2009 RPC CAF experience

4
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: • Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/ Trentadue Mandate: run “quality/validation” by hands and fast feedback to P5 made by shifters+shift leader using “instructions” • PA, DQM online/offline and Noise • DCS offline ? Configuration ? Masked strips ? • “basic” analysis to produce plots and result – Good results but: tools and instructions were still under development, too many tools to use and not many experts in shift 1 Pigi Paolucci 2/3/10

description

2009 RPC CAF experience. We did a very good exercise at the end of 2009 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/ Carillo /Cimmino/Lomidze/Tupputi/Trentadue - PowerPoint PPT Presentation

Transcript of 2009 RPC CAF experience

Page 1: 2009 RPC CAF  experience

Pigi Paolucci 1

2009 RPC CAF experience

We did a very good exercise at the end of 2009– 2 shifters + 1 shift leader + Experts:

• Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue

– Mandate: run “quality/validation” by hands and fast feedback to P5 made by shifters+shift leader using “instructions”• PA, DQM online/offline and Noise• DCS offline ? Configuration ? Masked strips ?• “basic” analysis to produce plots and result

– Good results but: tools and instructions were still under development, too many tools to use and not many experts in shift2/3/10

Page 2: 2009 RPC CAF  experience

Pigi Paolucci 2

2009 RPC CAF organization

• For the 2010 manpower I would like to simplify the present schema and maximize the CAF efficiency and results

CAF

DQMAnna

PA?

NoiseSilvia

WBMRaffaello

RecoCamilo

Shifter

AnalysisSalvatore

OrsoHaiyunGeorgi

Go…………

2/3/10

Page 3: 2009 RPC CAF  experience

Pigi Paolucci 3

2010 CAF proposal

• Mandate: run “quality/validation” and fast feedback to P5

• Improve Run Quality certification:– Merging tools (DQM and PA) and include more

from Reco if we need– Stable procedure for the noise and DCS info !

• Have more expert at CAF (training)• Do we need shifter ? In the more wide sense

2/3/10

Page 4: 2009 RPC CAF  experience

Pigi Paolucci

2010 CAF organization• Merging Phase:– Prompt Analysis in DQM (David was supposed to include the

output list)

– DCS/XDAQ (ORCOF data) in DQM (Anna + ?)

– ORCOF data production (?)

– WBM: Raffaello

42/3/10

Run quality (Anna, Camillo, David, Silvia)

CAF

DQM PA?

NoiseSilvia

WBMRaffaello

Reco Expert

AnalysisDPG