2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a...
Transcript of 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a...
![Page 1: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/1.jpg)
2008 Wyoming EOR / IOR ConferenceSeptember 15 & 16, 2008
Jackson, WyomingPresented by:
Rick Binks, Harold Johnson & John PutnamFabrication Technologies, Inc.
Casper, Wyoming
![Page 2: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/2.jpg)
Implementing a Chemical EOR Project
Surface FacilitiesA Key to Field Success
![Page 3: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/3.jpg)
Presentation Overview
– The Goals of Facility Performance– Facilities Design Parameters– Process Flow Schematics– Scope of Equipment & Services– Fabricators– Conclusions
![Page 4: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/4.jpg)
Performance Requirements
Define Facility GoalsScale – pilot or full-field?
![Page 5: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/5.jpg)
EOR Chemical Injection Plant Design Parameters Project Name:
Parameter Description Design Data Example Total Field Injection 5,000 to 7,000 BPDMax. Inj. Pressure 1500 PSINo. of Injection Wells (IW’s) 3 IW injection range, per well 500 to 2500 BPDDoes ea. IW require separate Injection control?
Yes, must be able to adjustPolymer concentration to ea. IW
Chemical Design DataPolymer concentration injected 1800 ppmAlkaline
NaOH (state % active) No Na2CO3 1.0 percent active
Surfactant No. 1 0.5 percent active% active 50 Surfactant No. 2 or Solvent % active Injection Water DataTotal hardness 450 ppmSurface temperature range 20 ‐ 25°C Environmental DataGeographical location TexasAmbient temperature range 0 ‐ 33°CHumidity range 10 to 100 R.H.Elevation 500 Ft. MSL Facility Type Modular skid building Yes Max. module width / length(for transportation issues)
16’ W X 60’ L
Permanent building w/ concrete floor
No
Other:
Seismic Zone 2
![Page 6: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/6.jpg)
Performance Requirements
Define Facility GoalsScale – pilot or full-field?
Modular & MobileExpandableNon-mobile & Permanent
![Page 7: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/7.jpg)
![Page 8: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/8.jpg)
![Page 9: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/9.jpg)
Design Requirements...
Operating LogisticsRaw Chemical Receiving & Handling
![Page 10: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/10.jpg)
![Page 11: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/11.jpg)
Design Requirements...
Operating LogisticsRaw Chemical Receiving & HandlingOperator Oversight
Full-TimePart-Time
![Page 12: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/12.jpg)
Site Infrastructure Inspection
Water SourceRequired water treatment
Facilities LocationChemical & Process facilitySupply tanksDelivery truck access
Electrical PowerFlow Line & Injection Header
![Page 13: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/13.jpg)
Talk It Through
• Design Meetings are a must-have• Decide what is necessary• Define expectations
• Scope of Equipment Supply• Primary Equipment & System• Spare Parts
• Services• Pre-Fabrication Design Drawings• Factory Testing• Installation, Start-up & Operator Training• Warranty Support
![Page 14: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/14.jpg)
Talking It Through...
• Know your limitations• Local service providers
• Contractors, pipe-fitting, electrical• Cranes & rigging
• The selected fabricator• EOR Experience• Design & Engineering• Codes & Standards• Field Support
![Page 15: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/15.jpg)
![Page 16: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/16.jpg)
![Page 17: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/17.jpg)
Polymer Water Flood
![Page 18: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/18.jpg)
![Page 19: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/19.jpg)
![Page 20: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/20.jpg)
![Page 21: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/21.jpg)
Typical Facilities
• Raw chemical storage & handling
![Page 22: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/22.jpg)
![Page 23: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/23.jpg)
Typical Facilities
• Raw chemical storage & handling• Chemical processing
![Page 24: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/24.jpg)
![Page 25: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/25.jpg)
Typical Facilities
• Raw chemical storage & handling• Chemical processing• High Pressure Injection
![Page 26: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/26.jpg)
![Page 27: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/27.jpg)
Typical Facilities
• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management
![Page 28: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/28.jpg)
![Page 29: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/29.jpg)
Typical Facilities
• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management• Facility Start-Up & Commissioning
![Page 30: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/30.jpg)
![Page 31: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/31.jpg)
Typical Facilities
• Raw chemical storage & handling• Chemical processing• High Pressure Injection• Automation & Data Management• Facility Start-Up & Commissioning• Operator Training
![Page 32: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/32.jpg)
![Page 33: 2008 Wyoming EOR / IOR Conference September 15 & 16, 2008 ... · Casper, Wyoming. Implementing a Chemical EOR Project Surface Facilities A Key to Field Success. Presentation Overview](https://reader030.fdocuments.us/reader030/viewer/2022013021/5f0565e57e708231d412c379/html5/thumbnails/33.jpg)
Conclusions
Purpose designed & builtPre-design communicationsStake holder collaboration
Operator trainingUnderstanding the process
Lab to FieldQuality fluids down holeMeaningful data = accurate interpretation