2010 Recap Third consecutive year of negative absorption Warehouse/distribution vacancy stabilized...
-
Upload
ernesto-blackiston -
Category
Documents
-
view
213 -
download
0
Transcript of 2010 Recap Third consecutive year of negative absorption Warehouse/distribution vacancy stabilized...
2010 Recap Third consecutive year of negative
absorption
Warehouse/distribution vacancy stabilized
Construction remained nonexistant
INDUSTRIAL
IndustrialEd Brown, CCIM, SIORNAI Carolantic Realty
2011 Triangle NC-CCIM Commercial Real Estate Market Forecast
Networking. Education. Technology.
TRIANGLE INDUSTRIAL OVERVIEWEd Brown, SIOR, CCIMNAI Carolantic Realty
March 16, 2011
LOOK BACK TODAY PREDICITIONS
1996 4Q
1997 4Q
1998 4Q
1999 4Q
2000 4Q
2001 4Q
2002 4Q
2003 4Q
2004 4Q
2005 4Q
2006 4Q
2007 4Q
2008 4Q
2009 4Q
2010 4Q
10.61%11.50%
18.40%
11.90%
13.80%
19.60%21.00%
27.20%
25.30%
20.90%
12.50%
14.80%
17.30%
20.30% 20.80%
WAREHOUSE VACANCY
SUBLEASE SPACE
2001 4Q
2002 4Q
2003 4Q
2004 4Q
2005 4Q
2006 4Q
2007 4Q
2008 4Q
2009 4Q
2010 4Q
883,000
669,000
163,000219,000 224,000
438,000
1,446,000
876,000
1,300,000
824,000
ABSORPTION
Series1139,000
342,000 338,000
141,000257,000
1,830,000
265,000
278,000
58,000179,000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
4Q 4Q 4Q 4Q 4Q 4Q 4Q 4Q 4Q 4Q
LEASING ACTIVITY IN THE THREE LARGEST SUBMARKETS
Series1
894,687
248,145
303,571
151,374
61,302
743,677
181,232
88,770107,614
45,053
87,130179,261
20,857
565,831
34,094
RTP EAST WAKE NORTH RALEIGH/US1
2006 2007 2008 2009 2010
2005 4Q 2006 4Q Empire
2007 4Q Sweet Paper
(80k)
2008 4Q Owens & Minor
2009 4Q Impulse
2010 4Q Impulse
0
235,000
100,000
150,000
260,000
50,000
CONSTRUCTIONNO SPEC – ALL BUILD TO SUIT
ADVERTISED RENTAL RATESAnnualized
2000 2005 2010 Increase
900 Aviation Pkwy (30’) $3.75 $3.50 $4.00 0.67%
Edinburgh Place (30’) $4.10 $4.10 $5.25 2.8%
Bedford Place (30’) $4.50 $3.75 $5.25 1.7%
Tri-Center SouthVIII (30’) $4.25 $4.25 $4.95 1.6%
Tri-Center South II (24’) $3.90 $3.75 $4.75 2.2%
Keystone A (24’) $4.15 $3.50 $4.50 0.8%
Walnut Creek III (24’) N/A $4.55 $4.95 2.0%
Greenfield 800 (30’) N/A $4.25 $4.95 3.3%
1.88%
AVERAGE
TRIANGLE INDUSTRIAL OVERVIEW
LOOK BACK TODAY PREDICITIONS
Ed Brown, SIOR, CCIMNAI Carolantic Realty
March 16, 2011
TOTAL VACANCY & SIZE
DESCRIPTION %VACANT SIZE/VACANT
Total Direct 20.8% 25.3m / 5.2 m
Total w/o Durham Tobacco 17.7% 24.1m / 4.3 m
Direct & Sublease 24.1% 25.3m / 6.1 m
SUBMARKET VACANCY & SIZEDESCRIPTION %VACANT SIZE/
VACANT
Largest Submarket – RTP 9.3% 10.3m / 960k
2nd Largest Submarket – East Wake 24.6% 5.2m / 1.2m
3rd Largest Submarket – North Raleigh/US1 34.1% 3.9m / 1.3m
Lower Costs / Trade UpMOVE OUT OF MOVE IN TO
Beavex $6.95/sf Flex to $4.50/sf Warehouse31,000SF
Eaton $6.95/sf Flex to $4.50/sf Warehouse42,000SF
Coca-Cola 1950’s Facility to Modern 30’ Clear250,000SF
Document Storage Old 18’ Clear to Modern 30’ Clear100,000SF
Equipment Rental $7.50/sf Flex to $3.75/sf Warehouse40,000sf
MARKET ACTIVITY USE LATERAL MOVE NEW ABSORPTION ODDS
Document Storage 100,000sf 90%
Equipment 60,000sf 70%
Rental Co. 40,000sf 80%
Printing 70,000sf 60%
Medical 60,000sf 90%
Food 70,000sf 60%
Electronics 40,000sf 70%
Manufacturer 20,000sf 80%
Furniture 60,000sf 90%
200,000sf 320,000sf
NEGATIVE ASORPTION 2011Keystone 88,000sf
Two tenants downsize
Imperial Center 40,000sf Closes
180,000sf New Sublease
Tri-Center South 85,000sf Sublease goes direct
32,000sf move to Creedmoor
Tri-Center North 170,000sf direct to shadow space
Weck Drive 168,000sf recycler downsizes
2100 Harrod 89,000sf moves out
681,000sf
BUILDING SALES COMPS
Address Size $/SF Date
8605 Ebenezer ChurchRaleigh, NC 81,600sf $45.95/sf 05/25/10
323 Park Knoll Durham, NC 128,000sf $43.61/sf 12/22/10
4400 Emperor Blvd.Durham, NC 182,165sf $41.03/sf 07/01/10
INDUSTRIAL LAND COMPSAddress Size Use Price Date
100 Laurensfield Ct. 8.924 Truck $2.31/sfGarner, NC acres+/1 Maintenance $100,600/acre
7/29/10
2800 Spring Forest 4.80 $3.94/sfRaleigh, NC acres+/- Mini-Storage $171,600/acre
7/28/10
860 E. Garner 4.95 Martin $2.78/sfGarner, NC acres+/- Marietta $121,100/acre
4/1/10
S. New Hope Rd 10.08 Public Service $4.78/sf& Global St, Raleigh, NC acres+/- Gas $206,900/acre
4/1/10
Northeast Food 8.00 Manufacturing $29,000/acre 6/1/10Clayton, NC acres
CONSTRUCTION COSTS INCREASE• Steel has increased 16% this year
• Concrete to increase $5/yard in April
• Fuel increase effects asphalt /rubber roof/ PVC Pipe / Transportation
• Grading industry is out of business. When the market comes back, a few grading contractors will control the prices charged.
• $55/sf to build a 60,000sf concrete building.
LEASE COMPSTYPE RATE
24’ – 30’ Clear $3.75 - $4.50/sf100% HVACESFR
Lower Ceilings $2.95 - $3.75/sfOlder
Outside Wake As low as and Durham Counties $1.75/sf
AFFORDABLE OPTIONSLOCATION TYPE RATE/PRICENorth Raleigh 148,000sf (30’ clear) $3.75/sf lease Inside the Beltline 56,000sf (rail served) $3.25/sf lease
RTP 170,000sf (20’ clear) $3.25/sf lease
Knightdale 120,000sf (21’ clear) $2.95/sf lease
Clayton 490,000sf (30’ clear) $3.25/sf lease
Clayton Industrial Land $29,000 to $65,000/AC
Creedmoor 150,000sf (100% HVAC) $1.75/sf lease
Butner 42,000sf (Manufacturing) $18.00/sf purchase
Butner Industrial Land $19,000/AC
TRIANGLE INDUSTRIAL OVERVIEW
LOOK BACK TODAY PREDICITIONS
Ed Brown, SIOR, CCIMNAI Carolantic Realty
March 16, 2011
INDUSTRIAL PREDICTIONS
2011 2012 2013Absorption Negative Positive Positive
Vacancy Up Down Down
Rates Stable Stable Up
Spec Construction None None Yes
Land Value Down Stable Up
Construction Costs Up Up Up
Job Growth Good Better Best
SUPPORT TBJ SPACE QUARTERLY
• The information TBJ provides helps us all make better decisions.
• Most of the information in this overview came from TBJ SPACE.