Kellis Kincaid Andy “BigRed” Strotman Joe Pappalardo MILITARY SPENDING.
2008, July 15-17 Nantes 1 APD Tests : Status and Protocol Giuseppe S. Pappalardo INFN Catania.
-
Upload
corey-hodges -
Category
Documents
-
view
218 -
download
2
Transcript of 2008, July 15-17 Nantes 1 APD Tests : Status and Protocol Giuseppe S. Pappalardo INFN Catania.
1
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD Tests : Status and APD Tests : Status and ProtocolProtocol
Giuseppe S. PappalardoGiuseppe S. Pappalardo
INFN CataniaINFN Catania
2
2008, July 15-172008, July 15-17N
ante
sN
ante
s
• APD testing station in Catania
• Protocol
• Test results
• Conclusions and Perspectives
Outline
3
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Testing set-up / 1
4
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Testing set-up / 2
5
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Testing set-up / 3
6
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD dependence on the bias voltage
M(V) = H(V) / H(plateau)
Parameterization with an exponential plus a constant:
M(V) = p0 + p1 exp(p2V)
16 APDs under test simultaneously
7
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Definition of the plateau /1
1) H(plateau) = p0+p1 (from fit) -> not stable
2) H(plateau) = H(50)
8
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Definition of the plateau /2
Fit done only in the V30 region
9
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Time schedule for the tests
• ~10 min to assembly APDs on the plate
• ~20 min for the temperature stabilization
• ~40 min for the measurement of the gain curve + analysis
About 1 h 10 min to test 15 APDs (1 APD left as a reference)
About 6.5 week to test 1300 APDs (from Sept 1 to Oct 15)
10
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD Gain dependence on temperature /1
11
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD Gain dependence on temperature/2
APD 1-8
12
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD Gain dependence on temperature/3
APD 9-16
13
2008, July 15-172008, July 15-17N
ante
sN
ante
s
APD Gain dependence on temperature/4
- Small fluctuations from APD to APD
- Realistic measurement of the temperature (thermal equilibrium and thermocouple position)
14
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Temperature coefficient
1/M dM/dT = -1.7 % (@ M =
30)
Example:
T = 1° C
M = 30 0.5
15
Since now we have tested about 170 APDs
The average value of V30 is 362 Volts with an RMS of 13 Volts
10% of APDs have a V30>380 Volts
3.5% of APDs have a V30>390 Volts
V30 statistics:
16
2008, July 15-172008, July 15-17N
ante
sN
ante
s
Conclusions and Perspectives
Present Status:
• A working testing station has been set up
• Procedure tested
In the future:
• Starting the testing activity for APD mass production in September
• Realization of the system for gluing APD and light guide