Transcript of 2007 Update
2007 Update
AASHTO Technical Committee on Cost Estimating
TCCE – 2007 Update
• Member Update
• Chapter Update
• Information Available
• 2008 Workplan
Member Update
• AASHTO Liaison Keith Platte• FHWA Jim Sinnette
Frank Csiga, NV – Past Chair andJeff Hisem, OH – Past Vice Chair
Chair: VacantVice Chair: David Kent, NYSecretary: Jim Sinnette, FHWA
Region 1• Maryland Norie A. Calvert• New Jersey Joseph Weber • Vermont Michael J. Fowler• New York Dave Kent
Region 2• Florida Philip "Greg" Davis• Georgia Darrell Richardson• Kentucky Ryan Griffith • South Carolina James Frick
Region 3• Iowa Roger E. Bierbaum• Ohio Jeff Hisem• Missouri Travis D. Koestner• Minnesota Timothy Quinn
Region 4• Montana Lesly Tribelhorn• Oregon John Riedl• Texas Maria Burke• Washington John N. (Jay) Drye, Jr.
Chapter Update
• Cost Based Estimating– Travis Koestner
Missouri
• Bid Based Estimating– Jim Frick, South
Carolina
• Bid Analysis– John Riedl, Oregon
• Parametric Estimating– Mike Fowler, Vermont
• Risk/Probabilistic– Jay Drye, Washington
• Inflation Forecasting– John Riedl, Oregon
• Definitions/Format– Ryan Griffith,
Kentucky
Information Available
• A Practical Guide to Estimating– Draft of first 3 chapters– On the web– Google – AASHTO TCCE– TEA Website Link– Your AASHTO reps., Chief Engr, Bridge Engr,
Construction Rep, and Design Rep will be notified.
2008 Work Plan
• Finalize Definitions– Dec. 1, 2007
• Finalize first 3 chapters– Dec. 1, 2007
• Complete next 3 chapters – June 2008
• 20-7 Research Applications – June 2008
• Explore next chapter needs – Oct. 2008