2006
Technical AffairsWater Projects Department
Water Projects Department Role
Summary of Running Projects
Recently Awarded Contracts
Under Tendering Projects
Budget
Water Projects Department Role
In order to help kahramaa achieve its objectives, WP role is to provide Kahramaa with design engineering and execution of all water related projects and other civil constructions such as :
1. Construction of New and Refurbishment of Water Retaining Structures e.g.
1.1 Reservoirs (RC, steel, GRP, glass fused etc..)
1.2 Tanks (RC, steel, GRP, glass fused etc.. )
2. Construction of New, Extensions, Refurbishment of Pump Stations.
3. Construction of Primary Mains downstream the Power and Desalination Stations
4. Extensions and Replacement of Primary Mains
5. Extensions and Replacement of Distribution Networks
6. General Buildings (e.g. Warehouses, Administration Buildings Water Laboratories ,..etc)
Water projects department currently has a number
of running contracts.
Some contracts are newly awarded;
And some others are being prepared for tendering
soon.
In addition
New projects are frequently received from the end
user (WNA) to cover the timely development in
QATAR.
Summary of Running Projects
1. Ras Laffan A & B water pipelines and associated 1. Ras Laffan A & B water pipelines and associated reservoirs. reservoirs.
Total amount: QR Total amount: QR 911,927,064911,927,064
2. Extensions of Mains at Greater Doha, Al khor Ph I & II , Al 2. Extensions of Mains at Greater Doha, Al khor Ph I & II , Al Nassiriyah, Al Ghuairiyah and Muraikh.Nassiriyah, Al Ghuairiyah and Muraikh.
Total amount: QR Total amount: QR 285,217,742285,217,742
3. Replacement and Upgrading of Mains at Doha and 3. Replacement and Upgrading of Mains at Doha and Mesaieed. Mesaieed.
Total amount: QR Total amount: QR 270,932,629270,932,629
Grand Total Amount for Running Projects:Grand Total Amount for Running Projects:QRQR 1,468,077,435 1,468,077,435
Ras Laffan Pipeline & Associated
Extension of Mains
Rep. & Upgrad. Of Mains
Recently Awarded Contracts
Water supply
Upgrading Works
Replacement Works
Project #:
Title
Description of Works
Length of Mains (Kms)
Start Date Compl. Date
Contract Value in Ml. QR
Contractor
GTC 60/2005
Upgrading New & Old Salwa Distilate & Rising Mains
Supply and lay of DI pipes ranging in size from 400 mm. to 1400 mm. 31
Al Jaber Engineering Co.
93.8
Jan 2006 Jan 2007
Project #:
Title
Description of Works
Length of Mains (Kms)
start Date compl. Date
GTC 63/2005Replacement of Dist. Mains at
Doha (Package 1)
Supply and lay of DI pipes ranging in size from 100 mm. to 900 mm75.8
Jan 2006
Sep 2007
Contract Value in Ml. QR 99.7
Contractor AL Waha Contracting & Trading Co.
Project #:
Title
Description of Works
Length of Mains (Kms)
Start Date Compl. Date
Contract Value in Ml. QR
Contractor
GTC 69/2005Replacement of Water Dist. Mains at Doha & Messaieed City Supply and lay of DI pipes ranging in size from 100 mm to 600 mm.80
44.2
Boom Construction Co.
Feb 2006 Feb 2008
Project #:
Title
Description of Works
Length of Mains (Kms)
start Date Compl. Date
Contract Value in Ml. QR
Contractor
GTC 70/2005
Water Supply to Madinat Alshamal, Aljerian & Um Salal Ali
Supply and lay of DI pipes ranging in size from 100 mm to 600 mm.160
95
HBK Co.
Apr 2006 Oct 2008
GTC 71/2005
Upgrading of Pumping Stations at Salwa Industrial Area & Bani Hajer Replacement of 32 old pumps with new VFD pumps at 5 water Stations, Old Salwa, New Salwa, Airport, Salwa Indut. Area and Bani Hajir including replacement of old equipment.
May 2006 Oct 2007
Project #:
Title
Description of Works
Start Date Compl. Date
Contract Value in Ml. QR
Contractor Torishima
132
Future Projects Under Tendering
Reservoirs & Pump stations
Pipelines Works
Replacement Works
Title
Description of Works
Length of Mains (Kms)
Doha South Reservoir and Associated Pipeline
4 nos. Reservoirs and 8 pumps each of 450 liter per second at 55 meter head
35
Title
Description of Works
Madinat Al Shamal RPS & Associated Pipelines
One 6 MIG RC reservoir + 4 new pumps each of 125 liter per second at 40 meter head.
Title
Description of Works
Length of Mains (Kms)
Permanent Reservoir & Pumping Station at Shahaniyah to Doha600mm dia pipeline, in addition to one 6MIGD Reservoir and New pump house including 4 New pumps
11
Title
Description of Works
Length of Mains (Kms)
Ext. of Mains at Doha Suburbs
Supply and lay of DI pipes ranging in size from 100 mm to 900 mm.
118
Title
Description of Works
Length of Mains (Kms)
Upgrading of West bay & Gharafa Water Stations
Supply and lay of DI pipes ranging in size from 400 mm to 900 mm+ Pump Stations
22.6
Title
Description of Works
Length of Mains (Kms)
Provision of Distribution Networks at Doha &South Area (Phase1)
Supply and lay of DI pipes ranging in size from 100 mm to 400 mm.
107
Title
Description of Works
Length of Mains (Kms)
Supply and lay of DI pipes ranging in size from 100 mm dia. to 600 mm dia. at Doha and North Qatar
265
Provision of Distribution Networks at Doha & North Area (Phase1)
Title
Description of Works
Length of Mains (Kms)
Replacement of Old Pipes at Various Locations
Supply and lay of DI pipes ranging in size from 100 mm to 400 mm.
121
Title
Description of Works
Length of Mains (Kms)
Replacement of Mains at Doha (Package-3)
Supply and lay of DI pipes ranging in size from 100 mm to 900 mm.
100
Title
Description of Works
Length of Mains (Kms)
Replacement of Dist. Mains at Doha Vicinity, Wakrah & Wukair package-2
Supply and lay of DI pipes ranging in size from 100 mm to 600 mm.
138
BUDGET
20
5 30
0
76
9
0100200300400500600700800
Mill
ion
QR
s
2004 2005 2006
YEARS
BUDGET
Thanks
Kahramaa web sitewww.km.com.qa
Presented By:Eng. Mohamad Thani AL-Maadead
Head of designWater Projects