitalization Plan 2011-2015GoalsIncrease homeowner value by continuing to Invest in
both infrastructure and curb appeal elements on an ongoing basis.
Ongoing roofing replacement HVAC system upgrades/replacement Landscape, Xeriscape, and hardscape replacement Exterior building appearance (Painting & stucco
repair))Increase the focus on both energy and water
conservation initiatives to reduce operating cost. Avoid the need for large special assessments & HOA
fee increases by working on projects in “stages”Increase the number of Owner/Occupants by a
minimum of 10 % during the plan period (2011-2015)
![Page 3: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/3.jpg)
2011
Finalize and adopt a methodology for replacing the HVAC system and begin phase 1 of implementation (buildings J, K, L, M , N ,O)
Continue replacement of highest priority roofs (Bldg T-1,3, 5 Bldg Z-4,5,6,7)
Develop a new security/camera recommendation.Continue wooden step replacement (Entrance 1 & 4)Re-line stream and falls at main entrance (Water
conservation)Begin phase 1 of asphalt replacement at main entranceReplace selected retaining walls Repair/Recover Balcony Rooftops “Dog Houses” Resurface Swimming Pool Develop comprehensive /landscape plan. (water
conservation)
![Page 4: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/4.jpg)
A few 2011 Projects
![Page 5: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/5.jpg)
2012Continue replacement of highest priority roofsContinue wooden step replacement (Entrance 1 & 4)Replace selected retaining walls Replace selected sidewalk trip hazardsPhase 1 entrance light replacement with photocell
fixtures (Conserve electricity)Improve property drainage as needed. Install security cameras based on recommendationBegin Phase 1 landscape/xeriscape recommendation.
![Page 6: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/6.jpg)
2013
Begin phase 2 of HVAC replacement strategy (Buildings P,Q,R,S G,H,I)
Continue replacement of highest priority roofs (K-4,5,L-1 H-2, 3, I-1,2)
Begin Phase 2 asphalt replacement Entrance 1 (south and east of parking structure)
Continue wooden step replacement (Entrance 1 & 4)
Replace selected retaining wallsReplace selected sidewalk trip hazardsBegin phase 2 of landscape/xeriscape plan.
![Page 7: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/7.jpg)
2014Continue replacement of highest priority
roofs (buildings O-1,3,5, C-2,3,5)Begin Phase 2 asphalt replacement Entrance
1 (south and east of parking structure)Replace selected retaining walls Begin PHASE 1 exterior painting (buildings
A, B, C, AA, W, X, Y, Z)Begin phase 2 of landscape/xeriscape plan.
![Page 8: 2011-2015 Revitalization Plan. Revitalization Plan 2011-2015 Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.](https://reader036.fdocuments.us/reader036/viewer/2022070306/5519c83f55034649768b45aa/html5/thumbnails/8.jpg)
2015Begin phase 3 of HVAC replacement strategy
Buildings T,U,V,W,X,YContinue replacement of highest priority
roofs BB -1,3,4,6, N-2,3Replace selected retaining walls Begin phase 3 of Landscape/xeriscape plan.Begin phase 2 exterior painting buildings K,
L, M, N, O, PResurface upper deck parking garage