2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

21
2009 Annual Conference September 22, 2009 Tom Skebey, CFM

Transcript of 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Page 1: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

2009 Annual Conference September 22, 2009

Tom Skebey, CFM

Page 2: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Wet Floodproofing

Page 3: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Wet Floodproofing Techniques

• Openings• Flood resistant materials• Protect equipment

Elevate Protect in place

• Modify surfaces for easy cleanup

• Emergency preparedness planning

• O&M plan adjustments

Page 4: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Determine the FPL

Establish systemcomponent vulnerability

Develop alternatives(elevate or protect in place)

Verify with homeownerand code officials

Construct/implement

Wet Floodproofing Design Process

Page 5: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Typical Opening for Solid Foundation Wall

Page 6: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

FLOORING MATERIALS CLASSIFICATIONS FORFLOOD RESISTANCE

Classes of FlooringAcceptable Unacceptable

5 4 3 2 1

Asphalt tile Carpeting (glued down type) Concrete, precast or in-situ Terrazzo tile Vinyl tile or sheets (coatedon cork or wood productbackings)

Wood flooring orunderlayments

Pressure-treated lumber, .40CCA4

Flooring Materials

••

Page 7: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Modify Surfaces

• Contamination issues

• Ease of cleanup

• Paint

• Cladding

• Resurface

Page 8: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Utility Systems

• Electrical systems

• Heating, ventilation and air conditioning (HVAC) systems

• Fuel supply/storage systems

• Water systems

• Sewer systems

Page 9: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Electrical Systems

Protective measures:• Raise or relocate equipment

and devices above the FPL• Seal outside wall penetrations,

mechanically protect wiring system in flood-prone locations

• Seal out moisture• Add Ground Fault Interrupting

Circuit (GFIC) breakers

Page 10: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Heating, Ventilating, and Air Conditioning (HVAC) Systems

• Maintenance of required equipment clearances and access dictated by code and/or manufacturer

• Provision of adequate combustion air for fuel-burning equipment

• Modification and/or maintenance of proper venting of fuel-burning equipment

• Eliminating ductwork below the DFE

Page 11: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Fuel Supply/Storage Systems

• Use of flexible connections

• Adequate support and anchorage to resist hydrostatic and hydrodynamic forces that act on tank

• Relocation of fuel tank because of equipment relocation

• Use of automatic cut-off valves

Page 12: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Water Systems

• Minimizing plumbing fixtures below the FPL

• Modification of fixtures to prevent backflow

• Protection of system components from high velocity flow

• Modification of the well top using watertight casing

Page 13: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

• Installation and/or maintenance of a check or sewer backflow prevention valve

• Installation of an effluent ejector pump

• Provision of a backup electrical source

• Sealing of septic tank to prevent contamination

• Adequate anchorage of septic tank to withstand buoyancy forces

Sewer Systems

Page 14: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

1. RETURN AND SUPPLY AIR2. HORIZONTAL AIR FURNACE WITH

ADD-ON COOLING, 2 to 5 TON CAPACITY

3. EXTERNAL DUCT AND EQUIPMENT INSTALLATION

4. EARTHQUAKE STRAPPING

FLOORS NOT SHOWN FOR CLARITY

Elevation of HVAC Components Below a Floor, Above DFE

Page 15: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Enclosure to Protect From Shallow Flooding

Page 16: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Elevated Water Heater

Page 17: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Protection of Service Equipment

Page 18: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Emergency Preparedness Planning

• Flood warning system

• Warning time

• Implementation time

• Examples

Page 19: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Operation and Maintenance Plans

• Flood warning system

• Warning time

• Active involvement

• Who does what?

• Drills

• Examples

Page 20: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

References

Page 21: 2009 Annual Conference September 22, 2009 Tom Skebey, CFM.

Wet Floodproofing

Questions?